Backup Documents 05/26/2009 Item #16D13
16D13
MEMORANDUM
Date:
July 17, 2009
To:
Michael F. Hauer
Purchasing Acquisition Manager
From:
Ann Jennejohn, Deputy Clerk
Minutes & Records Department
Re:
Contract #09-5233 "NCRP Boardwalk Addition"
Contractor: Heatherwood Construction
Attached, please find an original contract as referenced above,
(Agenda Item #16013), approved by the Board of County
Commissioners on Tuesday, May 26, 2009.
The second original will be kept in the Minutes and Records Department
as part of the Board's official record.
If you should have any questions, please contact me at 252-8406.
Thank you.
Attachment
Colt,. County
Purchasing Department
3301 Tamiami Trail East
Naples, Florida 34112
Telephone: 239-252-8965
FAX: 239-252-6480
Email: MikeHauercollierQ.net
www.collierqov.net
16D 13/ l
&
Adrnnistrative Services Division
Purchasing
1"'-'-
::-::;
=c
,........_.. -'-r-
--7 .-;.-
...;.._ I
-.J ;:::.:.~
-< 1":=
ITEM NO.:
w
DATE RECEIVED:
IT
FILE NO.:
ROUTED TO:
DO NOT WRITE ABOVE THIS LINE
Date:
Co\ \ee-V'\
~
D"^-R. -, - it:; - O~
J/I' \S'.QC1
Orfl c:r
. ~I~ .[)DSL-
Contract #09-5233 "North Collier Regional Park Boardwalk Addition"
Request for Legal Services
June 19, 2009
To:
Colleen Greene
Assistant County Attorney
M/#
From:
Michael F. Hauer, CPPO, CPPB
Senior Purchasing Agent
Re:
Contractor: Heatherwood Construction
BACKGROUND OF REQUEST:
This contract was approved by the BCC on May /2 9; Agenda Item 16. D.13.
This .em has been previously submitted. ( 0 if - f /~ C - () / ?-I 3
.:
ACTION REQUESTED:
Contract review and approval.
OTHER COMMENTS:
Please forward to BCC for signature after approval. If there are any questions concerning the
document, please contact me at the telephone number or em ail address above. Purchasing would
appreciate notification when the documents exit your office.
GI Acq u isitions/T echF onnsandLetters/MemotoRequeslLegalServices
00_'_'_~~.~~.
16D13
Co1t,. County
Purchasing Department
3301 Tamiami Trail East
Naples, Florida 34112
Telephone: 239-252-8965
FAX: 239-252-6480
Email: MikeHauer@collieroov.net
www.collierqov.net
Adrnnistrative Services Division
Purchasing
TO:
Jeff Walker/Ray Carter
Risk Management Department
Michael F. Hauer, CPPO, CPP~~/1.// 7 / /
Senior Purchasing Agent / / L 7'#
Purchasing Department
FROM:
DATE:
June 19, 2009
RE:
Review of Insurance for Contract No. 09-5233 "North Collier
Regional Park Boardwalk Addition"
Contractor: Heatherwood Construction
This Contract was approved by the BCC on May 26, 2009; Agenda Item
16.0.13.
This contract is being re-submitted with the Payment and Performance
Bonds in the contract. Please review the Bonds and Insurance Certificate
in this Agreement for the above referenced contract. If everything is
acceptable, please forward to the County Attorney for further review and
61pproval. I would appreciate it if you would keep me advised on when this
document has been forwarded to the County Attorney's Office.
Thank you and if you have any further questions contact me at the following
telephone number: 252-8965.
C: Tony Ruberto, Parks and Recreation
GI Acquisitions/T ech F onnsa nd Lelters/MemotoR iskforl nsuranceReview
Rp\li_C:Arl" ,t!!1 ~/na___________
ITEM NO.: oq ..? Q..c - 0 \ d- \ ~
DATE RECEIVED:
<tX Qn tJz6rl3
~ of'
Purchasing Department V Va '
3301 Tamiami Trail East n ).;.^}} yv
Naples, Florida 34112 ~ ~ l~ ,It
Telephone: 239-252-8965 . '" ,~
FAX: 239-252-6480 0 Ii ~ 1'1 '
Email: MikeHauer@collieroov.net \ _ I '
www.collierqov.net ~~ c: b)
_0 C) c
--;i
/' '- -
, rr
I
~
T--",
.-:-~.l (-
=l:::r-
Adrnnistrative Services Division
Purchasing
FILE NO.:
-0
DO NOT WRITE ABOVE THIS LINE
r "\
--':i,
j~ pr;
ROUTED TO:
.s::-
Request for Legal Services
Date:
June 2, 2009
ex \Gq
5 lZ-:\ :D vJ.- \]\
7Jfl#
To:
Colleen Greene
Assistant County Attorney
From:
Michael F. Hauer, CPPO, CPPB
Senior Purchasing Agent
Re:
Contract #09-5233 "North Collier Regional Park Boardwalk Addition"
Contractor: Heatherwood Construction
BACKGROUND OF REQUEST: . /'
This contract was approved by the BCC on May 26, 2009; Agenda Item 16. D.'1\ ( 3 ZJ>tt . )
This item has not been previously submitted. ) ~~
ACTION REQUESTED: tf51 ():. _~~ "vf ~ ~.
Contract review and approval. IP V' n ~~
Ay l'.P -. (- .AJLt,
I \l~1 ~ "IVw
OTHER COMMENTS:
Please forward to BCC for signature after approval. If there are any questions concerning the
document, please contact me at the telephone number or email address above. Purchasing would
appreciate notification when the documents exit your office.
GI AcquisitionslT echFonnsandLetters/MemotoReq uestLegalServices
0.......:............1. A/ie/Inn
13
RLS # ~1- fJ ke. -
CHECKLIST FOR REVIEWING CONTRACTS
Entity Name: II f?..1I THElCtue:'C:J'l) (Jc;/lJS-rtl.(.l(l"'flo,u (10m Atw/
Entity name correcl on contracl? /Yes No
Entity registered with FL Sec. of State? VYes No
Provided $ k M.I L.
Provided $ l \
Provided $ I M. I L.
Provided $ t (
Provided $ 3~tJ) ~t7
Insurance
Insurance Certificate attached?
Insured registered in Florida?
Contract # &lor Project referenced on Certificate?
Certificate Holder name correct (BCC)?
Commercial General Liability
General Aggregale Required $ S-Ot7 J ()tJtl
PrrJuctslCompl/Op Required $ ,
Personal & Advert Required $
Each Occurrence Required $
Fire/Prop Damage Required $
Automobile Liability
Bodily Inj & Prop Required $ I "^ 1 L
Workers Compensation
Each accident Required $ lOP, Of) {1
I
Disease Aggregate Required $
Disease Each Empl Required $
Umbrella Liability
Each Occurrence Provided $ '"2. 1\,.(.1 L
Aggregate Provided $ L I
Does Umbrella sufficiently cover any underinsured portion?
Professional Liability
Each Occurrence Required $
Per Aggregate Required $
Other Insurance
Each Occur Type: f QUI f"
Provided $
-LYes
vYes
\7" Y es
~Yes
( MIL
Provided $ ,S-Ot) MCJ
Provided $ f I
Provided $ I I
Provided $
Provided $
Required $
County required to be named as additional insured?
County named as addilional insured?
Indemnification
Does indemnification meet County standards?
Is County indemnifying other party?
At-~
~(:"Ht:b
Performance Bond
!: :-equirement referenced in contract?
If atlached, expiration date of bond fJ 0 1"
Does dollar amount match contract?
Agent registered in Florida?
Signature Blocks
Correct executor name in signature block?
Correct title of executor?
Executor authorized to sign for entity?
Proper number ofwitnesses/notary?
Autllorization for executor to sign, if necessary:
rn;!irman's signature block?
attestation signature block?
County Attorney's signature block?
tJ\~
Attachments
Arc: all required attachments included?
No
No
No
No
Exp. Date 3(lct 1(0
Exp. Date to
Exp. Date l I
Exp. Date ' /
Exp. Date t '
Exp Date .. ? I I t( I If)
Exp Date Y ( I'~
Exp Date I I
Exp Date I ,
Exp Date 3/ICi (,,,
Exp Date I II
~es _No
Exp. Date
Exp. Date
Provided $ / S; tiP [)
Exp Date.3 /t q ;'P
-L Yes
../ Yes
~Yes
_Yes
/Yes
/Yes
=z- Yes
~Yes
~Yes
~Yes
~Yes
~Yes
~Yes
~Yes
-L Yes
_No
_No
No
~No
No
No
No
No
No
No
No
No
No
No
No ~
Reviewer Initials:t_
Date: tJ
04-COA-0 03 /222
16D13
North Collier Regional Park Boardwalk Addition
COLLIER COUNTY BID NO. 09-5233
COLLIER COUNTY, FLORIDA
COLLIER COUNTY PURCHASING DEPARTMENT
3301 Tamiami Trail, East
Naples, Florida 34112
TABLE OF COTENTS
A. PUBLIC NOTICE/LEGAL ADVERTISEMENT (PAGE 1 ONLY)
B. INSTRUCTIONS TO BIDDERS
C. BID, BID SCHEDULE AND OTHER DOCUMENTS
D. AGREEMENT
E. AGREEMENT EXHIBITS
EXHIBIT A: Performance and Payment Bond Forms
EXHIBIT B: Insurance Requirement Form
EXHIBIT C: Release and Affidavit Form
EXHIBIT D: Contractor Application for Payment Form
EXHIBIT E: Change Order Form
EXHIBIT F: Certificate of Substantial Completion Form
EXHIBIT G: Final Payment Checklist
EXHIBIT H: General Terms and Conditions
EXHIBIT I: Supplemental Terms and Conditions
EXHIBIT J: Technical Specifications
EXHIBIT K: Permits
EXHIBIT L: Standard Details (if applicable)
EXHIBIT M: Plans and Specifications shown on Plan Sheet A-1.
EXHIBIT N: Contractor's List of Key Personnel
16DI3
16D13
PUBLIC NOTICE
INVITATION TO BID
COLLIER COUNTY, FLORIDA
North Collier Regional Park Boardwalk Addition
COUNTY BID NUMBER 09-5233
Separate sealed bids for the construction of the boardwalk addition at North Collier
Regional Park, addressed to Mr. Steve Carnell, Purchasing Director, will be received at
the Collier County Government Complex, 3301 Tamiami Trail East, Purchasing
Building, Purchasing Department, Naples, Florida 34112, until 2:30 P.M. LOCAL TIME,
on the 29 day of April 2009, at which time all bids will be publicly opened and read
aloud. Any bids received after the time and date specified will not be accepted and
shall be returned unopened to the Bidder.
A non-mandatory pre-bid conference shall be held at the Purchasing Department,
Conference Room "A", Purchasing Building "G" at 8:30 a.m. LOCAL TIME on the 15th
day of April 2009, at which time all prospective Bidders may have questions answered
regarding the Bidding Documents for this Project.
Sealed envelopes containing bids shall be marked or endorsed "Bid for Collier County
Government, Collier County, North Collier Regional Park Boardwalk Addition Bid No.
09-5233 and Bid Date of April 15, 2009". No bid shall be considered unless it is made
on an unaltered Bid form which is included in the Bidding Documents. The Bid Schedule
(GC-P-1 through GC-P-14) shall be removed from the Bidding Documents prior to
submittal.
One contract will be awarded for all Work. Bidding Documents may be examined on the
Collier County Purchasing Department E-Procurement website: www.collierqov.neUbid.
Copies of the Bidding Documents may be obtained only from the denoted website.
Bidding Documents obtained from sources other than the Collier County Purchasing
Department website may not be accurate or current.
Each bid shall be accompanied by a certified or cashiers check or a Bid Bond in an
amount not less than five percent (5%) of the total Bid to be retained as liquidated
damages in the event the Successful Bidder fails to execute the Agreement and file the
required bonds and insurance within fifteen (15) calendar days after the receipt of the
Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute
the Agreement in the form attached hereto and incorporated herein.
The Successful Bidder shall be required to furnish the necessary Payment and
Performance Bonds, as prescribed in the General Conditions of the Contract
Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and
Certificates of Insurance shall be either executed by or countersigned by a licensed
resident agent of the surety or insurance company having its place of business in the
State of Florida. Further, the said surety or insurance company shall be duly licensed
and qualified to do business in the State of Florida.
GC-PN-1
16013
Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with
each bond a certified and effective dated copy of their Power of Attorney.
In order to perform public work, the Successful Bidder shall, as applicable, hold or
obtain such contractor's and business licenses, certifications and registrations as
required by State statutes and County ordinances.
Before a contract will be awarded for the Work contemplated herein, the Owner shall
conduct such investigations as it deems necessary to determine the performance record
and ability of the apparent low Bidder to perform the size and type of work specified in
the Bidding Documents. Upon request, the Bidder shall submit such information as
deemed necessary by the Owner to evaluate the Bidder's qualifications.
The Successful Bidder shall be required to finally complete all Work within ninety (90)
calendar days from and after the Commencement Date specified in the Notice to
Proceed.
The Owner reserves the right to reject all Bids or any Bid not conforming to the intent
and purpose of the Bidding Documents, and to postpone the award of the contract for a
period of time which, however, shall not extend beyond one hundred twenty (120) days
from the bid opening date without the consent of the Successful Bidder.
Dated this 8th day of April, 2009.
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
BY: Is/ Stephen Y. Carnell, C.P.M.
Purchasing and General Services Director
GC-PN-2
16D13
PART B - INSTRUCTIONS TO BIDDERS
Section 1. Definitions
1.1 The term "Owner" used herein refers to the Board of County Commissioners, or
its duly authorized representative.
1 .2 The term "Project Manager" used herein refers to the Owner's duly authorized
representative and shall mean the Division Administrator or Department Director, as
applicable, acting directly or through duly authorized representatives.
1.3 The term "Design Professional" refers to the licensed professional engineer or
architect who is in privity with the Owner for the purpose of designing and/or monitoring
the construction of the project. At the Owner's discretion, any or all duties of the Design
Professional referenced in the Contract Documents may be assumed at any time by the
Project Manager on behalf of the Owner. Conversely, at the Owner's discretion the
Project Manager may formally assign any of his/her duties specified in the Contract
Documents to the Design Professional.
1.4 The term "Bidder" used herein means one who submits a bid directly to the
Owner in response to this solicitation.
1.5 The term "Successful Bidder" means the lowest qualified, responsible and
responsive Bidder who is awarded the contract by the Board of County Commissioners,
on the basis of the Owner's evaluation.
1.6 The term "Bidding Documents" includes the Legal Advertisement, these
Instructions to Bidders, the Bid Schedule and the Contract Documents as defined in the
Agreement.
1.7 The term "Bid" shall mean a completed Bid Schedule, bound in the Bidding
Documents, properly signed, providing the Owner a proposed cost for providing the
services required in the Bidding Documents.
Section 2. Preparation of Bids
2.1 The Bids must be submitted on the standard form herein furnished by the Owner
(pages GC-P-1 to GC-P-14 as bound in these Bidding Documents). By submitting a Bid,
Bidder acknowledges and agrees that it shall execute the Agreement in the form
attached hereto and incorporated herein. The Bidder shall complete the Bid in ink or by
typewriter and shall sign the Bid correctly. Bid Schedules submitted on disk/CD shall be
accompanied by a hard copy of the completed Bid Schedule which shall be signed and
dated by the Bidder. The Bid may be rejected if it contains any omission, alteration of
form, conditional bid or irregularities of any kind. Bids must be submitted in sealed
envelopes, marked with the Bid Number, Project Name and Bid opening Date and Time,
and shall be addressed to the Collier County Purchasing Department, Purchasing
Building, Collier County Government Complex, 3301 Tamiami Trail, East, Naples,
Florida 34112. If forwarded by mail, the sealed envelope containing the Bid must be
enclosed in another sealed envelope addressed as above.
GC-P-1
16D13
Bids received at the location specified herein after the time specified for bid opening
will be returned to the bidder unopened and shall not be considered.
Section 3. Bid Deposit Reauirements
3.1 No Bid shall be considered or accepted unless at the time of Bid filing the same
shall be accompanied by a cashiers check, a cash bond posted with the County Clerk, a
certified check payable to Owner on some bank or trust company located in the State
of Florida insured by the Federal Deposit Insurance Corporation, or Bid Bond, in an
amount not less than 5% of the bidder's maximum possible award (base bid plus all
add alternates) (collectively referred to herein as the "Bid Deposit"). The Bid Deposit
shall be retained by Owner as liquidated damages if the Successful Bidder fails to
execute and deliver to Owner the unaltered Agreement, or fails to deliver the required
Performance and Payment Bonds or Certificates of Insurance, all within ten (10)
calendar days after receipt of the Notice of Award. Bid Bonds shall be executed by a
corporate surety licensed under the laws of the State of Florida to execute such bonds,
with conditions that the surety will, upon demand, forthwith make payment to Owner
upon said bond. Bid Deposits of the three (3) lowest Bidders shall be held until the
Agreement has been executed by the Successful Bidder and same has been delivered
to Owner together with the required bonds and insurance, after which all three (3) Bid
Deposits shall be returned to the respective Bidders. All other Bid Deposits shall be
released within ten (10) working days of the Bid Opening. No Bid including alternates,
shall be withdrawn within one hundred and twenty (120) days after the public opening
thereof. If a Bid is not accepted within said time period it shall be deemed rejected and
the Bid Deposit shall be returned to Bidder. In the event that the Owner awards the
contract prior to the expiration of the 120 day period without selecting any or all
alternates, the Owner shall retain the right to subsequently award to the Successful
Bidder said alternates at a later time but no later than 120 days from opening, unless
otherwise agreed by the Purchasing Director and the Successful Bidder.
3.2 The Successful Bidder shall execute five (5) copies of the Agreement in the form
attached and deliver same to Owner within the time period noted above. The Owner
shall execute all copies and return one fully executed copy of the Agreement to
Successful Bidder within thirty (30) working days after receipt of the executed
Agreement from Successful Bidder unless any governmental agency having funding
control over the Project requires additional time, in which event the Owner shall have
such additional time to execute the Agreement as may be reasonably necessary.
Section 4. Riaht to Reiect Bids
4.1 The Owner reserves the right to reject any and all Bids or to waive informalities
and negotiate with the apparent lowest, qualified Bidder to such extent as may be
necessary for budgetary reasons.
GC-P-2
16D13
Section 5. Sianina of Bids
5.1 Bids submitted by a corporation must be executed in the corporate name by the
president, a vice president, or duly authorized representative. The corporate address
and state of incorporation must be shown below the signature.
5.2 Bids by a partnership must be executed in the partnership name and signed by a
general partner whose title must appear under the signature and the official address of
the partnership must be shown below said signature.
5.3 If Bidder is an individual, his or her signature shall be inscribed.
5.4 If signature is by an agent or other than an officer of corporation or general
partner of partnership, a properly notarized power of attorney must be submitted with
the Bid.
5.5 All Bids shall have names typed or printed below all signatures.
5.6 All Bids shall state the Bidder's contractor license number.
5.7 Failure to follow the provisions of this section shall be grounds for rejecting the
Bid as irregular or unauthorized.
Section 6. Withdrawal of Bids
Any Bid may be withdrawn at any time prior to the hour fixed in the Legal Advertisement
for the opening of Bids, provided that the withdrawal is requested in writing, properly
executed by the Bidder and received by Owner prior to Bid Opening. The withdrawal of
a Bid will not prejudice the right of a Bidder to file a new Bid prior to the time specified
for Bid opening.
Section 7. Late Bids
No Bid shall be accepted that fails to be submitted prior to the time specified in the
Legal Advertisement.
Section 8. Interpretation of Contract Documents
8.1 No interpretation of the meaning of the plans, specifications or other Bidding
Documents shall be made to a Bidder orally. Any such oral or other interpretations or
clarifications shall be without legal effect. All requests for interpretations or clarifications
shall be in writing, addressed to the Purchasing Department, to be given consideration.
All such requests for interpretations or clarification must be received at least ten (10)
calendar days prior to the Bid opening date. Any and all such interpretations and
supplemental instructions shall be in the form of written addendum which, if issued,
shall be sent by mail or fax to all known Bidders at their respective addresses furnished
for such purposes no later than three (3) working days prior to the date fixed for the
GC-P-3
16D13
opening of Bids. Such written addenda shall be binding on Bidder and shall become a
part of the Bidding Documents.
8.2 It shall be the responsibility of each Bidder to ascertain, prior to submitting its Bid
that it has received all addenda issued and it shall acknowledge same in its Bid.
8.3 As noted in the Legal Advertisement, attendance by all bidders at the Pre-Bid
Conference is non-mandatory.
Section 9. Examination of Site and Contract Documents
9.1 By executing and submitting its Bid, each Bidder certifies that it has:
a. Examined all Bidding Documents thoroughly;
b. Visited the site to become familiar with local conditions that may in any manner
affect performance of the Work;
c. Become familiar with all federal, state and local laws, ordinances, rules, and
regulations affecting performance of the Work; and
d. Correlated all of its observations with the requirements of bidding documents.
No plea of ignorance of conditions or difficulties that may exist or conditions or
difficulties that may be encountered in the execution of the Work pursuant to these
Bidding Documents as a result of failure to make the necessary examinations and
investigations shall be accepted as an excuse for any failure or omission on the part of
the Successful Bidder, nor shall they be accepted as a basis for any claims whatsoever
for extra compensation or for an extension of time.
9.2 The Owner will make copies of surveys and reports performed in conjunction with
this Project available to any Bidder requesting them at cost; provided, however, the
Owner does not warrant or represent to any Bidder either the completeness or accuracy
of any such surveys and reports. Before submitting its Bid, each Bidder shall, at its own
expense, make such additional surveys and investigations as may be necessary to
determine its Bid price for the performance of the Work within the terms of the Bidding
Documents. This provision shall be subject to Section 2.3 of the General Conditions to
the Agreement.
Section 10. Material Requirements
It is the intention of these Bidding Documents to identify standard materials. When
space is provided on the Bid Schedule, Bidders shall specify the materials which they
propose to use in the Project. The Owner may declare any Bid non-responsive or
irregular if such materials are not specifically named by Bidder.
GC-P-4
16D13
Section 11. Bid Quantities
11.1 Quantities given in the Bid Schedule, while estimated from the best information
available, are approximate only. Payment for unit price items shall be based on the
actual number of units installed for the Work. Bids shall be compared on the basis of
number of units stated in the Bid Schedule as set forth in the Bidding Documents. Said
unit prices shall be multiplied by the bid quantities for the total Bid price. Any Bid not
conforming to this requirement may be rejected. Special attention to all Bidders is
called to this provision, because if conditions make it necessary or prudent to revise the
unit quantities, the unit prices will be fixed for such increased or decreased quantities.
Compensation for such additive or subtractive changes in the quantities shall be limited
to the unit prices in the Bid. Subsequent to the issuance of a notice to proceed, the
Project Manager and the Successful Bidder shall have the discretion to re-negotiate any
unit price(s) where the actual quantity varies by more than 25% from the estimate at the
time of bid.
Section 12. Award of Contract
12.1 Any prospective bidder who desires to protest any aspect(s) or provision(s) of the
bid invitation (including the form of the bid documents or bid procedures) shall file their
protest with the Purchasing Director prior to the time of the bid opening strictly in
accordance with Owner's then current Purchasing Policy.
12.2 The Collier County Board of County Commissioners has adopted a Local
Preference "Right to Match" policy to enhance the opportunities of local businesses to
receive awards of Collier County contracts.
