Loading...
Agenda 05/13/2008 Item #16D14 Agenda Item No. 16014 May 13, 2008 Page 1 of 18 EXECUTIVE SUMMARY Recommendation to approve and authorize the Chairman to sign a Florida Fish and Wildlife Conservation Commission (FWC), Florida Boating Improvement Program (FBIP) Grant Application for Bayview Park Boat Access Facility for the Coastal Zone Management Department that, if awarded, will provide grant fnnds in the amount of $400,000. OBJECTIVE: Recommendation to approve and authorize the Chairman to sign a Florida Fish and Wildlife Conservation Commission (FWC), Florida Boating Improvement Program (FBIP) Grant Application for Bayview Park Boat Access Facility for the Coastal Zone Management Department that, if awarded, will provide grant funds in the amount of $400,000. CONSIDERATIONS: Due to the increase in population growth throughout Collier County, Bayview Park site has experienced a dramatic increase in usage. The demand from the general public for the expansion of this park remains on a high priority status for the County. Upon final completion of the project the facility will provide 80 new parking accommodations, one new launch lane, 140 feet of increased dock loading space, increased safety standards, and educational signs that provide education on manatee & seagrass protection, recreational boater safety practices and site specific maps that def1ne existing sea grass beds. Funding from FBlP will relieve some of the costs associated with this project. We will use intergovernmental grant revenue to enhance Collier County Coastal Zone amenities. Specific objectives of this project include: - Removal of existing seawall and replace with new concrete seawall structure, - Rcmoval of existing dual-lane boat ramp and rcplace with new tripple-Iane concrete boat ramp, - Expand existing parking lot with new asphalt paving to include on and off site properties, - Construct new wood boat docks with wood decking and wood & concrete pilings, - Construct new kayak/canoe launching pad with elliptical concrete ramp, - Install landscape and irrigation system, - Install information kiosk and educational signage. This project is currently being fundcd with previously budgeted funds for design engineering and permitting resources the construction related funding source is projected in future reserve forecasting. FISCAL IMPACT: Upon award of the grant and approval of the grant agreement by the Board of County Commissioner's, a budget amendmcnt will be necessary to recognize rcvenue and establish the project's expense appropriation. GROWTH MANAGEMENT IMPACT: The Improvement of the Bayview Park Site supports Objective 7.4 of County Growth Management Plan. LEGAL CONSIDERATIONS: Thc County Attorneys Off1ce has reviewed and approved this item for form and legal sufficiency. RECOMMENDATION: Recommendation to approve and authorize the Chairman to sign a Florida Fish and Wildlife Conservation Commission (FWC), Florida Boating Improvement Program (FBIP) Grant Application for Bayview Park Boat Access Facility for thc Coastal Zone Management Department that, if awarded, will provide grant funds in the amount of $400,000. PREPARED BY: Pamela Keyes, Environmental Specialist, Coastal Zone Management Department Page 1 of 1 Agenda Item No. 16014 May 13, 2008 Page 2 of 18 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: Item Summary: 16014 Recommendation to approve a Florida Fish and Wildlife Conservation Commission (FWC), Florida Boating Improvement Program (FBIP) Application for Bayview Park Boat Access Facility for the Coastal Zone Management Department in the amount of $400,000. Meeting Date: 5/13/200890000 AM Prepared By Pamela Keyes Enviornmental Specialist Date Coastal Zone Management Public Services 4/25/200812:02:06 PM Approved By Gary McAlpin Costal Project Manager Date Public Services Coastal Zone Management 4/25/20083:33 PM Approved By Colleen Greene Assistant County Attorner Date County Attorney County Attorney Office 4/25/20084:19 PM Approved By Kathy Carpenter Executive Secretary Date Public Services Public Services Admin. 4/25/20085:00 PM Approved By Debra Eurom Assistant Grant Coordinator Date Administrative Services Administrative Services 4128120081047 PM Approved By Marla Ramsey Public Services Administrator Date Public Services Public Sorvices Admin. 