Agenda 05/13/2008 Item #10C Agenda Item No. 10C May 13, 2008 Page 1 of 16 EXECUTIVE SUMMARY Recommend approval of the recently completed Manatee Park Master Plan; Approval of staged approach to the park deyelopment; and approye of a time and material, not-to- exceed proposal to Corzo Castella Carballo Thompson Salman, P.A. (C3TS) to develop a Design Criteria Package to be utilized for design-build bidding and package solicitation for a total amount of $193,950. OBJECTIVE: To approve the recently completed Manatee Park Master Plan and obtain approval to proceed with a staged approach to park development and authorize the development of a Design Criteria Package to be used in design-build bid package for this project. The cost to deyelop the Design Criteria package is estimated at $193,950 on a time and material, not-to- exceed basis. CONSIDERATIONS: The County is proposing to deyelop a 60 acre parcel located in East Naples adjacent to Manatee Elementary School in the vicinity of Roost and Manatee roads into a predominantly passive park with isolated active elements. A phased approach is recommended to develop this park. In the initial phase of the park deyelopment the park infrastructure will be completely developed. Infrastructure deyelopment will include earthwork, utilities, drainage and roadways. The park will also include a dog park, maintenance compound, tennis courts, volleyball courts, horseshoes, bocce-ball, playground, splash deck, golf green, picnic areas, open play areas and supporting restrooms, pathways and shelters. Additionally, through an inter-local agrecment with Collier County Public Schools the existing lake will be expanded and deeded to the county. This will allow the public to utilize the lake concurrent with the park; the county to utilize the fill material from the lake for construction of the park; and, the county to maintain the lake consistent with the recreational needs of the community. The approximate cost of the initial phase development is $8,000,000. The second phase of the park development will be to build the complete Community Building Complex: The Community Building Complex will include a 6,700 SF community center building with capacity for 235 people; a 3,300 SF fitness center with capacity for 40 individuals; and a 6,700 SF day care center with a capacity for approximately 150 children. It is expected the completion of the Community Building Complex will cost an additional $7,000,000. The total cost of developing this park is estimated at approximately $15,000,000. ,~ Development of a Design Criteria Package to be used as the basis of our design-build bid package will be by C3TS on a time and material basis and not to exceed $193,950. The Design Criteria Package will not only include the initial park deyelopment phase but also an option for the Community Building Complex. Once design-build quotes are received, the cost and schedule of both phases of this project can be further developed and appropriate recommendations presented for funding. A design-build contracting method has been selected on the project due to the relatiYely straight forward nature and complexity of this project along with the economic enyironment within the consulting and contracting industries. Agenda Item No. 10C May 13, 2008 Page 2 of 16 ADVISORY COMMITTEE RECOMMENDATIONS: The Parks and Recreation Advisory Board voted to approve the Park master plan, approval of the phasing approach to Manatee Park development and approval of the work order to C3TS to develop the Design Criteria Package on 4/1 6/2008 by unanimous vote. COUNTY ATTORNEY FINDING: The County Attorney has reviewed and approved this item for form and legal sufficiency. FISCAL IMPACT: The Source of funds is from Parks & Recreation Fiscal Impact Fee Fund 346, Project 801222. Sufficient