Loading...
Backup Documents 06/23/2009 Item #16B 8 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 :B TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. Original documents should be hand delivered to the Board Oftice. The completed routing slip and original documents are to be forwarded to the Board Office only after thc Board has taken action on the item.) ROUTING SLIP Complete routing lines # 1 through #4 as appropriate for additional signaturcs, dates, and/or information needed. If the documcnt is already complete with the exce tion of the Chairman's si nature, draw a line throu h routin lines # I throu #4, com lete the checklist, and forward to Sue Filson line #5). Office Initials Date IC"" { 2. 3. 4. 5. Sue Filson, Executive Manager Board of County Commissioners (The primary contact is the holder of the original document pending BCC approval. Normally the primary contact is the person who created/prepared the executive summary. Primary contact information is needed in the event one of the addressees above, including Sue Filson, need to contact stafffor additional or missing information. All original documents needing the ,Bce Chairman's signature are to be delivered to the Bce oftice only after the BCC has acted to approve the item.) Name of Primary Staff Contact Agenda Date Item was A roved b the BCC Type of Document Attached 6. Clerk of Court's Office Yes (Initial) N/A (Not A licable) I. INSTRUCTIONS & CHECKLIST Initial the Yes column or mark "N/ A" in the Not Applicable column, whichever is a ro riate. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman, with the exception of most letters, must be reviewed and signed by the Office of the County Attorney. This includes signature pages from ordinances, resolutions, etc. signed by the County Attorney's Office and signature pages from contracts, agreements, etc. that have been fully executed by all parties except the BCC Chairman and Clerk to the Board and ossibl' State Officials.) All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other arties exce t the BCC Chairman and the Clerk to the Board The Chairman's signature line date has been entered as the date ofBCC approval of the document or the final ne otiated contract date whichever is a licable. "Sign here" tabs are placed on the appropriate pages indicating where the Chairman's si nature and initials are re uired. In most cases (some contracts are an exception), the original document and this routing slip should be provided to Sue Filson in the BCC office within 24 hours of BCC approval. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be awar of our deadlines! The document was approved by the BCC on (enter date) and all changes made during the meeting have been incorporated in the attached document. The Count Attorne 's Office has reviewed the chan es, if a licable. I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05 2. 3. 4. 5. 6. 16B 8 MEMORANDUM Date: June 24, 2009 To: Kevin Dugan Project Manager, Trans/TECM From: Martha Vergara, Deputy Clerk Minutes & Records Department Re: Contract Supplemental Agreement (Contract #06-3931) Contractor: Stanley Consultants, Inc. Attached is the original document, referenced above (Agenda Item #16B8), approved by the Board of County Commissioners on Tuesday, June 23, 2009. Please return a fully executed original back to the Minutes and Records Department once all signatures have been recieved, which will be kept as part of the Board's permanent records. If you should have any questions, please contact me at 252-7240. Thank you. EXHIBIT t\ -I Contract Supplemental Agreement 06-3931 168 8 "Design and Related Services for Roadway Capacity Improvements Golden Gate Blvd (from Wilson Blvd. to DeSoto Blvd,)" This supplemental agreement, dated , 2009 to the referenced agreement shall be by and between the parties to the original agreement, Stanley Consultants, Inc., (to be referred to as "Consultant") and Collier County, Florida, (to be referred to as "County"). Statement oflJnderstanding RE: Contract # 06-3931 "Design and Related Services for Roadway Capacity Improvements Golden Gate Blvd. (from Wilson Blvd. to DeSoto Blvd.)" The following change to the above referenced Agreement has been mutually agreed to by the Consultant and the County: In order to continue the services provided for in the original Contract document referenced above, the Consultant agrees to add the Supplemental Agreement to the above referenced Contract as per the requirements of Article two (2) Additional Services. This Supplemental Agreement shaIl also cover hourly rate increases to the original Collier County Proposed Fee Schedule B, based on current rates under similar contracts. The Supplemental Agreement including the new rate schedule, Exhibit "AI-A" is attached to this Supplemental Agreement and incorporated herein by reference. AIl other terms and conditions of the Agreement shall remain in force. IN WITNESS WHEREOF, the Consultant and the County have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date(s) indicated below. ~/2-~ f Accepted: ,2009 CONTRACTOR: Stanley Consultants, Inc. Tshalal E. Dennis, PE ViceP~sident ., By: OWNER: BOARD OF COUNTY COMMISSIO RS COLLIER TY. FLORIDA 'e: By: {;' I' .