Resolution 2001-313
RESOLUTION NO. OI-~3
13A
..
';I
:~
A RESOLUTION REPLACING EXHIBIT "B" OF RESOLUTION No.
99-328, AS PROVIDED FOR IN DIVISION 1.10 OF THE COLLIER
COUNTY LAND DEVELOPMENT CODE, PERTAINING TO A
SCHEDULE OF FIRE PREVENTION & CONTROL FEES
ESTABLISHED AND ADOPTED BY THE INDEPENDENT FIRE
DISTRICTS AND APPLYING TO DEPENDENT FIRE DISTRICTS;
AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS; the Collier County Land Development Code (LDC), ~ 1.10.1 provides the Board of
Collier County Commissioners (Board) shall establish and adopt by resolution a schedule of fees and
charges for application and document processing, public meetings, public hearing, other meetings and
hearings, transcripts, approvals, denials, development permits, development orders, development
construction, interpretations, enforcement inspection services, sale of documents, review, resubmission
and any other zoning or development related service and any other services provided or costs incurred
by the County; and
WHEREAS; LDC ~ 1.10.2. provides the fee schedules may be amended via Board resolution,
including those for fire inspection services; and
WHEREAS; the Board approved Resolution 95-642 establishing a fee schedule of development
related review and processing fees schedule of development related review and processing fees on
November 14, 1995; which resolution was subsequently amended by Resolution 96-594 on December
17, 1996; and these resolutions were superceded and replaced by Resolution 99-328 on August 3, 1999;
incorporating Exhibits A & B regarding such fees; and
WHEREAS; Exhibit B of Resolution 99-328, establishing a Schedule of Fire Prevention &
Control Fees, is now being replaced in its entirety to provide for an increase in fire inspection fees which
will allow for adequate staffing levels within the fire districts, improved quality of inspections, and
increased availability to contractors and developers; and
WHEREAS; the proposed revision to Exhibit B has been developed in cooperation with the
Collier Building Industry Association's Fire Task Force Subcommittee and the Development Services
Advisory Committee's Subcommittee.
12
"'--
1 ~ A ..... ~
WHEREAS; all fee's received pertaining to this resolution shall be designated and a1locate~r the sole ...
purpose of funding construction inspections including training and equipment relating to the field of
construction inspections; and
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA that:
The Board of County Commissioners hereby declares the revised Exhibit "B," Schedule of Fire
Prevention & Control Fees, attached hereto, and incorporated by reference sets forth fair and reasonable
sums to be assessed to those who receive the benefits of those fire inspections required by the Land
Development Code and the County Permitting process.
BE IT FURTHER RESOL VED, this Resolution and Exhibit B, relating to Fire Code Compliance
Inspection Fees, be recorded as part of the official minutes of this Board; and Resolution Number 99-
328, be and, is hereby amended to the extent set forth by this Resolution. This Resolution and its
amended fees become effective on August 1,2001.
This Resolution adopted after motion, second, and majority vote.
Done the .3 / day of ~
- CI
, 2001
ATTEST
" 'J ,; f
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
",' ,t
,. .
,;
~
James D. er, Ph.D., Chairman
. .~
. . :/"Jh~~ ~~
:t~rrOCk~er
. It.. as to 1~'.
. s'~i~'ature ~l.r.
A roved as 0 form and legal sufficiency
Patrick G. White, Ass't. County Attorney
13
EXHIBIT B 13A
Schedule of Fire Prevention & Control Fees
A. FIRE PREVENTION & CONTROL PERMIT FEES
The following fees shall be assessed on all applications for building permits:
(Effective January 1, 2001)
1) Architectural plan review fees - .1% of the job value.
2) Fire Sprinkler Systems (new installations) - $30 + $.50 per head (rounded up).
3) Fire Sprinkler Systems (remodeling) - $30 + $1 per head altered or added.
4) Underground Fire Line -$30 + $.20 per foot (rounded up)
5) Standpipes - $30 + $50 per riser.
6) Fire Pumps (up to and including 500 gpm) - $50.
7) Fire Pumps (over 500 gpm) -$75.
8) Pre - engineered Systems (new) - $30 +$10 per bottle of suppression agent.
9) Pre - engineered Systems (remodel) - $30 + $1 per head altered or added.
10) Total Flood Systems (new) - $30 + $50 per bottle of suppression agent.
11) Total Flood Systems (remodel) - $30 + $1 per head altered or added.
12) Fire Alarm Systems (zoned systems) - $30 + $5 per indicating or initiating circuit.
