Backup Documents 05/26/2009 Item #16B 9
168 9
ORIGINAL DOCUMENTS CHECKI_IST & ROUTING SLIP
TO ACCOMPANY ALL ORrGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. Onginal documents should he hand delivered to the Board Ofilce fhe completed !'Outing slip and original
documents are to he forwarded to the Board Office only after the Board has taken action on the item.)
ROUTING SLIP
Complete routing lines # 1 through #4 as appropriate for additional signatures, dates, and/or information needed. If the documcnt is already complete with the
h
exception of the Chaim1an's signature, draw a hne through routmg lines #1 through #4, complete t e checklist, and forward to Sue Filson (line #5).
Route to Addressee(s) Office Initials Date
(List in routing order)
I.
2.
3.
4. Scott R. Teach, Deputy County Attorney County Attorney SRT 6-22-09
5. Sue Filson, Executive Manager Board 0 f County Commissioners
6. Minutes and Records Clerk of Court's Office
PRIMARY CONTACT INFORMATION
(The primary contact is the holder of the original document pending BCC approval. Normally the primary contact is the person who created/prepared the executive
summary. Primary contact information is needed in the event one of the addressees above, including Sue Filson, need to contact staff for additional or missing
information. All original documents needing the BCC Chairman's signature are to be delivered to the BCC office only aftcr the BCC has acted to approve the
item.)
Name of Primary Staff Brenda Brilhart, Purchasing Agent Phone Number 252-8446
Contact
Agenda Date Item was 5-26-09 Agenda Hem Number 16.B.9
Approved by the BCC
Type of Document Contract #09-5228 Number of Original Two
Attached Documents Attached
I.
INSTRUCTIONS & CHECKI.,IST
Initial the Yes column or mark "N/A" in the Not Applicable column, whichever is
ap ro riate.
Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney. This includes signature pages from ordinances,
resolutions, etc. signed by the County Attorney's Office and signature pages from
contracts, agreements, etc. that have been fully executed by all parties except the BCC
Chairman and Clerk to the Board and possibly State Officials.)
All handwritten strike-through and revisions have been initialed by the County Attorney's
Office and all other arties exce t the BCC Chaimlan and the Clerk to the Board
The Chairman's signature line date has been entered as the date ofBCC approval of the
document or the final negotiated contract date whichever is a licable.
"Sign here" tabs are placed on the appropriate pages indicating where the Chairman's
si nature and initials are re uired.
In most cases (some contracts are an exception), the original document and this routing slip
should be provided to Sue Filson in the BCe office within 24 hours ofBCC approval.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines'
The document was approved by the BCC on 5-6-09 and all changes made during the
meeting have been incorporated in the attached document. The County Attorney's
Office has reviewed the chan es, if a Iicable.
Yes
(Initial)
SRT
N/A (Not
A licable)
2.
3.
4.
5.
6.
SRT
SRT
SRT
SRT
SRT
I: Formsl County Forms/ BeC Fom1s1 Original Documents Routing Slip WWS Original 9.03.04, Revised 12605, Revised 224.05
09-PRC-0 1229/2
168 9
MEMORANDUM
Date:
June 23, 2009
To:
Brenda Brilhart, Purchasing Agent
Purchasing Department
From:
Martha Vergara, Deputy Clerk
Minutes & Records Department
Re:
Contract #09-5228: "CR951 South of Joll Bridge Landscape
and Irrigation Installation"
Contractor: Vila & Son Landscaping, Inc.
Attached please find the original contract, as referenced above, (Agenda
Item #16B9) approved by the Board of County Commissioners on Tuesday,
May 26, 2009.
The Minutes & Records Department has also retained an original copy which
will be kept as part of the Board's permanent record.
If you should have any questions, please contact me at 252-7240.
Thank you
16B~9
CR 951 South of Jolly Bridge Landscape and Irrigation Installation
COLLIER COUNTY BID NO. 09-5228
COLLIER COUNTY, FLORIDA
LAP Funded - Local Vendor Preference Waived
Design Professional:
Me Gee & Associates, Inc.
COLLIER COUNTY PURCHASING DEPARTMENT
3301 Tamiami Trail, East
Naples, Florida 34112
ORIGINAL
16B~9
TABLE OF CONTENTS
A. PUBLIC NOTICE/LEGAL ADVERTISEMENT (PAGE 1 ONLY)
B. INSTRUCTIONS TO BIDDERS
C. BID, BID SCHEDULE AND OTHER DOCUMENTS
D. AGREEMENT
E. AGREEMENT EXHIBITS
EXHIBIT A: Performance and Payment Bond Forms
EXHIBIT B: Insurance Requirement Form
EXHIBIT C: Release and Affidavit Form
EXHIBIT 0: Contractor Application for Payment Form
EXHIBIT E: Change Order Form
EXHIBIT F: Certificate of Substantial Completion Form
EXHIBIT G: Final Payment Checklist
EXHIBIT H: General Terms and Conditions
EXHIBIT I: Supplemental Terms and Conditions (LAP FUNDED)
EXHIBIT J: Technical Specifications
EXHIBIT K: Permits
EXHIBIT L: Standard Details (if applicable)
EXHIBIT M: Plans and Specifications prepared by Mc Gee & Associates
and identified as follows: CR 951 South of Jolly Bridge
Landscape and Irrigation Installation
as shown on Plan Sheets 1 through 74.
EXHIBIT N: Contractor's List of Key Personnel
160"9
PUBLIC NOTICE
INVITATION TO BID
COLLIER COUNTY, FLORIDA
CR 951 South of Jolly Bridge Landscape and Irrigation Installation
COUNTY BID NO. 09-5228
Separate sealed bids for the construction of CR 951 South of Jolly Bridge Landscape
and Irrigation Installation, addressed to Mr. Steve Carnell, Purchasing Director, will be
received at the Collier County Government Complex, 3301 Tamiami Trail East,
Purchasing Building, Purchasing Department, Naples, Florida 34112, until 2:30 P.M.
LOCAL TIME, on the 23rd day of April 2009, at which time all bids will be publicly
opened and read aloud. Any bids received after the time and date specified will not be
accepted and shall be returned unopened to the Bidder.
1.1 A mandatory pre-bid conference shall be held at the Purchasing Department,
Conference Room A, Purchasing Building "G" at 11 :00 a.m. LOCAL TIME on the 2nd
day of April 2009, at which time all prospective Bidders may have questions answered
regarding the Bidding Documents for this Project. In instances where the Owner has
deemed the pre-bid to be mandatory. the Bidder's failure to attend the pre-bid
conference shall result in the reiection of his bid.
Sealed envelopes containing bids shall be marked or endorsed "Bid for Collier County
Government, Collier County, CR 951 South of Jolly Bridge Landscape and Irrigation
Installation, and Bid No. 09-5228 and Bid Date of April 23, 2009. No bid shall be
considered unless it is made on an unaltered Bid form which is included in the Bidding
Documents. The Bid Schedule (GC-P-1 through GC-P-14) shall be removed from the
Bidding Documents prior to submittal.
One contract will be awarded for all Work. Bidding Documents may be examined on the
Collier County Purchasing Department E-Procurement website: www.collierqov.netlbid.
Copies of the Bidding Documents may be obtained only from the denoted website.
Bidding Documents obtained from sources other than the Collier County Purchasing
Department website may not be accurate or current.
Each bid shall be accompanied by a certified or cashiers check or a Bid Bond in an
amount not less than five percent (5%) of the total Bid to be retained as liquidated
damages in the event the Successful Bidder fails to execute the Agreement and file the
required bonds and insurance within fifteen (15) calendar days after the receipt of the
Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute
the Agreement in the form attached hereto and incorporated herein.
The Successful Bidder shall be required to furnish the necessary Payment and
Performance Bonds, as prescribed in the General Conditions of the Contract
Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and
Certificates of Insurance shall be either executed by or countersigned by a licensed
GC-PN-1
168 9
resident agent of the surety or insurance company having its place of business in the
State of Florida. Further, the said surety or insurance company shall be duly licensed
and qualified to do business in the State of Florida. Attorneys-in-fact that sign Bid
Bonds or Payment and Performance Bonds must file with each bond a certified and
effective dated copy of their Power of Attorney.
In order to perform public work, the Successful Bidder shall, as applicable, hold or
obtain such contractor's and business licenses, certifications and registrations as
required by State statutes and County ordinances.
Before a contract will be awarded for the Work contemplated herein, the Owner shall
conduct such investigations as it deems necessary to determine the performance record
and ability of the apparent low Bidder to perform the size and type of work specified in
the Bidding Documents. Upon request, the Bidder shall submit such information as
deemed necessary by the Owner to evaluate the Bidder's qualifications.
The Successful Bidder shall be required to finally complete all Work within one
hundred and eighty (180) calendar days from and after the Commencement Date
specified in the Notice to Proceed.
The Owner reserves the right to reject all Bids or any Bid not conforming to the intent
and purpose of the Bidding Documents, and to postpone the award of the contract for a
period of time which, however, shall not extend beyond one hundred twenty (120) days
from the bid opening date without the consent of the Successful Bidder.
Dated this 20th day of March, 2009.
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
BY: /s/ Stephen Y. Carnell, C.P.M.
Purchasing and General Services Director
GC-PN-2
I \16B 9
PART B - INSTRUCTIONS TO BIDDERS
Section 2. Definitions
2.1 The term "Owner" used herein refers to the Board of County Commissioners, or
its duly authorized representative.
2.2 The term "Project Manager" used herein refers to the Owner's duly authorized
representative and shall mean the Division Administrator or Department Director, as
applicable, acting directly or through duly authorized representatives.
2.3 The term "Design Professional" refers to the licensed professional engineer or
architect who is in privity with the Owner for the purpose of designing and/or monitoring
the construction of the project. At the Owner's discretion, any or all duties of the Design
Professional referenced in the Contract Documents may be assumed at any time by the
Project Manager on behalf of the Owner. Conversely, at the Owner's discretion the
Project Manager may formally assign any of his/her duties specified in the Contract
Documents to the Design Professional.
2.4 The term "Bidder" used herein means one who submits a bid directly to the
Owner in response to this solicitation.
2.5 The term "Successful Bidder" means the lowest qualified, responsible and
responsive Bidder who is awarded the contract by the Board of County Commissioners,
on the basis of the Owner's evaluation.
2.6 The term "Bidding Documents" includes the Legal Advertisement, these
Instructions to Bidders, the Bid Schedule and the Contract Documents as defined in the
Agreement.
2.7 The term "Bid" shall mean a completed Bid Schedule, bound in the Bidding
Documents, properly signed, providing the Owner a proposed cost for providing the
services required in the Bidding Documents.
Section 3. Preparation of Bids
3.1 The Bids must be submitted on the standard form herein furnished by the Owner
(pages GC-P-1 to GC-P-14 as bound in these Bidding Documents). By submitting a Bid,
Bidder acknowledges and agrees that it shall execute the Agreement in the form
attached hereto and incorporated herein. The Bidder shall complete the Bid in ink or by
typewriter and shall sign the Bid correctly. Bid Schedules submitted on disk/CD shall be
accompanied by a hard copy of the completed Bid Schedule which shall be signed and
dated by the Bidder. The Bid may be rejected if it contains any omission, alteration of
form, conditional bid or irregularities of any kind. Bids must be submitted in sealed
envelopes, marked with the Bid Number, Project Name and Bid opening Date and Time,
and shall be addressed to the Collier County Purchasing Department, Purchasing
Building, Collier County Government Complex, 3301 Tamiami Trail, East, Naples,
Florida 34112. If forwarded by mail, the sealed envelope containing the Bid must be
enclosed in another sealed envelope addressed as above. Bids received at the
GC-IB-1
16 8 ;,.f~9
location specified herein after the time specified for bid opening will be returned to the
bidder unopened and shall not be considered.
Section 4. Bid Deposit Requirements
4.1 No Bid shall be considered or accepted unless at the time of Bid filing the same
shall be accompanied by a cashiers check, a cash bond posted with the County Clerk, a
certified check payable to Owner on some bank or trust company located in the State
of Florida insured by the Federal Deposit Insurance Corporation, or Bid Bond, in an
amount not less than 5% of the bidder's maximum possible award (base bid plus all
add alternates) (collectively referred to herein as the "Bid Deposit"). The Bid Deposit
shall be retained by Owner as liquidated damages if the Successful Bidder fails to
execute and deliver to Owner the unaltered Agreement, or fails to deliver the required
Performance and Payment Bonds or Certificates of Insurance, all within ten (10)
calendar days after receipt of the Notice of Award. Bid Bonds shall be executed by a
corporate surety licensed under the laws of the State of Florida to execute such bonds,
with conditions that the surety will, upon demand, forthwith make payment to Owner
upon said bond. Bid Deposits of the three (3) lowest Bidders shall be held until the
Agreement has been executed by the Successful Bidder and same has been delivered
to Owner together with the required bonds and insurance, after which all three (3) Bid
Deposits shall be returned to the respective Bidders. All other Bid Deposits shall be
released within ten (10) working days of the Bid Opening. No Bid including alternates,
shall be withdrawn within one hundred and twenty (120) days after the public opening
thereof. If a Bid is not accepted within said time period it shall be deemed rejected and
the Bid Deposit shall be returned to Bidder. In the event that the Owner awards the
contract prior to the expiration of the 120 day period without selecting any or all
alternates, the Owner shall retain the right to subsequently award to the Successful
Bidder said alternates at a later time but no later than 120 days from opening, unless
otherwise agreed by the Purchasing Director and the Successful Bidder.
4.2 The Successful Bidder shall execute five (5) copies of the Agreement in the form
attached and deliver same to Owner within the time period noted above. The Owner
shall execute all copies and return one fully executed copy of the Agreement to
Successful Bidder within thirty (30) working days after receipt of the executed
Agreement from Successful Bidder unless any governmental agency having funding
control over the Project requires additional time, in which event the Owner shall have
such additional time to execute the Agreement as may be reasonably necessary.
Section 5. Right to Reiect Bids
5.1 The Owner reserves the right to reject any and all Bids or to waive informalities
and negotiate with the apparent lowest, qualified Bidder to such extent as may be
necessary for budgetary reasons.
Section 6. Signing of Bids
6.1 Bids submitted by a corporation must be executed in the corporate name by the
president, a vice president, or duly authorized representative. The corporate address
and state of incorporation must be shown below the signature.
GC-IB-2
16B~~#9
6.2 Bids by a partnership must be executed in the partnership name and signed by a
general partner whose title must appear under the signature and the official address of
the partnership must be shown below said signature.
6.3 If Bidder is an individual, his or her signature shall be inscribed.
6.4 If signature is by an agent or other than an officer of corporation or general
partner of partnership, a properly notarized power of attorney must be submitted with
the Bid.
6.5 All Bids shall have names typed or printed below all signatures.
6.6 All Bids shall state the Bidder's contractor license number.
6.7 Failure to follow the provisions of this section shall be grounds for rejecting the
Bid as irregular or unauthorized.
Section 7. Withdrawal of Bids
Any Bid may be withdrawn at any time prior to the hour fixed in the Legal Advertisement
for the opening of Bids, provided that the withdrawal is requested in writing, properly
executed by the Bidder and received by Owner prior to Bid Opening. The withdrawal of
a Bid will not prejudice the right of a Bidder to file a new Bid prior to the time specified
for Bid opening.
Section 8. Late Bids
No Bid shall be accepted that fails to be submitted prior to the time specified in the
Legal Advertisement.
Section 9. Interpretation of Contract Documents
9.1 No interpretation of the meaning of the plans, specifications or other Bidding
Documents shall be made to a Bidder orally. Any such oral or other interpretations or
clarifications shall be without legal effect. All requests for interpretations or clarifications
shall be in writing, addressed to the Purchasing Department, to be given consideration.
All such requests for interpretations or clarification must be received at least ten (10)
calendar days prior to the Bid opening date. Any and all such interpretations and
supplemental instructions shall be in the form of written addendum which, if issued,
shall be sent by mail or fax to all known Bidders at their respective addresses furnished
for such purposes no later than three (3) working days prior to the date fixed for the
opening of Bids. Such written addenda shall be binding on Bidder and shall become a
part of the Bidding Documents.
9.2 It shall be the responsibility of each Bidder to ascertain, prior to submitting its Bid,
that it has received all addenda issued and it shall acknowledge same in its Bid.
9.3 As noted in the Legal Advertisement, attendance by all bidders at the Pre-Bid
Conference is mandatory. In instances where the Owner has deemed the pre-bid to
GC-IB-3
16B~CJ
be mandatory, the Bidder's failure to attend the pre-bid conference shall result in
the reiection of his bid.
Section 10. Examination of Site and Contract Documents
10.1 By executing and submitting its Bid, each Bidder certifies that it has:
a. Examined all Bidding Documents thoroughly;
b. Visited the site to become familiar with local conditions that may in any manner
affect performance of the Work;
c. Become familiar with all federal, state and local laws, ordinances, rules, and
regulations affecting performance of the Work; and
d. Correlated all of its observations with the requirements of Bidding documents.
No plea of ignorance of conditions or difficulties that may exist or conditions or
difficulties that may be encountered in the execution of the Work pursuant to these
Bidding Documents as a result of failure to make the necessary examinations and
investigations shall be accepted as an excuse for any failure or omission on the part of
the Successful Bidder, nor shall they be accepted as a basis for any claims whatsoever
for extra compensation or for an extension of time.
10.2 The Owner will make copies of surveys and reports performed in conjunction with
this Project available to any Bidder requesting them at cost; provided, however, the
Owner does not warrant or represent to any Bidder either the completeness or accuracy
of any such surveys and reports. Before submitting its Bid, each Bidder shall, at its own
expense, make such additional surveys and investigations as may be necessary to
determine its Bid price for the performance of the Work within the terms of the Bidding
Documents. This provision shall be subject to Section 2.3 of the General Conditions to
the Agreement.
Section 11. Material Reauirements
It is the intention of these Bidding Documents to identify standard materials. When
space is provided on the Bid Schedule, Bidders shall specify the materials which they
propose to use in the Project. The Owner may declare any Bid non-responsive or
irregular if such materials are not specifically named by Bidder.
Section 12. Bid Quantities
11.1 Quantities given in the Bid Schedule, while estimated from the best information
available, are approximate only. Payment for unit price items shall be based on the
actual number of units installed for the Work. Bids shall be compared on the basis of
number of units stated in the Bid Schedule as set forth in the Bidding Documents. Said
unit prices shall be multiplied by the bid quantities for the total Bid price. Any Bid not
conforming to this requirement may be rejected. Special attention to all Bidders is
GC-16-4
16 B~9
called to this provision, because if conditions make it necessary or prudent to revise the
unit quantities, the unit prices will be fixed for such increased or decreased quantities.
Compensation for such additive or subtractive changes in the quantities shall be limited
to the unit prices in the Bid. Subsequent to the issuance of a notice to proceed, the
Project Manager and the Successful Bidder shall have the discretion to re-negotiate any
unit price(s) where the actual quantity varies by more than 25% from the estimate at the
time of bid.
Section 13. Award of Contract
12.1 Any prospective bidder who desires to protest any aspect(s) or provision(s) of the
bid invitation (including the form of the bid documents or bid procedures) shall file their
protest with the Purchasing Director prior to the time of the bid opening strictly in
accordance with Owner's then current Purchasing Policy.
12.2 The Award of Contract shall be issued to the lowest, responsive and qualified
Bidder determined on the basis of the entire Bid and the Owner's investigations of the
Bidder. In determining the lowest, responsive and qualified bidder, the Owner shall
consider the capability of the Bidder to perform the contract in a timely and responsible
manner. When the contract is awarded by Owner, such award shall be evidenced by a
written Notice of Award, signed by a Purchasing Agent of the Owner's Purchasing
Department or his or her designee and delivered to the intended awardee or mailed to
awardee at the business address shown in the Bid.
12.3 Award recommendations will be posted outside the offices of the Purchasing
Department generally on Wednesdays and Thursdays prior to the presentation to the
Board of County Commissioners. Award of Contract will be made by the Board of
County Commissioners in public session. Any actual or prospective bidder who desires
to formally protest the recommended contract award must file a notice of intent to
protest with the Purchasing Director within two (2) calendar days (excluding weekends
and holidays) of the date that the recommended award is posted. Upon filing of said
notice, the protesting party will have five (5) days to file a formal protest, said protest to
strictly comply with Owner's then current Purchasing Policy. A copy of the Purchasing
Policy is available at the offices of the Purchasing Director.
12.4 For Bidders who may wish to receive copies of Bids after the Bid opening, The
Owner reserves the right to recover all costs associated with the printing and distribution
of such copies.
Section 14. Sales Tax
14.1 The Successful Bidder acknowledges and agrees that Owner may utilize a sales
tax savings program and the Successful Bidder agrees to fully comply, at no additional
cost to Owner, with such sales tax savings program implemented by the Owner as set
forth in the Agreement and in accordance with Owner's policies and procedures.
Section 15. Exclusion of County Permits in Bid Prices
15.1 To ensure compliance with Section 218.80, F.S., otherwise known as "The Public
Bid Disclosure Act", Collier County will pay for all Collier County permits and fees
GC-IB-5
168'19
applicable to the Project, including license fees, permit fees, impact fees or inspection
fees applicable to this Work through an internal budget transfer(s). Hence, bidders shall
not include these permit/fee amounts in their bid offer. However, the Successful Bidder
shall retain the responsibility to initiate and complete all necessary and appropriate
actions to obtain the required permits other than payment for the items identified in this
section.
15.2 The Successful Bidder shall be responsible for procuring and paying for all
necessary permits not issued by Collier County pursuant to the prosecution of the work.
Section 16. Use of Subcontractors
16.1 To ensure the Work contemplated by the Contract Documents is performed in a
professional and timely manner, all Subcontractors performing any portion of the work
on this Project shall be "qualified" as defined in Collier County Ordinance 87-25,
meaning a person or entity that has the capability in all respects to perform fully the
Agreement requirements and has the integrity and reliability to assure good faith
performance. A Subcontractor's disqualification from bidding by the Owner, or other
public contracting entity within the past twelve months shall be considered by the Owner
when determining whether the Subcontractors are "qualified."
16.2 The Owner may consider the past performance and capability of a Subcontractor
when evaluating the ability, capacity and skill of the Bidder and its ability to perform the
Agreement within the time required. Owner reserves the right to disqualify a Bidder who
includes Subcontractors in its bid offer which are not "qualified" or who do not meet the
legal requirements applicable to and necessitated by this Agreement.
16.3 The Owner may reject all bids proposing the use of any subcontractors who have
been disqualified from submitting bids to the Owner, disqualified or de-certified for
bidding purposes by any public contracting entity, or who has exhibited an inability to
perform through any other means.
16.4 Notwithstanding anything in the Contract Documents to the contrary, the Bidders
shall identify the subcontractor(s) it intends to use for the categories of work as set forth
in the List of Subcontracts attached hereto, said list to be submitted with its bid. Bidders
acknowledge and agree that the subcontractors identified on the list is not a complete
list of the subcontractors to be used on the Project, but rather only the major
subcontractors for each category of Work as established by Owner. Bidders further
acknowledge that once there is an Award of Contract, the Successful Bidder shall
identify, subject to Owner's review and approval, all the subcontractors it intends to use
on the Project. Once approved by Owner, no subcontractor shall be removed or
replaced without Owner's prior written approval.
Section 17. Prohibition of Gifts
No organization or individual shall offer or give, either directly or indirectly, any favor,
gift, loan, fee, service or other item of value to any County employee, as set forth in
Chapter 112, Part Ill, Florida Statutes, Collier County Ethics Ordinance No. 2004-05,
and County Administrative Procedure 5311. Violation of this provision may result in one
GC-IB-6
1.68 "1:~9
or more of the following consequences: a. Prohibition by the individual, firm, and/or any
employee of the firm from contact with County staff for a specified period of time; b.
Prohibition by the individual and/or firm from doing business with the County for a
specified period of time, including but not limited to: submitting bids, RFP, and/or
quotes; and, c. immediate termination of any contract held by the individual and/or firm
for cause.
Section 18. Public Entitv Crimes
By its submitting a Bid, Bidder acknowledges and agrees to and represents it is
in compliance with the terms of Section 287.133(2)(a) of the Florida Statutes which read
as follows:
"A person or affiliate who has been placed on the convicted
vendor list following a conviction for a public entity crime
may not submit a bid, proposal, or reply on a contract to
provide any goods or services to a public entity; may not
submit a bid, proposal, or reply on a contract with a public
entity for the construction or repair of a public building or
public work; may not submit bids, proposals, or replies on
leases of real property to a public entity'; may not be
awarded or perform work as a contractor, supplier,
subcontractor, or consultant under a contract with any public
entity; and may not transact business with any public entity
in excess of the threshold amount provided in s. 287.017 for
CATEGORY TWO for a period of 36 months from the date of
being placed on the convicted vendor list."
GC-18-7
16019
eo'&.Count<Y
Administrative Selvices DNision
Purcnasing
3301 Tamiami Trail East
Naples, Florida 34112
Telephone: (239) 252-8446
FAX: (239) 252-6697
S re nd as ril ha rt@colliergov.net
www.colliergov.net
Memorandum
Date:
From@)
April 9, 2009
Brenda Brilhart, Purchasing Agent
To:
Interested Bidders
Subject:
ADDENDUM #1, Bid #09-5228 - CR 951 South of Jolly Bridge Landscape
and Irrigation Installation
Addendum #1 covers the following change for the above-referenced Bid:
CHANGE: Revised Bid Schedule attached - Addendum 1 bid schedule must be submitted in
order to be considered for award.
ADD: Qualifications Checklist - submit completed list with bid package.
CLARIFICATIONS:
1. Clarification of erosion control and detail
Erosion control is not a bid item, it is a heading for the below items.
The 91,525 sq. ft. should be removed from the bid schedule.
There are only two erosion control item are:
1. Rock Bags 400 ea.
2. Staked silt fence, Type III 14,724 LF (spec sheet attached)
2. Web address for NPEDS permit & SWPPP Monitoring.
The following web site address is the forms page for The NPEDS permit.
http://wWw.dep.state.fl.us/waterlstormwater/npdes/permitsforms.htm
This Notice of Intent (NOI) form is to be completed and submitted to the Department
before use of the Generic Permit for Stormwater Discharge From Large and Small
Construction Activities.
Notice of Intent to Use Generic Permit for Stormwater Discharqe from Larqe and Small
Construction Activities I Word (DEP Form 62-621.300(4)(b)
Acquisitions/AgentFormsandLetters/AddendumonBCCLetterhead
Revised: 3/16/09
168-9
The following is the link to the Generic Permit for Stormwater. To be submitted after the Notice
of Intent.
Generic Permit for Stormwater Discharqe from larqe and Small Construction Activities
(Rule 62-621.300(4)(a), FAC).
General information on completing the permit.
http://cfpub.epa.qov/npdes/home.cfm?proqram id=45
3. Web address to Marco Utilities standards.
http://www.citvofmarcoisland.com/P u blic Docu m ents/Ma reo I s I and F l Uti litieslindex
4. Clarification on Items # 5, 6 & 7 in tab.
Please refer to the FOOT indexes 100-106. EROSION CONTROL AND WATER
QUALITY
http://www.dot.state.fl.us/rddesiq nl rd/rtds/08/2008Standards. s htm
cc: Liz Deleon, Project Manager
Enc: Bid Schedule
Qualifications Checklist
Erosion Control Silt Fence Spec
Acquisition s/AgenlForm sandLetters/AddendumonBCC Letterhead
Revised: 3/16/09
......
=1:l::
2:
::J
o
Z
W
o
o
<{
"t:l
s::
cu
Q)
coo.
N CU
N 0
10 III
'"t:l
0') s::
o CU
C...J
m Q)
C)
"t:l
";:
m
~
o
"""")
-
o
.s::
-
:J
o
(f)
.I::
.~
::J
--l
co
(j)
E
co
CL
c5,
2:
0'
0:=
co
c
<;:::
1\1
-0
C
co
C
o
13
::J
L-
en
C
o
u
0)
c
.;::
::J
-0
QJ
~~
~~
:;3 Q)
L- QJ
o 3:
(5 QJ
L-..a
:S 0
'3 ::::
Cfl ~
~O'
QJ ~ 0:=
D.. ..
o Oil!!
E ..... 0
L. .82
~g .~(ij
~.t:~ 0l1iJ
~~mB-o
-l ~QJ-o:;~
~ ~3:~uo
ot)'+-'+-'-
o OQJOOD..
a. 0 "--' Ci.:x:: '"
(/) -r-Q 0-
C 0 o..~ rot9
"- D.. CJ ..a -0
~ ~31c<l15~
<( :g .;.:: -g N :g
z -e.8ror-O
o QJ-oCfl.I::C
i= .I::c2o..-
CJ ~ g~g~~
en Z ......;.:: -- -
~O 0:: <( 5'-CflCoD..
Wz 0 fu u.2~.8Q)
'=0 t:: 0::: CJE-g~~QJ
..... CO Z e.. Z 3: .::: QJ CO -0
~OWO~ OZ OCfl~D..iJ~
.<::: <{COQJCQJO)
a Z u::: CL en - 0::: ~ '- .~ E QJ
Co::: <{u..CLZt:: _CJCOQJ-occ
.2 e.. 2: ~ e.. ::i --l = t:: ~ QJ i: <;:::
..... -lO:::~5:CL~--l QJc<l::J co E.,,=
.;:: <( 0 u.. (fJ 0 Uj 0 ~ Z -;, E ~ 3: 13
~ffi~Oc<lO:::oO::: I-Qi3~~o~
ClI z W W I- 0 W I- ai ~ .~ 0 0) Cfl Q.
OwCLO~OWI-_zo uo:::iil~-o~o
Z C...... UC .....
CJ c<l ...... 0:: 0:: (f) 0 QJ ...... >-.- co 0 '-
r-""-l...W- fJJ4-Q...cu(i+J..........o
o Z CL I- 0 Z 0) ~ W 0.. D.. ::J 0 .;::
iiid]w(fJ:::::!iiiQco CflO::(f) CO 00:: CL
W2:I-O::JW(/)..a-gCL. ..ciLi-o
en>-~wO?(f)O-D';'::wco
<(<{<{CL(fJ<(o::o19t::
COCL2:z<{mWO:::(fJ(fJ
~
.....
o
I-
Ef7 Ef7 Ef7 Ef7
.....
1II
o
()
:::
c
::J
s::
o
;:;
S
lU
-
III
s::
s::
o
;:;
cu
C)
";:
....
a
.....
'c
:J
ujujujuj
..J ..J _LJ
c
o
:;::;
a:s
u
;;::
'u
Q)
>-
u
Cfl := Cfl
..........0 C
a3 e.. QJ
E I- E
::JO ::J
Uo U
gu.. g
uc<l u
~.c ~
cso...c
o 0 W 0
0000
(f)
06
Q)
N
en
CD CD Qi ID
CLCLCLCL
.....
10
en
0:::
()
......N(Y)"""
Ef7 Ef7 Ef7 Ef7
O",,"LO
O(J)N
-.::rl'-LO
-.:i ......-
...... (J)
. . u..
co u.. .
w..J(fJ
LOCOI'-CO
.....
o
Z
W
I-
<(
Z
er::
w
I-
-l
<(
N
o
Z
W
I-
<(
Z
0:::
w
I-
-l
<(
l")
o
Z
w
~
Z
0:::
w
I-
-l
<(
~
.....
o
I-
.....
'c
:J
c
o
:;::;
a:s
u
;;::
'u
ClI
(f)
06
ClI
.!::!
(f)
ClI
E
a:s
Z
c
o
E
E
o
()
ClI
E
a:s
Z
c;
.~
c
a:s
.....
o
m
(fJ
--l
<(
ii:
w
I-
<(
::iE
",,"I-
.z
0<(
Z-l
we..
I-
:!!:<(
>-z
mer::
w
~
<(
168 9
Ef7 Ef7 Ef7 Ef7 Ef7 Ef7
CilCONCOC0CO
C0CO...... N
ro ro ro ro ro ro
WWWWWW
i:1i
E
co
Z
>-
C
(\l
D..
E
o
o
c;
u
i:o
M
.J
<Ii
c;c;
u u
..: c;M"r
a. u."
1II .c.......
:::IC.... a. a.
F-;- .c: =-...0...t/J
~":(f)a.~cx:
"..J 0.= tJ) ...-l ......
..c.!!!::::Ji:o..c..c
. .... LL _.
CO..c .....Noo
~.. .....;.s::: T- -.:-
...1 <.0 ..c:.. ..I ....
-.::r .' . 0 0 co
'T""'L()V'T""'-r-~
-.::r
-
o
Q)
a:s
.....
:>
E CD 0
::::J a. .c
~ 8 _ 'C .~
.>l::'- .- 0 -l
a:s-l~~oo
o ~ '(ij c; 3: .c
ClI:;::;E'Cr!E
.:: a:s .;:: Q) ::::J
-lz~m>CJ
r!
o
-E..2
0:=
a:sE='C
c ::::J a:s a:s a:s
,~ ..... ..c c a:s .c
cua.a:sQ)::::J
'Cl;gC10~
..lII>.a:s-eE
':;: E U 'c a:s 'en
1II ::::J .!!! 'o..~ a:s
a:6~C;~(j;
(j; '(ij ~ ~ ..5 ~
::::J ::::J a:s t1I ::::J ::::J
o(!)()umm
(f)>(f)()(!)<((f)
wo(!)()ucom
~~~~~~~
.....
..-
=It
::2:
:J
o
Z
W
o
o
<(
"0
C
ra
lV
CX)Q.
N ra
N 0
II) III
'"0
en C
o ra
C..J
m lV
C)
"0
.;::
al
~
o
...,
-
o
.r::
-
:::I
o
en
..c
.~
'5
.....J
Cll
<D
E
Cll
0....
.....:
0)
::2:
"e
0....
c
o
'+"
.!!:!
ra
-
III
C
C
o
..
ra
Cl
.;::
~
~
It)
en
0:::
()
ni
-
o
I-
-
UI
o
U
~
I:
:J
o
-
'c
:J
I:
o
:0:;
III
U
;;:::
'0
G.l
C/')
cd
G.l
N
en
G.l
E
III
Z
I:
o
E
E
o
U
G.l
E
III
Z
"iii
.!:!
I:
III
-
o
m
:!:
>-C/')w
CI):!:o::
-I CO
<(..-
a..
fFl-
fFl- fFl- fFl-
r---
<:t
CO CO CO
C") N
Cll
W
tIi tIi tIi
WWW
....
.c:
....
e,)
o
.....
~+oi..,J
.=.c:.c:
.....;~.....
..Que,)
01000
..... ..... .....
E
"iii
0....
"iii
>-
o
0::
III
'0
.;:
o
u:
E E E
"iii"iii"iii
0..0....0....
G.l Cl) Cl)
ClClCl
III III III
..Q..Q..Q
..Q..Q..Q
III III III
UUU
III
-
III
Cii
III
'c
o
-
UI
>-
o
0::
000
t:~:::
Cl) Cl) Cl)
E E E
"iii"iii"iii
0.0.0.
"iii"iii"iii
..Q..Q..Q
III III III
C/')C/)C/)
fFl-fFl-fFl-fFl-fFl-fFl-fFl-
mmmcocomr---
CO..-<:t CO CO 0
LD CO N ..-_ O.
tIi tIi tIi tIi tIi tIi tIi
WWWWWWW
e,)
'0
'0 _ ~ e,)
;';:~Eo
"~ 0. Cl) <..i 0 <..i
.....: o.ii) ~ ci 00 ci
~o.:6M~<:tCo
M~:i..;'<t..:-'<t
io"':a:o. co...:
"':~_Ul~Ula.
-r--=~:;J.!!!+:J~
~:Ea...c:....;J::....;
o._Ul_.s::: .s:::
_Ulg:J~~:;"''t
<:t...i'~...i'''":.:c;
:E~><~~~~
OOr---OOMC")MC")
3:
e Cl) III
O.!!! ~
E'O
o ~ 0'S;:
I- III ::: I:
>. 0.... G.l'n;
Ill- .c:E Cl
'00 gj"iii ::::I
0'E mo....~S
~iD~Cl)3:IllUl
lll_t.!:::Ill,'";;.UI
'0 III >-LL. C/)..... Cl)
(j; .!:! :a: 't: ... >- c:
-0.>< III Cl):Co
~ecu3:~::::I.c:
>-1-s:oC/):a:1-
fFl- fFl- fFl- fFl- fFl- fFl- fFl-
m..-r---COLDCOLD
LDCOLDCONCOO
NC'!...-r---C'!.CO
N
tIi tIi tIi tIi tIi tIi tIi
WWWWWWW
e,) e,) ~ e,)
o 0 u 0 0 ~ ~
--0--00
:;"'0_0:;"'__
NMOMNoO
..; ..; M ..:- ..; M c:
0.0. co.o. c..:
.!!!.!!!o...!!!.!!!o..~
,.J.....;rn....;~rn-...
..c:..c::J..c:..c::J..;
~~f~~~~
OC-"r""'CO"r""'''r''''' 00 co
.... .. .. ..
. . . .
"iii"iii"iii"iii"iiiliilii
ClClClClClClCl
MM~M"r"'" 'I:""""
E
~ cu
I: ~
a: u
1:- I:
... ...
o 0
UI .c: >- .c:
::::I.c:1- =1-
o.UI- -1_
~ ::::I 0 >< 0
uml: .!!!1:
0... 3: Cl)LL. 3:
-gCl)e~~e
a.. ~ U 0 (j; U .!!:!
't:Cl)'t:U..Q't:'E
CUc.CU'OCl)IllO
3:Cl)3:=~3:0
oC/)os:mou
fFl-
o
<:t
<:t.
..-
..-
o
o
o
ui
Cll
W
LL
CI)
.c:
-
0.
Cl)
'0
M
'0
Cl)
E
Cl)
C/)
Cl
CU
..Q
~
:i
u
N
Cl)
...
::::I
UI
CU
Cl)
E
:!:!
Cl)
;;:::
=0
I:
Cl)
1ii
I:
o
:0:;
III
t
o
0.
UI
I:
III
...
t'"
UI
UI
CU
...
CU
:c:
CU
m
16B~9
en . ~
0.. C'O- ON
E 'O2~ ~LD
::l CIl CIl LD <J)
0.. E 0..02 Q)'O.
ill 2u)Q)~~ D-~
en ~"EC5~g :Jo...
gen~.gJgg.8 ~~
.c .~ ~ ~ 0 oI:l <J) C .8
~ro't=cn~~-g .9~ mco
~ .g g> ~ '0 W U ~ 0.... .~.~
0.... '(3 :.c :-E: ~ ~ 'o~ (/). ~ g1 .c.c
('f) ~ ~ ~ .: en .... c U) c -0 t5
Q.(j)q:::Jo;:=_-oO>:;::; ~~
..c (j) ~ "'C +-' .E ro '+=- :8 iE U u
o-G:i3l~=~enr.l<+=o.... 00
::; 0 (j) 19 _.!; ~ 0... 0 '+- '+-
~ t5 B 0 .~ ~ oI:l ~ 0 0 ~ ~ ~
o CIlE Ool:lCll 0..0..000
> '5 0 '-CIl (i :J en U Co .- J9 19
> C ..... "'" 0.. '- ~ oI:l ~ I CO .- .-
'- CIl ::l ~ ::l <J) 0 'v .~ ~ ~
.9 E ro '+- ~ 0- '0.. :;=- I E ~ U TI
o '0 0 0 ro 0 0 ..c .:;;: ~ 2 2
~ ~ ~ B ~.~ ~ :; '3 ~ g. ~ ~
~(j)~L..,-rooro~:=-arnlJ),-
g C ro ~.8 G:i ~ (j) = .~ ~ .~ .~ g
-W .2 > 0 0....... '0 C CIl .....: '-- C (/)
CO ..... C CIl 0 C .- E ~ <J) <J) <J) 0)
<IlocOb ouiCll CIlo..o..(/)C
Q) <+= ::l :.;::; C ~ 0 c E c ..... 0.. 0.. <J) .-
- .- 0 CIl 0 0 CIl 0 <J) 0 0 ~
g-g EmOo C-'O.5:+:l'O 0 o:J:lU::
Z 0.. ..... -..- 0 .- CIl . '0 '0 <J) _x
(/) Q) (/) C _ ~ Q:5 <U 0> en ._ '_ "- "'V
== _..o.~ 0 (/) ~ c.. O)"E coo'+- 0)
19 ~ .Q ~:;::::; c (/) _ "C .- .SQ r/) if) :5 c
<Il '00 O):a El .2 CIl .!:= '0 0.. ~ ~'S: '0..
C ..... '- E (/) t5 <:t C '0 <J) '- '0 '0 > .-
-<J)<J) cowNO<J)Q)<J)ccco....
oI:l '0 (j) 3l <:t cOB Q) ,;,c: 0.. 5 5 .2 en
~ en E <Il 0 5 0 G:i ,;,c: ~ .~ rn rn CO C
8: ~ 2 ~ <( 0 0 0.. ~ 0> ~ ~ ~ en '0
::l '0. '0 '<J) ..... 0 '0.. 0 0> 0 <J) Q) <J) '- 0..
cnC/)l.-Ea>~Eo~o~2:5:5~~
-1<( .. <J) _x E .;:: 0 0 0 0 CIl > > ..... 0
No..'-V ,-<J)CI)oN<Il>. .CIlo>
o::=lt-oQ;~<DCIl..-(/)~==CIlCll~15
wQ)CU1....-+-'- ~_ _00_00)0')>_
1-05CCIlOWO<llCllO>N<:t~.c
<( 5 '';::; 0 5: 0 5 0 5 U 0 <:t ..- ..- .~ Q)
:a:~~~3lo~o~0~~00::2:~
ZE~2::l~Q)~<J)~"-mSSc:ic
o Q) 0 ~ ~ . . EN E ..- 0 en <( <( LLro
1--..... OE- ';"0' ooNc....chE
~ '" Co? 0 <.) () 0 N ..- .- ~ ~
~<(<Ilo<J)<J)'-<J)'-<J)..-..-~55S~
o~c~~~~~~.!:=..-()CIl>>~.....
z~2cooe~e~()~~eeQ;~
w~roocc~m_Q)> Q_~-+-'.c
~ FB~.;5~5~0""~~~5~~
<( ~enl-~O>()>~NCI)OOI~
Z
0::
W
I- CO m O..-N ~7LDm
-I C") C") <:t<:t7 <:t7<:t<:t
<(
fFl-
fFl- fFl- fFl-
-UI _
Cl)'O
c,Cii '0
I: .- I:
.- LL. (I)
"'1: -
fl-cu m
UI E UI
.C-Ill Cl) ::::10. .a
III Cl) UI:t: = III ~~ -Ill 0.
cu ~(j;~Cl) ~.c:1: I: ~
o "'I:.!!!::::I 0..9 o III <J) U
~Cl) ~Yg.~ g~~(g.~~ ~
I: ~ cu UI ~ U UI EIll - := ~ <(
f! .: ... 0 Cl) cu cu 1:: := ~ ~ == .!!!
Cl Cl oS! '0 0.'01 ~ UI >- E UI E._ ~
Ill~~g~(j;:= ~Ecu~cucuE ~
~cuBlllcu..Q~_"'cu~.=:~::::Io. 0
Cii Bill:': 0 C 'n; ~ ~ Iii 0 0 - ...
-_U<J)CCl)Cl OCl.c:.c:~~cu ~
cCii~E~.c:::::Iw~bo.~co..E ~
2~>-CU<D::::IO~00::::lUl~::::I1ll ::::I
mC/'):a:IC/):a:mu~o....wo..oWN :a:
C/') ~ u C!>C/)o uo.. ~ 0
o..o..~m00::~o..o::~C/)~~:a::!:ZI-:a:LL.I Z
c/)c/)C/'):JmC/')~~C/')~moo....o..wo..oWNU 0
mO"-~NC")<:tLDcor---coo::mo"-NC")<:tLD5cogr---
"-NNC/)NNNNNNN0NC")~C")C")~C"):a:C")C/')C")
fFl-
T"'''-~
N(J)
C")_ <:t_
CON
tIi
W
CIlLLLL
w-i-i
CIl
W
fFl- fFl- fFl- fFl-
COCONN
CO CO
COCO
uici
NCO
Qj
E
CIl
Z
>-
c
CIl
0..
E
o
o
LLU,tIitli
-i-lWW
<:t
'0
N
~
2:
:::>
o
z
W
o
o
<(
c
0
:;:
~
C'tl
....
tIl
C
C
0
~
C'tl
C>
";:
...
"C
C
C'tl
Q)
CO C.
N C'tl
N 0
1.0 tIl
I "0
Ol C
0 C'tl
C ...J
iii Q)
C>
"C
";:
III
~
0
...,
-
0
J::
....
:::l
0
en
T'"
ID
en
0::
U
.s:::.
.~
:J
--l
ro
a:i
E
ro
0...
....:
OJ
2:
"e-
o...
YT
YTYTYTYTYTYTYT
YT
YT
YT YT
YT
YT
N
'<tl!)N'<tNQ)1'-
N
co
N
(")
N
(")
w
()
C2
a..
c
<(
w
:::c
~
Q) l!) W '<t'<;f'(")o
Q) co C r-r--mT"""
'<""- l!) :::> ..-I'-'<;f'
-I N
()
Z
-
cci ro cci cci cci cci
W W WWWW
cci
W
cci cci <Ii cci cci <Ii cci
WWWWWWW
cci
W
cci
W
cci
W
cci
W
ui
c
.!:!1
0...
Q)
Q)
(/)
rorn ~
:J :J :J
rrrr 00
Q)Q) ~ '0
'0 '0 0..'- Q)
Q)Q) en '0
>> '0 Qj 8 OJ
o 0 m 00 c
~~ ~ 'C ~"ffi
0..0.. C .c_ 2: ~ ~
ro co Bo...o
00 00 00 E 0 Q) (/)2
Q) 00 .-
2 88 ~ 3:ui ~ ~ ~
o .0.0 -t:: >-Q) > 3: (J)
> ._._ -= '0 OJ.- (J) C
0.. zz -s ,gc ~ :'00 = OJ
o EE .s:::. ro Q) '<"":J C C
~ . ~. . u u~ ~rnmW - 0
22 ~ 3:~ ~ ~~ro2 o~.o'-.o ro rn
ti 0000 Ern Q)rn rn ~~~~ -.~-Q),- E
oo OlOJ X .~> 2> .s:::.> -~>-o ~oorn.oa c 0
Q) .~.~ 00 0 Q) c ~ C .-t:: C 8 0 ro c (J) ~ ~ .8 "- Q 0
~ ~~~ .0 ~Q Q 3:Q '-'O~~ui~.-,-Q)o ~ b
:J .~~~ui,g ro~ ~~ Q)~ ~'6(/)002~~2~~ ~ l!)
g200'O~E >~uig~ui~~ui_~o..Ei(J)o~o..-ui~ .~
'O~cCO-:J ~~cQ)~c>ro.~co-:::>Q)'-8c~-<(-cQ)w~0
rooEE~~~ 000.!:!1~00.!:!1 oo.!:!1>-~~~Q)ro.!:!1o.. 020...0>
-.s:::. o...s: .- Q) .~ C (J) 0.. oo Q) 0.. ~ Q) 0.. ~ U 0 0..:0 '0 0.. 00 : . '0 ro 0 .0 Q)
&~~~3:,,-.8.s:::. 2~~u~~0'c~u 0...,-rocOO'<;f'2>I-'O
~3:~(J)(J)~Qj~ ~~ooo~oo~~ooQjo.s:::.~~ro~~~~o_~o
~~ti~~~~'O om~om~~m~0..~~c.~00~2..-000...s:::.2~
~rn(J)>>~~2dEO~50~(/)0~~,<""I.!:!1i~Q)~~~~~og
~>,-(J)Q)(J) 'rnQ)oN'OoN'OoN'O.o.s:::.: 0.. _ro~,- Q)'-~~-
~~~~_ID~_mm~mID~~m~E~Nom~ la=nrn~-~
rn'ffi~roro~~wIDill~IDill~IDn~IDw~T"""~~=mwroo~~u2
.~ 00 Ol Ol ro.~ 2: .s:::. 0.. .s:::. 0.. Q) .s:::. 0.. 00 00 '- ~ ro 0.. E .s:::. I- 0 .!:!1 >- ro
o..'O(J)ccE> 3:00> 00> -> 00(J)Q)Q) E'- 00 (J):J.o3:
a::: c ~ 0 0 :J "- Q) 00 00 > ~ 00 > ~ W > ~ ro 2 'C ~ 3: (/) 0.. e 3: . > 0 -
ui:~~~a~il~~.o~~.o~~.oQj~~~2~~~e~~~~~
~~~.~~~~Qj~~~j~~j~~j~~~~~o...o...[~mtiE~~
oro.o'O'O-'--Q)-l!)ro-l!)ro l!)ro-000...>ro00.~~Ero~(J)'O
o..OJ~Q)Q)<(~~~Qj~>QjN>~~>Qjro Q)~N~ .~~Q)~2Q)
~(J) ~~coooQ)OO..-Q)OO..-(J)._..-Q)~Eo'O:J Eo..(J)-wro>
o~~ooQ(J)o>oro~oro~Qjro~>,-~~~~~:JooEro >e
3:00 00-'- - 00 Woo 00~Q)~'0<('- E c"-,-
Q~~>->-~0...~~~~0~~00~0~~e~~~8~.8~~~~~
.o~~~~~~O~~~E~~E~~E~g~~2~Q)2:~~~o~>-
Q) 0..0.. _ -N :IN:J :J,-'- .00.0 '-Q)EOOQ)-
~ ~ ~ (J) (J) in ro ~ 0...,....: .~ '~.,....: .~ .~ N ~ ~: '0 cL 3: .0 - 0 ui '- > "- 0 Q) S
- = (.f) U "0 ..~ :J _ ~ OJ _ ~ co _ ~ ro LO E N 0 ::J rn -- a.> ~ ''';::; 0 LO - 0
.S '+= u; <D Q) '""_ -== ~ 8 U? .8 .~ U? .8 ~ u;> .8 S ~ = -r;- u:: m ~ rn.~ ~ ~ (1) T""" (/) 0
ro ~ 0 ~ ~ 0: '<;f' ~ >< ro .s:::. >< ro .s:::. >< co .s:::. = N >< X -g ~ .~ 00 'C "" ~ en U =
E:J:J co <ll~Nm 0 ''S~, s~ ''S.~ ro'O~ 0 0..0 0..Q) 00 (/)> ro
c ,Q" '0 ;;:: ;;:: <( - r- 'S ~ OJ 3: r- OJ 3: r- OJ 3: ~ ro 0... '0 - Ei: ~ "- (/) ~ .s:::. .!:!1 0... ~
2=~~~~g~o~~~~~~~~~~EN~~g~BEQ~~~~
roOO(J)==o'<t~coQ)co(J)co(J)c~(J)o'-(,,)<ll=~eoQ)w ~
~o...=cc'O'OQ)ON~:JN~:JN~:J>-rol'-.8l!)O_ro"-Oco...I
~ :J._._roroZ~N(/)=N(/)=N(/)=-rol!)ro-Q)~EOJcoOU
~gO<llEroEEE '~e(/)Be(/)BeooB&'Oesg~2Q)~~Q)I(/)
Ln T""" -0 ~ L... ~ 'C 0 ~ if) 0 ~ (/) 0 ~ (j) :J coO) 'i:: co co -5 .9- '- c::: ::
N6~~N~~--l~l-o..~~0..~l-o..~oorol-~~--l--l(/)0...00'<t'<t
r-
'<;f'
COcnO,<""N(")'<t
'<t'<;f'l!)L{)l[)l!)l[)
L{)
l!)
m
l!)
co
l!)
Q)
l!)
o
m
..-N(")'<t
mmmm
r-
l!)
168 9
OJ
C
'C
.~
o
c
E
.~
(/)
rn
Qj
1Q
r-:
()
llJ
--,
0
0::
a..
llJ
I
I-- W I--
~ ..J Z
llJ
0 ::l ::!E
0:: a llJ
u.. W 0::
I
Z () ::l
0 rn rn ~
i= a <
llJ llJ ::l
-' iii ::!E 0::
llJ lI::: 0:: I
0 0:: 0 I--
0:: 0 a ...
0 ~ z ...
z o!I < en
0 ~
i= rn I--
::l ..J i= z
< llJ
I-- 1i: z ::!E
i= <
r/) llJ ::l ::l
o:l I-- 0 ()
:::J < 0
r/). ::!E w 0
I--
Z llJ in I--
0 I 0
i= I-- :Z [:i
0 ~ 0 I--
0 a ..J z
<
<( llJ Z 0
0 I-- LL 0
rn
I-- :::::i u..
I-- 0 0
() rn I-- I--
llJ I-- I-- Z
--, Z () W
o:l llJ W I--
:::J ::!E ..... F
r/) llJ al
r/) 0:: ::l
~ ::l r/) I
llJ rn r/) I--
t: < llJ iii
w I-- I
0 :;: <
(jj o!I ::!E ><
i= llJ
r/) 00 ~
llJ llJ r/)
I-- i= w llJ
<( i= u.. >:
() u.. llJ
0 Z 0 0::
< uJ
~ :::J lI::: en
0 < Z
llJ ..J I-- 0
I-- ..J Z i=
< < < <
z cij ..J 0
0:: ll. LL
llJ llJ
I-- I-- llJ 1i:
..J 0 0:: llJ
< Z < >
~
c
'm
E
c;
-
0
I-
YT YT YT YT
-
rn
0
()
-
'2
:::>
(J) m N m
(") m ..-
0 Q.i
E
:!:: ro
C cci cci cci cci Z
:::> w W W W >-
c
ro
0..
E
0
C U
0
.. .c
ell ::J c;
0 ...
~ c; .t: 0
'13 en
Cl> 0 i:o
N :; r-:
en u.. ....
oa ...: - ...:
Cl> a. ell a.
N rn ...: C)1Il
en "'r 0.1'- M
~ .
.... .......... ....
.t:
0 .t: .t: .t:
"'r M 00 '<;f'
.... 0
(")
Cl>
E
ro
Z
C
o
E
E
o
()
en
w
N
en
I-
Z
<(
-I
a.
C
w
()
Cl> :::>
E C
nl W
Z ~
c;
,2
C
nl
-
o
en
en
-I
<(
C2
W
I-
<(
:2:
(01-
'Z
0<(
Z-I
wOo
I-
:2:<(
>-Z
rn~
W
I-
-I
<(
Cl>
ell
-
:>
E Cl>
::J a.
C nl
O)()-
~:.J ~'~
o Cl>'--
> nl nl
~..E~
._ nl nl '-
-I Z..., en
nl
...
o
"5...2
0=
E--c
~::Jc;ro
,~ U "5.. ~
,!: C 0 C)'-
O)nlC
'- III >- nl
':;: E 0'2
III ::::l .~ .-
::::l0....3-
~ .~ [:]
Cl>nlo..Cl>
::::l ::::l nl C'll
O(!)()()
en> en() (!)
wO(!)()()
~~~~f8
I-
..-
'*l:
2
::>
o
z
w
o
o
4:
"0
r:::
ns
Q)
coo.
N ns
N 0
1.0 I/)
'"0
en r:::
o ns
O...J
CD ~
"0
"i::
CO
;::.
o
'"')
-
o
..r:::
....
::::J
o
en
.J:::
.~
~
---I
<U
Qi
E
<U
Il.
~
2
"e
Il.
Y7 Y7 Y7 Y7 Y7 Y7
c:
....
o
III .J::
='.J::I-
a.1Il-
:u =' 0
uCOC: !!!c:o
0....:=4.ILL:=
"8~e~~e~
c..EuoGiU::
't: 4.1 't: U .0 't: 'E
C'llc..C'll"C4.lC'll
:=4.1:==.2:=,!!!
Oooo3:COO-e
o
.1Il - -5.
4.I"C ='
c,Q) w
.!: u: ci..
.... c: c
9- C'll ..:::
III E W
-c:lll ::Ja. ~
CII -4.1 III 4.1 ~ C'll -Ill -CII
C'll uGi';:i .J::.J::.- c:~
.... ';: c: !!!::J a. 9 C:o _ _4.1.0
o ~ .- = 0 0 C'll .... ~ C'll 4.1 III
!E 4.1 . 9 a. == t ::: ~ 0 .~ ::I: .-
-g~CII::l:g~'Cii EC'll.E~=~~~
~ .- .... 0 4.1 CII CII t = c: E .-
Cl9.l~"CO a.'c,..!!:! III >- E III E
-.... 4.1.... = ::J E C'll C'll C'll C'll
.!!! .... 4.1 c: .... 4.1 > a. .- e - .- C'll
.!!! .!!! u .!!! C'll .0 c: 00 :u !!! -e .... CII -e .-
~J:::j CII Cll g ~'i1j0::: u ~o,g=; 0 ~
c: ~ ,g E l!! :c g' W .g ~ -5. ~ c: -5. N
2.::. >-C'll Cll~ oi!) 0 O::J Ill.!!! ='LL
cooo:;E::I:OO..:::couc..c..wc..ow~
III
00 c.. U (!)ooo uc.. :t~
eoooowc..D..c..CO(!)o:::uc..O:::~OO~:;E:;E:;EZI-:;Eo
COCO:;Eo:::oooooo::>cooo:;E::I:OO..:::cooc..c..wc..owz
mO~"-N~~~~m~romo"-O:::N~~~m~
m~c..~~~~oo~~~~~roro(!)rorororororo
~<J)
N
r:::
o
+:i
.!!!
ns
-
I/)
r:::
r:::
o
+:i
ns
C>
'i::
...
cO cO
ww
-co
C'll U
U _
. M
N
...:
...: a.
a. III
III -
_ to
~
-....;
"";.J::
.J::.
. ~
0....
..- -'
.' N
co ....
....
1.0
en
0:::
()
o
.0
"C .5
0-1
o 0
:=.0
C'll E
.... ='
~(!)
C'll
C'll.c
Cll ='
o ....
.0 CII
.... E
CII .-
CII III
.- CII
III ...
Cll Cll
c: III
- ....
::J ='
coco
~romro
~~N
cO cO cO cO
wwww
~
00
....;~~~
J::b....;..;
+!...:uo
u.c. -
_. NLO
coco..-....
E
co
~ E E E
~COCOco
oc..c..c..
0::: Cll Cll Cll
C'llClClCl
~~~~
o-g-g-g
U::uuu
.J!! 0 0 0
!!!iii
Cll E E E
C'll___
.- CII CII CII
ga.a.a.
..... - --
III C'll C'll CII
>-.0 .0 .0
o C'll C'll C'll
0:::000000
Y7 Y7 Y7 Y7 Y7 Y7 Y7
mmmromm~
m..-~roroo
~ roN"-_O.
cO cO cO cO cO cO cO
wwwwwww
c.i
o u' u' u"
;". "
. c.CO 0 t.!_o.o
~a.Cl~oOoOo
ooa.~M: ~~
...sM. _ ~~ ~...:
C'll"':Ec.. ~c..a.
Clg.2..!!!alll~
"'...:3 CoP"': ~;:'.....;
~:F:E:=!!:= :=
III 00 ='00: 000
_ N:!E....N........
~ -=- ex, -F ~... -=., -=-
1:~><~~~~
WMCO~-c-~-r-
:=
e Cll C'll
o .!!! Jg
E"C
o ~ 0 'S;
I-CII ~ c:
>- c.. Cll 'i1j
CII - .J:: E Cl
"8~ ~~IIl~
I- ._ 4.1 III .....
>-CO-4.I:=CllIIl
CII _ 1:: .= C1l Ci III
'E~~LLOO ..!!:!
Cll'- 't:.... >- c:
-a.><C'llCll:CO
g:e~:=~~.J::
>-1->000..:::1-
Y7Y7Y7Y7Y7Y7
m..-N<J)~<J)
~mmroNro
..-NO..-~N
N N
cO cO cO cO cO cO
WWWWWW
. c.i "
~ ~
~ 0 0 0
:Obbb
~MMM
N :'...:- :- :'
"':c..g.c..~
~~:J~..OO
::i1::F1:;"'O
.J::: to: N:
: 0 _N":O
CO....O....CllM
~ ~ a. ~.!: ...:-
COCO: CO...J Cll
Cl Cl LO OJ _ c:
..........,....M:.J
.:.::
c:
a::
E
C1l
Cll
...
U
.9i
o
<Ul:;
'- C
o 0
- 0
..- ~
wO
o >
_0
]j~
0.> I
"C..-
,-'0
0.> C
o..CI:l
. ~ E
~:.a~
Cf.~~
'- 0
Co.>>
0-
.- 0 0
OI-C0
o.>~N
C C
C 0
00
Oo.1S
0.> 0.>
0U~
'2:2: Il.
0.> 0.> I
cn(j)O
f'-..g.g ~
ot5or-
Zo.>o.>
WWW
l-
e:(
Z
0:::
w
I-rom
...Jroro
e
cO CI:l
W W
cO cO
w w
c
o C
'"5 0
0.>15
c 0.>
C C
o C
o 0
o.1SU
co.1S
.Q C
CO .Q
Cm
'0 C
au
o '-
08
uiO
.~ ~
m ,Q
0~
'E r3
~'E
0..0
cn~
(/)(j)
.<!! (/)
~ ill
:.;:::;:..;:::i
::>:=
'0::5
~-g
!!!.~
o!!!.
2 0
CI:l U
2 ro
'-2
0.> '-
0..0.>
G:> 0..
Q) ill
E(j)
G:> E
ro Q;
3m
0.> 3
(/) 0.>
co ill ~
. n::: 0.>
0= n:::
z~
w.,.-(ry
l-
e
z
0:::
w
1-0..-
...Jmm
e
>- >-
cc
~ :::J
o 0
00
>. >.
COCO
cO cO
ww
~ 'm
w~
o-:g
'00 ID
(j)o..
'0 0
I.... "0..
0.> '-
0..0
~ 0
o.>(j)
-2 ~
'- 0
00 CI:l 0
:;Eo a
Wo2
!::150
1-20
U C c
Woo
..., .~ :.;:::;
o<U<U
0:::U5U5
D..ro-<r
O~N
W I I
:J~~
&:Q:Q
::>>>
0000
>-0::0::
I-..-N
~oo
o ill OJ
Uoo
ffi:gE
- 0 0
:]00
o
U
16Br9
i:ti
E
<U
Z
>.
C
CI:l
0..
E
o
o
~
-
o
~
..-
o
.,.-N
16 B\~9
Collier County Board of County Commissioners
Contractor's Experience
Bid Number: 09-5228
CR-951 South of Jolly Bridge Landscape & Irrigation Installation
In order for Contractors and Subcontractors to be qualified to provide the services required
by Collier County under this solicitation, Bidders must submit the information requested
below. Documentation for items must be submitted with the bid or they may be deemed
non-responsive. Information must provide convincing, clear and concise evidence
acceptable to Collier County, that Bidder meets each of the following minimum
requirements:
1. Bidder must have a minimum of five (5) years experience in landscape/irrigation
installation in the roadway that the Bidder is providing services for. This experience
must include proiects of like size and complexitv for each service listed.
a. Who will be performing the landscape installation:
Prime:
or Subcontractor:
Do they meet the 5 year South Florida experience minimum?
(Defined as the following Counties: Collier, Lee, Broward, Miami-Dade and
West Palm Beach)
Yes: No:
Projects of like size and complexity:
Yes: No:
b. Who will be performing the irrigation system installation?
Prime:
or Subcontractor:
Do they meet the 5 year South Florida experience minimum?
Yes: No:
Projects of like size and complexity:
Yes: No:
c. Who will be performing the maintenance of traffic:
Prime:
or Subcontractor:
Do they meet the 5 year experience minimum?
Yes: No:
16 B': 9
Projects of like size and complexity:
Yes: No:
d. Who will be performing the Motorola Controller installation:
Prime:
or Subcontractor:
Do they meet the 5 year experience minimum?
Yes: No:
Projects of like size and complexity:
Yes: No:
2. Bidder must provide convincing, verifiable, clear and concise documentation
acceptable to Collier County, that Bidder and his subcontractor's must have a
minimum of five (5) years experience in the specific areas of expertise that the
Bidder and subcontractor is providing services for as listed above in items A through
D; this documentation must be substantiated that each firm has provided services
that are comparable in size and complexity to those requested in the solicitation.
For items A-D below, provide the name of the account, address, telephone number
and name of contact person, dates of service, contract amount, approximate size of
areas serviced and type of work performed for verification.
A. Landscape installation, prime or sub-contractor.
B. Irrigation system installation, prime or sub-contractor.
C. Maintenance of Traffic, prime or sub-contractor.
D. Irrigation, Motorola Controller installation, prime or sub-contractor.
3. Provide evidence of communication equipment for prime contractor such as cellular
telephone, which allow the County immediate access to the contractor when
services are required. The access must be provided on a twenty-four (24) hour
basis seven (7) days a week both on and off-site.
4. The contractor is to provide a list of all leased and owned equipment.
5. List of landscape installation and irrigation employees performing the work on each
project (provide title, length of employment with your company, experience).
6. List current projects that are part of your firm's workload for April through December
2009 (provide location, contract amount, duration, staff assigned).
7. Provide copies of Collier County's current landscaping/irrigation licenses.
2
<:
.2
Q ,
, .~
~ ~ ,
" ~ "E
~ '6
'" :li en 0
en
lA
c
~
2
;;;
c
o
'->
OJ
.~
.~
~
,
~
1~ ~
_ c
o~E
. '
QJ....~
~~ ~
2 .g,~
, . ^
O'I-c:Ci
-,
~~~
""c
.~:2 c
0,,,
<:.~
> ^
c Q 0
~~~
.- ~
" -
o ~ ^
~ ~~
'-. ,00
~~~
~~~
.~ ~~
_0
~ ~
.~ Q,l g"
l": :S"u
. 0
.go.)}
" ,
1/}.1!!'li
.~~-2
g -0 \J
c5} ~
. Q
'" <:
~ ~
~ ti
l
..0
1;( U[) .do/S
III
II
(t)
~
:s
i-
C,J
::::!
g:
(t)
~
~
~
a
i-
<<:
~
h
<<:
...J
~
(t)
'<:'
......
G
,I-
.....
a
l~
,~
OJ"-l
Q
~V)
:~
. , . C)
~ ~ ~
o .
'->~
.../
'"
'"
IF.. ...
C)
co
.,
C)
~
c> (t)
~ e5
~
Q:l
co 4J
~ ~
i-
.. '-t 4J
~ ~
g~'-CO
'" '" Cl:::: Cl::
., '<C a
g ::t
<5} <..J t3
~
C)
~
C)
2
16B~9
,;
z M
: 0 .
~ ..... :('\1
r--iO
Ie .:or-
! i2
.....
o
~
~
L....
i-
~
t:::
~
>.:
I-
.....
o
~
~
o
U
I-
a3
~ ~
.g fa
OJ (J)
~ ~
~ q;
~ ~
8 0
" IE
>..
~
o
~
~
~
~
C,J
h
~
i-
~
(t)
~
(,:)
~
C,J
<<:
~
f;3
~
~
~
~
Cl::
U)
~
<.J
L..JI-
-.Je;
~
I:::l
cd~
:z: C:i "'l:
Sl U) a..
~ l.t.J 0::
:> -.J C:i
L..J "'l:L....
i:;j co
<.JU)
.....fl::
I-~
~O::
~~
U)4J
~
I-
~
0:
I
I
I
I
I
~---- :
.'-' \
.....-..: i5 .
t)~"tJ 0 .
~!<~L...,"- .
c: C\,j 0. vi C) "t::I
~ -:.s ~ .., '-
~~g~~~
~ ~~ -g ~ ~
'S: '- r,;j o.~ III
~ ~ cO' ~ ~~
l.... ~ CO Q::......
'- (:) ~ '- III C) .
~~~~O:::2~
ii ::s"'t;0I-g
c::'::: 1I,}"'l::I 'l\ c:: ,U
~~a~~~~
=~~~~~&
~
0:
.0
~
-,
"
o
'"
: --;;:au ~
....
Q
I
I I
I ~ II ~
m~
~l 2
I ~ I Cl
I ~ I
<3
U)
~
2
<.J
::J
e:
U)
c'
{;
~.~
'" '
!! 0 j:
Jd .
. .
~
-.J
~
lJ)
~
C>
o
<Xl
-
..
t
~
"
<:;,
o
.
-.
.;
"
2
to
~
f5
[;3 ~
f..,:
L..J
.... L..J
~ ~
8 ......
I:::l
~
C:i
~
~
I- ~
...., <.J
~ ~
.....
C:i
g:
F
~ '5 ~
Cs g-
o <Xl
Cl.- ] '"
o .
ct~ '-'
0
'"
" ~
{;'"
02
.'"
~'"
2:5
~ i: <:
~ ~ ~ ~
- ;.. ~ .....
~ ~ ~
. ...., }..:
.3 Lj ~
...;'" ~
. <:> .
~c; ~ 1;
~ ~ ~ ~ .~ ..;
~ :~.~~~~
~ ~~ g.~~
~ ; 2 ~2 t
g.o~'C ~
~ ~ "E ~ ~
~2~~:
~~~.~g.
IllO_....~
:S 0.g"W <l.I
~~~~~~
~~eE~5
,
"
{;
o
~
~
<1'
.0
:
,;
~
,
.
c..
~
-
-1i
III
~
,
,g
~
15
..... .....
I-
<<: ~
:> :>::
L..J .....
i:;j
L..J
~
~
-.J
i:::!
L....
'-'
~
-.J
"'l:
U)
~
<.J
l-
e;
f;3
:::-
"'l:
~
::5
f5
L....
U)
85
.....
~
~
L..J
~
I-
~ ~
~ q)
~ ~
en ~
o
"
'-'
....,
~
~
~
~
() .
~ ~
~ ~
f..,: i;
~ .
V) t
o
~ ~
~
tI) <:
~ ~
~ ::::
"
o
o
L..J
~
f5
~
-.J
~
<.J
~
~
I-
~
U)
'"
./ 'I l
" \"- ~ ,,)\"- ~
.!. 0 [. 0 1-' it
ci.
~
-
.
~
'-'
~
<'..l~
. .
-Q'S
",C>
o 0
,,"-'
~
.
~5
0"
0."-'
""
c:: ll,\ c:
.~ e .g ~
~~ if ~
.
~ ],~
~ .~ &<:{
~ ~~~
:S CIl:::J ~
~ II> III 0
v .~ ~:
.~ Q,'"
Vi .~ ~ ~
g ~ ~ ~
~ ~..!? II>
~ ~.-~t
Cl.
:S &~.~
c:: ~:g--
o ,~~ 2
~ Qj(1)"i:
~ :: ~s
~ ~~s
~ ~lf)t
~ a. ~-g
(.) lU::J
~ ~ ~~~
i j ~~l
_ ~ [5 ~
~....... ()
..,.-
~~~
, ' "-'
t..?t
%.~ ~
.2:2~
",'-'
'0 ~ th
~ ~::~
:; -00.2
-2~-g
~("Jt?;
"* 'O.l....
r:n:S~
<-
~ ~
~ ~
~ .i
.0 0
t '2-
~ 2
] ,S
o
"-'
...;
"
'"
~
it
e~
o 0
- ,
~~
16 B '-9
5
~
~
<.J
I-
~
~
[i1
(J)
~
""
~
1i)
o
BJ
>-
0:::
~
~
~
<<i
~ lW
~~
'-'<;I
~~
~2
<= ~ ~
<:::>
;:: ~6
~ ~e:
L..J >-
Lj ~ "t
bjS
:0'"
~~
00
~<;I
~
~
-.J
L..JU)
i5-.J
....~
tl)L....
.....
<:::>9:;
2~
I-U)
<<:85
~
.
~
V)
o
~
:i!
'-'''-'
",ils
~~
~ ~~
~ lu ~
~ ~~
~ i>!~
L..J'J!
S~
os
~~
:0
~~
00
hiii
u
,
'il
c..
~ .~
~"'t.g
~c..
t~~
,&"'c..o~ ~ ~~
.............. 0\
~
.--_____ __ -'J h=
--L________ ::::::- ~
^
o
~
~
a
""'
""'
.~.~~
~~~
~~~
-0_
~~~--:
~:~~ r
"'"
~...." ~....
"3 1:;)Cl
o....,.SQ
Qa...........
.;
~
~,
~
o
Q
o
o
.2
g
======_=~=::J
~ I
0- .
11 ~ -I
, "
.2'" I
0....
82
",c.. I
l -""'
u"
i~
0"
~~
~~
- =~.c==J~
f~~
a.Jorv .lO,q
"
'"
~~g~
~~C~~
..g~ 1)"0"")
&~~~;
-_...."t)'l.l
~ooa~
Q.t.r)Vl::r::.n
.~
.c
o
c..
..
o
oG:
.0
,,"
.~ C3
~~
. ,
Oa
Cl."
-!,,,
.0. ~
.~ g
Q~
~
;:::
~
'"
,:;j
0:
~
;:::
~
'J
~
o
.2
."
o
Cl.
...
/'
I
I
1
1
.
o
Cl.
<;
~
g
=~
I
I
I
I
I
1
+1
1
~
~: ~~
~ '<;j-: ""-
~~(~~
'~-g~g~
::~1~~
~ccC5~
QVlV;:r.::Vl
<I.JO;Y .10.[
~
o
Q
"
.
~~
-<:
c1l~
. .
u u
o 0
. ~
c..c..
~ '
o ~
:::>5
-:::>
:::>
"
~~
o
. .
.'"
.-
c "
~:~
Cl~
a'"
,,~
:'0
~ ~
0'
~"
_ 0
"'....
\11 t: C
~.g'~
&~C;
~tS~
~ .~.~
~lL...
~ \.J lU
o.9..c:
<t"....
g.
G:
~
'"
"
.\'
L..J
U
~
I-
>:::!
U)
::::..
......
~
)..:
h
"
o
o
o
G
.
;::
o
:<;
~
~
o
Cl.
"
e;
'"
~
,
'"
~
h
~
'"
,:;j
~
o
Cl.
\ ~,
;\ 1\
,.. ,
,
o
~ I
E
~
Vi
:'
.
~
",c..
.~~
~~
~~
"-",
~;:
c:~
~ 11),
~~
~
L..J
U
~
h
>:::!
U)
l::J
L..J
~
I-
~
~~\
~
"__"""""N"~"'"~'~_~~__
~
L..J
......
::::..
<:
<<:
-J
Q.
.':J
~
.~~
]~
oC::;
Q~
~~
~Q
~~
.'': ~
~
c..
U)
t3
~
l(
I-
>:::!
U)
~
h
(.')
~
~
~
U)
~
~
~
......
-J
~
t3
~
l(
I-
>:::!
U)
16B~; 9
Q
z'"
iio.
~M~
"p
~i~~
<5
e::
.2 8
. ....
"
~ ~
'"
<;
0 S .. ~
i5 13
.:o! @
'0, ~ "
~ ~ ~ Cf)
" c..
a c: ~
0 Vi .2'
0 " 8 ~
" ~
~ 0 ~ ~
~ Vi 0
0 (j)
0 .2 u.
2 ~ ~ :g a
" 0 Bi
~ 0 ~ '"
.Q~
.2 . 's :>-
"
.~ ,: u a::
~ 0 ~ ~
~~ "
~~ 2
~ ~
Vi ~ S
c-5
.0 ~ ~
~'"
u 0 S
~~ ,
"'0 .2
" 0 .J?
0.0 0
~ ' " @
~'" ~
~~ .c
" ~ .2
. ~ ~
. 0
o ~ "
~ " ~
~ .~ c..
" 0 ~
~ '
0
..,: '"
V1
t3
~
h
;::!
V1
~
~
~
,
.2
'"
-8
o
5}
~
s
*
~
i5
.S
,,-.;
~]
~~
" .
,,-
~~
.0
^'"
0"
o
",::-t:
0;':;::
U ,
o
- "
- u
~ 0
00
E~
o~
i:O
~ .S
~~
0'%
-"Si
~ ~
~~
~~
~S
. "
~~
-.;
.
~ "
o ~
""
~ ,
-;; "
. .
"'0
'"
~~
o
,
]'<1:
l~ .
......"- ""
" 0
fj~:
" ~ 0
5 '2 ~
~ ~.~
o . "
~ ~:
.- ~
E ~ 0
.1)....... '-
" 0 0
~" "
QJo.,lI.l
~]~
- ~
. " ,
~ ~ f::
~ ~ :
,,-
~ ~.s
3t;~
~, 0
",O.Q
~~ g
~.~ :
~ ~~
~~~
~~.2
~~~
" . .
h.,::! :E
"
.c
.2
"
~
.
~
o .
~ t
~~
~ 0
~ ~
~~
o 0
~'"
~c:
o .
, 5
"'E
.0 ,
~ t
;;::-0
""
~ .
