Agenda 05/27/2008 Item #16A 1
.Il.genda Item No. 16A 1
May 27,2008
Page 1 of 6
EXECUTIVE SUMMARY
To accept final and unconditional conveyance of the water utility facility for
Fiddler's Creek Club Center
OBJECTIVE: The Board of County Commissioners, Ex-Officio the Governing Board of
the Collier County Water-Sewer District, to accept final and unconditional conveyance of
the water facilities.
CONSIDERATIONS:
1) The Developer of Fiddler's Creek Club Center has constructed the water facility within
dedicated easements to serve this development. See attached location map.
2) Preliminary acceptance of this water utility facility was approved by the Engineering
and Environmental Services Department staff on March 16, 1999. At that time, the
value of this utility facility (assets) was $62,825.75 (see attachment[s]). Final
Acceptance is in accordance with Ordinance 2004-31, as amended.
---
3) Staff has recorded all preliminary acceptance documents in the public records of
Collier County, which have been reviewed and approved by the County Attorney's
office as to form and legal sufficiency.
4) The water facility has been operated and maintained by the Collier County Water-
Sewer District during, not less than, the required one (1) year warranty period.
5) A final inspection to discover defects in materials and workmanship has been
conducted by the Engineering and Environmental Services Department staff and this
facility has been found to be satisfactory and acceptable.
6) The water utility infrastructure connected beyond the master meter is owned and
maintained by the owner.
7) The PUD Monitoring staff has reviewed this request in relation to possible issues
raised by the applicable Home Owners Association (HOA). Staff is unaware of any
issues that would serve to negate the recommendation to release the applicable
secu rity.
FISCAL IMPACT: Approval of this Executive Summary will have no specific financial
impact. However, approval of this Executive Summary will result in the Collier County
Water-Sewer District receiving unconditional title to the utility facility, which at the time of
preliminary acceptance, had a total (undepreciated) value of $62,825.75.
GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no
r' growth management impact.
.t.,Clsrlca item t~o. 'j 6/J., '1
-' 1\.18Y 27. 2008
Page 2 of 6
LEGAL CONSIDERATIONS: No additional legal review from the County Attorney
was required to complete this final acceptance.
RECOMMENDATION: That the Board of County Commissioners, Ex-Officio the
Governing Board of the Collier County Water-Sewer District, to accept final and
unconditional conveyance of the water facility for Fiddler's Creek Club Center, and
authorize the County Manager, or his designee, to release any Utilities Performance
Security (UPS) to the Project Engineer or the Developer's designated agent.
PREPARED BY: Jodi P. Hughes, Engineering Technician
~""
Item Number:
Item Summary:
Meeting Date:
Page 1 of 2
.L\genda item No. 16A 1
May 27,2008
Page 3 of 6
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
16A1
To accept final and unconditional conveyance of the water utility facility for Fiddler's Creek
Club Center
5/27/200890000 AM
Prepared By
Jodi Pannullo
Community Development &
Environmental Services
Administrative Assistant
Date
Approved By
CD:::S Engineering Services
3/24/2008 11 :04:43 AM
Pamela Libby
Public Utilities
Water Operations Manager
Date
Water
3f25/2008 9:05 AM
Approved By
Paul Mattausch
Public Utilities
Water Director
Date
Water
3/27/2D08 12:00 PM
Approved By
William D. Lorenz, Jr., P.E.
Community Development &
Environmental Services
Environmental Services Director
Date
Environmental Services
4!9/2.008 4:45PM
Approved By
Judy Puig
Community Development &
Environmental Services
Operations Ana1rst
Date
Community Development &
Environmental Services Admin.
4/15/20081 :13 PM
Approved By
Roy 8. Anderson, P.E.
Public Utilities
Public UtiHties Engineering Director
Date
Public Utilities Engineering
4/15,'20083:55 PM
Approved By
Joseph K. Schmitt
Community Development &
Envir::Jnmental Services Adminstr'ator
Date
Environmental Services
Community Development & Community Development &
Environmental Services Admin.
