Agenda 10/28/2008 Item #16A 9 Agenda Item No. 16A9 October 28, 2008 Page 1 of 15 EXECUTIVE SUMMARY Recommendation to grant final approval of the roadway (private) and drainage improvements for the final plat of Fiddler's Creek Parkway Extension, Phase Three with the roadway and drainage improvements being privately maintained. OBJECTIVE: To grant final approval of the infrastructure improvements associated with that subdivision known as Fiddler's Creek Parkway Extension, Phase Three. CONSIDERATIONS: 1. On December 5, 2005, Engineering and Environmental Services Department granted preliminary acceptance of the roadway and drainage improvements in Fiddler's Creek Parkway Extension, Phase Three, 2. The roadway and drainage improvements will be maintained by the project's Community Development District. There are no building Lots associated with this Phase of development. - 3. The required improvements have been constructed in accordance with the Land Development Code. The Engineering and Environmental Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4, A resolution for final acceptance has been prepared and approved by the County Attorney's Office. A copy of the document is attached. 5. The developer has fulfilled his commitments with respect to the Construction and Maintenance Agreement for Subdivision Improvements. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's Community Development District. GROWTH MANAGEMENT IMPACT: There is no growth management impact. LEGAL CONSIDERATIONS: The County Attorney's Office has reviewed and approved the Resolution for legal sufficiency, This item is ready for Board consideration and approval. STW ~' Agenda Item No. 16A9 October 28, 2008 Page 2 of 15 RECOMMENDATION: That the Board of County Commissioners grant final acceptance of the roadway and drainage improvements in Fiddler's Creek Parkway Extension, Phase Three and release the maintenance security. 1, Authorize the Chairman to execute the attached resolution authorizing final acceptance. 2, Authorize the release of the maintenance security. PREPARED BY: John Houldsworth, Senior Engineer, Engineering and Environmental Services Department ,..- -, Item Number: Item Summary: Meeting Date: Page 10f2 Agenda Item No. 16A9 October 28, 2008 Page 3 of 15 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS 16A9 Recommendation to grant final approval of the roadway (private) and drainage improvements for the final plat of Fiddlers Creek Parkway Extension, Phase Three with the roadway and drainage improvements being privately maintained. 10128/2008 9:00:00 AM Prepared By John Houldsworth Community Development & Environmental Services Senior Engineer Date Approved By Engineering Services 10/7120089:28:44 AM Judy Puig Community Development & Environmental Services Operations Analyst Community Development & Environmental Services Admin. Date Approved By 10/7/200810:47 AM Steven Williams Attorney's Office Assistant County Attorney Date Attorney's Office 10/71200810:53 AM Approved By MaryAnn Devanas Community Development & Environmental Services Senior Planner Date Approved By CDES Engineering 10/10/20088:58 AM Joseph K. Schmitt Community Development & Environmental Services Community Development & Environmental Services Adminstrator Date Community Development & Environmental Services Admin. 