~ ~
~ ^
~.~
~ 5
~.Q
" "
0:'::;:'
"
E'{?
o.:o!
.
~"
o
.~ 0
"C ~
5'~
~ u
aQ
~8
CQ
o 0
Cle;
..;
"
lJ ORIGINAL
16B! 9
CONSTRUCTION BID
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
CR 951 South of Jolly Bridge Landscape and Irrigation Installation
BID # 09-5228
Full Name of Bidder \//'/a.- G()rl ~rot L..m-ir!'i;('11r,'V1j r26r p .
Main Business Address ;2(J~51 SW:2./ & -fA Sf: J..-{/aJrJ // 11. 33/7()
Place of Business J..jj 75 BtJcJ<:1 ~ ham KJ. -':t !-I'I~c; J 12. 33Q()S
Telephone No. ~~. J.j~~ . ')?DU Fax No. ;2.30;. -'-/tc,. <..J7()O
State Contractor's License # Gr1~ ()(;,() '7 '13
To: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA
(hereinafter called the Owner)
The undersigned, as Bidder declares that the only person or parties interested in this
Bid as principals are those named herein, that this Bid is submitted without collusion
with any other person, firm or corporation; that it has carefully examined the location of
the proposed Work, the proposed form of Agreement and all other Contract Documents
and Bonds, and the Contract Drawings and Specifications.
Bidder proposes, and agrees if this Bid is accepted, Bidder will execute the Agreement
included in the Bidding Documents, to provide all necessary machinery, tools,
apparatus and other means of construction, including utility and transportation services
necessary to do all the Work, and furnish all the materials and equipment specified or
referred to in the Contract Documents in the manner and time herein prescribed and
according to the requirements of the Owner as therein set forth, furnish the Contractor's
Bonds and Insurance specified in the General Conditions of the Contract, and to do all
other things required of the Contractor by the Contract Documents, and that it will take
full payment the sums set forth in the following Bid Schedule:
NOTE: If you choose to bid, please submit an ORIGINAL and ONE COPY of your
bid pages.
GC-P-1
~
'l=l:
::2:
::J
o
Z
LU
o
o
<(
"0
c:
l'll
CI)
ClC)Q.
N l'll
N (,,)
I() 1Il
'''0
en c:
o l'll
C..J
r:a CI)
C)
"0
'i:
r:a
~
(5
.,
-
o
..c:
-
::::l
o
en
.>:
,g
::I
...J
ro
(ij
E
ro
0..
...:
OJ
::2:
0'
a:
c:
o
:;::
~
ni
-
1Il
c:
c:
o
:;::
l'll
C)
"i:
...
't'"'
I()
."
0::
(J
iV
-
o
I-
0000
0000
6666
coooo
~ LO. co LO
C'") C'")
000
~~~
OLON
OLON
o C'") C'")
""01'--
~~~~
~~~~
-
1/1
o
()
0000
0000
6666
coooo
~ LO. co LO
C'") C'")
OOCO
~~~
1'--00
-
'c
::J
~~~~
~~~
5
O",,"LO
OO)N
""" I'--.~
"""~
~ 0)
-
'c
::::I
. . . .
~~~(/)
...J ...J ...J ...J
roLiLJ..,
LU..,j(/)
c
o
..
CIl
U
l;:::
'u
Q)
Q.
C/)
06
Q)
N
en
;>.
(.)
en ==
- 0
alo..
EI-
::10
Uo
c3u..
_oc':l
u>. 13
ro __ ~
-E5Q..c
ooLUo
0000
00
c
Q)
E
::I
U
o
o
00
Q)
00
rn
ro
0-
m
:8
0.....
a.i co.....:
o Q) . ~'m
~ .;: == cD"""
I- '0 -ffi .!::: ~
...J =3j-o-E
<( ~~213
(/J O'-;';:::\t-
o oaleo
~ ~ '0' 0- t5 .!:::
C _o~:!::~C)
0- <.9 '0
c ~3joc':l:gffi
~ '(3 ~ '0: rn
Z i5oCNQ)
,-_ro""'-"O
o ~-g~.sc
'" 6 -roog.
'-" 0:: a5:==C'O
(/) z <( c~
~~ ~ fu 8E~~
!:::O t: a::: <.9Ealo.rn
t- cc Z 0. Z ~ .= 03 ffi
W()~,,~ Z 0005-0.:0
,-,'-'''::; 0 <(roQ)CQ)
~ Z u:: 0.. (/) - 0:: 2: ..... .~ E Q)
c~<(u..o..z!::: _<.9roQ)'Occ
00.::2: <(0..<(...J = 't:~Q)E:E<;:::
.. o::O::s:1iO Q)oc':l,3ro:t=
'~~0~(/)o::E6 g;z OJE~~
U a::: u.. 0 oc':l ^" W a::: I- 0 C rn ro .-
Cl)wo.:: u..CI- j:::;:;c'-O
~ Z LU LU t: 0 W z <Ii <( .~ .Q OJ:!:.
wo..O::2:~!:::o gO::Q)1il-g::;3.8
(!) oc':l zO::o:: C/) 0 Q) <( ;>..S:? ro 0 .....
I-<(LU- -o..roCi__o
5! z Z 0.. I- 5! z ~:;: LU Q. 0- ::I 0 'C
COLULU(/)::::!COOrorno::(/)roOO::o..
W::2:l-o::Jww.calo..<ci ..cic.:i-c:i
c/)>-~LU~C/)Ot5~LU
<(<(<(o..(/)<(a:::o~t:
CO 0..::2: z <(co LUO::(/)(/)
Q)
o
E
Ci3 CD CD Q;
0..0..0..0..
T'""" N C"") ""'"
LO co I'-- co
.....
o
z
W
~
z
a:::
W
I-
...J
<(
N
o
z
W
~
z
a:::
W
I-
...J
<(
M
o
z
W
~
z
a:::
W
I-
...J
<(
iV
-
o
I-
-
III
o
()
-
'c
::::I
o
-
'c
::::I
c
o
..
CIl
U
l;:::
'u
Q)
Q.
C/)
06
Q)
N
en
Q)
E
CIl
z
C
o
E
E
o
()
Q)
E
CIl
z
iV
U
'c
CIl
-
o
co
C/)
~
it:
W
~
::E
"",I-
~5
wo.
:E~
>-z
I/la:::
W
I-
...J
<(
OOCOOI'--O
00"""0"""0
u-5cxi6cxiN6
O)N..-COLOLO
NLONNCO",,"
N""..o"" cO
~~~~~~
00"""00)0
~~~~~~
LOCO",,"LOI'--LO
LOO)COO.....N
N NNC'")
~~~~~~
O)CONCOC'")CO
C'")CO~ N
. . . . . .
ro ro ro ro ro ro
LULULULULULU
iV
U
in iViV
M uu
..; iVM~
Q. U..
III .g~Q.Q.
r.;. ...... (I) (/)
.c '. .
io. ..; C/) Q. co. 0:
...;0.=11>....;..;
.c.!!!:Jin.c.c
....u- ..
co.c .... N IX)
";".. ..;..c:: "": ~
.co.c...
"'" .' . 0 0 co
,.....I()~~.........
Q)
CIl
-
:>
E :u 0
:J Q. ..Q
C CIl .~
..ll: ,21 () ,- -g ...J
CIl...J ~ ~ 0 0
o ~ 'jij iV ~ ..Q
Q) .- E 'tl CIl E
>~ '-"':J
::iz~m~(!)
CIl
'"
o
-a.2
0=
CIlE1iji
lij.a.cCCll~
'-UQ.CIlQ):J
Ceo '" 0 '"
'51 CIl C Cl..Q CIl
"'1II>-CIl",E
.:; E U 'c CIl '(ij
III :J .!!.! 'Q. ,!l:! CIl
B~l6iVl3:U
:U'jij8:l3.E~
:J :J CIl CIl :J :J
O(!)()()COCO
C/)>C/)()(!)<(C/)
wO(!)()()COCO
WNC'")",,"LOCCI'--
Ct::.,......,......,......,..............-
I-
16 B \"9
...,j
u:i
Q)
E
ro
Z
;>.
C
ro
0.
E
o
o
"""
-
o
......
'1:i:
~
::l
a
z
W
a
a
<(
'0
s::
CI:S
Q)
coo.
N CI:S
N to)
it) Ul
''0
en s::
o CI:S
g-'
m Q)
C)
'0
'i:
m
~
"0
...,
-
o
..s::
-
::::J
o
in
.r:.
g
:J
...J
ell
Ci.i
E
ell
0..
....:
OJ
~
'0'
0::
s::
o
+i
.!!!
ns
-
Ul
.E
s::
o
..
CI:S
C)
"i:
~
or-
it)
en
e:::
u
iU
-
o
....
-
III
o
U
~
c
::)
"
-
't:
::)
c
o
+::
III
U
;0:
'u
II)
0.
W
O/S
II)
N
in
II)
E
III
Z
C
o
E
E
o
u
II)
E
III
Z
iU
.!:!
c
III III
- -
o III
al Qi
,!!!
c
o
-
III
>-
o
0::
:E
>-ww
(I):EO::
;;ico
c..
o
~
o
v
C')
o
CON (0
~C'!t'-:
1l')(OIl')
C')COO)
N. ~ I'-
VN
Eh
Eh Eh Eh
o
~
o
N
N
(01'-1'-
~~~
......0)0)
......0)0)
......
Eh
Eh Eh Eh
CO (0 CO
C') N
I'-
V
ell
W
ell ell ell
WWW
.;
J::.
.;
c..i
C
....
..:.i:........
l:;J::.J::.
...""";
.cc..ic..i
cineo
.... .... ....
E
iU
c..
iU
>-
o
0::
III
"tl
'i:
o
u:
E E E
iUiUiU
c..c..c..
II) II) II)
ClClCl
III III III
.c.c.c
.c.c.c
III III III
UUU
000
===
II) II) II)
E E E
iUiUiU
0.0.0.
iUiUiU
.c.c.c
III III III
www
COil')
C'!~
vO
0)......
v(O
r-:
......OCON(O
~~oqt'-:~
NONI'-Il')
vCOC')N
(ONCO Il')
"':..fN..ft.O
Eh Eh Eh Eh Eh Eh Eh
NIl')O)OCOCOCO
~~oq~~~~
VOVll')OC')(O
Il')C')CO ......
Eh Eh Eh Eh Eh Eh Eh
0) 0) 0) CO (0 0) I'-
(0 VCOCOO
Il') CO N ....... O.
ell ell ell ell ell ell ell
WWWWWWW
c..i
"tl .0 c..i c..i
tiio:tEo 0
. 0. II) <.> <.>
cij 8: 1f io .0 ~ .0
UC'd:!~~ ~~
.. :' j .... ..... .... .....
~~:E~.;~lS.
,... J!! ..:::J ~ +:t en
~';0.J::.":J::.
c.f.!!! ..c.. 1:
1II0';~: ~
~~;:l:N:!:N~
~~~~~~~
eo ,... eo M ",'M '"
~
e II) III
... III
0:0 Jg
E III '>
~ ; ~ c
>,c.. J::. ~ 'jij
~o llliU g
~~:E~~~~
"tl III >-LI.. W C) II)
lii.!:!:E't:"'~E
Ui8")(IIlg!J::.o
1I)...~~=.ii1J::.
>....>Ow"""....
NCOC')COll')vO
M~~C'!t'-:t'-:~
OVVll')l'-C')O)
C')O(OOV(O(O
OOI'-NI'-O
"':N..f"':Nr-:..f
Eh Eh Eh Eh Eh Eh Eh
CO CO 0) CO 0) 0) CO
~~t'-:~t'-:~
(o1'-C')(OC')C')u:l
Eh Eh Eh Eh Eh Eh Eh
0)...... 1'-(0 1l')(O Il')
1l')(OIl')CONCOO
.,......NN~,......NCO
N
. . . . . . .
ell ell ell ell ell ell ell
WWWWWWW
c..i c..i c..i c..i
o 0 c..i 0 0 c..i c..i
0: 00
","c_ o~_ .
NMcMNcO
.!",:-('I')...:,-..:('I') co:
0.0. ~o.o.~":
.!!!.!!! ~.!!!.!!! ~ ~
..J..,J(/)........;CI)__
..r::..c";]J:J::;J...
~&'f&'~f;=
........co..........oooo
- ~ ~ - - ~ -
. . . . . . .
iUiUiUiUiUiUiU
ClClClClClClCl
M M,... M..............
~
c
a::
E
III
II)
...
u
c c
... ...
o 0
III J::. >- J::.
~J::."" =....
0.1II~ ..J~
; ~ 0 )( 0
Ualc ..!!!c
O...~II)LI..~
-gll)e~~e
c..~UOliiUII)
't:1II't:U.c't:~
1Il'Q.1Il"tl III III 0
~III~='=~O
owo3:alCU
o
~
o
CO
r-:
C')
Eh
Il')
C'!
C')
Eh
o
v
v.
......
......
ell
W
J::.
-
0.
III
"tl
M
"tl
II)
E
II)
w
Cl
III
.c
~
~
U
N
:c
c
II)
iXi
c
o
+::
III
t::
o
0.
III
C
III
...
r-
"tl
C
II)
iXi
III
~
-
0.
>-
iU
U
~
W
<(
II)
"tl
III
(5
1::.
U
:i
:E
o
~
o
o
I'-
Eh
v
6
Eh
o
o
o
Il')
LL
(/)
o
~
o
o
o
N
C')
Eh
o
~
o
o
~
N
C')
Eh
ell
W
168 9
o
~
o
o
Il')
OVIl')
~~~
OOCO
OCOIl')
L()V~
OL()
N
(Ov
C'!~
L()O)
vL()
co. N.
N I'-
Ov
~~
0(0
0......
L()
Eh
Eh Eh Eh
(o(oNN
(0 (0
co. (0.
L() 0
NCO
Cll
E
ell
Z
>-
C
ell
a.
E
o
u
o
~
o
o
L()
OVIl')
~C'!~
OC')N
o
~
LLLLellell
...J...JWW
U
a. ~'O u~
E -o,g~ ~L()
6. E ~~2 ~*-
03 (l)ui<D~~ a.:;
Cii Cii'EQ)~g 50..
o >-ellt)a.o o..Cll
o (j) ~ '0 C (j) U Cll c
.c52ffio<Xlal c.8
~~~V)~;::,-g .9~ rorn
1! .g ~ gJ -g uJ g ffi 0.. .~.~
0.. 'u E E 13 U .- (j)' 0.. (j) .c.c
M g{ ~ ;: .S ';;; .9 c . C) U t5
a. (j) <;::: :5 .8 = -' 0 g, B .~.~
.cU)~"'C____-a5~~E\f:: "'0"0
O-L-......c_ VJ()ij:::Q.. L-.....
~ (j) ~ ~ ~ .~ i;:: ~ S
~ U ~ ~ .~ ~ <Xl .~ 6 ~ on Cll al
OellEU<Xl~a.a.ouC:O:O
~ 'S 0 ro 0. ::J (f) U ro .Q 19 ~
c - oc::: 0. L.. ~ oC5 '- :r: co "5 ::J
Oell:J""':JCllu~ell.r:..g(j)(j)
-0 E ell - l: a..o........ I '0 '0
~ '0 '0 0 g ro 0 U .s ~ .~ 2 al
c ffi C a. c: ...... -'S C1> a. co ~
.~ ell U 0 0 ... (j) > C (j) 'S
..::: (/) (l) --:;:::;.9 - Q) .- "0 VJ ~
U c ~ Q:; 0 ~ (,) ~ .S c: c: .S (;
.91 0 ell a. - al ~ Cll - .'= ell .:-. (j)
W",;::> Uo.--ocro _L....Ccn
gJ ~ -g ~ ~ ~ 8 ~.~ ~ ~ g ~ ~ r
a.'o 0 - 0 0 . ell C 0 Q) 0 0 ~ ;7"
ellCllEroUoca.O:;::'OuuCll~
z a. al Cii ..--.Q...:;:: ~ ui :g :g 8! <Xl
(/) .0 C C ~ ro Q.) co "C c - - ~
ro r.r> .Q .~ g ~ (j) 0. ,g>.:: 22 ~ ~ ~ g'
en 10 0>:0 ~ ,9 ro ,:: -0 ~:c- ~.~ 'a'
C Q) ~ E (j) u ~ .2 ~ * Cll C C C ~
<Xl '0 Q) ~ ~ ~ U 115 Q) .:<.: ~ i5 i5 .Q (j)
.?- ui E (j) U 5 a ~ ~ ~ .: 0> 0> 115 ~
2i ffi e ~ <( u .Q a. ell OJ ~ ~ ~ Cii 0
'^ :J a. ~ 2 ~ .~.... a. 0 OJ 0 Cll al Cll ... a.
VI (/) ~ ::!i? 0 0 > .: .: Cll ::::
_;;i N ala.... ~ ~ '_E _~ (/)8 0 0 N ro :s: :s: .s 0
ON (j) > . . ell ~
0::': roe ~ ell al.~""".~~;g ~~~.Q
W u C - 115 P (j) 0 (j) _ell U > N _ ...!- .c
~ L.... 0 C ~ - C ... C ~ C
<( :J :;:: 0 > 0 0 0 0 U 0 v .- al
:ESl~~~~u~~~~~~~~~
Zo E a. Cii e:! ~.. eN, Cii <( <( LL 'm
_Q.)O(U ~c~c~o E
L- 0 E;.,., '0 0 0 N .~ ~; "' (/)'
~ ~?f'. ,., U u U UN::: ~ ~
~~cnO~Q.) . ~,~,~~c
'C)C~'O'028!28!~uffi:S::S:~0
~~gc~~e~e'iu>.?-ee~i
W~~,g~cE~E~~o..2iEEE~
t;: .;:: E 0 0 0 ro 0 ro Ln:J 0 0 :J
Z =(j)~~U>U>~N(/)UUI~
0::
W
.... co 0) 0 N C')VL()(O
~ C') C') vvv vvvv
Eh
Eh Eh Eh
"III .
CII"tl
'ClQi
c: .-
._ LI..
... C
p.. III
III E
.C "Ill ~ 0.
III e III ~ ~ III "III "Ill
r: .g~~~ -aeJ't:1Il ;
~ =t U .- 0 0 -Ill e III III Qi
:ell) "1Il~:g.€ ti~~~.~;t
C:gIllIllCUIII IIlE~:=CllIIl::
r: .- ... 0 CII III III ~ = - E .- III
Cl Cl ~"tl ,- III III ~ E'" E -
CII==Oo.Cl- ..... 1Il1ll'-
.!!!~liicelii~ a E.!!! e.l9,!!! 5
:i N ~.!!! ~~.5w ~~~o..!!!€ 0.
~~ uQi c.!!! ~o::W 0 ClJ::.J::.Qi,g.!!!
5 e ';: E e J::. ~ > "tl ~ 0. ~ lij 0. E
... _ >- III Gl ~ 0 0 0 0 ~ III .- ~ III
alW:E:r:W:EIXIUc..c..WQ..OWN
W c.. U C)~C uc.. :r: C)
c..c..c..alC)o::uc..o::uW~:E:E:EZ"":ELL:r: zo-:www::)alW:E:r:W:Ealoc..c..Wc..OWNU
o)O......~NC')VL()(oI'-COO::o)O......NC')VL()..J(OOI'-
......NNWNNNNNNNC)NC')C')C')C')C')C')iC')~C')
.--C')
NO)
C'). V.
(0 N
ell
W
ellLLLL
W...J...J
v
-
o
N
~
:;t
::2
::J
o
Z
W
o
o
<(
"0
c:
nl
Ql
ClO C.
N nl
N (,)
Lt) 1Il
'''0
en c:
o nl
C-J
m ~
"0
'i:
m
~
'0
.,
-
o
J:
-
:::::s
o
en
r.
g
::J
-J
ro
Qi
E
ro
0..
....:
OJ
::2
'0'
n:
\0
~
'<t
M
N..
NOOCO
LO~CX!'<l:
O\O~o)
I'-\O\ON
~LOCOI'-
~ N
000
CX!~~
~'<tLO
\O~M
co I'-
I'-
t.'7
t.'7 t.'7 t.'7 t.'7 t.'7 t.'7 t.'7
co
r--:
~
\0
MOOI'-OOO
~~~M~~O
NMONO\OLO
o)~MMM\O
'<tLO'<t'<t'<tN
t.'7
t.'7 t.'7 t.'7 t.'7 t.'7 t.'7 t.'7
'<tLON'<tNOlI'-
N
N
c:
o
:;:;
..!!!
nl
-
1Il
c:
c:
o
:;:;
nl
C)
'i:
...
ro
w
ro ro ro ro ro ro ro
WWWWWWW
roro
::J ::J
0' 0'
<ll <ll
-0 -0
<ll <ll
> >
o 0
0.0.
c. c.
ro ro
o 0
o 0
C,) C,)
C,) .0.0
~ ZZ
o EE :5
~ ~ ~ :5 ~ .~
(f) g' g' x'~ ~ ~
~ :~:~ ~ .8 ~ g >
i~~~~~~ g~~g
ro 0 r. r. .8 a5::J ~.~ ffi ..9!
a.--.......'-"'Cc: cCJ)-O
en :5 ~ .~ .~ ~ .8:f; -o<ll'~ ~ ~
g"~ C,) <ll <ll ~ .... .- ~ '-'
:;:;<ll1!2:2:....<ll~ (f)(f).!!20
if ~ ~ ~ ~ ~ ~ ~ .g ~ ~ E
~>!:;22<ll roQiuN-o~
.... ~ - <ll _ ..9! <ll ~
g"Cij ~ ~ ~ ~ ~ ~ Qi W :E <ll W
'0. -0 ~ C C E > .i; VJ ::> c. VJ
iiffic.oo::J <ll"~::>XVJ
<ll .~ ~ ~ i3 ~ ~ ~ ~ ~ .8 ~
~ OJro 0 0 roQi > ,.....0::: <ll....
.... ::J E ~ ~ ~ ~ <ll ~ ~ ~ ~ .~
'8. ~.g ~ ~ <C :5 g. ~ .~ ~ :> Qj
:t::<llVJroroc~O<ll(f) ~(f)
o :J ~ 0 0 .Q <ll C,) 2: 0 ro .- 0
~r.n uu.......L.....:::c:.CUNQ)CiJN
o ~ .~ >0 >0 ~ 0.. .2 > N -0 0 N
:0 0. ~ ij ~ 'E g ::J OJ ~ ::J ~ Ln
<ll C. C. - :;:; 0 .~ N ~ .~:::!
C~ro<ll<ll~ro, Ci. .....~,
= r.n "0 "0 .2> ~ ::::J T""" ._~ ro
.~ ~ CD ~ ~ T"""_ l:: ~- 8 L{)- 0 c
E~C,)ccuN;g~x]i:s
C 6-.g ~ ~ ~ . I'- .2 ~ 5,'~
o:.::i E::'+-'+- I a c:::J~ 9->_~
<ll <ll N MOO'~ _
.~ CJ) Q) ~ ~ 0 ~ rJ) c 0 ~ 'c
.~ 0.. ~ C C -0 -0 Qi 0 N ::J ::J
-= 0 <5 .- .- ro ro Z :;:; N VJ -
o -0 E ~ E E ti .~ ~ ~ 1)1
~2; ffi"rN~~..,j-=1- c.-=:
~
<ll
2
.....
Lt)
en
0::
U
I'-
'<t
COOlO~NM'<t
'<t'<tLOLOLOLOLO
o
~
N
~
M.
~
~
o
~
N
Ol
N
0)
o
~
o
o
o.
o
LO
co
I'-
I'-
u1
N
o
CX!
Ol
M
'<t
M
000
OO<q
6cx:i\O
~NO
I'-O~
- ,......~ ,-
~LO
o
~
o
\0
M
t.'7
t.'7
t.'7
t.'7
t.'7
t.'7
o
~
'<t
o
'<t
o
~
'<t
o
'<t
o
LO
w
(J
~
D.
~
W
:I:
~
W
C
:J
...J
(J
~
'<t'<t
~ I'-
....- I'-
co
CX!
LO
000
o~<q
.oNO
N N
o
'<l:
M
LO
'<t
o
~
o
o
~
~
N
t.'7
co
N
t.'7
M
N
t.'7
LO
co
LO
t.'7
M
t.'7
t.'7
0)
Ol
~.
ro
W
ro
W
ro
W
ro
W
ro
W
ro
W
VJ
C
~ ro
::J a:
~ -0 <ll
<ll <ll <ll
VJ 0. -0 (f)
-0 Qj 8 OJ
ro r.n L... C
-0 .;:: o'(jj
C ::2 0 >
ro.~ 0.. C,) al
U;:5 CD Qj en
~ .~ ~ ro ~
~ ~ ~.~ ~ '-~
~ 0 C C,) ~
ai -0 ~~ ~~';;;~ C
> ~ ffi~ro..9! _o~.c"".c ~
- <ll N N <ll E
~ ~ ~~r.N VJ~~.c:J C
g ~g ~~[~VJ~~~~~ ~
~ <ll~ E~(f)~::J~aQjc.c. OJ
o >-0 ca.EuQ)o~'_~B '_E
~ro !!!0..9! roC,).... VJ
~ffi>~_~_e::J2""C,)ffi~c.-~g<llw<ll
VJ v''"~w~ro..9!ro 2:0..0
<llCi.-o<llc.~uoc..c-oCi.~ -oroo.c
j~~j~~oo......roC.8.8~~>Iro
(f).!!2..9!o(f)~~>r.~~roQj~~1)1~r.g
\O~~\Oro_NI~5~~'-~ ::JOJ:;:;
~ a5 UJ ~ a5 g ~, is. ro ro & .2 15 .~ 0 '(jj al
~~~.2_-oEENoaio..,C.=.c~~~
_<uu ~Q)'~~~~~Q)CJ)~oo_~
~ c. <ll r. c. VJ v, - 'v c. E I-
S:ijwS:ij;~~~~~ae: ~i3OJ-
-O.cVJ-O ....ro~o:::o U'-o~ro<ll
<ll ~ <ll .0 <ll > (f) ;;::: - > OJ .... ~ > 0 .~
O:::~~O:::~a5""x<ll<ll::2o..c""~ E~
LnroCDLOroE~o:::~~fuo~~Etiro~
~~~~>QjEo..~U;N\O~~~m~~
roNj ~roQj~~~~VJ::Jc.<llrowro
<ll~(f):'~~a5e2<(~;~~~~~0:::~
-o.co-o.cVJEo::J....:<llG-~ro-o '-
~E~~E~ol-~~....<ll::2ec.<ll~~
C .2., C.2. -0 a: ~ .0 .8 .0_0 0, .... <ll E <ll
.-. ro N _ ro Ln E N .Q ~ ~ ~ <ll .;:: '5 5S ~
u1 0 C u1 0 C , u.. .... _~ OJ.t::! ~ -g <ll
~~~~~~ ~x~~ cc.~.c~~~o>
, ::J'- ~ :i .- ro -0 0::: 0 >0:: 0 c. <ll VJ
~OJ~NOJ~U;roo..-o-c.c.-VJ.... ~o..
~~~N~~CENffi~o<ll~Eotiuo
0<llC6<llC~QjO....Mffi.~~~~m~'<t~
N....::JN....::J>oCD~OLOC,)=ro-~ o..I
N::J N::J -c.ro~]i-<ll~EOJccOU
o~Ee~E o::JeOJ<ll<llC<lloI(f)
~~~o~w~~~~~~~~-aem
1-c.=I-c.-=:(f)rol-~~-J-JVJiiCDB"r"r
LO
LO
Ol
LO
~NM'<t
\0\0\0\0
o
\0
\0
~
I'-
~
co
LO
~
(,)
LU
-,
o
a::
a..
LU
I
f- W f-
::! ..J z
o :J W
a:: c ::E
LL W ~
Z :I: :J
o ~ (f) "l
f= c I1j :J
~ iii ::E D::
LU ~ D:: :I:
o D:: Q f-
a:: 0 c "":
o 3: z
6 oll < in
f= (f) ~ f-
::> ..J f= Z
f- < Z W
f= ii: < ::E
(J) W :J :J
~ ~ 0 g
~ ::E ~ c
6 ~ 1ii t;
f= f- :Z <
15 ~ 0 g:
o C ..J Z
<( W ~ 0
o~u:U
~ ::J 0 ~
(,)(f)f-f-
LU f- f- Z
-, Z U W
CD W W f-
::> ::E -, Z
(J) W III ..
(J) D:: :::l
::! :J (f) I
LU (f) (f) f-
t: I1j ~ iii
o ::E < i:
CD oll ~ ~
[J l:3 (f) 3:
f- f= W W
<3 f= It ~
15 ~ ~ a::
~ 5 ~ ~
W ..J f- 0
f- ..J Z f-<-
< < <
Z rii ..J U
D:: W 0.. u:
~ f- W ii:
..J 0 D:: W
<( Z < >
16B 9
CV
-
o
I-
-
m
o
(J
-
'i:
:J
a
-
'i:
:J
c:
o
:.;::;
nl
lJ
;.;::
'(j
cP
Co
l/)
ad
cP
N
U5
cP
E
nl
Z
c:
o
E
E
o
(J
l/)
W
N
(i.i
I-
Z
<
...J
D.
C
W
(J
cP :J
E C
nl W
Z 0::
CV
lJ
'i:
nl
-
o
lXl
l/)
...J
<
~
w
~
:::E
101-
oZ
z~
wo..
::E~
>-z
l/l0::
w
I-
...J
<
0)00'<t
'<l:~~~
....-O)'<to
LOM'<t1O
co CO~
MMN.
00
~~~
'<t I'- N
Ol co \0
0)
. . . .
ro ro ro ro
WWWW
<ll
E
ro
Z
>0
C
ro
c.
E
o
U
CV
lJ
N
.c
2ia
.s::. lJ
l/)in
3"':
u.....
~ ....; ~
(f)~~g.
~ g.,.... M
:c;:J';...
o.s::..s::..s::.
...~MCO
'<t
-
o
M
cP
nl
-
:>
...
E [
:l nl
~(J
~:::i nl 'cP>-
Onl cP.!:!
>nlCV
~:.;::;E'tl
:::i~~~
nl
...
o
-a..2
0::
nlE='tl
c: :l nl III
nl _ .s::. c:
'c g g. E
'0, III c: CI
... m >- III
.:; E lJ .-
m :l m .!:
:l 'L: B-
lJ ~ III III
Qj 'iij ~ :tl
:l :l III III
OC)(J(J
l/)>l/)(JC)
wOC)(J(J
WLO\O~CO
0::\0\0\0\0
I-
~
:::2:
::J
o
Z
LU
o
o
<(
"0
c:
ell
G)
CO a.
N ell
N (.)
Ion ell
'''0
0) c:
(;) ell
0...1
m ~
"0
'i:
m
~
(5
...,
-
o
J:
-
;j
o
(f)
J::.
.S2
:J
--l
co
Q)
E
co
a..
....:
OJ
:::2:
'e-
o...
-Ul _
Ql1:l
"CIGi
c: .-
._ lL.
... c:
P. III
Ul E
-c: -: Ul Ql :[ g.-Ul
III ~ ... .~ ~ ~ ~ .-
... .~ ~ .!l! ~ c. 0 c:
o ~'_=O O.llle
!E =",Oc.~ ti::::.::
1:1 Ql III ~ft III = 0
c: ~ III Ul C U Ul IllE - ~
E .- ... 0 Ql III III ~ =
Cl g' ~ 1:1 c.'61 ~ Ul >- E
III ... ... 0 Ql ... .- ~ E III ~ III III
'-IllQlC:"'Ql> c. .-.......-Ill
!!!. ._ U III III ..0 c: (/) :; .!l! of ... III of .-
Ql ~ III :: 0 5i .itj a:: U III 0 ,g = 0 E
- .- U Ql c: _ Cl W 0 Cl ~ Ql ~ III
C:Gi'~ E e~ ~ 1:I~c.~C: c.N
2 J:l >- III Ql ~ 0 ~ 0 0 ~ Ul .!!! ~ lL.
m(/)::E::J:(/)::EmoQ..Q..wQ..cw':'!
Ul
(/) Q.. 0 <!>(/)c OQ.. ::J:,S!
~(/)(/)wQ..Q..Q..m<!>a::oQ..a::O(/)~::E::E::EZ~::EO
mm::Ea::(/)(/)(/)~m(/)::E::J:(/)::EmoQ..Q..wQ..cwz
~o~~Nn~~~~~oo~o~a::Nn~~~~
~~Q..~~~~(/)~~~~~oooo<!>oooooooooooo
~ N
~~
~~
~N
~~
~
Y7 Y7
~ N
~q
~ ~
~~
Y7 Y7
n~
N
c:
o
:;::;
~
ni
-
ell
c:
c:
o
:;::;
ell
C)
'i:
...
co co
LULU
....:i6
III U
U .
. M
N
...:
...: c.
C.Ul
Ul _
. ~
'o:t
-...
...~
~ .
. 'o:t
0....
.... -'
.' N
00....
.....
Ion
en
c:::
U
o
..0
1:1 .5
0...1
o 0
3=..0
III E
... ~
~<!>
III
Ill..o
Ql ~
o ...
..0 III
... E
III .-
III Ul
.- III
Ul ...
CIl Ql
c: Ul
- ...
~ ~
mm
~o~oo
~~~~
ooooo~
O~""'N
Nn~oo
c:O.,tN'
Y7 Y7 Y7 Y7
LOO~-r-
~~I'-:I'-:
~~NN
~ ~ 0 0
~ ~ '("'""" '("'"""
Y7 Y7 Y7 Y7
~oo~oo
'o:tnN
ro ro ro ro
LULULULU
..,j
u)
...;~~~
oC.b..;..,.;
...:...UU
u..o. .
..NIt)
0000........
E
i6
~ E E E
~i6i6i6
0Q..Q..Q..
a:: Ql Ql Ql
IllClClCl
~~~~
o-g-g-g
i:i:ooo
III 0 0 0
~~~~
-QlQlQl
Ql E E E
Ill___
.- III III III
Sc.c.c.
.... - --
Ul III III III
>-..0 ..0 ..0
o III III III
a::(/)(/)(/)
~~li'lOO~'o:tN
~OOli'l'o:t~Nli'l
C'iC'icci6Lria:iM
0li'l0'o:t,....~00
Nn~n~~n
.,tN N "':N-ri
Y7 Y7 Y7 Y7 Y7 Y7 Y7
li'l~~~~~~
li'l~'o:t~~~n
C'ir--:C'iC'ili'lNM
N 'o:t
Y7 Y7 Y7 Y7 Y7 Y7 Y7
~~~oo~~~
~~'o:tooooo
~ OON~_q,
co cci cO cO cO cO ro
LULULULULULULU
u
o u' u' u'
;" .
'C:i60~.o.o
~C.ClkoCoCo
(/)C.~M' 'o:t'o:t
.....:..<1-...:~...:~
lll"'Ec.~c.C.
ClC.QlUl'-UlUl
I'-.!!'t;)-= ~:;:.-=
~~ ~ ...!. :c ::J J: :c
c.. %::..r...
UlCo ~Co' Coo
. N::E....N........
M .. _ .. ~ .. ..
. ....: 00"": ~....:....:
:E~><~~~~
(oMCO.......-or-"&""'"
3=
e CIl III
o.!!! ~
E1:I
o Eo':;
~~ ~.~
Ill.... ~E Cl
1:10 Ul_ ~
0"E .5~Ul~
I:: .- Ql Ul
>-m- e 3= III Ul
III _ 1:: .- III Ci Ul
"E ~ >- lL. (/) ~
Ql ._ :!il 't: ... >- c:
tlC.><Ill~:C:O
Qle::3==.;~
)-~>C(/)""~
~~N~O~
N~~~~~
.,rcciM.,ro~
n~li'lNO~
li'l00~_~0_li'l_
~ ~n
Y7 Y7 Y7 Y7 Y7 Y7
~~~~oo~
nn~nn~
MC"')Ncv1"':~
Y7 Y7 Y7 Y7 Y7 Y7
~~N~~~
li'l~~OONOO
NO_~~N_
N N
co co co ro ro ro
LU LULU LU LULU
~ u ~
~ 000
o. . .
. 000
'o:tMMM
N~..:~~
..:a~at.!
~.!!1::;.!!1.ou
-...~...;"o
~~k~N.
. 0 _N ..:g
oo....o....Ql
~ ~ c. ~.5 ..:
i6i6. i6...1 Ql
Cl Cl It) Cl. c:
..........t....M::i
E
.lIl: III
c: e
ii: 0
c: c:
... ...
o 0
Ul ~ >-~
~~1- =~
c.Ul- ...1_
:; ~ 0 >< 0
umc: .!l!c:
0... 3=QllL. 3=
"8C1le~~e~
Q..~OoliiO=
't: CIl 't: 0 ..0 't: .-
1llQ.1ll1:lCllIllE
~~~~ffi~
~ -
we
U >
_0
.- ~
co~
Q3~
'0
....'0
CIl C
0. co
'Q)
.c
<fl .-
CIl.o
CIl co
lL.U:::
c Cii 3:
0-
:;::;(50
u....n
CIl-N
c c
C 0
oU
UoC:l
CIl CIl
U U
.~ .~ a..
CIlCllI
U)U)O
I'- .g .g '-;-
cit)t5~
ZCIlCll
www
~
Z
a::
W
~OO~
...10000
~
o
q
o
o
00
N
Y7
co co
LU LU
o
q
o
o
q,
Y7
ro co
LU LU
c
.Q c
t5 ,9
~t5
c CIl
o c
u 5
oC:l u
coC:l
.2 c
co .Q
.~ 1i5
1: .~
0'0
o ....
U g
viU
.~ ~
16 ,9
u-
if: r5
C,)\;::
~<3
U)~
<flU)
.Q! <fl
:;: CJ.)
5~
'05
~~
!!2~
0!!2
u
ro 8
:::2: Co
Cii~
o.CIl
~ ~
CIl CIl
E'Q)
w E
ro Q)
~1i5
CIl ~
~ CIl
OOCll~
. 0:: CIl
~ro~
w......:""
~
Z
a::
W
~o~
...I~~
~
o
o
6
o
li'l'.
~ + ,f
Y7
>. >.
CC
::l :J
o 0
UU
>. >.
coco
ro ro
LULU
'("'""" :-=
, co
LU-
u.g;
'(ij W
'Q)o.
'0 0
'- "0.
CIl ....
0.0
- U
CIlU)
'E .!!2
.... 0
(/)-;:;;0
:!ilea
Wo:::2:
!::au
~:::2:0
u c c
Woo
.., :.;:; ''+::;
o~~
a::U)U)
Q..oo'o:t
C~N
W ' ,
:J';';
Q..'O'O
Q.. .- .-
~ > >
(/)E:2
)-0...0...
I-~N
Z ' ,
~uu
O .... ....
CIl ill
u--
a::ee
Wee:
- 0 0
:Juu
o
u
16B 9
~
ej)
~
d
CIl
E
co
z
>.
c
co
0.
E
o
u
'o:t
'0
'o:t
~
o
N
168 9
MATERIAL MANUFACTURERS
THIS FORM MUST BE COMPLETED OR BID SHALL BE DEEMED NON-
RESPONSIVE
All Bidders shall confirm by signature that they will provide the manufacturers and
materials outlined in this Bid specifications. Exceptions (when equals are acceptable)
may be requested by completing the Material Manufacturer Exception List below. If an
exception for a manufacturer and/or material is proposed and listed below and is not
approved by Engineer/Project Manager, Bidder shall furnish the manufacturer named in
the specification. Acceptance of this form does not constitute acceptance of material
proposed on this list.
Complete and sign section A OR B.
Section A (Acceptance of all manufactures and materials in Bid specifications)
On behalf of my firm, I confirm that we will use all manufacturers and materials
as specifically outlined in the Bid specifications.
Company: Vd (/L {]Y)d ~ Land ,'\CJl pi ()j {' alp'
Signature: ((.. ~ ~ Date: i'-~z...oV
Section B (Exception requested to Bid specifications manufacturers and materials)
EXCEPTION MATERIAL
EXCEPTION MANUFACTURER
1.
2.
3.
4.
5.
Please insert additional pages as necessary.
Company:
Signature:
Date:
GC-P-3
168 9
LIST OF MAJOR SUBCONTRACTORS
THIS LIST MUST BE COMPLETED OR BID MAY BE DEEMED NON-RESPONSIVE
The undersigned states that the following is a list of the proposed subcontractors for the
major categories outlined in the requirements of the Bid specifications.
The undersigned acknowledges its responsibility for ensuring that the Subcontractors
for the major categories listed herein are "qualified" (as defined in Ordinance 87-25 and
Section 15 of Instructions to Bidders) and meet all legal requirements applicable to and
necessitated by the Contract Documents, including, but not limited to proper licenses,
certifications, registrations and insurance coverage. The Owner reserves the right to
disqualify any Bidder who includes non-compliant or non-qualified Subcontractors in its
bid offer. Further, the Owner may direct the Successful Bidder to remove/replace any
Subcontractor, at no additional cost to Owner, which is found to be non-compliant with
this requirement either before or after the issuance of the Award of Contract by Owner.
(Attach additional sheets as needed). Further, the undersigned acknowledges and
agrees that promptly after the Award of Contract, and in accordance with the
requirements of the Contract Documents, the Successful Bidder shall identify all
Subcontractors it intends to use on the Project. The undersigned further agrees that all
Subcontractors subsequently identified for any portion of work on this Project must be
qualified as noted above.
Major Category of Work
Subcontractor and Address
1.
2.
L JA.()c( cc. C1Afe....
:x:rrL~c:bLOVl
6or~JP~,d,'ono,J Dr;}!
-
;:::)~~:s~~1~:; u
76 Bo~ ~D53l
~Cl.-bc:n fl(<-((,(~rs K. 33QO&
3.
4.
5.
Company: , } i ) 0-.. o-nJ
-
La.. 9...
Son Landsr'I1.p;':j
~~
&p.
Signature:
Date: ~ -2..<.-<$
GC-P-4
168 9
STATEMENT OF EXPERIENCE OF BIDDER
The Bidder is required to state below what work of similar magnitude completed within
the last five years is a judge of its experience, skill and business standing and of its
ability to conduct the work as completely and as rapidly as required under the terms of
the Agreement.
Proiect and Location
1.
Se.L.. CAtt-O\.C h {,~
2.
3.
4.
5.
6.
Dated,lf -- ~?--oq
GC-P-5
Reference
Vii f7.- o.rd ~ ! () Y)d~ ('11 pi nOl ex p.
Bidder J
BY: W~~~~-
16B 9
TRENCH SAFETY ACT
Bidder acknowledges that included in the various items of the bid and in the Total Bid
Price are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida)
effective October 1, 1990. The Bidder further identifies the cost to be summarized
below:
Trench Safety
Measure
(Description)
Units of
Measure
(LF,SY)
Extended
Cost
Unit
(Quantity)
Unit
Cost
1. 0-A
2.
3.
4.
5.
TOTAL $
Failure to complete the above may result in the Bid being declared non-responsive.
Dated 4-,.2?.- d~
\t 'ItA- {JK)d <~!:m (andswpin!) CDrf.
Bidder
~a~~
BY:
GC-P-6
168 9
Upon notification that its Bid has been awarded, the Successful Bidder will execute the
Agreement form attached to the Bidding Documents within ten (10) calendar days and
deliver the Surety Bond or Bonds and Insurance Certificates as required by the Contract
Documents. The bid security attached is to become the property of the Owner in the
event the Agreement, Insurance Certificates and Bonds are not executed and delivered
to Owner within the time above set forth, as liquidated damages, for the delay and
additional expense to the Owner, it being recognized that, since time is of the essence,
Owner will suffer financial loss if the Successful Bidder fails to execute and deliver to
Owner the required Agreement, Insurance Certificates and Bonds within the required
time period. In the event of such failure, the total amount of Owner's damages, will be
difficult, if not impossible, to definitely ascertain and quantify. It is hereby agreed that it
is appropriate and fair that Owner receive liquidated damages from the Successful
Bidder in the event it fails to execute and deliver the Agreement, Insurance Certificates,
and Bonds as required hereunder. The Successful Bidder hereby expressly waives and
relinquishes any right which it may have to seek to characterize the above noted
liquidated damages as a penalty, which the parties agree represents a fair and
reasonable estimate of Owner's actual damages at the time of bidding if the Successful
Bidder fails to execute and deliver the Agreement, Insurance Certificates, and Bonds in
a timely manner.
Upon receipt of the Notice of Award, the undersigned proposes to commence work at
the site within 5 calendar days from the commencement date stipulated in the written
Notice to Proceed unless the Project Manager, in writing, subsequently notifies the
Contractor of a modified (later) commencement date. The undersigned further agrees to
substantially complete all work covered by this Bid within one hundred and fifty (150)
consecutive calendar days, computed by excluding the commencement date and
including the last day of such period, and to be fully completed to the point of final
acceptance by the Owner within thirty (30) consecutive calendar days after Substantial
Completion, computed by excluding commencement date and including the last day of
such period.
Respectfully Submitted:
State of S L.. .
County of 1. p~ _
L 0--. , being first duly sworn on
oath deposes nd say that the Bidder on the above Bid is organized as indicated and
that all statements herein made are made on behalf of such Bidder and that this
deponent is authorized to make them.
!1 )frde (}~/( ) i I a.. o..rd. S- E1Y\ , also deposes and says
that it has ex mined nd carefully prepared Its Bid from the Bidding Documents,
including the Contract Drawings and Specifications and has checked the same in detail
before submitting this Bid; that the statements contained herein are true and correct.
GC-P-7
16B 9
(a) Corporation
The Bidder is a corporation organized and existing
F/dr i d Cl- , which operates under
\J/I t1.-. (l~ g()n LD..xvi A Lt1.pl nSJ 6a-p.
officers are as follows:
under the laws of the State of
the legal name of
, and the full names of its
President 'f( I e-k Le..cJ
Secretary ~CLll ('Ii 11'0 Vi 0--
Treasurer fYI f1. rv'L r1 J1J-z-
Manager 11 )f1. d e J CiJapMoJ)
The &ef)t'vnJ Ha.Y\<^ 0 eV'- is authorized to sign construction bids
and contracts for the company by action of its Board of Directors taken
l) ()(l f' m her ;2(j., J :Jj)1J F ' a certified copy of which is hereto attached (strike
out this last sentence( if not applicable).
(b) Co-Partnership
The Bidder is a co-partnership consisting of individual partners whose full names are as
follows:
The co-partnership does business under the legal name of:
(c) Individual
The Bidder is an individual whose full name is
and if operating under a trade name, said trade name is
DATED
legal entity
BY:
GC-P-8
168 9
Witness H e.11 ~ 4 H. uY-y"~
~15-
Name of Bidder (Typed)0...J:>dL CnuprYla.Y
~9~
Signature
GeneroJ f-{o..n a.. ~-er
Title
STATE OF Flun'd~
COUNTY OF LtU!.-
The foregoing instrumen,A was acknowledged before me this _ day of
2009, by uJncU2- ",-,h() rrnOY\ , as r?-pl"). !Y.a=-r
of \ fl' { 11- Cli'ld:. gt:lY'l t a.v.ac;ra ~ G1Yv:" , a co oration, on
behalf of the corporation. he IS personally known to me or has produced
'f\. ~/ f1- as identification
and did (did not) take an oath.
-
NAME:
~~.
(Signature of Nota~
klfc.~ 'QccW1~1.-
(Legibly Printed)
My Commission Expires:
(AFFIX OFFICIAL SEAL)
Notary Public, State of .fU>tidR
Commission No.:'))'MlIl51Q
NOTARY PUBLIC.STAT! or MlfDA
......','".. Arlene RodrilulZ
(~icommisiion #OD811579
~,....\\\,<l' Expires: AUG. 04, 2012
BONDED THRU ATlANTIC 8OM)DlO CO,. Die.
GC-P-9
16B 9
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we Vila & Son Landscaping Corp.
(herein after called the Principal) and
Westfield Insurance Company , (herein called the Surety), a
corporation chartered and existing under the laws of the Stat~ of Ohio with its
principal offices in the city of Westfield Center and authorized to do business in the
State of Florida . are held and firmly bound unto the
Collier County Board of County Commissioners (hereinafter called the Owner), in
the full and just sum of Five Percent of the Amount Bid dollars
($ 5% ) good. and lawful money of the United States of America, to be
paid upon demand of the Owner, to which payment well and truly to be made, the
Principal and the Surety bind themselves, their heirs, and executors, administrators, and
assigns, jointly and severally and firmly by these presents.
Whereas, the Principal is about to submit, or has submitted to the Owner, a Bid for
furnishing all labor, materials, equipment and incidentals necessary to furnish, install,
and fully complete the Work on the Project known as :
CR 951 South of Jolly Bridge Landscape and Irrigation Installation
Sid No. 09.5228
NOW, THEREFORE, if the Owner shall accept the Bid of the PRINCIPAL and the
PRINCIPAL shall enter into the required Agreement with the Owner and within ten days
after the date of a written Notice of Award in accordance with the terms of such Bid, and
give such bond or bonds in an amount of 100% the total Contract Amount as specified in
the Bidding Documents or Contract Documents with good and sufficient surety for the
faithful performance of the Agreement and for the prompt payment of labor, materials and
supplies furnished in the prosecution thereof or, in the event of the failure of the
PRINCIPAL to enter into such Agreement or to give such bond or bonds, and deliver to
Owner the required certificates of insurance, if the PRINCIPAL shall pay to the OBLIGEE
the fixed sum of $ 5% of Amount Bid noted above as liquidated damages, and not as a
penalty, as provided in the Bidding Documents, then this obligation shall be null and void,
otherwise to remain in full force and effect.
IN TESTIMONY Thereof, the Principal and Surety have caused these presents to be
duly signed and sealed this 23rd day of April ,2009.
Vila & Son Landscaping Corp.
BY
Principal
(Seal)
Surety
Ap. . .
Countersig
Local Resident Producing Age
(Seal)
esident Agent .
Westfield Insurance Company
Inquiries: (407) 834-0022
GC-P.10
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME
POWER # AND ISSUED PRIOR TO 01129109, FOR ANY PERSON OR PERSONS NAMED BELOW.
168
9
General
Power
of Attorney
POWER NO. 099186202
Westfield Insurance Co.
Westfield National Insurance Co.
Ohio Farmers Insurance Co.
Westfield Center, Ohio
CERTIFIED COPY
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a *Company* and collectively as *Companies: duly
organized and existing under the laws of the State of Ohio, and having Its principal office in Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
JACK W. GUIGNARD, BRYCE R. GUIGNARD, M. GARY FRANCIS, PAUL J. CIAMBRIELLO, APRIL L. LIVELY, JENNIFER L.
MCCARTA, MARGIE LYNN MORRIS, JOINTLY OR SEVERALLY
of LONGWOOD and State of FL its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred In its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other Instruments or contracts of
suretyship- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - - - - -
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
*Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint anyone or more suitable persons as Attorney(s)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary:
*Be it Further Resolvec/, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.* (Each adopted at a meeting
held on February B, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 29th day of
JANIJA~Y ,{\..D.,2009.
.JIf"~""'~
CO:)lorat~ . .'~Jt...(b~'.
Seals ~~..._....~-#'
Affixed ...y~.' .... \:,.
~I \0
l~fSEALj~
\ ,\.. It
.,. ...... ,.. .,/,"
......-
,,"""U"',
\"'''''''~\ONAl. /"'"
.... ~""'..........~& '...,
.::'0.,." .....~\
filf \'Zl
:LL: SEAL :():
:~: Em;
;~'- :()~
~-?'_." .'~O~
......7., i......
...'....., .............. .............
""'r',,,'~.n.'t"'''''''
~ ~..,"",,.~
.,~~
~"..., ............. ~
I .. .. .. :l
! w;;ff}AflJEIti.~I,
!_: : I
\..~....~8_4~...~'"i j
, ....... ...
'",..... ...............
".,..........
WESTFIELD INSURANCE COMPANY
WESTFIELD NATIONAL INSURANCE COMPANY
OHIO FARMERS INSURANCE COMPANY
SMe of Ohio
County of Medina
By:
Richard L. Kinnaird, Jr., Senior Executive
sS.:
On this 29th day of JANUARY A.D., 2009 , before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say, that he resides in Medina, Ohio; that he Is Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that they were so affixed
by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order. ~
Notarial ~ /d ... .
Seal f~~~.\~h.,-\'~
Affixed ~..~"w@t'V)
Stoloo'OhlO \:E~
County of Medina ss.: ~.. '9 ol' '"
.... ~~ of 0......
'.~""h"H".""""""
William J. Kahelin, A rnay at Law, Notary Public
My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still in full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 23rd day of
April A.D., 2009.
fiJ.;uj":C~,
~ ~ ..,_...~4' '\
if..' .... \: Ct
\S(SEAL)j
.,. .......:':/ "c'
""UIU""
.......""~\ONAl. /","
,,~~'..........'1t& ",
l'o ..... .....c,-p.'.....
fil/ \'Zl
:LL: SEAL :():
:1-: Em;
l~~. /()i
\~ .... .....0.,::
..,.... .............,. ..........
"""';I"I~ttlt""'''\''
. ~'."'"''
." ~:?-.
~",. ........... '!r.
~ .. ... -. .,
{, ..:....&Ur....:..I\
iw;;:~'iwICq~ I
: : : I
~ . : -
\l}...1848 /'"i !
"f,~. ....:':"....... ~~.:~
'1" ..,."
""..i......,........
n--' LJ I
'&!J;n/Lot~ S_
BPOAC2 (combined) (06.02)
16B 9
THIS SHEET MUST BE SIGNED BY VENDOR
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
Purchasing Department
BIDDERS CHECK LIST
IMPORTANT: Please read carefully, sign in the spaces indicated and return with
your Bid.
Bidder should check off each of the following items as the necessary action is completed:
1. The Bid has been signed.
2. The Bid prices offered have been reviewed.
3. The price extensions and totals have been checked.
4. Any required drawings. descriptive literature, etc. have been included.
5. Any delivery information required is included.
6. If required, the amount of Bid bond has been checked, and the Bid bond or
cashiers check has been included.
7. Any addenda have been signed and included.
8. The mailing envelope has been addressed to:
Purchasing Director
Collier County Government Center
Purchasing Building
3301 Tamiami Trail, East
Naples, Florida 34112
9. The mailing envelope must be sealed and marked with:
<:>Bid Number;
<:>Project Name;
<:>Opening Date.
10. The Bid will be mailed or delivered in time to be received no later than the
specified openinQ date and time. (Otherwise Bid cannot be considered.)
ALL COURIER-DELIVERED BIDS MUST HAVE THE BID NUMBER
AND PROJECT NAME ON THE OUTSIDE OF THE COURIER PACKET
V~(o.- o....vvJ S~ ~d<3CL1fl 05 Ctrrp.
Bidder Name
r~~ G--efl, kaYla...9 if"'
Signature & Title X-
DATE:
.y -.az. -oT
GC-P-11
168 9
RESOUI,UT[O~L9XBQ&.RIlOfJ21RECTORS elF
Yll,A /K SQ~r-1;\NI}.)~~~l)ING~i)HPOIiL\IOl\f
At a Special Meeting of the Board of Directors of Vila & Son Landscaping Corporation, d
Florida corporation, held onl)ec9!lpet22nd~)ilQR__at 8:00 am, the following persons were
present, being all of the Directors and Officers of the corporation: Juan Carlos V da,
Ricardo Leal, President; Y ordanka Rivero, Vice President or Human Resources, Secretary 8::
Treasurer. A quorum bemg present, the following resolution was unanimously adopted, and S;Ucl
resolution has not been amended, modi f"ied or rescinded:
Resolved, that with respect to contracts and subcontracts between Vila & Son Landscaping
Corporation and Owner's, General Contractors, and other organizations contracting with said
corporation to perform landscaping & irrigation services, the following individuals arc herehv
authorized to execute, contracts, subcontracts, bonds, monthly requests for payment and all
related releases ofliens and, in addition arc further authorized to enter into Subcontractor's
Change Orders with the appropriate parties:
Brett Ashley
Kenneth Morris
Gustavo Benitez
Wade Chapman
General Manager, West Palm Beach Branch
Cencral Manager, Orlando Branch
General Manager, Miami Branch
CJencral Manager, F1. Myers Branch
There being no further business to come before the meeting, it IS upon motion duly made,
seconded, and unanimously carried. adjourned.
/N WITNESS WHEREOF. J Iwvl: slgned this Rc~el.ution the 2~llt day DeCen1)her,200g.
,,::'.:: ! '11
/,; i] Ij l .<' , " I:" ,r/L~.
(t.",(~"~,;",,,; i,_,..;I'('",~..)'i_(,~,,(,../:::,.),:- ,'_ ::~?:.j ;' ," II
ficardo Leal- i~
I~resident
I Corporate ,C;eal)
I
An'EST:
Secretary
STATE OF FLORIDA
COUNTY OF DADE
On this 22l1d _day of December ,,2008 before me personally appeared RICARDO LEAL duly
sworn, did depose and say that he is the President, of Vila & Son Landscaping Corporation, the
corporation described in and which executed the foregoing Resolution; that they know the seaL
that it was affixed to said instrument as such corporate seal; that it was so att"ixcd by order or the
Board of Directors of said corporatton and they sigllt;,91 their names lhe;:reto by., i (mler
[:' H ',,~ '!" ~"'(:l_~^(;~Jl~i~',~:' ur; f:.)f:r~?)(i"O~GU0')nr-'(,; " :'_,, \
(Scal)\ C",,",'iIOO()1GJCf,1
. E"p'I""" 01121200') ,
: ., . i,',nlLoJ ti,rll (0(1Q.~;r2'8$:.5 Notary f\lblic
My Commission l);pire:li"",,, A1.-!;n I,\r:";
J~~c " ....,co~~.;~nr.~(;..,"~"
168 9
Collier County Board of County Commissioners
Contractor's Experience
Bid Number: 09-5228
CR-951 South of Jolly Bridge Landscape & Irrigation Installation
In order for Contractors and Subcontractors to be qualified to provide the services required
by Collier County under this solicitation, Bidders must submit the information requested
below. Documentation for items must be submitted with the bid or they may be deemed
non-responsive. Information must provide convincing, clear and concise evidence
acceptable to Collier County, that Bidder meets each of the following minimum
requirements:
1. Bidder must have a minimum of five (5) years experience in landscape/irrigation
installation in the roadway that the Bidder is providing services for. This experience
must include proiects of like size and complexity for each service listed.
a. Who will be performing the landscape installation:\jja a.rol.. S~
Prime: X
~
or Subcontractor:
Do they meet the 5 year South Florida experience minimum?
(Defined as the following Counties: Collier, Lee, Broward, Miami-Dade and
West Palm Beach)
Yes: X No:
Projects of like size and complexity:
Yes: X No:
b.
Prime: X.
or Subcontractor:
Do they meet the 5 year South Florida experience minimum?
Yes: K No:
,
Projects of like size and complexity:
Yes: k No:
c. Who will be performing the maintenance of traffic: U / I a rLvl('lj ~.
Prime:
)(
or Subcontractor:
Do they ?'leet the 5 year experience minimum?
Yes: ~ No:
168 9
Projects of like size and complexity:
Yes: 'I- No:
d. Who will be performing the Motorola Controller installation:
\/('{ ~'"t- Srrn
-
Prime: 'i
or Subcontractor:
Do they meet the 5 year experience minimum?
Yes: ~ No:
Projects of like size and complexity:
Yes: ~ No:
2. Bidder must provide convincing, verifiable, clear and concise documentation
acceptable to Collier County, that Bidder and his subcontractor's must have a
minimum of five (5) years experience in the specific areas of expertise that the
Bidder and subcontractor is providing services for as listed above in items A through
D; this documentation must be substantiated that each firm has provided services
that are comparable in size and complexity to those requested in the solicitation.
For items A-D below, provide the name of the account, address, telephone number
and name of contact person, dates of service, contract amount, approximate size of
areas serviced and type of work performed for verification.
A. Landscape installation, prime or sub-contractor.
B. Irrigation system installation, prime or sub-contractor.
C. Maintenance of Traffic, prime or sub-contractor.
D. Irrigation. Motorola Controller installation, prime or sub-contractor.
3. Provide evidence of communication equipment for prime contractor such as cellular
telephone, which allow the County immediate access to the contractor when
services are required. The access must be provided on a twenty-four (24) hour
basis seven (7) days a week both on and off-site.
4. The contractor is to provide a list of all leased and owned equipment.
5. List of landscape installation and irrigation employees performing the work on each
project (provide title, length of employment with your company, experience).
6. List current projects that are part of your firm's workload for April through December
2009 (provide location, contract amount, duration, staff assigned).
7. Provide copies of Collier County's current landscaping/irrigation licenses.
2
Colt.. County
16B
9
Admnistrative Services Ovision
Purchasing
3301 Tamiami Trail East
Naples, Florida 34112
Telephone: (239) 252-8446
FAX: (239) 252-6697
Brend a B ri Ihart@colliergov.net
www.colliergov.net
Memorandum --- ~.~
Date: April 22, 2009
From: Brenda Brilhart, Purchasing Agent
To: Interested Bidders
Subject: ADDENDUM #2, Bid #09-5228 - CR 951 South of Jolly Bridge Landscape
and Irrigation Installation
Addendum #2 covers the following change for the above-referenced Bid:
ADD: This addendum will allow for the following:
. Uploading slot for the Excel bid schedule spreadsheet.
. Add Alternates 7 and 8 to the electronic unit prices.
This addendum does not reauire any action from the prospective bidders.
cc: Liz DeLeon, Project Manager
Acq U I slti ons/ AgentF ormsa n d Letters/ Adden du monBCC Letterhead
Revised: 3/16/09
168 9
3301 Tamiami Trail East
Naples, Florida 34112
Telephone: (239) 252-8446
FAX: (239) 252-6697
BrendaBrilhart@colliergov.net
www.colliergov.net
leT Cou.J.t:ty
Admnislrative Services Dvision
Purchasing
Memorandum
~
Date:
April 9, 2009
From:
Brenda Brilhart, Purchasing Agent
To:
Interested Bidders
Subject:
ADDENDUM #1, Bid #09-5228 - CR 951 South of Jolly Bridge Landscape
and Irrigation Installation
Addendum #1 covers the following change for the above-referenced Bid:
CHANGE: Revised Bid Schedule attached - Addendum 1 bid schedule must be submitted in
order to be considered for award.
ADD: Qualifications Checklist - submit completed list with bid package.
CLARIFICATIONS:
1. Clarification of erosion control and detail
Erosion control is not a bid item, it is a heading for the below items.
The 91,525 sq. ft. should be removed from the bid schedule.
There are only two erosion control item are:
1. Rock Bags 400 ea.
2. Staked silt fence, Type 11114,724 LF (spec sheet attached)
2. Web address for NPEDS permit & SWPPP Monitoring.
The following web site address is the forms page for The NPEDS permit.
http://www.dep.state.fl.us/water/stormwater/npdes/permitsforms.htm
This Notice of Intent (NOI) form is to be completed and submitted to the Department
before use of the Generic Permit for Stormwater Discharge From Large and Small
Construction Activities.
Notice of Intent to Use Generic Permit for Stormwater Discharqe from Larqe and Small
Construction Activities I Word (DEP Form 62-621.300(4)(b)
Acq u i siti on sl AgentFormsa n d Lettersl Adden d umon BCC Letterhead
Revised: 3/16/09
168 9
The following is the link to the Generic Permit for Stormwater. To be submitted after the Notice
of Intent.
Generic Permit for Stormwater DischarQe from LarQe and Small Construction Activities
(Rule 62-621.300(4)(a), FAC).
General information on completing the permit.
http://cfpub .epa. qov/npdes/home. cfm ?proqram id=45
3. Web address to Marco Utilities standards.
http://www.citvofmarcoisland.com/Pu bl ic Documents/Ma rco Isla nd FL Uti I ities/i ndex
4. Clarification on Items # 5, 6 & 7 in tab.
Please refer to the FOOT indexes 100-106. EROSION CONTROL AND WATER
QUALITY
http://www.dot.state.fl.us/rddesiqn/rd/rtds/08/2008Standards. shtm
cc: Liz DeLeon, Project Manager
Enc: Bid Schedule
Qualifications Checklist
Erosion Control Silt Fence Spec
,
~~
Acq U ISI tion sl AgentF ormsan d Lettersl Ad dend umon Bee Letterh ead
Revised: 3/16/09
Fax;
May 29 2008 07;4rpm P002/005
168 9
Cabco Corp
P.O. Box 60531
Ft. Myers, FL 33906-0531
Office (239)334-4427
Fax (239)334-3997
E-Mail: cahco~orp@.embal.Qmail.com
Attention: ~ ~
We would like to take this oppottu.nity to provide you with the following liit ofvarloul
utility construction services Cabco Corp can provide to your ~mpany.
. Road Boring and street crossing with capabilities ofup to aDd including 20"
casings.
. Directional Boring capabilities under canals and streams.
. All types oftrencbing, backhoe and cable plowinS;
. Removing and replacing of asphalt, concrete, curbing, etc.
. All types of landscaping.
The' following is a partia11ist of equipment:
· Boring Equipment
· Dump Trucks
* Vermeer Machinery
* Various types of Water Pumps
* Equipment Trailers
· . Case Machinery
· Compaction Tampers
· Flat Bed TNgks
* Case Vibratory Rollers
· Air Compressors and Air Tools
· Electric Generators
· Portable Concrete Mixers
We are a Florida Power & Light approved GOntractor with certification in Traffic Safety.
We are a fUlly licensed and insured contractor aDd have been doing business in the
Southwest Florida area for over 2S years. We thank yc)U for the opportunity to be of
service and we look to working with you.
~~
Pre6i.cfelt.t
Fax;
May 29 2008 0?;48prn P003/005
168 9
Attention:
IIi
,.
$; UIWl.",fIIOIUVl, lw:.
10600 Sharon Drive
Fort Myers, PI., 33917
(23') 462-3781
(239) 462-3997 :Fax
E-Mail: hl~lerram.~.com
Cabco Corp
P,O. Box 60531
Ft. Myers, FL 33906-0531
Office (239)334-4427
Fax (239)334-3997
E-Mail: cabcocorp@embarqmaitcom
We would like to take this opportunity to provide you with the following liat ofvari~
utility construaion services Cabco Corp and H " S Underground, Inc. can provide to
your company.
*Directional Drilling
-Trenching. Backhoe and Cable Plowing
*Lift station Rehab and New Installation
*Firc Line Jnstallation
"All Types of Site Excavation
- All Types of Landscaping
· Road Boring
.. Waterlines/Sewer linesIDrainage
Repair. Replace &: New
.. Backflow J'nstallation &; Testins
· Re~1ace Asphalt.Concrete,
Curbing etc.
Wrtb. many other services to offer. .. .., ..
The following is a partia1list of equipment:
· Boring Equipment
* Dump Trucks
· Veoneer Machinery
· Various types of Water Pumps
III Equipment Trailers
· Case Machinery
* Compaction Tampers
· Flat Bed Trocks
* Case VibratOry Rollers
* Air Compressors and Air Tools
* Electric Generators
· Portable Concrete Mixers
And much, much more... .....
Cabco Corp., is a Florida Power & Liaht approved contractor aDd along with H" S
Underground, Inc. is certif1ed in Traftlc Safety.
We are fully licensed and insured contractors and have been doing business in the
Southwest Florida area for over 25 years. We thank you for the opportunity to be of
service and we look forward to working with you.
RwvI!I Mrw
PraideBt - Cabco Corp.
HoUfJ ~
PraldIDi - US Ullcteraromld,lIIe.
IWlill VIIU i
Time: 10:22 AM
Pa e: 001
Fax;
. 9, 12993343917" ~uuo
May 29 2008 07; 41 Q4ijS
9
IU'~WI.
Date: 5/13/2008
TO:
ACQB.Q. CERTIFICATE' OF LIABILITY INSURANCE :S~
THIICIJltTllIICATIJI ...UII:) M A MATTIR OF INFORMATION
ONLY AND CONFERS NO RlGHTI UPON THE CERTIFICATE
HOLDER. THII CERTlPlCATE OOH NOT AM EXTI!ND OR
T
I'ROClUCER 407 70-3000 FAX (407)711-7933
Insurance Off1ce of Amer1ca, Inc.
P.O, Box 162207
AltllDlCl'lte Spr1ngs,FL U716-~a07
NAIC ..
10190
18t88
101 S
INliIJ:l&R A:
INIlLA!R 8:
~C:
INSIJIlER 0;
IN8IJIlE~ E;
nil; POLICIES OP INSURANCe: ~ISTiC lIiL.OW HAVE liEN ISSUED TO THE INSURED NAMED NJI:NE FOR 1HE POLICY PERIOD INDICATED. NOTWITHSTANDING
IN( R~Il'tI!MI!NT. T!"" OR CONDmON OF Nt( CON'l'MCT OR OTHER DCCUUINTWI'TH RESPECT TO WHICH iHI8 CERTlPIOATE MAY SE II8USO OR
MAY PI!iRTAlN, THE INIlURANOE AFFORDED BY 1HE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL iHE TERMS, EXCLUSIONS AND CONDmcHI OF SUCH
POLICIES. AGC!REOATE UMITS SHO'.NN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INIR
1 000
300
10
1 000
a 000
2 000
1JMI1'I
$
.
.
s
s
.
'I'IPI a, INIl.IMNC&
tI&HSiRAL. L.1A8Ll'lV
X cOMMSACIAl. Ga.EAAL. L.IAllII.ITV
CV.MS lIlAOE [!] occu~
A
MED El(p l/ll'li OIW IlII'ICll'1l
~6IiDVINJl..lltV
GENERAL. AGGREGATE
Ji'ROOUCTS ~ cawolOP M9
B
DEOUCTIBLf
IWENTlON .
'MRGiRII CO,.,...TION AND
...~ UA8ll.I'I"t
C AAV PRCPRIil'ClRlPNmERIli>CECUTlVE
"'''IC~ EXClLOED'l
If ~. deSorIIle ull(\tl' .
SPECIAL PAO\IISIONS D8IcW
~
DEICRI'tlClN OP OI'I!l'A'IllINI' L.CIC:A'I'ICI..'WHIC:LIIIIlCC:l.UIICHI AJ:IGID""~' IINClAl. ,,1ta\IISlCNlt
Vi' a- N- San lal'ldsc:aping
At1:n: Rcquel Bened1c:t
4175 Buck1ngham .
Ft. Myers I .FL 33905
IHClULI:I /IHr CIP ".. dlMl aac:"'C1 JOClUCIIS.. ~ IIlilI'CRIi THIi
IilCPIAATION DATE TIEAEOF, THE I88UIICIINIURER WLL. ENCEAVOR TO WI..
~ PAn WImEN NOTICE TO TI-E CERTll'lCATE HOLDERNAIEO TO M L.EFT,
IllIl' 'AIWRSi TO MAL e(lCIoIl1011CE IIW.L. JMIIClIE NO OIlLIGATlON OR UASlLI'TV
QII aNt IClND ~CIN '1M! mI A..,.,.. ellt~./mYIS.
AUTHORIZED Nl"NIIINTA1M! /""? /
Jeffl"e . RICIA --r:# ci'~
u.cORI:) CORPORAnON 111I8
ACORD 2S (2001101)
Fax:
May 29 2008 07; 41 Qsas
9
85/1S/26B8 18:43
Rllollivod:
2392758e37
May 19 200a 10:44PIB
VTW
~CM FAX
V.1M'" Trob.c ,. WoocIy, :Inc.
411CJ CWIter Point O".Wl
SUite US
Fort My...... PL 31911
11I_. al"fl'"OUl'II. nc.
10e00 Sh.ron Driv.
North Fol"'t Myera, FL 35117
NAIC .
INSIDER Cli
IN Il
THE ~LrCEI O'F IN8URANCI L11T1C .ILOW HAVE ElE!l!N 1uum TO THIi IN8URlg NAMlD ABOVE FOR THE PQUCY PElAIOD ..l*:A'l'IiI), NCnWI'MiSTAII)lJ<<l
fWY ftEQUIMMINT TlIW 0" CONCIITION OF f<<'f eotmIIACT CM OTWIIIl DOCl.lt.!IIiNT WITH RESPECT TO WHICH THII CllltTlACATe UAV n I&S1JED OR
MAY PlFIT~.L. THE INSURANCE APPOIU:lIO IV THII'OLIC1E8 DllCRIIElloIa'RE\1llII SUIIoI!C'II' TO ALL. T'" TiIWlS, EXCLUBIONIAND'CO~' OF fUQIol
I'OLICI!8. 'WiQfll.ID'TEl UMITlI aHtMN MAV!il.VnHN "mUCEl IV 'AlD CLAIMS, . .
,.",. CIP "'UNCE iooI.#f M~
.-w. LIAIIlm' 141846 OJ
X CCMlmICIAL esHlaW. ~IMILIT'I'
0tM41 M".. [!] occ:uR
uumiI
5
.
I
r.
. 1 ooa.
sa
J
looa
l00G
1 DOG
A
.
.
COllllMlD IINlILl! lJMlT
~~ .
&c
1CXl1~ Y JNJUIIl'\'
~ ,.,...,)
.
IICI:lIl. or lNoIIAW
(PII'1lllIIlIIr4I
.
CWlAlIC UAM.lTV
NlY ~TO
I'1lOI'l!mY ~
(I'ef IIOOICIINl .
NJTCONly.I!UCC1DIIINT $
I!A.-.cc .
AU .
.
.
... .
"
.
.
~1'IWl
AIITO om. Y:
DiCBlllUMPI!II.IA l.IMl.ft"I'
llecu~ 0 GLAMiIW'lK
~ OCCUM8lOli
AGQRIGA'I1I
DlIllJCTIIUl
. DftNTlDN .
WIllIlICRSI GCIII......Tal AND
1!IIfPl.QYIIIUI' UAarfY
~PJ"~CiU1M
W .llII'IllIul'llllr
IlRCMIDIS MIoW
OIIlIil/II'rDI OfIllNIIiTlON8 I \.OCA'TlOIIIl1 V'IflICLIIIIIlICl U_ MlGIID J\" ....1II1lN'1' IIIIICW. ~1Il:NIIe"
Vila-la-Son l.anIIIse"nl
4175 Buc:k.lII_ Road
Fort Myers, FL JI.05
JIIO\A.O Nil'tCllf". 411CM". ;NMD lIOl.ICIIIa CANClII.l.'m III!JIO\IIl! 'l1lI!
~ IMTIi TJlII..... TtII"'O lIIIURIiI WILL IIMtIIIM'DI'l TO Mlo
...!!.. DM'I WRIT'ID.ffCm;I TO ntt OII'IlPICATlI NCLllIUI tullllD 1'0 T14! li!II'T,
IUT l'AIWIlITO 1IMo1Ulll1 NO'tIOIIIW.L I_NIl ClIIUIA'I1CAl all WMlllIolI"I
011 >>N ICIm lJlClII 'nil! rrs GII ~"'INIIo
~.~A'nIooWo
.:I 12
,
N11U
AClGRD II (1001101)
16B 9
~
Florida Department of Transportation
CHARLIE CRIST
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
STEPHANIE C. KOPELOUSOS
SECRETARY
June 24, 2008
VILA AND SON LANDSCAPING CORP.
20451 S.W. 216TH STREET
MIAMI, FLORIDA 33170
RE: CERTIFICATE OF QUALIfICATION
Dedr Sir/Madam:
The Department of Transportation has qualified your company for the amount and
the type of \vork indicated below. Unless your company is notified otherwise, this
rating will expire 6/30/2009. However, the new application is due 4/30/2009.
In accordance with 8.337.14 (1) F.S. your next application must be fi2ed within
(4) months of the ending date of the applicant's audited annual financial
~tatements and, if applicable, the audited interim financial statements. Section
337.14 (4) F. S. provides t.hat your certificate will be valid for 18 months after
your financial statement date. This gives a two month period to allow you to bid
on jobs as we process your ne,,1 application for qualification. To remain qualified
with the Department, a new application must be submitted subsequent to any
significant change in the financial position or the structure of your firm as
described in Section 14-22.005(3), Florida Administrative Code.
MAXIMUM CAPACITY RATING: $65,500,000.00
FOOT APPROVED WORK CLASSES:
F2t~CING, GR..~DING, GRASSING, SEEDING Arm SODDING, LP.lmSCl\PING
FOOT APPROVED SPECIALITY CLASSES OF WORK:
HARDSCAPE (CONCRETE I-IALKS, PAVERS, RIKE P.i'\.THS) AND IRRIGATION (LAWN SPRINKLERS).
You may apply, in writing, for a Revised Certificate of Qualification at any time
prior to the expiration date of this certificate according to Section
14-22.0041 (3), Florida AdIninistrative Code. Please be advised if certification
in additional classes of work is desired, documentation is needed to show that
your company has done such work with your own forces and equipment or that
'experience was gained with' another contrac.tor and that you have the necessary.
equipment. for each additional class of \-Jork requested.