4f29/2Q08 4:05 PM Approved By OMS Coordinator OMS Coordinator Date County Manager's Office Office of Management & Budget 4/30/20088:02 AM Approved By Mark Isackson Budget Analyst Date County Manager's Office Office of Management & Budget 5/51200810:25 AM Approved By James V. Mudd COllnty Manager Date Board of County Commissioners County Manager's Office 515/2008 1,06 PM file://C:IAgenda TestlExportl 107 -May%20 13, %2020081 l6.%20CONSENT%20AGENDA 116... 5/7/2008 RESOLL:TION NO. 2008- Aoenda item r~o, 16C 14 - May 13, 2008 Page 3 of 18 RESOLUTION AFFIRMI:'olG AN APPLICATION FOR A GRANT FRO'l1 THE FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION, FLORIDA BOATING IMPROVEMENT PROGRAM \VHEREAS, the State of Florida Fish and \Vildlife Conservation Commission encourages counties to improve recreational boating in their areas through the Florida Boating Improvement Pro,gram (FBIr); and \VHEREAS, Collier County desires to improve Bayview Park Site located in the County: and \\'HEREAS, Staff is requesting that the Board of County Commissioners affirm submittal of a !,rran! application and signed hy the Chairman on behalf of Collier County and to authorize the County Manager to desi&'11ate a staff project manager to perform all necessary acts to obtain these grants, and to accomplish the goals of such a b'Tant if av.'arded to the County. NOW, THEREFORE, BE IT RESOLVED BV THE BOARD OF COU'ITY COMMISSIONERS OF COLLIER COU'ITY, FLORIDA that: The Board of County Commissioners affirms submittal of the grant application sign by the Chairman, attached hereto, and authorizes the project manager to apply for and administer the grant on behalf of the Board \vith all understandings and assurances contained therein, and also authorizes Staff to act in accordance therc\vith. This Resolution adopted this _ day of second and majority vote in favor of adoption. 200R, after motion, ATTEST DWIGHT E. BROCK, Clerk BOARD OF COC~TY COMMISSIONERS COLLI ER COUNTY. FLORIDA By: By: Tom Henning, Chairman Approved as to form and legal sufficiency: Colleen Greene Assistant County Attomey Florida Fish and Wildlife Conservation Commission MyFWC.com Florida Boating Program Grant Application Access Facilities Agenda Item No. 16014 May 13, 2008 Page 4 of 18 Improvement for Boating Grant Application Number: FOR OFFICE USE ONLY I Date Received: Fill in all sections that apply - Leave all other sections blank I - APPLICANT INFORMATION a. Applicant: Collier County Coastal Zone Management Department b. Federal Employer Id. No.: 59-6000558 c. Project Manager Name: Clinton Perryman Project Manager Title: Project Manager d. Mailing Address: 3300 Santa Barbara Blvd. City: Naples Zip Code: 34116 e. Shipping Address: SAME City: Zip Code: f. Telephone: 239.252.4245 Fax: 239.530.6531 Email: clintonperryman@colliergov.net g. District Numbers: State House: 77 State Senate: 37 County Commission: II - PROJECT SUMMARY a. Project Title: Bayview Park Improvements b. Type of Application: [gJ New (never considered before) o Reconsideration o Phased Continuation-Phase No.: _ TIER-I TIER-II c. Project Category: o A - Public Launching Facilities [gJ A - Boat Ramps, Piers, and Docks DB - Public Launching Facilities d. Project Cost: Total Cost: $ 2,280.000.00 miltion Amount Requested: $ 400.000.00 FWCJFBIP-B (Ol/OR) Page 1 of9 Agenda Item ~Jo. 16014 Mav 13. 2008 e. Project Summary: Page 5 of 18 Bayview Park currently consists of an existing boat ramp and boat dock with parking lot, picnic pavilions, restrooms and playground. Co1Jier County's scope of work associated with this project includes: professional design engineering and permitting services, to redesign and expand the existing parking lot. complete replacement of the existing seawall, re- construction of the existing dual-lane boat ramp to be replaced with a newly constructed tri-lane boat ramp, site starn1 water management plan, replacement of the existing boat docks and the installation of newly designed boat docks, installation of kayak and canoe launching pad, new landscaping, and new informational & educational signage. This park site is heavily utilized by citizens throughout Collier County and is considered a preferred site due to its unique location within Naples Bay waters, and boundaries of the county. The park has been in existence for more than three decades and this particular park site is the only County-ovmed boat ramp location within a 15 mile radius. The typical usage of this boat ramp far exceeds the intended design capacity by a marginal percentage of 100% causing many frequent boaters to park along the street sides creating what is commonly viewed as an extremely hazardous safety condition. Other governmental agencies such as Fish & \Villi