Agenda 11/12/2019 Item #16C 1 (Contract #19-7634 Stantec Consulting Services, Inc.)11/12/2019
EXECUTIVE SUMMARY
Recommendation to approve the selection committee’s ranking for Request for Professional
Services (“RPS”) No. 19-7634, “Heritage Bay Government Center Design,” and authorize staff to
begin contract negotiations with the top-ranked firm, Stantec Consulting Services Inc., so that staff
can bring a contract back to the Board at a subsequent meeting.
OBJECTIVE: To obtain professional design services for the Heritage Bay Government Center Project.
This solicitation is for design, permitting and construction administration services for the planned satellite
government campus within the Heritage Bay Planned Unit Development (PUD) in accordance with the
approved Collier County Master Plan.
CONSIDERATIONS: The Facilities Management Division is coordinating with Collier County
Constitutional Offices, Emergency Medical Services team and other County divisions and stakeholders to
develop a satellite campus that provides the necessary services for the expanding population in the area.
The project will be constructed on 6.33 acres of Collier County owned property located approximately
one quarter mile north of the intersection of 951 and Immokalee Road and immediately north of the
Naples Community Hospital (NCH) Northeast Facility and west of Heritage Bay Vistas (see Attachment
A: Location Map).
On August 12, 2019, the Procurement Services Division issued a notice for RPS No. 19-7634, Heritage
Bay Government Center Design. The County notified 18,127 firms, 118 interested companies
downloaded the solicitation documents, and staff received five proposals by the September 12, 2019,
submission deadline. The County determined that all five firms are responsive and responsible. The
selection committee met on September 18, 2019 and, as described in step 1 of the solicitation documents,
scored each of the proposals and shortlisted the following top four firms to move on to step 2, oral
presentations: Parker/Mudgett/Smith Architects, Inc., MK Architecture LLC, BSSW Architects, Inc. and
Stantec Consulting Services Inc.
On October 7, 2019, the selection committee reconvened for the step 2 oral presentations, where each
firm presented, resulting in the following ranking:
Company Name City County State Final Ranking Responsive/Responsible
Stantec Consulting
Services Inc.
Naples Collier FL 1 Yes/Yes
Parker/Mudgett/Smith
Architects, Inc.
Fort
Myers
Lee FL 2 Yes/Yes
BSSW Architects, Inc. Naples Collier FL 3 Yes/Yes
MK Architecture LLC Fort
Myers
Lee FL 4 Yes/Yes
Straughn Trout
Architects, LLC.
Lakeland Polk FL Not Ranked Yes/Yes
Staff is recommending negotiations with the top ranked firm, Stantec Consulting Services Inc.
FISCAL IMPACT: Phase 1 (Government Service Center) of this project is funded by the Collier
County Tax Collector’s Office. Phase 2 (EMS Station) of the project has secured funding through the
infrastructure sales tax program and will be funded by Project 55211 in accordance with the previously
16.C.1
Packet Pg. 970
11/12/2019
approved FY 2020 budget.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority
vote for Board approval. -SRT
GROWTH MANAGEMENT IMPACT: There is no Growth Management impact.
RECOMMENDATION: To approve the selection committee’s ranking for RPS No. 19-7634, “Heritage
Bay Government Center Design,” authorize staff to begin negotiating with the top ranked firm, Stantec
Consulting Services Inc., and in the event that an agreement cannot be reached with that firm, to continue
negotiating with the second ranked firm, so that a proposed agreement can be brought to the Board for
consideration at a subsequent meeting.
Prepared by: Tony Barone, Senior Project Manager, Facilities Management Division
ATTACHMENT(S)
1. BCC Heritage Bay Design Firm Ranking REV4 (PDF)
2. 19-7634 Attachment A - Location Map (PDF)
3. 19-7634 Attachment B - Space Planning Report (PDF)
4. 19-7634 Attachment C - Project Timetable (PDF)
5. 19-7634 NORA (PDF)
6. 19-7634 Final Ranking (PDF)
7. 19-7634 Request for Professional Services (PDF)
16.C.1
Packet Pg. 971
11/12/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.1
Doc ID: 9235
Item Summary: Recommendation to approve the selection committee’s ranking for Request for
Professional Services (“RPS”) No. 19-7634, “Heritage Bay Government Center Design,” and authorize
staff to begin contract negotiations with the top-ranked company, Stantec Consulting Services Inc., so that
staff can bring a contract back to the Board at a subsequent meeting.
