Loading...
Forest Lakes MSTU Agenda 09/03/2019 September 3, 2019 Forest Lakes MSTU 1/1 AGENDA SEPTEMBER 3, 2019 I. CALL TO O RDER II. A TTENDANCE Advisory Committee: Marianne Fanning – Chair (4/21/2022) Barbara Bell – Vice Chair (4/21/2023) Richard Barry (4/21/2022) George E. Fogg (4/21/2020) John Goody (4/21/2023) Staff: Michelle Arnold – Director Dan Schumacher – Project Manager Contractors: Aaron Gross – Ground Zero Landscaping Wendy Warren – Premier Staffing (Transcription) II. APPROVAL OF A GENDA III. APPROVAL OF M INUTES – A UGUST 6, 2019 IV. CONTRACTOR R EPORTS A. Ground Zero Landscaping – Aaron Gross V. P ROJECT M ANAGERS R EPORT A. MSTU By-Laws. B. BUDGET REPORT. C. Status Report: 1. Trees. 2. Roadway Signage. 3. Stormwater – Staff Gauges. 4. Light Pole re-numbering. 5. Replacement light pole – Woodshire Ln. 6. Code Enforcement. D. Procurement: 1. RFQ – Wire Fence Repair. VI. N EW B USINESS VII. O NGOING B USINESS VIII. P UBLIC C OMMENTS IX. ADJOURNMENT NEXT M EETING O CTOBER 1, 2019 - 10:00 AM F OREST L AKES C ONDO ASSOCIATION C LUBHOUSE 1058 F OREST LAKES D RIVE, N APLES, FL 34112 (239) 261-5497 FOREST LAKES ROADWAY AND DRAINAGE M.S.T.U. ADVISORY COMMITTEE 3299 East Tamiami Trail - Suite 103, Naples, FL 34112 MINUTES August 6, 2019 Forest Lakes MSTU 1/5 FOREST LAKES ROADWAY AND DRAINAGE M.S.T.U. ADVISORY COMMITTEE 3299 East Tamiami Trail - Suite 103, Naples, FL 34112 MINUTES AUGUST 6, 2019 I. CALL TO ORDER Chair Fanning called the meeting to order at 10:00 A.M. A quorum was established. II. ATTENDANCE Advisory Committee Marianne Fanning – Chair Barbara Bell – Vice Chair Richard Barry George Fogg John Goody Staff Michelle Arnold – Director (Excused) Dan Schumacher - Project Manager Contractors Aaron Gross - Ground Zero Landscaping Wendy Warren – Premier Staffing Community Attendees Rick Korb – Quail Run GC III. APPROVAL OF AGENDA Mr. Fogg moved to approve the Agenda for the Forest Lakes Roadway and Drainage M.S.T.U. as presented. Second by Mr. Goody. Carried unanimously 5 - 0. IV. APPROVAL OF MINUTES – JULY 2, 2019 Mr. Barry moved to approve the minutes of the July 2, 2019 Forest Lakes Advisory Committee as presented. Second by Mr. Fogg. Carried unanimously 4 - 0. V. CONTRACTORS REPORTS A. Ground Zero Landscape Maintenance – Aaron Gross Mr. Gross reported on landscape maintenance as follows:  Entry island Bougainvilleas were hand pruned to strengthen and thicken the trunks. Weeping style will be implemented in fall 2019.   The Potato Vine by the fence has been removed. The area will continue to be sprayed and vine pruned to eliminate growth.  Mr. Korb will request Mr. Burnham secure a quote and present it to the Quail Run Golf Club Board, for removal of the distressed tree in the area of the maintenance building.  