Loading...
Agenda 11/12/2019 Item #16C 1 (Contract #19-7634 Stantec Consulting Services, Inc.)11/12/2019 EXECUTIVE SUMMARY Recommendation to approve the selection committee’s ranking for Request for Professional Services (“RPS”) No. 19-7634, “Heritage Bay Government Center Design,” and authorize staff to begin contract negotiations with the top-ranked firm, Stantec Consulting Services Inc., so that staff can bring a contract back to the Board at a subsequent meeting. OBJECTIVE: To obtain professional design services for the Heritage Bay Government Center Project. This solicitation is for design, permitting and construction administration services for the planned satellite government campus within the Heritage Bay Planned Unit Development (PUD) in accordance with the approved Collier County Master Plan. CONSIDERATIONS: The Facilities Management Division is coordinating with Collier County Constitutional Offices, Emergency Medical Services team and other County divisions and stakeholders to develop a satellite campus that provides the necessary services for the expanding population in the area. The project will be constructed on 6.33 acres of Collier County owned property located approximately one quarter mile north of the intersection of 951 and Immokalee Road and immediately north of the Naples Community Hospital (NCH) Northeast Facility and west of Heritage Bay Vistas (see Attachment A: Location Map). On August 12, 2019, the Procurement Services Division issued a notice for RPS No. 19-7634, Heritage Bay Government Center Design. The County notified 18,127 firms, 118 interested companies downloaded the solicitation documents, and staff received five proposals by the September 12, 2019, submission deadline. The County determined that all five firms are responsive and responsible. The selection committee met on September 18, 2019 and, as described in step 1 of the solicitation documents, scored each of the proposals and shortlisted the following top four firms to move on to step 2, oral presentations: Parker/Mudgett/Smith Architects, Inc., MK Architecture LLC, BSSW Architects, Inc. and Stantec Consulting Services Inc. On October 7, 2019, the selection committee reconvened for the step 2 oral presentations, where each firm presented, resulting in the following ranking: Company Name City County State Final Ranking Responsive/Responsible Stantec Consulting Services Inc. Naples Collier FL 1 Yes/Yes Parker/Mudgett/Smith Architects, Inc. Fort Myers Lee FL 2 Yes/Yes BSSW Architects, Inc. Naples Collier FL 3 Yes/Yes MK Architecture LLC Fort Myers Lee FL 4 Yes/Yes Straughn Trout Architects, LLC. Lakeland Polk FL Not Ranked Yes/Yes Staff is recommending negotiations with the top ranked firm, Stantec Consulting Services Inc. FISCAL IMPACT: Phase 1 (Government Service Center) of this project is funded by the Collier County Tax Collector’s Office. Phase 2 (EMS Station) of the project has secured funding through the infrastructure sales tax program and will be funded by Project 55211 in accordance with the previously 16.C.1 Packet Pg. 970 11/12/2019 approved FY 2020 budget. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: There is no Growth Management impact. RECOMMENDATION: To approve the selection committee’s ranking for RPS No. 19-7634, “Heritage Bay Government Center Design,” authorize staff to begin negotiating with the top ranked firm, Stantec Consulting Services Inc., and in the event that an agreement cannot be reached with that firm, to continue negotiating with the second ranked firm, so that a proposed agreement can be brought to the Board for consideration at a subsequent meeting. Prepared by: Tony Barone, Senior Project Manager, Facilities Management Division ATTACHMENT(S) 1. BCC Heritage Bay Design Firm Ranking REV4 (PDF) 2. 19-7634 Attachment A - Location Map (PDF) 3. 19-7634 Attachment B - Space Planning Report (PDF) 4. 19-7634 Attachment C - Project Timetable (PDF) 5. 19-7634 NORA (PDF) 6. 19-7634 Final Ranking (PDF) 7. 19-7634 Request for Professional Services (PDF) 16.C.1 Packet Pg. 971 11/12/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.1 Doc ID: 9235 Item Summary: Recommendation to approve the selection committee’s ranking for Request for Professional Services (“RPS”) No. 19-7634, “Heritage Bay Government Center Design,” and authorize staff to begin contract negotiations with the top-ranked company, Stantec Consulting Services Inc., so that staff can bring a contract back to the Board at a subsequent meeting. Meeting Date: 11/12/2019 Prepared by: Title: – Facilities Management Name: Tony Barone 10/10/2019 2:20 PM Submitted by: Title: Director - Facilities Management – Facilities Management Name: Damon Grant 10/10/2019 2:20 PM Approved By: Review: County Attorney's Office MaryJo Brock Level 2 Attorney Review Skipped 10/15/2019 3:04 PM Procurement Services Opal Vann Additional Reviewer Completed 10/10/2019 3:40 PM Procurement Services Evelyn Colon Additional Reviewer Completed 10/10/2019 3:42 PM Facilities Management Damon Grant Director - Facilities Completed 10/10/2019 3:58 PM Procurement Services Ted Coyman Additional Reviewer Completed 10/11/2019 9:54 AM Public Utilities Department Dan Rodriguez Additional Reviewer Completed 10/11/2019 10:37 AM Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 10/11/2019 11:20 AM Public Utilities Department Dan Rodriguez Level 2 Division Administrator Review Completed 10/11/2019 11:23 AM Public Utilities Department Dan Rodriguez Level 2 Division Adminsistration Completed 10/11/2019 11:23 AM County Attorney's Office Scott Teach Additional Reviewer Completed 10/12/2019 11:42 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 10/14/2019 4:23 PM County Attorney's Office Scott Teach Level 3 County Attorney's Office Review Completed 10/12/2019 11:44 AM Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 10/14/2019 8:57 AM Budget