Life Services and the Sheliffs Department. heavily depend on this boat ramp for immediate access into Naples Bay. Due to the increase in population growth throughout Collier County, this park site has experienced a dramatic increase in usage. The demand from the general public for the expansion of this park remains on a high priority status for the County. Upon final completion of the project the facility \}.,rill provide 80 new parking accommodations. one new launch lane, 140 feet of increased dock loading space, increased safety standards, and educational signs regarding education on manatee & seagrass protection, recreational boater safety practices and site specific maps that define existing sea grass beds. The funds Collier County is requesting will help offset the costs of the new boat launch site and the new loading and off loading dock space. These two projects will greatly increase the efficiency and safety of boaters and allow them to arrive at their destination in a more efficient manor. FWC/fBIP-B (OliOX) Page 2 of9 III - FACILITY INFORMATION a. Facility Name: Bayview Park Site Improvements b. Type of Facility: i2<:J Existing Boat Ramp / Public Launching Facility o Existing Marina / Tie-up / Overnight Moorage Facility o Proposed Boat Ramp / Public Launching Facility o Proposed Marina / Tie-up / Overnight Moorage Facility o Other: c. Facility location: County: Collier Water body: Naples Bav Latitude: N deg. mm. sec. Longitude: W deg. mm. sec. Facility Street Address or Location: 1500 Danford Street Naples, Florida d. Upland Ownership: i2<:J Public - Fee Simple o Public - Lease Number of Years Remaining in Lease: _ Name of Owner: Board of Collier County Commissioners e. Is this facility open to the general public? i2<:J Yes DNo f. Estimate Percent (%) Use of Launching Facility: 90% Motorboats/Sailboats lQ% Non-Motorboats g. Day Use, Parking or Launch Fee Amount: $6.00 Tie-up/Overnight Moorage: $ h. Number of Launch Lanes: Two Condition: o New o Good o Average i2<:J Poor i. Length of Boarding Docks: 60 Ft. Condition: o New o Good o Average i2<:J Poor Type of docks: i2<:J Fixed Wooden o Fixed concrete o Floating concrete o Other: J. Number of Boat Trailer Parking Spaces: 12. Condition: o New o Good i2<:J Average o Poor k. Length of Tie-up Dock or Moorage: _Ft or _Slip Condition: o New o Good D Average o Poor Type of docks: o Fixed Wooden o Fixed concrete D Floating concrete o Other: I. Other Facility Attributes: Restroom: i2<:J Yes 0 No 0 Proposed Other: Pump out or Dump Station: 0 Yes i2<:J No Other: m. Names of adjacent boating facilities, public and private (ramps, tie-up facilities/marinas) within a IO-mile radius. Name Distance Name Distance 1. Collier Blvd Boat Ramp 15.0 2. 3. Naples Boat Ramp 10.0 4. 5. 6. 7. 8. Agenda Item No. 16014 May 13, 2008 Page 6 of 18 19 10. FWC/FBIP-B (01/08) Page 2 of9 A,gerlda Item No. 16D14 May 13, 2008 Page 7 of 18 IV - PROJECT DESCRIPTION a. List Primary Need for Project: l8J Safety o Age-end of Useful Life o Environmental Needs of the Area o Other: l8J High Demand by Users o Recommended by FWC Staff o Lack afIn-house Capability b. Need Statement: The primary' objective of this project is addressing the urgent need to resolve existing safety related issues and the overwhelming demands for adequate access to the v.,'aterways from the general public. Bayview Park site is heavily utilized on a daily basis exceeding the maximum functional capacity of the existing design layout. Currently, there are only two boat launching sites, 60 feet of unloading and loading dock space and sixteen trailer parking spaces. The funds Collier County is requesting will help offset the costs of the new boat launch site and the new loading and off loading dock space. The current dock space only allows for two to three boats to park at one time. During peak hours, boats begin line up and block the canal and stop traffic from exiting. The new dock space is going to increase dramatically from 60 feet to 200 feet. Allowing for boaters to safely move off to the side of the canal and load Of unload. These two projects will greatly increase the efficiency and safety" of boaters and allow them to arrive at their destination in a more efficient manner. c. Project Tasks: The Tasks listed below are for the v"ho1c Bayview Project. The FBIP funds requested will assist with Task 4 and 6. Task 1 - Provide professional design engineering and pennitting services for the expansion and development of the site, Task 2 ~ Site demolition, clearing