Meeting Date: 11/12/2019
Prepared by:
Title: – Facilities Management
Name: Tony Barone
10/10/2019 2:20 PM
Submitted by:
Title: Director - Facilities Management – Facilities Management
Name: Damon Grant
10/10/2019 2:20 PM
Approved By:
Review:
County Attorney's Office MaryJo Brock Level 2 Attorney Review Skipped 10/15/2019 3:04 PM
Procurement Services Opal Vann Additional Reviewer Completed 10/10/2019 3:40 PM
Procurement Services Evelyn Colon Additional Reviewer Completed 10/10/2019 3:42 PM
Facilities Management Damon Grant Director - Facilities Completed 10/10/2019 3:58 PM
Procurement Services Ted Coyman Additional Reviewer Completed 10/11/2019 9:54 AM
Public Utilities Department Dan Rodriguez Additional Reviewer Completed 10/11/2019 10:37 AM
Public Utilities Department Drew Cody Level 1 Division Reviewer Completed 10/11/2019 11:20 AM
Public Utilities Department Dan Rodriguez Level 2 Division Administrator Review Completed 10/11/2019 11:23 AM
Public Utilities Department Dan Rodriguez Level 2 Division Adminsistration Completed 10/11/2019 11:23 AM
County Attorney's Office Scott Teach Additional Reviewer Completed 10/12/2019 11:42 AM
Office of Management and Budget Susan Usher Additional Reviewer Completed 10/14/2019 4:23 PM
County Attorney's Office Scott Teach Level 3 County Attorney's Office Review Completed 10/12/2019 11:44 AM
Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 10/14/2019 8:57 AM
Budget and Management Office Ed Finn Additional Reviewer Completed 10/15/2019 9:40 AM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 11/03/2019 9:40 PM
Board of County Commissioners MaryJo Brock Meeting Pending 11/12/2019 9:00 AM
16.C.1
Packet Pg. 972
16.C 19-7634 Heritage Bay
Government Center Design
Ranking
Tony Barone, Senior Project Manager
Facilities Management Division
November 12, 2019
Agenda Item 16.C
Collier County | Florida
16.C.1.a
Packet Pg. 973 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
BACKGROUND
u The Facilities Management Division is coordinating with
Collier County Constitutional Offices, Emergency Medical
Services team and other County divisions and stakeholders
to develop a satellite campus that provides the necessary
services for the expanding population in the area.
u The project will be constructed on 6.33 acres of Collier
County owned property located approximately one quarter
mile north of the intersection of 951 and Immokalee Road
and immediately north of the Naples Community Hospital
(NCH) Northeast Facility and west of Heritage Bay Vistas
(see Attachment A: Location Map).
16.C.1.a
Packet Pg. 974 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
Location Plan
Public Utilities Department
Facilities Management Division
16.C.1.a
Packet Pg. 975 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
Project Scope
Public Utilities Department
Facilities Management Division 3
u Phase 1 –Government Services Building / Site
Development
–Includes design and construction of full site and 20,000 sf Government Services Building
–All programming, SDP and other site permitting, public outreach, design and installation of site utilities
and infrastructure stubbed out to phase 2-4 building pads.
–Tax Collector
–Town Hall Meeting Space
–Driver License Testing
–Property Appraiser
–Supervisor of Elections
–Clerk of Court
–Building Department
u Phase 2 EMS Station
–Includes design and construction of EMS / Fire Station and associated driveways and parking area
around building.
–$2.22M is currently validated by Sales Tax Committee and approved by the BCC.
u Phase 3 and 4 –Future Use -Building / Parking Structure
–Future Government Office Building and Potential Parking Structure as determined by the BCC.
16.C.1.a
Packet Pg. 976 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
Project Phasing
16.C.1.a
Packet Pg. 977 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
Conceptual Budget and Timeline
16.C.1.a
Packet Pg. 978 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
Recommendation
u Recommendation to approve the selection committee’s
ranking for Request for Professional Services (“RPS”) No.
19-7634, “Heritage Bay Government Center Design,” and
authorize staff to begin contract negotiations with the top-
ranked firm, Stantec Consulting Services Inc., so that staff
can bring a contract back to the Board at a subsequent
meeting.
Public Utilities Department
Facilities Management Division 6
16.C.1.a
Packet Pg. 979 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
Heritage Bay Government Center
16.C.1.a
Packet Pg. 980 Attachment: BCC Heritage Bay Design Firm Ranking REV4 (9235 : 19-7634 Heritage Bay Government
SITE CONTEXT
+/-6.22 acres
Attachment A: Location Map 16.C.1.b
Packet Pg. 981 Attachment: 19-7634 Attachment A - Location Map (9235 : 19-7634 Heritage Bay
Memo
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
To: Tony Barone, PMP From: Tim Hancock, AICP
Senior Project Manager
Division of Facilities Management
Collier County Government
Naples, Florida
File: Collier County Master Space Plan Date: June 21, 2019
Reference: Collier County Master Space Plan Support – Heritage Bay Site, Summary of Information
In July of 2018 Collier County engaged Stantec for the Preliminary Study and Planning for a Public Facility
Complex at 15430 Collier Boulevard, more commonly known as the ‘Heritage Bay Site’. This effort was to be
part of the overall Collier County Master Space Plan to assist the County with understanding the potential
options and relative yield for this site.
The property is currently owned by Collier County and is partially developed with an in-line booster station
owned and operated by Collier County Utilities. The County is assessing its future needs via the Master
Space Plan to better serve the growing population in the eastern part of the county as well as reviewing the
age and potential storm vulnerability of existing facilities. Stantec was engaged to provide preliminary
planning support regarding the Heritage Bay Site in determining the potential yield and various development
scenarios depending on how future needs materialize. This memorandum represents a final reporting of work
products and exhibits for the Heritage Bay Site to assist the County in determining how this site may fit into
the overall Collier County Master Space Plan.
All information presented in this document and the attachments are to be considered preliminary and solely
for the purpose of general planning and study to assist Collier County in determining how best to meet the
long-range needs of the community.
The County identified preliminary uses for the Heritage Bay site as follows:
• Collier County Tax Collector and other Constitutional Officers
• Town Hall Meeting Space
• General Government Services
• Collier County EMS (possible joint use facility with Fire)
Each of the above is discussed in additional detail below:
Collier County Tax Collector
As population grows in the eastern portion of the County, the need for additional space to better serve the
existing and future population has become evident (See Appendix B, Population Estimates). Working with
the office of the Collier County Tax Collector and applying services currently provided at existing Tax
Collector offices, a preliminary programming and conceptual space planning effort was performed (See
Appendix C). Included in this programming are functions anticipated to be performed by the Tax Collector,
Clerk of Courts, Supervisor of Elections, and associated support services. Programming for typical
government retail function, such as customer service, are located on the ground floor with an estimate square
footage of 13,263.