SincerF~ly,
~~~
Juanita Moore, Manager
COfitra-=~"':s :\:ir~l.~ y~~~;,:!'.:t.~ ("'r: ()t::"fic8
.JM: cj
www.dot.state.fl.us
* RECYCLED PAPER
168 9
SON
Emergency Contact Numbers
Corporate office 1-305-255-9206
Ft. Myers Office 1-239-466-2700
General Manager Wade Chapman 239-225-5396
Project Manager Racquel Benedict 239-225-5074
Landscape Supervisor Jon Romine 239-243-6243
Irrigation Supervisor David Hernandez 239-243-4115
Maint. Supervisor Rafael Davila 239-633-2083
168 9
GUIGNARD COMPANY
SURETY BONDS
July 26t\ 2006
Ocean Bank of Miami
Attn: Juan Menciola
Re: Vila and Son Landscaping, Inc.
Dear Juan,
Guignard Company is the agency handling the Performance and Payment Bond requirements for Vila and
. .
Son Landscaping Corp. Bonds are currently provided through Westfield Insurance Company, with a
Best's Key Rating of A (Excellent), xn, and included in the U.S. Department of Treasury with an
underwriting limitation of $57,988,000.
Prudent surety underwriting requires our satisfaction of financial abi lity, experience, and personnel. Vi la
and Son Landscaping Corp. has our complete confidence in all these areas. This contractor has been
approved for bonding on single projects of $5,000,000, with an aggregate work program of $25,000,000,
as normal parameters. Its surety has never declined a bond requested by Vila and Son Landscaping
Corp., and we are certain that any bonds required will be provided.
As always, the surety reserves the right to perform normal underwriting at the time of any bond request,
including, without limitation, prior review and approval of relevant contract documents, bond forms, and
project financing.
Yours truly,
Guignard Company
-,.-....
i j ,r,
.-~.11i ' I
t c. :..0J.L
{\
1"1 '.. /)1
II" \ -. I ,{ iifr,
~(LhYl Olj",(;.iJj.
Paul J. Ciambriello
Vice President
1904 BOOTHE CIRCLE 0 LONGWOOD, FL 32750
PH (407) 834-0022 1(888) 220-3780 .. FAX (407) 260-1767 / (888) 220-3228 · www.guignardcompony.com
168 9
L1CENSES+INFO+L1ST +SHEET
#8
12/15/2008
Qualifier Certification Information
CDPR2307 - Qualifier Certification Information
Collier County Board .-;f County Commissioners
CD-Plus for Windows
Printed on 9/22/200 l:li:49PM
CERT NER:
22978
QUALIFIER NER:
22746
ARIEL CABALLERO
CLASS CODE: 4220
IRRIGATION SPRINKLER CONTR.
STATE NBR:
COUNTY COMP CARD:
STATE EXP
LIAB EXP
4/1/2009
WC EXP
4/1/2009
ORIG ISSD
10/25/2001
RENEWAL
EXPIRES
9130/2009
DBA:
VILA & SON LANDSCAPING CORP
WC EXEMPT: N
OL EXEMPT: Y
ADDRESS:
20451 S.W. 216TH STREET
EXE~lPT EXP DinE:
CITY:
"1IAHI
FL
33170-.
PHONE:
(3J5) 255-9206
FAX :
~IOTE:: It is the qualifi.er's responsibili.ty to keep all business, li.censing and requirements
current and to provide up to date copies for Collier County files. This includes all insurance
certificates and any change of address information.
Stat~~ Nbr:
llC -
c'~ 1 i ier 20un ty
Ce ct
NIAMl
~; i 'J'Ilcd
168 9
L1CENSES+INFO+L1ST +SHEET
#9
12/15/2008
Qualifier Certification Information
CDPR2307 - Qualifier Certification Information
Collier County Board of County Conunissioners
CD-Plus for Windows
Printed on 9/22/200 1:18:32PM
CERT NBR:
22977
QUALIFIER MER:
22746
ARIEL CABALLERO
eLF.S5 CODE: 423~
LANDSCAPrNG RESTRICTED CONTR.
STATE NBR:
COUNTY COMP CARD:
STATE EXP
LIl\B EXP
4/1/2009
we EXP
4/1/2009
ORIG ISSD
10/25/2001
WC EXEMPT: N
EXEMPT EXP DATE::
RENEWAL
EXPIRES
9/30/2009
DBA:
VILA & SON LANDSCAPING CORP.
OL EXEMPT: Y
ADDRESS:
20451 S.W. 216TH STREET
CITY:
,:'-1: AfvlI
n~
33170-
PHONE:
(305) 255-9206
FAX:
NOTE: It is the qualifier's responsibility to keep all business, licensing and requirements
current and to provide ~p to date copies for Collier County files. This includes all insurance
certificates and any change of address information.
Coli ~e:r '-~')L.:.nt!
tat e r-It..-:
LAND
:)f
-'e-r:: Nbr: ?,;:Q7
MIAMI
170
5i9ned;~_~~__
\168
9.
~
ACORVr&
~
Willis of Florida, Inc.
26 Century Blvd.
P. O. Box 305191
Nashville, TN 37230-5191
CERTIFICATE OF LIABILITY INSURANCE Page 1 of 2 ~A:~i:';~~
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
i INSURERS AFFORDING COVERAGE NAIC#
877-945-7378
PRODUCER
INSURED
Vila and Son Landscaping Corp
20451 SW 216 Street
Miami, FL 33170
IINSIJ~ERA ~nj.te~_S_tat~.l" F~ir~~Ilsu",-ancec::Emp,,~x_ 21113 - 001
iINSUFlEF<El~N:at;ional Union Fire!Ils~alIlc:~~Compan}'_~f~ 19445-005
! INSURER C:
INSURER 0:
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADD'
L TR INSR
A
TYPE OF INSURANCE
GENERAL LIABILITY
--1
X-1 COMMERCIAL GENERAL LIABILITY I
-_ ~J CLAIMS MADE I~J OCCUR'
POLICY NUMBER
LIMITS
5417001009
I EA~I::I()CCLJRRENCE_ ~~
I DAMAGE TO RENTED
PR~/"1I;;~;;jgj!Q<::,,ureQge 1 ~
r",ED EXP(Any_one person)
I PERSONAL & ADV INJURY
I C;~~~RAL AGGR~~A ~~
I PRODUCTS ~ COr",P/OP AGG
, $
-t -
:$
$
$
$
$
1, OOQ-,~Q
.___~_QQ, 000__
5, Q ()JL_
lLOOQ,QQQ
2LQQQ..()Q,Q
_.2.LQ.QQ,Q()Q
LOC
A
: AUTOMOBILE LIABILITY
:~l ANY AUTO
.JL! ALL OWNED AUTOS
,.---1 SCHEDULED AUTOS
1-~1 :::~~:~TE~SAUTOS
~ - - ------------
1387301616
4/1/2009
4/1/2010
COMBINED SINGLE LIMIT
(Ea accident)
'$ 1,000,000
BODILY INJURY
(Per person)
BODIL Y INJURY
(Per aCCIdent)
I~RAGE LIABILITY
I _I ANY AUTO
, I
EXCESS' UMBRELLA LIABILITY BE 65 6 4 7 4 2
X: OCCUR il CLAIMS MADE
PROPERTY DAMAGE
(Per aCCIdent)
I ~~:::~~:~AACC~:~~~r~--
I AUTO ONLY: AGG , $
B
4/1/2009
4/1/2010
; EACH OCCURRENCE
: AGGREGATE
.4.LQ.QQ1. Q ()Q
4 .L.QQ_!),L 0 Q.Q.
A
DEDUCTIBLE
X RETENTION $ 1
WORKERS COMPENSA nON 40 6 6 8 0 3 97 2
AND EMPLOYERS' LIABILITY Y I N I
ANY PROPRIETORJPARTNERJEXECUTIVE [N" :
OFFICER/MEMBER EXCLUDED? . _._
(Mandatory in NH)
If yes, descrrbe under
SPECIAL PROVISIONS below
I OTHER
4/1/2009
4/1/2010
WC STATU~ 1
X TQRYLIMITS.
E.L. EACH ACCIDENT
E.L. DISEASE ~ EA EMPLOYEE
J$
"';$ .
1$
. 1
- -- j$
i $
OTH~ '
~R..
E.L. DISEASE ~ POLICY LIMIT
$ _1., QQ 0 ,Q.Q.Q. ..
$ 1, QQQ--,QQQ
$ 1 000 000
DESCRIPTION OF OPERATIONS' LOCATIONS' VEHICLES' EXCLUSIONS ADDED BY ENDORSEMENT' SPECIAL PROVISIONS
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
Proof of Insurance IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
ACORD 25 (2009/01) Coll: 2670613 Tpl: 909547 Cert: 12408565 @1988-2009ACORDCORPORATION.AII rights reserved.
The ACORD name and logo are registered marks of ACORD
ci.J!3
... 0
o G)
(,)'0'
- ...
C)ll.
t:
.- t:
0.0
CI:I .-
0-
tI) 0
"0 2
t: -
CI:I tI)
...J t:
t: 0
0(,)
en G)
CI:I E
'i::
>ll.
.......
.......-60
C>N
Q)-",,"
....... E OJ (")
"""
o.~-l
(i) U) 0 0) LL
(,)::) Q)O)
> L.- -C")
;-g Q)o-co
0.."" oOL.-COC")
w 0) a.. co
(\) ..- it co 0 5 g- >. en
-",," OCOCllO~LC)
C)U) 000 ~ L.- 0 ~ C")
c::) O)N -~ (])__
C'CS --0........->
._ T-. o.'c C\I C """ ~
'-~ co 0.C\I 0)",," C '"
I-OZ<(wOJco::)~
C
t5 .Q
0).......
. --. co
o U
L.- 0
o..-l
0) i...:
............0
coc.......
o g g
tE'::;
co <( C
...... 0
Cf).......0
......u>:::
u ~ Q)
.92. C C
e 0 ~
0..00
~ ..-
......-ci0
aJ C > N
(0 L.- 0)-",,"
.... .92 E OJ (")
0= o.~-l
..J 00 0 0) LL
0) ~
(\) -0 ~ 0 ~ (")0
(,)c OL.-CO
C'CSCO Q)o..C")
--o...JcoO C a. or
Q.>u..o~ oOCO)
....(\) N\ _ 0 co CIl 0 . en LC)
~L.UCIlNI'-05OL.-C")
. CIl Q) Q) 0) '"0 0) --
- 0.. - ..- > ..-
C'CS .:;: C 0) C """ .- o:;t
:Ec~L~~~~d!;5~
C
1:5 .Q
0).......
. --. co
o U
L.- 0
o.....J
0) i...:
............0
co C ......
o g g
tE'::;
co <( C
...... 0
Cf)......0
.......u_
U co L.-
0) ,::; 0)
.~ C C
e 0 ~
o..uo
'-
(\) ....-
.... 0
c: >- C~N
(\)~ O)-'<t
U ~ E OJ (")
~ rn...J a...::t:....-J
'-nLL OQ)LL
C'CS""" O)~
>. - >O~C")
o..~-c 0) L.-O
~~~ oOO5&C")
~O) coOco. co
> . >. I
In .- Coo 0 0 ..... 0)
'- c.- 0 0 CIl 0 '- LC)
(\)::)~NOO5O~C")
> ,,... Q) .~ '"0 ..- Q)> --
._ ...~ > 0) ...~ ..-
C f'-.. .- C ..- C """ .- """
_(")C::JL!)O)'<:tCO)
-LC)::)'JwlIlco:::>___
16 B ;i )
CIl
E (])
;j ~>.
'-0 -0 a. CO I"-
> e ~ 0
U-OJ o..-CO)
(\)co cco~
..c co a.. ,. ~ ..-
I- OC ...J f'-.. 0 U 0) ...J C\I
LL 0 'C 0) LL ~
@) (3 u) ~ ~ E(]) 0) u) cO
.... L.- L.- (") 0 L.- l"-
(\) -oc Q) 0) CO <C 0 Q) C\I
~ >'..0 -..c >.
1::' co ~ 0 L!) t 0 ~ 0)
C'CSL!) .1:5~0i?5 .C")
1-f'-..u::OwZf'-..u::~
0) i...: 0) i...:
....... 0 ....... 0
....... C ....... C
co ....... CO ......
0 ::J U 0 ::J U
0 co 0 co
t E L.- t E L.-
....... .......
co <( C co <C C
....... 0 ...... 0
C Cf) 1:50 C Cf) 1:50
....... 0 ....... co>::: ....... 0 ....... co>:::
U :;::; U L.- (]) U :;::; U
0) co .92., C C (]) CO Q) L.- (])
'~c C
'5' U e 0 ~ 'e- U e 0 ~
L.- 0 0
a.. -l 0..00 a.. -l 0..00
rn
c
C'CS
.-
"'C
(\)
:E
~ Oco
-g 0) 0'::
o ....... 0 .- C\I
0::::2 OJE"-co
~ CO >..~ ~ o:;t
~2 gocEC")o:;t
c...JNo::JCO...Jor
C'CS 0 LL >. 0) 00 I- LL o:;t
~....... _t....co ._f'-..
o CIlCOf'-..L.-WCllI'-
E ::; 0) 2 ,....... .92 ..- ~ .-
o...oN=O 0.0)
EU)coQ)coo(")co~
:::>ZLLWO(")Z
C
1:5 .Q
0) .......
. --. co
o U
L.- 0
o..-l
Q) i...:
.............0
COC"""
O::Ju
o ~
~~~
~1:5~
u co L.-
0) L.- 0)
'~c C
e 0 ~
0..00
U
C
CIl
(])
.......
co
'0
o
(/)
(/)
'- <(
~ '"0
C CQ)LC)
L.- co > 0
(\) 0 C <( I"-
U L.- co >. C") ..-
(\)'- """cO) ...J E ~ LC) ..-
LL o'"OL.->C\l9
(,)Q) 0L.-Q)>
C 0 r:n co r--: w.::: .. co
C'CS-L.-O(")=CCC")
U co Q) 0..- co:::> 0 N
C >'N _..c (/)__
(\) 0 ~ >.o:;t ~ f'-.. -0 co
(\) co (") co"- m 0
-J8u:~~~;n~~
C
1:5 .Q
0)"""
. --. co
o U
L.- 0
o.....J
Q) i...:
......"""0
COC......
o g g
tEL.-
co C
"""<(0
U).......o
......U_
U co L.-
Q) L.- (])
'--' C C
e 0 ~
0..00
ci.~
i- (J
o Q)
(,)'0'
- i-
0)0..
c:
.- c:
g. .2
(J-
III (J
"C 2
c:-
co III
-I c:
c: 0
0(,)
CJ) Q)
co E
'i:
::;:0..
~
ns
==
..lIl::
~
ns.....J
Q.LL
lJ) CIl
- ....
CD (])
"- >-
~2
ns
eiL
C
t5 .Q
(]) ......
......., ro
o U
.... 0
Q.......J
>
-
CD
(/)
ns
.J:.....J
Q.LL
~ (/)
"'l:t (])
(/)0.
::)~
C
t5 .Q
0)""
......., co
o U
.... 0
Q.......J
........
o
0)
('I")
(;5('1")........
0.>-1;:
co 00 >-PLLN
o ...... - I
ocoCCcnl()
N('f)::JO....('f)
..c I.[)~ 0 2 ~ ('I")
UCDU 0 00:::::--
""0) (])o":::::o)
co I.[) (])l()......('0
2w-.....J........LL~
<]) i.....:
...."""0
co C ......
O::Ju
o ro
tE';:;
co .A" C
...........0
(f)....u
....U--.
U co ....
<]) .... (])
.......,c C
e 0 ~
Q..UO
ctl
....
l-
N
E........
>-.~ ~ ~
OcE('0~
O::JCO-lor
COr--:OI-LL~
o('f)U . ~I"-
o~....wcnl"-
N ~O) 0)__
>- I"- = ........ a. 0)
CO~Ooctl('0
2W-U~Z~
<])+.;i.....:
(Uc.8
o 5 g
t E ....
co C
"""<(0
(f)....u
......u--.
U co ....
<]) .... <])
.......,c C
e 0 ~
Q..uo
-0
0:::
C
o
-
U)
CJ)
~ .S;
ns >
~:.:J
..x: 0
~-
ns -0 ....
a.. > 0
CD co (])
_ co CD >- .,g
CUm 80c(/)
C>.o-lNO::J~
C roLL ~cD8....
CDcocnco~....~
"'C co O)::J ~ 0)
- C 0...0 I.[) = I.[)
,~ co co <]) ~ 0 gs
\J(f)ZLLW-()N
C
t5 .2
0)......
. --. co
o t)
.... 0
Q..-l
-0
0:::
<])
CJ)
:2
0:::
<])
C
Q..
"'C 0
0:::......
-0
co:::
o 0)
1;) 0)
C)ctl
c-5
"S: E
:J E
c
t5 .2
0)......
. --. ctl
o (.)
L.. 0
o..-l
<]) i.....:
...."""0
coc......
o 5 g
tE.t:;
19 <( 6
w......()
_Ul:::
t) co
Q) ,;:. 0)
....... C c
e 0 3:
Q..uo
....
o
<])
o
I.[) >- ..c
OOC(/)
-l00::J~
LLNciO....
_~..;:t()0
~coo~(j)I
o.::JN=l()
COCO)oco
ZCOco()co
...., w- N
<]) i.....:
...... ...... 0
co C ......
o 5 g
tE.t:;
co <( C
05....8
_t)l:::
U ~ <])
.~c C
e 0 ~
Q..uo
~
o
........N
~O)
('0........
.....Jor
lL'=t
.1"-
(/)1"-
(])--
-0)
a.('f)
CON
z_
~
o
........N
~O)
('0........
.....Jor
LL~
~I"-
cnl"-
<])-
-0)
a.('f)
CON
z_
"
"'C
>-l
COLL
In (/)
"S: 0)
co a.
c~
c
t5 .2
0).....
. --. co
o (.)
L.. 0
o..-l
lbB
L..
o
0)
o
l() >- ..c
OocW
~~::Jo~
>. ........ L..
'- -.;t () 0
coO)....I
::J - Q)
.... ........ ._ LO
..0('1")=0)
<])........00)
LLWON
<]) i.....:
..........0
co C ......
o 5 g
tE';:'
co <( c
(f).... 0
t5~
1:5 ro '-
<]) .... ())
.......c C
e 0 3:
Q..oo
-0
>
CIl
U)
CJ)
C
'C
a.
(f)
co
:!:::
9
\.
~
o
........N
-.;to)
('1")........
-lor
u..-.;t
./'-
w/'-
0)-
-0)
0.('1")
ctlN
z_
C
o
CIl ........
o 0
"'C...... 0)
tV ()) I.[) ..... ('0
... .~ .....J 0 (f) ('0
C-lLLOo ())
o >-:>.NO >-2
1;)cc<vocc
C)::J::J..Qo::Jo
c88E.........82
"_ <]) /'- 0
> ()) ()) > 0) ()) 0
"- ()) <]) 0 N ()) LO
..J.....J.....JZw.....J........
C
t5 .2
0)-
. --. ctl
o (.)
L.. 0
0.......J
<]) i.....:
_-0
co C ......
o 5 g
tEl:;
co <( C
05 0
_t5~
co L..
~ .t:; ())
......., C c
e 0 3:
Q..oo
........
.....J ........
LLN
rJi,J,
....('i)
~('i)
20)
.('0
iL~
a.
...
o III
(,)tJ
C)G.1
I: '-'
._ 0
a....
call.
c.J G.I
III c.J
"0 I:
I: ca
ca I:
..J G.I
I:c
0.-
en ca
ca~
>
~
'-
ea
'-
.c
.-
..J
- I"-
ea 0
c: O..c
o N.....
"e,...J r-: 5
Q)LL""E
,.; - 0)
.... ~.o 0
enQ)E.....
Q) >- 0) ..c
~~--c
ea 0.0) 0
...JLt(/)E
en ~
Q) 0
'C en
ro ('f)
..... ('f)
:9-- N
...J(/)...Jen
Q)>-CLLN
..... 0 I
.2 C .- cii ~
~::lc""<o
Q) 0 ::> ~-.;t
enOLOOO::::::---'
....Q)-.;t.c:::::en
Q)Q)('f)"";('f)
0.....J N LL ~
0) i...:
+-' ..... 0
co c.....
o E 6 ~
t .... E .....
2~<{~
c(/)..........o
o__UU-
t5 .- U co ro Q).....
Q) ..... 0) ..... .....
....., ro .~ c c C
egeoo3:
1:1....J1:1.000
C)
c:
"i:
Q)
(1)
c:
.-
C)
c:
W
c:
o
en
c:
..s:::
o
..,
OJ ~
I"- 'E 0
o Q).....~
~ __ Q) U) ('f) ('f)
_ U .~ C I LO
...J ~ co OJ 0 -- -.;t
LL.....;:.ocenLLN
-O)COWC I
en .0 O. ..c en ~
Q5Eu..-co.....<O
.....t-o-,~-.;t
~2 ro co_ ~ co ~---.
o.~N..cLO .~
.....0) "-O~""'N
LL(/)..-f:/7-,NLL__
0) L..:
+-' ..... 0
co c_
o E ::l ~
tQ5~';:'
21-<{6
c(/)---u
_O+-'uu_
u U co co ....
Q) ..... 0) ..... .... 0)
.~ co .~ C C c
egeoo~
1:1....JD..OUO
"C
>
CD
Q)
- t-
ea 0
O...JO
u...N
c: _I-
Q) en Q)
"C Q).o
-0..9
o ro u
Ozo
(j)
I-
O-.;t
0)0
..... O~N
U >-..c -.;t en
~ cen('f)-.;t
.....0::lQ)...J"?
C~o~u..-.;t
800Io -t-
..... 0 I- en ,-
roOQ)LOQ)---.
Q) ..,f = co 0. (j)
>-LOOCOCO(")
..-f:/70NZ~
Q) .;...; L..:
- cO
ro -
o E 6 ~
tQ5E';:'
21-<{5
cU)-.....u
.....O.....uu_
u .- u ro ro 0)1-
Q)-Q)..........
.~ ro '-' c c c
e g e 0 0 ~
1:1....J1:1.000
o
L{)
en
t- co ('f)
o "E__('f)
...JO o(/)...J
LL N..... /n C LL (j)
- U \.J -.;t
- co ro ro .Q m (")
roNI- .....1--0(")
"E.....cOcro....,
OQ) O::l~OLO
(9.o8col:1. (9t-
or- E .....-.;t_::> LO
"'I:t2Q)ro<oO>ctl---.
cncu~o>-<oc~
::)~t3..-;;o~~~
Q) i...:
..... -- 0
ro c --
o ::lU
E 0 ~
~~~~
e U).......... 1::5 t5 0
t .Q -
Q).....a3~~Q5
.~ ro ....., c e e
o U e 0 0 3:
ct.3a...UOO
u
Q)
en t-
ea 0
J:...JO
D..u..N
....
or- en Q)
"'I:tO).o
0..9
cnrou
::)zO
Q)
.....
ro
o
t
ro
.....
C U) .....
.....O_U
U .- U ro
Q).....Q).;:.
....., ro ....., c
o U 0 0
0::.30::0
It)
......
-
@)
"C
~
~
e...J
uu..::
en -Q)
~e.o
'-0)0
0..........
u~8
168 9
U)
I-
O~
Q)O
..... o..-N
U >-..c ~ (j)
~OCCll(")-.;t
-0::lQ)-l"?
500~LL-.;t
uoO 0 _t-
1-0 I-I CIlt-
ro - Q) Q) ---.
Q) (j) :.= L{) 0.. (j)
>- (") 0 co ro ('f)
(,,)OCOZN
..- f:/7 N __
i...:
o
.....
U
ro
I-
-
e
o
t50
rol::::
..... Q)
..... e
5 3:
00
.....
c
E 6
Q5 E
I-<{
bt5 U5
o ~ Q)
~co.z.e
oOee
U-.;t::lO
....(")o~
rot-Oo
Q)c-0Q)O
>- (") Q) LO
..- f::F7 ...J ..-
Q) i...:
..... ..... 0
ro c.....
o E 6 ~
t.....E.;:.
2~<{5
eU)t5t50
t .Q t5 ro ro I::::
Q)--Q).;:..;:.Q)
.~ ro ....., e c e
o U e 003:
ct.3a...UUO
..-
o
(j)
(")
(")..-
..-
...J..-
LLN
u)J:,
.....('f)
~('f)
~O)
. ('f)
U::~
a.
~
o fA
u-
(,)
C)CD
s::: .--
._ 0
a.~
CI:lll.
(,) CD
fA (,)
'0 s:::
s::: CI:l
CI:l s:::
..J CD
s::: C
o .-
en n:s
n:s~
>
c:
E-lJ'o..
ou..8
- r.n N
co .... ....
(/) Q) Q)
~ ~15
co .t)
Oito
(/)
.....
C
Q)
E LO
t 0
ro ~
0..~C0
<( co ~
'- -I -I J'o..
o EC .- u.. ~
Q)~OEenN
:<=0 oCi;~
.~ gg cu >> .-
Ci>tD~8::;?:~
"0 (") ro LO . \ . J
.~ ffi 0 J'o.. u:: ~
Q) L:
..... .....0
ro C .....
OE~a;
tCi;E';;
19f-<(c
.. Cf) 0
C .....-u
.....o.....uu_
u .- u ro co ~
Q) ..... Q) ..... .... ....
'-' ro '-' C C C
e g e 0 0 ~
ll.-la..UUO
(/)
co
Q)
~
<(
c:
o
E
E
o
u-lJ'o..
.!u..8
co r.n N
"CQ;Ci;
~ >-...0
~2.8
.- . u
~U::O
.....
C
Q)
E
t
ro
0..
Q)
o
Q) ~
~ 0)
roCOC0
_ CC0C00
(.) .- N N
co lLN-I..-
';;0 >>.....lLN
C ..... Q) I
o~C:>en(")
"O::::l:>.....(")
'-' OroQ)l{)
..... co ..... >-
COO_UO::;?:O)'
~ (") Q) 0 . (")
N~..5a..U::~
Q) L:
ro c.8
OE~a;
tCi;E';;
19f-<(6
cCf)..........U
_o.....uu_
u . - u co co 0)....
Q)-Q).........
'-' co '-' C C c
e g e 0 0 ~
ll.-la..UUO
-
-
o
10.
10.
co :t::
:E .g ~:g
..... :> 0)
>- co~C0
.c J'o.. ::;?:....C00
o co
(/) -I 0 >>a.. -l 0
"lLN O...oOu..~
........ (/).... I
ctS en Q) 0) ~ "0 ..... en L()
~""'...o.....O'-Q)....1'-
~ ~ E 'c ~ ~::;?: ~ N
:::s "'::::: Q);';:: LO_ t LO "'::::: .-
OO::::::UO)I'-::::lLOO::::::<J)
. Q)"ON O~ .(")
() it 0 .~ ffi U ~ it ~
Q) L:
..... ..... 0
ro c......
OE~a;
t....E.;;
19~<(6
cU).....-<;-;:U
.....o.....U\..l-
u '- U CO ro '-
.~ ro .~ -E -E ~
oUeoo~
a:Sa..UUO
0')
c:
.-
"
c:
ctS
-oJ
.s::
(/)
...
ctS
:E
..-
o
N
~
Z
CJ) _
+J C"m M
U CO.....O
J'o..CO :t=f-..-I'-
o ~ ::::l .- -.;t
06 CJ)EC0co
~ u 0 5 .~ -l r-;-
~Q)..c~UElLCO
...0 ..... LO CO _ ~
oECI'-Cf-CJ)<J)
'- Q) oEo 0...... 0).-
Q) > rri :Q ~ 0.. <J)
U50-.;tNQ)O)COC'0
WZ"-ffi::;?:-.;tZ~
Q) ...... L:
ro c.8
OE~a;
t'-E';;
19~<(6
cCf)t5t5U
t5 .Q t5 co co l:::
Q).....Q)~~Q)
'-' ~ '-' C C C
eoeoo~
a..-1a..UUO
168'\9
(/)
-
c:
CI)
E
1::
ctS
Co
<(-l"
_lLo.....
w _ u
C:CJ)Oco
O~N~O"O
Q.u....cOc
<(0)0.0
c ..ouoa..
O..cE....J'o..c
OlQ)ro......
... .- > Q) - 0
CI) ~ 0 >>gj Ci;
J:-lZ..-wI
Q) L:
..... .....0
co c_
O E ~ g
tCi;E';:;
19f-<(5
cU)..........u
_O.....uu_
u .- u ro ro ~
0) - Q) '- '- .....,
'-' co '-' C C C
e g e 003:
a..-1o..uuo
2"ON
c>J'o..
Q)lDO)
ECJ)C0
tQ)C0
ro~
0.. roLL. 0
<( -I - LO
Q)CJ)co
Ol~<O
co U I
-<(co
:= <0
>..cC0
N .Ql 0;-
C0..cC0
NQ)N
..- -I ..........
c
o
.......
to- g
....
D::-.J (j)
(l)LL c
>. 0
"C+-' 0 l{)
>C 0) l{)
N'l.:::l au co
r.&.IO o=C'<t
'" U . 0) C I
_ I,{) LL. >. l{)
(/)'D NO)LLI'--
';: cu C0_ 0 C ~
e 3: 0 co .'- '<t
~eg~~3~
(l)a:lNEI3-.....I~_
C1l
"C
Q.~
~ t:
o ctI
UQ.
C)E
t: 0
.- U
Q."C
ctI C1l
CJ_
~~
t: Q.
ctI E
.....I 0
t:U
o If)
fn..c
ctI 0
= .,
> ~
o
'--'
ctI
~
;..:
- 0
c_
:::l U
o ~
~~g
CCD(:50
t3 . Q Cl.. C'Cl 1::0)
0) +-' ....
'-' co E c C
ego 0 3:
0.......1000
"C
>
al.....l
~LL
...
~
-
e
CU
~
co
a::; g
o c ._ 0'>
oO)O)CO
<O>Ecb
~ ~<(oeo
-EO'>:Bo~::"
0)> 0) ~- ;::. Co ~
0) ~.- C'0
<(~EI3-0f-_
;..:
- 0
c_
:::l U
o ~
~~g
c+-'-o
+-'oO)u-
U .- Cl.. C'Cl 0)....
0) +-' ....
'-' co E c C
o u 0 0 ~
o::.:looo
-CU
.....
~
U
..:ac:
u
o
c:::
"0 U)
~ >. C
.... c o.~ g
....:::l 0-0....0
~ 00 ci C 0) or-
o oO)-gc0
e"E I'--Oa:l~
.- co N C
E ~ '<t 0 'E- ~ ~
CU 00., col{)
(l)c!i~~~o~
;..:
+-' 0
c_
:::l U
o ro
E.b
~ <( 6
C+-'+-'O
_OO)U1::
U:';::;Cl..~O)
0) C'Cl +-'
'-' u E C C
eooo~
0.......1000
~ 0
"'I:t .....I :::l 0
o C '0)- ~
CULL 00) I
e - o>Eeo
~~ <0<( oeo
~:::l 0) '+- f- '<t
(.) c 0'> C""i 0 >.--
(/) 0) 0'> I'-- >. C ~
m~~~G~~
;..:
- 0
c_
:::l U
o ro
E.b
'D <( C
0) 0
c+-'-o
+-,oO)U-
u .- Cl.. ro 0)....
0) +-' ....
'-' ro E c C
egoo~
0..--,000
CU
"0.....1
eLL
~
.....c
C) u
co
o 0)
ea:l
~ 'E
~ ro
:E~
16111-"9
Cl.. 0
...-
o:::l ~
oeO)<o
cic.9Ci).,t
C'0'DO)<O
1'--0)--,0)
'<tcr>-c'--
OOC'Cl...cLO
0l{)20~
N EI3- u... -, '-'
i...:
c.8
:::l u
o ro
E.b
-O<(C
0) 0
_ .~ Ci) ~ ~
a3 - Cl.. .... 0)
'-' ro E c C
egoo~
0.......1000
(/)
0')
e
.;:
Q......I
(1)1.1..
cu >.
.s::-
... C
... :::l
n:I 0
(/)0
cu{5
... C'Cl
"C 0)
em
~ E
... co
(1)0..
Cl..
:::l
e
0<.9
O'D
Lc.i2
l{) ro
1'---
- ~
0)0'>
O)NO)
O)eo..c
~EI3-f-
;..:
c.8
:::l u
o C'Cl
E.b
~<(6
CCi)t3S:2
-u 0 - C'Cl ....
0):.;::;0......0)
'-' C'Cl E c C
egoo~
0.......1000
roO
..cO
uo)
00)
cr:6
0<0
t'<t
0) .--
.01,{)
00
cr:22.
16 B ~g
E
o
.c
s:
~
'0
!
Rl
.'8
:::JI
'0
CP
10
~
::l
.e
.E
~
Q
1ii
CIS
..J
w
()
ii:
Q.
W
()
~
In
)-0::
o::~
o
I-z llJ
ZO(l)19
WU3~(fJ~
>s;<{
zs..J~
I
....J
U)z (I)
o :5ffi
~g ii~
O~~f-f-
9o!~~~
02SLL
(I) (I)
o 0
z z
<{ <{
..J ..J
2
~ (I) (fJ (/) (I) (I) (I)
000000
LL Z Z Z Z Z z
ti:J ::s :5 ::s :s :5 ::s
n::
f-
2 >- 2
n:: (fJ 0:: 0::
<l:: 0 w <l::
LL Z (/) u..
ti:J:s~ti:J
~ z ~
(I) (I) (/) (/)
o 000
z z z z
<l:: <{ <l:: <l::
-J.....J...J-1
2
..J
<l::
0..
- - f-
22(1)
:::; :::; w
2 2 S
2
..J
<{
0..
~ ~ In
::=; <l:: W
2 ~ S
o (/) (/)
2 <l:: 0::0::
..J wooww
<l:: f-OO>->-
0.. (l)ZZ22
ln~_-~:s:slY:lY:
w 00::0::00
S2IOOu..u..
:f:I::
..J
<C
it:
w
~~8~(Od';ffj~g88~;:ffj
NCOl{")LC)Q)~"'f'..C)T""""'Q"L()O
*~~~~~*~~;J;~~~~
~>~~~~~:;~;~;::~~~
T"""C\IT"""C\lNT"""T"""T"""T"""'C"?C\lNN
l!i L[) l.() It) L() L{) L() l.{) LO L.() IJ') 1.0 L.O
o t'-T"""' coco
CDCOI.{)l{)<D
NN<DMCO
<0 CD LO T""" 1.0
OOOO:;CD~
I.{) I.{) I.{) l{) l{)
NNNNN
l{) I.{) I.{) l{) l{)
~o8g~~goo~~8
Wooooooooooo
>NNNNNNNNNNN
M
o
o
N
I.{) I.{) I.{) v
o 0 0 0
o 0 0 0
N N N N
..J 0::
W W
80?~C")g~~~0?~g~~~S?
:E~r1J~~JJ:;;~~~chchchchg
o 0 0 0
o 0 I.l) 0
C") C") N M
ch~~~
W f- f- f- f- f- I- f- f- f- I- f- f- f- <l:: f- f- f- f- f-
.... <{ <l:: <l:: <{ <( <l:: <l:: <l:: <{ <l:: <l:: <l:: <l:: Z <l:: <l:: <l:: <l:: <(
-OUOUOOUUUOUOUo::OOUUU
~rollJrorororollJrororollJllJllJWllJrollJllJllJ
cOOOOOOOOOOOOOf-OOOOO
ro C1l ro ro llJ llJ llJ llJ llJ ro llJ ro ro Z ro ro llJ ro ro
=t:l:
~~NM~~~~OO~O~NM~~W~OOm
Z33~33~3~~~~~3~~~~33
:::JIOO~~~OO~WOO~~OO~OOln~~mOOm
168 19
/u)c
o
';
'S
krQj
0.. 0..
o 0
I I
(/) (/)
Z U)
4: 0
If-(fJ ~-f- Z
UZO ZZ_<(
W4:~O:::4:4:O:::~J
:2: :2: ...J ff :2: :2: ff
U) 0:::
UU C ~
d:8 ~
I5~~~~~(/)
~.sitit~itdffioo
.! tH tH ttJ ttJ ::: ~Z 0 0
U 0::: 0::: 0::: 0::: ~ Z _
:c !;( !;: !;( !;: ~ ~ :3 :3 ~_
~~~~~~fi:i5g5:2:
~
<(
~
"'" I.() to N
""''''''L()tO Ol
NOr---tO 0
.... ~I.() r--- C") N 2
--.-.- to I.() C")
.....4:<(<(
iii~uwwC")co
'C 0::: 0.. (fJ (/) 00 ~
epOOL()r---OOC")r---
~~~~~~~
:tI::><LLLLSL{)LL
I-1...J-,OON
Cf-OOf-tOf-
>~~~~~~
tOr---r---r---OOOlOOOOOlCO
sgggggggggo
C'CS~~~S~~~~23~
~C")("'JC")C")C")C")C")C")C")~
)(~~~~~CD~~(o~
W N
N to
00 ..-
L() ..-
..- "'"
co C")
<( <(
w w
>< >
N 0
LL LL
o to
~ ~
Z I
f- f-
LL LL
..- ..- ..-
N
o
<::t
I!)
OON
tOo
000
~~
<(I!)
0..>-
Nr--
OCO
o T""
"-Z
O:::N
~~
LLN
.-
ClO
Q
Q
N
:at
g
....
o
>-
..-
N
L()
S
,...
CI ~
CI 0)
N CO CV')
~8~BQ6~I~~<O
iit~%g;$~;?fu~~z
....~~~>~S~~R
"''''''('''JL()I.()OO..-Olr---NO)
ca O'l Ol Ol O'l r- 0 O'l Ol 0 CO
~~~~~~~~~~~
::l
Q) 0
"'tI 0:::
o 0 w
:E~!5
u.. (/)
o 0
L() I.()
"'" C")
u... u.
(fJ
L()
00000
to L() L() L()
:2: ..- N N
o u... u.. u..
o:::(f)
w<O
CJCO
z<O
<(0:::
0:::
(j) 0 ~O O~
.:r:~f2o:::&UO:::~&O:::U
caOOOO<(OOOO<{
:E LL u.. LL LL :2: LL LL LL LL ~
~~~:~
.- .... M tt) 00 C'\!I
C I , , · <:)
::::':)1-1-1-1- .
n.n.c..t:bl-
i'-oi'--ltlJ~g
~C{~t19~
1-1-1-1->
n.c..Ill.D..>
16819
E
0
~
&
'0
..
"'
~
'0
..
"'
~ I
~
.5
..
"'
0 I
1;;
'"
..J
UJ I
(.)
ii2 I
0..
UJ
I u ,
<(
J:
'"
'"
::;)
0..
~ ~ ~
'" o N ro
ro 0 ~
~ ro ~ ~
0.. ~:2 ~
w W UJ IV
::ll ~
~I ,~~
::;)
'"
1~>1?~:J::~~lX9.:':
11i] b g ~ ~ 8 .:
Ii: ' :': .'
.:;) '" ~ M ;C :ci
1>- ~ ~ Sl b5 iJ1
a::.S! "5 => => => =>
2~
z'"
~~
~ c; f- !-- f- I-- l-- ~
I-~
(fJ-
z
Of-!-- f- f- f-
~~~~~~
15
o
UJ
~
(.)
o
..J
:r
tJ
z
~"
III :0
"
II
j
~ I"
~ooO;i
~~~~~
1r...J...J...J'"
2~~@5~
~~~~2~8;
~g~~g~8
Ci:: ffl ~ l5 ~ ~ ~
~~~~~~~
-~~~~~!&
:;t;'k~~~~~
>3!:oooooo
u. U- 1J. lL lL U.
~g
Co,
I f. ~
w <2
Is '"
~
I-
g
I-
'"
<>
co IX} a:> co <()
gg8gg
~::~g
[\j N N ~ ~
~
I-ftl g ~ 3? ~ ~ ~ ~111
'-" ct 0 (\J ~ C>
,...ij5g:e~~;;;
0> > {/) :::> :J >
~ :g g: U ON8 ~I
~ ~ 2' ,~,. 'J
~ ~ ~ ~ '" ~ ~I
:E J ;1 u. J. ~ LLj
~ D,O 0 0 0 oj
<( Q;;j ~ 0::: 0: a.: ffl
J:i~I~~~eG:
~ ~I~ ~ H ~I
::J u.;1~ (I)(/) (t) en
~
c>
~
GO
.,
c>
~~
.....0;;
z
a:",
<(~
...
w
00
0'"
:&~
w
x: 0
<Cl<
::;;;:I'
'"
I-
z9
....
w
a:
Q.
.w
<C
:r
<II
a:
:::l
Q.
g
~
I
;168~~9
I ! rl~ IIITif
+in e~o~JI ~
III' 1/.. ! II .~ ! II I
, I t I' .
::J?; r
lDN
wiD
"'0
1'111 II I
It
II~
II
<0
'"
OJ
t;J t;J t;! i;! t;!
ll'J (,0,.... CI:l en
00000
,.........,.......... f'-.
liiii
::i
;ig
a. z
~~to:5~
~HUj~
1.0 (QO)ID 0)
<D~~~@
<.o('O')(O/'-.......
M",,,,
~~~O~
~~~g~
>- >- >-- >- >-
C")MM"ItN
~~~~~
....... T""" ..- N N
~ :E :a :i ~
0000 coco CO
00000
00000
N~r.':'!NN
~~!:2~!:?
N ~ ~ ~ ~,
o
~
;:
l?
u.
~
o
~ ~ ~ ~
W UJ W UJ
o ~
~ 0
g ;:
<oS':
'" '"
'" ..
'" 0
'"
::!
N
'"
<0
~
'"
'"
I
o I.~
S': I-~
j ~
DO M
o
;;;;
"'NO
0"''''
'" '" N
"'''''''
~~~
..
~
~ ~ ~ ~
00..- 0
8~~~
(0 If) CO \l")
1..()lf)~1.{')
i;! t;! i;! t;! t;J
~~~12R
~~~~~
w W w
(f) rJ) if) en (j)
o 0 000
zzzzz
:3 :s :s j :5
<Il
~ l<
o <;( ~ 0
~ Q. ~ ~
:5~t?~j
~~~[23
~1..()2~O:;
~r~*~
~re~<Il~~
-'Go.. a::
~ I ~ S? ~
(01f}(")C")C")
~ t :;( ~ ~
"'~~~-
~~~~~
co co O'J a:,) o:J
00000
00000
~ ~ N C\J N
~ ~ 81 ~ g
8;::: 2 ~ ~
~~~~g
<( z z >< ::>
~8~ffi~
~ '" ~
~a~n(")
<DI.{')W<DW
5~3G5
::s:: o:x:: ~ ::(
Ua:::uou
~f2~~~
~~~~
~~~~
N .- '<t m Si
~~g.:~~
C')C")C"'1(')M
ZO ~ <; ;,0 ;:0
I J: I I I
uuuuu
:::i :L :x:: ::L .:::.r:::
U 0 U () U
0<[ <( <( <t: <(
::i ::i ::i :; ::i
OJ
~t;!t;!g~g
.-"..-"It'<tM.....
I'- ,.... ,.... ,.... ,..... I'-
t: t: ~ ~ ~ t=
~ fE UJ UJ r ~
<Il
o
z
:3
~(FJCO(J)
tfa~o
W5~5
<Jl
'"
w 0
,. 0
::i z
~I~fr~j
~j:i:I'~[5
'" '"
Mr--.--I'-CO<P
~~~;~.;
~~;1,~~~
~~~~S?~
a::~91~::g~
>= "'<t ~ lfi' to (>')
M T""" Gl m G: ..-
~~~~~~
i;OcoroCOCOC(l
888888
~S~~~~
("')MMMC"')M
NNNNNN
~I ~ ~ ~ ~ ,-
6;3
~lG
0'"
<Il Z
>
~
<Il
6~~
~8~
z z >
~~~~~ffi
(")(")00 (")
Q;..-OOO.....
G5~~~3
Mv~~~~~I:~O~NM~~~~~mo
ooooooo~~ ~~~~~~~
I 'I' . I I . . . I I . , I . I . I
~~~~~~~~~~~~~~~~~~
:::.:: :ex::: 0 0 0 :::,::
U U a:: a:: (( U
<( <( 000 <{
~ ~ LL LL ll.. ~
'"
~
"
m
:J;
o
o
o
:g
iii
il!il!il!t;!
~ ;:: ~ c.o
,... I"-"!,-
~ ~ ~ ~
UJwww
!I
~\~
<f)<f)
00
z z
::3 :3
;Ii
<Il
'"
OW
o ,.
z ::i
.. f-
~ '"
~[2
f5G~a;
~~~~
~~f~
c.o N (j) X
~ ~ ~ ~
~ ~ ~ ~
~:> ~ ~
gggg
~ ~ ~ QI
("') C2 ;;j M
~ ~ ~ ~
~
~ ~ ~ ~
~52~
ffi~~ffi
(") ("'") M C")
~ ~ ~ f
u U u 0
L :::,:: :::,:: ::(
u u u u
<:( <( <( -<(
::i ::i ::i ::i
~NMoo;;t
NNNN
~~~,.:..
~
o
co
m
'"
~
L
I
i
. I
J
I
l
~~LI
16 B 19
E l 111~ij
0
.J:.
~
.Q
...
S ~t~.~I+I-lf
j
:;:) I--~ - +- -
i& i -r
, I ' I I I
, [ II .~ I I I
'f ;:,
0 00
~ 0: C>
lL C>
'0 "! :;; I
.E w ;;; ~
0: vi
.. 0: 0 >
.. w
u. 0 i
Cl (f) z
;; z 5 I
"" ~
'" ,n: '"
-' f- a I-
.. [I I I
.. I
'J:: I I I' II ; III I i II III
I <l.. 1111) I I III
1
I .J:. I I
l:!
;:I
c..
~~~~~~~~~~ ~~
~~ ~~~~~~~~~~ ~~ ~ I'
1-1- I~ I ~~~~~~~~:E~ ~~ I- I
~ ~ ~ 2 ~ 2 2 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 21 ~I
H 11['; Immmuu B I II I I
~~~~~~~J ~~~~~~oom~N~~~~~~~~gM~~~~~~~~~~~M~~~~~~~~~J
uuuuuuucuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu3uuuuuuuuuuj
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~c!~~~~~~~~~~~~~~~~~~~
I
,
II>
I~ I
w 'l
e
ii:
~ " '" <.9 " <.9 " " <.9 " " " '" <.9 '" " " " " " , "
.. '" Iii 0: ~ ~ ~ '" g: '" ~ '" '" '" '" '" '" '" ~ '" '"
~ ~ ~ * gJ co ~ ... e) f:i Si ~ ~ g
m OJ OJ en en OJ 0; OJ en '"
:;
c: >- >- >- >- >- ((
0 (( '" 0: re '" ""
'iii l- I- l- I- I- UJ UJ UJ UJ W "- I- f- f- l- f- f- f- l- I- f- f- f- l- f- l- I- l-
V) V) V) VJ V) w
~ Z Z Z Z z re '" 0: '" 0: I- W Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z
;( ;( ;( ;( ;( ::> ::> ::> ::> ::> ~ " <' ;;' ;;' ;;' ;;' ;( ;;' ;( ;;' ;;' ;( ;( ;( <' ;;' <' ;;'
Cl :; ;:, :; ;:, :; z z z z Z I- :; :; :; :; :; :; :; :; ::; ::; :; ;:, :; :; :; :; ::;
>-
a: II
0
I- .. 0: " j j VJ
Z g V) UJ UJ V)
W " 0 :'i f- f- 3 n: 0 0 0 0 :::: " :::: ::::
-' UJ 0 0 "" <( UJ 0 '> '> ~
> >- " <( <( >- 0: '" re re <( <( <(
.J:. ::; 0 "" 0 c. a. 5: 5: a. :; 0 <( .. <( <( z a. z :; a. a.
~ .. z 5: z ~ ~ ~ ~ ~ 0 ~ l- re re l- f- Z 8 5: 5: 5: a f- a l- I- ~ l-
e I- ~ 5 0 5 10 V) <( <( V) '" 5 0 0 0 V) (f) V) re VJ if)
E re .. <( <( .. <( "" "" UJ UJ ~ UJ () UJ () UJ .. UJ
U ~ re re '" 8 a re 0: re '" " ~
m ~ 0 ell 0 ~ ~ ~ ~ ~ ~ 5: d u 5: u.. 0 ell ell ell ell "'i 5: "'i 5: ~ 5:
I- ~ co co
~ .... i i 'T co en ~ ~ ;;' ~ ~ 00 '" 00 ~ '" C>
e) co en '" '" '" ~ .... '" '" '"
~ '" '" en ~ .. '" .... N
... ... ,2 ...
N N N '" '" .... '" co C> N
.. '" '" ;; N N N N tj a C>
en en en :'5 if) " ~ ~ @ ~ ~ 2i '" 2i ~ 2i g ~ 2i "
- :; ::; :; :; :; ~ ~
.. ~ ~ :e ij? ~ I " ~ ~ X co '" :g fJ\ ~ R iri
i N '" ~ N ~
[;j i;J i;J N N 8 [;j :?l :;j N i;J i;J
<0 '" '" co <0 co <0 " <0 '"
en X X ~ ~ ~ en N a; a; CO CO a; CO CO a; a; a; C> CO CO a; a;
I~ Ilj .. '" f'3 '"
co co <(
:g '" :g ,_, '" " <( .. .. <( .. <( <( <( .. <( ~ .. <( i1i " "-
en '" '" T if) ~ a. a. a. a. a. "- a. a. a. a. a. V) VJ
:> ~ '!.! if) ~ '!.! 2 ~ u.. ~ ~ "- ~ ~ "- u.. ~ ~ ~ (,' X ~
... ~ ~ ... ..
en en '" ~ en ~ en ~ '" en en en ~ 8 '" en ~ en '" g '"
~ C> 0 a C> 0 C> C> 8 g ~ ~ 8 ~ C>
C> C> 0 C> 0 f'3 C> C> C> C>
N CO' N ~ l- N N N ~ N ~ f3 ~ ~ 13
~ g g g g 2; 25 g g g g g g g g
Z ;;j co e) ,.,
~ "' "' "' "' "' "' UJ "' "' "' "' "' "' "' "' "' "' "' "' "'
Z
..
Ig ::;
I re
UJ
t- o.. ;
lli. ~ '"
UJ
t- ~
~ 5': :;
OI- l- X 5: 0 0 0 "- Z
l- I- l- I- UJ > > '" i5 X 9J >- > <(
::il: '" ili il5 f!: C> ~ 0 ::> UJ UJ UJ iE ~ ~
"' ~ N 9 N '" 8 '" 15
....~ '" ~ ~ ~ .i: ~ i'; i:! ~ '" g OJ ill
e) ~ :; ;; N ~ C> w: N
f- f- f- f- I- U "" '" '" '" r a. r
~ '" ~ '" '" S! .... .... ~ ~ ~ "' '" '" "' "' g 8 00 '" g N
g ~ C> ~ a C> C> 0 8 g ~ C> g C> C> C>
C> C> C> 0 0 f'3 C> C> C> C> 0
! N N N -, N N N N N N N N N N N N N
0: '" "
:g~~~
o :;c 4: :<
:& ::; :; :;
z z Z
0: re '"
w UJ UJ
f- f- I-
if)", if)
UJ W UJ
s: 5: 5:
IV ;: t iE
ii :J :J ::J
:lE~S5S:
"~NM
=000
C:UU(J
::;)1-1-1-
i "
'"
~
f-
Z
;;'
:;
...
...
0
:::: ~
.. v
a. '"
?- m
if) "-
UJ
5:
C>
N
m
....
'"
C>
<!J
~
ro
""
~
'"
i
"'
-.
~
Iii
0;
2l
C>
N
E
0
.~
i
15
~
::I
w
'" c-
Q, ~~
15
I~ D
m
::I i
.E
.5 g
~ !~
co
~ EC:
E'"
m",
t1J...,
..
"
'C
Ii I I I I
I
"
0..
fll
I.~
w
E
u:
.e:" (') l')
~~~~
c
o
u;~~~
'S: ;( < ~
is ::; ::; ::;
"
..
1ii
"
3 :33
.c '" '"
" Q. a.
C ~ t- f-
eu <C ~ ~ !
D5~33
.J ~ ~
C6~~~N(!)
l~;:;;
'*~~~
;;~~~
00 00 00
!III
ill
Ig
l-
I&] t; ~ t;
:;;Sl~$
Q N U":l N
~~~~
,.. ~ ~ f;:j
C > .1: :r:
co co co
000
22~
~
>-
'"
0; ~
~~
:l! ::;
'" '"
~ ~
z z
'" '"
U U
~ ffi ffi
~ ~ :2
.: :5 ~ :;
co: ::l U U
==~rt~
::tt;oq-U')(,Dt--OJ
_1.t')l,()L('}l,()1l')
'cuuuuu
:;.')1-1--1-1-1--
"
'" '"
;g ;2
" ro
00
~ !
ma:i
'" u
~ ~
O~8 ~
~g
<OlD
x
, w
[;j g
;1, 3
88
2 ~
'"
x
'"
'"
'"
'"
::;
Jw ~
U :0
<( '"
a. r
(!) 19
'" '"
~ g
'"
(!)
>- z
z u;
=< w
::; 0
'"
UJ
c-
'"
3
'"
~ ~
u ~
~
'"
~
(!)
'"
M
'"
>-
z
=<
::;
16~ B ~9
Ir ../
~~ ..r
I
~.
N
'"
co
o
co
~
o
w
en
if>
00
o
~I
~
:"i
g
x
~
I~
>- I
z
=<
::;
I
>-
if>
'"
0
u
Z
':0
if>
II I II
I
I i
l-
I
~
:g
if>
'"
8
en
'"
'"
'"
(!)
I!
.~,
if>
~
a::
OJ,
00
i
r.,
r
i II
- j
(j)O.....NMo:::tl.O~,.....CCOlO..--N
~~~~~~~~;J~Jz~~
1-1-1-1--1--1--1-1-1-1-1-1-1-1-
,
,
I
...,
...,
o
N
~
'"
11.
w
(,)
ii2
0..
W
~
X
th
IX
>-::)
O::!:I-
QZZ
I-Q2
zth<(
w~~
>Q~
zi---=
'Q
G~
I-g
..J
:t:
(,)
!; ~
" <(
lXI -
-~
"'"
~
IX
W
tho
-0
""'~
Z ..,.
>~
<(
1-..2
~g
)oN
- !--
..J
~g
0'"
:E
1--
Ww
~~
:EU
-I--
-0
!:::i:
Z<.>
::)1-
E
o
j
A
'~
10
'8
:;:)
-I--
~
'8
::)
.e
oS
.Ie
l'Il
o
....
III
l'Il
..J
-I--
Z
o
i=
<(
~
0::
Q:;
2
-'
<(
a..
f-
(j)
ill
S
o
'"
.....
..,.
CJ)
o
u..
:;
'"
Ol
Ol
o
CJ)
CJ)
w
(/)
<(
<.)
Z
o
i=
<(
19
ii"
a::
Z Z Z
000
i= i= i=
<( <( <(
~ <.9 CJ
0:: ii" ii"
0:: Q:; Q:;
2
-'
<(
a..
f-
r.f)
W
S
:;;;
o -'
o <(
Z a..
2<(f-
<( it! ~
~ 0 s
L[)
L[)
.....
o
o
on
N
ill
'"
o
X
n::
>
O)....~
0) COo::
'" ..,. N
CD co <Xl
0) ..,. 0
N '" a..
~ 5: a::
~ ~ >
o
ill 0
r.f) 0
::> N
o
o
i-'-
0::
<(
000
CD CD '"
co '" ..,.
>
0::
W
ill
2
0::
ill
>
0::
W ill ill
(J) (J) W
<(<(2
u U ffi
>
"''<tU')",r--.C()CDO
99<T'TC?OO"i"""
r.r.XX:x::i:.:i:.:i.:
ouuuu<.>uu
1-1-1-1-1-1-1-1-
o
L[)
on
o
o
o
I
I I
I
~
~
:;;;
f-
<(
-'
-'
ill
(jJ
0
f-
"
'7
I IQ 0
00::
S)':
I
z z Z Z Z Z Z Z Z Z
0 0 0 0 0 0 0 0 0 0
i= i= i= i= i= i= i= i= i= i=
<( <( <( <( <( <( <( <( <( <(
" CJ " Cl CJ 19 " CJ CJ CJ
ii" ii" ii" ii" iY ii" iY ii" iY ii"
0:: 0:: n:: 0:: 0:: n:: 0:: 0:: 0:: a::
(f) (J) (f)
0:: n:: 2 0::
0 ill 0 ill -' ill 0
>- >- <( >-
0 2 0 2 a.. :;;; 0
Z Z Z
<( ~ f- ~ <( f- ~ f- f- <(
-' 0:: -' n:: (J) 0:: -'
n:: <( 0 <( Do: 0 <( ill 0 Do:
0 ~ u.. ~ 0 u.. ~ S u.. 0
M
<Xl
'"
0
0
0
f= CJ)
;;; N
'" :J ;;
..,. N ;n
..,. CD ..... N ..... ;; 0) 0 Ol
..,. ;; 0 0) ..... .... CD (") '"
N u.. CJ) CJ) CJ) '" N 0
..,. u.. 0:: N N N N u.. ;::
(jJ <( ;::: 0:: 0:: (J) U) U) <(
~ ..., ~ ~ ~ ~ ..., ('1
0 0 0 0 0 co M '"
W ill ill ill ill Ol 0 0
(jJ (jJ (f) (jJ U) ~ 0 0
:J :J :J :J ::> N N
I 0 0 <( 0 ::t: 0 0
0 '" N 0 N 0 N 0 ..,.
('") '" <Xl N <Xl N CO '" i-'-
0 ('") ~ ~ ~ CO ~ '"
~ > ~ a::
:r I :r :r :r :r :r
U 0:: U <.) U U U <.)
I::: ill I::: I::: I::: f- f- W f-
S ill ill S S S ~ ~ ~
(f) :;;; (jJ
<( :r I <(
:r U n:: I :r :r u I
U ill <.) U U U U u
I::: > f- f- I- f- f- f-
0 0 is 0 0 0 0
N M ..,. II') <DI'- CO CD o ~ N M
.... ~ ... ... ~ .... .... ... N N NN
. :i: :i: :i: :i.::i.: :t: :i: :i: :i: it
r.
u u <.> u uu u u u u UU
l- I- l- I- 1-1- 1-1- l- I- 1-1-
168 9
1_-
....
t!
~
J!!lJ..
(II ~
0~
c
o
';jj rJ)
'$0
i5~
-'
rJ)
o
Z
S
~~
c
o
;:
rl
.s ~
i.~ ~ ~
>cr: o~
1--0 lJ..",
ig
I-
.....
o lJ..
>-
:::
co
o
I
... L{)
~~
lJ.. lJ.. lJ..
cr: n:: n::
I'- 0 ('oJ
<0 M ...
N ('oJ ('oJ
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
cr: n:: n:: n:: n:: n:: n:: n:: n:: n::
O("1(")QCOCOI'--CDNI'--
N~~~~~NN~~
f-- f-- U) (J)
Z ZOO
o;:o;:<('<('ZZ
cr: cr: :::; :::; S S
(J) (J)
o 0
Z Z
<( <(
-' -'
rJ) rJ) rJ) f--
~ ~ ~ Z
:s S S ~
I~I
D. <(
f-- D.
(J) :::;
w <(
::: f--
W
fi
1~rJ) U) U)
Z ffi ffi s ffi
<(' >- >- <( >-
rJ):::; :::; D.:::;
~~~~~~~~
~1t~1t~:::1t~
~I~I
a. :::; <(
f-- f-- D.
rJ) cr: :::;
W 0 <(
3: lJ.. ,...
C) cJ,
OJ
C) <D
OJ ('oJ
C) N
U)~
G ro
to C)
C) C)
MO
o 0
m Z
0;;
NO
Z
~~ ~o;~ ~
6;~ro~ ~~ (f)
g~~o~g:g g
O...JN"'OW...JLO
r--~~~o..""'xCOX2
~2gg~~g~~N
ZG0~a::ro~U(O
~~~~g,~~
~ ~:g;=~;:
('oJ ...
I'- 0
('oJ
<0 '"
C) I'-
C) W
('oJ
<0 I'-
o 0 X
M ('oJ N
r-- ;e (0
;::: ::J X
0:: [!] a.
f-- '" >
~ x:: CO
C;ff:5:
u: ~ 3:
0:: ... (!)
(9 f--
lJ.. >
> ...,
CO
;;~
>- G Z Z
.,IXo.
t-o.caN
"'l;;f" 0 ,...... """
9 j;;! I! s
~ 0 I f-- -' ::: f--
~~~~s~j~
>( >-
m 0
tOtO
a) ('oJ
<0>
~~~~b8C;gs~Q!;~o~
O)O)O')OOOO(j)cj)(J)ooO'>
~ ~ ~ N N N ~ ~ N N ~
~
o
:i!
<II W
..lIl:O
III <(
2:::;
w
:::;
o
I
0::
W
>D.(9
<( f-- 0::
W (!) <(
m <( f--
CD
X
ro
U)
D.
:::;
<(
f-- cr:
a. fh
o ::J
>( 0
~ W
CD <0 ;;;:
ii~~
C) rJ) CD
I'- -' ~
10
0)
X
a)
...
>-
o
m
3:
o
-'
U)
D.
:::;
rff: 10
fh ~
:J CO
0'"
w >-
;;;: :i5
CO :::
~ 0
('oJ -'
0:: 0::
W W
f-- > >.
c=! Z ~ ~
ii5 X 55 m t'5 0:: m
0:: W n:: 0:: <( W 0::
wl-ww(f)-1(L~w
--1 OGo-'omG
-' (9 Z <( 0 <( 0 w <(
~(j)<(wGSImw
(!)
0::
W W
Z >
WI
(9(!)
~
~~NM~~~~~~O~NM~~~~
~~~~~~~~~~~~~~~~~~
~~~~I-~~I-~~~~I-~~~1-
1()B~9
~ ~ ~ ~ Q ~ Q ~ ~ ~ ~ ~
0:: 0:: n:: a:: a:: a:: a:: 0:: n:: n:: a:: 0::
"<:j" f"-I.()Nrom"'<f"tOLn\.DM
~~~~~N~~~~~~
m
(!) ~
~(j)
<( w
-' 0
m
rJ) f-- ~ f-- f-- f-- f--
~~a:[Z~~0;:~0;:~
::;:::;lro:::;:::;Ir:::;Ir:::;
'II:
~"iiiii?
LL.. 'C Ol
o <II g
~ CI) ro
Z 'II: 0
W.5~
>>;;
Z 0
Z
W
~ S f-- f-- f--
coQ)o:)Q)Q)CO(1)(J)O)coo>zQ)O)zz
QoooooooooOWOOWLU
~~~~~~~?:3~~R:~~~~~
wggggggggc:;g~gg~2
gLO(?;<DU3<DW05i.D~C:O~U3(O~~
I-
g f-- U
I->~
c:o~o
eg~
~ ~ 8 81
:::; D. Z Z
~ tJj ::i S ~
o wo::o:: <(
lJ.. S 0 0 ~
IhJ ~I
~tJjs:::;tJj~s
<(WIr<(W<(1r
~3:o~s~o
N~(")CO~;(O <q-~m
~~~~to~~ ~~gjr--
gC!;8~og8 S;g8~
~~~~oo~~~~:o~~o~('oJ~
~c:o(Oo"""" MNo'-VNO
~~~~~~;ij~~~E~
ffi~~~~j~~gggg
Ol
o
o
N
2;
M
ill
(j)O'lrnmcnmcnmQ)O'lQ)O)
000000000000
000000000000
~ ~ 23 ~ 25 25 25 23 25 23 25 a
('f){""')("')("')('t")MMMMMMM
U5 (0 <:0 (0 c:o CD <0 (0 <D CD (0 c:o
I:;
-,
L{)
l!)
f--
>
I
f-- f--
> >
..., -,
... M
l!) ""
f--
>
...,
('oJ
'"
('oJ
M
I:;
I
C)
"7
"-
o
(5
lJ..X>-~<(>::J~""S
~~~~~~25~~~~
~>~g8~(J)t;s[i3~
m OCOc.or'--M
m oooeno
m oooeno
T'""" N N N..-- C'\.I
L()O')O)O)r'--O 0
omO)mO)o 0
00)0)0)0)0 0
N..-- ..--..-- N N
co
o
Ir
w
-'
<('
0::
f--
a:
Q:; ~
roo
X OJ
CD OJ
..".
rJ)
D.
::2:
rff:
fh
:J
o
W
;;;:
a) CO
X X
CD CD
~ ~
f--
-' W
ZSOZZ
~S5m~5555
~ffiffiwffiffi
UlOj:::;OO
i3~~~~~
w W
o 0
<( 0:: 0::: <(
>- :::; W W :::;
f-- W a. Cl. W
:J :::; 0 0 :::;
f=0000
:JIIII
00 CD 0.... N M'<t U) IOI'-COO>
~~~~~~~~N~~~
WWWWWWWWWWWW
I-I-~I-~~~I-~I-I-~
D.
W
M
0)
('oJ
::J'
lJ..
0::
a)
N
ex
a
~
<(
~
ro
X
o
~
W
o
<(
:::;
w
:::;
o
I
lJ..
0::
C)
CD
N
LL LL u.... LL I.J... LL LL
a 0:: 0:: 0:: 0:: Ir 0::
L{)o:.) co tl)<OQ)<O
o 0 M l[) 0 ('f) L{)
NC\lNNNNN
0;:
0::
co
Ul(J)~ Ul,...
OO(j) Oz
ZZwO;:Z<('O;:
::i::5oIrS:::;O::
:::;
-'
<(
Cl.
f--
Ul
W
S
~ IHI~~
::5~S::i::itJj
0:: <( 0:: 0:: n:: W
0~0003:
o
o
~ ~
~cri
:::;0
M
I'-
N
o
N
M
o
o
N
o
Z
;;
o
Z
l{) Ul to
~~~~~~~
~07~gO~
~<ol9(QNCO(f)
8~~~g~ffi
O(.O~t-M~~
~~~~~~r::~
~~<(U)m~55~
0)
o
o
N
2;
M
ill
Q)o)"""o)O'lQ)m(J)
00000000
00000000
C\IN~NNNNN
gg;;:;ggggg
ZD(D~CD;:a<DCO<D
<( I:;
~ I
<D ('oJ
~ ;:;:;
>(
lJ..
N
M
~
::J
::;E
I
...
M
>
Sa.>O a.ws:
~~8~i~~~
;3~~~:;~;
OCO.......ON<ONN
OlOO'>QOQOCO
(1)00)00000>
N..--NNNN
cr: to
UJ 0)
.J X
~ ~
f-- 6
l/J [!]
~ S
<( 0
.J -'
a
ill
--1
<('
Ir
f--
Ul
o
Z
<(
--1
W
o
<(
:::;
W
:::;
o
I
o
(9 I
0::: --1 -I U
<(;j' w<(' f--
~~ ~25g:~~
-'OOWf--OWI
-'<(n::>Ul<(>U
WOOI:::>OIf--
S:-,-,UlU-,(!)O
....NM'<l'lt)(oI'-DOCDO
MMMMMC?<?'7M'-
WWWWWWWWWW
~~~I-~f-~f-~1-
LL
lr
'"
N
N
a:
cr:
:2'
~
:2'
I.. ~ I
:2' <(
<( -'
~ ~
Ol
00
(0
00
o
(/)
cr:
00
'"
o
<D
<D
r--
<XJ
o
N
<D
'"
<D
o
(/)
0:::
W
2:
:r::
<0 if)
::;: I-
'" ~
if)
'"
o
o
N
23
'"
<:a
Ol Ol
00
00
N N
23 <3
'" (')
CD <:0
I-
>
:r::
(')
M
I- 0
> (9
:r:: '"
'" 0
M ~
:2'
:2'
:r::
(')
<XJ
>
:2' :2'
:2' I-
itio
00 '"
><0
'" N
r-- 0
Ol 0
~ N
if)
a..
:2'
<(
cr:
~
~
o
w
~
<:0
X
(!)
~
:r::
o
~
S
I
o
I-
a
:r::
o
I-
~
:r::
o iL
6 ~
~~~::t~
WWWWW
1-1-1-1-1-
LL LL
DC DC
r-- 0
L[) '"
N ('oJ
LL
n::
'"
N
LL LL LL
DC cr: n::
N co
<0 '" (!)
N N N
ir ii
Q; DC
I- I-
Z Z
~ ;;:a:ii:
:2' :2' a:: !f
I
o
o
'7
;;:
-'
cr:
o
:2'
0-'0
o <( 0
Z a.. '7
:'5 tIi 3
DC w 0::
o S 0
o
'"
00
N
lD
N
...J
N
r--
N
<0
-'
<(
Ol
W
lD '"
L[) '" L[)
Ol <0 <D
cooo
N cr: 0::
lD r-- r--
N ~
-'
N
(!)
N
<0
-'
<(
Ol
W
s s
Xo
a.. a..
00
00
00
o 0
if) (/)
o 0
Ol 00
o 0
o 0
N N
23 23
'" '"
co as
Ol Ol
o 0
o 0
N N
o 23
'" '"
25 (0
I-
>
-,
r--
;;:;
-,
LL
o
'"
9?
(9
S
lr
N
'"
-,
N
o
>L
(!)
o
I
~
a..
N
L[)
o
W
N
o
o
('oJ
NCOOO <0
o Q) OJ 0
o '" OJ 0
N ..-..- N
z
o
if)
cr:
w
:2'
w
I
U
I-
~
I
U
I-
Ci
I-
...J
~
ro
cr:
w
l-
I-
W
ro
z
o
if)
0::
w
:2'
w
to
'<i'
UJ
I-
i'-CIOC>
'<i'1''<i'
WLUuJ
1-1-1-
0....
to to
LULU
1-1-
l.l.
0::
Ol
N
N
a:
Q;
(/) I-
o Z
Z ~
:'5 :2'
o
o
z
<(
-'
a::
o
:2'
-'
<(
a..
:z I-
~ ~
;;;~-_.-
<D
Ol
"I
o
o
o
CD
L[)
('oJ
'"
OJ
o
Z
::2'
'"
N
co co
NO
o <0
N N
(') (')
o 0
00
N N
o 0
Z Z
'> '>
00
Z Z
?-
m Z
o w
o Z
N <(
g::2'
<:a ffi
a..
<(
...J
<D
N
2 >
I <XJ
0<D
Ol Ol
s G
~
(J)
Ol
(J)
~
a::
w
-'
;;:
er
I-
Z
o
I-
r--
'"
X
o
w w
o 0
<( <(
;;; ::2'
w w
::2' :2'
o 0
I I
LL
0::
o
~_.~~
LL LL
0:: er
o lD
en N
N N
I.L u... I.L LL
0:: 0:: er 0::
(') '" N
~ ~ N ~
if) I- if) Ul
~z~~
:'5~:'5:'5
:1 I
I. ,
::2'1
-' 0
<( 0
a.. z
I- <(
Ul -'
W a::
S 0
L[) (') <D
f:3 ~ ~
goo
(9 U 0
(') (') ....
aNt-- 0
ON N N
g50COCO
M ~ ~ ~
8 z z
00>- >-
!Xl U1 ..q '<:t
Q)())O)Q)
0000
000 0
N N N N
0000
..., ("<") M M
(D(oCD(D
to; to; to;
...., ...., ....,
co N (')
u:; ~ ~
ZUI-X
x>->o
'<:;t CD I "l:t
r- N I,{) 0
N c.o 0 co
ILL'" >
'" '" ....
0000
000 0
N N N N
z Z
o 0
>- Ul if)
I- 0:: a::
~ ::; :!i ~
..J i= Z Z
ro ~ <( <(
UlI'l)
cr: 0::
w W
>- >-
:2' ::2'
I- I-
a:: cr:
o 0
LL LL
~fri;1;~~~~~~~~:6~~~
WUJuJuJuJWWWWWUJuJuJWUJ
1-1-1-1-1-1-1-1-1-1-1-1-1-1-1-
:2'
er
<(
I- LL
Z W
~ w
:2' g:
:' jl
" f I
i ! /
Ig I
Z
<( ~
-' <(
~ ~
<:0
"I
N ....
o lD
0,....
o L[)
00
(9 -'
'"
"I '"
NO
0'"
"I Z
<( <(
ro I
ON
lD
?-
m Z
oW
o Z
N <(
g :2'
<:a ffi
a..
>L
LL
'"
'"
~ Z
0;;;
~ M
I 0
'"
o
o
N
0::
W
...J
;;:
0::
I-
Z
o
I-
o
N
0::
W
>
<(
w
ro
0::
u:: W
S ~
(f) W
16B
LL
0::
'"
~
u.. l..L LL Ll.
0:: 0:: 0:: 0::
..q- LO co r----
.... .... ....
N ('\.j N N
(f)
o
z
:'5
Ul Ul Ul I-
~ ~ ~ z
.5 :'5:'5 ~
::;
.0
<(
a..
r-
Ul
W
S
,.~
:JOOO
<(000
0. Z Z Z
I- <( <( <(
(/) ..J -f -.J
W cr: cr: cr:
sO 0 0
<D
co
r--
(!)
;;
U
(')
00
N
co
Z
al
Z
>-
'"
~ ~ ~
C; 0 0
000
000
(9(9(9
'" '" '"
a:> X ....
N N N
000
N N N
<( <( <(
al al ro
000
'" '" L[)
CJ) en en 0') ())
o 0000
o 0000
23 23 25 23 ;3
C'0 C'") C") (>') M
<0 to CD (0 (a
~
o
o
o
:;
5 N~~>
(oj M M :;;:;: i:O
;; ;;;o;o;~
I- <(roalal
M M l() l() l() 1.O
o 0000 0
o 0000 0
N NNNN N
z
o
(f)
cr:
w
o
z
<(
z
o
Ul >- >- >-
cr:1-1-1-
~ ::::J =:i :J
zi=i=i=
<(~~~
i'-(J()C>>O
lOCDtOt-;-
WWWW
1-1-1-1-
f-. I-
> >
...., -,
<D (J)
L[) ;;:;
co
X
<0
~
>-
I-
::;
i=
~
-,
Ol
....
lD
>L
u.
0::
o
N
N
I-
Z
;;;'
::2'
..,1
~I
::;;
I-
er
o
LL
r--
'"
o
o
o
(9
on
N
N
o
N
<(
<Xl
o
<f)
Ol
o
o
N
23
'"
<:a
9
LL
0::
'"
lD
N
LL LL
0:: 0::
co on
~ N
Ul I- (/)
o Z 0
:f ;;:~
-'.. :2..J
o
o
z
:'5
0::
o
:2'
-'
<(
a..
- I-
::2' (/)
<( w
~ S
<0
a:>
L[)
'"
on
o
-'
X
'"
o
'"
Z
<(
I
N
;::
r--a:>
....'"
;; 0
"1<0
0'"
08
aon
<OX
ON
"I a:>
C; OJ
~ Z
;"~
Ol
o
o
N
23
'"
<:a
'" '"
00
00
N "I
00
'" '"
<:0 c:o
~
o
OJ
'"
:;
a..
>
'"
on
<D
a..
<( Z
>- X
<0 ~
o ~
Ol
Ol
Ol
N e')
o 0
o 0
N N
cr:
W
>
<(
W
<Xl
cr:
w
l'l
<(
w
a:>
X
CD
W
o
<(
::2'
W Z
::2' 0
o (f)
:r:: 0:
U W
I- 0
UZ
I- <(
....NM'<i'illtOi'-
:L:Z:L:Z~:Z~
1-1-1-1-1-1-1-
t~[\ 6 B ~.a
J)' ~
-~~~--'----~--------~~-~--~~--"-'--'-'-----~----'-------- __ ___n____.___________._P_ .~_ ___.~.m.._____._______" __~______'__ ~,., ~.__~_~" ~
I TH~!NVENTORV
UNiT#. MAKE MODEL YEAR "IN '# I SERIAL '1# LOCATION DIVISION
TH-83 CA TERPILAR TH-83 1997 3RN00350 ORLANDO LANDS
TH-103 CA TERPllAR TH-103 1997 3PN00538 MIAMI LAN OS
TH-560B CA TERPllAR TH-560B 2004 SlG00666 ORLANDO LANDS
:16B 9
I I
j
c: 1
)m 0
" ;:; I
0 as =
(J c::::;
..... 00 .....J 0 I
z -10 <( 0
W .!Z 0... Z
> ,g <( I- <(-
(/) -l~
Z .c...J W 0:::<(
- ::~ s O~
.