< .4',4; A cd as to form anld L al su '__nttl;(~/ C County Attorney T:Je~ By: DEPARTMENT DIRECTOR By 22::... P t:. /t~ / dq DIVISION ADMINISTRATOR By: Norman Feder leRl~T Al-~ SCHEDULE A SUPPLEMENTAL AGREEMENT NO.1 SCOPE OF SERVICES 06-3931 "Design and Permitting of Golden Gate Boulevard (Wilson Boulevard to Desoto Boulevard)", Project #60040 DESCRIPTION This SUPPLEMENTAL AGREEMENT NO.1 between the Collier County Government (COUNTY) and Stanley Consultants, Inc. (CONSULTANT) amends their original agreement of April 11th 2006 (Contract No. 06-3931) for CONSULTANT to provide services to the COUNTY for Widening of Golden Gate Boulevard (CR 876), from immediately west of Wilson Boulevard to immediately east of Desoto Boulevard, a distance of approximately 6.0 miles (County Project #60040). Except as specifically amended by this Supplemental Agreement, all the terms and conditions of the original Agreement shall remain in full force and effect. The original agreement involved preparation of final (100%) plans and environmental permitting for the widening of Golden Gate Boulevard to six lanes. The objective of this supplemental agreement involves preparation of 60% level plans and environmental permitting services for widening of Golden Gate Boulevard to four lanes. Elements of work shall include, but may not be limited to: roadways, structures, intersections, drainage, signalization, utility design, coordination and relocation, right-of-way maps and legal descriptions, cost estimates, noise analysis, environmental permits, a public meeting, and all necessary incidental items as listed and estimated in this scope of work and attached fee sheet. The Scope of Services establishes which items of work described in the Florida Department of Transportation (FOOT) Plans Preparation Manual, Collier County Land Development Code and other pertinent manuals to accomplish the work are specifically included in this contract, and also which of the items of work will be the responsibility of the CONSULTANT or the COUNTY. In preparing this Scope of Services for SUPPLEMENTAL AGREEMENT NO.1, the anticipated level of effort for the 60% design and plans preparation is assumed consistent with Table 2 - Anticipated Plan 1 It,.~ ~ HHtA/T A/V Sheets contained in Schedule A of the original Agreement. Based on Table 2, the 60% phase deliverable plan set will include the following: . Key Sheet . Drainage maps . Typical Sections . General Notes Sheet . Bridge Hydraulic Sheet . Roadway Plan & Profile . Conceptual Traffic Control Plan, Details, General Notes . Project Network Control . Intersection & Miscellaneous Details . Drainage Structures . Ponds - Stormwater Management Plans . Roadway Cross Sections . Structural Plans Set . Conceptual Signing & Marking Plans . Conceptual Signalization Plans . Right-of-Way Maps (By Others) CONSULTANT's preparation of plans under this Supplemental Agreement is to the 60% level only. CONSULTANT does not assume any responsibility or liability for the completion of these services by the design-build contractor, or other consultant retained by COUNTY to complete the design and plans preparation. The design-build contractor or other consultant will indemnify and hold CONSULTANT harmless for the services performed to complete the project construction documents. II PRIME CONSULTANT SERVICES Task 1 PROJECT GENERAL TASKS Cost Estimates The CONSULTANT shall be responsible for producing a construction cost estimate at the 60% submittal phase only. The detailed preliminary construction estimate will include project pay items and corresponding quantities. Proiect Schedule The CONSULTANT shall provide a detailed project activity/event schedule for COUNTY and CONSULTANT activities required to meet the completion date for design. The schedule shall 2 ,111 -"---',.,--.