A "local business" is defined as a business that has a valid occupational license issued
by either Collier or Lee County for a minimum of one (1) year prior to a Collier County
bid or proposal submission that authorizes the business to provide the commodities or
services to be purchased, and a physical business address located within the limits of
Collier or Lee Counties from which the vendor operates or performs business. Post
Office Boxes are not verifiable and shall not be used for the purpose of establishing said
physical address. In addition to the foregoing, a vendor shall not be considered a "local
business" unless it contributes to the economic development and well-being of either
Collier or Lee County in a verifiable and measurable way. This may include, but not be
limited to, the retention and expansion of employment opportunities, the support and
increase to either Collier or Lee County's tax base, and residency of employees and
principals of the business within Collier or Lee County. Vendors shall affirm in writing
their compliance with the foregoing at the time of submitting their bid or proposal to be
eligible for consideration as a "local business" under this section.
When a qualified and responsive, non-local business submits the lowest price bid, and
the bid submitted by one or more qualified and responsive local businesses is within ten
percent (10%) of the price submitted by the non-local business, then the local business
with the apparent lowest bid offer (i.e. the lowest local bidder) shall have the opportunity
to submit, an offer to match the price(s) offered by the overall lowest, qualified and
responsive bidder.
GC-P-5
16D13
In such instances, staff shall first verify if the lowest non-local bidder and the lowest
local bidder are in fact qualified and responsive bidders. Next, the Purchasing
Department shall determine if the lowest local bidder meets the requirements of Section
287.087 F.S.
If the lowest local bidder meets the requirements of 287.087, F.S., the Purchasing
Department shall invite the lowest local bidder to submit a matching offer to the
Purchasing Department which shall be submitted within five (5) business days
thereafter. If the lowest local bidder submits an offer that fully matches the lowest bid
from the lowest non-local bidder tendered previously, then award shall be made to the
local bidder. If the lowest local bidder declines or is unable to match the lowest non
local bid price(s), then award will be made to the lowest overall qualified and responsive
bidder. If the lowest local bidder does not meet the requirement of Section 287.087 F.S.
and the lowest non-local bidder does, award will be made to the bidder that meets the
requirements of the reference state law.
Bidder must complete and submit with their bid response the Affidavit for Claiming
Status as a Local Business which is included as part of this solicitation.
Failure on the part of a Bidder to submit this Affidavit with their bid response will
preclude said Bidder from being considered for local preference on this
solicitation.
A Bidder who misrepresents the Local Preference status of its firm in a bid submitted to
the County will lose the privilege to claim Local Preference status for a period of up to
one year.
The County may, as it deems necessary, conduct discussions with responsible bidders
determined to be in contention for being selected for award for the purpose of
clarification to assure full understanding of, and responsiveness to solicitation
requirements.
12.3 Award recommendations will be posted outside the offices of the Purchasing
Department generally on Wednesdays and Thursdays prior to the presentation to the
Board of County Commissioners. Award of Contract will be made by the Board of
County Commissioners in public session. Any actual or prospective bidder who desires
to formally protest the recommended contract award must file a notice of intent to
protest with the Purchasing Director within two (2) calendar days (excluding weekends
and holidays) of the date that the recommended award is posted. Upon filing of said
notice, the protesting party will have five (5) days to file a formal protest, said protest to
strictly comply with Owner's then current Purchasing Policy. A copy of the Purchasing
Policy is available at the offices of the Purchasing Director.
12.4 For Bidders who may wish to receive copies of Bids after the Bid opening, The
Owner reserves the right to recover all costs associated with the printing and distribution
of such copies.
GC-P-6
16D13
Section 13. Sales Tax
13.1 The Successful Bidder acknowledges and agrees that Owner may utilize a sales
tax savings program and the Successful Bidder agrees to fully comply, at no additional
cost to Owner, with such sales tax savings program implemented by the Owner as set
forth in the Agreement and in accordance with Owner's policies and procedures.
Section 14. Exclusion of County Permits in Bid Prices
14.1 To ensure compliance with Section 218.80, F.S., otherwise known as "The Public
Bid Disclosure Act", Collier County will pay for all Collier County permits and fees
applicable to the Project, including license fees, permit fees, impact fees or inspection
fees applicable to this Work through an internal budget transfer(s). Hence, bidders shall
not include these permit/fee amounts in their bid offer. However, the Successful Bidder
shall retain the responsibility to initiate and complete all necessary and appropriate
actions to obtain the required permits other than payment for the items identified in this
section.
14.2 The Successful Bidder shall be responsible for procuring and paying for all
necessary permits not issued by Collier County pursuant to the prosecution of the work.
Section 15. Use of Subcontractors
15.1 To ensure the Work contemplated by the Contract Documents is performed in a
professional and timely manner, all Subcontractors performing any portion of the work
on this Project shall be "qualified" as defined in Collier County Ordinance 87-25,
meaning a person or entity that has the capability in all respects to perform fully the
Agreement requirements and has the integrity and reliability to assure good faith
performance. A Subcontractor's disqualification from bidding by the Owner, or other
public contracting entity within the past twelve months shall be considered by the Owner
when determining whether the Subcontractors are "qualified."
15.2 The Owner may consider the past performance and capability of a Subcontractor
when evaluating the ability, capacity and skill of the Bidder and its ability to perform the
Agreement within the time required. Owner reserves the right to disqualify a Bidder who
includes Subcontractors in its bid offer which are not "qualified" or who do not meet the
legal requirements applicable to and necessitated by this Agreement.
15.3 The Owner may reject all bids proposing the use of any subcontractors who have
been disqualified from submitting bids to the Owner, disqualified or de-certified for
bidding purposes by any public contracting entity, or who has exhibited an inability to
perform through any other means.
15.4 Notwithstanding anything in the Contract Documents to the contrary, the Bidders
shall identify the subcontractor(s) it intends to use for the categories of work as set forth
in the List of Subcontracts attached hereto, said list to be submitted with its bid.
GC-P-7
16D13
Bidders acknowledge and agree that the subcontractors identified on the list is not a
complete list of the subcontractors to be used on the Project, but rather only the major
subcontractors for each category of Work as established by Owner. Bidders further
acknowledge that once there is an Award of Contract, the Successful Bidder shall
identify, subject to Owner's review and approval, all the subcontractors it intends to use
on the Project. Once approved by Owner, no subcontractor shall be removed or
replaced without Owner's prior written approval.
Section 16. Prohibition of Gifts
No organization or individual shall offer or give, either directly or indirectly, any favor,
gift, loan, fee, service or other item of value to any County employee, as set forth in
Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004-05,
and County Administrative Procedure 5311. Violation of this provision may result in one
or more of the following consequences: a. Prohibition by the individual, firm, and/or any
employee of the firm from contact with County staff for a specified period of time; b.
Prohibition by the individual and/or firm from doing business with the County for a
specified period of time, including but not limited to: submitting bids, RFP, and/or
quotes; and, c. immediate termination of any contract held by the individual and/or firm
for cause.
Section 17. Public Entitv Crimes
By its submitting a Bid, Bidder acknowledges and agrees to and represents it is
in compliance with the terms of Section 287.133(2) (a) of the Florida Statutes which
read as follows:
"A person or affiliate who has been placed on the convicted vendor list following
a conviction for a public entity crime may not submit a bid, proposal, or reply on a
contract to provide any goods or services to a public entity; may not submit a bid,
proposal, or reply on a contract with a public entity for the construction or repair of a
public building or public work; may not submit bids, proposals, or replies on leases of
real property to a public entity'; may not be awarded or perform work as a contractor,
supplier, subcontractor, or consultant under a contract with any public entity; and may
not transact business with any public entity in excess of the threshold amount provided
in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being
placed on the convicted vendor list."
GC-P-8
16D13
CONSTRUCTION BID
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
North Collier Regional Park Boardwalk Addition
BID NUMBER. 09-5233
Full Name of Bidder Ho.-"fll<<..C,..~O Co..\~~llC),.) ~ MP....'i
Main Business Address: '8CJjO 1"'~~ CovJL;:r:
Place of Business: ~,.).,.. ~~~ Cl,
.
Telephone No: ~3'i 't'-l'1 ll/iSS;-
State Contractor's License # ~COSS"",,~
Fax No: .;l3~ (fqq l4Ji!il.
To: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA
(Hereinafter called the Owner)
The undersigned, as Bidder declares that the only person or parties interested in this
Bid as principals are those named herein, that this Bid is submitted without collusion
with any other person, firm or corporation; that it has carefully examined the location of
the proposed Work, the proposed form of Agreement and all other Contract Documents
and Bonds, and the Contract Drawings and Specifications.
Bidder proposes, and agrees if this Bid is accepted, Bidder will execute the Agreement
included in the Bidding Documents, to provide all necessary machinery, tools,
apparatus and other means of construction, including utility and transportation services
necessary to do all the Work, and furnish all the materials and equipment specified or
referred to in the Contract Documents in the manner and time herein prescribed and
according to the requirements of the Owner as therein set forth, furnish the Contractor's
Bonds and Insurance specified in the General Conditions of the Contract, and to do all
other things required of the Contractor by the Contract Documents, and that it will take
full payment the sums set forth in the following Bid Schedule:
NOTE: If you choose to submit a manual bid, please submit an ORIGINAL and
ONE COpy of your bid pages.
GC-P-9
1 6 0 1 3
- 0'0
4-< 0
0 0 0
N
- 0 ----
v 0 0 0 0 r--.
b1) 0 0 0 0 0 N
C':l M ~ 0 0 0 ----
0... -;t 0 0 <n
11:I Lf1 \!J Lf1 0 Lf1
... -;t Lf1
0 ~ rl -;t -;t w
fo- <It <fl <fl \Ft <fl
'"
(l)
...
0
Z
M M M M M
Lf1 Lf1 Lf1 Lf1 Lf1
\!J \!J \!J \!J \!J
...... ...... ...... ...... ......
...... ...... ...... ...... ......
...... ...... ...... ...... ......
(J'I (J'I (J'I (J'I (J'I
0 0 0 0 0
0 0 0 0 0
N N N N N
(l) --- --- --- --- ---
... (J'I (J'I (J'I (J'I (J'I
11:I C::.::E: N::E: C::.::E: C::.::E: N::E:
0 -;t<( :;r<( -;t<( -;t<( :;r<( 0'0
<r:
00
00
00
'-0
CJ r'l
.... .... co
0 :J r--.
Vl r'I
.'t: 11:I '-0
c: (l) CJ1 U- <( <( CJ1 <n
::):t -l -l L.U L.U -l I
0 0 0 U
N
0 0 0 0 U
M 0 Lf1 0 0 0'0
(l) -;t N 0 0
~ U Lf1 M ...... Lf1 I
\!J Lf1 c.....
c: .;: ~ ...... ......' ~ 00 a
::)0.. {It {It {It {It {It
I:: > <r:
0 ... ..".
.~ ;:; I
C ..".
"3 11:I 0 0
:J 0'0
..0 0' 0 ..".
C':l ...... (J'I -;t \!J ...... I
[- U
U
I:: <r:
0 u
.~ "t '-0
0' 00
:g u 0
<( co
"0 0 II
IJJ '1: "'C:l
> ce
C \!J
I:: III x 0..
.- C. N <Il
S E c C':l
.!2 0'1
"'C:l 0 ::.: a. c ..0
<r: u ro .sl
c (j)
C ~ ::::>
I 0 -0 0 "'C:l
:.;:; ::.: L ~
S u ro ro 0 ro ~
V ::l ~ 0 ..c CI:
.. .Cl
- .... -0 (j) a.
<Il III L L (j) 0 .-
>. C ro 0 fo- S
IJJ 0 c: 0 "- ro
.Cl (j) L "'C:l
u 0 (j) 0
b1) L ~
"tl '01 ;:; "- ro OJ "-
I:: o 0 0- 0 .C ::.: ..c Q)
:.a o 01 .;: ro Q) u U1 U .-
~ ~! Q) ...... OJ ::J C $
:-s! u .... ro Cl a.
Gi Gi '" ro E 0'1
co <li ::.: c OJ V
.c.c 0 0'1 <Xl 0 .w ...... I::
1a10 c x ro
V C .... 0 L.U c...... ;;.:
.5 Gi Gi E 0 \: .... u
::1::: ro OJ Q),!!! 0
-a <li <lJ .Cl > ~ ~<lJ o1J
.. Gi ...... Q ro w::
.... -l 0 <(CJ1 ~
0 ~E .~
€ III III -
c.C "0
E ~
::l o III .... j
0 u:::l <li
U .... .... .0
o 0 E E
~ 'O"tl
~ C C 111 :J ----
(l) Gi i!::z N M -;t LJ"l ----
"0 >> 0..
U .E
16D13
MATERIAL MANUFACTURERS
THIS FORM MUST BE COMPLETED OR BID SHALL BE DEEMED NON-
RESPONSIVE
All Bidders shall confirm by signature that they will provide the manufacturers and
materials outlined in this Bid specifications. Exceptions (when equals are acceptable)
may be requested by completing the Material Manufacturer Exception List below. If an
exception for a manufacturer and/or material is proposed and listed below and is not
approved by Engineer/Project Manager, Bidder shall furnish the manufacturer named in
the specification. Acceptance of this form does not constitute acceptance of material
proposed on this list.
Complete and sign section A OR B.
Section A (Acceptance of all manufactures and materials in Bid specifications)
On behalf of my firm, I confirm that we will use all manufacturers and materials
as specifically outlined in the Bid specifications. IAl r n L.f'..lO
".. A.\.. ,-ul- '-"""~ ,
Section B (Exception requested to Bid specifications manufacturers and materials)
EXCEPTION MATERIAL
EXCEPTION MANUFACTURER
1.
2.
3.
4.
5.
Signature:
Please insert additional pages as necessary.
t)oHTptlh'f ;~ . ." 1, - . '
,;'Date: 4-t'i .07
GC-P-11
16D13
LIST OF MAJOR SUBCONTRACTORS
THIS LIST MUST BE COMPLETED OR BID MAY BE DEEMED NON-RESPONSIVE
The undersigned states that the following is a list of the proposed subcontractors for the
major categories outlined in the requirements of the Bid specifications.
The undersigned acknowledges its responsibility for ensuring that the Subcontractors
for the major categories listed herein are "qualified" (as defined in Ordinance 87-25 and
Section 15 of Instructions to Bidders) and meet all legal requirements applicable to and
necessitated by the Contract Documents, including, but not limited to proper licenses,
certifications, registrations and insurance coverage. The Owner reserves the right to
disqualify any Bidder who includes non-compliant or non-qualified Subcontractors in its
bid offer. Further, the Owner may direct the Successful Bidder to remove/replace any
Subcontractor, at no additional cost to Owner, which is found to be non-compliant with
this requirement either before or after the issuance of the Award of Contract by Owner.
(Attach additional sheets as needed). Further, the undersigned acknowledges and
agrees that promptly after the Award of Contract, and in accordance with the
requirements of the Contract Documents, the Successful Bidder shall identify all
Subcontractors it intends to use on the Project. The undersigned further agrees that all
Subcontractors subsequently identified for any portion of work on this Project must be
qualified as noted above.
Major Category of Work
Subcontractor and Address
1.
2.
3.
4.
5.
GC-P-12
16D13
51 A 1EMEN1 OF EXPERIENCE OF BIDDER
The Bidder is required to state below what work of similar magnitude completed within
the last five years is a judge of its experience, skill and business standing and of its
ability to conduct the work as completely and as rapidly as required under the terms of
the Agreement.
Proiect and Location
Reference
1.
PllG.lt. Q ~o ~, r:ott:r Mtu-s>
j~ ttp..lc.- LLC- - ~ ,J;::'-~D'lSt..'1
2.
Cr-l\. ~L ~.-rA- ~~,...~~
,
~L. ~L ~ ..k~ W~~'-
3.
l=11L~"T' ~u.~ 1.>.,.,...l t-J~.~
,
4.
c.o~S~i\, (p~~\U""'~ I' eJ~(...~
~""c:.~ l..""c.....- ~to:.. ~~
C't&.&,-r ~, c......> ~.......lc.... - CbUoG. ~ ~
~-n;,~~ Of> ~, ~\o~l. .k~ g-~
5.
~~N .. \)~ \J:-. ~g..-r c.~~ ~~... 9~<; 'l:.-c.~ V~UIItkJ
MA<<..-<..O Co\o~~~' ffiA<<40 kW ~~ ~~ - jLcn t---t (l~
6.
Dated 4. '2- c; ~ 0<]
C~fh
BY:
\,1\\ ~"lf41 G,A-wTo I~
~/L.~ ,1?t,...J\"
GC-P-13
16D13
AFFIDAVIT FOR CLAIMING STATUS AS A LOCAL BUSINESS
ITB#:09-5233 (Check Appropriate Boxes Below)
STATE OF FLORIDA
AND
o COLLIER COUNTY ~E COUNTY
PROPOSER/BIDDER/QUOTER AFFIRMS THAT IT IS A LOCAL BUSINESS AS
DEFINED BY THE PURCHASING POLlCY OF THE COLLIER COUNTY BOARD OF
COUNTY COMMISSIONERS AND THE REGULATIONS THERETO.
AS DEFINED IN SECTION XI OF THE COLLIER COUNTY PURCHASING POLlCY;
A "local business" is defined as a business that has a valid occupational license issued
by either Collier or Lee County for a minimum of one (1) year prior to a Collier County
bid or proposal submission that authorizes the business to provide the commodities or
services to be purchased, and a physical business address located within the limits of
Collier or Lee Counties from which the vendor operates or performs business. Post
Office Boxes are not verifiable and shall not be used for the purpose of establishing said
physical address. In addition to the foregoing, a vendor shall not be considered a "local
business" unless it contributes to the economic development and well-being of either
Collier or Lee County in a verifiable and measurable way. This may include, but not be
limited to, the retention and expansion of employment opportunities. the support and
increase to either Collier or Lee County's tax base, and residency of employees and
principals of the business within Collier or Lee County. Vendors shall affirm in writing
their compliance with the foregoing at the time of submitting their bid or proposal to be
eligible for consideration as a "local business" under this section.
Please provide the following information for the Proposer/Bidder/Quater:
Year Business Established in DCollier County or ~ee County: 5
Number of Employees (Including Owner(s) or Corporate Officers):~
Number of Employees Living in ~lIier County or ~e (Including Owner(s) or
Corporate Officers):~
GC-P-15
16D13
If requested by the County, proposer/bidder/quater will be required to provide
documentation substantiating the information given in this affidavit. Failure to do so will
result in proposer/bidder/quater's submission being deemed not applicable.
I ~ I"r/:!.....k\A ~.> per' s>r"" c:::t I.~
Proposer/Bidder/Quater Name
G.~?I\,"'" l;J.1.vwt ~I"~~
I
Signature
C?'1.-~ ,,0('-/ J
Title
STATE OF FLORIDA
o COLLIER COUNTY ~EE COUNTY
Sworn to and Subscribed Before Me, a Notary Public, for the above State and County,
onth8~YOf A......... ,2000,.
Notary Public
My Commission Expires:
(AFFIX OFFICIAL SEAL)
~..............".... ........,
NlClOLE CARR :
(I ~DCllMt4S7, i
. EllI*Ia .1__ :
I ~ ~ IJaIcIed lIlru (100)432-4254 i
: ~J'j\" Florid.:'! Notary As,,;" &ilC :
:......~"........,. . . LJ. ~._ '.~..#"...:
GC-P-16
16D13
Upon notification that its Bid has been awarded, the Successful Bidder will execute the
Agreement form attached to the Bidding Documents within ten (10) calendar days and
deliver the Surety Bond or Bonds and Insurance Certificates as required by the Contract
Documents. The bid security attached is to become the property of the Owner in the
event the Agreement, Insurance Certificates and Bonds are not executed and delivered
to Owner within the time above set forth, as liquidated damages, for the delay and
additional expense to the Owner, it being recognized that, since time is of the essence,
Owner will suffer financial loss if the Successful Bidder fails to execute and deliver to
Owner the required Agreement, Insurance Certificates and Bonds within the required
time period. In the event of such failure, the total amount of Owner's damages, will be
difficult, if not impossible, to definitely ascertain and quantify. It is hereby agreed that it
is appropriate and fair that Owner receive liquidated damages from the Successful
Bidder in the event it fails to execute and deliver the Agreement, Insurance Certificates,
and Bonds as required hereunder. The Successful Bidder hereby expressly waives and
relinquishes any right which it may have to seek to characterize the above noted
liquidated damages as a penalty, which the parties agree represents a fair and
reasonable estimate of Owner's actual damages at the time of bidding if the Successful
Bidder fails to execute and deliver the Agreement, Insurance Certificates, and Bonds in
a timely manner.
Upon receipt of the Notice of Award, the undersigned proposes to commence work at
the site within 5 calendar days from the commencement date stipulated in the written
"Notice to Proceed" unless the Project Manager, in writing, subsequently notifies the
Contractor of a modified (later) commencement date. The undersigned further agrees to
substantially complete all work covered by this Bid within seventy-five (75) consecutive
calendar days, computed by excluding the commencement date and including the last
day of such period, and to be fully completed to the point of final acceptance by the
Owner within fifteen (15) consecutive calendar days after Substantial Completion,
computed by excluding commencement date and including the last day of such period.
Respectfully Submitted:
State of 'f L
County of t- -e. f5
\N Ac:re.'L W...JFOJIr.(4? rp4S ,0,;,../-. , being first duly sworn on
oath deposes and says that the Bidder on the above Bid is organized as indicated and
that all statements herein made are made on behalf of such Bidder and that this
deponent is authorized to make them.
VJ en.. "{lWl (fll~.... ~~ ?J'1.4.$ '0"""" } , also deposes and says
that it has examined and care/ully prepared its Bid from the Bidding Documents,
including the Contract Drawings and Specifications and has checked the same in detail
before submitting this Bid; that the statements contained herein are true and correct.
GC-P-17
16D13
(a) Corporation
The Bidder is a corporation organized and existing under the laws of the State of
r\... ~oA , I" which operat~ under the legal name of
\--\~'"'_o ~~c;.-{(t.."t..-'1\oo.-l ~-'rI\,...)'1. J and the full names of its
officers are as follows:
President W 1).-l."lA'l-
Secretary_W ,)..- V\~
Treasurer W fvt-~
Manager W ~\..-,~
~~f~~~
&.4-....1 r~
WOooJ f"o.y?
~'fu>~
The is authorized to sign constructinn bids-
and contraots fer the vUlllpallY by action of ib Ooard of Dircetars f~kep
, a certified copy of which i~ J lei eta attact:ll2'rl (strike
@tit tl.b 1C::l~l :::>t::lIlt::m;t;: ir rlut applicable). ~
(b) Co-Partnership
The Bidder is a co-partnership consisting of individual partners whose full names are as
follows:
The co-partnership does business under the legal name of:
(c) Individual
The Bidder is an individual whose full name is
and if operating under a trade name, said trade name is
DATED
Legal entity
GC-P-18
ff9#
Witness
{);/1 i2r, ,
WJness
1~~.~jOffu"" t~.!lJ.J CPi-1
BY: W ().. \,..-"'\Y,(l L(L~ ~~
Name f Bidder (Typed)
Signa re
~ (L.-5 \t7,;.-J~
Title
STATE OF ~ U)4.4~
COUNTY OF LA'-
The foregoing instrument was acknowledged before me this ~~ -r- day of ~\,..
20Jl1., by ~Ac..T~ Uz..A.lPOLd ,as
~I~ of ~~~d Co~S1t.Uc..T&o~ (p,..,LP...., a
~~~"" corporation, on behalf of the corporation. she is pe sonally
(tfr1own to me ~or has produced
as identification and did (did not) take an oath.
ra...........................'