16.C.1.c
Packet Pg. 982 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
Additional consideration was given to allow for future expansion as well as the potential need for public
meeting space and miscellaneous support services within this building. A conceptual second floor plan was
developed to provide ‘back of house’ uses such as breakrooms, conference rooms, etc. that are not required
to be on the first floor as well as a ‘Town Hall’ meeting space and miscellaneous allocations for future uses.
Both 1st and 2nd floor space plans were developed at a conceptual level and are also included in Appendix C.
Any future design and development work for this site will need to revisit and further refine or amend the
programming elements to meet the proposed needs.
General Government Services
Once the anticipated site demands for the Tax Collector and EMS buildings were developed, multiple
conceptual scenarios were developed for the balance of the site in order to determine the potential yield. As
shown in the three drawings in Appendix A, the following scenarios were developed:
No Garage Option
This site plan assumes that a parking garage will not be constructed on site in the future and all parking will
be provided for at-grade. Due to the high parking demands typical of government facilities, rather than using
the code required parking ratio of 1 space per 300 square feet for office uses, a blended parking ratio of 1
space per 225 square feet was applied. As a result, the building configuration and parking shown on this
exhibit will support 67,950 sq. ft., not including EMS which is self-parked. NOTE: the total building square
footage shown on the plan is 70,000 sq. ft. exclusive of EMS.
Future Garage Option
This site plan was developed in order to determine the available building footprint should the County want an
option for a future parking garage to serve either the public, employees or for additional vehicle storage. With
all parking at grade, this scenario (at 1 space per 225 sq. ft.) supports 78,750 sq. ft. by using a smaller
footprint for the Government Services Building in Phase 3 as compared to the No-Garage Option. Again, this
is exclusive of the EMS site which is self-parked, and the building footprints shown total slightly more square
footage (80,000 sq. ft) than is supported by the at-grade parking at the blended rate.
Garage Option
This plan was created to demonstrate the maximum supportable square footage for the site through the
construction of a parking garage. As shown, the available parking would support 117,225 square feet of
building area at the 1 space per 225 sq. ft. ratio. Alternatively, the site could support a lesser square footage
of 80,000 square feet (as shown on the plan) and retain an excess of 165 parking spaces for use by the
County. Should the County wish to proceed with the construction of a parking garage on this site in order to
fully maximize developable area, additional building configurations and options should be explored based on
the future needs identified for this site.
Collier County EMS
A footprint and site layout were provided by Collier County based on the recently completed Station 25
(designed by BSSW), a Fire/EMS combined station. This footprint was incorporated into the conceptual site
layouts as shown in Appendix A. This project will in all likelihood be the first phase of development.
Graphic Images - Appendix D includes graphic images prepared for a potential phasing scenario.
Project Schedule - Appendix E is a draft project schedule developed for the County for general planning
purposes.
16.C.1.c
Packet Pg. 983 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
Appendix A
Conceptual Site Layouts
16.C.1.c
Packet Pg. 984 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
16.C.1.c
Packet Pg. 985 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
16.C.1.c
Packet Pg. 986 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
16.C.1.c
Packet Pg. 987 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
Appendix B
Population Estimates
16.C.1.c
Packet Pg. 988 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
^_
^_
^_Total: 139,968
Total: 104,403
Total: 112,403
Stantec Consulting Services Inc.5801 Pelican Bay Blvd. Suite 300Naples, FL 34108tel 239.649.4040fax 239.263.6449
2017 POPULA TION ESTIMATESPublic Facility Complex Service AreasMay 2019
0 5,000 10,000 15,000
Feet($$¯\\US1226-F01\V:\1773\active\177311078\gis\mxd\177311078_CC_Service_Centers_Pop_20190515_v03_123269.mxd Revised: 2019-05-21 By: dreeceDisclaimer: Stantec assumes no responsib ility for datasupplied in electronic format. The recipient acceptsfull responsibility for verifying the accuracy andcompleteness of the data. The recipient releases Stantec, its officers, employees, consulta nts andagents, from any and a ll cla ims arising in a ny wayfrom the content or provision of the d ata.
^_Collier County Government Complex
^_North Collier Government Center
^_Heritage Bay Service Center
Collier County Government Center AreaNorth Collier Government Center AreaHeritage Bay Service Area2017 Census Block Groups
Prepared by:Techn ical Review by:Ind ep en dent R eview by:
D.R. 05/21/19X.X.X MM/DD/YYX.X.X MM/DD/YY
Notes:1. Coordinate System: N AD 1983 StatePlane Florida East FIPS 0901 Feet2. Source data: Population Estimates are from th e 2017 American Community Survey conducted by the US Census Bureau / Collier County 3. Imagery: ESRI, Collier County
L E G E N D
16.C.1.c
Packet Pg. 989 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
Appendix C
Preliminary Programming and Conceptual
Floor Plans
16.C.1.c
Packet Pg. 990 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
HERITAGE BAY GOVERNMENT CENTER June 11, 2019
CONCEPTUAL SPACE NEEDS PROGRAM
Naples, FL
[E] = Enclosed, [O] = Open/Workstation, [A] = Alcove,
[C] = Canopy covered, [X] = Outdoors (exterior)
sf
SUMMARY - Building Spaces
1st Floor (Tax Collector & Clerk of Courts Program Spaces)13,263
2nd Floor (Town Hall, Commissioner's Office, and Amenity Spaces)15,672
28,934
1st Floor 40
STAFF
Deputy Director or Office Manager 2
Supervisor or Administrative Assistant 4
Retail Clerks 32 FTE 2 PTE (shared floating station)
Bullpen/Lobby O 120 x 30 3,600 Tickets obtained, customer seating, & reception,
information kiosk. Customers face away from the
clerks.