and preparation, Task 3 - Remove existing seawal1 and replace with nev,' concrete seawall structure, Task 4 - Remove existing dual-lane boat ramp and replace \\/ith new tripp]e-Iane concreate boat ramp, Task 5 - Expand existing parking lot with new asphalt paving to include on and off site properties, Task 6 - Construct new wood boat docks with \I,.'ood decking and wood & concrete pilings, Task 7 - Construct new kayak/canoe launching pad with elliptical concrete ramp, Task 8 - Install landscape and ilTigation system, Task 9 - Install information kiosk and educational signage. d. Project Benefits: The project will substantially enhance boating in the community by greatly improving the existing site conditions, provideing maximum layout & functionality. and incrcasing the sufficiency for direct access to the water\vays. The increase in population throughout Collier County has raised the demands for sufficient public boat launching facilities. The growth management plan for Collier County mandates the County to provide adequate access to these water ways. Cun'ent!y, Collier County has over 24,000 registercd boaters. The expansion of Bay view Park site will enhance the existing facilities, increase the amenities and substantially improve direct access to Naples Bay and the sun-ounding water ways. The historical data of the high usage of this site clearly demonstrates that the demands are on a continual rise, whereas the existing congested parking conditions are currently creating liability concems and extremely hazardous safety conditions. The expansion of this site will indeed eliminate the exposed liability issues and provide safer conditions to the general public. F\\'CiFHIP-B (OI'OS) Page 2. of9 v - PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES a. Type of project: o Engineering / Planning only o Renovation / Repair r8J Expansion D New Construction b. Boat Ramp Number of existing launch lanes to be repaired: Two Type oframp: o Asphalt ~ Concrete o Other Number of new/added launch lanes: One Type of new ramp: o Asphalt ~ Concrete o Other c. Boarding Dock Length of existing boarding docks to be repaired! replaced: 60 ft. Type of docks: ~ Fixed wooden o Fixed concrete o Floating Concrete o Other Length of new/added boarding docks: 200 ft. Type of new docks: ~ Fixed wooden o Fixed concrete o Floating Concrete o Other d. Parking Number of existing boat trailer parking spaces to be refurbished l.2. Type of parking: ~ Asphalt o Concrete o Other Number of new/added boat trailer parking spaces 80 Type ofnew!added parking: ~ Asphalt o Concrete ~ Other Concrete curbinq e. Lifts, Hoists, Marine Railways Number oflifts or hoists to be repaired / replaced: - Maximum length of vessel that can be lifted:_ Number of new lifts or hoists to be installed I added: - Maximum length of vessel that can be lifted:_ Length of marine railway to be repaired I replaced: - ft. Length of new marine railway to be added: - ft. r. Amenities / Other elements o Restrooms: Describe o Access Road: Length of access road: _ yds. Type of road: o Gravel ~ Aspbalt o Other ~ Educational kiosk / signage: Describe Free standing encased unit Agenda Ifem No. 16014 May 13, 2008 Page 8 of 18 FWC'FBIP-B (Ol/OR) Page 2 of9 AJsnja !tem ~~o. 16014 o May 13,2008 Page 9 of 18 VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES (Piers / Docks) I a. Type of project: o Engineering / Planning o Renovate i' Repair ~ Expansion o New Construction b. Docks / In-water slips Length of existing docks to be repaired replaced: 60 ft. Number of tie-ups I slips: _ Type of dock: ~ Fixed Wooden o Fixed Concrete o Floating Concrete o Other Length of new docks to be added / installed: 140 ft. Number of tie-ups / slips:_ Type of dock: ~ Fixed Wooden o Fixed Concrete o Floating Concrete o Other e. Mooring Buoys Area of mooring field: _ sq. ft. Number of mooTing buoys to be repaired / replaced:_ Number of new mooring buoys to be installed: _ d. Dry Storage Number of existing dry siorage slips to be repaired / replaced: - Number of new dl)' storage slips to be constructed: _ e. Amenities/ Other elements o Restrooms: Describe o Access Road: Length of access road: _yds. Type of road: o Gravel o Asphalt ~ Other Kayak launch L2J Educational kiosk / signage: Describe Free standing double-sided enclosed kiosk o Pump-out or Dump station VII - PROJECT ENGINEERING AND CONSTRUCTION a. Who is or will be completing project design/engineering'? b. Level of engineering completed at time of application: o Applicant's Own Staff o