Loading...
Agenda 09/23/2008 Item #16B 6Item # 1666 September 23, 2008 Page 1 of 8 EXECUTIVE SUMMARY Recommendation to approve Work Order #AAI -FT- 3588 -08 -03 to Ardaman & Associates, Inc. for the quality assurance and materials testing services for Santa Barbara Boulevard Extension construction project from Rattlesnake Hammock Road to Davis Boulevard (Project #60091), using the Annual Contract for Materials Testing Services, Contract No. 04 -3588, in the amount of $312,000. OBJECTIVE: To approve a work order for the Santa Barbara Boulevard Extension construction project from Rattlesnake Hammock Road to Davis Boulevard for the quality assurance and materials testing services, to Ardaman & Associates, Inc. in accordance with the Annual Contract for Materials Testing Services, Contract No. 04 -3588. CONSIDERATIONS: Transportation Engineering and Construction Management Department has opted to perform the Construction Engineering and Inspection (CEI) services for the Santa Barbara Boulevard project with in -house staff, resulting in a large savings to the County. As part of taking on this CEI work, the County is required to obtain services for quality assurance and materials testing. These services provide nuclear density testing, concrete cylinder testing, asphalt batch plant inspection, laboratory testing of concrete and soils, etc. This work requires licensed technicians, a certified laboratory and a nuclear gage license which the County does not have. This work order provides for the necessary tasks to complete this type of work. Ardaman & Associates is under contract #04 -3588 with Collier County for quality assurance and materials testing services. Approval of this work order will require Board of County Commissioners approval to waive the $200,000 limit on work orders that is standard County purchasing policy. FISCAL IMPACT: Funds in the amount of $312,000 are available in Gas Taxes and Impact Fees. Source of funds are impact fees and gas taxes. GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this Executive Summary. LEGAL CONSIDERATIONS: There are no direct legal considerations to address. - SRT. RECOMMENDATION: That the Board of County Commissioners waives the $200,000 work order limit and approve Work Order #AAI -FT- 3588 -08 -03 to Ardaman & Associates, Inc. in the amount of $312,000 for the Santa Barbara Boulevard construction project. Prepared By: Joseph F. Delate, ASLA, Senior Project Manager, Transportation Engineering and Construction Management Department Attachments: (1) Copy of Work Order #AAI -FT- 3588- 08 -03. Item # 16B6 September 23, 200E Page 2 of 8 Recommendation to approve Work Order #AAI -FT- 3588 -08 -03 to Ardaman & Associates, Inc. for the quality assurance and materials testing services for Santa Barbara Boulevard Extension construction project from Rattlesnake Hammock Road to Davis Boulevard (Project #60091), using the Annual Contract for Materials Testing Services, Contract No. 04 -3588, in the amount of $312,000. Prepared By: Department Date Trans. Eng. And Const. Mgmt. 8/21/2008 10:52:05 AM Approved By: Department Approval Office of Management Approved and Budget Approved By: Department Approval County Manager's Office Approved ATTACHMENTS: Name: Description: D ExSu. AwardArd...aman'..sWorkOrder.doc Executive Summary D Work Order AAI-FT- 3588 -08- 0.3_Santa Barbara _Blyd.,._Exten.s..ion.pdf Work Order D Approyal_S.heet.d_oc Previous Approvals Date 9/14/2008 11:25 AM Date 9/14/2008 1:08 PM Type: Executive Summary Work Order Backup Material 6 # 1686 September 23, 2008 Page 3 of 8 WORK ORDER # AAI -FT- 3588 -08 -03 "Fixed Term Materials Testing Services" Contract 404 -3588, Dated December 14, 2004 This Work Order is for Fixed Term Materials Testing Services, subject to the terms and conditions of the Contract referenced above, for work known as: Project: Quality Assurance and Materials Testing Services for Santa Barbara Boulevard Extension from Rattlesnake Hammock Road to Davis Boulevard The work is specified in the proposal dated July 18, 2008 from Ardaman & Associates, Inc. which is attached hereto and made part of this Work Order. In accordance with terms and conditions of the Agreement referenced above, Work Order #AAI -FT- 3588 -08 -03 is assigned to Ardaman & Associates, Inc. Scope of Work: As detailed in the attached proposal and the following: Task I: Field Testing and Inspection -Task IA: Soils (Roadway/ Utility Trenching) -Task IB: Concrete -Task IC: Asphalt Batch Plant Inspection Task II: Laboratory Testing -Task IIA: Concrete -Task IIB: Soils (See attached proposal for exact scope of work and budgeted amounts for each task.) Schedule of Work: Complete work within 20 months from receipt of the Purchase Order and Notice to Proceed, which is accompanying this Work Order. Compensation: In accordance with Item 3 of the Agreement, the County will compensate the Firm in accordance with a time and material amount (established hourly rate- Schedule "A "), with a do not exceed total cost of $312,000, as provided in the attached proposal. Any change made subsequent to final department approval will be considered an additional service and charged according to an executed Change Order as enumerated in Schedule "A" of the of the Original Conk A e nt PREPARED BY: -foeDelate, ASLA, Senior Project Manager D Transp /orta`tio�n/.F�ngineering and Construction Management REVIEWED BY:�% Gary Putaansuu, PE, Principal Project Manager Date Transportation Engineering and Construction Management APPROVED BY: Trans APPROVED BY:C Nora] Trail. ATTEST: Dwight E. Brock, Clerk By: Deputy Clerk E, and Construction Feder, AICP, Administrator station Services Division D to Man Be9e�nta Date BOARD OF COUNTY COMMISSIONERS !31 Collier County, Florida Tom Henning, Chairman Item # 1666 ATTEST: September 23, 2008 Page 4 of 8 (Corporate Secretary) By: wA" Gary A. Drew, P.E., Vice - President Ardaman & Associates, Inc. Approved as to Form and Legal Sufficiency: Assistant County Attorney Item # 1666 September 23, 2008 Page 5 of 8 — - Ardaman & Associates, Inc. Materials Con Environmental and Materials ConsWtants Ardaman Proposal No. 08 -051 June 30, 2008 Revised August 12, 2008 TO: Collier County Transportation Engineering & Construction Management Dept. 2885 South Horseshoe Drive Naples, FL 34104 Attention: Mr. Steve Ritter SUBJECT: Proposal for Quality Assurance /Materials Testing Services Santa Barbara Extension Naples, Collier County, Florida Dear Mr. Ritter: Per our recent discussion, Ardaman is pleased to provide this revised proposal to provide materials sampling and testing services for Collier County. It is our understanding that you wish to utilize a technician on -site full time for approximately 20 months to perform soil and concrete testing on behalf of the Collier County Transportation Engineering andConstruction Management Department. The project will be the extension of Santa Barbara Road, from Davis Blvd to Rattlesnake Hammock. We understand that there will be Saturday work (estimated every other Saturday) and an occasional night shift (very rarely). Ardaman will provide a field technician for an eight- hour -a -day, five -day work week for a cost of $2,880.00 per week (plus associated laboratory testing fees). If a technician is required for Saturday or Sunday, the rate will be $90.00 /hr. The hourly fee includes all typical field testing for concrete, grout, mortar and soils. Any laboratory fees incurred will be invoiced in accordance with the attached unit fee schedule no. 08 -051 for actual services rendered (this unit fee schedule is in agreement with the unit rates for laboratory testing listed in Ardaman's Fixed Term Material Testing Service contract #04 -3588 currently in force with Collier County). Based on the above assumptions, we have included an estimated scope of services and fees for the project for your review. We estimate that our costs will be about $312,000. We will invoice in accordance with unit fees for actual services rendered. Ardaman & Associates, Inc. agrees to the same terms and conditions of current Contract No. 04 -4588 "Fixed Term Materials Testing Services ". Please authorize us to proceed through your Work Order System. Please contact the undersigned if you have any questions. Very truly yours, ARDAMAN & ASSOCIATES, IN 1 Andrew S. High Construction Services Manager ABH:GAD /egs Gary A. Drew, P.E. Branch ManagerNice President 9970 Bavaria Road, Fort Myers, Florida 33913 Phone (239) 768 -6600 FAX (239) 768 -0409 Offices in Bartow, Cocoa, Fort Myers, Miami, Orlando, Port Charlotte, Port St. Lucie, Sarasota, Tallahassee. Tampa, W. Palm Beach FIELD TESTING AND INSPECTION Soils (Roadway /Utility Trenching) 5,000 In -Place Density Tests 86 weeks of technician time @ $ 2,880.00/week 43 days of Technician Overtime (Saturday