_NICOU!:DDCMemS~
.... 11121/2008 ~
: ......lIlrII {IOO)432-4254 E
." Florida Notary Assn . Inc :
I.......... ............ t.. co,.. t...... a..... II......" ....t
My Commission Expires:
NAME:
(Legibly Printed)
(AFFIX OFFICIAL SEAL)
Notary Public, State of
Commission No.:
GC-P-19
"
16D13
PLAZA INSURANCE COMPANY
700 W 47th Street, Kansas City, MO 64112
Phone 816-412-2800; Fax 816-412-7550
Bond No. PSB1775
BID BOND
The language in this document conforms to the language used in
American Instilule of Architecls (AlA) Document A31 0, February, 1970 edilion.
KNOW ALL MEN BY THESE PRESENTS, that we Heatherwood Construction Company
Contractor (Name and Address)
8880 Terrene Court Bonita Springs. FL 34135
as Principal, hereinafter called the Principal, and PLAZA INSURANCE COMPANY, a Missouri corporation, as Surety.
hereinafter called the Surety, are held and firmly bound unto
Board of County Commissioners Collier County, FL
Owner (Name and Address)
3301 E. _~~l11i~l11i!rCiJ~ Naples, FL 34112
as Obligee, hereinafter called the Obligee, in the sum of ___
5_00% of amount of bid
($ XXXXXXXXXXX~,
for the payment of which sum well and truly to be made, lhe said Principal and the said Surety, bind ourselves, our
heirs, executors. administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for ___North Collier Regiqn~1 Park Boardwalk Addition
(Name, Address and Description of Project)
Naples,---EL
#09-5233
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract
with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the
bidding or Contract Documenls with good and sufficient surety for the faithful performance of such Contract and for
the prompt paymenl of labor and malerial furnished in the prosecution thereof. or in the event of the failure of the
Principal to enler such Conlract and give such bond or bonds, if the Principal shall pay to lhe Obligee the difference
nollo exceed the penally hereof between the amount specified in said bid and such larger amount for which the
Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation
shall be null and void, otherwise to remain in full force and effect.
Signed and sealed this
29th
~_ day of
April
2009
I~~~'
CONTRACTOR AS PRINCIPAL:
By
Name ~ A-....-r~1:- c.~_ 'fc::'-~
Title 2.a-'f.J.:! O~ V
By
PIC 200~ (7/07)
Page 1 of 1
16D13
PLAZA INSURANCE COMPANY
700 W 47th Street, Kansas City, MO 64112
Phone 816-412-2800; Fax 877-742-8762
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:
The Plaza Insurance Company OT the State of Missouri, a Missouri corporation, does hereby appoint,
Joel Speckman
its true and lawful Attorney(s)-in-Fact, with full authority 10 execute on its behalf, bonds, undertakings, recognizances and other
conlracts of indemnity and writings obligatory in lhe nature lheraof, issued in the course of its business and to bind the Company
lhereby, in an Amount not to exceed $.325,000.00 This Power of Attorney shall expire without further action on January 1,2013.
The Power of Attorney is granled and is signed and sealed by facsimile under and bv the authority of the following written consent of
the Board of Directors of PLAZA INSURANCE COMPANY daled January 2, 2008
"RESOL VED that the Chief ExeCutive Officer, President or any Vice President, Executive Vice President, Secretary or Assistant
Secretary, shall have the power and authority:
1. To appoint Attpmey(s)-in-Fact and to avthorize them to execute on behalf of the Company, and attach the seal of the
Company thel'9to, bonds and undertakings, contracts of indemnity, and other writing obligatory in the nature thereof and,
2. To remove, at any time, any such Attorney-in-Fact and revoke the authority given.
RESOL VED FURTHER, that the signatures of such officers and the seal of the Company may be affIXed to any such Power of
AttorneY or certificate relating thereto by facsimile, and any such Power of Attorney or certfflcate bearing such facsimile signatures or
facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertakinB to which it is
attached. >>
lN WITNESS WHEREOF, Plaza Insurance Company has caused its seal to be affixed herelo and executed by its President on the 2nd
day of January, 2008.
STATE OF MISSOURI
COUNTY OF PLATTE
",\,"IIIt"",
9
!I ~ ~~
j;r, ~\
:5 SEAl. ~:
~o. ~s
~ ~~
~" ~$
"" '* ,~...
""'n'I"\"
By:
On this 2nd day of January, 2008, before me, Michelle L. Smith, a notary public, personally appeared Terry Younghanz, President of
Plaza Insurance Company, to me personally known to be lhe individual and officer described herein, and acknowledged lhat he
executed the foregoing instrument and affixed the seal of said corporalion therelo by authorily of his office.
i a u of Notary
My Commission expires Deoember 28. 2010
,,'Ill,
"~9..VPu"
,\~.Y'::...~,
';-~::~lO'fARY"P'-:
_... ... . 'It-
:~...SEJ\L..~:
'. '?6~'iI\~"
1'!,rIV.\\
MICHELlE L. SMITH
My COO1IJ1ission Expires
December 28, 2010
Platt& County
Comrniaalon 1IOWil9414
I, Jerry W. Brumfield, Secretary of Plaza Insurance Company, do hereby certify that lhe Power of Attorney and the written consent of
the Board of Directors of said Company as set forth above, are true and correct transcripts thereof and that neither the said Power of
Attorney nor lhe written consent have been revoked and they are now in full force and effect.
Agency No. AGT496
:\\\\IU"'IIII.
",,"'~\)f\^NC?''''
::~"'....~'f'-'a~~
.. ~~AI \~....
~~ S~li
\~ ~i
~ . ~
"'" * ,,<to'"
"""1\1\\'
April , 2009 .
~\
J ryW. umfield, Secretary
IN WITNESS WHEREOF, I have hereunto gel my hand this 29th day of
Bond No. PSB1775
..
~
16D13
ACKNOWLEDGMENT OF SURETY
STATE OF ILLINOIS }
} S.S.
COUNTY OF DlJPAGE }
On April 29, 2009, before me, Bonnie J. Kruse, a Notary Public in and for said County
and State, residing therein, duly commissioned and sworn, personally appeared Joel
Speckman, known to me to be Attomey:-in-Fact of Plaza Insurance Company, the
corporation described in and that executed the within and foregoing instrument, and
known to me to be the person who executed the said instrument on behalf of the said
corporation executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, the
day and year stated in this certificate above.
OFFICIAL SEAL
BONNIE J. KRUSE
NOTARY PUBLIC. STATE. OF ILLINOIS
MY, CoMMISSION EXPIRES NOVEMBER 29.2012
My Commission Expires on November 29, 2012
~~-
Notary Public onnie J. se
16D13
THIS SHEET MUST BE SIGNED BY VENDOR
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
Purchasing Department
BIDDERS CHECK LIST
IMPORTANT: Please read carefully, sign in the spaces indicated and return with
your Bid.
Bidder should check off each of the following items as the necessary action is completed:
1. The Bid has been signed.
2. The Bid prices offered have been reviewed.
3. The price extensions and totals have been checked.
4. Any required drawings, descriptive literature, etc. have been included.
5. Any delivery information required is included.
6. Local Vendor Preference Affidavit completed.
7. If required, the amount of Bid bond has been checked, and the Bid bond or
cashiers check has been included.
8. Any addenda have been signed and included.
9. The mailing envelope has been addressed to:
Purchasing Director
Collier County Government Center
Purchasing Building
3301 Tamiami Trail, East
Naples, Florida 34112
10. The mailing envelope must be sealed and marked with:
. Bid Number: 09-5233
. Project Name: North Collier Regional Park Boardwalk Addition
. Opening Date: April 29, 2009 at 2:30 p.m.
11. The Bid will be mailed or delivered in time to be received no later than the
specified openinQ date and time. (Otherwise Bid cannot be considered.)
ALL COURIER.DELlVERED BIDS MUST HAVE THE BID NUMBER
AND PROJECT NAME ON THE OUTSIDE OF THE COURIER PAC~ET
~~l-\~o..:>.? C.........<;.1?-vC1\U... . ~"'""l'l~.....,
I -(l- C~~.rvO
Bidder me
( f:5,Of-J r
DATE: 4"""' '2- q. 09
GC-P-22
16013
CONSTRUCTION AGREEMENT
THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY,
FLORIDA, ("Owner") hereby contracts with Heatherwood Construction Company
("Contractor") of 8880 Terrene Court, Bonita Springs, FL 34135, a Florida
Corporation, authorized to do business in the State of Florida, to perform all work
("Work") in connection with the North Collier Regional Park Boardwalk Addition, Bid
Number 09-5233 ("Project"), as said Work is set forth in the Plans and Specifications
and other Contract Documents hereafter specified.
Owner and Contractor, for the consideration herein set forth, agree as follows:
Section 1. Contract Documents.
A. The Contract Documents consist of this Agreement, the Exhibits described in
Section 6 hereof, the Legal Advertisement, the Bidding Documents and any duly
executed and issued addenda, Change Orders, Work Directive Changes, Field Orders
and amendments relating thereto. All of the foregoing Contract Documents are
incorporated by reference and made a part of this Agreement (all of said documents
including the Agreement sometimes being referred to herein as the "Contract
Documents" and sometimes as the "Agreement" and sometimes as the "Contract"). A
copy of the Contract Documents shall be maintained by Contractor at the Project site at
all times during the performance of the Work.
S. Owner shall furnish to the Contractor one reproducible set of the Contract
Documents and the appropriate number of sets of the Construction Documents, signed
and sealed by the Design Professional, as are reasonably necessary for permitting.
Section 2. Scope of Work.
Contractor agrees to furnish and pay for all management, supervision, financing, labor,
materials, tools, fuel, supplies, utilities, equipment and services of every kind and type
necessary to diligently, timely, and fully perform and complete in a good and
workmanlike manner the Work required by the Contract Documents.
Section 3. Contract Amount.
In consideration of the faithful performance by Contractor of the covenants in this
Agreement to the full satisfaction and acceptance of Owner, Owner agrees to pay, or
cause to be paid, to Contractor the following amount (herein "Contract Amount"), in
accordance with the terms of this Agreement: One hundred fifty nine thousand, one
hundred ninety three dollars and no cents [$159, 193.00].
Gc-cA-I
16D13
Section 4. Bonds.
A. Contractor shall provide Performance and Payment Bonds, in the form
prescribed in Exhibit A, in the amount of 100% of the Contract Amount, the costs of
which are to be paid by Contractor.
B. The Performance and Payment Bonds shall be underwritten by a surety
authorized to do business in the State of Florida and otherwise acceptable to Owner;
provided, however, the surety shall meet the requirements of the Department of the
Treasury Fiscal Service, "Companies Holding Certificates of Authority as Acceptable
Sureties on Federal Bonds and as Acceptable Reinsurance Companies" circular. This
circular may be accessed via the web at www.fms.treas.gov/c570/c570.html#certified.
Should the Contract Amount be less than $500,000, the requirements of Section
287.0935, F.S. shall govern the rating and classification of the surety.
C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes
insolvent, its right to do business is terminated in the State of Florida, or it ceases to
meet the requirements imposed by the Contract Documents, the Contractor shall, within
five (5) calendar days thereafter, substitute at its cost and expense another bond and
surety, both of which shall be subject to the Owner's approval.
Section 5. Contract Time and liQuidated Damaaes.
A. Time of Performance.
Time is of the essence in the performance of the Work under this Agreement. The
"Commencement Date" shall be established in the written "Notice to Proceed" to be
issued by the Project Manager, as hereinafter defined. Contractor shall commence the
Work within five (5) calendar days from the Commencement Date. No Work shall be
performed at the Project site prior to the Commencement Date. Any Work performed by
Contractor prior to the Commencement Date shall be at the sole risk of Contractor.
Contractor shall achieve Substantial Completion within seventy-five (75) calendar days
from the Commencement Date (herein "Contract Time"). The date of Substantial
Completion of the Work (or designated portions thereof) is the date certified by the
Design Professional when construction is sufficiently complete, in accordance with the
Contract Documents, so Owner can occupy or utilize the Work (or designated portions
thereof) for the use for which it is intended. Contractor shall achieve Final Completion
within fifteen (15) calendar days after the date of Substantial Completion. Final
Completion shall occur when the Agreement is completed in its entirety, is accepted by
the Owner as complete and is so stated by the Owner as completed. As used herein
and throughout the Contract Documents, the phrase "Project Manager" refers to the
Owner's duly authorized representative and shall mean the Division Administrator or
Department Director, as applicable, acting directly or through duly authorized
representatives.
B. Liquidated Damages in General.
Owner and Contractor recognize that, since time is of the essence for this Agreement,
Owner will suffer financial loss if Contractor fails to achieve Substantial Completion
GC-CA-2
16D13
within the time specified above, as said time may be adjusted as provided for herein. In
such event, the total amount of Owner's damages, will be difficult, if not impossible, to
definitely ascertain and quantify. Should Contractor fail to achieve Substantial
Completion within the number of calendar days established herein, Owner shall be
entitled to assess, as liquidated damages, but not as a penalty, two hundred forty-
nine dollars ($249.00) for each calendar day thereafter until Substantial Completion is
achieved. Further, in the event Substantial Completion is reached, but the Contractor
fails to reach Final Completion within the required time period, Owner shall also be
entitled to assess and Contractor shall be liable for all actual damages incurred by
Owner as a result of Contractor failing to timely achieve Final Completion. The Project
shall be deemed to be substantially completed on the date the Project Manager (or at
his/her direction, the Design Professional) issues a Certificate of Substantial Completion
pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any
right which it may have to seek to characterize the above noted liquidated damages as
a penalty, which the parties agree represents a fair and reasonable estimate of the
Owner's actual damages at the time of contracting if Contractor fails to Substantially or
Finally Complete the Work within the required time periods.
C. Computation of Time Periods.
When any period of time is referenced by days herein, it shall be computed to exclude
the first day and include the last day of such period. If the last day of any such period
falls on a Saturday or Sunday or on a day made a legal holiday by the law of the
applicable jurisdiction, such day shall be omitted from the computation, and the last day
shall become the next succeeding day which is not a Saturday, Sunday or legal holiday.
D. Determination of Number of Days of Default.
For all contracts, regardless of whether the Contract Time is stipulated in calendar days
or working days, the Owner will count default days in calendar days.
E. Right of Collection.
The Owner has the right to apply any amounts due Contractor under this Agreement or
any other agreement between Owner and Contractor, as payment on such liquidated
damages due under this Agreement in Owner's sole discretion. Notwithstanding
anything herein to the contrary, Owner retains its right to liquidated damages due under
this Agreement even if Contractor, at Owner's election and in its sole discretion, is
allowed to continue and to finish the Work, or any part of it, after the expiration of the
Contract Time including granted time extensions.
F. Completion of Work by Owner.
In the event Contractor defaults on any of its obligations under the Agreement and
Owner elects to complete the Work, in whole or in part, through another contractor or its
own forces, the Contractor and its surety shall continue to be liable for the liquidated
damages under the Agreement until Owner achieves Substantial and Final Completion
of the Work. Owner will not charge liquidated damages for any delay in achieving
Substantial or Final Completion as a result of any unreasonable action or delay on the
part of the Owner.
GC-CA-3
16D13
G. Final Acceptance by Owner.
The Owner shall consider the Agreement complete when the Contractor has completed
in its entirety all of the Work and the Owner has accepted all of the Work and notified
the Contractor in writing that the Work is complete. Once the Owner has approved and
accepted the Work, Contractor shall be entitled to final payment in accordance with the
terms of the Contract Documents.
H. Recovery of Damages Suffered by Third Parties.
Contractor shall be liable to Owner to the extent Owner incurs damages from a third
party as a result of Contractor's failure to fulfill all of its obligations under the Contract
Documents. Owner's recovery of any delay related damages under this Agreement
through the liquidated damages does not preclude Owner from recovering from
Contractor any other non-delay related damages that may be owed to it arising out of or
relating to this Agreement.
Section 6. Exhibits Incorporated.
The following documents are expressly agreed to be incorporated by reference and
made a part of this Agreement.
Exhibit A:
Exhibit B:
Exhibit C:
Exhibit D:
Exhibit E:
Exhibit F:
Exhibit G:
Exhibit H:
Exhibit I:
Exhibit J:
Exhibit K:
Exhibit L:
Exhibit M:
Exhibit N:
Performance and Payment Bond Forms
Insurance Requirements
Release and Affidavit Form
Contractor Application for Payment Form
Change Order Form
Certificate of Substantial Completion Form
Final Payment Checklist
General Terms and Conditions
Supplemental Terms and Conditions
Technical Specifications
Perm its
Standard Details (if applicable)
Plans and Specifications and shown on Plan Sheet A-1.
Contractor's List of Key Personnel
Section 7. Notices
A. All notices required or made pursuant to this Agreement by the Contractor to the
Owner shall be shall be deemed duly served if delivered by U.S. Mail, E-mail or
Facsimile, addressed to the following:
Mr. Tony Ruberto
North Collier Regional Park
15000 Livingston Rd
Naples, FL 34119
GC-CA-4
16D13
B. All notices required or made pursuant to this Agreement by Owner to Contractor
shall be made in writing and shall be deemed duly served if delivered by U.S. Mail, E-
mail or Facsimile, addressed to the following:
Heatherwood Construction Company
Attn: Walter Crawford, President
8880 Terrene Court
Bonita Springs, FL 34135
Tel: 239-949-6855
Fax: 239-949-6856
C. Either party may change its above noted address by giving written notice to the
other party in accordance with the requirements of this Section.
Section 8. PUBLIC ENTITY CRIMES.
8.1 By its execution of this Contract, Construction Contractor acknowledges that it
has been informed by Owner of the terms of Section 287.133(2)(a) of the Florida
Statutes which read as follows:
"A person or affiliate who has been placed on the convicted vendor list following
a conviction for a public entity crime may not submit a bid on a contract to provide any
goods or services to a public entity for the construction or repair of a public building or
public work, may not submit bids on leases of real property to a public entity, may not
be awarded or perform work as a contractor, supplier, subcontractor, or consultant
under a contract with any public entity in excess of the threshold amount provided in s.
287.017 for CATEGORY TWO for a period of 36 months from the date of being placed
on the convicted vendor list."
Section 9. Modification.
No modification or change to the Agreement shall be valid or binding upon the parties
unless in writing and executed by the party or parties intended to be bound by it.
Section 1 O. Successors and Assigns.
Subject to other provisions hereof, the Agreement shall be binding upon and shall inure
to the benefit of the successors and assigns of the parties to the Agreement.
Section 11. Governing Law.
The Agreement shall be interpreted under and its performance governed by the laws of
the State of Florida.
GC-CA-5
16D13
Section 12. No Waiver.
The failure of the Owner to enforce at any time or for any period of time anyone or
more of the provisions of the Agreement shall not be construed to be and shall not be a
waiver of any such provision or provisions or of its right thereafter to enforce each and
every such provision.
Section 13. Entire Aareement.
Each of the parties hereto agrees and represents that the Agreement comprises the full
and entire agreement between the parties affecting the Work contemplated, and no
other agreement or understanding of any nature concerning the same has been entered
into or will be recognized, and that all negotiations, acts, work performed, or payments
made prior to the execution hereof shall be deemed merged in, integrated and
superseded by the Agreement.
Section 14. Severability.
Should any provision of the Agreement be determined by a court to be unenforceable,
such a determination shall not affect the validity or enforceability of any other section or
part thereof.
Section 15. Chanae Order Authorization.
The Project Manager shall have the authority on behalf of the Owner to execute all
Change Orders and Work Directive Changes to the Agreement to the extent provided
for under the Owner's Purchasing Policy and accompanying administrative procedures.
Section 16. Construction.
Any doubtful or ambiguous language contained in this Agreement shall not be
construed against the party who physically prepared this Agreement. The rule
sometimes referred to as "fortius contra proferentum" (pursuant to which ambiguities in
a contractual term which appears on its face to have been inserted for the benefit of one
of the parties shall be construed against the benefited party) shall not be applied to the
construction of this Agreement.
Section 17. Order of Precedence
In the event of any conflict between or among the terms of any of the Contract
Documents, the terms of the Construction Agreement and the General Terms and
Conditions shall take precedence over the terms of all other Contract Documents,
except the terms of any Supplemental Conditions shall take precedence over the
Construction Agreement and the General Terms and Conditions. To the extent any
conflict in the terms of the Contract Documents cannot be resolved by application of the
Supplemental Conditions, if any, or the Construction Agreement and the General Terms
and Conditions, the conflict shall be resolved by imposing the more strict or costly
obligation under the Contract Documents upon the Contractor at Owner's discretion.
GC-CA-6
16D13
****
GC-CA-7
16D13
IN WITNESS WHEREOF, the parties have executed this Agreement on the
date(s) indicated below.
CONTRACTOR:
~ES:
F STWITNESS
By:
-WAvre-t CtzAw~~O 11c-es .~~..,-
Type/Print Name and Title
e
S
~ t::'t (lJ.-* (-n:\...t.~-n-tc--Y\....
Type/Print Name
Date:
Dwight E..l3ro~J~'~~f~
, . .
OWNER:
BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY iif'DA . 1 _
BY: ~~. d~
Donna Fiala, Chairman
ATTEST:
BY: ( .
\ Itt-.tft
Approv~ As Td,F-:0rm
and Legal $pffici~.~~.y:'
~~
Print Name: Cd leen Ween e..
Assistant County Attorney
Item # J..!elll '3
Agenda 5.... "2h--01
Date
Date 'l....11-M
Rec'd :...Y I
GC-CA-8
THE AMERICAN INSTITUTE OF ARCHITECTS
16D13
1.~.li:i'
f" I
Bond No. 1000759769
AlA Document A312
Performance Bond
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address):
Heatherwood Construction Company
8880 Terrene Court
Bonita Springs, FL 34135
OWNER (Name and Address):
Board of County Commissioners, Collier County, FL
3301Tamiami Trail East
SURETY (Name and Principal Place of Business):
American Contractors Indemnity Company
601 S. Figueroa Street, Suite 1600
Los Angeles, CA 90017
Naples, FL 34112
CONSTRUCTION CONTRACT
Date:
Amount: $159,193.00 One Hundred Fifty Nine Thousand One Hundred Ninety Three Dollars and 00/100
Description (Name and Location): North Collier Regional Park Boardwalk Addition - Contract #09-5233
BOND
Date (Not earlier than Construction Contract Date): June 10, 2009
Amount: $159,193.00 One Hundred Fifty Nine Thousand One Hundred Ninety Three Dollars and 00/100
Modifications to this Bond: ~ None e9 See Page 3
CONTRACTOR AS P INCIPAL
Company: (Corporate S
Heatherwood Co ruction Company
SURETY
Company: (Corporate Seal)
American Contractors Indemnity Company
Signature: (" fl1lu~ A, \. ~l{Alj/zoll;
Name and Title: Melissa A. Schmidt
Attorney-in-Fact
Signature:
Name and ~ Ie: W A\...:T ~tt...
(Any additional signatures appear on page 3)
(FOR /NFORMA nON ONL Y - Name, Address and Telephone)
AGENT or BROKER:
HUB International Scheer's
601 Oakmont Lane, Suite 400
Westmont, IL 60559
630-468-5600
OWNER'S REPRESENTATIVE (Architect, Engineer or other
party) :
AlA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1984 ED.. AIA@
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW" WASHINGTON, D.C. 20006
THIRD PRINTING. MARCH 1987
A312-1984
1
1 The Contractor and the Surety, jointly and severally,
bind themselves. their heirs, executors, administrators,
successors and assigns to the Owner for the performance
of the Construction Contract, which is incorporated herein
by reference.
2 If the Contractor performs the Construction Contract,
the Surety and the Contractor shall have no obligation
under this Bond, except to participate in conferences as
provided in Subparagraph 3.1.