10110/20088:27 PM Approved By William D. Lorenz, Jr., P.E. Community Development & Environmental Services Environmental Services Director Date Environmental Services 101141200810:54 AM Approved By OMB Coordinator Administrative Services Applications Analyst Date Information Technology 10/16120088:33 AM Approved By Mark Isackson County Manager's Office Budget Analyst Date Office of Management & Budget 10/16/200810:00 AM Approved By file:IIC:\AgendaTest\Export\ 115-0ctober%2028, %202008\16. %20CONSENT%20AGEN... 10/22/2008 Page 2 of2 Agenda Item No. 16A9 October 28,2008 Page 4 of 15 James V. Mudd County Manager Date Board of County Commissioners County Manager's Office 10/211200810:18 AM file:IIC :\Agenda T est\Export\ 115 -Octo ber%2028, %202008\ 16, %20CONSENT%20A GEN... 10/22/2008 " + " l.Uy.... ~ , ~ i 'M.~IllN~ ~:'" , "^"""""" GOl-f1<:l.UIl MAP Agenda Item No, 16A9 October 28, 2008 Page 5 of 15 t I ~ ~ -~ MDOLD:'S CllEElC ('Oll~~ ':NOWN ~s loIAACO SIlOllI::$, UNJ1JO) PNl~SEPClWT R.V,RE5OfIT / flOOI..ER'5CRW SITE MAP FIDDLER'S CREEK PARKWAY EXTENSION. PHASE THREE Agenda Item No. 16A9 October 28, 2008 Page 6 of 15 Prepared by: Q. Grady Minor & Associates, P.A. Civil Engineers - Land Surveyors - Planners 3800 Via Del Rey Bonita Springs, Florida 34134 (239) 947-1144 (239) 947-0375 (Fax) November 29, 2004 ,/ / , / .. Mark W. Mino FL # 45324 " \1) ~4- Agenda Item No. 16A9 October 28, 2008 Page 7 of 15 FIDDLER'S CREEK PARKWAY EXTENSION PHASE 3 ENGINEER'S OPINION OF PROBABLE COST SCHEDULE "A" UPDATED: 2/8/2003, 11/29/04 EARTHWORK & SITE PREP Clearing, grubbing and preparation of roadway rights-of-way, and easements areas as designated by the Engineer in the field including chipping and grinding of all materials on the Owner's property and then disposal of all residue off the Owner's property, all as specified, per acre complete. All work in right-of-way is subject to inspection by the owner, Collier County DOT and FOOT contingent on final acceptance of improvements as shown and specified on the contract documents. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE A-I Fill (on-site) CY 33,385 $2.00 $66,770.00 A-2 Silt Fence LF 13,500 $2,00 $27,000.00 TOTAL $93,770,00 COST TO COMPLETE 10% remaining x $93,770.00 = $9,377.00 Agenda Item No. 16A9 October 28. 2008 Page 8 of 15 FIDDLER'S CREEK PARKWAY EXTENSION PHASE 3 ENGINEER'S OPINION OF PROBABLE COST UPDATED: 2/8/2003, 11/29/04 SCHEDULE "E" IRRIGATION DISTRIBUTION Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, disinfecting pipelines, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DEP and Collier County with a complete working water distribution system as shown on the drawings and specified in these contract documents. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE E-l 16" CL 200 PYC LF 90 $42.50 $3,825.00 E-2 16" CL 150 PYC LF 5555 $38.80 $215,534.00 E-3 12" CL 150 PYC LF 20 $24.90 $498.00 E-4 12" CL 200 PYC LF 90 $27.50 $2,475.00 E-5 10" CL 150 PVC LF 20 $20.70 $414.00 Remove plug from existing J 6" Irrigation E-6 main and connect to proposed main LS 1 $500.00 $500.00 E-7 Connect to existing Irrigation main LS 1 $500.00 $500.00 E-8 Temporary Blow-off wi gate valve EA 2 $1,750.00 $3,500.00 ALTERNATE E-9 Blasting or Mechanical Excavation LS 1 $2,500,00 $2,500.00 TOTAL $229,746.00 COST TO COMPLETE 50% remaining x $229,740.00 = $114,873,00 Agenda Item No. 16A9 October 28,2008 Page 9 of 15 FIDDLER'S CREEK PARKWAY EXTENSION PHASE 3 ENGINEER'S OPINION OF PROBABLE COST SCHEDULE "F" STORM DRAINAGE UPDATED: 2/8/2003, 11/29/04 Includes furnishing and handling of all required materials, dewatering, bedding material (if necessary), rock removal and disposal off-site (if necessary), installation, backfilling, compaction, compaction testing in road- way areas, final grading, coordinating with other contractors and utility companies, flushing, clean-up, seeding, sodding of all areas disturbed by construction, repair of any damage caused by construction and other items necessary to complete the system and provide the owner, Collier County DOT and FDOT with a complete working drainage system as shown on the drawings and specified on these contract documents. Pipe measurement is to the outside of the structures. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE F-l 15" RCP LF 148 $22.60 $3,344.80 F-2 18' RCP LF 954 $25.40 $24,231.60 F-3 24" RCP LF 530 $33.90 $17,967.00 F-4 30" RCP LF 154 $41.80 $6,437.20 F-5 36" RCP LF 330 $49,90 $16,467,00 Type 'C' Ditch Bottom Inlet $1,140.00 F-6 comolete wI grate EA 3 $3,420.00 F-7 Throat Inlet EA 13 $1,140,00 $14,820.00 F-8 18" Flared End EA 1 $1,865.00 $1,865,00 F-9 24" Flared End EA 3 $1,930,00 $5,790.00 F-lO Box Culvert (Twin 7' x 8' boxes) EA 1 $50,000.00 $50,000,00 F-ll Junction Box (C bottom) EA 1 $1,980.00 $1,980.00 ALTERNATE F-B Maintenance of Traffic LS 1 $1,500.00 $1,500.00 Blasting or Mechanical F-14 Excavation LS I $5,500.00 $5,500.00 F-15 Flowable Fill CY 120 $50.00 $6,000.00 TOTAL $159,322,60 COST TO COMPLETE 50% remaining x $159.322,60 = $79,661.30 Agenda Item No. 16A9 October 28,2008 Page 1 0 of 15 FIDDLER'S CREEK PARKWAY EXTENSION PHASE 3 ENGINEER'S OPINION OF PROBABLE COST UPDATED: 2/8/2003, 11129/04 SCHEDULE "B" PAVING Clearing, grubbing and preparation of roadway rights-of-way, and easements areas as designated by the Engineer in the field including chipping and grinding of all materials on the Owner's property and then disposal of all residue off the Owner's property, all as specified, per acre complete. All work in right-of-way is subject to inspection by the owner, Collier County DOT and FDOT contingent on final acceptance of improvements as shown and specified on the contract documents. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE B-1 Type "E" Curb LF 2,080 $4.75 $9,880,00 B-2 Type "F" Curb LF 2,440 $6.80 $16,592.00 B-3 1-1/2" Asphaltic Concrete (Type S-III) SY 8,160 $4.30 $35,088.00 B-4 8" Limerock Base (compacted and primed) SY 8,160 $7.90 $64,464.00 B-5 12" Stabilized Subgrade SY 8,990 $1.50 $13,485.00 B-6 Road Prep & Final Grading SY 12,530 $1.00 $12,530.00 B-7 Stabilized Access Road SY 10,090 $2.00 $20,180.00 B-8 4" Concrete Sidewalk (5' wide) SY 716 $15.10 $10,811.60 B-9 4" Concrete Sidewalk (6' wide) SY 764 $15,10 $11,536.40 B-I0 Signing & Pavement Markings LS