None L2J Consulting Engineers ~ Conceptual (Master Plan Phase) o N/A (J\1atcrials or Equipment Purchase) o Preliminal)' o Other: o Final (Ready to Bid) rWC/FBIP-B (OliOS) Page 2 of9 VIII - BUDGET a. Has a detailed cost estimate been developed for this project? If yes, attach a copy to application. ~ Yes, Preliminary DYes, Final ONo b. PROJECT COST: NON-CASH FUNDS Other source Do Not Use Cost I tern Applicant (List below in This Column TOTAL Section VIII) Administration $ $ $ Project Management $ 5.000 $ $ 5,000 In-Kind Engineering $ $ $ In-Kind Labor $ $ $ In-Kind Materials $ $ $ In-Kind Equipment $ $ $ Total Non-Cash Funds $ 5,000 $ $ 5,000 c. PROJECT COST: CASH FUNDS Other source FBIP Grant Cost Item Applicant (List below in Request TOTAL Section VIII) Administration I Project Management $ 0 $ $ $ Design / Engineering $ $ $ $ Permitting $ $ $ $ Construction / Repair: Boat Ramps $ 180,000 $ $ 200,000 $ 380,000 Construction I Repair: Lifts, Hoists, Marine Railways $ $ $ $ Construction I Repair: Piers or Docks $ 80,000 $ $ 200,000 $ 280,000 Construction / Repair: Parking $ $ $ $ Construction I Repair: Restrooms $ $ $ $ Other: Seawall replacement $ $ $ $ Other: Landscaping & Irrigation $ $ $ $ Other: Kayak/Canoe concrete launching pad $ $ $ $ Other: signage $ $ $ $ Other: $ $ $ $ Total Cash Funds $ 260,000 $ $ 400,000 $ 660,000 Aoenda Item No. 16014 ~ May 13, 2008 Page 10 of 18 d. TOTAL FUNDS: non-cash + cash funds $ 5,000 $ 0 $ 660,000 $ 665,000 r\VC/FBIP-B (01/08) Page 2 of9 Agenda item No. 16014 May 13, 2008 Page 11 of 18 IX - OTHER SOURCE OF FUNDS (Partnerships) I a. Funding source / Agency: N/A b. Type of funding: o Federal grant D State/Local grant o Loan c. Grant Name: Amount $ d. Approval Status: o Approved D Pending o Intend to Apply, Date: a. Funding source / Agency: b. Type of funding: o Federal grant D State/Local grant o Loan c. Grant Name: Amount $ d. Approval Status: o Approved o Pending o Intend to Apply. Date: a. Funding source .I Agency: b. Type of funding: o Federal grant o State/Local grant o Loan c. Grant Name: Amount $ d. Approval Status: o Approved o Pending o Intend to Apply, Date: a. Funding source / Agency: b. Type of funding: D Federal grant D State/Local grant o Loan c. Grant Name: Amount $ d. Approval Status: o Approved D Pending o Intend to Apply, Date: x - PERMITS Submitted Approved N/A a. Florida Department of Environmental Protection ~ 0 0 b. Florida Fish and \Vildlife ConsclV'ation Commission* 0 0 ~ c. U.S. Anny Corps of Engineers 0 ~ 0 d. Local and Others (If needed) n 0 0 LJ * For mooring buoy projects, a Florida Unifo1111 Watcrv..'ay Marker Application must be submitted to F\VC prior to submittal of the grant application. FWC.TBIP-B (OLOS) Page 2 of9 XI - ENVIRONMENTAL ASSESSMENT YES NO a. Will the project significantly or adversely affect the environment? 0 I2SJ b. If Yes, please explain key issues and describe any mitigation actions proposed. This project will not negatively affect the environment. There are no mitigation requirements for this project from FDEP and it does comply with the Manatee Protection Plan. On both sides of the channel leading out into Gordon Pass are two seagrass beds. These beds consist of paddle grass (Halophila decipiens) and shoal grass (Halodulewrightii) species. Within the last year a private developer, developed the lot opposite the two boat launch sites and part of their mitigation was to install channel markers. Collier County partnered with the City of Naples on design of new site specific maps depicting the channel and kid friendly signage. The idea of kid friendly signage has been used at other Collier Park locations for Gopher Tortoise awareness, and has proven to be a huge success. The signage at Bayview Park will be posted at the end of the Park and visible for all boaters leaving the Park. It is our hope that children will advise their parents to stay within the marked channel. Please see attached signage. Agenda Item No. 16014 May 13, 2008 Page 12 of 18 XlI - BOATER SAFETY a. Explain how the project may affect boater safety whether positively or negatively. The improvements at Bayview Park site will greatly increase boater safety. Collier County has over 24,000 registered boaters and only 4 public boat ramps. Bayview Park boat ramp provides direct access to Gordon River in Naples Bay, a major boating channel that provides access to Keywadin ]Sland, a popular weekend destination, and direct access to the Gulf. Bayview Park is operating over its capacity on a daily