Backup Documents 12/01/2009 Item #16G3
1663"
MEMORANDUM
Date:
January 20, 2010
To:
Sue Trone, Operations Analyst
Bayshore Gateway CRA
4069 Bayshore Drive
Naples, Florida 34112
From:
Teresa Polaski, Deputy Clerk
Minutes & Records Department
Re:
Brownfield Site Rehabilitation Agreement
Attached is one (1) original document referenced above,
(Agenda Item #16G3) approved by the Board of County Commissioners on
December 1, 2009.
The Minutes & Records Department has kept one of the originals as part of
the Board's Official Records.
If you should have any questions, please contact me at 252-8411.
Thank you.
"*-/0(;,3
BAY S H 0 R E /2/'!1?:>
GATEW/\Y16G'::!
TRIANGLE ,;)
COMMUNITY REDEVELOPMENT AGENCY
Memorandum
To:
CC:
Date:
Re: Request attestatio of Brownfield Site Rehabilitation Agreement
Two copies of the Brownfield Site Rehabilitation Agreement (BSRA) executed
between the Collier County CRA (Bayshore Gateway Triangle office) and the Florida
Department of Environmental Protection (FDEP) are attached. One copy is the
original (it is one-sided with original signatures from DEP [Collier County signatures
are color copies-that is all we have available])-please attest this and keep for your
records. The other copy is stapled and double-sided-please attest this and return to
me for my records.
If you have any questions do not hesitate to call me.
We always appreciate ~ur help-
1
1663
BEFORE THE STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
IN RE: Collier County Community Redevelopment Agency
Hubert's Welding and Repair
4315 Bayshore Drive, Naples, FL 34112
Bayshore Cultural Arts Catalytic Facility for Redevelopment
Brownfield Area Identification Number: BF110901000
Brownfield Site Identification Number: BF110901001
OGC Tracking Number - 09-4088
BROWNFIELD SITE REHABILITATION AGREEMENT PURSUANT TO 3376.80(5),
Florida Statutes (F.S.)
WHEREAS, the Brownfields Redevelopment Act was enacted to reduce public
health and environmental hazards on existing commercial and industrial sites by offering
incentives to encourage responsible persons to voluntarily develop and implement
cleanup plans; and
WHEREAS, the Department of Environmental Protection ("Department") is the
administrative agency of the State of Florida having the power and duty to protect
Florida's environment and to administer and enforce the provisions of Chapters 403 and
376, F.S., and the rules promulgated thereunder, Chapters 62-777 and 62-785, Florida
Administrative Code (FAC.), as amended; and
WHEREAS, the Department has jurisdiction over the matters addressed in this
Brownfield Site Rehabilitation Agreement ("BSRA"); and
WHEREAS, the Department has the authority, pursuant to 3376.81, F.S., to
establish by rule, criteria for determining the rehabilitation program tasks that comprise a
site rehabilitation program and the level at which a rehabilitation program task and a site
rehabilitation program may be deemed complete;
NOW, THEREFORE, in consideration of the mutual covenants and agreements
hereinafter contained, it is agreed as follows:
This BSRA is entered into between the Department and the Collier County
Community Redevelopment Agency, hereinafter the Person Responsible For Brownfield
Site Rehabilitation ("PRFBSR") (collectively referred to as the "parties"), for the
rehabilitation of a brownfield site within a designated brownfield area pursuant to
3376.80(5), F.S. The Department and the PRFBSR agree to the following:
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF11 0901 001
16GJ ..
1. DEPARTMENT OF ENVIRONMENTAL PROTECTION
The Department is the agency of the State of Florida with authority and power to
enforce the provisions of Chapters 376 and 403, F.S.
2. PERSON RESPONSIBLE FOR BROWNFIELD SITE REHABILITATION
The Collier County Community Redevelopment Agency is the PRFBSR as defined
in 3376.79(13), F.S., for the real property described in the map and legal
description in Attachment A (the "Brownfield Site"), incorporated herein, that has
been designated by Collier County in Resolution Number 09-273 on November 10,
2009 as a brownfield area as defined in 3376.79(4), F.S. Attachment A is a
composite exhibit that includes: (a) the legal description and map of the Brownfield
Site; and (b) the county resolution with all attachments including the map of the
designated brownfield area. The brownfield site consists of 0.623176 acres.
3. PRFBSR'S DUTIES
The PRFBSR agrees:
(a) to conduct "site rehabilitation" of any "contaminated site(s)" as defined in
3376.79, F.S., whose source originates on the real property described in
Attachment A as the Brownfield site. If such contaminated site(s)
extend(s) beyond the boundary of the Brownfield site, then PRFBSR agrees
to conduct site rehabilitation to address the entire contaminated site;
(b) to conduct site rehabilitation and submit technical reports and rehabilitation
plans in a timely manner according to the attached brownfield site
rehabilitation schedule agreed upon by the parties (see Attachment B),
and incorporated herein;
(c) to conduct site rehabilitation activities under the observation of professional
engineers or professional geologists, as applicable, who are registered in
accordance with the requirements of Chapters 471 or 492, F.S.,
respectively. Submittals provided by the PRFBSR must be signed and
sealed by a professional engineer registered under Chapter 471, F.S., or by
a professional geologist registered under Chapter 492, F.S., as applicable,
certifying that the submittal and associated work comply with the laws and
. rules of the Department and those governing the profession. Upon
completion of the approved remedial action, a professional engineer
registered under Chapter 471, F.S., or a professional geologist registered
under Chapter 492, F.S., as applicable, must certify that the corrective
action was, to the best of his or her knowledge, completed in substantial
Page 2 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
16G3
conformance with the plans and specifications approved by the
Department;
(d) to conduct site rehabilitation in accordance with Chapter 62-160, FAC., as
the same may be amended from time to time;
(e) to obtain any local, state or federal approvals or permits required for the site
rehabilitation work and to conduct the necessary site rehabilitation
consistent with local, state, and federal laws, rules and ordinances. All site
rehabilitation shall be consistent with the cleanup criteria in 3376.81, F .S.,
the requirements of Chapters 62-785, FAC., Brownfields Cleanup Criteria,
and 62-777, FAC., Contaminant Cleanup Target Levels;
(f) to allow access by the Department during the entire site rehabilitation
process, as evidenced by the attached documentation (see Attachment C)
incorporated herein, establishing that such site access has been secured by
agreement with the real property owner. Upon the transfer of any real
property interest in any portion of the Brownfield Site before site
rehabilitation is complete, the PRFBSR shall notify the Department within
15 days from the date that such an interest is effective. With notice the
PRFBSR shall provide a copy of an access agreement in substantially the
same form as that in Attachment C with any successor in interest to the
real property owner of the Brownfield Site or with any party with a real
property interest in the Brownfield Site after the effective date of this
agreement, granting such access to the Department; and
(g) to consider appropriate pollution prevention measures and to implement
those that the PRFBSR determines are reasonable and cost-effective,
taking into account the ultimate use or uses of the real property described in
Attachment A.
4. CERTIFICATION
The PRFBSR certifies that he/she has consulted with the local government with
jurisdiction over the brownfield area about the proposed redevelopment of the
brownfield site, that the local government is in agreement with or approves the
proposed redevelopment, and that the proposed redevelopment complies with
applicable laws and requirements for such redevelopment. Documentation that
supports this certification is provided as Attachment D.
5. SITE CONTRACTOR
The PRFBSR must ensure that the contractor who is performing the majority of the
site rehabilitation program tasks pursuant to this BSRA or supervising the
Page 3 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
11 ,,l"
lbG3
performance of such tasks by licensed subcontractors in accordance with the
provisions of 3489.113(9), F.S., has provided certification to the Department that
the contractor meets the requirements listed below. If the identity of the contractor
is known at the time of the execution of this BSRA; a Brownfields Redevelopment
Program Contractor Certification Form (CCF) shall be submitted as Attachment E
to this BSRA. If the contractor has not yet been determined, the PRFBSR shall
ensure that the CCF is submitted to the District Brownfield Coordinator and
approved by the Department before the contractor begins performing any site
rehabilitation tasks at the site.
The PRFBSR must submit to the Department documentation as Attachment F,
which shows a National Environmental Laboratory Accreditation Program
("NELAP")-recognized authority has accredited the laboratory(s) that will perform
the analyses required by this agreement.
Any contractor that performs site rehabilitation tasks at a contaminated site
originating on the real property as described in Attachment A shall provide
documentation in accordance with the provisions of the paragraph above and with
Attachments E and F, if applicable, showing that any contractor that performs site
rehabilitation tasks:
(a) meets all certification and license requirements imposed by law; and
(b) performs, or has laboratory analyses performed, pursuant to NELAP
certification requirements and performs, or has field sampling work
performed, in accordance with the Standard Operating Procedures
provided in Chapter 62-160, FAC., as amended, if applicable to
performance of site rehabilitation tasks.
6. CONTINUOUS COMPLIANCE
During the entire site rehabilitation process, the PRFBSR agrees to ensure that
the contractor continues to comply with the requirements of Paragraph 5 of this
BSRA pursuant to the requirements of 3376.80(6), F.S.
7. VOLUNTARY CLEANUP TAX CREDIT PROGRAM
Not all activities that are approved or performed in association with a BSRA are
eligible for the state's Voluntary Cleanup Tax Credit (VCTC). In accordance with
Chapter 62-788, FAC., only costs incurred and paid that are either integral,
necessary and required for site rehabilitation or for solid waste removal, are
eligible for the VCTC. "Site rehabilitation" means the assessment of site
contamination and the remediation activities that reduce the levels of
contaminants at a site through accepted treatment methods to meet the cleanup
target levels established for that site. For purposes of sites subject to the
Page 4 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
16G3
Resource Conservation and Recovery Act, as amended, the term includes
removal, decontamination, and corrective action of releases of hazardous
substances. "Solid waste removal" means removal of solid waste from the land
surface or excavation of solid waste from below the land surface and removal of
the solid waste from the brownfield site. Nothing contained herein is intended to
limit the VCTC otherwise available to the PRFBSR under applicable law. General
information about the VCTC Program is available at
http://www.dep.state.fl.ustwaste/categories/vctc/default.htm . For specific
questions regarding the VCTC Program, please contact the Department's Bureau
of Waste Cleanup at (850) 245-8927.
8. ADVISORY COMMITTEE
The PRFBSR shall establish an advisory committee pursuant to the requirements
of 3376.80(4), F.S., for the purpose of improving public participation and receiving
public comments on rehabilitation and redevelopment of the brownfield area,
future land use, local employment opportunities, community safety, and
environmental justice. The advisory committee should include residents within or
adjacent to the brownfield area, businesses operating within the brownfield area,
and others deemed appropriate. However, if an appropriate local advisory
committee already exists, this committee may be used for requesting public
participation and for the purposes of complying with this paragraph.
The PRFBSR shall provide the advisory committee a copy of the final proposed
draft BSRA and a copy of the executed BSRA. When the PRFBSR submits a site
assessment report or the technical document containing the proposed course of
action following site assessment to the Department or the local pollution control
program for review, the PRFBSR shall hold a meeting or attend a regularly
scheduled meeting to inform the advisory committee of the findings and
recommendations in the site assessment report or the technical document
containing the proposed course of action following site assessment.
The names, addresses, and contact numbers for all advisory committee members
are included as Attachment G.
9. INDEMNIFICATION
The PRFBSR shall save and hold harmless and indemnify the Department against
any and all liability, claims, judgments or costs of whatsoever kind and nature for
injury to, or death of any person or persons and for the loss or damage to any
property resulting from the use, service, operation or performance of work under
the terms of this BSRA and from the negligent acts or omissions of the PRFBSR
or its employees, agents, contractors, subcontractors, or other representatives, to
the extent allowed by law.
Page 5 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
16G3
10. LIABILITY PROTECTION
The liability protection provided under 3376.82, F.S., shall become effective upon
execution of this BSRA and shall remain effective, provided the PRFBSR complies
with the terms of this BSRA.
11. TERMINATION
If the PRFBSR fails to comply with this BSRA, the Department shall notify the
PRFBSR and allow 90 days for the PRFBSR to return to compliance with the
provision at issue or to negotiate a modification to the BSRA with the Department
for good cause shown. If an imminent hazard exists the 90-day grace period shall
not apply. If the project is not returned to compliance with this BSRA and a
modification cannot be negotiated, the Department shall terminate this BSRA.
The PRFBSR may terminate this BSRA at any time upon written notice to the
Department.
Termination of this BSRA by either party will revoke the immunity provision of
3376.82, F.S.
12. IMMINENT HAZARD
Nothing herein shall be construed to limit the authority of the Department to
undertake any action in response to, or to recover the costs of responding to,
conditions at or from the real property described in Attachment A that require the
Department to take action to abate an imminent hazard to the public health,
welfare or the environment.
13. RELEASE OF LIABILITY
Upon successful completion of this BSRA as evidenced by the issuance of a Site
Rehabilitation Completion Order (SRCO) for each contaminated site originating
from the real property described in Attachment A, the PRFBSR and his or her
successors and assigns, shall be relieved from further liability for site rehabilitation
as described in paragraph 3.a. of this BSRA to the Department and third parties
and of liability in contribution to any other party who has or may incur cleanup
liability for the contaminated site(s).
This release of liability is subject to the reopener provisions of 3376.82(3), F.S.
Page 6 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site ID # BF110901001
1663
14. GOVERNING LAW
This BSRA has been delivered in the State of Florida and shall be construed in
accordance with the laws of Florida and any applicable local regulations.
Wherever possible, each provision of this BSRA shall be interpreted in such
manner as to be effective and valid under applicable law. If any provision of this
BSRA shall be prohibited or invalid under applicable law, such provision shall be
ineffective to the extent of such prohibition or invalidity, without invalidating the
remainder of such provision or the remaining provisions of this BSRA. Any action
hereon or in connection herewith shall be brought in Collier County, Florida.
15. SUBMITTALS
The PRFBSR shall. submit two hard (paper) copies or one hard copy and one
electronic (digital) copy of any certifications or documentation required in
Paragraph 5 ("Site Contractor") above, and all data, reports, responses, addenda,
or modifications to reports and plans required by this BSRA to:
Mel Reinhart, Brownfield Coordinator
Florida Department of Environmental Protection
P.O. Box 2549
Ft. Myers, FL 33902.
The Department encourages the submittal of documents for review in an electronic
format rather than the submittal of paper copies. All electronic copies of
documents shall be in the format listed in Section 8 of the Instructions and
attached as Attachment H. Time frames for the Department's review of technical
reports and plans and submittal of documents by the PRFBSR shall be governed
by the attached schedule (see Attachment B), incorporated herein. After final
Department approval of each report or plan, an electronic copy shall be submitted
to the Department within 30 days. The electronic copy of the report shall be
submitted on Compact Disc (CD) for archiving purposes in the format listed in
Attachment H.
16. DOCUMENT REVIEW
During the site rehabilitation process, if the Department fails to complete the
review of a technical document within the time frame specified in this BSRA, with
the exceptions of "no further action proposals," "monitoring only proposals," and
feasibility studies, which must be approved prior to implementation, the PRFBSR
may proceed to the next site rehabilitation task. However, the PRFBSR does so at
its own risk and may be required by the Department to complete additional work
on a previous task.
Page 7 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
16G3
17. ASSIGNMENT
The PRFBSR shall not assign any rights or responsibilities under this BSRA to any
other party without the written consent of the Department and the local
government with jurisdiction over the real property described in Attachment A.
However, the Department shall not withhold its consent to such an assignment if:
(a) the proposed assignee meets all of the eligibility criteria under 3376.82, F.S.;
(b) the proposed assignee has agreed, in writing, to assume all obligations of the
PRFBSR under the terms of this Agreement; and (c) the assignment of PRFBSR
obligations under any agreement with the local government with jurisdiction over
the real property has been approved, in writing, by the local government.
18. WAIVER
By entering into this BSRA, the PRFBSR waives its right to challenge the contents
of this BSRA in an administrative hearing afforded by 3120.569 and 3120.57, F.S.,
or an appeal afforded by the terms of 3120.68, F.S. This BSRA does not deny the
PRFBSR a right to challenge the Department's actions taken pursuant to this
BSRA. No delay or failure to exercise any right, power or remedy accruing to
either party upon breach or default by either party under this BSRA, shall impair
any such right, power or remedy of either party; nor shall such delay or failure be
construed as a waiver of any such breach or default, or any similar breach or
default thereafter.
19. EFFECTIVE DATE AND ADMINISTRATIVE HEARING
This BSRA (Order) is final and effective on the date of execution unless a timely
petition for an administrative hearing is filed under 33120.569 and 120.57, F.S.,
within 21 days after the date of receipt of notice of agency action. Upon the
timely filing of such petition, this BSRA will not be effective until further order of the
Department. The liability protection for the PRFBSR pursuant to 3376.82(2), F.S.,
becomes effective upon execution of the brownfield site rehabilitation agreement.
The procedures for petitioning a hearing are set forth below.
Persons other than the PRFBSR who are affected by this BSRA have the following
options:
(a) If you choose to accept the Department's decision regarding this BSRA,
you do not have to do anything. This BSRA is final and effective 21 days
after the date of execution.
(b) If you choose to challenge the Department's decision, you may do the
following:
Page 8 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF11 0901 001
16G3
(i) File a request for an extension of time to file a petition for hearing
with the Agency Clerk of the Department in the Office of the
General Counsel at 3900 Commonwealth Boulevard, Mail Station
35, Tallahassee, Florida 3.2399-3000 within 21 days of receipt of
this BSRA; such a request should be made if you wish to meet
with the Department in an attempt to informally resolve any
disputes without first filing a petition for hearing.
Or
(ii) File a petition for administrative hearing with the Agency Clerk of
the Department in the Office of the General Counsel at 3900
Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida
32399-3000 within 21 days of receipt of this BSRA.
Please be advised that mediation of this decision pursuant to 3120.573, F.S., is
not available.
How to Request an Extension of Time to File a Petition for Hearino:
For good cause shown, pursuant to Rule 62-110.106(4), FAC., the
Department may grant a request for an extension of time to file a petition for
hearing. Such a request shall be filed with (received by) the Agency Clerk
of the Department in the Office of the General Counsel at 3900
Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-
3000, within 21 days of receipt of this BSRA. Petitioner shall mail a copy of
the request to the PI3FBSR at the time of filing. Timely filing a request for
an extension of time tolls the time period within which a petition for
administrative hearing must be made.
How to File a Petition for Administrative Hearinq:
A person whose substantial interests are affected by this BSRA may
petition for an administrative proceeding (hearing) under 33120.569 and
120.57, F.S. The petition must contain the information set forth below and
must be filed with (received by) the Agency Clerk of the Department in the
Office of the General Counsel at 3900 Commonwealth Boulevard, Mail
Station 35, Tallahassee, Florida 32399-3000, within 21 days of receipt of
this BSRA. Petitioner shall mail a copy of the petition to the PRFBSR at the
time of filing. Failure to file a petition within this time period shall constitute
a waiver of any right to request an administrative proceeding under Chapter
120, F.S.
Pursuant to 3120.569(2), F.S., and Rule 28-106.201, FAC., a petition for
administrative hearing shall contain the following information:
Page 9 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
1663
1. The name, address, and telephone number of each petitioner; the
name, address, and telephone number of the petitioner's representative,
if any; the PRFBSR's name and address; the Department's Brownfield
Area and Brownfield Site Identification Numbers; and the name and
address of the Brownfield Site; the name and address of each agency
affected;
2. A statement of when and how each petitioner received notice of the
Department's action or proposed action;
3. An explanation of how each petitioner's substantial interests are or will
be affected by the Department's action or proposed action;
4. A statement of the disputed issues of material facts, or a statement
that there are no disputed facts;
5. A concise statement of the ultimate facts alleged, including a
statement of the specific facts the petitioner contends warrant reversal or
modification of the Department's action or proposed action;
6. A statement of the specific rules or statutes the petitioner contends
require reversal or modification of the Department's action or proposed
action; and
7. A statement of the relief sought by the petitioner, stating precisely the
action petitioner wishes the Department to take with respect to the
Department's action or proposed action.
Because the administrative hearing process is designed to formulate final
agency action, the filing of a petition means that the Department's final
action may be different from the position taken by it in this BSRA. Persons
whose substantial interests will be affected by any such final decision of the
Department have the right to petition to become a party to the proceeding,
in accordance with the requirements set forth above.
20. JUDICIAL REVIEW
Except for the PRFBSR, any party has the right to seek judicial review of this
BSRA under 3120.68, F.S., by filing a notice of appeal under Rule 9.110 of the
Florida Rules of Appellate Procedure with the Agency Clerk of the Department in
the Office of the General Counsel at 3900 Commonwealth Boulevard, Mail Station
35, Tallahassee, Florida 32399-3000, and by filing a copy of the notice of appeal
accompanied by the applicable filing fees with the appropriate District Court of
Page 10 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
1663
Appeal. The notice of appeal must be filed within 30 days after this BSRA is filed
with the clerk of the Department (see below).
21. CONTACTS FOR GENERAL AND LEGAL QUESTIONS
Any questions about the content of this BSRA, the Department's review of the
BSRA, or technical questions should be directed to the Department's District
Brownfields Coordinator at:
Mel Reinhart, Brownfield Coordinator
Florida Department of Environmental Protection
P.O. Box 2549
Ft. Myers, FL 33902
(239) 332-6975 x 104
or to the PRFBSR's representative at:
Sue Trone, Project Manager
Bayshore Gateway Triangle CRA
4069 Bayshore Drive
Naples, Florida 34112
(239) 643-1115
Questions regarding legal issues should be referred to the Department's
Brownfields Program Attorney in the Office of General Counsel at (850) 245-2242.
Contact with any of the above does not constitute a petition for administrative
hearing or request for an extension of time to file a petition for administrative
hearing.
22. ENTIRETY OF AGREEMENT
This BSRA represents the entire agreement of the parties. Any alterations,
variations, changes, modifications or waivers of provisions of this BSRA shall only
be valid when they have been reduced to writing, duly signed by each of the
parties hereto, and attached to the original of this BSRA, unless otherwise
provided herein.
REMAINOER OF PAGE INTENTIONALLY LEFT BLANK
Page 11 of 13
11/21/08 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
16GJ
IN WITNESS WHEREOF, each of the parties has made and executed this
Brownfield Site Rehabilitation Agreement on the date set forth for each signature of each
representative below: Jon Inglehart, Director South District, State of Florida Department
of Environmental Protection, and Collier County Community Redevelopment Aaency,
the Person Responsible for Brownfield Site Rehabilitation, signing by and through Jim
Coletta, duly authorized to execute same.
PERSON RESPONSIBLE FOR
BROWNFIELO SITE REHABILITATION
STATE OF FLORIOA OEPARMENT OF
ENVIRONMENTAL PROTECTION
By:
.4~c
on Inglehart
Oirector South Oistrict OEP
(Jim Coletta, Chairman, Collier
County Community Redevelopment
Agency)
Date:
i7_!\l; /2.009
Date:
/2-/<;(-2.00'1
Approved as to form and legality:
3301 East Tamiami Trail, Naples,
Florida 34112
Rtv.G~
Stan M. Warden, FOEP Attorney
(239) 252-8097
(Telephone)
FILING AND ACKNOWLEDGMENT FilED, on this date,
pursuant to 9120.52 Florida Statutes, with the designated
Department Clerk, receipt of which is hereby acknowledged.
Date: 12.. 1(,,' 0 '\
Oate:
~ "p'i~
t E. Brock, Collier CounlY'GI~rrj, ~:, 'r",
'f:.~"'iS,'~' Ij ~:,.-~
\ l Lb I ~~lb'... ,. ,~-
',~': '. ~ " . "."t:" :~(:. .- ,:..-:
Attest II t()~,.'l~". .(,".>'
4191l8ture on ;'.' 'cJ' :CG':'c\'i.~'
Approved as to form and legal sufficiency:
lk.-- 7. uti-:-
(Steve Williams, Collier County
Assistant County Attorney)
cc: Stan M. Warden, FOEP Brownfields Program Attorney
Kim Walker, FOEP Brownfields Liaison
Mel Reinhart, FOEP
REMAINOER OF PAGE INTENTIONALLY LEFT BLANK
Page 12 of 13
11/21108 Revised BSRA Model
Collier County Community Redevelopment Agency
Brownfield Site Rehabilitation Agreement
Brownfield Site 10 # BF110901001
16G3
List of Attachments
Attachment A
Local Government Resolution for the Brownfield Area and Map and
Legal Description of the Brownfield Site
Attachment B
Brownfield Site Rehabilitation Schedule
Attachment C
Site Access Agreement
Attachment D
Certification of Redevelopment Agreement
Attachment E
Contractor Certification Form
Attachment F
Quality Assurance Certificate
Attachment G
Advisory Committee Members
Attachment H
Format for Submittal of Technical Documents
Page 13 of 13
11/21/08 Revised BSRA Model
SECTION 1: ATTACHMENT A - - LOCAL GOVERNMENT RESOLUTION FOR THE
BROWNFIELD AREA AND MAP AND LEGAL DESCRIPTION OF THE
BROWNFIELD SITE
6.1;3 '
;...t ..
16G3
RESOLUTION NO. 09- 2.-1-3
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA, DESIGNATING A BROWNFIELD
AREA WITHIN THE BAYSHORE GATEWAY TRIANGLE
COMMUNITY REDEVELOPMENT AGENCY (CRA) AREA; FINDING
THAT ALL PARCELS ARE OWNED BY THE CRA AND THAT THE
CRA INTENDS TO REDEVELOP THE SITE TO FACILITATE
ECONOMIC DEVELOPMENT AND ENVIRONMENTAL
REMEDIATION, IF NEEDED; DESIGNATING THE CRA LOCAL
ADVISORY BOARD AS THE BROWNFIELDS ADVISORY
COMMITTEE; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, Collier County Community Redevelopment Agency (CRA), owns 17.665 acres (more or
less) on Bayshore Drive, Naples, Florida (the "Property") the legal description of which is attached hereto as
Exhibit A and as depicted on Exhibit B, attached hereto, both of which are incorporated herein by the this
reference; and
WHEREAS, Collier County Community Redevelopment Agency, proposes to redevelop the property to
facilitate economic development and environmental remediation, if needed; and
WHEREAS, Collier County Community Redevelopment Agency, requests that the Collier County Board
of County Commissioners designate the Property a Brownfield Area as authorized under the Florida Brownfields
Redevelopment Act, Sections 376.77 - 376.85, Florida Statutes; and
WHEREAS, the CRA Board requests that the Bayshore Gateway Triangle Local Advisory Board serves
as the Brownfields Advisory Committee for any and all Brownfields Areas in the Bayshore Gateway Triangle
CRA,and
WHEREAS, the Brownfields Redevelopment Act authorizes this Board, by Resolution, to designate
contiguous areas consisting of one or more Brownfields sites as Brownfields Areas to facilitate enviromnental
remediation, if needed, and to facilitate economic development; and
WHEREAS, all of the designated Brownfield Area is within a Collier County designated Community
Redevelopment Area (Bayshore Gateway Triangle component); and
WHEREAS, the designated Brownfield Area contains portions of land that was nsed as a gasoline filling
station and has docnmented environmental contamination; and
WHEREAS, valnable economic incentives accrue to those who redevelop designated Brownfield sites;
WHEREAS, Collier Connty shall notify the Florida Department of Environmental Protection of the
designation of this Brownfield Area; and
WHEREAS, the procedures set fOrtil in Subsection 376.80(1), Florida Statutes, have been followed, and
proper notice has been provided in accord with Section 376.80 and Subsection 125.66 (4)(b)(2), Florida Statutes.