3 If there is no Owner Default, the Surety's obligation
under this Bond shall arise after:
3.1 The Owner has notified the Contractor and the
Surety at its address described in Paragraph 10 below
that the Owner is considering declaring a Contractor
Default and has requested and attempted to arrange a
conference with the Contractor and the Surety to be
held not later than fifteen days after receipt of such
notice to discuss methods of performing the
Construction Contract. If the Owner, the Contractor
and the Surety agree, the Contractor shall be allowed a
reasonable time to perform the Construction Contract,
but such an agreement shall not waive the Owner's
right, if any, subsequently to declare a Contractor
Default; and
3.2 The Owner has declared a Contractor Default and
formally terminated the Contractor's right to complete
the contract. Such Contractor Default shall not be
declared earlier than twenty days after the Contractor
and the Surety have received notice as provided in
Subparagraph 3.1; and
3.3 The Owner has agreed to pay the Balance of the
Contract Price to the Surety in accordance with the
terms of the Construction Contract or to a contractor
selected to perform the Construction Contract in
accordance with the terms of the contract with the
Owner.
4 When the Owner has satisfied the conditions of
Paragraph 3, the Surety shall promptly and at the Surety's
expense take one of the foHowing actions:
4.1 Arrange for the Contractor, with consent of the
Owner, to perform and complete the Construction
Contract; or
4.2 Undertake to perform and complete the
Construction Contract itself, through its agents or
through independent contractors; or
4.3 Obtain bids or negotiated proposals from qualified
contractors acceptable to the Owner for a contract for
performance and completion of the Construction
Contract, arrange for a contract to be prepared for
execution by the Owner and the contractor selected
with the Owner's concurrence, to be secured with
performance and payment bonds executed by a
qualified surety equivalent to the bonds issued on the
Construction Contract, and pay to the Owner the
amount of damages as described in Paragraph 6 in
excess of the Balance of the Contract Price incurred by
the Owner resulting from the Contractor's default; or
16D13
4.4 Waive its right to perform and comptete, arrange
for completion, or obtain a new contractor and with
reasonable promptness under the circumstances:
.1 After investigation, determine the amount for
which it may be liable to the Owner and, as
soon as practicable after the amount is
determined, tender payment therefor to the
Owner; or
.2 Deny liability in whore or in part and notify the
Owner citing reasons therefor.
5 If the Surety does not proceed as provided in
Paragraph 4 with reasonable promptness, the Surety shall
be deemed to be in default on this Bond fifteen days after
receipt of an additional written notice from the Owner to the
Surety demanding that the Surety perform its obligations
under this Bond, and the Owner shall be entitled to enforce
any remedy available to the OWner. If the surety proceeds
as provided in Subparagraph 4.4, and the Owner refuses
the payment tendered or the Surety has denied liability, in
whole or in part, without further notice the Owner shall be
entitled to enforce any remedy available to the Owner.
6 After the Owner has terminated the Contractor's right to
complete the Construction Contract, and if the Surety
eJects to act under Subparagraph 4.1, 4.2, or 4.3 above,
then the responsibilities of the Surety to the Owner shall
not be greater than those of the Contractor under the
Construction Contract, and the responsibilities of the
Owner to the Surety shall not be greater than those of the
Owner under the Construction Contract. To the limit of the
amount of this Bond, but subject to commitment by the
Owner of the Balance of the Contract Price to mitigation of
costs and damages on the Construction Contract, the
Surety is obligated without duplication for:
6.1 The responsibilities of the Contractor for
correction of defective work and completion of the
Construction Contract;
6.2 Additional legal, design professional and delay
costs resulting from the Contractor's Default. and
resulting from the actions or failure to act of the Surety
under Paragraph 4; and
6.3 Liquidated damages, or if no liquidated damages
are specified in the Construction Contract, actual
damages caused by delayed performance or non-
performance of the Contractor.
7 The Surety shall not be liable to the Owner or others for
obligations of the Contractor that are unrelated to the
Construction Contract, and the Balance of the Contract
Price shall not be reduced or set off on account of any
such unrelated obligations. No right of action shall accrue
on this Bond to any person or entity other than the Owner
or its heirs, executors, administrators or successors.
8 The Surety. hereby waives notice of any change,
including changes of time, to the Construction Contract or
to related subcontracts, purchase orders and other
obligations.
9 Any proceeding, legal or equitable, under this Bond
may be instituted in any court of competent jurisdiction in
the location in which the work or part of the work is located
AlA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1984 ED.. AlA ili'l
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON. D.C. 20006
THIRD PRINTING. I'MRCH 1967
A312-1984
2
and shall be instituted within two years after Contractor
Default or within two years after the Contractor ceased
working or within two years after the Surety refuses or fails
to perform its obligations under this Bond, whichever
occurs first. If the provisions of this Paragraph are void or
prohibited by law, the minimum period of limitation
available to sureties as a defense in the jurisdiction of the
suit shall be applicable.
16D13
have been made, including allowance to the
Contractor of any amounts received or to be received
by the Owner in settlement of Insurance or other
claims for damages to which the Contractor is entitled,
reduced by all valid and proper payments made to or
on behalf of the Contractor under the Construction
Contract.
10 Notice to the Surety, the Owner or the Contractor shall
be mailed or delivered to the address shown on the
signature page.
12.2 Construction Contract: The agreement betwen
the Owner and the Contractor identified on the
signature page, including all Contract Documents and
changes thereto.
11 When this Bond has been furnished to comply with a
statutory or other legal requirement in the location where
the construction was to be performed, any provision in this
Bond conflicting with said statutory or legal requirement
shall be deemed deleted herefrom and provisions
conforming to such statutory or other legal requirement
shall be deemed incorporated herein. The intent is that
this Bond shall be construed as a statutory bond and not
as a common Jaw bond.
12.3 Contractor Default: Failure of the Contractor,
which has neither been remedied nor waived, to
perform or otherwise to comply with the terms of the
Construction Contract.
12 DEFINITIONS
12.1 Balance of the Contract Price: The total
amount payable by the Owner to the Contractor under
the Construction Contract after all proper adjustments
12.4 Owner Default: Failure of the Owner, which has
neither been remedied nor waived, to pay the
Contractor as required by the Construction Contract or
to perform and complete or comply with the other
terms thereof.
MODIFICATIONS TO THIS BOND ARE AS FOLLOWS:
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL
Company:
(Corporate Seal)
SURETY
Company:
(Corporate Seal)
Signature:
Name and Title:
Address:
Signature:
Name and Title:
Address:
AlA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1964 ED.. AIA@
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. N.W.. WASHINGTON, D.C. 20006
THIRD PRINTING. MARCH 1987
A312-1984
3
THE AMERICAN INSTITUTE OF ARCHITECTS
16D13
Bond No.
1000759769
AlA Document A312
Payment Bond
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address):
Heatherwood Construction Company
8880 Terrene Court
Bonita Springs, FL 34135
OWNER (Name and Address):
Board of County Commissioners, Collier County, FL
330Hamiami Trail East
SURETY (Name and Principal Place of Business):
American Contractors Indemnity Company
601 S. Figueroa Street, Suite 1600
Los Angeles, CA 90017
Naples, FL 34112
CONSTRUCTION CONTRACT
Date:
Amount: $159,193.00 One Hundred Fifty Nine Thousand One Hundred Ninety Three Dollars and 00/100
Description (Name and Location): North Collier Regional Park Boardwalk Addition - Contract #09-5233
BOND
Date (Not earlier than Construction Contract Date): June 10, 2009
Amount: $159,193.00 One Hundred Fifty Nine Thousand One Hundred Ninety Three Dollars and 00/100
Modifications to this Bond: {] None 00 See Page 6
Signature:
Name and
CONTRACTOR AS PRINCIPAL
Company: (Corpor
Heatherwood Co truction Company
le:Wl\\.."\~ C~(e:.~ r:rn.~i(J~ ~
(Any additional signatures appear on page 6)
SURETY
Company: (Corporate Seal)
American Contractors Indemnity Company
Signature:vl/kv~~ /[ ~U(j(j{O
Name and Title: Melissa A. Schmidt
Attorney-in-Fact
(FOR INFORMA nON ONL Y - Name, Address and Telephone)
AGENT or BROKER:
HUB International Scheer's
601 Oakmont Lane, Suite 400
Westmont, IL 60559
630-468-5600
OWNER'S REPRESENTATIVE (Architect, Engineer or other
party) :
AlA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1984 ED. . AIA@
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE. N.W., WASHINGTON. D.C. 20006
THIRD PRINTING. MARCH 1987
A312-1984
4
1 The Contractor and the Surety, jointly and severally,
bind themselves, their heirs, executors, administrators,
successors and assigns to the Owner to pay for labor,
materials and equipment furnished for use in the
performance of the Construction Contract, which is
incorporated herein by reference.
2 With respect to the Owner, this obligation shall be null
and void if the Contractor:
2.1 Promptly makes payment, directly or indirectly, for
all sums due Claimants, and
2.2 Defends, indemnifies and holds harmless the
Owner from claims, demands, liens or suits by any
person or entity whose claim, demand, lien or suit is for
the payment for labor, materials or equipment furnished
for use in the performance of the Construction Contract,
provided the Owner has promptly notified the
Contractor and the Surety (at the address described in
Paragraph 12) of any claims, demands, liens or suits
and tendered defense of such claims, demands, liens
or suits to the Contractor and the Surety, and provided
there is no Owner Default.
3 With respect to Claimants, this obligation shall be null
and void if the Contractor promptly makes payment,
directly or indirectly, for all sums due.
4. The Surety shall have no obligation to Claimants under
this Bond until:
4.1 Claimants who are employed by or have a direct
contract with the Contractor have given notice to the
Surety (at the address described in Paragraph 12) and
sent a copy, or notice thereof, to the Owner, stating that
a claim is being made under this Bond and, with
substantial accuracy, the amount of the claim.
4.2 Claimants who do not have a direct contract with
the Contractor:
.1 Have furnished written notice to the Contractor
and sent a copy, or notice thereof, to the
Owner, within 90 days after having last
performed labor or last furnished materials or
equipment included in the claim stating, with
substantial accuracy, the amount of the claim
and the name of the party to whom the
materials were furnished or supplied or for
whom the labor was done or performed; and
.2 Have either received a rejection in whole or in
part from the Contractor, or not received within
30 days of furnishing the above notice any
communication from the Contractor by which
the Contractor has indicated the claim will be
paid directly or indirectly; and
.3 Not having been paid within the above 30
days, have sent a written notice to the Surety
(at the address described in Paragraph 12)
and sent a copy, or notice thereof, to the
Owner, stating that a claim is being made
under this Bond and enclosing a copy of the
previous written notice furnished to the
Contractor.
16D13
5 If a notice required by Paragraph 4 is given by the
Owner to the Contractor or to the Surety, that is sufficient
compliance.
6 When the Claimant has satisfied the conditions of
Paragraph 4, the Surety shall promptly and at the Surety's
expense take the following actions:
6.1 Send an answer to the Claimant, with a copy to the
Owner, within 45 days after receipt of the claim, stating
the amounts that are undisputed and the basis for
challenging any amounts that are disputed.
6.2 Payor arrange for payment of any undisputed
amounts.
7 The Surety's total obligation shall not exceed the
amount of this Bond, and the amount of this Bond shall be
credited for any payments made in good faith by the
Surety.
8 Amounts owed by the Owner to the Contractor under the
Construction Contract shall be used for the performance of
the Construction Contract and to satisfy claims, if any, under
any Construction Performance Bond. By the Contractor
furnishing and the Owner accepting this Bond, they agree
that all funds earned by the Contractor in the performance of
the Construclion Contract are dedicated to satisfy
obligations of the Contractor and the Surety under this
Bond, subject to the Owner's priority to use the funds for the
completion of the work.
9 The Surety shall not be liable to the Owner, Claimants or
others for obligations of the Contractor that are unrelated to
the Construction Contract. The Owner shall not be liable for
payment of any costs or expenses of any Claimant under
this Bond, and shall have under this Bond no obligations to
make payments to, give notices on behalf of, or otherwise
have obligations to Claimants under this Bond.
10 The Surety hereby waives notice of any change,
including changes of time, to the Construction Contract or to
related subcontracts, purchase orders and other obligations.
11 No suit or action shall be commenced by a Claimant
under this Bond other than in a court of competent
jurisdiction in the location in which the work or part of the
work is located or after the expiration of one year from the
date (1) on which the Claimant gave the notice required by
Subparagraph 4.1 or Clause 4.2.3, or (2) on which the last
labor or service was performed by anyone or the last
materials or equipment were furnished by anyone under the
Construction Contract, whichever of (1) or (2) first occurs. If
the provisions of this Paragraph are void or prohibited by
law, the minimum period of limitation available to sureties as
a defense in the jurisdiction of the suit shall be applicable.
12 Notice to the Surety, the Owner or the Contractor shall
be mailed or delivered to the address shown on the
signature page. Actual receipt of notice by Surety, the
Owner or the Contractor, however accomplished, shall be
sufficient compliance as of the date received at the address
shown on the signature page.
13 When this Bond has been furnished to comply with a
statutory or other legal requirement in the location where the
construction was to be performed, any provision in this Bond
AlA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1984 ED. . AIA@
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE. NW, WASHINGTON. D.C. 20006
THIRD PRINTING. MARCH 1987
A312-1984
5
conflicting with said statutory or legal requirement shall be
deemed deleted herefrom and provisions conforming to
such statutory or other legal requirement shall be deemed
incorporated herein. The intent is that this Bond shall be
construed as a statutory bond and not as a common law
bond.
16D13
service or rental equipment used in the Construction
Contract, architectural and engineering services
required for performance of the work of the Contractor
and the Contractor's subcontractors, and all other
items for which a mechanic's lien may be asserted in
the jurisdiction where the labor, materials or
equipment were furnished.
14 Upon request by any person or entity appearing to be a
potential beneficiary of this Bond, the Contractor shall
promptly furnish a copy of this Bond or shall permit a copy
to be made.
15.2 Construction Contract: The agreement
between the Owner and the Contractor identified on
the signature page, including all Contract Documents
and changes thereto.
15 DEFINITIONS
15.1 Claimant: An individual or entity having a direct
contract with the Contractor or with a subcontractor of
the Contractor to furnish labor, materials or equipment
for use in the performance of the Contract. The intent
of this Bond shall be to include without limitation in the
terms "labor, materials or equipment" that part of
water, gas, power, light, heat, oil, gasoline, telephone
15.3 Owner Default: Failure of the Owner, which has
neither been remedied nor waived, to pay the
Contractor as required by the Construction Contract or
to perform and complete or comply with the other
terms thereof.
MODIFICATIONS TO THIS BOND ARE AS FOllOWS:
Paragraph 6 above is deleted in its entirety and the following is substituted in its place:
6. When the Claimant has satisfied the conditions of Paragraph 4, and has submitted all supporting documentation and any
proof of claim requested by the Surety, the Surety shall, with reasonable promptness, notify the Claimant of the amounts that
are undisputed and the basis for challenging any amounts that are disputed, including, but not limited to, the lack of
substantiating documentation to support the claim as to entitlement or amount, and the Surety shall, with reasonable
promptness, payor make arrangements for payment of any undisputed amount; provided, however, that the failure of the
Surety to timely discharge its obligations under this paragraph or to dispute or identify any specific defense to all or any part of
a claim shall not be deemed to be an admission of liability by the Surety as to such claim or otherwise constitute a waiver of the
Contractor's or Surety's defenses to, or right to dispute, such claim. Rather, the Claimant shalf have the immediate right,
without further"notice, to bring suit against the Surety to enforce any remedy available to it under this Bond.
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL
Company:
(Corporate Seal)
SURETY
Company:
(Corporate Seal)
Signature:
Name and Title:
Address:
Signature:
Name and Title:
Address:
AlA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1984 ED.. AlA Qi)
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW.. WASHINGTON. D.C. 20006
THIRD PRINTING. MARCH 1987
A312.1984
6
16013
POWER OF ATTORNEY
AMERICAN CONTRACTORS INDEMNITY COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY
KNOW ALL MEN BY THESE PRESENTS: That American Contraclors Indemnily Company, a California corporation, Uniled States
Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a Texas corporation (colleclively, the
"Companies"), do by these presents make, constitute and appoint:
Stephen T. Kazmer, James I. Moore, Mary Beth Peterson, Joel E. Speckman, Elaine G. Marcus, Melissa A. Schmidt,
or Kelly A. Gardner of Westmont, Illinois
its true and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, wilh full power and authority
hereby conferred in its name, place and slead, 10 execute, acknowledge and deliver any and all bonds, recognizances, undertakings
or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond
penalty does not exceed ****Three Million**** Dollars ($ **3,000,000.00** ).
This Power of Attorney shall expire without further action on March 18, 2011. This Power of Attorney is granted under and by
authority of the following resolutions adopted by the Boards of Directors of the Companies:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full
power and authority to appoint anyone or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following
provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds,
recognizances, contracts, agreements or inderrmity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the
Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President
and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating
thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to
any bond or undertaking to which it is attached.
IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporale seals to be herelo affixed, this
15th day of July, 2008.
AMERICAN CONTRACTORS INDEMNITY COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY
Corporate Seals
By: ~~~~ ,
Daniel P. Aguilar, Vice President
Slate of California
County of Los Angeles SS:
On this 15th day of July, 2008, before me, Deborah Reese, a notary public, personally appeared Daniel P. Aguilar, Vice President of
American Contractors Indemnity Company, United Slates Surety Company and U.S. Specialty Insurance Company who proved to me
on the basis of satisfactory evidence to be lhe person whose name is subscribed to the within instrument and acknowledged to me that
he executed the same in his authorized capacity, and that by his signature on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, execuled the instrument.
I certifY under PENALTY OF PERJURY under the laws of lhe State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
11-- _.-D~REEsEu..t
t~ Commll$lon # 1726211
~. NOtary I'\lbUC . CQlllornla I
I lot Angel.. County t
J ,.' Mf~~,,:~l~.~~ .
........................ ...
I, Jeannie J. Kim, Assistant Secretary of American Contractors Indemnity Company, United States Surety Company and U.S.
Specialty Insurance Company, do hereby certify thaI the above and foregoing is a true and correct copy of a Power 0f Attorney,
executed by said Companies, which is still in full force and effect; furthermore, the resolulions of the Boards of Directors, sel out in
the Power of Attorney are in full force and effect.
Signature
J ~..A
v1e~
( Seal)
In Witness Whereof, I have hereunto set my hand and affixed lhe seals of said Companies al Los Angeles, California this lOt 11 _ day
of June ,2009 .
Corporale Seals
~!\lO ~
Bond No. 1000759769
Agency No. l1?lfi
Jeannie J. Kim, Assistant Secretary
16D13
State of Illinois}
} ss.i
County of Dupage }
On June 10,2009, before me, Tariese M. Pisciotto, a Notary Public in and for said
County and State, residing therein, duly commissioned and sworn, personally appeared
Melissa Schmidt known to me to be Attorney-in-Fact of
American Contractors Indemnity Company the corporation described in and that
executed the within and foregoing instrument, and known to me to be the person who
executed the said instrument in behalf ofthe said corporation, and he duly acknowledged
to me that such corporation executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, the
day and year stated in this certificate above.
s-'~"'v"'_. ."""",,~
C)i::Flc~.'\r' ?
TM\Ir':.~-;E ivi,' ,;
NOTAi~'( p: ,Ul il.' . <' . l
MY COMi'viISS{1;\i ,:::d'II-!: c," ~,
"''''~
Commission No. 560807
16D13
EXHIBIT B
INSURANCE REQUIREMENTS
(1) The amounts and types of insurance coverage shall conform to the following minimum
requirements with the use of Insurance Services Office (ISO) forms and endorsements or their
equivalents. If Contractor has any self-insured retentions or deductibles under any of the below listed
minimum required coverages, Contractor must identify on the Certificate of Insurance the nature and
amount of such self-insured retentions or deductibles and provide satisfactory evidence of financial
responsibility for such obligations. All self-insured retentions or deductibles will be Contractor's sole
responsibility.
(2) The insurance required by this Agreement shall be written for not less than the limits specified
herein or required by law, whichever is greater.
(3) Coverage's shall be maintained without interruption from the date of commencement of the
Work until the date of completion and acceptance of the Project by the Owner or as specified in this
Agreement, whichever is longer.
(4) Certificates of insurance (3 copies) acceptable to the Owner and in the form set forth in
Attachment I to this Exhibit B shall be filed with the Owner within ten (10) calendar days after Notice
of Award is received by Contractor evidencing the fact that Contractor has acquired and put in place
the insurance coverages and limits required hereunder. In addition, certified, true and exact copies of
all insurance policies required shall be provided to Owner, on a timely basis, if requested by Owner.
(5) The Contractor and/or its insurance carrier shall provide 30 days written notice to the Owner of
policy cancellation or non-renewal on the part of the insurance carrier or the Contractor. Contractor
shall also notify Owner, in a like manner, within twenty-four (24) hours after receipt, of any notices of
expiration, cancellation, non-renewal or material change in coverages or limits received by Contractor
from its insurer and nothing contained herein shall relieve Contractor of this requirement to provide
notice. In the event of a reduction in the aggregate limit of any policy to be provided by Contractor
hereunder, Contractor shall immediately take steps to have the aggregate limit reinstated to the full
extent permitted under such policy.
(6) All insurance coverage's of the Contractor shall be primary to any insurance or self insurance
program carried by the Owner applicable to this Project.
(7) The acceptance by Owner of any Certificate of Insurance does not constitute approval or
agreement by the Owner that the insurance requirements have been satisfied or that the insurance
policy shown on the Certificate of Insurance is in compliance with the requirements of this Agreement.
(8) Contractor shall require each of its Subcontractors to procure and maintain, until the
completion of the subcontractors work, insurance of the types and to the limits specified in this
Section unless such insurance requirements for the Subcontractor are expressly waived in writing by
the Owner.
(9) Should at any time the Contractor not maintain the insurance coverage's required herein, the
Owner may terminate the Agreement or at its sole discretion shall be authorized to purchase such
GC-CA-B-1
16D13
coverage's and charge the Contractor for such coverage's purchased. If Contractor fails to reimburse
Owner for such costs within thirty (30) days after demand, Owner has the right to offset these costs
from any amount due Contractor under this Agreement or any other agreement between Owner and
Contractor. The Owner shall be under no obligation to purchase such insurance, nor shall it be
responsible for the coverage's purchased or the insurance company or companies used. The
decision of the Owner to purchase such insurance coverage's shall in no way be construed to be a
waiver of any of its rights under the Contract Documents.
(10) If the initial or any subsequently issued Certificate of Insurance expires prior to the completion
of the Work or termination of the Agreement, the Contractor shall furnish to the Owner, renewal or
replacement Certificate(s) of Insurance not later than ten (10) calendar days after the date of their
expiration. Failure of the Contractor to provide the Owner with such renewal certificate(s) shall be
considered justification for the Owner to terminate the Agreement.
(11) All insurance policies required by this Agreement shall include the following provisions and
conditions by endorsement to the policies:
11.1 All insurance policies, other than the Business Automobile and Workers Compensation
policies, provided by Contractor to meet the requirements of this Agreement shall name
Collier County, Florida, as an additional insured as to the operations of Contractor under
this Agreement and shall contain a severability of interests provisions.
11.2. Companies issuing the insurance policy or policies shall have no recourse against
Owner for payment of premiums or assessments for any deductibles which all are at the
sole responsibility and risk of Contractor.
11.3. All insurance coverages of Contractor shall be primary to any insurance or self-
insurance program carried by Owner applicable to this Project, and the "Other
Insurance" provisions of any policies obtained by Contractor shall not apply to any
insurance or self-insurance program carried by Owner applicable to this Project.
11.4. The Certificates of Insurance, which are to be provided on the form set forth in
Attachment I to this Exhibit B, must identify the specific Project name, as well as the site
location and address (if any).
11.5. All insurance policies shall be fully performable in Collier County, Florida, and shall be
construed in accordance with the laws of the State of Florida.
WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY
Required by this Agreement? [g] Yes D No
(1) Workers' Compensation and Employers' Liability Insurance shall be maintained by the
Contractor during the term of this Agreement for all employees engaged in the work under this
Agreement in accordance with the laws of the State of Florida. The amounts of such insurance shall
not be less than:
a. Worker's Compensation - Florida Statutory Requirements
GC-CA-B-2
16D13
b. Employers' Liability
[ZJ $100,000 Each Accident
$500,000 Disease Aggregate
$100,000 Disease Each Employee
$1,000,000 Each Accident
$1,000,000 Disease Aggregate
$1,000,000 Disease Each Employee
(2) The insurance company shall waive all claims rights against the Owner and the policy shall be
so endorsed.
(3) United States Longshoreman's and Harborworker's Act coverage shall be maintained where
applicable to the completion of the work.
D Applicable [ZJ Not Applicable
(4) Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the
work.
D Applicable [ZJ Not Applicable
COMMERCIAL GENERAL LIABILITY
Required by this Agreement? [ZJ Yes D No
(1) Commercial General Liability Insurance shall be maintained by the Contractor on an
occurrence basis. Coverage will include, but not be limited to, Bodily Injury, Property Damage,
Personal Injury, Contractual Liability for this Agreement, Independent Contractors, Broad Form
Property Damage including Completed Operations and Products and Completed Operations
Coverage. Limits of Liability shall not be less than the following:
General Aggregate $ 300,000
Products/Completed Operations Aggregate $ 300,000
Personal and Advertising Injury $ 300,000
Each Occurrence $ 300,000
Fire Damage $ 50,000
[ZJ General Aggregate $ 500,000
Products/Completed Operations Aggregate $ 500,000
Personal and Advertising Injury $ 500,000
Each Occurrence $ 500,000
Fire Damage $ 50,000
General Aggregate $1,000,000
Products/Completed Operations Aggregate $1,000,000
GC-CA-B-3
Personal and Advertising Injury
Each Occurrence
Fire Damage
General Aggregate
Products/Completed Operations Aggregate
Personal and Advertising Injury
Each Occurrence
Fire Damage
General Aggregate
Products/Completed Operations Aggregate
Personal and Advertising Injury
Each Occurrence
Fire Damage
16D13
$1,000,000
$1,000,000
$ 50,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$ 50,000
$ 5,000,000
$ 5,000,000
$ 5,000,000
$ 5,000,000
$ 50,000
(2) The General Aggregate Limit shall apply separately to this Project and the policy shall be
endorsed using the following endorsement wording. "This endorsement modifies insurance provided
under the following: Commercial General Liability Coverage Part. The General Aggregate Limit
under LIMITS OF INSURANCE applies separately to each of your projects away from premises
owned by or rented to you."
(3) The Owner shall be named as an Additional Insured and the policy shall be endorsed that such
coverage shall be primary to any similar coverage carried by the Owner.
(4) Coverage shall be included for explosion, collapse or underground property damage claims.
(5) Watercraft Liability coverage shall be carried at the limits shown above if applicable to the
completion of the work under this Agreement.
D Applicable [SJNot Applicable
(6) Aircraft Liability coverage shall be carried at limits of $10,000,000 each occurrence if
applicable to the completion of the work under this Agreement.
D Applicable [SJ Not Applicable
PROPERTY INSURANCE - BUILDERS RISK
(1) The Owner may purchase and maintain in a company or companies lawfully authorized to do
business in the State of Florida and in Collier County, property insurance in the amount of the initial
Contract Amount as well as subsequent modifications thereto for the entire Work at the site on a
replacement cost basis without voluntary deductibles. Such property insurance shall be maintained,
unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons
and entities who are beneficiaries of such insurance, until final payment has been made or until no
person or entity other than the Owner has an insurable interest in the property required to be covered,
whichever is earlier. This insurance shall include interests of the Owner, the Contractor,
Subcontractors, Sub-subcontractors and Material Suppliers in the Work.
GC-CA-B-4
16D13
(2) Property insurance shall be on an all-risk policy form and, at the Owner's option, shall cover
reasonable compensation for Professional's services and expenses required as a result of such
insured loss. At the Owner's option, flood and windstorm insurance will also be purchased.
(3) The property insurance provided by the Owner requires minimum deductibles and the
Contractor shall pay costs not covered by the deductibles. The responsibility of the Contractor for
any deductible associated with the all-risk policy described above shall be limited to a maximum of
$5,000 for each occurrence unless higher deductibles are identified in Exhibit C of the Contract
Documents. The responsibility of the Contractor for any deductible associated with the flood or
windstorm insurance identified herein, if purchased by the Owner, shall be limited to a maximum of
$5,000 for each occurrence unless higher deductibles are identified in Exhibit C of the Contract
Documents.
(4) This property insurance shall cover portions of the Work stored off the site after written
approval of the Owner at the value established in the approval, and also portions of the Work in
transit.
(5) Boiler and Machinery Insurance. The Owner shall have the option of purchasing and
maintaining boiler and machinery insurance required by the Contract Documents or by law, which
shall specifically cover such insured objects during installation and until final acceptance by the
Owner. If purchased this insurance shall include interests of the Owner, Contractor, Subcontractors
and Sub-subcontractors in the Work.
(6) Waivers of Subrogation. The Owner and Contractor waive all rights against (1) each other and
any of their subcontractors, sub-subcontractors, agents and employees, each of the other, and (2) the
Design Professional, and Design Professional's subconsultants, for damages caused by fire or other
perils to the extent of insurance proceeds actually received by Owner under property insurance
obtained pursuant to this Exhibit or other any property insurance applicable to the Work, except such
rights as they have to proceeds of such insurance held by the Owner as fiduciary. The policies shall
provide waivers of subrogation by endorsement or otherwise.
(7) A loss insured under Owner's property insurance shall be adjusted by the Owner and made
payable to the Owner for the insured, as their interests may appear.
AUTOMOBILE LIABILITY INSURANCE
Required by this Agreement? DYes D No
(1) Automobile Liability Insurance shall be maintained by the Contractor for the ownership,
maintenance or use of any owned, non-owned or hired vehicle with limits of not less than:
Bodily Injury & Property Damage - $ 500,000
IZI Bodily Injury & Property Damage - $1,000,000
Bodily Injury & Property Damage - $ 2,000,000
GC-CA-B-5
16D13
UMBRELLA LIABILITY
(1) Umbrella Liability may be maintained as part of the liability insurance of the Contractor and, if
so, shall be in addition to and in excess of any Employers' Liability, Commercial General Liability, and
Automobile Liability coverage's and shall include all coverage's on a "following form" basis.
(2) The policy shall contain wording to the effect that, in the event of the exhaustion of any
underlying coverage due to the payment of claims, the Umbrella policy will "drop down" to apply as
primary insurance.
GC-CA-B-6
~b"
PRODUCER
CERTIFICATE OF LIABILITY INSURANCE
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
-~~_._~-_.. 6..?fJ1~~rJ6/~~1 b~~~~
LTR NSR[ TYPE OF INSURANCE POLICY NUMBER LIMITS
GENERAL LIABILITY EACH OCCURRENCE $ 1000000
-
A X ~ COMMERCIAL GENERAL LIABILITY GL2052621 03/19/09 03/19/10 u '''. $ 300000
=:J CLAIMS MADE ~ OCCUR ~R.EMISES (Ea occurence)
MED EXP (Anyone person) $ 10000
-
PERSONAL & ADV INJURY $ 1000000
-
GENERAL AGGREGATE $ 2000000
-
GEN'LAGGRE5ilE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2000000
I X PRO- n i Emp Ben. 1000000
POLICY JECT LOC
AUTOMOBILE LIABILITY i
COMBINED SINGLE LIMIT : $ 1000000
A ~ '" '"w CA 2052618 03/19/09 03/19/10 (Ea accident)
ALL OWNED AUTOS BODILY INJURY
(Per person) $
SCHEDULED AUTOS
~
- HIRED AUTOS BODILY INJURY
, $
i '- NON-OWNED AUTOS i (Per accident)
I i
- PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
H ANY AUTO --
OTHER THAN EA ACC $
AUTO ONLY: AGG $
EXCESS I UMBRELLA LIABILITY EACH OCCURRENCE $ 2000000
A ~ OCCUR =:J CLAIMS MADE CU 2052622 03/19/09 03/19/10 AGGREGATE $ 2000000
$
;:l DEDUCTIBLE $
X RETENTION $0 $
WORKERS COMPENSATION I TORY L1MITS- I X I UJ~-
AND EMPLOYERS' LIABILITY YIN
B ANY PROPRI ETOR/PARTNERIEXECUTIVn 2059588 01/01/09 01/01/10 E.L EACH ACCIDENT $ 500000
OFFICER/MEMBER EXCLUDED?
(Mandatory In NH) _E:_L: DISEASE - EA EMPLOYEE $ 500000
~P~MtS~~6';:~?o~s below E.L DISEASE - POLICY LIMIT $ 500000
OTHER
i
A Rented/Leased Equi IM2059784 03/19/09 03/19/10 Rent/Leas $15,000
I
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
General Contractor Project # 09-5233
THE CERTIFICATE HOLDER IS AN ADDITIONAL INSURED AS RESPECTS TO GENERAL
LIABILITY SUBJECT TO THE TERMS, CONDITIONS, AND EXCLUSIONS OF THE POLICY.
Bouchard-Fort Myers
8191 College Pkwy Suite 202
Fort Myers FL 33919
Phone:239-489-3232 Fax:239-489-1084
INSURED
Heatherwood Construction
MS. Connie Osborne
8880 Terrene Ct
Bonita Springs FL 34135
COVERAGES
CERTIFICA TE HOLDER
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
INSURERS AFFORDING COVERAGE
NAIC#
19488
19488
INSURER A: Amerisure Insurance Company
1 INSURER B: Amerisure Insurance Company
INSURER c:
INSURER D
INSURER E
CANCELLATION
THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER
COUNTY, FLORIDA
3301 TAMIAMI TRAIL EAST
NAPLES FL 34112
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
BOCCCOL DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES.
AU D
ACORD 25 (2009/01)
988- 09 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
This Certificate of Insurance does not constitute a contract between the issuing insurer(s), authorized
representative or producer, and the certificate holder, nor does it affirmatively or negatively amend,
extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2009/01)
16D13
EXHIBIT C
RELEASE AND AFFIDAVIT FORM
COUNTY OF COLLIER)
STATE OF FLORIDA)
Before me, the undersigned authority, personally appeared
who after being duly sworn, deposes and says:
(1) In accordance with the Contract Documents and in consideration of $ paid,
("Contractor") releases and waives for itself and it's subcontractors,
material-men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort,
against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the
Agreement between Contractor and Owner dated , 20_ for the period from
to , excluding all retainage withheld and any pending claims or
disputes as expressly specified as follows:
(2) Contractor certifies for itself and its subcontractors, material-men, successors and assigns, that all charges for
labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a
demand against any payment bond might be filed, have been fully satisfied and paid.
(3) To the maximum extent permitted by law, Contractor agrees to indemnify, defend and save harmless Owner from
all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the
performance by Contractor of the Work covered by this Release and Affidavit
(4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No.
CONTRACTOR
BY:
ITS:
President
DATE:
Witnesses
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me this _ day of , 20_, by
, as of , a
corporation, on behalf of the corporation. He/she is personally known to me or has produced
as identification and did (did not) take an oath.
My Commission Expires:
(Signature of Notary)
NAME:
(Legibly Printed)
(AFFIX OFFICIAL SEAL)
Notary Public, State of
Commissioner No.:
GC-CA-C-1
16D13
EXHIBIT D
FORM OF CONTRACT APPLICATION FOR PAYMENT
(County Project Manager)
(County Department)
Collier County Board of County Commissioners (the OWNER) or
Collier County Water-Sewer District (the OWNER)
Bid No.
Project No.
Application Date
FROM:
(Contractor's Representative) Payment Application No.
(Contractor's Name) for Work accomplished through the Date:
(Contractor's Address)
RE:
(Project Name)
%
%
Original Contract Price: $
Total Change Orders to Date $
Revised Contract Amount $
Total value of Work Completed
and stored to Date $
Less Retainage $
Total Earned Less Retainage $
Less previous payment (s) $
AMOUNT DUE THIS
APPLICATION: $
Original Contract Time:
Revised Contract Time:
Retainage @ 10% thru[insert date] $
Retainage @ _% after [insert date] $
=
Percent Work completed to Date:
Percent Contract Time completed to Date
Liquidated Damages to be Accrued $
Remaining Contract Balance $
ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION
CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments
received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in
full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment
numbered 1 through _ inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed
in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims,
security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have
been paid for work which previous payments were issued and received from the OWNER and that current payment is now
due; and (4) CONTRACTOR has only included amounts in this Application for Payment properly due and owing and
CONTRACTOR has not included within the above referenced amount any claims for unauthorized or changed Work that
has not been properly approved by Owner in writing and in advance of such Work.
By CONTRACTOR: (Contractor's Name)
(Signature) DATE:
(Type Name & Title)
(shall be signed by a duly authorized representative of CONTRACTOR)
Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended:
(DP's Name)
(Signature) DATE:
(Type Name & Title)
Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved:
By Design Professional:
By OWNER'S Project Manager:
(Signature) DATE:
(Type Name and Title)
GC-CA-D-1
I
~ f----
1--
I I
,-
l-g
I::J
.!:
'E
o
C,)
e'-
l-
m
I~
C/)
w
:J
...J
<(
>
LL
o
W
...J
:J
o
W
:I:
()
C/)
i..:
CI)
.c
E
:;, 0
~ I-
u '"
.~ s .g
n: d ~
c,;
E
il i
I
Wo
Cl...J
;t<w
I-~J:
o<j!:
I-~~
~ S
~ ~ ;
I: <I- ~
'tI,
W !I
cr: -1
w
Cl
*~
~<
I-
W
0::
WJ:
Olll
Zz
:)u::
<0
III 1-'
I
!
:
I-W
ZI-
WW
0...J
0::0..
w:i!
0..0
o
fa~w
;tti:io::~
I-...JOo
~~li;o
!8olll-
III
O...J
W<
gjii:
I-w
lIl!;i
:i!
o
W
I-
W
..J
0..
:i!
o
o
lI:::
0::
o
:=
I
I
10
lIlO
i:ii:
I-W
0.
~~
QC!i
I-w
<0
~~
o..lIl
0..
<w
lIll-
::l<
00
>::l
wa:
O::J:
0..1-
o
~w
::l::l
O...J
w<
J:>
o
III
Z
o
i=
0..
ii:
o
III
W
o
0::
:i!w
will
!::~
Z
I~
E
o
()
Q) If)
::> Q)
"'19
.!!! If) _ __ ..,.1...-
~ .!!!
~~
'(ij ,
- <::
~ E
- ::>
00
c: u ~--
.Q Q)
urn
::>0
'OQ)
~ ()
... <::
oUi
~ ~ - - ----- ---.-
"* ,~
"''0
fll Q)
~ ~
Q) a.
C U)-
::> ,-
Q).S!
~~
0._
~:5
I ~ Cii
'u1ij--
fll <::
.::; 0
c::.;:;
o fll
() E
Q) ...
.<::,2
-- c: _ __.
I
II)
..J
<
I-
o
I-
1:: .
::> <::
<:: E
o ::>
~8
E W
on;
1; 0 I
- ::>
ro.c
Q)I-
~~
a. -
<::
.~ ~-
~~
Q) a. I,
Q> .~
.<:: W
:;: 0), ,
.!!! ~ I I
Q) '(ij--j------:---c--
ro (j) i
0'" I
::) .~
.c~
~ c: I
~ ~ i
~ t) __ +_ --.~+--_-n-.-l---.
00*
<:: W
~:5
~ '0 :
~JB !
o.fll
<( '0 ,I I
If) w, W'L I
5:; g', --t--c--
.:; .8,,~1
~ ~~I
cie;
W 0','-1
-g ~l Q)
::> E g'1
If) ... fll
co.!:
Et:'();
~ ;;~!
o (1;L_i
~ 1Ii:~!
Z :iii~1
o.,lf)
~ ~'O
:: ~I ~
o If) Q)
~;S~
~---~ :: ~
~ ~ ~
..!!!..!!!.<::
0.0._
~.8~
. <:::;:
I
I
J..__.~..~_____ _
I
16D13
N
o
I
<.(
()
U
<.9
,.-
16D13
"
..
o
CJ
Q)
a::::
In
iii
.&:
Q)
-
l'G
:!E
"
Q)
..
o
-
(f)
0
I-
Q) iii
UJ CJ -
C In
l'G .5
iii
III
"
" 0
J.! .&:
0 iii Q) !
- a.. I
In ,~ i
.5 .c
I-
>-
-"
In Q)
:::l-
U 0-
._ l'G
>-
Q) In
.. C
a..-
"
" 0
Q) '&:
> Q)
OJ 'G) a..
CJ .~
Q)
a:::: .c
I-
~"
In Q)
:::l >
<( o .-
,- Q)
> CJ
Q) Q)
e:a::::
Q) ..
Q)
CJ ..c
'0 E
> :::l
.5 z
..
.~
is.
g
(f) I
I
I
c I
0
:;:
.9-
..
CJ
In
Q)
c I
I I
- -
Q)
- I
l'G
C I
I
("')
o
.d:
u
U
l'J
UJ
II
o
U
OJ
+
<(
..!!!
::J
E
L-
o
LL
----
"
(i)
::J
C
+:;
C
o
U
-
o
.......
.0
.r:.
><
UJ
16D13
EXHIBIT E
CHANGE ORDER
TO:
Project Name:
Sid No.:
Change Order No.:
FROM: Collier County Government
Construction Agreement Dated:
Date:
Change Order Description
Original Agreement Amount.................. .......... ...... ....... ..................$
Sum of previous Change Orders Amount .......................................$
This Change Order Amount ........................................................... $
Revised Agreement Amount........................................................... $
Original Contract Time in calendar days
Adjusted number of calendar days due to previous Change Orders
This Change Order adjusted time is
Revised Contract Time in calendar days
Original Notice to Proceed Date
Completion date based on original Contract Time
Revised completion date
Contractor's acceptance of this Change Order shall constitute a modification to the Agreement
and will be performed subject to all the same terms and conditions as contained in the
Agreement, as if the same were repeated in this acceptance. The adjustments, if any, to the
Agreement shall constitute a full and final settlement of any and all claims of the Contractor
arising out of, or related to, the change set forth herein, including claims for impact and delay
costs.
Prepared by: Date:
Project Manager
Recommended by: Date:
Design Professional
Accepted by: Date:
Contractor
Approved by: Date:
Department Director
Approved by: Date:
Division Administrator
Approved by: Date:
Purchasing Department
GC-CA-E-5
Authorized by
Director
(For use by Owner: Fund
Numbe~ )
Cost Center:
Date:
Object Code:
GC-CA-E-6
16D13
Project
16D13
EXHIBIT F
CERTIFICATE OF SUBSTANTIAL COMPLETION
OWNER'S Project No.
Design Professional's Project No.
PROJECT:
CONTRACTOR
Contract For
Contract Date
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof:
To
OWNER
And
To
Substantial Completion is the state in the progress of the Work when the Work (or designated
portion) is sufficiently complete in accordance with the Contract Documents so that the Owner
can occupy or utilize the Work for its intended use. The Work to which this Certificate applies has
been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN
PROFESSIONAL, and that Work is hereby declared to be substantially complete in accordance with the
requirements of the Contract Documents on:
DATE OF SUBSTANTIAL COMPLETION
A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive,
and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all
the Work in accordance with the Contract Documents. The items in the tentative list shall be completed
or corrected by CONTRACTOR within days of the above date of Substantial Completion.
GC-CA-F-1
16.~D..l.~
~<.;'
The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance,
heat, utilities, insurance and warranties shall be as follows:
RESPONSIBILITIES:
OWNER:
CONTRACTOR
The following documents are attached to and made a part of this Certificate:
This certificate does not constitute an acceptance of Work not in accordance with the Contract
Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the
Contract Documents.
Executed by Design Professional on
,20
Design Professional
By:
Type Name and Title
CONTRACTOR accepts this Certificate of Substantial Completion on
,20_
CONTRACTOR
By:
Type Name and Title
OWNER accepts this Certificate of Substantial Completion on
,20_
OWNER
By:
Type Name and Title
GC-CA-F-2
16D13
EXHIBIT G
FINAL PAYMENT CHECKLIST
Bid No.:
Contractor:
Project No.:
Date:
,20_
The following items have been secured by the
for the Project known as
and have been reviewed and found to comply with the requirements of the Contract Documents.
Original Contract Amount:
Final Contract Amount:
Commencement Date:
Substantial Completion Time as set forth in the Agreement:
Actual Date of Substantial Completion:
Calendar Days.
Final Completion Time as set forth in the Agreement:
Actual Final Completion Date:
Calendar Days.
YES
NO
1. All Punch List items completed on
2. Warranties and Guarantees assigned to Owner (attach to this form).
3. Effective date of General one year warranty from Contractor is:
4. 2 copies of Operation and Maintenance manuals for equipment and
system submitted (list manuals in attachment to this form).
5. As-Built drawings obtained and dated:
6. Owner personnel trained on system and equipment operation.
7. Certificate of Occupancy No.:
issued on (attach to this form).
8. Certificate of Substantial Completion issued on
9. Final Payment Application and Affidavits received from Contractor on:
10. Consent of Surety received on
11. Operating Department personnel notified Project is in operating phase.
12. All Spare Parts or Special Tools provided to Owner:
13. Finished Floor Elevation Certificate provided to Owner:
14. Other:
If any of the above is not applicable, indicate by N/A. If NO is checked for any of the above, attach
explanation.
Acknowledgments:
(Company Name)
(Signature)
(Typed Name & Title)
By Contractor:
GC-CA-G-1
By Design
Professional:
By Owner:
GC-CA-G-2
16D13
(Firm Name)
(Signature)
(Typed Name & Title)
(Department Name)
(Signature)
(Name & Title)
16D13
EXHIBIT H
GENERAL TERMS AND CONDITIONS
1. INTENT OF CONTRACT DOCUMENTS.
1.1 It is the intent of the Contract Documents to describe a functionally complete
Project (or portion thereof) to be constructed in accordance with the Contract
Documents. Any work, materials or equipment that may reasonably be inferred from
the Contract Documents as being required to produce the intended result shall be
supplied whether or not specifically called for. When words which have a well known
technical or trade meaning are used to describe work, materials or equipment, such
words shall be interpreted in accordance with that meaning. Reference to standard
specifications, manuals or codes of any technical society, organization or association or
to the laws or regulations of any governmental authority having jurisdiction over the
Project, whether such reference be specific or by implication, shall mean the latest
standard specification, manual, code, law or regulation in effect at the time the Work is
performed, except as may be otherwise specifically stated herein.
1.2 If before or during the performance of the Work Contractor discovers a conflict,
error or discrepancy in the Contract Documents, Contractor immediately shall report
same to the Project Manager in writing and before proceeding with the Work affected
thereby shall obtain a written interpretation or clarification from the Project Manager;
said interpretation or clarification from the Project Manager may require Contractor to
consult directly with Design Professional or some other third party, as directed by
Project Manager. Contractor shall take field measurements and verify field conditions
and shall carefully compare such field measurements and conditions and other
information known to Contractor with the Contract Documents before commencing any
portion of the Work.
1.3 Drawings are intended to show general arrangements, design and extent of Work
and are not intended to serve as shop drawings. Specifications are separated into
divisions for convenience of reference only and shall not be interpreted as establishing
divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the
event of a discrepancy between or among the drawings, specifications or other Contract
Document provisions, Contractor shall be required to comply with the provision which is
the more restrictive or stringent requirement upon the Contractor, as determined by the
Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws,
fittings, fillers, hardware, accessories, trim and other parts required in connection with
any portion of the Work to make a complete, serviceable, finished and first quality
installation shall be furnished and installed as part of the Work, whether or not called for
by the Contract Documents.