and Management Office Ed Finn Additional Reviewer Completed 10/15/2019 9:40 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 11/03/2019 9:40 PM Board of County Commissioners MaryJo Brock Meeting Pending 11/12/2019 9:00 AM 16.C.1 Packet Pg. 972 16.C 19-7634 Heritage Bay Government Center Design Ranking Tony Barone, Senior Project Manager Facilities Management Division November 12, 2019 Agenda Item 16.C Collier County | Florida 16.C.1.a Packet Pg. 973 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government BACKGROUND u The Facilities Management Division is coordinating with Collier County Constitutional Offices, Emergency Medical Services team and other County divisions and stakeholders to develop a satellite campus that provides the necessary services for the expanding population in the area. u The project will be constructed on 6.33 acres of Collier County owned property located approximately one quarter mile north of the intersection of 951 and Immokalee Road and immediately north of the Naples Community Hospital (NCH) Northeast Facility and west of Heritage Bay Vistas (see Attachment A: Location Map). 16.C.1.a Packet Pg. 974 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government Location Plan Public Utilities Department Facilities Management Division 16.C.1.a Packet Pg. 975 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government Project Scope Public Utilities Department Facilities Management Division 3 u Phase 1 –Government Services Building / Site Development –Includes design and construction of full site and 20,000 sf Government Services Building –All programming, SDP and other site permitting, public outreach, design and installation of site utilities and infrastructure stubbed out to phase 2-4 building pads. –Tax Collector –Town Hall Meeting Space –Driver License Testing –Property Appraiser –Supervisor of Elections –Clerk of Court –Building Department u Phase 2 EMS Station –Includes design and construction of EMS / Fire Station and associated driveways and parking area around building. –$2.22M is currently validated by Sales Tax Committee and approved by the BCC. u Phase 3 and 4 –Future Use -Building / Parking Structure –Future Government Office Building and Potential Parking Structure as determined by the BCC. 16.C.1.a Packet Pg. 976 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government Project Phasing 16.C.1.a Packet Pg. 977 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government Conceptual Budget and Timeline 16.C.1.a Packet Pg. 978 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government Recommendation u Recommendation to approve the selection committee’s ranking for Request for Professional Services (“RPS”) No. 19-7634, “Heritage Bay Government Center Design,” and authorize staff to begin contract negotiations with the top- ranked firm, Stantec Consulting Services Inc., so that staff can bring a contract back to the Board at a subsequent meeting. Public Utilities Department Facilities Management Division 6 16.C.1.a Packet Pg. 979 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government Heritage Bay Government Center 16.C.1.a Packet Pg. 980 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government SITE CONTEXT +/-6.22 acres Attachment A: Location Map 16.C.1.b Packet Pg. 981 Attachment: 19-7634 Attachment A - Location Map (9235 : 19-7634 Heritage Bay Memo gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx To: Tony Barone, PMP From: Tim Hancock, AICP Senior Project Manager Division of Facilities Management Collier County Government Naples, Florida File: Collier County Master Space Plan Date: June 21, 2019 Reference: Collier County Master Space Plan Support – Heritage Bay Site, Summary of Information In July of 2018 Collier County engaged Stantec for the Preliminary Study and Planning for a Public Facility Complex at 15430 Collier Boulevard, more commonly known as the ‘Heritage Bay Site’. This effort was to be part of the overall Collier County Master Space Plan to assist the County with understanding the potential options and relative yield for this site. The property is currently owned by Collier County and is partially developed with an in-line booster station owned and operated by Collier County Utilities. The County is assessing its future needs via the Master Space Plan to better serve the growing population in the eastern part of the county as well as reviewing the age and potential storm vulnerability of existing facilities. Stantec was engaged to provide preliminary planning support regarding the Heritage Bay Site in determining the potential yield and various development scenarios depending on how future needs materialize. This memorandum represents a final reporting of work products and exhibits for the Heritage Bay Site to assist the County in determining how this site may fit into the overall Collier County Master Space Plan. All information presented in this document and the attachments are to be considered preliminary and solely for the purpose of general planning and study to assist Collier County in determining how best to meet the long-range needs of the community. The County identified preliminary uses for the Heritage Bay site as follows: • Collier County Tax Collector and other Constitutional Officers • Town Hall Meeting Space • General Government Services • Collier County EMS (possible joint use facility with Fire) Each of the above is discussed in additional detail below: Collier County Tax Collector As population grows in the eastern portion of the County, the need for additional space to better serve the existing and future population has become evident (See Appendix B, Population Estimates). Working with the office of the Collier County Tax Collector and applying services currently provided at existing Tax Collector offices, a preliminary programming and conceptual space planning effort was performed (See Appendix C). Included in this programming are functions anticipated to be performed by the Tax Collector, Clerk of Courts, Supervisor of Elections, and associated support services. Programming for typical government retail function, such as customer service, are located on the ground floor with an estimate square footage of 13,263. 