1663
NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA, that:
Section 1. Findings. The Commission, acting as the governing body of Collier County and the
Community Redevelopment Agency, finds the preanlble hereof to be true and correct.
Section 2. Designation. For the purposes of the Florida Brownfield Redevelopment Act, Sections
376.77 - 376.85, Florida Statutes, the Property attached hereto as Exhibit A and as depicted on Exhibit B, is
hereby designated a Brownfield Area. The area is within a Collier County Community Redevelopment Area is
hereby designated for enviromnental remediation, if needed, and for redevelopment purposes per Sections 376.77
through 376.85, Florida Statutes. This designation shall not render Collier County liable for costs of site
rehabilitation or source removal (as defined in Sections 376.77 through 376.84, Florida Statutes) nor for any other
costs above and beyond such costs otherwise attributable to Collier COlU1ty in its role as property owner of all of
the subject designated Brownfield Area.
Section 3. Advisory Committee. The Bayshore Gateway Triangle CRA Local Advisory Board shall
serve as the Brownfields Advisory Committee for any and all Brownfields Areas designated within the Bayshore
Gateway Triangle CRA boundary.
Section 4. Notification. The County Manager shall notifY the Florida Department of Environmental
Protection, pursuant to Section 376.80, Florida Statutes, of this Brownfield Area designation.
Section 5. Officers and employees of Collier County and Commnnity Redevelopment Agency are
hereby anthorized to do all things necessary and proper to carry out the intent and purposes of this Resolution.
Section 6. This Resolution shall take effect immediately upon passage and adoption. This
Resolution adopted after motion, second and majority vote this \0+1, day of November 2009.
"l\Ollfil,; .
\", I"ft-
,,\,\ r;. '..~IDirHO'~::",
, ^%- ," .
ATTEST: :'i.'\.~.""'"'';.''':':''' -.
., :Zi .~. .' ..~.
DWIGU'1'''b:' BRelCK::'l ". "-"- '-.
!~~, e"- " -".,.' ~-
:: ~!.jt: {"~'_\'I(jl!>"""'~~ ".~:::.
_. .."".... .", ~
- ~"... ~I" ','! ".' .-. .' -
.,\ ~ .~.~':.. (j-.'-'~,~';<~~:?>.' ;~..=: .
" ., . "...., " 1)_'
_ .,~, " . ~rL
.,. ",.",.' ., ~'<~Cl k
. ftQt..~ "".: '...... er
'1" ....'J,~Q~~"." ,
s OOlt_" ., .,.,
~.,~ :_",.~,;'''.~:~'' ,.I",
APPROVED AS to FORM AND
LEGAL SUFFICIENCY:
li:- 7. ~M~
Steven Williams
Assistant County Attorney
BOARD OF C T:jNTY COMMISSIONERS
OF COLLIE . UNTY, FLO~A_
By: Itrr~ ~/u-4_
Donna Fiala, Chair
EXHIBIT A
16G3
Last Record Title Holder:
Collier County Community Redevelopment Agency
Tax X ill Numbers: 61840960006 and 61840960103 and 61840840003 and 53401680005
Legal Descriptions:
Parcell:
The West 425 feet of Lot 109, NAPLES GROVE AND TRUCK CO'S LITTLE FARMS
NO.2, according to the plat thereof, recorded in Plat Book 1, page 27 A, less the East 200
feet and the West 25 feet thereof, Public Records of Collier County, Florida.
Parcel 2:
The East 200 feet of the West 425 feet of Lot 109, NAPLES GROVE AND TRUCK
CO'S LITTLE FARMS NO.2, according to the plat thereof, recorded in Plat Book 1,
page 27 A, Public Records of Collier COWIty, Florida. Together with an ingress and
egress easement across the North 30 feet of the East 200 feet of the West 225 feet of Lot
109, NAPLES GROVE AND TRUCK CO'S LITTLE FARMS NO.2.
Parcel 3:
All of Lot 108, less and excepting the North 273.44 feet of the West 425 feet and the
Kelly Road right-of-way, NAPLES GROVE AND TRUCK CO'S LITTLE FARMS NO.
2, according to the plat thereofrecorded in Plat Book 1, page 27A, Public Records of
Collier County, Florida;
TOGETHER WITH:
All of Lot 109, less and excepting the West 425 feet and the Kelly Road right-of-way,
NAPLES GROVE AND TRUCK CO'S LITTLE FARMS NO.2, according to the plat
thereof, recorded in Plat Book I, page 27 A, Public Records of Collier County, Florida.
And
Parcel A, LAKESIDE MOBILE ESTATES, in accordance with and subject to the plat
recorded in Plat Book 9, page 99, Public Records of Collier County, Florida.
co
l-
ea
I
Q
I-----
~
ro
Q)
l-
e:(
(/)
"0
Q)
l<=
C
~
o
?-
m
1-:.
1[3 -1j.S13I\~vltl
lQ~,
I
~'
-,--
I~
T
z.....
...... ..
...." ..
...... ..
. . . .1-
. .
-
.. .
.. .
.. .
. .
. .
.. .
..:..:::::"::: ..
...... ..
...... ..
., .
.. .
........ ..
..........::.. ..
.. .. .. .. .. .. .. : : : : ..
.................. ..
...... ......
...... ..
.. ........ ........
.............. ..............
........ ..
. .
...... ..
................ ..
................ ..
...... ..
...... ..
...... ..
.. .
.~
au
-,,-,HSAV8
~
'"
0'"
0"-
M
o
'"
~
to
....
01
~
.. .
.. .
..":::: :
...... ..
...... ..
...... ..
......: L_n..
...... ..
...... ..
. -i : :
"'C
r::
Ql
Cl
j
Agenda It! ~ G J
,vember 10,02009 .
j!l u Page80f17
Cii .,:
.....
"C ..-
2 "C
'" '"
<:: <::
~ 6 U)
5 ~ ~ ~
() U 0 co
~DiD
f
(I 1
-1
-
IV'
o
1l
w
w
~
..-
-
-
-
. .
..----
-
. .
I'
L
ll'
. Ill.
..'
''''
~
,
I
1-
-I
I
1
..: Ol m 1663
"'C
e "w:5..x:: L.. ~
OJ
e Ol'_ 0 Ol OJ
..>:::;: 0= z.....( aLL
COOlIIlCi N
Ow ....lu"'O '<t
<(C co_
.cl- CO a. 0
11l_ a>"EcCl)
>-(1) u o'-"'C
ca I-o_r.... C1l
me co u co 0 -
a.coc.u us
."...J Ol 0
'"COle::: ~ "C
't"'"w C._ ~ N Qi
o -_ u .
M- +:::i en .- co l;::: (/)
"ltLL .Q..sa .9 :is :2 c: Qi (/)
'-ro_::J"- to :;: U "C
....z ~...ua.o 0 't' e ~ '"
0:: CIlOl - ~ c '" 0
Ol LlJ'~ - L.L. III Cl... c:::
o .0 m - G)
c.O Q) ::J CJ) ~ Cl ~DI
caD:: (ii=CIlOlC 0 G)
Cl15"'CCl5
::Em Ol;2ccoO ...J
....l coc.
I
f::> fS3^~YH~ ..
,
fj;~ NOOV; M3N
l~,- -y W .
l- e::::
- 0
, ' CJ)
CJ)
0 f-....._- e::::
....I UJ
..--- 0..
W UJ
- UJ
U. """')
/" z
fs>Jir11\>J ~\
CO \
, I
tlO 3tlOHS^,,/8-
1663
Legal Description of Brownfield Site located within
Brownfield #BFl10901001
Parcel A, Lakeside Mobile Estates, in accordance with and subject to the plat in Plat Book 9,
page 99, Public Records of Collier county, Florida.
116:(; j
Attachment B
Table I
Brownfield Site Rehabilitation Schedule
Type of Report or Activity CRA Action or Submittal Department Review or
Time Frames Comment Time frames
Waste Management Profile for disposal of
impacted soil; arrangement for disposal of tanks, September 21, - October 11, 2009
hydraulic lift and tank's and hydraulic lift's
contents
Permit application and notification to Collier October 9, 2009 Within 10 days of receipt
Countv Pollution Control
Removal of USTs and Interim Source Removal; October 12 - November 12, 2009
backfill tank site, soil and oroundwater monitorino
Within 60 days of completion of
Submittal of Closure Assessment Report (TCAR) removal activities. ~~stimated date Within 60 days of receipt.
November 30, 2009
No Further Action (NFA) Proposal When the site meets the criteria for Within 60 days of receipt.
NFA (See Rule 62-785.680, FAC.).
SECTION 3: ATTACHMENT C - - SITE ACCESS AGREEMENT
16G"3
-
SITE ACCESS AGREEMENT
PERMISSION TO ENTER PROPERTY
BROWNFIELDS REDEVELOPMENT PROGRAM
1. The Collier County Community Redevelopment Agency, the real property owner ("undersigned"
or "owner"), hereby gives permission to the State of Florida, Department of Environmental
Protection ("Department") and its agents and subcontractors to enter the undersigned's property
("the property") located at 4315 Bavshore Drive. Naples. Florida 34112, as described in
Attachment A attached to the BSRA for the brownfield site assigned the Brownfield Site
Identification Number BFl10901001, beginning on the date of execution of the BSRA and
ending on such date as deemed appropriate by the Department or the successful completion of
the BSRA, whichever occurs first.
2. This permission is contemplated to be used for the following activities that may be performed by
the Department, its agents, representatives or subcontractors:
a. Having access to areas where contamination may exist.
b. Investigation of soil and groundwater including, but not limited to, the installation of
groundwater monitoring wells, the use of geophysical equipment, the use of an auger for
collection of soil and sediment samples, the logging of existing wells, videotaping, preparation of
site sketches, taking photographs, any testing or sampling of groundwater, soil, surface water,
sediments, air, and other materials deemed appropriate by the Department and the like.
c. Removal, treatment and/or disposal of contaminated soil and water, which may include
the installation of recovery wells or other treatment systems.
3. Upon completion ofthe investigation, the Department will restore the property as near as
practicable to its condition immediately prior to the commencement of such activities.
4. The granting of this permission by the undersigned is not intended, nor should it be construed, as .
an admission ofliability on the part of the undersigned or the undersigned's successors and
assigns for any contamination discovered on the property.
5. The Department, its agents, representatives or subcontractors may enter the property during
normal business hours and may also make special arrangements to enter the property at other
times after agreement from the undersigned.
6. The Department acknowledges and accepts its responsibility for damages caused by the acts of
its employees acting within the scope of their employment while on the property.
7. The Department acknowledges and accepts any responsibility it may have under applicable law
(Section 768.28, Florida Statutes) for damages caused by the acts of its employees acting within
the scope of their employment while on the property.
Page 1 of2
11121108 Revised BSRA Model
SECTION 3: ATTACHMENT C - - SITE ACCESS AGREEMENT
1663
8. In exercising its access privileges, the Department will take reasonable steps not to interfere with
the Owner's operations, or the remediation and redevelopment activities pursuant to the BSRA.
~~~
Jim Coletta, Chairman Witness
Collier County Community
Agency
\ 2-/ \lr/L.-OOC:\
,
\'2-/ \Y!LOO\
Date
Date
Approved as to form and legal sufficiency:
Steven Williams
Assistant County Attorney
ATIEST:,,,
DW~ROCK,~, .....)~.~...~.....v..'.{.'.'..
~. .~...,<;;,
. " 'il ' )\.i_."""". ....' .~,
, . '''',~~, -./
, Oepuly clEitk ,,' (, ' 'I \':-
- . \.....- ' . ,. . :-
""' . ,.,....1.. . -.....
Attt!t.n \.~.~'\.~;~ .... 'f
.1Qnat\lf'~ ot!.... ....-.~l '(;}.
"0,"." "'., ~~Q:.
L" ....... \..,
'i/tOJ. ,'0\.,.'
lb. 7. W~
Accepted by the Department by the following authorized agent:
7;/<.R~.c~ 7./ F:;g~
Signature of Department repr sentative
Witness
I J f;! !() r
Date
/2/2//0"/
Date
Page2of2
11121/08 Revised 8SRA Model
SECTION 4: ATTACHMENT D - - CERTIFICATION OF REDEVELOPMENT
AGREEMENT
l6GJ
IBAYSHORE
.;. '. GATEWAY
..k TRIANGLE
1663
eRA Board
Commissioner
James N. Coletta
Chairman
Commissioner
Fred W. Coyle
Commissioner
Donna Fiala
Commissioner
Frank Halas
Commissioner
Tom Henning
Advlsorv
.!!2!r!!
Chairman
Lindsey Thomas
Vice-Chair
Jill Barry
Karen Beatty
Larry Ingram
Chuck Gunther
Maurice
Gutierrez
Steve Main
Bill Neal
Bruce Preble
eRA Staff
David L. Jackson
Executive
Director
Jean Jourdan
Project Manager
Sue T fone
Operations
Analyst
Shirley Garcia
Operations
Coordinator
December 16,2009
To Whom It May Concern:
This letter is to certify that the Collier County Community Redevelopment Agency is
the "Person Responsible for Brownfield Site Rehabilitation" ("PRFBSR") for the
Brownfield Area designated on November 1 0, 2009 by the Collier County Board of
Commissioners. This Brownfield Area was designated by Collier County Resolution
No. 09-273, the title of which indicates that the entire Brownfield Area is intended for
community redevelopment:
DESIGNATING A BROWNFIELD AREA WITHIN
THE BAYSHORE GATEWAY TRIANGLE
COMMUNITY REDEVELOPMENT AGENCY
(CRA) AREA; FINDING THAT ALL PARCELS ARE
OWNED BY THE CRA AND THAT THE CRA
INTENDS TO REDEVELOP THE SITE TO
FACILITATE ECONOMIC DEVELOPMENT AND
ENVIRONMENTAL REMEDIATION. . . .
A copy of Resolution No. 09-273 in its entirety is included with this letter for your
reVIew.
The 0.63 acre Brownfield Site for this BSRA is 4315 Bayshore Drive, Naples, FL
34112, which is part ofa larger Brownfield Area (4265 Bayshore Drive and
contiguous parcels), which, in total, makes up a total of 17.665 acres and is described
as the Bayshore Cultural Arts Catalytic Facility.
A large group of community stake-holders have expressed interest in redeveloping
this site as a multi-use cultural arts facility. To this end, the CRA entered into contract
#09-5184 with a developer, Pizzuti Solutions LLC, to make this dream into a reality.
The contract Scope of Work, contract parties' responsibilities, and signature page are
enclosed with this letter.
If there are questions related to the CRA's commitment to the redevelopment of the
Bayshore Cultural Arts Catalytic Facility please contact me to discuss further.
Regards,
.1 J1 ~\:1
t(jtuvcK~"fd--
David Jackson , ' //
Executive DirectoV
4069 Bayshore Drive. Naples, Florida 34112
P: (239) 643-1115. F: (239) 775-4456
www.colliercra.com
161; l'
RESOLUTION NO. 09- 2-'1-3
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA, DESIGNATING A BROWNFIELD
AREA WITHIN THE BAYSHORE GATEWAY TRIANGLE
COMMUNITY REDEVELOPMENT AGENCY (CRA) AREA; FINDING
THAT ALL PARCELS ARE OWNED BY THE CRA AND THAT THE
CRA INTENDS TO REDEVELOP THE SITE TO FACILITATE
ECONOMIC DEVELOPMENT AND ENVIRONMENTAL
REMEDIATION, IF NEEDED; DESIGNATING THE CRA LOCAL
ADVISORY BOARD AS THE BROWNFIELDS ADVISORY
COMMITTEE; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, Collier County Community Redevelopment Agency (CRA), owns 17.665 acres (more or
less) on Bayshore Drive, Naples, Florida (the "Property") the legal description of which is attached hereto as
Exhibit A and as depicted on Exhibit B, attached hereto, both of which are incorporated herein by the this
reference; and
WHEREAS, Collier County Community Redevelopment Agency, proposes to redevelop the property to
facilitate economic development and environmental remediation, if needed; and
WHEREAS, Collier County Community Redevelopment Agency, requests that the Collier County Board
of County Commissioners designate the Property a Brownfield Area as authorized under the Florida Brownfields
Redevelopment Act, Sections 376.77 - 376.85, Florida Statutes; and
WHEREAS, the CRA Board requests that the Bayshore Gateway Triangle Local Advisory Board serves
as the Brownfields Advisory Committee for any and all Brownfields Areas in the Bayshore Gateway Triangle
CRA, and
WHEREAS, the Brownfields Redevelopment Act authorizes this Board, by Resolution, to designate
contiguous areas consisting of one or more Brownfields sites as Brownfields Areas to facilitate environmental
remediation, if needed, and to facilitate economic development; and
WHEREAS, all of the designated Brownfield Area is within a Collier County designated Community
Redevelopment Area (Bayshore Gateway Triangle component); and
WHEREAS, the designated Brownfield Area contains portions of land that was used as a gasoline filling
station and has documented environmental contamination; and
WHEREAS, valuable economic incentives accrue to those who redevelop designated Brownfield sites;
WHEREAS, Collier County shall notify the Florida Oepartment of Environmental Protection of the
designation of this Brownfield Area; and
WHEREAS, the procedures set forth in Subsection 376.80(1), Florida Statutes, have been followed, and
proper notice has been provided in accord with Section 376.80 and Subsection 125.66 (4)(b)(2), Florida Statutes.
1663
NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA, that:
Section!. Findings. The Commission, acting as the governing body of Collier Connty and the
CommUllity Redevelopment Agency, finds the preamble hereof to be true and correct.
Section 2. Designation. For the pUlposes of the Florida Brownfield Redevelopment Act, Sections
376.77 _ 376.85, Florida Statutes, the Property attached hereto as Exhibit A and as depicted on Exhibit B, is
hereby designated a Brownfield Area. The area is within a Collier COUllty Community Redevelopment Area is
hereby designated for environmental remediation, if needed, and for redevelopment purposes per Sections 376.77
through 376.85, Florida Statutes. This designation shall not render Collier County liable for costs of site
rehabilitation or source removal (as defined in Sections 376.77 throngh 376.84, Florida Statutes) nor for any other
costs above and beyond such costs otherwise attributable to Collier COUllty in its role as property owner of all of
the snbject designated Brownfield Area.
Section 3. Advisory Committee. The Bayshore Gateway Triangle CRA Local AdvisOlY Board shall
serve as the Brownfields Advisory Committee for any and all Brownfields Areas designated within the Bayshore
Gateway Triangle CRA bonndary.
Section 4. Notification. The County Manager shall notifY the Florida DepaJiment of Environmental
Protection, pursnant to Section 376.80, Florida Statutes, of this Brownfield Area designation.
Section 5. Officers and employees of Collier Connty and Commnnity Redevelopment Agency are
hereby authorized to do all things necessary and proper to carry out the intent aJld purposes of this Resolution.
Section 6. This Resolution shall take effect immediately upon passage and adoption. This
Resolution adopted after motion, second and majority vote this \0-\1., day of November 2009.
, " \ \ \ ~ \ \' " , , " ; ;;1 ;'f J.
,\' ~'~0f\I1\1'~ I,.
ATTES'lS" ,f>'V-~~.";'~"'r:.:~ €!,;'t"...
"J:!i- .. ,. ' .'
DWIGH-r;'.t;;:'BRf)t;K:;'l. .... .~:!-\
:: ff..Y:" ,e" "il/,> ,......~, ','~;..:
- ~_' t,~(..,~I\.. 'j~ ~"_ ~ ':,,: ~
:i.... ~ ~.~~. '1(~_.;\',\'-;~"~~f' . I~.; .
',., . '. .\', 0 '._' 1J_'
.... ;. . ~rl..
. ~.: . <. \. ~ " - -.!..
.( Mt;.", '. . .,;lWiulv Clerk
"j' , fJ,~;i~\~~ ~
$ ~l!t,:?\:~',I...:'
APPROVED As TO FORM AND
LEGAL SUFFICIENCY:
~ 7. ~QL.
Steven Williams
AssistaJlt COUllty Attorney
BOARD OF cq TY COMMISSIONERS
OF COLLIEl UNTY, FLO~A _
By: ~.../ <::> ,<-4.-llc
Donna Fiala, Chair
EXHIBIT A
1663
Last Record Title Holder:
Collier County Community Redevelopment Agency
Tax X ID Numbers: 61840960006 and 61840960103 and 61840840003 and 53401680005
Legal Descriptions:
Parcell:
The West 425 feet of Lot 109, NAPLES GROVE AND TRUCK CO'S LITTLE FARMS
NO.2, according to the plat thereof, recorded in Plat Book 1, page 27A, less the East 200
feet and the West 25 feet thereof, Public Records of Collier County, Florida.
Parcel 2:
The East 200 feet of the West 425 feet of Lot 109, NAPLES GROVE AND TRUCK
CO'S LITTLE FARMS NO.2, according to the plat thereof, recorded in Plat Book 1,
page 27 A, Public Records of Collier County, Florida. Together with an ingress and
egress easement across the North 30 feet of the East 200 feet of the West 225 feet of Lot
109, NAPLES GROVE AND TRUCK CO'S LITTLE FARMS NO.2.
Parcel 3:
All of Lot 108, less and excepting the North 273.44 feet of the West 425 feet and the
Kelly Road right-of-way, NAPLES GROVE AND TRUCK CO'S LITTLE FARMS NO.
2, according to the plat thereof recorded in Plat Book 1, page 27A, Public Records of
Collier County, Florida;
TOGETHER WITH:
All of Lot 109, less and excepting the West 425 feet and the Kelly Road right-of-way,
NAPLES GROVE AND TRUCK CO'S LITTLE FARMS NO.2, according to the plat
thereof, recorded in Plat Book I, page 27 A, Public Records of Collier County, Florida.
And
Parcel A, LAKESIDE MOBILE ESTATES, in accordance with and subject to the plat
recorded in Plat Book 9, page 99, Public Records of Collier County, Florida.
cO
I-
ro
:r:
><
ill
Cll
~
c:(
C/)
"0
Q)
l+=
c:
~
L-
ea
:z.....c:
~
"
o,f
o
'"
o
"'
~
Ie
o
l--
I
-.... ... ..,
.., . . . aL
.... ........
-::.:::::.::::::.::::......---:-:
........... ::. . ..........
k : : :: ::::::::..:::.:::.::::::
. .... .. .......
....... ... .....
.... .....::.............
.. ....... ...... ......
:::::::::::::::::::.::::::: :
........ ..... .... ........
.... .... .
~::::: .' ::::.....::.....::.
~'" , oIY " .~: : : : : , : : : : : : : : : : : : : : : : : : : : : :
Yv "-l vi: : :: : : :: ' : : : : : : : : : : :: : : : : : : : =
... .. .
---II ......::..... :::... ':"'-
...... ..... .........
......::...............:.....-
..... ......:....... ...
.....:::.......:.. ...:.....-
I-\.. .... ... .... .....
~(l J)y:::::!::::'::::.::::'::::,J=
b(( "~ll~yT::<J::/:: ::':::~I!.! u
\ .....::......:
.............. ..
- .,.. ...... ..
T- ... .....
I T 'I IT...::....:::..
IT'" .. . .... . .
.....::.....: .
. ... ......:
.. . ::...........
........ ............
,"........:......... ..
.. .
T
'11
SEJ~H\fiH
'C
C
Q)
tll
~
'II;",..m ",,! 6 G 3
e! vember 1 0, 2009
.l!l 0 Page 8 of 17
i:i5 .,:
r--
'0 ~
.23 '0
III .,
C c
'E o~
m tI) $
c<("OQ)
8 ~ :g ~
~DiD
(I l
rY'
o
-gr
!:!.l
w
"""')
-
-
-
.... ""~
"..
I
I
. .
........ "I
. '11I.'
l
HSA.\i8
I
<-iU
I
i
.,'
I
l
I
~
---
I
16GJ
TG2. TG2 will be the lead cultural arts consultaJt and in collaboration with AMS will conduct a
cultural and performing arts programming studYllcluding an estimated operating cost and
suggested governing process.
Phase 1 Scope of Work:
Pizzuti shall provide and manage the following pl'Ofessional services which shall constitute the
general scope of the Services under the terms and provisions of the Professional Services
Agreement.
In Phase 1 the scope of work is divided into thre(: broad tasks.
Task 1. Existing Conditions Analysis.
. Task 2. Conceptual Master Plan and Initi"l Entitlements.
Task 3. Draft Development Agreement alld Financial Model
Each of the steps are described below.
Task 1. Existing Conditions Analysis.
Tasks include:
1. Kickoff meeting with the CRA to co:lfirm project goals, key benchmarks, and Phase
1 schedule
2. Review of existing site documentation
3. Review current land development cocles and confIrm public approval process
4. Review permitting .requirements (locd and State)
5. Initial interviews & meetings with oWer identified stakeholders
6. Initiate required site civil work including as appropriate including surveys, topo,
initial geotechnical evaluations, weLmd determinations, and bathymetric including .
follow up meetings with the appropri<lte permitting agencies.
7. Evaluate other parcels adjacent to the site for future acquisition
8. Public workshop to identify import:mt goals and objectives of local residents &
businesses, review site analysis, discus potential plan elements and alternatives
9. TG2 and AMS to meet with local C(Immunity arts leaders to collect information for
the cultural and performing arts progJ::lnuning study.