-- 168 8 EXHIBIT AI-A indicate, at a minimum, submission dates for Draft and Final 60% Plans, The schedule shall allow up to two weeks for the COUNTY'S review of the Draft 60% Plans. Periodically, throughout the duration of the project, the schedule shall be reviewed and, with the approval of the COUNTY, adjusted as necessary to incorporate changes in the work concept and progress to date. Submittals A Draft and Final submittal of the plans, reports, and associated documents shall be made at the 60% level plan development. For the Draft 60% Submittal, the CONSULTANT shall provide the COUNTY with twelve (12) sets of 11" x 17" size plans for review and distribution. The CONSULTANT shall incorporate comments received from the COUNTY into the Final 60% plans, reports and documents. Electronic (digital) files of the plans, reports and associated project documents will be submitted to the COUNTY on a compact disk (CD) or other media approved by the COUNTY. Drawings files shall be provided in a fully functional Microstation (.dgn) software format, and also plotted or scanned to an Adobe Acrobat (.pdt) format. Furnishing electronic copy of CADD drawings in format other than Bentley's MicroStation will be considered Additional Services. Proiect Coordination & Technical Meetinas Includes all trips required to obtain necessary data for all elements of the project identified in this scope of work.: Includes meetings with the COUNTY and/or Agency staff, between disciplines and SUBCONSUL TANTS, such as local governments, progress review meetings (phase review), and miscellaneous meetings. Quality Assurance/Quality Control The purpose of CONSULTANT plan reviews is to ensure that the CONSULTANT's plans follow the plan preparation procedures outlined in the FDOT Plans Preparation Manual, that state and federal design criteria are followed consistent with the COUNTY concept, and that the CONSULTANT submittals are complete. The CONSULTANT shall be responsible for the 3 168 8 EXHIBIT AI-A professional quality, technical accuracy and coordination of all surveys, designs, drawings, reports and other services furnished by the CONSULTANT under this contract. The CONSULTANT shall through all stages of design, without additional compensation, correct all errors or deficiencies in the designs, maps, drawings, reports and/or other services Public Involvement Public involvement is an important aspect of the project development process. Public involvement includes communicating to all interested persons, groups, and government organizations information regarding the development of the project. Property owners adjacent to project shall be kept informed about the project. One (1) Public Meeting will be held on this project, following incorporation of 60% review comments and per the direction of the COUNTY. Task 2 ROADWAY & UTILITIES Tvpical Section Design will provide for a four-lane urban roadway within the existing right of way wherever possible and providing bike lanes and sidewalks adjacent to the outside lane on both sides of the facility. The alignment for the four-lane roadway shall be established based upon the ultimate six-lane facility designed under the original agreement. In consideration for the City of Naples' 36" water main and the proximity of residences, the northern edge of pavement established for the six-lane facility will be held for the four-lane design, east of 4th Street. This will result in the southern edge of pavement proposed for the six-lane facility to move 22 ft. north and the proposed right-of-way width reduced accordingly through out the project limits. Horizontal & Vertical Master Desiqn Files Includes all work required to develop base design files including overall Plan, Profile, Drainage, Utility, Right of Way, and master Traffic Control files. · Limits: Golden Gate Boulevard (CR 876), from immediately west of Wilson Boulevard to immediately east Desoto Boulevard, a distance of approximately 6.0 miles. Within these limits, Golden Gate Boulevard will be designed to 60% Plans. 4 16B 8 EXHIBIT A I-A · Intersections: Improvements to the following intersections are included within this scope of services: · Golden Gate Boulevard and Wilson Boulevard, · Golden Gate Boulevard and Everglades Boulevard, and · Golden Gate Boulevard and Desoto Boulevard Cross Section Desian Files Includes all effort to establish roadway template and run the model to produce cross sections for Golden Gate Boulevard, Wilson Boulevard, Everglades Boulevard and Desoto Boulevard. Existing ground and proposed design sections will be modeled at a maximum of 100 ft. stations taken along the center line of construction. This information will be utilized to establish the limits of construction and proposed Right of Way for the project. Plan Sheets Prepare 60% level plan sheets for proposed improvements on Golden Gate Blvd, Wilson Blvd, Everglades Blvd, and Desoto Blvd thru the project limits. Generally this includes Key Sheet and General Notes, Plan/Profile views, Typical Sections, Drainage Structure sheets, Cross Sections at every 100 ft., Utility Adjustment sheets and miscellaneous Details. Task includes all work to establish and set up sheets, labeling and incorporation of information into the plans. The anticipated plans for the 60% Phase level shall be consistent with