Mr. Schumacher offered to visit the area to confirm scope of work required with Mr. Korb. VI. PROJECT MANAGERS REPORT A. MSTU Bylaws Mr. Schumacher emailed members verbiage revisions highlighted in red to The Forest Lakes Roadway & Drainage Municipal Service Taxing Unit (MSTU) Advisory Committee bylaws. MINUTES August 6, 2019 Forest Lakes MSTU 2/5 During Committee discussion members recommended additional revisions to the current bylaws. Mr. Schumacher will provide a final copy of the bylaws to the Committee for signature execution at the September 2019 meeting. B.     Budget Report Mr. Schumacher presented the “Forest Lakes MSTU Fund 159, August 6, 2019” for FY19 noting:  FY19 Ad Valorem property tax revenue budget is $278,900.00, an increase of 6.18%.  Total revenue FY19 is $444,027.00 including investment interest, transfers and contributions (minus a 5% reserve of $14,000).  Operating Expense Budget is $178,027.00 of which $42,973.27 is committed; $85,702.15 expended.  Unencumbered Operating Expense funds available are $49,351.58.  A Purchase Order for Lykins Signtek in the amount of $5,848.00 is reflected in the Capital Outlay budget, Line 35. Capital Outlay budget remainder is $144,252.00.  Reserves of $23,100.00, line 42, are adequate.  Budget funds not expended in 2019 will “roll-over” to the FY-20 budget.  Upon termination of the bond payments in 2022, capital maintenance projects such as drainage, sidewalks and street paving will be considered.  Total available balance for FY-19 is $218,799.82.  The Forest Lakes MSTU FY-20 budget is finalized. Mr. Schumacher will submit Purchase Order requests for FY-20 in September. C. Status Report  1. Trees  Many of the residents Mr. Schumacher contacted to solicit agreement to the Sidewalk Tree Project Replacement Plan, expressed a preference to forego new trees in the Right of Way (ROW) abutting their property. Six (6) Crepe Myrtle and two (2) Queen Crepes will be planted within the next two weeks. Mr. Schumacher will re-contact residents who declined trees when the new trees are planted to provide them an opportunity to reconsider their decision. Homeowners on the cul-de-sacs were previously notified in writing by the M.S.T.U. regarding their responsibly to maintain trees in the ROW (exclusive of branches over hanging the sidewalk for which the M.S.T.U. assumes responsibility). It was noted that Ground Zero’s Landscape contract does not include structural pruning of M.S.T.U. trees along the Forest Lakes Blvd. sidewalk but does include fertilization. Mr. Goody motioned to approve homeowners’ option to accept or decline replacement MSTU sidewalk trees in the Right of Way adjoining their land for trees damaged in Hurricane Irma. Second by Ms. Bell. The motion passed with 4 votes in favor and 1 against. Mr. Fogg opposed.   2. Roadway Signage        The list for street name and traffic signs identified for replacement is complete. Golf Cart crossing signs are included. Cross Walk signs will be replaced as necessary. MINUTES August 6, 2019 Forest Lakes MSTU 3/5 A “Do Not Enter” sign will be added to the program for placement on Forest Lakes Boulevard, south end of the Pine Ridge Road inbound entrance median. The Committee motioned on June 6, 2019 to approve a 25-mph speed limit on roadways and 15- mph yellow advisory signs on curves. The