-'
.... CO lOC"0
l~ I~ N '<;j- i.l)
'<:t CO
lO Q) (") 0
lO 0 ...-- CO
CO m 0 0
i:: 0 ...-- .q (/)
...-- N LL >-
C; l.O 0
,...... LL lO Q)
'C N OJ N N
CIJ CO <(
(f) N C"0 0
...-- N CO
- I- Q) U N
:t:t 0 N <( 0
C I.!) 0 OJ l-
s: 0- 0 I 0
'<:t .q ...-- ...--
I
., m L':~ IZ
0 t ~ I W
(\) 0 ~ Z
- N <(
tV --
"0 0 ~
Q., C"0 ff~ 0:::
--
>< CO W
w I l:l. 0...
:t:t
0>
{2
CO
C>
=It :::> OJ N OJ
0> 0... '<:t 0 lO
(2 C"0 ...-- CO '<:t
lO '<:t ...-- ""
,... 0 I.!) 0::: lO
C> W U X U
lO ...-- lO (j)
0 CO CO (j)
0 Q) (j) (j)
I. N ...-- ..- ...--
C\'I
~
"i
"0
0
:E LL
LL
I :::>
<( >-
I
I Z ill
(\) ~ UJ 0 (/)
..lIl: I- :::> 0:: 0::
as J n:: <( 0
:E 0... LL I 0
=It ...--
- I ...-- N (")
Ii '2 --' , I .
I- ....... >>
--
:::;:) 0 I- 1-1-
16 B -g
..-
c
0
,-
- ~ :2: I
~ m
0::: (,) ~ "..J
0 <( <(
0 - Q, Ct
CI)
~ (j ~~ ~ ~ I
Z U) (f) I
W :c w <( W I
> ~ s: ~ s
z
- ...q-(J)
I I'-
I'- I.{) (0
I l.{) "''''
U 'N 010 I
0
s 0 00
=1:1: '<"'" uo
"i ..- ...q-...q-
co 0 ...q-
'C C'\l 0 0
CD ..- N N
tJ) (") ..- ...-
- ..- (0 (0
=1:1: Z W W
c 0:: <( <(
:;; > :r: I
..- """ """
0> (J) (J)
S 0 0 0
0 0 0
ns C'\l '" N
"C -- -- --
0 0 0
a (") C"') C"')
-- -- --
w co (0 co
=1:1:
g
I-
co
0
! >- l- I-
J 0 0
(") "<:t I.{)
0> co 00
0J C'\l '"
::> (f) (/)
..- "<:t ...q-
0 0 0
0 0 0
... N N N
ns
~
<C 0::: 0:::
0
Cii 0 w w
co a.. a..
"C ..- (f) (/)
0 (.) s S
:E ell
oc:
W
~ U ()
4) ~ w w
~ a:::: l- I-
ns I.lI .....J -'
:E > <( <(
...... N CV) '<t
0 0 0 0
;t: I I I I
- I I I I U_
I '2 u u () 0
;::) s s s s
1 6 B 9
IE I I !
0
s:
'" ,
" I
.. i
'"
'"
}l
I .. I
I~
! <:12 i
.5 ,
~ ,
t~ I I
..J I
" I
u
1:
0.
"
..
..
~ I I I
:J
0.
0 ~~I o I I
0 00 i
ill :g I "'"" I~
.. 00 I~~ I
0. '" "'00
c ~ <( :al
" lD
", f- f-
~ .... "'''' '"
'" alv a;
V V "'.... '"
al OX> 0'" ~
0.00 OX> r:R
WOO '"
w w ww W
~Q)aJCO ~ffiffi~' 'mcoaJcom
u.. if)(/) if) rJ)ifJifJ(JJ(/)
i~~~ moo ('0 U)(Q...-(\jCJ>
...,."'<tl1)V "'<tv"'=:!"-.:r.....
.. NNC\lN 0JNNNN
",
".
~~
"'"
;~ ti)~
-::::>
-@ ;
CD ..
> ..
E.!!!~~~~~~j:j:
<l) 1ft l..iJ W W
0.5
:c
CDIJ (/) if) (/) IJ) (/) U) UJ (j)
> 00000000
. zzzzzz:zz
I-,~<(<(<(<(<(<(<(<
s:r::;;; ...J....J.....l....l -l -1....J ...J
"
~o 0 g?oo~
g~~~~~~~~
....I<(<(<(<(::==-<<(~
~~~[~~~~::r:
~o 0 0000
" LL LL
>
OX> ~
gp'
u~
if) U
:::J 2
r
lOvvm\O(") r
~:;n2 :in; ~ ~ ~
~~;;~~~ga;~
~::;:~gJ8fi~~
~g~~~t~g
~~~Q3~;goo;
CLL<,="U.>'-lJ...~>
>C5~(i5~C5 X
~~~fu~~ ~
!~ 00 00 CD 00 00 co IX,) OJ
00000000
00000000
~.Q!~~~t'!~~
~~o__~~~~
C"')C")C'?t?(")C")('<1(")
NN0JNC\lNNC\l
........-.,...."............-.--......
~
l-
GO
'"
i':
OX>
::i
z
cv~~~E~~*~
1-C")C0<>1QlO'JvOCO
~~~(gf-~g:~~
'-l!)r0<OOOlO(O(1)(J)
~gSg8aigd;g5
_N......C\.I('J..-N............
JODe; WoifJo
I,{) Otl)CC<.D1.{) o;DCO
Li)OlOMCOU')CD ,
J..~LLM~LL;fii
13
19
(f)
::::>
",,"
i:?f?
uu
(f)(f)
::::>::::>
r-I--t-I-
i:EiEII
U) if) if)(f) (/)
00000
zzzzz
<(<(<(<(0:{
,....J .....l......l.-l.....l
j 0:30
;;;:::<0<(0
..::D...zo...z
<:( I- <:( 1-' <(
~f3r2~i~
~o~o
MCOr--r---
\.0 I[) <00
'<;f".....,.....CO
NlOC"':lO
OM'lTC"?
<(<(NN
~6:~~~
~~~~g
0)Q)r'--t-
>-~LLu..
5>.:i,Si,S
u.....l.J...LLlL
..-......('1')(")
ggg8~
NNNNiii
~~~~E
~~~~~
2:200<
~~$r:~1
lOOO(J)Q)1.O
...-0 Ql (j)('O)
ZZZZo
en t') (0 co I[)
(()Q)OOO
~~~~~
oOooffi
OOl!"llf)---!
~S~J~
r
f- jJ
.. J:
1000 ::s:::O~(.') 0000
:icr:cr::a::~ucrOw o::a:::a:,yd
fi' fi' fi'i ~ fi' ~ 8: i2 i2 fi' S' '!!
.'-N('I')~I[)W~OO~O"-NMO J
:::999999999';'7~'-J
5~~~~~~~~~~~~~~
168. 9 .,
e
0
:
J:J
l!:l
i
:>
" I
~
..
!~
:>
.g
.E
~
Q
....
1/1
j
, II " I
1/1
1/1
.~
W
1/1
1/1
~ I
c <( <{
:J <( <(
rn Z Z Z Z
c 1
0
-;; rJ) rJ) (f) rJ)
:~ 0 0 0 0
z z z z
Q :3 :3 :5 :3
'tl
!l
co
e>
.3::< ~
>-.c...J w
o:::e>rt ~
olijf-:ii<(!;;:ii
I-"~ ~<(
Z OJ :;;: :ii &: ~
w
>
z
-"*'
aifti
<(~
"*'
c
:>
'" '"
.~ 00
o 0
co N N
egg
aco<o
~
t!
~~~
00(:3;;<(<(
Of2d~~
g ~ '"
.....Li'f!
II:; ~ ~ ~ g
o ;;b
N 0 "-
<oN",
'" '" '"
",<ON
...J"'..J
~:gfu
;; ~;;
;: ~
~~m
~ z
<( <(
2 Z
!g '"
....:JCI)
:8~~~ca
IOf-f-
:i;;20ca
~g::J~r-
a;~~;~
'g1i'ii'ii'1i'
:IE ococ ococ
<( <( <( <(
w w W
...J 0 00
~ <( <( <( <(
.. z :2 ::; :2
:IE 0 w W ill
>= :2 ::; :2
<( 0 co
Z I I I
~ ~ N "'''' I'
~~~~~
<(<(<(<(
168 9
E
i
A
't:I
2
1:1 j
::> i
't>
"
10
1
::I
~
~
c
...
..
..
"J
I I
1/1
1/1
r.E
w
1/1
i
,~ "f "f '"
VI z Z 2
I--
Z
<(
::;;
V5
0
z ::;;
c <{ a
-' <{
>- 0 U: (f) LL
c:: 'iij w 0 UJ
0 'S;: W 2 W
is oc j rr
l- I-- I--
Z
W 'C
> -!
~ ~ 0 (f) 0
I- <{ a i:5
oJ W LLI
Z .c I-- > I--
(/) ::; (f)
W u W I- W
:E c ::; ::;;
l!! a
0 0 0
:z: UI :r: LL I
U .... 0
<( '" 0>
'" M
I- * '" 0
I- ia 0 ~
<( ;:;; '"
'I: '" Ul i
~ ..,.
*
c
:;
-!
0
IS
w
Ii '" '" "f
I- z z z
g
I-
...
Q
g
I-
....
Q
Ig '" '" '"
I-
'" z z Z
Q
.. Ul on <{
: 0 0
> ~ ~ z
Cii
1:1
0 '"
:;; ....
l- t- I-
.: <{ <{ <{
u u ()
Cll '" ro
.. 0 0 0
:E Cll '" aJ
~
0 ~o:
'il:~ 9w
-0. ...JC)
'c 0:: i:!:ii
::>1.:)
168 9
E
0
J:
.~
t:t:l
'tl
J!l I
III i
~ ,
! I
::lI
N
"0 '"
.s J,
III E ro
~ .!'! ~ ~
C <Il
;::I (J) 0 E
] ~ -0 ro
~(J)'O
.o'O~
Q.(J)(J)
~ ill .~
~ ..... c = I I I I I I I
I iU I I~ ~ t: I I I I I I I
(J) ~ ill
0 o~
ro $ (/)
.... ~b~
II)
III &~~
..J
0 0 0 0 0
0 0 0 0 0
L\.I 6 6 6 6 0
0 <X> <X> co 0
() '" ~ ~ O?
Q: .0 .0 1.6 l{) '"
"" "" "" "" ff> ....
D. 0
W 0
N
~ CJ
z
::J: Z
() z
ct: (3
;::I ill
Q. III
00 00 0 0 0 0 0
>- Z :::; :::; Z Z Z 0 0 Z :::; :::; 0 0 0 :::;
0 r2 r2 r2 0 <( 0
0:: 0:: 0 0:: 0:: 0:: 00 0 0::
0::: U; <( <( ~ ~ ~ ~ ~ ~ <( <( ~ ~ ~ <( ....,
0 :;; u.. u.. l- LL LL u.. ill
ill I- ill I- l- I- ....J ....J ~ ill ~ ~ ill ....J ....J ....J ~ ill LL
I- 0 ill Z W ~ ~ ~ ....J ....J Z ill ill ....J ....J ....J ill 0
Z 0:: <( 0:: <( <( <( 0 0 <( <( 0:: <( <( 0:: 00 0 <( 0:: 0.
W I- :::; I- :::; :::; :::; I I :::; ~ I- ~ ~ l- I I I ~ I- u..
> Z :::; :::; (J)
Z 0 :::; ~ ~ ill :::; Lti <( :::; ~ ~ ~ UJ 0::
....J U U U ....J ill ....J U <.) <.) <.) ill 0
- ~ 0 0 <( 0 0 0 0 0 0 I- <( 0:: 0:: <( 0 0 0 I- >- ....,
I 0 0 0. 0 0 0 0:: 0:: 0 0:: 0. l- I- 0. 0:: 0:: 0:: 0:: :::; ill
~ () Z Z I- Z Z Z 0 Z 0 I- (J) (fJ I- 0 0 0 0 u..
<( :5 :5 :5 :5 0 :5 LL u.. I-
0 ....J (J) 0:: 0:: 0. (fJ ....J ....J (fJ 0:: 0:: 0:: D- o:: 0
..J 0:: 0:: ill 0::: 0::: 0::: <( <( 0::: 0:: w :::J :::J ill <( <( <( 0::: 0 0.
0 0 5: 00 0 I I 0 <( 5: ~ (9 5: I I I <( u.. u..
'I:t: v cr:; m 0
..J 0 N ro
CO '" '"
c:( m m m 0 Lt) v " 0 N
Q: 0 <l) '" '" '" '" <X> m 0 f") m 0 '" CO '" f") m "
<l) <D <l) <l) Lt) '" <l) 0 <l) m 0 0 m <l) 0 " '" CO
UJ m '" OJ OJ OJ 0 " OJ m CO .... '" <X> 0 " <l) '" 0 a
<l) co co '" '" '" <l) a '" .... '" '" v <l) ;; ... .... ....
l1J '" <D CD .... co '" 0 co 0 ;; ;; 0 0 0 0 '" L{)
0 0 0 0 0 <( (9 0 0 <( 0 <( 0 0 0 0
- 0 x x 0 0 I- (J) 0 0 0 0 0. I- (J) 0 0 0 r2
'I:t: ... " ... (J) OJ OJ if) <.) <.) x if) (fJ (fJ 0 if) u (J) x "
Z x x x u.. LL LL N 0 LL ~ ~ ~~ x ~ 0 ~ ~ x ~
CD <D CD X <D
:;; 0 0 0 <( <( <( ... 0 <( " " " ... I ... 0 ... ... 0 0
0 0 0 ;:: ;:: :>::: 0 0 ;:: 0 0 00 0 0 0 0 0 0 0
s S 5: ...., ...., ...., :::; :::; -, s s s s :::; :::; :::; S 5: S :::;
, <D <D <D
ct: 0 0 0
0 o 0
~ N N N
...I
UJ ... ... ...
8 x x X
<D CD CD
:e 0::: 0:: 0:: 0:: 0:: 0:: 0:: 0:: 0::: 0:: 0::: 0::: 0:: 0:: 0:: 0::
0 0 0 ill ill ill 0 0 w 0 0 0 0 0 0 0 0 0 0 0
l- I- I- ....J ...J ....J l- I- ...J l- I- l- I- t- l- t- l- I- l- I-
<( <( <( :::J :::J :::J <( <( :::J <( <( <( <( <( <( <( <( <( <( <(
~ (9 (') :::; :::; :::; <:J (9 :::; ~ ~ (9 (9 (9 (9 ~ ~ ~ ~ ~
LlJ
~ 0:: 0:: 0:: Q Q Q 0:: 0:: Q 0:: 0:: 0:: 0:: 0:: 0:: 0:: 0:: 0:: 0:: 0::
UJ ill UJ ill ill UJ ill ill ill ill ill UJ UJ UJ ill uu
:e UJ ill W <( <( <( ill ill <( w ill ill ill ill ill ill w W ill ill
0 0 0 (J) (fJ (J) 0 0 (fJ 0 0 0 0 0 0 0 0 0 0 0
z z z <( <( <( Z Z <( Z Z Z Z Z Z Z Z Z Z Z
I I I S S 5 I I 5: I I I I I I I :c :c I :c
0 0 0 <( ~ ~ 0 0 ~ 0 0 0 0 0 0 0 0 0 0 0
-, -, ...., ~ ...., -, ...., ...., -, ...., -, -, ...., ...., ...., ...., ....,
'II: ...... N M ~ lO to r- oo en 0 ...... N M"<t It) <D r- oo en 0 ....'" M"<t 1.1')<.0
!:: 0 0 00 '? 0 0 0 0 .... ...... .... ...... .... .... ...... ...... ...... ~ N N N N N NN
Z :> :> >-:> > >- >- :> ~ :> :> :> :> :> >- :> ~ >- >- :> ~ ~ ~ ~~
;::) ~ I- 1-1- l- I- l- I- l- I- ~ ~ l- I- I- !;( I- ~
<C <C<C <( <l( <C <C <C <C <C <C <( <iC <iC <( <C <iC <C<(
16 B;\~9
e
0
~.
:,:,
.Q
'tl
~
I :B I I
::l> i
" I
.$
<<l
.'8
:::I
.2
.5
S I I r I I
<<l
e
1ii
<<l
-I
W
u
it: r- r-
Q,. 0 0
w 0 0
N N
~ cO do
N N
::r:: M M
~ :t= :t=
0 0
u u
::;) m 'iij
Q,. "- a.
Z (l)
>- 0 l')
ii5 [f) [f) [f) [f) [f) [f) [f) [f) [f)
0::: z 0 0 0 0 0 0 0 0 0
0 ~ Uj z z z z z z z z Z
l.lJ :) <( <( <( <( <( <( <( <(
l- e 0 -' -' -' -' ....J -' -' -'
z
w "
> $
z llJ
U [f)
-; .9 :;; :2 a:::
J: 0 -' -' w
<( <( >-
III .r;. 0 D- o.. :2
u z
c :2 <( ~ I- ~ I- :2 :2 :2 l-
f ....J [f) [f) a:::
<( 0:: <( W <( W <( <( <( 0
!Xl :2 0 :2 S ~ S: :2 :2 ~ "-
'It:
~
0:: 0) r-- N (J) N -q
~ r- r- ;;; N
;::: l() (') ~ r-- <:) CD
'" CD (') r-- to N N -q
- OJ <0 CD N (J) a:> '" OJ -q c;
c; a <:) -q " 0 <:) r--
'It: M M N N N M (') M OJ
" a <:) <:) 0 a 0 <:) <:) M
Z () (j l') CD l') l') l') l') (9 ()
s: to -, .-, .-, -, -, -, .-, .-, l[)
Z -, .-, .-, -, -, -, .-, -, Z
'" ;; c; l() m <:) N N M LfJ
0 '" (J) <:) 0 <:) <:) <:)
~ 0 a <:) 0) '" <:) 0 0 <:) <:)
N N N ~ ~ N N N N N
N N ('oJ
[f) (f) :;; (f)
w w w
12 12 a::: 12
-I w w w w
W [f) [f) D- (f)
::J
8 :::;:::; :2 :::; :::; :::; if) :::;
00 6 6 6 6 <:) 6
:IE OJ a:> cc a:> a:> OJ co co
<() lO <() <() <() <() <() l[)
W
~ w w w w W l.lJ LU W W W
(f) [f) if) (f) (/) [f) [f) (/) (f) if)
<( <( <( <( <( <( <( <( <( <(
:e () u () u 0 () 0 0 U U
'"' ..- NM "* o.n (l) i'- CIO<>> 0 'F
I- 9 00 9 9 9 9 99 ";' "';
z . .
::r:: ::r:: ::r:: ::c ::r:: ::r:: ::r::::r:: ::r:: ::r::::r::
::;) lO lD lD 00 00 00 mal m moo
1 ~ 8 1CJ
1. Q 8 f9
E
o
.c
i:
.c
""
$
..
::l
al
co
..,
::>
.2
.5
ell
1\j
c
'Iii
.!!
..
'c ;'
::> c;
E if)
:J
C
ell
g l- I--
>- ii a' a'
g5 ~ :n!!
r-
z
w
>
~'g
o 1\j ~ ~
a.. g ~ ~
O...JI-f-
.t::if)if)
~ ~ ~
tii
ro '"
N co
-"'",
-~...
-...",
.. w "
'CWUJ
ell X "'
,~ '" ...
w. -' a.
_~l.O
c u. i!
.- ;: x
>00
~ ~
0",
~~~
~g~
:a g; ~
~~~
~~~
~~1
'" 0 0
itSgj
:;Eu.u.
~ N
"00
.~ 0 6
C 0..10..
=>00
16 8 '9
IE
0
i
1.
i
:::>
~ I
~ I
I.s.
.5
.. i
'Ii
Q
~
~
IX
ll.
I ~ I j
'" i
IX
:::>
...
I I
'"
~ M
ro
M J
ro
W
'I
:~I
'"
l!! ~ ~
;;: ~ ~
fI)
>-:5 ~ ~
C!:(.) I
0", J
r-Z
z-
Wz
>0 on
~lii on
0 0
'S; Z z
tis 5 51
B
oS 0
.c 0
" z "
Ii! 5 <(
III oc "
0
.. ro
~ ~
~ 0 ~
g ~
~ i'i
~
.. ;;
z <( "
:;: ~ ~,
I I~ ~
0 I
I~ ~
I~
r:.
!
.,
<:>
...
'"
<:>
'" 2j
... ~ ~J
'"
<:>
~ N
~
cr,
..J )
8 ~
~ ro
I I
:l! u u
~ ~ ..
U u
::!i " :1
"
:;l;g9~
~55bbJ
16'8 'i9
IE ,
~
.6
'l:J
~
~
::l
'"
2
t I~
::l
.2
.5
~
0
...
..
.3
..
I .fn I
III I I
;;
..
.5
i
i.i:
I~ [;I ~ ~ N :;! J;I il:! N J;I
a:: a:
'" .,. 0 '" <D 0 I"- 0) 0')
tI) ~ ;! ~ ;:: ;!. ~ ;:! ;: ;'!.:
c
0 <J) <J) (f) (f) (f) (f) (f) (f)
:!i 0 0 0 0 0 0 0 0
> z z z z z z z z
is :"i:"i:"i :"i :"i :"i :"i :"i
'l:J
.s
lJ (f) (f)
0 a: ::; ::; a:
..J 0 ~ -' 0 <<: ~ 0
J: 0 <! 0 <( 0
" z ::; a. z u. ::; Z
>- C :"i .... .... ~ :i :"i UJ .... :"i
<<: <J) u a::
0:: I!! a: w <! <! a:: a::
0 3: ~ ~ <<: 0
o III 0 lL 0 .... l.l. 0
f- ~ <D ro .,. 0 :? M '"
Z 0 <D "' ?J :;: ~ ;!
'" 0 0
W* 0 '" '" ;; "' CD eo
~ 0 .,. 0 .,.
>iii 0 ro '" '" Cl 0
l.l. U. 0 <( ill
z'C r;: '" .... 3: g;
-;-c1J N '" 0 x ".
.,. .,. 0 '" 1;J fj ~
ro :I 0 ;Z
co- ::; 0 ;; 0
0 0 z If) ... '" ..
u..* a: a: :> !I: 0 '" G. l.l.
~ N '" ~
0 Cl 0 -' U f-
~ ~ Z ::J ~ .... 0
'"
Cll 0
'Iii .... t.- ~ .... .... .... f- f-
0 z i3 z z z z z
~ w ~ '" OJ W OJ UJ .Ii W
Z <D z z z z Z
<! <( -<( <( <( ,) <(
::; ::; ::; ::; ::; ::;
Ii a: (:~ a: a:: a: a: t'.:. a:
w hJ UJ W OJ W LL! W
I- a. D- o. D- o. i:.'.. a.
Ii ~ i
l- t
CO ro
'"
C N
I Ii !!;
l- f':: I I
... .,.
C I
g <! <( !!; 0 -<( .... Z Z <(
'" .,. 0 00 '" " " l"-
I- 0 0 a. '" 0 "' " '" 0
'" "' I"- oo '" ;;; "'
'" 0') '" .,. .,. '" <:) '" '"
C U U I () U () U U
"' "' .,. <D .. :::: a) "' '"
ro ro 0) '" 00 oo '" "
~ ~ ~ ~ ~ '" ~ ~ m
.. ~
CO
~
a:
w
-'
~
....
0
UJ
iii '"
"0 f-
0 <(
:; -'
lL
W UJ UJ W W W
Z Z
<( <( 0 0 0 0 W
0 0 <( <! <( <! Z
::; :2 ;; ;;
: w w w ?;: w UJ UJ ;:;:
~~ Z f-
;; :J :2 <! ;; ;; Z
CO 0 F= 0 0 0 0 0
:; 19l9 I ::J I .... I I U.
-=.....NM ....,., c..o r- CO O'l <:> ~ '" '" ..
~cr99 99 9C?cr9 ~ ~ ~ ~ ~
cmDlDllllccccmmDl mmccmm
::>>u..LLU.U.!.!..LLI.L.LLLL u..u..u.u...u..
L()
M
W ~-
U~
~
0..
W
U
<(
J:
II)
a::
>-=>
0:::0.
Oz
1-0
Zen(/)
w -0
> ~Z
C<!
Z .....J
,"0
......J~
LL (11
(..)
o
...J
.r::.
(..)
t::
(I1llJ
'-lL
003;
=It:
...J
<(
"
Wro
(/)8
-0
=It:~
~8
>=5
0:::85
<(m
w~
>-
..J
W
0(9
Om
~::g
~Iw
<(OJ
~<!
o
:Jil~
16B~-'9
E
o
.l:
$
.5
"i:ji
lD
"'"
@
]
~
r-
"0
QI
-
C\J
~
=>
o
....
t::
QI
-
(11
c
-
III
(11
...J
-
!-..
168 ~9
E
0
.c:
~
~
~
Gl
....
tlII
:B t I
::J
"0
Gl
....
tlII
'B
:::l
.E
f" I I
I /j I I I
I I
....
III
tlII
.../
W
(J
"
0.
W
~
:t:
en
>- a::
::J
0::: 0.
Oz
1-0
Zc;; (fJ (fJ (fJ (fJ (f) (fJ (fJ
w- 0 0 0 0 0 0 0
>~ z z z z z z z
<{ <{ <{ <{ <{ <( <{
ZO -' -' -' -' -' -' -'
'''0
W,!
.-J tlII
(,)
..92 (fJ
DC
.c:: -' 0 0 0 W
(,) if 0 0 0 >-
C I- Z Z z 2
<{ ~ <{ ::i - l-
e (fJ 2
-' ~ -' ~ DC
mW 0:: 0:: a: 0
S 0 2 0 0 2 u..
'1:1:
~
" ro Ol ~
W 0 c<) C') ro
l('J <.D 0 '<t '0 N
en (0 <.D 0 N ro CD (")
~
- 0 ~ '<t 0 0 ~ 0
'1:1: N '<t (") 0 0 co co
0 0 ~ c<) C') U) (")
z 0 0 0 00 0 0
~ UJ W c)l':> C)
:> <{ UJ W --, --, UJ --,
...., ..., -, --, --, I --,
a::
<(
W ro co N N N (\j /'-
>- <Xl Ol 0 0 0 0 0
en Ol 0 0 0 0 0
~ ~ N (\j (\j (\j (\j
.../ ~ X I-
W l- X
0 CliI q 2 2 9 2
0 ~ ~ ~ 6 6 6
:E N N (\j /'- /'- N /'-
CD CD <.0 l() t1) (\j t1)
w
~ UJ W W W UJ UJ UJ
(fJ (fJ U) (fJ (fJ (fJ (fJ
:E <{ <( <{ <{ <{ <{ <(
000 0 0 0 0
;:1 ~ N M ~ 1O<.oi'-
21:00010 000
, . ,
:;.wwww WWW
..J-.I...J...J -.I...J...J
16Blr9
~~
0
i
~
Q
~
Q
I!l.
::Ii
Q
W
~
0
a-
:;)
ft
I :i!: I I I
w
~ I I
0
~
:3
0 0 0 0
lD lD 0 0
W lD lD 0 0
0 0 ill '"
(.) N N N N
02
a-
w
~
::J:
>- rn
Q:
a::: :;)
0 a-
t- Z
Z 0
w en
> :> cr: cr: cr: cr:
z a Q; Q; Q; Q;
I
W 0
::2: w
~
(.)
g
::J: :2
(.) -' 0
<(
~ 0- 0
I- Z
<( ~ ~
(/) -'
IX! LJ.J a:: <( <(
;;: 0 ~ ~
'It "" N
lD lD
~ ill 0
(; 0 I I
02 <( <(
u... ll.
W co CD
(/) <( ...., ill I"-
- ro ro 0 Q)
'It (; 0 0 ~
""
[") '" 0 (;
z 0 0 ~
:> l- I- m
<( <( "" co
u u "" (9
N 0 N to
~ 0 0 0
0 0 0 0
N N N N
~
.J U
W ro (;() lD
8 0 0 N lD
0 N
[") M '" 0
:E '"
w ~ ~ ~ ~
~ '0. '0. 0. '0.
ill ill ill Q;
:E m m m ro
u u u u
~..... N M'<I'
I- 0 0 00
Z iii W WW
;,:) :Ii: :iE :zi~
e
o
~
16B~t~9
o
wg
(.)N
li:w
0.
W
~
>-::c
o::~
0:;'
1-0.
dJz
>0(1)
Z(;jO
_2
-><(
0::25-'
w
-.J
-.JZ(I)
000::
rv-W
u..~>-
(.)::2
otr
...JO
IL
'II::
..J
<C
li:
w
U>CXl
_0
'll::RJ
Z~
- 0
>0
N
0:::
<Co
wO
)oN
FT. MYERS OPEN JOB LIST
16B~9
. . 1523. FORT MYERS OFFICE- VILA & SON . .n.______
1875 ALlCO LAKES VILLAGE-MILLER CONSTRUCTION
___1879 THE OASIS IN FT MYERS-THE RELATED GIlQllP
_ 2190 _ CROSS CREEK ______._______. .__
__2208 __ LEE CANCER CARE BUILDING - MARS.H..t<bh_I:..RDMAN.___
2274 UNIVERSITY PARK CENTER- BENDERSQlIl.i:lgVJ'1.0PMENL
_2319 _ CITY OF NAPLES-TREE REPLACEM EN:rT.i:.~r.1n~gfllJRACT
__2378 ___ DEL!,RADO-BALFOUR BEATTY
_ 2379 LITTLETON ROAD-LEi: c;Q!JN.TL_
__2398 __ HAB.OUR RESORT________ __
2447 RIVERSTRAND CLUBHOUSE-LENNAFiI-IQ.r.1r:S
2463 IALlCO ROAD RETRO-LEE COUNTY
__2477_ Ctl!\B_LOTIE COUI'lILHlGH _~l::!lQOL
~!;3~__ GUNNERY RD (SR~2 TOhi:E!lLYQ1_
2542 HERIT AGE,!:!,~~1;l9LJFUIFT_ STATION 5
~-i~~-~_~~~~ :~V.~.p.D.E.....I3.. .l.yo
__2576_~JJ1ER.1I~ RQ
__~599 ---fYILLAGi:.!V~.LK_
.3!.!!.~T SOUIH~I1.ctirlgL_
2621 7-11 Store # 33973
1510 JOHNSON ENGINEERING
1~.~7-US-41 -CITYOFPUNTA-GORDA{stiiio~n}
1Z.~6 .~~Ji.c5LLlER @~~Jl~E:::MAR~9_sI~i~_[)_-=: _
1822 I CORKSCREVV@I-7!;.-: 1.1::i:l::Ql!T.N.LJQIiNl)()N ENGINEEING
1877 BARKLE'r'.F'.LAl::E: -El~Il~I.I:YEl..~J'
1!1O!; . QQLDEI'i.G..t<TE~.9LLlER COUN.TYQ9Yr:BN.r.1E:..NT
_ 1906 _ .l!.NJY.E:R_l)ITYO\lE:RL~'I'..mE:..Nl..II_L GRlF'EI!tl:!-E:_i: CgI)N.l'l'i:lQT
__1jIi5._ LAISES REGIONALLIEL~.RY- hEE COllN.T,!, lIV1Qrlth!<:> Month)
__19211=1_..B!y.r:.RP.A.1E:-hi:E COI)..NTY___ .
_193.1 US 4!J'Ji!-.lS.E: G.- l::QhJdi:.R cg..ll~I.YGO\lI:.RI'lMi:NT
2013 COURTYARD MARRIOTT-MARRIOTT
.. ::2046:::: BQ.NIT A SPR!.~GSM~i~JENAlilc-E~i::-rfj()[~()~TAnl)!'RII'lGS
.__~llQ_ '!'J\..c;"'LC.!-lI~CITYQLCAPE c;C>.RAL
_2~Q~.. IARGEI_@FORUM-NA"'-_
___2389 _ PALp"LE!I:.J\l::!I.:LEE COUNTY ____.________ _
__2442_ 'v'VIGQ!N...l>..I.!-!5.E:..S..:.WIGGINS LAKES & PRESERVr:../'l)l)OC1ATIO..N
2468 CCHA- COLLIER COUNTY HOUSING AUTHORITY
..)515--!j:ffi\ITCOCONijTF>i~N!t'.!IONRr:SQRT:::::-
__ .2~16.~GE:~l::.Y'CQl::ONU.I.F)OINT__
2517 HYATT VACATION MARKETING
'~:"-2518:_ INTEB:NATIQ~ALj)~iGt-.i~-,:_I'li~R::
___~~~ ..r.1I~()r.1ARQUTLEI~____._
f--:~~: :::::l~~I~R:~K~~ ~~L~~1I~~tJCIAI!QN_
f...- J~~t:::~I.~~~j~&~T~:~~;@}c5~~c~t-.i.Ti_~::.
2591 .. . (C...ICK-FIL-J\.______ ___
___2~1J__~~ANI,6, E!ARBA~BLVD Davis tQ l::OPPfilrleaf
2613 ,COLLIER PARK OF COMMERCE
:::::=~:~~:::::~~~~~CAELfE~T~RQE~f>'--E!).
VILA-1523.__
MILLE1875
~ RELAI.1879:
CRQSS2190
MARSH2208
BEND22?!.
NAP!-E:~319
fit~~~~713 n ..1
HAR239!L
.h.l:~N1~4!7
L_I:.I:.~:'t6.L
CJi!-RJ~47
___ l1gl:.~~}.9
.L~~.",12~L _ ._....1
BENi:I~!;i'Q. . i
:STAHLSTAHL
t".. ----"-------- ----
fL_r:.E;~5ZL
j BI:N.D259!1
I
I
i
_17949.15.
_1192~~2
_ I'lL~_.
nn1IIJ~1.?!I...
N/A
. _.1ll:g!~:l_
. _ 1~1l9().1
N/A
11145139. u_
N/A
.1ll.1.6~~6
1851400
_n_____________
ill gOl' 1
N/A
N/A ..
. J.!;.I.Ii..
.25T1L__ _
w_l!!n complEl!fil
_20TH_
25TH
15TH
15TH
___n_____
n_1!;!tL ---
15TH
15TH
15TH
.. .nn.lOTH_
30TH
30T_H____
__2_~h
;lOTH
_.30IH_____ __
. _ n.25TH
J-
ur
un!
JOHNS1 ~O
CITY41Jm_
M.~~~117~_6
__ LEE18.22
BARK.1111i'7
'<::.C>I.Li199.!i _ _n
.!-E.E:.1ll96 .
n n LEEJ~!i
.1".1:..1:1929...
: COLLi1931
. ~~~1lt
i l::APnE;2~OQ
: NORTH22Q6
.j~~~f?:~X: .
. 1<::_C!iJ\2~611
,HYATT2515
iHYATT2516
__m_ -.1 HYP.:fT~517
. i INli:225111 .
'MIROM2~1n .
. .1G:.i.iilf2535
: Al.ICO~549_ .
: ONETI2558 .
1 HOLI[)HOhI2 .
_ _; CHIC12~91
.COLl..I~~11. _
AD.LE;R2613 .
ADLER2614
PL_ATl2623
,futptembfilr1,';!007 ....I_S.llP!e_mbe!_h~()lI
. Q!lc:ll.rnber 17Ll()08_1 De~filrn~e_rJll,-~11
. f~bruary _8,~()9.1I__ n JFe~rlJ'!I}'Jh 20Qll
I ~.. e. ~~-.b. ~~i;L.0.....-.liI:1~;e~. b.' ~..~.1.:20()8 .
Qf.t.<:>.bfilrhJ()II7... _ . _ QctQll.filr 1, lQ09 ___
_ Febrl!li!1}' ~0,~()Q.9 Febru.!..ry2_0,2010 __
""QNTH TQ __ r.1QNT.tI__m_
Q<:t<:ll>llI'l,.l9.()? Q<:!.Ql>e.r ~ ,2()09 _____
Q<:t<:>.~er1,~.ol'.. QcJober 1,_~QO!l.
J.,llIlJi)ry1,209.~_ ... .. I [)filc:lI.rr1l>er_3~,.2008
~llrllary .1. ,2()()L _ _ _~J.li!I1.lIl1..ry 3.0...10.1 0
_ l'o1ay 1,~()Il~ill.(),.2()09
l'o1a:t.1,_2_00.8 _~2':i!~O.! 29.0!l .
J..1!I1'o'.a.ry2_0.... 200!!._ .Janua'YJ0,.201()____
J.1l1l1li!ry1.,.2ll.Oll.[)ecember 31, ~()ll.!I_
FlI.~rllary 1!~009_ I FellrlJ_ary 1,2010
I '
---t
l't1li!r<:h 1 ,200!l__
Mli!rc~lln1,2010 .
-j
4/1/2009_
~~/~Jl()L
..!;IY_~()().ll
~lgq()!!
!;/1/20()9
5/1/2009
. _~Y1()1()
. 4/1/20~()
!;/1I201.o.
5/1/~1O_
5/!l20.1Q.
5/1/2010
_I
i
i
IcbR~ig;OltFlCl\! I
20451 SW 216th STREET
MIAMI, FL 33170
PHONE
FAX
REMOTE FAX
BACK FAX
305-255-9206
305-255-9207
305-255-4238
305-909-0046
IMlQUYO.""lClf
13901 NW 118 AVENUE
MEDLEY, FL 33178
PHONE
FAX
305-805-0066
305-805-4270
IOft~()f!f!lC!'\(" ,
1900 WILLIAMS ROAD
WlNTERGARDEN, FL 34787
PHONE 407-654-9415
FAX 407-654-9417
BACK FAX (ED) 407-34H1004
IWlS'I'P;U,I'H)iIl=iCl!l
1686 D ROAD
LOXAHATCHEE, FL 33470
PHONE 561-795-3070
FAX 561-795-3879
Renee's FAX 561-795-4253
1j;'f~iQRl~"
4175 Buckingham Road
FT. Myers, FL 33905
PHONE 239-466-2700
FAX 239-466-4700
If,wPA-dN/cI!<
IlsIlOWARCOIt'lCl!',i'
1225 S Dixie Highway
Pompano Beach, FL 33060
PHONE 954-782-1009
FAX 954-782-0792
I~i,)i:'
1810 D ROAD
LOXAHATCHEE, FL 33470
PHONE 561-753-7866
FAX 561-753-7867
I.....Q_~f0j;: ":1
330 ORANGE AVE.
FRUIT COVE, FL 32259
PHONE 904-287-1050
FAX 904-287-1053
I"'Q'~':"
18851 SW 240th Street
Homestead, FL 33031
PHONE 305-248-1810
FAX 786-221-0061
1..W.~!t~1'!lI:JMlQ$;
JUAN CARLOS VILA
RICHARD FEREIRA
RICK LEAL
JOE JANSSEN
1118~12f$1' '. I
10
55
11
47
MarUM
C~"rlos
IQ"'TACOI!l~HJl~;QDK't_'t'''~.6
John Castilla VILA IT 786-269-3932
Brinks Security 800-445-0872
305-986.2244
305-796-6246
305-986-2245
305-986-2300
786-412A50'l
.30:,)-796-55flO
168 9
Emp# Name Phone No. Radio Number Title Division
F3753 Adelso l.opez ~4007 159*93209*24 Foreman Main!enanc8
F 2517 Alfredo Pad ron 239-462-4720 159*93209*12 Shoo Manaaer G&A
0210 Arlene Rodrinuez 239-895-1072 1 59*93209* 15 Accounts Pavable G;5..!~
F4137 Carlos Flores 2J94l0-15J3.9 159*93209*16 Irriaation Technician Irria<llion
F3279 Cesar VNdecia ~-S344 159*93209*4 Water Truck Drive' l.andSC;JD';
OPEN 239-229-123.3 158*1215'1'145
0302 David Hernandez 239-243-4115 159*93209*10 Irriaation Sunervisor Irriaation
F2855 Frandsco Rosales b19-229-37{ig 159*31715*17 Foreman t.andscape
F2939 Freddv Velasco ~19-229-6o;>;,; 159'31715*12 Foreman LdndscdPe
F2776 Gilberto Gonzales 239-2294771' 159'31715"41 Foreman Lallchcane
0278 Hector Melendez 239-707 -5289 , 58'12151'203 Buyer G&A.
F741 Henrv Velasco b19-22~-3770 159*31'715'40 Foreman L~mL~cape
0211 ,Iahaira Stoute 239-895-1063 159*93209'8 Human Resources G&,4
F2753 ,Iaime Gonzalez 239-22{i-54;!1 159*93209'20 Foreman L"ndscane
OPEN 239-895-1097 159*93209' 17
0187 ,Iason Cleland 239-425-5354 159'93209'30 Sf. Estimator G&,'
0231 Jeff Balveat 239-225-5288 159'93209'25 Business Dev Gonstr G8,.1\
F3948 Jhonnv Castillo 239-225-5074 159*93809'37 Yard Manaoer G&A
0310 .Ion Romine 239-243-6243 159*93209*31 Proiect ManaCler Landscane
F3275 ..Iose Luis lonez b111-28()-60~ 159*31715*58 Foreman Mallltenance
F2173 .lose Maldonado 239-229..j}()'m 158*12151'149 Forernan Irriq"tion
F3274 Jose Moreno 239-225-6456 159'5019'336 Driver Landsca().,
F 2645 Julio Velasco 239-229-1894 158*12151 '147 I-oreman Irngdtion
0217 Kris Brannan 239-633-2047 159*317'15'20 Account Manauer Mainl:enanc1~
F4147 Mario TlOchez :b19-2:lll143 " 158'12151'190 Foreman I rriua!ion
0296 Melinda Murr<lv 239-2'10-1254 159*93209'40 Jr. Estimator (;80'\
Opal 'nll ~U!'~.0,1r,4; I oil' 121 '5l '!40 Semi driver Landscaoe
Opnt 2.10..2:;l[)..f; 19,' '1 59 '0l1 r 1 !jll Semi driver LandsGaoe
OPEH 2:14221i8::15 ; l~'l'")H! 't'i) Mechanic G8J\
(IPEH 2l9-'1846S9g NOT ACTIVE YET
OPEH 239.4G2.1?1!l NOT ACTIVE YET
F3592 Pilar Gonzales 23Q-225-84i.] 159*31715*49 Inioation Technician Maintenance
F3851 Rafael Davila 239-633-2083 159*31715*33 Supervisor Maintenance
0260 Raouioll 'Rock v' Benedict 239-877 -9922 159"5019*375 Construclion Manaoe, Landscape
F4161 Rene Flores 239-41>;2-9005 159*93209*11 Forel11an Maintenance
F2052 Roberto Zequiera 239-280-9592 159*93209*29 CDl L<lndi;cape
F2583 Roberto Zeauiera, Jr 239-229-0436 158"12151*146 COt. LandscapE'
F3276 ROlelio Aauilera "Rov" 239-2211..QQ64 158'12151*73 l.abore.. MaintB.nar)(~.B
0201 SI19llv Williamson 239-895-1005 159'93209*7 Proiect Enaineer G&.A
F7356 Terrv Kellv 239-225-5246 159*5019*331 Sorav Tech Maintenanc.:>3
0293 Trov While 239-225-8605 159*31715*50 Irriqalion Suoervisor Irrioalion
F3191 Venancio Cordero 2.Jll2.7.r.awI3 159*93209*39 Foreman Maint:en"nCe'
0236 Wade Chapman 239-225-5396 159*5019 '86 I General Manager G&A
0301 William DeRossett 239-210-1251 159"93209*36 IBusiness Dev Maint G&<l.
I
Ft. Myer's Branch Phone List
168 t'9
Employee 10 Name Job Title Depmt
F2052 ZEQUEIRA, ROBERTO CDLDRV FTMDCL
F3274 MORENO, JOSE E CDLDRV FTMDCL
F3279 VERDECIA, CESAR CDLDR\! FTMDCL
F2583 ZEQUEIRA JR. ROBERTO COLOR\! F TMDCL
F2753 GONZALES ORNELAS, JAIME FRM FTMDCL
F2939 VELASCO, FREDY FRM FTMDCL
F741 VELASCO, HENRY FRM FTMDCL
F2855 ROSALES, FRANCISCO 0 LDMN FTMDCL
F2776 GONZALEZ. GILBERTO LDMN FTMDCL
F3385 NEGRIN HERNANDEZ. MART LDMN FTM DCL
F2348 LOPEZ- HERNANDEZ, JORG LDMN FTMDCL
F4068 BENITEZ, ROBERTO LDMN FTMDCL
F3091 GALVAN, LUIS FLDLAB FTMDCL
F3231 GONZALEZ, ALFREDO FLDLAB FTMDCL
F3256 BACAJOL, HERNAN FLDLAB FTMDCL
F3451 FLORES HERNANDEZ, JOSE FLDLAB FTMDCL
F3690 DIAZ MARCOS. GASPAR FLDLAB F TMDCL
F3817 PADILLA, URBANO FLDLAB ICTMDCL
F3888 GUIFARRO, RAUL FLDLAB FTMDCL
F2173 MALDONADO, JOSE SALOMO FRM FTMDCI
F2645 VELASCO, JULIO C FRM FTMDCI
F3088 VASQUEZ, lUIS LDMN FTMDCI
F2847 VELASCO RODRIGUEZ. ISAEL LDMN FTMDCI
F4147 VALLARDES TROCHEZ. MARIO LDMN FTMDCI
F2808 YANEZ, ADALBERTO FLDLAB FTMDCI
F3547 ROSALES, JERICK FLDLAB FTMDCI
F4138 SOSA,ORESTES FLDLAB FTMDCI
F3404 RESENDIZ, RODOLFO FLDLAB FTMDCI
F2757 ALFARO, SAMUEL FLDLAB FTMDCI
F4038 OLVERA, RAMIRO FLDLAB FTMDCI
F3191 CORDERO, VENANCIO FRM FTMDCM
F3275 LOPEZ, JOSE FRM FTMDCM
F3753 LOPEZ, ADELSO FRM FTMDCM
F4161 FLORES, RENE FRM FTMDCM
F3947 ANTONIO, MARIO 1. LDMI\I FTMDCM
F2588 VELASQUEZ, TEODORO FLDLAB FTMDCM
F2779 GONZALEZ, GUADALUPe FLDLAB FTMDCM
F3276 AGUILERA, ROGELlO FLDLAB FTMDCM
F3991 GONZALES, JUAN FLDLAB FTMDCM
F4139 ORTIZ, WALDEMAR FLDLAB FTMDCM
F3525 VASQUEZ. ALEJANDRO FLDLAB FTMDCM
F3592 GONZALEZ, PILAR IRRTEC FTMDCM
F4137 FLORES, CARLOS IRRTEC FTMDCM
F3756 KELLEY, TERRY SPRYTCH FTMDCM
F3948 CASTILLO. JHONNY YSIVlGR FTMGA
F2517 PADRON. ALFREDO SHPMGR SHOP
0187 CLELAND, JASON ESTIMA FTMBD
0201 WilLIAMSON, SHELLY PRJENG FTMBD
0210 RODRIGUEZ. ARLENE ACTPS FTMGA
0211 STOUTE, JAHAIRA PAYTEC FTMGA
0217 BRANNAN,CRYSTAL BUSDVL FTMGA
0231 BALYEAT, JEFFREY S. BUSDVL FTMBD
0236 CHAPMAN, WADE GMGR FTMGA
0260 BENEDICT, RACQUEL FTMGA FTMGA
0278 MELENDEZ, HECTOR BUYER FTMGA
0293 WHITE, TROY SP\!SR FTMDCL
0296 MURRAY, MELINDA ESTIMA FTMBD
0301 DEROSSETT, WILLIAM BUSDVL FTMBD
0302 HERNANDEZ, DAVID SPVSR FTMDCI
F3851 DAVILA, RAFAEL SPVSVR FTMDICM
0310 ROMINE, JONATHAN SP\lSVR FTMDGA
81DOER QUALIFICATIONS
FIRM:
Vila & Son Landscaping Corporation
4175 Buckingham Road
Ft Myers, Florida 33905
Corporate Office
Vila & Son Landscaping Corporation
2045\ SW 216th Street
Miami, FL 33170
Fed Ex number
TELEPHONES:
Wade Chapman, General Manager
Racquel Benedict, Project Manager
Jeff Bal yeat, Business Development
E-mail jeffu@vila-n-son.com
Off: (239) 466-2700
Cell: (239) 225-5288
Fax: (239) 466-4700
AREA COVERAGE: Florida.
YEARS IN BUSINESS UNDER PRESENT NAME: 24 YEARS
WORK NOW UNDER CONTRACT: $65,900,000
WORK TO COMPLETE $35,000,000
INSURANCE AGENT:
Willis North America, Inc.
26 Century Blvd.
Nashville, TN 37230-5191
Terry Gutierrez
BOND CAPACITY:
DUN & BRADSTREET NUMBER: 18-676-7737
AVERAGE ANNUAL SALES LAST THREE YEARS:
PERCENT OF WORK PERFORMED BY OWN FORCES:
OWNERSHIP OF FIRM: Juan Carlos Vila
Vila & Son
168 9
$35,000,000
$60,000,000
95?/0
I 000;;)
- I
Vila 8:. Son Landscaping Corporation
168'9
General Contractor # CGC060773
Florida Certified Minority Business Enterprise # MOO 1322
State of Florida Agriculture License 69533-12
Florida DOT Vendor Identification Number 59-2384066
Florida Certified Landscape Contractor
Licensed Irrigation Contractor Throughout Florida.
Certified Arborist - International Association of Arboriculture
TOTAL NUMBER OF PERMANENT STAFF EMPLOYED BY FIRM:
Draftsman/Designer: 3
Estimators: 15
Office Pcrsonal: 92
Journeymcn: 100
Field Personal: 464
BANK REFERENCE: Jorge Najera, Sf. VP.
305-594-5947
Bank United
7970 N.W. 36th Street
Miami, FL 33166
HAS FIRM FAILED TO COMPLETE A CONTRACT: NO
HAS FIRM BEEN INVOLVED IN BANKRUPTCY: NO
HAS FIRM PENDING JUDGEMENTS CLAIMS OR SUITS AGAINST THEM: NO
TRADE REFERENCES:
John Deere Landscapes
Kevin Natella
11170 Palm Beach Blvd.
Fort Myers. FL 33905
239-633-6597
Groundwerks
George Nottingham
8] 40 93 Lane South
Boynton Beach, FL 33472
800-753-5]27
EB Simmonds Electric
Bernie
4406 Exchange Ave.
Naples, FL 34104
239-643-2770
2
Vila & Son Landscaping Corporation
16 8 ~'9
GENERAL CONTRACTORS:
Suffolk / Kratt
Joe Stamp
941-209-0965
Related Group
Roberto Rocha
305-460-9900
Centex Homes
Dayna Berger
239-449-4359
Bcnderson Development
Jim Ready
941-400-5009
Balfour Beatty
Charles Carrico
239-458-2881
Landscape Architects:
McGee & Associates
Naples, FL
Johnson Engineering
FOli Myers, FL
SIGNIFICANT PROJECTS:
CURRENTLY UNDER CONSTRUCTION OR
RECENTLY COMPLETED (Partial List)
Target Shopping Center at the Forum.
Location: F0l1 Myers, Northwest Comer of 1-75 and Colonial Blvd.
Project Value: $665,000.
Items of Interest: Rain Garden.
Contact: Greg Race, NOlih American Properties, gr~.,i~.S:~@ll}~lll!:i~p(;.rtj~::~:(.::glrl,
Phone: 239-989-4860.
Completed March 2008.
Santa Barbara Phase 2,
.3-
Vila & Son Landscapill1g Corporation
16 B ~9
Location: Cape Coral, FL.
Project Value: $190,000
Items of Interest: DOT roadway work.
Contact: Charles Carrico, Balfour Beatty,
Phone: 239-825-2726
To be completed: August 2008.
University Center Park Place.
Location: University Park, FL
Project Value: $515,000
Contact: Jim Ready, Benderson Development, J..<]JIJe:sreaQY{Q}b('Il(lcrson.~)[Hn
Phone: 941-400-5009
sl
To be completed: August 31' .2008.
Ave Maria University.
Location: Tmmokalee, FL.
Project Value: $2,050,000.
Contact: Joe Stamp, Suffolk/ Kraft Construction,
j slam p(Zi.;SUt1l) I kconstm~119D, 1:<2..m,
Phone: 941-554-3702.
Completed October 2007
Oasis Towers I & n.
Location: Downtown Fort Myers, FL
Project Value: $1,500,000
Items of Interest: 7 story elevated pool deck with Majool Date Palms.
Contact: Barry Campos, The Related Group.
Phone: 786-255-6491
To be completed: September 2008.
Alico Lakes Shopping Center.
Location: South Fort Myers, FL
Project Value: $1,000,000.
Contact: David Mat1inez, Miller Construction,
d mart} n eZ(ll;m 111 crl'DJJ.~r!l c 11 ~)n:S;OI11
Phone: 954-444-9596
To be completed: December 2008.
Towers at Channelside
Tampa, FL
Batson & Cook
$ 400,000
Disneyworld Contemporary Suites
Orlando, FL
Hardin Construction
$ 500,000
Disney Animal Kingdom
$ 7,000,000
- 4-
Vila & Son Landscaping Corporation
Orlando, FL
Walt Disney World
Timber Trace
Daytona Beach, FL
First Florida Builders
$ 250.000
South Tower at City Place
West Palm Beach, FL
The Related Group
$610,000
Office Depot World Headquarters
West Palm Beach, F L
Balfour Beatty
$ 1,200,000
SIGNIFICANT CONSTRUCTION PROJECTS:
Completed (Partial List)
The Related Group 9 Projects total
$ 4,750,000
Brickell Yacht Club
Miami, FL
$ 256,300
St. Andrews at the Springs
Palm Beach, FL
$ 629,755
Yacht Club at Portofino
Miami, FL
$ 226,300
St. Andrews at the Springs
Palm Beach, FL
$ 662,475
The Enclave at Naples
Current Buildcrs
Naples, FL
$ 870,000
Murano at Portofino
Miami Beach, FL
$439,200
The Preserve at Miramar
Fort Lauderdale
$671, 700
Murano Grande
John Morardy and Associates
Miami Beach, FL
$509.700
Seminole Hard Rock Hotel and Casino
$ 2,672,700
- 5
Vila & Son Landscaping COIl1oration
16B 19
Peri - Suitt Construction
Fort Lauderdale, FL
Ocean One
John MOlimiy and Associates
Sunny Isles, FL
Ocean Three
John Moriarty and Associates
Sunny Isles, FL
City Place
Whiting - Tuner Construction
West Palm Beach, FL
Cleveland Clinic
Centex Construction
Weston, FL
Holiday Park
Zurgui Construction
Fort Lauderdale, FL
Village of MelTiek Park
Turner - Lathrop
Coral Gables, FL
A ventura Town Plaza
AIda Construction
A ventura, FL
FINANCIAL STATEMENT: will provided upon request.
$ 501,000
$ 50 1,000
$ 1.330,000
$ 612,600
$ 707,700
$ 1,800,000
$ 232,600
16B 9
- 6-
Vila & Son L.andscaplTlg CoqlOrallll11
'<j
16 B).
9
Florida Department of Transportation
CHARLIE CRIST
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
STEPHANIE KOPELOUSOS
INTERIM SECRETARY
January 30, 2007
~. ]{ordyRivero
Vila & Son Landscaping COfp.
20451 S.W. 216 Street
Miami, Florida 33170
\-..... n I' q 'NO]
r,r" . "
RE: DBE AFFIRMATIVE ACTION PLAN APPROVAL (REVISION)
Dear Mr. Rivero:
The Disadvantaged Business Enterprise Affirmative Action Plan submitted by:
Vila & Son Landscaping Corp.
has been approved for a period of three years. Please update and submit a new plan
before the expiration date shown below. If you do not plan to work on any Florida
Department of Transportation projects, it will not be necessary for you to submit a new
plan.
If you need any additional information, please call me at (850) 414-4750.
Sincerely, .
;'"'\
( rlWP ~/0
~M\}reene
Administrative Assistant
Equal Opportunity Office
Iclg
AFFIRMATIVE ACTION PLAN EXPIRATION: January 27, 2010
www.dot.state.fl.us
168 9
1. Forms Due with Submission of Bid Package
Ref Form # Title When Required Notes
1.1 N/A DBE/ AA Plan Submit BOTH with Bid If your DBE/AA Plan has not
Package: been approved by FOOT:
Disadvantaged Business
Enterprise Affirmative Action Gt FOOT DBE/AA Plan A sample DBE policy and plan
Plan Approval Letter (Form 275-030-11B) has been
provided with approval
I
MUST BE APPROVED BY G1 Copy of DBE/ AA instructions.
FOOT Policy and Plan
1.2 N/A EEO/ AA Plan Submit with Bid Package: A sample EEO policy and plan
Ii Copy of EEO/AA has been provided.
Equal Employment
Opportunity Affirmative I Policy and Plan Your plan is not required to be
Action Plan approved by FOOT.
/'
1.3 700-011-13 Notification of EEO Officer Submit with Bid Package
V-
1.4 700-010-52 Affidavit Vehicle Submit with Bid Package /
Registration
Bid Opportunity List Submit with Bid Package /
1.5 275-030-10
1.6 Exhibit P Declaration of Debarment Submit with Bid Package
1.7 700-010-36 Certification of Sublet Work Submit with Bid Package /
/
1.8 275-030-11A Anticipated DBE Statement Submit with Bid Package V
1.9 C -004 Certification of Non- Submit with Bid Package V
segregated Facilities I
I
Fill in forms may be found by accessing the Florida Department of Transportation's website at
http://formserver.dot.state . fl. u sica ptu rell istings/Form Listing.aspx ?ListTvpe=Form N umber.
168 9
01/30/2007 10:46 FAX 305 909.0046 VILA AND SON ~q02 ........ .. ... ..
I ". .' ....' , ",'. "'. "',.."
DBE AFFIRMATIVE ACTJON PLAN
r",:.:
It is the policy of . "i 1 i1 & Snn I...nrl"~lI}>ini Corp that dlsadvan~~d;fj~SI~~:~~{:'::.:i:e.~(~:}:); :1
as defined by 49 CFR Pert 26, Subp.rt D and Implementid under Rule Chapter 14-78, F.A;C.~"'i6all/'i"v.the::,.:::'.'>:':',' .'
opportunity to participa~ as subcontractors and supplief'8 on ell contracts Zlwarded by th~(r:'oij~~i,P,p~.~~:e'l,(>;.:lS ..../ ~': '
of Transportation. . .":';:::"':.r~Y"k.'"t,{j(:';;")'<'.', .,.' '.:
. The requirements:of Rule C?hapter'14-78. FAC.. shall applvto all cOntracts ente~J~\~:~~m~~~~::i;\~/\.i:;'::'.;H:<j
Florida Department of Tninsportation and "of 1 A t:. j:lnn 1 A'I'ltlq('-"ping- ~n"'P .:t;.fi;'e:"-:':;,:'.\';';?:>:'!o:~~'<:"~yy:\,:,:~;>:{;:~.
S 1..-- t ct ,.ll rs ppliersto 1 ~ "'.r.'..'.....I..'.....,.........I..,...C"...;......,,....
ul.NVn fa ora anl"llo U Vi II & Son LJ:ln .r'.~i.ng Corp. ','; ..;...,~S,':;.:;;'('":,:<c,.;.-;'~.,.,:"::,,.';..:'5.<:'..'c..
, - '~~...?:.~~;;,~. t,:~: ;-::~ ,,';t :.~.,... ,,;.':>:'~.,:,;;, ,~." ': ;:'-,':~t ':~\';". ':.'
Will also be bound by the requirements of Rule Chapter 1~78 F.A. ',J,,;;"'.;,,"';:';;'(:";''; /',;,'~;':' ,...:,,:,:;.
. ~::";3~:;,:~~,;))::~~'J(~;J;~:~:'~::':.~;:_:~.;r':;;:'~ ;':" :';::":~ .'_~;'. .,~~, ; \ '.~: '.~.
all necessary and ~~~n:bfeo:eM?~~=t~O~ Chapter 14-18, FAC., '~~~:~r:~%~~~~~~1~,.;~T;i..:;;/?/.:.
businesses have the opportunity to compete and perform work contracted with the Florlda.\p:~~,-p}.lijrijeijt'bf>~ii:t::;.;!:L~:\:;'~'<.
Transportation. '. ri~!~:.~~:}.;1tf'i~i~~:~!1JRf~~;:';i;~t;?d(f.:~~:}:..:(:
Vila & S6n Landsea:pina Corp.. , and its su~nfr?c::19r.~f$h~tl:.:::<;:'.:r:>;::.;.:. .
not discriminate on the basls of race, color, reffglon. nationa' origin, disability, sex, or age iii;the.~m)6'i .,. 16n't'i;;;/iT?>.'.
of contracts with the Department of Transportation. :{t\.y3~:.;~~i1i.~E~:;::;f)~i;.~;;t:.~;;~L'~..:,gtC~.'.
Vila & Son Lanch.cap:ma Corp. . . has design.~~e.d~nct'~pP.QJlJt~d~:'<';~?t;;:i:~'::;
a Liaison Offioer to develop; maintain, and monitor the DeE AffIrmative Action Plan Implen1~'-6.f8tiQ~~;ffi~:'y\11,'!!iX:-~;~..,$.:~~~;9J';~::',.
llaJ$onOffioer will be resPonsible for disseminating this polfq 8 throughout'?k'(:i'!!!;~i:~:).F~';:\:'.Pi";)>>~V:~!,:"i'.~:'i.
bU$inesses. The statement IS posted on notice boards of
x
x~~
. '(1':""".':""'"
~'-: c":"";;'f' \'C11...~1(JT-- CiJZ1:~.~ir,". .,
":>~. "~1" c' .....': '~ 'J ()
APPROV~~: ~ l i ()/ ; I. .!2d1-~ ;:~~.:..
DISAPP. "'(fo/;/(J:;' --- ;;.!J::;l,!"~!I'l'i';"t!,X'j';~f;;;i"i .
DATE ~, / --- .
I .
Plllt . L j lfll,l ('i,TJII I lJ~;::U!l.lrDil
01/30/2007 10:47 FAX 305 909 0046
VILA AND SON
168 9
l4J 003
27f-030-11
SQUAl OPPORTUNITY O,,'C&
1OJ08
Pall"2at3
I. DESIO NATION OF LIAISON OFFICER
VILA. & BQ}T LA.NnSCllPING will aggressively recruit
disadvantaged businesses as subcontractors and suppliers for all contracts with the Florida Department of
Transportation. The Company has appointed a Uaison Officer to develop and malnialn this Affinnative Action
Plan in accordance with the requirements of Rule Chapter 14-78, F AC.
The Liaison Officer will have primary responsibility for developing, maintaining, and monitoring the
Company's uUli:z:ation of disadvantaged subcontractors In addItion to the fol/owlng specific duties:
(1) The Liaison Officer sh~1I aggressively solicIt bids from disadvantaged business
subcontractors for all Florida Department of Transportation contracts;
(2) The liaIson Officer will submit aU records, reports, and documents required by the Florida
Department of Transportation, and shall maintain such records for a period of not leIS than three
, years, or as directed by any specific contractual requirements of the Florida Department of
Transportation,
The following individual hal been designated Liaison OffICer wIth responsibility 'for implementing the
Company's affirmative action program In accordance with the requirements of the Florlda Oepartment
Transportation.
YORDY RIVERO
VILA & SON LANDSCAPING
20451 S.W. 216 STREET. MIAMI, FLORIDA 33170
(305) 255-9206
II. AFFIRMATIVE ACTION METHODS
In order to formulate a relillis1ic Affirmmive Action Plan, VILA & SON l--ANDSC':A 'PTN~
has identified the following known barriers to participation by dIsadvantaged sUbcontrt!lctors, before describing
its proposed affirmative action methods;
1. Lack of Qualified dIsadvantaged subcontractors in our specific geographical areas of work;
2. Lack of certlfled disadvantaged subcontractors who seek to perform Florida Department of
Transportation work;
3. Lack of Interast In performing on Florida Department of Transportation contracts;
4. Lack of response when requested to bid;
5. Limited knowledge of Florida Department of Transportation plans and spec1fications to
prepare a responsible bid.
In view of the barriers to disadvantaged busineS$eS stated above, it shall be th~ policy of
VILA & SON J..ANDSCAPING to provIde opportunity by
utflizing the following affirmative action methods to ensure participation on the contracts with the Florida
Department of Transportation. . VILA & SON LANDSCAPING will:
1. Provide written notice to all certlfied DBE subcontractors in the geographical area where the
work is to be subcontracted by the Company;
2. Advertfse in minority focused media concerning 'Subcontract opportunliies with the Company;
3, Select portions of the work to be performed by DBEs in order to increase the likelihood of meeting
contract goals (Including, where appropriate, breaking down contracts into economically feasible
units to facilitate OBE partlcipation);
168 9
01,30/2007 10:41 FAX 305 909 0046
VILA AND SON
[4! 004
~7.Q:Jo-11
EQUAL OPPOImJNITY OFFICE
1QIO.
1"l1"aota
4. Provide adequate information about the plans, specifications. and raql.lirement5 of the contract, not
rejecting subcontractors without sound reasons based on a thorough investigation of their
capabilities; .
5. Waive reql.lirements of performance bonds where it Is practical to do so;
6. Attend pre-bid meetings held by the Florida Department of Transportation to apprise disadvantaged
subcontractors of opportunities with the Company;
7, Follow up on initial solicitations of interest to DaE subcontractors ,to determine with certainty
whether the DBE company is interested in the subcontract opportunity,
UTU F. ~()1i'T.Al\TnI;!I"A'PT).'Jl'! understands that this list
of affirmative action methods is not exhaustive and will include additional approaches after having established
familiarity with the disadvantaged subcontracting community andJor determined the stated approaches to be
Ineffective.
III. IMPLEMENTATION
On contracts with speclfJc DBE goals,
will make every effort to meet contract goals as stated by u IIlzlng its rmatl action metho s. On projects
with no specific goals. the Company will, 88 8n expression of good faith, seek to utilize DBE subcontractors
where work is to be subcontracted.
i
IV. REPORTING I
VILA & SON LANDSCAPING fall keep and maintain
such records as are necessary to determine the Company's compliance with ts DBE Affirmative Action Plan.
The Company will design its record keeping system to indicate:
1, The number ofDBE subcontractors and suppliers used by the Com(;lsny, identffylng the items
of work, materials and services provided; I
2. The efforts and progress being made in obtaining DBE subcontract9r8 through local and
community sources; I
3. Documentation of all contracts, to Include correspondence. telephone calls, newspaper
advertisements, etc.. to obtain DBE participation on all Florida Departmelnt of Transportation projects;
4. The Company: shall comply ~h Florida Department of Tran.p~rtation'$ requirements
regarding payments to subcontractors including DBEs for each month (estimate period) in
which the companlM have worked.
v. QBE DIRECTORY
VILA. & SON LANDSCAPING wdl utilize the D8E Directory
published by the Florida Department of Transportation. L
The Company will distribute Form Number 275.030.01, Schedule A Certifi tlon Form Number 1, to
potential DBE contractors and assist in their completion.
168 9
EOUAL OP?ORTtJHITY OFFICE
Oft HAY 2 t P~I 3: 39
EEO/AA POliCY & PLAN
PAGE 1 OF 5
VILA AND~.;SON LANDSCAPING CORP.
hereafter remrred to as 'the Company' or 'this Company' has adopted this polley
Date: MAY 18,2004 By: JUAN";CARLOS VILA, PRESID
EQUAL EMPLOYMENT OPPORTUNITY AND
AFFIRMATIVE ACTION
EEO/AA POLICY AND PLAN
EEOIAA POLICY STATEMENT
It Is the policy of this Company to comply and cooperate to the fullest extent with all
applicable regulations of the Equal Employment Opportunity Provisions of the Civil Rights
Act of 1964, Executive Order 11246, the R ehabi/ltatlon A ct of 1 973 (29 U.S.C, 793), the
Americans with Disabilities Act (ADA) of June 26, 1990 and the Vietnam Era Veterans
Readjustment AssIstance Act of 1972, all as amended. This policy pertains, as far as the
responsibility of this Company Is concerned, to any arrangement under which employees,
including trainees, are selected for work.
It is the policy of this Company not to discrimInate against any employee or applicant
for employment because of race, religion, color, age, sex, and.natlonal origin, dIsabilities or
Vietnam Era and SpecIal Disabled Veterans status,
This Company will take affirmative action to assure an equal employment opportunity
to all qualified persons, and that employees are treated equally during employment without
regard to their race, religion, color, age, sex, national origin, disabilities, or VIetnam Era and
Spec/al Disabled Veteran's status. Such action shall include but not be limited to:
1. Employment, upgrading, demotIon, or transfer.
2. Recrtiitment and .recruitment advertising
3. Layoff or termination .
4. Rate of pay of other forms of compensation
5. SelectIon for training, including apprenticeship, pre.apprentJceship and/or on.
the.job training.
fED OFFICER DUTIES
It Is the policy of thIs Company to contlnuously maIntain the appointment of an Equal
Employment OpportunIty Officer (EEO Officer), The name and contact Information for the
EEO OffIcer will be communIcated along with this polley. The EEO Officer has responsibility
for effectively administering and promoting an active. program of equal employment
opportunity, The EEO Officer will coordinate the EEO efforts of superintendents.
supervisors, foremen and others in the positlon.of hIring personnel.
.',
EEOIAA POlICY & PLAN
PAGE 2 OF 5
This Company's EEO Officer has the responsibility for effectively administering and
promoting an active program of equal employment opportunity within the Company, The
EEO Officer will make recommendations, where appropriate, to correct any deficiencies
found In the Company's program, The EEO OffIcer will ensure that this policy and plan are
being carried out.
EEO/AA PLAN
It is the policy of this Company that there not be any discrimination by virtue of race,
religion, color, age, sex, national origin, disabilities or Vietnam Era and Special Veterans
status, In the functions of hiring, placement, up.gradlng, transfer or demotion, In addition,
there shall not be any discriminatory practices In recruitment, advertising, or solicitation for
employment, rates of payor other fonns of compensation, selection for training Including
apprenticeship, layoff or termination, or treatment durIng employment. The Company has
affirmative action obligations in the hiring of minorIties,. females, . disabled . and veteran's
applicants.
aWe will not use goals, timetables or affirmative action standards to discriminate
against any person because of their race, religion, color, age, national origin, disabilities, or
Vietnam Era and Special Disabled Veteran's status, The Company will not transfer minority or
female employee or trainees from one Company to another or from project to project for the
sole purpose of meeting goals.
This Company shall take specific affirmative actions to ensure equal opportunity, Our
compliance with this policy and plan shall be based upon our efforts to achieve maximum
results from our actions and we shall document our efforts fully. ThJs Company will
implement specific affirmative action steps, at least as extensive as the following actions to
ensure equal employment opportunity:
1. Ensure and maintain a working envIronment free of harassment, intimidation, and
coercion at all times and In all facilities at which our employees are assigned to work.
Where pOSSible we will assign two or more women to each construction project. We
shaJl specifically ensure that all foremen, superintendents and other on-site
supervisory JErsonnel are aware of and carry out our obligations to maintain such a
working environment, with specific attention to minority or female Individuals working
at such sites or In such facilities.
2. Establish and maintain a current list of minority and female recruitment sources,
provide written notification to minority. and female recruitment sources and to
community organizations when we have employment opportunities available, and
maintain a record of the organizatIon's responses.
3. Maintain a current file of the names, addresses and telephone number of each minority
and females off-the-street a pplJcant 0 r female referral f rom a union and mInority 0 r
female referrals from a union, a recruItment source or community organization and of
what action was taken with respect to each such Individual. If such individual was sent
to the Union hirlng hall for referral and was not referred back to the Company by the
union or, If referred, not employed by the Company, this shall be documented In the
file with the reason therefore, along with whatever addItional actions the Company
may have taken.
168 9
168 9
EEOIAA POLlCV & PLAN
PAGE 3 OF 5
4. Provide immediate written notification to the Director when the unIon or unIons with
which we rave a collective bargaining agreement have not referred to us a mInority
person or woman sent by us, or when we have other Information that the union referral
process has impeded our efforts to meet our obligations.
5. Develop on-the-Job training opportunities and/or participate In training programs for the
area which expressly include minorities and women. Including upgrading programs
and apprenticeship and trainee programs relevant to the Company's employment
needs, espeCially those programs funded or approved by the Department of Labor.
We shall provide notice of these programs to the sources complied under "2" above.
6. Disseminate the company E EO policy notice by providing notIce to the unions and
training programs and requesting their cooperatJon In assisting us in meeting our EEO
obllgatlons; by includIng It In any polley manual and colleCtIve bargaining agreemE;nt:
by pUb/iclzlng./t in the company newspaper, annual report, etc.; by specific revIew of
the policy with all management personnel and wIth all minority and female employees
at least once a year: and by posting the company EEO policy on bulletin boards
accessible to all employees at each location where construction work is performed,
7. Review, at least annually, the Company's EEO polley and affirmative action obligations
under these specifications with all employees havIng any responslbmty for hiring,
assignment, layoff, termination or other employment decisions including speciflc
review of these Items wIth onsite supervisory personnel such as Superintendents,
General Foreman, etc. prior to the initiation of construction work at any job site. A
written record shall be made and maintained Identifying the time and place of these
meetings, persons attending, subject matter discussed and disposition of the subject
matter.
8. DIsseminate the Company EEO polley externally by includIng it In any advertising In
the new media, specifically Including minority and female news media and proving
written notification to and discussIng the company EEO polley with other contractors
and subcontractors wIth whom the company does or anticipates doIng busIness.
9. Direct our recruitment efforts, both oral and written, to minority, female and communIty
organizations, to schools with minority and female students and to female reclt//tment
and training organIzations serving our reclt/itment area and Ol,Jr employment needs,
Not later than ohe month prior to the date for the acceptance of applications for
apprenticeship or other traIning by any recruitment source, we shall send written
notification to organizations such as the above, describing the openings, screening
procedures, and tests to be used In the selection process.
10. We will encourage present minority and female employees to reclt/it other minority
persons and women and, where reasonable, provide after school, summer and
vacation employment to minority and female youth. both on the site and In other areas
of our workforce.
168 9
EEOIAA POliCY & PLAN
PAGE 4 OF 5
11. ValIdate all test and other selection requirements where there Is an obligation to do
so under 41 CFP Part 60-3.
12. Conduct at least annually, an Inventory and evaluation of all minority and female
personnel for promotional opportunitIes and encourage these employees to
prepare for, through approprIate training, etc, such opportunities.
13. Ensure that seniority practices, Job class ff1catlons , work assignments and other
personnel practices, do not have a discriminatory affect by continually monitoring all
personnel and employment related activities to ensure that the E EO P olley a nd 0 ur
obligations under these specifications are beIng carrIed out.
14, Ensure. that all facilities and company activities are non-segregated except that
separate or sIngle-user toilets and necessary changIng facilities shall be provided to
assure privacy between the sexes.
15. Document and maIntaIn a record of all solfcltat/ons of offers for subcontracts from
minorIty and female construction contractors and suppliers, Including circulation of
solicitations to minority and female contractor assocIatIons and other busIness
associatIons.
16. Conduct a review, at least annually, of all supervisors' adherence to and performance
under the company EEO policies and affirmative action obligations,
RECORDS
This company will keep records to monitor all employment related activity to ensure
that the company's EEO policy Is beIng carried out. Records shall at least include for each
employee the name, address, telephone numbers, construct/on trade, union affiliatIon IT any,
employee Identification number when assIgned, social security number, race, sex, status (e.g"
mechanic, apprentice, trainee, helper, or laborer), dates and changes In status, hours worked
per week in the Indicated trade, rate of pay, and locatIons at whIch the work was performed.
REPORTING OF COMPLAINTS
If. afaJiy time anyone feefs he. or she ,has been dIscriminated against because of sex,
race, religion, color, age, national origin, dlsabllltfes or Vietnam Era and SocIal Disabled
Veteran status, they should report this matter to the company EEO Officer whose name and
contact InformatIon is communIcated along with this polley.
The EEO Officer will Investigate i;lll complaints of alleged discrIminatIon made to the
company in connectIon with its contractual obligatIons. The EEO Officer will attempt to
resolve such complaInts, corrective actions to be taken and will then follow
up on actions taken and their effect. If the InvestigatIon Indicates that the discrimination may
affect persons other that the complainant, such corrective actIons shall include such other
persons.
Upon completion of each Investigation, the EEO OffIcer will Inform every complainant
of all of his or her avenues of appeal. The addresses shown below are such avenues for
appeals.