funds are ayailable to fund the Design and Criteria for $193,950. Additional funds for the total estimated cost are currently not available. GROWTH MANAGEMENT IMPACT: Manatee Community Park satisfies requirements of the Growth Management Plan and will be inventoried within the growth management plan. RECOMMENDATION: Recommend approval of the recently completed Manatee Park Master Plan; Approval of staged approach to the park development; and approve of a time and material, not-to-exceed proposal to Corzo Castella Carballo Thompson Salman, P.A. (C3TS) to develop a Design Criteria Package to be utilized for design-build bidding and package solicitation for a total amount of $ 193,950. PREPARED BY: Gary McAlpin, Director Page] of2 Agenda Item No. 10C May 13, 2008 Page 3 of 16 "- COLLIER COUNTY BOARO OF COUNTY COMMISSIONERS Item Number: Item Summary: 10C Recommend to review and obtain approval of the recently completed proposed Manatee Park Master Plan, obtain direction from the Board of County Commission on how to proceed and approve a time and material, not-ta-exceed proposal to Corzo Castella Carballo Thompson Salman, P.A. (C3T8) to develop a Design Criteria Package to be utilized for a design-build bid package and solicitation. (Gary McAlpin, Coastal Zone Management Director and Barry Williams, Parks and Recreation Director) Meeting Dale: 5/13/2008 9:00:00 AM Approved By Gary McAlpin Costal Project Manager Date Public Services Coastal Zone Management 4/1/200811:59 AM Approved By Linda Best Contracts Agent Date Administrative Services Purchasing 4/1/20082:18 PM Approved By Colleen Greene Assistant County Attorner Date County Attorney County Attorney Office 4/1/20084:29 PM Approved By Toni A. Mott Real Property Supervisor Date Administrative Services Facilities Management 4/2/20087:36 AM Approved By Steve Carnell Purchasing/General Svcs Director Date Administrative Services Purchasing 4/11/20088:53 AM Approved By Barry Williams Director Date Public Services Parks and Recreation 5/6/2008 9:04 AM Approved By Marla Ramsey Public Services Administrator Date Public Services Public Services Admin. 5/6/2008 10:22 AM Approved By Susan Usher Senior ManagemenUBudget Analyst Date County Manager's Office Office of Management & Budget 5/6/2008 5:29 PM Approved By James V. Mudd County Manager Date file://C:\AgendaTest\Export\1 07 -May%20 I 3, %202008\ I 0.%20COUNTY%20MANAGER%... 5/7/2008 Page 20f2 Agenda Item No. 10C May 13, 2008 Page 4 of 16 Board of County Commissioners County Manager's Office 5/6/20086:47 PM file://C:\AgendaTest\Export\ 107 -May%20 13, %202008\ 1 0.%20COUNTY%20MANAGER%... 5/7/2008 ()OOtO ~= o "' ~~Q) ~>-Ol e",,,, ~:2'CL '" '0 e Q) OJ <( ,.l ..,! lllE C( c; ., ~c~ ~ u 1~.1 q mlw~ ~ t $ m :~ ~~ u . " ; ~ ~ (J) cf".ll 'V'ClRI01::l 'AlNno:) ~13n10::> , . ~ I :c ~ c ~i= >RI'Vd 33NNV'V\J : ~ ~. i :0 u C> c, ii 00"'1 ~ 0 I~ '-1::-.. .., =:.. <(LJ.Ja.~a " - 0 ~;I !-- I .' "'~~"'~;~:o~~:.~r~...J', ~.~~~-':i;~~~~;.;~;;;:;~t!- ..'i~r~:',;..;~"... ''r'-..1t,'--w'".':;,: l....lP.. "\. (:..... 0.. ~,; . .~~ . ._~. '.:~a.. ...!:>',i.~~BiO.\l..,.l'"~; "'..~....~~. .;:":." ...:_:.;.~..o -:~Io" .'...,'\~-t;,:':~cS~~~~1i...c.~,<).}",","'"' ~;~~. . .... "-"0 -',',.~~:-t.... :~!"'..: .:'~~~{.~~~~~~~~~;~::~k~;-~:?~; ,"\:,-'~,~ I ~.~ i. )-:-~~~~~~\t ..., ..,' ...... l..""'n"~....,,_,-,, . !., W '.':: I : :..~~:r:~~\'2 ""f~'L~.:~_'"" . o. :~;,:;~~~~ ~~ ..... .,., .... . "'l'" . ! f ~ :? \\J~!:)' .. ~o' '. 2,H9' -.,2<.,,;.,", II I II !) I, " I I [W'J -~lfl II ';;;: .1:11 t,JOo. ,r <'~":~':j o. ]0 ". "'! I @) -' >, , II I I '. ':(41 , ' .z.'",... , '. ...\, . : C' ~o- ;~ .0 , ~.' :..':. .~ .1;._:_. -:. :;'c r,~ "'-- =-~:::~.:=~:-_=-~ - --- -=-:==--=:=:- "'~"o!Q.~~_~___ _~__ _0______ - ---__0._ ....:.-1....___ ------_.~ --------.