Traffic Operations Department drove the roads and concurred with the Committees recommendation. No responses were received for a Request for Quote (RFQ) for sign replacement and installation, advertised twice on BidSync, the County’s internet-based quote solicitation system. Lykins Signtek’s quote in the amount of $17,595.00, received post deadline, is under review by the Procurement Division. The project will be funded by the Capital Improvements budget category. Mr. Fogg motioned to approve up to twenty-thousand dollars ($20,000.00) for roadway and community signage. Second by Ms. Bell. Carried unanimously 5 – 0. 3. Stormwater – Staff Gauges Three Staff Gauges to measure water level and flow in the lakes were purchased. Two gauges will be installed at the entry and exit sides of Lake 5. An additional gauge was installed at the weir. Data collection will assist the County and Agnoli, Barber and Brundage in determining weir water levels at the southwest corner compared with recommended levels. A survey, based on a global reference point, will be ordered to establish a common reference with the Golden Gate Canal Study. Mr. Schumacher emailed a portion of Agnoli, Barber and Brundage’s (ABB) Gorden River Watershed Study to Advisory Committee members. 4. Light Pole Re-Numbering Light pole renumbering on the north side of Forest Lakes Boulevard to eliminate numeric duplication, including letter designation on the entry way pole, and provide ease of identification, is complete. Rainy conditions precluded painting over the old numbers. Ms. Rosio Garcia will update the map to reflect the current pole numbers and integrate the data into the Cartegraph Asset Tracking and Work Maintenance Inventory System. Mr. Schumacher will check light pole #156 to determine if numbers are missing as reported by a Committee member. 5. Replacement Light Pole – Woodshire Lane On receipt of the fixture, pole installation will be scheduled. 6. Code Enforcement Staff responded to a call received from Code Enforcement requesting maintenance be performed in the vicinity of Control Enclosures on the west side of Forest Lakes Boulevard (as you enter inbound from Pine Ridge Road). Mr. Schumacher advised that the M.S.T.U. is not MINUTES August 6, 2019 Forest Lakes MSTU 4/5 responsible for landscape maintenance in this area and suggested FPL or Traffic Operations Division be contacted. D. Procurement 1. RFQ – Wire Fence Repair Mr. Schumacher will issue a Request for Quote (RFQ) to repair two retaining wall Cable fences on Lakes 2 and 7 in the next few weeks. VII. NEW BUSINESS Water Leak An irrigation leak was reported in the vicinity of Emerald Greens Condominiums and Woodshire Lane. Mr. Schumacher noted the M.S.T.U. is not responsible for irrigation maintenance in that location. Australian Pine Tree Trimming on Pine Ridge The trees, owned by the Quail Run Golf Club, are due for trimming in August 2020. Prior communication from the Transportation Department cited height interference with light poles, hazardous debris and impediment to