1 3,600
Elevator Core & Lobby 30 x 28 840 1 840
Employee Entrance 6 x 8 48 1 48
E 12 x 14 168 Office with Visual to Bullpen 1 1 168
Tax Collector: Supervisor/Subject Matter Experts E 12 x 20 240 Central Office for Supervision 3 1 240
Tax Collector: Frontline Clerk O 5 x 8 40 Open to Bullpen 30 30 1,200
Clerk of Courts: Deputy Director E 12 x 14 168 Office 1 1 168
Clerk of Courts: Administrative Assistant O 10 x 20 200 Cubicle 1 1 200
Clerk of Courts: Clerks O 5 x 8 40 open desk at bullpen; file cabinet and cash drawers
at each location; floating station
2 2 80
*Floating Office 10 x 12 120 1 120
*Spare Office (or Small Conf. Room)12 x 14 168 1 168
Supervisory of Election: Clerks O 10 x 12 120 floating station 2
Driver's License Testing Room E 20 x 10 200 (12) Computer Stations; Area to be monitored;
Orange Blossom has one-way glass for monitoring
room
1 200
Quiet Room E 8 x 8 64 Glass enclosed; For Supervisor & Customer; Table
& Chairs
2 128
Work Room / Mail Room / Copy E 12 x 15 180 scanning, copiers,supply storage 1 180
Copy Room / Storage E 10 x 12 120 1 120
E 11 x 12 132 Also secures regulated items such as titles and ID
laminates. Shredder in same space
1 132
*Conference Room 20 x 15 300 12-15 people; shared space 1 300
I.T.12 x 10 120 1 120
E 12 x 24 288 Approx 4 fixtures (based on Bullpen Size)1 288
E 12 x 24 288 Approx 4 fixtures (based on Bullpen Size)1 288
E 10 x 20 200 2 400
E 10 x 12 120 janitor cart storage, 1 shelf, mop sink 1 120
E 10 x 8 80 plywood on walls, isolated / dedicated pwr 1 80
E 24 x 11 264 to be verified during detailed design, provide
additional sf if separate buildings
1 264
Sprinkler / Water Room E 12 x 11 132 to be verified during detailed design, provide
additional sf if separate buildings
1 132
Electrical E 21 x 11 231 to be verified during detailed design, provide
additional sf if separate buildings
1 231
E 10 x 12 120 to be verified during detailed design, provide
additional sf if separate buildings
1 120
E 11 x 24 267 to be verified during detailed design, provide
additional sf if separate buildings
1 267
Subtotal 40 10,202
Circulation 30%3,061
13,263
Employee Restrooms
Custodian Rooms
Tax Collector: Office Manager
*IT Room
*Mechanical Room
Cash Vault / Secure Storage
Outdoor Storage (Maintenance)
*Elevator Machine Room
Men's Restroom (Public)
1st Floor TOTALS
Staffing Qty
Women's Restroom (Public)
SUMMARY - Building Spaces GSF TOTALS
Space Name Space Standard Remarks Spacedims
Page 1 of 2
16.C.1.c
Packet Pg. 991 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
HERITAGE BAY GOVERNMENT CENTER June 11, 2019
CONCEPTUAL SPACE NEEDS PROGRAM
Naples, FL
[E] = Enclosed, [O] = Open/Workstation, [A] = Alcove,
[C] = Canopy covered, [X] = Outdoors (exterior)
sf Staffing QtySpace Name Space Standard Remarks Spacedims
2nd Floor
Title Size Area Notes Staff No SF
Elevator & Lobby 15 x 48 720 1 720
Elevator Core 7 x 9 63 1 63
Storage 7 x 7 49 1 49
Women's Restroom (Public)13 x 18 234 1 234
Men's Restroom (Public)13 x 18 234 1 234
22 x 24 528 1 528
14 x 22 308 1 308
16 x 28 448 1 448
Aid's Office 16 x 17 272 1 272
I.T.10 x 13 130 1 130
Work Room & Storage 19 x 22 418 1 418
Elected Officials' Flex Space 12 x 27 324 1 324
J.C. & Storage 10 x 12 120 1 120
Storage 12 x 16 192 1 192
Unisex Toilet 8 x 8 64 1 64
Storage 4 x 7 28 1 28
Wellness 10 x 12 120 1 120
Flex Office Space 9 x 12 108 1 108
Flex Office Space 9 x 12 108 1 108
Flex Office Space 19 x 30 570 1 570
Break Room with Kitchenette 22 x 39 858 1 858
Storage 14 x 32 448 1 448
A.V. Room 13 x 14 182 1 182
Storage 11 x 13 143 1 143
Town Hall Meeting Space 57 x 73 4,161 1 4,161
Support Space 20 x 21 420 1 420
Lobby 23 x 35 805 1 805
Subtotal 40 12,055
Circulation 30%3,617
15,672
* SPACES THAT CAN BE MOVED TO THE SECOND FLOOR.
Waiting Room
Receptionist
Large Conference Room
2nd FloorTotals
Page 2 of 2
16.C.1.c
Packet Pg. 992 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
SUPERVISOR OFFICE FOR
(3)
ELEV
(11)
CLERKS
(9)
CLERKS
WORK/
MAILROOM
CONFERENCE
ROOM
QUIET
ROOM
QUIET
WOMEN'S
(STAFF)
SPRINKLER
MEN'S
(STAFF)
TC: OFF
MNGR
CC: DEPUTY
DIRECTOR
EXTERIOR STOR.