-;------_-0 ,. ---\ I 0""'" oo~ ~o_ .N 0 o -'" Z~<1) ~>-Ol "roro ~:;;:a.. '" '0 " Cl Ol <( It,..j ~ .' ~ '1 .<! . t IIIB li.- ., ~ ~ ~ i~'i i '* ~ i,l~ ............... :ll j~ () Q) Ql :il! II ~ ~ qi~ val~O'::l 'A1Nno:) ~3mo::) ~ 1'1 .J::.- c ~ "'lit >tel'li d 331 'liN'liVIJ : ~ ~ . I I ~I 0 CJ 01 0 i I- . - ,,-. .~ ~ ~ 0 <(UJ~~a I ~;l ~ ,,0", '_.2:.'0.'" ! , , , I , \ , i , , , ------..---.--.- r.~::~'::~r.:;~':~:~..f' :, --_d"~;~";:~~>~:~f;:~~J " ",.,--\::...,.,... -... ..."'t; ~ ',' .....: '''''1 ;'~'~l!,;i~;~k^';~~i ~ i .: j' - ,':"'.. . '.'.- ".1., :.0- -:: \ ..\\,..{~ - I " '. ' I" -"1 I \_-~~?:.- ! I I .:\ , , , , , ; .. ;,;ii' , r", !f II\! " "j 4_0. : ", ,", : ~Ot".f.rl r':~' ,~'..~ O. 'OJ " ill 0:1 , I': ,,~ co. I ',:--1 , __--"---lo jJ~,J'; ---.--.- ----- ___"--_~__.l___.__ -- ----~- ---:1'---- ---\ /~. u"'<O oo~ ?""'- o ~ - <J) E"'O> w"'''' "':2CL '" '0 C W 0> <l: _....j ~ . " '1 :: J . t IlfB .. . .,.. .~. ~ ~ ~ 1~51 ~ ~ 1#llli ~ -.......... "i1 U U (1l Ql <:, ;~ ~~qr 'lial~Ol:l 'AlNnO:> ~31110:) , a " ~ " I ;0- ~"O g ~ I!! >RI'v'd 331 'v'N'v'V'J .~. . i I j 0 ~ c-_ ~ ~ ~ <(UJa.~a I' u 0 . ,~ ~;! ---------~------- / , i i i , 1 , , , 1 , , , , i i i i , \ if '( \ I ( ill II'I!I Ii i II I I i " , i, I \ i I 'I ) V ~ /~--- j7 'ill ! /~- II I, L____ ____oj) " e.,,>l. e,.<;,2.1'" f-~-~.,' .~~.~:.~~~. ;:~f.:~-:~~;~~,--,:,<,,: :.1:;,-ii~ f. . .J1--~:;".~._'~""'-'T1'i-,..,_,..:) ....!. .y~. .00( .'::/, ".ii~1 .1f-,__,d~~,...,i!I..'IoL~"'IW.,...;;r:-'h~ Ir'" "':,:.' ..:t..-I ". ". .:~~~~1;;;~<~.A"",){,~ .. . .-." .,1. . 00- ...~ J ,,~ '.~ ~~. ~:~:.,7' . :~il\~ ~i .:' " \~:~l;; ; ~o' " Iii!J III i.i '~;' .'j t ,Jo~. i ~ f", ~"~'l" o. :. 0" "': j I ') i' 12; ~i~ tEl, '81 . " .' , . . : .' " , : . " , ~.7 ?~ .' -"--:!":- ,--;-- ~. \ (' Agenda Item No. 10C May 13, 2008 Page 8 of 16 March 24, 2008 Collier County Coastal Zone Management Department 3300 Santa Barbara Blvd. Naples, FL 34116 Attention: Mr. J. Gary McAlpin Director Reference: Manatee Park Design Criteria Package Dear Mr. McAlpin: The firm of Corzo Castella Carballo Thompson Salman, P.A. (C3TS) is pleased to submit this price proposal for the above referenced project for your review and consideration. We look forward to the opportunity of working with Collier County (County). It is our understanding that the County is proposing to develop a Parks facility on a 60 acre parcel of property that is currently undeveloped. The facility, to be known as Manatee Park, is intended to be a predominantly passive park with isolated actiye elements. The scope of the park will be based on the Master Plan developed in the previous stagE the project. The initial phase of park development is intended to include the majority VI underlying infrastructure improvements including earthwork, utilities drainage and roadways. The park will also include a Dog Park, Maintenance Compound, Tennis Courts, Volleyball Courts, Horseshoe, Bocce Ball, Playground, Splashdeck, Golf Green, Picnic Areas, Open Play Areas and supporting restrooms, pathways and shelters. Ultimately the park is intended to contain a Community Center with Meeting Rooms, Fitness Center, Game Room, Administrative Offices and a Child Care Center. At this time, we understand that the County wishes to continue to develop the approved Site Plan into preliminary plans with a Design Criteria Package to be utilized in the adyertisement for a Design Build Contractor. Concurrent with this effort, the County wishes to proceed with the processing of permits through the SFWMD and the County CDES. Consultant Scope Phase 2 - Schematic Design and Plans Development Additional Design The CONSULTANT will continue design efforts for the elements selected to be included in this phase of Construction. The degree of design completion will deper>rl on the project element and its relation to permitting and plans