EEO/AA POLICY & PLAN
REPORT COMPLAINTS TO:
YORDY RIVERO - EEO OFFICER
VILA AND SON LANDSCAPING
20451 SW 216 STREET-. .-.
MIAMI, FL 33170
168 9
PAGE 5 OF 5
Florida Commission on Human
Relations
2009 Apalachee Parkway, Suite 100
Tallahassee, FI32301-4857
909-0046 (850) 488-7082 or (800) 342-8170
(305) 255-9206 OR l305)
U,S. Dept. of Labor, Regional Director
Office of Federal Contract Gempliance
61 Forsyth Street, SW, Room 7875
Atlanta, Ga 30303
(404 )-562-2424
U.S. Equal Employment Opportunity
Commission
Miami District Office
One 8iscayne Tower
2 South Biscayne Blvd., Suite 2700
Miami, FI33131
(800) 669-4000
U.S. Federal Highway Administration
227 N. Bronaugh Street, Room 2015
Tallahassee, Fl32301
(850) 942-9650
U.S. Equal Employment Opportunity
Commission
Tampa District Office
501 East Polk Street, Suite 1020
Tampa, Fl33602
(800) 669-4000
.end.
168
9
275-021-13
02105
EQUAL OPPORTUNITY OFFICE
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
EIIO OFFICER NOTIFICATION
Section 1: COMPANY IDENTIFICATION
2. FEID No.
Section 2: EEO OFFICER IDENTIFICATION
8. Name of fED OffIcer ( first name, middle initial, last name)
9. EEO Officer', Working TItle
Section 3: SIGNATURE OF CORPORATE OFFICIAL
As required in the Equal Employment Opportunity Special Provisions included in Federally Funded
Highway Construction Contracts and as required in the Equal Employment Opportunity
Requirements included in all State funded highway construction contracts, this official notice of EEO
Officer appointment (and/or update) is made tot he Florida Department 0 f Transportation a nd the
U.S. Federal Highway Administration (FHWA). I understand that additional Information regarding the
EEO Officer, the EEO Policy and other aspects of the construction contract compliance program may
be found in the EEO Construction Contract Compliance Workbook.
15. AppointIng OffICial', Signature
16. Date (MoIDaylYr.)
t.!Z1!DJ
0 0
c:
(J1 :P-
I
.- :.'.,
N ~
..-'
~ :z
:J: ===i
9? -<
0
-,.,
r">
rr\
.q f 6 ^/~.d
18. Official'. Title (printed)
- t.1.:J ~JCc4.1 i-I If. 1ofYl.~
(This Section For FOOT Use) Section 4: Processing of Notification
d to Contractor
c, ,e[)OrvM~
. ,',',;';<' .,..;,:;' .~-7Zi/lJ~
168 9
CONTRACTOR'S AFFIDAVIT
VEHICLE REGISTRATION
700-010-52
CONSTRUCTION
08/01
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
State: .J7 {)'(""l d.o...
-
County: LL-f!.....
BEFORE ME, this day personally appeared U Jo.Ae.- Chupm~/\/~'(c... (lAY'll Ch-t / fJvd.,;r{J-pJ~
~ontractor's Name)
who says that all of the vehicles operated or caused to be operated by said Contractor, are registered in the State of Florida, in
accordance with Section 320.
("
k -~ ~~
Contractor's Si9~
TYPEDNAME: lVade..- CY1{~w\a..f)
POSITION: C-re j()Pfct.1 K0....v\O tjf V
COMPANY NAME \4~ ~l ~~ .~;~~f~ AP'
COMPANY ADDRESS. [ I ('. .
--'
rt'. H.U,-t'V'5 L -Fl.. "33%S
State of Florida
County: ~
Sworn to and subscribed before me this 2~ day
of ~\L .100q by ~~ ~~z.
(Print name of perso igning Certification)
~~ NOTA"
Notary Public .....~y PUBALJIC'STATE OF FLORIDA
A .. I~:,,; r ene ROdriguez
.)f\A.~ 0-1. 'lOll \.!1I1,J Co~mislioD II DD811579
Commi on Expires .",,,..... Exp1tes: AUG,04 2012
BONDED I1iRu ATl..ANTICBONDING Co.,INe.
Personally Known / OR Produced Identification
Type of Identification Produced
TO BE COMPLETED BY DOT PERSONNEL
BUDGET ITEM NUMBER:
FIN PROJECT NUMBER:
CONTRACT NUMBER:
168 9
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION CONTRACTORS
BID OPPORTUNITY LIST
275-030-10
EQUAL OPPORTUNITY OFFICE
02/08
Please complete and mail or fax to:
Equal Opportunity Office
605 Suwannee St., MS 65
Tallahassee, FL 32399-0450
TELEPHONE: (850) 414-4747
FAX: (850) 414-4879
This information may also be included in your bid or proposal package.
Prime Contractor/Consultant: \~ l a a-nci SI">Y) L..t:l VV{S en n; Y?j c..o rY? .
- I I
Address/Telephone Number: ~/75 J30ck i'2Jhl1Y'Y1 t\rJ. H: )...I'l,ol/'S / R. 3"J1()S :2 3c.;, 4ftl,';2 70l
Bid/Proposal Number: () 9 - '5 ;;),;;Z;?
Quote Submitted MM/YR: 03 ~r2(')Jq
49 CFR Part 26.11 requires the Florida Department of Transportation to develop and maintain a "bid opportunity list." The
list is intended to be a listing of all firms that are participating, or attempting to participate, on DOT-assisted contracts. The
list must include all firms that bid on prime contracts, or bid or quote subcontracts and materials supplies on DOT-assisted
projects, including both DBEs and non-DBEs. For consulting companies this list must include all subconsultants
contacting you and expressing an interest in teaming with you on a specific DOT assisted project. Prime contractors and
consultants must provide information for Nos.1, 2, 3 and 4 and should provide any information they have available on
Numbers 5, 6, 7, and 8 for themselves, and their subcontractors and subconsultants.
1. Federal Tax 10 Number: 5tJ- ;}3J"'1DfA~ 6. ~ DBE 8. Annual Gross Receipts
2. Firm Name: lXlo... Md Sm, Ln.~v.tt1pin5 Non-DBE 0 Less than $1 million
3. Phone "1. ~. ~~~ 0 Between $1 - $5 million
4. 0 Between $5 - $10 million
~:r~~~ 7 ,J~ 'n ~1h1 1<d. 7. 0 Su bcontractor 0 Between $10 - $15 million
I 0 Su bconsultant ~ More than $15 million
5. Year Firm Established: I C/ '81-./
1. Federal Tax 10 Number: g,-:J.TI'IfX C1J 6.~ 8. Annual Gross Receipts
2. Firm Name: G~ ~ on-DB ~ Less than $1 million
3. Phone: ;r;A~ 3 - Lf'fa'1 Between $1 - $5 million
4. A~ess: Between $5 - $10 million
"00)(. ld),'1"31 7. 13' Su bcontractor 0 Between $10 - $15 million
H H'{'U"S t 1=1_, m9Q(( o Subconsultant 0 More than $15 million
5. Year Firm Established: R3'7
1. Federal Tax 10 Number: 6. 0 DBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-DBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Su bconsultant 0 More than $15 million
5, Year Firm Established:
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION CONTRACTORS
BID OPPORTUNITY LIST
168 ~
2Z30-10
EQUAL OPPORTUNITY OFFICE
02/08
1. Federal Tax 10 Number:
2. Firm Name:
3. Phone:
4. Address:
6. 0 OBE
o Non-OBE
7. 0 Subcontractor
o Subconsultant
8. Annual Gross Receipts
o Less than $1 million
o Between $1 - $5 million
o Between $5 - $10 million
o Between $10 - $15 million
o More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 DBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 DBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Subcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 OBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 OBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number:
2. Firm Name:
3. Phone:
4. Address:
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION CONTRACTORS
BID OPPORTUNITY LIST
6. 0 OBE
o Non-OBE
168 9
275-030-10
EQUAL OPPORTUNITY OFFICE
02/08
7. 0 Subcontractor
o Subconsultant
8. Annual Gross Receipts
o Less than $1 million
o Between $1 - $5 million
o Between $5 - $10 million
o Between $10 - $15 million
o More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 OBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Subcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 OBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 OBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Subconsultant 0 More than $15 million
5. Year Firm Established:
1. Federal Tax 10 Number: 6. 0 OBE 8. Annual Gross Receipts
2. Firm Name: 0 Non-OBE 0 Less than $1 million
3. Phone: 0 Between $1 - $5 million
4. Address: 0 Between $5 - $10 million
7. 0 Su bcontractor 0 Between $10 - $15 million
0 Su bconsultant 0 More than $15 million
5. Year Firm Established:
168 9
EXHIBIT .p"
DeClARATION OF DEBARMENT
The bidder, in accordance with Section XXIX of the prevailing Collier County
Purchasing Policy, (known as -Debarment and Suspension") shall sign the
appropriate declaration under this exhibit. In doing so, the undersigned hereby
declares that:
~ '/ 0- OJ"Jr( Soh
l-anJ.~{,fl ft, ~
Name of Bu On
&0,
1
1. They are a prospective contractor, vendor, affiliate, or otherwise interested
or affected party as defined under Section XXIX of the Collier County
Purchasing Policy.
2. They are not nor have not been debarred or suspended by any public
entity within the last five (5) years of the date of this submission.
3. Signature of this declaration constitutes a material representation of fact
upon which reliance was placed when this submission was entered and
evaluated. Further, should it subsequently be determined that the
signatory knowingly or unknowingly rendered an erroneous declaration;
the County shall reserve the right to reject the bid offer associated with
this declaration and/or suspend/debar the bidder/signatory.
4. They shall provide immediate written notice to the person to whom this
proposal is submitted if at any time they leam that its declaration was
erroneous when submitted or has become erroneous by reason of
changed circumstances.
5. Should the proposed agreement be entered into, they shall not knowingly
enter into any subcontract or supplier agreement with a person or entity
who is debarred, suspended, declared ineligible, or voluntarily excluded
from participation in this agreement, unless otherwise authorized by the
Collier County Purchasing/General Services Director.
The bidder shall sign the appropriate declaration below and comply with any
accompanying requirements set forth therein:
(A) I hereby declare that my firm nor its principals is presently debarred,
suspended, proposed for debarment, declared ineligible, or voluntarily
excluded from participation in this transaction by any publiC agency.
168 i9
Name(s) and TItle(s) of Authorized Representatlve(s)
Ilila awl ~ !ay'Vl~;t1j &p.
Name of B....'
~ -l.z. ..e?
Date
(B) I am unable to declare that my firm is in compliance with one or more
statements contained within this declaration and I shall attach an
explanation for determination by the Collier County Purchasing Director.
Name(s) and TItle(s) of Authorized Representatlve(s)
Name of Business
Date
Authorized Signature(s)
I I 13aa NON
r T r
_ Baa I I Ti
} E_ ---,
<(Cl>
_ .c
.ffi:;)
0(1)
f-
1\
~ ~ljJed
j
E
'**' 0
c:i ,c:, ~
~ .8
....... t5
~ ro
....
-
c
~ 0
t>
.c
:;)
\ (I)
~
\.(J
'**'
0
W
LL
-
Ji3!l
:ll Z f'-
a Q e
~ >- 0
d ~
0'"
f'- >-
(f)
Z
o
u
~
~~
<(
~~
~~
~~ . ~
, ,!;( \~ :g
" a::: -t....J...., <(
~ 0 ~
<;~ \:
t ~ ')
51->
~
~
\t
L()
()
<3'
\'D
t\)
~
~
I
~
~
>.
CD
~
QD::
>-0
~3:
o
"-....
'fiw
~...J
~m
O::J
~(J)
::ELL
~o
friz
~o
0-
"'....
'3<(
~u
8U:
>- -
<<....
too=:
W
U
I'-'
I--
Q
.E
(ij
....
z
o
i=
<(
t-
o:::
o
Q.
(j)
Z
<(
0:::
t-
LL
o
t-
Z
w
:2
t-
o:::
<(
Q.
W
o
<(
o
0::
o
...J
LL
LL
o
W
t-
<(
t-
(j)
W
I
t-
ti
.& ci
a: z
E c
c :;)
iL 0 0
() ()
c
:;)
o
~ -tl
1i1 ~
~ -
c .ffi
8 ~I
(ij
-
o
f-
ci
z
iii ci
Cl> z
2 & a..
28~~
c
o
'';::;
a.
'C
t>
en
Cl>
o
.:.:
~
en
:s ~
Cl>
EO'"
~ ~
Q 0
~ N
"0
Cl>
.c
'C
t>
en
.c
:;)
en
"0
~d
~~
~
(1)'0
(ij
(5
f-
~
coW
"0....,)
.C
o
u:....
.... 0
o~
2 c
.ffi 5
(I)()
Cl>
E
ro
z
>- @ '0 Qj :v
:t:: _ C":i a....c '- 1ij en
5ctlOJ e:~.fl;;o
t)t::=Eo Q.I....<<J ti
~8.al]iju~voJ=:g~
ca.~~~U)~~8~8
8~ ~o B~.E~.g \1)-0
al ~ ~ ~ ~ a3 ~; ~ .~ ii1
5 w - .Q =5 ~ ~ = a. ::J
g~~~~g8.f;i2~al
~~E~;;;;~a3E .~
~ "? ~ Bl ~ ;~~ ~ ~.~
E~ii11!5~~~.sE~
15 .~ S B .~ ~ ~ ~ ~ /3 g
:: e01;{K~"'::> c.>-v
::>a.t::v_~~s8~(;;
~~ ~g~ ~.~ ~~JlE
~~~c:~-oC:<IIo~ctJC:Q.)E
.... ...... c: ~ ~ :; t
2(/J=2..()~~.....-"OttI
g"03:::J=..c~o~f6g-
u~~al~~-,,<II_O
m __ :::: ~ ..x: ....: > 10- 13 <U
~ ~ "3 .- .~ 0 t5 ~ ~ .~ :5
a~<;.~~~~~~eo
~ <t: ~ ~ .ffi ~ c: 0 c: a.. <{
~I~.i'1l~E 8 c:/3:!2~
'- E OJ ~ OJ 1 ~
a.u..:o:=ooEo.crn.......
Q)__~3=oUi::"'CI-l...Q)
=~ciiti"Ooa.ti .~:5
o~(ij~~~~~~~~
~c~c~.;g-o.oc"O
c 0 ~ 8 c: c ~ u 0 ll)
Q)u_.ooQ)~"oti("')-o
E c: 0 ::J 0 ~ -0 'm ~ ~ ai
~ .2 ~ ~ ,~ ~ ~ ~ 5 "7 ~
&g~:E~ E 0,0 o<(:J
~~ct:15= E:J~E~IS ~
'tJC:LL>~'-C: ~
c: 00 c..fJ).~ ctl E :u~-g
~~(')8~E-gQJ-oo.....
c:._N-o.oCIJN'55~~
Q<f :v.~~:5 E 0">0 Q)
5~e:.:e~ E g~;!: u-o
e~fJ)~ o~ni.g~~
~~~",g~~o~~~
ai CII B 0 ~ 0 ;::: ~ ~ ;- :~
€ .~ "~ ~ ~ ~ ~ ~ b ro ~
8-'~ & B ~ ~ ~ E E .~ "~
= e ~ ~ ffi ~ c ~ ~ ~ ~
<(o..a::w'=uoRC1l .cE
r- ,"-,c..-5~~
....
o
t5
co
....
C
o
()
.c
:;)
(I)
;i'iUIlLD
168
9
~ ~~<.l
~~Ir)oi"i
o. ~ ~ ("'"~j'"
t: l':lc":: '"i0
.....coo ,'?
o "t".1~ .":l (...; aJ
r.l~ -~ ,:;; :
~' .. .:.:<'S
~:: r,J.S
~; ~ ';S ~~.~
r.:; '< E .'iP
~ (3 :~~~
>- "...,,,..:.;:::~
~/ . .~-
I-~~
o ~.
Z .....t,...~
()
:;)
"0
e
a.. "0
0::: ~
o -5
\I~
.Q
~ ro
g ~
~ c
~~
(ij
C ....
o 0
en Cl>
.... a.
w >.
a.. f-
c: j!
o .c
~ .~
c.a.
c C1l a.
,2 -= m
~ t5 g
~E~
~ ~ ~
<5 ~ E..
;,;~
::> c: '"
~ ~ ~
c "~ (1J
~~~
::> 0 '"
<II C. c:
~ ~ ~
c: , '"
g a ,f:
"~ .:E
~ 0 (.)
t:: c: '"
~ .g ffi
<II "'-
E .~ ":;
:;; E ~
"~ ~ co
"~ ~ ~
"O"'C >
V c: c:
c: '" '"
5-6.8
~ ~ ~
~ ~ ~
E ~ ~
U <II
"~ ~ ~
,~ 5- ~
~ 15 E 3i
o~g>~
c ~ ~ Q)
Q) -0 <1] Cij
~ (; E i'i5
~cE-g
fJ) 0 C ctl
~ .~ ~ ~
ClJ 0 - III
_ > "'C -0
<:( ~ ffi ~
168 9
Instructions for Form:
The contractor must provide enough information through a Schedule "A" spreadsheet to determine which pay-item(s) are
being sublet, the amounts, and cost. For sublet calculations, the amount will be calculated based on the actual contract
unit price(s) unless there is a partial sublet. For partial sublets, use the unit prices from the actual sub-contract.
1) Enter the Date of the certification of sublet work was prepared.
2) Enter the sequential number of the request starting with number 1.
3) Enter the Federal Aid Project number for the Prime Contractor if any.
4) Enter the Financial Project Identification number of the Contract.
5) Enter the Contract number of the Contract with the Department.
6) Enter the County name where the work is being performed.
7) Enter the Name of the Prime Contractor.
8) Enter the FEID number of the Prime Contractor.
9) Enter the Original Contract dollar amount (round to nearest whole dollar).
10) Enter a "Y" in the space marked Change if any information on the line has changed since the
previous certification of sublet work was prepared. Otherwise, leave blank.
11) Enter the Subcontractor names. Enter all the subcontractor(s) regardless of their tier.
12) Enter the tier number for the subcontractor. If the subcontractor works directly for the Prime
Contractor, enter a "1 ", If he works one level below, enter a "2" and so on.
13) Enter the FEID number of the Subcontractor(s).
14) Enter the name of the pertinent Contractor or Subcontractor that hired subcontractor.
15) Enter a short description of the work to be performed.
16) Enter a "P" if any pay-item for the sublet is a partial sublet.
17) Enter the DBE status for the subcontractor: "D" for DBE, "N" for non-DBE.
18) The Department may require subcontractor to be prequalified with the Department as described
in the Special Provisions and the Bid Solicitation Notice whenever construction projects contain
certain classes of work that require specific expertise.
19) One (1) copy of this form shall be submitted to the District Office by the contractor.
20) To be signed by principal of the firm or someone with the delegated authority and notarized.
/1618
.9:
. '
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
ANTICIPATED DBE PARTICIPATION STATEMENT
275-030-11A
EQUAL OPPORTUNITY OFFICE
02/08
1. FINANCIAL PROJECT NO. 2. FAP NO. 3. CONTRACT NO. 4. COUNTY(lES) 5. DISTRICT
-4/<./<1.'14. f. :1Y' 0) '1 Frs 3 f-/ ~5i-D/ If;~o~Y7 ~!I/er-
6. PRIME CONTRACTOR NAME 7. FEID NUMBER
I!/(Q f')I/',J St?ff\ j C^ .J n ~ ~ n) Yl n, envn. 59 - ;;2.3J -40&&
8. CONTRACT DOLLAR AMOUNT T J , 9. REVISION?.n.a.... IF YES, REVISION NUMBER:
-
10. IS THE PRIME CONTRACTOR A FLORIDA 11. IS THE WORK OF THIS CONTRACT
CERTIFIED "DBE"? (DISADVANTAGED !NO CONSTRUCTION ~ OR MAINTENANCE O?
BUSINESS ENTERPRISE) YES
12. ANTICIPATED DBE SUBCONTRACTS:
PERCENT OF
DBE SUBCONTRACTOR or SUPPLIER TYPE OF WORK/SPECIALTY DOLLAR AMOUNT CONTRACT
DOLLARS
A
B
C
D
E
F 11A TOTAL DOLLARS TO 11 B TOTAL PERCENT OF
DBE'S CONTRACT
$0.00 0.00%
13. SUBMITTED BY 12.DATE 13. TITLE OF SUBMITTER
I I J )() ",/.e- f ho .tHi~1f J VI H'/~'!Jq 4-~ 11 e-V'aJ U f1 f"lC'A--'J. er
14. EMAlL ADDRESS O~ SUBMITTER 15. FAX NUMBER 16. PHONE NUMBER
JCLS~ ~ ~ U'-(rA-h-SOYl. ('~ ;L '3 C1 . 4./:~~ . ^t7 Db ~'3q . 4~Le . :J-700
NOTE: THIS INFORMATION IS USED TO TRACK AND REPORT ANTICIPATED DBE PARTICIPATION IN ALL STATE AND FEDERALLY
FUNDED FOOT CONTRACTS. THE ANTICIPATED DBE AMOUNT IS VOLUNTARY AND WILL NOT BECOME A PART OF THE
CONTRACTUAL TERMS. THIS FORM MUST BE SUBMITTED AT THE PRE CONSTRUCTION OR PRE WORK CONFERENCE. FOOT STAFF
FORWARDS THE FORM TO THE EQUAL OPPORTUNITY OFFICE.
THE FOLLOWING SECTIONS ARE FOR FDOT USE
17 .PROCESSED BY 18. DATE TO EO OFFICE 19. LETTING DATE 20. EXECUTED DATE 21. PRECON CONF DATE
DIS
T I D FAX D EMAIL
22 .SUBMITTED TO EO BY D SHARED FOLDER
EO 23 .INCLUDED IN DBE PARTICIPATION REPORT OF (M/DN) I I
OFC I
!.168 \'~9
CERTIFICATION OF NONSEGREGATED FACILITIES - 41 CFR PART 60-1.8
Notice to Prospective Federallv Assisted Construction Contractors
1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a federally-
assisted construction contract exceeding $10,000 which is not exempt from the provisions of the Equal
Opportunity Clause.
2. Contractors receiving federally-assisted construction contract awards exceeding $10,000 which
are not exempt from the provisions of the Equal Opportunity Clause will be required to provide for the
forwarding of the following notice to prospective subcontractors for supplies and construction contracts
where the subcontracts exceed $10,000 and are not exempt from the provisions of the Equal Opportunity
Clause. NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001.
Notice to Prospective Subcontractors of Reauirements for Certification of Non-Seareaated Facilities
1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a subcontract
exceeding $10,000, which is not exempt from the provisions of the Equal Opportunity Clause.
2. Contractors receiving subcontract awards exceeding $10,000 which are not exempt from the
provisions of the Equal Opportunity Clause will be required to provide for the forwarding of this notice to
prospective subcontractors for supplies and construction contracts where the subcontracts exceed $10,000
and are not exempt from the provisions of the Equal Opportunity Clause. NOTE: The penalty for making
false statements in offers is prescribed in 18 U.S.C. 1001.
CERTIFICATION OF NONSEGREGATED FACILITIES
The federally-assisted construction contractor/subcontractor certifies that she or he does not
maintain or provide, for his employees, any segregated facilities at any of his establishments and that she or
he does not permit his employees to perform their services at any location, under his control, where
segregated facilities are maintained. The federally-assisted construction contractor/subcontractor certifies
that she or he will not maintain or provide, for his employees, segregated facilities at any of his
establishments and that she or he will not permit his employees to perform their services at any location
under his control where segregated facilities are maintained. The federally-assisted construction
contractor/subcontractor agrees that a breach of this certification is a violation of the Equal Opportunity
Clause in this contract.
As used in this certification, the term "segregated facilities" means any waiting rooms, work areas,
restrooms, and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage
or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and
housing facilities provided for employees which are segregated by explicit directives or are, in fact,
segregated on the basis of race, color, religion, or national origin because of habit, local custom, or any
other reason. The federally-assisted construction contractor/subcontractor agrees that (except where she
or he has obtained identical certifications from proposed subcontractors for specific time periods) she or he
will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding
$10,000 which are not exempt from the provisions of the Equal Opportunity Clause and that she or he will
retain such certifications in his files.
~L
Signature
"- l'~~
J ^ )ar4 () _ r no...pmCLV')
Printed Name
~rda CArd ~ 1.-(lYlJo"/\--in3 L6~~
f!'irm Name ~
9/2008
Form C-004
168
9
~<
CONSTRUCTION AGREEMENT
THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA,
("Owner") hereby contracts with Vila and Son Landscaping Corp. ("Contractor") of
4175 Buckingham Road, Fort Myers, Florida 33905, a Florida, authorized to do
business in the State of Florida, to perform all work ("Work") in connection with CR 951
South of Jolly Bridge Landscape and Irrigation Installation, Bid No. 09-5228
("Project"), as said Work is set forth in the Plans and Specifications prepared by McGee
& Associates, Inc., the Engineer and/or Architect of Record ("Design Professional") and
other Contract Documents hereafter specified.
Owner and Contractor, for the consideration herein set forth, agree as follows:
Section 1. Contract Documents.
A. The Contract Documents consist of this Agreement, the Exhibits described in
Section 6 hereof, the Legal Advertisement, the Bidding Documents and any duly
executed and issued addenda, Change Orders, Work Directive Changes, Field Orders
and amendments relating thereto. All of the foregoing Contract Documents are
incorporated by reference and made a part of this Agreement (all of said documents
including the Agreement sometimes being referred to herein as the "Contract
Documents" and sometimes as the "Agreement" and sometimes as the "Contract"). A
copy of the Contract Documents shall be maintained by Contractor at the Project site at
all times during the performance of the Work.
B. Owner shall furnish to the Contractor one reproducible set of the Contract
Documents and the appropriate number of sets of the Construction Documents, signed
and sealed by the Design Professional, as are reasonably necessary for permitting.
Section 2. Scope of Work.
Contractor agrees to furnish and pay for all management, supervision, financing, labor,
materials, tools, fuel, supplies, utilities, equipment and services of every kind and type
necessary to diligently, timely, and fully perform and complete in a good and
workmanlike manner the Work required by the Contract Documents.
Section 3. Contract Amount.
In consideration of the faithful performance by Contractor of the covenants in this
Agreement to the full satisfaction and acceptance of Owner, Owner agrees to pay, or
cause to be paid, to Contractor the following amount (herein "Contract Amount"), in
accordance with the terms of this Agreement: Four hundred forty one thousand,
nineteen dollars and ninety three cents ($441,019.93)
GC-CA-12
168
9
f
t
Section 4. Bonds.
A. Contractor shall provide Performance and Payment Bonds, in the form
prescribed in Exhibit A, in the amount of 100% of the Contract Amount, the costs of
which are to be paid by Contractor. The Performance and Payment Bonds shall be
underwritten by a surety authorized to do business in the State of Florida and otherwise
acceptable to Owner; provided, however, the surety shall meet the requirements of the
Department of the Treasury Fiscal Service, "Companies Holding Certificates of Authority
as Acceptable Sureties on Federal Bonds and as Acceptable Reinsurance Companies"
circular. This circular may be accessed via the web at www.fms.treas.gov/
c570/c570.html#certified. Should the Contract Amount be less than $500,000, the
requirements of Section 287.0935, F.S. shall govern the rating and classification of the
surety.
B. If the surety for any bond furnished by Contractor is declared bankrupt, becomes
insolvent, its right to do business is terminated in the State of Florida, or it ceases to
meet the requirements imposed by the Contract Documents, the Contractor shall, within
five (5) calendar days thereafter, substitute at its cost and expense another bond and
surety, both of which shall be subject to the Owner's approval.
Section 5. Contract Time and liQuidated Damaqes.
A. Time of Performance.
Time is of the essence in the performance of the Work under this Agreement. The
"Commencement Date" shall be established in the written Notice to Proceed to be
issued by the Project Manager, as hereinafter defined. Contractor shall commence the
Work within five (5) calendar days from the Commencement Date. No Work shall be
performed at the Project site prior to the Commencement Date. Any Work performed by
Contractor prior to the Commencement Date shall be at the sole risk of Contractor.
Contractor shall achieve Substantial Completion within one hundred and fifty (150)
calendar days from the Commencement Date (herein "Contract Time"). The date of
Substantial Completion of the Work (or designated portions thereof) is the date certified
by the Design Professional when construction is sufficiently complete, in accordance
with the Contract Documents, so Owner can occupy or utilize the Work (or designated
portions thereof) for the use for which it is intended. Contractor shall achieve Final
Completion within thirty (30) calendar days after the date of Substantial Completion.
Final Completion shall occur when the Agreement is completed in its entirety, is
accepted by the Owner as complete and is so stated by the Owner as completed. As
used herein and throughout the Contract Documents, the phrase "Project Manager"
refers to the Owner's duly authorized representative and shall mean the Division
Administrator or Department Director, as applicable, acting directly or through duly
authorized representatives.
B. Liquidated Damages in General.
Owner and Contractor recognize that, since time is of the essence for this Agreement,
Owner will suffer financial loss if Contractor fails to achieve Substantial Completion
within the time specified above, as said time may be adjusted as provided for herein. In
GC-CA-13
168
9
1
such event, the total amount of Owner's damages, will be difficult, if not impossible, to
definitely ascertain and quantify. Should Contractor fail to achieve Substantial
Completion within the number of calendar days established herein, Owner shall be
entitled to assess, as liquidated damages, but not as a penalty, seven hundred and
fifteen dollars ($715.00) for each calendar day thereafter until Substantial Completion
is achieved. Further, in the event Substantial Completion is reached, but the Contractor
fails to reach Final Completion within the required time period, Owner shall also be
entitled to assess and Contractor shall be liable for all actual damages incurred by
Owner as a result of Contractor failing to timely achieve Final Completion. The Project
shall be deemed to be substantially completed on the date the Project Manager (or at
his/her direction, the Design Professional) issues a Certificate of Substantial Completion
pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any
right which it may have to seek to characterize the above noted liquidated damages as
a penalty, which the parties agree represents a fair and reasonable estimate of the
Owner's actual damages at the time of contracting if Contractor fails to Substantially or
Finally Complete the Work within the required time periods.
C. Computation of Time Periods.
When any period of time is referenced by days herein, it shall be computed to exclude
the first day and include the last day of such period. If the last day of any such period
falls on a Saturday or Sunday or on a day made a legal holiday by the law of the
applicable jurisdiction, such day shall be omitted from the computation, and the last day
shall become the next succeeding day which is not a Saturday, Sunday or legal holiday.
D. Determination of Number of Days of Default.
For all contracts, regardless of whether the Contract Time is stipulated in calendar days
or working days, the Owner will count default days in calendar days.
E. Right of Collection.
The Owner has the right to apply any amounts due Contractor under this Agreement or
any other agreement between Owner and Contractor, as payment on such liquidated
damages due under this Agreement in Owner's sole discretion. Notwithstanding
anything herein to the contrary, Owner retains its right to liquidated damages due under
this Agreement even if Contractor, at Owner's election and in its sole discretion, is
allowed to continue and to finish the Work, or any part of it, after the expiration of the
Contract Time including granted time extensions.
F. Completion of Work by Owner.
In the event Contractor defaults on any of its obligations under the Agreement and
Owner elects to complete the Work, in whole or in part, through another contractor or its
own forces, the Contractor and its surety shall continue to be liable for the liquidated
damages under the Agreement until Owner achieves Substantial and Final Completion
of the Work. Owner will not charge liquidated damages for any delay in achieving
Substantial or Final Completion as a result of any unreasonable action or delay on the
part of the Owner.
G. Final Acceptance by Owner.
GC-CA-14
lQ8 9
The Owner shall consider the Agreement complete when the Contractor has completed
in its entirety all of the Work and the Owner has accepted all of the Work and notified
the Contractor in writing that the Work is complete. Once the Owner has approved and
accepted the Work, Contractor shall be entitled to final payment in accordance with the
terms of the Contract Documents.
H. Recovery of Damages Suffered by Third Parties.
Contractor shall be liable to Owner to the extent Owner incurs damages from a third
party as a result of Contractor's failure to fulfill all of its obligations under the Contract
Documents. Owner's recovery of any delay related damages under this Agreement
through the liquidated damages does not preclude Owner from recovering from
Contractor any other non-delay related damages that may be owed to it arising out of or
relating to this Agreement.
Section 6. Exhibits Incorporated.
The following documents are expressly agreed to be incorporated by reference and
made a part of this Agreement.
Exhibit A:
Exhibit B:
Exhibit C:
Exhibit D:
Exhibit E:
Exhibit F:
Exhibit G:
Exhibit H:
Exhibit I:
Exhibit J:
Exhibit K:
Exhibit L:
Exhibit M:
Exhibit N:
Performance and Payment Bond Forms
Insurance Requirements
Release and Affidavit Form
Contractor Application for Payment Form
Change Order Form
Certificate of Substantial Completion Form
Final Payment Checklist
General Terms and Conditions
Supplemental Terms and Conditions
Technical Specifications
Permits
Standard Details (if applicable)
Plans and Specifications prepared by McGee & Associates
and identified as follows: CR 951 South of Jolly Bridge
Landscape and Irrigation Installation
as shown on Plan Sheets 1 through 74.
Contractor's List of Key Personnel
Section 7. Notices
A. All notices required or made pursuant to this Agreement by the Contractor to the
Owner shall be shall be deemed duly served if delivered by U.S. Mail, E-mail or
Facsimile, addressed to the following:
Pamela Lulich, Project Manager
Alternative Transportation Modes Department
2885 S. Horseshoe Drive I Naples, Florida 34104
(239) 252-6291
GC-CA-15
'. ~ a ~9
B. All notices required or made pursuant to this Agreement by Owner to Contractor
shall be made in writing and shall be deemed duly served if delivered by U.S. Mail, E-
mail or Facsimile, addressed to the following:
Mr. Wade Chapman
Vila and Son Landscaping Corp.
4175 Buckingham Road
Fort Myers, Florida 33905
239-466-2700
Fax: 239-466-4700
C. Either party may change its above noted address by giving written notice to the
other party in accordance with the requirements of this Section.
Section 8. PUBLIC ENTITY CRIMES.
8.1 By its execution of this Contract, Construction Contractor acknowledges that it
has been informed by Owner of the terms of Section 287.133(2)(a) of the Florida
Statutes which read as follows:
"A person or affiliate who has been placed on the convicted
vendor list following a conviction for a public entity crime may not
submit a bid on a contract to provide any goods or services to a
public entity for the construction or repair of a public building or
public work, may not submit bids on leases of real property to a
public entity, may not be awarded or perform work as a contractor,
supplier, subcontractor, or consultant under a contract with any
public entity in excess of the threshold amount provided in s.
287.017 for CATEGORY TWO for a period of 36 months from the
date of being placed on the convicted vendor list."
Section 9. Modification.
No modification or change to the Agreement shall be valid or binding upon the parties
unless in writing and executed by the party or parties intended to be bound by it.
Section 10. Successors and Assigns.
Subject to other provisions hereof, the Agreement shall be binding upon and shall inure
to the benefit of the successors and assigns of the parties to the Agreement.
Section 11. Governing Law.
The Agreement shall be interpreted under and its performance governed by the laws of
the State of Florida.
GC-CA-16
168
c
~i
Section 12. No Waiver.
The failure of the Owner to enforce at any time or for any period of time anyone or
more of the provisions of the Agreement shall not be construed to be and shall not be a
waiver of any such provision or provisions or of its right thereafter to enforce each and
every such provision.
Section 13. Entire AQreement.
Each of the parties hereto agrees and represents that the Agreement comprises the full
and entire agreement between the parties affecting the Work contemplated, and no
other agreement or understanding of any nature concerning the same has been entered
into or will be recognized, and that all negotiations, acts, work performed, or payments
made prior to the execution hereof shall be deemed merged in, integrated and
superseded by the Agreement.
Section 14. Severability.
Should any provision of the Agreement be determined by a court to be unenforceable,
such a determination shall not affect the validity or enforceability of any other section or
part thereof.
Section 15. ChanQe Order Authorization.
The Project Manager shall have the authority on behalf of the Owner to execute all
Change Orders and Work Directive Changes to the Agreement to the extent provided
for under the Owner's Purchasing Policy and accompanying administrative procedures.
Section 16. Construction.
Any doubtful or ambiguous language contained in this Agreement shall not be
construed against the party who physically prepared this Agreement. The rule
sometimes referred to as "fortius contra proferentum" (pursuant to which ambiguities in
a contractual term which appears on its face to have been inserted for the benefit of one
of the parties shall be construed against the benefited party) shall not be applied to the
construction of this Agreement.
Section 17. Order of Precedence
In the event of any conflict between or among the terms of any of the Contract
Documents, the terms of the Construction Agreement and the General Terms and
Conditions shall take precedence over the terms of all other Contract Documents,
except the terms of any Supplemental Conditions shall take precedence over the
Construction Agreement and the General Terms and Conditions. To the extent any
conflict in the terms of the Contract Documents cannot be resolved by application of the
Supplemental Conditions, if any, or the Construction Agreement and the General Terms
and Conditions, the conflict shall be resolved by imposing the more strict or costly
obligation under the Contract Documents upon the Contractor at Owner's discretion.
GC-CA-17
160'9
IN WITNESS WHEREOF, the parties have executed this Agreement on the date(s)
indicated below.
CONTRACTOR:
TWO WITNESSES:
Vila and Son Landscaping Corp.
I --..."
,"'- r " ' '
1'0,\ "~ 'J:' cC'
7 .,--, l' , ' " ' !1,.~n nrv' {-,.-..
FIRST WIT SS
L,\, ..\1 ~ '\ \'. ." --
..... ") .\(~ . 'A ,'-..-), \. n ,',,-," '--., ')
:rypelprint Nam L 'L-
By:
r-~~
w..u~,_ ~ . CHA~ ",,;,#.1 I 6"'1J~~ I'-Ot~
Type/Print Name and Title
OWNER:
BY: . .'
~:to.~
s1INtn '- o..'f
Approved As To Form
and Legal Sufficiency:
Print Name: ~tt12i.e-L
A8sivLcrr'I't County Attorney
"De,~
BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUN FLORIDA
'~~~
nna Fiala, Chairman
BY:
GC-CA-18
16819
GUIGNARD COMPANY
SURETY BONDS
June 15,2009
The Board of County Commissioners
of Collier County, Florida
3301 East Tamiami Trail
Naples, FL 34112
Re: Authority to Date Bonds and Powers of Attorney
Principal: Vila & Son Landscaping Corp.
Bond No.: 0071981
Project: 09-5228, CR 951 South of Jolly Bridge Landscape and
Irrigation Installation
Dear Sir or Madam:
Please be advised that as Surety on the above referenced bond, executed on
your behalf for this project, we hereby authorize you to date the bonds and
the powers of attorney concurrent with the date of the contract agreement.
Once dated, please send a copy of the dated bonds to our office.
ny
. Live
Attorney In Fact and
Florida Licensed Resident Agent
1904 BOOTHE CIRCLE · LONGWOOD, FL 32750
PH (407) 834-0022 / (888) 220-3780 · FAX (407) 260-1767 / (888) 220-3228 · www,guignardcompany.com
166 9
Executed in 2 Counterparts
EXHIBIT A
PUBLIC PAYMENT BOND
CR 951 South of Jolly Bridge Landscape and Irrigation Installation
Bond No. 0071981
Contract No. 09-5228
KNOW ALL MEN BY THESE PRESENTS: That vila & Son Landscaping Corp.
4175 Buckingham Road, Ft. Myers, FL 33905, (239) 466-2700 , as Principal,
and Westfield Insurance Company , as
Surety, located at POBox 5001, Westfield Center, OH 44251-5001, (800) 430-1386
(Business Address) are held and firmly bound to The Board of County Commissioners Collier County
as Obligee in the sum of 1<'l>l1r H11nnrpn Forty-One Thousand N.ineteen and 93/100
($441,019.93 ) for the payment whereof we bind ourselves, our heirs, executors,
personal representatives, successors and assigns, jointly and severally.
WHEREAS, Principal has entered into a contract dated as of the _ day of
2009, with Obligee for CR 951 South of Jolly Bridge Landscape and Irrigation
in Collier County, FL accordance with drawings and specifications, whiHiftallatlOn
contract is incorporated by reference and made a part hereof, and is referred to herein
as the Contract.
THE CONDITION OF THIS BOND is that if Principal:
Promptly makes payment to all claimants as defined in Section 255.05(1), Florida
Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly
by Principal in the prosecution of the work provided for in the Contract, then this bond is
void; otherwise it remains in full force.
Any changes in or under the Contract and compliance or noncompliance with any
formalities connected with the Contract or the changes do not affect Sureties obligation
under this Bond.
The provisions of this bond are subject to the time limitations of Section 255.05(2), In
no event will the Surety be liable in the aggregate to claimants for more than the penal
sum of this Payment Bond, regardless of the number of suits that may be filed by
claimants.
IN VVITNESS WHEREOF, the above parties have executed this instrument this
day of __ 2009, the narne of each party being affixed and these presents
duly signed by its undersigned representative, pursuant to authority of its governing
body.
Owner's Address: 3301 Tamiami Trail, Naples, FL 34112 (239) 252-8446
GC-CA-A-1
168 CJ
Signed, sealed and delivered
in the presence of:
PRINCIPAL
Vila & Son Landscaping Corp.
~~~E~~~~~~
ITS: 6~p4.Jl.~&. ~.4If4-.s~
Witnesses as to Principal
STATE OF Florida
COUNTY OF Collier
~~Mo,re~:ing i?'5'o~~,~aCa~n~~~~;;2/b~fz~e ~f?:~,a fm<~~Of
Vila & Son Landscaplng Corp. , a Florida corporation, on behalf of the
corporation.ct!!fshe is personaiiy known to me OR has produced C}Jn.U1:i!~'a'.J as
identification and did (did not) take an oath. X, I { (~~
My Commission Expires: ~,-L( ~; 'k~':r---)
~~I<Y PUe( SHELLY WILLIAMSON (Signature of otary)
~ MY COMMISSION # DO 512739 I )
>\- ... EXPIRES: May 31,2010 NAME: ,_jilt'! (I Lc, I! ({)y?S CY)
"OFfCO~"'" BoAdedThru Budget Notlly Services (Leg ibly Printed)
(AFFIX OFFICIAL SEAL)
Notary Public, State of '=~i?,'Cl{,-
Commission No,: [')0 '5/ ;:) 71 ~;
ATTEST:
SURETY:
Westfield Insurance Company
(Printed Name)
~lm
. A / /
,.-' , . ., .' y-----,----,...-
~.)~~~ ~0____
Witness~s Irety
442~1
.... I ,~./
pril Ll ~'ely ". Fl,:)ri,da Licensed
Resident-.1\~nt
(Printed Name)
GC-CA-A-2
}Jl/7
~-y ~'0C
\,'---- '-.. "-~~m C-Jr> \
Witness s
STATE OF Florida
COUNTY OF Seminole
The foregoing instrument was
June , 2009, by
Z'lttorTley lTl Fi'rir't
Surety, on behalf of Surety.
Personally Known
take an oath.
My Commission Expires:
JENNIFER L. McCAllA
Notary PublIc. SIll. of florida
My -=-- ..... Feb. 10. 2010
C~ No. DD 51,.
(AFFIX OFFIC1AL SEAL)
16 B ;~9
OR
April L. Lively
(Printed Name)
1904 Boothe Circle
Longwood. FL 32750
(Business Address)
(407) 834-0022
(Telephone Number)
Name:Jennifer L. McCarta
(Legibly Printed)
Notary Public, State of: Florida
Commission No.: DD 511896
GC-CA-A-3
168 9
Executed in 2 Counterparts
EXHIBIT A
PUBLIC PERFORMANCE BOND
CR 951 South of Jolly Bridge Landscape and Irrigation Installation
Bond No. 0071981
Contract No. 09-5228
KNOW ALL MEN BY THESE PRESENTS: That Vila & Son Landscaping Corp.
4175 Bucklngham Road, Ft. Myers, .. ,
, as Pnnclpal, and Westfleld Insurance Company
FL 33905 (239) qtiti-L IOU St. I t d t
as ure y, oca e a
POBox SOOl, Wpstfiplrl ~pnter, OH 44251 5001, (800) 130 1386
(Business Address) are held and firmly bound to
The Board of County Commissioners of Collier County as Obligee in the sum of
Four Hundred Forty-Onp TnOllsr:mrl Ni neteen and 93/100
($ 441 019 93 ) for the payment whereof we bond ourselves, our heirs, executors,
personal rep"resentatives, successors and assigns, jointly and severally,
WHEREAS, Principal has entered into a contract dated as of the day of
2009, with Obligee for
CR 951 South of Jolly Bridgp T,;mnsf:rlpP rlnrl Trri0at ion Installation
in accordance with drawings and specifications, which contract is incorporated by
reference and made a part hereof, and is referred to herein as the Contract.
THE CONDITION OF THIS BOND is that if Principal:
1. Performs the Contract at the times and in the manner prescribed in the Contract;
and
2. Pays Obligee any and all losses, damages, costs and attorneys' fees that
Obligee sustains because of any default by Principal under the Contract, including, but
not limited to, all delay damages, whether liquidated or actual, incurred by Obligee; and
3. Performs the guarantee of all work and materials furnished under the Contract for
the time specified in the Contract, then this bond is void; otherwise it remains in full
force. Any changes in or under the Contract and compliance or noncompliance with
any formalities connected with the Contract or the changes do not affect Sureties
obligation under this Bond.
The Surety, For value received, hereby stipulates and agrees that no changes,
extensions of time, alterations or additions to the terms of the Contract or other vvork to
be performed hereunder, or the specifications referred to therein shall in anyvvise affect
its obligations under this bond, and it does hereby waive notice of any such changes,
extensions of time, alterations or additions to the terms of the Contract or to work or to
the specifications.
Owner's Address: 3301 E. Tamiami Trail, Naples, FL 34112, (239) 252-8446
GC-CA-A-4
16819
This instrument shall be construed in all respects as a common law bond. it is
expressly understood that the time provisions and statute of limitations under Section
255.05, Florida Statutes, shall not appiy to this bond.
In no event will the Surety be liable in the aggregate to Obligee for more than the penal
sum of this Performance Bond regardless of the number of suits that may be filed by
Obligee.
iN WITNESS WHEREOF, the above parties have executed this instrument this
day of , 2009, the name of each party being affixed and these
presents duly signed by its undersigned representative, pursuant to authority of its
governing body.
Signed, sealed and delivered
in the presence of:
PRINCIPAL
vila & Son Landscaping Corp.
BY:
~:. "- ~~
kJ ~lt~ b. c.HA ,.H.JII<<]
6~AG.,t.,+'- ~"A/.J4~~1I!
Witnesses as to Principal
NAME:
ITS:
STATE OF Florida
COUNTY OF Collier
The foregoing instrument was", ac~nowledged. before me this J 7 day of
~\'-..C.-. , 2009, by I L ~n[t.c c;.J 10/)/ r 10 i '" ' as
c:.YJ",-C\'QL !--(o.n.c,<-:,.( IL of Vl a & Son Landscaping Corp. , a
corporation, on behalf of the corporation. @/she is
personally known to me OR has produced t~)( \._.X( ~ in (( c
t~ \ Cc t "'") '-..... as identification and did (dL_n_Q!) take an oath .j
My commiSS~oPi~~~'{,.":'I=-"" ,~~/~~~kat~;~' h:j \c\ QL 0, I kX",
* . * EXPIRES: May31,2010 L' I.
'""'~.' ,...,.._""""- Name: (L~~~~~~~d) Cel, L /, Q n ,SIlL-
(AFFIX OFFICIAL SEAL) Notary. PL~blic, State of:lt.f~ CC;:/f
C::ommlsslon No., DI~ ':) (
_.__.-._~---~-_..-
GC-CA-A-5
168 9
ATTEST:
SURETY:
Westfield Insurance Company
me
(Attach Power of Attorney)
) .~
"'- '-~ 6'\Cl2J
April L. Lively
(Printed Name)
1904 Boothe Circle
I,nngwnnrl, PI, 1?7r:;n
(Business Address)
(407) 834-0022
(Telephone Number)
STATE OF Florida
COUNTY OF Seminole
The foregoing instrument was acknowledged before me this 15th day of
June ,2009, by April L. Lively ,8sAttorney-in-Fact
of Westfield Insurance Company, a Ohio Corporation Surety, on
behalf of Surety. He/She is personally known to m ' OR has produced
Personally Known as identificatiotll and who d (Crd....n.....c.....j..._).7.~t._.)7__.__7n!ath.
My Commission EKpires: ~T-
'-
JENNIFER L. McCARTA
NoIIry Public. State 01 Florida
My COM. up. Feb. 10. 2010
CcJaa. No. DO 51,.
(AFFIX OFFICIAL SEAL)
Name: Jenni fer L. McCarta
(Legibly Printed)
Notary Public, State of: Florida
Commission No.:DD 511896
GC-U\-A-6
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME
POWER # AND ISSUED PRIOR TO 01/29109, FOR ANY PERSON OR PERSONS NAMED BELOW.
168
9
CERTIFIED COPY
POWER NO. 099186202
Westfield Insurance Co.
Westfield National Insurance Co.
Ohio Farmers Insurance Co.
Westfield Center, Ohio
'General
Power
of Attorney
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter relerred to individually as a -Company" and collectively as "Companies: duly
organized and existing under the laws of the State of OhiO, and having its principal office in Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
JACK W. GUIGNARD, BRYCE R. GUIGNARD, M. GARY FRANCIS, PAUL J. CIAMBRIELLO, APRIL L LIVELY, JENNIFER L
MCCARTA, MARGIE LYNN MORRIS, JOINTLY OR SEVERALLY
of LONGWOOD and State of FL its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in Its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
"Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and is hereby vested with lull power and authority to appoint anyone or more suitable persons as Attorney(s)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisIOns:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as If signed by the President and sealed and attested by the Corporate Secretary.-
"Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by faCSimile, and any power of attorney or certificate bearing faCSimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting
held on February 8, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 29th day 01
JANUARY A.D.,2009.
......1lMt......,'....
Corporate ,jI'" >>,.UR.(~ ........
Seal s I'. ~ '1....-....,..C~ ,
Affixed J;:.... - .... Ct'"
I ~( SEAL )~)~
\ ~c. It
\ "" ...... ,... ..... "'t- ...
'" ~...._..
'.
State of Ohio
County of Medina ss.:
\\1_,,,,\UU"""I#
.., :\ ,ONAl II\! "
!~7;"""""""~~~\
~LL: SEAL :0:
\~~....,.... ..._..........~~J
;""I'~ * .,\,,~~
It.lt.It".,'
. ~,.,.....~...................
,~ "
.... ..,........ ~'~
litt,~...rE'i;.~\
=0: :~=
\~" 1848 ..~j
\oll! .. .......::-........... .....;
""""~. ,...............
I'"...."t',
WESTFIELD INSURANCE COMPANY
WESTFIELD NATIONAL INSURANCE COMPANY
OHIO FARMERS INSURANCE COMPANY
By:
Richard L. Kinnaird, Jr., Senior Executive
On this 29th day 01 JANUARY A.D.,2009, before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say, that he resides in Medina. Ohio; that he is Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument; that he knows the seals of said Companies: that the seals affixed to said instrument are such corporate seals: that they were so affixed
by order of the Boards of Directors of said Companies; and that he Signed hiS na;/{Jme thereto b..y like order. ;aL
Notarial .._._....
A~ie:~d ~~;1~i~~..~.:t;\
r.~)
State of Ohio \. "')- .',0
County of Medina ss.: ". .q 0 -l- ....
....".,.~ of' ..,..,
............"......
William J. Kahelin, A rney at Law, Notary Public
My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing IS a true and correct copy 01 a Power of Attorney, executed by said
Companies, which is still in full force and effect: and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full forc~ arJlj effect
In Witness Vlh~reo;. I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, thiS
A.D,
..,.,....,.....,.,
A. ~UR.( .....,
'^ ...~.. _....!iC.~'<.
~ ..' ". v ..
J;:~' -.. ".Ct'-
1i4:/svXI \~\
i ...: J:...M.I..II' ... J
i ':.\ jJJJ;}
'\ "" ". ~ .... $'
~... "'00__- /CI
',~
day of
",UU",.
......~\()NA{ ;......
.' \' .,......;.I\!" ".
.' 0.' ""0'.
/.?:./ '....~\
;11: SEAL :0:
\~:~........ ....../f/
JJ',,'Jlj.,,~.I'I.'\\\\\\
.........~...."",",I.,,.,,,
.....:...c;"......... ";'"
~~ "~"""
" .' - ..r'1
{&o;;{t"WEItD\i!
=0: :::",=
\%....1848/$f
~~.. ......:':"....... . .......:
"" ...."....
"".,........""...
~;nodc'el~ S.-ury
BPOAC2 (combined) (06-02)
/~QD
ACORD
~
16B
PRODUCER
CERTIFICATE OF LIABILITY INSURANCE Page 1 of 3 ~A~ii:II~~~
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
877-945-7378
willis of Florida. Inc.
26 Century Blvd.
P. O. Box 305191
Nashville. TN 37230-5191
INSURERS AFFORDING COVERAGE
NAIC#
INSURED
Vila and Son Landscaping Corp
4175 Buckingham Road
Ft. Myers. FL 33905-7206
INSURER A: United States Fire Insurance Com any 21113-001
~~URERB: N~~ional Union Fire Insurance Company of 19445-005
INSURER C:
INSURER D:
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
~---
INSR ~pD'Li TYPE OF INSURANCE POLICY NUMBER ~~flf~it;~t~l 62f~~~~~6~'J#~~ LIMITS
LTR NSRfi
A X ~NERAL LIABILITY 5417001009 4/1/2009 4/1/2010 EACH OCCURRENCE $ 1.000.000
DAMAGE TO RENTED $ 300.000
elL COMMERCIAL GENERAL LIABILITY PREMISES (Ea occurence)
c-- o CLAIMS MADE .:JL] OCCUR ..MED EXP (Anyone person) $ 5.000
PERSONAL & ADV INJURY $ 1 000 000
f-- --~-
: GENERAL AGGREGATE $ 2 000 000
f--
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2 000 000
n !Xl PRO il
POLICY X JECr! LOC
A X ~TOMOBILE LIABILITY 1387301616 4/1/2009 4/1/2010 COMBINED SINGLE LIMIT 1,000,000
(Ea accident) $
elL ANY AUTO
eX- ALL OWNED AUTOS BODILY INJURY
$
SCHEDULED AUTOS (Per person)
f-- --
eX- HIRED AUTOS BODILY INJURY
eX- NON-OWNED AUTOS (Per aCCIdent) 1$
I
I PROPERTY DAMAGE I
f-- ! !$
, (Per aCCIdent)
RRAGE LIABILITY AUTO ONLY - EA ACCIDENT 1$
----" --". ~
ANY AUTO OTHER THAN EAACC $
AUTO ONLY: AGG $
B ~ESS I UMBRELLA LIABILITY BE6564742 4/1/2009 4/1/2010 EACH OCCURRENCE $ 4 000 000
X OCCUR D CLAIMS MADE --
AGGREGATE $ 4.000.000
--~----_._--~
$
8 DEDUCTIBLE -- $
X RETENTION $ 10.00 $
! WORKERS COMPENSATION 4066803972 4/1/2009 4/1/2010 I WCSTATU- I IOTH-
A ; AND EMPLOYERS' LIABILITY X TORY LIMITS ER
Y/N
, ANY PROPRIETOR/PARTNER/EXECUTIVE [EJ EL EACH ACCIDENT $ 1.000.000
OFFICER/MEMBER EXCLUDED? 1.000.000
(Mandatory in NH) EL DISEASE - EA EMPLOYEE $
If yes, describe under -..--.--"---
SPECIAL PROVISIONS below EL DISEASE - POLICY LIMIT $ 1 000 000
OTHER
i
DESCRIPTION OF OPERATIONS/ LOCATIONS IVEHICLES f EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
THIS VOIDS AND REPLACES PREVIOUSLY ISSUED CERTIFICATE DATED: 6/1/2009 WITH ID: 12594461
Contract #09-5228
It is agreed that Collier County BOCC is included as an Additional Insured as respects to General
Liability and Automobile Liability. but solely in regards to work being performed by or on behalf
of the Named Insured when recmireCi bv written 0.,.. w...,......... .....r....m..nr.
CERTIFICATE HOLDER
CANCELLATION
Collier County BOCC
Attn: Brenda Brillhart
3301 East Tamiami Trail
Naples. FL 34112
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
ACORD 25 (2009/01)
ColI: 2731471 Tpl: 916884 Cert: 12645172 @1988-2009ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
PRODUCER
CERTIFICATE OF LIABILITY INSURANCE Page 2 of 3 06/t:72009
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
WillIs
877-945-7378
willis of Florida, Inc.
26 Century Blvd.
P. O. Box 305191
Nashville, TN 37230-5191
~_j~~_SURERS AFFORDING COVERAGE
I~~URERA United States Fire Insurance Company
I.~SURERB: National Union Fire Insurance Company of
, INSURER C:
1-~-.--._-_.._--
INSURER D:
NAIC#
INSURED
Vila and Son Landscaping Corp
4175 Buckingham Road
Ft. Myers, FL 33905-7206
21113-001
19445-005
INSURER E:
DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS
It is further agreed that such insurance as is afforded shall be primary and non-contributory with
any other insurance in force for or which may be purchased by the Additional Insured.
It is understood and agreed that the company waives its right of subrogation against the
Additional Insured which may arise by reason of a payment of claim under the General Liability,
Automobile Liability and Workers Compensation policies when required by written contract or written
agreement.
Coll:2731471 Tpl:916884 Cert:12645172
168 9
Page 3 of 3
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
This Certificate of Insurance does not constitute a contract between the issuing insurer(s), authorized
representative or producer, and the certificate holder, nor does it affirmatively or negatively amend,
extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2009/01)
Coll:2731471 Tpl:916884 Cert:12645172
Policy Number
5417001009
168 9
SCHEDULE OF FORMS AND ENDORSEMENTS
UNITED STATES FIRE INSURANCE COMPANY
Named Insured: Vila and Son Landscaping Corp
Agent Name: WILLIS OF FLORIDA - MIAMI
Effective Date: 4/1/2009
12:01 A.M., Standard Time
Agent No. 83324
COMMON POLICY FORMS AND ENDORSEMENTS
FM 206.0.6
FM 206.0.2
FM 206.0.11
FM 206.0.1
FM 206.0.3
IL 00 17
FM 206.0.8
FM 600.0.963
FM 206.0.204
IL 00 21
FM 108.0.816
04-94
04-94
09-07
04-94
04-94
11-98
04-94
04-94
07 - 93
07 - 02
11-01
COMMON POLICY DECLARATIONS
SCHEDULE OF FORMS AND ENDORSEMENTS
SIGNATURE PAGE - US FIRE
SCHEDULE OF NAMED INSUREDS
SCHEDULE OF LOCATIONS
COMMON POLICY CONDITIONS
SCHEDULE OF TAXES, SURCHARGES OR FEES
PREMIUM PAYMENT SCHEDULE
AMENDMENT OF CANCELLATION CONDITION
NUCLEAR ENERGY LIABILITY EXCLUSION ENDT
TO OUR FLORIDA POLICY HOLDERS
GENERAL LIABILITY FORMS AND ENDORSEMENTS
CG 22 94
CG 00 01
FM10101252
FM10101404
FM 206.0.5
CG 02 20
CG 04 35
.. CG 20 10
CG 20 34
CG 21 47
CG 21 55
CG 21 73
CG 22 43
CG 25 03
FM 206019
FM10101206
FM10101441
FM10101806
FM10101839
FM10101840
FM10101847
... FM1010 184 8
FM10101903
FM10101916
FM10102086
FM10102167
FM6000955
CG 24 04
CG 21 39
FM 2.0.949
10-01
12-07
10-05
07-01
04-94
12-07
12-07
07-04
07-04
12-07
09-99
01-08
07-98
03-97
07-03
08-03
11-96
08-03
04-00
04-00
08-00
07-00
11-05
06-01
12-02
05-04
09-99
10-93
10-93
12-06
EXCLUSION-DMG TO WORK BY SUBCONTRACTORS
COMMERCIAL GENERAL LIABILITY COV FORM
ABSOLUTE ASBESTOS EXCLUSION
COMM GL COV PART SUPP DECLARATION
COMPOSITE RATING PLAN ENDORSEMENT SCHEDU
FL CHANGES - CANCELLATION & NONRENEWAL
EMPLOYEE BENEFITS LIABILITY COVERAGE
ADDTL INSD - OWNERS, LESSEES OR
ADDTL INSD LESSOR OF LEASED EQUI
EMPLOYMENT-RELATED PRACTICES EXCLUSION
TOTAL POLLUTION EXCL. WITH HOSTILE FIRE
EXCLUSION OF CERTIFIED ACTS OF TERRORISM
EXCL-ENGINEERS, ARCH OR SURV (PROF LIAB)
DESIGNATED CONSTRUCTION PROJECTS GENERAL
COMPOSITE RATING PLAN ENDT
GL ENHANCEMENT ENDT
ARBITRATION ENDT - RETRO RATING PLANS
GL ENHANCEMENT ENDORSEMENT SUPP SCHEDULE
SUBSIDENCE I EARTH MOVEMENT I PRESSURE EXCL
CGL EIFS I DEFS EXCLUSION
ECOMLIABILITY
ADDL INSD - BY WRITTEN CONTRACT
EXCLUSION - CONSTRUCTION DEFECTS
MOLD EXCLUSION
CONSTRUCTION RELATED PRODUCTS AMENDATORY
ABSOLUTE SILICA EXCLUSION
LEAD EXCL ENDT
WAIV OF TRNSFR RHTS OF REC AG OTH TO US
CONTRACTUAL LIABILITY LIMITATION
FLORIDA HURRICANE CATASTROPHE FUND Sic
FM 206.0.2 04 94
168 9
Named Insured: Vila and Son Landscaping Corp
COMMERCIAL GENERAL LIABILITY
CG 20 10 07 04
Policy Number: 541 7001009
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - OWNERS, LESSEES OR
CONTRACTORS - SCHEDULED PERSON OR
ORGANIZATION
This endorsement modifies insurance provided under the following:
- COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Name Of Additional Insured Person(s)
Or Organization(s): Location(s) Of Covered Operations
Collier County SOCC
As per written contract or agreement
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
A. Section II - Who Is An Insured is amended to include
as an additional insured the person(s) or organization(s)
shown in the Schedule, but only with respect to liability for
"bodily injury", "property damage" or "personal and
advertising injury" caused, in whole or in part, by:
B. With respect to the insurance afforded to these
additional insureds, the following additional exclusions
apply:
This insurance does not apply to "bodily injury" or
"property damage" occurring after:
1. Your acts or omissions; or
2. The acts or omissions of those acting on your behalf;
1. All work, including materials, parts or
equipment furnished in connection with such
work, on the project (other than service,
maintenance or repairs) to be performed by or
on behalf of the additional insured(s) at the
location of the covered operations has been
completed; or
in the performance of your ongoing operations for the
additional insured(s) at the location(s) designated above,
2. That portion of "your work" out of which the
injury or damage arises has been put to its
intended use by any person or organization
other than another contractor or subcontractor
engaged in performing operations for a
principal as a part of the same project.
CG 20 10 070 4
@ ISO Properties, Inc. 2004
Page 1 of 1
'16B "g
VIII. MOBILE EQUIPMENT
The following is added under SECTION V - DEFINITIONS, 12. "Mobile Equipment":
Paragraph f.(1) does not apply to self-propelled vehicles of less than 1,000 pounds gross
vehicle weight.
IX. ADDITIONAL INSUREDS BY WRITTEN CONTRACT
SECTION II - WHO IS AN INSURED is amended to include as an additional insured any
person or organization whom you are required to add as an additional insured to this
policy by a written contract or written agreement that is:
(1) currently in effect or becoming effective during the term of this policy; and
(2) executed prior to the "bodily injury", "property damage" or "personal and
advertising injury".
A. The Insurance provided to the additional insured applies as follows:
1. That person or organization is only an additional insured with respect to liability
caused by your negligent acts or omissions at or from:
(a) premises you own, rent, lease, or occupy or
(b) your ongoing operations performed for the additional insured at the job
indicated by written contract or written agreement.
2. The limits of insurance applicable to the additional insured are those specified in
the written contract or written agreement or in the Declarations of this policy
whichever are less. These limits of insurance are inclusive of and not in addition
to the limits of insurance shown in the Declarations.
B. If the additional insured is an architect, engineer, or surveyor, the insurance provided
to the additional insured does not apply to "bodily injury", "property damage", or
"personal and advertising injury" caused by the rendering of or failure to render any
professional services including:
1. preparing, approving, or failing to prepare or approve maps, drawings, opinions,
reports, surveys, change orders, designs or specifications; and supervisory,
inspection, or engineering services.
C. SECTION IV - COMMERCIAL GENERAL LIABILITY CONDITIONS, under 4. Other
Insurance, is amended as follows:
Includes copyrighted material of Insurance Services Office, Inc.,
with its permission.
FM 101.0.12060803
Page 4 of 8
16 B '9
The following is added to item a.:
Regardless of whether other insurance is available to an additional insured on a
primary basis, this insurance will be primary and noncontributory if a written contract
between you and the additional insured specifically requires that this insurance be
primary.
D. With respect to the insurance afforded these additional insureds, following
additional exclusion applies:
This insurance does not apply to:
1. "Bodily injury" or "property damage" occurring after:
(a) all work, including materials, parts or equipment furnished in connection
with such work, on the project (other than service, maintenance or
repairs) to be performed by or on behalf of the additional insured(s) at
the site of the covered operations has been completed; or
(b) that portion of "your work" out of which the injury or damage arises has
been put to its intended use by any person or organization other than
another contractor or subcontractor engaged in performing operations
for a principal as part of the same project.
X. ADDITIONAL INSURED - STATE OR POLITICAL SUBDIVISIONS - PERMITS
SECTION II - WHO IS AN INSURED is amended to include as an additional insured any
state or political subdivision which as issued a permit to you.
1. This applies only with respect to operations performed by you or on your behalf for
which the state or political subdivision which as issued a permit to you.
2. This insurance does not apply to:
a. "Bodily injury", Property Damage", or "Personal and Advertising injury" arising out
of operations performed for the state or municipality; or
b. "Bodily injury" or "Property Damage" included within the "Products-Completed
Operations Hazard".
XI. PROPERTY DAMAGE LIABILITY - ELEVATORS AND SIDETRACK AGREEMENTS
The following is added under SECTION I - COVERAGES, COVERAGE A. BODILY
INJURY AND PROPERTY DAMAGE LIABILITY, 2. Exclusions:
Includes copyrighted material of Insurance Services Office, Inc.,
with its permission.
FM 101.0.12060803
Page 5 of 8
1~~ 19
# 541 7001009
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSUREDS BY WRITTEN CONTRACT -
INCLUDING COVERAGE FOR COMPLETED OPERATIONS
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART AND THE GENERAL LIABILITY
ENHANCEMENT ENDORSEMENT
Item XIII. ADDITIONAL INSUREDS BY WRITTEN CONTRACT in General Liability Enhancement
Endorsement is replaced by the following:
Section II - WHO IS AN INSURED is amended to include as an additional insured any person or
organization whom you are required to add as an additional insured to this policy by a written contract or
written agreement that is:
1. currently in effect or becoming effective during the term of this policy; and
2. executed prior to the "bodily injury", "property damage", "personal and advertising injury".
A. The insurance provided to the additional insured applies as follows:
1. That person or organization is only an additional insured with respect to liability caused by your
acts or omissions at or from
a. premises you own, rent, lease or occupy; or
b. work performed for the additional insured at the job indicated by written contract or written
agreement.
2. The limits of insurance applicable to the additional insured are those specified in the written
contract or written agreement or in the Declarations of this policy, whichever is less. These limits
of insurance are inclusive of and not in addition to the limits of insurance shown in the
Declarations.
B. If the additional insured is an architect, engineer, or surveyor, the insurance provided to the additional
insured does not apply to "bodily injury", "property damage", "personal injury and advertising injury"
caused by the rendering of or failure to render any professional services including:
1. the preparing, approving, or failing to prepare or approve maps, drawings, opinions, reports,
surveys, change orders, designs or specifications; and
2. supervisory, inspection, or engineering services.
C. Section IV - COMMERCIAL GENERAL LIABILITY CONDITIONS, under 4. Other Insurance, is
amended as follows:
The following is added to item a.:
Regardless of whether other insurance is available to an additional insured on a primary basis, this
insurance will be primary and noncontributory if a written contract between you and the additional
insured specifically requires that this insurance be primary.
FM 101.0.18480700
Policy Number
1387301616
Named Insured:
169 9
SCHEDULE OF FORMS AND ENDORSEMENTS
UNITED STATES FIRE INSURANCE COMPANY
Agent Name: WILLIS OF FLORIDA. MIAMI
Effective Date: 4/1/2009
12:01 A.M,. Standard Time
Agent No. 83324
COMMON POLICY FORMS AND ENDORSEMENTS
FM 206.0.6 04-94 COMMON POLICY DECLARATION
FM 206.0.2 04-94 SCHEDULE OF FORMS AND ENDORSEMENTS
FM 206.0.11 09-07 SIGNATURE PAGE - US FIRE
FM 206.0.1 04-94 SCHEDULE OF NAMED INSUREDS
IL 00 17 11-98 COMMON POLICY CONDITIONS
FM 206.0.8 04-94 SCHEDULE OF TAXES, SURCHARGES OR FEES
FM 600.0.963 04-94 PREMIUM PAYMENT SCHEDULE
IL 00 21 07-02 NUCLEAR ENERGY LIABILITY EXCLUSION ENDT
FM 108.0.816 11-01 TO OUR FLORIDA POLICY HOLDERS
AUTOMOBILE FORMS AND ENDORSEMENTS
CA 20 01
FM 206.0.19
FM 114.0.1116
FM 114.0.1116A
CA 00 01
FM 101. 0 .1544
FM 206.0.5
CA 01 28
CA 02 67
CA 21 72
FM 114.0.1254
CA 22 10
CA 20 56
CA 99 03
CA 99 16
CA 99 23
CA 99 33
CA 99 44
CA 99 54
...FM 114.0.1263
FMl14.0.1269
FM2.0.852
FM 114.0.1041
FM 2.0.949
CA 99 10
03-06
07-03
04-06
04-06
03-06
02-02
04-94
02-03
07-07
03-06
06-03
07-04
02-99
03-06
12-93
12-93
02-99
12-93
07-97
02-02
04-02
12-03
01-89
12-06
09-02
ADDL INSD - LESSOR
COMPOSITE RATING PLAN ENDORSEMENT
BUSINESS AUTO POLICY - DEC
BUSINESS AUTO DECLARATIONS (CONTINUED)
BUSINESS AUTO COVERAGE FORM
RISK RETENTION AGGREGATE LIMIT ENDT
MANUSCRIPT ENDORSEMENT
FLORIDA CHANGES
FL CHANGES - CANCELLATION AND NONRENEWAL
FL UNINSURED MOTORISTS COV - NON STACKED
COVERAGE SYMBOL ENDORSEMENT
FL PERSONAL INJURY PROTECTION
FELLOW EMPLOYEE COV FOR DESIG EMPLOYEES
AUTO MEDICAL PAYMENTS COVERAGE
HIRED AUTO SPECIFIED AS COV AUTO YOU OWN
RENTAL REIMBURSEMENT COVERAGE
EMPLOYEES AS INSUREDS
LOSS PAYABLE CLAUSE
COVERED AUTO DESIGNATION SYMBOL
COMMERCIAL AUTO BROAD FORM ENDORSEMENT
FL-DED INSURANCE DAMAGE & DEF COMBINED
REJECTION/ELECTION OF UM COVERAGE
NOTICE TO FLORIDA AUTO P/H WITH P.I.P.
FLORIDA HURRICANE CATASTROPHE
DRIVE OTHER CAR COVERAGE
FM 206.0.2 04 94
16 B if9
Vila & Son Pol. No. 138730161 6
(See Page 3 of 5 for Additional Insured
Wording)
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
COMMERCIAL AUTOMOBILE
BROAD FORM ENDORSEMENT
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless
modified by this endorsement.
A. Broadened Insured Status
The following are added as Named Insureds to this policy:
1. Any subsidiary which is a legally incorporated entity of which you own a financial interest of more than
50% of the voting stock on the effective date of this Coverage Form.
However, the insurance afforded by this provision A.1. does not apply to any subsidiary that is an
insured under any other automobile liability policy, or would be an insured under such policy but for the
termination of such policy or the exhaustion of such policy's limits on insurance.
2, Any organization you newly acquire or form, and over which you maintain majority interest.
The insurance afforded by this provision A.2.:
(a) Is effective on the acquisition or formation date, and is afforded only until the end of the policy
period of this Coverage Form, or the next anniversary of its inception date, whichever is
earlier.
(b) Does not apply to "bodily injury" pr "property damage" resulting from an "accident" that
occurred before you acquired or formed the organization,
(c) Does not include any newly acquired or formed organization that is:
i. A joint venture or partnership; or
ii. An insured under any other automobile liability policy, or would be an insured
under such policy but for the termination of such policy or the exhaustion of
such policy's limits of insurance.
B. Coverage Extensions - Supplementary Payments
Supplemental Payments a.(2.) and a.(4.) in Coverage Extensions (Section II) are revised as follows:
1. In a.(2), the limit for the cost of bail bonds is increased to $3,000; and
2. In a.(4), the limit for the actual loss of earnings is increased to $1,000 per day.
FM 114.0.1263 (2/02)
Page 1 of 5
16 B "9
C. Duties in the Event Of An Accident, Claim, Suit, Or Loss
1. Your obligation in Loss Condition 2.a. (Section IV) relative to notification requirements applies only when
the "accident" or "loss" is known to:
a. You, if the named "Insured" is an individual;
b. A partner, if the named "insured" is a partnership;
c. A member, if the named "insured" is a joint venture or limited liability company; or
d. An executive officer or insurance manager, if the named "insured" is an organization other than a
partnership, joint venture or limited liability company.
2. Your obligation in Loss Condition 2,b (Section IV) relative to providing us with documents concerning a
claim or "suit" will not be considered breached unless the breach occurs after such claim or "suit" is
known to:
a. You, if the named "insured" is an individual;
b. A partner, if the named "insured" is a partnership;
c. A member, if the named "insured" is a joint venture or limited liability company; or
d. An executive officer or insurance manager, if the named "insured" is an organization other than a
partnership, joint venture or limited liability company.
D. Unintentional Failure To Disclose Hazards
If you unintentionally fail to disclose any hazards existing on the effective date of this policy, we will not
deny coverage under this Coverage Form because of such failure. However, this provision does not
affect our right to collect additional premium due to us as a result of these undisclosed hazards in
accordance with our filed rating plans.
E. Coverage Territory - Short Term Hired Commercial "Autos"
The following is added to the General Condition 7. Policy Period, Coverage Territory (Section IV):
f. Anywhere in the world if:
(1) A covered "auto" of the commercial van, pick-up, or truck type is leased, hired, rented or borrowed
for a period of 30 days or less; and
(2) The "insured's" responsibility to pay damages is determined in a "suit" on the merits, in the United
States of America, the territories and possessions of the United States of America, Puerto Rico, or
Canada or in a settlement we agree to.
We will cover "loss" to, or "accidents" involving, a covered "auto" while being transported between any of
these places.
FM 114.0.1263 (2/02)
Page 2 of 5
168 9
F. Mental Anguish Resulting From "Bodily Injury"
The definition of "bodily injury" in Section V. - Definitions is replaced by the following:
"Bodily injury" means physical injury, physical sickness or physical disease sustained by any person, including
"mental anguish" or death resulting from any of these. It does not include mental anguish to any person
which occurs in the absence of physical injury, physical sickness or physical disease to that person.
For the purpose of this provision, the term "mental anguish" shall mean any type of mental or emotional
illness or distress.
G. Non-Owned Auto Waiver Of Subrogation
We hereby waive any right of subrogation against any of your officers, directors, or "employees" which
might arise by reason of any payment under the insurance afforded by this policy for the operation"
maintenance, use, loading, or unloading of non-owned "autos". This waiver extends only to payments in
excess of other valid and collectible insurance available to the officer, director, or "employee".
H. Blanket Waiver of Subrogation When Required Under Written Contract
The following is added to Section IV - Business Auto Conditions, A.5, Transfer Of Rights Of Recovery
Against Others To Us:
However, we waive any right of recovery we may have against a person, organization or government
entity when you have waived such right of recovery under a written "insured contract" provided such
written "insured contract" is:
1. currently in effect or becoming effective during the term of this policy; and
2. executed prior to the "accident" or "loss"; or
3. executed after the "accident" or "loss" if:
a. the terms and conditions of the written "insured contract" had been agreed upon prior to the
"accident" or "loss"; and
b. you can definitively establish that the terms and conditions of the written "insured
contract" ultimately executed are the same as those which had been agreed upon prior to the
"accident" or "loss".