16.C.1.c Packet Pg. 982 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx Additional consideration was given to allow for future expansion as well as the potential need for public meeting space and miscellaneous support services within this building. A conceptual second floor plan was developed to provide ‘back of house’ uses such as breakrooms, conference rooms, etc. that are not required to be on the first floor as well as a ‘Town Hall’ meeting space and miscellaneous allocations for future uses. Both 1st and 2nd floor space plans were developed at a conceptual level and are also included in Appendix C. Any future design and development work for this site will need to revisit and further refine or amend the programming elements to meet the proposed needs. General Government Services Once the anticipated site demands for the Tax Collector and EMS buildings were developed, multiple conceptual scenarios were developed for the balance of the site in order to determine the potential yield. As shown in the three drawings in Appendix A, the following scenarios were developed: No Garage Option This site plan assumes that a parking garage will not be constructed on site in the future and all parking will be provided for at-grade. Due to the high parking demands typical of government facilities, rather than using the code required parking ratio of 1 space per 300 square feet for office uses, a blended parking ratio of 1 space per 225 square feet was applied. As a result, the building configuration and parking shown on this exhibit will support 67,950 sq. ft., not including EMS which is self-parked. NOTE: the total building square footage shown on the plan is 70,000 sq. ft. exclusive of EMS. Future Garage Option This site plan was developed in order to determine the available building footprint should the County want an option for a future parking garage to serve either the public, employees or for additional vehicle storage. With all parking at grade, this scenario (at 1 space per 225 sq. ft.) supports 78,750 sq. ft. by using a smaller footprint for the Government Services Building in Phase 3 as compared to the No-Garage Option. Again, this is exclusive of the EMS site which is self-parked, and the building footprints shown total slightly more square footage (80,000 sq. ft) than is supported by the at-grade parking at the blended rate. Garage Option This plan was created to demonstrate the maximum supportable square footage for the site through the construction of a parking garage. As shown, the available parking would support 117,225 square feet of building area at the 1 space per 225 sq. ft. ratio. Alternatively, the site could support a lesser square footage of 80,000 square feet (as shown on the plan) and retain an excess of 165 parking spaces for use by the County. Should the County wish to proceed with the construction of a parking garage on this site in order to fully maximize developable area, additional building configurations and options should be explored based on the future needs identified for this site. Collier County EMS A footprint and site layout were provided by Collier County based on the recently completed Station 25 (designed by BSSW), a Fire/EMS combined station. This footprint was incorporated into the conceptual site layouts as shown in Appendix A. This project will in all likelihood be the first phase of development. Graphic Images - Appendix D includes graphic images prepared for a potential phasing scenario. Project Schedule - Appendix E is a draft project schedule developed for the County for general planning purposes. 16.C.1.c Packet Pg. 983 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx Appendix A Conceptual Site Layouts 16.C.1.c Packet Pg. 984 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 16.C.1.c Packet Pg. 985 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 16.C.1.c Packet Pg. 986 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 16.C.1.c Packet Pg. 987 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx Appendix B Population Estimates 16.C.1.c Packet Pg. 988 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) ^_ ^_ ^_Total: 139,968 Total: 104,403 Total: 112,403 Stantec Consulting Services Inc.5801 Pelican Bay Blvd. Suite 300Naples, FL 34108tel 239.649.4040fax 239.263.6449 2017 POPULA TION ESTIMATESPublic Facility Complex Service AreasMay 2019 0 5,000 10,000 15,000 Feet($$¯\\US1226-F01\V:\1773\active\177311078\gis\mxd\177311078_CC_Service_Centers_Pop_20190515_v03_123269.mxd Revised: 2019-05-21 By: dreeceDisclaimer: Stantec assumes no responsib ility for datasupplied in electronic format. The recipient acceptsfull responsibility for verifying the accuracy andcompleteness of the data. The recipient releases Stantec, its officers, employees, consulta nts andagents, from any and a ll cla ims arising in a ny wayfrom the content or provision of the d ata. ^_Collier County Government Complex ^_North Collier Government Center ^_Heritage Bay Service Center Collier County Government Center AreaNorth Collier Government Center AreaHeritage Bay Service Area2017 Census Block Groups Prepared by:Techn ical Review by:Ind ep en dent R eview by: D.R. 05/21/19X.X.X MM/DD/YYX.X.X MM/DD/YY Notes:1. Coordinate System: N AD 1983 StatePlane Florida East FIPS 0901 Feet2. Source data: Population Estimates are from th e 2017 American Community Survey conducted by the US Census Bureau / Collier County 3. Imagery: ESRI, Collier County L E G E N D 16.C.1.c Packet Pg. 989 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx Appendix C Preliminary Programming and Conceptual Floor Plans 16.C.1.c Packet Pg. 990 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) HERITAGE BAY GOVERNMENT CENTER June 11, 2019 CONCEPTUAL SPACE NEEDS PROGRAM Naples, FL [E] = Enclosed, [O] = Open/Workstation, [A] = Alcove, [C] = Canopy covered, [X] = Outdoors (exterior) sf SUMMARY - Building Spaces 1st Floor (Tax Collector & Clerk of Courts Program Spaces)13,263 2nd Floor (Town Hall, Commissioner's Office, and Amenity Spaces)15,672 28,934 1st Floor 40 STAFF Deputy Director or Office Manager 2 Supervisor or Administrative Assistant 4 Retail Clerks 32 FTE 2 PTE (shared floating station) Bullpen/Lobby O 120 x 30 3,600 Tickets obtained, customer seating, & reception, information kiosk. Customers face away from the clerks. 