development. general, elements will be designed to the level needed to process the necessary permits and to incorporate design information into the plans. Manatee Park Design Criteria Package March 24, 2008 Page 2 of 7 Agenda Item No. 10C May 13, 2008 Page 9 of 16 Plans Development The CONSULTANT will develop preliminary plans to better define the intended scope of the project. The degree of plan development will vary depending on the project element and its relation to permitting and the ultimate Design Criteria Package (DCP). The plans indicated below will be accompanied by notes and the DCP written narrative that will provide a descriptiye supplement to the design intent. Following is a list of various plan components and the anticipated degree of plan development ~ . Site Plan - The site plan is anticipated to be 75% complete to account for permitting requirements through the Site Deyelopment Plan reyiew process · Paving Grading Drainage Plans - The Master PGD Plan is anticipated to be at least 50% complete to indicate the oyerall system with drainage patterns and general grading. Large scale plans of the park with specific grading will be left to the Design-Builder. Detail Sheets may be proYided as necessary to secure permits and communicate design intent. . Utility Plans - Master Plan of the proposed water and sewer systems are expected to be at least 50% to show the layouts, sizes and operating parameters of the elements. Element specific plans and profiles with elevations will be left to the Design-Builder. Detail Sheets may be provided as necessary to secure permits and communicate design intent. Plans for water utilities will be limited to on-site development. Plans for sewer development require construction to extend along Roost Road to Manatee Road. This part of the deyelopment will not be specifically designed or surveyed and will be deferred to the responsibility of the design build team. . Architectural Plans - Building Plans are anticipated to be developed to Schematic Design Phase to show floor plans and eleyations for the intended design. Additional schedules and details may be added as necessary to communicate the design intent. The services for the main Community Center building have been separated into a distinct task that can be included or excluded at the direction of the County pending the funding available for the project budget. . Building Systems - Design intent for Structural, Electrical, Mechanical and Fire Protection are anticipated to be communicated through written narrative specifying the systems, standards, materials, code references, performances and other qualifying characteristics. A simple schematic plan may be included for Structural if deemed necessary to communicate the design intent. . Electrical and Communication Services - A schematic plan may be required to indicate service points and/or proposed easements for service proyiders. Otherwise, it is anticipated that the provision of electrical, phone and cable services will be communicated through written narratiye. · Landscape Architecture - It is anticipated that Landscape Plans will be at least 50% complete to allow for Site Development Plan Review. It is also Manatee Park Design Criteria Package March 24, 2008 Page 3 of 7 Agenda Item No. 10C May 13, 2008 Page 10 of 16 anticipated that a Site Furnishings Plan will be at least 50% complete in order to communicate project scope. Detail Sheets may be provided as necessary to secure permits and communicate design intent. . Irrigation Plans - It is anticipated that Irrigation Plans might require a schematic plan for the major system components. Specific zone and sprinkler head layout will be left to the Design Builder. Detail Sheets may be proYided as necessary to secure permits and communicate design intent. Otherwise, this