Loading...
Resolution 2001-313 RESOLUTION NO. OI-~3 13A .. ';I :~ A RESOLUTION REPLACING EXHIBIT "B" OF RESOLUTION No. 99-328, AS PROVIDED FOR IN DIVISION 1.10 OF THE COLLIER COUNTY LAND DEVELOPMENT CODE, PERTAINING TO A SCHEDULE OF FIRE PREVENTION & CONTROL FEES ESTABLISHED AND ADOPTED BY THE INDEPENDENT FIRE DISTRICTS AND APPLYING TO DEPENDENT FIRE DISTRICTS; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS; the Collier County Land Development Code (LDC), ~ 1.10.1 provides the Board of Collier County Commissioners (Board) shall establish and adopt by resolution a schedule of fees and charges for application and document processing, public meetings, public hearing, other meetings and hearings, transcripts, approvals, denials, development permits, development orders, development construction, interpretations, enforcement inspection services, sale of documents, review, resubmission and any other zoning or development related service and any other services provided or costs incurred by the County; and WHEREAS; LDC ~ 1.10.2. provides the fee schedules may be amended via Board resolution, including those for fire inspection services; and WHEREAS; the Board approved Resolution 95-642 establishing a fee schedule of development related review and processing fees schedule of development related review and processing fees on November 14, 1995; which resolution was subsequently amended by Resolution 96-594 on December 17, 1996; and these resolutions were superceded and replaced by Resolution 99-328 on August 3, 1999; incorporating Exhibits A & B regarding such fees; and WHEREAS; Exhibit B of Resolution 99-328, establishing a Schedule of Fire Prevention & Control Fees, is now being replaced in its entirety to provide for an increase in fire inspection fees which will allow for adequate staffing levels within the fire districts, improved quality of inspections, and increased availability to contractors and developers; and WHEREAS; the proposed revision to Exhibit B has been developed in cooperation with the Collier Building Industry Association's Fire Task Force Subcommittee and the Development Services Advisory Committee's Subcommittee. 12 "'-- 1 ~ A ..... ~ WHEREAS; all fee's received pertaining to this resolution shall be designated and a1locate~r the sole ... purpose of funding construction inspections including training and equipment relating to the field of construction inspections; and NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA that: The Board of County Commissioners hereby declares the revised Exhibit "B," Schedule of Fire Prevention & Control Fees, attached hereto, and incorporated by reference sets forth fair and reasonable sums to be assessed to those who receive the benefits of those fire inspections required by the Land Development Code and the County Permitting process. BE IT FURTHER RESOL VED, this Resolution and Exhibit B, relating to Fire Code Compliance Inspection Fees, be recorded as part of the official minutes of this Board; and Resolution Number 99- 328, be and, is hereby amended to the extent set forth by this Resolution. This Resolution and its amended fees become effective on August 1,2001. This Resolution adopted after motion, second, and majority vote. Done the .3 / day of ~ - CI , 2001 ATTEST " 'J ,; f BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA ",' ,t ,. . ,; ~ James D. er, Ph.D., Chairman . .~ . . :/"Jh~~ ~~ :t~rrOCk~er . It.. as to 1~'. . s'~i~'ature ~l.r. A roved as 0 form and legal sufficiency Patrick G. White, Ass't. County Attorney 13 EXHIBIT B 13A Schedule of Fire Prevention & Control Fees A. FIRE PREVENTION & CONTROL PERMIT FEES The following fees shall be assessed on all applications for building permits: (Effective January 1, 2001) 1) Architectural plan review fees - .1% of the job value. 2) Fire Sprinkler Systems (new installations) - $30 + $.50 per head (rounded up). 3) Fire Sprinkler Systems (remodeling) - $30 + $1 per head altered or added. 4) Underground Fire Line -$30 + $.20 per foot (rounded up) 5) Standpipes - $30 + $50 per riser. 6) Fire Pumps (up to and including 500 gpm) - $50. 7) Fire Pumps (over 500 gpm) -$75. 8) Pre - engineered Systems (new) - $30 +$10 per bottle of suppression agent. 9) Pre - engineered Systems (remodel) - $30 + $1 per head altered or added. 