basis. Currently, Bayview Park only has 16 trailer parking sites and two launching sites; this creates long lines and dangerous parking situations along side roads. Also, the current docks for loading and unloading are only 60 feet in length; this provides only two or three boats access for loading or unloading. On weekends this becomes a hazardous situation because boats begin to line up and cause congestion in the canal. Expanding Bayview Park will eliminate the congestion, hazardous parking and unsafe boating situations. It will also allow more spaces for law enforcement, Florida Fish and Wildlife officer and County Sheriff officers quick and easy access to Naples Bay. The improvement plans will allow for 80 more trailer parking sites, one more boat launch site, an additional 140 feet of loading and unloading dock space and increased education through an informational kiosk. Collier County has already partnered with the City of Naples and funded the installation of a site specific map on the existing scagrass beds and a more kid friendly signage asking boaters to "please stay in marked channel" (please see attached). All of these improvements to the Bayview Park site will greatly increase boater safety with an increase in safe parking areas, loading and unloading facilities, an additional launch site and public awareness through education. FWC/fBIP-B (01108) Page 2 of9 :"\genda item No. 16014 May 13 2008 Page 13 of 18 XIII - APPLICATION A TT ACHMENTS CHECKLIST Submit one (1) electronic copy on CD or floppy disk and seven (7) photocopies of the application with attachments. Inc. - - - Required Attachments - - - D a. Coyer Letter: application transmittal cover letter (Identify priority rank with multiple applications). D b. Application: One (1) application with original signature from authorized individual. c. Resolution: An adopted resolution, by the Governing Body, authorizing that the Project Manager has the authority to D apply for and administer the grant on behalf of the applicant. If the Applicant is applying on behalf of another public entity. then a Memorandum of Understanding betv..'een the Applicant and the public entity must also be submitted. D d. Boundary :\tap: indicate boundar)' of the project area. D e. Site Control Documentation: (e.g. a deed, lease, results of title search, etc. for the project site.) D f. F.xi~ting Condition Photographs (sufficient to depict the physical characteristics of the project area) D g. Aerial Photographs (marked with the approximate boundaries of the project site) D h. Navigational Chart: An 8.5" x 11" photocopy of a curTent NOAA. North American Datum 83 nautical chart (provide the NOAA chart name and number) indicating the precise location of the project site. - - - Optional Attachments - - - D 1. Detailed Cost Estimate: Cost estimate in the form of a fonnal bid, v,Titten quote from proposed vendor or an engineer's cost estimate. D J. Plans: preliminary design/engineering plans (if completed). D k. Permits: Photocopies of necessal)' project pelmit(s) or permit application(s). If exempt, provide notification of exemption from pemlitting agency. D I. Support/Opposition: Attach letters of known public support or known public opposition. APPLICANT SIGNATURE Application is hcreby made for the activities described herein. I certify that I am familiar with the information contained in the application, and, to the best of my knowledge and belief, this infonnation is true, complete, and accurate. I further certify that I possess thc authority including the necessary requisite propcrty interests to undertake the proposed activities. I also certify that the Applicant's governing body is aware of and has authorized the Project Manager as the official rcpresentative of the Applicant to act in connection with this application and subsequent project as well as to provide additional infonnation as may be required. By signature below, the Applicant agrees to comply with all applicable federal, state, and local laws in conjunction with this proposal and resulting project so approved. Print/Type Name Title Applicant Signature Date STATE OF FLORIDA, COUNTY OF ( Personally appeared before me this day of subscribed and swore (0 the above instrument in my presence. , 200~. , who Notal)' Public Name: My commission expires: NOTE: Instruction and further information regarding this application and the Florida Boating Improvement Program can be found in the Florida Boating ImprO\'cmcnt Program Procedure Guide or you may contact the Program