Agenda 03/11/2008 Item #16B 5 Agenda Item No. 1685 March 11, 2008 Page 1 of 11 EXECUTIVE SUMMARY Recommendation to approve a change order to Kraft Construction Company, Inc. to move savings in the amount of $590,560 as a result of value engineering to allowance line items amending contract #07-4173 Gordon River Water Quality Park (Freedom Park) Project No. 51018. OBJECTIVE: To revise existing contract #07-4173 by change order to assist the Transportation Services Division, Stonnwater Management Department in the construction of the Freedom Park (aka Gordon River Water Quality Park) for enhanced benefits to the public, CONSIDERATIONS: The Gordon River Water Quality Park (Freedom Park) construction contract was awarded to Kraft Construction Company, Inc. on September 26, 2007. A value engineering study was conducted on the $9,852,655 project in October 2007 by Robinson, Stafford and Rude, Inc. The final results adopted by the County included a cost savings of $590,560, The major cost saving measures include material substitution for boardwalk pilings, realigning the boardwalk to reduce the amount of wood vs. asphalt, reduce plant sizes for landscaping, eliminating covered entrance and eliminating a bridge access to the adjacent property. The value engineering ideas that the County is adopting do not change the project schedule, however it adds value to the project and reduces costs. In order to maximize the value engineering cost savings, a change order is required to identify the allocation of the realized cost savings to specific allowance line items, including the following: civil, landscaping, architectural, structural and site development. FISCAL IMPACT: A contract in the amount of $9,852,655 is in place with Kraft Construction Company, Inc. A savings in the amount of $590,560 is available in the encumbered purchase order, Gordon River Water Quality Park Project (Freedom Park) (Project No. 510185). The source of funding is a grant from Florida Communities Trust, South Florida Water Management District and ad valorem taxes. The value engineering money saved is being put into contingency accounts for unforeseen conditions, GROWTH MANAGEMENT IMPACT: This request is in accordance with objectives of the Drainage Sub-element of the Growth Management Plan. the uoals and " RECOMMENDATION: That the Board approve a change order for the "Gordon River Water Quality Park (Freedom Park) Construction Contract" to re-allocate the amount of $590,560 from value engineering cost savings to specific allowances under the contract. Prepared By: Margaret A. Bishop, Senior Project Manager, Transportation Services Division, Stonnwater Management Department "".- Attachments: (1) Change Order; (2) Request for Change Order; (3) Schedule of Values Page 1 of2 ,Agenda ltem No. 1685 March 11, 2008 Page 2 of 11 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: Item Summary: 16B5 Meeting Date: Recommendation to approve a change order to Kraft Construction Company, Inc. to move savings In the amount of $590.56000 as a result of value engineering to allowance line items amending contract #07-4173 Gordon River Water Quality Park (Freedom Park) project No. 51018, 3/11/200890000 