10. Information gathering to begin prelirrinary market report.
Deliverables:
1. Initial Schedule of Key Benchmarks, ::Zesponsibilities, and Project Status Report
'I
- ~, - .
lb' "
. ., t;
-"
2. Completion of the Initial Due DiIigenc~ Report (format included as an addendum to
Schedule A)
3. Report on results of first public worksl:op
4. PreIiminary Market Report presented tl) CRA for discussion
5. Report on initial findings of discussion with local arts leaders
Task 2. Conceptual Master Plan and Initial Entitkments.
Tasks include:
1. Finalize Market Study for mixed use c,tltural arts development
2. Develop public space concept followiq fIrst public workshop
3. Engineering preparation of master cOGept plan for rezoning. Additional engineering
work in this phase includes traffic imP:lct statement, protected species survey and any
additional geotechnical and environmental assessments that may be required as a
result of Phase 1.
4. Team members will present these preliminary concepts and drawings to Collier
COllilty for evaluation and alternatives discussion.
S. Schedule and conduct second public workshop presenting draft concept plan and
design considerations
6. Development of preliminary master plan & preliminary design criteria package
following input from CRA, first public workshop, and initial fIndings in Task I.
7. PreIiminary infrastructure design.
8. Update on cultural and performing ats study including programming, estimate of
operating costs and recommended govlTnance process.
Deliverables:
1. Completion of the Market Analysis Sedion of Due Diligence Report (format included
as an addendum to Exhibit A (Final Mmket Report) - fInal presentation to CRA
2. Completion of second public workshof and report of fIndings
3. Development of Concept Master Plan
4. Rezoning application processed for PrcJerty to accommodate mixed use project
5. Completion of Initial Site and Infrastru::ture Plan
6. Completion of cultural and performing ,rrts fInancial operating pro-forma and
recommendations regarding govemanc1'I and management structures
Task 3. Implementation Plan and Financial M(ldel
Tasks include:
1. Completion of project pricing and preli:l1inary engineering cost estimates
2. Development of Financial Plan and pro.!Josed schedule of improvements
3. ReView recommendations on cultural arts study
4. Completion of architectural concept ren ierings & preliminary design guidelines
5. ModifIcation, refInement & evaluation "ffinal concept plan
- 3 -
1663
6. Presentation offinal concept plan to eRA/Collier County
7. Develop Implementation Plan
Deliverables:
1. Completion of final Due Diligence Rt:port
2. Completion of Project Pricing
3. Final report on Cultural Arts Programming Study
4. Completion of Financial Plan, ProfoDlla, and Project Schedule
5. PresentatioIl of Final Master Plan to eRA/Collier County
6. Completion of Implementation Plan
Phase 2- Development (permitting, leasing, finmcing, construction, and property
management)
At the conclusion of the first phase the Conceptud Master Plan will have been approved and
financial model will have finalized providing for:he opportunity for the development to proceed
to Phase 2. Phase 2 is the final design, permittinl!, construction, leasing, and management of the
site and will be initiated upon the execution ofth!: development agreement by both parties.
-4.
I tl,fG)
Contract 09,5184
Master Developer for a Mixed Use Development on eRA Owned Land
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered intCt this ~day of JLlYle..
2009, by and between the Collier CRA Community Redevelopment Agency, Florida, a political
sub~ivision of the State of Florida (hereinafter rel'erred to as the "CRA" or "OWNER") and
Piz~uti Solutions LLC, authorized to do busines" in the State of Florida, whose business
address is 300 S. Orange Avenue, Suite 1500, Orlmdo, Florida 32801 (hereinafter referred to
as the "CONSULTANT").
WI T N E S S:: T H:
WHEREAS, the OWNER desires to obti~in the professional Master Developer
Consulting services of the CONSULTANT conc''lrning Mixed Use Development on CRA
Owned Land (hereinafter referred to as the "Projec"), said services being more fully described
in Schedule A, "Scope of Services", which is attached hereto and incorporated herein;
WHEREAS, the CONSULTANT has submitted a proposal for provision of those services;
and
WHEREAS, the CONSULTANT represenh: that it has expertise in the type of
professional services that will be required for the Proj-'lcl.
NOW, THEREFORE, in consideration of the mutual covenants and provisions contained
herein, the parties hereto agree as follows:
PSA
D.I
ARTICLi: ONE
CONSULTANT'S F:ESPONSIBILlTY
16G)
1.1. CONSULTANT shall provide to OWNER. professional Master Developer Consultant
services in all phases of the Project to which this II.greement applies.
1.2. The Basic Services to be performed by CONSULTANT hereunder are set forth in the
Scope of Services described in detail in Schedule A. The total compensation to be paid
CONSULTANT by the OWNER for all Basic Services is set forth in Article Five and Schedule B,
"Basis of Compensation", which is attached hereto and incorporated herein.
--- ----.----"---- ._-~_.._--_.._--------
1.3. The CONSULTANT agrees to obtain and mlintain throughout the period of this Agreement
all such licenses as are required to do busine~5. in the State of Florida and in Collier CRA;
Florida, including; but not limited to, all license,; required by the respective state boards and
other governmental agencies responsible for regulating and licensing the professional services
to be provided and performed by the CONSUL TJI;'IIT pursuant to this Agreement.
1.4. The CONSULTANT agrees that, when the services to be provided hereunderrelate to a
professional service which, under Florida Statute:!, requires a license, certificate of authorization
or other form of legal entitlement to practice SUi:h services, it shall employ and/or retain only
qualified personnel to provide such services to OWNER.
1.5. CONSULTANT designates Thomas i\ Harmer, ICMA-CM, a qualified licensed
professional to serve as the CONSULTANT'S pmject coordinator (hereinafter referred to as the
"Project Coordinator"). The Project Coordinator i, authorized and responsible to act on behalf
of the CONSULTANT with respect to directing, wxdinating and administering all aspects of the
services to be provided and performed under this Agreement. Further, the Project Coordinator
has full authority to bind and obligate the CONSU_TANT on all matters arising out of or relating
to this Agreement. The CONSULTANT agree'; that the Proj,?ct Coordinator shall. devote
whatever time is required to satisfactorily manage the services to be provided and performed by
PSA
0-2
J6G3
the CONSULTANT hereunder. The Project Coordinator shall not be removed by
CONSULTANT from the Project without OWNElrS prior written approval, and if so removed
must be immediately replaced with a person accelltable to OWNER.
1.6. CONSULTANT agrees, within fourteen (14; calendar days of receipt of a written request
from Owner to promptly remove and replace thE: Project Coordinator, or any other personnel
employed or retained by the CONSULTANT, or any subconsultants or subcontractors or any
personnel of any such subconsultants or subc(lntractors engaged by the CONSULTANT to
provide and perform services or work pursuant to the requirements of this Agreement, said
request may be made with or without cause. An:1 personnel so removed must be immediately
replaced with a person acceptable to OWNER.
1.7. The CONSULTANT represents to the C iNNER that it has expertise in the type of
professional services that will be performed pUlsuant to this Agreement and has extensive
experience with projects similar to the Project re1luired hereunder. The CONSULTANT agrees
that all services to be provided by CONSULTANT pursuant to this Agreement shall be subject
to the OWNER'S review and approval and shall Ile in accordance with the generally accepted
standards of professional practice in the State Ilf Florida, as well as in accordance with all
applicable laws, statutes, ordinances, codes,ules, regulations and requirements of any
governmental agencies, including the Florida Building Code where applicable, which regulate or
have jurisdiction over the Project or the sEvices to be provided and performed by
CONSULTANT hereunder. In the event of any conflicts. in these requirements, the
CONSULTANT shall notify the OWNER of SU';h conflict and utilize its best professional
judgment to advise OWNER regarding resolution of each such conflict. OWNER'S approval of
the design documents in no way relieves CONS'lL TANT of its obligation to deliver complete
and accurate documents necessary for successfu construction of the Project.
1.7.1 The eRA reserves the right to deduct portiOllS of the (monthly) invoiced (task) amount for
the following: Tasks not completed within the expressed time frame, including required
deliverables, incomplete and/or deficient docume lts, failure to comply with local, state and/or
PSA 0-3
1663
federal requirements and/or codes and ordinancl'ls applicable to Consultant's performance of
the work as related to the project. This list is not deemed to be all-inclusive, and the CRA.
reserves the right to make sole determination regarding deductions. After notification of
deficiency, if the Consultant fails to correct the ddiciency within the specified timeframe, these
funds would be forfeited by the Consultant. The eRA may also deduct or charge the Consultant
for services and/or items necessary tb correct the deficiencies directly related to the
Consultant's non-performance whether or not the GRA obtained substitute performance.
1.8. CONSULTANT agrees not to divulge, furnish or make available to any third person, firm or
organization, without OWNER'S prior written wnsent, or unless incident to the proper
performance of the CONSULTANT'S obligation', hereunder, or in the course of judicial or
legislative proceedings where such information h11s been properly subpoenaed, any non-public
information concerning the services to be re:ldered by CONSULTANT hereunder, and
CONSULTANT shall require all of its employees, "gents, subconsultants and subcontractors to
comply with the provisions of this paragraph. CONSULTANT shall provide OWNER prompt
written notice of any such subpoenas.
1.9 As directed by OWNER, all plans and drawings referencing a specific geographic area
must be submitted in an AutoCad Digital ExchangE. File (DXF) format on a CD or DVD, drawn in
the Florida State Plane East (US Feet) Coordinate System (NAD 83/90). The drawings should
either reference specific established Survey MonUlnentation, such as Certified Section Corners
(Half or Quarter Sections are also acceptable), orwhen implemented, derived from the
RTK(Real-Time Kinematic) GPS Network as provicled by OWNER. Information layers shall
have common naming conventions (Le. right-of-wa~f - ROW, centerlines - CL, edge-of-
pavement - EOP, etc), andadhere to industry standard CAD specifications.
PSA
D-4
1663
ARTICU: TWO
ADDITIONAL SER\/ICf:S OF CONSULTANT
If authorized in writing by OWNER through a Change Order to this.Agreement, CONSULTANT
shall furnish or obtain from others Additional Se rvices of the types listed in Article Two herein.
The agreed upon scope, compensation and sc~edule for Additional Services shall be set forth
in the Amendment authorizing those Additional Services. With respect to the individuals with
authority to authorize Additional Services und '~r this Agreement, such authority will be as
established in OWNER'S Purchasing Policy and Administrative Procedures in effect at the time
such services are authorized. These services wi I be paid for by OWNER as indicated in Article
Five and Schedule B. Except in an emergencf endangering life or property, any Additional
Services must be approved in writing via an Amendment to this Agreement prior to starting such
services. OWNER will not be responsible for the costs of Additional Services commenced
without such express prior written approval. Elilure to obtain such prior written approval for
Additional Services will be deemed: (i) a wai"er of any claim by CONSULTANT for such
Additional Services and (ii) an admission by CONSULTANT that such Work is not additional but
rather a' part of the Basic Services required of CONSULTANT hereunder. If OWNER
determines that a change in the Agreement is required because of the action taken by
CONSULTANT in response to an emergency, all Amendment shall be issued to document the
consequences of the changes or variations, pro,,jded that CONSULTANT has delivered written
notice to OWNER of the emergency within fory-eight (48) hours from when CONSULTANT
knew or should have known of its occurrence. Fclilure to provide the forty-eight (48) hour written
notice noted above, waives CONSULTANT'S I'ight it otherwise may have had to seek an
adjustment to its compensation or time of perfcrmance under this Agreement. The following
services, if not otherwise specified in Schedule /~ as part of Basic Services, shall be Additional
Services:
2.1. Preparation of applications and supporting documents (except those already to be
furnished under this Agreement) for private or governmental grants, loans, bond issues or
advances in connection with the Project.
PSA
D-5
1663
2.2. Services resulting from significant changes :1 the general scope, extent or character of the
Project or its design including, but not limited to, changes in size, complexity, OWNER'S
schedule or . character of construction; and re'.-ising studies, reports, design documents or
Contract Documents previously accepted by O'NNER when such revisions are required by
changes in laws, rules, regulations, ordinances, c:odes or orders enacted subsequent to and not
reasonably anticipated prior to the preparation <If such studies, reports or documents, or are
due to any other causes beyond CONSULTANT':, control and fault.
2.3 Providing renderings or models for OWNER'S use.
2.4 Investigations and studies involving detailed consideration of operations, maintenance
and overhead expenses; the preparation of leasibility studies, cash flow and economic
evaluations, rate schedules and appraisals; anc: evaluating processes available for licensing
and assisting OWNER in obtaining such process licensing.
2.5. Furnishing services of independent professilmal associates and consultants for other than
the Basic Services to be provided by CONSUL TA IJT hereunder.
2.6. Services during travel outside of Collier and Lee Counties required of CONSULTANT and
directed by OWNER, other than visits to the ProjEd site or OWNER's office.
2.7 Prepar<Oition of operating, maintenance and slaffing manuals, except as otherwise provided
for herein.
2.8. Preparing to serve or serving as a CONSULTANT or witness for OWNER in any litigation,
or other legal or administrative proceeding, inl'olving the Project (except for assistance in
consuitations which are included as part of the Sa 3ic Services to be provided herein).
PSA
D-6
1663
2.9 Additional services rendered by CONSUL TA'H in connection with the Project, not otherwise
provided for in this Agreement or not customaril'( furnished in Collier CRA as part of the Basic
Services in accordance with generally accepted I,rofessional practice.
ARTICLE THREE
OWNER'S RESPONSIBILITIES
3.1. The OWNER shall designate in writin!~ a project manager to act as OWNER'S
representative with respect to the services to /:;.3 rendered under this Agreement (hereinafter
referred to as the "Project Manager"). The Pmject Manager shail have authority to transmit
instructions, receive information, interpret and define OWNER'S policies and decisions with
respect to CONSULTANT'S services for the Pl'Oject. However, the Project Manager is not
authorized to issue any verbal or written orders (r instructions to the CONSULTANT that would
have the effect, or be interpreted to have the effect, of modifying or changing in any way
whatever:
(a) The scope of services to be pl'Ovided and performed by the CONSULTANT
hereunder;
(b) The time the CONSULTANT is obligated to commence and complete all such
services; or
(c) The amount of compensation! he OWNER is obligated or committed to pay
the CONSULTANT.
3.2. The Project Manager shail:
(a) Review and make appropriate 13commendations on all requests submitted by
the CONSULTANT for payment For services and work provided and performed
in accordance with this Agreeme It;
(b) Provide all criteria and information requested by CONSULTANT as to
OWNER's requirements for t1- 3 Project, including design objectives and
constraints, space, capacity aJ d performance requirements, flexibility and
expandability, and any budgetary limitations;
PSA
D~7
1663
(c) Upon request from CONSULTANT, assist CONSULTANT by placing at
CONSULTANT'S disposal all available information in the OWNER'S
possession pertinent to the Proj'~ct, including existing drawings, specifications,
shop drawings, product Iiteratur<:'. previous reports and any other data relative
to the Project;
(d) Arrange for access to and makE: all provisions for CONSULTANT to enter the
Project site to perform the serv ces to be provided by CONSULTANT under
this Agreement; and
(e) Provide notice to CONSULTANT of any deficiencies or defects discovered by
the OWNER with respect to th'~ services to be rendered by CONSULTANT
hereunder.
ARTICLE FOUR
TIME
4.1. Services to be rendered by CONSULTAIH shall be commenced subsequent to the
execution of this Agreement upon written Noti,;e to Proceed from OWNER for all or any
designated portion of the Project and shall be pe'formed and completed in accordance with the
Project Milestone Schedule attached hereto andnade a part hereof as Schedule C. Time is of
the essence with respect to the performance of ths Agreement.
4.2. Should CONSULTANT be obstructed or d,dayed in the prosecution or completion of its
services as a result of unforeseeable causes beye,nd the control of CONSULTANT, and not due
to its own fault or neglect, including but not restrUed to ads of nature or of public enemy, acts
of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or
lock-outs, then CONSULTANT shall notify OWNIR in writing within five (5) working days after
commencement of such delay, stating the specii' c cause or causes thereof, or be deemed to
. .
have waived any right which CONSULTANT may have had to request a time extension for that
specific delay.
PSA
D-8
161;
J
IN WITNESS WHEREOF, the parties hereto have ~xecuted this Professional Services
Agreement for Master Developer for a Mixed USll' Development on eRA Owned Land the
day and year first written above.
ATTEST:
~--;/~
Witness SI70h/?A L. /1?OOI"'L-
W'"~~l~
PSA
CCLLlER COUNTY COMMUNITY
REDEVELOPMENT AGENCY
~. ,,~
By: :,,;~;':"J t .
Jim C etta, Chairman
D.22 .
16&3
SCHEDULE A
Scope of Sj'rvices
Phase 1- PlanninglProfessional Services
Through a public solicitation process, the CRA SOl:ght a master developer to partner with to plan
for and develop property acquired by the CRA for 't cultural arts mixed use project. It is the
intent of the CRA to prepare the property for devel1lpment consistent with the goals of the eRA
and the Cultuial Arts District through a Phase 1 plflnning effort and to ultimately sell the
property fee simple to a Master Developer (phase;1 of the project).
During Phase 1, Pizzuti will lead the development leam through a planning and entitlement
process on the CRA's property. During this phase ,}fthe project Pizzuti will serve as the eRA's
prime consultant managing the development team ':hrough the necessary planning to create a
market supportable development plan and the nece::sary entitlements to support the Plan.
These services will include performing the necessary site due diligence and initial civil and
engineeritig work to prepare the site for developmmt. An updated mixed use market study will
be performed and stakeholder input will be solicitel! and considered in the development of a
coriceptual master plan and financial feasibility model that will become the basis of the
implementation plan and proceeding to Phase 2.
The Development Team includes the following members along with their primary role on the
Team:
Pizzuti Solutions, LLC. Pizzuti will manage the (ll1tire Phase 1 process and serve as the point of
contact for the CRA. Pizzuti will also provide pricing estimates and develop the financial model
and project proforma and in partnership with the CRA prepare the implementation plan
necessary to proceed to Phase 2. Pizzuti will also kad a mixed use market study for the overall
Bayshore Gateway Triangle Co=unity Redevelo":lment Agency Cultural Arts property.
Bellomo-Herbert. Bellomo Herbert will lead the planning efforts and the development of the
Concept Master Plan. Bellomo Herbert will also allsist in developing the architectural guidelines
for the project.
Project for Pnblic Spaces(pPS). PPS will facilitaie the initial stakeholder meetings and provide
project goals for the development of the Concept 11 aster Plan. PPS will consult on the Plan from
the stakeholder meetings through completion ofth(1 design.
Banks Engineering. Banks will perform the nece~:sary site due diligence and perform the
necessary civil services to prepare the site plan for the project. Banks will also manage the
environmental consultant. "
Dexter Bender. Ilexter Bender will serve as the eLvironmental consultant and assist with site
evaluations and the related entitlement process to il'sure the project is permitable.
SECTION 5: ATTACHMENT E - - CONTRACTOR CERTIFICATION FORM
1663
1663
Department of
Environmental Protection
Twin Towers Office BUilding
2600 Biair Stone Road
Tailahassee, Florida 32399-2400
Michael W. Sole
Secretary
Charlie Crist
Governor
CONTRACTOR CERTIFICATION FORM
Brownfields Redevelopment Program
Contractor Name HSA Enqineers and Scientists
Contractor Address: 1520 Roval Palm Square Blvd. Suite 260
Contact Name: Roxanne Gause
Phone No.: 239-936-4003
Brownfield Site ID #: Y':, l=- \ \ 0'1 0 1001
Oate: November 13. 2009
Fax No.: 239-936-0819
Contractor Certifies by Checking All Appropriate Boxes:
Yes
No
1. It meets all certification and license requirements imposed by law.
[2]
o
2. It performs or contracts laboratory analysis pursuant to National
Environmental Laboratory Accreditation Program certification
requirements and performs or contracts field-sampling work in
accordance with the Standard Operating Procedures for Field Activities
pursuant to Chapter 62-160, Florida Administrative Code.
3. It complies with all applicable OSHA regulations.
4. Has the capacity to perform the majority of the site rehabilitation
program tasks pursuant to a brownfield site rehabilitation agreement or
supervise the performance of such tasks by licensed subcontractors in
accordance with Section 489.113(9), F.S.
The person named below by signing as an "Officer of the Company" hereby certifies to the Florida
Oepartment of Environmental Protection (FOEP) that the Contractor named above meets the
requirements for contractors participating in the Brownfields Redevelopment Program [Sections
37680~~c!j?) FjPra Statutes (F.S.)]:
/tvu "A/""-_..,. 11/13/09 Richard G. Lewis, II
Signature of Officer of the Company and Date Signed Print Name of Officer of the Company
[2]
o
[2]
o
[2]
o
Principal. Engineer
Title of Officer ofthe Company
This form will be kept on file by the FOEP Oistrict office. Contractors must immediateiy notify the FDEP
(Brownfields Oistrict Coordinator) of any change in the above criteria. The FDEP may order a
suspension or cessation of work for failure of a contractor to maintain their required certification. Please
return this form to the appropriate Oistrict Brownfields Coordinator.
"Proleet, Conserve and Manage Florida's Environment and Natural Resources"
Printed on recycled poper.
Revised 11/f2110a
SECTION 6: ATTACHMENT F - - QUALITY ASSURANCE CERTIFICATE
1663
CD
CII
.;:
~
..
o
..Q
j
Ii-
0-
't:I ::I jg
-- ca-
.. GI ""
..Q ..!!::-
U. ::It: co
't-m8~
o ~o co
G) .J:- m
.....:!::: tI)
Cll 11I-
_ GIll>
en .-
::J:.c
...1-
o
-
C
GI
f
III
C.
CII
C
o
~
ui
w
ii:
o
~~
Owm
j8~
c
-'c-l
:!-1Uo
zOn!"
w::cW
:51-1-
z::>-
oo~
lI::lIl'"
>0
z'"
w'"
II::
~
ii:
::J
....
'"
.,
;::
o
liP
-
'"
~u
.m
w "
(2;"3
" 0
"'CI=
o.E
u"
.,.c
>-
.- c:
1ij..,.
.b III
III '"
"2 a.
.- E
E '"
~!
4!f~
'i: CD
..2E
u. "
.c e
- .-
.- >
:: c
'i~
_ 0
o.e
E 0
0=
u '"
III .5
.. E
.c '"
~
"
.c
-
..
oS
Q
'Z
.~~
~S;:J
<0::0
Iii!!!'"
::;;<1:.;"
,:5...1
o::..I;:!:fl
l!:!<l:IU-
o Z
c(-::;;<
s:ifi'Cl
IU:I:~O::
,-,0.,.0
,,":.;:0 IU
",zffi...l
b"'t-~
11.0<(...1
1::;::0
~oJ>
zCl)(]'
~vi-cn
>0::;;-'
0::_1U<
I-Z -
cnc:cJ:"
_C101U
::;;o::c!:(
~oz::;;
owod:-J
...J-,coet
151=:JO
",0-
...I"'::;;
20 _w
IU>>-J:
Cl'~O
,a:WC
O::W:;:Z
IUt-W<
!;:;g;:c9
",>0-'
>UJ-JO
W..l",'"
..J [Q a:: ..
lIl;3w!'l
;!O:Zl'J
OD..~a.
~z:.ch
zO",W
OZ-,C
z -:$ U
..VJ 0::-
U'UDWrD
00.....0:::
Z~<~
<(Cf.I~rh
~~<i!w
0509
UJ--o
-,1Il::;;1=
1Il0::w'"
~~S~
()0Q1
",lUzCD
~C1""-I
~--",
00-
i=::iD::
IfaOt:!
0::11."'<
W i- w:S
!:CffiY...I
s:...~t'l
~~~~
~wo:>:
...-'~o
~~'"
zo~
011.0
zzi2
~~
"gc
... ..-..
w
.... ",,'"
<0 ..->
".sS
-I!
::Jo"'CI
lI::.a'"
u.ea
ct -::J .
LL .! Q) m
"0:5;>'
iof!m
...",e
'" e E '"
-e 0 "C
ca=.9c
"OrGU'lCU
c=:::Icn
m"CCJ-c
~~"ClO
uc.c
oum1i)
:ict,l!lE
w'Qc...
zQ)~.s
Gl o.U ::I
.cO ,g
_ u . ~
:EU)~C'II
._ ~N 0.
~ 0 ~...
GI""'.s
u f .. '
~O~.g
:.Doi:
g..!l;;:..2
r;;;; CD ",LL
o,c.!!c
u... -'-
me"> tn
.!: 0 5.a
O"tl to CIS
CJ CD':': -OJ
,-u
c U co c:
~ cu""'J.9
.2t;d'tu
m....,...o
",wNI:
Q)t!><E
8 .- 0 OJ
::It:IDU
en B w U)
e", O.~
&. .e a: .s
::s.2'rira
C f!.!! 6
etClS.....a
Dl-aB.!!
~cfCU
~coo.c
00.0;'
u"artlo
en 0...1 c
.- :5"'0 '"
eGl Cl
..2Eg'"
'5uE.!!l
",,!6::J:S
_UID:5
~ ["'.-
U (/):5 ;:
"guim
::I e '"
eO-
;::;::;1;:
e '" C
0'30
U "IG'
e! ~
<<:)
T""
<<:)
N
~
<<:)
('I)
CI)
c
:s
""')
::I:
C)
~
o
a:::
::c
I-
Cl)
Qi
<<:)
N
N
T""
I.,
CI)
..Q
.s
()
o
w
>
I-
o
W
LL
LL
W
1663
"'on
g.!!
Nfl
l:!",
'J. g:.c: a:e
~ ..i5~ ;;;i'l
"!EJ:~:bi:
2]'0;::, ~
..: co.... ...m III
ClJ...JI;t-g;)-
~'lt-o :gmw~
o I;"f'" II)
!jij"~,,wil
U Icn!:5~"5
= ,,0Ll.<l:l!!
:!!l%I <a::te::: a.
1 .,:'00 w=
.!!5 ~:
~_ zm
oLl. i2i:
, I- I:'!
,.__ Z 8.
0:1
zell
\...
1663
SECTION 7: ATTACHMENT G - - ADVISORY COMMITTEE MEMBERS
Name Work Phone Email
Lindsey Thomas 304-9000 I.Ulantllc@comcast.net
1925 6th Street South
Naples, FL 34102
Jill Barry 643-7275 x 11 jbarry@naplesgarden.org
199 Lady Palm Drive
Naples, FL 34104
Larry Ingram III (239) 262-4121 Iningram@comcast.net
631 17th Ave S.