Administrator at F]orida Fish and \Vild]ife Conscryation Commission, Florida Boating Improvement Program, 620 South Meridian Street, Tallahassee, FL 32399-1600; or call (850) 488~5600; or email fl;il1i(/)\hFWC.Ct)l1l. F\VC'FHII'-H (OJ/(Jg) Page 2 of9 Agenda Item No. 16014 May 13, 2008 Page 14 of 18 FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION FLORIDA BOATING IMPROVEMENT PROGRAM Instructions for completing the Grant Application for Boat Access Facilities General Instructions: · Submit one (1) original and seven (7) copies. . Submit an electronic copy of application on CD or floppy disk. . Staple application in upper left-hand corner, or clip with one binder clip. DO NOT SPIRAL BIND OR PLACE IN A THREE-RING BINDER OR REPORT COVER. . Please place a tabbed divider between each attachment. . Please make all photocopies of attachments on paper no larger than I I" x IT'. I - APPLICANT INFORMATION a. Applicant: Enter the nal11e of the county, municipality, or other governmental entity applying for the grant. b. Federal Employer Id. No.: Enter the applicant's Federal Employer Identification (FEID) Nunlber. Payment will be sent to the address associated with this FEID number. c. Project Manager Name: Enter the name and title of the person in charge of the Title: project. All correspondence will be sent to this person. d. Mailing Address: Enter the mailing address for the Project Manager. All correspondence will be sent to this address. e. Shipping Address: If mailing address is a P.O. box, please include a street address for overnight deliveries. f. Telephone No.: Enter the telephone number, fax number, and email Fax No.: address where the Project Manager may be contacted E-mail: during regular business hours. " District Numbers: Enter the District numbers for the State House, State '" Senate and the County Commission for the project location. Page 5 of5 Aoenda :tern r>Jo. 16014 - May 13, 2008 Page 15 of 18 II - PROJECT SUMMARY a. Project Title: Provide a brief title for the project. b. Type of Application: Check "New" if you have never applied for FBIP funding for this project. Check "Reconsideration" if you have applied before but did not receive funding. Check "Phased Continuation" if the project has previously received FBIP funding. c. Project Category: Check only one project category. Refer to the guidelines for project category descriptions. Application will compete only against other applications within the same project category. The Commission reserves the right to re-assign the application to a different project category to maximize funding. d. Project Cost: Enter total amount ofproject cost, including only the eligible project elements where grant funds will be used. Enter the amount of funds requested from FBIP (rounded to the nearest dollar). e. Project Summary: Provide a brief description of the goal of the project, the work to be done and the expected outcome or final product. III - GENERAL FACILITY INFORM A TION Describe existing conditions by checking all that apply. For new facilities, provide infOlmation as facility is proposed to be and check "New" for questions about condition of facility. IV - PROJECT DESCRIPTION a. List Primary Need for Project: Check the category that is most applicable. b. Need Statement: Briefly describe why this project is needed. Explain any existing problems and how this project will correct the problcm. c. Project Tasks: Describe in detail the exact work to be completed. For example, Task 1-. ConstlUct one-lane, concrete boat ramp, Task 2 - ConstlUct 20 boat/trailer parking spaces. d. Project Benefits: Describe how this project will enhance boating in the local community. Page 5 of 5 Agenda Item No. 16014 May 13, 2008 Page 16 of 18 v - PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES Check only those elements of the project that will use grant funding. Note: elements must be completed before FWC will reimburse costs. Indicate the type of proj ecl: . Engineering/Planning only = no grant funds will be used for construction . Renovate/Repair = replacement or repair of existing facilities with no increased capacity . Expansion = increased boat access by adding more boat launch lanes, more docks, or increased parking, etc. . New = construction of a facility where none currently exists, or adding a new amenity to an existing facility where none existed before VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES Check only those elements of the project that will use grant funding. Note: elements must