I $12,000.00 $12,000.00 B-ll Bahia Sod SY 6,500 $0.32 $2,080.00 B-12 Maintenance of Traffic LS 1 $5,500.00 $5,500.00 B-13 Street Lights EA 5 $2,000.00 $10,000.00 B-14 Landscape and Irrigation LS 1 $20,000.00 $20,000.00 TOTAL $244,147.00 COST TO COMPLETE 90% remaining x $244,147.00 = $219,732.30 Agenda Item No. 16A9 October 28,2008 Page 11 of 15 FIDDLER'S CREEK PARKWAY EXTENSION PHASE 3 ENGINEER'S OPINION OF PROBABLE COST UPDATED: 2/8/2003,11/29/04 SCHEDULE "C" W ASTEW A TER COLLECTION Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DEP and Collier County with a complete working wastewater collection system as shown on the drawings and specified in these contract documents, ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE Hot Tap existing 16" forcemain with 4" tapping C.l sleeve and plug valve' LS 1 $4,500,00 $4,500.00 C.2 4" CL 150 PVC (DRI8) LF 1723 $9.90 $17,057,70 C-3 4" Plug Valve & Box EA 2 $936.00 $1,872.00 C-4 manhole 4'.6' cut EA 1 $2,052.00 $2,052,00 C-5 manhole 6'.8' cut EA 4 $2,432.00 $9,728,00 C.6 manhole 8'.10' cut EA 1 $3,064.00 $3,064.00 C-7 manhole 10'-12' cut EA 3 $3,768,00 $11,304.00 C-8 manhole 12'.14' cut EA 1 $4,382,00 $4,382.00 C-9 8" pvc(SDR 26) 4'.6'cut LF 45 $17.20 $774,00 C-I0 8" pvc (SDR 26) 6'.8'cut LF 156 $22.20 $3,463.20 C-ll 8" pvc (SDR 26) 8'-10'cut LF 53 $30.70 $1,627,10 C-12 8" pvc (SDR 26) 10'.12'cut LF 108 $41.00 $4,428,00 C-13 8" pvc (SDR 26)12'.14'cut LF 156 $49.00 $7,644.00 C-14 concrete encase 8" pvc LF 22 $30.00 $660.00 Blasting or Mechanical C-15 Excavation LS 1 $1,500,00 $1,500.00 TOTAL $74,056,00 ALTERNATE COST TO COMPLETE 50% remaining x $74,056.00 = $37,028.00 Agenda Item No. 161\9 October 28, 2008 Page 12 of 15 FIDDLER'S CREEK PARKWAY EXTENSION PHASE 3 ENGINEER'S OPINION OF PROBABLE COST UPDATED: 2/8/2003, 11129/04 SCHEDULE liD" POTABLE WATER DISTRIBUTION Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, disinfecting pipelines, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DEP and Collier County with a complete working water distribution system as shown on the drawings and specified in these contract documents. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE D-l 12" Gate Valve & Valve Box EA 6 $1,384.00 $8,304.00 D-2 12" CL 150 PVC (DR 18) LF 5757 $24.90 $143,349.30 D-3 12" CL 200 PVC (DR 14) LF 210 $27.50 $5,775.00 D-4 10" CL 200 PVC (DR 14) LF 20 $27.10 $542.00 D-5 Temporary Blow-offwl gate valve EA 4 $1,710.00 $6,840,00 Remove flushing hydrant and 12x6 reducer D-6 and connect to proposed 12" water main LS 1 $500.00 $500.00 D-7 Connect to existing 12" watermain LS 1 $500.00 $500.00 Temporary Backflow Assembly (Gap D-8 configuration) EA 1 $4,500,00 $4,500.00 D-9 3/4" water service wi meter box LF 55 $60.00 $3,300.00 D-I0 4" conduit for water service crossing LF 50 $5.50 $275.00 D-l1 Temporary Bacterial Sample Point EA 1 $370.00 $370,00 D-12 Permanent Bacterial Sample Point EA 1 $890.00 $890.00 D-13 Fire Hydrant Assembly Complete EA 10 $2,130.00 $21,300.00 ALTERNATE D-14 Blasting or Mechanical Excavation LS 1 $3,500.00 $3,500.00 TOTAL $199,945.30 COST TO COMPLETE 50% remaining x $199,945.30 = $99,972.65 I l Agenda Item No. 16A9 October 28, 2008 Page 13 of 15 RESOLUTION NO. 08-_ A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN FIDDLER'S CREEK PARKWAY EXTENSION, PHASE THREE, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 43, PAGES 12 THROUGH 14; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE MAINTENANCE RESPONSIBILITY FOR THE ROADWAY AND DRAINAGE IMPROVEMENTS THAT ARE NOT REQillRED TO BE MAINTAINED BY THE FIDDLER'S CREEK COMMUNITY DEVELOPMENT DISTRICT 2 WHEREAS, the Board of County Commissioners of Collier County, Florida, on April 27, 2004 approved the plat of Fiddler's Creek Parkway Extension, Phase Three for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Engineering and Environmental Services Section of the Community Development Department has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Fiddler's Creek Parkway Extension, Phase Three, pursuant to the plat thereof recorded in Plat Book 43, pages 12 through 14, and the Clerk is hereby authorized to release the maintenance security. Agenda Item No. 16A9 October 28,2008 Page 14 of 15 BE IT FURTHER RESOLVED AND ORDERED that the County accept the future maintenance and other attendant costs for those roadway and drainage improvements that are not required to be maintained by the Fiddler's Creek Community Development District 2, This Resolution adopted after motion, second and majority vote favoring same, this day of ,2008. DATE: A TrEST: DvnGHTE.BROCK,CLERK BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA By: TOM HENNING, CHAIRMAN , Deputy Clerk Approved as to form and legal sufficiency: It 7 w'Jj Steven T. Williams Assistant Collier County Attorney r'~\:~ff-g!tw. 17:;;,-_~'.1-' \, U:I;ctsWD U \~~~, 1ot,,L :~' "'J't@~f0\ OfOlCA nONS ANO RESfRVA TIONS ..,1I".-~ ..~-..:' ....,,''"' '." "'.1;1> _~, .....,....... -..,.,." "". V' ,....>~;.o;"'. ,,,,_...-, ,"'IJ' ,.....,...P<<...-;,<.:i:;"....""'~.-":!~Ji...,.rt.....'!'.(rfC. r~-'. ..,r :~~ ~ .,~. ''''~'' .......~, .........1III.an-w:': ....~ ;;..: :.:..~~..:.~:~;~,;. -";':t. ," :.:;~-~:;:::. ,,,'.. ~ ," t -~fff~7!L;~4?-~~~i.i ~;'~F~~rt~~~; ,-~ .,_J......",..,"...,.-'"...:.A.,.-.,..."......T.w,.. ;:';:.~~:':O .'I!'......,..lf"''',.'':';'~ o-"".,""i~"lBl"'<;O . -..------, ... ,~-" . .<' "'.~. 'w.' -'. " -'7111.~ "_' I .' ~~... :.j .. "...'.,.,. u ._,'",_,-.,~, '.~''';.'.. ..........,., ...' ...........'T; ',,-,,':; .., .Il! ,..,-, 'ntj.I"~,~' ..",. _A" ....,. ,""'---, . .... ., '.""..,. . ,,'.' -~ ,.~.~-...; ~..' .<or"', ,. _'-',,~ ,,-.,"', .... "-, ,./ ....~~,.". .....~~...."'" _ '"'' ',," ....:,.,.,.., W:.-'.-' ..p.'.....' ' 'q."~ '. . .,., :.: ,.,."".... ,.. ..-,-,~ ~.".. '.' ,--......_-__: . ....-,.:.1'"'.' .....,"'1_ .',,""'!rA'lo, .... II' _l[.._,,_~"_l_, . ,. "" ,.... .' "" .",., '1 __ .~..> .-~ 'l" ',~ '3/-. ... ._,,- ...'C.,.,;.... ',~ ""....".J '~""i",'" ,- '"":,,.) ....:,. .- -~ ....~' ',~- ..:' '.... ....",-, ..,,,,, .. ~ ."'" "_. ,,_ ~ ".' "._ "., .. - '.. ., 'n ".' ..,,' .. -:" ~rJr: - ~ - ;'.-" . ~ ',-,-. ~-...... . -,,- ~.'" . ;, . ". '.,,' . ',,: .. ::.." . ..-~------_& , ........, ,..",,, "'I'""~~"'" .~.'. ,~., '-'" '~--..' "..~, _,.". .. .,..'""':. '"-"-...y._.....c.'".;.H. ,0'" ....r.J.L._......_____ ._,-"F.r:,'.r ....."~~.."....,. ,. -' '." .,~.. -,"-." "'","','.""".':;; w<l-,"_:"'~---- f. _..'