Naples, FI 34102
Chuck Gunther 248-1394 f1guntherc@gmail.com
2448 Bayside Street
Naples, FL 34112
Karen Beatty 269-7788 klbeatty48@aol.com
3113 Basin Street
Naples, FL 34112
Steve Main 774-0222 gs mservice@earthlink.net
15 Newbury Place
Naples, FL 34112
Bruce Preble 261-4744 brucepreble@aol.com
4703 Lighthouse Lane
Naples, FL 34112
.
Maurice Gutierrez 263-0572 mgutier1893@earthlink.net
2736 Shoreview Drive
Naples, FL 34112
16G3
SECTION 8: ATTACHMENT H - - FORMAT FOR SUBMITTAL OF TECHNICAL
DOCUMENTS
1. Two hard copies or one hard copy and an electronic copy of each report or proposal and
final reports shall be submitted to the Department or to the delegated local program.
2. In an effort to increase efficiency, responsiveness, and to enhance environmental
protection, electronic records are an acceptable media substitute for hard copy and shall
be pursued as the first option of choice to arrive at compliance. Where an electronic
format exists of the records it shall be used to transmit the data, file, report, document,
map, plans, picture, record, or any other object that may be available in an electronic
format. Electronic records shall be kept in industry standard non-proprietary formats:
TIFF, GIF, JPEG, PDF, or in Microsoft Word, Microsoft Excel, and Microsoft Access not
older than one (1) release behind the current.
3. Data requested shall be transmitted using available media such as E-mail, Compact Disc
(CD), or File Transfer via an FTP site. Additional formats may be considered at the time
ofthe request.
4. After final approval of each report, an electronic copy and one hard copy shall be
submitted within 30 days. The electronic copy shall be submitted on Compact Disc (CD)
for archiving purposes.
5. The media shall include a file directory and specify the "naming convention".
(a) Final reports (any text files) must be in one of the approved formats.
(b) Site maps and surveys shall be in TIFF, JPEG or ".pdf' format.
(c) Site-specific GIS data tables shall be in Excel or text (tab delimited) format.
(d) The cover of the media shall include the Site Name, Designated Brownfield Area,
Date and Type ofReport(s).
(e) The left inside cover of the media should list all the files located on the media.
16 G 3'
MEMORANDUM
Date:
January 21, 2010
To:
Sue Trone, Operations Analyst
Bayshore Gateway CRA
4069 Bayshore Drive
Naples, Florida 34112
From:
Teresa Polaski, Deputy Clerk
Minutes & Records Department
Re:
Voluntary Cleanup Tax Credit Application - Signature
Page
Attached is one (1) original document referenced above,
(Agenda Item #16G3) approved by the Board of County Commissioners on
December 1,2009.
The Minutes & Records Department has kept one of the originals as part of
the Board's Official Records.
If you should have any questions, please contact me at 252-8411.
Thank you.
t )i:"F'" TJ )r~-
CUUJ\ll Y Af TonrJi:y
1663
ITEM NO.: !D -C"'-P, 0:>701
FILE NO.:
,,!flll'1 l C, ~ 1 I r:: ...," 1 -1 ~ r'
",diJ J,,(j D,(TtRECEJ~ED:
ROUTED TO:
DO NOT WRITE ABOVE THIS SPACE (Orig. 9/89; Rev. 6/97) )rr13
REQUEST FOR LEGAL SERVICES '1./
(please type or print) /-..
.. DW'f;l.I}'O
To: Office of the County Attorney, Attn: Steve WIlhams
Date: 01/15/2010
From: Sue Trone
(Name)
(Division)
Project Manager <: ~'1 J \
(Title) Jj('l'1 ~
Bayshore Gateway .4'~~ D
(Department) -J ~ \'1.;
j cP
CRA
Telephone # (Very Imoortant): 643-1115
Re: Legal review and signature of completed Voluntary Cleanup Tax Credit
Application
(Subject)
BACKGROUND OF REQUESTIPROBLEM:
(Describe problem and give background information - be snecitic. concise, and articulate.)
(Are there documents or other information needed to review this matter? If yes, attach and reference this information.)
This item haslhas not been previously submitted.
(If previously submitted provide County Attorney's Office File No.) 10-CMP~0699
ACTION REQUESTED:
(Be very specific. Identify exactly what you need in the way of legal services.)
Please review the following application for legal sufficiency. Page 5 requires the signature
of CRA chairman, Jim Coletta and notarization. I believe your signature is required before
I can obtain Mr. Coletta's signature--please sign BOTH COPIES if you deem this
application to be legally sufficient.
OTHER COMMENTS:
The CRA approved applying for this tax credit and allowing the chairm to sign documents
in item 16G3 on Dec. 1, 2009. This application must be signed by Mr. Coletta no later than
January 26, 2010.
cc: David Jackson
16G3
DEPFonn# 62-788.9OOm
Form Title: Voluntarv CleanuD
Tax Credit AODlication
Effective Date: XXIXX/XXXX
Department of
Environmental Protection
DEP Application No.:
(FDEPUseOnly)
VOLUNTARY CLEANUP TAX CREDIT (VCTC)
APPLICATION
(please Print or Type)
For more detail see subsections 62-788.300. .310. .320. and .330. F.A.C.
Pursuant to the provisions ofs. 376.30781, F.S., application for tax credit is hereby made. The following
information is submitted in support of this application. Please complete the applicable sections of this form,
draw a diagonal line through inapplicable sections, and submit the entire 13 page application form along with any
other required documentation.
SECTION I.
1. Applicant Information*:
Name: Collier County Community Redevelopment Agencv
Address: 4069 Bavshore Drive
Naples.
(Cdy)
Collier County.
(Co=ty)
Florida
(State)
34112
(Zip Code)
Telephone Number: (239) 643-1115
(Area Code)
E-mail: suetrone{al.colliergov.net
Federal Employment Identification Number (FElD): (if applicable) 59-6000558
-OR-
Social Security Number: (if applicable) --
- - - (9-aigit num6ei) - - -
Calendar Year(s) for which VCTC are being claimed: 2009
-Note: If multiple taxpayers are submitting a joint application for one site, please make copies of this page and
have each taxpayer complete Section L number 1 (above) of this application.
2. Tvoe of Site: (check"; only one)
o (a) A drycleaning solvent contaminated site eligible for state-funded site rehabilitation under s. 376.3078(3), F.S. The
applicanl must complete Section LA. on page 2 ;
o (b) A drycleaning solvent contaminated site at which cleanup is undertaken by the real property owner pursuant to
s. 376.3078(11), F.S., if the real property owner is not also, and has never been, the owner or operator of the
drycleaning facility where the contamination exists. The applicant must complete Section LB. on page 2;
IZJ (c) A brownfield site in a designated brownfield area under s. 376.80, F.S.; or
o (d) A brownfield site in a designated brownfield area under s. 376.80, F.S., that is, or was, also a RCRA site.
(Section I. continued 00 next page)
lofl3
VCTC Application
SECTION I. (continued)
SECTION I.A.
16G3
Drvcleaninl! Solvent Cleanuo Prol!ram (DSCP) Sites Elil!ible
for State-funded Site Rehabilitation
For more detail see oaralQaoh 62-788.300(3)(d!. F.A.C.
Ifbox 2.(a) is checked on page I, the applicant must submit with this application a copy of the FDEP eligibility
order for the DSCP and the appropriate deduc1ible paymen1, as indicated in 1he order. Please check the
appropria1e box below to indicate the amoun1 enclosed or previously paid:
D $1 ,000 (complete DSCP applications submitted by June 30, 1997)
D $5,000 (complete DSCP applications submitted July I, 1997, through September 30, 1998)
D $10,000 (complete DSCP applications submitted October I, 1998, through December 3 I, 1998)
D Deductible previously paid in
(year) VCTC application.
Please include a cashier's check or money order (DO NOT SEND CASH, PERSONAL CHECKS, OR
CORPORATE CHECKS) made payable 10 1he Water Quality Assurance Trus1 Fund. This check or money order
must be separate from the $250 non-refundable application review fee required by Section IV of1his applica1ion.
SECTION I.B.
Real Prooertv Owner Affidavit
For more detail see oaraf!raoh 62-788.300(3)(b). F.A.C.
Ifbox 2.(b) is checked on page I, the real property owner mus1 sign the following affidavi1:
The undersigned applicant, under penalties of petjury, does solemnly swear that he, she, or it is the real property
owner of1he property con1aining 1he drycleaning solvent contaminated site at which he, she, or i1 is volun1arily
conducting site rehabilitation, and that he, she, or i1 is not, and has never been, 1he owner or operator of the
drycleaning facility where 1he contamination exis1s.
Print Name of Real Property Owner or Corporate Real Property Owner
Signature of Real Property Owner or Authorized Corporate Real Property Owner Representative
Date
Print Name of Authorized Corporate Real Property Owner Representative
Title
Notary Seal for Real Property Owner Affidavit
STATE OF FLORIDA
COUNTY OF
Sworn to (or affirmed) Wld subscribed before me this _ day of
.20----, by
Real Property Ownes-' s name
Personally known ~ OR Produced Identification ~
Signature of Notary Public - State of Florida
Type of Identification Produced
(print, type, or stamp Commissioned Name of Notary Public)
20f13
VCTC Application
16G 3
SECTION I. (continued)
3. General Site Information:
DC Facility/BF Site Name: Hubert's Welding
FacilitylSite Location: 4069 Bavshore Drive
(Address)
Naples Collier CounlY Florida 34114
(CIty) (County) (Zip Code)
Brownfield Site Identification Number: B F 110901001
- - (9-digit number)
Is there more than one contaminated site, as defined by Department rule, covered by the above BSRA? No (Y es/No)
Jfyes, please attach a list/description of the contaminated sites covered by this BSRA.
Which contaminated site is being claimed in this application?
-OR-
DEP Drycleaning Facility Identification Number:
- - - (9=Oi.gmtumber)- - -
-AND-
Real Properly Owner, if this application is for a DSCP site and the RPO is different than the applicant:
Name:
Address:
(C,ty)
~-- (County)
(State)
(Zip Code)
Telephone Number:
(Area Code)
)
E-mail:
4. Tvoe of Tax Credit ReQuested: (check"; all that apply and complete Section 11 accordingly)
~ (a) Site Rehabilitation (per contaminated or potentially contaminated site): Requires comple1ion of Section 11.A.
o (b) Site Rehabilitation Completion Order (per contaminated site only): Requires completion of Section II.A.
o (c) Affordable Housing (once per brown field site only): Requires completion of Section 11.B.
o (d) Health Care (once per brownfield site only): Requires completion of Section II.C.
o (e) Solid Waste Removal (once per brownfield site only): Requires completion of Section II.D.
3 of 13
VCTC Application
SECTION II.A.
16G3
Aoolicant's Site Rehabilitation VCTC Affidavit*
(if aDolicable)
For more detail see Rule 62-788.300. F.A.C.
Pursuant to s. 376.30781, F.S., the undersigned applicant is claiming a credit in the amount of 50 % of the costs of
voluntary cleanup activity that was integral 10 site rehabilitation conducted during the calendar year for which this tax
credit application is being submitted.
The total site rehabilitation costs incurred and paid for this calendar year were $61.427.00, and 50% of that amount =
$30.713.50 (or $500,000, whichever is less), which is being claimed in this tax credit application.
If submitting a joint application with multiple tax credit applicants, please fill in the blank:
The undersigned contributed % to payment of site rehabilitation costs.
Pursuant to s. 376.30781 (3)( c), F .S., if site rehabilitation is completed at the si1e, as evidenced by the Department issuing
a "No Further Action" order (i.e., Site Rehabilitation Completion Order), the undersigned may claim an additional 10%
ofthe total elil!ible site rehabilita1ion costs incurred from July 1, 1998, through June 30, 2006, no1 to exceed $50,000,
in the final tax credit application for site rehabilitation. If applicable, fill in the following: The total site rehabilitation
costs that were claimed in VCTC applications from July 1, 1998 through June 30, 2006 =
$ . and 10% of1hat amount = $ (or $50,000, whichever is less), which is
being claimed in this tax credit application.
Pursuant to s. 376.30781 (3)( c), F.S., if site rehabilitation is completed at the site, as evidenced by the Department issuing
a "No Further Action" order (i.e., Site Rehabilitation Completion Order), the undersigned may claim an additional 250;'
of the total elil!ible site rehabilitation costs incurred on or after July 1, 2006, not to exceed $500,000, in the final tax
credit application for site rehabilitation. If applicable, fill in 1he following: The 10tal site rehabilitation costs that have
been or are being claimed in VCTC applications on or after July 1, 2006 = $ , and 25% of
that amount = $ (or $500,000, whichever is less), which is being claimed in this tax credit
application.
PLEASE NOTE: THE COMBINED NFAfSRCO EXTRA CREDIT AMOUNT REQUESTED ABOVE FOR
SITE REHABILITATION CONDUCTED BEFORE AND AFTER JUNE 30, 2006 CANNOT
EXCEED $500,000.
If submitting ajoint application with multiple tax credit applicants that contains total site rehabilitation costs for all
years, please fill in the blank:
The undersigned contributed
% to payment of 10tal site rehabilitation costs.
(SECTION II.A. continued on next page)
4 of 13
VCTC Application
SECTION II.A. (continued)
For more detail see Rule 62-788.300. F.A.C.
16G3
The undersigned applicant, under penalties of petjury, certifies that it has read and understands the requirements of
Chapter 62-788, F.A.C., and Sections 376.30781 and 220.1845, F.S., and that all information contained in this
applica1io n uding1j1 cor IS c ed and paid and claimed in this tax credit application, are true and
correct.
\\.;LI\IO
Date
Jim Coletta
Print Name
Collier County Community Redevelooment Agency Chairman
Print Title
Collier County Community Redevelooment Agency
Print Company Name (if applicable)
January I. 2009-December 31. 2009
Time period covered by application
Notary Seal for Applicant's Site Rehabilitation Affidavit
STATE OF FLORIDA .
COUNTY OF to \ \ I ex
Sworn to (or affirmed) and subscribed before me this ~ day of ~f\UCl ~i~ . 20~ by '.:slVl\ ~ l e ~
Applicant's name
Ii" ;............, welDY A. KLOPF
"i..":t;7~\. MY COMMISSION I DD 766906
'[!i1::.,!1!kj,j EXPIRES: Apli112. 2012
"'l,t...-r..~' BondedThroNotaIyPIilicUnderWriIeIS
,,'U;..,
p ,\. "1\~r.L~""'pl
Signature of Notary .c-Stateof rida '.
~evy\~ a. I-Z \~-f
(Print, type, or stamp onunissioned Name fNotary Public)
Personally known ./ OR Produced Identification_
Type of Idcntification Produced App,~aa to form. ~~ ~dll.1l'I
'Notes: I. Ifmultiple tax credit applicants are submitting ajoint applicationfor one s~trl~jPMtpageS 4 & 5
and have each tax credit applicant complete the affidavit and indicate each tax credit applicant's percentage
contribution to payment of site rehabilitation costs.
2. Application documentation must clearly demonstrate when site rehabilitation work was performed and when
invoices for that work were paid.
Remainder ofthis page intentionally left blank
t
0'3,1.,\1\"
5 of 13
VCTC Application
SECTION II.B.
16G 3
Aoolica"t's Affordable DORsi"!! Affidavit*
(if aDDlicable)
For more detail see Rule 62-788.310. F.A.C.
Pursuant 10 s. 376.30781, F.S., use of the brownfield site identified in the BSRA is limited to affordable housing, and the
undersigned tax credit applicant is claiming a credit in the amount of 25 % of the eligible costs of voluntary cleanup
activity that were integral to si1e rehabilitation and that were incurred and paid on or after July 1, 2006.
The total eligible site rehabilitation costs incurred and paid that have been or are being claimed in VCTC
applications on or after July 1, 2006 =$ , and 25% of that amount = $
(or $500,000, whichever is less), which is being claimed in this tax credit application.
Also Dursuant to s. 376.30781. F.S.. I am submitting the required certification letter that is from the approDriate Darty to
the use 821'eement. [see subsection 62-788.310(2). F.A.C.l
If submitting a joint application with multiple tax credit applicants, please make copies of this page and have each tax
credit applicant complete the affidavit and indicate each tax credit applicant's percentage contribution to payment of site
rehabilitation costs below:
The undersigned contributed % to payment of si1e rehabilitation costs.
The undersigned applicant, under penalties of peryury, certifies 1hat it has read and understands the requirements of
Chapter 62-788, F.A.C., and Sections 376.30781 and 220.1845, F.S., and that all information contained in this tax credit
application, is true and correct.
Signature of applicant
Date
Print Name
Print Title
Print Company Name (if applicable)
Time period covered by application
Notary Seal for Applicant's Affordable Housing Affidavit
STATE OF FWRlDA
COUNTY OF
Sworn to (or affirmed) and subscribed before me this _ day of
. 20_, by
Applicant's name
Signature ofNolary Public - State ofRorida
(print, type, or stamp Commissioned Name of Notary Public)
Personally known _ OR Produced Identification ~
Type of Identification Produced
"Note: {[multiple tax credit applicants are submitting ajoint applicationfor one browrifield site. please make a copy of page
6 and have each tax credit applicant complete the affidavit and indicate each tax credit applicant's percentage
contribution to payment of site rehabilitation costs.
60fl3
VCTC Application
SECTION II.C.
16 G J'
ADolicant's Health Care Facility or Health Care Provider Affidavit*
(if aDDlicable)
For more detail see Rule 62-788.320. F.A.C.
Pursuant to s. 376.30781, F.S., use ofthe brownfield site identified in the BSRA includes a health care facility or a
health care provider, pursuant to Sections 408.032, 408.07, or 408.7056, F.S., and the undersigned tax credit applicant is
claiming a credit in the amount of25 0;' of the eligible costs of voluntary cleanup activity that were integral to site
rehabilitation and that were incurred and paid on or after January 1, 2008.
Tvoe of elil!ible Health Care Facility or Health Care Provider: (check Vane, and specifY applicable type offacility/provider)
D (a) Health Care Facility pursuant to Section 408.032, F.S.,
D (b) Health Care Facility pursuant to Section 408.07, F.S.,
D (c) Health Care Provider pursuant to Section 408.07, F.S.,
D (d) Health Care Provider pursuant to Section 408.7056, F.S.,
The health care facilitylprovider claimed in this application is doing business as
, and
Company Name
is located at
Street # Street Name
Florida, and may be reached at
City County
Also, pursuant to s. 376.30781, F.S., I have included
Phone #
the required backup documentation listed below: (check Vane)
D (a) Certificate of Occupancy
D (b) License for the operation of the health care facility or health care provider
D (c) Certificate for the operation of the health care facility or health care provider
The total eligible site rehabilitation costs incurred and paid that have been or are being claimed in VCTC
applications on or after January 1, 2008 =$ , and 25% of that amount =
$ (or $500,000, whichever is less), which is being claimed in this tax credit application.
If submitting a joint application with multiple tax credi1 applicants, please provide a copy of this page for each applicant
and indicate each tax credit applicant's percentage contribution to payment of site rehabilitation costs below.
The undersigned contributed % 10 payment of site rehabilitation costs.
The undersigned applicant, under penalties of perjury, certifies thaI it has read and understands the requirements of
Chapter 62-788, F.A.C., and Sections 376.30781 and 220.1845, F.S., and that all infonnation contained in this tax credit
application, is true and correct.
Signature of applicant
Date
Print Name
Print Title
Print Company Name (if applicable)
Time period covered by application
(SECTION II.C. continued on next page)
7 of 13
VCTC Application
16G3
SECTION II.C. (continued)
Aoolicant's Health Care Facility or Health Care Provider Affidavit*
(ifaoolicable)
For more detail see Rule 62-788.320. F.A.C.
Notary Seal for Applicant's Health Care Affidavit
ST ATE OF FLORIDA
COUNTY OF
Sworn to (or affirmed) and subscribed before me this ~ day of
.20~by
Applicant', name
Signature of Notary Public - State of Florida
(Print, type, or stamp Conunissioned Name of Notary Public)
Personally known _ OR Produced Identification ~
Type of Identification Produced
'Note: lfmultiple tax credit applicants are submitting ajoint applicationfor one brownfield site. please make copies of
pages 7 & 8, and have each tax credit applicant complete the affidavit and indicate each tax credit applicant's
percentage contribution to payment of site rehabilitation costs.
Remainder of this page intentionally left blank
8 of 13
VCTC Application
SECTION II.D.
16G 3
Aoolicant's Solid Waste Removal Affidavit* (if aoolicable)
For more detail see Rule 62-788.330. F.A.C.
Pursuant to s. 376.30781, F.S., solid waste removal occurred in accordance with the applicable department rules and
guidelines, from within the footprin1 of the eligible brownfield site identified in the BSRA, and the undersigned
applican1 is claiming a tax credit in the amount of 50% of the costs incurred and paid on or after July 1, 2006, that were
required for that solid waste removaL
The total costs for solid was1e removal from this brownfield site incurred and paid on or after July 1, 2006, =
$ ,and 50% of that amount = $ (or $500,000, whichever is less),
which is being claimed in this tax credit application.
Also pursuant to s. 376.30781, F.S., after consultation with (the appropriate local
government official), whose title is and whose phone number is , and
after consultation with (the DEP official), whose 1itle is
and whose phone number is I certify, to the best of my knowledge, that the brownfield site as
identified in the BSRA was never operated as a permitted solid waste disposal area or for monetary compensation.
If submitting a joint application with multiple taxpayers, please make copies of this page and have each tax credit
applicant complete the affidavit and indicate each tax credit applicant's percentage contribution to payment of solid
waste removal below:
The undersigned contributed % to payment of the costs 10 remove, transport, and dispose of solid waste.
The undersigned applicant, under penalties of peIjury, certifies that it has read and understands the requirements of
Chapter 62-788, F .A.C., and Sections 376.30781 and 220.1845, F .S., and that all information contained in this
application, including all records of cos1s incurred and paid and claimed in the tax credit applica1ion, are true and
correct.
Signature of applicant
Date
Print Name
Print Title
Print Company Name (if applicable)
Time Period covered by application
Notary Seal for Applicant's Solid Waste Removal Affidavit
STATE OF FLORIDA
COUNTY OF
Sworn to (or affirmed) and subscribed before me this _ day of
.20~by
Applicant's name
Personally known ~ OR Produced Identification_
Signature of Notary Public - Stale of Florida
Type of Identification Produced
(Print, type, or stamp CommiSllioned Name ofNowy Public)
"Notes: 1. Ifmultiple tax credit applicants are submitting ajoint application for the brown field site, please make a copy of
page 9, and have each tax credit applicant complete the affidavit and indicate each tax credit applicant's
percentage contribution to payment of solid waste removal costs.
2. Application documentation must clearly demonstrate the period when solid waste removal was performed and
when invoices for that work were paid.
90fl3
VCTC Application
SECTION III.
16G 3
Documentation
For more detail see oarafll'aohs 62-788.300(3)(fJ and 330(3)fdi. F.A.C.
This application package must include copies of documentation sufficient to demonstrate that the tax credit applicant,
which mus1 be the signatory to the VCA or BSRA, also paid the costs that were either integral to site rehabilitation or
that were for solid waste removal (applies to BSRA's only). Costs for site rehabilitation must have been incurred and
paid during the calendar year for which 1his tax credit application is being submitted; costs for solid waste removal
must have been incurred and paid since July 1, 2006.
The documentation must clearly describe the goods or services and associated costs that are being claimed in the
application. Copies of documents for goods or services that are being claimed must be sufficient to demonstrate a link
between the contractual records, the payment requests associated with the contractual records, and the payment records
for the claimed portions ofthe payment requests, as required by each ofthe following three subparagraphs:
1. Contractual records that describe the scope of work performed during the applicable time period that was either
integral to site rehabilitation or for solid waste removal. Examples include: contracts, documentation of contrac1
negotiations, proposals, work orders, task orders, and change orders; and
2. Payment requests that describe the goods or services provided in support of the above scope of work. Examples
include: invoices, sales tickets, and account statements. Payment request documents that include costs for goods
or services that are not being claimed in the VCTC application must clearly identify which costs are being
claimed; and
3. Payment records that describe the actual costs incurred and paid for the goods or services above. Examples include:
cancelled checks, or other payment records from purchases, sales, leases, or other transactions.
PLEASE NOTE: The CPA and Technical Professional Certifications are not required if the applicant is onlv claiming
an Affordable Housing, Health Care, andlor SRCO VCTC, because the tax credit applicant will have
previously provided this documentation in the annual site rehabilitation application(s).
Remainder ofthis page intentionally left blank
(SECTION III continued on next page)
10 of 13
VCTC Application
WORK ORDERS, PURCHASE ORDERS, SCOPES OF WORK, AND NOTICES TO
PROCEED
16G 3
iIIi HSA
ENGINEERS & SCIENTISTS
A member of the eRA Family of Companies
16G3
August 21,2009
Collier County Redevelopment Agency
(Bayshore Agency Gateway Triangle)
4069 Bayshore Drive
Naples, Florida 34112
Attention:
Ms. Sue Trone
Subject:
Underground Storage Tank Removal
4315 Bayshore Drive
Naples, Florida 34112
DEP Facility #8629388
Collier County Contract # 06-3970
HSA Proposal Number 75-34668
Dear Ms. Trone:
HSA Engineers & Scientists (HSA) is pleased to submit a cost proposal for a Tank Closure and the
removal of a hydraulic lill station at the above relerenced property which will include soil and
groundwater sampling and analysis as well as engineering services. The Tank Closure will be
performed according to the Florida State Statutes, Chapter 62-761 Florida Administrative Code
(FAC).
PROJECT HISTORY
. A Phase 11 Environmental Site Assessment (ESA) was conducted by Environmental Risk
Management, Inc. (ERMI) in May 2008 that identified three underground storage tanks
(USTs) located on the subject property. ERMI conducted a regulatory search for the USTs
and concluded that the tanks were closed in place prior to 1986 when a Tank Closure
Assessment Report (TCAR) requirement under Chapter 62-761 came into elTect. There was
no additional information regarding the USTs available. According to ERMI, a hydraulic
lilt station was observed on the site property as well. Concrete staining was observed in
connection with the hydraulic Ii ft station. The conclusions to the ERMI Phase II ESA report
are as follows:
o Laboratory analytical results for soil sample SB-5 collected at 7 feet below land surface
indicated concentrations of benzene, toluene, total xylenes, and methyl tert-butyl ether
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33919
Tel: (239) 936-40031 Fax: (239) 936-0819
Tampa. Orlando. Fort Myen!1 . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Onented Quality Driven
Underground Storage Tank Removal
4315 Bayshore Drive
Collier County Contract #06-3970
HSA #75-34668
August 21. 2009
Page 2 of6
-
16G 3
-
that exceeded the commercial Soil Cleanup Target Level (SCTL) per Chapter 62-777
FAC.
o Laboratory analytical results tor the groundwater sample collected trom temporary
monitor well TMW-I indicated concentrations of I-Methylnaphthalene, 2-
Methylnaphthalene, and naphthalene that exceeded the Groundwater Target Cleanup
Levels (GCTLs) per Chapter 62-777 F AC. Laboratory analytical results for the
groundwater sample collected from temporary monitor well TMW-2 indicated
concentrations of benzene, ethylbenzene, total xylenes, and methyl tert-butyl ether that
exceed the GCTLs.