1 3,600 Elevator Core & Lobby 30 x 28 840 1 840 Employee Entrance 6 x 8 48 1 48 E 12 x 14 168 Office with Visual to Bullpen 1 1 168 Tax Collector: Supervisor/Subject Matter Experts E 12 x 20 240 Central Office for Supervision 3 1 240 Tax Collector: Frontline Clerk O 5 x 8 40 Open to Bullpen 30 30 1,200 Clerk of Courts: Deputy Director E 12 x 14 168 Office 1 1 168 Clerk of Courts: Administrative Assistant O 10 x 20 200 Cubicle 1 1 200 Clerk of Courts: Clerks O 5 x 8 40 open desk at bullpen; file cabinet and cash drawers at each location; floating station 2 2 80 *Floating Office 10 x 12 120 1 120 *Spare Office (or Small Conf. Room)12 x 14 168 1 168 Supervisory of Election: Clerks O 10 x 12 120 floating station 2 Driver's License Testing Room E 20 x 10 200 (12) Computer Stations; Area to be monitored; Orange Blossom has one-way glass for monitoring room 1 200 Quiet Room E 8 x 8 64 Glass enclosed; For Supervisor & Customer; Table & Chairs 2 128 Work Room / Mail Room / Copy E 12 x 15 180 scanning, copiers,supply storage 1 180 Copy Room / Storage E 10 x 12 120 1 120 E 11 x 12 132 Also secures regulated items such as titles and ID laminates. Shredder in same space 1 132 *Conference Room 20 x 15 300 12-15 people; shared space 1 300 I.T.12 x 10 120 1 120 E 12 x 24 288 Approx 4 fixtures (based on Bullpen Size)1 288 E 12 x 24 288 Approx 4 fixtures (based on Bullpen Size)1 288 E 10 x 20 200 2 400 E 10 x 12 120 janitor cart storage, 1 shelf, mop sink 1 120 E 10 x 8 80 plywood on walls, isolated / dedicated pwr 1 80 E 24 x 11 264 to be verified during detailed design, provide additional sf if separate buildings 1 264 Sprinkler / Water Room E 12 x 11 132 to be verified during detailed design, provide additional sf if separate buildings 1 132 Electrical E 21 x 11 231 to be verified during detailed design, provide additional sf if separate buildings 1 231 E 10 x 12 120 to be verified during detailed design, provide additional sf if separate buildings 1 120 E 11 x 24 267 to be verified during detailed design, provide additional sf if separate buildings 1 267 Subtotal 40 10,202 Circulation 30%3,061 13,263 Employee Restrooms Custodian Rooms Tax Collector: Office Manager *IT Room *Mechanical Room Cash Vault / Secure Storage Outdoor Storage (Maintenance) *Elevator Machine Room Men's Restroom (Public) 1st Floor TOTALS Staffing Qty Women's Restroom (Public) SUMMARY - Building Spaces GSF TOTALS Space Name Space Standard Remarks Spacedims Page 1 of 2 16.C.1.c Packet Pg. 991 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) HERITAGE BAY GOVERNMENT CENTER June 11, 2019 CONCEPTUAL SPACE NEEDS PROGRAM Naples, FL [E] = Enclosed, [O] = Open/Workstation, [A] = Alcove, [C] = Canopy covered, [X] = Outdoors (exterior) sf Staffing QtySpace Name Space Standard Remarks Spacedims 2nd Floor Title Size Area Notes Staff No SF Elevator & Lobby 15 x 48 720 1 720 Elevator Core 7 x 9 63 1 63 Storage 7 x 7 49 1 49 Women's Restroom (Public)13 x 18 234 1 234 Men's Restroom (Public)13 x 18 234 1 234 22 x 24 528 1 528 14 x 22 308 1 308 16 x 28 448 1 448 Aid's Office 16 x 17 272 1 272 I.T.10 x 13 130 1 130 Work Room & Storage 19 x 22 418 1 418 Elected Officials' Flex Space 12 x 27 324 1 324 J.C. & Storage 10 x 12 120 1 120 Storage 12 x 16 192 1 192 Unisex Toilet 8 x 8 64 1 64 Storage 4 x 7 28 1 28 Wellness 10 x 12 120 1 120 Flex Office Space 9 x 12 108 1 108 Flex Office Space 9 x 12 108 1 108 Flex Office Space 19 x 30 570 1 570 Break Room with Kitchenette 22 x 39 858 1 858 Storage 14 x 32 448 1 448 A.V. Room 13 x 14 182 1 182 Storage 11 x 13 143 1 143 Town Hall Meeting Space 57 x 73 4,161 1 4,161 Support Space 20 x 21 420 1 420 Lobby 23 x 35 805 1 805 Subtotal 40 12,055 Circulation 30%3,617 15,672 * SPACES THAT CAN BE MOVED TO THE SECOND FLOOR. Waiting Room Receptionist Large Conference Room 2nd FloorTotals Page 2 of 2 16.C.1.c Packet Pg. 992 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) SUPERVISOR OFFICE FOR (3) ELEV (11) CLERKS (9) CLERKS WORK/ MAILROOM CONFERENCE ROOM QUIET ROOM QUIET WOMEN'S (STAFF) SPRINKLER MEN'S (STAFF) TC: OFF MNGR CC: DEPUTY DIRECTOR EXTERIOR STOR. CC: ADMIN ASSISTANT WORK RM/ COPIER TC: FLOAT OFF TC: SPARE OFF J.C. MECH. EMR STAIR B CASH I.T. LOBBY ELEC DRIVER'S TEST MEN'SWOMEN'S 135' - 3"117' - 6"SEATING AREA 63' - 1 1/2"10' - 0"62' - 1 1/2"43' - 0"31' - 6"43' - 0"SEATING AREA SEATING AREA (12) CLERKS SEATING AREA SEATING AREA 5' - 0"8' - 0"10' - 0"7' - 0"5' - 0"10' - 0"8' - 0"5' - 0" 10' - 0" SEATING AREA RECEPTIONIST 0 16'8'32' 1st Floor - Concept Heritage Bay - Public Facilities Complex | 177311078 | Collier County, FL | 03/27/19A1 16.C.1.c Packet Pg. 993 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 135' - 3"43' - 0"31' - 6"43' - 0"117' - 6"TOWN HALL MTG SPACE STOR.ELEV OPEN TO BELOW CORRIDOR STAIR B MEN'SWOMEN'S ELECTED OFFICIALS' FLEX SPACE AID'S OFFICE LARGE CONFERENCE ROOM BREAK ROOM WITH KITCHENETTE FLEX OFFICE SPACE WELLNESS J.C. & STOR. STORAGE STOR. UNISEX TOILET I.T. STORAGE A.V. ROOM STORAGE SUPPORT SPACE OVERFLOW LOBBY WAITING ROOM RECEPTIONIST WORK ROOM & STORAGE LOBBY