Loading...
Backup Documents 03/10/2009 Item #16D 3 26D3 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. Original documents should be hand delivered to the Board Oftice. The completed routing slip and original documents are to be forwarded to the Board Otlice only afh.'f the Board has taken action on the item.) ROUTING SLIP Complete routing lines #1 through #4 as appropriate for additional signatures, dates, and/or information needed. If the document is already complete with the excention of the Chairman's simature, draw a line throuJ?:h routing: lines #1 throuQ:h #4, comnlete the checklist, and forward to Sue Filson line #51. Route to Addressee(s) Office Initials Date (List in routing: order) L - --.-- --.---.......- "..~ 2, .-..-"'-- ---,.- - .- ..-- 3, -"- .------- --------- 4. Colleen M. Greene, Assistant County County Attorney () /1 ?- 03/16/09 Attorney 5. Sue Filson OMB 6. Minutes and Records Clerk of Court's Office PRIMARY CONTACT INFORMATION (The primary contact is the holder of the original document pending Bee approval. Normally the primary contact is the person who created/prepared the executive summary. Primary contact information is needed in the event one orthe addressees above, including Sue Filson, need to contact staif for additional or missing information. All original documents needing the Bee Chairman's signature are to be delivered to the BCe office only after the Bee has acted to approve the item.) Name of Primary Staff Marlene Foord Phone Number 252-4768 Contact Agenda Date Item was March 10, 2009 Agenda Item Number 16.D.3 Aooroved bv the BCC Type of Document Grant Application for Artificial Reef Number of Original 1 Attached Construction Documents Attached INSTRUCTIONS & CHECKLIST Initial the Yes column or mark "N/ A" in the Not Applicable column, whichever is appropriate. 1. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman, with the exception of most letters, must be reviewed and signed by the Office of the County Attorney. This includes signature pages from ordinances, resolutions, etc. signed by the County Attorney's Office and signature pages from contracts, agreements, etc. that have been fully executed by all parties except the BeC Chainnan and Clerk to the Board and possibly State Officials. All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other arties exee t the BCC Chairman and the Clerk to the Board The Chairman's signature line date has been entered as the date ofSCC approval of the document or CMG the final ne otiated contract date whichever is a licable. "Sign here" tabs are placed on the appropriate pages indicating where the Chairman's signature and CMG initials are re uired. In most cases (some contracts are an exception), the original document and this routing slip should be provided to Sue Filson in the BCC office within 24 hours of Bee approval. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of our deadlines! The document was approved by the BCe on 03/JO/09 and all changes made during the meeting CMG have been incorporated in the attached document. The County Attorney's Office has reviewed the chan es if a Heable. 2. N/A 3. 4. 5. N/A 6. I: Fonns/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised] .26.05, Revised 2.24.05 <<matter _numbem/<<document_ number>> MEMORANDUM Date: March 17,2009 To: Marlene Foord, AICP Grants Coordinator From: Teresa Polaski, Deputy Clerk Minutes & Records Department Re: Grant Application for Artificial Reef Construction Attached you will find an original of the above referenced document (Agenda Item # 16D3) which was approved by the Board of County Commissioners on Tuesday, March 10,2009. If you should have any questions regarding this item, please feel free to call me at 252-8411. Thank you. Attachment (l) 16D3 I 16D3 FWC DIVISION OF MARINE FISHERIES MANAGEMENT ARTIFICIAL REEF CONSTRUCTION GRANT APPLICATION .t,.~"'nqtf; Name of locll co..tal go....rnment, unIversity, or eligible not-fof..proflt corporlltlon Printed Name, Title Collier County Pamela Keyes, Environmental Specialist Mailing Add..... Mailing Address 3301 Tamiami Trail East 3300 Santa Barbara Blvd. Physical Address, for courier servlce, with zip code (If different than mailing .ddntu) Physical Address, for courier service, with zip code jlf different than mailing address) City Naples 34112 City Naples Zip Code 34116 Telephone 1239 ) 252-2980 1 239 ) 353-4061 Telephone 1239 ) 252-2980 FEID Number 59-6000558 Emall addreu Pamelakeyes@colliergov,net 3110 2v(Fl Date ":'Ln \\ ,\. " ~tL\t'-. (hl\ll' MtU\.. . Printed Name and Title Name of Proposed Reef Project: Types of Material Proposed for Deployment: Clean concrete rubble, culverts Amount of Material (tons), and/or Number of Module Units Approximately 940 Tons Proposed for Dsployment: Proposed Coordinates LA TlLON decimal minutes: Grant Funds Requested: $ 60,000 .t<:~?i~~rtM... Santa Lucia Reef Site 26,094167 -81,842333 Depth (ft.): 26 Matching Funds (Cash Only): $ 0 (attach letter stating cash match amount) Total Project Cost: $ 60,000 "..,;,-,-,. "'>~'~' Name of Permit Holder: Collier County Board of County Commissioners (if different than applicant, attach a letter of authorization from the permit holder to use the site) Name of Permitted Site: Santa Lucia Reef Site f/f Check here if the permitted site is located in State waters FDEP Permit Number: (forsileslocaledSlatewalers) NGP 11-0238050-002-EG18 Issued: 11/10 /2008 Expires: 11/10 /2013 Issued: 7 /' /2008 Expire~;' 'I-P /2013 -' ,.' I.) ~'l, , , , , .' USACOE Permit Number: SAJ-2008-1645 (IP-LAE) o Check here if information for additional permitted sites is attached. Approved as 10 lonn & 8gal s iciancy FWC Form AR01 (re.o1I08) -t.WOO.c~age 1 of4 Coli n Greene, ARAiRtAnt Countv Attornev ATTEST: >,_ ~~#~PI~tiO~__ All APPLICANTS MUST SUBMIT RESPONSES TO THE FOllOWING AS ATTACHMENTS CORRESPONDING TO THE INDICATED NUMBERS: Project Site Selection and Environmental Assessment 1. A general location map using the most recent NOAA nautical chart showing: a. The chart name, chart number, and date of chart; b. The coastline adjacent to the proposed depioyment location; c. The bearing and distance (in nautical miles) from a described navigational marker or distinctive topographical feature (e.g. mouth of inlet) to the proposed deployment location...... ............. ........ ........... ........... ...(a-c,requireddocumentatlon) 2, An accurate and legible site-specific map (recommended on 81/2 x 11 paper) of the proposed deployment area showing: a. Compass rose with a north arrow, scale, and legend; b, Name of permitted site; c. Dimensions (in feet) of the permitted site (length/width for polygons, radius for circuiar sites); d. Area of the permitted site in acres and/or square nautical miles; e. Center and corner coordinates in latitude/longitude format as described in the Army Corps of Engineers permit. If the original permit uses LORAN-C coordinates to describe the site, the applicant must obtain GPS coordinates for the center and corners of the site using a vessel equipped with both types of navigational receivers. lORAN-C coordinates alone are not acceptable; f Directional orientation of permitted site in relation to the compass rose; g. Overlay of the permit corner coordinates with the most recent NOAA nautical chart and compare the permit corner coordinates with the charted permit area. Discuss any discrepancies between the NOAA charted site and the permit; h. Minimum and maximum water depths (feet, MLW) for the permitted site; i. All orevious oublic reef deolovments in the oermitted site and the orooosed deolovment with a reference number for each; j. A table (on a separate page) which lists by reference number the deployment date, type, amount of materials, and coordinates in latitude/longitude for each prior deployment and the proposed deployment in the permitted site. k. The location of the closest natural habitats (e.g., hardbottom) to the deployment site... . . ... ... ... ... ... ... ... ... ... . ........ ... ............ (a-k, required documentation) 3. The results and a discussion of a bottom survey for the proposed deployment site which includes the date the survey was accomplished, the type of survey used (visual or fathometer), an estimate of the total area surveyed (in square feet) and a description of the sediments or occurrence of natural hard bottom and/or existing artificial reefs observed. Provide confirmation that there is no natural hard bottom or seagrass habitat within 150 ft. of the deployment site. Note: visual surveys by SCUBA are required at depths of 100 fsw or less.......... . ... ......... ... ... ... ."......... "........ ... ...(up to four points) 4. An environmental assessment that justifies the project site based upon minimum environmental impact. The environmental assessment should include a description of potential onsite, offsite, and cumulative impacts of the proposed artificial reef construction project on vegetation, threatened or endangered species, fisheries, wildlife, water quality, and cultural resources...... ........... ,.......... .........(uptofivepoints) 5, A discussion of the availability of other relevant prior biological, or environmental data associated with the proposed reef site or general reef vicinity... ....... ... ...(up to four points) 6, A discussion of the range of wave height, current velocity, temperature, salinity, visibility, tidal range, and other physical oceanography conditions and how those factors may affect the project... ........... ........... ........................ .......(up to five points) 7. Material Placement Report Forms for any previously unsubmitted non-FWCC funded public reef projects completed during the last calendar year (as required by Federal Permit conditions), listed by material type and deployment date..... .......(St.tute requirement) 8. The number of existing artificial reef deployments (materials) within a 0.25 nm radius of the proposed project, Depict each deployment on the site-specific drawing required in number .-/ 2(i) above (more points awarded for fewer deployments)........ ........... (up to four points) ~ FWC Form AROl (1/09) Page 2 of 4 rI 'i/ rI ri rI ri ~ 16D3 " .. .s::; u t!! <I: 000_ Construction Grant Application Project Objectives 9, Specific, well defined and measurable objectives to gauge the success of the project......... ..... .................. ..(up to four poinls) 10. A plan to measure the success of project objective achievement ,.. .., ... .(up to five points) Project Design 11. A detailed description and discussion of the reef design and configuration, habitat complexity, interstitial spaces, surface area, material placement and positioning... .............. .......(uplolenpoinls) 12. A demonstration of the durability and stability of the reef material at the depth proposed for placement based on prior field evaluations or stability analyses........... ... ........... (four poinls) Project Planning and Management 13. A project timeline and construction schedule. . . . .. (required documentation) 14, Number of staff and percentage of time available to undertake administrative and field aspects of project, including subsequent monitoring and assessment .... .