Backup Documents 09/24/2019 Item #16A15 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 A 1 5
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office
, L•41`.(\kms
4. BCC Office Board of County
Commissioners V6\\y�l�
5. Minutes and Records Clerk of Court's Office
/ r' (011,41 to I 2Rkw,
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Michele Mosca, Stormwater Management Phone Number 252-2466
Contact/Department
Agenda Date Item was 9/24/19 Agenda Item Number 16-A-15
Approved by the BCC
Type of Document Agreement—Wagon Wheel Road Number of Original 1
Attached Documents Attached
PO number or account
number if document is 103-172927-649030
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature JAK
2. Does the document need to be sent to another agency for additional signatures? If yes, JAK
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be JAK
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's JAK
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JAK
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JAK
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip JAK
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 9/24/19 and all changes made during the JAK N/A is not
meeting have been incorporated in the attached document. The County Attorney's an option for
Office has reviewed the changes,if applicable. th�' ,line.
9. Initials of attorney verifying that the attached document is the version approved th1 1 kit k/A`i not
BCC,all changes directed by the BCC have been made,and the document is rea y for44.‘ , option for
Chairman's signature. � 's.' e. '`
h�Q
[04-COA-01081/1344830/1]I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;
Revised 11/30/12
16A15
Ann P. Jennejohn
From: Ann P.Jennejohn
Sent: Tuesday, October 22, 2019 9:00 AM
To: MoscaMichele
Subject: Item #16A15 (9-24-19 BCC Meeting)
Attachments: Item #16A15 (9-14-19 BCC Meeting).pdf
Good Morning Michele,
A (recorded) copy of Agenda Item #16A15, from the
Board's September 2.4, 2.019 Meeting is attached for your
records. Page 2 details the recording charges.
Thank you have a great day!
r
Ann Jennejohn
BMR Senior Deputy Clerk
Clerk to the Value Adjustment Board
Office: 239-252-8406
Fax: 239-252-8408(if applicable)
Ann.Jennejohn@CollierClerk.com
Office of the Clerk of the Circuit Court
&Comptroller of Collier County
3299 Tamiami Trail, Suite#401
Naples, FL 34112-5324
www.CollierClerk.com
1
INSTR 5777446 OR 5684 PG 581
RECORDED 10/14/2019 3:01 PM PAGES 6
CLERK OF THE CIRCUIT COURT AND COMPTROLLER
COLLIER COUNTY FLORIDA
REC$52.50
AGREEMENT
THIS AGREEMENT(hereinafter referred to as the"Agreement") is made and entered into
this2eof Sey-�, sr; 2019, by and between COLLIER COUNTY, FLORIDA, a
political subdivision of the State of Florida (hereinafter referred to as "COUNTY") and the BIG
CYPRESS NATIONAL PRESERVE,a federal agency within the National Park Service and under
the United States Department of the Interior (hereinafter referred to as "BCNP"), whose address
is 33100 Tamiami Trail East, Ochopee, Florida 34141.
RECITALS:
WHEREAS, the BCNP received funding in the amount of$100,000.00 from the South
Florida National Parks Trust (SFNPT) to help correct hydrologic conditions on the wetlands and
watersheds of a portion of the BCNP, near Upper Wagon Wheel Road, located in eastern Collier
County, Florida; and
WHEREAS, despite prior re-diversion efforts in the 1990s to restore water flow to the
wetlands and watersheds of a portion of the BCNP, the water delivery system remains deficient as
roadbeds continue to block and prevent water from recharging wetlands with sufficient sheet flow
on the downstream sides of the roads; and
WHEREAS, the BCNP and the COUNTY have a shared interest in the restoration of water
flow to the wetlands and watersheds, including but not limited to: (1)the project's location within
and alongside the right-of-way of county-owned roads, (2)the mutual goal of rehydrating wetland
and stream systems within conservation lands negatively affected by road and canal infrastructure,
(3) the desire to prevent damaging high water overtopping roadways, and (4) the benefits of dual
agency project cost savings, (5) improving outdoor educational opportunities administered in the
local catchment; and
WHEREAS, the BCNP and the COUNTY have the experience, resources and expertise to
combine efforts and jointly submit permit applications and to apportion construction and
maintenance responsibilities amongst themselves as project partners on the Upper Wagon Wheel
Road Sheet Flow Project (hereinafter, the "Project") as more fully set forth below; and
WHEREAS, the BCNP and COUNTY have determined and mutually agree that it is
economically advantageous and in the best interest of the public to consummate this Agreement
to help correct the hydrologic conditions in the wetlands and watersheds of a portion of the BCNP,
WITNESSETH:
NOW, THEREFORE, in consideration of the above promises and other good and valuable
consideration exchanged amongst the parties, and in consideration of the covenants contained
herein, the parties agree as follows:
1. All of the above recitals are true and correct and are hereby expressly incorporated
herein by reference as if set forth fully below,
CAO
16A15
2. This Agreement shall be executed upon approval by the Board of County
Commissioners and by an authorized representative of the BCNP. This Agreement shall be
recorded by the County in the Official Records of Collier County, Florida, within fourteen (14)
days after the Agreement is fully executed. The County shall pay all costs of recording this
Agreement._
3. The Parties will perform as follows:
A. BCNP and the COUNTY shall be co-applicants on the joint permit application
for the Project. BCNP shall be responsible for 100 percent of the permitting,
including providing additional information as required during permit review
and any mitigation obligations that may arise during review.