work) @ $720.00 /day CONCRETE 15 sets of cylinders molded, slump test and temperature 15 hrs. of technician time @ $ 72.00 /hr. Asphalt Batch Plant Inspection 8 weeks full time batch plant inspection @ $72.00 /hr. LABORATORY TESTING CONCRETE 15 sets @$67.00 /set SOILS 20 LBR Tests @$288.00/ea. 2 Organic Content Tests (ASTM D 2974) @ $47.00 /test 5 Sieve Analysis (ASTM D 421, D 422) @ $55.00/test 15 Modified Proctors @$91.00 /ea. Item # 1686 September 23, 2008 Page 6 of 8 Ardaman Proposal No. 08 -051 June 30, 2008 Revised August 12, 2008 included in hourly rate 247,680.00 30,960.00 included in hourly rate 1,080.00 $23,040.00 $1,005.00 $5,760.00 $94.00 $275.00 $1,365.0 0 Total Estimated Cost for Testing Services: $311,259.00 Ardaman & Associates, Inc. 2 Ardaman & Associates, Inc.IFort Myers/Naples Revised Fee Schedule No. 08 -051 - August 12, 2008 Collier County Transportation Engineering and Construction -- Quality Assurance /Materials Testing Item # 16136 September 23, 2008 Page 7 of 8 FIELD SERVICES -SOILS UNITS COST Soils Technician (Observation and Monitoring of fill and excavation) per hour $72.00 In -Place Density Tests (ASTM D -2922) each Included in hourly rate FIELD SERVICES — CONCRETE, MORTAR AND GROUT Concrete Technician (Perform testing on concrete mortar and grout) per hour $72.00 Temperature, Slump and cylinder molding each Included in hourly rate SOILS- LABORATORY SERVICES Standard Proctor (ASTM D-698) each $67.00 Modified Proctor (ASTM D 1557)) each $91.00 LBR Test each $288.00 Moisture Content (ASTM D 2216) each $22.00 Organic Content (ASTM D 2974) each $47.00 Grain -Size Distribution • Sieve Analysis (ASTM D 421, D 422) each $49.00 • Fines Content (ASTM D 1142) each $35.00 Atterberg Limits (ASTM D 4318)) each $77.00 CONCRETE MORTAR AND GROUT - LABORATORY SERVICES Concrete compressive strength test (set of 4) each $67.00 Mortar compressive strength test (set of 3) each $66.00 Grout compressive strength test (set of 4) each $66.00 ENGINEERING AND TECHNICAL SUPPORT Unit fees for the above services include our costs for engineer's review and reporting and mailing. We will invoice for requested services that may be needed during construction such as project site meetings or to help resolve construction materials testing issues. Personnel and hourly rates are given below. Project Engineer /Construction Services Manager per hour $118.00 Inspector per hour $72.00 Technical Secretary per hour $45.00 Weekend and holiday work and work in excess of 8 hours per day or before 7 AM or after 5 PM will be charged at 1.25 times the standard fee. `These prices are in effect for work completed through December 31, 2009. This fee schedule will be superseded by 2010 unit fees for work performed after December 31, 2009. — - Ardaman & Associates, Inc. 3 Item # 1666 September 23, 2008 Page 8 of 8 Time Action Who 8/2112008.1O.44 AM Document Created bunker_, 8/2112008'. 10 44 AM Document Updated drunker _s 8/21/2008: 1O 46 AM Document Updated drunker s 812112008 10 46 AM Document Updated brunker s -`8/21/2008: 10' 46 AM Document Updated drunker _s 8/2112008: 10'41 AM Document Updated hrunker s 8I2112008'10'.41 AM Document Updated brunker_, +`"812112008'. 10,47 AM Document Updated brunker s - `9/912008'1'.50 AM Document Updated ottersteve - X9/9/2008'4'. Attachment Ex Sum Award Ardeman's Work dianel nch y 32 PM Order don uploaded -� 919/2008' 4'. 32 PM Document Updated dianelynch 9110/2008:9'. 35 AM Document Updated dianelynch �+ Attachment Work Order AAI -FT- 358808 -03 Santa dianelynch 9110/2008:9.36 AM Barbara Blvd. Extension.doc.pdf uploaded ,x911012008 9 36 AM Document Updated dianelynch `9/10/2008'.10.13 AM Document Approved with the following comments. jayahmad :-911012008' 12'48 PM Document Updated rhondacummings - `9110/2008: 12: 49 PM Document Updated dcndacun ings �-9I1012008' 12: 49 PM Document Approved with the following comments: rhondacummings °`'9111/2008:8'. 28 AM Document Approved with the following comments'. dianelynch 9111/2008: 8: 44 AM Document Approved with the following comments camel! s -� 9!1212008:3:08 PM Document Approved with the following comments a.,Jr, colt 9/122008.3: 28 PM Assigned Meeting changed Iednhard_p -`9/1212008.3'. 28 PM Document Updated lehnhard_p 9112/2008' 4'. 31 PM Document Approved with the following comments. taylor_I `9112/2008 4 '.33 PM Document Approved with the following comments'. fader _n