13) Fire Alarm Systems (intelligent system) - $30+ $.50 per indicating or initiating
device
14) Installation of pollutant storage tanks :
Above ground - $30 + $20 per tank
Underground - $30 + $30 per tank
15) Pollutant Storage Tank Removal Above ground -$40
Underground -$40
16) Pollutant StorageTank Abandonment - $50 (requires notarized letter of consent from
property owner)
14
17) LPG Installations
1 '
3A it
Above ground - $30 + $10 per tank
Underground - $30 + $20 per tank
18) LPG Tank Removal - $40 per tank
19) LPG Tank Abandonment - $50 (requires notarized letter of authorization from
the property owner)
20) All fees listed above include the initial review and ONE re- review. Additional reviews
will be provided in accordance with the following schedule:
2nd re- review 10% of original review $30 minimum
3rd re- review 25% of original review $50 minimum
4th re- review 50% of original review $100 minimum
5th re- review 100% of original review $200 minimum
B. Fire Code Compliance Inspection Fees *:
(Effective Augustl, 2001)
1) BUILDINGS - Square footage is defined as the total area of the structure(s) under roof.
Construction Types I, 11, III, IV & V:
New single story: $300.00 + $0.02 per square foot
New multi story: $150.00 per floor, per tower + $0.02 per square ft
Construction Type VI:
All: $300.00 per floor + $0.03 per square foot
Remodels & Alterations:
All: $250.00 per floor, per tower + $0.15 per square ft
2) FIRE SPRINKLERS
New: $300.00 per floor, per tower + $0.65 per head
Remodels: $200.00 per floor, per tower + $1.00 per head
3) FIRE ALARM SYSTEMS
New: $300.00 per floor, per tower + $0.65 per device
Remodels: $200.00 per floor, per tower + $1.00 per device
Monitoring: $100.00 per system
4) HOODS
All: $200.00 + $1.00 per foot of duct
5) SUPPRESSION SYSTEMS
Total Flood & Pre - Engineered: $50.00 per bottle + $2.00 per head
6) SPRAY BOOTHS (total square foot of booth)
All: $0.50 per square foot
7) UNDERGROUND FIRE LINES
All: $100.00 + $1.00 per linear foot
8) STANDPIPES
All: $100.00 per independent riser
15
9) FIRE PUMPS
All: $300.00 each pump
10) LP GAS INSTALLATIONS
Above Ground: $50.00 per tank
Under Ground: $100.00 per tank
11) FUEL STORAGE INSTALLATIONS
Above Ground$100.00 per tank
Under Ground $150.00 per tank
12) HYDRANT RESTRAINTS
All: $50.00 per restraint
13) ALTERNATIVE WATER SUPPLY / DRAFT HYDRANTS
All: $250.00
14) STREET NAME CHANGE
All: $120.00
15) MISCELLANOUS & MINIMUM PERMIT FEE
Fire Retardant: $100.00 each structure
Special Event Tent: $100.00 each
Emergency Access /Electric Gates: $100.00
Minimum Permit Fee (not otherwise noted) $100.00
16) TIME SPECIFIC INSPECTIONS
All: $75.00 each inspection — subject to availability
17) OCCUPATIONAL LICENSE INSPECTIONS
Inspection and one re- inspection: $75.00
2nd re- inspection: $50.00 additional
3`d re- inspection: $75.00 additional
4th re- inspection: $100.00 additional
5th and subsequent re- inspections: $200.00 additional
18) YELLOW TAGS (re- inspections)
1 st Fail; per unit $50.00
2nd Fail; per unit $75.00
3`d Fail; per unit $100.00
4th Fail; per unit $250.00
5th Fail & each subsequent fail $500.00 per unit
19) RED TAGS (each incident)
• Working without Permit Card on Site.
13A
• Safety violations on site.
• Combustibles on site without water supply (hydrants / approved alternative water supply).
• Job sites inaccessible to fire apparatus.
• Working without Collier County Building Permit.
EXCEPTIONS:
1) Structural permits for detached one and two family dwellings are exempt from fire
prevention permit fees.
2) Permits that, in the opinion of the Fire Code Official, do not present a fire protection
concern, i.e., swimming pools, concrete deck radio transmission towers, etc. shall be
exempt from fire prevention inspection fees.
16
*Note: Fire Districts may have additional fees, duly adopted by their local board of fire commissioners,
for other various services such as open burning permits, fireworks display, etc. Please refer to the
appropriate resolution of the fire district.
13A
IVA