traffic necessitates scheduled maintenance every three (3) years. Mr. Barry recommended the tree trimming expense be considered a Capital Maintenance Project, funded by the Forest Lakes M.S.T.U. Capital Improvements Budget category, on termination of the Bond payments in 2022. Mr. Schumacher noted a project study can be initiated as the M.S.T.U. bond retirement date nears. The County Attorney’s office would then be consulted. VIII. ON GOING BUSINESS In response to Lowell Hayes’ request for the M.S.T.U. provide drainage relief for water accumulation adjacent to her condominium during storm events, Mr. Barry noted the M.S.T.U. created a drainage swale in the area years ago. Mr. Schumacher and Mr. Barry will review the situation and evaluate the entity responsible for drainage maintenance in the area described. IX. PUBLIC COMMENTS None. X. ADJOURNMENT There being no further business to come before the Committee, the meeting was adjourned by the Chair at 11:45 P.M. NEXT MEETING: SEPTEMBER 3, 2019 - 10:00 A.M. FOREST LAKES CONDO ASSOCIATION CLUBHOUSE 1058 FOREST LAKES DRIVE, NAPLES, FL 34105 (239) 261-5497 MINUTES August 6, 2019 Forest Lakes MSTU 5/5 FOREST LAKES ROADWAY AND DRAINAGE MSTU ADVISORY COMMITTEE ________________________________ Marianne Fanning, Chair The Minutes were approved by the Committee on , as presented ____, or as amended _______. FOREST LAKES MSTU FUND 159 September 3, 2019 FY-19 Vendor Item PO# Budget Commitments Expenditures Budget Remainder 1 CUR AD VALOREM TAX (278,900.00)$ -$ (263,015.86)$ (15,884.14)$ 2 DEL AD VALOREM -$ -$ -$ -$ 3 OVERNIGHT INTEREST -$ -$ (1,587.15)$ 1,587.15$ 4 INVESTMENT INTEREST -$ -$ (5,104.79)$ 5,104.79$ 5 INTEREST TAX COLLECTOR -$ -$ (137.00)$ 137.00$ 6 REVENUE STRUCTURE (278,900.00)$ -$ (269,844.80)$ (9,055.20)$ 7 CARRY FORWARD GEN (154,200.00)$ -$ (154,200.00)$ 8 CARRY FORWARD OF ENCUMB AMT (24,927.00)$ -$ (24,927.00)$ 9 TRANSFER FROM TAX COLLECTOR -$ -$ 10 NEG 5% EST REV 14,000.00$ -$ 14,000.00$ 11 TRANSFERS & CONTRIB (165,127.00)$ -$ -$ (165,127.00)$ 12 TOTAL REVENUE (444,027.00)$ -$ (269,844.80)$ (174,182.20)$ 13 ENGINEERING FEES 10,000.00$ -$ -$ 10,000.00$ 14 ENGINEERING FEES OTHER 8,000.00$ -$ -$ 8,000.00$ 15 INDIRECT COST REIMBURS Collier County Direct Pay 5,000.00$ -$ 5,000.00$ -$ 16 INTERDEPT. PAYMENT Collier County Direct Pay 500.00$ -$ -$ 500.00$ Ground Zero Landscape Incidentals - FY19 4500191318 2,362.20$ 7,637.80$ Ground Zero Landscape Incidentals - FY18 4500184455 ` 17 LANDSCAPE INCIDENTALS 12,688.00$ 2,362.20$ 7,637.80$ 2,688.00$ Ground Zero Grounds & Swales Maint - FY19 4500191318 16,210.00$ 38,790.00$ Mettauer Routine Lakes Maint - FY19 4500190382 -$ 2,625.00$ 3,675.00$ Florida Fountains Lake Fountain Maint. 