RAMP UP UP DN ELEVATOR LOBBY PLATFORM FLEX OFFICE SPACE FLEX OFFICE SPACE 0 16'8'32' 2nd Floor - Concept Heritage Bay - Public Facilities Complex | 177311078 | Collier County, FL | 06/11/19A2 - 2nd floor 16.C.1.c Packet Pg. 994 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx Appendix D Site Graphics – Phasing 16.C.1.c Packet Pg. 995 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 16.C.1.c Packet Pg. 996 Attachment: 19-7634 Attachment B - Space Planning 16.C.1.c Packet Pg. 997 Attachment: 19-7634 Attachment B - Space Planning 16.C.1.c Packet Pg. 998 Attachment: 19-7634 Attachment B - Space Planning 16.C.1.c Packet Pg. 999 Attachment: 19-7634 Attachment B - Space Planning 16.C.1.c Packet Pg. 1000 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government 16.C.1.c Packet Pg. 1001 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx Appendix E Draft Schedule 16.C.1.c Packet Pg. 1002 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking) May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May Site Space Planning Design Procurement (Phases 1-4) CM@Risk Procurement (Phases 1-4) Design (Phase 1) Building Programming (Phase 2) Design (Phase 2)4 Months Site Development Plan Building Permit Construction Occupancy 1 Building Programming (Phase 3-4) Design (Phase 3-4 Site Development Plan Amendment Building Permit Construction Occupancy 1 4 MonthsPHASES 1-22020 2021 2022 2023 Pre-Design TaskPhase PROJECT TIMELINE HERITAGE BAY GOVERNMENT CENTER PHASES 3-42 Mos. 12 Months 4 Months 18 Months 6 Months 6 Months 3 Months 2 Mos. 4 Months 4 Months 6 Months 2019 16.C.1.c Packet Pg. 1003 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government MayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMaySite Space PlanningDesign Procurement (Phases 1‐4)CM@Risk Procurement (Phases 1‐4)Design (Phase 1)Building Programming (Phase 2)Design (Phase 2)4 MonthsSite Development PlanBuilding PermitConstructionOccupancy1Building Programming (Phase 3‐4)Design (Phase 3‐4Site Development Plan AmendmentBuilding PermitConstructionOccupancy1HERITAGE BAY GOVERNMENT CENTERPHASES         3‐42 Mos.12 Months4 Months18 Months6 Months6 Months3 Months2 Mos.4 Months4 Months6 Months20192023Pre‐DesignTaskPhasePROJECT TIMELINE4 MonthsPHASES            1‐22020 2021 202216.C.1.dPacket Pg. 1004Attachment: 19-7634 Attachment C - Project Timetable (9235 : 19-7634 Heritage Bay Government Center 16.C.1.e Packet Pg. 1005 Attachment: 19-7634 NORA (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 16.C.1.e Packet Pg. 1006 Attachment: 19-7634 NORA (9235 : 19-7634 Heritage Bay Government Center Design Ranking) Selection Committee Final Ranking Sheet RPS #: 19-7634 Title: Heritage Bay Government Center Design Name of Firm John McCormick Tony Barone Rob Stoneburner Vickie Downs Shawn Duffey Total Selection Committee Final Rank Stantec Consulting Services, Inc.1 2 2 2 1 8 1.0000 Parker Mudgett Smith Architects 2 1 3 1 3 10 2.0000 BSSW Architects, Inc.3 3 1 3 2 12 3.0000 MK Architecture 4 4 4 4 4 20 4.0000 Procurement Professional Evelyn Colon Step 1: Upon direction by the Procurement professional, the individual selection committee member should provide their ranking of the proposals (from highest being number one (1) to lowest. Step 2: The procurement professional will review the mathematically calculated final rank and discuss the rank order and determine if consensus is reached. Page 1 of 1 16.C.1.f Packet Pg. 1007 Attachment: 19-7634 Final Ranking (9235 : 19-7634 Heritage Bay Government Center Design Ranking) COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS REQUEST FOR PROFESSIONAL SERVICES (RPS) In accordance with Florida Statute 287.055 Consultants’ Competitive Negotiation Act FOR HERITAGE BAY GOVERNMENT CENTER DESIGN RPS NO.: 19-7634 EVELYN COLON, PROCUREMENT MANAGER PROCUREMENT SERVICES DIVISION 3295 TAMIAMI TRAIL EAST, BLDG C-2 NAPLES, FLORIDA 34112 TELEPHONE: (239) 252-2667 evelyn.colon@colliercountyfl.gov (Email) This proposal solicitation document is prepared in a Microsoft Word format (rev 8/16/17). Any alterations to this document made by the Consultant may be grounds for rejection of proposal, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government. 16.C.1.g Packet Pg. 1008 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 2 19-7634 Heritage Bay Government Center Design SOLICITATION PUBLIC NOTICE REQUEST FOR PROFESSINAL SERVICES (RPS) NUMBER: 19-7634 PROJECT TITLE: Heritage Bay Government Center Design PRE-PROPOSAL CONFERENCE: There is no pre-proposal meeting for this solicitation. LOCATION: Procurement Services Division, Conference Room A, 3295 Tamiami Trail East, Bldg. C-2, Naples, FL 34112 RPS OPENING DAY/DATE/TIME: September 12, 2019 at 3:00PM PLACE OF RPS OPENING: Procurement Services Division 3295 Tamiami Trail East, Bldg. C-2 Naples, FL 34112 All proposals shall be submitted online via the Collier County Procurement Services Division Online Bidding System: https://www.bidsync.com/bidsync-cas/ INTRODUCTION As requested by the Facilities Management Division (hereinafter, the “Division”), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for P rofessional Services (hereinafter, “RPS”) with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and project description stated or attached. The Consultant, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated. Collier County is pursuing the development of a Government Center within the Heritage Bay PUD to support the growing population of the County. The project will be constructed on 6.33 Acres of Collier County Owned property located approximately one quarter mile north of the intersection of 951 and Immokalee Road and immediately north of the Naples Community Hospital (NCH) Northeast Facility and west of Heritage Bay Vistas (see Attachment A: Location Map). This RPS will result in an award for all design ser vices associated