. On May 29, 2008 a Discharge Report Fonn in conjunction with the Phase II sampling report
was sent to the Collier County Pollution Control & Prevention Department.
. Collier County Pollution Control & Prevention Department, authorized by the Department
of Environmental Protection has requested a Site Assessment (SA) to be conducted on the
subject site and submitted to the department by May 03, 20 I O.
PROPOSED SCOPE OF WORK
Prior to conducting the Site Assessment, as a more cost etl'ective way to deal with the petroleum
contamination documented at the subject property, IISA proposes to remove the three (3) USTs and
former hydraulic Iill system's tank and excavate the impacted soil. The Tank Closure and hydraulic
lift system will be performed according to the Florida State Statutes, Chapter 62-761 FAC IISA
will conduct the following requirements tor the tank closure:
Undere.round Storae.e Tanks
Initially the underground storage tanks and hydraulic !ill tank will be excavated and removed by the
HSA's licensed tank contractor. IISA will conduct auger borings on each side of the excavation
pits and in the areas where the contaminated soils have been documented. The soil samples
obtained from the auger borings will be screened for visual signs of stains, odor, and tested using an
organic vapor analyzer (OVA) in accordance with Chapter 62-770.200, FAC., to detennine the
volatile organic content of the soils by way of a soil-gas analysis. Based on the response of the
OVA, all impacted soils will be removed until tinal OVA results are below the FDEP definition of
excessively contaminated soils for the kerosene analytical group as those soils that return an OVA
Underground Storage Tank Removal
4315 Bayshore Drive
Collier County Contract #06-3970
HSA #75-34668
August 21. 2009
Pagc 3 of6
-
16GJ
iIE
value in excess of 50 ppm and tor the gasoline analytical group as those that return an OVA value in
excess 01'500 ppm. (Chapter 62-770 FAC)
Following the OVA analysis, live soil samples will be collected, as required by Chapter 62-761
F AC, from each side of the excavation pit and one Irom the bottom based on the screening results
obtained during the excavation. Since the type of fuel sold is unknown, the soil samples will be sent
to the laboratory for the Kerosene Analytical Group according to EPA Method 8020, 8100, and
FLPRO, lor low volatile organics aromatics, polycyclic aromatic hydrocarbons and total
recoverable petroleum hydrocarbons. In addition since contaminated soils have been identified, one
soil sample may need to be collected prior to disposal lor analysis as required by Waste
Management.
In order to address concerns lor groundwater contamination from the UST, as required, we propose
the installation of one temporary monitor well in the "location believed to be most likely to have
contamination based on the screening results obtained prior to, or during, excavation". Following
installation of the well, groundwater samples will be collected and sent to the laboratory tor
analysis, according to EP A Method 8020, 8100 and FLPRO for volatile aromalic organics.
Hvdraulic Ull
Following the removal of the small hydraulic lill tank, if' soil visually stained or saturated with
hydraulic oil is identified and excavated, at least one soil sample will be obtained from the
excavation in the area that represents the "worst case" contamination. In addition if contamination
is identified and removed one monitor well will be installed in the area that represents the "worst
case" contamination.
HSA will notity the Collier County Pollution Control & Prevention Department prior to
commencement, oversee and manage the excavation activities of the licensed tank contractor,
arrange for disposal of the impacted soils, provide the manilests for the soil disposal and oversee the
backfilling of the project. Quality assurance (QA) procedures for the collection of samples and
decontamination of sampling apparatus prior to and during use in the field was conducted in general
conformance with the Florida Department of Environmental Protection field sampling and
laboratory analysis quality assurance protocol codified in Chapter 62-160 F AC Standard Operation
Procedures for Field Activities (FOEI' SOP-OOI/OI). Engineering and technical support services
will also be required to analyze the data obtained and prepare an engineering report.
Underground Storage Tank Removal
4315 Bayshorc Drive
Collier County Contract #06-3970
HSA #75-34668
August 21 , 2009
Page 4 of6
-
16G3
iIiE
SCHEDULE
HSA is prepared to begin work upon receipt of written authorization.
Cost Estimate
Service Activitv Cost Pavment
Removal and disposal of the 3 USTs $12,000 Lump Sum
Licensed Tank ~ I hydraulic lift tank _ _
Contractor Disposal of tanks' contents - assumed $10,000 Lump Slum
to be concrete (worst case scenario)
Waste Transportation and disposal of estimate
of 120 tons ofimpacted soil and clean $8,000 Lump Sum
Management backfill material 0J $75.00 oer ton
Organizing and managing the project,
Engineering soil and groundwater sampling, $18,200 Lump Sum
Services laboratory analysis and final
enl!ineerinl! reoort
Additional Services bevond the ScoDe of Work $1,000 T&M*
T Total: $49,200
*Time & Materials
The fees quoted above are valid for 90 days from the date of this proposal/contract letter, J I'
authorization is received after the 90-day period has expired, HSA retains the right to revise the fee
schedule,
All items specified in the above Scope of Services shall be provided one (I) time for each item.
Assumptions are that there are only three USTs and one hydraulic lift tank, that the tank contents are
concrete, that the soil and groundwater sampling is required at the hydraulic lift and that there is
120 tons of impacted soil that will be removed from the site. Should this aforementioned fee be
detennined inaccurate, HSA will notify you before the above limit is reached, and indicate the
amount of work to be completed, the amount of work yet to perfonn, the approximate costs of the
remaining work, and a written explanation describing the circumstances that caused the estimate to
be inaccurate. Written authorization to proceed for additional work is required.
Services not specifically described above and not included in this proposal will be performed as
additional services on an hourly basis, plus reimbursable expenses, in accordance with the Collier
County rate schedule. Services and fees provided in this Agreement are based upon governmental
rules, regulations and policies in enect at the time of execution of this Agreement. Should changes
Underground Storage Tank Removal
4315 Bayshore Drive
Collier County Contract #06-3970
HSA #75-34668
August 2t, 2009
Page 50f6
-
16G3"f
take etTect during the period services are being performed and result in additional HSA work
requirements, this Agreement will be modified by approval of all involved parties, In addition, HSA
will pertonn additional services beyond the work described within this Agreement, as requested and
authorized by the Client. When such work can be identified in advance, HSA will provide a
reasonable estimate for such work and will proceed with the work upon written authoriz.ation by the
Client.
EXCLUSIONS
The professional services to be provided by HSA are limited to only those as described in the Scope
of Services. Please review Attachment A, which includes a list of services specifically excluded
from this proposal
HSA appreciates the opportunity to provide you with these services. Should you have any
questions, please feel free to contact us at (239) 936-0789.
HSA ENGINF.;ERS & SCIENTISTS
,
~. J
12>-~~'-)~.
Roxanne L. Gause, P.E.
Senior Environmental Engineer
Attachments: Attachment A - Services not Included in Contract Proposal
Underground Stol'llge Tank Removal
4315 Ba)'Shore Drive
Collier County Contract #06-3970
HSA #75-34668
August 21. 2009
Page 6 of6
-
-
ATTACHMENT A - Sen'ices not Included in Contract Proposal
. Concrete Slab Replacement
. Geotechnical services / Soil Compaction.
. Ecological Environmental (wetland/wildlife) services, studies, reports & pennitting.
. Legal advice or assistance.
. Land Surveying services.
. Utility or utility relocation design.
. Landscape design. (Must be perfonned by Florida registered Landscape Architect)
. Dewatering pennitting.
. Design ofof1~site improvements.
. Full-time construction observation/inspection.
16G3
:.:::
,",'
. '.
,'.',',, ..
:""<:,.;'~~y:s~, briv....~~, F~34112
"':..:",,> P:'I~9l643,1~15'. F:'1<13~)}~~
'.'...' '''WWW,COlII~a;Coi1i .. . .
.. ..,.;.;.".....
..........
,.......
.".,
'. ....yf"l.:...
...... ;:;.';:'>>+
.... ..........
> ....-....,......
...,. ',','..'
1
3
Board of CQ\lnty Commissioners
Pun:l1aslng Department
3301 Tamiaml rr.. E
Naples. FIolida34112
Tax Exempt: 85-8012112183OC-2
<t)
Send alllnvpices to:
Board ofColJnty Commi<slon....
Attn: Accounts Payable
PO Box 413016
Naples. Florida 34101-3018
Purch.. Order 'number must.ppe.r on all related
correspondencel shipping papers and Invoices-:
Vondor# 1173n
HS" ENGINEERS & SCIENTISTS AND SCOlT
SIMS &ASSOC'''TES
1820 R.OY"L PALMSQ BLVD, STE 260
FTMYERS FL 33919
PYl'Cha$~!.c)rder':m::"'"
PO N,,,,"'" 4500111875 "'..10107/2009
CCntaet PelSCn Comm Redev Agency
T_,,"
23s-e.3.1115
Please deliver 10:
BAYSHORE GATEWAY TRIANGLE eRA
4069 BAYSHORE DR
NAPLES FL 34112
Delivery Dale' 0913012010
Terms of Payment
Nol3O Daya
Currency
USD
]. /fOlD M~"
00010
.:A~~~i'b,.~!iW;::i:1:[: ...
Bevins cleanup escrowed
'I,:;;,)::;,
.".. ::,~
;:'.:-.-[::
i~:~:i:~'~',
49,200 each
Pr1c":.~~~"
1.00
IlI8:fV"""!"': I
49,200.00
Release order against contract 4600001744
Item 00010
+i.t.i.Ji~iiJ...
VENDOR Terms and Conditions
The VENDOR 801'88$. to comply with sh Purchase Order Terms and Conditions as ouUined on the Collier County Purchasing Interne1 site:
http://wwwconiergov.netllndexaspx?page-762 (revision date 0112212008). including delvery t1nd payment tel1Tl$. Further the VENDOR agrees to:
1. Provide goods and services outlined in this Purchase Order with the prices. terms, delivery method and
specifiCatIons listed above.
2. Notify department Immediately if Older fulfillment cannot occur as specified.
3. Send aM lnvoioes to:
Board of County Commissioners
AUn: Acco,,"1s Payable
PO Box413018
Naples. Florida 34101-3018
TM Purchase Order is authorized under direction of Collier County Board of County COmmissioners by;
. !Ill. ". Go@_ Stephen Y. camen. GenOfaI Services I Pun:l1asiog Director
Printed Thu Oct 06 200912:09:111 GMT-O<<lQ
187-1~~6341i1W
Page 1 of1
WORK ORDER
l~tS~
...
Agreement for Fixed Term Professional Mechanical-Electrical Eneineering Services
Dated August 8, 2006 (Contract #06-3970)
This Work Order is for Professional Mechanical-Electrical Engineering Services known as:
Proiect: Underground Storage Tank Removal: 4315 Bayshore Drive
The work is specified in the proposal dated August 2], 2009 which is attached here10 as Exhibit
A, and made a part of this Work Order. In accordance with the Terms and Conditions of the
Agreemen1 referenced above, this Work Order is assigned 10 HSA En2ineers & Scientists.
Scope of Work: As detailed in the attached proposal and the following:
. Task 1.1 - Removal & disposal of 3 USTs and 1 hydraulic lift tank
. Task 1.2 - Disposal tank's conten1s
. Task 2.0 - Transportation & disposal of impacted soil & clean backfill material
. Task 3.0 - Organization/management of project, soil/groundwater sampling & 1esting
Schedule of Work: Complete work (Tasks 1.0 through 3.0) within 16 weeks (112 calendar days)
from receipt of the Notice to Proceed authorizing start of work.
Subs1itute Performance: In the even1 the Contractor fails to perform any required service within
the time schedule under the subsequent contract, the County and/or CRA reserves the righ1 10
obtain substi1ute performance. Further, the County/CRA reserves the right to deduct the cost of
such substitu1e performance from the Contractor's payments. The Contractor may be exempt
from this provision if such exemption is granted by the Contract Manager or their designee, in
wri1ing, prior to any delays or as a result of an Act of Nature.
COffiDensation: In accordance with Article Five of the Agreement, the County/CRA will
compensate the Firm in accordance wi1h following method(s): XXX Negotiated Lump Sum
(LS); _Lump Sum Plus Reimbursable Costs _XXX_ Time & Material (TM) (established
hourly rate - Schedule B) _Cost Plus Fixed Fee, as provided in the attached proposal.
TASK
. Task 1.1
. Task 1.2
. Task 2.0
. Task 3.0
TOTAL
BUDGET
$12,000
$10,000
$ 8,000
$18,200
$ 1.000
$49,200
TYPE DESCRIPTION
LS - Removal/disposal 3 USTs, 1 Hydraulic Lift
LS - Disposal tank's contents
LS - Transportation/disposal & fill of material
LS - Project management & water/soil sampling
TM - Contingencies
.
WORK ORDER Continued - Page 2
Underground Storage Tank Removal: 4315 Bayshore Drive.
Any change within monetary authority of this Work Order made subsequen1 to final department
approval will be considered an additional service and charged according 10 Schedule "8" of the
Agreement.
^PPROVED BY:
I~
David Iackson, Executive D'
Bayshore Gateway Triangle
^CCEPTED BY:
:;~
ROlUlllne L. Gause, P .E.
On behalf of HS^ Engineers & Scientists.
By:
Signature
t
Date
16[;3
16
Send all Invoices to:
Board of County Commissioners
Purchasing Department
3301 Tamiami Trail E
Naples, Florida 34112
Tax Exempt: 85-8012621830C-2
(i)
Board of County Commissioners
Attn: Accounts Payable
PO Box413016
Naples, Florida 34101-3016
Purchase Order number must appear on all related
correspondence, shipping papers and invoices:
Purchase order
PON"mbe, 4500111875 0,..10/07/2009
Vendor # 117377
HSA ENGINEERS & SCIENTISTS AND SCOTT
SIMS & ASSOCIATES
1520 ROYAL PALM SQ BLVD, STE 260
FT MYERS FL 33919
Contact Person Comm Redev Agency
Telephone
239-643-1115
Please deliver to:
BA YSHORE GATEWAY TRIANGLE eRA
4069 BAYSHORE DR
NAPLES FL 34112
Delivery Date: 09/3012010
T enns of Payment
Net 30 Days
Currency
USD
Item Material
Description
Bevins cleanup escrowed
Release order against contract 4600001744
Order Qty Unit
49,200 each
Price Per Unit
1.00
Net Value I
49,200.00
00010
Item 00010
4315 Bavshore Drive cleanup and removal of tanks, reimbursable by Stewart Title monies in escrow account
Total net value excl. tax: USD
49,200.00 I
VENDOR Terms and Conditions
The VENDOR agrees to comply with all Purchase Order Terms and Conditions as outlined on the Collier County Purchasing Internet site:
http://www.colliergov.netllndex.aspx?page=762 (revision date 01/22/2008), including delivery and payment terms. Further the VENDOR agrees to:
1. Provide goods and services outlined in this Purchase Order with the prices, terms, delivery method and
specifications listed above.
2. Notify department Immediately if order fulfillment cannot occur as specified.
3. Send all invoices to:
Board of County Commissioners
Attn: Accounts Payable
PO Box413016
Naples, Florida 34101-3016
The Purchase Order is authorized under direction of Collier County Board of County Commissioners by:
JliJ, " c;;..(!L
Stephen Y. Carnell, General Services 1 Purchasing Director
Printed Thu Oct 08 200912:09:18 GMT-Q400
187-138325-634999
Page 1 of1
.HSA
16G3
E!NGINEmB & SCIENTISTS
A member of the eRA FarTily ofCampans
October 30, 2009
Collier COllnty Redevelopmellt Ageney
(Bayshore Agney Gateway Triangle)
4069 Bayshore Drive
Naples, Florida 34H2
Attention:
Mr. David Jackson
S ubjec!:
Environmental Engineering Consulting Services
43 15 Bayshore Drive
Naples, Florida 34112
FDEP Facility #8629388
Collier County Contract # 06-3970
HSA Proposal Number 75-34668
Dear Mr. Jackson:
We have identified additional services required to finalize the underground storage removal for the
referenced project. The additional services are presented below for your consideration.
I. According to the contract HSA proposed the removal of an estimated 120 tons of impacted soil
that would be removed from the site during the tanks removal. As we discussed during the
excavation, there was a former spill area located nonh of the dispenser's location with petroleum
impacted soil that was removed and disposed of with 1he initial estimated tonnage. At that time
HSA indicated concern with regards to additional soil which would need to be removed to better
insure a clean groundwater sample. According to the Waste Management Manifests a total of
290 tons of soil were removed from the site. Attached is a copy of 1he waste manifests from
Waste Management.
2. We request that our contract be amended to include the transportation and disposal of an
additional 170 tons of impacted soil and replacement of clean backfill material @ $75.00 per ton.
Our lump sum fee for the combined additional services as described above is $12,750.
We respectfully request your favorable consideration of this request. Please contact Roxanne Gause
should you have questions or need additional information.
HSA ENGINEERS & SCIENTISTS
..
. J
~___, L_~I
i ,J- -~,.. i~-
Roxanne L. Gause, P.E.
Project Manager
www.hsa-env.com
Client Focused . Solution Oriented . Quality Driven
1520 Royal Palm Square Boulevard, Suite 260. Fort Myers, Florida 33919
Tel: (239) 93&4003 or (239) 936-0789 . Fax: (239) 938-0819
Offices in: Charleston. R. Myers. Hmon Head. Orlando. Pensacola. Savannah. Tampa. West Palm 8each
CONTRACTIWORK ORDER MODIFICATION
1663
PROJECT NAME: Underground Storage Tank Removal: 4315 Bayshore Drive PROJECT MANAGER: O....id L. JllGkson
BIDlRFP., 06-3870 MOO.,,.. .POlII:4500111875 WORKORDER.,POI\I4500111175
DEPARTMENT: B8Y"hore Omew"Y Triangle CRA CONTRACTOR/FIRM NAME: HSA Engln__ & 5clen_
Cu_ Contract Amount:
$ 4lI,200
- (Starting Point)
$~ ~oIal Amount Approved by the BCC)
S 49,200
-(Including All Changes Prior To Thill Modification)
$_12,750
$_11,950
(Including This Change Order)
Original Conlnct Amount:
Curr_ BCe Appro_ Amount:
Change Amount:
Revised contrs_ Order Amount:
Cumulative Dollsr Velue of Ch....... to
tIlls ContI'llC\fo\'oik Order:
$_12,750
Date 01 Lea Bee Approval_NA
Agenda I1em # _NA
Percentage ofthe change overIunder cu.....nt contreel emount_25..
Formula: (Revised AmountfLast BCC approved amount}-1
CURRENT COMPlETION DATE (S): ORIGINAL: Februarv 1 2010
CURReNT: Februsry 1, 2010
Describe the change(s): Original Work Onler Task 2 is modified to include an increased amount of contaminated
soli removed from the project site - above and beyond the original estim'" of sol to be removed.
Specify the ntllSOIlS for the change(s) 1. Planned or Elective ... 2. Unforeseen Conditions XX 3. Quantity
Adjustments' 4. Correction of Emirs (Plans, Specmcatlons or Scope of Work) XX II. Value Added
: - 6. Schedule Adjustments Note: One or more may be checked, depending on the nature of the change(s).
Identify all negative Impacts to the project if this change onler were not processed: To complete the required
environmental cleanup, all Impactecl soH has to be removed. This cleanup procass, once begun, Is progressive
until all Impacted soli Is removed, and the "Initial" amount of soil removal Is an estimate.
This change was requested by: Icontractor/consultant XX Owner
:....o.slgn Professional IRegulatory Agency (Specify)
f Using Department L CDES
other (Specify)
CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS:
Yes XX No
Date:
II/oJ/O,!
APPROVED BY:
REVIEWED BY:
Date:
('/N_/O't
.... - --------1-4
, .'
. ..
H .....~u?/....
, ,'., ",-",.,' ,,'"
. ".-. -
, ," ........ ,
. .. 1...._. .,.. .
, " ." -,.. ,
.Dlttl. ./......... '..
::~ :;' '; '. ::.:'" ::;y' "~:', -. ,"
'. ::: " '...::<. .
> ".'
.
..~.
'" , .
'::: -:'-. ':.::-::'. 2 ;.:.,: ."
/~:.;I.""'O' ,1"'::;:
il /7>(0/.
. . f. .....
... --
Send all Invoices to:
Board of County Commissioners
Purchasing Department
3301 Tamiami Trail E
Naples, Florida 34112
Tax Exempt: 85-8012621830C-2
(i)
Board of County Commissioners
Atln: Accounts Payable
PO Box 413016
Naples, Florida 34101-3016
Purchase Order number must appear on all related
correspondence, shipping papers and Invoices:
Purchase order
po Nom"", 4500111875 0"'010/07/2009
Vendor # 117377
HSA ENGINEERS & SCIENTISTS AND SCOTT
SIMS & ASSOCIATES
1520 ROYAL PALM SQ BLVD, STE 260
FT MYERS FL 33919
Contact Person Comm Redev Agency
Telephone
239-643.1115
Please deliver to:
BAYSHORE GATEWAY TRIANGLE eRA
4069 BAYSHORE DR
NAPLES FL 34112
Delivery Date: 09/3012010
Terms of Payment
Net 30 Days
Currency
USD
1.00
Net Value I
49,200.00
Item Material
00010
Description
Bevins cleanup escrowed
Order Qty Unit
49,200 each
Price Per Unit
Quantity still to be delivered
Release order against contract
41,881.5each
4600001744 Item 00010
4315 Bayshore Drive cleanup and removal of tanks, reimbursable by Stewart Title monies in escrow account
Item partially delivered
00020
PO increase $12,750
Release order against contract 4600001744
12,750 each
1.00
12,750.00
Item 00010
Work Order Modification 4315 Bavshore Drive.
Total net value excl. tax USD
61,950.00 I
VENDOR Terms and Conditions
The VENDOR agrees to comply with all Purchase Order Terms and Conditions as outlined on the Collier County Purchasing Internet site:
http://www.colliergov.neUlndex.aspx?page=762 (revision date 01/22/2008), including delivery and payment terms. Further the VENDOR agrees to:
1. Provide goods and services outlined in this Purchase Order with the prices, terms, delivery method and
specifications listed above.
2. Notify department Immediately if order fulfillment cannot occur as specified.
3. Send all invoices to:
Board of County Commissioners
Atln: Accounts Payable
PO Box413016
Naples, Florida 34101-3016
The Purchase Order is authorized under direction of Collier County Board of County Commissioners by:
l/.iJ.,~~
Stephen Y. Carnell, General Services I Purchasing Director
Printed Tue Nav 10 200916:01:46 GMT-OSOO
187-138325-634999
Paga10f1
16G3
INVOICES
~HSA
ENGINEERS & SCIENTISTS
A member of the eRA Family of Companies
Bayshore Gateway Triangle
4069 Bayshore Drive
Naples, FL. 34112
Attention: David Jackson
16G :3
Invoice #: 659333
Project: 7534666
Project Name: Collier County CRA 4315 Bayshore Drive
Invoice Group: 00
Invoice Date: 10/23/2009
Purchase Order: Contract 063790
For Professional Services Rendered through: 10/11/2009
UNDERGROUND STORAGE TANK REMOVEL - 4315 BAYSHORE DRIVE
CONTRACT NO.: 06-3970
Phase Code I Name
% of Contract
00 -- Removal/Disposal 3USTs 1 LIft (lS) 24.39
01 -- Disposal Tank's Contents (lS) 20.33
02 -- TransporllDisposal/Fill Material(lS) 16.26
03 -- Project ManagementlWater/Soil Sample (lS) 36.99
04 -- Contingencies (NTE) 2.03
Total Fee:
Previous Current Total
Phase Fee Amount Amount % Complete Fee Earned
12,000.00 0.00 2,430.00 20.25 2,430.00
10,000.00 0.00 475.00 4.75 475.00
8.000.00 0.00 0.00 0.00 0.00
18,200.00 0.00 4,413.50 24.25 4,413.50
1,000.00 0.00 0.00 0.00 0.00
49,200.00
Total Fee Earned To Date 7,318.50
Less Previous Billings 0.00
Amount Due this Invoice 7,318.50
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 / Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myen!? . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Oriented Quality Driven
.HSA
ENGINEERS & SCIENTISTS
A member of the eRA Family of Companies
Bayshore Gateway Triangle
4069 Bayshore Drive
Naples, FL 34112
Attention: David Jackson
16G3
Invoice #: 660714
Project: 7534668
Project Name: Collier County CRA 4315 Bayshore Dr
Invoice Group: 00
Invoice Date: 11/1712009
Purchase Order: POll 4500111875
For Professional Services Rendered through: 10/25/2009
UNDERGROUND STORAGE TANK REMOVEL - 4315 BAYSHORE DRIVE
CONTRACT NO.: 06-3970
PURCHASE ORDER NO.: 4500111875
Phase Code I Name
0/0 of Contract
00 -- Removal/Disposal 3USTs 1 Lift (LS) 19.37
01 -- Disposal Tank's Contents (LS) 16.14
02 -- Transport/Disposal/Fill Material (LS) 12.91
03 -- Project ManagementlWater/Soil (LS) 29.38
04 -- Contingencies (NTE) 1.61
05 -- Change Order NO.1 (LS) 20.58
Total Fee:
Phase Fee
12,000.00
10,000.00
8,000.00
18,200.00
1,000.00
12,750.00
61,950.00
Previous
Amount
2,430.00
475.00
0.00
4,413.50
0.00
0.00
Current
Amount % Complete
7,170.00 80.00
9,525.00 100.00
8,000.00 10000
8,326.50 70.00
477.00 47.70
7,012.50 55.00
Total
Fee Earned
9,600.00
10,000.00
8,000.00
12,740.00
477.00
7,012.50
Total Fee Earned To Date
Less Previous Billings
Amount Due this Invoice
47,829.50
7,318.50
40,511.00
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myerl? . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Onented Quality Driven
~HSA
ENGINEERS & SCIENTISTS
A member of the eRA Family of Companies
Bayshore Gateway Triangle
4069 Bayshore Drive
Naples, FL. 34112
Attention: David Jackson
1663
Invoice #: 662409
Project: 7534668
Project Name: Collier County CRA 4315 Bayshore Dr
Invoice Group: 00
Invoice Date: 12/2212009
Purchase Order: PO# 4500111875
For Professional ServIces Rendered throu9h: 12/22/2009
UNDERGROUND STORAGE TANK REMOVEL - 4315 BAYSHORE DRIVE
CONTRACT NO.: 06-3970
PURCHASE ORDER NO.: 4500111875
Phase Code / Name
% of Contract
00 -- Removal/Disposal 3USTs 1 Lift (LS) 19.37
01 -- Disposal Tank's Contents (LS) 16.14
02 -- TransportlDlsposalfFiII Material (LS) 12.91
03 -- Project ManagementlWater/Soil Sample (LS)29.38
04 -- Contingencies (NTE) 1.61
05 -- Change Order No.1 (LS) 20.58
Total Fee:
Phase Fee
12,000.00
10,000.00
8,000.00
18,200.00
1,000.00
12,750.00
61,950.00
Previous
Amount
9,600.00
10,000.00
8,000.00
12,740.00
477.00
7,012.50
Current
Amount % Complete
2,400.00 100.00
0.00 100.00
0.00 100.00
5,460.00 100.00
0.00 47.70
5,737.50 100.00
Total Fee Earned To Date
Less Previous Billings
Amount Due this Invoice
Total
Fee Earned
12,000.00
10,000.00
8,000.00
18,200.00
477.00
12,750.00
61,427.00
47,829.50
13,597.50
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myers. West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Onented Quality Driven
16G3
PROOF OF PAYMENT
o
I
>
~
;.
m flsO
~ o!
