Agenda 09/09-10/2008 Item #16A15 EXECUTIVE SUMMARY '-,."~ A~j:'N ~ NO'~~" Sf/-' 0 v 2008 Pg I 0+ ~ - Recommendation to approve final acceptance of the water and sewer utility facilities for Majorca at Fiddler's Creek OBJECTIVE: The Board of County Commissioners, Ex-Officio the Governing Board of the Collier County Water-Sewer District, to accept final and unconditional conveyance of these water and/or sewer facilities. CONSIDERATIONS: I) The Developer of Majorca at Fiddler's Creek, has constructed the water and sewer facilities within dedicated easements to serve this development. See attached location map. 2) Preliminary acceptance of these utility facilities was approved by the Engineering and Environmental Services Department staff on March 14, 2002. At that time, the value of these utility facilities (assets) was $39,995.20 for the water facilities and $49,069.80 for the sewer facilities (see attachment[s]). This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 3) Staff recorded all preliminary acceptance documents in the public records of Collier County, which have been reviewed and approved by the County Attorney's office as to form and legal sufficiency. 4) The water and sewer facilities have been operated and maintained by the Collier County Water-Sewer District during, not less than, the required one (I) year warranty period. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering and Environmental Services Department staff, and these facilities have been found to be satisfactory and acceptable. 6) The PUD Monitoring staff has reviewed this request in relation to possible issues raised by the applicable Home Owners Association (HOA). Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water-Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total (undepreciated) value of $89,065. GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: The elements necessary to accept final and unconditional conveyance of these water and/or sewer facilities have been met. There is no additional legal review from the County Attorney required to complete this final acceptance. - JAB RECOMMENDATION: That the Board of County Commissioners, Ex-Officio the Governing Board of the Collier County Water-Sewer District, authorize final acceptance of these water and sewer utility facilities for Majorca at Fiddler's Creek, and authorize the County Manager, or his designee, to release any Utilities Performance Security (UPS) to the Project Engineer or designated agent. -~ N~~n~1-;? SI:I-' 0 J 20u8 er's [). b . " 1 Pg ~ s I I . ~ ~ g ~ ~ < ~ ITtXGl!OH / ~ " . . . " . i c.. i . <( :2: IIi " IIi- Z 0 - I- <( ! ! () .j I I . " 0 . . Ii ....J < g . II . . a.. <( :2: W I- C/) "" .. .. t3 "' '- .. '5 -0 i1: 1ii ~ o .'" ::;; . Contractor's Certification - TOTAL COST AND QUANTITIES N~GENDA !Ti:;; ~~m;-fr~oi Pg 4 r:rf- b Majorca (Parcel 8). Fiddler's Creek WATER SYSTEM This is a detailed accounting of all cost and all quantities of materials used and installed in this project per the as-built and record drawings with each item separatley described by size, quantily, unit price and total cost Include full description and quantity installed for each category. The mobilization. restoration, pavement repair, testing, ate is included in the appropriate individual hne item cost listed below. Unit Item Descrlntion Size Quantltv Unit Cost Total DR.18 Water Main 8" 1056 LF $ 13,95 $ 14.731,20 DR-14 Water Main 8" 90 LF $ 18,10 $ 1,62900 Gate Valve & Box 8" 1 EA $ 896,00 $ 896,00 Permanent Bac- T 1 EA $ 840,00 $ 840.00 TemDorarv MeIer 6" 1 LS $ 3,500,00 $ 3,500,00 WS Casin 4" 40 LF $ 5,00 $ 200.00 Sinale WS 1" 6 EA $ 396,00 $ 2,37600 Double WS 1,5" 6 EA $ 538.00 $ 3,228.00 FH Assemblv 3 EA $ 2,000,00 $ 6,000,00 Bends & Fittinas 8" 31 EA $ 13500 $ 4,995,00 Air Release Valve 1 EA $ 1,600,00 $ 1,600.00 . . .~ Total Water System: Il$~i59;996l20,,1 Page 2 of4 , ' . Contractor's Certification - TOTAL COST AND QUANTITIES Majorca (Parcel 8) - Fiddler's Creek This is a detailed accounting of all cost and alt quantities of materials used and installed in this project per the as-bullt and record drawings with each.item separatley described by size, quantity, unit price and total cost. Include full description and quantity installed for each category. The mobilization, restoration, pavement repair, testing, etc. is included in the appropriate individual line item cost listed below. SEI- ZI J 2!l~~ Pg S ~b WASTEWATER SYSTEM I ..~~ Quantltv Unit Item Oescrlntlon Size Unit Cost Total SDR.26 0'-6' 8" 859 LF $ 17,20 $ 14,774,80 SDR.266'.8' 8" 300 LF $ 22,20 $ 6,660,00 Sanitary MH 0'.6' 4' dia. 8 EA $ 2,052,00 $ 16.416,00 Sanitarv MH 6'-B' 4' dis. 2 EA $ 2,432.00 $ 4,864.00 Connect To Exislino 8" 1 LS $ 1,20000 $ 1,200,00 Sewer Service 6. 280 LF $ 12,50 $ 3,500,00 Sewer Clean out 6" 10 EA $ 87,00 $ 870'00 " cc, --:- 'J , . Total Wastewater System: HSM-48,284;80,\ Page 3 of4 .. Contractor's Certification - AGENDA~M -- HO;~rw,:qour S {C' ~ ~ TOTAL COST AND QUANTITIES Majorca (Parcel 8) - Fiddler's Creek WASTEWATER PUMPING SYSTEM Pg This is a detailed accounting of all cost and all quantities of materials used and installed in this project per the as.built and record drawings with each item separatley described by size, quantity, unit price and tolal cost. Include full description and quantity installed for each category. The mobilization, restoration, pa'Vement repair, testing, etc. is included in the appropriate individual line item costllsted below Unit Item DeseriDtlon - Size Quantitv Unit Cost Total Wve 8"x1.5" 1 EA $ 75.00 $ 75,00 5ch. eo PVC Force Main 15" 195 IF $ 3.00 $ 585 00 PluCl Valve & Box 1,5" 1 EA $ 125,00 $ 125,00 'J . . Total Wastewater Pumping System: 1$ 785.00 I Page 4 of 4