Table 2 - Anticipated Plan Sheets contained in Schedule A of the original Agreement, and as shown above in Section I DESCRIPTION. Utilitv Coordination The CONSULTANT shall schedule (time and place), notify participants, and conduct two (2) utility meetings with all affected UAO(s) for the purpose of presenting the project, review the current design schedule, evaluate the utility information collected, provide follow-up information on compensable interest requests, and discuss any future design issues that may impact utilities. This is also an opportunity for the UAO(s) to present proposed facilities. At a minimum of three (3) weeks prior to the meeting(s), the CONSULTANT shall transmit two (2) complete 5 168 8 EXHIBIT AI-A sets of project plans to each UAO having facilities located within the project limits, and one set to the COUNTY Offices as required by the COUNTY. The CONSULTANT shall schedule (time and place), notify participants, and conduct the Utility meeting with all affected UAO(s). The CONSULTANT shall be prepared to discuss drainage, traffic signalization, maintenance of traffic (construction phasing), review the current design schedule and letting date, evaluate the utility information collected, provide follow-up information on compensable interest requests. The CONSULTANT shall keep accurate minutes of all meetings and distribute a copy to all attendees. Utilitv Desian (Collier County 30" raw water) Prepare 60% plans for relocation of the Collier County raw water main (30") on Wilson Blvd. through the proposed construction limits in consideration for other utilities and right-of-way limitations. The intent of the relocation is to move the raw water main from under the proposed roadway pavement. Preparing a relocation plan for other COUNTY utilities, such as potable water, sanitary sewer, storm sewer, reclaimed water, etc. is not anticipated or included in this scope of services and will be considered Additional Services. Task 3 SIGNALIZATION ANALYSIS & PLANS This Scope of Services includes the design for three (3) signalized intersections: 1. Wilson Boulevard and Golden Gate Boulevard 2. Everglades Boulevard and Golden Gate Boulevard 3. Desoto Boulevard and Golden Gate Boulevard (a new signal will be designed) All signals will be designed as mast arm systems. The CONSULTANT shall provide 60% signalization plans to include mast arm tabulation, assemblies and sign layout for each signalized intersection. No Signal Warrants have been included in this Scope of Services to evaluate the need for additional signalization. Signal Warrants and Signal Designs (in addition to those mentioned above) will be considered Additional Services. Signal specifications and control cabinet details shall not be included in this Scope of Services. 6 168 8 EXHIBIT A I-A Task 4) SIGNING & MARKING PLANS PRELIMINARY LAYOUT & CONCEPTUAL PLANS CONSULTANT shall develop pavement marking plans suitable to adequately depict the laneage and turning lanes at intersections throughout the project limits. This information will be incorporated into the graphical exhibits prepared for the Public Involvement Meeting. Final 60% plans submittal shall include conceptual plans component for the roadway signing & marking design. The anticipated scale of the plan sheets is 1" = 60 ft. Quantities for signing & marking shall not be indicated or tabulated in the plans. Task 5 STRUCTURES Bridoe Development Report The Consultant shall provide letter addendum to the original Bridge Development Report (BDR) prepared under the original agreement for the six-lane roadway. The BDR addendum shall only address changes that will be necessary when converting from a six-lane bridge to a four-lane bridge. No alternative analysis will be prepared. Medium Span Concrete Bridoes The design of three (3) medium span concrete bridges is anticipated as part of this scope of services. For each bridge the typical section, location, length, and other pertinent information to describing the proposed bridge work is included. The CONSULTANT shall prepare plans for the Medium Span Concrete Bridges consistent with the level of detail previously submitted at 60% Phase under the original contract. Reinforcing Bars will not be detailed at 60%, however The CONSULTANT shall provide Design Documentation to the COUNTY with each submittal consisting of structural design calculations and other supporting documentation developed during the development of the plans. The design calculations submitted shall adequately address the complete design of all structural elements. These calculations shall be neatly and logically presented on 8W'x11" paper (where possible) and all sheets shall be numbered. All computer programs and parameters used in the design calculations shall include sufficient 