AM Prepared By Margaret A. Bishop Project Manager Date Transportation Services Stormwater Management 2/22/20084:19:32 PM Approved By Caroline Soto AdministratJve Assistant Date Transportation Services Transportation Engineering and Construction 2/25/200810:06 AM Approved By Barry WlIfiams Director Date Public Services Parks and Recreation 2/25/200811:11 AM Approved By Gerald Kurtz Senior Engineer Date Transportation Services Storm water Management 2125/2008 1 :54 PM Approved By Rhonda Rembert Contract Spec~alist Date Administrative Services Purchasing 2/25/20084:04 PM Approved By John Vliet Roads Maintenance Superintendant Date Transportation Services Road Maintenance 2/25/20084:21 PM Approved By Margaret A. Bishop Project Manager Date Transportation Services Stormwater Management 2/25/20084:56 PM Approved By Kelsey Ward Contract Administration Manager Date Administrative Services Purchasing 2125/2008 5:09 PM Approved By Nom; E. Feder, Ale? Transportation Division Administrator DOlta Transportation Services Transportation Services Admin. Zf26l2Q08 10;54 AM file://C:\AgendaTcst\Export\1 02-March%20 11.%202008\ 16,%20CONSENT%20AGENDA \ 1... 3/5/2008 Page 2 of 2 l\oenda Item No. 1685 - March 11, 2008 Page 3 of 11 Approved By Sharon Newman Accounting Supervisor Date Transportation Services Transportation Services Admin 2/28/2008 1:43 PM Approved By Pat Lehnhard Executive Secretary Date Transportation Services Transportation Services Admin 2/28/20083:10 PM Approved By OMS Coordinator Applications Analyst Date Administrative Services Information Technology 2f29i2008 7:45 AM Approved By Susan Usher Senior ManagemenUBudget Analyst Date County Manager's Office Office of Management & Budget 3/1/2008.2:47 PM Approved By James V. Mudd County Manager Date Board of County Commissioners County f\!;cHlager's Office 3.'3/20086:25 PM file://C:\AuendaTest\ExDort\! 02-March%2011.%202008\ 16.%20CONSENT%20AGENDA\ I... 3/5/2008 I CHANGE ORDER Agenda Item !"o, 1 685 March 11, 2008 Page 4 of 11 CHANGE ORDER NO. 1 CONTRACT NO. 07-4173 BCC Date: 9/11/07 Agenda Item: 10K TO: Henry F. McKevitt Kraft Construction Company, Inc. 3520 Kraft Road Naples, FL 34105 DATE: February 14, 2008 PROJECT NAME: Freedom Park (fka Gordon River Water Qualitv Park) PROJECT NO,: 510185 Under our AGREEMENT dated January 27, 2008 You hereby are authorized and directed to make the following change(s) in accordance with Oterms and conditions of the Agreement: The purpose of this change order is to move $590,560,00 in savings as a result of value engineering to allowance line items for unforeseen conditions, FOR THE (Additive) Sum of: zero dollars and no cents (0,0) Original Agreement Amount $9,852.65500 Sum of Previous Changes $0 This Change Order (Subtract) $000 Present Agreement Amount $9.852,655.00 The time for completion shall be increased by Q calendar days due to this Change Order. Accordingly, the Contract Time is now (547) calendar days. The substantial completion date is March 10, 2008 and the final completion date is June 10, 2008. Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance, The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact aJd delay costs. Accepted: ;2. ~/ / , 2008 OWNER: CONTRACTOR: ' BOARD OF COUNTY COMMISSIONERS Kraft Constructi9J:1Company, Inc. OF COLLIER :~~tG4Jt:2\ ByfJ"'4 0") eXliej-1 n 'YMcKevitt MargaretA. sIspop, PE., Sr. ProjectManager , Sr. ,/,rbject Manager /-\;! _,;1 .;{/ . // B . / _J~,;.: /./ fi/"-n y,; /'/"'C'- ,,,,~'d/ , {<~Ohn \/Ii'et, Interim Director By: Norman Feder, AICP, Administrator :C<.oenda item No. 1685 ~ March 11, 2008 Page 5 of 11 Request for Change Order No. 002 January 25, 2008 To: Collier County Government 2600 Horseshoe Drive North Naples, FL 34104 Phone: (239) 213-5857 Fax: (239) 659-5790 Attn: Margaret A Bishop R EC C:. \ IE. '"' Schedule Change Days: 0 . '. l-1\i_LJ ~ :' ,. . J." J Project: Gordon River Water Quality Park - Naples, FL STOAMWATER MGMT. Kraft Construction Co., Inc. proposes to make the following changes in this contract as directed per the following scope of work: Credit for Value Engineering $590560 Cost of the Work # Budqet Code Description Total 1 B-11 Eliminate Cover over ($40,720 00) entry area 2 8-16 change to 8X8 ($2,400.00) qreenhart 3 L-1 Reduce Plant sizes ($8,984.00) 4 L-8 Irrigation ($9.150.00) 5 M-3 HOPE Drainage ($5,144.00) Piping 6 P-4 Eliminate North ($33,600.00) ParkinQ area 7 T-1 Greenhart piles I PT ($234,184.00) understructure 8 M-2 Change of water ($18,594 00) fountains g T-20 #1 RealiQn boardwalk ($54,565.00) 10 T -2- # 2Realign path # 2 if ($40,270 00) feasible 11 T -20 # 3 Widen all paths to $26,046.00 8 feet 12 T-34 Use metal mesh infiJl ($57,602.00) 13 B-21 add fence around $3,50000 storaQe yard 14 Add fire sprinklers to Ed $30,000.00 Bldg (ALLOWANCE) 15 Add Electronic controlled $26,400.00 locks 16 Change to traditional SYP ($12,08000) trusses 17 Delete electric at pavilions $11,156.00) 18 On site top soil $34,000.00) 19 Change sprinkler heads $11,242.00) 20 Landscaping per # 5 $76,470,00) 21 Add hose bids at pavilions $6,900,00 22 P 2c Delete BridQe ($56,900.00) 23 electronic controlled Qates $23,655.00 /\genda Item No. 1685 March 11, 2008 Page 6 of 11 Request for Change Order No. 002 January 25, 2008 General Items L Markup I Amount ~ Cost of the Work: General Items: Total: ($590,560.00) ($590,560.00) Please review the listed items. Upon concurrence, sign below and return an original signed copy.. If you have any questions regarding this proposal please do not hesitate to contact Kraft Construction Thank you, Approval: Collier County Government By: Date: Agenda I~em ~~o, Ai 685 March 11, 2003 Page 7 Df 11 K R AFT CON S T R U C T ION COM PAN Y , INC. Gordon River Water Quality Park Value Engineering 11/13/2007 (Revised 111512008) ~ Item#- Description Comments Cost Estimate De~igll Owner /\'t.((",<;,'ial) ALCep!eJ B-3 Add more restrooms ar Necd only if P~4 cannot be done TBD X TBD educational building B-6 Reconfigure Educational ~ecd only if P-4 cannot be done TBD X TBD Building for better space utilization B-ll Elimimne the independent .540,720 YES covered entry area B-16 Delete the Ipe columns at the Change to 8'~:r 8 "greenhan -$2,400 YES oak hammock pavilion and go to wood-wrapped steel columns i-I Reduce plant sizes J S'llggej'led \pecie'i Sand Cordgra'ii -$8,9S4 YES !P' ice only, (Bahama wBia and Fiddlewood - not avadah/e commenially 111 ima/la \iz,,~ L-S Use permanent irrigation Alternate VEpropoyed (temporal)' .