4500193704 258.00$ 129.00$ Harts Electrical Replacement Light Poles 4500194954 383.60$ 12,556.40$ Ground Zero Grounds Maint - FY18 4500184455 -$ 1,913.00$ Ground Zero Swales Maint - FY18 4500183632 -$ 1,872.00$ 18 OTHER CONTRACTUAL 99,677.00$ 19,476.60$ 58,935.40$ 21,265.00$ 19 OTHER CONTRACTUAL Century Fence Co. Repairs for fence 450095232 10,000.00$ -$ 8,565.00$ 1,435.00$ 20 ELECTRICITY FP&L Electricity Direct Pay 15,000.00$ 3,178.63$ 10,021.37$ 1,800.00$ 21 WATER AND SEWER City of Naples Reclaimed Water Direct Pay 2,500.00$ 468.33$ 1,031.67$ 1,000.00$ 22 RENT EQUIPMENT JM Todd Copier/Printer Lease (shared) 4500191080 300.00$ -$ 266.12$ 33.88$ 23 INSURANCE GENERAL Collier County Insurance Direct Pay 300.00$ 75.00$ 225.00$ -$ 24 SPRINKLER SYSTEM MAIN FIS Irrigation Parts 4500189928 1,500.00$ 320.39$ 179.61$ 1,000.00$ 25 MULCH Forestry Resources Mulch 4500191049 1,000.00$ 1,000.00$ -$ -$ 26 LIGHTING MAINTENANCE Harts Electric Light Pole Relamps 4500192777 5,562.00$ 1,271.48$ 3,728.52$ 562.00$ Juristaff, Inc. Transcriptionist 4500182118 -$ -$ 436.57$ Premier Staffing Transcriptionist 4500189934 -$ 889.81$ 2,110.19$ 27 OTHER MISCELLANEOUS 3,500.00$ 889.81$ 2,546.76$ 63.43$ LICENSE & PERMITS Cartegraph Licensing & Supplies software liscensing 4500197283 464.00$ (464.00)$ 28 OFFICE SUPPLIES Staples Advantage Office Supplies 4500190280 300.00$ 163.46$ 36.54$ 100.00$ 29 COPYING CHARGES JM Todd Monthly CPC (shared) 4500191081 300.00$ 103.49$ 196.51$ -$ SiteOne Landscape Fertilizer 4500191419 -$ 300.00$ -$ Florikan Fertilizer 4500189762 -$ -$ 382.50$ 30 FERT HERB CHEM 1,500.00$ 300.00$ 382.50$ 817.50$ Golden Gate Trophy Name Plates for Committee VISA 243.00$ Sunshine Ace Light Pole Numbers VISA 70.23$ 31 OTHER OPERATING SUPPLIES 200.00$ -$ 313.23$ (113.23)$ 32 OTHER TRAINING 200.00$ -$ -$ 200.00$ 33 OPERATING EXPENSE 178,027.00$ 29,609.39$ 99,530.03$ 48,887.58$ Lykins Signtek Roadway Signage 4500197353 17,595.00$ 34 IMPROVEMENTS GENERAL Lykins Signtek Street & Traffic Signs 4500196430 150,100.00$ 5,848.00$ -$ 35 CAPITAL OUTLAY 150,100.00$ 23,443.00$ -$ 126,657.00$ 36 TRANS TO 111 UNINCOR 57,900.00$ -$ 57,300.00$ 600.00$ 37 TRANS TO 112 UNINCOR 25,400.00$ -$ 25,400.00$ -$ 38 TRANSFERS 83,300.00$ -$ 82,700.00$ 600.00$ 39 Budget Trans from Appraiser 2,500.00$ -$ 2,092.78$ 407.22$ 40 Budget Trans from Tax Collector 7,000.00$ -$ 5,910.98$ 1,089.02$ 41 TRANSFERS CONST 9,500.00$ -$ 8,003.76$ 1,496.24$ 42 RESERVES FOR FUTURE CONST 23,100.00$ -$ -$ 23,100.00$ 43 RESERVES 23,100.00$ -$ -$ 23,100.00$ 44 TOTAL EXPENDITURES 444,027.00$ 53,052.39$ 190,233.79$ 200,740.82$ 176,394,909 FY-10 Final Taxable Value 145,888,273 FY-11 Final Taxable Value 132,933,552 FY-12 Final Taxable Value 129,715,669 FY-13 Oct Taxable Value 129,977,881 FY-14 Oct Taxable Value 140,171,072 FY-15 Oct Taxable Value 152,711,783 FY-16 Oct Taxable Value 165,722,702 FY-17 Oct Taxable Value 190,428,196 FY-18 Oct Taxable Value 202,132,375 FY-19 Oct Taxable Value 210,499,015 FY-20 July Estimate Taxable Value 4.14% Adj. FY-19 to FY-20 Operating Budget Summary Millage Summary FY 20 FY 19 Debt Service Operations Total Millage: 1.4052 1.3793 2.5948 1.4052 4.0000 Revenue: $295,793 $278,801 $546,200 $295,800 $842,000 Property Tax Summary FY-20 July Estimate Taxable Value 210,499,015 FOREST LAKES MSTU Forest Lakes MSTU 7/23/2019 Tree Forest Lakes Blvd Light 2018 Plan July 2019 X  Tree July 2019 