CC: ADMIN
ASSISTANT
WORK RM/
COPIER
TC: FLOAT
OFF
TC: SPARE
OFF
J.C.
MECH.
EMR
STAIR B CASH
I.T.
LOBBY
ELEC
DRIVER'S
TEST
MEN'SWOMEN'S
135' - 3"117' - 6"SEATING
AREA
63' - 1 1/2"10' - 0"62' - 1 1/2"43' - 0"31' - 6"43' - 0"SEATING AREA
SEATING
AREA
(12)
CLERKS
SEATING
AREA
SEATING
AREA 5' - 0"8' - 0"10' - 0"7' - 0"5' - 0"10' - 0"8' - 0"5' - 0"
10' - 0"
SEATING
AREA
RECEPTIONIST
0 16'8'32'
1st Floor - Concept
Heritage Bay - Public Facilities Complex | 177311078 | Collier County, FL | 03/27/19A1
16.C.1.c
Packet Pg. 993 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
135' - 3"43' - 0"31' - 6"43' - 0"117' - 6"TOWN HALL MTG SPACE
STOR.ELEV
OPEN TO BELOW
CORRIDOR
STAIR B
MEN'SWOMEN'S
ELECTED
OFFICIALS'
FLEX SPACE
AID'S
OFFICE
LARGE
CONFERENCE
ROOM
BREAK ROOM WITH
KITCHENETTE
FLEX OFFICE SPACE
WELLNESS
J.C.
& STOR.
STORAGE
STOR.
UNISEX
TOILET
I.T.
STORAGE
A.V. ROOM
STORAGE
SUPPORT
SPACE
OVERFLOW
LOBBY
WAITING ROOM
RECEPTIONIST
WORK ROOM
&
STORAGE
LOBBY
RAMP
UP
UP
DN
ELEVATOR LOBBY
PLATFORM
FLEX
OFFICE
SPACE
FLEX
OFFICE
SPACE
0 16'8'32'
2nd Floor - Concept
Heritage Bay - Public Facilities Complex | 177311078 | Collier County, FL | 06/11/19A2 -
2nd
floor
16.C.1.c
Packet Pg. 994 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
Appendix D
Site Graphics – Phasing
16.C.1.c
Packet Pg. 995 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
16.C.1.c
Packet Pg. 996 Attachment: 19-7634 Attachment B - Space Planning
16.C.1.c
Packet Pg. 997 Attachment: 19-7634 Attachment B - Space Planning
16.C.1.c
Packet Pg. 998 Attachment: 19-7634 Attachment B - Space Planning
16.C.1.c
Packet Pg. 999 Attachment: 19-7634 Attachment B - Space Planning
16.C.1.c
Packet Pg. 1000 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government
16.C.1.c
Packet Pg. 1001 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government
gk v:\1773\active\177311078\reports\mem_planning_heritagebay_20190621.docx
Appendix E
Draft Schedule
16.C.1.c
Packet Pg. 1002 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May JuneJuly Aug Sept Oct Nov Dec Jan Feb Mar Apri May
Site Space Planning
Design Procurement (Phases 1-4)
CM@Risk Procurement (Phases 1-4)
Design (Phase 1)
Building Programming (Phase 2)
Design (Phase 2)4 Months
Site Development Plan
Building Permit
Construction
Occupancy 1
Building Programming (Phase 3-4)
Design (Phase 3-4
Site Development Plan Amendment
Building Permit
Construction
Occupancy 1
4 MonthsPHASES 1-22020 2021 2022 2023
Pre-Design
TaskPhase
PROJECT TIMELINE
HERITAGE BAY GOVERNMENT CENTER
PHASES 3-42 Mos.
12 Months
4 Months
18 Months
6 Months
6 Months
3 Months
2 Mos.
4 Months
4 Months
6 Months
2019
16.C.1.c
Packet Pg. 1003 Attachment: 19-7634 Attachment B - Space Planning Report (9235 : 19-7634 Heritage Bay Government
MayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMayJuneJuly Aug SeptOct Nov Dec Jan Feb MarApriMaySite Space PlanningDesign Procurement (Phases 1‐4)CM@Risk Procurement (Phases 1‐4)Design (Phase 1)Building Programming (Phase 2)Design (Phase 2)4 MonthsSite Development PlanBuilding PermitConstructionOccupancy1Building Programming (Phase 3‐4)Design (Phase 3‐4Site Development Plan AmendmentBuilding PermitConstructionOccupancy1HERITAGE BAY GOVERNMENT CENTERPHASES 3‐42 Mos.12 Months4 Months18 Months6 Months6 Months3 Months2 Mos.4 Months4 Months6 Months20192023Pre‐DesignTaskPhasePROJECT TIMELINE4 MonthsPHASES 1‐22020 2021 202216.C.1.dPacket Pg. 1004Attachment: 19-7634 Attachment C - Project Timetable (9235 : 19-7634 Heritage Bay Government Center
16.C.1.e
Packet Pg. 1005 Attachment: 19-7634 NORA (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
16.C.1.e
Packet Pg. 1006 Attachment: 19-7634 NORA (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
Selection Committee
Final Ranking Sheet
RPS #: 19-7634
Title: Heritage Bay Government Center Design
Name of Firm John
McCormick
Tony
Barone
Rob
Stoneburner
Vickie
Downs
Shawn
Duffey Total
Selection
Committee
Final Rank
Stantec Consulting Services, Inc.1 2 2 2 1 8 1.0000
Parker Mudgett Smith Architects 2 1 3 1 3 10 2.0000
BSSW Architects, Inc.3 3 1 3 2 12 3.0000
MK Architecture 4 4 4 4 4 20 4.0000
Procurement Professional Evelyn Colon
Step 1: Upon direction by the Procurement professional, the individual selection committee member should provide their ranking of
the proposals (from highest being number one (1) to lowest.
