Agenda 09/09-10/2008 Item #16A14
EXECUTIVE SUMMARY
...-.... =---==
SEP O;J 2D08
Pg I'
Recommendation to approve final acceptance of the water and sewer utility
facilities for Bellagio at Fiddler's Creek
OBJECTIVE: The Board of County Commissioners, Ex-Officio the Governing Board
of the Collier County Water-Sewer District, to accept final and unconditional conveyance
ofthese water and/or sewer facilities.
CONSIDERATIONS: I) The Developer of Bellagio at Fiddler's Creek, has constructed
the water and sewer facilities within dedicated easements to serve this development.See
attached location map. 2)Preliminary acceptance of these utility facilities was approved
by the Engineering and Environmental Services Department staff on September 27,2001.
At that time, the value of these utility facilities (assets) was $64,299.80 for the water
facilities and $63,3 I3. 90 for the sewer facilities (see attachment( s J). This final acceptance
is in accordance with Collier County Ordinance No. 2004-3 I, as amended. 3)Staff
recorded all preliminary acceptance documents in the public records of Collier County,
which have been reviewed and approved by the County Attorney's office as to form and
legal sufficiency. 4)The water and sewer facilities have been operated and maintained by
the Collier County Water-Sewer District during, not less than, the required one (I) year
warranty period. 5) A final inspection to discover defects in materials and workmanship
has been conducted by the Engineering and Environmental Services Department staff,
and these facilities have been found to be satisfactory and acceptable. 6) The PUD
Monitoring staff has reviewed this request in relation to possible issues raised by the
applicable Home Owners Association (HOA).Staff is unaware of any issues that would
serve to negate the recommendation to release the applicable security.
FISCAL IMPACT: Approval of this Executive Summary will have no specific
financial impact. However, approval of this Executive Summary will result in the
Collier County Water-Sewer District receiving unconditional title to the utility
facilities, which at the time of preliminary acceptance, had a total (undepreciated)
value of $127,613.70.
GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will
have no growth management impact.
LEGAL CONSIDERATIONS: The elements necessary to accept final and
unconditional conveyance of these water and/or sewer facilities have been met. There is
no additional legal review from the County Attorney required to complete this final
acceptance. - JAB
RECOMMENDATION: That the Board of County Commissioners, Ex-Officio the
Governing Board of the Collier County Water-Sewer District, authorize final
acceptance of these water and sewer utility facilities for Bellagio at Fiddler's
Creek, and authorize the County Manager, or his designee, to release any
- N~~t-?; ~M~
SE ' ,">""
F.., ';".,,(
Pg ~j VO~5
Utilities Performance Security (UPS) to the Project Engineer or the Developer's
designated agent.
a..
. L i ' <(
I ::2:
~i
i Z
IIi · I~. i 0
, -
I-
<(
U
~ ! 0
.1 I I . -oJ
. .
I ,..-
<
~
.
3N't'"l Al:Ul38lIl"
d
~
o
.
NAGENDA IT M
O,_~. '-
Pg
~hg'
$II~8>-
~~~~
li:g!fl
SEr Ii '. 2 "'.
,'....' ;, ~J,:1
:s*
a..
<(
::2E
W
I-
-
en
.
Contractor's Certification
.
TOTAL COST AND QUANTITIES
8ellaglo (Parce' 5) . Fiddle~s Creek
Pg
WATER SYSTEM
This is a detailed accounting of all cost and alt quantities of materials used and installed
in this project per the as-bullt and record drawings with each item separatley described
by size, quantity, unit price and total cost. Include full description and quantity installed
for each category. The mobilization, restoration, pavement repair, testing, etc. is
included in the appropriate individual line item cost listed below.
Unit
Item OescrlDtlon Size Quantitv Unit Cost Total
DR.18 Water Main 10" 1979 LF $ 20.20 $ 39,975,80
DR.14 Water Main 10" 70 LF $ 21,80 $ 1,528,00
Gate Valve & Box 10" 2 EA $ 1,104,00 $ 2,208.00
Permanent Bac- T 1 EA $ 840,00 $ 840,00
Connect To Existino 10" 1 LS $ 3,500,00 $ 3,50000
WS Sleeve 4. 670 LF $ 5,00 $ 3,350,00
FH Assemblv 5 EA $ 2,000,00 $ 10,000,00
Bends & Fittin s 10" 2 EA $ 150,00 $ 300,00
Deflections 10" 2 EA $ 500,00 $ 1,000,00
Air Release Valves 1 EA $ 1,800,00 $ 1,600,00
Total Water System: I $
Page 2 of3
64,299.80 I
. Contractor's Certification
TOTAL COST AND QUANTITIES
.
--:~G~~- ~'
::iff" V v ;;1[18
Pg S o-t'- ::>
8ellaglo (Parcel 5) - Fiddler's Creek
WASTEWATER SYSTEM
This is a detailed accounting of all cost and all quantities of materials used and installed
in this project per the as-built and record drawings with each item separatley described
by size, quantity, unit price and total cost. Include full description and quantity installed
for each category. The mobilization. restoration, pavement repair, testing, etc. is
included in the appropriate individuslline item cost listed below.
Unit
Item De8crlotlon Size Quantltv Unit Cost Total
SDR.26 0'-6' 6" 661 LF $ 17,20 $ 14,609,20
SDR.26 6'.8' 6" 475 LF $ 22,20 $ 10,545,00
SDR.26 8'-10' 8" 291 LF $ 30,70 $ 8,933,70
Sanltarv MH 0'-6' 4' dia. 5 EA $ 2,052,00 $ 10,260-00
Sanita MH 6'.6' 4' die. 2 EA $ 2.432,00 $ 4,664,00
Sanitarv MH 8'.10' 4' dia. 1 EA $ 3,064,00 $ 3,064,00
Connect To EXistinn 6" 1 LS $ 500,00 $ 500,00
Sewer Service 6" 660 LF $ 12,50 $ 6250,00
Sewer Cleanoul 6" 24 EA $ 87,00 $ 2,088,00
Total W..tewater System:
1$
63,313.90 I
Page3of3