$9.150 YES system for selected area and 'i)'Hem not oprlnwl) - Al!m-1' "y\lCm to temporary system for other 'Yp1ay auoss sidcl1-'(dk\ I edudng areas heads while maintaining 1000(J uJVel age L.-28 Change Oak hammock to Design s.uggcstion No cost change YES subtropical hardwood hammock L.30 Reduce Florida -Interior trees only .)'e~' Kruji VE Sheet YES specifications 011 trees -Need commitment to hand-select for best quality M-3 Use all HDPE drainage .$5,144 YES piping P-2 Replace bridge with culvert Ifacc.css is still needed -$51,450 NO P-2(al Delete bridge completely -$60,400 NO P 2(b) Replace bridge with culvert Provide maintenance accen' road -547,700 NO P-2(c) Delete bridge compJelt:ly Prol-'idc maintenal/ce acceH "oad + .$56,900 YES maintenance pm kin!? P-4 Eliminate north parking an:a -maintenance access only Eliminate n011h parking area YES -move NW restroom lO SW comeI of completely -$ 33,fiOO main parking -add parkmg to mujo lot Agenda Item No. 16B5 March 11, 2008 Page 8 of 11 K R AFT CON S T R U C T ION COM PAN Y, INC. Gordon River Water Quality Park Value Engineering 11/13/2007 (Revised 1115/2008) ~ P-6 Consolidate all parking near ~reduce bathroums to two head TBD X TBD educational facility T-] Substitute alternate piles for -concrete 1) Concrete Piles with PT 1)1\0 concrete piles -grccnhart understructure for 39001f ~P1 understl11cture where not in $127,687 water Please spec TVt'O alternatives: 1 Keep 2) Grecnhart Piles with PI 2) YES concrete piles and do aU understructure fOI 39001f. understructure in PI; 2 Replace $234,184 concrete piles with grecheart, and do all understructure in P'l T-141 Provide water fountains, not Eliminate water fountains altogetner, I) Eliminate completely water I)NO water cool~rs make sure there is one on the outside coolers and associated electrical of the Education Building outlets -$19,408 M-2 2) Change fi-om water cooler to 2) YES bubblers rype founrains and delete associated electrical outlets. .$18,594 T-20 Realign pathways to reduce -See attal:hcd ~ketch 1) Realign boardwalks per Kraft X I)YCS boardwalk around attached Palh if I documents, constructed wethmds $54.565 -realign boardwalks to use asphult 2) Realign boardwalks per Kraft X 2) YES where possible attached Path #2 documents (if feasible) -$40,270 -widen main loop of the path to 8 3) widen all paths to 8 feet 3) YES feet (T -40) $26,046 T-34 Use metal mesh infill Need to see samples ofJlroduct~ -$57,602 YES B-2 Eliminate restroom building Move near Education Building Eliminate restroom completely NO ~usc two head facility at NW cornel -$109,850 B-31 Add a fenced in yard and (design suggestion) Fenced area $3,500 YES access to it at maintenance using one side(26') of maintenance building building. T otat size 30' x 26' with one 12' double swing gate. B-37 Add fire sprinkler system (design suggestion) $30,000 Allowance X YES Add Electronic controls on gates One dOllb/e gate fol' main en/fJ' onl)' $23,655 YES limilal to NNRP north entmn(e Add Electronic controls on Lock comtois on educa/itm building S26,400 YES restroom lot:ks only fot