2. INVESTIGATION AND UTILITIES.
2.1 Subject to Section 2.3 below, Contractor shall have the sole responsibility of
satisfying itself concerning the nature and location of the Work and the general and
local conditions, and particularly, but without limitation, with respect to the following:
GC-CA-H-1
16D13
those affecting transportation, access, disposal, handling and storage of materials;
availability and quality of labor; water and electric power; availability and condition of
roads; work area; living facilities; climatic conditions and seasons; physical conditions at
the work-site and the project area as a whole; topography and ground surface
conditions; nature and quantity of the surface materials to be encountered; subsurface
conditions; equipment and facilities needed preliminary to and during performance of
the Work; and all other costs associated with such performance. The failure of
Contractor to acquaint itself with any applicable conditions shall not relieve Contractor
from any of its responsibilities to perform under the Contract Documents, nor shall it be
considered the basis for any claim for additional time or compensation.
2.2 Contractor shall locate all existing roadways, railways, drainage facilities and
utility services above, upon, or under the Project site, said roadways, railways, drainage
facilities and utilities being referred to in this Sub-Section 2.2 as the "Utilities".
Contractor shall contact the owners of all Utilities to determine the necessity for
relocating or temporarily interrupting any Utilities during the construction of the Project.
Contractor shall schedule and coordinate its Work around any such relocation or
temporary service interruption. Contractor shall be responsible for properly shoring,
supporting and protecting all Utilities at all times during the course of the Work. The
Contractor is responsible for coordinating all other utility work so as to not interfere with
the prosecution of the Work (except those utilities to be coordinated by the Owner as
may be expressly described elsewhere in the Contract Documents).
2.3 Notwithstanding anything in the Contract Documents to the contrary, if conditions
are encountered at the Project site which are (i) subsurface or otherwise concealed
physical conditions which differ materially from those indicated in the Contract
Documents or (ii) unknown physical conditions of an unusual nature, which differ
materially from those ordinarily found to exist and generally recognized as inherent in
construction activities of the character provided for in the Contract Documents, and
which reasonably should not have been discovered by Contractor as part of its scope of
site investigative services required pursuant to the terms of the Contract Documents,
then Contractor shall provide Owner with prompt written notice thereof before conditions
are disturbed and in no event later than three (3) calendar days after first observance of
such conditions. Owner and Design Professional shall promptly investigate such
conditions and, if they differ materially and cause an increase or decrease in
Contractor's cost of, or time required for, performance of any part of the Work, Owner
will acknowledge and agree to an equitable adjustment to Contractor's compensation or
time for performance, or both, for such Work. If Owner determines that the conditions at
the site are not materially different from those indicated in the Contract Documents or
not of an unusual nature or should have been discovered by Contractor as part of its
investigative services, and that no change in the terms of the Agreement is justified,
Owner shall so notify Contractor in writing, stating its reasons. Claims by Contractor in
opposition to such determination by Owner must be made within seven (7) calendar
days after Contractor's receipt of Owner's written determination notice. If Owner and
Contractor cannot agree on an adjustment to Contractor's cost or time of performance,
the dispute resolution procedure set forth in the Contract Documents shall be complied
with by the parties.
GC-CA-H-2
16D13
3. SCHEDULE.
3.1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award,
shall prepare and submit to Project Manager, for their review and approval, a progress
schedule for the Project (herein "Progress Schedule"). The Progress Schedule shall
relate to all Work required by the Contract Documents, and shall utilize the Critical Path
method of scheduling and shall provide for expeditious and practicable execution of the
Work within the Contract Time. The Progress Schedule shall indicate the dates for
starting and completing the various stages of the Work.
3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly
updates to the Progress Schedule shall be subject to the Project Manager's review and
approval. Contractor shall submit the updates to the Progress Schedule with its
monthly Applications for Payment noted below. The Project Manager's review and
approval of the submitted Progress Schedule updates shall be a condition precedent to
the Owner's obligation to pay Contractor.
3.3 All work under this Agreement shall be performed in accordance with the
requirements of all Collier County Noise Ordinances then in effect. Unless otherwise
specified, work will generally be limited to the hours of 7:00 a.m. to 5:00 p.m., Monday
through Friday. No work shall be performed outside the specified hours without the
prior approval of the Project Manager.
4. PROGRESS PAYMENTS.
4.1 Prior to submitting its first monthly Application for Payment, Contractor shall
submit to Project Manager, for their review and approval, a schedule of values based
upon the Contract Price, listing the major elements of the Work and the dollar value for
each element. After its approval by the Project Manager, this schedule of values shall
be used as the basis for the Contractor's monthly Applications for Payment. This
schedule shall be updated and submitted each month along with a completed copy of
the Application for Payment form signed by the Contractor's authorized representative
and attached to the Agreement as Exhibit D.
4.2 Prior to submitting its first monthly Application for Payment, Contractor shall
provide to the Project Manager the list of its Subcontractors and materialmen submitted
with its Bid showing the work and materials involved and the dollar amount of each
subcontract and purchase order. Contractor acknowledges and agrees that any
modifications to the list of Subcontractors submitted with Contractor's Bid and any
subsequently identified Subcontractors are subject to Owner's prior written approval.
The first Application for Payment shall be submitted no earlier than thirty (30) days after
the Commencement Date. Notwithstanding anything herein to the contrary, if approved
by Owner in its sole discretion, Contractor may submit its invoice for any required
Payment and Performance Bonds prior to the first Application of Payment provided that
Contractor has furnished Owner certified copies of the receipts evidencing the premium
paid by Contractor for the bonds.
GC-CA-H-3
16D 1.:~
4.3 Unless expressly approved by Owner in advance and in writing, said approval at
Owner's sole discretion, Owner is not required to make any payment for materials or
equipment that have not been incorporated into the Project. If payment is requested on
the basis of materials and equipment not incorporated into the Project, but delivered
and suitably stored at the site or at another location, and such payment and storage
have been agreed to by Owner in writing, the Application for Payment also shall be
accompanied by a bill of sale, invoice or other documentation warranting that the Owner
has received the materials and equipment free and clear of all liens, charges, security
interests and encumbrances, together with evidence that the materials and equipment
are covered by appropriate property insurance and other arrangements to protect
Owner's interest therein, all of which shall be subject to the Owner's satisfaction.
Thereafter, with each Application for Payment, Contractor also shall complete and
submit to Owner as part of its Application for Payment, the Stored Materials Record
attached hereto and made a part hereof as Exhibit D.
4.4 Contractor shall submit six (6) copies of its monthly Application for Payment to
the Project Manager or his or her designee, as directed by Owner (which designee may
include the Design Professional). After the date of each Application for Payment is
stamped as received and within the timeframes set forth in Section 218.735 F.S., the
Project Manager, or Design Professional, shall either: (1) Indicate its approval of the
requested payment; (2) indicate its approval of only a portion of the requested payment,
stating in writing its reasons therefore; or (3) return the Application for Payment to the
Contractor indicating, in writing, the reason for refusing to approve payment. Payments
of proper invoices in the amounts approved shall be processed and paid in accordance
with Section 218.735, F.S. and the administrative procedures established by the
County's Purchasing Department and the Clerk of Court's Finance Department
respectively.
In the event of a total denial by Owner and return of the Application for Payment by the
Project Manager, the Contractor may make the necessary corrections and re-submit the
Application for Payment. The Owner shall, within ten (10) business days after the
Application for Payment is stamped and received and after Project Manager approval of
an Application for Payment, pay the Contractor the amounts so approved.
4.5 Owner shall retain ten percent (10%) of the gross amount of each monthly
payment request or ten percent (10%) of the portion thereof approved by the Project
Manager for payment, whichever is less. Such sum shall be accumulated and not
released to Contractor until final payment is due unless otherwise agreed to by the
Owner in accordance with Florida Statute 255.078. The Project Manager shall have the
discretion to establish, in writing, a schedule to periodically reduce the percentage of
cumulative retainage held through out the course of the Project schedule. Owner shall
reduce the amount of the retainage withheld on each payment request subsequent to
fifty percent (50%) completion subject to the guidelines set forth in Florida Statute
255.078 and as set forth in the Owner's Purchasing Policy.
GC-CA-H-4
16D13
4.6 Monthly payments to Contractor shall in no way imply approval or acceptance of
Contractor's Work.
4.7 Each Application for Payment, subsequent to the first pay application, shall be
accompanied by a Release and Affidavit, in the form attached as Exhibit C,
acknowledging Contractor's receipt of payment in full for all materials, labor, equipment
and other bills that are then due and payable by Owner with respect to the current
Application for Payment. Further, to the extent directed by Owner and in Owner's sole
discretion, Contractor shall also submit a Release and Affidavit from each
Subcontractor, sub-subcontractor, or supplier in the form attached as Exhibit C
acknowledging that each Subcontractor, sub-subcontractor or supplier has been paid in
full through the previous month's Application for Payment. The Owner shall not be
required to make payment until and unless these affidavits are furnished by Contractor.
4.8 Contractor agrees and understands that funding limitations exist and that the
expenditure of funds must be spread over the duration of the Project at regular intervals
based on the Contract Amount and Progress Schedule. Accordingly, prior to submitting
its first monthly Application for Payment, Contractor shall prepare and submit for Project
Manager's review and approval, a detailed Project Funding Schedule, which shall be
updated as necessary and approved by Owner to reflect approved adjustments to the
Contract Amount and Contract Time. No voluntary acceleration or early completion of
the Work shall modify the time of payments to Contractor as set forth in the approved
Project Funding Schedule.
4.9 Notwithstanding anything in the Contract Documents to the contrary, Contractor
acknowledges and agrees that in the event of a dispute concerning payments for Work
performed under this Agreement, Contractor shall continue to perform the Work
required of it under this Agreement pending resolution of the dispute provided that
Owner continues to pay Contractor all amounts that Owner does not dispute are due
and payable.
5. PAYMENTS WITHHELD.
5.1 The Project Manager may decline to approve any Application for Payment, or
portions thereof, because of subsequently discovered evidence or subsequent
inspections that reveal non-compliance with the Contract Documents. The Project
Manager may nullify the whole or any part of any approval for payment previously
issued and Owner may withhold any payments otherwise due Contractor under this
Agreement or any other agreement between Owner and Contractor, to such extent as
may be necessary in the Owner's opinion to protect it from loss because of:
(a) defective Work not remedied; (b) third party claims filed or reasonable evidence
indicating probable filing of such claims; (c) failure of Contractor to make payment
properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt
that the Work can be completed for the unpaid balance of the Contract Amount; (e)
reasonable indication that the Work will not be completed within the Contract Time; (f)
GC-CA-H-5
16D13
unsatisfactory prosecution of the Work by the Contractor; or (g) any other material
breach of the Contract Documents by Contractor.
5.2 If any conditions described in 5.1. are not remedied or removed, Owner may,
after three (3) days written notice, rectify the same at Contractor's expense. Provided,
however, in the event of an emergency, Owner shall not be required to provide
Contractor any written notice prior to rectifying the situation at Contractor's expense.
Owner also may offset against any sums due Contractor the amount of any liquidated or
non-liquidated obligations of Contractor to Owner, whether relating to or arising out of
this Agreement or any other agreement between Contractor and Owner.
6. FINAL PAYMENT.
6.1 Owner shall make final payment to Contractor in accordance with Section
218.735, F.S. and the administrative procedures established by the County's
Purchasing Department and the Clerk of Court's Finance Department after the Work is
finally inspected and accepted by Project Manager as set forth with Section 20.1 herein,
provided that Contractor first, and as an explicit condition precedent to the accrual of
Contractor's right to final payment, shall have furnished Owner with a properly executed
and notarized copy of the Release and Affidavit attached as Exhibit C, as well as, a duly
executed copy of the Surety's consent to final payment and such other documentation
that may be required by the Contract Documents and the Owner. Prior to release of
final payment and final retainage, the Contractor's Representative and the Project
Manager shall jointly complete the Final Payment Checklist, a representative copy of
which is attached to this Agreement as Exhibit G.
6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and
all claims by Contractor against Owner arising out of this Agreement or otherwise
relating to the Project, except those previously made in writing in accordance with the
requirements of the Contract Documents and identified by Contractor as unsettled in its
final Application for Payment. Neither the acceptance of the Work nor payment by
Owner shall be deemed to be a waiver of Owner's right to enforce any obligations of
Contractor hereunder or to the recovery of damages for defective Work not discovered
by the Design Professional or Project Manager at the time of final inspection.
7 . SUBMITTALS AND SUBSTITUTIONS.
7.1 Contractor shall carefully examine the Contract Documents for all requirements
for approval of materials to be submitted such as shop drawings, data, test results,
schedules and samples. Contractor shall submit all such materials at its own expense
and in such form as required by the Contract Documents in sufficient time to prevent
any delay in the delivery of such materials and the installation thereof.
7.2 Whenever materials or equipment are specified or described in the Contract
Documents by using the name of a proprietary item or the name of a particular supplier,
the naming of the item is intended to establish the type, function and quality required.
Unless the name is followed by words indicating that no substitution is permitted,
GC-CA-H-6
16D13
materials or equipment of other suppliers may be accepted by Owner if sufficient
information is submitted by Contractor to allow the Owner to determine that the material
or equipment proposed is equivalent or equal to that named. Requests for review of
substitute items of material and equipment will not be accepted by Owner from anyone
other than Contractor and all such requests must be submitted by Contractor to Project
Manager within thirty (30) calendar days after Notice of Award is received by
Contractor, unless otherwise mutually agreed in writing by Owner and Contractor.
7.3 If Contractor wishes to furnish or use a substitute item of material or equipment,
Contractor shall make application to the Project Manager for acceptance thereof,
certifying that the proposed substitute shall adequately perform the functions and
achieve the results called for by the general design, be similar and of equal substance
to that specified and be suited to the same use as that specified. The application shall
state that the evaluation and acceptance of the proposed substitute will not prejudice
Contractor's achievement of substantial completion on time, whether or not acceptance
of the substitute for use in the Work will require a change in any of the Contract
Documents (or in the provisions of any other direct contract with Owner for the Project)
to adapt the design to the proposed substitute and whether or not incorporation or use
by the substitute in connection with the Work is subject to payment of any license fee or
royalty. All variations of the proposed substitute from that specified will be identified in
the application and available maintenance, repair and replacement service shall be
indicated. The application also shall contain an itemized estimate of all costs that will
result directly or indirectly from acceptance of such substitute, including costs for
redesign and claims of other contractors affected by the resulting change, all of which
shall be considered by the Project Manager in evaluating the proposed substitute. The
Project Manager may require Contractor to furnish at Contractor's expense additional
data about the proposed substitute.
7.4 If a specific means, method, technique, sequence or procedure of construction is
indicated in or required by the Contract Documents, Contractor may furnish or utilize a
substitute means, method, sequence, technique or procedure of construction
acceptable to the Project Manager, if Contractor submits sufficient information to allow
the Project Manager to determine that the substitute proposed is equivalent to that
indicated or required by the Contract Documents. The procedures for submission to
and review by the Project Manager shall be the same as those provided herein for
substitute materials and equipment.
7.5 The Project Manager shall be allowed a reasonable time within which to evaluate
each proposed substitute and, if need be, to consult with the Design Professional. No
substitute will be ordered, installed or utilized without the Project Manager's prior written
acceptance which shall be evidenced by a Change Order, a Work Directive Change, a
Field Order or an approved Shop Drawing. The Owner may require Contractor to
furnish at Contractor's expense a special performance guarantee or other surety with
respect to any substitute. The Project Manager will record time required by the Project
Manager and the Project Manager's consultants in evaluating substitutions proposed by
Contractor and making changes in the Contract Documents occasioned thereby.
Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse
GC-CA-H-7
16D13
Owner for the charges of the Design Professional and the Design Professional's
consultants for evaluating each proposed substitute.
8. DAILY REPORTS, AS-BUlL TS AND MEETINGS.
8.1 Unless waived in writing by Owner, Contractor shall complete and submit to
Project Manager on a weekly basis a daily log of the Contractor's work for the preceding
week in a format approved by the Project Manager. The daily log shall document all
activities of Contractor at the Project site including, but not limited to, the following:
8.1.1 Weather conditions showing the high and low temperatures during
work hours, the amount of precipitation received on the Project site, and any other
weather conditions which adversely affect the Work;
8.1.2
8.1.3
personnel;
Soil conditions which adversely affect the Work;
The hours of operation by Contractor's and Sub-Contractor's
8.1.4 The number of Contractor's and Sub-Contractor's personnel present
and working at the Project site, by subcontract and trade;
8.1.5 All equipment present at the Project site, description of equipment use
and designation of time equipment was used (specifically indicating any down time);
8.1.6 Description of Work being performed at the Project site;
8.1.7 Any unusual or special occurrences at the Project site;
8.1.8 Materials received at the Project site;
8.1.9 A list of all visitors to the Project
8.1.10 Any problems that might impact either the cost or quality of the Work or
the time of performance.
The daily log shall not constitute nor take the place of any notice required to be given by
Contractor to Owner pursuant to the Contract Documents.
8.2 Contractor shall maintain in a safe place at the Project site one record copy of
the Contract Documents, including, but not limited to, all drawings, specifications,
addenda, amendments, Change Orders, Work Directive Changes and Field Orders, as
well as all written interpretations and clarifications issued by the Design Professional, in
good order and annotated to show all changes made during construction. The
annotated drawings shall be continuously updated by the Contractor throughout the
prosecution of the Work to accurately reflect all field changes that are made to adapt the
Work to field conditions, changes resulting from Change Orders, Work Directive
Changes and Field Orders, and all concealed and buried installations of piping, conduit
GC-CA-H-8
16D13
and utility services. All buried and concealed items, both inside and outside the Project
site, shall be accurately located on the annotated drawings as to depth and in
relationship to not less than two (2) permanent features (e.g. interior or exterior wall
faces). The annotated drawings shall be clean and all changes, corrections and
dimensions shall be given in a neat and legible manner in a contrasting color. The
"As-Built" record documents, together with all approved samples and a counterpart of all
approved shop drawings shall be available to the Project Manager or Design
Professional for reference. Upon completion of the Work and as a condition precedent
to Contractor's entitlement to final payment, these "As-Built" record documents, samples
and shop drawings shall be delivered to Project Manager by Contractor for Owner.
8.3 Contractor shall keep all records and supporting documentation which concern or
relate to the Work hereunder for a minimum of five (5) years from the date of
termination of this Agreement or the date the Project is completed or such longer period
as may be required by law, whichever is later. Owner, or any duly authorized agents or
representatives of Owner, shall have the right to audit, inspect and copy all such
records and documentation as often as they deem necessary during the period of this
Agreement and during the document retention period noted above; provided, however,
such activity shall be conducted only during normal business hours.
9. CONTRACT TIME AND TIME EXTENSIONS.
9.1 Contractor shall diligently pursue the completion of the Work and coordinate the
Work being done on the Project by its subcontractors and material-men, as well as
coordinating its Work with all work of others at the Project Site, so that its Work or the
work of others shall not be delayed or impaired by any act or omission by Contractor.
Contractor shall be solely responsible for all construction means, methods, techniques,
sequences, and procedures, as well as coordination of all portions of the Work under
the Contract Documents, and the coordination of Owner's suppliers and contractors as
set forth in Paragraph 12.2 herein.
9.2 Should Contractor be obstructed or delayed in the prosecution of or completion
of the Work as a result of unforeseeable causes beyond the control of Contractor, and
not due to its fault or neglect, including but not restricted to acts of Nature or of the
public enemy, acts of government, fires, floods, epidemics, quarantine regulation,
strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48)
hours after the commencement of such delay, stating the cause or causes thereof, or be
deemed to have waived any right which Contractor may have had to request a time
extension.
9.3 No interruption, interference, inefficiency, suspension or delay in the
commencement or progress of the Work from any cause whatever, including those for
which Owner may be responsible, in whole or in part, shall relieve Contractor of its duty
to perform or give rise to any right to damages or additional compensation from Owner.
Contractor expressly acknowledges and agrees that it shall receive no damages for
delay. Contractor's sole remedy, if any, against Owner will be the right to seek an
extension to the Contract Time; provided, however, the granting of any such time
GC-CA-H-9
16D13
extension shall not be a condition precedent to the aforementioned "No Damage For
Delay" provision. This paragraph shall expressly apply to claims for early completion,
as well as to claims based on late completion.
9.4 In no event shall any approval by Owner authorizing Contractor to continue
performing Work under this Agreement or any payment issued by Owner to Contractor
be deemed a waiver of any right or claim Owner may have against Contractor for delay
damages hereunder.
10. CHANGES IN THE WORK.
10.1 Owner shall have the right at any time during the progress of the Work to
increase or decrease the Work. Promptly after being notified of a change, Contractor
shall submit an itemized estimate of any cost or time increases or savings it foresees as
a result of the change. Except in an emergency endangering life or property, or as
expressly set forth herein, no addition or changes to the Work shall be made except
upon written order of Owner, and Owner shall not be liable to the Contractor for any
increased compensation without such written order. No officer, employee or agent of
Owner is authorized to direct any extra or changed work orally. Any alleged changes
must be approved by Owner in writing prior to starting such items. Owner will not be
responsible for the costs of any changes commenced without Owner's express prior
written approval. Failure to obtain such prior written approval for any changes will be
deemed: (i) a waiver of any claim by Contractor for such items and (ii) an admission by
Contractor that such items are in fact not a change but rather are part of the Work
required of Contractor hereunder.
10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be
issued and executed promptly after an agreement is reached between Contractor and
Owner concerning the requested changes. Contractor shall promptly perform changes
authorized by duly executed Change Orders. The Contract Amount and Contract Time
shall be adjusted in the Change Order in the manner as Owner and Contractor shall
mutually agree.
10.3 If Owner and Contractor are unable to agree on a Change Order for the
requested change, Contractor shall, nevertheless, promptly perform the change as
directed by Owner in a written Work Directive Change. In that event, the Contract
Amount and Contract Time shall be adjusted as directed by Owner. If Contractor
disagrees with the Owner's adjustment determination, Contractor must make a claim
pursuant to Section 11 of these General Conditions or else be deemed to have waived
any claim on this matter it might otherwise have had.
10.4 In the event a requested change results in an increase to the Contract Amount,
the amount of the increase shall be limited to the Contractor's reasonable direct labor
and material costs and reasonable actual equipment costs as a result of the change
(including allowance for labor burden costs) plus a maximum ten percent (10%) markup
for all overhead and profit. In the event such change Work is performed by a
Subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all
GC-CA-H-10
16D13
Subcontractors' and sub-subcontractors' direct labor and material costs and actual
equipment costs shall be permitted, with a maximum five percent (5%) markup thereon
by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen
percent (15%). All compensation due Contractor and any Subcontractor or
sub-subcontractor for field and home office overhead is included in the markups noted
above. Contractor's and Sub-Contractor's bond costs associated with any change order
shall be included in the overhead and profit expenses and shall not be paid as a
separate line item.
10.5 Owner shall have the right to conduct an audit of Contractor's books and records
to verify the accuracy of the Contractor's claim with respect to Contractor's costs
associated with any Change Order or Work Directive Change.
10.6 The Project Manager shall have authority to order minor changes in the Work not
involving an adjustment to the Contract Amount or an extension to the Contract Time
and not inconsistent with the intent of the Contract Documents. Such changes may be
effected by Field Order or by other written order. Such changes shall be binding on the
Contractor.
10.7 Any modifications to this Contract shall be in compliance with the County
Purchasing Policy and Administrative Procedures in effect at the time such
modifications are authorized.