Number Between …Pole #Species Species Missing Camelia Ln 105 ST‐1 1 Bottle Brush Bottle Brush X 2 Bottle Brush Bottle Brush X City of Naples Lift Station 3 Bottle Brush Bottle Brush X 106 4 Bottle Brush Bottle Brush X 5 Bridal Veil Bridal Veil X 1713 Forest Lakes Blv Jeffery & Julia Carroll DRIVEWAY 107 6 Bottle Brush Crape Myrtle X 7 Bottle Brush Bottle Brush X 108 1711 Daisy Ln Michael & Oleksandra Bell Daisy Ln 1701 Daisy Ln Kevin & Anette Gray 109 Non‐MSTU Non‐MSTU ‐none‐ 110 Hedges Hedges 111 Tree Forest Lakes Blvd Light 2018 Plan July 2019 X  Tree July 2019 1627 Eucalyptus Ln Lisa Vinciguerra Eucalyptus Ln 1621 Eucalyptus Ln Pamela Lynn Collett              Card, 7/23 Dana Lettieri, 216‐0660 112 ST‐1 8 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 1 9 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 1 10 Bridal Veil Bridal Veil 113 11 Bridal Veil Hong Kong Orchid X 1 12 Pink Velour Crape Myrtle Hong Kong Orchid X 1 13 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 0 114 1619 Fig Ln Rexford & Kathleen Kennedy NO THANKS. Fig Ln 1613 Fig Ln Robert & Deborah Deppisch 115 ST‐3 14 Muskogee Crape Myrtle Muskogee Crape Myrtle 15 Muskogee Crape Myrtle Muskogee Crape Myrtle 16 Muskogee Crape Myrtle Muskogee Crape Myrtle 116 17 Bridal Veil Bridal Veil X DRIVEWAY 1611 Forest Lakes Blv Pescetto Family Trust 18 Floss Silk Floss Silk 117 19 Muskogee Crape Myrtle Muskogee Crape Myrtle 20 Muskogee Crape Myrtle Muskogee Crape Myrtle 21 Bridal Veil Bridal Veil X 118 Gardenia Ln 1601 Gardenia Ln Andre & Marie Mailloux 800 W. San Martin Ave, SM, CA 95046 Feb 5, 2019 Sidewalk Trees 1/6 FOREST LAKES MSTU 119 ST‐4 22 Bottle Brush ‐ R Bottle Brush ‐ R 23 Bottle Brush ‐ R Bottle Brush ‐ R 24 Royal Poinciana Royal Poinciana 120 DRIVEWAY 25 Royal Poinciana Royal Poinciana 26 Queen Crape Myrtle Queen Crape Myrtle 121 27 Queen Crape Myrtle Queen Crape Myrtle Storm Drain & non‐MSTU Trees  122 28 Queen Crape Myrtle Queen Crape Myrtle 29 Queen Crape Myrtle Queen Crape Myrtle 123 Tree Forest Lakes Blvd Light 2018 Plan July 2019 X  Tree July 2019 Number Between …Pole #Species Species Missing 30 Queen Crape Myrtle Queen Crape Myrtle 1529 Forest Lakes Blv Celeste Elser DRIVEWAY 124 Happolo Ln 1521 Happolo Ln Susan Handrahan 125 ST‐5 31 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 32 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 126 FPL Lightpole Power Meter 33 Pink Velour Crape Myrtle Queen Crape Myrtle X 2 127 Natchez Crape Myrtle 1519 Ivy Gate Ln Rona Miranda House Empty ‐ default YES Ivy Gate Ln 1511 Ivy Gate Ln Monzur & Farhana Rahman 128 St‐6 34 Natchez Crape Myrtle Natchez Crape Myrtle X 35 Natchez Crape Myrtle Natchez Crape Myrtle X 36 Shady Lady Shady Lady X 129 37 Ex. Silk Floss ‐ R Ex. Silk Floss ‐ R 38 Natchez Crape Myrtle Natchez Crape Myrtle X 130 39 Natchez Crape Myrtle ‐ R Natchez Crape Myrtle ‐ R 1509 Jimpson Ln Sebahat & Geraldine Malo Jimpson Ln 1501 Jimpson Ln Ronald & Diana Miller 2250 Derringer Ave, Villages, 32162 131 ST‐7 40 Bottle Brush Bottle Brush X 41 Bottle Brush