B. BCNP shall be fully responsible for the canal infilling aspect of the Project,
which shall include, without limitation, (1) the installation and maintenance of
a canal plug within the Birdon or "Getaway" Canal, located adjacent to
Birdon Road, and (2) improvements to the existing canal plugs network in the
Upper Wagon Wheel Canal. BCNP will also be responsible for supplying all
pipe,rip-rap and other materials necessary to complete the work.
C. County shall be responsible for all equipment and labor necessary for the
installation of triple 24-inch, high density polyethylene (HDPE) culverts, at
five (5) locations on Upper Wagon Wheel Road, estimated to require about
three (3) months of work time, and for future maintenance of the installed
culverts. A copy of the Overview Map of the Upper Wagon Wheel Sheet
Flow Project identifying the existing and proposed culvert locations is
attached hereto as Exhibit"A."
4. BCNP and COUNTY will assign their below designated contract representatives to
coordinate going forward and to synchronize the management of their respective responsibilities
on the permitting and construction of the Project:
BCNP: COUNTY:
Tony Pernas, Chief of Resource Mgmt. Michele R. Mosca, AICP, Principal Planner
National Park Service Growth Management Department
Big Cypress National Preserve Stormwater Management Section
33100 Tamiami Trail E. 2865 S. Horseshoe Drive, Ste. 103
Ochopee, Florida 34141 Naples, FL 34104
5. No modification or change in this Agreement shall be valid or binding upon either party
unless in writing and executed by the party or parties intended to be bound by it. The parties,
however,may amend this Agreement to provide further specificity, if necessary, once the
Page 2of 6
1 6 A 15
permitting process is concluded and the plans and details regarding procurement and construction
are more fully known.
6. It is further understood and agreed, by and between the parties herein that this
Agreement is subject to appropriation by their respective agencies.
7. This Agreement shall remain in full force and effect from the date first above
written and shall terminate upon the completion of services and responsibilities outlined herein as
mutually performed by BCNP and by COUNTY to the written satisfaction each to the other.
8. This Agreement shall be governed by the laws, rules, and regulations of the State
of Florida and by such laws, rules and regulations of the United States as made applicable to
services funded by the United States government. Any suit or action brought by either party to
this Agreement against the other party relating to or arising out of this Agreement must be brought
in the appropriate federal or state courts in Collier County, Florida, which courts have sole and
exclusive jurisdiction on all such matters.
STANDARD CLAUSES
A. Civil Rights
During the performance of this Agreement, the participants agree to abide by the terms of
U,S. Department of the Interior - Civil Rights Assurance Certification, non-discrimination
and will not discriminate against any person because of race, color, religion, sex, or
national origin. The participants will take affirmative action to ensure that applicants are
employed without regard to their race, color, sexual orientation, national origin,
disabilities, religion, age, or sex.
B. Promotions
The County will not publicize, or otherwise circulate, promotional material (such as
advertisements, sales brochures,press releases,speeches, still and motion pictures,articles,
manuscripts or other publications) which states or implies Governmental, Departmental,
bureau, or Government employee endorsement of a product, service, or position which the
repository represents. No release of information relating to this Agreement may state or
imply that the Government approves of the County's work product, or considers the
Count's work product to be superior to other products or services.