11. CLAIMS AND DISPUTES.
11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or
interpretation of the terms of the Contract Documents, payment of money, extension of
time or other relief with respect to the terms of the Contract Documents. The term
"Claim" also includes other disputes and matters in question between Owner and
Contractor arising out of or relating to the Contract Documents. The responsibility to
substantiate a Claim shall rest with the party making the Claim.
11.2 Claims by the Contractor shall be made in writing to the Project Manager within
forty-eight (48) hours from when the Contractor knew or should have known of the event
giving rise to such Claim or else the Contractor shall be deemed to have waived the
Claim. Written supporting data shall be submitted to the Project Manager within fifteen
(15) calendar days after the occurrence of the event, unless the Owner grants additional
time in writing, or else the Contractor shall be deemed to have waived the Claim. All
Claims shall be priced in accordance with the provisions of Subsection 10.4.
11.3 The Contractor shall proceed diligently with its performance as directed by the
Owner, regardless of any pending Claim, action, suit or administrative proceeding,
unless otherwise agreed to by the Owner in writing. Owner shall continue to make
payments in accordance with the Contract Documents during the pendency of any
Claim.
GC-CA-H-11
16D13
12. OTHER WORK.
12.1 Owner may perform other work related to the Project at the site by Owner's own
forces, have other work performed by utility owners or let other direct contracts. If the
fact that such other work is to be performed is not noted in the Contract Documents,
written notice thereof will be given to Contractor prior to starting any such other work. If
Contractor believes that such performance will involve additional expense to Contractor
or require additional time, Contractor shall send written notice of that fact to Owner and
Design Professional within forty-eight (48) hours of being notified of the other work. If
the Contractor fails to send the above required forty-eight (48) hour notice, the
Contractor will be deemed to have waived any rights it othelWise may have had to seek
an extension to the Contract Time or adjustment to the Contract Amount.
12.2 Contractor shall afford each utility owner and other contractor who is a party to
such a direct contract (or Owner, if Owner is performing the additional work with
Owner's employees) proper and safe access to the site and a reasonable opportunity
for the introduction and storage of materials and equipment and the execution of such
work and shall properly connect and coordinate its Work with theirs. Contractor shall do
all cutting, fitting and patching of the Work that may be required to make its several
parts come together properly and integrate with such other work. Contractor shall not
endanger any work of others by cutting, excavating or othelWise altering their work and
will only cut or alter their work with the written consent of the Project Manager and the
others whose work will be affected. The duties and responsibilities of Contractor under
this paragraph are for the benefit of such utility owners and other Contractors to the
extent that there are comparable provisions for the benefit of Contractor in said direct
contracts between Owner and such utility owners and other contractors.
12.3 If any part of Contractor's Work depends for proper execution or results upon the
work of any other contractor or utility owner (or Owner), Contractor shall inspect and
promptly report to Project Manager in writing any delays, defects or deficiencies in such
work that render it unavailable or unsuitable for such proper execution and results.
Contractor's failure to report will constitute an acceptance of the other work as fit and
proper for integration with Contractor's Work.
13. INDEMNIFICATION AND INSURANCE.
13.1 To the maximum extent permitted by Florida law, Contractor shall indemnify and
hold harmless Owner and its officers and employees from any and all liabilities, claims,
damages, penalties, demands, judgments, actions, proceedings, losses or costs,
including, but not limited to, reasonable attorneys' fees and paralegals' fees, whether
resulting from any claimed breach of this Agreement by Contractor or from personal
injury, property damage, direct or consequential damages, or economic loss, to the
extent caused by the negligence, recklessness, or intentional wrongful misconduct of
Contractor or anyone employed or utilized by the Contractor in the performance of this
Agreement.
GC-CA-H-12
160 1"3
13.2 The duty to defend under this Article 13 is independent and separate from the
duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the
Contractor, Owner and any indemnified party. The duty to defend arises immediately
upon presentation of a claim by any party and written notice of such claim being
provided to Contractor. Contractor's obligation to indemnify and defend under this
Article 13 will survive the expiration or earlier termination of this Agreement until it is
determined by final judgment that an action against the Owner or an indemnified party
for the matter indemnified hereunder is fully and finally barred by the applicable statute
of limitations.
13.3 Contractor shall obtain and carry, at all times during its performance under the
Contract Documents, insurance of the types and in the amounts set forth in Exhibit B to
the Agreement. Further, the Contractor shall at all times comply with all of the terms,
conditions, requirements and obligations set forth under Exhibit B.
14. COMPLIANCE WITH LAWS.
14.1 Contractor agrees to comply, at its own expense, with all federal, state and local
laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the
Project, including but not limited to those dealing with taxation, worker's compensation,
equal employment and safety (including, but not limited to, the Trench Safety Act,
Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are
at variance therewith, it shall promptly notify Project Manager in writing. To the extent
any law, rule, regulation, code, statute, or ordinance requires the inclusion of certain
terms in this Agreement in order for this Agreement to be enforceable, such terms shall
be deemed included in this Agreement. Notwithstanding anything in the Contract
Documents to the contrary, it is understood and agreed that in the event of a change in
any applicable laws, ordinances, rules or regulations subsequent to the date this
Agreement was executed that increases the Contractor's time or cost of performance of
the Work, Contractor is entitled to a Change Order for such increases, except to the
extent Contractor knew or should have known of such changes prior to the date of this
Ag reement.
14.2 By executing and entering into this agreement, the Contractor is formally
acknowledging without exception or stipulation that it is fully responsible for complying
with the provisions of the Immigration Reform and Control Act of 1986 as located at 8
U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended.
Failure by the Contractor to comply with the laws referenced herein shall constitute a
breach of this agreement and the County shall have the discretion to unilaterally
terminate this agreement immediately.
15. CLEANUP AND PROTECTIONS.
15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish
and waste materials arising out of the Work.
GC-CA-H-13
16D 1.3
At the completion of the Work, Contractor shall remove all debris, rubbish and waste
materials from and about the Project site, as well as all tools, appliances, construction
equipment and machinery and surplus materials, and shall leave the Project site clean
and ready for occupancy by Owner.
15.2 Any existing surface or subsurface improvements, including, but not limited to,
pavements, curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery,
not indicated in the Contract Documents to be removed or altered, shall be protected by
Contractor from damage during the prosecution of the Work. Subject to the Section 2.3
above, any such improvements so damaged shall be restored by Contractor to the
condition equal to that existing at the time of Contractor's commencement of the Work.
16. ASSIGNMENT.
16.1 Contractor shall not assign this Agreement or any part thereof, without the prior
consent in writing of Owner. Any attempt to assign or otherwise transfer this Agreement
or any part herein, without the Owner's consent, shall be void. If Contractor does, with
approval, assign this Agreement or any part thereof, it shall require that its assignee be
bound to it and to assume toward Contractor all of the obligations and responsibilities
that Contractor has assumed toward Owner.
17. PERMITS, LICENSES AND TAXES.
17.1 Pursuant to Section 218.80, F.S., Owner will pay for all Collier County permits
and fees, including license fees, permit fees, impact fees or inspection fees applicable
to the Work through an internal budget transfer(s). Contractor is not responsible for
paying for permits issued by Collier County, but Contractor is responsible for acquiring
all permits. Owner may require the Contractor to deliver internal budget transfer
documents to applicable Collier County agencies when the Contractor is acquiring
permits.
17.2 All permits, fees and licenses necessary for the prosecution of the Work which
are not issued by Collier County shall be acquired and paid for by the Contractor.
17.3 Contractor shall pay all sales, consumer, use and other similar taxes associated
with the Work or portions thereof, which are applicable during the performance of the
Work.
18. TERMINATION FOR DEFAULT.
18.1 Contractor shall be considered in material default of the Agreement and such
default shall be considered cause for Owner to terminate the Agreement, in whole or in
part, as further set forth in this Section, if Contractor: (1) fails to begin the Work under
the Contract Documents within the time specified herein; or (2) fails to properly and
timely perform the Work as directed by the Project Manager or as provided for in the
approved Progress Schedule; or (3) performs the Work unsuitably or neglects or
refuses to remove materials or to correct or replace such Work as may be rejected as
unacceptable or unsuitable; or (4) discontinues the prosecution of the Work; or (5) fails
GC-CA-H-14
16D13
to resume Work which has been suspended within a reasonable time after being
notified to do so; or (6) becomes insolvent or is declared bankrupt, or commits any act
of bankruptcy; or (7) allows any final judgment to stand against it unsatisfied for more
than ten (10) days; or (8) makes an assignment for the benefit of creditors; or (9) fails to
obey any applicable codes, laws, ordinances, rules or regulations with respect to the
Work; or (10) materially breaches any other provision of the Contract Documents.
18.2 Owner shall notify Contractor in writing of Contractor's default(s). If Owner
determines that Contractor has not remedied and cured the default(s) within seven (7)
calendar days following receipt by Contractor of said written notice or such longer
period of time as may be consented to by Owner in writing and in its sole discretion,
then Owner, at its option, without releasing or waiving its rights and remedies against
the Contractor's sureties and without prejudice to any other right or remedy it may be
entitled to hereunder or by law, may terminate Contractor's right to proceed under the
Agreement, in whole or in part, and take possession of all or any portion of the Work
and any materials, tools, equipment, and appliances of Contractor, take assignments of
any of Contractor's subcontracts and purchase orders, and complete all or any portion
of Contractor's Work by whatever means, method or agency which Owner, in its sole
discretion, may choose.
18.3 If Owner deems any of the foregoing remedies necessary, Contractor agrees that
it shall not be entitled to receive any further payments hereunder until after the Project is
completed. All moneys expended and all of the costs, losses, damages and extra
expenses, including all management, administrative and other overhead and other
direct and indirect expenses (including Design Professional and attorneys' fees) or
damages incurred by Owner incident to such completion, shall be deducted from the
Contract Amount, and if such expenditures exceed the unpaid balance of the Contract
Amount, Contractor agrees to pay promptly to Owner on demand the full amount of
such excess, including costs of collection, attorneys' fees (including appeals) and
interest thereon at the maximum legal rate of interest until paid. If the unpaid balance of
the Contract Amount exceeds all such costs, expenditures and damages incurred by the
Owner to complete the Work, such excess shall be paid to the Contractor. The amount
to be paid to the Contractor or Owner, as the case may be, shall be approved by the
Project Manager, upon application, and this obligation for payment shall survive
termination of the Agreement.
18.4 The liability of Contractor hereunder shall extend to and include the full amount of
any and all sums paid, expenses and losses incurred, damages sustained, and
obligations assumed by Owner in good faith under the belief that such payments or
assumptions were necessary or required, in completing the Work and providing labor,
materials, equipment, supplies, and other items therefore or re-letting the Work, and in
settlement, discharge or compromise of any claims, demands, suits, and judgments
pertaining to or arising out of the Work hereunder.
18.5 If, after notice of termination of Contractor's right to proceed pursuant to this
Section, it is determined for any reason that Contractor was not in default, or that its
default was excusable, or that Owner is not entitled to the remedies against Contractor
GC-CA-H-15
16lJ13
provided herein, then the termination will be deemed a termination for convenience and
Contractor's remedies against Owner shall be the same as and limited to those afforded
Contractor under Section 19 below.
18.6 In the event (i) Owner fails to make any undisputed payment to Contractor within
thirty (30) days after such payment is due or Owner otherwise persistently fails to fulfill
some material obligation owed by Owner to Contractor under this Agreement, and
(ii) Owner has failed to cure such default within fourteen (14) days of receiving written
notice of same from Contractor, then Contractor may stop its performance under this
Agreement until such default is cured, after giving Owner a second fourteen (14) days
written notice of Contractor's intention to stop performance under the Agreement. If the
Work is so stopped for a period of one hundred and twenty (120) consecutive days
through no act or fault of the Contractor or its Subcontractors or their agents or
employees or any other persons performing portions of the Work under contract with the
Contractor or any Subcontractor, the Contractor may terminate this Agreement by giving
written notice to Owner of Contractor's intent to terminate this Agreement. If Owner
does not cure its default within fourteen (14) days after receipt of Contractor's written
notice, Contractor may, upon fourteen (14) additional days' written notice to the Owner,
terminate the Agreement and recover from the Owner payment for Work performed
through the termination date, but in no event shall Contractor be entitled to payment for
Work not performed or any other damages from Owner.
19. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION.
19.1 Owner shall have the right to terminate this Agreement without cause upon
seven (7) calendar days written notice to Contractor. In the event of such termination
for convenience, Contractor's recovery against Owner shall be limited to that portion of
the Contract Amount earned through the date of termination, together with any
retainage withheld and reasonable termination expenses incurred, but Contractor shall
not be entitled to any other or further recovery against Owner, including, but not limited
to, damages or any anticipated profit on portions of the Work not performed.
19.2 Owner shall have the right to suspend all or any portions of the Work upon giving
Contractor not less than two (2) calendar days' prior written notice of such suspension.
If all or any portion of the Work is so suspended, Contractor's sole and exclusive
remedy shall be to seek an extension of time to its schedule in accordance with the
procedures set forth in the Contract Documents. In no event shall the Contractor be
entitled to any additional compensation or damages. Provided, however, if the ordered
suspension exceeds six (6) months, the Contractor shall have the right to terminate the
Agreement with respect to that portion of the Work which is subject to the ordered
suspension.
20. COMPLETION.
20.1 When the entire Work (or any portion thereof designated in writing by Owner) is
ready for its intended use, Contractor shall notify Project Manager in writing that the
entire Work (or such designated portion) is substantially complete.
GC-CA-H-16
16D13
Within a reasonable time thereafter, Owner, Contractor and Design Professional shall
make an inspection of the Work (or designated portion thereof) to determine the status
of completion. If Owner, after conferring with the Design Professional, does not
consider the Work (or designated portion) substantially complete, Project Manager shall
notify Contractor in writing giving the reasons therefore. If Owner, after conferring with
the Design Professional, considers the Work (or designated portion) substantially
complete, Project Manager shall prepare and deliver to Contractor a Certificate of
Substantial Completion which shall fix the date of Substantial Completion for the entire
Work (or designated portion thereof) and include a tentative punch-list of items to be
completed or corrected by Contractor before final payment. Owner shall have the right
to exclude Contractor from the Work and Project site (or designated portion thereof)
after the date of Substantial Completion, but Owner shall allow Contractor reasonable
access to complete or correct items on the tentative punch-list.
20.2 Upon receipt of written certification by Contractor that the Work is completed in
accordance with the Contract Documents and is ready for final inspection and
acceptance, Project Manager and Design Professional will make such inspection and, if
they find the Work acceptable and fully performed under the Contract Documents shall
promptly issue a final Certificate for Payment, recommending that, on the basis of their
observations and inspections, and the Contractor's certification that the Work has been
completed in accordance with the terms and conditions of the Contract Documents, that
the entire balance found to be due Contractor is due and payable. Neither the final
payment nor the retainage shall become due and payable until Contractor submits:
(1) Receipt of Contractor's Final Application for Payment.
(2) The Release and Affidavit in the form attached as Exhibit C.
(3) Consent of surety to final payment.
(4) Receipt of the final payment check list.
(5) If required by Owner, other data establishing payment or satisfaction of all
obligations, such as receipts, releases and waivers of liens, arising out of
the Contract Documents, to the extent and in such form as may be
designated by Owner.
Owner reserves the right to inspect the Work and make an independent determination
as to the Work's acceptability, even though the Design Professional may have issued its
recommendations. Unless and until the Owner is completely satisfied, neither the final
payment nor the retainage shall become due and payable.
21. WARRANTY.
21.1 Contractor shall obtain and assign to Owner all express warranties given to
Contractor or any subcontractors by any subcontractor or materialmen supplying
materials, equipment or fixtures to be incorporated into the Project. Contractor warrants
to Owner that any materials and equipment furnished under the Contract Documents
shall be new unless otherwise specified, and that all Work shall be of good quality, free
from all defects and in conformance with the Contract Documents. Contractor further
warrants to Owner that all materials and equipment furnished under the Contract
GC-CA-H-17
16013
Documents shall be applied, installed, connected, erected, used, cleaned and
conditioned in accordance with the instructions of the applicable manufacturers,
fabricators, suppliers or processors except as otherwise provided for in the Contract
Documents. If, within one (1) year after Substantial Completion, any Work is found to
be defective or not in conformance with the Contract Documents, Contractor shall
correct it promptly after receipt of written notice from Owner. Contractor shall also be
responsible for and pay for replacement or repair of adjacent materials or Work which
may be damaged as a result of such replacement or repair. Further, in the event of an
emergency, Owner may commence to correct any defective Work, without prior notice
to Contractor, at Contractor's expense. These warranties are in addition to those
implied warranties to which Owner is entitled as a matter of law.
21.2 No later than 30 days prior to expiration of the warranty, the Project Manager, or
another representative of the Owner, shall conduct an inspection of the warranted work
to verify compliance with the requirements of the Agreement. The Contractor's
Representative shall be present at the time of inspection and shall take remedial actions
to correct any deficiencies noted in the inspection. Failure of the Contractor to correct
the cited deficiencies shall be grounds for the Owner to disqualify the Contractor from
future bid opportunities with the Owner, in addition to any other rights and remedies
available to Owner.
22. TESTS AND INSPECTIONS.
22.1 Owner, Design Professional, their respective representatives, agents and
employees, and governmental agencies with jurisdiction over the Project shall have
access at all times to the Work, whether the Work is being performed on or off of the
Project site, for their observation, inspection and testing. Contractor shall provide
proper, safe conditions for such access. Contractor shall provide Project Manager with
timely notice of readiness of the Work for all required inspections, tests or approvals.
22.2 If the Contract Documents or any codes, laws, ordinances, rules or regulations of
any public authority having jurisdiction over the Project requires any portion of the Work
to be specifically inspected, tested or approved, Contractor shall assume full
responsibility therefore, pay all costs in connection therewith and furnish Project
Manager the required certificates of inspection, testing or approval. All inspections,
tests or approvals shall be performed in a manner and by organizations acceptable to
the Project Manager.
22.3 Contractor is responsible, without reimbursement from Owner, for re-inspection
fees and costs; to the extent such re-inspections are due to the fault or neglect of
Contractor.
22.4 If any Work that is to be inspected, tested or approved is covered without written
concurrence from the Project Manager, such work must, if requested by Project
Manager, be uncovered for observation. Such uncovering shall be at Contractor's
expense unless Contractor has given Project Manager timely notice of Contractor's
intention to cover the same and Project Manager has not acted with reasonable
GC-CA-H-18
16D13
promptness to respond to such notice. If any Work is covered contrary to written
directions from Project Manager, such Work must, if requested by Project Manager, be
uncovered for Project Manager's observation and be replaced at Contractor's sole
expense.
22.5 The Owner shall charge to Contractor and may deduct from any payments due
Contractor all engineering and inspection expenses incurred by Owner in connection
with any overtime work. Such overtime work consisting of any work during the
construction period beyond the regular eight (8) hour day and for any work performed
on Saturday, Sunday or holidays.
22.6 Neither observations nor other actions by the Project Manager or Design
Professional nor inspections, tests or approvals by others shall relieve Contractor from
Contractor's obligations to perform the Work in accordance with the Contract
Documents.
23. DEFECTIVE WORK.
23.1 Work not conforming to the requirements of the Contract Documents or any
warranties made or assigned by Contractor to Owner shall be deemed defective Work.
If required by Project Manager, Contractor shall as directed, either correct all defective
Work, whether or not fabricated, installed or completed, or if the defective Work has
been rejected by Project Manager, remove it from the site and replace it with non-
defective Work. Contractor shall bear all direct, indirect and consequential costs of
such correction or removal (including, but not limited to fees and charges of engineers,
architects, attorneys and other professionals) made necessary thereby, and shall hold
Owner harmless for same.
23.2 If the Project Manager considers it necessary or advisable that covered Work be
observed by Design Professional or inspected or tested by others and such Work is not
otherwise required to be inspected or tested, Contractor, at Project Manager's request,
shall uncover, expose or otherwise make available for observation, inspection or tests
as Project Manager may require, that portion of the Work in question, furnishing all
necessary labor, material and equipment. If it is found that such Work is defective,
Contractor shall bear all direct, indirect and consequential costs of such uncovering,
exposure, observation, inspection and testing and of satisfactory reconstruction
(including, but not limited to, fees and charges of engineers, architects, attorneys and
other professionals), and Owner shall be entitled to an appropriate decrease in the
Contract Amount. If, however, such Work is not found to be defective, Contractor shall
be allowed an increase in the Contract Amount and/or an extension to the Contract
Time, directly attributable to such uncovering, exposure, observation, inspection, testing
and reconstruction.
23.3 If any portion of the Work is defective, or if Contractor fails to supply sufficient
skilled workers, suitable materials or equipment or fails to finish or perform the Work in
such a way that the completed Work will conform to the Contract Documents, Project
Manager may order Contractor to stop the Work, or any portion thereof, until the cause
GC-CA-H-19
16Dl,:~
for such order has been eliminated. The right of Project Manager to stop the Work shall
be exercised, if at all, solely for Owner's benefit and nothing herein shall be construed
as obligating the Project Manager to exercise this right for the benefit of Design
Engineer, Contractor, or any other person.
23.4 Should the Owner determine, at its sole opinion, it is in the Owner's best interest
to accept defective Work, the Owner may do so. Contractor shall bear all direct, indirect
and consequential costs attributable to the Owner's evaluation of and determination to
accept defective Work. If such determination is rendered prior to final payment, a
Change Order shall be executed evidencing such acceptance of such defective Work,
incorporating the necessary revisions in the Contract Documents and reflecting an
appropriate decrease in the Contract Amount. If the Owner accepts such defective
Work after final payment, Contractor shall promptly pay Owner an appropriate amount
to adequately compensate Owner for its acceptance of the defective Work.
23.5 If Contractor fails, within a reasonable time after the written notice from Project
Manager, to correct defective Work or to remove and replace rejected defective Work
as required by Project Manager or Owner, or if Contractor fails to perform the Work in
accordance with the Contract Documents, or if Contractor fails to comply with any of the
provisions of the Contract Documents, Owner may, after seven (7) days written notice
to Contractor, correct and remedy any such deficiency. Provided, however, Owner shall
not be required to give notice to Contractor in the event of an emergency. To the extent
necessary to complete corrective and remedial action, Owner may exclude Contractor
from any or all of the Project site, take possession of all or any part of the Work, and
suspend Contractor's services related thereto, take possession of Contractor's tools,
appliances, construction equipment and machinery at the Project site and incorporate in
the Work all materials and equipment stored at the Project site or for which Owner has
paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Design
Professional and their respective representatives, agents, and employees such access
to the Project site as may be necessary to enable Owner to exercise the rights and
remedies under this paragraph. All direct, indirect and consequential costs of Owner in
exercising such rights and remedies shall be charged against Contractor, and a Change
Order shall be issued, incorporating the necessary revisions to the Contract Documents,
including an appropriate decrease to the Contract Amount. Such direct, indirect and
consequential costs shall include, but not be limited to, fees and charges of engineers,
architects, attorneys and other professionals, all court costs and all costs of repair and
replacement of work of others destroyed or damaged by correction, removal or
replacement of Contractor's defective Work. Contractor shall not be allowed an
extension of the Contract Time because of any delay in performance of the Work
attributable to the exercise by Owner of Owner's rights and remedies hereunder.
24. SUPERVISION AND SUPERINTENDENTS.
24.1 Contractor shall plan, organize, supervise, schedule, monitor, direct and control
the Work competently and efficiently, devoting such attention thereto and applying such
skills and expertise as may be necessary to perform the Work in accordance with the
GC-CA-H-20
16D13
Contract Documents. Contractor shall be responsible to see that the finished Work
complies accurately with the Contract Documents. Contractor shall keep on the Work at
all times during its progress a competent resident superintendent, who shall be subject
to Owner's approval and not be replaced without prior written notice to Project Manager
except under extraordinary circumstances. The superintendent shall be employed by
the Contractor and be the Contractor's representative at the Project site and shall have
authority to act on behalf of Contractor. All communications given to the superintendent
shall be as binding as if given to the Contractor. Owner shall have the right to direct
Contractor to remove and replace its Project superintendent, with or without cause.