I. Blanket Additional Insured When Required Under Written Contract
Who Is An Insured (Section II - Liability Coverage, Paragraph A.1) is amended to add:
d. Any person, organization or governmental entity with respect to the operation, maintenance, or use of
a covered "auto" if you are required to add such person, organization or governmental entity to this policy
as an additional "insured" in order to comply with the terms of a written "insured contract" or written
agreement. This Additional Insured status is not conferred when such "insured contract" or written
agreement":
1. involves the owner or anyone else from whom you hire or borrow a covered "auto" unless it is
a "trailer" connected to a covered "auto" you own; or
FM 114.0.1263 (2/02)
Page 3 of 5
1 & B ~9
2. is executed after the date of "accident" or "loss";
Paragraph d.2. above does not apply if:
a. the terms and conditions of the written "insured contract" or written agreement had been
agreed upon prior to the "accident" or "loss"; and
b. you can definitively establish that the terms and conditions of the written "insured contract" or
written agreement ultimately executed are the same as those which had been agreed upon
prior to the "accident" or "loss".
J. Physical Damage - Glass Breakage
If you carry Comprehensive Coverage for the damaged covered "auto", then this coverage
extension J. applies to that covered "auto":
The following paragraph is added to A.3., Glass Breakage (Section III):
Any deductible shown in the Declarations will not apply to glass breakage if such glass is repaired, in a
manner acceptable to us, rather than replaced. If the glass must be replaced and there is no other
damage associated with the "loss", the deductible will be $100 unless a lower deductible is shown on the
declarations page for this coverage.
K. Physical Damage -
Increased Temporary Transportation Expense, Including Coverage
for Commercial Vehicles
If you carry Comprehensive coverage for the damaged covered "auto", then this coverage extension K,1. and
K,2. applies if the "loss" results from a Comprehensive "loss", even if the covered "auto" is not of the private
passenger type. If you carry Collision coverage for the damaged covered "auto", then coverage extension
K,2. applies if the "loss" results from a Collision "loss", even if the covered "auto" is not of the private
passenger type.
1. Paragraph A.4.a, Coverage Extension (Section III) is revised, with respect to temporary transportation
expenses incurred by the named "insured", to provide a per day limit of $50 per day subject to a
maximum limit of $1,500. In addition, the waiting period is hereby reduced so that coverage will
begin 24 hours after the theft.
No deductibles shall apply to this coverage.
2. We will pay for necessary and actual additional transportation expenses, including rental
reimbursement, incurred by the named "insured" due to "loss", other than theft, to a covered "auto"
which is:
a. identified or described in the Declarations or Schedule; and
b. carries physical damage coverage for the "loss" under this policy.
This coverage shall be provided without deductible and is limited to $50 per day subject to a maximum
limit of $1,500. This coverage does not apply while there are spare or reserve "autos" available to the
named "insured". We will only pay for those additional transportation expenses incurred during the policy
period beginning 24 hours after the "loss" and ending, regardless of the policy's expiration, when the
covered "auto" is repaired or replaced, or we pay for its "loss", whichever is earlier.
FM 114.0.1263 (2/02)
Page 4 of 5
16 8~9
L. Multiple Deductible Protection
If you carry Comprehensive and Collision coverages for the damaged covered "autos", then this coverage
extension L. applies to those covered "autos".
The following is added to Paragraph D. Deductible under Section 111- Physical Damage Coverage:
Whenever a covered "auto" and trailer are each damaged in the same "loss" while operating as a
combined truck and trailer unit, only one deductible shall apply to the "accident". The larger of the two
deductibles shall apply.
If another policy or coverage form issued by us, that is not an automobile policy or coverage form,
applies to the same "loss" or "accident", the following applies:
1. If the deductible under this Business Auto Coverage Form is not the largest deductible, it
will be waived.
2. If the deductible under this Business Auto Coverage Form is the largest deductible, it will
be reduced by the amount of the smaller (or smallest) deductible.
M. Extra Expenses - Stolen Vehicles
The following is added under Paragraph A.4.a. Coverage Extensions of Section III - Physical Damage
Coverage:
We will pay for all reasonable and necessary expenses to return a stolen covered "auto" to the named insured
if such covered "auto" carries Comprehensive coverage.
N. Extended Towing Coverage
If the named insured carries Comprehensive and Collision Coverage for the damaged covered commercial
"auto", then this coverage extension N. applies to that covered "auto". If the damaged covered "auto" is of the
private passenger type, then in addition to Comprehensive and Collision Coverage, the damaged covered
"auto" must also carry Towing Coverage in order for this coverage extension N. to apply.
We will pay for towing and associated labor costs each time a covered "auto" is disabled. All labor must be
performed at the place of disablement. If the "auto" is of the private passenger type, there will be no
deductible, If the "auto" is not a private passenger type, a $250 deductible will apply to this coverage but it
will not reduce the available limit of insurance. For all types of "autos", the most we will pay under this
coverage is $1,000 per disablement. "Autos" which are disabled do not include stolen vehicles.
o. Airbag Coverage
If the named "insured" carries Comprehensive and Collision Coverage for the damaged covered "auto", then
this coverage extension O. applies to that covered "auto".
The following is added to subparagraph 3.a. under Paragraph B. Exclusions (Section III - Physical Damage
Coverage ):
The accidental discharge of an airbag shall not be considered mechanical breakdown and therefore shall not
be excluded. This provision does not apply to "autos" you hire with a driver and it is excess over any warranty
specifically designed to provide this coverage.
FM 114.0.1263 (2/02)
Page 5 of 5
Policy Number
4066803972
16B 9
SCHEDULE OF FORMS AND ENDORSEMENTS
UNITED STATES FIRE INSURANCE COMPANY
Named Insured:
Agent Name: WILLIS OF FLORIDA - MIAMI
Effective Date: 4/1/2009
12:01 A.M., Standard Time
Agent No. 83324
WC 00 00 00 A
FM 206.0.11
WC 00 00 01 C
FM 206.0.1
FM 206.0.2
FM 600.0.963
WC 174
FM 110.0.619
FM 101. 0 .1441
FM 101.0.1544
FM 206.0.204
WC 00 03 03 B
WC 00 03 03 C
WC 00 03 10
..WC 00 03 13
WC 00 04 14
WC 09 03 03
WC 09 04 03
WC 09 06 06
WC 34 03 01 B
WC 49 03 01
WC 99 03 02
FM 111. 0.754
WC 09 04 03A
WORKERS COMPENSATION FORMS AND ENDORSEMENTS
INSURANCE POLICY
US FIRE INSURANCE COMPANY SIGNATURE PAGE
INFORMATION PAGE - PAGE 1
SCHEDULE OF NAME INSUREDS
SCHEDULE OF FORMS AND ENDORSEMENTS
PREMIUM PAYMENT SCHEDULE
WC AND EMPL LIAB EXTENSION OF INFO PAGE
WC FOREIGN VOLUNTARY COMP & EL COV ENDT
ARBITRATION ENDORSEMENT
RISK RETENTION AGGREGATE LIMIT
AMENDMENT OF CANCELLATION CONDITION
EMPLOYERS LIABILITY COVERAGE ENDT
EMPLOYERS LIABILITY COVERAGE ENDT
SOLE PROPRIETORS, PARTNERS, OFFICERS END
WAIVER OF OUR RIGHT TO RECOVER
NOTIFICATION OF CHANGE IN OWNERSHIP ENDT
FL EMPLOYERS LIAB COV ENDT
FL CONTRACTING PREMIUM ADJUSTMENT ENDT
FL EMPLOYMENT & WAGE INFO RELEASE ENDT
OH EMPLOYERS LIABILITY COVERAGE ENDT
WY AMENDATORY ENDT
FL DEDUCTIBLE ENDORSEMENT
POLICYHOLDER DISCLOSURE NOTICE
FLORIDA TERRORISM RISK INSURANCE
09-07
07-97
04-94
04-94
04-94
04-84
07-87
11-96
02-02
07-93
08-05
07-03
01-08
01-08
FM 206.0.2 04 94
168 9
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
This endorsement changes the policy to which it is attached effective on inception date of the
policy unless a different date is indicated below.
(The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy)
This endorsement effective 12:01 AM 04/01/2009 forms a part of Policy No 4066803972
Issued to
Vila and Son Landscaping Corp.
By
United States Fire Insurance Company
Premium
Included
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will
not enforce our right against the person or organization named in the Schedule. This agreement applies
only to the extent that you perform work under a written contract that requires you to obtain this
agreement from us.
This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule,
Schedule
Collier County soee
As per written contract or agreement
CWU~b)'. ~.J.o-..:w.~
~~
This form is not applicable in California, New Jersey, or Texas.
WC 00 03 13
(Ed. 4/84)
Copyright 1988 National Council on Compensation Insurance
168 9
EXHIBIT B
INSURANCE REQUIREMENTS
(1) The amounts and types of insurance coverage shall conform to the following minimum
requirements with the use of Insurance Services Office (ISO) forms and endorsements or their
equivalents. If Contractor has any self-insured retentions or deductibles under any of the below listed
minimum required coverages, Contractor must identify on the Certificate of Insurance the nature and
amount of such self-insured retentions or deductibles and provide satisfactory evidence of financial
responsibility for such obligations. All self-insured retentions or deductibles will be Contractor's sole
responsibility.
(2) The insurance required by this Agreement shall be written for not less than the limits specified
herein or required by law, whichever is greater.
(3) Coverage's shall be maintained without interruption from the date of commencement of the
Work until the date of completion and acceptance of the Project by the Owner or as specified in this
Agreement, whichever is longer.
(4) Certificates of insurance (3 copies) acceptable to the Owner and in the form set forth in
Attachment I to this Exhibit B shall be filed with the Owner within ten (10) calendar days after Notice
of Award is received by Contractor evidencing the fact that Contractor has acquired and put in place
the insurance coverages and limits required hereunder. In addition, certified, true and exact copies of
all insurance policies required shall be provided to Owner, on a timely basis, if requested by Owner.
(5) The Contractor and/or its insurance carrier shall provide 30 days written notice to the Owner of
policy cancellation or non-renewal on the part of the insurance carrier or the Contractor. Contractor
shall also notify Owner, in a like manner, within twenty-four (24) hours after receipt, of any notices of
expiration, cancellation, non-renewal or material change in coverages or limits received by Contractor
from its insurer and nothing contained herein shall relieve Contractor of this requirement to provide
notice. In the event of a reduction in the aggregate limit of any policy to be provided by Contractor
hereunder, Contractor shall immediately take steps to have the aggregate limit reinstated to the full
extent permitted under such policy.
(6) All insurance coverage's of the Contractor shall be primary to any insurance or self insurance
program carried by the Owner applicable to this Project.
(7) The acceptance by Owner of any Certificate of Insurance does not constitute approval or
agreement by the Owner that the insurance requirements have been satisfied or that the insurance
policy shown on the Certificate of Insurance is in compliance with the requirements of this Agreement.
(8) Contractor shall require each of its Subcontractors to procure and maintain, until the
completion of the subcontractors work, insurance of the types and to the limits specified in this
Section unless such insurance requirements for the Subcontractor are expressly waived in writing by
the Owner.
(9) Should at any time the Contractor not maintain the insurance coverage's required herein, the
Owner may terminate the Agreement or at its sole discretion shall be authorized to purchase such
coverage's and charge the Contractor for such coverage's purchased. If Contractor fails to reimburse
GC-CA-B-1
16B~9
Owner for such costs within thirty (30) days after demand, Owner has the right to offset these costs
from any amount due Contractor under this Agreement or any other agreement between Owner and
Contractor. The Owner shall be under no obligation to purchase such insurance, nor shall it be
responsible for the coverage's purchased or the insurance company or companies used. The
decision of the Owner to purchase such insurance coverage's shall in no way be construed to be a
waiver of any of its rights under the Contract Documents.
(10) If the initial or any subsequently issued Certificate of Insurance expires prior to the completion
of the Work or termination of the Agreement, the Contractor shall furnish to the Owner, renewal or
replacement Certificate(s) of Insurance not later than ten (10) calendar days after the date of their
expiration. Failure of the Contractor to provide the Owner with such renewal certificate(s) shall be
considered justification for the Owner to terminate the Agreement.
(11) All insurance policies required by this Agreement shall include the following provisions and
conditions by endorsement to the policies:
11.1 All insurance policies, other than the Business Automobile and Workers Compensation
policies, provided by Contractor to meet the requirements of this Agreement shall name
Collier County, Florida, as an additional insured as to the operations of Contractor under
this Agreement and shall contain a severability of interests provisions.
11.2. Companies issuing the insurance policy or policies shall have no recourse against
Owner for payment of premiums or assessments for any deductibles which all are at the
sole responsibility and risk of Contractor.
11.3. All insurance coverages of Contractor shall be primary to any insurance or self-
insurance program carried by Owner applicable to this Project, and the "Other
Insurance" provisions of any policies obtained by Contractor shall not apply to any
insurance or self-insurance program carried by Owner applicable to this Project.
11.4. The Certificates of Insurance, which are to be provided on the form set forth in
Attachment I to this Exhibit B, must identify the specific Project name, as well as the site
location and address (if any).
11.5. All insurance policies shall be fully performable in Collier County, Florida, and shall be
construed in accordance with the laws of the State of Florida.
WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY
Required by this Agreement? [ZJ Yes 0 No
(1) Workers' Compensation and Employers' Liability Insurance shall be maintained by the
Contractor during the term of this Agreement for all employees engaged in the work under this
Agreement in accordance with the laws of the State of Florida. The amounts of such insurance shall
not be less than:
a. Worker's Compensation - Florida Statutory Requirements
b. Employers' Liability
GC-CA-B-2
16819
X $1,000,000 Each Accident /
$1,000,000 Disease Aggregate
$1,000,000 Disease Each Employee
(2) The insurance company shall waive all claims rights against the Owner and the policy shall be
so endorsed.
(3) United States Longshoreman's and Harborworker's Act coverage shall be maintained where
applicable to the completion of the work.
o Applicable L8J Not Applicable
(4) Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the
work.
o Applicable L8J Not Applicable
COMMERCIAL GENERAL LIABILITY
Required by this Agreement? L8J Yes 0 No
(1) Commercial General Liability Insurance shall be maintained by the Contractor on an
occurrence basis. Coverage will include, but not be limited to, Bodily Injury, Property Damage,
Personal Injury, Contractual Liability for this Agreement, Independent Contractors, Broad Form
Property Damage including Completed Operations and Products and Completed Operations
Coverage. Limits of Liability shall not be less than the following:
x
General Aggregate
Products/Completed Operations Aggregate
Personal and Advertising Injury
Each Occurrence
Fire Damage
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$ 50,000
(2) The General Aggregate Limit shall apply separately to this Project and the policy shall be
endorsed using the following endorsement wording. "This endorsement modifies insurance provided
under the following: Commercial General Liability Coverage Part. The General Aggregate Limit
under LIMITS OF INSURANCE applies separately to each of your projects away from premises
owned by or rented to you."
(3) The Owner shall be named as an Additional Insured and the policy shall be endorsed that such
coverage shall be primary to any similar coverage carried by the Owner.
(4) Coverage shall be included for explosion, collapse or underground property damage claims.
(5) Watercraft Liability coverage shall be carried at the limits shown above if applicable to the
completion of the work under this Agreement.
o Applicable L8JNot Applicable
GC-CA-B-3
168 ~9
(6) Aircraft Liability coverage shall be carried at limits of $10,000,000 each occurrence if
applicable to the completion of the work under this Agreement.
o Applicable IZl Not Applicable
PROPERTY INSURANCE - BUILDERS RISK
(1) The Owner may purchase and maintain in a company or companies lawfully authorized to do
business in the State of Florida and in Collier County, property insurance in the amount of the initial
Contract Amount as well as subsequent modifications thereto for the entire Work at the site on a
replacement cost basis without voluntary deductibles. Such property insurance shall be maintained,
unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons
and entities who are beneficiaries of such insurance, until final payment has been made or until no
person or entity other than the Owner has an insurable interest in the property required to be covered,
whichever is earlier. This insurance shall include interests of the Owner, the Contractor,
Subcontractors, Sub-subcontractors and Material Suppliers in the Work.
(2) Property insurance shall be on an all-risk policy form and, at the Owner's option, shall cover
reasonable compensation for Professional's services and expenses required as a result of such
insured loss. At the Owner's option, flood and windstorm insurance will also be purchased.
(3) The property insurance provided by the Owner requires minimum deductibles and the
Contractor shall pay costs not covered by the deductibles. The responsibility of the Contractor for
any deductible associated with the all-risk policy described above shall be limited to a maximum of
$5,000 for each occurrence unless higher deductibles are identified in Exhibit C of the Contract
Documents. The responsibility of the Contractor for any deductible associated with the flood or
windstorm insurance identified herein, if purchased by the Owner, shall be limited to a maximum of
$5,000 for each occurrence unless higher deductibles are identified in Exhibit C of the Contract
Documents.
(4) This property insurance shall cover portions of the Work stored off the site after written
approval of the Owner at the value established in the approval, and also portions of the Work in
transit.
(5) Boiler and Machinery Insurance. The Owner shall have the option of purchasing and
maintaining boiler and machinery insurance required by the Contract Documents or by law, which
shall specifically cover such insured objects during installation and until final acceptance by the
Owner. If purchased this insurance shall include interests of the Owner, Contractor, Subcontractors
and Sub-subcontractors in the Work.
(6) Waivers of Subrogation. The Owner and Contractor waive all rights against (1) each other and
any of their subcontractors, sub-subcontractors, agents and employees, each of the other, and (2) the
Design Professional, and Design Professional's subconsultants, for damages caused by fire or other
perils to the extent of insurance proceeds actually received by Owner under property insurance
obtained pursuant to this Exhibit or other any property insurance applicable to the Work, except such
rights as they have to proceeds of such insurance held by the Owner as fiduciary. The policies shall
provide waivers of subrogation by endorsement or otherwise.
GC-CA-B-4
16B~9
(7) A loss insured under Owner's property insurance shall be adjusted by the Owner and made
payable to the Owner for the insured, as their interests may appear.
AUTOMOBILE LIABILITY INSURANCE
Required by this Agreement? [2J Yes 0 No
(1) Automobile Liability Insurance shall be maintained by the Contractor for the ownership,
maintenance or use of any owned, non-owned or hired vehicle with limits of not less than:
X Bodily Injury & Property Damage - $ 2,000,000
UMBRELLA LIABILITY
(1) Umbrella Liability may be maintained as part of the liability insurance of the Contractor and, if
so, shall be in addition to and in excess of any Employers' Liability, Commercial General Liability, and
Automobile Liability coverage's and shall include all coverage's on a "following form" basis.
(2) The policy shall contain wording to the effect that, in the event of the exhaustion of any
underlying coverage due to the payment of claims, the Umbrella policy will "drop down" to apply as
primary insurance.
GC-CA-B-5
16 B i9
EXHIBIT C
RELEASE AND AFFIDAVIT FORM
COUNTY OF COLLIER )
STATE OF FLORIDA)
Before me, the undersigned authority, personally appeared
who after being duly sworn, deposes and says:
(1) In accordance with the Contract Documents and in consideration of $ paid,
("Contractor") releases and waives for itself and it's subcontractors,
material-men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort,
against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the
Agreement between Contractor and Owner dated ' 2009 for the period from
to ' excluding all retainage withheld and any pending claims or
disputes as expressly specified as follows:
(2) Contractor certifies for itself and its subcontractors, material-men, successors and assigns, that all charges for
labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a
demand against any payment bond might be filed, have been fully satisfied and paid.
(3) To the maximum extent permitted by law, Contractor agrees to indemnify, defend and save harmless Owner from
all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the
performance by Contractor of the Work covered by this Release and Affidavit.
(4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No.
CONTRACTOR
BY:
ITS:
President
DATE:
Witnesses
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me this _ day of ' 2009, by
,as of ,a
corporation, on behalf of the corporation. He/she is personally known to me or has produced
as identification and did (did not) take an oath.
My Commission Expires:
(Signature of Notary)
NAME:
(Legibly Printed)
(AFFIX OFFICIAL SEAL)
Notary Public, State of
Commissioner No.:
GC-CA-C-1
168'9
' . 'f!~
EXHIBIT D
FORM OF CONTRACT APPLICATION FOR PAYMENT
(County Project Manager)
(County Department)
Collier County Board of County Commissioners (the OWNER) or
Collier County Water-Sewer District (the OWNER)
Bid No.
Project No.
Application Date
FROM:
(Contractor's Representative) Payment Application No.
(Contractor's Name) for Work accomplished through the Date:
(Contractor's Address)
(Project Name)
RE:
Original Contract Time:
Revised Contract Time:
Retainage @ 10% thru[insert date] $
Retainage @ _% after [insert date] $
=
Percent Work completed to Date:
Percent Contract Time completed to Date
%
%
Liquidated Damages to be Accrued $
ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION
Original Contract Price: $
Total Change Orders to Date $
Revised Contract Amount $
Total value of Work Completed
and stored to Date $
Less Retainage $
Total Earned Less Retainage $
Less previous payment (s) $
AMOUNT DUE THIS
APPLICATION: $
Remaining Contract Balance $
CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments
received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in
full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment
numbered 1 through _ inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed
in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims,
security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have
been paid for work which previous payments were issued and received from the OWNER and that current payment is now
due; and (4) CONTRACTOR has only included amounts in this Application for Payment properly due and owing and
CONTRACTOR has not included within the above referenced amount any claims for unauthorized or changed Work that
has not been properly approved by Owner in writing and in advance of such Work.
By CONTRACTOR: (Contractor's Name)
(Signature) DATE:
(Type Name & Title)
(shall be signed by a duly authorized representative of CONTRACTOR)
Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended:
By Design Professional:
(DP's Name)
(Signature) DATE:
(Type Name & Title)
Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved:
By OWNER'S Project Manager:
(Signature) DATE:
(Type Name and Title)
GC-CA-D-1
en
w
::::>
...J
<(
>
u..
o
W
...J
::::>
Cl
W
J:
U
en
L:
Q)
.0
E
::J 0
Z l-
t; u
'5- s .g
0:C3~
Wo
..Jel..J
<(<(w
I-ZJ:
O<(J:
I-I-!::
~?;
~ i
~ ~ ~
I ~ ~
~ ~
<fl
<1l
E
o
u
~2
.~ ~ I
'<1l <fl
g:c
cl-
1ii C
~ E
'+- ::::J
0(5
C u
.Q <1l
urn
::::JO
~ 8
~ c
OU)
~~
OJ_
"* .~
~-o
OJ <1l
~~
.!!! D-
C <fl
::::J ,-
<1l2
II~~
~:5
u ~
.~ ~
tl OJ
OJ c
.::. 0
c:;::;
o OJ
u E
~'.E
- c
W
el
~~
0-
...~
W
0::
WJ:
Oe/)
z-
<(~
..JU-
<(0
co I-
I-W
ffitLi
0..J
ffi~
0..0
o
[low
..JI-WI-
<(wO::<l:
I-..JOo
~~li;o
SadI-
e/)
O..J
W<(
~~
I-w
e/)~
:E
1:
::::J c
c E
o~
:t:' 0
CIl u
E <1l
Om
'Eo
= :J
CU.c
all-
~~
D- -
= C
. 3i :;;
::::J <1l
~ ~
aXCi
a> .!Q
.c al
3: en
,~ ~
<1l OJ
roID
o ~
I C
I~ .~
.'-jH
c al
25
~o
Jih
~~2
0.. ::J ~
a> 5 .~
-O:;:;Q)
COJen
::::J E c
<fl ~ CIl
C O.c
E '+- U
::::J .~ <1l
CI) ornE
-l U-<1l
<l: o<flu
I- 1: ~ .~
o <1l &~
I- 5 CIl <1l
~ .c c
.2 .~: ~
Ie 51 g
-,.Q ~ ..c
I~I~ ~
:b1~1~
Cl
W
I-
W
-l
a.
:2:
o
u
::.::
0::
o
~
o
e/)O
i:,C::
I-'W
10..
e/)W
zl-
0<(
_0
I-w
<(0
~z
~en
a.
<(W
e/)I-
::J<(
00
>::J
wo::
O::J:
0..1-
o
~w
::J::J
0..J
W<(
J:>
o
en
z
o
1=
a.
~
o
en
:0 ~
<1l
::::J
c
+:i
C
o
o
~r- ~ i I :2: ffil
If!l ~ w~1
u____J ~ _ '~ _,_1_ =-1.1___
_1_- _
16BI9
N
o
<i:
u
U
(9
I
0
I-
Q) cu
w 0 .....
C III
III .5
cu
m
"C
"C 0
I Q) .;:
Q)
0 cu 0..
.....
I III .~
C ..c -
I I-
+ ~"C
<( III Q)
~ ::J-
U Ocu
::J 'S; .....
E III
Q) C L-
L- ...
0 0..
LL
"C
"C 0
Q) ";:
> Q)
CO "(j) 0..
0 "~
Q)
0:: ..c
I-
~"C
III Q)
::J >
<( 0 '(j)
'S; 0
Q) Q)
... 0::
Q) 0..
...
0 ~ I
Q) ...
Q) I
0 .Q
'0 E
> ::J
C Z
-
...
.!!!
c..
c..
::J
rn
c
~ 0
+::
(]) c..
::J .;:
c 0
C III
Q)
0 0
~
0
+-'
~
.J:::
X
W
Q) I
.....
III
0 I
I
_r.-","._ ...."""'...'... nll'li. III
W
I
o
U
CO
"E
o
o
Q)
0::
II)
cu
.;:
Q)
.....
III
~
"C
.....
rn
1.168 9
(")
I
o
.d:
u
o
CJ
168 9
EXHIBIT E
CHANGE ORDER
TO:
Project Name:
Bid No.:
Change Order No.:
Change Order Description
FROM: Collier County Government
Construction Agreement Dated:
Date:
Original Agreement Amount ... ...... .............................. ................. ...$
Sum of previous Change Orders Amount .......................................$
This Change Order Amount ........................................................... $
Revised Agreement Amount........................................................... $
Original Contract Time in calendar days
Adjusted number of calendar days due to previous Change Orders
This Change Order adjusted time is
Revised Contract Time in calendar days
Original Notice to Proceed Date
Completion date based on original Contract Time
Revised completion date
Contractor's acceptance of this Change Order shall constitute a modification to the Agreement
and will be performed subject to all the same terms and conditions as contained in the
Agreement, as if the same were repeated in this acceptance. The adjustments, if any, to the
Agreement shall constitute a full and final settlement of any and all claims of the Contractor
arising out of, or related to, the change set forth herein, including claims for impact and delay
costs.
Prepared by: Date:
Project Manager
Recommended by:
Design Professional
Date:
Accepted by:
Date:
Contractor
Approved by:
Date:
Department Director
Date:
Approved by:
Division Administrator
Purchasing Department
Authorized by
Director
Date:
Approved by:
Date:
(For use by Owner: Fund
Numbe~ )
Cost Center:
Object Code:
Project
GC-CA-E-5
16Btl9
EXHIBIT F
CERTIFICATE OF SUBSTANTIAL COMPLETION
OWNER'S Project No.
Design Professional's Project No.
PROJECT:
CONTRACTOR
Contract For
Contract Date
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof:
To
OWNER
And
To
Substantial Completion is the state in the progress of the Work when the Work (or designated
portion) is sufficiently complete in accordance with the Contract Documents so that the Owner
can occupy or utilize the Work for its intended use. The Work to which this Certificate applies has
been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN
PROFESSIONAL, and that Work is hereby declared to be substantially complete in accordance with the
requirements of the Contract Documents on:
DATE OF SUBSTANTIAL COMPLETION
A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive,
and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all
the Work in accordance with the Contract Documents. The items in the tentative list shall be completed
or corrected by CONTRACTOR within days of the above date of Substantial Completion.
GC-CA-F-1
168 9
The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance,
heat, utilities, insurance and warranties shall be as follows:
RESPONSIBILITIES:
OWNER:
CONTRACTOR
The following documents are attached to and made a part of this Certificate:
This certificate does not constitute an acceptance of Work not in accordance with the Contract
Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the
Contract Documents.
Executed by Design Professional on
,2009
Design Professional
By:
Type Name and Title
CONTRACTOR accepts this Certificate of Substantial Completion on
,2009
CONTRACTOR
By:
Type Name and Title
OWNER accepts this Certificate of Substantial Completion on
,2009
OWNER
By:
Type Name and Title
GC-CA-F-2
168' 9
EXHIBIT G
FINAL PAYMENT CHECKLIST
Bid No.: Project No.:
Contractor:
The following items have been secured by the
for the Project known as
Date:
,2009
and have been reviewed and found to comply with the requirements of the Contract Documents.
Original Contract Amount: Final Contract Amount:
Commencement Date:
Substantial Completion Time as set forth in the Agreement: Calendar Days.
Actual Date of Substantial Completion:
Final Completion Time as set forth in the Agreement: Calendar Days.
Actual Final Completion Date:
YES NO
1. All Punch List items completed on
2. Warranties and Guarantees assigned to Owner (attach to this form).
3. Effective date of General one year warranty from Contractor is:
4. 2 copies of Operation and Maintenance manuals for equipment and
system submitted (list manuals in attachment to this form).
5. As-Built drawings obtained and dated:
6. Owner personnel trained on system and equipment operation.
7. Certificate of Occupancy No.:
issued on (attach to this form).
8. Certificate of Substantial Completion issued on
9. Final Payment Application and Affidavits received from Contractor on:
10. Consent of Surety received on
11. Operating Department personnel notified Project is in operating phase.
12. All Spare Parts or Special Tools provided to Owner:
13. Finished Floor Elevation Certificate provided to Owner:
14. Other:
If NO is checked for any of the above, attach
If any of the above is not applicable, indicate by N/A.
explanation.
Acknowledgments:
By Contractor:
(Company Name)
(Signature)
(Typed Name & Title)
By Design
Professional:
(Firm Name)
(Signature)
(Typed Name & Title)
(Department Name)
(Signature)
(Name & Title)
By Owner:
GC-CA-G-1
168 9
EXHIBIT H
GENERAL TERMS AND CONDITIONS
1. INTENT OF CONTRACT DOCUMENTS.
1.1 It is the intent of the Contract Documents to describe a functionally complete
Project (or portion thereof) to be constructed in accordance with the Contract
Documents. Any work, materials or equipment that may reasonably be inferred from
the Contract Documents as being required to produce the intended result shall be
supplied whether or not specifically called for. When words which have a well known
technical or trade meaning are used to describe work, materials or equipment, such
words shall be interpreted in accordance with that meaning. Reference to standard
specifications, manuals or codes of any technical society, organization or association or
to the laws or regulations of any governmental authority having jurisdiction over the
Project, whether such reference be specific or by implication, shall mean the latest
standard specification, manual, code, law or regulation in effect at the time the Work is
performed, except as may be otherwise specifically stated herein.
1.2 If before or during the performance of the Work Contractor discovers a conflict,
error or discrepancy in the Contract Documents, Contractor immediately shall report
same to the Project Manager in writing and before proceeding with the Work affected
thereby shall obtain a written interpretation or clarification from the Project Manager;
said interpretation or clarification from the Project Manager may require Contractor to
consult directly with Design Professional or some other third party, as directed by
Project Manager. Contractor shall take field measurements and verify field conditions
and shall carefully compare such field measurements and conditions and other
information known to Contractor with the Contract Documents before commencing any
portion of the Work.
1.3 Drawings are intended to show general arrangements, design and extent of Work
and are not intended to serve as shop drawings. Specifications are separated into
divisions for convenience of reference only and shall not be interpreted as establishing
divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the
event of a discrepancy between or among the drawings, specifications or other Contract
Document provisions, Contractor shall be required to comply with the provision which is
the more restrictive or stringent requirement upon the Contractor, as determined by the
Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws,
fittings, fillers, hardware, accessories, trim and other parts required in connection with
any portion of the Work to make a complete, serviceable, finished and first quality
installation shall be furnished and installed as part of the Work, whether or not called for
by the Contract Documents.
2. INVESTIGATION AND UTILITIES.
2.1 Subject to Section 2.3 below, Contractor shall have the sole responsibility of
satisfying itself concerning the nature and location of the Work and the general and
local conditions, and particularly, but without limitation, with respect to the following:
those affecting transportation, access, disposal, handling and storage of materials;
GC-CA-H-1
16 8 ~_g
availability and quality of labor; water and electric power; availability and condition of
roads; work area; living facilities; climatic conditions and seasons; physical conditions at
the work-site and the project area as a whole; topography and ground surface
conditions; nature and quantity of the surface materials to be encountered; subsurface
conditions; equipment and facilities needed preliminary to and during performance of
the Work; and all other costs associated with such performance. The failure of
Contractor to acquaint itself with any applicable conditions shall not relieve Contractor
from any of its responsibilities to perform under the Contract Documents, nor shall it be
considered the basis for any claim for additional time or compensation.
2.2 Contractor shall locate all existing roadways, railways, drainage facilities and
utility services above, upon, or under the Project site, said roadways, railways, drainage
facilities and utilities being referred to in this Sub-Section 2.2 as the "Utilities".
Contractor shall contact the owners of all Utilities to determine the necessity for
relocating or temporarily interrupting any Utilities during the construction of the Project.
Contractor shall schedule and coordinate its Work around any such r~location or
temporary service interruption. Contractor shall be responsible for properly shoring,
supporting and protecting all Utilities at all times during the course of the Work. The
Contractor is responsible for coordinating all other utility work so as to not interfere with
the prosecution of the Work (except those utilities to be coordinated by the Owner as
may be expressly described elsewhere in the Contract Documents).
2.3 Notwithstanding anything in the Contract Documents to the contrary, if conditions
are encountered at the Project site which are (i) subsurface or otherwise concealed
physical conditions which differ materially from those indicated in the Contract
Documents or (ii) unknown physical conditions of an unusual nature, which differ
materially from those ordinarily found to exist and generally recognized as inherent in
construction activities of the character provided for in the Contract Documents, and
which reasonably should not have been discovered by Contractor as part of its scope of
site investigative services required pursuant to the terms of the Contract Documents,
then Contractor shall provide Owner with prompt written notice thereof before conditions
are disturbed and in no event later than three (3) calendar days after first observance of
such conditions. Owner and Design Professional shall promptly investigate such
conditions and, if they differ materially and cause an increase or decrease in
Contractor's cost of, or time required for, performance of any part of the Work, Owner
will acknowledge and agree to an equitable adjustment to Contractor's compensation or
time for performance, or both, for such Work. If Owner determines that the conditions at
the site are not materially different from those indicated in the Contract Documents or
not of an unusual nature or should have been discovered by Contractor as part of its
investigative services, and that no change in the terms of the Agreement is justified,
Owner shall so notify Contractor in writing, stating its reasons. Claims by Contractor in
opposition to such determination by Owner must be made within seven (7) calendar
days after Contractor's receipt of Owner's written determination notice. If Owner and
Contractor cannot agree on an adjustment to Contractor's cost or time of performance,
the dispute resolution procedure set forth in the Contract Documents shall be complied
with by the parties.
GC-CA-H-2
16B~9
3. SCHEDULE.
3.1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award,
shall prepare and submit to Project Manager, for their review and approval, a progress
schedule for the Project (herein "Progress Schedule"). The Progress Schedule shall
relate to all Work required by the Contract Documents, and shall utilize the Critical Path
method of scheduling and shall provide for expeditious and practicable execution of the
Work within the Contract Time. The Progress Schedule shall indicate the dates for
starting and completing the various stages of the Work.
3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly
updates to the Progress Schedule shall be subject to the Project Manager's review and
approval. Contractor shall submit the updates to the Progress Schedule with its
monthly Applications for Payment noted below. The Project Manager's review and
approval of the submitted Progress Schedule updates shall be a condition precedent to
the Owner's obligation to pay Contractor.
3.3 All work under this Agreement shall be performed in accordance with the
requirements of all Collier County Noise Ordinances then in effect. Unless otherwise
specified, work will generally be limited to the hours of 7:00 a.m. to 5:00 p.m., Monday
through Friday. No work shall be performed outside the specified hours without the
prior approval of the Project Manager.
4. PROGRESS PAYMENTS.
4.1 Prior to submitting its first monthly Application for Payment, Contractor shall
submit to Project Manager, for their review and approval, a schedule of values based
upon the Contract Price, listing the major elements of the Work and the dollar value for
each element. After its approval by the Project Manager, this schedule of values shall
be used as the basis for the Contractor's monthly Applications for Payment. This
schedule shall be updated and submitted each month along with a completed copy of
the Application for Payment form signed by the Contractor's authorized representative
and attached to the Agreement as Exhibit D.
4.2 Prior to submitting its first monthly Application for Payment, Contractor shall
provide to the Project Manager the list of its Subcontractors and materialmen submitted
with its Bid showing the work and materials involved and the dollar amount of each
subcontract and purchase order. Contractor acknowledges and agrees that any
modifications to the list of Subcontractors submitted with Contractor's Bid and any
subsequently identified Subcontractors are subject to Owner's prior written approval.
The first Application for Payment shall be submitted no earlier than thirty (30) days after
the Commencement Date. Notwithstanding anything herein to the contrary, if approved
by Owner in its sole discretion, Contractor may submit its invoice for any required
Payment and Performance Bonds prior to the first Application of Payment provided that
Contractor has furnished Owner certified copies of the receipts evidencing the premium
paid by Contractor for the bonds.
GC-CA-H-3
16B 9
4.3 Unless expressly approved by Owner in advance and in writing, said approval at
Owner's sole discretion, Owner is not required to make any payment for materials or
equipment that have not been incorporated into the Project. If payment is requested on
the basis of materials and equipment not incorporated into the Project, but delivered
and suitably stored at the site or at another location, and such payment and storage
have been agreed to by Owner in writing, the Application for Payment also shall be
accompanied by a bill of sale, invoice or other documentation warranting that the Owner
has received the materials and equipment free and clear of all liens, charges, security
interests and encumbrances, together with evidence that the materials and equipment
are covered by appropriate property insurance and other arrangements to protect
Owner's interest therein, all of which shall be subject to the Owner's satisfaction.
Thereafter, with each Application for Payment, Contractor also shall complete and
submit to Owner as part of its Application for Payment, the Stored Materials Record
attached hereto and made a part hereof as Exhibit D.
4.4 Contractor shall submit six (6) copies of its monthly Application for Payment to
the Project Manager or his or her designee, as directed by Owner (which designee may
include the Design Professional). After the date of each Application for Payment is
stamped as received and within the timeframes set forth in Section 218.735 F.S., the
Project Manager, or Design Professional, shall either: (1) Indicate its approval of the
requested payment; (2) indicate its approval of only a portion of the requested payment,
stating in writing its reasons therefore; or (3) return the Application for Payment to the
Contractor indicating, in writing, the reason for refusing to approve payment. Payments
of proper invoices in the amounts approved shall be processed and paid in accordance
with Section 218.735, F.S. and the administrative procedures established by the
County's Purchasing Department and the Clerk of Court's Finance Department
respectively.
In the event of a total denial by Owner and return of the Application for Payment by the
Project Manager, the Contractor may make the necessary corrections and re-submit the
Application for Payment. The Owner shall, within ten (10) business days after the
Application for Payment is stamped and received and after Project Manager approval of
an Application for Payment, pay the Contractor the amounts so approved.
4.5 Owner shall retain ten percent (10%) of the gross amount of each monthly
payment request or ten percent (10%) of the portion thereof approved by the Project
Manager for payment, whichever is less. Such sum shall be accumulated and not
released to Contractor until final payment is due unless otherwise agreed to by the
Owner in accordance with Florida Statute 255.078. The Project Manager shall have the
discretion to establish, in writing, a schedule to periodically reduce the percentage of
cumulative retainage held through out the course of the Project schedule. Owner shall
reduce the amount of the retainage withheld on each payment request subsequent to
fifty percent (50%) completion subject to the guidelines set forth in Florida Statute
255.078 and as set forth in the Owner's Purchasing Policy.
GC-CA-H-4
1.6 B ~9
4.6 Monthly payments to Contractor shall in no way imply approval or acceptance of
Contractor's Work.
4.7 Each Application for Payment, subsequent to the first pay application, shall be
accompanied by a Release and Affidavit, in the form attached as Exhibit C,
acknowledging Contractor's receipt of payment in full for all materials, labor, equipment
and other bills that are then due and payable by Owner with respect to the current
Application for Payment. Further, to the extent directed by Owner and in Owner's sole
discretion, Contractor shall also submit a Release and Affidavit from each
Subcontractor, sub-subcontractor, or supplier in the form attached as Exhibit C
acknowledging that each Subcontractor, sub-subcontractor or supplier has been paid in
full through the previous month's Application for Payment. The Owner shall not be
required to make payment until and unless these affidavits are furnished by Contractor.
4.8 Contractor agrees and understands that funding limitations exist and that the
expenditure of funds must be spread over the duration of the Project at regular intervals
based on the Contract Amount and Progress Schedule. Accordingly, prior to submitting
its first monthly Application for Payment, Contractor shall prepare and submit for Project
Manager's review and approval, a detailed Project Funding Schedule, which shall be
updated as necessary and approved by Owner to reflect approved adjustments to the
Contract Amount and Contract Time. No voluntary acceleration or early completion of
the Work shall modify the time of payments to Contractor as set forth in the approved
Project Funding Schedule.
4.9 Notwithstanding anything in the Contract Documents to the contrary, Contractor
acknowledges and agrees that in the event of a dispute concerning payments for Work
performed under this Agreement, Contractor shall continue to perform the Work
required of it under this Agreement pending resolution of the dispute provided that
Owner continues to pay Contractor all amounts that Owner does not dispute are due
and payable.
5. PAYMENTS WITHHELD.
5.1 The Project Manager may decline to approve any Application for Payment, or
portions thereof, because of subsequently discovered evidence or subsequent
inspections that reveal non-compliance with the Contract Documents. The Project
Manager may nullify the whole or any part of any approval for payment previously
issued and Owner may withhold any payments otherwise due Contractor under this
Agreement or any other agreement between Owner and Contractor, to such extent as
may be necessary in the Owner's opinion to protect it from loss because of:
(a) defective Work not remedied; (b) third party claims filed or reasonable evidence
indicating probable filing of such claims; (c) failure of Contractor to make payment
properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt
that the Work can be completed for the unpaid balance of the Contract Amount; (e)
reasonable indication that the Work will not be completed within the Contract Time; (f)
unsatisfactory prosecution of the Work by the Contractor; or (g) any other material
breach of the Contract Documents by Contractor.
GC-CA-H-5
16B~:9
5.2 If any conditions described in 5.1. are not remedied or removed, Owner may,
after three (3) days written notice, rectify the same at Contractor's expense. Provided,
however, in the event of an emergency, Owner shall not be required to provide
Contractor any written notice prior to rectifying the situation at Contractor's expense.
Owner also may offset against any sums due Contractor the amount of any liquidated or
non-liquidated obligations of Contractor to Owner, whether relating to or arising out of
this Agreement or any other agreement between Contractor and Owner.
6. FINAL PAYMENT.
6.1 Owner shall make final payment to Contractor in accordance with Section
218.735, F.S. and the administrative procedures established by the County's
Purchasing Department and the Clerk of Court's Finance Department after the Work is
finally inspected and accepted by Project Manager as set forth with Section 20.1 herein,
provided that Contractor first, and as an explicit condition precedent to the accrual of
Contractor's right to final payment, shall have furnished Owner with a properly executed
and notarized copy of the Release and Affidavit attached as Exhibit C, as well as, a duly
executed copy of the Surety's consent to final payment and such other documentation
that may be required by the Contract Documents and the Owner. Prior to release of
final payment and final retainage, the Contractor's Representative and the Project
Manager shall jointly complete the Final Payment Checklist, a representative copy of
which is attached to this Agreement as Exhibit G.
6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and
all claims by Contractor against Owner arising out of this Agreement or otherwise
relating to the Project, except those previously made in writing in accordance with the
requirements of the Contract Documents and identified by Contractor as unsettled in its
final Application for Payment. Neither the acceptance of the Work nor payment by
Owner shall be deemed to be a waiver of Owner's right to enforce any obligations of
Contractor hereunder or to the recovery of damages for defective Work not discovered
by the Design Professional or Project Manager at the time of final inspection.
7. SUBMITTALS AND SUBSTITUTIONS.
7.1 Contractor shall carefully examine the Contract Documents for all requirements
for approval of materials to be submitted such as shop drawings, data, test results,
schedules and samples. Contractor shall submit all such materials at its own expense
and in such form as required by the Contract Documents in sufficient time to prevent
any delay in the delivery of such materials and the installation thereof.
7.2 Whenever materials or equipment are specified or described in the Contract
Documents by using the name of a proprietary item or the name of a particular supplier,
the naming of the item is intended to establish the type, function and quality required.
Unless the name is followed by words indicating that no substitution is permitted,
materials or equipment of other suppliers may be accepted by Owner if sufficient
information is submitted by Contractor to allow the Owner to determine that the material
or equipment proposed is equivalent or equal to that named. Requests for review of
substitute items of material and equipment will not be accepted by Owner from anyone
GC-CA-H-6
16B 9
other than Contractor and all such requests must be submitted by Contractor to Project
Manager within thirty (30) calendar days after Notice of Award is received by
Contractor, unless otherwise mutually agreed in writing by Owner and Contractor.
7.3 If Contractor wishes to furnish or use a substitute item of material or equipment,
Contractor shall make application to the Project Manager for acceptance thereof,
certifying that the proposed substitute shall adequately perform the functions and
achieve the results called for by the general design, be similar and of equal substance
to that specified and be suited to the same use as that specified. The application shall
state that the evaluation and acceptance of the proposed substitute will not prejudice
Contractor's achievement of substantial completion on time, whether or not acceptance
of the substitute for use in the Work will require a change in any of the Contract
Documents (or in the provisions of any other direct contract with Owner for the Project)
to adapt the design to the proposed substitute and whether or not incorporation or use
by the substitute in connection with the Work is subject to payment of any license fee or
royalty. All variations of the proposed substitute from that specified will be identified in
the application and available maintenance, repair and replacement service shall be
indicated. The application also shall contain an itemized estimate of all costs that will
result directly or indirectly from acceptance of such substitute, including costs for
redesign and claims of other contractors affected by the resulting change, all of which
shall be considered by the Project Manager in evaluating the proposed substitute. The
Project Manager may require Contractor to furnish at Contractor's expense additional
data about the proposed substitute.
7.4 If a specific means, method, technique, sequence or procedure of construction is
indicated in or required by the Contract Documents, Contractor may furnish or utilize a
substitute means, method, sequence, technique or procedure of construction
acceptable to the Project Manager, if Contractor submits sufficient information to allow
the Project Manager to determine that the substitute proposed is equivalent to that
indicated or required by the Contract Documents. The procedures for submission to
and review by the Project Manager shall be the same as those provided herein for
substitute materials and equipment.
7.5 The Project Manager shall be allowed a reasonable time within which to evaluate
each proposed substitute and, if need be, to consult with the Design Professional. No
substitute will be ordered, installed or utilized without the Project Manager's prior written
acceptance which shall be evidenced by a Change Order, a Work Directive Change, a
Field Order or an approved Shop Drawing. The Owner may require Contractor to
furnish at Contractor's expense a special performance guarantee or other surety with
respect to any substitute. The Project Manager will record time required by the Project
Manager and the Project Manager's consultants in evaluating substitutions proposed by
Contractor and making changes in the Contract Documents occasioned thereby.
Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse
Owner for the charges of the Design Professional and the Design Professional's
consultants for evaluating each proposed substitute.
GC-CA-H-7
16 B '9
8. DAILY REPORTS, AS-BUlL TS AND MEETINGS.
8.1 Unless waived in writing by Owner, Contractor shall complete and submit to
Project Manager on a weekly basis a daily log of the Contractor's work for the preceding
week in a format approved by the Project Manager. The daily log shall document all
activities of Contractor at the Project site including, but not limited to, the following:
8.1.1 Weather conditions showing the high and low temperatures during
work hours, the amount of precipitation received on the Project site, and any other
weather conditions which adversely affect the Work;
8.1.2
8.1.3
personnel;
Soil conditions which adversely affect the Work;
The hours of operation by Contractor's and Sub-Contractor's
8.1.4 The number of Contractor's and Sub-Contractor's personnel present
and working at the Project site, by subcontract and trade;
8.1.5 All equipment present at the Project site, description of equipment use
and designation of time equipment was used (specifically indicating any down time);
8.1.6 Description of Work being performed at the Project site;
8.1.7 Any unusual or special occurrences at the Project site;
8.1.8 Materials received at the Project site;
8.1.9 A list of all visitors to the Project
8.1.10 Any problems that might impact either the cost or quality of the Work or
the time of performance.
The daily log shall not constitute nor take the place of any notice required to be given by
Contractor to Owner pursuant to the Contract Documents.
8.2 Contractor shall maintain in a safe place at the Project site one record copy of
the Contract Documents, including, but not limited to, all drawings, specifications,
addenda, amendments, Change Orders, Work Directive Changes and Field Orders, as
well as all written interpretations and clarifications issued by the Design Professional, in
good order and annotated to show all changes made during construction. The
annotated drawings shall be continuously updated by the Contractor throughout the
prosecution of the Work to accurately reflect all field changes that are made to adapt the
Work to field conditions, changes resulting from Change Orders, Work Directive
Changes and Field Orders, and all concealed and buried installations of piping, conduit
and utility services. All buried and concealed items, both inside and outside the Project
site, shall be accurately located on the annotated drawings as to depth and in
relationship to not less than two (2) permanent features (e.g. interior or exterior wall
faces). The annotated drawings shall be clean and all changes, corrections and
GC-CA-H-8
16 B '~9
dimensions shall be given in a neat and legible manner in a contrasting color. The
"As-Built" record documents, together with all approved samples and a counterpart of all
approved shop drawings shall be available to the Project Manager or Design
Professional for reference. Upon completion of the Work and as a condition precedent
to Contractor's entitlement to final payment, these "As-Built" record documents, samples
and shop drawings shall be delivered to Project Manager by Contractor for Owner.
8.3 Contractor shall keep all records and supporting documentation which concern or
relate to the Work hereunder for a minimum of five (5) years from the date of
termination of this Agreement or the date the Project is completed or such longer period
as may be required by law, whichever is later. Owner, or any duly authorized agents or
representatives of Owner, shall have the right to audit, inspect and copy all such
records and documentation as often as they deem necessary during the period of this
Agreement and during the document retention period noted above; provided, however,
such activity shall be conducted only during normal business hours.
9. CONTRACT TIME AND TIME EXTENSIONS.
9.1 Contractor shall diligently pursue the completion of the Work and coordinate the
Work being done on the Project by its subcontractors and material-men, as well as
coordinating its Work with all work of others at the Project Site, so that its Work or the
work of others shall not be delayed or impaired by any act or omission by Contractor.
Contractor shall be solely responsible for all construction means, methods, techniques,
sequences, and procedures, as well as coordination of all portions of the Work under
the Contract Documents, and the coordination of Owner's suppliers and contractors as
set forth in Paragraph 12.2. herein.
9.2 Should Contractor be obstructed or delayed in the prosecution of or completion
of the Work as a result of unforeseeable causes beyond the control of Contractor, and
not due to its fault or neglect, including but not restricted to acts of Nature or of the
public enemy, acts of government, fires, floods, epidemics, quarantine regulation,
strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48)
hours after the commencement of such delay, stating the cause or causes thereof, or be
deemed to have waived any right which Contractor may have had to request a time
extension.
9.3 No interruption, interference, inefficiency, suspension or delay in the
commencement or progress of the Work from any cause whatever, including those for
which Owner may be responsible, in whole or in part, shall relieve Contractor of its duty
to perform or give rise to any right to damages or additional compensation from Owner.
Contractor expressly acknowledges and agrees that it shall receive no damages for
delay. Contractor's sole remedy, if any, against Owner will be the right to seek an
extension to the Contract Time; provided, however, the granting of any such time
extension shall not be a condition precedent to the aforementioned "No Damage For
Delay" provision. This paragraph shall expressly apply to claims for early completion,
as well as to claims based on late completion.
GC-CA-H-9
16B~9
9.4 In no event shall any approval by Owner authorizing Contractor to continue
performing Work under this Agreement or any payment issued by Owner to Contractor
be deemed a waiver of any right or claim Owner may have against Contractor for delay
damages hereunder.
10. CHANGES IN THE WORK.
10.1 Owner shall have the right at any time during the progress of the Work to
increase or decrease the Work. Promptly after being notified of a change, Contractor
shall submit an itemized estimate of any cost or time increases or savings it foresees as
a result of the change. Except in an emergency endangering life or property, or as
expressly set forth herein, no addition or changes to the Work shall be made except
upon written order of Owner, and Owner shall not be liable to the Contractor for any
increased compensation without such written order. No officer, employee or agent of
Owner is authorized to direct any extra or changed work orally. Any alleged changes
must be approved by Owner in writing prior to starting such items. Owner will not be
responsible for the costs of any changes commenced without Owner's express prior
written approval. Failure to obtain such prior written approval for any changes will be
deemed: (i) a waiver of any claim by Contractor for such items and (ii) an admission by
Contractor that such items are in fact not a change but rather are part of the Work
required of Contractor hereunder.
10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be
issued and executed promptly after an agreement is reached between Contractor and
Owner concerning the requested changes. Contractor shall promptly perform changes
authorized by duly executed Change Orders. The Contract Amount and Contract Time
shall be adjusted in the Change Order in the manner as Owner and Contractor shall
mutually agree.
10.3 If Owner and Contractor are unable to agree on a Change Order for the
requested change, Contractor shall, nevertheless, promptly perform the change as
directed by Owner in a written Work Directive Change. In that event, the Contract
Amount and Contract Time shall be adjusted as directed by Owner. If Contractor
disagrees with the Owner's adjustment determination, Contractor must make a claim
pursuant to Section 11 of these General Conditions or else be deemed to have waived
any claim on this matter it might otherwise have had.
10.4 In the event a requested change results in an increase to the Contract Amount,
the amount of the increase shall be limited to the Contractor's reasonable direct labor
and material costs and reasonable actual equipment costs as a result of the change
(including allowance for labor burden costs) plus a maximum ten percent (10%) markup
for all overhead and profit. In the event such change Work is performed by a
Subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all
Subcontractors' and sub-subcontractors' direct labor and material costs and actual
equipment costs shall be permitted, with a maximum five percent (5%) markup thereon
by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen
percent (15%). All compensation due Contractor and any Subcontractor or
sub-subcontractor for field and home office overhead is included in the markups noted
GC-CA-H-10
16B~9
above. Contractor's and Sub-Contractor's bond costs associated with any change order
shall be included in the overhead and profit expenses and shall not be paid as a
separate line item.
10.5 Owner shall have the right to conduct an audit of Contractor's books and records
to verify the accuracy of the Contractor's claim with respect to Contractor's costs
associated with any Change Order or Work Directive Change.
10.6 The Project Manager shall have authority to order minor changes in the Work not
involving an adjustment to the Contract Amount or an extension to the Contract Time
and not inconsistent with the intent of the Contract Documents. Such changes may be
effected by Field Order or by other written order. Such changes shall be binding on the
Contractor.
10.7 Any modifications to this Contract shall be in compliance with the County
Purchasing Policy and Administrative Procedures in effect at the time such
modifications are authorized.
11. CLAIMS AND DISPUTES.
11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or
interpretation of the terms of the Contract Documents, payment of money, extension of
time or other relief with respect to the terms of the Contract Documents. The term
"Claim" also includes other disputes and matters in question between Owner and
Contractor arising out of or relating to the Contract Documents. The responsibility to
substantiate a Claim shall rest with the party making the Claim.
11.2 Claims by the Contractor shall be made in writing to the Project Manager within
forty-eight (48) hours from when the Contractor knew or should have known of the event
giving rise to such Claim or else the Contractor shall be deemed to have waived the
Claim. Written supporting data shall be submitted to the Project Manager within fifteen
(15) calendar days after the occurrence of the event, unless the Owner grants additional
time in writing, or else the Contractor shall be deemed to have waived the Claim. All
Claims shall be priced in accordance with the provisions of Subsection 10A.
11.3 The Contractor shall proceed diligently with its performance as directed by the
Owner, regardless of any pending Claim, action, suit or administrative proceeding,
unless otherwise agreed to by the Owner in writing. Owner shall continue to make
payments in accordance with the Contract Documents during the pendency of any
Claim.
12. OTHER WORK.
12.1 Owner may perform other work related to the Project at the site by Owner's own
forces, have other work performed by utility owners or let other direct contracts. If the
fact that such other work is to be performed is not noted in the Contract Documents,
written notice thereof will be given to Contractor prior to starting any such other work. If
Contractor believes that such performance will involve additional expense to Contractor
or require additional time, Contractor shall send written notice of that fact to Owner and
GC-CA-H-11
168 '9
Design Professional within forty-eight (48) hours of being notified of the other work. If
the Contractor fails to send the above required forty-eight (48) hour notice, the
Contractor will be deemed to have waived any rights it otherwise may have had to seek
an extension to the Contract Time or adjustment to the Contract Amount.
12.2 Contractor shall afford each utility owner and other contractor who is a party to
such a direct contract (or Owner, if Owner is performing the additional work with
Owner's employees) proper and safe access to the site and a reasonable opportunity
for the introduction and storage of materials and equipment and the execution of such
work and shall properly connect and coordinate its Work with theirs. Contractor shall do
all cutting, fitting and patching of the Work that may be required to make its several
parts come together properly and integrate with such other work. Contractor shall not
endanger any work of others by cutting, excavating or otherwise altering their work and
will only cut or alter their work with the written consent of the Project Manager and the
others whose work will be affected. The duties and responsibilities of Contractor under
this paragraph are for the benefit of such utility owners and other Contractors to the
extent that there are comparable provisions for the benefit of Contractor in said direct
contracts between Owner and such utility owners and other contractors.
12.3 If any part of Contractor's Work depends for proper execution or results upon the
work of any other contractor or utility owner (or Owner), Contractor shall inspect and
promptly report to Project Manager in writing any delays, defects or deficiencies in such
work that render it unavailable or unsuitable for such proper execution and results.
Contractor's failure to report will constitute an acceptance of the other work as fit and
proper for integration with Contractor's Work.
13. INDEMNIFICATION AND INSURANCE.
13.1 To the maximum extent permitted by Florida law, Contractor shall indemnify and
hold harmless Owner and its officers and employees from any and all liabilities, claims,
damages, penalties, demands, judgments, actions, proceedings, losses or costs,
including, but not limited to, reasonable attorneys' fees and paralegals' fees, whether
resulting from any claimed breach of this Agreement by Contractor or from personal
injury, property damage, direct or consequential damages, or economic loss, to the
extent caused by the negligence, recklessness, or intentional wrongful misconduct of
Contractor or anyone employed or utilized by the Contractor in the performance of this
Agreement.
13.2 The duty to defend under this Article 13 is independent and separate from the
duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the
Contractor, Owner and any indemnified party. The duty to defend arises immediately
upon presentation of a claim by any party and written notice of such claim being
provided to Contractor. Contractor's obligation to indemnify and defend under this
Article 13 will survive the expiration or earlier termination of this Agreement until it is
determined by final judgment that an action against the Owner or an indemnified party
for the matter indemnified hereunder is fully and finally barred by the applicable statute
of limitations.
GC-CA-H-12
168"'9
13.3 Contractor shall obtain and carry, at all times during its performance under the
Contract Documents, insurance of the types and in the amounts set forth in Exhibit B to
the Agreement. Further, the Contractor shall at all times comply with all of the terms,
conditions, requirements and obligations set forth under Exhibit B.
14. COMPLIANCE WITH LAWS.
14.1 Contractor agrees to comply, at its own expense, with all federal, state and local
laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the
Project, including but not limited to those dealing with taxation, worker's compensation,
equal employment and safety (including, but not limited to, the Trench Safety Act,
Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are
at variance therewith, it shall promptly notify Project Manager in writing. To the extent
any law, rule, regulation, code, statute, or ordinance requires the inclusion of certain
terms in this Agreement in order for this Agreement to be enforceable, such terms shall
be deemed included in this Agreement. Notwithstanding anything in the Contract
Documents to the contrary, it is understood and agreed that in the event of a change in
any applicable laws, ordinances, rules or regulations subsequent to the date this
Agreement was executed that increases the Contractor's time or cost of performance of
the Work, Contractor is entitled to a Change Order for such increases, except to the
extent Contractor knew or should have known of such changes prior to the date of this
Agreement.
14.2 By executing and entering into this agreement, the Contractor is formally
acknowledging without exception or stipulation that it is fully responsible for complying
with the provisions of the Immigration Reform and Control Act of 1986 as located at 8
U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended.
Failure by the Contractor to comply with the laws referenced herein shall constitute a
breach of this agreement and the County shall have the discretion to unilaterally
terminate this agreement immediately.
15. CLEANUP AND PROTECTIONS.
15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish
and waste materials arising out of the Work. At the completion of the Work, Contractor
shall remove all debris, rubbish and waste materials from and about the Project site, as
well as all tools, appliances, construction equipment and machinery and surplus
materials, and shall leave the Project site clean and ready for occupancy by Owner.
15.2 Any existing surface or subsurface improvements, including, but not limited to,
pavements, curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery,
not indicated in the Contract Documents to be removed or altered, shall be protected by
Contractor from damage during the prosecution of the Work. Subject to the Section 2.3
above, any such improvements so damaged shall be restored by Contractor to the
condition equal to that existing at the time of Contractor's commencement of the Work.
GC-CA-H-13
168 9
16. ASSIGNMENT.
16.1 Contractor shall not assign this Agreement or any part thereof, without the prior
consent in writing of Owner. Any attempt to assign or otherwise transfer this Agreement
or any part herein, without the Owner's consent, shall be void. If Contractor does, with
approval, assign this Agreement or any part thereof, it shall require that its assignee be
bound to it and to assume toward Contractor all of the obligations and responsibilities
that Contractor has assumed toward Owner.
17. PERMITS, LICENSES AND TAXES.
17.1 Pursuant to Section 218.80, F.S., Owner will pay for all Collier County permits
and fees, including license fees, permit fees, impact fees or inspection fees applicable
to the Work through an internal budget transfer(s). Contractor is not responsible for
paying for permits issued by Collier County, but Contractor is responsible for acquiring
all permits. Owner may require the Contractor to deliver internal budget transfer
documents to applicable Collier County agencies when the Contractor is acquiring
permits.
17.2 All permits, fees and licenses necessary for the prosecution of the Work which
are not issued by Collier County shall be acquired and paid for by the Contractor.
17.3 Contractor shall pay all sales, consumer, use and other similar taxes associated
with the Work or portions thereof, which are applicable during the performance of the
Work.
18. TERMINATION FOR DEFAULT.
18.1 Contractor shall be considered in material default of the Agreement and such
default shall be considered cause for Owner to terminate the Agreement, in whole or in
part, as further set forth in this Section, if Contractor: (1) fails to begin the Work under
the Contract Documents within the time specified herein; or (2) fails to properly and
timely perform the Work as directed by the Project Manager or as provided for in the
approved Progress Schedule; or (3) performs the Work unsuitably or neglects or
refuses to remove materials or to correct or replace such Work as may be rejected as
unacceptable or unsuitable; or (4) discontinues the prosecution of the Work; or (5) fails
to resume Work which has been suspended within a reasonable time after being
notified to do so; or (6) becomes insolvent or is declared bankrupt, or commits any act
of bankruptcy; or (7) allows any final judgment to stand against it unsatisfied for more
than ten (10) days; or (8) makes an assignment for the benefit of creditors; or (9) fails to
obey any applicable codes, laws, ordinances, rules or regulations with respect to the
Work; or (10) materially breaches any other provision of the Contract Documents.
18.2 Owner shall notify Contractor in writing of Contractor's default(s). If Owner
determines that Contractor has not remedied and cured the default(s) within seven (7)
calendar days following receipt by Contractor of said written notice or such longer
period of time as may be consented to by Owner in writing and in its sole discretion,
then Owner, at its option, without releasing or waiving its rights and remedies against
the Contractor's sureties and without prejudice to any other right or remedy it may be
GC-CA-H-14
168 9
entitled to hereunder or by law, may terminate Contractor's right to proceed under the
Agreement, in whole or in part, and take possession of all or any portion of the Work
and any materials, tools, equipment, and appliances of Contractor, take assignments of
any of Contractor's subcontracts and purchase orders, and complete all or any portion
of Contractor's Work by whatever means, method or agency which Owner, in its sole
discretion, may choose.
18.3 If Owner deems any of the foregoing remedies necessary, Contractor agrees that
it shall not be entitled to receive any further payments hereunder until after the Project is
completed. All moneys expended and all of the costs, losses, damages and extra
expenses, including all management, administrative and other overhead and other
direct and indirect expenses (including Design Professional and attorneys' fees) or
damages incurred by Owner incident to such completion, shall be deducted from the
Contract Amount, and if such expenditures exceed the unpaid balance of the Contract
Amount, Contractor agrees to pay promptly to Owner on demand the full amount of
such excess, including costs of collection, attorneys' fees (including appeals) and
interest thereon at the maximum legal rate of interest until paid. If the unpaid balance of
the Contract Amount exceeds all such costs, expenditures and damages incurred by the
Owner to complete the Work, such excess shall be paid to the Contractor. The amount
to be paid to the Contractor or Owner, as the case may be, shall be approved by the
Project Manager, upon application, and this obligation for payment shall survive
termination of the Agreement.
18.4 The liability of Contractor hereunder shall extend to and include the full amount of
any and all sums paid, expenses and losses incurred, damages sustained, and
obligations assumed by Owner in good faith under the belief that such payments or
assumptions were necessary or required, in completing the Work and providing labor,
materials, equipment, supplies, and other items therefore or re-Ietting the Work, and in
settlement, discharge or compromise of any claims, demands, suits, and judgments
pertaining to or arising out of the Work hereunder.
18.5 If, after notice of termination of Contractor's right to proceed pursuant to this
Section, it is determined for any reason that Contractor was not in default, or that its
default was excusable, or that Owner is not entitled to the remedies against Contractor
provided herein, then the termination will be deemed a termination for convenience and
Contractor's remedies against Owner shall be the same as and limited to those afforded
Contractor under Section 19 below.
18.6 In the event (i) Owner fails to make any undisputed payment to Contractor within
thirty (30) days after such payment is due or Owner otherwise persistently fails to fulfill
some material obligation owed by Owner to Contractor under this Agreement, and
(ii) Owner has failed to cure such default within fourteen (14) days of receiving written
notice of same from Contractor, then Contractor may stop its performance under this
Agreement until such default is cured, after giving Owner a second fourteen (14) days
written notice of Contractor's intention to stop performance under the Agreement. If the
Work is so stopped for a period of one hundred and twenty (120) consecutive days
through no act or fault of the Contractor or its Subcontractors or their agents or
employees or any other persons performing portions of the Work under contract with the
GC-CA-H-15
Contractor or any Subcontractor, the Contractor may terminate this Agreement by giving
written notice to Owner of Contractor's intent to terminate this Agreement. If Owner
does not cure its default within fourteen (14) days after receipt of Contractor's written
notice, Contractor may, upon fourteen (14) additional days' written notice to the Owner,
terminate the Agreement and recover from the Owner payment for Work performed
through the termination date, but in no event shall Contractor be entitled to payment for
Work not performed or any other damages from Owner.
19. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION.
19.1 Owner shall have the right to terminate this Agreement without cause upon
seven (7) calendar days written notice to Contractor. In the event of such termination
for convenience, Contractor's recovery against Owner shall be limited to that portion of
the Contract Amount earned through the date of termination, together with any
retainage withheld and reasonable termination expenses incurred, but Contractor shall
not be entitled to any other or further recovery against Owner, including, but not limited
to, damages or any anticipated profit on portions of the Work not performed.
19.2 Owner shall have the right to suspend all or any portions of the Work upon giving
Contractor not less than two (2) calendar days' prior written notice of such suspension.
If all or any portion of the Work is so suspended, Contractor's sole and exclusive
remedy shall be to seek an extension of time to its schedule in accordance with the
procedures set forth in the Contract Documents. In no event shall the Contractor be
entitled to any additional compensation or damages. Provided, however, if the ordered
suspension exceeds six (6) months, the Contractor shall have the right to terminate the
Agreement with respect to that portion of the Work which is subject to the ordered
suspension.
20. COMPLETION.
20.1 When the entire Work (or any portion thereof designated in writing by Owner) is
ready for its intended use, Contractor shall notify Project Manager in writing that the
entire Work (or such designated portion) is substantially complete. Within a reasonable
time thereafter, Owner, Contractor and Design Professional shall make an inspection of
the Work (or designated portion thereof) to determine the status of completion. If
Owner, after conferring with the Design Professional, does not consider the Work (or
designated portion) substantially complete, Project Manager shall notify Contractor in
writing giving the reasons therefore. If Owner, after conferring with the Design
Professional, considers the Work (or designated portion) substantially complete, Project
Manager shall prepare and deliver to Contractor a Certificate of Substantial Completion
which shall fix the date of Substantial Completion for the entire Work (or designated
portion thereof) and include a tentative punch-list of items to be completed or corrected
by Contractor before final payment. Owner shall have the right to exclude Contractor
from the Work and Project site (or designated portion thereof) after the date of
Substantial Completion, but Owner shall allow Contractor reasonable access to
complete or correct items on the tentative punch-list.
GC-CA-H-16
168 9
20.2 Upon receipt of written certification by Contractor that the Work is completed in
accordance with the Contract Documents and is ready for final inspection and
acceptance, Project Manager and Design Professional will make such inspection and, if
they find the Work acceptable and fully performed under the Contract Documents shall
promptly issue a final Certificate for Payment, recommending that, on the basis of their
observations and inspections, and the Contractor's certification that the Work has been
completed in accordance with the terms and conditions of the Contract Documents, that
the entire balance found to be due Contractor is due and payable. Neither the final
payment nor the retainage shall become due and payable until Contractor submits:
(1) Receipt of Contractor's Final Application for Payment.
(2) The Release and Affidavit in the form attached as Exhibit C.
(3) Consent of surety to final payment.
(4) Receipt of the final payment check list.
(5) If required by Owner, other data establishing payment or satisfaction of all
obligations, such as receipts, releases and waivers of liens, arising out of
the Contract Documents, to the extent and in such form as may be
designated by Owner.
Owner reserves the right to inspect the Work and make an independent determination
as to the Work's acceptability, even though the Design Professional may have issued its
recommendations. Unless and until the Owner is completely satisfied, neither the final
payment nor the retainage shall become due and payable.
21. WARRANTY.
21.1 Contractor shall obtain and assign to Owner all express warranties given to
Contractor or any subcontractors by any subcontractor or materialmen supplying
materials, equipment or fixtures to be incorporated into the Project. Contractor warrants
to Owner that any materials and equipment furnished under the Contract Documents
shall be new unless otherwise specified, and that all Work shall be of good quality, free
from all defects and in conformance with the Contract Documents. Contractor further
warrants to Owner that all materials and equipment furnished under the Contract
Documents shall be applied, installed, connected, erected, used, cleaned and
conditioned in accordance with the instructions of the applicable manufacturers,
fabricators, suppliers or processors except as otherwise provided for in the Contract
Documents. If, within one (1) year after Substantial Completion, any Work is found to
be defective or not in conformance with the Contract Documents, Contractor shall
correct it promptly after receipt of written notice from Owner. Contractor shall also be
responsible for and pay for replacement or repair of adjacent materials or Work which
may be damaged as a result of such replacement or repair. Further, in the event of an
emergency, Owner may commence to correct any defective Work, without prior notice
to Contractor, at Contractor's expense. These warranties are in addition to those
implied warranties to which Owner is entitled as a matter of law.
21.2 No later than 30 days prior to expiration of the warranty, the Project Manager, or
another representative of the Owner, shall conduct an inspection of the warranted work
to verify compliance with the requirements of the Agreement. The Contractor's
GC-CA-H-17
168 9
Representative shall be present at the time of inspection and shall take remedial actions
to correct any deficiencies noted in the inspection. Failure of the Contractor to correct
the cited deficiencies shall be grounds for the Owner to disqualify the Contractor from
future bid opportunities with the Owner, in addition to any other rights and remedies
available to Owner.
22. TESTS AND INSPECTIONS.
22.1 Owner, Design Professional, their respective representatives, agents and
employees, and governmental agencies with jurisdiction over the Project shall have
access at all times to the Work, whether the Work is being performed on or off of the
Project site, for their obseNation, inspection and testing. Contractor shall provide
proper, safe conditions for such access. Contractor shall provide Project Manager with
timely notice of readiness of the Work for all required inspections, tests or approvals.
22.2 If the Contract Documents or any codes, laws, ordinances, rules or regulations of
any public authority having jurisdiction over the Project requires any portion of the Work
to be specifically inspected, tested or approved, Contractor shall assume full
responsibility therefore, pay all costs in connection therewith and furnish Project
Manager the required certificates of inspection, testing or approval. All inspections,
tests or approvals shall be performed in a manner and by organizations acceptable to
the Project Manager.
22.3 Contractor is responsible, without reimbursement from Owner, for re-inspection
fees and costs; to the extent such re-inspections are due to the fault or neglect of
Contractor.
22.4 If any Work that is to be inspected, tested or approved is covered without written
concurrence from the Project Manager, such work must, if requested by Project
Manager, be uncovered for obseNation. Such uncovering shall be at Contractor's
expense unless Contractor has given Project Manager timely notice of Contractor's
intention to cover the same and Project Manager has not acted with reasonable
promptness to respond to such notice. If any Work is covered contrary to written
directions from Project Manager, such Work must, if requested by Project Manager, be
uncovered for Project Manager's obseNation and be replaced at Contractor's sole
expense.
22.5 The Owner shall charge to Contractor and may deduct from any payments due
Contractor all engineering and inspection expenses incurred by Owner in connection
with any overtime work. Such overtime work consisting of any work during the
construction period beyond the regular eight (8) hour day and for any work performed
on Saturday, Sunday or holidays.
22.6 Neither obseNations nor other actions by the Project Manager or Design
Professional nor inspections, tests or approvals by others shall relieve Contractor from
Contractor's obligations to perform the Work in accordance with the Contract
Documents.
GC-CA-H-18
16B 9
23. DEFECTIVE WORK.
23.1 Work not conforming to the requirements of the Contract Documents or any
warranties made or assigned by Contractor to Owner shall be deemed defective Work.
If required by Project Manager, Contractor shall as directed, either correct all defective
Work, whether or not fabricated, installed or completed, or if the defective Work has
been rejected by Project Manager, remove it from the site and replace it with non-
defective Work. Contractor shall bear all direct, indirect and consequential costs of
such correction or removal (including, but not limited to fees and charges of engineers,
architects, attorneys and other professionals) made necessary thereby, and shall hold
Owner harmless for same.
23.2 If the Project Manager considers it necessary or advisable that covered Work be
observed by Design Professional or inspected or tested by others and such Work is not
otherwise required to be inspected or tested, Contractor, at Project Manager's request,
shall uncover, expose or otherwise make available for observation, inspection or tests
as Project Manager may require, that portion of the Work in question, furnishing all
necessary labor, material and equipment. If it is found that such Work is defective,
Contractor shall bear all direct, indirect and consequential costs of such uncovering,
exposure, observation, inspection and testing and of satisfactory reconstruction
(including, but not limited to, fees and charges of engineers, architects, attorneys and
other professionals), and Owner shall be entitled to an appropriate decrease in the
Contract Amount. If, however, such Work is not found to be defective, Contractor shall
be allowed an increase in the Contract Amount and/or an extension to the Contract
Time, directly attributable to such uncovering, exposure, observation, inspection, testing
and reconstruction.
23.3 If any portion of the Work is defective, or if Contractor fails to supply sufficient
skilled workers, suitable materials or equipment or fails to finish or perform the Work in
such a way that the completed Work will conform to the Contract Documents, Project
Manager may order Contractor to stop the Work, or any portion thereof, until the cause
for such order has been eliminated. The right of Project Manager to stop the Work
shall be exercised, if at all, solely for Owner's benefit and nothing herein shall be
construed as obligating the Project Manager to exercise this right for the benefit of
Design Engineer, Contractor, or any other person.
23.4 Should the Owner determine, at its sole opinion, it is in the Owner's best interest
to accept defective Work, the Owner may do so. Contractor shall bear all direct, indirect
and consequential costs attributable to the Owner's evaluation of and determination to
accept defective Work. If such determination is rendered prior to final payment, a
Change Order shall be executed evidencing such acceptance of such defective Work,
incorporating the necessary revisions in the Contract Documents and reflecting an
appropriate decrease in the Contract Amount. If the Owner accepts such defective
Work after final payment, Contractor shall promptly pay Owner an appropriate amount
to adequately compensate Owner for its acceptance of the defective Work.