(up 10 five points) 15. A written artificial reef monitoring and assessment plan, if available.,. ., ..... .,.(up to five poinls) 16. A five year local artificial reef management plan which shows linkage with the proposed project, if available.. ............. ........... .........,(uplofivepoints) 17, A demonstration of involvement with a marine advisory board with input on artificial reef issues, if available. Include a listing of marine advisory board members, and a copy of the most recent meeting minutes regarding the proposed project...... ............ ...... ....(two points) 0 18. One complete copy of each active ACOE and DEP permit with accompanying permit conditions applicable to the project........... .....(permit requirement) fi/ Local Demand and Public Access 19. A demonstration of public support for the proposed artificial reef project, based upon written letters or resolutions of support less than six months old............ .. ...(up to five points) 20. The presence of at least one navigable inlet access point within 20 nautical miles of the project site (list the number 01)............ .................. ...... ..... ..(three poinls) Material Transport and Ownership 21. A plan to address logistics, coordination, staging area availability, material location, and material transport and handling... ..... ............................. .... (up to five paints) 22. Assurance of the availability of reef material for the proposed project, with an itemized list describing the materials proposed to be deployed. ........... ..(three points) 23. Proof of ownership. For all proposed reef materials, indicate whether the reef material has already been purchased or donated (including letter(s) of verification)... ....(permit requirement) Project Practicality 24. An approximate estimate of handling and transportation cost per ton for secondary use materials, and/or purchase, handling, and transportation cost per unit for pre-fabricated materials. Discuss the extent to which the project is physically and economically feasible based upon the project description and the requested project funding.....,. ... .(up 10 five points) 25. The percentage financial match of the project. Although providing cash match funds is not required, the commitment to provide funds to help construct the proposed artificial reef will be ranked in proportion to the percentage match of the project... .... ,., (up to four poinls) FWC Form AR01 (1/09) Page 3 of4 ~ ri ~ M ri rrt rJ 16D3 ... Gl .<: " co = <l: { :-;" '~,\;;'" ~: :;<~;i ~ '" >:;~~ , ~ ~,:~~,..;1 COO,l,:;,;r tI rrt ~ ~ ~ rJ tI odtJ oop rno .,:','."", <:.,..:.....;,;.:... 'COO.'; : '.J: ::- ",.'- " ,000' '~.. .. , '.. ',',...".:..:ii"'::"o:.. ~ "i';'~";;fr:;. 000 -t {JD:J ODD 000 "11: ':;,~ n. -i;t, 000 ..,}~ ~ 000 - ODD .. ~K 'J , 000_, 000_ Construction Grant Application 26, The applicant's total artificial reef construction/monitoring budget (excluding funds requested from this grant) for the current calendar year including a description and amounts of additional funding by funding source... ............... (information only, no points) F!! Non-profit Eligibility Verification 27. Documentation of 501 (c)(3) tax status from the Internal Revenue Service,(Statute requirement) 28. Documentation of the corporation's By-laws and/or Articles of Incorporation which include artificial reef monitoring and/or development as an objective,. ,..,.,. . (Statute requirement) Procurement of Commodities or Contractual Services Verification 29. Documentation of the intended means which commodities or contractual services will be procured, pursuant to the requirements of Section 287,057, Florida Statutes. For Agreements in the amount of $25,000 or less, grantees will be required to obtain a minimum of two written quotes for any subcontracts. For Agreements in excess of $25,000, grantees will be required to publicly advertise and send bid specifications to a minimum of five potential subcontractors. For any Agreement requesting the use a sole source vendor, provide clear justification (in the response to this item) for Commission review and approval .... . (Statute requirement) THE FOLLOWING ADDITIONAL ITEMS WILL BE DETERMINED BY FWCC: 30, Overall quality of application preparation and accuracy. . ...... (up to four points) 31. The project is an innovative project or designed to provide future monitoring potential...... ........... ........... ................. (up to five points) 32. Estimated percent coverage of natural hardbottom in the multi-county area. More points allotted to lesser coverage...... ..... ....(up to eight points) 33. Number of recreational boats 16 feet long or longer registered in the affected County......... ....... .......... ,........................................... .(up to five points) 34. Number of one-year resident and nonresident recreational fishing license holders in the affected county..,...... ...... ...... ......... ..........., .... ..... (up to five points) 35. Number of charter/head boats in the affected county...... . ..(up to five points) 36. The applicant is located in an economically depressed rural coastal county,., . .... ..(five points) 37, First time participation in the program by the applicant .. ... (five points) 38, The applicant's historic ability to ensure timely project completion, and compliance with grant agreement terms and conditions based upon the most recent grant agreement performance... ............ ............. ..............(uptofivepoints) FWC Form AR01 (1/09) Page 4 of4 16D3 " III .c u ! <( ri/ ~ tt d -., 0_ "":,. ." o. ~ Construction Grant Application