le5troorm and loM)l doors Add Trusses on pavilions, Change to traditional SiP -$12,080 YES substitute g]u lam, or add refabdcated tnmo with syp T&G solid or mesh ceilings on underside of bottom COld and plywood deck undel roofing. TOTAL SAVINGS IOIALADDS VE#I-5 SAVINGS .I\OD#1 GRAI\D TOT AI. SAVINGS -1536,06700 $71,475,00 -$132,868.00 16,900.00 -$590,560.00 Agenda item No. 1685 March 11, 2008 Page 9 of 11 K R AFT CON S T R U C T ION COM PAN Y. INC. Gordon River Water Quality Park Value Engineering 11/13/2007 (Revised 1/15f20081 ~ VE# S I o av nQs wner Accented Only if bublers water fountains are accepted at pavillions, delete outlets lights and electric at 1 pavillions .$11 156 YES 2 Use onsite soil in lieu of imported selected fill .$34 000 YES 3 Revise pump station to Nap!es Electric pump package and delete wel well .$14,400 NO Change from Rainbird to Hunter equivalent sprinkler heads and controls as well as downsjzjng l11e 4 mainline from 4~ to 3" .$11242 YES Reduce the size of the following nems: Bald Cypress from 25gal to 15gal. Slash Pine from 2S gal to 15 gal, Snowberry from 3ga! to 1 gal, Wax Myrtle from 7 galla 3gal, Saw Palmetto from 3' x 3' to 7gal 24"h, Saw Palmetto 3gal to 19a1 Gopher Apple from 39a11o 1 gaL Myrtle Oak 15gal to 39al Prickly Pear Cactus from 3 gal to 1 gal Also change the follOYJing specified plants to species grown in the comercial market: from Partridge Pea to Bahama Cassia from Chaff Flower to Dune Sunflower, Yellow BristJegrass 10 5 Elliott's Lovegrass. Beaked Panpcum to Panic Grass. Variable Witchgrass to Wiregras5 -$76470 YES TOTAL SAVINGS -$132868 ADD# Adds Owner Acee ted Add hose bibs at pavilfions with water fountains (or maintance and aiding the initial planting. TOTAL ADDS $6,900 YES $6900 "'OJ~ roo~ ,.I.Q~o :0 ~ -~<D Eo 0) ",~ro _<1lo.. -;;;:2; " c <D OJ <J: .. ~gggg ggcido 00000 _ _000 ~~;igg . N 000 000 0)00 ~oo ",,00 <Do,.) ""N~ cx::>o........... ~ 0000000000000000000000000000000000 ~ ~~~~~~o~~~~~~~~~~~~~~qqqqqqqqqqq ~ ggg~~~NggggggMggggogggggg~~gg~gg ~ qqq~~~~qq~qqqqqqqq~q~qqqqqq~q~~q ~ ~~~~~~~~~~~~~N~~~~~cx::>.-~g~~~~Mg~~~ ~ ~ N_M ~ .- v ~ o ~ c o " ~ . z ~~~ ~~~ ~ ~www~~~w~~~w~~~~ ww~w~~w ~~~www~ . c ';: o W 00002005' 00 0 ~ci ci ""a 0 ~O '" <ri..r ("') '-':2 ~ 008000' 000000 ci..ru1Ncici OOOMQCOO v......cx::>tPoo> N-";..j "':N-<ri -M<:nIO..-lO t:!..----- ~~ ~ W-WWthtflth " 0 I c . ~ '" .9 0 ~ c~ 0 0- ~ 0 ~ " . ;;; c'E 0; 00 ~ c = 0 c > '" g 0 0 a..,Q c 0 0 t5 ~ '" . o 0 '" . E u t- O .~ E " ."- 0 0 " w " 0 I 0>- :> 0 .:c ~ 0; 'OW ~ 0 ~ C~ E ~ 0 c g~ c 0 :to '" ml- -c"'ID ~~ ro <Il a. (I) g :g en 0:- "- ~oO:ffi::3:g '5 ill ~ <Il s: 0..... o:J 1l,ill ID o ~"O..J r- '- 0 '" ~ u.- "- - a. Q) c ii ;;; ~ llJc..gJ-5i>-~ 15 c " c... t:: CO ('Ij C/l .- 0 0 -~C:~Cllr- UJ 0 z 2 5i glij ~2 "- ID E ,*~~ID~-* 0 ill Ie> 0 o~o:::~uo "'''' 0) 0) 0) 0) Ol;? ~ :500000 00 0 .00000 00 0 ggggci("j 66 00 N qoooo~ 0'" '" gcr>NOOlfi ciai 00 .....00.....<:0(")<:0 N N '" ....._U') co. ~ 0 ~ N ~ ~~~ ~ ~~ ~ c g . c ,g > o "- '" oi ~ 0: . ~ o ID o . ~ " ~ ~ ro o '" o . o o ill ~ c 'E ill 0_ C 0 0 g &~-g 'g gj(5 oeo_ U Q -c Olol:S-->:: -1U a....5;; OJ 0 ~ ~ "0 ~.E 1 en <];I i:: m t:: ~~5~~~ fl " . ID ~ '" "'~ ill ro ~~ ~~ o ill "'" ...-NC"J.,,-ll)<!l ~ '" ~ 2080 0000 ;2:;g~ "<tcn.....N <.Drool"': r:::..----=. lfllflWW ill ~ rn{5 ~ ll3 :12..c ill ~~ 0:; 05. ~ ill ~c ~ ~,g ~ ill ro o "0.2' a. ro::: ~ .- m {/)..c (Ll "6 ~ ~ ~ QJ .- =' m .!:::! ~-o'5 ill c ID Q.lmO:::-O .so::~~ ::5 8 g 8 :l :I m :l -0"001"0 & &:"f:: &: ill ~ ';;; ID g ",""'d"lO'" ................,.... 00000 00000 66cicio:i ooooro 0>0000) <Da5'IliLCiri lOcr.>NNO) ~ WE>9-b9-tF.><fi ill ill CIl Q5 Cl 0l6;'!;;; OJ "2CL~ ~ cO.!!"E lP m ..... IV ::;! en U 15 u LL m ~ .~ ~ ~,~ ffi f-OU)(/)...J ;:;::: N ~ ~ o o 00 N ~ 00 '" ~ o ID ro '2 ID ~ ID 0; > o o C ID ~ C ID ~ ID ~ E '" o c .~ OJ ~ ~ o 0000000000000000000 o 0000000000000000000 N cicicicicici"':cici6cicicicicicicio:i6 ~ gg~ggg8gggggg~gggffi~ cD LCiLCi~ciLCiLCi"":LCi~LCiLCiLCicD"":NciLCiNLCi "'" ~~ro..-N N'<tNv.......... 7C"J~cnN N C"J <0 ...... ~ <fi Wffib9-<fi<fi<fi<filflb9-ffib9-ffilflffib9-<fi<fi<filfl ill ID a '" c w c o ~ <D III 0 -0 m ~ 8 co ~- ro III ~ ~ is c IgUl'5 (:-(/)g ~C1-58 {/) 5]5 \G<>Ij.3u _'~ lG VlQ)::l EVl.....<t: -= l'Il ~"O m?; god "Oil"'ffi ~:::~ Lt-80o ~ () 'g '$ S ~.>&: 5 ~.s.~ (5 (.J m a. ~- ~CI) [j5 0 g><=I$: e OlO'E.G~ ~~ ii g Utia.?;~~~~n5Bm""':I~"""UEn 5.~m~8ig~R~2Q588rn.~~~(Ll O~()~O:::CO~WU(J)()~<(CLOICLm E m <o~rocnO""'NC"Jvl{)<o~romO.....NC"J"," .....................NNNNNNNNNNMMMC"lM 20'000000 00000000 o:i0<.Dcicilricici IJ>l{)vOOLOOO ll).....OIJ1O<O"<tO'l a5"':cDMOMcDcD ::..::..N MNN VtfhfhfhVtVtVt~ o :.s o . "' ID ro o g ill o s; c '" ro ~ " c .E 0 o 'B _ 0 ill i: Q) E..... '" '5 ~ $ ~ E ~.2 "'0 l/J (D 0 .0= m$"ro& S 10 >-...~..... ;U=.....~~6:;5~ "0 ro 0 ~.f,;: C::.Q 8"*.g$a.o5~ [):g~ ffi ~'; -'1 II mO;E.=E!E!-ro 3:-..cCLl..CCUl E ,rs m'- 0 0 0 :e o.so...~-00.o ,;: (J == C ~.!::'.!::' (D (D2ro2c55::3 ~~ :ii ro ~.;:, ~..c jg'E:Q:g g j; j;:g 00~<<L.lJ1.l.I<C ~"" ~ ~ o o '" ~ o N '" N .,; ~ o o 00 ~ m 6 ~ m ~ o o '" m '" N m '" .,; ~ LI') 0;)-:- "'O~ WO_ ~N 0 ci-:-~ Z:=iD Eo 0) 2m&: -;;;:2; '0 c Q) Ol <J: "' " w t: w Z ::J " > w z c3 "' ~ ^ m f- 0 00 0 00 0 ci-i N O~ ~ ,,~ ci ~e 0':. ~ c ,g III ':;: ~ ~ m~ S25 ffi ~ u c ~~ .~ 80 c m ~ Q) UJ III UJ "0 c: I Q) ffi E c: .~ a;--g~:::: S~~~ Q)o..-o.. ~ ~ ~ ~ 'f: ~ ffi-5 = Q).c Q) llJOOCC ~ o 0000 :=:> 0000 c:i c:ic:i66 o 000(0 o OOOlO ci cicicici o 0000) ;;;; ;;;;;;;;;;;;;; " . E ~IU g. ~~~~ -2 -~ ti~ ffi~~~ ...J<(fJ)fJ) a:JOOllJ -"'-"'-"'-'" UJ rJ) UJ UJ III III 1'Il nl r-r-r-r- 0000 0000 0-i6c:i l!"J'<too ~'" r::r>..ncnM --~c.. 020000 ooC!o~C! -iuilONOO rn("')'<toOO lOCO'=!.<D~C!. ai"';NlOr--M9 :::.e ~ ,-, 00 00 enD ~O "''' M<!:i N N ggggg~ 606NOg gs~g~~Ol N"":"';"":<!:ilO :::.:::.c..:::.~ o o .. ~ ,,' M ~ W-~ W-tfl~W- ~ <htfl<h<h<h~ ~~ v.~fhfh~W- ^ ~ IU m UJ ~ E 6 m ~ '-- 0 U .c '-- E ~ -5 23 (jj UJ ~ ~ ~ Q) C) t~ o ::I "" E -' UJ <>6 (ii ~ u ~ 2~ Er- ~ ~Q) a m~ E UJE~2 80.. ,Q~rJ)~ UJ Q)~ Q)1llfJ)1ll ccG ~tC:~ <>6 ~~ S ~~L~ U.c lllO,Qj UJ ~c: Q) ~ag~g &~ ~Q~~~ ~UJQ)~~ ~ ~~ffi[~ c: ~~~~:~ 1!~~rno.. u UJro8cfJ)..Q ~1ll ~::::!~::~ g~~~~ ~~1:~~~~ ~~ 8~ffi~m ~f]~~ Ej~~~~~3 80.. ~~~'~~ -~~€~~eQ)~o..UJuQ)_ouG~u~~~~ cOr-OLlll~*c:IU~~gE~EQ)~~o UJ BllJQ)ZCJ~'-Olc~-me~'eOleW-B!o ~o..]-ffi~ffig~~~~~o~O~~~~~-5~ 'E~~~~g6=&~!~~~~~6~~~&&~ ~;' 1.{)lO;::<O ::5~ ~ Ol~<O~;:: ~ 0- o ci w ~ ci ~ :". ~