23.5 If Contractor fails, within a reasonable time after the written notice from Project
Manager, to correct defective Work or to remove and replace rejected defective Work
GC-CA-H-19
168: 9
as required by Project Manager or Owner, or if Contractor fails to perform the Work in
accordance with the Contract Documents, or if Contractor fails to comply with any of the
provisions of the Contract Documents, Owner may, after seven (7) days written notice
to Contractor, correct and remedy any such deficiency. Provided, however, Owner shall
not be required to give notice to Contractor in the event of an emergency. To the extent
necessary to complete corrective and remedial action, Owner may exclude Contractor
from any or all of the Project site, take possession of all or any part of the Work, and
suspend Contractor's services related thereto, take possession of Contractor's tools,
appliances, construction equipment and machinery at the Project site and incorporate in
the Work all materials and equipment stored at the Project site or for which Owner has
paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Design
Professional and their respective representatives, agents, and employees such access
to the Project site as may be necessary to enable Owner to exercise the rights and
remedies under this paragraph. All direct, indirect and consequential costs of Owner in
exercising such rights and remedies shall be charged against Contractor, and a Change
Order shall be issued, incorporating the necessary revisions to the Contract Documents,
including an appropriate decrease to the Contract Amount. Such direct, indirect and
consequential costs shall include, but not be limited to, fees and charges of engineers,
architects, attorneys and other professionals, all court costs and all costs of repair and
replacement of work of others destroyed or damaged by correction, removal or
replacement of Contractor's defective Work. Contractor shall not be allowed an
extension of the Contract Time because of any delay in performance of the Work
attributable to the exercise by Owner of Owner's rights and remedies hereunder.
24. SUPERVISION AND SUPERINTENDENTS.
24.1 Contractor shall plan, organize, supervise, schedule, monitor, direct and control
the Work competently and efficiently, devoting such attention thereto and applying such
skills and expertise as may be necessary to perform the Work in accordance with the
Contract Documents. Contractor shall be responsible to see that the finished Work
complies accurately with the Contract Documents. Contractor shall keep on the Work at
all times during its progress a competent resident superintendent, who shall be subject
to Owner's approval and not be replaced without prior written notice to Project Manager
except under extraordinary circumstances. The superintendent shall be employed by
the Contractor and be the Contractor's representative at the Project site and shall have
authority to act on behalf of Contractor. All communications given to the superintendent
shall be as binding as if given to the Contractor. Owner shall have the right to direct
Contractor to remove and replace its Project superintendent, with or without cause.
Attached to the Agreement as Exhibit N is a list identifying Contractor's Project
Superintendent and all of Contractor's key personnel who are assigned to the Project;
such identified personnel shall not be removed without Owner's prior written approval,
and if so removed must be immediately replaced with a person acceptable to Owner.
24.2 Contractor shall have a competent superintendent on the project at all times
whenever contractor's work crews, or work crews of other parties authorized by the
Project Manager are engaged in any activity whatsoever associated with the Project.
Should the Contractor fail to comply with the above condition, the Project Manager
shall, at his discretion, deduct from the Contractor's monthly pay estimate, sufficient
GC-CA-H-20
168 9
moneys to account for the Owner's loss of adequate project supervision, not as a
penalty, but as liquidated damages, separate from the liquidated damages described in
Section 5.8, for services not rendered.
25. PROTECTION OF WORK.
25.1 Contractor shall fully protect the Work from loss or damage and shall bear the
cost of any such loss or damage until final payment has been made. If Contractor or
anyone for whom Contractor is legally liable for is responsible for any loss or damage
to the Work, or other work or materials of Owner or Owner's separate contractors,
Contractor shall be charged with the same, and any moneys necessary to replace such
loss or damage shall be deducted from any amounts due Contractor.
25.2 Contractor shall not load nor permit any part of any structure to be loaded in any
manner that will endanger the structure, nor shall Contractor subject any part of the
Work or adjacent property to stresses or pressures that will endanger it.
25.3 Contractor shall not disturb any benchmark established by the Owner or Design
Professional with respect to the Project. If Contractor, or its subcontractors, agents or
anyone for whom Contractor is legally liable, disturbs the Owner or Design
Professional's benchmarks, Contractor shall immediately notify Project Manager and
Design Professional. The Owner or Design Professional shall re-establish the
benchmarks and Contractor shall be liable for all costs incurred by Owner associated
therewith.
26. EMERGENCIES.
26.1 In the event of an emergency affecting the safety or protection of persons or the
Work or property at the Project site or adjacent thereto, Contractor, without special
instruction or authorization from Owner or Design Professional is obligated to act to
prevent threatened damage, injury or loss. Contractor shall give Project Manager
written notice within forty-eight (48) hours after Contractor knew or should have known
of the occurrence of the emergency, if Contractor believes that any significant changes
in the Work or variations from the Contract Documents have been caused thereby. If
the Project Manager determines that a change in the Contract Documents is required
because of the action taken in response to an emergency, a Change Order shall be
issued to document the consequences of the changes or variations. If Contractor fails
to provide the forty-eight (48) hour written notice noted above, the Contractor shall be
deemed to have waived any right it otherwise may have had to seek an adjustment to
the Contract Amount or an extension to the Contract Time.
27. USE OF PREMISES.
27.1 Contractor shall maintain all construction equipment, the storage of materials and
equipment and the operations of workers to the Project site and land and areas
identified in and permitted by the Contract Documents and other lands and areas
permitted by law; rights of way, permits and easements, and shall not unreasonably
encumber the Project site with construction equipment or other material or equipment.
Contractor shall assume full responsibility for any damage to any such land or area, or
GC-CA-H-21
168 9
to the owner or occupant thereof, or any land or areas contiguous thereto, resulting from
the performance of the Work.
28. SAFETY.
28.1 Contractor shall be responsible for initiating, maintaining and supervising all
safety precautions and programs in connection with the Work. Contractor shall take all
necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
28.1.1 All employees on or about the project site and other persons and/or
organizations who may be affected thereby;
28.1.2 All the Work and materials and equipment to be incorporated therein,
whether in storage on or off the Project site; and
28,1.3 Other property on Project site or adjacent thereto, including trees,
shrubs, walks, pavements, roadways, structures, utilities and any underground
structures or improvements not designated for removal, relocation or replacement in the
Contract Documents.
28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and
regulations of any public body having jurisdiction for the safety of persons or property or
to protect them from damage, injury or loss. Contractor shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners of
adjacent property and of underground structures and improvements and utility owners
when prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation or replacement of their property. Contractor's duties and
responsibilities for the safety and protection of the Work shall continue until such time
as the Work is completed and final acceptance of same by Owner has occurred.
28.3. Contractor shall designate a responsible representative located on a full time
basis at the Project site whose duty shall be the prevention of accidents. This person
shall be Contractor's superintendent unless otherwise designated in writing by
Contractor to Owner.
28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner
property. All employees of Contractor, as well as those of all subcontractors and those
of any other person or entity for whom Contractor is legally liable (collectively referred to
herein as "Employees"), shall not possess or be under the influence of any such
substances while on any Owner property. Further, Employees shall not bring on to any
Owner property any gun, rifle or other firearm, or explosives of any kind.
28.5 Contractor acknowledges that the Work may be progressing on a Project site
which is located upon or adjacent to an existing Owner facility. In such event,
Contractor shall comply with the following:
28.5.1
All Owner facilities are smoke free. Smoking is strictly prohibited;
GC-CA-H-22
16U 9
28.5,2 All Employees shall be provided an identification badge by
Contractor. Such identification badge must be prominently displayed on the outside of
the Employees' clothing at all times. All Employees working at the Project site must log
in and out with the Contractor each day;
28.5.3 Contractor shall strictly limit its operations to the designated work
areas and shall not permit any Employees to enter any other portions of Owner's
property without Owner's expressed prior written consent;
28.5.4 All Employees are prohibited from distributing any papers or other
materials upon Owner's property, and are strictly prohibited from using any of Owner's
telephones or other office equipment;
28.5.5 All Employees shall at all times comply with the OSHA regulations
with respect to dress and conduct at the Project site. Further, all Employees shall
comply with the dress, conduct and facility regulations issued by Owner's officials
onsite, as said regulations may be changed from time to time;
28.5.6 All Employees shall enter and leave Owner's facilities only through
the ingress and egress points identified in the site utilization plan approved by Owner or
as otherwise designated, from time to time, by Owner in writing;
28.5.7 When requested, Contractor shall cooperate with any ongoIng
Owner investigation involving personal injury, economic loss or damage to Owner's
facilities or personal property therein;
28.5.8 The Employees may not solicit, distribute or sell products while on
Owner's property. Friends, family members or other visitors of the Employees are not
permitted on Owner's property; and
28.5.9 At all times, Contractor shall adhere to Owner's safety and security
regulations, and shall comply with all security requirements at Owner's facilities, as said
regulations and requirements may be modified or changed by Owner from time to time.
29. PROJECT MEETINGS.
Prior to the commencement of Work, the Contractor shall attend a pre-construction
conference with the Project Manager, Design Professional and others as appropriate to
discuss the Progress Schedule, procedures for handling shop drawings and other
submittals, and for processing Applications for Payment, and to establish a working
understanding among the parties as to the Work. During the prosecution of the Work,
the Contractor shall attend any and all meetings convened by the Project Manager with
respect to the Project, when directed to do so by Project Manager or Design
Professional. The Contractor shall have its subcontractors and suppliers attend all such
meetings (including the pre-construction conference) as may be directed by the Project
Manager.
GC-CA-H-23
168 9
30. VENDOR PERFORMANCE EVALUATION
Owner has implemented a Vendor Performance Evaluation System for all contracts
awarded in excess of $25,000. To this end, vendors will be evaluated on their
performance upon completion/termination of this Agreement.
31. MAINTENANCE OF TRAFFIC POLICY
For all projects that are conducted within a Collier County Right-of-Way, the Contractor
shall provide and erect Traffic Control Devices as prescribed in the current edition of the
Manual On Uniform Traffic Control Devices (MUTCD), where applicable on local
roadways and as prescribed in the Florida Department of Transportations Design
Standards (DS), where applicable on state roadways. These projects shall also comply
with Collier County's Maintenance of Traffic Policy, #5807, incorporated herein by
reference. A copy is available through Risk Management and/or Purchasing
Departments, and is available on-line at colliergov.netlpurchasing.
The Contractor will be responsible for obtaining copies of all required manuals, MUTCD,
FDOT Roadway & Traffic Design Standards Indexes, or other related documents, so to
become familiar with their requirements. Strict adherence to the requirements of the
Maintenance of Traffic ("MOT") policy will be enforced under this Contract.
All costs associated with the Maintenance of Traffic shall be included on the line item on
the bid page. If MOT is required, MOT is to be provided within ten (10) days of receipt
of Notice of Award.
32. SALES TAX SAVINGS AND DIRECT PURCHASE
32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated
with the Work or portions thereof, which are applicable during the performance of the
Work. No markup shall be applied to sales tax. Additionally, as directed by Owner and
at no additional cost to Owner, Contractor shall comply with and fully implement the
sales tax savings program with respect to the Work, as set forth in section 32.2 below:
32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from
sales tax and may wish to generate sales tax savings for the Project, Owner reserves
the right to make direct purchases of various construction materials and equipment
included in the Work ("Direct Purchase"). Contractor shall prepare purchase orders to
vendors selected by Contractor, for execution by Owner, on forms provided by Owner.
Contractor shall allow two weeks for execution of all such purchase orders by Owner.
Contractor represents and warrants that it will use its best efforts to cooperate with
Owner in implementing this sales tax savings program in order to maximize cost
savings for the Project. Adjustments to the Contract Amount will be made by
appropriate Change Orders for the amounts of each Owner Direct Purchase, plus the
saved sales taxes. A Change Order shall be processed promptly after each Direct
Purchase, or group of similar or related Direct Purchases, unless otherwise mutually
agreed upon between Owner and Contractor. With respect to all Direct Purchases by
Owner, Contractor shall remain responsible for coordinating, ordering, inspecting,
accepting delivery, storing, handling, installing, warranting and quality control for all
GC-CA-H-24
1168 9
Direct Purchases. Notwithstanding anything herein to the contrary, Contractor
expressly acknowledges and agrees that all Direct Purchases shall be included within
and covered by Contractor's warranty to Owner to the same extent as all other
warranties provided by Contractor pursuant to the terms of the Contract Documents. In
the event Owner makes a demand against Contractor with respect to any Direct
Purchase and Contractor wishes to make claim against the manufacturer or supplier of
such Direct Purchase, upon request from Contractor Owner shall assign to Contractor
any and all warranties and Contract rights Owner may have from any manufacturer or
supplier of any such Direct Purchase by Owner.
32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for
sale tax under Chapter 212, Florida Statutes, and for its responsibilities for Federal
excise taxes.
33. SUBCONTRACTS
33.1 Contractor shall review the design and shall determine how it desires to divide
the sequence of construction activities. Contractor will determine the breakdown and
composition of bid packages for award of subcontracts, based on the current Project
Milestone Schedule, and shall supply a copy of that breakdown and composition to
Owner and Design Professional for their review and approval prior to submitting its first
Application for Payment. Contractor shall take into consideration such factors as
natural and practical lines of severability, sequencing effectiveness, access and
availability constraints, total time for completion, construction market conditions,
availability of labor and materials, community relations and any other factors pertinent to
saving time and costs.
33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying
or providing any portion of the Work pursuant to a contract with Contractor. Contractor
shall be solely responsible for and have control over the Subcontractors. Contractor
shall negotiate all Change Orders, Work Directive Changes, Field Orders and Requests
for Proposal, with all affected Subcontractors and shall review the costs of those
proposals and advise Owner and Design Professional of their validity and
reasonableness, acting in Owner's best interest, prior to requesting approval of any
Change Order from Owner. All Subcontractors performing any portion of the Work on
this Project must be "qualified" as defined in Collier County Ordinance 87-25, meaning a
person or entity that has the capability in all respects to perform fully the Agreement
requirements with respect to its portion of the Work and has the integrity and reliability
to assure good faith performance.
33.3 In addition to those Subcontractors identified in Contractor's bid that were
approved by Owner, Contractor also shall identify any other Subcontractors, including
their addresses, licensing information and phone numbers, it intends to utilize for the
Project prior to entering into any subcontract or purchase order and prior to the
Subcontractor commencing any work on the Project. The list identifying each
Subcontractor cannot be modified, changed, or amended without prior written approval
from Owner. Any and all Subcontractor work to be self-performed by Contractor must
be approved in writing by Owner in its sole discretion prior to commencement of such
GC-CA-H-25
16B 9
work. Contractor shall continuously update that Subcontractor list, so that it remains
current and accurate throughout the entire performance of the Work.
33.4 Contractor shall not enter into a subcontract or purchase order with any
Subcontractor, if Owner reasonably objects to that Subcontractor. Contractor shall not
be required to contract with anyone it reasonably objects to. Contractor shall keep on
file a copy of the license for every Subcontractor and sub-subcontractor performing any
portion of the Work, as well as maintain a log of all such licenses. All subcontracts and
purchase orders between Contractor and its Subcontractors shall be in writing and are
subject to Owner's approval. Further, unless expressly waived in writing by Owner, all
subcontracts and purchase orders shall (1) require each Subcontractor to be bound to
Contractor to the same extent Contractor is bound to Owner by the terms of the
Contract Documents, as those terms may apply to the portion of the Work to be
performed by the Subcontractor, (2) provide for the assignment of the subcontract or
purchase order from Contractor to Owner at the election of Owner upon termination of
Contractor, (3) provide that Owner will be an additional indemnified party of the
subcontract or purchase order, (4) provide that Owner will be an additional insured on
all liability insurance policies required to be provided by the Subcontractor except
workman's compensation and business automobile policies, (5) assign all warranties
directly to Owner, and (6) identify Owner as an intended third-party beneficiary of the
subcontract or purchase order. Contractor shall make available to each proposed
Subcontractor, prior to the execution of the subcontract, copies of the Contract
Documents to which the Subcontractor will be bound. Each Subcontractor shall
similarly make copies of such documents available to its sub-subcontractors.
33.5 Each Subcontractor performing work at the Project Site must agree to provide
field (on-site) supervision through a named superintendent for each trade (e.g., general
concrete forming and placement, masonry, mechanical, plumbing, electrical and
roofing) included in its subcontract or purchase order. In addition, the Subcontractor
shall assign and name a qualified employee for scheduling direction for its portion of the
Work. The supervisory employees of the Subcontractor (including field superintendent,
foreman and schedulers at all levels) must have been employed in a supervisory
(leadership) capacity of substantially equivalent level on a similar project for at least two
years within the last five years. The Subcontractor shall include a resume of experience
for each employee identified by it to supervise and schedule its work.
33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and
purchase orders shall provide:
33.6.1 That the Subcontractor's exclusive remedy for delays in the
performance of the subcontract or purchase order caused by events beyond its control,
including delays claimed to be caused by Owner or Design Professional or attributable
to Owner or Design Professional and including claims based on breach of contract or
negligence, shall be an extension of its contract time.
33.6.2 In the event of a change in the work, the Subcontractor's claim for
adjustments in the contract sum are limited exclusively to its actual costs for such
changes plus no more than 10% for overhead and profit.
GC-CA-H-26
16B 9
33.6.3 The subcontract or purchase order, as applicable, shall require the
Subcontractor to expressly agree that the foregoing constitute its sole and exclusive
remedies for delays and changes in the Work and thus eliminate any other remedies for
claim for increase in the contract price, damages, losses or additional compensation.
Further, Contractor shall require all Subcontractors to similarly incorporate the terms of
this Section 33.6 into their sub-subcontracts and purchase orders.
33.6.4 Each subcontract and purchase order shall require that any claims by
Subcontractor for delay or additional cost must be submitted to Contractor within the
time and in the manner in which Contractor must submit such claims to Owner, and that
failure to comply with such conditions for giving notice and submitting claims shall result
in the waiver of such claims.
34. CONSTRUCTION SERVICES
34.1 Contractor shall maintain at the Project site, originals or copies of,
on a current basis, all Project files and records, including, but not limited to, the following
administrative records:
34.1.1
34.1.2
34.1.3
34.1.4
34.1.5
34.1.6
34.1.7
34.1.8
34.1.9
34.1.10
34.1.11
34.1.12
34.1.13
34. 1 . 14
34. 1 . 1 5
34.1.16
34.1.17
34.1.18
34.1.19
34.1.20
34.1.21
34.1.22
34.1.23
34.1.24
34.1.25
34.1.26
34.1.27
34.1.28
34.1.29
Subcontracts and Purchase Orders
Subcontractor Licenses
Shop Drawing Submittal/Approval Logs
Equipment Purchase/Delivery Logs
Contract Drawings and Specifications with Addenda
Warranties and Guarantees
Cost Accounting Records
Labor Costs
Material Costs
Equipment Costs
Cost Proposal Request
Payment Request Records
Meeting Minutes
Cost-Estimates
Bulletin Quotations
Lab Test Reports
Insurance Certificates and Bonds
Contract Changes
Permits
Material Purchase Delivery Logs
Technical Standards
Design Handbooks
"As-Built" Marked Prints
Operating & Maintenance Instruction
Daily Progress Reports
Monthly Progress Reports
Correspondence Files
Transmittal Records
Inspection Reports
GC-CA-H-27
16B 9
34.1.30
34.1.31
34.1.32
Punch Lists
PMIS Schedule and Updates
Suspense (Tickler) Files of Outstanding
Requirements
The Project files and records shall be available at all times to Owner and Design
Professional or their designees for reference, review or copying.
34.2 Contractor Presentations
At the discretion of the County, the Contractor may be required to provide a brief update
on the Project to the Collier County Board of County Commissioners, "Board", up to two
(2) times per contract term. Presentations shall be made in a properly advertised Public
Meeting on a schedule to be determined by the County Manager or his designee. Prior
to the scheduled presentation date, the Contractor shall meet with appropriate County
staff to discuss the presentation requirements and format. Presentations may include,
but not be limited to, the following information: Original contract amount, project
schedule, project completion date and any changes to the aforementioned since Notice
to Proceed was issued.
35. SECURITY
If required, Contractor shall be responsible for the costs of providing background checks
and drug testing for all employees that shall provide services to the County under this
Agreement. This may include, but not be limited to, checking federal, state and local
law enforcement records, including a state and FBI fingerprint check, credit reports,
education, residence and employment verifications and other related records.
Contractor shall be required to maintain records on each employee and make them
available to the County for at least four (4) years.
36. VENUE
Any suit or action brought by either party to this Agreement against the other party
relating to or arising out of this Agreement must be brought in the appropriate federal or
state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction
on all such matters.
37. VALUE ENGINEERING
All projects with an estimated cost of $10 million or more shall be reviewed for
consideration of a Value Engineering (VE) study conducted during project development.
A "project" shall be defined as the collective contracts, which may include but not be
limited to: design, construction, and construction, engineering and inspection (GEl)
services. Additionally, any project with an estimated construction value of $2 million or
more may be reviewed for VE at the discretion of the County.
38. ABOVEGROUNWUNDERGROUNDTANKS
An underground 62-761, Florida Administrative Code (F.A.C.) or aboveground 62-762,
F.A.C. regulated tank requires notification to the 'County' prior to installation or closure
GC-CA-H-28
168 9
of the tank. The Pollution Control Department (239-252-2502), via contract GC-690
with the Florida Department of Environmental Protection (FDEP), is the County (local
program) for the purposes of these rules.
Regulated tanks require notification to the 'county'local program thirty (30) days prior to
installation and again forty-eight (48) hours prior to commencement of the installation.
Closure activities require a ten (10) day notification and then a forty-eight (48) hour
notification prior to commencement. The notification is to allow for scheduling of the
inspections pertaining to the installation/closure activities. A series of inspections will
be scheduled based upon system design after discussing the project with the
contractor/project manager. Specifics on applicability, exemptions, and requirements
for regulated pollutant storage tank systems can be found in 62-761, F.A.C. and 62-762,
F.A.C. or you may contact the Pollution Control Department with your questions.
Please note that equipment must be listed on the FDEP approved equipment list and
will be verified at inspection along with installation and testing procedures. The
approved equipment list is constantly updated and can be found at the FDEP Storage
Tank Regulation website along with rules, forms and other applicable information.
39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES.
The Contractor shall employ people to work on Owner's projects who are neat, clean,
well-groomed and courteous. Subject to the Americans with Disabilities Act, Contractor
shall supply competent employees who are physically capable of performing their
employment duties. The Owner may require the Contractor to remove an employee it
deems careless, incompetent, insubordinate or otherwise objectionable and whose
continued employment on Owner's projects is not in the best interest of the County.
GC-CA-H-29
168 9
EXHIBIT I
Local Agency Program (LAP) Requirements
SUPPLEMENTAL TERMS AND CONDITIONS
Refer to the Form and Reporting Requirements Exhibit to become familiar with all
documentation and compliance reporting that must be submitted throughout the project.
The following items must be submitted with the bid package. Any missing
items will be considered a nonresponsive bid.
REQUIRED FORMS (Attached)
N/A DBE/ AA Plan Submit BOTH with Bid If your DBE/ AA Plan has not
Package: been approved by FOOT:
Disadvantaged Business
Enterprise Affirmative Action 0 FDOT DBE/AA Plan A sample DBE policy and plan
Plan Approval Letter (Form 275-030-11B) has been
provided with approval
DBE PLAN SUBMITTED WITH 0 Copy of DBE/ AA Policy instructions.
BID MUST BE APPROVED BY and Plan
FOOT
N/A EEO/ AA Plan Submit with Bid Package: A sample EEO policy and plan
has been provided.
Equal Employment 0 Copy of EEO/ AA Policy
Opportunity Affirmative and Plan The EEO plan is not required
Action Plan to be approved by FDOT.
700-011-13 Notification of EEO Officer Submit with Bid Package
700-010-52 Affidavit Vehicle Registration Submit with Bid Package
275-030-10 Bid Opportunity list Submit with Bid Package
Exhibit P Declaration of Debarment Submit with Bid Package
700-010-36 Certification of Sublet Work Submit with Bid Package
27S-030-11A Anticipated DBE Statement Submit with Bid Package
C-004 Certification of Non- Submit with Bid Package
segregated Facilities
Provide FOOT Submit with Bid Package
Prequalification #
The following terms and conditions supersede any terms and conditions
under the General Conditions of this contract and/or policy and guidelines of
Collier County Government for the purpose of this engagement only.
GC-CA-I-1
168 ~9
2. Audit Reports
(49 CFR Subtitle A Part 90,48 CFR 31 Federal Acquisitions Requlations)
In the event that a recipient expends $500,000 or more in federal awards in its fiscal
year, the recipient must have a single or program specific audit conducted in
accordance with the United States Office of Management and Budget (OMB)
Circular A-133.
If the recipient expends less than $500,000 in federal awards during its fiscal year, an
audit conducted in accordance with the OMB Circular A-133 is not required. If a
recipient expends less than $500,000 in federal awards during its fiscal year and elects
to have an audit conducted in accordance with OMB Circular A-133, the cost of the
audit must be paid from non-federal funds.
Reporting Packages and management letters generated from audits conducted in
accordance with OMB Circular A-133 shall be submitted to the awarding FOOT office,
by the recipient within 30 days of receiving it. The aforementioned items are to be
received by the appropriate FDOT office no later than 9 months after the end of the
recipient's fiscal year.
3. Bonding and Prequalification
(3-5.7-13,8-7.1 and 2-5.1 Florida Department of Transportation Guidelines)
Prequalification of Bidders
Except as noted below, pre-qualify with the Department to be eligible to bid. The
Department publishes regulations covering prequalification of bidders under separate
cover. The Department does not require the Contractor to be pre-qualified if bidding
contracts of $250,000 or less or if constructing buildings.
For contracts exceeding $250,000 amount, file an application for qualification on forms
furnished by the Department, giving detailed information with respect to financial
resources, equipment, past record, personnel, and experience. For qualified applicants,
the Department will issue a certificate fixing the types of work and the aggregate
amount of work that the Department allows the pre-qualified bidder to have under
contract at anyone time. However for projects that exceed $250,000 and on the
National Highway System or State Highway System, the contractor must be FDOT pre-
qualified.
A person or affiliate who has been placed on the convicted vendor list following a
conviction for a public entity crime may not submit the following:
(a) A bid on a contract to provide any goods or services to a public entity.
(b) A bid on a contract with a public entity for the construction or repair of
a public building or public work.
(c) Bids on leases of real property to a public entity.
A person or affiliate who has been placed on the convicted vendor list following a
conviction for a public entity may not be awarded or perform work as a contractor,
GC-CA-I-2
168 9
supplier, subcontractor, or consultant under a contract with any public entity, and may
not transact business with any public entity in excess of the threshold amount provided
in Section 287.0 17 F.S, for Category Two. All restrictions apply for a period of 36
months from the date of placement on the convicted vendor list.
All pre-qualified Contractors bidding on any Contract must include with their bid
proposal a copy of their Certification of Current Capacity (Form 375-020-22 and Status
of Contract On Hand (Form 375-030-21).
Guaranty to Accompany Proposals
The Department will not consider any proposal unless it is accompanied by a proposal
guaranty of the character and amount indicated in the Advertisement, and unless it is
made payable to the Florida Department of Transportation. Submit proposals with the
understanding that the successful bidder shall furnish a Contract Bond pursuant to the
requirements of 3-5.
Contract Bond Required
General Requirements of the Bond: Upon award, furnish to the Department, and
maintain in effect throughout the life of the Contract, an acceptable surety bond in a
sum at least equal to the amount of the Contract. Execute such bond on the form
furnished by the Department. Obtain a surety that has a resident agent in the State of
Florida, meets all of the requirements of the laws of Florida and the regulations of the
Department, and has the Department's approval. Ensure that the surety's resident
agent's name, address, and telephone number is clearly stated on the face of the
Contract Bond.
On contracts of $150,000 or less, the Department may waive the requirement for all or a
portion of a surety bond if it determines that the project is of a non-critical nature and
nonperformance will not endanger the public health, safety, or property. The
Department may require alternate means of security it if waives the requirement for a
surety bond.
Continued Acceptability of Surety: Provide a surety bond that remains acceptable to the
Department throughout the life of the Contract. In the event that the surety executing the
bond, although acceptable to the Department at the time of execution of the Contract,
subsequently becomes insolvent or bankrupt, or becomes unreliable or otherwise
unsatisfactory then the Department any require that the Contractor immediately replace
the surety bond with a similar bond drawn on a surety company that is reliable and
acceptable to the Department. In such an event, the Department will bear all costs of
the premium for the new bond, after deducting any amounts that are returned to the
Contractor from his payment of premium on the original bond.
Default by Contractor: In case of default on the part of the Contractor, the Department
will charge against the bond all expenses for services incidental to ascertaining and
collecting losses under the bond, including accounting, engineering, and legal services,
together with any and all costs incurred in connection with renegotiation of the Contract.
GC-CA-I-3
168 9
Surety to Furnish Legal Defense: The surety company shall indemnify and provide
dense for the Department when called upon to do so for all claims or suits against the
Department arising out of the Contract. It is expressly understood that the monetary
limitation on the extent of the indemnification shall be the approved Contract amount,
which amount shall be original contract amount as may be increased by subsequent
Supplemental Agreements.
Liability for Wrongful or Criminal Act by Contractor: The principal and surety executing
the bond shall be liable to the State in any civil action that might be instituted by the
Department or any officer of the State authorized in such cases, for double any amount
in money or property the State might lose, or be overcharged or otherwise be defrauded
of by any wrongful or criminal act of the Contractor, his agent or his employees.
Execution of Contract and Bond
Within twenty (20) days after Contract award, execute the necessary agreements to
enter into a contract with the Department and return the agreement along with a
satisfactory surety bond and documentation evidencing all insurance required by 7-13 to
the Department's Contract Office that awarded the Contract. For each calendar day that
the successful bidder is late in delivering to the Department's Contract Office all
required documents in properly executed form, the Department will deduct one day from
the Allowable Contract Time as specified in 8-7.1. The Department will not be bound by
any proposal until it executes the associated Contract. The Department will execute the
Contract and bond in the manner stipulated in 2-5.1.
The Department will execute the Contract within 15 days after receipt of the necessary
agreements and bond from the Contractor.
Failure by Contractor to Execute Contract and Furnish Bond
In the event that the bidder fails to execute the awarded Contract, and to file an
acceptable bond, as prescribed in 3-5 and 3-6, within 20 days of Contract award, the
Department may annul the award, causing the bidder to forfeit the proposal guaranty to
the Department; not as a penalty but in liquidations of damages, sustained. The
Department may then award the Contract to the next lowest responsible bidder, re-
advertise, or accomplish the work using day labor.
4. Buy America and Foreign Contractor and Supplier Restriction
(Florida Department of Transportation Guidelines)
Source of Supply Steel (Federal-Aid Contracts Only): For Federal-aid Contracts,
only use steel and iron produced in the United States, in accordance with the Buy
America provisions of 23 CFR 635.410, as amended. Ensure that all manufacturing
processes for this material occur in the United States. As used in this specification, a
manufacturing process is any process that modifies the chemical content, physical
shape or size, or final finish of a product beginning with the initial melding and mixing
and continuing through the bending and coasting stages. A manufactured steel or iron
product is complete only when all grinding, drilling, welding, finishing and coating have
been completed. If a domestic product is taken outside the United States for any
GC-CA-I-4
168 9
process, it becomes foreign source material. When using steel and iron as a component
of any manufactured product incorporated into the project (e.g., concrete pipe, pres-
stressed beams, corrugated steel pipe, etc.), these same provisions apply, except that
the manufacturer may use minimal quantities of foreign steel and iron when the cost of
such foreign materials does not exceed 0.1 % of the total Contract amount or $2500,
whichever is greater.
These requirements are applicable to all steel and iron materials incorporated into
the finished work, but are not applicable to steel and iron items that the Contractor uses
but does not incorporated into the finished work. Provide a certification from the
producer of steel or iron, or any product containing steel or iron as a component, stating
that all steel or iron furnished or incorporated into the furnished product was
manufactured in die Untied States in accordance with the requirements of this
specification and the Buy America provisions of 23 CFR 635.410, as amended. Such
certification shall also include (1) a statement that the product entirely within the United
States, or (2) a statement that the product was produced within the United States
except for minimal quantities of foreign steel and iron valued at $(actual value). Furnish
each such certification to the Engineer prior to incorporating the material into the
project. When FHWA allows the use of foreign steel on a project, furnish invoices to
document the cost of such material, and obtain the Engineer's written approval prior to
incorporating the material into the project.
5. Change Orders
See Exhibit H, General Terms and Conditions, Section 10. Changes in the
Work, Article, 10.2 Change Order, Collier County Contract - See attached contract
section pages GC-CA-H.
6. Claims
See Exhibit H, General Terms and Conditions, Section 11. Claims and
Disputes, Collier County Contract - SeeattachedcontractsectionpageGC-CA-H.
7. Contractor Purchased Equipment for State or Local Ownership
Provision excluded from this contract.
8. Debarment and Suspension (Collier Countv Purchasinq PolicV)
The Board shaff grant authority to County staff to suspend and/or debar vendors, contractors,
consultants and other interested and affected persons from active participation in obtaining County
contracts. The purpose of any such action shaff be to protect the County's interests and the integrity of
the County's contracting process. The suspension and debarment processes shaff be considered to be
separate from and in addition to the award evaluation and vendor performance evaluation processes
authorized elsewhere in this policy.
Definition of Terms: For the purposes of this section, the following terms have been defined as
follows:
Affiliate refers to associated business entities or individuals that control or could
control the contractor or are controlled by the contractor or could be controlled by the
contractor.
GC-CA-I-5
16 B ~9
Civil Judgment refers to a judgment or finding of a civil offense by any court of
competent jurisdiction.
Contractor means any individual or legal entity that:
a. Directly or indirectly (e.g.; through an affiliate), submits offers for or is
awarded, or reasonably may be expected to submit offers for or be
awarded, a County contract for construction of for procurement of
commodities and services, including professional services; or
b. Conducts business, or reasonably may be expected to conduct business,
with the County as an agent, surety, representative or subcontractor of
another contractor.
For the purposes of this section, the terms "vendor" and "consultant" shall have the
same meaning as "contractor" and the term "sub consultant" shall have the same
meaning as the term "subcontractor".
Conviction means a judgment or conviction of a criminal offense, felony or misdemeanor, by any
court of competent jurisdiction, whether entered upon a verdict or a plea, and includes a conviction
entered upon a plea of no 10 contendere.
Debarment means action taken by the County to exclude a contractor from County contracting and
County-approved subcontracting for a reasonable, specified period as provided herein.
Preponderance of the Evidence means proof by information that, compared with that opposing it,
leads to the conclusion that the fact at issue is more probably true than not.
Subcontractor: Any individual or legal entity that offers or agrees to provide commodities or services
to a party deemed to be a contractor under this section.
Suspension refers to action taken by the Purchasing/General Services Director (hereinafter referred
to as lithe PGS Director'J to temporarily disqualify a contractor from County contracting or County-
approved subcontracting.
Suspension: The Purchasing/General Services Director shall have the authority to suspend a
contractor, subcontractor or person from consideration for award of contracts if there appears to be a
reasonable basis for debarment as set forth under Section XXXIX. If a suspension precedes a
debarment, the suspension period shall be considered in determining the debarment period. The
suspension period shall not exceed three months without the approval of the County Manager. A
decision to suspend by the Purchasing/General Services Director shall be considered final and conclusive
with no right of appeal.
Debarment:
Causes for Debarment: The prospective causes for debarment include one or more of the following:
a. Conviction for commission of a criminal offense as an incident to obtaining or attempting to
obtain a public or private contract or subcontract, or in the performance of such contract or
subcontract.
b. Conviction under state or federal law of embezzlement, theft, forgery, bribery,
falsification or destruction of records, receiving stolen property, or any other offense indicating a
lack of business integrity or business honesty which currently, seriously and directly affects
responsibility as a contractor.
c. Conviction under state or federal antitrust laws arising out of the submission of bids,
proposals or other competitive offers.
GC-CA-I-6
168 9
d. Violation(s} of county contract(s) provisions, which is (are) deemed to be serious and to warrant
debarment, including the failure, without good cause, to perform in accordance with the terms, conditions, specifications,
scope, schedule or any other provisions of the contract(s}.
e. Refusal to provide bonds, insurance or other required coverages and certifications thereof
within a reasonable time period.
f. Refusal to accept a purchase order, agreement or contract, or perform accordingly
provided such order was issued timely and in conformance with the solicitation and offer
received.
g. Presence of principals or corporate officers in the business of concern, who were
principals within another business at the time when the other business was suspended or
debarred within the last three years under the provisions of this section.
h. Violation of the ethical standards set forth under applicable state or county laws.
i. Debarment of the contractor by another public agency
j. Any other cause deemed to be so serious and compelling as to materially affect the
qualifications or integrity of the contractor.
Debarment Procedure:
a. The county department requesting the debarment action shall submit to the PGS
Director a written complaint setting forth the reason(s) for seeking debarment and shall identify a
recommended debarment period.
b. The PGS Director shall review the complaint, verify whether it is compliant with the
provision of this policy, direct any appropriate changes and forward the complaint to the
contractor.
c. The contractor shall review the complaint and shall provide a written response (with
supporting documentation) to each allegation. The response shall be provided to the PGS
Director within 10 (ten) business days of receipt of the allegations submittal. In the event that the
contractor fails to respond to the complaint within the prescribed time period, the complaint, as
forwarded to the contractor, shall become an effective debarment decision without further appeal.
d. In the event that the contractor files a timely and complete response to the complaint and
the debarment action is based upon a conviction, judgment or other event(s) where there is no
significant dispute over material facts, the PGS Director shall determine the period of debarment
on the basis of the undisputed material information set forth or referenced in the complaint, the
contractor's reply and the parameters set forth in this section. In the event that the Contractor
objects to the PGS Director's decision, the Contractor shall have a maximum of three business
days to file an appeal of the debarment decision with the PGS Director. The appeal will be
forwarded to and considered by the County Manager (or his designee), who will review the
debarment record compiled by the initiating department and the contractor. Should the County
Manager overturn the PGS Director's decision; the County Manager shall formally cite the
reasons for doing so.
e. In the event that the contractor files a timely and complete reply to the complaint and
where the facts are in dispute, the Purchasing Department will convene a debarment committee
(hereinafter referred to as "the committee') consisting of at least three individuals who will review
the complaint and the contractor's reply The County Manager or his designee shall formally
appoint the committee, which will generally consist of county employees, none of whom shall be a
member of the department initiating the complaint. At the discretion of the County Manager, a
member from private industry with a particular area of relevant expertise may be appointed to the
committee, provided that this member is not a direct or indirect competitor of the firm in question.
The Office of the County Attorney shall appoint a representative to attend the hearing. The
representative shall not be considered a voting member of the committee, but shall be available
to provide legal counsel to the committee as necessary. All members appointed to serve on the
debarment committee shall disclose, to the PGS Director, or his designee, any actual or
GC-CA-I-7
168 9
prospective conflicts of interest at the time of appointment or at the time in which the member
becomes aware of the actual or prospective conflict.
f The PGS Director, or his designee, shall chair the committee and serve as the
Purchasing Department's representative to the committee. The Purchasing representative shall
preside over and facilitate the deliberations of the committee as a non-voting member and serve
as the County's liaison to the Contractor in the debarment process. Aff voting committee
members are prohibited from having any communication regarding the debarment issue outside
the committee deliberations with any of the parties involved (n the specific debarment or their
representatives until after the committee decision has been issued or, in the event of an appeal of
that decision by the Contractor, until the conclusion of the appeal process. Aff committee
deliberations are subject to Section 286.011 F. S.
g. Where the material facts are in dispute, the committee shaff evaluate the evidence, judge
the credibility of witnesses and base its decision upon the preponderance of the evidence.
Should the contractor fail to appear at the debarment hearing, the contractor shaff be presumed
to be unqualified and or non-responsive and shall be subject to debarment. The committee
decision shall be by a majority vote of those voting members in attendance. The committee shaff
be the sole trier of fact. In the event that the committee decides to impose debarment, the
debarment decision wiff formally include, but not be strictly limited to the following information:
1) The specific reasons for the debarment;
2) The scope of the debarment; and
3) The period of debarment, including the effective and expiration dates.
The committee's decision shaff be issued in writing within 20 business days of the
conclusion of the hearing unless the committee extends this period for good cause.
h. The PGS Director shaff forward the committee's decision to the contractor and affiliates
involved. Should the contractor object to the committee's decision, the contractor shall have a
maximum of three business days to file an appeal of the debarment decision with the PGS
Director. The appeal will be forwarded to and considered by the County Manager (or his
designee), who will review the debarment record compiled by the initiating department, the
contractor and the committee. Should the County Manager overturn the committee's decision;
the County Manager shaff formally cite the reasons for doing so.
Debarment Period:
a. At its sole discretion, the committee shaff determine the period of debarment. The
debarment period shall be commensurate with the severity of the causers) and in no event shaff
be the debarment period exceeds five years without the approval of the Board.
b. At its sole discretion, the committee (having the same or different composition) may
reduce the debarment period upon a written request from the contractor to do so, based on one
or more of the fOffowing reasons:
1. Newly discovered material evidence;
2. A reversal of the conviction, civil judgment or other action
upon which the debarment was based;
3. Bona fide change in ownership or management;
4. Elimination of other causes for which the debarment was imposed; or
5. Other reasons that the committee might deem appropriate.
The contractor's request shall be submitted to the PGS Director in writing and
shall be based on one or more of the aforementioned reasons.
c. The decision of the committee regarding a reduction of the debarment period is
final and not subject to appeal.
The Effects of Debarment:
GC-CA-I-8
168 9
a. Debarred contractors are excluded from receiving County contracts.
Departments shall not solicit offers from, award contracts to, or consent to subcontractors
with debarred contractors, unless the County Manager or his designee determines that
emergency or single source conditions exist and grants written approval for such actions.
Debarred contractors are excluded from conducting business with the County as agents,
representatives, subcontractors or partners of other contractors.
b. The Purchasing Department shall notify all Board departments of the final
debarment decision and the effects of that decision with regard to conducting business
with the debarred entity(ies) during the debarment period.
Continuation of Current Contracts:
a. Departments may not renew or otherwise extend the duration of current
contracts with debarred contractors in place at the time of the debarment unless the PGS
Director or his designee determines that it is in the best interests of the County to allow
the contractor to continue or finish the work within an additional, limited period of time.
b. Debarment shall constitute grounds for terminating an open agreement with a
contractor. However, the contract manager may permit completion of an open contract(s)
provided that the debarred contractor has performed in a satisfactory manner to date
under the open contract(s) unless otherwise directed by the PGS Director.
Restrictions on Subcontracting:
a. When a debarred contractor is proposed as a subcontractor for any subcontract
subject to County approval, the department shall not consent to subcontracts with such
contractors unless the County Manager or his designee determines that emergency or
single source conditions exist, thus justifying such consent and approves such decision.
b. The County shall not be responsible for any increases in contract costs or other
expenses incurred by a contractor as a result of rejection of proposed subcontractors
pursuant to subsection 6.a provided that the subcontractor was debarred prior to the
submission of the applicable bid or proposal offer.
The Scope of Debarment:
Debarment applies to all officers, principals, directors, partners, qualifiers, divisions or other
organizational elements of the debarred contractor, unless the debarment decision is limited by its terms
to specific divisions, organizational elements or commodity/services. The committee's decision includes
any existing affiliates of the contractor if they are specifically named and are given written notice of the
proposed debarment and an opportunity to respond. Future affiliates of the contractor are subject to the
pre-existing terms of the committee's decision.
GC-CA-I-9
16R 9
EXHIBIT "P"
DECLARATION OF DEBARMENT
The bidder, in accordance with Section XXIX of the prevailing Collier County Purchasing
Policy, (known as "Debarment and Suspension") shall sign the appropriate declaration
under this exhibit. In doing so, the undersigned hereby declares that:
Name of Business
1. They are a prospective contractor, vendor, affiliate, or otherwise interested or
affected party as defined under Section XXIX of the Collier County Purchasing
Policy.
2. They are not nor have not been debarred or suspended by any public entity within
the last five (5) years of the date of this submission.
3. Signature of this declaration constitutes a material representation of fact upon which
reliance was placed when this submission was entered and evaluated. Further,
should it subsequently be determined that the signatory knowingly or unknowingly
rendered an erroneous declaration; the County shall reserve the right to reject the
bid offer associated with this declaration and/or suspend/debar the bidder/signatory.
4. They shall provide immediate written notice to the person to whom this proposal is
submitted if at any time they learn that its declaration was erroneous when submitted
or has become erroneous by reason of changed circumstances.
5. Should the proposed agreement be entered into, they shall not knowingly enter into
any subcontract or supplier agreement with a person or entity that is debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this
agreement, unless otherwise authorized by the Collier County Purchasing/General
Services Director.
The bidder shall sign the appropriate declaration below and comply with any
accompanying requirements set forth therein:
(A) I hereby declare that my firm nor its principals is not presently debarred, suspended,
proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any public agency.
Name(s) and Title(s) of Authorized Representative(s)
Name of Business
Date
Authorized Signature(s)
(B) I am unable to declare that my firm is in compliance with one or more statements
contained within this declaration and I shall attach an explanation for determination
by the Collier County Purchasing Director.
Name(s) and Title(s) of Authorized Representative(s)
GC-CA-I-10
168 9
Name of Business
Authorized Signature(s)
Date
9. Disadvantaged Business Enterprises
(Florida Department of Transportation Guidelines)
Disadvantaged Business Enterprise Program:
General: Prior to award of the Contract, have an approved DBE Affirmative Action
Program Plan filed with the Equal Opportunity Office. Update and resubmit the plan
every three (3) years. No Contract will be awarded until the Department approves the
Plan. The DBE Affirmative Action Program Plan and commitment to carry out the Plan
must be incorporated into and become a part of the awarded Contract. Failure to keep
these commitments will be deemed noncompliance with these Specifications and a
breach of the Contract. Take all necessary and reasonable steps to ensure that FDOT
Certified Disadvantaged Business Enterprises, as defined in 40 CFR Part 26 and DOT
Rule Chapter 14-78, have the opportunity to participate in, compete for and perform
subcontracts. Do not discriminate on the basis of age, race, color, religion, national
origin, sex or disability in the award and performance of DOT assisted Contracts.
Plan Requirements: Include the following in the DBE Affirmative Action Program
Plan:
(a) A policy statement, expressing a commitment to use DBEs in all aspects
of contracting to the maximum extent feasible. The policy making body
must issue a policy statement signed by the chairperson, which
expresses its commitment to utilize DBEs, outlines the various levels of
responsibly, and states the objectives of the program. Circulate the policy
statement throughout the Contractor's organization
(b) The designation of a Liaison Officer within the Contractor's organization,
as well as support staff, necessary and proper to administer the program,
and a description of the authority, responsibility, and duties of the Liaison
Officer and support staff. The Liaison Officer and staff are responsible for
developing, managing, and implementing the program on a day-to-day
basis for carrying out technical assistance activities for DBEs and for
disseminating information on available business opportunities sot that
DBEs are provided an equitable opportunity to participate in Contract let
by the Department.
Use techniques to facilitate DBE participation in contracting activities which include,
but are not limited to:
1. Soliciting price quotations and arranging a time for the review of plans,
quantities, specifications, and delivery schedules, and for the
preparation and presentation of quotations.
2. Providing assistance to DBEs in overcoming barriers such as the
inability to obtain bonding, financing, or technical assistance.
GC-CA-I-11
16 B ~~9
3. Carrying out information and communication programs or workshops
on contracting procedures and specific contracting opportunities in a
timely manner, with such programs being bilingual where appropriate.
4. Encouraging eligible DBEs to apply for certification with the
Department.
5. Contacting Minority Contractor Associations and city and country
agencies with programs for disadvantaged individuals for assistance in
recruiting and encouraging eligible DBE contractors to apply for
certification with the Department.
DBE Records and Reports: Submit the Anticipated DBE Participation Statement at or
before the Pre-Construction Conference. Report monthly, through the Equal Opportunity
Reporting System on the Department's Website, actual payments, retainage, minority
status, and work type of all subcontractors and major suppliers. The Equal Opportunity
Office will provide instructions on accessing this system. Develop a record keeping
system to monitor DBE affirmative action efforts which include the following:
(a) the procedures adopted to comply with these Specifications;
(b) the number of subordinated Contracts on Department projects awarded to
DBEs;
(c) the dollar value of the Contracts awarded to DBEs;
(d) the percentage of the dollar value of all subordinated Contracts to DBEs
as a percentage of the total Contract amount;
(e) a description of the general categories of Contracts awarded to DBEs.
(f) The specific efforts employed to identify and award Contracts to DBEs.
Upon request, provide the records to the Department for review.
All such records are required to be maintained for a period of five (5) years
following acceptance of final payment and have them available for
inspection by the Department and the Federal Highway Administration.
10. Equal Employment Opportunity
(Florida Department of Transportation Guidelines and US Department of Labor
Employment Standards)
Equal Employment Opportunity Requirements:
Equal Employment Opportunity Policy: Accept as the operating policy, the
following statement which is designed to further the provision of equal opportunity to all
persons without regard to their age, race, color, religion, national origin, sex, or disability
and to promote the full realization of equal employment opportunity through a positive
continuing program:
"It is the policy of this Company to assure that applicants are employed, and that
employees are treated during employment, without regard to their age, race, religion,
color national origin, sex or disability. Such action must include: employment,
upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of payor other forms of compensation; and selection for training,
including apprenticeship, pre-apprenticeship, and/or on-the-job training."
GC-CA-I-12
168 9
Equal Employment Opportunity Officer.' Designate and make known to the
Department's contracting officers and equal employment opportunity officer (hereinafter
referred to as the EEO Officer) who must be capable of effectively administering and
promoting an active Contractor program employment opportunity and who must be
assigned adequate authority and responsibility to do so.
Dissemination of Policy: All members of the Contractor's staff who are authorized
to hire, supervise, promote, and discharge employees, or who recommend such action,
or who are substantially involved in such action ,will be made fully cognizant of, and will
implement, the Contractor's equal employment opportunity policy and contractual
responsibilities.
Recruitment: When advertising for employees, include in all advertisements for
employees the notation "An Equal Opportunity Employer".
Personnel Actions: Establish and administer wages, working conditions,
employee benefits, and personnel actions of every type, including hiring, upgrading,
promotion, transfer, demotion, layoff, and termination without regard to age, race, color,
religion, national origin, sex, or disability.
Follow the following procedures:
1. Conduct periodic inspections of project sites to ensure that working conditions
and employee facilities do not indicate discriminatory treatment of project
site personnel.
2. Periodically evaluate the spread of wages paid with each classification to
determine any evidence of discriminatory wage practices.
3. Periodically review selected personnel actions in depth to determine
whether there is evidence of discrimination. Where evidence if found,
promptly take corrective action. If the review indicates that the discrimination
may extend beyond the actions reviewed, such corrective action must
include all affected persons.
4. Investigate all complaints of alleged discrimination made in connect with
obligations under this Contract, attempt to resolve such complaints, and
take appropriate corrective action. If the investigation indicates that the
discrimination may affect persons other than the complainant, such
corrective action must include such other persons. Upon completion of each
investigation inform every complainant of all of the avenues of appeal.
Subcontracting: Use the best efforts to ensure subcontractor compliance with their equal
employment opportunity policy.
Records and Reports: Keep such records as are necessary to determine compliance with
the equal employment opportunity obligations. The records kept will be designed to indicate
the following:
1. The number of minority and non-minority group members employed in each
work classification on the project.
GC-CA-I-13
168. 9
2. The progress and efforts being made in cooperation with unions to increase
minority group employment opportunities (applicable only to Contractors
who rely in whole or in part on unions as a source of their work force).
3. The progress and efforts being made in locating, hiring, training, qualifying,
and upgrading minority group employees as deemed appropriate to comply
with their Equal Employment Opportunity Policy.
4. The progress and efforts being made in securing the services of minority
group subcontractors or subcontractors with meaningful minority group
representation among their employees as deemed appropriate to comply
with their Equal Employment Opportunity Policy.
All such records must be retained for a period of three years following completion of
the contract work and be available at reasonable times and places for inspection by
authorized representatives to the Department and the Feral Highway Administration.
Upon request, submit to the Department a report of the number of minority and non-
minority group employees currently engaged in each work classification required by the
Contract work.
Executive Order 11246, As Amended
Executive Order 11246-Equal Employment Opportunity
SOURCE: The provisions of executive Order 11246 of September 24, 1965, appear
at 30 FR 12319, 12935,3 CFR, 1964-1965 Comp., p. 339, unless otherwise noted.
Under and by virtue of the authority vested in me as President of the United States
by the Constitution and statutes of the United States, it is ordered as follows:
Part I-Nondiscrimination in Government Employment
[Part I superseded by EO 11478 of August 8, '69, 34 FR 12985, 3 CFR, 1966-1970
Comp., p. 803]
Part II-Nondiscrimination in Employment by Government Contractors and
Subcontractors
Subpart A-Duties of the Secretary of Labor
SEC. 201. The Secretary of Labor shall be responsible for the administration and
enforcement of Parts II and III of this Order. The Secretary shall adopt such results and
regulations and issue such orders as are deemed necessary and appropriate to achieve
the purposes of Parts II and III of this Order.
[Sec. 201 amended by EO 12086 of 10/5/78, 43 FR 46501, 3 CFR, 1978 Comp., p. 230]
Subpart B-Contractor's Agreements
Sec. 202. Except in contract exempted in accordance with Section 204 of this
Order, all Government contracting agencies shall include in every Government contract
hereafter entered into the following provisions:
GC-CA-j-14
168 9
During the performance of this contract, the contractor agrees as follows:
1) The contractor will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, or national origin. The
contractor will take affirmative action to ensure that applicants are employed, and
the employees are treated during employment, without regard to their race, color,
religion, sex, or national origin. Such action shall include, but not be limited to the
following: employment, upgrading, demotion, or transfer; recruitment or
recruitment advertising; layoff or termination; rates of payor other forms of
compensation; and selection for training, including apprenticeship. The contractor
agrees to post in conspicuous places available to employees and applicants for
employment, notices to be provided by the contracting officer setting forth the
provisions of this nondiscrimination clause.
2) The contractor will, in all solicitations or advancements for employees placed by
or on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, or
national origin.
3) The contractor will send to each labor union or representative of workers with
which he has a collective bargaining agreement or other contract or
understanding, a notice, to be provided by the agency contracting officer,
advising the labor union or worker's representative of the contractor's
commitments under Section 202 of Executive Order No. 11246 of September 24,
1965, and shall post copies of the notice in conspicuous places available to
employees and applicants for employment.
4) The contractor will comply with all provisions of Executive Order No. 11246 of
September 24, 1965, and of the rules, regulations, and relevant orders of the
Secretary of Labor.
5) The contractor will furnish all information and reports required by Executive Order
No. 11246 of September 24, 1965, and by the rules, regulations, and orders of
the Secretary of Labor, or pursuant thereto, and will permit access to his books,
records, and accounts by contracting agency and the Secretary of Labor for
purposes of investigation to ascertain compliance with such rules, regulations,
and orders.
6) In the event of the contractor's noncompliance with the nondiscrimination clauses
of this contract with any of such rules, regulations, or orders, this contract may
be cancelled, terminated, or suspended in whole or in part and the contractor
may be declared ineligible for further Government contracts in accordance with
procedures.
7) The contractor will include the provisions of paragraphs (1) through (7) in every
subcontract or purchase order unless exempted by rules, regulations, or orders
of the Secretary of Labor issued pursuant to Section 204 of Executive Order No.
11246 of September 24, 1965, so that such provisions will be binding upon each
subcontractor or vendor. The contractor will take such action with respect to any
subcontract or purchase order as may be directed by the Secretary of Labor as a
means of enforcing such provisions including sanctions for noncompliance:
Provided, however, that in the event the contractor becomes involved in, or is
threatened with, litigation with a subcontractor or vendor as a result of such
direction, the contractor may request the United States to enter into such
GC-CA-I-15
168'9
litigation to protect the interest of the United States. [Sec. 202 amended by EO
11375 of October 3, 1967,32 FR 14303, 3 CFR, 1966-1970 Comp., p. 684, EO
12086 of October 5, 1978,43 FR 46501,3 CFR, 1978 Comp., p. 230]
Sec. 203. (a) Each contractor having a contract containing the provisions prescribed
in Section 202 shall file, and shall cause each of his subcontractors to file, Compliance
Reports with the contracting agency or the Secretary of Labor as may be directed.
Compliance Reports shall be file within such times and shall contain such information as
to the practices, policies, programs, and employment policies, programs, and
employment statistics of the contractor and each subcontractor, and shall be in such
form, as the Secretary of Labor may prescribe.
(b) Bidders or prospective contractors or subcontractors may be required to state
whether they have participated in any previous contract subject to the provisions of this
Order, or any preceding similar Executive Order, and in that event to submit, on behalf
of themselves and their proposed subcontractors, Compliance Reports prior to or as an
initial part of their bid or negotiation of a contract.
(c) Whenever the contract or subcontractor has a collective bargaining agreement or
other contract or understanding with a labor union or any agency referring workers to
providing or supervising apprenticeship or training for such workers, the Compliance
Report shall include such information as to such labor union's or agencies practices and
policies affecting compliance as the Secretary of Labor may prescribe. Provided, that to
the extent such information is within the exclusive possession of a labor union or an
agency referring workers or providing or supervising apprenticeship or training and such
labor union or agency shall refuse to furnish such information to the contractor, the
contractor shall so certify to the Secretary of Labor as part of its Compliance Report and
shall set forth what efforts he has made to obtain such information.
(d) The Secretary of Labor may direct that any bidder or prospective contractor or
subcontractor shall submit, as part of his Compliance Report, a statement in writing,
signed by an authorized officer or agent on behalf of any labor union or any agency
referring workers or providing or supervising apprenticeship or other training, with which
the bidder or prospective contractor deals, with supporting information. To the effect that
the signer's practices and policies do not discriminate on the grounds of race, color,
religion. sex or national origin, and that the signer either affirmatively cooperate in the
implementation of the policy and provisions of the Order or that it consents and agrees
that recruitment, employment, and the terms and conditions of employment under the
proposed contract shall be in accordance with the purposes and provisions of the order.
In the event that the union, or the agency shall refuse to execute such a statement, the
Compliance Report shall so certify and set forth what efforts have been made to secure
such statement and such additional factual material as the Secretary of Labor may
require.
[Sec. 203 amended by EO 11375 of October 13, 1967, 32 FR 14303, 3 CFR,
10966-1970 Comp., p. 684; EO 12086 of October 5, 1978,43 FR 46501,3 CFR, 1978
Comp., p. 230]
GC-CA-I-16
168 <)
Sec. 204 (a) The Secretary of Labor may, when the Secretary deems that special
circumstances in the national interest so require, exempt a contracting agency from the
requirement of including any or all of the provisions of Section 202 of this Order in any
specific contract, subcontract, or purchase order.
(b) The Secretary of Labor may, by rule or regulation, exempt certain classes of
contracts, subcontractors, or purchase orders (1) whenever work is to be or has been
performed outside the United Sates and no recruitment of workers within the limits of
the United States is invoiced; (2L for standard commercial supplies or raw materials;
(3) involving less than specified amounts of money or specified numbers of workers; or
(4) to be the extent that they involve subcontracts below a specified tier.
(c) Section 202 of this Order shall not apply to a Government contractor or
subcontractor that is a religion corporation, association, educational institution, or
society, with respect to the employment of individuals of a particular religion to perform
work connected with the carrying on by such corporation, association, educational
institution, or society of its activities. Such contractor and subcontractors are not
exempted or excused from complying with the other requirements contained in this
Order.
(d) The Secretary of Labor may also provide, by rule, regulation, or order, for the
exemption of facilities of a contractor that are in all respects separate and distinct from
activities of the contractor related to the performance of the contract: provided, that such
an exemption will not interfere with or impede the effectuation of the purposed of this
Order: and provide further, that in the absence of such an exemption all facilities shall
be covered by the provisions of this Order.
[Sec. 204 amended by EO 13279 of December 9,200267 FR 77141, e CFR, 2002
Comp., p. 77141-77144]
Part C-Powers and Duties of the Secretary of Labor and the Contracting Agencies
Sec. 205 The Secretary of Labor shall be responsible for securing compliance by all
Government contractors and subcontractors with this Order and any implementing rules
or regulations. All contracting agencies shall comply with the terms of this Order and
any implementing rules, regulations, or orders of the Secretary of Labor. Contracting
agencies shall cooperate with the Secretary of Labor and shall furnish such information
and assistance as the Secretary may require.
[Sec 205- amended by EO 12086 of October 5, 1978, 43 FR 46501, 3 CFR, 1978
Comp., p. 230]
sec 206 (a) The Secretary of Labor may investigate the employment practices of
any Government contractor or subcontractor to determine whether or not the contractual
provisions specified I Section 202 of this Order have been violated. Such investigation
shall be conducted in accordance with the procedures established by the Secretary of
Labor.
GC-CA-I-17
168 \"~9
(b) The Secretary of Labor may receive and investigate complaints by employees or
prospective employees of a Government contractor or subcontractor which allege
discrimination contrary to the contractual provisions specified in Section 202 of this
Order.
[See 206 amended by EO 12086 of 10/5/78, 43 FR 46501, 3 CFR, 1978 Comp., p. 230]
See 207 The Secretary of Labor shall use his/her best efforts, directly and through
interested Federal, State, and local agencies, contractors, and all other available
instrumentalities to cause any labor union engaged in work under Government contracts
or any agency referring workers or providing or supervising apprenticeship or training
for or in the course of such work to cooperate in the implementation of the purposes of
this Order. The Secretary of Labor shall, in appropriate cases, notify the Equal
Employment Opportunity Commission, the Department of Justice, or other appropriate
Federal agencies whenever it has reason to believe that the practices of any such labor
organization or agency violate Title VI or Title VII of the Civil Rights Act of 1964 or other
provision of Federal law.
[See 207 amended by EO 12086 of 10/5/78, 43 FR 46501, 3 CFR, 1978 Comp., p. 230]
See 208 (a) The Secretary of Labor, or any agency, officer, or employee in the
executive branch of the Government designated by rule, regulation. Or order of the
Secretary, may hold such hearings, public or private, as the Secretary may deem
advisable for compliance, enforcement, or educational purposes.
(b) The Secretary of Labor may hold, or cause to be held, hearing in accordance
with subsection of this Section prior to imposing, ordering, or recommending the
imposition of penalties and sanctions under this Order. No order for debarment of any
contractor from further Government contacts under Section 209(6) shall be made
without affording the contractor an opportunity for a hearing.
Subpart D-sanetions and Penalties
See 209 In accordance with such rules, regulations, or orders as the Secretary of
Labor may issue or adopt, the Secretary may:
(1) Publish, or cause to be published, the names of contractors or unions which it
has concluded have complied or have failed to comply with the provisions of this
Order or of the rules, regulations, and orders of the Secretary of Labor.
(2) Recommend to the Department of Justice that, in cases in which there is
substantial or material violation or the threat of substantial or material violation of
the contractual provisions set forth in Section 202 of this Order, appropriate
proceedings be brought to enforce those provisions, including the enjoying,
within the limitations of applicable law, of organizations, individuals, or groups
who prevent directly or indirectly, or seek to present directly or indirectly,
compliance with the provisions of this Order.
GC-CA-I-18
1_~ B ~9~
(3) Recommend to the Equal Employment Opportunity Commission or the
Department of Justice that appropriate proceedings be instituted under Title VII
of the Civil Rights Act 0 1964.
(4) Recommend to the Department of Justice that criminal proceedings be brought
for the furnishing of false information to any contracting agency or to the
Secretary of Labor as the case may be.
(5) After consulting with the contracting agency, direct the contracting agency to
cancel, terminate, suspend, or cause to be cancelled, terminated or suspended,
any contract, or any portion or portions thereof, for failure of the contractor or
subcontractor to comply with equal employment opportunity provisions of the
contract. Contracts may be cancelled, terminated, or suspended absolutely or
continuance of contracts may be conditions upon a program for future
compliance approved by the Secretary of labor.
(6) Provide that any contracting agency shall refrain from entering into further
contracts, or extensions or other modifications of existing contracts, with any
non-complying contractor, until such contractor has satisfied the Secretary of
Labor that such contractor has established and will carry out personnel and
employment policies in compliance with the provisions of this Order.
(b) Pursuant to rules and regulations prescribed by the Secretary of Labor, the
Secretary shall make reasonable efforts, within a reasonable time limitation, to
secure compliance with the contract provisions of this Order by methods of
conference, conciliation, mediation, and persuasion before proceedings shall be
instituted under subsection (a)(2) of this Section, or before a contract shall be
cancelled or terminated in whole or in part under subsection (a)(5) of this
Section.
[See 209 amended by EO 12086 of 10/5/78, 43FR 46501,3 CFR, 1978 Comp., p. 230]
See 210 Whenever the Secretary of Labor makes a determination under Section
209, the Secretary shall promptly notify the appropriate agency. The agency shall take
the action directed by the Secretary and shall report the results of the action it has taken
to the Secretary of Labor within such time as the Secretary shall specify. If the
contracting agency fails to take the action directed within thirty (30) days, the Secretary
may take the action directly.
[Sec 210 amended by EO 12086 of October 5, 1978, 43 FR 46501, 3 CFR, 1978
Comp., p. 230]
See 211 If the Secretary shall so direct, contracting agencies shall not enter into
contracts with any bidder or prospective contractor unless the bidder of prospective
contractor has satisfactorily complied with the provisions of this Order or submits a
program for compliance acceptable to the Secretary of Labor.
[See 211 amended by EO 12086 of October 5, 1978,43 FR 46501,3 CFR, 1978
Comp., p. 230]
GC-CA-I-19
1.68t7'9
sec 212 When a contract has been cancelled or terminated under Section 209(a)(5)
or a contractor has been debarred from further Government contracts under Section
209(a)(6) of this Order, because of noncompliance with the contract provisions specified
in Section 202 of this Order the Secretary of Labor shall promptly notify the Comptroller
General of the United States.
[Sec 212 amended by EO 12086 of 10/5/78, 43 FR 46501, 3 CFR, 1978 Comp., p. 230]
Subpart E-Certificates of Merit
sec 213 The Secretary of labor may provide for issuance of a United States
Government Certificate of Merit to employers or labor unions, or other agencies which
are or may hereafter be engaged in work under Government contracts, if the Secretary
is satisfied that the personnel and employment practices of the employer, or that the
personnel, training, apprenticeship, membership, grievance and representation,
upgrading, and other practices and policies of the labor union or other agency conform
to the purposes and provisions of this Order.
sec 214 Any Certificate of Merit may at any time be suspended or revoked by the
Secretary of Labor If the holder thereof, in the judgment of the Secretary, has failed to
comply with the provisions of this Order.
sec 215 The Secretary of Labor may provide for the exemption of any employer,
labor union, or other agency from any reporting requirements imposed under or
pursuant to this Order if such employer, labor union, or other agency has been awarded
a Certificate of Merit which has not been suspended or revoked.
Part III - Nondiscrimination Provisions in Federally Assisted Construction
Contracts
sec 301 Each executive department and agency, which administers a program
involving Federal financial assistance shall require as a condition for the approval of any
grant, contract, loan, insurance, or guarantee there under, which may involve a
construction contract, that the applicant for Federal assistance undertake and agree to
incorporate, or cause to be incorporated, into all construction contracts paid for in whole
or in part with funds obtained from the Federal Government or borrowed on the credit of
the Federal Government pursuant to such grant, contract, loan, insurance, or
guarantee, or undertaken pursuant to any Federal program involving such grant,
contract, loan, insurance, or guarantee the provisions prescribed for Government
contracts by Section 202 of this Order or such modification thereof, preserving in
substance the contractor's obligations there under, as may be approved by the
Secretary of Labor, together with such additional provisions as the Secretary deems
appropriate to establish and protect the interest of the United States in the enforcement
of those obligations. Each such applicant shall also undertake and agree (1) to assist
and cooperate actively with the Secretary of Labor in obtaining the compliance of
contractors and subcontractors with those contract provisions and with the rules,
regulations and relevant orders of the Secretary, (2) to obtain and to furnish to the
Secretary of Labor such information as the Secretary may require for the supervision of
GC-CA-I-20
168 9
such compliance, (3) to carry out sanctions and penalties for violation of such
obligations imposed upon contractors and subcontractors by the Secretary of labor
pursuant to Part II, Subpart D, of this Order, and (4) to refrain from entering into any
contract subject to this Order, or extension or other modification of such a contract with
a contractor debarred from Government contracts under Part II, Subpart D, of this
Order.
[See 301 amended by OE 12086 of 10/5/78, 43 FR 46501,3 CFR, 1978 Comp., p 230]
See 302 (a) "Construction contract" as used in this Order means any contract for the
construction, rehabilitation, alteration, conversion, extension, or repair of buildings,
highways, or other improvements to real property.
(b) The provisions of Part II of this Order shall apply to such construction contracts,
and for purposes of such application the administering department or agency shall be
considered the contracting agency referred to therein.
(c) The term "applicant" as used in this Order means an applicant for Federal
assistance or, as determined by agency regulation, other program participant, with
respect to whom an application for any grant, contract, loan, insurance, or guarantee is
not finally acted upon prior to the effective date of this Part, and it includes such an
applicant after he/she becomes a recipient of such Federal assistance.
See 303 (a) The Secretary of Labor shall be responsible for obtaining the
compliance of such applicants with their undertakings under this Order. Each
administering department and agency id directed to cooperate with the Secretary of
Labor and to furnish the Secretary such information and assistance as the Secretary
may require in the performance of the Secretary's functions under this Order.
(b) In the event an applicant fails and refuses to comply with the applicant's
undertakings pursuant to this Order, the Secretary of Labor may, after consulting with
the administering department or agency, take any or all of the following actions: (1)
direct any administering department or agency to cancel, terminate, or suspend in
whole or in part the agreement, contract or other arrangement with such applicant with
respect to which the failure or refusal occurred; (2) direct any administering department
or agency to refrain from extending any further assistance to the applicant under the
program with respect to which the failure or refusal occurred until satisfactory assurance
of future compliance has been received by the Secretary of Labor from such applicant;
and (3) refer the case to the Department of Justice or the Equal Employment
Opportunity Commission for appropriate law enforcement or other proceedings.
(c) In no case shall action be taken with respect to an appliance pursuant to clause
(1) or (2) of subsection (b) without notice and opportunity for hearing.
[See 303 amended by EO 12086 of 10/78,43 FR 46501,3 CFR, 1978 Comp., p 230]
See 304 Any executive department or agency which imposes by rule, regulation or
order requirements of nondiscrimination in employment, other than requirements
imposed pursuant to this Order, may delegate to the Secretary of Labor by agreement
GC-CA-I-21
16819
such responsibilities with respect to compliance standards, reports, and procedures as
would tend to bring the administration of such requirements into conformity with the
administration of requirements imposed under this Order: Provided, that actions to
effect compliance by recipients of Federal financial assistance with requirements
imposed pursuant to Title VI of the Civil Rights Act of 1964 shall be taken in conformity
with the procedures and limitation prescribed in Section 602 thereof and the regulations
of the administering department of agency issued there under.
Part IV Miscellaneous
See 401 The Secretary of Labor may delegate to any officer, agency, or employee
in the Executive branch of the Government, any function or duty of the Secretary under
Parts II and III of th is Order.
[See 401 amended by EO 12086 of 10/5/78,43 FR 46501, 3 CFR, 1978 Comp., p 230]
See 402 The Secretary of Labor shall provide administrative support for the
execution of the program known as the "Plans for Progress."
See 403 Executive Orders Nos. 10590 (January 19, 1955), 10722 (August 5, 1957),
10925 (March 6,1961),11114 (June 22,1963 and, 11162 (July 28,1964), are hereby
superseded and the President's Committee On Equal Employment Opportunity
established by Executive Order NO.1 0925 is hereby abolished. All records and property
in the custody of the Committee shall be transferred to the Office of Personnel
Management and the Secretary of Labor, as appropriate.
(b) Nothing in this Order shall be deemed to relieve any person of any obligation
assumed or imposed under or pursuant to any Executive Order superseded by this
Orders. All rules, regulations, orders, instructions, designations, and other directives
issued by the President's Committee 0 Equal Employment Opportunity and those
issued by the heads of various departments or agencies under or pursuant to any of the
Executive orders superseded by this Order, shall, to the extent that they are not
inconsistent with this Order, remaining in full force and effect such directives to
provisions of the superseded orders shall be deemed to be references to the
comparable provisions of this Order.
[See 403 amended by EO 12107 of 12/28/78, 44 FR 1055, 3 CFR, 1978 Comp., p 264]
See 404 The General Services Administration shall take appropriate action to revise
the standard Government contract forms to accord with the provisions of this Order and
of the rules and regulations of the Secretary of Labor.
See 405 This Order shall become effective thirty (30) days after the date of this
Order.
11. Equipment Rental Rates
(8-1 Florida Department of Transportation Guidelines)
GC-CA-I-22
1. 6 8 ~9
The limitations set forth in 8-1, concerning the amount of work that may be sublet,
do not apply to work performed by equipment rental agreement. However, for any work
proposed to be performed by equipment rental agreement, notify the Engineer in writing
of such intention before using the rented equipment, and indicate whether the
equipment will be rented on an operated or non-operated basis. Include with the written
notice a listing and description of the equipment and a description of the particular work
to be performed with such equipment. As an exception to the above requirements, the
Department will not require written notice for equipment to be rented (without operators)
from an equipment dealer or from a firm whose principal business is the renting or
leasing of equipment.
The operators of all rented equipment, whether rented on an operated or a non-
operated basis are operators are subject to all wage rate requirements applicable to the
project. When renting equipment without operators, the Contractor shall carry the
operators on his own payroll. For equipment that is rented on a non-operated basis, and
when required by the Contract or requested by the Engineer, furnish payrolls from the
lessor with the names of the operators shown thereon.
When a lessor provides rentals of equipment on an operated basis that exceed
$10,000, such lessor is subject to any Equal Employment Opportunity requirements that
are applicable to the project.
12. Foreign Contractor and Supplier Restriction
(Florida Department of Transportation Guidelines and US Department of Labor
Emplovment Standards)
For Federal-aid Contracts, only use steel and iron produced in the United States, in
accordance with the Buy America provisions of 23 CFF 635.410, as amended. Ensure
that all manufacturing process for this material occur in the United States. As used in
this specification, a manufacturing process is any process that modifies the chemical
content, physical shape or size, or final finish of a product, beginning with the initial
melding and mixing and continuing through the bending an coating stages. A
manufactured steel or iron product is complete only when all grinding, drilling, welding,
finishing and coating have been completed. If a domestic product is taken outside the
United States for any process, it becomes foreign source material. When using steel
and iron as a component of any manufactured product incorporated into the project
(e.g., concrete pipe, prestressed beams, corrugated steel pipe, etc.), these same
provisions apply, except that the manufacturer may use minimal quantities of foreign
steel and iron when the cost of such foreign materials does not exceed 0.1 % of the total
Contract amount or $2,500, whichever is greater. These requirements are applicable to
all steel and iron materials incorporated into the finished work, but are not applicable to
steel and iron items that the Contractor uses but does not incorporate into the finished
work. Provide a certification from the producer of steel or iron, or any product
containing steel or iron as a component, stating that all steel or iron furnished or
incorporated into the furnished product was manufactured in the United States in
accordance with the requirements of this specification and the Buy America provisions
of 23 CFR 635.410, as amended. Such certification shall also include (1) a statement
that the product was produced entirely within the United States, or (2) a statement that
GC-CA-I-23
16B~9
the product was produced within the United States except for minimal quantities of
foreign steel and iron valued at $(actual value). Furnish each certification to the
Engineer prior to incorporating the material into the project. When FHWA allows the
use of foreign steel on a project, furnish invoices to document the cost of such material,
and obtain the Engineer's written approval prior to incorporating the material into the
project.
13. Incentive/Disincentive Clauses (Project Specific) (Collier County Policy)
The County desires to expedite construction on this Contract to minimize the inconvenience to the
traveling public and to reduce the time of construction. In order to achieve this, an incentive-disincentive
provision is established for the Contract. The total "incentive payment" or disincentive deduction shall not
exceed $
The County will pay the Contractor an "incentive payment" in the amount of $ , for each calendar
day the actual completion date precedes the Original Contract Time and subject to the conditions
precedent set forth below. The term "Original Contract Time" as used in this Article will mean the number
of calendar days established for completion of the work in the Contract on the date the Contract was
executed. The term "calendar day" as used in this Article will mean every day shown on the calendar.