7 l6B 8 EXHIBIT A I-A backup information to facilitate the review task. The design of the three (3) medium span concrete bridges shall utilize the existing AASHTO beam design developed under the original agreement for a six lane facility. Beam spacing shall be based on current spacing developed under the original contract or as best determined to minimize overhang dimensions. The following design assumptions are noted below: A. Slab design will not require change. Overhang lengths will increase, but will be less than 6' maximum from SDG 4.2.4B. Overhang at water main will require additional reinforcement, but is not included in this estimate. B. AASHTO beams will be shifted laterally to produce overhangs of equal length. The beam spacing will not be changed, but the composite dead load will be distributed to fewer beams. The existing beam designs will be checked for the increased dead loads. Note that SDG 2.8 now distributes barrier and railing loads in accordance with LRFD 4.6.2.2. c. End bents and intermediate bents will be shortened by 22' and some piles removed. If possible, the piles will not be modified and the resulting overhang on the south side will be used. However, at the Golden Gate intermediate bents and the Miller end bents a pile is currently located 22' from the south end. The pile spacing and STAAD model will need to be revised at these locations. D. The lateral forces applied to the bents will change due to the narrower bridge and fewer beams. The STAAD models will be revised to reflect these forces and the lateral shift of the beams. STAAD models will be rerun to verify the adequacy of the piles. No revisions will be made unless deemed necessary. E. The capacity of the cap with the existing reinforcement will be checked against the forces reported by the revised STAAD runs. No revisions will be made unless deemed necessary. The design of miscellaneous structure services, i.e., culvert extensions, foundations, mast arms, etc., is anticipated as part of this Scope of Services. Any miscellaneous structure longer than 20 ft required for this project will be considered Additional Services. The design of new box culvert(s) is not anticipated as part of this Scope of Services and will be considered Additional Services. 8 16B 8 EXHIBIT AI-A Task 6 DRAINAGE PLANS & PERMITS Stormwater ManaQement Facilities Task involves all plans preparation effort required to incorporate stormwater management design into 60% plan sheets. This includes plans and details for roadway conveyance ditches, offsite ponds, outfalls and roadway storm drainage system as determined with subconsultant GEl (see Section III SUBCONSUL TANT SERVICES). Permits The CONSULTANT and SUBCONSUL TANTS (GEl and SCHEDA see Section III SUBCONSUL TANT SERVICES) will: · Identify all needed permits. · Obtain COUNTY approval on decisions regarding, or modifications to, permits. · Obtain COUNTY review prior to submittal of applications and designs to the permitting agency. · The SUBCONSUL TANTS will be responsible for performing all required environmental assessments and surveys. Phase II Surveys (Environmental) and Specific Species (T&E) Surveys, if required, will be considered Additional Services. · Obtain all necessary permits including, but not limited to Environmental Resource Permit (ERP) from the South Florida Water Management District and the Army Corps of Engineers. A COUNTY representative will be present at all meetings with regulatory agencies. In addition to permit coordination, this task includes signing and sealing permitting documents required for agency approval, preparing dredge and fill sketches for wetland impact exhibits, and attendance at technical meetings. Task 7 NOISE ANALYSIS & REPORT The CONSULTANT will revise the previously submitted Noise Study Report utilizing updated projected traffic data provided by the COUNTY and reflecting the revised corridor width for the four-lane roadway. The updates to the report will be made via letter addendum to the original report. 9 Task 1 Task 2 Task 3 168 8 EXHIBIT AI-A III SUBCONSUL TANT SERVICES RIGHT OF WAY MAPPING Revise Sketch and Description - Lane Re-design (225) 1.1 Prepare 225 revised sketch and legal descriptions for the re-design from six to four lanes. Revise ROW Map - Lane Re-desion 2.1 Prepare revised right-of-way map for the re-design from six to four lanes. ENVIRONMENTAL PERMITTING & DRAINAGE Scheduled Public Meetinos and Presentations GEl will attend scheduled meetings with the general public and county officials to clarify and define development goals and requirements for the Project. This includes communicating with interested persons, groups and government organizations as required. At this time, no public meetings are planned for this project. If required, meetings will