with the Heritage Bay Government Center Project. The Collier County Tax Collector’s Office and Collier County Board of County Commissioners may decide to contract with the awarded firm a s a single contract through one of the entities or separately by Phase. The results of this solicitation may be used by other County Constitutional Officers once awarded according to the Board of County Commissioners Procurement Ordinance, as amended. BACKGROUND The Project is driven by three main factors. First, extensive master space planning at the County level determined that a government services center at this location would better serve the growing population. Next, long term planning involves locating facili ties further north and east to relocate, over time, away from flood prone and high hazards areas along the coast. Additionally, the Collier County Emergency Medical Services (EMS) Division has identified a need for an additional operation at this location to provide timel y emergency medical services to citizens of Collier County. This space planning study done in conjunction with Stantec identified several potential facilities that could be located on the property based on the identified needs of Collier County Government and various const itutional offices. Following the space planning study, Collier County requested a report that included conceptual site plans to determine acreag e and general sizing needs. The conceptual plans and cost estimates were used to develop the budget and preliminary project concept. It is important to note that the concept plans and space planning document should only be used for a base understanding of the Project. Collier County fully expects the development team to evaluate the needs identified in the report, solicit feedback from the various stakeholders and create an updated concept plan and phasing recommendations that will be used to guide the Project through design and construction. 16.C.1.g Packet Pg. 1009 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 3 19-7634 Heritage Bay Government Center Design The County is interested in pursuing the project in four (4) phases as shown below: Phase 1: Government Services Center Phase 2: Emergency Medical Services Phase 3: Collier County Government Phase 4: Parking Structure Once engaged fully with a Design Team and Construction Manager, Collier County is open to variations on both the phasing and the concept of four separate structures. The concept plans shown in the space planning document (Attachment B: Space Planning Study) is purely a fit study for this site as part of a larger plan to document the needs of the Count y as a whole. A key component of this project relates to the schedule. The selected design team will be expected to complete their work in an expeditious manner in order to meet the goals of the project. As shown in the space planning study, the Collier County Tax Collector’s Office is the majority stakeholder in the first -floor services operation of the Government Services Center. They intend to move into the Phase 1 Building in June 2021 at the expiration of their current lease agreement. Project planning, programming, design and permitting shall be completed on a timeline that facilitat es this move date. The Project Timeline shown in Attachment B: Space Planning Report illustrates the basic timeline that the project will need to follow to ensure successful completion. The timeline for the Phase 1 Building is critical and interested firms should include a strategy to ensure on-time completion of the building. Working with the Construction Manager, the Design Team shall plan, prepare project documents and complete permitting efforts to facilitate the quickest start of the site’s physical development and Phase 1 and 2 construction. Collier County fully expects the design team to employ all creative methods necessary to move the project forward to an on time and successful opening of the Government Services Center and each subsequent phase. Collier County EMS has historically utilized a protype design, modified and updated over several years, to construct new stand-alone EMS stations. The most recent iteration of this prototype is EMS Station 25 at Hacienda Lakes, Permit Number PRBD20190100504. Once fully planned and programmed, this project may or may not include a stand -alone EMS Station, proposing design firms may consider this prototype design as an option. Phase 3 and 4 have been planned only at the conceptual level and include the design and construction of a Collier County Government Building up to five stories tall and a parking structure to accommod ate the parking needs of the overall Government Center. While the existing programming for Phase 1 is robust, programming for Phase 3 only exists at the conceptual level and it will be the responsibility of the consultant to facilitate this process from start to finish. Our intentions for these phases remain subject to the programming effort that will be facilitated by the selected firm and may include the design and construction of any facility type that best serves the needs of the County and maximizes the use of the project site. The Design Firm will be expected to work with the Development Team, (Construction Manager at Risk Approach) from the schematic phase of the design in order to develop the best construction design for the most efficient installat ion. The Construction Manager is being selected under a separate solicitation and will report to the County under a separate contract. The chosen Design Firm must be creative, understand value design/engineering, and have worked in a Construction Manager at Risk environment in the past. The Project will be constructed in phases as and it is the County’s intent that the Firm will work with the Development Team to run overlapping designs so that as a phase is going through a Board