10) Total Flood Systems (new) - $30 + $50 per bottle of suppression agent. 11) Total Flood Systems (remodel) - $30 + $1 per head altered or added. 12) Fire Alarm Systems (zoned systems) - $30 + $5 per indicating or initiating circuit. 13) Fire Alarm Systems (intelligent system) - $30+ $.50 per indicating or initiating device 14) Installation of pollutant storage tanks : Above ground - $30 + $20 per tank Underground - $30 + $30 per tank 15) Pollutant Storage Tank Removal Above ground -$40 Underground -$40 16) Pollutant StorageTank Abandonment - $50 (requires notarized letter of consent from property owner) 14 17) LPG Installations 1 ' 3A it Above ground - $30 + $10 per tank Underground - $30 + $20 per tank 18) LPG Tank Removal - $40 per tank 19) LPG Tank Abandonment - $50 (requires notarized letter of authorization from the property owner) 20) All fees listed above include the initial review and ONE re- review. Additional reviews will be provided in accordance with the following schedule: 2nd re- review 10% of original review $30 minimum 3rd re- review 25% of original review $50 minimum 4th re- review 50% of original review $100 minimum 5th re- review 100% of original review $200 minimum B. Fire Code Compliance Inspection Fees *: (Effective Augustl, 2001) 1) BUILDINGS - Square footage is defined as the total area of the structure(s) under roof. Construction Types I, 11, III, IV & V: New single story: $300.00 + $0.02 per square foot New multi story: $150.00 per floor, per tower + $0.02 per square ft Construction Type VI: All: $300.00 per floor + $0.03 per square foot Remodels & Alterations: All: $250.00 per floor, per tower + $0.15 per square ft 2) FIRE SPRINKLERS New: $300.00 per floor, per tower + $0.65 per head Remodels: $200.00 per floor, per tower + $1.00 per head 3) FIRE ALARM SYSTEMS New: $300.00 per floor, per tower + $0.65 per device Remodels: $200.00 per floor, per tower + $1.00 per device Monitoring: $100.00 per system 4) HOODS All: $200.00 + $1.00 per foot of duct 5) SUPPRESSION SYSTEMS Total Flood & Pre - Engineered: $50.00 per bottle + $2.00 per head 6) SPRAY BOOTHS (total square foot of booth) All: $0.50 per square foot 7) UNDERGROUND FIRE LINES All: $100.00 + $1.00 per linear foot 8) STANDPIPES All: $100.00 per independent riser 15 9) FIRE PUMPS All: $300.00 each pump 10) LP GAS INSTALLATIONS Above Ground: $50.00 per tank Under Ground: $100.00 per tank 11) FUEL STORAGE INSTALLATIONS Above Ground$100.00 per tank Under Ground $150.00 per tank 12) HYDRANT RESTRAINTS All: $50.00 per restraint 13) ALTERNATIVE WATER SUPPLY / DRAFT HYDRANTS All: $250.00 14) STREET NAME CHANGE All: $120.00 15) MISCELLANOUS & MINIMUM PERMIT FEE Fire Retardant: $100.00 each structure Special Event Tent: $100.00 each Emergency Access /Electric Gates: $100.00 Minimum Permit Fee (not otherwise noted) $100.00 16) TIME SPECIFIC INSPECTIONS All: $75.00 each inspection — subject to availability 17) OCCUPATIONAL LICENSE INSPECTIONS Inspection and one re- inspection: $75.00 2nd re- inspection: $50.00 additional 3`d re- inspection: $75.00 additional 4th re- inspection: $100.00 additional 5th and subsequent re- inspections: $200.00 additional 18) YELLOW TAGS (re- inspections) 1 st Fail; per unit $50.00 2nd Fail; per unit $75.00 3`d Fail; per unit $100.00 4th Fail; per unit $250.00 5th Fail & each subsequent fail $500.00 per unit 19) RED TAGS (each incident) • Working without Permit Card on Site. 13A • Safety violations on site. • Combustibles on site without water supply (hydrants / approved alternative water supply). • Job sites inaccessible to fire apparatus. • Working without Collier County Building Permit. EXCEPTIONS: 1) Structural permits for detached one and two family dwellings are exempt from fire prevention permit fees. 2) Permits that, in the opinion of the Fire Code Official, do not present a fire protection concern, i.e., swimming pools, concrete deck radio transmission towers, etc. shall be exempt from fire prevention inspection fees. 16 *Note: Fire Districts may have additional fees, duly adopted by their local board of fire commissioners, for other various services such as open burning permits, fireworks display, etc. Please refer to the appropriate resolution of the fire district. 13A IVA