Bottle Brush X 42 Yellow Poinciana Yellow Poinciana X 132 43 Yellow Poinciana ‐ R Yellow Poinciana ‐ R 44 Bottle Brush ‐ R Bottle Brush ‐ R 45 Bottle Brush ‐ R Bottle Brush ‐ R 133 1429 Kelp Ln Luz Mary Ramirez Kelp Ln 1421 Kelp Ln Randall Woolf & Cynthia Mejia Feb 5, 2019 Sidewalk Trees 2/6 FOREST LAKES MSTU 134 ST‐8 46 Muskogee Crape Myrtle Muskogee Crape Myrtle 47 Muskogee Crape Myrtle Muskogee Crape Myrtle 48 Seagrape Tree Seagrape Tree X 135 49 Seagrape Tree Muskogee Crape Myrtle X 1 50 Muskogee Crape Myrtle Muskogee Crape Myrtle 51 Muskogee Crape Myrtle Muskogee Crape Myrtle 136 1419 Lyonia Ln Dora Ortiz                                  Card, 7/23 YES. Lyonia Ln 1411 Lyonia Ln Michelle Perry                       Card, 7/23 137 ST‐9 52 Pink Velour Crape Myrtle Queen Crape Myrtle X 1 53 Pink Velour Crape Myrtle Queen Crape Myrtle X 1 54 Pink Velour Crape Myrtle Pink Velour Crape Myrtle 138 Resident's four (4) trees 139 1409 Milkwort Ln Humberto Delacruz Milkwort Ln 1401 Milkwort Ln Debra Velovitch 140 ST‐10 55 Queen Crape Myrtle Queen Crape Myrtle X 56 Queen Crape Myrtle Queen Crape Myrtle X 57 Queen Crape Myrtle Queen Crape Myrtle X 58 Golden Rain Tree Golden Rain Tree X 141 59 Golden Rain Tree ‐ R Golden Rain Tree ‐ R Tree Forest Lakes Blvd Light 2018 Plan July 2019 X  Tree July 2019 Number Between …Pole #Species Species Missing 60 Queen Crape Myrtle ‐ R Queen Crape Myrtle ‐ R 61 Queen Crape Myrtle ‐ R Queen Crape Myrtle ‐ R 142 1331 Narita Ln Petraq & Ilda Konakciu Narita Ln 1323 Narita Ln Natalia & Victor Sirghii 143 ST‐11 62 Bridal Veil Bridal Veil X DRIVEWAY 63 Jacaranda Jacaranda X 144 64 Natchez Crape Myrtle ‐ R Natchez Crape Myrtle ‐ R 65 Natchez Crape Myrtle ‐ R Natchez Crape Myrtle ‐ R 66 Natchez Crape Myrtle ‐ R Natchez Crape Myrtle ‐ R 145 1321 Opuntia Ln Robert Murphy PO Box 88, Oak Bluffs, MA, 02557 Opuntia Ln 1311 Opuntia Ln Beverly Depiero 146 ST‐12 67 Bottle Brush Bottle Brush X 68 Bottle Brush Bottle Brush X 69 Muskogee Crape Myrtle Muskogee Crape Myrtle 147 70 Muskogee Crape Myrtle Muskogee Crape Myrtle 71 Muskogee Crape Myrtle Muskogee Crape Myrtle X 72 Muskogee Crape Myrtle (Pink?)X 1 Feb 5, 2019 Sidewalk Trees 3/6 FOREST LAKES MSTU 73 Bottle Brush Bottle Brush X 148 1309 Pixiemoss Ln Sylvia Walker   Spoke to her, wants it.Remove Stump, fill hole. Pixiemoss Ln Tree in between. 1301 Pixiemoss Ln Mark Swanson 149 ST‐13 74 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 75 Pink Velour Crape Myrtle Pink Velour Crape Myrtle 150 76 Pink Velour Crape Myrtle Pink Velour Crape Myrtle X 77 Pink Velour Crape Myrtle ‐ R Pink Velour Crape Myrtle ‐ R 151 78 Shady Lady Shady Lady X 79 Natchez Crape Myrtle Natchez Crape Myrtle X 79 Natchez Crape Myrtle Natchez Crape Myrtle 152 80 Natchez Crape Myrtle Natchez Crape Myrtle X 81 Shady Lady Shady Lady X 82 Shady Lady Shady Lady X 153 Lake #5 Twin Culverts 84 Golden Rain Tree Golden Rain Tree St‐14 1301 Forest Lakes Blv Frances Lopus 122 Moorings Pk Dr, Apt G601, 34105 154 85 Golden Rain Tree Golden Rain Tree 86 Golden Rain Tree Golden Rain