be provided on an hourly basis, plus reimbursable expenses. Meetinos with Reoulatorv Aoencies GEl, together with other members of the ERP permitting Team will attend a number of meetings with agencies, including the Lower West Coast Service Center of the South Florida Water Management District, The Big Cypress Basin Naples office and the US Army Corp of Engineers in Fort Myers. The meetings included in this budget will be part of the permitting process with regulatory agencies and allow an informal exchange and input into the ongoing design and permitting process. At this time, two (2) meetings are anticipated. Proiect Team Meetinos As part of the project design team, GEl will attend meetings to coordinate permitting strategies and resolve design issues as they arise during the process. ENVIRONMENTAL ASSESSMENT Update Environmental Permits Scheda will update the Environmental Resource Permit document originally prepared for the 6-lane roadway design to accommodate the new 4-lane roadway design. Review Dredoe and Fill Sketches Scheda will review draft wetland impact exhibits to ensure they accurately depict jurisdictional wetland boundaries and impact areas. If revisions are necessary, Scheda will provide markups and written comments. 10 16B 8 EXHIBIT A I-A Technical MeetinQs Scheda will prepare for and attend a maximum of four technical meetings. These meetings may include regulatory agency meetings, progress meetings, public information meetings, or meetings with Collier County staff or other agencies. Request for Additional Information Scheda will provide answers to the environmental questions for two RAls. MitiQation Requirements for Protected Species Scheda will provide a technical memorandum discussing the impacts to protected wildlife associated with the new 4-lane proposed roadway design. This will include mitigation options available to Collier County for species such as the Florida panther (Puma concolor coryl) and wood stork (Mycteria Americana). IV SERVICES PROVIDED BY COUNTY For this SUPPLEMENTAL AGREEMENT NO.1 between the Collier County Government (COUNTY) and Stanley Consultants, Inc. (CONSULTANT) the terms and conditions of the original Agreement regarding Services Provided by County shall remain in full force and effect. 11 168 8 SCHEDULE B SUPPLEMENTAL AGREEMENT NO.1 BASIS OF COMPENSATION DIRECT LABOR COSTS PLUS REIMBURSABLE EXPENSES 1. MONTHLY STATUS REPORTS 8.1.1 As a condition precedent to payment, CONSULTANT shall submit to OWNER as part of its monthly invoice, a progress report reflecting the current status, in terms of the total work effort estimated to be required for the completion of SUPPLEMENTAL AGREEMENT NO. 1 and any then-authorized Additional Services, as of the last day of the subject monthly billing cycle. Among other things, the report shall show all Service items and the percentage complete of each item. 81.1.1 All monthly status reports and invoices shall be mailed to the attention of Kevin Dugan, Project Manager, Collier County Government, Transportation Division, 2885 Horseshoe Drive South, Naples, 34104. 2. COMPENSATION TO CONSULTANT 8.2.1. For the 8asic Services provided for in this Supplemental Agreement, OWNER agrees to make monthly payments to CONSULTANT based upon CONSULTANT'S Direct Labor Costs and Reimbursable Expenses in accordance with the terms stated below. Provided, however, in no event shall such compensation exceed the amounts set forth in the table below. NOT TO ITEM DESCRIPTION EXCEED AMOUNT: Task 1 - 60% Draft and Final Submittal $ 536,213 Monthly based 7 upon percent complete Reimbursables $37,089 Monthly based on time and material Total Fee $ 573,302 8.2.2. Direct Labor Costs mean the actual salaries and wages (basic, premium and incentive) paid to CONSULTANT'S personnel, with respect to this Supplemental Agreement, including all indirect payroll related costs and fringe benefits, all in accordance with and not in excess of the rates set forth in the Attachment 8 to this Schedule 8. 8.2.3. With each monthly Application for Payment, CONSULTANT shall submit detailed time records, and any other documentation reasonably required by OWNER, regarding CONSULTANT'S Direct Labor Costs incurred at the time of billing, to be reviewed and approved by OWNER. 