element will be specified through written narrative. . Additional Survey - Additional survey will be performed to provide legal descriptions and sketches for the lake property being conveyed by the school board. Phase 3 - Permitting Permitting The Consultant team will be responsible for preliminary permitting in order to address significant project concerns prior to engaging a Design Build team. It is anticipated that the status of permits will be at various stages at the end of ' Design Criteria Package Phase. Following is a list of various permitting efforts ai,,, the anticipated leyel of completion. . Site Development Plan - The Consultant team will apply for and process an SDP package through the Collier County CDES. It is anticipated that we will address the major comments that materially affect the design of the project. However, it is anticipated that the permit will not be finalized at the time of RFP. We anticipate having a list of outstanding comments that will be included in the RFP package. The design builder would then be responsible for incorporating the necessary comments and finalizing the permitting process prior to construction . Drainage Permits - The Consultant team will apply for and process an Environmental Resource Permit (ERP) package through the South Florida Water Management District (SFWMD). Similarly, we anticipate addressing the major comments while leaving a list of outstanding comments for the design build team to address during final processing. . Environmental Permits - The Consultant team will process the environmental components of the ERP and SDP. The ERP process includes review and processing from the Army Corps, Fish and Wildlife, DEP and other state agencies. It is anticipated that the enyironmental aspects of these permits will need to be satisfied prior to proceeding to the Design Build RFP process. . Water Use Permit - It is anticipated that the SFWMD Water Use Permit 10""1 be applied for and processed by the Design Build team. . Utility Permits - It is anticipated that the processing of local utility permits will be filed and processed by the Design Build team. Manatee Park Design Criteria Package March 24, 2008 Page 4 of 7 Agenda Item NO.1 OC May 13, 2008 Page 11 of 16 · Building Permits - It is anticipated that the Design Build Team will be responsible for filing and processing of all building permits. · Concession Permits - It is anticipated that the Design Build Team will be responsible for any kitchen permits through DBPR Hotels and Restaurants. · Utility Coordination - The consultant will provide additional coordination for the provisions of utility services at the park entrance. Utility locates and softdigs will be performed to identify existing utilities within the right-of-way of Roost Road in front of the park.. Additional survey will be performed to collect the location data and show those utilities on the survey. Phase 4 Design Criteria Package The CONSULTANT shall prepare Design Criteria Documents consisting of concept drawings and other documents illustrating the scale and relationship of Project components. The criteria design submittal shall include: a) Request for Design-Build Qualifications (RFQ) b) Request for Design-Build Proposals (RFP); c) RFQ weighted selection criteria and Procedures; d) Master Plan Concept e) Concept site plan f) Concept floor plans g) Concept elevations indicating aesthetic characteristics; h) Permit packages and outstanding comments i) Equipment requirements; j) Performance specifications; k) Legal Description; I) Survey Information m) Interior space requirements; n) Material quality standards; 0) Schedules; p) Site Requirements; q) Utilities; r) Stormwater Requirements; s) Parking Requirements; Manatee Park Design Criteria Package March 24, 2008 Page 5 of 7 