Tree 87 Golden Rain Tree Golden Rain Tree X 155 88 Queen Crape Myrtle Queen Crape Myrtle 89 Queen Crape Myrtle Queen Crape Myrtle 90 ‐ none ‐ ‐ none ‐ 156 91 Bridal Veil Bridal Veil X 1229 Forest Lakes Blv Michael & Terese Naretta DRIVEWAY 157 92 Bridal Veil Queen Crape Myrtle X 1 93 Queen Crape Myrtle Pink Velour Crape Myrtle 94 Ex. Queen Crape Myrtle Ex. Queen Crape Myrtle 158 1227 Rosepetal Ln Kraig Abraham Shuttered for Summer Rosepetal Ln 1221 Rosepetal Ln Christopher Bentley Tree Forest Lakes Blvd Light 2018 Plan July 2019 X  Tree July 2019 Number Between …Pole #Species Species Missing 159 ST‐15 95 Bottle Brush ‐ R Bottle Brush ‐ R 96 Bottle Brush ‐ R Bottle Brush ‐ R 97 Yellow Poinciana ‐ R Yellow Poinciana ‐ R 160 98 Bottle Brush ‐ R Bottle Brush ‐ R 99 Bottle Brush ‐ R Bottle Brush ‐ R 161 1219 Salvia Ln Robert & Cathy Samouce Salvia Ln 1211 Salvia Ln Gail Collins NO THANKS 162 ST‐16 Feb 5, 2019 Sidewalk Trees 4/6 FOREST LAKES MSTU 100 Bottle Brush Bottle Brush X 1 101 Bottle Brush Golden Rain Tree X 1 102 Golden Rain Tree Bottle Brush X 1 non‐MSTU Power Meter 163 103 Golden Rain Tree Golden Rain Tree X 104 Bottle Brush Bottle Brush X 105 Bottle Brush Bottle Brush X 164 1209 Tuppence Ln Eugene & Rachel Cherynsh Tuppence Ln 1201 Tuppence Ln Eugene & Donna Venditto 165 ST‐17 106 Natchez Crape Myrtle Natchez Crape Myrtle 107 Ex. White Geiger Ex. White Geiger 108 Ex. Golden Shower Tree Ex. Golden Shower Tree 166 109 Ex. Golden Shower Tree Ex. Golden Shower Tree 110 Ex. White Geiger Ex. White Geiger 111 Natchez Crape Myrtle ‐R Natchez Crape Myrtle ‐R 167 1125 Unica Ln Janet Gray Unica Ln 1119 Unica Ln Michelle & David Rowland 168 ST‐18 112 Muskogee Crape Myrtle Muskogee Crape Myrtle 113 Muskogee Crape Myrtle Muskogee Crape Myrtle 114 Muskogee Crape Myrtle Muskogee Crape Myrtle 169 115 Seagrape Tree ‐ R Seagrape Tree ‐ R 116 Muskogee Crape Myrtle Muskogee Crape Myrtle 117 Muskogee Crape Myrtle Muskogee Crape Myrtle 1117 Vinca Ln Marie Vickaryous 8025 Vera Cruz Way, 34109 Vinca Ln 1111 Vinca Ln Silvia & Melvin Salguero 171 ST‐19 118 Bottle Brush Bottle Brush X 170 119 Bottle Brush Bottle Brush X 120 Royal Poinciana Royal Poinciana 172 121 Royal Poinciana Royal Poinciana 122 Bottle Brush Bottle Brush X 123 Bottle Brush Bottle Brush X 173 Wisteria  Ln 1109 Wisteria  Ln Dynasty Properties LLC, Suite 1210 1314 E. Las Olas Blvd, Ft Laud, 33301 Wisteria  Ln 1101 Wisteria  Ln Danny & Debra Edmonds  C,         7/23 174 ST‐19 124 Natchez Crape Myrtle Natchez Crape Myrtle X 1 125 Natchez Crape Myrtle Hong Kong Orchid X 1 126 Natchez Crape Myrtle Natchez Crape Myrtle X 1 175 127 Shady Lady Natchez Queen Crape Myrtle X 1 128 Hong Kong Orchid Hong Kong Orchid 129 Queen Crape Myrtle ‐ R Queen Crape Myrtle ‐ R Tree Forest Lakes Blvd Light 2018 Plan July 2019 X  Tree July 2019 Feb 5, 2019 Sidewalk Trees 5/6 FOREST LAKES MSTU Number Between …Pole #Species Species Missing 176 130 Orange Geiger Orange Geiger 1098 Woodshire Ln Fairways @ Emerald Greens Unit H (6 Apts) DRIVEWAY ‐ END TOTAL 8 Feb 5, 2019 Sidewalk Trees 6/6