Step 2: The procurement professional will review the mathematically calculated final rank and discuss the rank order and determine if
consensus is reached.
Page 1 of 1
16.C.1.f
Packet Pg. 1007 Attachment: 19-7634 Final Ranking (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
REQUEST FOR PROFESSIONAL SERVICES (RPS)
In accordance with Florida Statute 287.055
Consultants’ Competitive Negotiation Act
FOR
HERITAGE BAY GOVERNMENT CENTER DESIGN
RPS NO.: 19-7634
EVELYN COLON, PROCUREMENT MANAGER
PROCUREMENT SERVICES DIVISION
3295 TAMIAMI TRAIL EAST, BLDG C-2
NAPLES, FLORIDA 34112
TELEPHONE: (239) 252-2667
evelyn.colon@colliercountyfl.gov (Email)
This proposal solicitation document is prepared in a Microsoft Word format (rev 8/16/17). Any
alterations to this document made by the Consultant may be grounds for rejection of proposal,
cancellation of any subsequent award, or any other legal remedies available to the Collier County
Government.
16.C.1.g
Packet Pg. 1008 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
2 19-7634 Heritage Bay Government Center Design
SOLICITATION PUBLIC NOTICE
REQUEST FOR PROFESSINAL
SERVICES (RPS) NUMBER:
19-7634
PROJECT TITLE: Heritage Bay Government Center Design
PRE-PROPOSAL CONFERENCE: There is no pre-proposal meeting for this solicitation.
LOCATION: Procurement Services Division, Conference Room A, 3295 Tamiami Trail East,
Bldg. C-2, Naples, FL 34112
RPS OPENING DAY/DATE/TIME: September 12, 2019 at 3:00PM
PLACE OF RPS OPENING: Procurement Services Division
3295 Tamiami Trail East, Bldg. C-2
Naples, FL 34112
All proposals shall be submitted online via the Collier County Procurement Services Division Online Bidding System:
https://www.bidsync.com/bidsync-cas/
INTRODUCTION
As requested by the Facilities Management Division (hereinafter, the “Division”), the Collier County Board of County
Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for P rofessional Services (hereinafter,
“RPS”) with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and
project description stated or attached. The Consultant, at a minimum, must achieve the requirements of the Specifications or Scope
of Work stated.
Collier County is pursuing the development of a Government Center within the Heritage Bay PUD to support the growing population
of the County.
The project will be constructed on 6.33 Acres of Collier County Owned property located approximately one quarter mile north of the
intersection of 951 and Immokalee Road and immediately north of the Naples Community Hospital (NCH) Northeast Facility and
west of Heritage Bay Vistas (see Attachment A: Location Map).
This RPS will result in an award for all design ser vices associated with the Heritage Bay Government Center Project. The Collier
County Tax Collector’s Office and Collier County Board of County Commissioners may decide to contract with the awarded firm a s
a single contract through one of the entities or separately by Phase.
The results of this solicitation may be used by other County Constitutional Officers once awarded according to the Board of County
Commissioners Procurement Ordinance, as amended.
BACKGROUND
The Project is driven by three main factors. First, extensive master space planning at the County level determined that a government
services center at this location would better serve the growing population. Next, long term planning involves locating facili ties further
north and east to relocate, over time, away from flood prone and high hazards areas along the coast. Additionally, the Collier County
Emergency Medical Services (EMS) Division has identified a need for an additional operation at this location to provide timel y
emergency medical services to citizens of Collier County.
This space planning study done in conjunction with Stantec identified several potential facilities that could be located on the property
based on the identified needs of Collier County Government and various const itutional offices.
Following the space planning study, Collier County requested a report that included conceptual site plans to determine acreag e and
general sizing needs. The conceptual plans and cost estimates were used to develop the budget and preliminary project concept.
It is important to note that the concept plans and space planning document should only be used for a base understanding of the Project.
Collier County fully expects the development team to evaluate the needs identified in the report, solicit feedback from the various
stakeholders and create an updated concept plan and phasing recommendations that will be used to guide the Project through design
and construction.
16.C.1.g
Packet Pg. 1009 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
3 19-7634 Heritage Bay Government Center Design
The County is interested in pursuing the project in four (4) phases as shown below:
Phase 1: Government Services Center
Phase 2: Emergency Medical Services
Phase 3: Collier County Government
Phase 4: Parking Structure
Once engaged fully with a Design Team and Construction Manager, Collier County is open to variations on both the phasing and the
concept of four separate structures. The concept plans shown in the space planning document (Attachment B: Space Planning Study)
is purely a fit study for this site as part of a larger plan to document the needs of the Count y as a whole.
A key component of this project relates to the schedule. The selected design team will be expected to complete their work in an
expeditious manner in order to meet the goals of the project.
As shown in the space planning study, the Collier County Tax Collector’s Office is the majority stakeholder in the first -floor services
operation of the Government Services Center. They intend to move into the Phase 1 Building in June 2021 at the expiration of their
current lease agreement. Project planning, programming, design and permitting shall be completed on a timeline that facilitat es this
move date.
The Project Timeline shown in Attachment B: Space Planning Report illustrates the basic timeline that the project will need to follow
to ensure successful completion. The timeline for the Phase 1 Building is critical and interested firms should include a strategy to
ensure on-time completion of the building.