be completed before FWC will reimburse costs. Indicate the type of proj ecl: . Engineering/Planning only = no grant funds will be used for construction . Renovate/Repair = replacement or repair of existing facilities with no increased capacity . Expansion = increased boat access by adding more boat launch lanes, more docks, or increased parking, etc. . New = construction of a facility where none currently exists, or adding a new amenity to an existing facility where none existed before VII - PROJECT ENGINEERING AND CONSTRUCTION a. Who is or will be completing project Please check as appropriate. design/engineering? b. Level of engineering completed at time of Please check as appropriate. If engineeling is application: complete (conceptual, preliminary, or final), please include a copy of the plans with your application. Page 5 of 5 A:Jsllda li9m r~O. 16D14 - May 13, 2008 Page 17 of 18 VIII - BUDGET a. Has a detailed cost estimate Indicate whether a preliminary or final cost estimate has been developed for this been developed. If yes, attach a copy of the estimate to the project? application. Enter amount of in-kind matching funds for each cost item. b. PROJECT COST - NON- Amounts in "Other" column should include in-kind funds CASH FUNDS* from any third-party agreements (provided by someone other than the applicant). *Please note: All applications must include some form of non-cash matching funds. c. PROJECT COST - CASH Enter amount of funding to be provided by the applicant and FUNDS other sources. Enter the amount of funding requested in the column labeled "FBIP Grant Request." d. TOTAL FUNDS Sum of non-cash funds and cash funds for each column. IX - OTHER SOURCE OF FUNDS (Partnerships) Include information on funding from sources other than FBIP or the applicant. Enter infornlation for each funding source. a. Funding Sourcc / Agency: Entcr the name of the funding source or the partner b. Type of funding: Check source of funds: Federal grant, State/Local grant, or loan. c. Grant Name: Enter the name of the grant program (if applicable). d. Approval Status: Enter status of grant/loan application. If "Intending to Apply", enter date of application deadline. X - PERMITS a. Florida Department of Check status of all pernlit applications. If project type does Environmcntal Protcction not rcquire pemlits, or project is exempt from pemlitting requirements, check "N/A". If applicable, attach a b. Florida Fish and Wildlife photocopy of all pennits or pel111it applications. If project is cxcmpt, attach a copy of exemption notification. Conservation Commission Note: For projects involving mooring buoys, a Florida c. U.S. Army Corps of Enginccrs Uniform \Vaterway Marker Application must bc submitted to FWC prior to submittal of the grant application. A copy of the Florida Unifonn Waterway d. Local and Others (Ifnceded) Marker Application may bc downloadcd at hl to :/iM v FW C .co 111 'boat in ~/\\'atcrwavs/ Page 5 of 5 Agenda Item No. 16014 May 13, 2008 Page 18 of 18 XI - ENVIRONMENTAL ASSESSMENT a. Will the project signif1cantly Explain how the project will have a signif1cant or adverse or adversely affect the affect on the envirol1l11ent and include information on the envirol1l11ent? impacts to water quality, wetlands, seagrasses, imperiled b. If Yes, please explain key species, etc. issues and describe any mitigation actions proposed. XII - BOATER SAFETY a. Explain how the project may Provide explanation of how the project may improve boater affect boater safety whether safety (i.e. increased education, increased law enforcement, positively or negatively. etc.) or, explain any potential boater safety hazards and how they will be corrected. Also, please indicate if the project will have no effect on boater safety. XIII - APPLICATION ATTACHMENTS CHECKLIST Indicate which attachments have been included with the application. Required attachments must be included or application will be deemed incomplete. Optional attachments may be omitted, but applications with optional attachments included will receive a higher score during evaluation. Please place a tabbed divider between each attachment. Submit one (1) original (with original signature) and seven (7) photocopies' of the entire application with attachments. Completed applications should be in the following order: Cover Letter, Application Form, Attachments in the order they are listed on the checklist. *Only one (1) copy ofthe site control documentation and permits or permit applications is necessary. Page 5 of 5