~g . ~ J!
'8~~ ~ ~ii~
~X' -( il
(jiO 8 [...
I~~~~ < . I~l
I Ze; ~
,!;() z:
I~" g
I ~ ~
I
I
I
I
r--..-----
,
I
I
I
1/,.",
I. N
.. ,
I ~;.
o~
~-<
!ll...
o
~...
.. :I:
m
"'-0J:
-tflf~
::00m
-<=R"'z
g;lo>.m
(I)~enill
ill....~!ll
~QCI)
~r-?i~
.0 ~ m en
OM(lJO
o m
Z
...
en
...
en
>
Z
"
en
"
~
'"
....
<
p
~
m
'"
g
'"
o
,.
:D
c::l
Z 0
> ."
;!! 0
m 0
!" c:
-l '"nZ
J; b~'"
o ::0,.. 0(
lil 611I0
,. )0"0
il ~8ii:
." ..... c. 3: .
<: N!i 0 .
!@i
1
z
c
'"
"
.
.
.
(j
~
~
N
m
'"
o
.!;'
~
.
.
.
.
~"
">
~;
~
..
~ J
:1 ~ .
~ ~
~ ~
m
l
"
o
:I:
!'l
"
~
"1I
:I"'
...m
~'"
<
,,2
':1: "
. m )0
: n ~
. m
: iIl::IJ
. g ~
~zl:l
....."
~ )0
~ -<
o ..
'l
~
~
...
...
co
...
o
1663
.
en
m
o
c
m
z
()
m
z
c
s::
CD
m
??
--.J
W
.....
(}1
0>
en
w
r-,)
'U
)>
o
o
~
f1:I
.....
r-,)
-
r-,)
r-,)
N
o
o
to
.
.
i6GJ
(f)
m
0
c
m
z
0
m
z
c
s::
OJ
m
;:0
-...I
W
~
0'1
(Xl
Ol
W
N
'U
)>
0
to> 0
,=> )>
'"
~ -I
to> f1:1
to>
~ ~
'" N
'"
'" N
'"
w N
.... -
0' N
15 0
'" 0
~ CD
g
g
<>
m
..
;;,
'"
'"
~
"
~
~UO MSodaa JO::l
899Ll~99
llu!leJado sJaeu!IlU3 \fSH eqp
:JU! sa:Juaps l/IlE3 aJe~
--.---r....---.--- -..
r--
~I
ljl-<
"'e!
!i:..
.. '"
m
.,,-"''''
-1~~~
:!: 000 1"1\
-<JJ~Z
gJO>e
U)~trJZ
-n,-tr.IHl
~ 0",
~Q(I)
~,-)IoS2't
~;::;;lC/)
....(I)CI)o
"'0 -
. !l;
j!! ::l
< '"
.? ~
'" )>
of z
o
'"
'" '"
o 8
::j
o
"
~
~
: fiao
C i
~il
~ It').
o n ~ ~
I ~c 0 O~Cl
8~CI:l ~ ~q
J:)(. -( ~ll
I ~o (J i.i
. ~~~~ ~ . ~~[
ilia ~
, ::D('j ~
I C>>; 0
I ~ ~
,
I
I.
"-T.~--
'"
m
'"
m
z
~
"
~
z
o
i
:0
",
",
J:
"
Z
o
"
",
o
!!!
Gl
J:
..
m
~
C
'"
o
'"
o
,.
:II
o
~ !i:
;l! 8
~ c:
jIlg!'i
ir-:<
g~8
~g~
.,,~
;;~o;
(!)~ ~ i
III .,
(- iZ ,I
. i
: I
i
. !
i
i
"I
'; ~ !
, ~ . ,
g, !
i! ~ !
. I
~ 'I
!t I
III :
" . I
~ ,I
CD 31: !
cD ~ I
:g", I
'" ,
': 1
.
Ol.
:!!
Ii
-<
~
,
~
..,
~~
/,!",
..
~
.
.
.
'"
(')0
. ",,,
.", >
: ~ ~
: It-!B
: 31:0 -
. ..
... 0
... 0
~ ~
g '"
.
..
'"
10
-
::l
..
...
o
16631
C/l
m
o
C
m
z
o
m
z
c
s:
OJ
m
~
I
.1
.1
1
. ,
,
. :
--l
~
<.0
0>
.j>.
01
0>
I\)
-u
)>
o
o
::;
f1:1
~
I\)
-
o
CJ>
-
I\)
o
o
<.0
. ,
, i
. ,
!
t~~J
C/l
m
0
C
m
z
0
m
z
c
s:
OJ
m
~
~
~
'"
Ol
.j:>
<.n
Ol
N
"0
;t>
0
" 0
" ;t>
" -I
'"
~ m
"
'" ~
~
'" N
" -
" 0
to CD
"' -
" N
"' 0
'"
" 0
'" '"
'"
:l
'"
a
"
"'
--
m
iP
~
0
"
'"
~
"
~
AIUO llsodaO JD,j
C99H ~S9
6U!lEJado sJaau!6U3 \ISH eqp
OUJ saOue!os 4lJE3 aJl?l:j
r---'"
I
0:=
"-<
i...
o
~..
.. '"
'"
.,,-..r
r-if:~~
~OW,.,
'<"..~
!llQ>_
W)Io0Z
'11.r-cnm
.... 0"
;:Qcn
f:l!t~..
.. nlm
-"000
"0 -
~
0;
;;l
~
Z
o
po
~ m
8
:j
~
~
I~ N(,-:.,
. ~
. a... or
. ......,....'"
~
~
f
~fl"O
o 0'
t &
. Q i
'., 0 i
n ~ n~
I !io <'I 5'l!o
..c~ g o~
I i~~~ ~ .~~
I i~1 .~, H
I :~
. x
I
I
l__.._.m..
. .. ...-..,.-,........- ...
III
~
i!l
o
~ ."
.... n
III 0
. C
~n~
~~n
~2i
N~cn .
i6)i.
~
s
In
m
;ii
Z
C
..
"
.
.
.
...
r
~
m
m
Z
i!
o
<=
i
"
.
,
~
:!l
3
n
a
.
.
.
.
<
o
.!.! e;
. '" >
: !! :!I
. > m
: I: :II
. 0 ~
;;:el!!
=!i~
:< ..
g ..
.
~o
S~
~m
~
..
n
'"
~
~
"I:
" ..
=!ll
lil
I
i
i
:!l ~ 1
~ ~ ' i
~ ~ ,
i ~ !
6. .
.
~
z
x
.
co '
. .
~
...
~
..
Cl
16G3
(Jl
m
o
c
m
z
(")
m
z
c
;;;::
OJ
m
?:J
'l
'l
t
(.0.)
CD
N
~
; I
.1
. i
. i
i
.1
'U
;t-
o
o
~
!l:1
o
~
-
~
~
i's
o
~
o
, i
i
i
. i
, :
'o' !
1663
Rare Earth Sciences Inc
dba HSA Engineers Operating
65117663
For Deposit Only
~
c
ft
0-
~
"
w
ijj
~
'"
g
c:;
0 ;;;
~ g
0 c:;
'"
~ M
"
~ M
~ c:;
- '"
~ ~
0
"'
w ~
!;: "
<.J
r.
"
0 ,...
0
c:(
c..
~
N
co
C'l
'<t
'<t
"-
"-
Ii
w
al
:2
::>
z
w
u
z
w
::>
0
w
CI)
16G3
SECTION III. (continued)
Certified Public Accountant (CPA) Certificat!~n
For more detail see vararzravhs 62.788.300(J)(h1 and .330(3iM. F.A.C.. and subsections 62-788,300(41 and 330 (41. F.A.C.
The following certification shall serve as proof that the documentation listed in Section III of this application has been
reviewed by the undersigned independent CPA in accordance with standards established by the American Institute of
Certified Public Accountants. Specifically, the undersigned CPA is attesting to the accuracy and validity of the costs
incurred and paid after having conducted an independent review of the data presented by the applicant; that the costs
included in the application form are not duplicated within the application; and that the application contains only those
costs that were incurred and paid during the timeframe represented in the tax credit application. In addition, a copy of
the Independent CPA's report must be submitted whenever Section III is completed (with all annual site rehabilitation
and all solid waste removal applications). The CPA is not responsible for attesting to whether the costs claimed are for
site rehabilitation or solid waste removal.
Under penalties of perjury, j declare that I have read A Guideline for Agreed-Upon Procedures for Attestation Service
for the Voluntary Cleanup Tax Credit (VCTC) Program", Chapter 62-788, F.A.C., and Sections 376.30781 and
220.1845, F.S., and that I understand the accounting requirements associated with these documents. In addition, I attest
that I have read the foregoing Voluntary Cleanup Tax Credit application and that the facts stated in it are true to the best
of my knowledge and belief.
$ 61,427.00
Total site rehabilitation amount claimed in application
$ 61,427.00
Total site rehabilitation amount approved by CPA
Total solid waste removal amount approved by CPA
Total solid waste removal amount claimed in application
- These amounts must be consis1ent with the amounts stated in the CPA Report.
d.,~ /1~J/<,h~
0ndependentPf\ Signature
.-?>h ;{h-O
Oat
2009
Time period covered by application
CPA Information:
Name: James J. Scullin
Address: 5064 Jarvis Lane
N-illlles
(City)
Collier
(COWlty)
FL
(State)
34119
(Zip Code)
Telephone Number: l239c) 435 - 3536
(Atea ode)-
License Number:
Expiration Date:
AC38987
12/3112011
Original Issue Date: 12/20/2006
"Note: FDEP has developed guidance to assist CPAs in the review ofVCTC applications. This guidance, currently in draft
form, is entitled A Guideline for Af!T'eed-Uoon Procedures Attestation Service for the Va/unlorv CleanuD Tax Credit
(VCTC) Prof[f'am, August 2008, and may be obtained by calling the VCTC program manager at (850) 245-8927.
11 of 13
VCTC Application
16G3
INDEPENDENT CPA'S REPORT
SCULLIN & SOBELMAN, P.A.
Certified Public Accountants
1250 TAMIAMI TRAIL NORTH, SUITE 302
NAPLES, FLORIDA 34102
1663
TELEPHONE
FAX
(239) 435-3536
(239) 435-9066
JAMES J. SCULLIN, CPA"
JERRY SOBELMAN, CPA""
STEPHANIE L. COX, CPA
"'Licensed in FL & MA
"Licensed in FL & PA
Members of:
American Institute of Certified Public Accountants
Florida Institute of Certified Public Accountants
Bayshore Gateway Triangle Community Redevelopment Agency
Naples, FL
We have performed the procedures enumerated below, which were agreed to by Gateway Triangle
CRA, solely to assist them with the filing of a Voluntary Cleanup Tax Credit Application (the
Application Package) related to the Gateway Triangle CRA site rehabilitation project with the Florida
Department of Environmental Protection for the calendar year ending December 31, 2009. Gateway
Triangle CRA's management is responsible for the filing of a Voluntary Cleanup Tax Credit
Application related to the Gateway Triangle CRA site rehabilitation project with the Florida
Department of Environmental Protection. This agreed-upon procedure engagement was conducted in
accordance with attestation standards established by the American Institute of Certified Public
Accountants. The sufficiency of the procedures is solely the responsibility of the party specified in this
report. Consequently, we make no representation regarding the sufficiency ofthe procedures described
below either for the purpose for which this report has been requested or for any other purpose.
Our procedures and findings are as follows:
1. Procedure - VerifY the accuracy and validity of the payment request numbers, payment request
dates, payment request amounts and mathematical accuracy of the payment requests included in
the Application Package.
Finding - No exceptions were found as a result of applying the procedure. The same
purchase order number is used on all payment requests.
2. Procedure - VerifY that the site rehabilitation costs included in the Application Package were
for expenses incurred and paid within the 2009 calendar year.
Finding - No exceptions were found as a result of applying the procedure.
Total applicable costs - $ 61,427.00
3. Procedure - VerifY that the payment requests or costs for the project were not duplicated in the
Application Package.
Finding - No excep1ions were found as a result of applying the procedure.
4. Procedure - Obtain copies of payment records and the related endorsements from Bayshore
Gateway Triangle CRA for the calendar year payable to HSA. Compare these payment records
to the payment requests provided by HSA.
Finding - No exceptions were found as a result of applying the procedure.
..
Th&CPA.,Ne....rUrderestimat..Th..valu..~
Procedures & findings - continued:
166j
5. Procedure - Obtain an independent confirmation from HSA of the information being tested to
verifY that the costs included in the Application Package were related to Bayshore Gateway
Triangle CRA site rehabilitation project, that the work was performed, and that the payments
were received during the calendar year end 2009.
Finding - No exceptions were found as a result of applying the procedure.
6. Procedure - Obtain a representation letter from management confirming they have made
available to us all relevant information and they have responded fully to all inquiries made by
us during the engagement.
Finding - A signed representation letter was obtained.
We were not engaged to, and did not, conduct an audit, the objective of which would be the
expression of an opinion, on the accounting records. Accordingly, we do not express such an opinion.
Had we performed additional procedures, other matters might have come to our attention that would
have been reported to you.
This report is intended solely for the information and use of Bayshore Gateway Triangle CRA and is
not intended to be, and should not be, used by anyone other than the specified party.
~,.~ ",o~
Scullin & Sobelman, P.A.
January 14, 2010
<iD
TheCPA.Nev'''Unde''''llmM.T~valve'!
16G3
INDEPENDENT CONFIRMATION OF INFORMATION TESTED FROM HSA PER
BULLET 5 ON PAGE 4 OF "A GUIDELINE FOR AGREED-UPON PROCEDURES
ATTESTATION SERVICE FOR THE VOLUNTARY CLEANUP TAX CREDIT (VCTC)
PROGRAM" PROVIDED BY CPA
01/14/2010 15:49
2399350819
HSA
PAGE 02/02
/
,.,.
,
al/1412010 12:28
n94~S9056
SCULLIN li\ SOBELMAN
PAGE 02/02
1663
BA YSHORE GA TEW A Y TRIANGLE COMMUNiTY DEVELOPMENT AGENCY
4069 Baymore Drive
Naples, Florida 34112
P: (239) 643-1115 F: (239 775-4456
www.collierera.com.
January 13,2010
HSA Engineers &'. Scientist~
1520 Royal Palm Square :Boulevard, Suite 260
Fort Myers, Florida 33919
In connel'tion with our Vohmtary Cleanup Tax Cl'lldit (VCTe) application, our
independent certified public aceotlnting finn, Soullin &. Sobelman, P.A., requests
confmnation of certain infonnation regardw.g our transactions with your firm.
Please indieate in the space provided below whether this information is in agreexnEll'lt with
your records. If thel'll are any differEll'lces, please provide any lnfOmllltiOJ) yO\! have thlt
will baIp reQoncile the differences.
Please sign and date your I'llsponse IJld maU your reply directly to Scullin &. Sobelllllln.
P.A., 1250 Tamiami Trai.l Nortb, Suite 302, Naples, FL 34102. In addition to mailing
your reply, we respectfully request that you also fax your reply directly to Scullin &.
Sobelman, PA. at 239-435-9066.
~
C) ,AICP
Bayshore Gateway Triangle CRA
::::>
In
Agreement
(Yes) (No) Invoice # Invoice Date Amount
I{~
"(~
"l'LC,
659333
660714
662409
1 01.23/09
11/17/09
12/22109
$ 7,318.50
$ 40,511.00
$ 13,597.50
I(~
'{6h'
Y'......
'1',A
All work was related to Baysh,Ol'e Gateway Triangle CRA,
All work was for their .ite rehabilitation project.
All work for the above Invoice. was penormed by HSA.
All of e above invoices have been paid by BGT CltA.,
I
/ /8
S16A!;1-,,,,,,,,q
",,"rs
16G3
SECTION III. (continued)
Technical Professional Certification
For more detail see oaraf!T'aohs 62-788.300(3)(,,) and.330(3)(e). F.A.C.
The following certification shall serve as proof that the voluntary cleanup activities have been conducted under the
observation of, and related technical documents have been signed and sealed by, an appropriate professional registered
in the State of Florida in each contributing technical discipline associated with the documentation listed in Section III of
this application for either annual site rehabilitation or for solid waste removal that has occurred since July 1, 2006, in
accordance with department rules and regulations.
Under penalties of perjury, I declare that I have read and understand the requirements of Chapter 62-788, F.A.C., and
Sections 376.30781 and 220.1845, F.S. In addition, I certifY that I have read the foregoing Voluntary Cleanup Tax
Credit application, including all the backup documentation; that I understand and have adhered to the requirements
stated on page 10 of this tax credit application; and that the costs incurred and paid and claimed in this application were
integral, necessary, and required for either site rehabilitation or for solid waste removal.
Seotember 2009
Site rehabilitation period covered by application
December 2009
Solid waste removal period covered by application
(SEAL)
Januarv 7. 2010
Date
Roxanne Lewis Gause
Print Name
Professional Eneineer
Print Title (e.g., Professional Engineer, Professional Geologist)
Technical Professional Information:
Roxanne Lewis Gause P. E.
Name:
Address:
1520 Roval Palm Seuare Boulevard. Suite 260
Fort Mvers
(City)
Lee
(County)
Florida
(State)
33919
(Zip Code)
Telephone Number: (239 )
(Area Code)
936
4003
State of Florida License Number: 53261
Expiration Date: Februarv 28. 2011
Original Issue Date: August 17, 1998
12 of 13
VCTC Application
1663
SECTION IV.
Non-refundable ADDlication Review Fee
For more detail see oarall1'aohs 62-788.300(3)(e). 31O(3)(c), 320(3)(c) or 330(3)(c) F.A.C.
All applicants must include a cashier's check or mouey order (DO NOT SEND CASH, PERSONAL CHECKS,
OR CORPORATE CHECKS) made payable 10 the Water Quality Assurance Trus1 Fund in the amount of$250 10
cover the administra1ive cos1s associated with the Department's review of 1he tax credit application. The $250
applica1ion review fee is non-refundable; failure 10 submit the non-refundable applica1ion review fee as required
by s. 376.30781 (6)(a), F.S., shall result in the application being deemed "incomplete", in accordance with Rule 62-
788.400, F .A.C.
Send Comoleted Aoolications to:
Departmen1 of Environmental Pro1ection
Division of Waste Management
Attn.: Voluntary Cleanup Tax Credi1
2600 Blair Stone Road, Mail Sta1ion 4505
Tallahassee, Florida 32399-2400
-OR-
Hand deliver to:
Department of Environmental Protection
Division of Waste Management
Bureau of Waste Cleanup
2600 Blair Stone Road
Room 309
Tallahassee, Florida
Atln.: Voluntary Cleanup Tax Credit
KEEP A COPY OF THIS COMPLETED APPLICATION FOR YOUR RECORDS.
13 of 13
VCTC Application
MEMORANDUM
Date:
January 26,2011
To:
Sue Trone, Operations Analyst
Bayshore Gateway CRA
4069 Bayshore Drive
Naples, Florida 341 ] 2
From:
Ann Jennejohn, Deputy Clerk
Minutes & Records Department
Re:
Bayshore Gateway Triangle CRA's
2010 Application for a Voluntary Cleanup
Tax Credit for property at 4069 Bayshore Drive
Attached is the original application referenced above, (Item #I6G3)
approved by the Board of County Commissioners on December 1, 2009.
The Minutes & Records Department will hold a copy of the application
in the Official Records of the Board.
If you have any questions, please contact me at 252-8406.
Thank you.
Attachment
16G3
Patricia L. Morgan
16G3
From:
Sent:
To:
Cc:
Subject:
TroneSue [SueTrone@colliergov.net]
Tuesday, January 25,2011 11:14 AM
Ian Mitchell
Patricia L. Morgan; JacksonDavid
RE: Item for Signature
Item 16G3 from Dee. 1,2009.
Sue Trone, AICP
Project Manager
Bayshore Gateway Triangle CRA & Haldeman Creek MSTU
4069 Bayshore Drive
Naples, Florida 34112
T: (239) 643-1115 I F: (239) 252-6928
co II i e rcra. com/ bays h 0 reg a tew ay
From: Mitchelllan
Sent: Tuesday, January 25, 2011 11:13 AM
To: TroneSue; JacksonDavid
Cc: 'Patricia L. Morgan'
Subject: Item for Signature
Importance: High
I need to know when this was passed and the item number, we cannot process it without this information.
Regards,
Ian Mitchell
Executive Manager, BCC
(239) 252-8097 phone
(239) 252-6406 fax
ianmitchell@colliergov.net
Uri'~" f;')';:'I.~l L.j'",,,, <'rn;li!ldd,',:,<>,,'; .If" ri'jl:'I;i j. r:.lIh r'I.; ki ", "il,1 y',j1if .'; -,:1 J-:(II'<',;:; ,,,r"i,.,j i:- ,,"0'11';1'0',(' ~i: ,I pd';II': ],oqd,' :"'~l;,';t de r'd .;, :"~
i"ll! ':" 1'11" (fl!il',; !'1 '.'(<ld (,)"1,10 '!l . 'if,!" "",';~I',;' 'i'!inr:)
. ,. ....'1 I BAY S H 0 R E
,. -' GATEWAY
"'~ ." ';"i\ TRIAN.GLE
EaElfn . ~
16G3
'^---^-
eRA Board
Commissioner
Donna F'lala
Chailmdn
ComrnjssjOJl(~r
F(1'd Vi Coyle
(~OI'm:!~_'iiOil(~r
J'.lfli?S N. C):,;tt~
COllllni$si0l10f
Tom Hf,nr.inq
(:,J/1irTlI<;;;ioner
C~()rgia Hiller
Ad'lisorv
8"q.~.f~
Gh.\inllan
UllrhAY Tholln')
Vice-Chair
J,II B:my
I<;lr-'~n (l",llty
L..'lf1y'-Ottr.! IIh,JI_Hl1
CilliCk G1.lIIH1;}(
~.1,lulici' C;II:I-')II"I
Ste',e r.,1.1in
PI!ter D'ior Jk
1~lu';~' Pr"til!)
CH.AStaif
1}".j,J L Jlr~k_,I)il
"-d ," UII',C('))
j . ill.I'JllI'rLln
,':'rc;,,;t ~.!,lcl'pr
:,~Ij' rr'iu~
~ .' I " ~ t r J ,I'. I ; "I
r:J",id J?'_lr:I,,'" ~jt
, . ',;II,L,I:i.;'1
To:
From:
Date:
RE:
Mr. Ian MitChellz;f (- \
Sue Trone '\
January 25, 2011 ~
Commissioner Fiala's sign ture and your Notary Public on attached
Yoluntary Cleanup Tax Credit application for the CRA
Attached is the Bayshore Gateway Triangle CRA's application for the 2010
Voluntary Cleanup Tax Credit (YCTC) for expenses the CRA paid toward the
cleanup of petroleum contamination on the brownfield site on the 17+ acre site.
Per our discussion last week, I am leaving this application with you for you to get
Commissioner Fiala's signature on page 11 and for your notarization. Steve
Williams reviewed the application for legal sufficiency yesterday and signed it on
page 11. After you are finished please call me and I will pick it up and take it to the
Clerk of Court's for recording because I am under a very strict deadline to get this
mailed to Tallahassee.
As always, I sincerely thank you for coordinating with my schedule, the
commissioner's schedule, and your own very busy schedule. I also appreciate your
willingness to notarize the application. Without your spirit of teamwork the CRA
would be severely hamstrung. Thanks, Ian, for all you do!
\\,'\C)
\ "r,) t
/\\'JV'" y~'S_-
:/
__I- \ 6'1'
\,U
\_ C'\I
\~ fC'-,J t~ .
\W
\\vs\\\
<(\~v IX
(~()G'J R,1y~;hiJr,:.! D!i\,.,~ . ~!;Jp)'~s, FI,)()(!, 1 3~ 112
P 1,J.~0) ,:;-+:3 I r 1:1 . r. ('J,'\'")j //:,; tl1.'i)
,'/\(,;/.,:<:11" I i~(l .:rjlll
Department of
Environmental Protection
16631
VOLUNTARY CLEANUP TAX CREDIT
APPLICATION AND AFFIDAVIT
Pursuant to the provisions ofs. 376.30781, F.S., application for a Voluntary Cleanup Tax Credit (VCTC) is
hereby made. The following infonnation is submitted in support of this application. Please complete the
applicable sections of this fonn, draw a diagonal line through inapplicable sections, and submit the entire
application fonn along with any other required documentation.
Application Number
SECTION I. - APPLICANT INFORMATION
A. APPLICANT'
(FDEPl:seOnlyj
Name: Collier Countv Community Redevelopment Agency
Address: 4069 Bazshore Drive
(Street or P. . Box)
Naples.