Working with the Construction Manager, the Design Team shall plan, prepare project documents and complete permitting efforts to
facilitate the quickest start of the site’s physical development and Phase 1 and 2 construction. Collier County fully expects the design
team to employ all creative methods necessary to move the project forward to an on time and successful opening of the Government
Services Center and each subsequent phase.
Collier County EMS has historically utilized a protype design, modified and updated over several years, to construct new stand-alone
EMS stations. The most recent iteration of this prototype is EMS Station 25 at Hacienda Lakes, Permit Number PRBD20190100504.
Once fully planned and programmed, this project may or may not include a stand -alone EMS Station, proposing design firms may
consider this prototype design as an option.
Phase 3 and 4 have been planned only at the conceptual level and include the design and construction of a Collier County Government
Building up to five stories tall and a parking structure to accommod ate the parking needs of the overall Government Center.
While the existing programming for Phase 1 is robust, programming for Phase 3 only exists at the conceptual level and it will be the
responsibility of the consultant to facilitate this process from start to finish. Our intentions for these phases remain subject to the
programming effort that will be facilitated by the selected firm and may include the design and construction of any facility type that
best serves the needs of the County and maximizes the use of the project site.
The Design Firm will be expected to work with the Development Team, (Construction Manager at Risk Approach) from the schematic
phase of the design in order to develop the best construction design for the most efficient installat ion. The Construction Manager is
being selected under a separate solicitation and will report to the County under a separate contract.
The chosen Design Firm must be creative, understand value design/engineering, and have worked in a Construction Manager at Risk
environment in the past. The Project will be constructed in phases as and it is the County’s intent that the Firm will work with the
Development Team to run overlapping designs so that as a phase is going through a Board approv ed guaranteed maximum price
(GMP) contract amendment, the subsequent phase will follow quickly to meet the project timeline until the entire Project is
completed.
TERM OF CONTRACT
County reserves the right to modify this scope during negotiations for budgetary reasons.
The contract term, if an award is made is intended to be for the duration of the project. Collier County Tax Collector’s Office intends
to sign a direct contract with the selected firm for Phase 1 and Collier County Board of Commissioners intends to sign a direct contract
for Phase 2, 3 and 4.
Prior to moving into major design work associated with Phases 3 and 4 of the project, Collier County intends to evaluate bot h the
performance of the design team and available budgets to determine whether moving forward under this award is desired. The County
may decide to move forward with none, some or all the services associated with Phase 3 and 4 at that time.
Prices shall remain firm for the initial term of the awarded contract.
16.C.1.g
Packet Pg. 1010 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
4 19-7634 Heritage Bay Government Center Design
Surcharges will not be accepted in conjunction with this award, and such charges should be incorporated into the pricing structure.
DETAILED SCOPE OF WORK
The Consultant shall provide the full scope of design, permitting, bidding and contract administration services necessary to complete
the Heritage Bay Government Center Project as described including but not limited to the following:
1. Provide all programming and preliminary design documents for use in establishing the basis for the final design of
the site and buildings. These documents will include site plans, floor plans and building elevations in sufficient
detail to illustrate the program of spaces, convey general building and site design and generate a project budget.
2. Provide all geotechnical, topographical, traffic, environmental and species surveys, reports and studies necessary to
fully permit and complete the project.
3. Prepare and submit for all permits related to the project, including the building permit, and ensure necessary
permitting is completed to facilitate projected schedule. Coordinate with the Construction Manager as necessary
during the submission of the building permit.
4. Facilitate required public outreach and meetings necessary to complete a project of this size and scope in this specific
location. Public input for the programming and overall design of the site will be important, particularly in relation to
the town hall meeting space and other spaces that will directly serve the public.
5. Coordinate with Real Property Management on all necessary easements and/or encumbran ces.
6. Coordinate with County staff to develop an effective and efficient program, acquire all necessary permits in a timely
manner, provide a design suitable for the intended use incorporating best design practices for efficient and resilient
building.
7. Coordination with the County’s contracted Construction Manager throughout the design and construction process to
ensure value, constructability and an efficiently planned and constructed facility.
8. Provide final design documents including, but not limited to, architecture, civil engineering, structural engineering,
mechanical, electrical and plumbing (MEP) engineering, low voltage/technology and landscape architecture documents required
for permitting and construction.
9. Facilitate and attend all project meetings, prepare agendas, generate meeting minutes and provide follow up on tasks.
10. If available, utilize the County’s project management platform throughout the project for all project communications,
document management, approvals, site observations, requests for information, etc.
11. Provide the County all necessary and appropriate documents for review throughout each review point of each phase
of the project.
12. The awarded firm shall appoint a person to act as a primary contact for the dur ation of the project. This person (or
their back-up) shall be readily available during normal working hours by phone or in person and shall be
knowledgeable of the overall project status and activities.
Architectural/Engineering Services
1. Preliminary Site and Building Design:
▪ Generate schematic floor plans and site plans to illustrate the proposed design for each phase of the project.
▪ Generate three-dimensional and BIM/Rivet models.
▪ Review the design options along with the preliminary cost estimates with Collier County Facilities and
implement any changes and/or modifications to the preliminary design documents.
▪ Coordination with Transportation Division and other organizations to incorporate any required traffic impact
mitigation elements into design of the project.
▪ Schedule and attend Site Development Plan (SDP) Pre‐application meeting with Collier County Growth
Development Services ba sed on the selected site/building plan (SDP pre‐application fee paid by Collier County).
▪ Provide Architects/engineers opinion of construction cost for use in establishing the project budget.
2. Final Design:
▪ Site Development Plan (SDP) modification submittal.