Attached to the Agreement as Exhibit N is a list identifying Contractor's Project
Superintendent and all of Contractor's key personnel who are assigned to the Project;
such identified personnel shall not be removed without Owner's prior written approval,
and if so removed must be immediately replaced with a person acceptable to Owner.
24.2 Contractor shall have a competent superintendent on the project at all times
whenever contractor's work crews, or work crews of other parties authorized by the
Project Manager are engaged in any activity whatsoever associated with the Project.
Should the Contractor fail to comply with the above condition, the Project Manager
shall, at his discretion, deduct from the Contractor's monthly pay estimate, sufficient
moneys to account for the Owner's loss of adequate project supervision, not as a
penalty, but as liquidated damages, separate from the liquidated damages described in
Section 5.B, for services not rendered.
25. PROTECTION OF WORK.
25.1 Contractor shall fully protect the Work from loss or damage and shall bear the
cost of any such loss or damage until final payment has been made. If Contractor or
anyone for whom Contractor is legally liable for is responsible for any loss or damage
to the Work, or other work or materials of Owner or Owner's separate contractors,
Contractor shall be charged with the same, and any moneys necessary to replace such
loss or damage shall be deducted from any amounts due Contractor.
25.2 Contractor shall not load nor permit any part of any structure to be loaded in any
manner that will endanger the structure, nor shall Contractor subject any part of the
Work or adjacent property to stresses or pressures that will endanger it.
25.3 Contractor shall not disturb any benchmark established by the Owner or Design
Professional with respect to the Project. If Contractor, or its subcontractors, agents or
anyone for whom Contractor is legally liable, disturbs the Owner or Design
Professional's benchmarks, Contractor shall immediately notify Project Manager and
Design Professional. The Owner or Design Professional shall re-establish the
benchmarks and Contractor shall be liable for all costs incurred by Owner associated
therewith.
GC-CA-H-21
16D 1:,
26. EMERGENCIES.
26.1 In the event of an emergency affecting the safety or protection of persons or the
Work or property at the Project site or adjacent thereto, Contractor, without special
instruction or authorization from Owner or Design Professional is obligated to act to
prevent threatened damage, injury or loss. Contractor shall give Project Manager
written notice within forty-eight (48) hours after Contractor knew or should have known
of the occurrence of the emergency, if Contractor believes that any significant changes
in the Work or variations from the Contract Documents have been caused thereby. If
the Project Manager determines that a change in the Contract Documents is required
because of the action taken in response to an emergency, a Change Order shall be
issued to document the consequences of the changes or variations. If Contractor fails
to provide the forty-eight (48) hour written notice noted above, the Contractor shall be
deemed to have waived any right it otherwise may have had to seek an adjustment to
the Contract Amount or an extension to the Contract Time.
27. USE OF PREMISES.
27.1 Contractor shall maintain all construction equipment, the storage of materials and
equipment and the operations of workers to the Project site and land and areas
identified in and permitted by the Contract Documents and other lands and areas
permitted by law, rights of way, permits and easements, and shall not unreasonably
encumber the Project site with construction equipment or other material or equipment.
Contractor shall assume full responsibility for any damage to any such land or area, or
to the owner or occupant thereof, or any land or areas contiguous thereto, resulting from
the performance of the Work.
28. SAFETY.
28.1 Contractor shall be responsible for initiating, maintaining and supervising all
safety precautions and programs in connection with the Work. Contractor shall take all
necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
28.1.1 All employees on or about the project site and other persons and/or
organizations who may be affected thereby;
28.1.2 All the Work and materials and equipment to be incorporated therein,
whether in storage on or off the Project site; and
28.1.3 Other property on Project site or adjacent thereto, including trees,
shrubs, walks, pavements, roadways, structures, utilities and any underground
structures or improvements not designated for removal, relocation or replacement in the
Contract Documents.
28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and
regulations of any public body having jurisdiction for the safety of persons or property or
to protect them from damage, injury or loss.
GC-CA-H-22
16D13
Contractor shall erect and maintain all necessary safeguards for such safety and
protection. Contractor shall notify owners of adjacent property and of underground
structures and improvements and utility owners when prosecution of the Work may
affect them, and shall cooperate with them in the protection, removal, relocation or
replacement of their property. Contractor's duties and responsibilities for the safety and
protection of the Work shall continue until such time as the Work is completed and final
acceptance of same by Owner has occurred.
28.3. Contractor shall designate a responsible representative located on a full time
basis at the Project site whose duty shall be the prevention of accidents. This person
shall be Contractor's superintendent unless otherwise designated in writing by
Contractor to Owner.
28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner
property. All employees of Contractor, as well as those of all subcontractors and those
of any other person or entity for whom Contractor is legally liable (collectively referred to
herein as "Employees"), shall not possess or be under the influence of any such
substances while on any Owner property. Further, Employees shall not bring on to any
Owner property any gun, rifle or other firearm, or explosives of any kind.
28.5 Contractor acknowledges that the Work may be progressing on a Project site
which is located upon or adjacent to an existing Owner facility. In such event,
Contractor shall comply with the following:
28.5.1
All Owner facilities are smoke free. Smoking is strictly prohibited;
28.5.2 All Employees shall be provided an identification badge by
Contractor. Such identification badge must be prominently displayed on the outside of
the Employees' clothing at all times. All Employees working at the Project site must log
in and out with the Contractor each day;
28.5.3 Contractor shall strictly limit its operations to the designated work
areas and shall not permit any Employees to enter any other portions of Owner's
property without Owner's expressed prior written consent;
28.5.4 All Employees are prohibited from distributing any papers or other
materials upon Owner's property, and are strictly prohibited from using any of Owner's
telephones or other office equipment;
28.5.5 All Employees shall at all times comply with the OSHA regulations
with respect to dress and conduct at the Project site. Further, all Employees shall
comply with the dress, conduct and facility regulations issued by Owner's officials
onsite, as said regulations may be changed from time to time;
28.5.6 All Employees shall enter and leave Owner's facilities only through
the ingress and egress points identified in the site utilization plan approved by Owner or
as otherwise designated, from time to time, by Owner in writing;
GC-CA-H-23
16D13
28.5.7 When requested, Contractor shall cooperate with any ongoing
Owner investigation involving personal injury, economic loss or damage to Owner's
facilities or personal property therein;
28.5.8 The Employees may not solicit, distribute or sell products while on
Owner's property. Friends, family members or other visitors of the Employees are not
permitted on Owner's property; and
28.5.9 At all times, Contractor shall adhere to Owner's safety and security
regulations, and shall comply with all security requirements at Owner's facilities, as said
regulations and requirements may be modified or changed by Owner from time to time.
29. PROJECT MEETINGS.
Prior to the commencement of Work, the Contractor shall attend a pre-construction
conference with the Project Manager, Design Professional and others as appropriate to
discuss the Progress Schedule, procedures for handling shop drawings and other
submittals, and for processing Applications for Payment, and to establish a working
understanding among the parties as to the Work. During the prosecution of the Work,
the Contractor shall attend any and all meetings convened by the Project Manager with
respect to the Project, when directed to do so by Project Manager or Design
Professional. The Contractor shall have its subcontractors and suppliers attend all such
meetings (including the pre-construction conference) as may be directed by the Project
Manager.
30. VENDOR PERFORMANCE EVALUATION
Owner has implemented a Vendor Performance Evaluation System for all contracts
awarded in excess of $25,000. To this end, vendors will be evaluated on their
performance upon completion/termination of this Agreement.
31. MAINTENANCE OF TRAFFIC POLICY
For all projects that are conducted within a Collier County Right-of-Way, the Contractor
shall provide and erect Traffic Control Devices as prescribed in the current edition of the
Manual On Uniform Traffic Control Devices (MUTCD), where applicable on local
roadways and as prescribed in the Florida Department of Transportations Design
Standards (DS), where applicable on state roadways. These projects shall also comply
with Collier County's Maintenance of Traffic Policy, #5807, incorporated herein by
reference. Copies are available through Risk Management and/or Purchasing
Departments, and are available on-line at colliergov.netlpurchasing.
The Contractor will be responsible for obtaining copies of all required manuals, MUTCD,
FDOT Roadway & Traffic Design Standards Indexes, or other related documents, so to
become familiar with their requirements. Strict adherence to the requirements of the
Maintenance of Traffic ("MOT") policy will be enforced under this Contract.
GC-CA-H-24
16D13
All costs associated with the Maintenance of Traffic shall be included on the line item on
the bid page.
If MOT is required, MOT is to be provided within ten (10) days of receipt of Notice of
Award.
32. SALES TAX SAVINGS AND DIRECT PURCHASE
32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated
with the Work or portions thereof, which are applicable during the performance of the
Work. No markup shall be applied to sales tax. Additionally, as directed by Owner and
at no additional cost to Owner, Contractor shall comply with and fully implement the
sales tax savings program with respect to the Work, as set forth in section 32.2 below:
32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from
sales tax and may wish to generate sales tax savings for the Project, Owner reserves
the right to make direct purchases of various construction materials and equipment
included in the Work ("Direct Purchase"). Contractor shall prepare purchase orders to
vendors selected by Contractor, for execution by Owner, on forms provided by Owner.
Contractor shall allow two weeks for execution of all such purchase orders by Owner.
Contractor represents and warrants that it will use its best efforts to cooperate with
Owner in implementing this sales tax savings program in order to maximize cost
savings for the Project. Adjustments to the Contract Amount will be made by
appropriate Change Orders for the amounts of each Owner Direct Purchase, plus the
saved sales taxes. A Change Order shall be processed promptly after each Direct
Purchase, or group of similar or related Direct Purchases, unless otherwise mutually
agreed upon between Owner and Contractor. With respect to all Direct Purchases by
Owner, Contractor shall remain responsible for coordinating, ordering, inspecting,
accepting delivery, storing, handling, installing, warranting and quality control for all
Direct Purchases. Notwithstanding anything herein to the contrary, Contractor
expressly acknowledges and agrees that all Direct Purchases shall be included within
and covered by Contractor's warranty to Owner to the same extent as all other
warranties provided by Contractor pursuant to the terms of the Contract Documents. In
the event Owner makes a demand against Contractor with respect to any Direct
Purchase and Contractor wishes to make claim against the manufacturer or supplier of
such Direct Purchase, upon request from Contractor Owner shall assign to Contractor
any and all warranties and Contract rights Owner may have from any manufacturer or
supplier of any such Direct Purchase by Owner.
32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for
sale tax under Chapter 212, Florida Statutes, and for its responsibilities for Federal
excise taxes.
33. SUBCONTRACTS
33.1 Contractor shall review the design and shall determine how it desires to divide
the sequence of construction activities.
GC-CA-H-25
16D13
Contractor will determine the breakdown and composition of bid packages for award of
subcontracts, based on the current Project Milestone Schedule, and shall supply a copy
of that breakdown and composition to Owner and Design Professional for their review
and approval prior to submitting its first Application for Payment. Contractor shall take
into consideration such factors as natural and practical lines of severability, sequencing
effectiveness, access and availability constraints, total time for completion, construction
market conditions, availability of labor and materials, community relations and any other
factors pertinent to saving time and costs.
33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying
or providing any portion of the Work pursuant to a contract with Contractor. Contractor
shall be solely responsible for and have control over the Subcontractors. Contractor
shall negotiate all Change Orders, Work Directive Changes, Field Orders and Requests
for Proposal, with all affected Subcontractors and shall review the costs of those
proposals and advise Owner and Design Professional of their validity and
reasonableness, acting in Owner's best interest, prior to requesting approval of any
Change Order from Owner. All Subcontractors performing any portion of the Work on
this Project must be "qualified" as defined in Collier County Ordinance 87-25, meaning a
person or entity that has the capability in all respects to perform fully the Agreement
requirements with respect to its portion of the Work and has the integrity and reliability
to assure good faith performance.
33.3 In addition to those Subcontractors identified in Contractor's bid that were
approved by Owner, Contractor also shall identify any other Subcontractors, including
their addresses, licensing information and phone numbers, it intends to utilize for the
Project prior to entering into any subcontract or purchase order and prior to the
Subcontractor commencing any work on the Project. The list identifying each
Subcontractor cannot be modified, changed, or amended without prior written approval
from Owner. Any and all Subcontractor work to be self-performed by Contractor must
be approved in writing by Owner in its sole discretion prior to commencement of such
work. Contractor shall continuously update that Subcontractor list, so that it remains
current and accurate throughout the entire performance of the Work.
33.4 Contractor shall not enter into a subcontract or purchase order with any
Subcontractor, if Owner reasonably objects to that Subcontractor. Contractor shall not
be required to contract with anyone it reasonably objects to. Contractor shall keep on
file a copy of the license for every Subcontractor and sub-subcontractor performing any
portion of the Work, as well as maintain a log of all such licenses. All subcontracts and
purchase orders between Contractor and its Subcontractors shall be in writing and are
subject to Owner's approval. Further, unless expressly waived in writing by Owner, all
subcontracts and purchase orders shall (1) require each Subcontractor to be bound to
Contractor to the same extent Contractor is bound to Owner by the terms of the
Contract Documents, as those terms may apply to the portion of the Work to be
performed by the Subcontractor, (2) provide for the assignment of the subcontract or
purchase order from Contractor to Owner at the election of Owner upon termination of
Contractor, (3) provide that Owner will be an additional indemnified party of the
subcontract or purchase order, (4) provide that Owner will be an additional insured on
GC-CA-H-26
16D13
all liability insurance policies required to be provided by the Subcontractor except
workman's compensation and business automobile policies, (5) assign all warranties
directly to Owner, and (6) identify Owner as an intended third-party beneficiary of the
subcontract or purchase order. Contractor shall make available to each proposed
Subcontractor, prior to the execution of the subcontract, copies of the Contract
Documents to which the Subcontractor will be bound. Each Subcontractor shall
similarly make copies of such documents available to its sub-subcontractors.
33.5 Each Subcontractor performing work at the Project Site must agree to provide
field (on-site) supervision through a named superintendent for each trade (e.g., general
concrete forming and placement, masonry, mechanical, plumbing, electrical and
roofing) included in its subcontract or purchase order. In addition, the Subcontractor
shall assign and name a qualified employee for scheduling direction for its portion of the
Work. The supervisory employees of the Subcontractor (including field superintendent,
foreman and schedulers at all levels) must have been employed in a supervisory
(leadership) capacity of substantially equivalent level on a similar project for at least two
years within the last five years. The Subcontractor shall include a resume of experience
for each employee identified by it to supervise and schedule its work.
33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and
purchase orders shall provide:
33.6.1 That the Subcontractor's exclusive remedy for delays in the
performance of the subcontract or purchase order caused by events beyond its control,
including delays claimed to be caused by Owner or Design Professional or attributable
to Owner or Design Professional and including claims based on breach of contract or
negligence, shall be an extension of its contract time.
33.6.2 In the event of a change in the work, the Subcontractor's claim for
adjustments in the contract sum are limited exclusively to its actual costs for such
changes plus no more than 10% for overhead and profit.
33.6.3 The subcontract or purchase order, as applicable, shall require the
Subcontractor to expressly agree that the foregoing constitute its sole and exclusive
remedies for delays and changes in the Work and thus eliminate any other remedies for
claim for increase in the contract price, damages, losses or additional compensation.
Further, Contractor shall require all Subcontractors to similarly incorporate the terms of
this Section 33.6 into their sub-subcontracts and purchase orders.
33.6.4 Each subcontract and purchase order shall require that any claims by
Subcontractor for delay or additional cost must be submitted to Contractor within the
time and in the manner in which Contractor must submit such claims to Owner, and that
failure to comply with such conditions for giving notice and submitting claims shall result
in the waiver of such claims.
GC-CA-H-27
16D13
34. CONSTRUCTION SERVICES
34.1 Contractor shall maintain at the Project site, originals or copies of,
on a current basis, all Project files and records, including, but not limited to, the following
administrative records:
34.1.1
34.1.2
34.1.3
34. 1 .4
34.1.5
34.1.6
34.1.7
34.1.8
34.1.9
34.1.10
34.1.11
34.1.12
34. 1 . 1 3
34. 1 . 14
34. 1 . 15
34. 1 . 16
34. 1 . 17
34. 1 . 18
34. 1 . 19
34.1.20
34.1.21
34.1.22
34.1.23
34.1.24
34.1.25
34.1.26
34.1.27
34.1.28
34.1.29
34.1.30
34.1.31
34.1.32
Subcontracts and Purchase Orders
Subcontractor Licenses
Shop Drawing Submittal/Approval Logs
Equipment Purchase/Delivery Logs
Contract Drawings and Specifications with Addenda
Warranties and Guarantees
Cost Accounting Records
Labor Costs
Material Costs
Equipment Costs
Cost Proposal Request
Payment Request Records
Meeting Minutes
Cost-Estimates
Bulletin Quotations
Lab Test Reports
Insurance Certificates and Bonds
Contract Changes
Permits
Material Purchase Delivery Logs
Technical Standards
Design Handbooks
"As-Built" Marked Prints
Operating & Maintenance Instruction
Daily Progress Reports
Monthly Progress Reports
Correspondence Files
Transmittal Records
Inspection Reports
Punch Lists
PMIS Schedule and Updates
Suspense (Tickler) Files of Outstanding
Requirements
The Project files and records shall be available at all times to Owner and Design
Professional or their designees for reference, review or copying.
34.2 Contractor Presentations
At the discretion of the County, the Contractor may be required to provide a brief update
on the Project to the Collier County Board of County Commissioners, "Board", up to two
(2) times per contract term. Presentations shall be made in a properly advertised Public
GC-CA-H-28
16D13
Meeting on a schedule to be determined by the County Manager or his designee. Prior
to the scheduled presentation date, the Contractor shall meet with appropriate County
staff to discuss the presentation requirements and format. Presentations may include,
but not be limited to, the following information: Original contract amount, project
schedule, project completion date and any changes to the aforementioned since Notice
to Proceed was issued.
35. SECURITY
If required, Contractor shall be responsible for the costs of providing background checks
and drug testing for all employees that shall provide services to the County under this
Agreement. This may include, but not be limited to, checking federal, state and local
law enforcement records, including a state and FBI fingerprint check, credit reports,
education, residence and employment verifications and other related records.
Contractor shall be required to maintain records on each employee and make them
available to the County for at least four (4) years.
36. VENUE
Any suit or action brought by either party to this Agreement against the other party
relating to or arising out of this Agreement must be brought in the appropriate federal or
state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction
on all such matters.
37. VALUE ENGINEERING
All projects with an estimated cost of $10 million or more shall be reviewed for
consideration of a Value Engineering (VE) study conducted during project development.
A "project" shall be defined as the collective contracts, which may include but not be
limited to: design, construction, and construction, engineering and inspection (CEI)
services. Additionally, any project with an estimated construction value of $2 million or
more may be reviewed for VE at the discretion of the County.
38. ABOVEGROUNrnUNDERGROUNDTANKS
An underground 62-761, Florida Administrative Code (F.A.C.) or aboveground 62-762,
F.A.C. regulated tank requires notification to the 'County' prior to installation or closure
of the tank. The Pollution Control Department (239-252-2502), via contract GC-690
with the Florida Department of Environmental Protection (FDEP), is the County (local
program) for the purposes of these rules.
Regulated tanks require notification to the 'county' local program thirty (30) days prior to
installation and again forty-eight (48) hours prior to commencement of the installation.
Closure activities require a ten (10) day notification and then a forty-eight (48) hour
notification prior to commencement. The notification is to allow for scheduling of the
inspections pertaining to the installation/closure activities.
GC-CA-H-29
16D13
A series of inspections will be scheduled based upon system design after discussing the
project with the contractor/project manager. Specifics on applicability, exemptions, and
requirements for regulated pollutant storage tank systems can be found in 62-761,
F.A.C. and 62-762, F.A.C. or you may contact the Pollution Control Department with
your questions. Please note that equipment must be listed on the FDEP approved
equipment list and will be verified at inspection along with installation and testing
procedures. The approved equipment list is constantly updated and can be found at the
FDEP Storage Tank Regulation website along with rules, forms and other applicable
information.
39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR,
EMPLOYEES
The Contractor shall employ people to work on Owner's projects who are neat, clean,
well-groomed and courteous. Subject to the Americans with Disabilities Act, Contractor
shall supply competent employees who are physically capable of performing their
employment duties. The Owner may require the Contractor to remove an employee it
deems careless, incompetent, insubordinate or otherwise objectionable and whose
continued employment on Owner's projects is not in the best interest of the County.
GC-CA-H-30
16D13
EXHIBIT I
SUPPLEMENTAL TERMS AND CONDITIONS
PARK CONSTRUCTION REQUIRED GENERAL CONDITIONS
. If applicable, a Lease Agreement with the Board of County Commissioners.
When approved, need a preliminary site plan for BCC.
. Copy of all plans must be reviewed and approved by Parks Department
. All permits that are applicable must be obtained and a copy given to Department
prior to start of work.
. Contractor must call "No Cuts" and verify all utilities prior to digging.
. All utilities (water, sewer, electrical, telephone, sprinklers, etc.) shall be restored
prior to job completion. All lines that were cut shall be repaired and finish.
. All previous final grades and sod shall be restored to pre-construction condition.
. No disruption of park activities or closure of park facilities shall be accepted.
. All ditches shall be closed prior to end of each working day.
. Any storage of construction equipment or materials on site must be pre-approved
by Department.
. When applicable, a complete copy of record drawings must be submitted to
Parks and Recreation Department within one month after completion of project.
. Job site shall be kept clean at all times, free of refuse and debris. All debris to be
removed daily.
. Emergency phone numbers shall be submitted to the Department.
. Fenced off during construction.
GC-CA-I-1
16D13
EXHIBIT J
TECHNICAL SPECIFICATIONS
Scope of Work:
Contractor shall supply all Material, Labor and Equipment for the Proposed Boardwalk
Addition.
1) Contractor to mark proposed boardwalk location and get approval from owner
prior to starting construction.
2) Contractor to cut and remove all shrubs and trees at area of boardwalk.
Contractor to avoid cutting Cypress Trees.
3) Contractor shall stay within the work area of the boardwalk.
4) The proposal length of the boardwalk is approximately 900'-0" by 6'-0" wide.
Contractor to verify the length of the boardwalk.
5) See Drawing A-1 for proposed area of boardwalk and details.
6) Contractors to visit site and familiarize themselves with existing conditions prior
to submitting bid.
7) Contractor shall submit all shop drawings and Material for approval to owner prior
to starting the work.
8) Total Days to complete the Project is 90 Calendar days from Permit approval and
as agreed with owner.
9) See attached "Park Construction" General Conditions, which are part of this
Contract.
10) See attached Reference Drawings SP7.0 and SD7.0 by Bellomo-Herbert.
GC-CA-J-1
16013
EXHIBIT K
PERMITS
THIS INFORMATION IS ON THE SEPARATE DOWNLOADABLE
SPECIFICATION/PLAN SET
GC-CA-K-1
161Jl.3
EXHIBIT L
STANDARD DETAILS
THIS INFORMATION IS ON THE SEPARATE DOWNLOADABLE
SPECIFICATION/PLAN SET
GC-CA-L-1
16D13
EXHIBIT M
PLANS AND SPECIFICATIONS
THIS INFORMATION IS ON THE SEPARATE DOWNLOADABLE
SPECIFICATION/PLAN SET
GC-CA-M-1
16D13
EXHIBIT N
CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT
GC-CA-N-1