-__l"~__"'" '. ,......., ,,--,,!,;' _,;.'-' ...... .;,..",~~.....,-..\., .".','r:.urnl- f<<l<f"~.''','' ".. ".>,7"~.~ .,;" . ,,' -"-' ,.,.-". .~"-';.,. ,,,,,,. ....,..'~ ... 'l.......~ >'-.....,~.,.".' ."'''- .... -~"". .,. ,... :. .:'-".",,~"''''- "'".,{'...... ~"-- ,~ ,'..........., '" ._~'.-,,,... ....... _''-'''. .... .'......,~ -,'w ~,~~ !JJ;;cIt .,' ,,' -" ,-,',. ,~,_11" SAlrLnIMt. . e-- '>*.!' '! ....-......:.. ......".....,.-..-.........-., ~{~~, ~~ '!?!t.!-'~- FIDDLER'S CREEK PARKWA Y EXTENSION, PHASE THREE A SUBDIVISION LOCATED IN SECTIONS 11 AND 14. TOWNSHIP 51 SOUTH, RANGE 26 EAST COLUER COUNTY, FLORIDA I,OCI< nON MAP PARII/ERSHlP ACKNO'MEJJCI./ENT J .::~~;~~-:.~~iF2:";~~fii~-~;:~~~0.i:, ~ ,......."*''''1:''._ ~. .;:.;:~~"." ,~.... '.ll( _. ~,. .,' ....t,,'. '!: _' :._::::.S-- 1Ct,)~1 LEGAL OfSCRlPnON NonCE rHSPlAT. ASRfCC'IfDED IiI~GlWtfCFTRII.IS 1HC mrcw. W'lC1KI< iT 1H[ 5lB.l'IUll WIIS (){st1/Ilf]) I/lfIfJI AND III " II() Cll/C.l/STNICES BE 5/J1f'W{7E/J " AllfHORfTY 8Y ANY OTtO fiRAFffC (Ii {]IQTA/. Ft1iJ/ (y H" PlAT. Rflf MAY IE AlQ1JaVAL RfSrTilClKItS THM ARC NOT RECalJED at THS PlAT 7HJ.T IlAY IC FlX.II1 It rJE 1UJ.K: Rft>>IDS OF 7HIS (XlJIiT't: ~: .. -.;,''' : -'":. -\. ~l" I I KE,[1f:IP ENGINEERING REVIEW "~;:,,:;.;:r:,~ ~_ -~.L:J;;.L. .c..... ",,,, :. .1~ COUNTY ATTORNEY :;' ':,,,.:c'.::~~::::.:.:";~ COONTY coo~;~;r~, G~ '::,,~::: 4\7- \-~ '1;tr:~' ,~h:l.,4 FILING RECORD '___'i:i~'-' ,-.._.-.'-......, ,.__~......... '.,. . ......" , . '''''.' .--. .. ~ ''-t'~.'' ' :f~~.~\~,~-G~1,~:,f.'j~f-:~~tt~ .'-, ',i{.-'i,-.!/ ~~:"1.f4;-'" .:.~- -V';""'^"~" CD/JNTY SURVEYOR AND MAPPER .~:"It'.....-~,.. "" '7~~~ .~",.-. ",>",,-,,_, "'"'I:f. "..,..- .... ~..G_.... ("__ '~t~:~'. :"~~-;',~"",, _ ....... SURVEYOR'S CfJlnFlCATlON '''">r".,.....-..,......,........' ...."":".. "",_,. ,."..~ ......... '"1'<.' . . :,' ,.. ,..~" .'...: .,' ...' " ........ . .,T-" ,",,', ~. ,'--.' ~ .....0 ,.-"'.,..;:. "'ff'~' ,"';".'" ..... ""'~!' ~ ..... ...,- 1(." ~ ,~..', """ """,,, """ ,~. .,....'... - '''.1'' ". .-,. ....~ -,",,' 1 .....,.. .., .,...""_, ".i"'.... ....,..', ".,~ M"l' ,:JC-....(aL _ _ Agenda Item No, 16A9 October 28, 2008 Page 15 of 15 pur IIOtJK PACE SNItn' OF n...... \'t GENERAL NO rES '. '!_,......'-~"..:"C.~J;-_',"''''....:! ,....:~.. ",..".." ..~""',..,,"""";<< ''''WH''''''l,-'.' ~ ~:~:;;.~',~ ./:;.:~~ i::;';..1f,'iat: ~ . ... "" [,>C, "'I....... .~'... 'I' ',.r .... .<<.t,f(<O,!..'II:71Ol!1; Ll''l">t nv. __.....'UlT...'_...'" ,:...,,''i..~Z"':"__...i ..=-..,.,.-,....." ,.., Ii<M.~"''''''II'I","," ......'"<....,....1'''_'' ,,~,...--;","I'-.:'''''.., .......... ",,,.'~' """ ,..y.-,', 'f,~' ~,' ~....r'~,'..... ,'J '~,_.' "'f ,,,,r ';' 'F;o..~ '.~i'....,: '''~';:'t''<l'..,''':'.._-.on.. ...-... .~.", "'....""r'"'o.,. . .....',..",. ,~.;"..~ 0" -,.. , .. '.....,V~..,I~":'...."L\.'~"',' /_, '~:;_' "" "1(oIr.' "'"'- ,.,..., ,,. .:-r,f.. ~~'.' .;.~:.' ~''''''.' ~,....~.- t. "'1i-1"~,,-c-:.g;,,,..QJ.' '{![.Y~IIl'""'''-','''ro__ ..,':.: --'-"''' -.--------. _l~"" ,mJ I't' CIWJ'/IIJIOI/"'""""""" fr"_-"," /h.,M_ t," ~~;;-;-::-=':':'::" ...::'~...,...-':.\.-,,-........- _. ~ - ..,,, ....;,~:,..,._..J'~._".. ""'" '......11 _ rg _",...rm:; _______!!Eft.-