Agenda Item NO.1 OC May 13, 2008 Page 12 of 16 It is anticipated that this project will be advertised in a two step process. The Request for Design-Build Qualifications (RFQ) solicits submittals of relevant experience, references, bonding capacity, etc, for the purpose of pre-selecting a group of design-build teams with the capabilities to perform the project. After short listing the qualified teams, the RFP will request the project specific technical design and price proposal for the project. Phase 5 Bidding and Evaluation The CONSULTANT shall assist in the bidding and evaluation process by participating in the following actiyities: . Evaluating and commenting on qualification packages for the submittals for the Step 1 . Attending a short listing meeting with the selection committee . Attending pre-bid meeting for the short-listed proposers. . Addressing RFl's and issuing addenda regarding questions raised during the bid process . Eyaluate the Step 2 Proposals from the short-listed teams . Attend selection committee meeting to assist in the evaluation of team presentations and to rank proposers . Assist in negotiation by evaluating alternate recommendations and yalue engineering. Meetings C3TS will meet with the County at various stages throughout the planning phase. Two meetings with the County are anticipated. Deliverables Throughout this phase, C3TS will deliver the results of our efforts as defined above. We anticipate that deliyerables will include the following. Preliminary Plans As Outlined Above Design Criteria Package As Outlined Above Deliverables will include five signed and sealed copies of various surveys and documents, as well as additional unsigned copies as requested. Expenses for deliverables will be charged as reimbursable as defined below. Manatee Park Design Criteria Package March 24, 2008 Page 6 of 7 Agenda Item No. 10C May 13, 2008 Page 13 of 16 ADDITIONAL WORK Phases for Design Review and Construction Administration will be performed in future phases and are not a part of this proposal. Service under this work order terminate when the Design Criteria Package is ready for advertisement. CONSULTANT FEES The performance of the attached Scope of Work will be billed in accordance with Contract No 07-4153 "Professional Engineering Services for Coastal Zone Management Projects" The Scope of Work will be performed on an Hourly-not-to-Exceed Basis for the Prime Consultant and major Sub-Consultants. Minor Sub-Consultants with a defined scope of work such as Surveying and Geotechnical Exploration will be billed as a lump sum. Due to the nature of this proposal, there are work efforts that are indefinable at this time. The permitting process will possibly raise questions that will affect the work effort involyed in this proposal. Furthermore, the issue of joint permitting with the School Board and the time implications involved could be a factor. As a result, this proposal represents an estimate of the time and materials needed to perform the scope of services described. The estimated billings for this project as described is $193,950.00 (One Hundred Ninety Three Thousand Nine Hundred Fifty Dollars and Zero Cents) broken down as follows: Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Additional Design - Phase 2A Plans Deyelopment - Phase 2B Permitting - Phase 3 Design Criteria Package - Phase 4 Community Center Building - Phase 4A Biddinq and Evaluation- Phase 5 $ 15,000.00 $ 50,870.00 $ 58,740.00 $ 24,420.00 $ 35,880.00 $ 9,040.00 $ 193,950.00 TOTAL BASE SERVICES The Scope of Work described above will be performed with due diligence in regards to schedule. It is anticipated that the scope will be completed in 180 Days from a Notice to Proceed. This schedule assumes timely cooperation from the County and other necessary Agencies. We will