Calendar days will be consecutively counted from commencement of Contract Time regardless of
weather, weekends, holidays, suspensions of Contractor's operations, delays or other events as
described herein. For purposes of the calculation and the determination of entitlement to the "incentive
payment" stated above, the Original Contract Time will not be adjusted for any reason, cause or
circumstance whatsoever, regardless of fault, save and except in the instance of a catastrophic event
(i.e., hurricane or a declared state of emergency).
The parties anticipate that delays may be caused by or arise from any number of events during the
course of the Contract, including, but not limited to, work performed, work deleted, change orders,
supplemental agreements, delays, disruptions, differing site conditions, utility conflicts, design changes or
defects, time extensions, extra work, right of way issues, permitting issues, actions of suppliers,
subcontractors or other contractors, actions by third parties, shop drawing approval process delays,
expansion of the physical limits of the project to make it functional, weather, weekends, holidays,
suspensions of Contractor's operations, or other such events, forces or factors sometimes experienced in
highway construction work. Such delays or events and their potential impacts on performance by the
Contractor are specifically contemplated and acknowledged by the parties in entering into this Contract,
and shall not extend the Original Contract Time for purposes of calculation of the "incentive payment" set
forth above. Further, any and all costs or impacts whatsoever incurred by the Contractor in accelerating
the Contractor's work to overcome or absorb such delays or events in an effort to complete the Contract
prior to expiration of the Original Contract Time, regardless of whether the Contractor successfully does
so or not, shall be the sole responsibility of the Contractor in every instance.
In the event of a catastrophic event (i.e., hurricane or a declared state of emergency) directly and
substantially affecting the Contractor's operations on the Contract, the Contractor and the County shall
agree as to the number of calendar days to extend the Original Contract Time so that such extended
Original Contract Time will be used in calculation of the "incentive payment". In the event the Contractor
and County are unable to agree to the number of Calendar Days to extend the Original Contract Time,
the County will unilaterally determine the number of calendar days to extend the Original Contract Time
reasonably necessary and due solely to such catastrophic event and the Contractor shall have no right
whatsoever to contest such determination, save and except that the Contractor establishes that the
number of calendar days determined by the County were arbitrary or without any reasonable basis.
However, notwithstanding anything above to the contrary, upon the Contractor's written request being
made directly to the Project Manager, with copies provided to both the Resident Construction Engineer
and the District Construction Engineer, the County reserves unto the Project Manager, in his sole and
absolute discretion, according to the parameters set forth below, the authority to make a determination to
either fully enforce the above provisions with no modification, modify the "Original Contract Time" by
GC-CA-I-24
168 9
moving it, or both modify the "Original Contract Time" by moving it and also modify the "incentive amount"
by reducing it.
No modification of this "Incentive-Disincentive" provision will be considered by the Project Manager for
any impacts, whatsoever, beyond the reasonable control of the Contractor, for which the effect results in
a time extension of less than 15% of the time remaining in the period from the first day of occurrence of
such impact to the expiration of the "Original Contract Time". Furthermore, as to any such impact, for
which the effect results in a time extension of 15% or more of the time remaining in the period from the
first day of occurrence of such impact to the expiration of the "Original Contract Time," no modification of
this "Incentive-Disincentive" provision will be considered by the Project Manager unless the Contractor
clearly establishes that it has continuously from the beginning of the project aggressively, efficiently and
effectively pursued the achievement of the "incentive payment". This would include the utilization of any
and all reasonably available means and methods to overcome all impacts and accelerate the work so as
to still achieve the "incentive payment", and that, but for this impact, the Contractor would have otherwise
earned the "incentive payment" provided in the original Contract. Also, to the extent the request is not
submitted in writing to the Project Manager within not less than twenty (20) calendar days prior to the
expiration of the "Original Contract Time," the Contractor must also continue to aggressively, efficiently,
and effectively pursue the completion of the "Incentive-Disincentive" work. This would include the
utilization of any and all reasonably available means and methods to overcome all impacts and accelerate
the work, until a determination is made by the Project Manager or twenty (20) calendar days has expired
since such written request was received by the Project Manager. There shall be no right of any kind on
behalf of the Contractor to challenge or otherwise seek review or appeal in any forum, of any
determination made by the Project Manager under this provision.
The Contractor shall have no rights under the Contract to make any claim arising out of this incentive
payment provision except as is expressly set forth in this Article.
As conditions precedent to the Contractor's entitlement to any "incentive payment" the Contractor must:
(1) Deliver in-hand to the County any and all claims, in full accordance with Exhibit "H" - General Terms
and Conditions, Section 11 - Claims and Disputes
(2) Actually complete the Contract and obtain final acceptance by the County prior to expiration of the
Original Contract Time.
(3) No later than 60 days after final acceptance by the County, the Contractor must either (a) elect to be
paid the "incentive payment" pursuant to (4) below, or (b) notify the County in writing that the Contractor is
electing to be paid the "incentive payment" and is reserving one or more outstanding claims for final and
fully binding determination in accordance with Exhibit "H" - General Terms and Conditions, Section 11 -
Claims and Disputes.
(4) The Contractor shall notify the County in writing, within 60 days after final acceptance of the Contract
by the County, that the Contractor elects to be paid the "incentive payment" which the Contractor is
eligible to be paid based on the actual final acceptance date, and such written notice shall constitute a full
and complete waiver, release and acknowledgment of satisfaction by the Contractor of any and all claims,
causes of action, issues, demands, disputes, matters or controversies, of any nature or kind whatsoever,
known or unknown, against the County, its employees, officers, agents, representatives, consultants, and
their respective employees, officers and representatives, the Contractor has or may have, including, but
not limited to, work performed, work deleted, change orders, supplemental agreements, delays,
disruptions, differing site conditions, utility conflicts, design changes or defects, time extensions, extra
work, right of way issues, permitting issues, actions of suppliers or subcontractors or other contractors,
actions by third parties, shop drawing approval process delays, expansion of the physical limits of the
project to make it functional, weather, weekends, holidays, suspensions of the Contractor's operations,
extended or unabsorbed home office or job site overhead, lump sum maintenance of traffic adjustments,
lost profits, prime mark-up on subcontractor work, acceleration costs, any and all direct and indirect costs,
any other adverse impacts, events, conditions, circumstances or potential damages, on or pertaining to,
or as to or arising out of the Contract. This waiver, release and acknowledgment of satisfaction shall be
all-inclusive and absolute, save and except any routine County final estimating quantity adjustments.
GC-CA-I-25
1.6 B ~9
Should the Contractor fail to actually complete the Contract and obtain final acceptance by the County
prior to expiration of the Original Contract Time, or should the Contractor, having timely completed the
Contract and obtained final acceptance by the County prior to expiration of the Original Contract Time but
having failed to timely request the "incentive payment" for any reason, and including but not limited to the
Contractor choosing not to either reserve one or more outstanding claims in accordance with Exhibit "H" -
General Terms and Conditions, Section 11 - Claims and Disputes for final and fully binding determination
as set forth in (3)(b) above, or to fully waive, release and acknowledge satisfaction as set forth in (4)
above, the Contractor shall have no right to any payment whatsoever under this Article. Notwithstanding
the Contractor's election or non-election of the "incentive payment" under this provision, the disincentive
provision applies to all circumstances where the work in the Contract is not finally accepted by the
Allowable Contract Time.
Completion and acceptance of the Contract for purposes of this Article shall be in accordance with Exhibit
"H" - General Terms and Conditions, Section 20 - Completion. Should the Contractor fail to complete
the Contract on or before expiration of the Allowable Contract Time, as adjusted in accordance with
Exhibit "H" - General Terms and Conditions, Section 9 - Contract Time and Time Extensions, the County
shall deduct a specified liquidated damage amount for each calendar day completion exceeds the
Allowable Contract Time, from the monies otherwise due the Contractor. The term "Allowable Contract
Time" as used in this Article shall mean the Original Contract Time plus adjustments pursuant Exhibit "H"
_ General Terms and Conditions, Section 9 - Contract Time and Time Extensions. This deduction shall
be the disincentive for the Contractor's failing to timely complete the Contract. Liquidated damages
remain in effect and is applicable in accordance with Section 5 of the Construction Agreement. In the
event the Contractor elects to exercise this "incentive payment" provision, should this provision conflict
with any other provision of the Contract, the Contract shall be interpreted in accordance with this
provision.
14. Indian Preference On Federal-aid Projects
Provision excluded from this contract.
15. FHWA-1273
(Florida Department of Transportation Policy)
Required Contract Provisions Federal-Aid Construction Contracts
Required Contract Provisions Federal-Aid Construction Contracts
I. General
II. Nondiscrimination
III. Nonseqreqated Facilities
IV. Payment of Predetermined Minimum WaQe
V. Statements and Payrolls
VI. Record of Materials. Supplies, and Labor
VII. SublettinQ or AssiqninQ the Contract
VIII. Safety: Accident Prevention
IX. False Statements ConcerninQ HiQhway Projects
X. Implementation of Clean Air Act and Federal Water Pollution Control Act
XI. Certification ReqardinQ Debarment, Suspension IneliQibility, and Voluntary
Exclusion
XII. Certification ReQardinQ Use of Contract Funds for LobbyinQ
Attachments
Employment Preference for Appalachian Contracts (included in Appalachian
contracts only)
GC-CA-I-26
168 9
GENERAL
1. These contract provisions shall apply to all work performed on the contract
by the contractor's own organization and with the assistance of workers under the
contractor's immediate superintendence and to all work performed on the contract
by piecework, station work, or by subcontract.
2. Except as otherwise provided for in each section, the contractor shall
insert in each subcontract all of the stipulations contained in these Required
Contract Provisions, and further require their inclusion in any lower tier subcontract
or purchase order that may in turn be made. The Required Contract Provisions shall
not be incorporated by reference in any case. The prime contractor shall be
responsible for compliance by any subcontractor or lower tier subcontractor with
these Required Contract Provisions.
3. A breach of any of the stipulations contained in these Required Contract
Provisions shall be sufficient grounds for termination of the contract.
4. A breach of the following clauses of the Required Contract Provisions may
also be grounds for debarment as provided in 29 CFR 5.12:
. Section I, paragraph 2;
. Section IV, paragraphs 1, 2, 3, 4, and 7;
. Section V, paragraphs 1 and 2a through 2g.
5. Disputes arising out of the labor standards provisions of Section IV
(except paragraph 5) and Section V of these Required Contract Provisions shall not
be subject to the general disputes clause of this contract. Such disputes shall be
resolved in accordance with the procedures of the U.S. Department of Labor (DOL)
as set forth in 29 CFR 5, 6, and 7. Disputes within the meaning of this clause
include disputes between the contractor (or any of its subcontractors) and the
contracting agency, the DOL, or the contractor's employees or their representatives.
6. Selection of Labor: During the performance of this contract, the
contractor shall not:
a. discriminate against labor from any other State, possession, or territory of
the United States (except for employment preference for Appalachian contracts,
when applicable, as specified in Attachment A), or
b. employ convict labor for any purpose within the limits of the project unless
it is labor performed by convicts who are on parole, supervised release, or
probation.
II. NONDISCRIMINATION
(Applicable to all Federal-aid construction contracts and to all related subcontracts
of $10,000 or more.)
1. Equal Employment Opportunity: Equal employment opportunity (EEO)
requirements not to discriminate and to take affirmative action to assure equal
opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35,
29 CFR 1630 and 41 CFR 60) and orders of the Secretary of Labor as modified by
the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall
constitute the EEO and specific affirmative action standards for the contractor's
project activities under this contract. The Equal Opportunity Construction Contract
GC-CA-I-27
16B~9
Specifications set forth under 41 CFR 60-4.3 and the provisions of the American
Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29
CFR 1630 are incorporated by reference in this contract. In the execution of this
contract, the contractor agrees to comply with the following minimum specific
requirement activities of EEO:
The contractor will work with the State highway agency (SHA) and the
Federal Government in carrying out EEO obligations and in their review of his/her
activities under the contract.
a. The contractor will accept as his operating policy the following statement:
"It is the policy of this Company to assure that applicants are employed, and that
employees are treated during employment, without regard to their race, religion,
sex, color, national origin, age or disability. Such action shall include: employment,
upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of payor other forms of compensation; and selection for training,
including apprenticeship, preapprenticeship, and/or on-the-job training."
2. EEO Officer: The contractor will designate and make known to the SHA
contracting officers an EEO Officer who will have the responsibility for and must be
capable of effectively administering and promoting an active contractor program of
EEO and who must be assigned adequate authority and responsibility to do so.
3. Dissemination of Policy: All members of the contractor's staff who are
authorized to hire, supervise, promote, and discharge employees, or who
recommend such action, or who are substantially involved in such action, will be
made fully cognizant of, and will implement, the contractor's EEO policy and
contractual responsibilities to provide EEO in each grade and classification of
employment. To ensure that the above agreement will be met, the following actions
will be taken as a minimum:
Periodic meetings of supervisory and personnel office employees will be
conducted before the start of work and then not less often than once every six
months, at which time the contractor's EEO policy and its implementation will be
reviewed and explained. The meetings will be conducted by the EEO Officer.
a. All new supervisory or personnel office employees will be given a
thorough indoctrination by the EEO Officer, covering all major aspects of the
contractor's EEO obligations within thirty days following their reporting for duty with
the contractor.
b. All personnel who are engaged in direct recruitment for the project will be
instructed by the EEO Officer in the contractor's procedures for locating and hiring
minority group employees.
c. Notices and posters setting forth the contractor's EEO policy will be placed
in areas readily accessible to employees, applicants for employment and potential
employees.
d. The contractor's EEO policy and the procedures to implement such policy
will be brought to the attention of employees by means of meetings, employee
handbooks, or other appropriate means.
GC-CA-I-28
168 9
4. Recruitment: When advertising for employees, the contractor will include
in all advertisements for employees the notation: "An Equal Opportunity Employer."
All such advertisements will be placed in publications having a large circulation
among minority groups in the area from which the project work force would normally
be derived.
The contractor will, unless precluded by a valid bargaining agreement,
conduct systematic and direct recruitment through public and private employee
referral sources likely to yield qualified minority group applicants. To meet this
requirement, the contractor will identify sources of potential minority group
employees, and establish with such identified sources procedures whereby minority
group applicants may be referred to the contractor for employment consideration.
a. In the event the contractor has a valid bargaining agreement providing for
exclusive hiring hall referrals, he is expected to observe the provisions of that
agreement to the extent that the system permits the contractor's compliance with
EEO contract provisions. (The DOL has held that where implementation of such
agreements have the effect of discriminating against minorities or women, or
obligates the contractor to do the same, such implementation violates Executive
Order 11246, as amended.)
b. The contractor will encourage his present employees to refer minority
group applicants for employment. Information and procedures with regard to
referring minority group applicants will be discussed with employees.
5. Personnel Actions: Wages, working conditions, and employee benefits
shall be established and administered, and personnel actions of every type,
including hiring, upgrading, promotion, transfer, demotion, layoff, and termination,
shall be taken without regard to race, color, religion, sex, national origin, age or
disability. The following procedures shall be followed:
The contractor will conduct periodic inspections of project sites to insure
that working conditions and employee facilities do not indicate discriminatory
treatment of project site personnel.
a. The contractor will periodically evaluate the spread of wages paid within
each classification to determine any evidence of discriminatory wage practices.
b. The contractor will periodically review selected personnel actions in depth
to determine whether there is evidence of discrimination. Where evidence is found,
the contractor will promptly take corrective action. If the review indicates that the
discrimination may extend beyond the actions reviewed, such corrective action shall
include all affected persons.
c. The contractor will promptly investigate all complaints of alleged
discrimination made to the contractor in connection with his obligations under this
contract, will attempt to resolve such complaints, and will take appropriate corrective
action within a reasonable time. If the investigation indicates that the discrimination
may affect persons other than the complainant, such corrective action shall include
such other persons. Upon completion of each investigation, the contractor will
inform every complainant of all of his avenues of appeal.
6. Training and Promotion: The contractor will assist in locating, qualifying,
and increasing the skills of minority group and women employees, and applicants
for employment.
GC-CA-I-29
168 9
Consistent with the contractor's work force requirements and as
permissible under Federal and State regulations, the contractor shall make full use
of training programs, Le., apprenticeship, and on-the-job training programs for the
geographical area of contract performance. Where feasible, 25 percent of
apprentices or trainees in each occupation shall be in their first year of
apprenticeship or training. In the event a special provision for training is provided
under this contract, this subparagraph will be superseded as indicated in the special
provision.
a. The contractor will advise employees and applicants for employment of
available training programs and entrance requirements for each.
b. The contractor will periodically review the training and promotion potential
of minority group and women employees and will encourage eligible employees to
apply for such training and promotion.
7. Unions: If the contractor relies in whole or in part upon unions as a source
of employees, the contractor will use his/her best efforts to obtain the cooperation of
such unions to increase opportunities for minority groups and women within the
unions, and to effect referrals by such unions of minority and female employees.
Actions by the contractor either directly or through a contractor's association acting
as agent will include the procedures set forth below:
The contractor will use best efforts to develop, in cooperation with the
unions, joint training programs aimed toward qualifying more minority group
members and women for membership in the unions and increasing the skills of
minority group employees and women so that they may qualify for higher paying
employment.
a. The contractor will use best efforts to incorporate an EEO clause into each
union agreement to the end that such union will be contractually bound to refer
applicants without regard to their race, color, religion, sex, national origin, age or
disability.
b. The contractor is to obtain information as to the referral practices and
policies of the labor union except that to the extent such information is within the
exclusive possession of the labor union and such labor union refuses to furnish such
information to the contractor, the contractor shall so certify to the SHA and shall set
forth what efforts have been made to obtain such information.
c. In the event the union is unable to provide the contractor with a
reasonable flow of minority and women referrals within the time limit set forth in the
collective bargaining agreement, the contractor will, through independent
recruitment efforts, fill the employment vacancies without regard to race, color,
religion, sex, national origin, age or disability; making full efforts to obtain qualified
and/or qualifiable minority group persons and women. (The DOL has held that it
shall be no excuse that the union with which the contractor has a collective
bargaining agreement providing for exclusive referral failed to refer minority
employees.) In the event the union referral practice prevents the contractor from
meeting the obligations pursuant to Executive Order 11246, as amended, and these
special provisions, such contractor shall immediately notify the SHA.
8. Selection of Subcontractors, Procurement of Materials and Leasing
of Equipment: The contractor shall not discriminate on the grounds of race, color,
religion, sex, national origin, age or disability in the selection and retention of
subcontractors, including procurement of materials and leases of equipment.
GC-CA-I-30
16B'l9
The contractor shall notify all potential subcontractors and suppliers of
his/her EEO obligations under this contract.
a. Disadvantaged business enterprises (DBE), as defined in 49 CFR 23,
shall have equal opportunity to compete for and perform subcontracts which the
contractor enters into pursuant to this contract. The contractor will use his best
efforts to solicit bids from and to utilize DBE subcontractors or subcontractors with
meaningful minority group and female representation among their employees.
Contractors shall obtain lists of DBE construction firms from SHA personnel.
b. The contractor will use his best efforts to ensure subcontractor compliance
with their EEO obligations.
9. Records and Reports: The contractor shall keep such records as
necessary to document compliance with the EEO requirements. Such records shall
be retained for a period of three years following completion of the contract work and
shall be available at reasonable times and places for inspection by authorized
representatives of the SHA and the FHWA.
The records kept by the contractor shall document the following:
1. The number of minority and non-minority group members and women employed
in each work classification on the project;
2. The progress and efforts being made in cooperation with unions, when
applicable, to increase employment opportunities for minorities and women;
3. The progress and efforts being made in locating, hiring, training, qualifying, and
upgrading minority and female employees; and
4. The progress and efforts being made in securing the services of DBE
subcontractors or subcontractors with meaningful minority and female
representation among their employees.
The contractors will submit an annual report to the SHA each July for the
duration of the project, indicating the number of minority, women, and non-minority
group employees currently engaged in each work classification required by the
contract work. This information is to be reported on Form FHWA-1391. If on-the-job
training is being required by special provision, the contractor will be required to
collect and report training data.
III. NONSEGREGATED FACILITIES
(Applicable to all Federal-aid construction contracts and to all related subcontracts
of $10,000 or more.)
a. By submission of this bid, the execution of this contract or subcontract, or
the consummation of this material supply agreement or purchase order, as
appropriate, the bidder, Federal-aid construction contractor, subcontractor, material
supplier, or vendor, as appropriate, certifies that the firm does not maintain or
provide for its employees any segregated facilities at any of its establishments, and
GC-CA-I-31
168 9
that the firm does not permit its employees to perform their services at any location,
under its control, where segregated facilities are maintained. The firm agrees that a
breach of this certification is a violation of the EEO provisions of this contract. The
firm further certifies that no employee will be denied access to adequate facilities on
the basis of sex or disability.
b. As used in this certification, the term "segregated facilities" means any
waiting rooms, work areas, restrooms and washrooms, restaurants and other eating
areas, timeclocks, locker rooms, and other storage or dressing areas, parking lots,
drinking fountains, recreation or entertainment areas, transportation, and housing
facilities provided for employees which are segregated by explicit directive, or are, in
fact, segregated on the basis of race, color, religion, national origin, age or disability,
because of habit, local custom, or otherwise. The only exception will be for the
disabled when the demands for accessibility override (e.g. disabled parking).
c. The contractor agrees that it has obtained or will obtain identical
certification from proposed subcontractors or material suppliers prior to award of
subcontracts or consummation of material supply agreements of $10,000 or more
and that it will retain such certifications in its files.
IV. PAYMENT OF PREDETERMINED MINIMUM WAGE
(Applicable to all Federal-aid construction contracts exceeding $2,000 and to all
related subcontracts, except for projects located on roadways classified as local
roads or rural minor collectors, which are exempt.)
General:
All mechanics and laborers employed or working upon the site of the work will be
paid unconditionally and not less often than once a week and without subsequent
deduction or rebate on any account [except such payroll deductions as are
permitted by regulations (29 CFR 3) issued by the Secretary of Labor under the
Copeland Act (40 U.S.C. 276c)] the full amounts of wages and bona fide fringe
benefits (or cash equivalents thereof) due at time of payment. The payment shall be
computed at wage rates not less than those contained in the wage determination of
the Secretary of Labor (hereinafter "the wage determination") which is attached
hereto and made a part hereof, regardless of any contractual relationship which may
be alleged to exist between the contractor or its subcontractors and such laborers
and mechanics. The wage determination (including any additional classifications
and wage rates conformed under paragraph 2 of this Section IV and the DOL poster
(WH-1321) or Form FHWA-1495) shall be posted at all times by the contractor and
its subcontractors at the site of the work in a prominent and accessible place where
it can be easily seen by the workers. For the purpose of this Section, contributions
made or costs reasonably anticipated for bona fide fringe benefits under Section
1 (b)(2) of the Davis-Bacon Act (40 U.S.C. 276a) on behalf of laborers or mechanics
are considered wages paid to such laborers or mechanics, subject to the provisions
of Section IV, paragraph 3b, hereof. Also, for the purpose of this Section, regular
contributions made or costs incurred for more than a weekly period (but not less
often than quarterly) under plans, funds, or programs, which cover the particular
weekly period, are deemed to be constructively made or incurred during such
GC-CA-I-32
168 9
weekly period. Such laborers and mechanics shall be paid the appropriate wage
rate and fringe benefits on the wage determination for the classification of work
actually performed, without regard to skill, except as provided in paragraphs 4 and 5
of this Section IV.
Laborers or mechanics performing work in more than one classification
may be compensated at the rate specified for each classification for the time
actually worked therein, provided, that the employer's payroll records accurately set
forth the time spent in each classification in which work is performed.
a. All rulings and interpretations of the Davis-Bacon Act and related acts
contained in 29 CFR 1, 3, and 5 are herein incorporated by reference in this
contract.
1. Classification:
The SHA contracting officer shall require that any class of laborers or
mechanics employed under the contract, which is not listed in the wage
determination, shall be classified in conformance with the wage determination.
a. The contracting officer shall approve an additional classification, wage rate
and fringe benefits only when the following criteria have been met:
1. the work to be performed by the additional classification requested is not
performed by a classification in the wage determination;
2. the additional classification is utilized in the area by the construction industry;
3. the proposed wage rate, including any bona fide fringe benefits, bears a
reasonable relationship to the wage rates contained in the wage determination; and
4. with respect to helpers, when such a classification prevails in the area in
which the work is performed.
b. If the contractor or subcontractors, as appropriate, the laborers and
mechanics (if known) to be employed in the additional classification or their
representatives, and the contracting officer agree on the classification and wage
rate (including the amount designated for fringe benefits where appropriate), a
report of the action taken shall be sent by the contracting officer to the DOL,
Administrator of the Wage and Hour Division, Employment Standards
Administration, Washington, D.C. 20210. The Wage and Hour Administrator, or an
authorized representative, will approve, modify, or disapprove every additional
classification action within 30 days of receipt and so advise the contracting officer or
will notify the contracting officer within the 30-day period that additional time is
necessary.
c. In the event the contractor or subcontractors, as appropriate, the laborers
or mechanics to be employed in the additional classification or their representatives,
and the contracting officer do not agree on the proposed classification and wage
rate (including the amount designated for fringe benefits, where appropriate), the
contracting officer shall refer the questions, including the views of all interested
parties and the recommendation of the contracting officer, to the Wage and Hour
Administrator for determination. Said Administrator, or an authorized representative,
will issue a determination within 30 days of receipt and so advise the contracting
officer or will notify the contracting officer within the 30-day period that additional
time is necessary
GC-CA-I-33
168 9
d. The wage rate (including fringe benefits where appropriate) determined
pursuant to paragraph 2c or 2d of this Section IV shall be paid to all workers
performing work in the additional classification from the first day on which work is
performed in the classification.
2. Payment of Fringe Benefits:
Whenever the minimum wage rate prescribed in the contract for a class of
laborers or mechanics includes a fringe benefit which is not expressed as an hourly
rate, the contractor or subcontractors, as appropriate, shall either pay the benefit as
stated in the wage determination or shall pay another bona fide fringe benefit or an
hourly case equivalent thereof.
a. If the contractor or subcontractor, as appropriate, does not make
payments to a trustee or other third person, he/she may consider as a part of the
wages of any laborer or mechanic the amount of any costs reasonably anticipated in
providing bona fide fringe benefits under a plan or program, provided, that the
Secretary of Labor has found, upon the written request of the contractor, that the
applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor
may require the contractor to set aside in a separate account assets for the meeting
of obligations under the plan or program.
3. Apprentices and Trainees (Programs of the U.S. DOL) and Helpers:
Apprentices:
1. Apprentices will be permitted to work at less than the predetermined rate for
the work they performed when they are employed pursuant to and individually
registered in a bona fide apprenticeship program registered with the DOL,
Employment and Training Administration, Bureau of Apprenticeship and Training, or
with a State apprenticeship agency recognized by the Bureau, or if a person is
employed in his/her first 90 days of probationary employment as an apprentice in
such an apprenticeship program, who is not individually registered in the program,
but who has been certified by the Bureau of Apprenticeship and Training or a State
apprenticeship agency (where appropriate) to be eligible for probationary
employment as an apprentice.
2. The allowable ratio of apprentices to journeyman-level employees on the job
site in any craft classification shall not be greater than the ratio permitted to the
contractor as to the entire work force under the registered program. Any employee
listed on a payroll at an apprentice wage rate, who is not registered or otherwise
employed as stated above, shall be paid not less than the applicable wage rate
listed in the wage determination for the classification of work actually performed. In
addition, any apprentice performing work on the job site in excess of the ratio
permitted under the registered program shall be paid not less than the applicable
wage rate on the wage determination for the work actually performed. Where a
contractor or subcontractor is performing construction on a project in a locality other
than that in which its program is registered, the ratios and wage rates (expressed in
percentages of the journeyman-level hourly rate) specified in the contractor's or
subcontractor's registered program shall be observed.
3. Every apprentice must be paid at not less than the rate specified in the
registered program for the apprentice's level of progress, expressed as a
percentage of the journeyman-level hourly rate specified in the applicable wage
determination. Apprentices shall be paid fringe benefits in accordance with the
provisions of the apprenticeship program. If the apprenticeship program does not
GC-CA-I-34
168 9
specify fringe benefits, apprentices must be paid the full amount of fringe benefits
listed on the wage determination for the applicable classification. If the Administrator
for the Wage and Hour Division determines that a different practice prevails for the
applicable apprentice classification, fringes shall be paid in accordance with that
determination.
4. In the event the Bureau of Apprenticeship and Training, or a State
apprenticeship agency recognized by the Bureau, withdraws approval of an
apprenticeship program, the contractor or subcontractor will no longer be permitted
to utilize apprentices at less than the applicable predetermined rate for the
comparable work performed by regular employees until an acceptable program is
approved.
a. Trainees:
1. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at
less than the predetermined rate for the work performed unless they are employed
pursuant to and individually registered in a program which has received prior
approval, evidenced by formal certification by the DOL, Employment and Training
Administration.
2. The ratio of trainees to journeyman-level employees on the job site shall not
be greater than permitted under the plan approved by the Employment and Training
Administration. Any employee listed on the payroll at a trainee rate who is not
registered and participating in a training plan approved by the Employment and
Training Administration shall be paid not less than the applicable wage rate on the
wage determination for the classification of work actually performed. In addition, any
trainee performing work on the job site in excess of the ratio permitted under the
registered program shall be paid not less than the applicable wage rate on the wage
determination for the work actually performed.
3. Every trainee must be paid at not less than the rate specified in the approved
program for his/her level of progress, expressed as a percentage of the journeyman-
level hourly rate specified in the applicable wage determination. Trainees shall be
paid fringe benefits in accordance with the provisions of the trainee program. If the
trainee program does not mention fringe benefits, trainees shall be paid the full
amount of fringe benefits listed on the wage determination unless the Administrator
of the Wage and Hour Division determines that there is an apprenticeship program
associated with the corresponding journeyman-level wage rate on the wage
determination which provides for less than full fringe benefits for apprentices, in
which case such trainees shall receive the same fringe benefits as apprentices.
4. In the event the Employment and Training Administration withdraws approval
of a training program, the contractor or subcontractor will no longer be permitted to
utilize trainees at less than the applicable predetermined rate for the work performed
until an acceptable program is approved.
b. Helpers:
Helpers will be permitted to work on a project if the helper classification is
specified and defined on the applicable wage determination or is approved
pursuant to the conformance procedure set forth in Section IV.2. Any worker
listed on a payroll at a helper wage rate, who is not a helper under an
GC-CA-I-35
16B 9
approved definition, shall be paid not less than the applicable wage rate on the
wage determination for the classification of work actually performed.
4. Apprentices and Trainees (Programs of the U.S. DOT):
Apprentices and trainees working under apprenticeship and skill training
programs which have been certified by the Secretary of Transportation as promoting
EEO in connection with Federal-aid highway construction programs are not subject
to the requirements of paragraph 4 of this Section IV. The straight time hourly wage
rates for apprentices and trainees under such programs will be established by the
particular programs. The ratio of apprentices and trainees to journeymen shall not
be greater than permitted by the terms of the particular program.
5. Withholding:
The SHA shall upon its own action or upon written request of an authorized
representative of the DOL withhold, or cause to be withheld, from the contractor or
subcontractor under this contract or any other Federal contract with the same prime
contractor, or any other Federally-assisted contract subject to Davis-Bacon
prevailing wage requirements which is held by the same prime contractor, as much
of the accrued payments or advances as may be considered necessary to pay
laborers and mechanics, including apprentices, trainees, and helpers, employed by
the contractor or any subcontractor the full amount of wages required by the
contract. In the event of failure to pay any laborer or mechanic, including any
apprentice, trainee, or helper, employed or working on the site of the work, all or
part of the wages required by the contract, the SHA contracting officer may, after
written notice to the contractor, take such action as may be necessary to cause the
suspension of any further payment, advance, or guarantee of funds until such
violations have ceased.
6. Overtime Requirements:
No contractor or subcontractor contracting for any part of the contract work
which may require or involve the employment of laborers, mechanics, watchmen, or
guards (including apprentices, trainees, and helpers described in paragraphs 4 and
5 above) shall require or permit any laborer, mechanic, watchman, or guard in any
workweek in which he/she is employed on such work, to work in excess of 40 hours
in such workweek unless such laborer, mechanic, watchman, or guard receives
compensation at a rate not less than one-and-one-half times his/her basic rate of
pay for all hours worked in excess of 40 hours in such workweek.
7. Violation:
Liability for Unpaid Wages; Liquidated Damages: In the event of any violation of
the clause set forth in paragraph 7 above, the contractor and any subcontractor
responsible thereof shall be liable to the affected employee for his/her unpaid
wages. In addition, such contractor and subcontractor shall be liable to the United
GC-CA-I-36
168 ()
States (in the case of work done under contract for the District of Columbia or a
territory, to such District or to such territory) for liquidated damages. Such liquidated
damages shall be computed with respect to each individual laborer, mechanic,
watchman, or guard employed in violation of the clause set forth in paragraph 7, in
the sum of $10 for each calendar day on which such employee was required or
permitted to work in excess of the standard work week of 40 hours without payment
of the overtime wages required by the clause set forth in paragraph 7.
8. Withholding for Unpaid Wages and Liquidated Damages:
The SHA shall upon its own action or upon written request of any authorized
representative of the DOL withhold, or cause to be withheld, from any monies
payable on account of work performed by the contractor or subcontractor under any
such contract or any other Federal contract with the same prime contractor, or any
other Federally-assisted contract subject to the Contract Work Hours and Safety
Standards Act, which is held by the same prime contractor, such sums as may be
determined to be necessary to satisfy any liabilities of such contractor or
subcontractor for unpaid wages and liquidated damages as provided in the clause
set forth in paragraph 8 above.
V. STATEMENTS AND PAYROLLS
(Applicable to all Federal-aid construction contracts exceeding $2,000 and to all
related subcontracts, except for projects located on roadways classified as local
roads or rural collectors, which are exempt.)
O. Compliance with Copeland Regulations (29 CFR 3):
The contractor shall comply with the Copeland Regulations of the
Secretary of Labor which are herein incorporated by reference.
1. Payrolls and Payroll Records:
Payrolls and basic records relating thereto shall be maintained by the
contractor and each subcontractor during the course of the work and preserved for a
period of 3 years from the date of completion of the contract for all laborers,
mechanics, apprentices, trainees, watchmen, helpers, and guards working at the
site of the work.
a. The payroll records shall contain the name, social security number, and
address of each such employee; his or her correct classification; hourly rates of
wages paid (including rates of contributions or costs anticipated for bona fide fringe
benefits or cash equivalent thereof the types described in Section 1 (b)(2)(B) of the
Davis Bacon Act); daily and weekly number of hours worked; deductions made; and
actual wages paid. In addition, for Appalachian contracts, the payroll records shall
contain a notation indicating whether the employee does, or does not, normally
reside in the labor area as defined in Attachment A, paragraph 1. Whenever the
Secretary of Labor, pursuant to Section IV, paragraph 3b, has found that the wages
of any laborer or mechanic include the amount of any costs reasonably anticipated
in providing benefits under a plan or program described in Section 1 (b)(2)(B) of the
GC-CA-I-37
16B 9
Davis Bacon Act, the contractor and each subcontractor shall maintain records
which show that the commitment to provide such benefits is enforceable, that the
plan or program is financially responsible, that the plan or program has been
communicated in writing to the laborers or mechanics affected, and show the cost
anticipated or the actual cost incurred in providing benefits. Contractors or
subcontractors employing apprentices or trainees under approved programs shall
maintain written evidence of the registration of apprentices and trainees, and ratios
and wage rates prescribed in the applicable programs.
b. Each contractor and subcontractor shall furnish, each week in which any
contract work is performed, to the SHA resident engineer a payroll of wages paid
each of its employees (including apprentices, trainees, and helpers, described in
Section IV, paragraphs 4 and 5, and watchmen and guards engaged on work during
the preceding weekly payroll period). The payroll submitted shall set out accurately
and completely all of the information required to be maintained under paragraph 2b
of this Section V. This information may be submitted in any form desired. Optional
Form WH-347 is available for this purpose and may be purchased from the
Superintendent of Documents (Federal stock number 029-005-0014-1), U.S.
Government Printing Office, Washington, D.C. 20402. The prime contractor is
responsible for the submission of copies of payrolls by all subcontractors.
c. Each payroll submitted shall be accompanied by a "Statement of
Compliance," signed by the contractor or subcontractor or his/her agent who pays or
supervises the payment of the persons employed under the contract and shall
certify the following:
1. that the payroll for the payroll period contains the information required to
be maintained under paragraph 2b of this Section V and that such information is
correct and complete;
2. that such laborer or mechanic (including each helper, apprentice, and
trainee) employed on the contract during the payroll period has been paid the full
weekly wages earned, without rebate, either directly or indirectly, and that no
deductions have been made either directly or indirectly from the full wages earned,
other than permissible deductions as set forth in the Regulations, 29 CFR 3;
3. that each laborer or mechanic has been paid not less that the applicable
wage rate and fringe benefits or cash equivalent for the classification of worked
performed, as specified in the applicable wage determination incorporated into the
contract.
d. The weekly submission of a properly executed certification set forth on the
reverse side of Optional Form WH-347 shall satisfy the requirement for submission
of the "Statement of Compliance" required by paragraph 2d of this Section V.
e. The falsification of any of the above certifications may subject the
contractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 231.
f. The contractor or subcontractor shall make the records required under
paragraph 2b of this Section V available for inspection, copying, or transcription by
authorized representatives of the SHA, the FHWA, or the DOL, and shall permit
such representatives to interview employees during working hours on the job. If the
contractor or subcontractor fails to submit the required records or to make them
available, the SHA, the FHWA, the DOL, or all may, after written notice to the
contractor, sponsor, applicant, or owner, take such actions as may be necessary to
cause the suspension of any further payment, advance, or guarantee of funds.
GC-CA-I-38
168 9
Furthermore, failure to submit the required records upon request or to make such
records available may be grounds for debarment action pursuant to 29 CFR 5.12.
VI. RECORD OF MATERIALS, SUPPLIES, AND LABOR
O. On all Federal-aid contracts on the National Highway System, except
those which provide solely for the installation of protective devices at railroad grade
crossings, those which are constructed on a force account or direct labor basis,
highway beautification contracts, and contracts for which the total final construction
cost for roadway and bridge is less than $1,000,000 (23 CFR 635) the contractor
shall:
Become familiar with the list of specific materials and supplies contained
in Form FHWA-47, "Statement of Materials and Labor Used by Contractor of
Highway Construction Involving Federal Funds," prior to the commencement of work
under this contract.
a. Maintain a record of the total cost of all materials and supplies purchased
for and incorporated in the work, and also of the quantities of those specific
materials and supplies listed on Form FHWA-47, and in the units shown on Form
FHWA-47.
b. Furnish, upon the completion of the contract, to the SHA resident engineer
on Form FHWA-47 together with the data required in paragraph 1 b relative to
materials and supplies, a final labor summary of all contract work indicating the total
hours worked and the total amount earned.
1. At the prime contractor's option, either a single report covering all contract
work or separate reports for the contractor and for each subcontract shall be
submitted.
VII. SUBLETTING OR ASSIGNING THE CONTRACT
O. The contractor shall perform with its own organization contract work
amounting to not less than 30 percent (or a greater percentage if specified
elsewhere in the contract) of the total original contract price, excluding any specialty
items designated by the State. Specialty items may be performed by subcontract
and the amount of any such specialty items performed may be deducted from the
total original contract price before computing the amount of work required to be
performed by the contractor's own organization (23 CFR 635).
"Its own organization" shall be construed to include only workers
employed and paid directly by the prime contractor and equipment owned or rented
by the prime contractor, with or without operators. Such term does not include
employees or equipment of a subcontractor, assignee, or agent of the prime
contractor.
a. "Specialty Items" shall be construed to be limited to work that requires
highly specialized knowledge, abilities, or equipment not ordinarily available in the
type of contracting organizations qualified and expected to bid on the contract as a
whole and in general are to be limited to minor components of the overall contract.
1. The contract amount upon which the requirements set forth in paragraph 1
of Section VII is computed includes the cost of material and manufactured products
GC-CA-I-39
16Bt"'9
which are to be purchased or produced by the contractor under the contract
provisions.
2. The contractor shall furnish (a) a competent superintendent or supervisor
who is employed by the firm, has full authority to direct performance of the work in
accordance with the contract requirements, and is in charge of all construction
operations (regardless of who performs the work) and (b) such other of its own
organizational resources (supervision, management, and engineering services) as
the SHA contracting officer determines is necessary to assure the performance of
the contract.
3. No portion of the contract shall be sublet, assigned or otherwise disposed
of except with the written consent of the SHA contracting officer, or authorized
representative, and such consent when given shall not be construed to relieve the
contractor of any responsibility for the fulfillment of the contract. Written consent will
be given only after the SHA has assured that each subcontract is evidenced in
writing and that it contains all pertinent provisions and requirements of the prime
contract.
VIII. SAFETY: ACCIDENT PREVENTION
O. In the performance of this contract the contractor shall comply with all
applicable Federal, State, and local laws governing safety, health, and sanitation (23
CFR 635). The contractor shall provide all safeguards, safety devices and protective
equipment and take any other needed actions as it determines, or as the SHA
contracting officer may determine, to be reasonably necessary to protect the life and
health of employees on the job and the safety of the public and to protect property in
connection with the performance of the work covered by the contract.
1. It is a condition of this contract, and shall be made a condition of each
subcontract, which the contractor enters into pursuant to this contract, that the
contractor and any subcontractor shall not permit any employee, in performance of
the contract, to work in surroundings or under conditions which are unsanitary,
hazardous or dangerous to his/her health or safety, as determined under
construction safety and health standards (29 CFR 1926) promulgated by the
Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and
Safety Standards Act (40 U.S.C. 333).
2. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the
Secretary of Labor or authorized representative thereof, shall have right of entry to
any site of contract performance to inspect or investigate the matter of compliance
with the construction safety and health standards and to carry out the duties of the
Secretary under Section 107 of the Contract Work Hours and Safety Standards Act
(40 U.S.C. 333).
IX. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS
In order to assure high quality and durable construction in conformity with
approved plans and specifications and a high degree of reliability on statements and
representations made by engineers, contractors, suppliers, and workers on Federal-
GC-CA-I-40
168"'9
aid highway projects, it is essential that all persons concerned with the project
perform their functions as carefully, thoroughly, and honestly as possible. Willful
falsification, distortion, or misrepresentation with respect to any facts related to the
project is a violation of Federal law. To prevent any misunderstanding regarding the
seriousness of these and similar acts, the following notice shall be posted on each
Federal-aid highway project (23 CFR 635) in one or more places where it is readily
available to all persons concerned with the project:
NOTICE TO ALL PERSONNEL ENGAGED ON FEDERAL-AID HIGHWAY
PROJECTS
18 U.S.C. 1020 reads as follows:
"Whoever, being an officer, agent, or employee of the United States, or of any
State or Territory, or whoever, whether a person, association, firm, or corporation,
knowingly makes any false statement, false representation, or false report as to the
character, quality, quantity, or cost of the material used or to be used, or the quantity
or quality of the work performed or to be performed, or the cost thereof in
connection with the submission of plans, maps, specifications, contracts, or costs of
construction on any highway or related project submitted for approval to the
Secretary of Transportation; or
Whoever knowingly makes any false statement, false representation, false
report or false claim with respect to the character, quality, quantity, or cost of any
work performed or to be performed, or materials furnished or to be furnished, in
connection with the construction of any highway or related project approved by the
Secretary of Transportation; or
Whoever knowingly makes any false statement or false representation as to
material fact in any statement, certificate, or report submitted pursuant to provisions
of the Federal-aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended
and supplemented;
Shall be fined not more than $10,000 or imprisoned not more than 5 years or
both. "
X. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER
POLLUTION CONTROL ACT
(Applicable to all Federal-aid construction contracts and to all related
subcontracts of $100,000 or more.)
By submission of this bid or the execution of this contract, or subcontract, as
appropriate, the bidder, Federal-aid construction contractor, or subcontractor, as
appropriate, will be deemed to have stipulated as follows:
O. That any facility that is or will be utilized in the performance of this
contract, unless such contract is exempt under the Clean Air Act, as amended (42
U.S.C. 1857 et seq., as amended by Pub.L. 91-604), and under the Federal Water
Pollution Control Act, as amended (33 U.S.C. 1251 et seq., as amended by Pub.L.
92-500), Executive Order 11738, and regulations in implementation thereof (40 CFR
15) is not listed, on the date of contract award, on the U.S. Environmental Protection
Agency (EPA) List of Violating Facilities pursuant to 40 CFR 15.20.
GC-CA-I-41
16 B '~9
1. That the firm agrees to comply and remain in compliance with all the
requirements of Section 114 of the Clean Air Act and Section 308 of the Federal
Water Pollution Control Act and all regulations and guidelines listed there under.
2. That the firm shall promptly notify the SHA of the receipt of any
communication from the Director, Office of Federal Activities, EPA, indicating that a
facility that is or will be utilized for the contract is under consideration to be listed on
the EPA List of Violating Facilities.
3. That the firm agrees to include or cause to be included the requirements
of paragraph 1 through 4 of this Section X in every nonexempt subcontract, and
further agrees to take such action as the government may direct as a means of
enforcing such requirements.
XI. CERTIFICATION REGARDING DEBARMENT, SUSPENSION,
INELIGIBILITY AND VOLUNTARY EXCLUSION
O. Instructions for Certification - Primary Covered Transactions:
(Applicable to all Federal-aid contracts - 49 CFR 29)
By signing and submitting this proposal, the prospective primary
participant is providing the certification set out below.
a. The inability of a person to provide the certification set out below will not
necessarily result in denial of participation in this covered transaction. The
prospective participant shall submit an explanation of why it cannot provide the
certification set out below. The certification or explanation will be considered in
connection with the department or agency's determination whether to enter into this
transaction. However, failure of the prospective primary participant to furnish a
certification or an explanation shall disqualify such a person from participation in this
transaction.
b. The certification in this clause is a material representation of fact upon
which reliance was placed when the department or agency determined to enter into
this transaction. If it is later determined that the prospective primary participant
knowingly rendered an erroneous certification, in addition to other remedies
available to the Federal Government, the department or agency may terminate this
transaction for cause of default.
c. The prospective primary participant shall provide immediate written notice
to the department or agency to whom this proposal is submitted if any time the
prospective primary participant learns that its certification was erroneous when
submitted or has become erroneous by reason of changed circumstances.
d. The terms "covered transaction," "debarred," "suspended," "ineligible,"
"lower tier covered transaction," "participant," "person," "primary covered
transaction," "principal," "proposal," and "voluntarily excluded," as used in this
clause, have the meanings set out in the Definitions and Coverage sections of rules
implementing Executive Order 12549. You may contact the department or agency to
which this proposal is submitted for assistance in obtaining a copy of those
regulations.
e. The prospective primary participant agrees by submitting this proposal
that, should the proposed covered transaction be entered into, it shall not knowingly
GC-CA-I-42
16 819
enter into any lower tier covered transaction with a person who is debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this
covered transaction, unless authorized by the department or agency entering into
this transaction.
f. The prospective primary participant further agrees by submitting this
proposal that it will include the clause titled "Certification Regarding Debarment,
Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction,"
provided by the department or agency entering into this covered transaction, without
modification, in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
g. A participant in a covered transaction may rely upon a certification of a
prospective participant in a lower tier covered transaction that is not debarred,
suspended, ineligible, or voluntarily excluded from the covered transaction, unless it
knows that the certification is erroneous. A participant may decide the method and
frequency by which it determines the eligibility of its principals. Each participant
may, but is not required to, check the nonprocurement portion of the "Lists of Parties
Excluded From Federal Procurement or Nonprocurement Programs"
(Nonprocurement List) which is compiled by the General Services Administration.
h. Nothing contained in the foregoing shall be construed to require
establishment of a system of records in order to render in good faith the certification
required by this clause. The knowledge and information of participant is not required
to exceed that which is normally possessed by a prudent person in the ordinary
course of business dealings.
i. Except for transactions authorized under paragraph f of these instructions,
if a participant in a covered transaction knowingly enters into a lower tier covered
transaction with a person who is suspended, debarred, ineligible, or voluntarily
excluded from participation in this transaction, in addition to other remedies
available to the Federal Government, the department or agency may terminate this
transaction for cause or default.
Certification Regarding Debarment, Suspension, Ineligibility and Voluntary
Exclusion--Primary Covered Transactions
10. The prospective primary participant certifies to the best of its knowledge
and belief, that it and its principals:
a. Are not presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from covered transactions by any Federal
department or agency;
b. Have not within a 3-year period preceding this proposal been convicted of
or had a civil judgment rendered against them for commission of fraud or a criminal
offense in connection with obtaining, attempting to obtain, or performing a public
(Federal, State or local) transaction or contract under a public transaction; violation
of Federal or State antitrust statutes or commission of embezzlement, theft, forgery,
bribery, falsification or destruction of records, making false statements, or receiving
stolen property;
GC-CA-I-43
168 9
c. Are not presently indicted for or otherwise criminally or civilly charged by a
governmental entity (Federal, State or local) with commission of any of the offenses
enumerated in paragraph 1 b of this certification; and
d. Have not within a 3-year period preceding this application/proposal had
one or more public transactions (Federal, State or local) terminated for cause or
default.
11. Where the prospective primary participant is unable to certify to any of the
statements in this certification, such prospective participant shall attach an
explanation to this proposal.
Instructions for Certification - Lower Tier Covered Transactions:
(Applicable to all subcontracts, purchase orders and other lower tier transactions
of $25,000 or more - 49 CFR 29)
I. By signing and submitting this proposal, the prospective lower tier is
providing the certification set out below.
m. The certification in this clause is a material representation of fact upon
which reliance was placed when this transaction was entered into. If it is later
determined that the prospective lower tier participant knowingly rendered an
erroneous certification, in addition to other remedies available to the Federal
Government, the department, or agency with which this transaction originated may
pursue available remedies, including suspension and/or debarment.
n. The prospective lower tier participant shall provide immediate written
notice to the person to which this proposal is submitted if at any time the prospective
lower tier participant learns that its certification was erroneous by reason of changed
circumstances.
o. The terms "covered transaction," "debarred," "suspended," "ineligible,"
"primary covered transaction," "participant," "person," "principal," "proposal," and
"voluntarily excluded," as used in this clause, have the meanings set out in the
Definitions and Coverage sections of rules implementing Executive Order 12549.
You may contact the person to which this proposal is submitted for assistance in
obtaining a copy of those regulations.
p. The prospective lower tier participant agrees by submitting this proposal
that, should the proposed covered transaction be entered into, it shall not knowingly
enter into any lower tier covered transaction with a person who is debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this
covered transaction, unless authorized by the department or agency with which this
transaction originated.
q. The prospective lower tier participant further agrees by submitting this
proposal that it will include this clause titled "Certification Regarding Debarment,
Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction,"
without modification, in all lower tier covered transactions and in all solicitations for
lower tier covered transactions.
r. A participant in a covered transaction may rely upon a certification of a
prospective participant in a lower tier covered transaction that is not debarred,
suspended, ineligible, or voluntarily excluded from the covered transaction, unless it
knows that the certification is erroneous. A participant may decide the method and
GC-CA-I-44
168 ~t;9
frequency by which it determines the eligibility of its principals. Each participant
may, but is not required to, check the Non-procurement List.
s. Nothing contained in the foregoing shall be construed to require
establishment of a system of records in order to render in good faith the certification
required by this clause. The knowledge and information of participant is not required
to exceed that which is normally possessed by a prudent person in the ordinary
course of business dealings.
t. Except for transactions authorized under paragraph e of these
instructions, if a participant in a covered transaction knowingly enters into a lower
tier covered transaction with a person who is suspended, debarred, ineligible, or
voluntarily excluded from participation in this transaction, in addition to other
remedies available to the Federal Government, the department or agency with
which this transaction originated may pursue available remedies, including
suspension and/or debarment.
*****
Certification Regarding Debarment, Suspension, Ineligibility and Voluntary
Exclusion--Lower Tier Covered Transactions:
21. The prospective lower tier participant certifies, by submission of this
proposal, that neither it nor its principals is presently debarred, suspended,
proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency.
22. Where the prospective lower tier participant is unable to certify to any of
the statements in this certification, such prospective participant shall attach an
explanation to this proposal.
XII. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR
LOBBYING
(Applicable to all Federal-aid construction contracts and to all related
subcontracts which exceed $100,000 - 49 CFR 20)
O. The prospective participant certifies, by signing and submitting this bid or
proposal, to the best of his or her knowledge and belief, that:
No Federal appropriated funds have been paid or will be paid, by or on
behalf of the undersigned, to any person for influencing or attempting to influence an
officer or employee of any Federal agency, a Member of Congress, an officer or
employee of Congress, or an employee of a Member of Congress in connection with
the awarding of any Federal contract, the making of any Federal grant, the making
of any Federal loan, the entering into of any cooperative agreement, and the
extension, continuation, renewal, amendment, or modification of any Federal
contract, grant, loan, or cooperative agreement.
a. If any funds other than Federal appropriated funds have been paid or will
be paid to any person for influencing or attempting to influence an officer or
employee of any Federal agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with this Federal
contract, grant, loan, or cooperative agreement, the undersigned shall complete and
submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance
with its instructions.
GC-CA-I-45
,168 -9
1. This certification is a material representation of fact upon which reliance
was placed when this transaction was made or entered into. Submission of this
certification is a prerequisite for making or entering into this transaction imposed by
31 U.S.C. 1352. Any person who fails to file the required certification shall be
subject to a civil penalty of not less than $10,000 and not more than $100,000 for
each such failure.
2. The prospective participant also agrees by submitting his or her bid or
proposal that he or she shall require that the language of this certification be
included in all lower tier subcontracts, which exceed $100,000 and that all such
recipients shall certify and disclose accordingly.
ATTACHMENT A - EMPLOYMENT PREFERENCE FOR APPALACHIAN
CONTRACTS
(Applicable to Appalachian contracts only)
3. During the performance of this contract, the contractor undertaking to do
work which is, or reasonably may be, done as on-site work, shall give preference to
qualified persons who regularly reside in the labor area as designated by the DOL
wherein the contract work is situated, or the subregion, or the Appalachian counties
of the State wherein the contract work is situated, except:
To the extent that qualified persons regularly residing in the area are not
available.
a. For the reasonable needs of the contractor to employ supervisory or
specially experienced personnel necessary to assure an efficient execution of the
contract work.
b. For the obligation of the contractor to offer employment to present or
former employees as the result of a lawful collective bargaining contract, provided
that the number of nonresident persons employed under this subparagraph 1 c shall
not exceed 20 percent of the total number of employees employed by the contractor
on the contract work, except as provided in subparagraph 4 below.
4. The contractor shall place a job order with the State Employment Service
indicating (a) the classifications of the laborers, mechanics and other employees
required to perform the contract work, (b) the number of employees required in each
classification, (c) the date on which he estimates such employees will be required,
and (d) any other pertinent information required by the State Employment Service to
complete the job order form. The job order may be placed with the State
Employment Service in writing or by telephone. If during the course of the contract
work, the information submitted by the contractor in the original job order is
substantially modified, he shall promptly notify the State Employment Service.
5. The contractor shall give full consideration to all qualified job applicants
referred to him by the State Employment Service. The contractor is not required to
grant employment to any job applicants who, in his opinion, are not qualified to
perform the classification of work required.
6. If, within 1 week following the placing of a job order by the contractor with
the State Employment Service, the State Employment Service is unable to refer any
qualified job applicants to the contractor, or less than the number requested, the
State Employment Service will forward a certificate to the contractor indicating the
GC-CA-I-46
160"9
unavailability of applicants. Such certificate shall be made a part of the contractor's
permanent project records. Upon receipt of this certificate, the contractor may
employ persons who do not normally reside in the labor area to fill positions covered
by the certificate, notwithstanding the provisions of subparagraph 1 c above.
7. The contractor shall include the provisions of Sections 1 through 4 of this
Attachment A in every subcontract for work which is, or reasonably may be, done as
on-site work.
16. Liquidated Damages
See Construction Agreement, Section 5B. Contract Time and Liquidated
Damages, Collier County Contract - See attached contract section pages GC-CA.
17. Local Hiring Preference
Provision excluded from this contract.
18. Lobbying Certification
(Florida Department of Transportation Policy)
"The undersigned hereby certifies, to the best of his or her knowledge and belief,
th at:
(a)No Federal appropriated funds have been paid or will be paid, by or on behalf
of the undersigned, to any person for influencing or attempting to influence either
directly or in-directly an officer or employees of any state or federal agency, a
Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with the awarding of any Federal Contract, the
making of any Federal grant, the making of any Federal loan, the entering into any
cooperative agreement, and the extension, continuation, renewals, amendment, or
modification of any Federal contract, grant, loan or cooperative agreement.
(b)lf any funds other than Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an officer or employee
of any agency, a member of Congress, and officer or employee of Congress, or an
employee of a member of Congress in connection with this Federal contract, grant
loan, or cooperative agreement, the undersigned shall complete and submit
Standard Form-L "Disclosure Form to Report Lobbying", in accordance with its
instructions.
(c) The undersigned shall require that the language of this certification be
included in the award documents for all sub-awards at all tiers (including
subcontracts, sub-grants, and contracts under grants, loans, and cooperative
agreements) and that all sub-recipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was
placed when this transaction was made or entered into. Submission of this
certification is a prerequisite for making or entering into the transaction imposed by
section 1352, title 31, US Code. Any person(s) who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not more
than $100,000 for each failure."
GC-CA-I-47
16B~9
19. Award and Execution of Contract (Method of construction (or method
of bidding). See Section 12, Part B. Instruction to Bidders, 12.2. - See
attached contract section pages GC-IB.
20. Non-collusion Provision
(Florida Department of Transportation Guidelines)
The undersigned hereby certifies, to the best of his or her knowledge and belief,
that on behalf of the person, firm, association, or corporation submitting the bid
certifying that such person, firm association, or corporation has not, either directly or
indirectly, entered into any agreement, participated in any collusion, or otherwise
taken any action, in restraint of free competitive bidding in connection with the
submitted bid. Failure to submit the executed statement as part of the bidding
documents will make the bid non-responsive and not eligible for ward consideration.
21. Owner Force Account/Cost Effective Justification
Provision excluded from this contract
22. Patented/Proprietary Materials
Provision excluded from this contract
23. Prevailing Minimum Wage
For this contract, payment of predetermined minimum wages applies. The
U.S. Department of Labor Wage Rates applicable to this Contract are listed in
Wage Rate Decision Number(s) FL, as modified up through ten days prior to the
opening of bids.
Obtain the applicable General Decision(s) (Wage Tables) through the United States
Department of Labor website(www.wdol.gov) and ensure that employees receive the
minimum wages applicable. Review the General Decisions for all classifications
necessary to complete the project.
General Decision Number: FL080039 02/08/2008 FL39
Superseded General Decision Number: FL20070039
State: Florida
Construction Type: Highway
Counties: Brevard, Collier, Hernando, Hillsborough, Lee,
Manatee, Martin, Orange, Osceola, Pasco, Pinellas, Polk,
Sarasota, Seminole and St Lucie Counties in Florida.
EXCLUDING CAPE CANAVERAL AIR FORCE STATION, PATRICK AIR FORCE
BASE, KENNEDY SPLACE FLIGHT CENTER AND MELABAR RADAR SITE
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building
structures in rest area projects, & railroad construction; bascule, suspension & spandrel
arch bridges; bridges designed for commercial navigation; bridges involving marine
construction; & other major bridges.
GC-CA-I-48
Modification Number Publication Date
Rates Fringes
BRICKLAYER (Manhole)............. $ 9.02
CARP ENTER........................
Concrete Fin isher................
ELECTRiCiAN..................... .
FENCE ERECTOR....................
Form Setter.. ....................
Guardrail erector................
Ironworkers:
Reinforcing................ .
Structural.... ..............
Laborers:
Asphalt Raker..............
Pipelayer.................. .
Unskilled... ..... ...........
N/A..............................
Painters:
Blaster. ... ....... ....... ...
Power equipment operators:
Asphalt Distributor.........
Asphalt Paving Machine......
Asphalt Plant Operator......
Asphalt Screed..............
Backhoe.................... .
Boom-Auger................ ..
Bulldozer.................. .
Concrete Curb Machine.......
Concrete Groover/Grinder....
Concrete Joint Saw..........
Concrete Mixer Operator.....
Concrete Paving Finish
Machine.................... .
Concrete Pump Op............
Crane, Derrick, or Dragline.
Earthmover................. .
Fork Lift...................
Front End Loader............
Gradall....... ....... .... ...
Grade Checker...............
Guardrail Post Driver.......
Mechan ic....................
Milling Machine Grade
Checker. .... ...... ..........
Milling Machine.............
Motor Grader................
$ 9.71
$ 8.91
$13.42
$ 7.75
$ 7.76
$ 7.95
$ 12.37
$ 6.60
.$ 7.23
$ 8.01
$ 6.60
$ 7.34
$ 10.72
$ 7.39
$ 8.23
$ 6.83
$ 7.68
$ 9.00
$ 9.40
$ 8.42
$ 8.50
$ 9.00
$ 9.97
$ 6.63
$ 8.50
$ 13.00
$ 11.53
$ 7.78
$ 7.63
$ 8.00
$ 8.76
$ 6.60
$ 10.78
$ 9.52
$ 7.03
$ 8.76
$ 9.54
GC-CA-I-49
16 8"'9
02/08/2008 * SUFL 1993-012 08101/1993
Mulching Machine............
Oiler, Greaseman............
Pavement Striping Machine...
Paving Striping Machine
Nozzleman.......... .........
Piledriver Leadsman.........
Piledriver Operator.........
Power Subgrade Mixer........
Rollers:
Finish.....................
Roug h. .... ... . ..... .. ......
Self-Prop., Rubber Tire....
Scraper................. ....
Sign Erector................
Small tool..................
Tractors:
80 HP or less.............. $ 6.60
Light...................... $ 6.76
Over 80 HP................. $ 10.62
Trenching Machine........... $ 8.00
Widening Spreader Machine... $ 7.52
16 819
$ 6.70
$ 7.21
$ 11.04
$ 7.50
$ 9.75
$ 10.82
$ 7.63
$ 7.24
$ 6.70
$ 7.01
$ 7.33
$ 13.27
$ 7.33
Traffic Controller
TRAFFIC CONTROL SPECIALlST..$ 7.15
TRAFFIC SIGNALIZATION:
Installer................ ..
Mechanic................. ..
Truck drivers:
Lowboy... .. . .... . .. ... ......
Multi-Rear Axle.............
Single Rear Axle............
$ 9.70
$ 13.25
$ 8.02
$ 6.97
$ 6.70
WELDERS - Receive rate prescribed for craft performing operation to which welding is
incidental.
-------------------------------------------------------------
-------------------------------------------------------------
Unlisted classifications needed for work not included within the scope of the
classifications listed may be added after award only as provided in the labor standards
contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do
not reflect collectively bargained wage and fringe benefit rates. Other designations
indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
GC-CA-I-50
168~9
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys,
should be with the Wage and Hour Regional Office for the area in which the survey was
conducted because those Regional Offices have responsibility for the Davis-Bacon
survey program. If the response from this initial contact is not satisfactory, then the
process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial
contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by
the action) can request review and reconsideration from the Wage and Hour
Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position
and by any information (wage payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal
directly to the Administrative Review Board (formerly the Wage Appeals Board). Write
to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
-------------------------------------------------------------
-------------------------------------------------------------
END OF GENERAL DECISION
GC-CA-I-51
16 B ~9
24. Progress Payments
See Exhibit H, Article 4. Progress Payments, Collier County Contract-
See attached contract section pages GC-CA-H.
25. Prohibition Against Convict Produced Materials
(Florida Department of Transportation Guidelines)
Source of Supply-Convict Labor (Federal-Aid Contracts Only): Do not use
materials that were produced after July 1, 1991, by convict labor for Federal-aid
highway construction projects unless the prison facility has been producing convict-
made materials for Federal-aid highway construction projects before July 1, 1987.
Use materials that were produced prior to July 2, 1991, b convicts on Federal-
aid highway construction projects free from the restrictions placed on the use of
these materials by 23 U.S.C. 114. The Department will limit the use of materials
produced by convict labor for use in Federal-aid highway construction projects to:
(1) materials produced by convicts 0 parole, supervised release, or probation
from a prison or,
(2) materials produced in a qualified prison facility.
The amount of such materials produced for Federal-aid highway construction
during any 12-month period shall not exceed the amount produced in such facility
for use in such construction during the 12-month period ending July 1, 1987.
26. Public Agencies in Competition with the Private Sector
The County does not allow other Public Agencies to compete with or bid on
construction projects against the private sector.
27. Publicly Owned Equipment
The County does not allow Contractors the use of publicly owned
equipment.
. 28. Records Retention
Establishment and Maintenance of Accounting Records: Records of costs
incurred under terms of this Agreement shall be maintained and made available
upon request to the Department at all times during the period of this Agreement and
for five (5) years after final payment is made. Copies of these documents and
records shall be furnished to the Department upon request. Records of costs
incurred includes the Agency's general accounting records and the project records,
together with supporting documents and records, of the Agency and all
subcontractors performing work on the project and all other records of the Agency
and subcontractors considered necessary by the Department for proper audit of
costs. If any litigation, claim or audit is started before the expiration of the five (5
year period, the records shall be retained until all litigation, claims, or audit findings
involving the records have been resolved.
Costs Incurred for the Project: The Agency shall charge to the project account
all eligible costs of the project. Costs in excess of the latest approved schedule of
GC-CA-I-52
16 B~9
funding or attributable to actions which have not received the required approval of
the Department shall not be considered eligible costs.
Documentation of Project Costs: All costs charged to the project, including any
approved services contributed by the Agency or others, shall be supported by
properly executed payrolls, time records, invoices, contracts or vouchers evidencing
in proper detail the nature and propriety of the charges.
29. Salvage Credits
Provision excluded from this contract.
30. Standardized Changes Conditions Contract Clauses - Differing site
conditions. (i) During the progress of the work, if subsurface or latent physical
conditions are encountered at the site differing materially from those indicated in the
contract or if unknown physical conditions of an unusual nature, differing materially
from those ordinarily encountered and generally recognized as inherent in the work
provided for in the contract, are encountered at the site, the party discovering such
conditions shall promptly notify the other party in writing of the specific differing
conditions before the site is disturbed and before the affected work is performed.
(ii) Upon written notification, the engineer will investigate the conditions, and
if it is determined that the conditions materially differ and cause an increase or
decrease in the cost or time required for the performance of any work under the
contract, an adjustment, excluding anticipated profits, will be made and the contract
modified in writing accordingly. The engineer will notify the contractor of the
determination whether or not an adjustment of the contract is warranted.
(iii) No contract adjustment which results in a benefit to the contractor will be
allowed unless the contractor has provided the required written notice.
(iv) No contract adjustment will be allowed under this clause for any effects
caused on unchanged work.
Suspensions of work ordered by the engineer. (i) If the performance of all
or any portion of the work is suspended or delayed by the engineer in writing for an
unreasonable period of time (not originally anticipated, customary, or inherent to the
construction industry) and the contractor believes that additional compensation
and/or contract time is due as a result of such suspension or delay, the contractor
shall submit to the engineer in writing a request for adjustment within 7 calendar
days of receipt of the notice to resume work. The request shall set forth the reasons
and support for such adjustment.
(ii) Upon receipt, the engineer will evaluate the contractor's request. If the
engineer agrees that the cost and/or time required for the performance of the
contract has increased as a result of such suspension and the suspension was
caused by conditions beyond the control of and not the fault of the contractor, its
suppliers, or subcontractors at any approved tier, and not caused by weather, the
engineer will make an adjustment (excluding profit) and modify the contract in
writing accordingly. The contractor will be notified of the engineer's determination
whether or not an adjustment of the contract is warranted.
(iii) No contract adjustment will be allowed unless the contractor has
submitted the request for adjustment within the time prescribed.
GC-CA-I-53
16 B \'9
(iv) No contract adjustment will be allowed under this clause to the extent
that performance would have been suspended or delayed by any other cause, or for
which an adjustment is provided or excluded under any other term or condition of
this contract.
Significant changes in the character of work. (i) The engineer reserves the
right to make, in writing, at any time during the work, such changes in quantities and
such alterations in the work as are necessary to satisfactorily complete the project.
Such changes in quantities and alterations shall not invalidate the contract nor
release the surety, and the contractor agrees to perform the work as altered.
(ii) If the alterations or changes in quantities significantly change the
character of the work under the contract, whether such alterations or changes are in
themselves significant changes to the character of the work or by affecting other
work cause such other work to become significantly different in character, an
adjustment, excluding anticipated profit, will be made to the contract. The basis for
the adjustment shall be agreed upon prior to the performance of the work. If a basis
cannot be agreed upon, then an adjustment will be made either for or against the
contractor in such amount as the engineer may determine to be fair and equitable.
(iii) If the alterations or changes in quantities do not significantly change the
character of the work to be performed under the contract, the altered work will be
paid for as provided elsewhere in the contract.
(iv) The term "significant change" shall be construed to apply only to the
following circumstances:
(A) When the character of the work as altered differs materially in kind or
nature from that involved or included in the original proposed construction; or
(B) When a major item of work, as defined elsewhere in the contract, is
increased in excess of 125 percent or decreased below 75 percent of the original
contract quantity. Any allowance for an increase in quantity shall apply only to that
portion in excess of 125 percent of original contract item quantity, or in case of a
decrease below 75 percent, to the actual amount of work performed.
31. Standard Specifications and Plans
See Exhibit M, Plans and Specifications, Collier County Contract
32. State Preference
Provision are excluded from this contract.
33. state/Local Owned/Furnished/Designated Materials
Provisions are excluded from this contract.
34. Subcontracting
See Exhibit H, General Terms and Conditions, Section 33. Subcontracts,
Collier County Contract - See attached contract section pages GD-CA H.
35. Termination of Contract
See Exhibit H, General Terms and Conditions, Section 18. Termination
for Default and Section 19. Termination for Convenience and Suspension,
Collier County Contract - See attached contract section pages GC-CA-H.
GC-CA-I-54
l~B1g
36. Time Extensions
See Exhibit H, General Terms and Conditions, Section 9. Contract Time
and Extensions, Collier County Contract - See attached section contract
pages GC-CA-H.
TITLE VI (See LAP Manual Chapter 16 Section 16.3 items 5 & 6)
The Sub-recipient or Contractor, in accordance with Title VI of the Civil Rights Act of
1964,78 Stat. 252, 42 U.S.C. 200d to 200d-7 and Title 49, Code of Federal
Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21,
Non-discrimination in Federally-assisted programs of the Department of Transportation
issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure
that in any contract entered into pursuant to this advertisement, disadvantaged business
enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids
in response to this invitation and will not be discriminated against on the grounds of
race, color, national origin, sex, age, disability in consideration for an award.
While performing this contract, the contractor - for itself, its assignees, and successors
in interest (hereinafter referred to as the "contractor") - agrees to the following:
1. Compliance with Regulations: The contractor will comply with the Regulations on
nondiscrimination in Federally-assisted programs of the U.S. Department of
Transportation ("USDOT") Title 49, Code of Federal Regulations, Part 21. The
recommendations may be amended from time to time, (from here on referred to as the
Regulations). They are incorporated here by reference and made a part of this contract.
2. Nondiscrimination: In work performed during the contract, the Contractor will not
discriminate on the grounds of race, color, or national origin in the selection and holding
of subcontractors. This includes obtaining materials and leases of equipment. The
contractor will not participate either directly or indirectly in the discrimination prohibited
by section 21.5 of the Regulations. This includes employment practices when the
contract covers a program set forth in Appendix B of the Regulations.
3. Solicitations for Subcontractors, Including Procurements of Materials and
Equipment: In all solicitations either by competitive bidding or negotiation made by the
contractor for work to be performed under a subcontract, the contractor will inform each
potential subcontractor or supplier of the contractor's obligations under this contract and
the Regulations relative to nondiscrimination on the grounds of race, color, or national
origin. The solicitations includes obtaining materials or leases of equipment,
4. Information and Reports: The contractor will provide all information and reports
required by the Regulations or directives. It will also permit access to its books, records,
accounts, other sources of information, and its facilities that are determined by the
(Recipient) or the (Name of Appropriate Administration) to be important to ensure
compliance with such Regulations, orders and instructions. In some cases, another
entity possesses the information required of a contractor and refuses to give the
GC-CA-I-55
168'9
information. Here, the contractor will confirm the lack of information with the (Recipient),
or the (Name of the Administration) as appropriate, and will explain its efforts to obtain
the information.
5. Sanctions for Noncompliance: In the event that the contractor does not comply
with the nondiscrimination provisions of this contract, the (Recipient) should enforce
contract sanctions as it or the (Name of Appropriate Administration) may determine to
be appropriate. Sanctions may include, but are not limited to:
a. Withholding of payments to the contractor under the contract until the
contractor complies, and/or
b. Cancellation, termination or suspension of the contract, in whole or in part.
6. Incorporation of Provisions: The contractor should include the terms of
paragraphs
(1) through (6) in every subcontract, including procurements of materials and leases
of equipment, unless exempt by the Regulations, or directives issued modifying the
Provisions. The contractor will take action with on any subcontract or procurement
that the (Recipient) or the (Name of Appropriate Administration) directs in order to
enforce provisions including sanctions for non-compliance. However, if a contractor
becomes involved in, or is threatened with, litigation with a subcontractor or supplier
because of such direction, the contractor may ask the (Recipient) to enter into such
litigation to protect the interests of the (Recipient). Also, the contractor may ask the
United States to enter into such litigation to protect the interests of the United States.
CERTIFICATION OF NONSEGREGATED FACILITIES - 41 CFR PART 60-1.8
Notice to Prospective Federally Assisted Construction Contractors
1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a
federally-assisted construction contract exceeding $10,000 which is not exempt from
the provisions of the Equal Opportunity Clause.
2. Contractors receiving federally-assisted construction contract awards exceeding
$10,000 which are not exempt from the provisions of the Equal Opportunity Clause will be
required to provide for the forwarding of the following notice to prospective subcontractors
for supplies and construction contracts where the subcontracts exceed $10,000 and are
not exempt from the provisions of the Equal Opportunity Clause. NOTE: The penalty for
making false statements in offers is prescribed in 18 U.S.C. 1001.
Notice to Prospective Subcontractors of Requirements for Certification of
Non-Segregated Facilities
1 A Certification of Non-segregated Facilities shall be submitted prior to the award of a
subcontract exceeding $10,000, which is not exempt from the provisions of the Equal
Opportunity Clause.
2 Contractors receiving subcontract awards exceeding $10,000 which are not exempt
from the provisions of the Equal Opportunity Clause will be required to provide for the
forwarding of this notice to prospective subcontractors for supplies and construction
GC-CA-I-56
16B 9
contracts where the subcontracts exceed $10,000 and are not exempt from the provisions
of the Equal Opportunity Clause. NOTE: The penalty for making false statements in
offers is prescribed in 18 U.S.C. 1001.
CERTIFICATION OF NONSEGREGATED FACILITIES
The federally-assisted construction contractor certifies that she or he does not maintain or
provide, for his employees, any segregated facilities at any of his establishments and that
she or he does not permit his employees to perform their services at any location, under his
control, where segregated facilities are maintained. The federally-assisted construction
contractor certifies that she or he will not maintain or provide, for his employees,
segregated facilities at any of his establishments and that she or he will not permit his
employees to perform their services at any location under his control where segregated
facilities are maintained. The federally-assisted construction contractor agrees that a
breach of this certification is a violation of the Equal Opportunity Clause in this contract.
As used in this certification, the term "segregated facilities" means any waiting rooms, work
areas, restrooms, and washrooms, restaurants and other eating areas, timeclocks, locker
rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or
entertainment areas, transportation, and housing facilities provided for employees which
are segregated by explicit directives or are, in fact, segregated on the basis of race, color,
religion, or national origin because of habit, local custom, or any other reason. The
federally-assisted construction contractor agrees that (except where she or he has obtained
identical certifications from proposed subcontractors for specific time periods) she or he will
obtain identical certifications from proposed subcontractors prior to the award of
subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal
Opportunity Clause and that she or he will retain such certifications in his files.
GC-CA-I-57
168 \9
EXHIBIT J
TECHNICAL SPECIFICATIONS
"
GC-CA-J-1
168 9
EXHIBIT K
PERMITS
GC-CA-K-1
If>.8~9
EXHIBIT L
STANDARD DETAILS
GC-CA-L-1
1.6iB 9
EXHIBIT M
PLANS AND SPECIFICATIONS
GC-CA-M-1
1_6 B 9
EXHIBIT N
CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT
GC-CA-N-1