16.C.1.g
Packet Pg. 1011 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
5 19-7634 Heritage Bay Government Center Design
▪ Provide 30/60/90 percent construction drawing submittals for review by Collier County. Document and track the
disposition of all County comments and feedback to ensure full and complete capture of stated needs.
▪ Provide evaluation of Construction Manager’s value engineering report and coordinate with Collier County to
incorporate the desired items.
▪ Provide construction documents including drawings and specifications to comply with the current Florida
Building Code, in sufficient detail for bidding, permitting and construction.
▪ Meet all appropriate codes and standards for the design of government buildings including all federal, state and
local requirements.
▪ Conduct a 60% completion stage project peer review to provide QA/QC of the contract documents and cost
estimate prior to submittal to the County. This review will be conducted by experienced personnel not involved in
the day-to-day design of the project to ensure a “fresh eyes” review.
▪ Provide detailed designs relating to ADA accessibility to ensure all requirements are clear and detailed.
▪ Provide finish & color selections coordinated with the stakeholders of each phase.
▪ Provide all civil, architectural, structural, mechanical, plumbing, electrical, landscape, fire alarm, and fire protection
designs to ensure a complete design. Ensure full coordination of design documents between trades and design
disciplines.
▪ Include all low voltage and technology designs as part of the design package. Coordinate with County’s Information
Technology (IT) Division, contract vendors, Facilities Management and other appropriate specialties to provide a
full design package that includes all low voltage systems.
▪ Coordinate with the County and Construction Manager to provide detailed layout drawings of the furniture, fixtures
and equipment as necessary.
▪ Submit any and all documents on behalf of the County for building permit review, provide any support during
that process to achieve a permit status of “Ready for Issuance”.
▪ Produce a complete “For Construction” package of drawings and specifications, in preparation for bidding and
coordinate with the Construction Manager to support the bidding process of each phase.
3. Contractor Bidding Phase:
▪ Coordinate with Construction Manager and Collier County Procurement during bidding for each phase of the project.
▪ Attend all pre‐bid conferences.
▪ Respond to contractor/subcontractor questions within three (3) business days.
▪ Prepare written Addenda, if applicable.
▪ Review bids and alternates and coordinate with Construction Manager to provide bidder reference checks and bid
evaluation.
▪ Coordinate with Construction Manager to provide owner with pricing analysis for each phase.
4. Construction Contract Administration Phase:
▪ Attend preconstruction conference.
▪ Process monthly Contractor Payment Applications.
▪ Review shop drawings within ten (10) business days.
▪ Respond to Requests for Interpretation (RFIs) within three (3) business days.
▪ Review and make recommendations on any use of allowances, contingencies and/or proposes amendments to the
construction contract.
▪ Observe field observations of construction activities for the duration of the construction through all phases of the
project.
▪ Incorporate the as-built drawings and information provided by the Construction Manager and any other vendors
into an updated final drawing set in Auto Cad format, including all layers, references and other accompanying
files.
▪ Perform final completion inspections, review of submitted manuals and all other contract closeout items.
5. Services Included:
▪ Architectural design and permit documents.
▪ Evaluation and incorporation of value engineering recommendations.
▪ Three-dimensional and BIM modeling.
▪ Civil engineering design.
▪ Structural engineering design.
▪ Building mechanical, electrical, plumbing engineering.
▪ Landscape architecture.
▪ Boundary and topographical surveys.
▪ Soil borings, geotechnical report and environmental study.
▪ Traffic study and incorporation of traffic impact mitigation elements of the project .
▪ Warranty inspection one year from date of final completion.
▪ Maintenance of all project documents for a minimum of ten years from the date of project completion.
16.C.1.g
Packet Pg. 1012 Attachment: 19-7634 Request for Professional Services (9235 : 19-7634 Heritage Bay Government Center Design Ranking)
6 19-7634 Heritage Bay Government Center Design
As previously stated, the design of each Facility will be part of a four -phase process and may be done individually or collectively
as funding permits. Each Facility should be planned to meet current staffing needs and anticipated needs based on the detailed
program coordinated with the County and prepared by the design team .
The first phase of the project will include all necessary site develo pment permitting and design to ensure future phases are
planned for and easily initiated.
RESPONSE FORMAT AND SCORING CRITERIA FOR DEVELOPMENT OF SHORTLIST:
Proposals must be assembled, at minimum, in the order of the Evaluation Criteria listed or your proposal
may be deemed non-responsive
Evaluation Criteria Maximum Points
1. Ability of Professional Personnel 20 Points
2. Certified Minority Business Enterprise 5 Points
3. Past Performance 25 Points
4. Project Approach, Willingness to Meet Time and Budget Requirements 20 Points
5. Location 10 Points
6. Recent, Current, and Projected Workloads of the Firm 20 Points
TOTAL POSSIBLE POINTS 100 Points
For complete explanation of each evaluation criteria, please see the file titled “RPS Instructions” included with this
advertisement.
VENDOR CHECKLIST
Vendor should check off each of the following items as the necessary action is completed (please see, Form 2: Vendor
Check List):
The Solicitation Submittal has been signed.
All applicable forms have been signed and included, along with licenses to complete the requirements of the project.
Required Reference Questionnaires have been completed for previous projects and included with the proposal.
Any addenda have been signed and included.
All grant requirements have been reviewed and forms completed (if applicable).
Division of Corporations - Florida Department of State – http://dos.myflorida.com/sunbiz/ (If work performed in the State).
E-Verify/Immigration Affidavit (Memorandum of Understanding).
ATTACHMENTS
Attachment A: Location Map
Attachment B: Space Planning Report dated June 21, 2019.