4/17/200810:19 AM
Approved By
OMS Coordinator
(',
County Manage;'s Office
Office of Man2gement & Budget
4!'18/2008 5:19 PM
Approved By
OMS Coordinator
Date
lile:IIC:\A!!cndaTcst\ExDort\ 1 08-Mav%2027.%202008\ 16,'Yo20CONSENT%20AGENDA \ 1 u. 5/21/2008
Page 20f2
L,g8nca item [\10. 16,L,1
Liiay 27. ~D()8
Po;Je4of6
Randy Greenwald
Management/Budget Analyst
:Jate
County Manager's Office
Office of Managemen~ & Budget
4/22/20089:34 AM
Approved By
MaryAnn Devanas
Community Development &
Environmental ServicE:s
Senior Planner
Date
Zoning & Land Development Review
41231200810:12 AM
Approved By
James V. Mudd
County Manager
Date
Board of County
Commissioners
County Manager's Office
4/24/2008 3 :27 PM
file://C:\AgendaTest\Export\] 08-May%2027,%202008\ 16.%20CONSENT%20AGENDA \ I... 5/21/2008
-;-COl.:l
~o~
<P-O 0
, C~
(])
..:... ..,j 0)
>,'"
E",D-
2::;;
'"
;2
iD
OJ
~
;:
/
(
~
z
o
w-
~!<
0;0
o
~
&:..,
c)
~
I
<~~ '4 !
"o~
,~
J"I\''.l$OJ.u>N / __
_ C-
(',
,
, "
.
,
~g:
.,
if
~z
~ Q ~
:J 0 ~ ~-
o :1
:E g i
,
li:::!-
i~! N
t' ,
:l i Ii ~ :
.., l,
OI,ili~ll~ '
I"~ " ,~
,I, :' '1
~u H".fS! .
---r' i,_
. "
2'
~\~ ,,'
r-\"
.
0...
<(
~
LLJ
I-
en
(;;
-
c:
(l)
<.)
.0
:J
U
""
(l)
(l)
<1
l/l
'-
(l)
'0
-0
u::
a...
<[
~
z
o
~
u
o
...JI
jL~m h)lJ. 1(31.\,1
rV1ay 27. 20G8
Pa;13 60f5
Q. GRADY MINOR & ASSOCIATES, P.A.
Civil Engineers. Land Surveyors. Planners
Q. GRADY MINOR, P.E.
MARK W. MINOR, PE
C DEAN SMITH, P .E.
[)A VID W. SCHMITT, P.E.
ALAN V. ROSEMAN
ROBERT W. THINNES, A.I.CP.
ERIC v. SANDOV AL, PS.M.
Fiddler's Creek Club Center
Verification of Final Cost
Utility Facilities
Water Distribution and Fire Protection
1. 8" PVC (DR 18) 1,105 Lf. @ $10.65 = $11,768.25
2. 3" PVC 400 l.f. @ 7.80 3,120.00
3. 1.5" PVC 480 l. f. @ 6.05 = 2,904.00
4. 0.75" PVC 330 l. f. @ 5.95 = 1.963.50
5. 8" Fire Meter I @ 16,575.00 = 16,575.00
6. 3" Domestic Meter 1 @ 12,700.00 = 12,700.00
7. Fire Hydrants 4 @ 1,655.00 = 6,620.00
8. Signage Connection 1 @ 952.00 = 952.00
9. Connect to existing 1 @ 475.00 = 475.00
10. 4" D.I.P. 150 l.f. @ 16.00 = 2,400.00
11. 4" PVC (DR 14) 372 l.f. @ 9.00 3,348.00
Total for Water = $62,825.75
F:FIDCREEK\FC,CH
(941) 947-1144 . FAX (941) 947-0375' E-Mail: QGMA@ao1.com
3800 Via Del Rey. Bonita Springs, Florida 34134