C. Public Information Release
1. Public Information
(a) The County will not publicize or otherwise circulate promotional material
(such as advertisements, sales brochures, press releases, speeches, pictures,
still and motion pictures, articles, manuscripts or other publications) which
states or implies Federal Government, Departmental, bureau, or Federal
Page 3 of 6
CAC
16A15
Government employee endorsement of a product, service, or position which
the [Partner] represents. No release of information relating to this
Agreement may state or imply that the Federal Government approves of the
work product of the [Partner] or considers the [Partner's] work product to
be superior to other products or services.
(b) The County will ensure that all information submitted for publication or
other public releases of information regarding this project will carry the
following disclaimer:
"The views and conclusions contained in this document are those of the
authors and should not be interpreted as representing the opinions or
policies of the U.S. Government. Mention of trade names or commercial
products does not constitute their endorsement by the U.S. Government."
(c) The County will obtain prior NPS approval from the regional public affairs
office for any public information release that refers to the Department of the
Interior, any bureau or employee (by name or title), or to this Agreement.
The specific text, layout, photographs, etc., of the proposed release must be
submitted to the Agreement's technical representative, who will forward
such materials to the public affairs office, along with the request for
approval.
(d) The County agrees to include the above provisions of this Article in any
sub-award to any sub-recipient, except for a sub-award to a state
government, a local government, or to a federally recognized Indian tribal
government.
2. Publications of Results of Studies
No party will unilaterally publish a joint publication without consulting the other
party. This restriction does not apply to popular publication of previously published
technical matter. Publications pursuant to this Agreement may be produced
independently or in collaboration with others; however, in all cases proper credit
will be given to the efforts of those parties contributing to the publication. In the
event no agreement is reached concerning the manner of publication or
interpretation of results, either party may publish data after due notice and
submission of the proposed manuscripts to the other. In such instances, the party
publishing the data will give due credit to the cooperation but assume full
responsibility for any statements on which there is a difference of opinion.
Remainder of Page Intentionally Left Blank
Signature Page to Follow
Page 4 of 6
16A15
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
by their appropriate officials, as of the date first above written.
NATIONAL PARK VICE
BIG CYPRESS NATIONAL PRESERVE
f
By: -'"
. A_; ---)
gri IL 1 i0 C,C pit)) Chk"- iej\der.,:.. 11.4,1 4 Loc:kric.,4
Print Name and Title
First Witness: 1110
e/
Print Name: 4,_c.r/041/ I), ��VI6E�
Second Witness so ,r
' / r
Print Name:
,0
l r-' V • C b OC?''.1-.
'�t
ATTEST: BOARD OF COUNTY COMMISSIONERS
CRYSTAL K. KLNZEL, Clerk COLLIER C . FLORIDA
( )Alr
BY w aiLti.AH'''
L�f .. BY �.l.���.�. '
t
De u lerk illiam L. McDaniel,Jr.
A ttest as tot % n s Chairman
tignature only.
Approve I s ib /1 • ega ity:
Jeffrey A. .4 atz•`4,W, County Attorney
Page 5 of 6
Exhibit A 16 A 15
Overview of Existing and Proposed Culvert Locations
, ' _1;,
t ; _ ':i; '
'' Middle ppe
:,a1 *' Wagon Plate wast>;Ppef , r---1i ,,i ,u _ Wa.onPlate 1/2 mile
r ` rit-
j culvert
.>I*Ft; _j,._._ ,j j M1 , bridge
ti�f
Upper water flow
0.114 I ;• Wagon Wheel earthen
Road
c canal plug
0
North a private
Birdon m 0-+v • property
Plate • inholdings
cea,
• >_
rr.
Lower
iv
Wagonwheel
Road 1-
s
•-I-I—I I
• Google Earth
Master Upper Wagon Wheel Plate - Existing Condition
tt N
Midd a Uppe 11n
Wagon Plate • ast Ipper
. <-, ,f , "lin,. • - Won Plate ,"
i r <.. • .sio , ,, ' , b proposed
41
PI=
_proposed new'.
F" yt • ".�f" '' E f W1�e -cuivertl atipn
r+Hlaoposed ngv
Upper
clealplu§"-. ,
Wagon Wheel location
X .
Road
`o Existing
orth v j culvert
03
Birdon
"-I'o 'bridge
Plate t0
• tY water flow
outocc
educatic • > earthen
canal plug
Lower
Wagonwheel private
Road = •property
F- inholdings
I-I=I i
• Google Earth
Master Upper Wagon Wheel Plate - Proposed Condition
C