(City)
Florida
(State)
34112
(Zip Code)
Applicant's Point of Contact: Sue Trone
Telephone Number: (239) 643-1115 E-mail: suetronelaicolliergov.net
I request that all correspondence related to this application be sent to the applicant's point of contact at their:
o postal address
~ e-mail address (Choose one)
Federal Employment Identification Number (FElD), if applicant is a business:
-OR-
Social Security Number, if applicant is an individual:
59-6000558
(9-digitnumber)
- - - ~digrrnunioer) - - -
B. APPLICANT'S AUTHORIZED AGENT OR REPRESENTATIVE (OPTIONAL)
Name:
Address:
(Street or P.O. Hox)
/'
...,//'''''
(City)
(State)
;' (LIp Lode)
Telephone Number: (
)
E-mail:
I request that, in addition to the applicant's point of contact, alr~~rrespondence related to this application be sent to
the applicant's authorized agent or representative~\Jhei(
o postal address
o e-.I)lairiiddress (Choose one)
I lfmultiple tax credit appllcants are submitting ajoint appllcationfor one site, please make copies of this page and
have each tax creJit appllcant complete Section J, Appllcant biformation of this appllcation.
// lof12
~----_/
DEP Fonn# 62-788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
SECTION II. - SITE INFORMATION
16G3
A. SITE IDENTIFICATION
Brownfield Site IDrycleaning Facility Name: Hubert's Weldin2
Address: 4315 Ba;sshore Drive
(Street or P. . Box)
Nafles
(CIty
Florida
(State)
34112
(Zip Code)
Brownfield Site Identification Number: .B..E 11090100 I
(9~digit number)
Is there more than one contaminated site, as defmed by Department rule, covered by the above Brownfield Site
Rehabilitation Agreement (BSRA)? _(YesINo)
------------------------------------------------------------------- 0 R -----------------____________________________________________________
DEP Drycleaning Facility Identification Number: _ _ _ _ _ _ _
(9-aijlt number)
If this application is for a Drycleaning Solvent Cleanup Program (DSCP) site and the Real Property Owner is not the
applicant, please provide Real Property Owner infonnation.
Name:
Address:
(~treet or P.O. Box)
(City)
(:State)
(Lip Code)
Telephone Number: (
)
E-mail:
B. TYPE OF SITE
o (I) A drycleaning solvent contaminated site eligible for state-funded site rehabilitation under s.
376.3078(3), F.S. The applicant must complete Section II.C. on page 3;
o (2) A drycleaning solvent contaminated site at which cleanup is undertaken by the real property owner
pursuant to s. 376.3078(11), F.S., if the real property owner is not also, and has never been, the
owner or operator of the drycleaning facility where the contamination exists. The applicant must
complete Section II.D. on page 3; or
~ (3) A brown field site in a designated brownfield area under s. 376.80, F.S.
2 of 12
DEP Fonn# 62-788.900(1) - Voluntary Cleanup Tax Credit Application _ Effective Date XXlXX/XXXX
16G3
C. DSCP SITES ELIGIBLE FOR STATE-FUNDED SITE REHABILITATION
See paragraph 62-788.300(3)(d), F.A.C.
If box B.(l) is checked on page 2, the applicant must submit with this application a copy of t&~
Department's eligibility order for the DSCP and the appropriate deductible payment, as indicated I the
order. Please include a cashier's check or money order (DO N?T SEND CASH, PERSONAL. C~CKS,
OR CORPORATE CHECKS) made payable to the Water Quahty Assurance Trust Fund. Thl~check or
money order must be separate from the $250 non-refundable application review fee required bY.S~ction VIII
of this application. Please check the appropriate box below to indicate the amount encloseg/or previously
~d: I
0$1,000 (complete DSCP applications submitted by June 30, 1997)
/
0$5,000 (complete DSCP applications submitted July I, 1997, through September 30,)998)
o $10,000 (complete DSCP applications submitted October I, 1998, through Decemb~r 3 I, 1998)
o Deductible previously paid in (year) VCTC application
/1
D. REAL PROPERTY OWNER AFFIDAVIT
See paragraph 62-788. 300(3) (b), F.A.C.
If box B.(2) is checked on page 2, the following affidavit must be signed by the real property owner and
notarized:
The undersigned, under penalties of perjury, does solemnly swear that the applicant is the real property
owner of the property containing the drycleaning so~v'mt contaminated site at which the applicant is
voluntarily conducting site rehabilitation, and that th.e applicant is not, and has never been, the owner or
operator of the drycleaning facility where the contamination exists.
Signature of Real Property Owner or Authorized Corporate ReapS;operty Owner Representative
/
Date
I
Print Name of Real Property Owner or Corporate Real ~r6perty Owner
Print Name of Authorized Corporate Real Prope~ Owner Representative
/
STATE OFFLORIDA i/'
COUNTY OF
Title
/1'
Sworn to (or affirmed) and S7ibCd before me this _ day of
/
Personally known ---?,6R Produced Identification _
/
. (
Type ofIdentlfic Ion Produced
,20_. by
ReaJPropertyOwner's:'\lame
SignatureofNolary Public-State of Florida
(Print, type, or stamp Commissioned 'Same of Notary Public)
3of12
DEP Fonn# 62-788.900(1) - Voluntary Cleanup Tax Credit Application. Effective Date XXlXXiXXXX
.. ---"-_._------- ~--_._---
166 :3
SECTION III. - DOCUMENTATION
For more detai!, see paragraphs 62-788.300(3)(j) and . 330(3)(d), F.A.C.
This application package must include copies of documentation sufficient to demonstrate that the tax credit
applicant, which must be the signatory to a Voluntary Cleanup Agreement or BSRA, paid the costs that were
either integral to site rehabilitation or that were for solid waste removal (applies to BSRAs only). Costs for
site rehabilitation must have been incurred between January I and December 31 of the year for which the
application is being submitted and paid prior to submittal of the tax credit application; costs for solid waste
removal must have been incurred and paid since July 1,2006.
The documentation must clearly describe the goods or services and associated costs that are being claimed in
the application. Copies of documents for goods or services that are being claimed must be sufficient to
demonstrate a link between the contractual records, the payment requests associated with the contractual
records, and the payment records for the claimed portions of the payment requests, as required by each of
the following three paragraphs:
I. Contractual records that describe the scope of work performed during the applicable time period that
was either integral to site rehabilitation or for solid waste removal. Examples include: contracts,
documentation of contract negotiations, proposals, work orders, task orders, and change orders; and
2. Payment requests that describe the goods or services provided in support of the above scope of
work. Examples include: invoices, sales tickets, and account statements. Payment request
documents that include costs for goods or services that are not being claimed in the VCTC
application must clearly identify which costs are being claimed; and
3. Payment records that describe the actual costs incurred and paid for the goods or services above.
Examples include: cancelled checks, or other payment records from purchases, sales, leases, or other
transactions.
The Certified Public Accountant (CPA) and Technical Professional Certifications are not required if the
applicant is claiming only an Affordable Housing, Health Care, and/or SRCO VCTC, because the tax credit
applicant will have previously provided this documentation in the annual site rehabilitation application(s).
4 of 12
DEP Fonn# 62-788.900(1) ~ Voluntary Cleanup Tax Credit Application - Effective Date XXlXX/XXXX
16G31
SECTION IV. - TAX CREDIT CLAIM AND CALCULATION
A. TYPE OF TAX CREDIT CLAIMED (Check all that apply and complete additional sections as directed)
[8J (a) Site Rehabilitation; requires completion of Section IV.B.
o (b) Site Rehabilitation Completion Order bonus; requires completion of Section IV.C.
o (c) Affordable Housing bonus; requires completion of Section IVD.
o (d) Health Care bonus; requires completion of Section IV.E.
o (e) Solid Waste Removal; requires completion of Section IV.F.
B. SITE REHABILITATION
See Rule 62-788.300, FA.C.
Complete this section to claim a credit in the amount of 50% of the cost of voluntary cleanup activity that was
integral to site rehabilitation conducted during the calendar year for which this tax credit application is being
submitted.
I. Total site rehabilitation costs incurred and paid
for this calendar year
2. 50% of the amount on line 1. or $500,000 -
whichever is less
3. Joint applicant The percentage and
corresponding amount of site rehabilitation costs
on line 1. contributed by the joint applicant for
this calendar year
$56.337.11
$28.168.55 Site Rehabilitation tax credit claimed
Joint applicant name
% contributed
$
Amount contributed
C. SITE REHABILITATION COMPLETION ORDER BONUS
See Rule 62-788.300, F.A.C.
If the Department issued a "No Further Action" (NF A) order (i.e., Site Rehabilitation Completion Order - SRCO) .
for the contaminated site, complete this section to claim the SRCO bonus in accordance with the dates an)i.--'/
percentages in the table below. ,//
/
//
/
~/...
./'~~
I.
Total eligible site rehabilitation costs incurred
and paid from July 1, 1998 through June 30, 2006
10% of the amount on line I. or $50,000 -
whichever is less
$
2.
$
/.,~
SRCO bo~laimed before
July 1..'Z006
,,/'/'
3.
Total eligible site rehabilitation costs incurred
and paid on or after July 1,2006
25% of the amount on line 3. or $500,000
whichever is less
$
"'
4.
,
./"..",.
/
$
/"
SRCO bonus claimed on or after
July 1,2006
/'
5. Joint applicant The percentage and /
corresponding amount of total eligible ~it{ Joint applicant name
rehabilitation costs on lines 1. and 3. conp"i~uted
by the applicant % contributed
/
$
Amount contributed
/
/"
,. If multiple tax credit.fJPplicants are submitting a joint application for one site, please have each applicant indicate
that applicant'sperCentage and amount contributed to payment of site rehabilitation costs on a copy of this page and
have each '!PPficant complete a separate copy of the affidavit in Section VlI.
,. The com/f[ned SRCO bonus amount claimed for site rehabilitation conducted before and after June 30, 2006 cannot
";Peed $500,000.
./ 5 of 12
DEP Fonn# 62-788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
16G31
D. AFFORDABLI! HOUSING BONUS
See Rule 62-788.310, F.A.C.
If use of the brownfield site identified in the BSRA is limited to affordable housing, complete this s-ection to
claim a tax credit in the amount of 25% of the eligible cost of voluntary cleanup activity that wa.g1ntegral to
site rehabilitation and incurred on or after July 1,2006. ./
/
/
,
,
/
/
/
/
I
Affo"~ble Housing bonus claimed
/
1. Total eligible site rehabilitation costs incurred
and paid on or after July 1, 2006
$
2. 25% of the amount on line 1. or $500,000 -
whichever is less
$
/
Joint applicant nam~'
/
-jofo contributed
$ / Amount contributed
/
I
,
/
In accordance with Rule 62-788.310(2), F.A.C., please provjde a certification letter from the party to the use
agreement that is identified below. /
./
3. Joint applicant The percentage and
corresponding amount of total eligible site
rehabilitation costs on line I. contributed by the
applicant
(a) Florida Housing Finance Corporation
/
/
/
o
o
o
(b) Local housing authority
/
I
/
/
/
(Name of Agency)
(c) Other govemment agency
(Name of Agency)
l> If multiple tax credit applicants are sub itting a joint application for one brown field site, please have each applicant
indicate that applicant's percentage d amount contributed to payment of site rehabilitation costs on a copy of this
page and have each applicant com ete a separate copy of the affidavit in Section Vll.
/
I
/
/
6 of 12
DEP Form# 62-788.900( I) - Voluntary Cleanup Tax Credit Application - Effective Date Xx/XX/XXXX
16G31
E!. HEALTH CARE FACILITY OR HEALTH CARE! PROVIDER BONUS
See Rule 62-788.320, F.A.C. I
I
If use of the brownfield site identified in the BSRA includes a health care facility or a health care pr9./i'der,
pursuant to Sections 408.032, 408.07, or 408.7056, F.S., complete this section to claim a credjt in the
amount of 25% of the eligible cost of voluntary cleanup activity that was integral to site rehabiJration and
incurred on or after January 1, 2008. /
1. Total eligible site rehabilitation costs incurred
and paid on or after January 1,2008
,I
/
$
~
.I
,
/
./
2. 25% of the amount on line 1. or $500,000 -
whichever is less
I
$
,
He"'tb Care Facility/Provider
bonus claimed
3. Joint applicant The percentage and
corresponding amount of total eligible site
rehabilitation costs on line 1. contributed by the
applicant
/
/'
Joint applicant nam~1
_~%contributed
$ _-I- Amount contributed
o
o
o
Please check the category of health care facility or health care provider and specify the type of
facility/provider in the space provided. /
/
(a) Health Care Facility pursuant to Section 408.032fS.,
(b) Health Care FacilitylProvider pursuant to Sectj6n 408.07, F.S.,
/
(c) Health Care Provider pursuant to Section 4iJ8.7056, F.S.,
,/
/
Health Care FacilitylProvider claimed in t\:lls application:
"
Doing Business As:
Address:
City:
Telephone Number: (
County:
)
In accordance with Rule 62-788.320(2), F.A.C., please provide a copy of one of the required supporting
documents listed below.
o (a) Certificate of Occupancy
o (b) License for the operation of the Health Care Facility or Health Care Provider
o ( c) <;:ertificate for the operation of the Health Care Facility or Health Care Provider
.
" If rl]ltltiple tax credit applicants are submitting a joint application for one brown field site, please have each applicant
i!Jdicate that applicant's percentage and amount contributed to payment of site rehabilitation costs on a copy of this
I.page and have each applicant complete a separate copy of the affidavit in Section VII.
7 of 12
DEP Form# 62~788.900(1). Voluntary Cleanup Tax Credit Application - Effective Date XX/XXlXXXX
16G31
/
/
/
Complete this section to claim a credit in the amount of 50% of the costs incurred and paid on or!~ July
1, 2006 for solid waste removal from within the boundary of the eligible brownfield site identyed in the
BSRA. /
I. Total costs for solid waste removal incurred and /
paid on or after July 1,2006 $ II
2. 50% of the amount on line 1. or $500,000 - ~
whichever is less $ Solid aste Removal tax credit
clai d
/
/
Joint applicant name /
/
I
% codtributed
j
,
Amount contributed
/
F. SOLID WASTE REMOVAL TAX CREDIT
See Rule 62-788.330, F.A.C.
3.
Joint applicant The percentage and
corresponding amount of the solid waste removal
costs on line 1. contributed by the applicant
$
In accordance with 62-788.330(2), F.A.C., I have consulted with/he following local govemm'ent and DEP
officials. With this application, I certifY that, to the best of my)<'nowledge, the brownfield site as identified
in the BSRA was never operated as a permitted solid waste di~osal area or for monetary compensation.
I
Name oflocal government official consulted: ;'
/
,.."Telephone Number:
/
Title:
)
Name of DEP representative consulted:
j/
I
;'
Telephone Number: (
)
Title:
,
~ Ifmultiple tax credit applicants are submiltiill; ajoint application/or one brawn field site, please have each applicant
indicate that applicant's percentage and finount contributed to payment 0/ solid waste removal costs on a copy 0/
this page and have each applicant complete a separate copy 0/ the affidavit in Section VII
/
:/
,
I
/
/
;'
/
/
8 of 12
DEP Fonn# 62-788.900(1) - Voluntat'): Cleanup Ta"( Credit Application - Effective Date XXlXXlXXXX
16G 3 i
SECTION V. - TECHNICAL PROFESSIONAL CERTIFICATION
For more derail see l'araRral'hs 62-71i1i.300(3i(g) and . 330(3)(e), F.A.C
The following certification shall serve as proof that the voluntary cleanup activities have been conducted
under the observation of, and related technical documents have been signed and sealed by, an appropriate
professional registercd in the State of Florida in each contributing technical discipline associated with the
documentation listed in Section III of this application for either annual site rehabilitation or for solid waste
removal that has occurred since July 1.2006, in accordance with department rules and regulations.
Under penalties of perjury, I declare that I have read and understand the requirements of Chapter 62-788,
F.A.c., and Sections 376.30781 and 220.1845, F.S, In addition, I certify that I have read the foregoing
V oluntary Cleanup Tax Credit application, including all the backup documentation; that I understand and
have adhered to the requirements stated on page 4 of this tax credit application; and that the costs incurred
and paid and claimed in this application were integral, necessary, and required for either site rehabilitation
or for solid waste removal, as applicable.
J anuarv 2010
Site Rehabilitation Period Covered by Application
\\\\\1111/1/
,II E. LEW I'I
"(i,...l\~.",." .Is GIIIII
,'~YUCENs "''1<::< I~
, Q;'.' " ." ~
~:*.: ".~::'
'. ~
December 2010
Solid Waste Removal Period Covered by Application
Januarv 19, 20 II
Dille
ign~l~ o'~ Registered Technical prores~E
-,0.. STATE ,: 0 ~
RO~~i!Wi.S~USC OF . .,#~......
PrintN~ \S'\S' ....~RI?~..' 0" ,,'
IIII/ONAL €.~\\\\
/1/11111\\\\
Technical Professional Information:
Profes.'\ional EmdncCf
Prinl Title (e.g., Professional Engineer. Prnkssional Geologist)
Name:
Roxanne Gause
Address: 1520 Roval Palm Square Blvd, Suite 260
(Streel or P.O. Box)
Fort Mvcrs
(City)
FL
(Slale)
33919
(ZipCnde)
Telephone Number: (239 ) 936 4003
State of Florida License Number: 5326 t
Expiration Date: Februarv 28, 2011
9 of 12
fJEP Form# h2-7SN.c)(jO(I) - Voluntary Ckallup T;IX Cn:dit AppJil:alillll -1:lfl'cliVl' Dale Xx/XX/XXX X
16G3
.
SECTION VI. - CERTIFIED PUBLIC ACCOUNTANT CERTIFICATION
For more detail. see paragraphs 62-788. 300(3) (h) and.330(3)(j). F.A.C..
and subsections 62-788.300(4) and .330 (4). F.A.C.
The following certification shall serve as proof that the documentation submitted in accordance with Section III of
this application has been reviewed by the undersigned independent CPA in accordance with standards established
by the American Institute of Certified Public Accountants. Specifically, the undersigned CPA is attesting to the
accuracy and validity of the costs incurred and paid after having conducted an independent review of the data
presented by the applicant; that the costs included in the application fonn are not duplicated within the
application; and that the application contains only those costs that were incurred during the timeframe represented
in the tax credit application and paid prior to submittal of the tax credit application. In addition, a copy of the
Independent CPA's report must be completed whenever an annual site rehabilitation or solid waste removal
application is submitted. The CPA is not responsible for attesting to whether the costs claimed are for site
rehabilitation or solid waste removal.
Under penalties of perjury, I declare that I have read A Guideline for Agreed-Upon Procedures for Attestation
Service for the Voluntary Cleanup Tax Credit (VCTC) Program', Chapter 62-788, F.A.C., and Sections
376.30781 and 220.1845, F.S., and that I understand the accounting requirements associated with these
documents. In addition, I attest that I have read the foregoing Voluntary Cleanup Tax Credit application and that
the facts stated in it are true to the best of my knowledge and belief.
For Site Rehabilitation applications:
For Solid Waste Removal applications:
$56,337.11
Total Site Rehabilitation Amount Claimed in Application
Total Solid Waste Removal Amount Claimed in Application
$56,337.11
Total Site Rehabilitation Amount Approved by CPA
Total Solid Waste Removal Amount Approved by CPA
01/01/10 - 12/31/10
Time Period Covered by Site Rehabilitation Application
Time Period Covered by Solid Waste Removal Application
d..,;,z.,en d~J/~___
cAignature ofCPV
<9/ /~ ///
Date/'
CPA Information:
Name:
James J. Scullin
1250 Tamiami Trail
N,
Suite 302
Address:
(Street or P.U. Box)
Naples
(City)
Telephone Number: ( 239 ) 435
License Number: AC 3 8 9 8 7
Expiration Date: December 31, 2012
Original Issue Date: December 20, 2006
Florida
(State)
34102
(ZIp Code)
_ 3536
1 DEP has developed guidance to assist CP As in the review of VCTC applications. This guidance is entitled d
Guideline for A <!reed-Upon Procedures Attestation Service for the Voluntarv Cleanup Tax Credit (VCTO Pro<!ram.
October 2010. and may be obtained by calling the VCTC program manager at (850) 245-8927.
100f12
DEP Fonn# 62-788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
16 G 31
SECTION VII. - APPLICANT CERTIFICATION AFFIDAVIT
The undersigned applicant, under penalties of perjury, certifies that (s)he has read and understands the
requirements of Chapter 62-788, F.A.C., and Sections 376.30781 and 220.1845, F.S., and that all
information contained in this application, including all records of costs incurred and paid and claimed in this
tax credit application, are true and correct.
The following sections of this application have been completed and the appropriate documentation to
support these claims is transmitted with this application.
(Check all that apply)
Time Period Covered by the Application
Section D.C. Drycleaning Solvent Cleanup Program Sites eligible for State-funded Sile Rehabjlitation
Sectlonll.O. Real Property Owner Affidavil
~ Section IV.B Site Rehabilitation Tax Credit
January 1,2010 through December 31, 2010
Set:tion IV.e. Site Rehabilitation Completion Order Bonu,
Seetlon IV.D Affordable Housing Bonus
Section IV.E. Health Care Facility or Health Care Provider Bonus
lIem#
j(o~3
/-
Agenda ~1
Oat. (/
Signature of plicant
Date
Roc'd
Donna Fiala
Print Name
Collier Coun
Print Title
Collier County Community Redevelooment Aeencv
Print Company Name (if applicable)
','-J,;"I""
1\1 [" n n~ _:'~ \'
'\\Jpn.iVfllJ ,.~: f;.; ;T)~jT ~I ';qdi :3ufticH9nc':/
! fI!! ,
~~7-.wL
~ c' '; li\" j'~ :
~t.:;ns : .,,;'
~, .,. .
"en.~..Oftf.lt. .
"")" j'.
Notary Seal for Applicant's Certification Affidavit J '" .
STATE OFFLORIDA
COUNTY OF
c. 0 L.- L. , E:. (2..
.
Sworn to (0' affirmed) and subscnbed before me this 1.5:. day OfJ 4rJvAo/. 20.Lt--. by
Personally known I OR Produced Identification_
~ SignatureofNotaryPublic-StateofFloda
j)ONNA hAL~
Applicant's Name
..............................................:
: IAN MITCHELL :
Type of Identification Produced i ~''''\~\~'''''' Comm# 000810028 E
.5ione~~:
: "$.p'!:~ Florida _ AIl8Il.. lno i
11 of 12 :......~/..~~~u.................................1
DEP Form# 62-788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX!XXJXXXX
16G3
SECTION VIII. - NON.REFUNDABLE APPLICATION REVIEW FEE
For more detail see paragraphs 62-788.300(3)(e), 310(3)(c), 320(3)(c) or 330(3)(c) F.A.C.
Please include a cashier's check or money order made payable to the Water Quality Assurance Trust Fund
in the amount of $250 to cover the administrative costs associated with the Department's review of the tax
credit application. The $250 application review fee is non-refundable. Failure to submit the non-refundable
application review fee as required by s. 376.30781(6)(a), F.S., shall result in the application being deemed
"incomplete", in accordance with Rule 62-788.400, F.A.C.
Send Completed Applications to:
Department of Environmental Protection
Division of Waste Management
Voluntary Cleanup Tax Credit
2600 Blair Stone Road, Mail Station 4505
Tallahassee, Florida 32399-2400
-OR-
Hand Deliver to:
Department of Environmental Protection
Division of Waste Management
Bureau of Waste Cleanup
2600 Blair Stone Road
Room 309
Tallahassee, Florida
Attn.: Voluntary Cleanup Tax Credit
KEEP A COPY OF THE COMPLETED APPLICATION FOR YOUR RECORDS.
120f12
DEP Fonn# 62-788.900(1). Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
16G 3
COLLIER COUNTY
POLLUTION CONTROL & PREVENTION DEPARTl\1ENT
13Lfl E;lq T:;i.m!.llt~l Tu.i: . ,\;;pk-:-. Fiond,l 3~n 12 .. 23~L252-2..::'1l.? b.x 231)-25;2:.';5;:1
08/0612009
Sue Trone
Collier County Redevelopment Agency (Bayshore Gateway Triangle)
4069 Bayshore Drive
Naples, FI. 34112
COLLIER County - Regulated Storage Tanks
HUBERT'S WELDING & REPAIR
4315 KELLEY RD
NAPLES, FL 33962
DEP Facility # 8629388
CHapter 62-770, FAC Requlltit for Sile Asse$$ment Activities
Dear Sue Trone:
Chapters 376 and 403, Florida Slatules (Fla. Stat) authorizes and directs the Department of
Environmental Protection or Its designee to control and prohibit the pollution of air and water. A
facility that allows or causes the discharge of pollutant materials onto the ground may be in violation
of Chapters 376 and 403, Fla. Stat. and the rules promulgated thereunder.
On OS/29/2008, this office received a Discharga Report Form (DRF) in conjunction with a PHASE II
sampling report which indicates 62-777, Florida Administrative Code exceedances of both
groundwater and soils at the facility (please note that the facility address hasn't physically changed
but the address road name has changed from Kelley road to Bayshore road). The PHASE II was
prepared by Environmental Risk Management, Inc. (ERMI) and Is dated May 13, 2008. At that time
the facility wasn't owned by Collier County, but the facility Is now owned by Collier County as part of
a community redevopment effort, Based on this information the date of discovery is 05/08/2008.
Due to the discovery of petroleum contamination, you are required to initiate a formal site
assessment (SA) at this facility in accordance with the requirements of Florida Administrative Code
(FAC) Chapter 62.770, within thirty (30) calendar days from the date of discovery. Please provide
written confirmation of the initiation of the SA to this office. The confirmation should be submitted
within ten (10) calendar days upon initiation of the SA. Additionally, please provide three (3) days
notice prior to Initiation of field activities. If a SA has already been inlllated, please provide written
confirmation of \his upon receipt of this letter.
16G 3
Sue Trone
Facility 10: 8629388
081ll6l2009
Page 2 of3
If free product attributable to this discharge is present at your site, you must take steps to obtain
cleanup services for product recovery or initiate product recovery within three (3) days of discovery
of free product Product recovery shall be perfonned in accordance with Rule 62-770.300, FAC.
Additionally, within 270 days of the discovery of the contamination (by 0510312010), two copies of a
Site Assessment Report (SAR), prepared, signed and sealed in accordance with Chapter 62-770,
FAC, shall be submitted for review to:
Vince Mele, Petroleum Cleanup
Florida Department of Environmental Protection
P.O. Box 2549
Ft Myers, FI. 33902
After submittal of the Site Assessment Report, please be advised that additional requirements for
cleanup of the contamination may apply.