approv ed guaranteed maximum price (GMP) contract amendment, the subsequent phase will follow quickly to meet the project timeline until the entire Project is completed. TERM OF CONTRACT County reserves the right to modify this scope during negotiations for budgetary reasons. The contract term, if an award is made is intended to be for the duration of the project. Collier County Tax Collector’s Office intends to sign a direct contract with the selected firm for Phase 1 and Collier County Board of Commissioners intends to sign a direct contract for Phase 2, 3 and 4. Prior to moving into major design work associated with Phases 3 and 4 of the project, Collier County intends to evaluate bot h the performance of the design team and available budgets to determine whether moving forward under this award is desired. The County may decide to move forward with none, some or all the services associated with Phase 3 and 4 at that time. Prices shall remain firm for the initial term of the awarded contract. 16.C.1.g Packet Pg. 1010 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 4 19-7634 Heritage Bay Government Center Design Surcharges will not be accepted in conjunction with this award, and such charges should be incorporated into the pricing structure. DETAILED SCOPE OF WORK The Consultant shall provide the full scope of design, permitting, bidding and contract administration services necessary to complete the Heritage Bay Government Center Project as described including but not limited to the following: 1. Provide all programming and preliminary design documents for use in establishing the basis for the final design of the site and buildings. These documents will include site plans, floor plans and building elevations in sufficient detail to illustrate the program of spaces, convey general building and site design and generate a project budget. 2. Provide all geotechnical, topographical, traffic, environmental and species surveys, reports and studies necessary to fully permit and complete the project. 3. Prepare and submit for all permits related to the project, including the building permit, and ensure necessary permitting is completed to facilitate projected schedule. Coordinate with the Construction Manager as necessary during the submission of the building permit. 4. Facilitate required public outreach and meetings necessary to complete a project of this size and scope in this specific location. Public input for the programming and overall design of the site will be important, particularly in relation to the town hall meeting space and other spaces that will directly serve the public. 5. Coordinate with Real Property Management on all necessary easements and/or encumbran ces. 6. Coordinate with County staff to develop an effective and efficient program, acquire all necessary permits in a timely manner, provide a design suitable for the intended use incorporating best design practices for efficient and resilient building. 7. Coordination with the County’s contracted Construction Manager throughout the design and construction process to ensure value, constructability and an efficiently planned and constructed facility. 8. Provide final design documents including, but not limited to, architecture, civil engineering, structural engineering, mechanical, electrical and plumbing (MEP) engineering, low voltage/technology and landscape architecture documents required for permitting and construction. 9. Facilitate and attend all project meetings, prepare agendas, generate meeting minutes and provide follow up on tasks. 10. If available, utilize the County’s project management platform throughout the project for all project communications, document management, approvals, site observations, requests for information, etc. 11. Provide the County all necessary and appropriate documents for review throughout each review point of each phase of the project. 12. The awarded firm shall appoint a person to act as a primary contact for the dur ation of the project. This person (or their back-up) shall be readily available during normal working hours by phone or in person and shall be knowledgeable of the overall project status and activities. Architectural/Engineering Services 1. Preliminary Site and Building Design: ▪ Generate schematic floor plans and site plans to illustrate the proposed design for each phase of the project. ▪ Generate three-dimensional and BIM/Rivet models. ▪ Review the design options along with the preliminary cost estimates with Collier County Facilities and implement any changes and/or modifications to the preliminary design documents. ▪ Coordination with Transportation Division and other organizations to incorporate any required traffic impact mitigation elements into design of the project. ▪ Schedule and attend Site Development Plan (SDP) Pre‐application meeting with Collier County Growth Development Services ba sed on the selected site/building plan (SDP pre‐application fee paid by Collier County). ▪ Provide Architects/engineers opinion of construction cost for use in establishing the project budget. 2. Final Design: ▪ Site Development Plan (SDP) modification submittal. 