#19-7515 C.O. #1 (Stahlman - England) Procurement Services C.Oler County Change Order Form ®Contract Modification 0 Work Order Modification ❑Amendment Contract#:I 19-7515 l Change#: 1 Purchase Order#:r4500195622 Project#: NA Contractor/Firm Name: Stahlman-England Irrigation Inc Contract/Project: Vanderbilt Beach Irrigation Manager Name: Harry Sells PTNE Project 9 Division Name: Original Contract/Work Order Amount $ 94,773 00 4/9/19 16D6 Original BCC Approval Date: Agenda Item# Current BCC Approved Amount $ 94,773.00 4/9/19 16D6 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 94,773.00 11/27/2019 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 11,995.00 12.66% Total Change from Original Amount Revised Contract/Work Order Total $ 106,768.00 12.66% Change from Current BCC Approved Amount Cumulative Changes $ 11,995.00 12.66% Change from Current Amount LCompletion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed[L 6/10/2019— I Original 12/7/2019 Last Approved I 12/7/2019 I Revised Date 12/7/2019 Date Completion Date Date (Includes this change) #of Days Added 0 Select Tasks ®Add new task(s) ❑ Delete task(s) ®Change task(s) 0 Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this cha.ige is not processed. Attach additional information from the Design Professional and/or Contractor if needed I. This Change Order request is to add/modify four items totaling$11,995.00 to the contract to cover items discovered during construction and as the result of other construction in the area. 2. This contract was based on original as-built drawings which proved to be inaccurate. leaving a gap in the proposed control network. . . If the needed changes are not granted,there %ill he gaps in the proposed irrigation and control network, preventing completion of the project. Modifications to Contract Bid Tab- Basis of Compensation Item 12A New Item add 2-3" Gate Valves Labor only $1500 each $3000.00 Item 4 Add one zone valve location Loc #15 $1450.00 each $1450.00 Item 5 Add remove section of sidewalk-4 sections at$1,800 each- includes all removal and restoration $7200.00 Item 6 Add one zone valve $ 345.00 Net Contract Change 511,995.00 (008 Revised. 10/28/2014 (Divisions who may require additional signatures may include on separate sheet) PROCUREMENT USE ONLY Admin Rpt BCC ES . Le‘.--- Prepared by Harry Sells. TU Project Manager for Golden Gate Beautification MSI U Dale:June 18,2019 Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above as fully as if the same were slated in this acceptance. The adjustment,if any to the Contract shall co titute a full and al settlement of any and all claims of the Contractor I Vendor/Consultant! Design Professional arising out of or rel to orth herein,including claims for impact and delay costs Accepted by. _ Date /�� - 2D �9 (Mark Stahlman,Stahlman-England�Irrig�ation Inc.) �) Approved by / , L.--------. t•.'-- i Date: b-/2-I/ - (Michelle Arnold,Director PINE 6iision SchneebergerSara Digitally signed by schneebergersara Approved by Date:2019.07.0212:49:07 04'00' Date: (Procurement Professional) I I ,�,n, a 4:''^. BOARD OF • _ •- • •MMISSIONERS •,y,+.-:, , K•KW , LERK CO LI ' • ,'FLOR ,A 1 1 By: C 11111"4. G fa., -. - Ito $1�C;h IS W,/ iam L. McDaniel, Jr., Chairman S �y lfibnty. - App •ve.idli absentia p&iL.' o ti•' 2000-149 on July 2 ;% : 90 f . E • pprov as t. i d legality y' ,� Leo E. Ochs, Jr., County ana:er A ,.. '• •;'uty County Attorney - CAt) Revised. 10/28/2014 (Divisions void may require additional signatures may include ori separate sheet 1 PROCUREMENT USE ONLY Admin Rp BCC ES Olp WESTAHLMAN - ENGLAND www.stahlman-england.com Irrigation, Inc. PROPOSAL 2063 TRADE CENTER WAY FL State License 50422 www.rmr4>Laa,n NAPLES FL.34109 SCC131151703 Yaw imlPlI-.Ea m" TEL:239-514-1200.FAX:239-514-1191 Site Details 6/17/2019 COLLIER COUNTY GOVERNMENT JOB NAME:VANDERBILT DRIVE IRRIGATION ROGER MULLER PROJECT 3301 E TAMIAMI TRAIL JOB ADDRESS;WEST SIDE OF ROAD FROM VANDERBILT BEACH RD. TO BLUEBILL AVE. NAPLES FL 34112 LABOR ONLY PARTS SUPPLIED BY FIS Phone 774-8494 Fax 774-5375 CHANGE ORDER#1 Manufacturer Quantity Description JOB SPECS: INSTALL THE FOLLOWING 2 BID TAB 24 ADD 2-3"GATE VALVES LABOR ONLY $1500.00 EA $3000.00 1 BID TAB#4 1 ADDED VALVE LOCATION#15 $1450.00 1 BID TAB#5 REMOVE 4 SECTIONS OF SIDEWALK WILLETT NORTH TO VANDERBUILT BEACH ROAD$1800.00 EA TOTAL $7200.00 1 BID TAB#6 1 ADDED ZONE VALVE #15 $345.00 TOTAL CIO #1 $11,995.00 C ADDITIONAL NOTES:Proposal is Void if not accepted within 60 days or installed within 12 months of date on proposal. We are not responsible to locate private utilities and are not responsible to repair damaged private utilities that are not properly marked. Final grade by others. (72)hours are required after acceptance for cable locates. Sleeves must be installed prior to all impervious areas. Additional cost required if existing sleeves buried bellow depth of 30". All required electric to equipment not included. Payment due within 30 days from invoice date.Additional cost required if"rock"found during excavation. Damages by others are not apart of this contract and may void warranty if not re.aired b Stahlman-En.land. To schedule the above work,this Proposal must be signed&returned to our office. TOTAL $11,995.00 Customer Date Stahlman-England Irrigation