8.2.4 For Additional Services provided pursuant to Article 2 of the Agreement, OWNER agrees to pay CONSULTANT a negotiated total fee and Reimbursable Expenses based on the services to be provided in compliance with the provisions of Section 3.5.1 below. There B-1 168 8 EXHIBIT A I-A shall be no overtime pay on Basic Services or Additional Services without OWNER'S prior written approval. B.2.5. The compensation provided for under Sections 2.1 of this Schedule B, shall be the total and complete amount payable to CONSULTANT for the Basic Services to be performed under the provisions of this Agreement, and shall include the cost of all materials, equipment, supplies and out-of-pocket expenses incurred in the performance of all such services. B.2.6 Notwithstanding anything in this Agreement to the contrary, CONSULTANT acknowledges and agrees that in the event of a dispute concerning payments for Services performed under this Agreement, CONSULTANT shall continue to perform the Services required of it under this Agreement, as directed by OWNER, pending resolution of the dispute provided that OWNER continues to pay to CONSULTANT all amounts that OWNER does not dispute are due and payable. 3. SCHEDULE OF PAYMENTS 8.3.1. CONSULTANT shall submit, with each of the monthly status reports provided for under Section 1.1 of this Schedule B, an invoice for fees earned in the performance services during the subject billing month. Notwithstanding anything herein to the contrary, the CONSULTANT shall submit no more than one invoice per month for all fees and Reimbursable Expenses earned that month for both Basic Services under this SUPPLEMENTAL AGREEMENT NO. 1 and any agreed upon Additional Services. Invoices shall be reasonably substantiated, identify the services rendered and must be submitted in triplicate in a form and manner required by Owner. Additionally, the number of the purchase order granting approval for such services shall appear on all invoices. B.3.2. Invoices not properly prepared (mathematical errors, billing not reflecting actual work done, no signature, etc.) shall be returned to CONSULTANT for correction. Invoices shall be submitted on CONSULTANT'S letterhead and must include the Purchase Order Number and the Project name and shall not be submitted more than one time monthly. B.3.3 Notwithstanding anything herein to the contrary, in no event may CONSULTANT'S monthly billings, on a cumulative basis, exceed the sum determined by multiplying the applicable not to exceed task limits set forth in the table in Section 2.1 by the percentage Owner has determined CONSULTANT has completed such task as of that particular monthly billing. B.3.4 Payments for Additional Services of CONSULTANT as defined in Article 2 hereinabove and for reimbursable expenses will be made monthly upon presentation of a detailed invoice with supporting documentation. B.3.5 Unless specific rates have been established in Attachment B, attached to this Schedule B, CONSULTANT agrees that, with respect to any subconsultant or subcontractor to be utilized by CONSULTANT for Additional Services, CONSULTANT shall be limited to a maximum markup of 10% on the fees and expenses associated with such subconsultants and subcontractors. B.3.5.1 Reimbursable Expenses associated with Additional Services must comply with section 112.061, Fla. Stat., or as set forth in the Agreement, be charged B-2 168 8 EXHIBIT A I-A without mark-up by the CONSULTANT, and shall consist only of the following items: 8.3.5.1.1. Cost for reproducing documents that exceed the number of documents described in this Agreement and postage and handling of Drawings and Specifications. 8.3.5.1.2. Travel expenses reasonably and necessarily incurred with respect to Project related trips, to the extent such trips are approved by OWNER. Such expenses, if approved by OWNER, may include coach airfare, standard accommodations and meals, all in accordance with section 112.061, F.S. Further, such expenses, if approved by OWNER, may include mileage for trips that are from/to destinations outside of Collier or Lee Counties. Such trips within Collier and Lee Counties are expressly excluded. 8.3.5.1.3. Permit Fees required by the Project. 8.3.5.1.4 Expense of overtime work requiring higher than regular rates approved in advance and in writing by OWNER. 8.3.5.1.5 Expense of models for the COUNTY's use. 8.3.5.1.6 Other items on request and approved in writing by the OWNER. 8.3.5.2 Should a conflict exist between the dollar amounts set forth in Section 112.061, F.S., and the Agreement, the terms of the Agreement shall prevail. B-3 SCHEDULE B SUPPLEMENTAL AGREEMENT NO.1 ATTACHMENT A SUMMARY OF FEE ESTIMATE IbH~ITAl-6 $ 37,089 $ 573,302 B-4 16>8 8 EXHIBIT AI-A SCHEDULE B SUPPLEMENTAL AGREEMENT NO.1 ATTACHMENT B EMPLOYEE HOURLY RATE SCHEDULE (PRIME CONSULTANT) Project Principal/Principal Engineer $198.00 Project Manager $148.00 Senior Engineer $148.00 Engineer $111.00 Chief Engineer $1 71 .00 Senior Designer $129.00 Graphics Technician $103.00 Administrative Assistant $54.00 END OF SCHEDULE B B-5 ~GJj ~ EXHIBIT AJ-A SCHEDULE C PROJECT MILESTONE SCHEDULE Schedule is based on the number of calendar days from issuance of Notice to Proceed. 1. TASK I - DRAFT 60% SUBMITTAL 120 Days 2. TASK II - FINAL 60% SUBMITTAL 240 Days C-1