16.C.1.g Packet Pg. 1011 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 5 19-7634 Heritage Bay Government Center Design ▪ Provide 30/60/90 percent construction drawing submittals for review by Collier County. Document and track the disposition of all County comments and feedback to ensure full and complete capture of stated needs. ▪ Provide evaluation of Construction Manager’s value engineering report and coordinate with Collier County to incorporate the desired items. ▪ Provide construction documents including drawings and specifications to comply with the current Florida Building Code, in sufficient detail for bidding, permitting and construction. ▪ Meet all appropriate codes and standards for the design of government buildings including all federal, state and local requirements. ▪ Conduct a 60% completion stage project peer review to provide QA/QC of the contract documents and cost estimate prior to submittal to the County. This review will be conducted by experienced personnel not involved in the day-to-day design of the project to ensure a “fresh eyes” review. ▪ Provide detailed designs relating to ADA accessibility to ensure all requirements are clear and detailed. ▪ Provide finish & color selections coordinated with the stakeholders of each phase. ▪ Provide all civil, architectural, structural, mechanical, plumbing, electrical, landscape, fire alarm, and fire protection designs to ensure a complete design. Ensure full coordination of design documents between trades and design disciplines. ▪ Include all low voltage and technology designs as part of the design package. Coordinate with County’s Information Technology (IT) Division, contract vendors, Facilities Management and other appropriate specialties to provide a full design package that includes all low voltage systems. ▪ Coordinate with the County and Construction Manager to provide detailed layout drawings of the furniture, fixtures and equipment as necessary. ▪ Submit any and all documents on behalf of the County for building permit review, provide any support during that process to achieve a permit status of “Ready for Issuance”. ▪ Produce a complete “For Construction” package of drawings and specifications, in preparation for bidding and coordinate with the Construction Manager to support the bidding process of each phase. 3. Contractor Bidding Phase: ▪ Coordinate with Construction Manager and Collier County Procurement during bidding for each phase of the project. ▪ Attend all pre‐bid conferences. ▪ Respond to contractor/subcontractor questions within three (3) business days. ▪ Prepare written Addenda, if applicable. ▪ Review bids and alternates and coordinate with Construction Manager to provide bidder reference checks and bid evaluation. ▪ Coordinate with Construction Manager to provide owner with pricing analysis for each phase. 4. Construction Contract Administration Phase: ▪ Attend preconstruction conference. ▪ Process monthly Contractor Payment Applications. ▪ Review shop drawings within ten (10) business days. ▪ Respond to Requests for Interpretation (RFIs) within three (3) business days. ▪ Review and make recommendations on any use of allowances, contingencies and/or proposes amendments to the construction contract. ▪ Observe field observations of construction activities for the duration of the construction through all phases of the project. ▪ Incorporate the as-built drawings and information provided by the Construction Manager and any other vendors into an updated final drawing set in Auto Cad format, including all layers, references and other accompanying files. ▪ Perform final completion inspections, review of submitted manuals and all other contract closeout items. 5. Services Included: ▪ Architectural design and permit documents. ▪ Evaluation and incorporation of value engineering recommendations. ▪ Three-dimensional and BIM modeling. ▪ Civil engineering design. ▪ Structural engineering design. ▪ Building mechanical, electrical, plumbing engineering. ▪ Landscape architecture. ▪ Boundary and topographical surveys. ▪ Soil borings, geotechnical report and environmental study. ▪ Traffic study and incorporation of traffic impact mitigation elements of the project . ▪ Warranty inspection one year from date of final completion. ▪ Maintenance of all project documents for a minimum of ten years from the date of project completion. 16.C.1.g Packet Pg. 1012 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking) 6 19-7634 Heritage Bay Government Center Design As previously stated, the design of each Facility will be part of a four -phase process and may be done individually or collectively as funding permits. Each Facility should be planned to meet current staffing needs and anticipated needs based on the detailed program coordinated with the County and prepared by the design team . The first phase of the project will include all necessary site develo pment permitting and design to ensure future phases are planned for and easily initiated. RESPONSE FORMAT AND SCORING CRITERIA FOR DEVELOPMENT OF SHORTLIST: Proposals must be assembled, at minimum, in the order of the Evaluation Criteria listed or your proposal may be deemed non-responsive Evaluation Criteria Maximum Points 1. Ability of Professional Personnel 20 Points 2. Certified Minority Business Enterprise 5 Points 3. Past Performance 25 Points 4. Project Approach, Willingness to Meet Time and Budget Requirements 20 Points 5. Location 10 Points 6. Recent, Current, and Projected Workloads of the Firm 20 Points TOTAL POSSIBLE POINTS 100 Points For complete explanation of each evaluation criteria, please see the file titled “RPS Instructions” included with this advertisement. VENDOR CHECKLIST Vendor should check off each of the following items as the necessary action is completed (please see, Form 2: Vendor Check List): The Solicitation Submittal has been signed. All applicable forms have been signed and included, along with licenses to complete the requirements of the project. Required Reference Questionnaires have been completed for previous projects and included with the proposal. Any addenda have been signed and included. All grant requirements have been reviewed and forms completed (if applicable). Division of Corporations - Florida Department of State – http://dos.myflorida.com/sunbiz/ (If work performed in the State). E-Verify/Immigration Affidavit (Memorandum of Understanding). ATTACHMENTS Attachment A: Location Map Attachment B: Space Planning Report dated June 21, 2019. 16.C.1.g Packet Pg. 1013 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking)