EXECUTIVE SUMMARY
Recommendation to approve and authorize the Chairman to sign a Florida Fish and Wildlife
Conservation Commission (FWC), Florida Boating Improvement Program (FBIP) Grant
Application for Bayview Park Boat Access Facility for the Coastal Zone Management
Department that, if awarded, will provide grant fnnds in the amount of $400,000.
OBJECTIVE: Recommendation to approve and authorize the Chairman to sign a Florida Fish and
Wildlife Conservation Commission (FWC), Florida Boating Improvement Program (FBIP) Grant
Application for Bayview Park Boat Access Facility for the Coastal Zone Management Department that,
if awarded, will provide grant funds in the amount of $400,000.
CONSIDERATIONS: Due to the increase in population growth throughout Collier County, Bayview
Park site has experienced a dramatic increase in usage. The demand from the general public for the
expansion of this park remains on a high priority status for the County. Upon final completion of the
project the facility will provide 80 new parking accommodations, one new launch lane, 140 feet of
increased dock loading space, increased safety standards, and educational signs that provide education
on manatee & seagrass protection, recreational boater safety practices and site specific maps that
def1ne existing sea grass beds. Funding from FBlP will relieve some of the costs associated with this
project. We will use intergovernmental grant revenue to enhance Collier County Coastal Zone
amenities. Specific objectives of this project include:
- Removal of existing seawall and replace with new concrete seawall structure,
- Rcmoval of existing dual-lane boat ramp and rcplace with new tripple-Iane concrete boat
ramp,
- Expand existing parking lot with new asphalt paving to include on and off site properties,
- Construct new wood boat docks with wood decking and wood & concrete pilings,
- Construct new kayak/canoe launching pad with elliptical concrete ramp,
- Install landscape and irrigation system,
- Install information kiosk and educational signage.
This project is currently being fundcd with previously budgeted funds for design engineering and
permitting resources the construction related funding source is projected in future reserve forecasting.
FISCAL IMPACT: Upon award of the grant and approval of the grant agreement by the Board of
County Commissioner's, a budget amendmcnt will be necessary to recognize rcvenue and establish the
project's expense appropriation.
GROWTH MANAGEMENT IMPACT: The Improvement of the Bayview Park Site supports
Objective 7.4 of County Growth Management Plan.
LEGAL CONSIDERATIONS: Thc County Attorneys Off1ce has reviewed and approved this item
for form and legal sufficiency.
RECOMMENDATION: Recommendation to approve and authorize the Chairman to sign a Florida
Fish and Wildlife Conservation Commission (FWC), Florida Boating Improvement Program (FBIP)
Grant Application for Bayview Park Boat Access Facility for thc Coastal Zone
Management Department that, if awarded, will provide grant funds in the amount of $400,000.
PREPARED BY: Pamela Keyes, Environmental Specialist, Coastal Zone Management Department
Page 1 of 1
Agenda Item No. 16014
May 13, 2008
Page 2 of 18
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
Item Number:
Item Summary:
16014
Recommendation to approve a Florida Fish and Wildlife Conservation Commission (FWC),
Florida Boating Improvement Program (FBIP) Application for Bayview Park Boat Access
Facility for the Coastal Zone Management Department in the amount of $400,000.
Meeting Date:
5/13/200890000 AM
Prepared By
Pamela Keyes
Enviornmental Specialist
Date
Coastal Zone Management
Public Services
4/25/200812:02:06 PM
Approved By
Gary McAlpin
Costal Project Manager
Date
Public Services
Coastal Zone Management
4/25/20083:33 PM
Approved By
Colleen Greene
Assistant County Attorner
Date
County Attorney
County Attorney Office
4/25/20084:19 PM
Approved By
Kathy Carpenter
Executive Secretary
Date
Public Services
Public Services Admin.
4/25/20085:00 PM
Approved By
Debra Eurom
Assistant Grant Coordinator
Date
Administrative Services
Administrative Services
4128120081047 PM
Approved By
Marla Ramsey
Public Services Administrator
Date
Public Services
Public Sorvices Admin.
4f29/2Q08 4:05 PM
Approved By
OMS Coordinator
OMS Coordinator
Date
County Manager's Office
Office of Management & Budget
4/30/20088:02 AM
Approved By
Mark Isackson
Budget Analyst
Date
County Manager's Office
Office of Management & Budget
5/51200810:25 AM
Approved By
James V. Mudd
COllnty Manager
Date
Board of County
Commissioners
County Manager's Office
515/2008 1,06 PM
file://C:IAgenda TestlExportl 107 -May%20 13, %2020081 l6.%20CONSENT%20AGENDA 116... 5/7/2008
RESOLL:TION NO. 2008-
Aoenda item r~o, 16C 14
- May 13, 2008
Page 3 of 18
RESOLUTION AFFIRMI:'olG AN APPLICATION FOR A
GRANT FRO'l1 THE FLORIDA FISH AND WILDLIFE
CONSERVATION COMMISSION, FLORIDA BOATING
IMPROVEMENT PROGRAM
\VHEREAS, the State of Florida Fish and \Vildlife Conservation
Commission encourages counties to improve recreational boating in their areas
through the Florida Boating Improvement Pro,gram (FBIr); and
\VHEREAS, Collier County desires to improve Bayview Park Site
located in the County: and
\\'HEREAS, Staff is requesting that the Board of County Commissioners
affirm submittal of a !,rran! application and signed hy the Chairman on behalf of
Collier County and to authorize the County Manager to desi&'11ate a staff project
manager to perform all necessary acts to obtain these grants, and to accomplish
the goals of such a b'Tant if av.'arded to the County.
NOW, THEREFORE, BE IT RESOLVED BV THE BOARD OF
COU'ITY COMMISSIONERS OF COLLIER COU'ITY, FLORIDA that:
The Board of County Commissioners affirms submittal of the grant application
sign by the Chairman, attached hereto, and authorizes the project manager to
apply for and administer the grant on behalf of the Board \vith all understandings
and assurances contained therein, and also authorizes Staff to act in accordance
therc\vith.
This Resolution adopted this _ day of
second and majority vote in favor of adoption.
200R, after motion,
ATTEST
DWIGHT E. BROCK, Clerk
BOARD OF COC~TY COMMISSIONERS
COLLI ER COUNTY. FLORIDA
By:
By:
Tom Henning, Chairman
Approved as to form and
legal sufficiency:
Colleen Greene
Assistant County Attomey
Florida Fish and Wildlife
Conservation Commission
MyFWC.com
Florida Boating
Program
Grant Application
Access Facilities
Agenda Item No. 16014
May 13, 2008
Page 4 of 18
Improvement
for
Boating
Grant Application Number:
FOR OFFICE USE ONLY
I Date Received:
Fill in all sections that apply - Leave all other sections blank
I - APPLICANT INFORMATION
a. Applicant: Collier County Coastal Zone Management Department
b. Federal Employer Id. No.: 59-6000558
c. Project Manager Name: Clinton Perryman Project Manager Title: Project Manager
d. Mailing Address: 3300 Santa Barbara Blvd. City: Naples Zip Code: 34116
e. Shipping Address: SAME City: Zip Code:
f. Telephone: 239.252.4245 Fax: 239.530.6531 Email: clintonperryman@colliergov.net
g. District Numbers: State House: 77 State Senate: 37 County Commission:
II - PROJECT SUMMARY
a. Project Title: Bayview Park Improvements
b. Type of Application: [gJ New (never considered before) o Reconsideration o Phased Continuation-Phase No.: _
TIER-I TIER-II
c. Project Category: o A - Public Launching Facilities [gJ A - Boat Ramps, Piers, and Docks
DB - Public Launching Facilities
d. Project Cost: Total Cost: $ 2,280.000.00 miltion Amount Requested: $ 400.000.00
FWCJFBIP-B (Ol/OR)
Page 1 of9
Agenda Item ~Jo. 16014
Mav 13. 2008
e. Project Summary: Page 5 of 18
Bayview Park currently consists of an existing boat ramp and boat dock with parking lot, picnic pavilions, restrooms and
playground. Co1Jier County's scope of work associated with this project includes: professional design engineering and
permitting services, to redesign and expand the existing parking lot. complete replacement of the existing seawall, re-
construction of the existing dual-lane boat ramp to be replaced with a newly constructed tri-lane boat ramp, site starn1 water
management plan, replacement of the existing boat docks and the installation of newly designed boat docks, installation of kayak
and canoe launching pad, new landscaping, and new informational & educational signage.
This park site is heavily utilized by citizens throughout Collier County and is considered a preferred site due to its unique
location within Naples Bay waters, and boundaries of the county. The park has been in existence for more than three decades
and this particular park site is the only County-ovmed boat ramp location within a 15 mile radius. The typical usage of this boat
ramp far exceeds the intended design capacity by a marginal percentage of 100% causing many frequent boaters to park along the
street sides creating what is commonly viewed as an extremely hazardous safety condition. Other governmental agencies such as
Fish & \Villi Life Services and the Sheliffs Department. heavily depend on this boat ramp for immediate access into Naples Bay.
Due to the increase in population growth throughout Collier County, this park site has experienced a dramatic increase in usage.
The demand from the general public for the expansion of this park remains on a high priority status for the County. Upon final
completion of the project the facility \}.,rill provide 80 new parking accommodations. one new launch lane, 140 feet of increased
dock loading space, increased safety standards, and educational signs regarding education on manatee & seagrass protection,
recreational boater safety practices and site specific maps that define existing sea grass beds.
The funds Collier County is requesting will help offset the costs of the new boat launch site and the new loading and off loading
dock space. These two projects will greatly increase the efficiency and safety of boaters and allow them to arrive at their
destination in a more efficient manor.
FWC/fBIP-B (OliOX)
Page 2 of9
III - FACILITY INFORMATION
a. Facility Name: Bayview Park Site Improvements
b. Type of Facility:
i2<:J Existing Boat Ramp / Public Launching Facility o Existing Marina / Tie-up / Overnight Moorage Facility
o Proposed Boat Ramp / Public Launching Facility o Proposed Marina / Tie-up / Overnight Moorage Facility
o Other:
c. Facility location:
County: Collier Water body: Naples Bav
Latitude: N deg. mm. sec. Longitude: W deg. mm. sec.
Facility Street Address or Location: 1500 Danford Street Naples, Florida
d. Upland Ownership:
i2<:J Public - Fee Simple o Public - Lease Number of Years Remaining in Lease: _
Name of Owner: Board of Collier County Commissioners
e. Is this facility open to the general public? i2<:J Yes DNo
f. Estimate Percent (%) Use of Launching Facility: 90% Motorboats/Sailboats lQ% Non-Motorboats
g. Day Use, Parking or Launch Fee Amount: $6.00 Tie-up/Overnight Moorage: $
h. Number of Launch Lanes: Two Condition: o New o Good o Average i2<:J Poor
i. Length of Boarding Docks: 60 Ft. Condition: o New o Good o Average i2<:J Poor
Type of docks: i2<:J Fixed Wooden o Fixed concrete o Floating concrete o Other:
J. Number of Boat Trailer Parking Spaces: 12. Condition: o New o Good i2<:J Average o Poor
k. Length of Tie-up Dock or Moorage: _Ft or _Slip Condition: o New o Good D Average o Poor
Type of docks: o Fixed Wooden o Fixed concrete D Floating concrete o Other:
I. Other Facility Attributes:
Restroom: i2<:J Yes 0 No 0 Proposed Other:
Pump out or Dump Station: 0 Yes i2<:J No Other:
m. Names of adjacent boating facilities, public and private (ramps, tie-up facilities/marinas) within a IO-mile radius.
Name Distance Name Distance
1. Collier Blvd Boat Ramp 15.0 2.
3. Naples Boat Ramp 10.0 4.
5. 6.
7. 8.
Agenda Item No. 16014
May 13, 2008
Page 6 of 18
19
10.
FWC/FBIP-B (01/08)
Page 2 of9
A,gerlda Item No. 16D14
May 13, 2008
Page 7 of 18
IV - PROJECT DESCRIPTION
a. List Primary Need for Project:
l8J Safety
o Age-end of Useful Life
o Environmental Needs of the Area
o Other:
l8J High Demand by Users
o Recommended by FWC Staff
o Lack afIn-house Capability
b. Need Statement:
The primary' objective of this project is addressing the urgent need to resolve existing safety related issues and the
overwhelming demands for adequate access to the v.,'aterways from the general public. Bayview Park site is heavily
utilized on a daily basis exceeding the maximum functional capacity of the existing design layout. Currently, there are
only two boat launching sites, 60 feet of unloading and loading dock space and sixteen trailer parking spaces.
The funds Collier County is requesting will help offset the costs of the new boat launch site and the new loading and off
loading dock space. The current dock space only allows for two to three boats to park at one time. During peak hours,
boats begin line up and block the canal and stop traffic from exiting. The new dock space is going to increase dramatically
from 60 feet to 200 feet. Allowing for boaters to safely move off to the side of the canal and load Of unload. These two
projects will greatly increase the efficiency and safety" of boaters and allow them to arrive at their destination in a more
efficient manner.
c. Project Tasks:
The Tasks listed below are for the v"ho1c Bayview Project. The FBIP funds requested will assist with Task 4 and 6.
Task 1 - Provide professional design engineering and pennitting services for the expansion and development of the site,
Task 2 ~ Site demolition, clearing and preparation,
Task 3 - Remove existing seawal1 and replace with nev,' concrete seawall structure,
Task 4 - Remove existing dual-lane boat ramp and replace \\/ith new tripp]e-Iane concreate boat ramp,
Task 5 - Expand existing parking lot with new asphalt paving to include on and off site properties,
Task 6 - Construct new wood boat docks with \I,.'ood decking and wood & concrete pilings,
Task 7 - Construct new kayak/canoe launching pad with elliptical concrete ramp,
Task 8 - Install landscape and ilTigation system,
Task 9 - Install information kiosk and educational signage.
d. Project Benefits:
The project will substantially enhance boating in the community by greatly improving the existing site conditions,
provideing maximum layout & functionality. and incrcasing the sufficiency for direct access to the water\vays. The
increase in population throughout Collier County has raised the demands for sufficient public boat launching facilities.
The growth management plan for Collier County mandates the County to provide adequate access to these water ways.
Cun'ent!y, Collier County has over 24,000 registercd boaters. The expansion of Bay view Park site will enhance the
existing facilities, increase the amenities and substantially improve direct access to Naples Bay and the sun-ounding water
ways. The historical data of the high usage of this site clearly demonstrates that the demands are on a continual rise,
whereas the existing congested parking conditions are currently creating liability concems and extremely hazardous safety
conditions. The expansion of this site will indeed eliminate the exposed liability issues and provide safer conditions to the
general public.
F\\'CiFHIP-B (OI'OS)
Page 2. of9
v - PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES
a. Type of project: o Engineering / Planning only o Renovation / Repair r8J Expansion D New Construction
b. Boat Ramp
Number of existing launch lanes to be repaired: Two
Type oframp: o Asphalt ~ Concrete o Other
Number of new/added launch lanes: One
Type of new ramp: o Asphalt ~ Concrete o Other
c. Boarding Dock
Length of existing boarding docks to be repaired! replaced: 60 ft.
Type of docks: ~ Fixed wooden o Fixed concrete o Floating Concrete o Other
Length of new/added boarding docks: 200 ft.
Type of new docks: ~ Fixed wooden o Fixed concrete o Floating Concrete o Other
d. Parking
Number of existing boat trailer parking spaces to be refurbished l.2.
Type of parking: ~ Asphalt o Concrete o Other
Number of new/added boat trailer parking spaces 80
Type ofnew!added parking: ~ Asphalt o Concrete ~ Other Concrete curbinq
e. Lifts, Hoists, Marine Railways
Number oflifts or hoists to be repaired / replaced: - Maximum length of vessel that can be lifted:_
Number of new lifts or hoists to be installed I added: - Maximum length of vessel that can be lifted:_
Length of marine railway to be repaired I replaced: - ft.
Length of new marine railway to be added: - ft.
r. Amenities / Other elements
o Restrooms: Describe
o Access Road: Length of access road: _ yds. Type of road: o Gravel ~ Aspbalt o Other
~ Educational kiosk / signage: Describe Free standing encased unit
Agenda Ifem No. 16014
May 13, 2008
Page 8 of 18
FWC'FBIP-B (Ol/OR)
Page 2 of9
AJsnja !tem ~~o. 16014
o May 13,2008
Page 9 of 18
VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES (Piers / Docks) I
a. Type of project: o Engineering / Planning o Renovate i' Repair ~ Expansion o New Construction
b. Docks / In-water slips
Length of existing docks to be repaired replaced: 60 ft. Number of tie-ups I slips: _
Type of dock: ~ Fixed Wooden o Fixed Concrete o Floating Concrete o Other
Length of new docks to be added / installed: 140 ft. Number of tie-ups / slips:_
Type of dock: ~ Fixed Wooden o Fixed Concrete o Floating Concrete o Other
e. Mooring Buoys
Area of mooring field: _ sq. ft.
Number of mooTing buoys to be repaired / replaced:_
Number of new mooring buoys to be installed: _
d. Dry Storage
Number of existing dry siorage slips to be repaired / replaced: -
Number of new dl)' storage slips to be constructed: _
e. Amenities/ Other elements
o Restrooms: Describe
o Access Road: Length of access road: _yds. Type of road: o Gravel o Asphalt ~ Other Kayak
launch
L2J Educational kiosk / signage: Describe Free standing double-sided enclosed kiosk
o Pump-out or Dump station
VII - PROJECT ENGINEERING AND CONSTRUCTION
a. Who is or will be completing project design/engineering'? b. Level of engineering completed at time of application:
o Applicant's Own Staff o None
L2J Consulting Engineers ~ Conceptual (Master Plan Phase)
o N/A (J\1atcrials or Equipment Purchase) o Preliminal)'
o Other: o Final (Ready to Bid)
rWC/FBIP-B (OliOS)
Page 2 of9
VIII - BUDGET
a. Has a detailed cost estimate been developed for this project? If yes, attach a copy to application.
~ Yes, Preliminary DYes, Final ONo
b. PROJECT COST: NON-CASH FUNDS
Other source Do Not Use
Cost I tern Applicant (List below in This Column TOTAL
Section VIII)
Administration $ $ $
Project Management $ 5.000 $ $ 5,000
In-Kind Engineering $ $ $
In-Kind Labor $ $ $
In-Kind Materials $ $ $
In-Kind Equipment $ $ $
Total Non-Cash Funds $ 5,000 $ $ 5,000
c. PROJECT COST: CASH FUNDS
Other source FBIP Grant
Cost Item Applicant (List below in Request TOTAL
Section VIII)
Administration I Project Management $ 0 $ $ $
Design / Engineering $ $ $ $
Permitting $ $ $ $
Construction / Repair: Boat Ramps $ 180,000 $ $ 200,000 $ 380,000
Construction I Repair: Lifts, Hoists, Marine Railways $ $ $ $
Construction I Repair: Piers or Docks $ 80,000 $ $ 200,000 $ 280,000
Construction / Repair: Parking $ $ $ $
Construction I Repair: Restrooms $ $ $ $
Other: Seawall replacement $ $ $ $
Other: Landscaping & Irrigation $ $ $ $
Other: Kayak/Canoe concrete launching pad $ $ $ $
Other: signage $ $ $ $
Other: $ $ $ $
Total Cash Funds $ 260,000 $ $ 400,000 $ 660,000
Aoenda Item No. 16014
~ May 13, 2008
Page 10 of 18
d. TOTAL FUNDS: non-cash + cash funds $ 5,000 $ 0 $ 660,000 $ 665,000
r\VC/FBIP-B (01/08)
Page 2 of9
Agenda item No. 16014
May 13, 2008
Page 11 of 18
IX - OTHER SOURCE OF FUNDS (Partnerships) I
a. Funding source / Agency: N/A
b. Type of funding: o Federal grant D State/Local grant o Loan
c. Grant Name: Amount $
d. Approval Status: o Approved D Pending o Intend to Apply, Date:
a. Funding source / Agency:
b. Type of funding: o Federal grant D State/Local grant o Loan
c. Grant Name: Amount $
d. Approval Status: o Approved o Pending o Intend to Apply. Date:
a. Funding source .I Agency:
b. Type of funding: o Federal grant o State/Local grant o Loan
c. Grant Name: Amount $
d. Approval Status: o Approved o Pending o Intend to Apply, Date:
a. Funding source / Agency:
b. Type of funding: D Federal grant D State/Local grant o Loan
c. Grant Name: Amount $
d. Approval Status: o Approved D Pending o Intend to Apply, Date:
x - PERMITS
Submitted Approved N/A
a. Florida Department of Environmental Protection ~ 0 0
b. Florida Fish and \Vildlife ConsclV'ation Commission* 0 0 ~
c. U.S. Anny Corps of Engineers 0 ~ 0
d. Local and Others (If needed) n 0 0
LJ
* For mooring buoy projects, a Florida Unifo1111 Watcrv..'ay Marker Application must be submitted to F\VC prior to submittal of the
grant application.
FWC.TBIP-B (OLOS)
Page 2 of9
XI - ENVIRONMENTAL ASSESSMENT
YES NO
a. Will the project significantly or adversely affect the environment? 0 I2SJ
b. If Yes, please explain key issues and describe any mitigation actions proposed.
This project will not negatively affect the environment. There are no mitigation requirements for this project from FDEP and it
does comply with the Manatee Protection Plan.
On both sides of the channel leading out into Gordon Pass are two seagrass beds. These beds consist of paddle grass
(Halophila decipiens) and shoal grass (Halodulewrightii) species. Within the last year a private developer, developed the lot
opposite the two boat launch sites and part of their mitigation was to install channel markers. Collier County partnered with
the City of Naples on design of new site specific maps depicting the channel and kid friendly signage.
The idea of kid friendly signage has been used at other Collier Park locations for Gopher Tortoise awareness, and has proven
to be a huge success. The signage at Bayview Park will be posted at the end of the Park and visible for all boaters leaving the
Park. It is our hope that children will advise their parents to stay within the marked channel. Please see attached signage.
Agenda Item No. 16014
May 13, 2008
Page 12 of 18
XlI - BOATER SAFETY
a. Explain how the project may affect boater safety whether positively or negatively.
The improvements at Bayview Park site will greatly increase boater safety. Collier County has over 24,000 registered boaters
and only 4 public boat ramps. Bayview Park boat ramp provides direct access to Gordon River in Naples Bay, a major boating
channel that provides access to Keywadin ]Sland, a popular weekend destination, and direct access to the Gulf.
Bayview Park is operating over its capacity on a daily basis. Currently, Bayview Park only has 16 trailer parking sites and two
launching sites; this creates long lines and dangerous parking situations along side roads. Also, the current docks for loading
and unloading are only 60 feet in length; this provides only two or three boats access for loading or unloading. On weekends
this becomes a hazardous situation because boats begin to line up and cause congestion in the canal.
Expanding Bayview Park will eliminate the congestion, hazardous parking and unsafe boating situations. It will also allow
more spaces for law enforcement, Florida Fish and Wildlife officer and County Sheriff officers quick and easy access to
Naples Bay.
The improvement plans will allow for 80 more trailer parking sites, one more boat launch site, an additional 140 feet of loading
and unloading dock space and increased education through an informational kiosk. Collier County has already partnered with
the City of Naples and funded the installation of a site specific map on the existing scagrass beds and a more kid friendly
signage asking boaters to "please stay in marked channel" (please see attached).
All of these improvements to the Bayview Park site will greatly increase boater safety with an increase in safe parking areas,
loading and unloading facilities, an additional launch site and public awareness through education.
FWC/fBIP-B (01108)
Page 2 of9
:"\genda item No. 16014
May 13 2008
Page 13 of 18
XIII - APPLICATION A TT ACHMENTS CHECKLIST
Submit one (1) electronic copy on CD or floppy disk and seven (7) photocopies of the application with attachments.
Inc. - - - Required Attachments - - -
D a. Coyer Letter: application transmittal cover letter (Identify priority rank with multiple applications).
D b. Application: One (1) application with original signature from authorized individual.
c. Resolution: An adopted resolution, by the Governing Body, authorizing that the Project Manager has the authority to
D apply for and administer the grant on behalf of the applicant. If the Applicant is applying on behalf of another public
entity. then a Memorandum of Understanding betv..'een the Applicant and the public entity must also be submitted.
D d. Boundary :\tap: indicate boundar)' of the project area.
D e. Site Control Documentation: (e.g. a deed, lease, results of title search, etc. for the project site.)
D f. F.xi~ting Condition Photographs (sufficient to depict the physical characteristics of the project area)
D g. Aerial Photographs (marked with the approximate boundaries of the project site)
D h. Navigational Chart: An 8.5" x 11" photocopy of a curTent NOAA. North American Datum 83 nautical chart (provide
the NOAA chart name and number) indicating the precise location of the project site.
- - - Optional Attachments - - -
D 1. Detailed Cost Estimate: Cost estimate in the form of a fonnal bid, v,Titten quote from proposed vendor or an
engineer's cost estimate.
D J. Plans: preliminary design/engineering plans (if completed).
D k. Permits: Photocopies of necessal)' project pelmit(s) or permit application(s). If exempt, provide notification of
exemption from pemlitting agency.
D I. Support/Opposition: Attach letters of known public support or known public opposition.
APPLICANT SIGNATURE
Application is hcreby made for the activities described herein. I certify that I am familiar with the information contained
in the application, and, to the best of my knowledge and belief, this infonnation is true, complete, and accurate. I further
certify that I possess thc authority including the necessary requisite propcrty interests to undertake the proposed activities.
I also certify that the Applicant's governing body is aware of and has authorized the Project Manager as the official
rcpresentative of the Applicant to act in connection with this application and subsequent project as well as to provide
additional infonnation as may be required. By signature below, the Applicant agrees to comply with all applicable
federal, state, and local laws in conjunction with this proposal and resulting project so approved.
Print/Type Name
Title
Applicant Signature
Date
STATE OF FLORIDA, COUNTY OF (
Personally appeared before me this day of
subscribed and swore (0 the above instrument in my presence.
, 200~.
, who
Notal)' Public Name:
My commission expires:
NOTE: Instruction and further information regarding this application and the Florida Boating Improvement Program can be found in
the Florida Boating ImprO\'cmcnt Program Procedure Guide or you may contact the Program Administrator at F]orida Fish and
\Vild]ife Conscryation Commission, Florida Boating Improvement Program, 620 South Meridian Street, Tallahassee, FL 32399-1600;
or call (850) 488~5600; or email fl;il1i(/)\hFWC.Ct)l1l.
F\VC'FHII'-H (OJ/(Jg)
Page 2 of9
Agenda Item No. 16014
May 13, 2008
Page 14 of 18
FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION
FLORIDA BOATING IMPROVEMENT PROGRAM
Instructions for completing the Grant Application for Boat Access Facilities
General Instructions:
· Submit one (1) original and seven (7) copies.
. Submit an electronic copy of application on CD or floppy disk.
. Staple application in upper left-hand corner, or clip with one binder clip. DO NOT
SPIRAL BIND OR PLACE IN A THREE-RING BINDER OR REPORT COVER.
. Please place a tabbed divider between each attachment.
. Please make all photocopies of attachments on paper no larger than I I" x IT'.
I - APPLICANT INFORMATION
a. Applicant: Enter the nal11e of the county, municipality, or other
governmental entity applying for the grant.
b. Federal Employer Id. No.: Enter the applicant's Federal Employer Identification
(FEID) Nunlber. Payment will be sent to the address
associated with this FEID number.
c. Project Manager Name: Enter the name and title of the person in charge of the
Title: project. All correspondence will be sent to this person.
d. Mailing Address: Enter the mailing address for the Project Manager. All
correspondence will be sent to this address.
e. Shipping Address: If mailing address is a P.O. box, please include a street
address for overnight deliveries.
f. Telephone No.: Enter the telephone number, fax number, and email
Fax No.: address where the Project Manager may be contacted
E-mail: during regular business hours.
" District Numbers: Enter the District numbers for the State House, State
'"
Senate and the County Commission for the project
location.
Page 5 of5
Aoenda :tern r>Jo. 16014
- May 13, 2008
Page 15 of 18
II - PROJECT SUMMARY
a. Project Title: Provide a brief title for the project.
b. Type of Application: Check "New" if you have never applied for FBIP funding
for this project. Check "Reconsideration" if you have
applied before but did not receive funding. Check
"Phased Continuation" if the project has previously
received FBIP funding.
c. Project Category: Check only one project category. Refer to the guidelines
for project category descriptions. Application will
compete only against other applications within the same
project category. The Commission reserves the right to
re-assign the application to a different project category to
maximize funding.
d. Project Cost: Enter total amount ofproject cost, including only the
eligible project elements where grant funds will be used.
Enter the amount of funds requested from FBIP (rounded
to the nearest dollar).
e. Project Summary: Provide a brief description of the goal of the project, the
work to be done and the expected outcome or final
product.
III - GENERAL FACILITY INFORM A TION
Describe existing conditions by checking all that apply. For new facilities, provide
infOlmation as facility is proposed to be and check "New" for questions about condition of
facility.
IV - PROJECT DESCRIPTION
a. List Primary Need for Project: Check the category that is most applicable.
b. Need Statement: Briefly describe why this project is needed. Explain any
existing problems and how this project will correct the
problcm.
c. Project Tasks: Describe in detail the exact work to be completed. For
example, Task 1-. ConstlUct one-lane, concrete boat
ramp, Task 2 - ConstlUct 20 boat/trailer parking spaces.
d. Project Benefits: Describe how this project will enhance boating in the
local community.
Page 5 of 5
Agenda Item No. 16014
May 13, 2008
Page 16 of 18
v - PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES
Check only those elements of the project that will use grant funding. Note: elements must be
completed before FWC will reimburse costs.
Indicate the type of proj ecl:
. Engineering/Planning only = no grant funds will be used for construction
. Renovate/Repair = replacement or repair of existing facilities with no increased capacity
. Expansion = increased boat access by adding more boat launch lanes, more docks, or
increased parking, etc.
. New = construction of a facility where none currently exists, or adding a new amenity to an
existing facility where none existed before
VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES
Check only those elements of the project that will use grant funding. Note: elements must be
completed before FWC will reimburse costs.
Indicate the type of proj ecl:
. Engineering/Planning only = no grant funds will be used for construction
. Renovate/Repair = replacement or repair of existing facilities with no increased capacity
. Expansion = increased boat access by adding more boat launch lanes, more docks, or
increased parking, etc.
. New = construction of a facility where none currently exists, or adding a new amenity to an
existing facility where none existed before
VII - PROJECT ENGINEERING AND CONSTRUCTION
a. Who is or will be completing project Please check as appropriate.
design/engineering?
b. Level of engineering completed at time of Please check as appropriate. If engineeling is
application: complete (conceptual, preliminary, or final),
please include a copy of the plans with your
application.
Page 5 of 5
A:Jsllda li9m r~O. 16D14
- May 13, 2008
Page 17 of 18
VIII - BUDGET
a. Has a detailed cost estimate Indicate whether a preliminary or final cost estimate has
been developed for this been developed. If yes, attach a copy of the estimate to the
project? application.
Enter amount of in-kind matching funds for each cost item.
b. PROJECT COST - NON- Amounts in "Other" column should include in-kind funds
CASH FUNDS* from any third-party agreements (provided by someone
other than the applicant). *Please note: All applications
must include some form of non-cash matching funds.
c. PROJECT COST - CASH Enter amount of funding to be provided by the applicant and
FUNDS other sources. Enter the amount of funding requested in the
column labeled "FBIP Grant Request."
d. TOTAL FUNDS Sum of non-cash funds and cash funds for each column.
IX - OTHER SOURCE OF FUNDS (Partnerships)
Include information on funding from sources other than FBIP or the applicant. Enter infornlation
for each funding source.
a. Funding Sourcc / Agency: Entcr the name of the funding source or the partner
b. Type of funding: Check source of funds: Federal grant, State/Local grant, or
loan.
c. Grant Name: Enter the name of the grant program (if applicable).
d. Approval Status: Enter status of grant/loan application. If "Intending to
Apply", enter date of application deadline.
X - PERMITS
a. Florida Department of Check status of all pernlit applications. If project type does
Environmcntal Protcction not rcquire pemlits, or project is exempt from pemlitting
requirements, check "N/A". If applicable, attach a
b. Florida Fish and Wildlife photocopy of all pennits or pel111it applications. If project is
cxcmpt, attach a copy of exemption notification.
Conservation Commission
Note: For projects involving mooring buoys, a Florida
c. U.S. Army Corps of Enginccrs Uniform \Vaterway Marker Application must bc
submitted to FWC prior to submittal of the grant
application. A copy of the Florida Unifonn Waterway
d. Local and Others (Ifnceded) Marker Application may bc downloadcd at
hl to :/iM v FW C .co 111 'boat in ~/\\'atcrwavs/
Page 5 of 5
Agenda Item No. 16014
May 13, 2008
Page 18 of 18
XI - ENVIRONMENTAL ASSESSMENT
a. Will the project signif1cantly Explain how the project will have a signif1cant or adverse
or adversely affect the affect on the envirol1l11ent and include information on the
envirol1l11ent? impacts to water quality, wetlands, seagrasses, imperiled
b. If Yes, please explain key species, etc.
issues and describe any
mitigation actions proposed.
XII - BOATER SAFETY
a. Explain how the project may Provide explanation of how the project may improve boater
affect boater safety whether safety (i.e. increased education, increased law enforcement,
positively or negatively. etc.) or, explain any potential boater safety hazards and how
they will be corrected. Also, please indicate if the project
will have no effect on boater safety.
XIII - APPLICATION ATTACHMENTS CHECKLIST
Indicate which attachments have been included with the application. Required attachments must
be included or application will be deemed incomplete. Optional attachments may be omitted, but
applications with optional attachments included will receive a higher score during evaluation.
Please place a tabbed divider between each attachment. Submit one (1) original (with original
signature) and seven (7) photocopies' of the entire application with attachments.
Completed applications should be in the following order: Cover Letter, Application Form,
Attachments in the order they are listed on the checklist.
*Only one (1) copy ofthe site control documentation and permits or permit applications is
necessary.
Page 5 of 5