bill you monthly for the percentage of services or hours of service rendered and for any Reimbursable expenses. Printing, shipping, permit fees or other miscellaneous expenses will be billed as Manatee Park Design Criteria Package March 24, 2008 Page 7 of 7 Agenda Item No. 10C May 13, 2008 Page 14 of 16 reimbursable expenses as allowed in the contract. We look forward to the opportunity of working with the County of Collier County. If you haye any questions, please feel free to contact me at (954) 565- 2113 or bye-mail at icrews@c3ts.com. Sincerely, Corzo Castella Carballo Thompson Salman, PA Jeffrey S. Crews Vice President Attachments P:\358 Collier County\Manatee Park\Proposal\Manatee Park DCP Proposal.doc u"" 00 ;;..0 E>- m'" "':2 '" '0 C m Ol <l; Ul W U :;; 0:: w Ul u iii <( III Ul w .... <( ::;; ;:: Ul w 0:: ::> o :I: Z <( ::;; '" cL e- m E '" (ij t:i (f) .,. o " goo ,:g ~~ 8~ ~ 1ij ~~~ f-a:c:C"l. .2 QJ ro>< 7ii ~~:g~ € Q).c.2M ro.~ a; U-.:: U Cl(i.i Q;lN :mJjQJrnJJ * ,~~~ ro~5"O~ U alz ~1O ~:E~~~ o ~Q) OlO U<CMU-f- ~ o o S ~ ~ ~ ~ .; ill o o ci ~ o o ci ~ o o ~ ,,; N ~ o o ci ~ o 0 o 0 o 0 ~ ~ ggg2;808 ~S*g~~g ~~~;iz;:;m~ 11l ~ Sj ~ CD '<t ~ o ~~ ~ 00008 ....**....g . ~ ~ ~ ~ Jr. .'; ~ ~. . ~ i j ~ t- f.( ~ . < , 00 ~ . " . ~ e .~ w ~ ~ " , 0 ,lEaD ~ ~:2 ~~.... .~ ~ g ~r J~~x~, '" -,\ !i ~ t!::< 0>", ~ ,>> ~:::i: "" l.", ~ o ~ o ~ ~ ~ ~ ~ 3l g> 1\i "c ljj ~ ~ < 0" -g Jj ~ g 1:" ~~l~~~ - " ~ l!l,g 2! "e ~~ ~ a. ~:iZ;:; -" JHHs u~ ~ " "~ " . "~ ~ j,'-;' ","" )" i.," '. ."". a: 5k; z , 0 o ~. , " ~ 0' " -< ~ o C " . ~ o ~ " " . " " . " S g ~ ~ -. a:: '" a:: ~ ~ !! '5 "i'ij E U5 => Ci <( ~ ;:!; :z ~ ~ '" ~ ~ ~ ~ 0 g g g g g ~ g ~ ~ ~aaagaaaag~j~a ~ g ~ 8 c:i N ~.,. .,. a:;;g o o ~ .,. .; N ~ o o ci N .,. N ;;; 00 00 ci 0 ~:; ;;;~ g g g g ~ :;;j ~ ~ '<1". '<1-.<0. ,_ ;;;;;z;:;~ CD ~ ~ ~ aNN N N a ~ <0 CD ~ ~ ~ ~ ~ 15l.., ::5 ~ g g ~ ~ g ~ ~ ~ ~ g ggg~~g:ig~....~ o o ~~~~~~~ ;;; 00000 ........w........ o o o ;f; 00 g ~ ~ ri ~ ~ ~ g g ~ ~ ~ gg:ig;i~ 00 " < " o " 00 " '" .., '<t co CD <0 0 ~ o " ~ ~ ~ 0 0 a a 0 0 0 0 a 0 0 a o a a a 0 0 0 0 0 0 a 0 a a a 0 ~ ~ ~ 0 N N N N 0 ~ <0 CD " " {l Q " ~ . E E . '" '" ~ w ~ 'E ;: Q ~ '" ~ ~ ~ ~ ~ ~~~ ~.w~g ~ s i ~ i 8 I : ~ ~ ~ ~ -< ~ ~ ~ ~~~_~g~ ~~ill 0:: 0:: .u >. u: ~ ~ * -e Cl ~ ffi g ~ ~ 3 8 8 I 8 ~ 8 ~ ~ <: 0. <0 ~ ~ ~ Z Z J:1 '0 ~ C '0 <: ~~~~[ ~ ~ .~ ~ ~ -< tf ~ 0 c3 ~ ~ ~ ~ % ~ ~ ~ ~ M ~ ~ ..t ~ ;J ~ ~ ll'" ~ 0 0 0 ~ 0 0 00 0 =0; ~ 0 0 B ~ ~ ~o ~~ ~ N ~ .0 0 ri '" ci . U M ~ ;; Z~ ~ E 0 0 >- 0 0 OJ'" 6 0 ~ =e;;; ~ ;g .0 Iii '" M '0 ~ C OJ 0 0 0 0 :;: 0 0 0 0 0 0> 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 0 6 0 0 0 0 0 6 0 6 0 ~ 6 <( N 0\ 0 0 6 ~ 6 6 6 ~ 6 ~ ~ 0 ~ w ~ ~ ~ ~ ~ 0 0 0 ~ 0 ~ g 0 ~ .; N N .0 ill ~ ill N ill '" ri ~ ~ ;;; ~ ~ ~ M ~ ~ ;;; ~.... ~ ~ ~ ~ ~ 0 ~ ~ 0 ~ 0 ~ ~ . . . . ~ ~ 0 . N N 0 0 Ol 0 0 0 0 0 0 0 ~ (J) ~ ~ ~ ~ ~ ~ ~ ~ ~ "' w ill U :> . 0: ~ 0 0 W 0 (J) " ::; U e ~ ~ in t <0; III (J) ~ W .... <0; ~ . :;: ~ ;:: w (J) W . 0: " . ::> ~ 0 e :I: 1 z w <0; :;: !ll ~ coo 200 ~ -E ....; ~.~ w'~ ~~ :!;2 5 g ~ 0 "~ . ~"~ ~ o.~ ~::!:fff :w Q;~g ~ ~ ~ ~ .~-E ~ ~.~ &i~'" ~ OW 0 ~~~g 0 ~ . ~ ~ 0 0 0 e~-E~ N N Ii: Cl. '-' '" ~ ~ <:~... . ~ _ W " ~ ~~ g . ~ ~ " e ~-E ~ ~ [l. ~~~ ~ . < _w 9.~g '" o~ ~ "c ~ "to: '" ~ ri ", w C . oo E ~ ~ 0; 0 " if) .. ~ . c "- rn ~ g ~ <0 " N . " "' W . 0 , Q c.~ oo . " . " . ~ z W ~ w E c QJg~ . ;; > z < 0 " ~ o c ~ 9 " " " ~ ~ " . MOO ~ ~ ~ " i z . ~ . >-D: EM . W 0 5 ~ ~ W o ,Q)('I:lX 0 ~ Ii: " . - > 't:I m I .. . " . Cijl!l<("t:l.J.. l: " " ~ W N . " -e lll.c.2M ~ ~ . " 0 W ;; . " ro c 05 u...... Z z w g ;; g " C).OJ..... cDN " . ~ ~ ;;; i i . 2 " " 0 ~ roc(l)-, 2 g g g g U ~ "ijj l!J ~ ~~ 0 ~ ~ ~ ~ " ~ ~ 0 W . Iii 'oC QiI.O ~ ~ ~ ~ , " W " w roE!t:::'C~ ~ U a:J~ ~~ o :t:W..J W 'l ~ 1! ~ ~ ~ t:!-5o>t::'.....: W '! '! ~ ~ , 84:~&~ ~ . . . . . . ~ ~ ~ ~