Please be aware that modifications to the tlmeframes Indicated herein may only be obtained
by requesting, in writing, the modifications sought. The written request must be submitted
20 days before the actions (the initiation of the SA or the submittal of the SAR) are due, AND
must show good cause to allow the modifications. Good cause shall mean unanticipated
events outside the control of the responsible party, This office does not consider generic
delays by contractors or Insurance carriers as good cause, It Is recommended that you
immediately provide a copy of this letter to your insurance carrier, as applicable, Failure to
meet Department timeframes for cleanup corrective actions may result in the calculation of
applicable penalties and Investigative costs.
If this site has previousiy existing petroleum contamination which is eligible for cleanup funding from
the Inland Protection Trust Fund under the Early Detection Incentive Program, Abandoned Tank
Restoration Program, Petroleum liability and Restoration Insurance Program of Petroleum Cleanup
Participation Program, section 376.30714, Fla. Stat. provides interested persons an option to apply
to the Department to enter into a Site Rehabilitation Funding Allocation agreement with the
Department. The agreement will establish the respective funding allocations of the Department and
the applicant for cleanup of the combined discharges, and wili establish the priority in which such
cleanup will occur. In such an agreement, the Department will be responsible for cleanup of no
more Ihan the existing eligible contamination and the applicant will be responsible for cleanup of no
more than the new discharge. Applicants wishing to take advantage of this option must submit a
limited Contamination Assessment Report (LeAR) and the application for Site Rehabilitation
Funding Allocation Agreement to the Department within 120 days of the date of discovery of the
new discharge. Until such a time as the application is submitted to the Department with a complete
leAR, you remain obligated to perform the site assessment activities set forth in Chapter 62-770,
FAC. In all cases, the owner, operator or responsible party must remove free product attributable to
the new discharge in accordance with Chapter 62-770, FAC. A copy of program information and
requirements, minimum content of the lCAR, and application form, may be obtained by contacting
the Bureau of Petroleum Storage Systems at 850/245-8839, or at the Bureau's internet web site
address at www.dep.state.f1.uslwastelcategoriaslpcpldefaulthtm
16G 3
Sue Trone
Facility ID: 8629388
0810612009
Paga 3 of 3
We look forward to your cooperation in completing the investigation and resolution of this malter.1f
you have any questions please contact me at 239-252-2502 at the letterhead address or bye-mail
philsnyderburn@colliergov.nel.
Sincerely,
~~~
PHILIP SNYDERBURN
SENIOR ENVIRONMENTAL SPECIALIST
Enclosure: 5/13/08 Phase 1I Environmental Assessment
c: File, Vince Mele
16G3
INVOICES
16G3
4
Bayshore Gateway Triangle
4069 eayshore Drive
Naples, FL. 34112
Attention: SUD Trone
Invoice #: 666918
Project: 7534668
Project Name: 4315 B3yshore Dri'Je SAR Report
Invoice Group: 06
Invoice Date: 03/171'2010
Purchase Order: POI! 4500111875
For Profgssional Services Rendered through; 212,(3,120.10
UNDER8ROUI\D STORAGE TANK REMOVEL. 4:J15 BAYSHORE DRIVE
SITE ASSESSMENT REPORT (SAR) S~RVICES
CONTRACT NO.: 06.3970
PURCHASFC ORDER NO' 4500111875
CH.~NGE ORDER 112
ACTIVITY THIS BUING PERIOD:
. PRO.lFCT COORDINATION
. MONITOR WELL INSTAllATION
. FIELD SUl'l'L1ES
Total Professional Fees and Expenses Due tl,ls Invoice
Percen1 CQr1plete 62 B5
6,285.00
www.hsa-env.com
1520 Royal Palm Square Boulevard. Suite 260 / Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax (239) 936-0819
Tampa. Orlando. Fort Myer" . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Oriented Quality Dnven
16G3
iEHSA
ENGINEERS & SCIENTISTS
t... member (If tf"e CRJ, F'5mllff;,1("~']mr-<lIjIE::
Bay.hare Gateway Triangle
4069 B..y.hore Drive
N..pl.... FL. 34112
Atten1lcn: Sue Trone
Invoice N; 670361 Revised
Project: 7534668
Project Name: Change Ord&r 3 & 4 - iSR Service.
Invoice Group: 07
I"volee Date: 05119/2010
Purcha.e Order: PO# 1500111875
For Professional Ser~joCe5 Rendered through; 5/9/2010
UNDERGROUND STORAGE TANK REMOVEL. 4315 BAYSHOFIE DRIVE
INTERIM SOURCE REMOVAL (lSR) SERVIC~S
CONTRACT NO.; 06.3970
PURCHASE ORDER NO.: 450Cll 1875
$32,525.00 CH.~NGE ORDER #3
$ 8,945.00 CIIANGC: ORDER #4
$41,470.00 TOTAl.
Chang~ order 3 & 4 Breakdown per prClposal
Budge'
Previous Amollnt Current Amount
Tolal Fee
Earned
1,ODD_00
0.00 2,770.00
000 4,642.95
O.OC 8.894.83
000 5,162.76
0.00 0.00
0.00 21,490.57
21,4QO.57
2,77000
To., 1 DiIOC! PusI' (LS)
5,550,00
Tesk 2 Excava:ion Activjlfes {LS,
7.000.00
4.642.96
T&::;k 3 ~VaBte Management (to, It.)
12,62.J.00
B,894.63
T.r=.sx 4 Engineeriflg Serv~ces (I,Si
15,30').00
5,182.78
Reimb'Jrsabre (NTE)
0.00
TOTAL
41,470.00
21,490.57
Total Professional Fees and E.penses Due this Invoice
wW'w_hsa-env.com
15~0 Royal Palm Square Boulevard, Suite 260/ Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Oriando . Fort Myer~ . Wesll"alm Beach. Pensacola 0 Savannah 0 Charleston. Hilton Head
Client Focused Solution Oriented Quality Dnven
16 G 3""
_HSA
ENOINEERS & SCIENTISTS
A ltlember Cl (he CRIlL F"iI~n",. L:fCl:'lnpan;e5
Bayehe,e Go""way Triangle
40&9 e...,.holll Drive
Nlpl.., FL 3.&112
Attention: Sue Trone
Invoice #: 67211~
ProJect: 7534006
Project Name: Chanije Order 2 - SAR Report
Invelce Group: 06
Invoice Dale: 061231l!010
Purch.e. O,d.r: POlII ~5001 1 1875
For ProfasioBIII $aNi!;.. Rendered through: ~/131201 0
UNDERGROUND STORAGE TANK REMOVEL. 4315 Bl\YSHORE DRIVE
SITE ASSESSMENT REPORT (SAR) SERVICES
CONTRACT NO": m-3910
PURCHASE ORDER NO.: 4500111875
CHANGE ORDER #2
ACTIVITY THIS BIlliNG PERIOD
. PROJECT COORDINATION
LJ\OORTORY COSTS
FIELD SUf>PUES
. SOIL SAMPLING
. SAR PREPARATION
Total Profes.iooal Fee. and Expenee. Due 111 Is Inyolce
Pert:E'rJl Complete: 77.07
2,963.83
www"hlla-tlnv.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33919
Tal: (239) 936-4003 I Fax: (239) 936-0819
Tampa. Orlando. Fort Myar~ . West Palm Beach. Pensacola. Savannah. Charleston. Hinon Head
Clten' Focuscd Solution Onented Quality Dnvcn
16G31
~HSA
ENGINEERS & SCIENTISTS
^ member of ~hB eRA Family ofClJm~nio:."S
Bayshore Gateway Triangle
40S9 83yshorc Drive
Naples, FL. 34112
Attcnt1on: Sue Trone
Invoice #: 672115 Ae'Jised
Prolect: 753466.9
Project Name: Change Order 3 & 4 . ISR Services
Invoice Group: 07
Invoice Date: 06/2312010
Purchase Order: PO# 45001' 1875
For Profession,']l Sorvices Rendered through: 6/1312010
uNOERGnOUNCl :3TORAGE TANK REMOVEL. 4315 8AYS-WRE (miVE
I~TERIM SOURGE; REMOVAL jlSRi SE'1VICES
CONTftAGT NO.: 06.-3970
PUllCHASE ORDER NO.: 4500111875
532,525.00 CHA~GE ORDER #3
S a.945.0~ CHANGE ORDER 04
541.470.0G' TOTAL
Breakdown per proposel
Task 1 Dirsel Push (LS)
rask 2 l::xcava\io'~ Ac:ti'/i:ies (LS)
Task 3 \Nsste Managemeni (NTE)
lask4 Eng'n~ering Service.!:! (LS)
R~lmbursa:'Jle {NTl::)
TOTAL
Budget PrevIous Amount Current Amount
5,550.00 2,770.00 2,380.00
7,000.00 ~,G42.ga ?,357.04
12,620.00 8,894.83 i,f15G.on
15.300.00 5,'~2.78 538.86
, ,000.00 0.0:; 5';::6.00
41,470.00 21,490.67 6,921.90
laial Fee
Earned
5,15000
7,000.00
9,944.83
5,721.64
598.00
28,412.47
Total Professional Fees and Expenses Due Ihis Invoice
6,921.90
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 2601 Fort Myers, Florida 33919
Tel: (239) 936.40031 Fax: (239) 936-0819
Tampa. Orlando. Fort Myerl? . West Palm Beach. Pensacola _ Savannah - Charleston. Hilton Head
Client Focusp.d Solution Oriented Quality Driven
16G3
..
.HSA
ENGINEERS & SCIENnSTS
A. mernber 0/ the CTi'A Family 01 Co"'r.lWl~
Ba~shora Gatewar Triangle
<W69 Bayshore Drive
Naples, Fl. 34112
Attention: Sue Trone
Invoice #: 673484
ProJect: 7534668
Project Name: Change Order 2. - SAR Report
Invoice Group: 06
Invoice Dale: 0711412010
Purchase Order: PON 4500111875
Fot Plofes.ional a.Nic'l Rendemd through: 612')'/2010
UNDERGROuND STORAGE TANK REMOVEL - 4315 BAYSHORE DRIVE
SITE ASSESSMENT REPORT ISAR) SERVlCES
CONTRACT NO.: ()6.3970
PURCHASE ORDER NO.: 4500111875
CHANGE ORDER #2
ACTIVITY THIS 81lLING PERIOD
. PROJECT COORDINATION
. REPOIH PREPARTION
. DRAFTING
. GROUNDWAi"OR FLOW DETERMINATION
Total Professional Fees and E~penses DUll this Invoice
Percent Complete: 97,{l$
2,397.50
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myen; . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Oriented Quality Driven
16G3
..
_HSA
ENGINEERS & SCIENTISTS
A me:noor o(the eRA Fll'mrl)' of CD'Tlpanle::
Baysho,e Gateway Triangle
4069 Baysho'e Drive
Naples, Fl. 34112
Allenlion: Sue Trone
Invoice #: 673485
Project: 7534658
Project Name: Change Order 3/\4 - ISR Services
Invoice Group: 07
Involc. Date: 0711412010
Pu,chase O,der: PO. 4500111875
For Proressional Services Rendered lhrough~ 6/27/2010
UND"RGROUND STORAGE TANK REMO'/EL, 43',5 BAYSHORE [HV[
INTERIM SOURCE REMOVAL (ISR) SERVICES
CONTnACT NO.: 06-3!HO
PURCHA5", ORDER NO: 45001 1 1875
$32,525.00 CHANGE O::lDER #3
S 8,945,00 CHANGE O;.lDER #4-
$41,470.00 TOTAL
Breakdown par proposal
Task 1 Direct PUSll (LSl
Task 2 Excavation Activllis.s (lS)
Task 3 Woslo Manage",e"! INTE)
Task 4 Er,gL'1~H:l:ing Services (LS)
RelribUrsable (NT!::)
TOTAL
Budget Previous Amount Current Amount
5,550.GO 5,150.00 0.00
7,000.00 7,000.00 0.00
12,620.00 9,944.83 0.00
15,300.00 5,721.54 980.00
1,ODO.QO 596.00 000
41.470.00 28,412.47 980.00
Tolal Fe.
Earned
5,150.00
7.000.00
9.944.83
6,7016.1
596 00
29,392.47
Total Professional Fees and Expenses Due Ihls Illvoice
980.00
Percen: Cornp!0!e:
70 eo
]NWw.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myerl> . West Palm Beach. Pensacola. Savannah. CharlestoYl . Hilton Head
Client Focused Solution Oriented Quality Driven
16G31
.HSA
ENGINEERS & SCIEN11STS
Amembfll or t~1t) eRA Famf!~ of CompL'lnres
Bayshore Gateway Triangle
4069 Bayshore Drive
Naples, Fl. 34112
AttenUon: Sue Trone
Invoice 1#: 674751
ProJect: 7534666
Project Name: Change Order 2 . SAR Repol1
Involc& Group: 06
Invoice Dale: 0810912010
Purch.... Order: P0II4500111875
For Prole""lon.' SOIVI"". Rlndlred through: 712512010
UNDERGROUND STORAGE TANK REMOVEL - 4315 BAYSHORE DRIVE
SITE ASSESSMENT REPORT (SAR) SERVICES
CONTRACT NO,: 06-3970
FURCHASE OF\DER NO.: 4500 111675
C HA NGE ORDE R #2
ACnVITY THIS BILLII'lG PERiOD
. PROJECT COORDINATION
. SAR REPORT
Toul Professional Feas and Expenses Due this Invoice
Petcent Complete: 100.00
~
353.67
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 / Fort Myers, Florida 33919
Tel: (239) 936-4003/ fax: (239) 936-0819
Tampa. Orlando. Fort Mye~ . West Palm Beach. Pensacola I Savannah. Charleston. Hilton Head
Client Focused Solution O(lented Quality Driven
16G31
HSA
ENOINEERS & SCIENTISTS
A meml:Jc~ o-f the CAli, Family O:Co:TlI:a'1ies
Bayohore Gateway Triangle
4069 B.yaho,e Orlvo
Naples, FL. 34112
Attention: Sue Trone
Invoice #: 674752
ProJect: 7534668
Project Name: Cl-tange Order 3 & 4 - [SR Selvk:es
Invoice Group: 07
Invoice Oatil: 09/09!201D
Purchase Order: PO" d5001 11875
For Protesstorit"lil Services Rendered through: 7/2512010
UNDERGROUND ST0i1A3E TANK flO'MOVEc . 'GJ15 SA YSHORE DRIVE
INTERIM SOURCE REMOVAL (;Sfl) SERVICES
CO:,TRAGT NO.: 06-3970
PURCHASE ORDER NO.: 4500111876
S32,525.0a GHANGF ORDER #3
$ 8,94-5.DO GH.~NGE ORDER "4
$41,470.C.0 TOTAL
Breakdown per proposal
Task 1 Diroc! Push {LS)
Tash 2 Excavation ActiVities (LS)
TL:lsk 3 lNas~e Management (NTE)
Task 4 Enginc-cring SS!Vt.c6S (LS)
ReimbIJrs!'lb:o {NTE)
TOTAL
Budget Previous Amount Current Amount
5,550.00 5,1500CI Q.OO
7,000.00 7,OOO.O~ 0.00
12,62C.CO 9.944.83 000
15,3DO.OO 13,70-1.64 0,25100
t ,QOCOO 596 00 O.OG
41 A70.0G 29,392.41 S,251.00
Total Fee
Earned
5,150,00
7.000.00
9.9~.t83
11,952.64
590,00
34,S43.41
Total Professional Fees and Expenses Due this Invoica
Peroenl Co-mplete; 8354
5,251.00
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 / Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myerl'; . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Chent Focused Solution Oriented Quality Driven
16G31
HSA
ENGINEERS & SCIENTISTS
t.. memi,;,~' ef t:iiOlCRA Fa-mil)' of C~mpBJ"1'E;
Bayshore Galeway Triangle
4069 8ayshore Drive
Naples, FL 34112
Attention; Sue Trone
Invoice #: 578406
proJect: 7534668
Project Name: Change Order 3 & 4 . ISR S~fvl"es
Invoice G(Oup: 07
Invoice Date: 10121/20'0
Purchase Order: PO. 458011187G
For Professional Services Rendered through: 101312010
UNDERGROUND STORAGE TANK REMOVEL - 43t5 8,lWSHORE DRIVE
INTERIM SOURCE REMOVAL (ISR) SERVICES
CONTRACT NO.: 06"3970
PURCHAS=- ORDER NO.: 4500111875
532.525.00 CHANGE ORDER ~3
~ 5,945.00 CHANGE ORDER M
>41.470.00 TOTAL
Breakdown per proposal
Task 1 Direcl Push (LS)
TC!.sk 2 Excavation AC1i....jti~5 (lS)
I ask 3 Wasle Managemen' (NTE)
Tafts 4 Engineering SSl\'ices (LS)
Reimbursable (NTE)
TOTAL
Budget PrevIous Amount Current Amount
5.550.00 5,150.00 0.00
7,000.00 7,000.00 0.00
12.620.00 g, 944 .83 2.675.17
15,300.0:1 11,952,64 678.58
I.ooom 596.00 ~-je5. 50
41,470.00 34,643.47 O,909.2S
Total Fee
Earned
5,15000
7,GOn.00
12,620.00
12,831.22
981.50
SB,S82.72
Total Professional Fees and Expenses Due this Invoice
Pe:cem Complete: 53.Q4
3,939.25
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 / Fort Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 935-0819
Tampa. Orlando. Fort Myer~ . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused SOIUtiOl1 Oriented Quality Driver!
~HSA
ENGINEERS & SCIENTISTS
A m(';mb~r Ctfth"!! CR; FLim'trofComparies
16G31
Bayshore Gateway Triangle
4069 Bayshore Drive
Naples, FL. 34112
Attention: Sue Trone
Invoice.: 679552
Project: 7531668
Prolect Name: Change Order 3 & 4 " ISR Services
rnvolce Group: 07
Invoice Date: 11111.12010
Purchase Order: PO# 45C0111875
For Professional S9rvioes Rendered through: 11/111.2010
UNDERGROUND STORAGE TANK REMOVEL. 4315 BAYSHORE ORIVE
INTcRI~' SOURCE REMOVAL (!SR) SERVICES
CONTRACT NO.: 06-3970
PuRCHASE ORDER NO.: 4500111875
S32.S25.W CHANGE ORDER #3
$ e.945.CO CHANGE ORDE~ #4
f.11 ,470.CO TOTAL
.:. Ple%e ~ote Previous t\rnount bJI~ed total has been aJjllSled 10 rafie;;t ine 27 C'lnt dedl.r~llon on 670361
Total Fee
Breakdown per proposal 8 udgol Previous Amount Current Amount Earne-ti
Task 1 Direct Push {LS) 5,55Q,1I0 5,15000 400.00 5,550.00
Ta5k 2 Excava~lcn Ac~i'/iti:::s (LS} 7,000.00 7,00000 0.00 "1,000.00
Task 3 Waste Mam..gcment (NfE) 12,62000 l?,n?G.CO 0.00 12,620.00
Task 4 E!lglneerir\g Services (LS) 15,30Q.OO 12,83U? 2.460.78 15.300.00
Rejmb,:nHbfe (~";TE) 1.0000e 98150 '-8.60 1.000.00
TOTAL 41,470,00 38,582.72 2,887.28 41,470,00
Total Professional Fees and Expenses Due this Involce
Pernenl Complete: 10D.00
2,887.28
www.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers, Florida 33010
Tel: (239) 936-4003/ Fax: (239) 936.0819
Tampa. Orlando. Fort Myer1i . West Palm Beach. Pensacola. Savannah. Charleston. Hilton Head
Client Focused Solution Oriented Quality Driven
Bayshore Gateway Triangle
4069 Bayshore Drive
Naples, FL. 34112
Attention: Sue Trone
ENGINEERS & SCIENTISTS
A rr.em1t:'! (It the eRA F~mlly ot t.:o('()!J.:?n!e;
16G3'1
Invoice It: 661258
Project: 7534668
Project Name: Change Order 3, 4 & 5 ISA Servic.~
Invoice Group: 07
Invoice Date: 12/1412010
Purcha.e Order: PO# 45Q0111875
For Fro~$lonal S~(vice$ Rendered through: l1f28J201Cl
UNIJcHGHQUND STOnAGE TANK REMOYEl- 4315 BAYSHORE DR!IJF
If.TERIM SOUClCE REMOVAL (ISR) SERVICES
CON TRACT NO.: 06.3870
PURCHASE ORDER NO.: 4500111875
$32,525..00 CHANGE 09DER #3
$ 8,945.00 CHANGe. O,~DEA #4
$ 4.700.00 CHANGE ORDER #5
$46,120,00 TOTAL
8reakdown per propo:;i31
Task 1 Direct Pu.h ILS)
Task 2 Excavation Aclivitie:s. (lS)
Task 3 Waste Management (NTE)
Task 4 E;.gineering Services {lS)
ReimbJr;able INTE)
CO#5
TOTAL
Budget
5,550.00
7.00000
12,620.00
15.300,00
I,OOO,OC'
4,700,00
46,170.00
PrevlOU9 Amount Current Amol.lnt
5,S50.00 0,00
7tGOG,OO 0.00
12,620.00 0.00
151300,00 0.00
1,000.00 0,00
0.00 2,66711
41A70,OO 2,B67,11
Total Professional Fees and Expenses Due this Invoice
2,867.11
Total Fee
Earned
5.550,00
7,000.00
12,620_00
15,300,00
1 .000_00
2857_11
44.,337.11
wwW.hsa-env.com
1520 Royal Palm Square Boulevard, Suite 260 / Fori Myers, Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. Orlando. Fort Myer$ . West Palm Bouch. Pensacola. Savannah. Charleston. Hilton Head
Client Fo<;used Solution Oriented Quality Dnven
16G31
PROOF OF PAYMENT
16G 3
Board of County Commissioners. Naples. Florida
Document Your document
0.18
D edu c1ions
Gross am.ount
0.00
6.285.00
5100560766 666918
03/1712010
5100560800 667334
03/2412010
0.00
10,580.40
0.00
16,865.40
S urn total
Effective January 11. 2010 please send all invoices to Finance Department,
3301 Tamiami Tr E, Bldg F 7th Fir, Naples, Fl 34112
\\ (;. \\< + 'h -3'-1 l.d{ ff (; (c
/ 'hL"({
([ ({ 'J'I,f
'''/.')1' ('1
/1)(j ,..::: U). L)
\)1 Clt ci
'7\ ,"3((t!7-{t)
/ Ii ',ii" j ((:
((;~75-,J.../
1~ /(), ')~'{'- Y ()
11:1 [~I ~'.'''-.j iil:cIll:..:'.........~.lUl:I~.. ~.,':'tej.:(t1:I.I'J .'1.1I:.l;11~ I.:tl..}~"": 1:::1 ,',I(~,l. :1.;f.ltolll.1j::l :,f'l:J :t:IIS."'l :::I::I;f..'{1"I :.:::1.1:. tl::l ,.~ I..
PJ.Y":9U IH
DATE
04129,'2010
CHECK NUMBER
S2SSB3
63-9171
670
BOARD OF COUNTY COMMISSIONERS
COllIER COUNTY nt.
NAPLES. FLORIDA 34112 ~
Flm,T1iI'ilOElAtiK
VOID AFTER 120 DAYS
CHECK AMOUNT
..... ....18.865.40.
... SIXTEEN THOUSANO EIGHT HUNDRED SiXTY.FIVE USD and FOR1Y C!Hll'S- H'
l;hi11QUtlO 19 C~ FI,Ind
10 CofkIr CaJIlty D~Il'3Sit:a~
,l,J,>thbcf...d II' Opl!n SJl,sliX1
PAY 10 THE
ORDER OE
HSA ENGINEERS & SCIENTISTS
1520 ROYAL I'ALM sa BLVD. STE 260
FT MYERS fl 33919
~w, c+-
CHA:f1MA!';, 6DA.~ OF COUNTY COI\fMISSlONEAS
,fi'.;?~
16G3
Board of County Commissfoners - Naples. Florida
5100575198
Your documonl
/
670361.-REVISEO
Date
Deductions
Gross amount
Document
05/19/20107<: ",LllIi..'"';-' (.'"j 0,00
21,490.57
5100575211
671948/
06i17/2010 76 ;>'17 ';(:'(1
r ,.l(('l,~ '/'-' ')
0.00
1.550.00
Su m total
0.00
23,040.57
Effective Januarv 11, 2010 please send all invoices to Finance Department,
3301 Tamiami 1r E, Bldg F 7th Fir. Naples, FL 34112
'I:' I
l' I m..."1lt'!!.1 :1M;..: r.l--......a.llh~;I;;;l.J;NM:.cC"I~HIII:II..111......hl ~I f 'IL'~-I! !'i1l11:J'4.."1;;(9tII:1 ~ ..;;1 ;;I"'.II:I-::;I.."15."1~;I ~ntol.4 iil4f:..l;ll '.11...
PA'OfSH ",r
DATE
07/21(2010
C.~ECK NUMBER
833MO
63-9111
670
BOARD Of COUNTY COMMISSIONERS
COLLIER COUNTY w..
NAPLES. FlORIOA ,..112 ~
"Ii'll-' rHI~:~ ElA-Ii~
.. t T\VENTY-THAEE THOLISANO FORTY usn and FIFTY.$EVf.N Cems ...
VelD AFTCfl 120 DAYS
i CHECK AMOUNT
I ........23,040.~7.
l;',...~~a ~~ G~ll F..rrJ
1~ C9lh.r COW1ly DItpll~ilDlY
J'.UI'lOtt'Zed i~ OP'J'~ ~S-~Of\
PAY TO THE
ORDER OF,
HS^ ENGINeERS 8. SCIENTISTS
1520 ROYAL PALM so DLVD. STE 250
I'T MYERS FL 33919
~w.~
......;;r"J."t.
, ,
CttJ>.;I'M-'rJ E101l,F\O I:oF CQIJ...r.. COM:\o\15:::11J"'~R5
w~ . ~;,f.~!~
BOA~'COW"I'S5IaNf!il'$
" f
",~ \ r J "to
16G31
Board of County Commissioners - Naples. Florida
Document
Your document
Date
Deductions
Gross amount
5100578402 672114
5100578404 672054
06/23.12010 ^, , ~ l (~.( S. (/- 0.00
,
06/21,'2010 .>{, '>-.. .,," -'&(,
-:\"Zc.~.\(' 0.00
2.963.83
1.000,00
Sum total 0.00
3,963.83
Effective January 11. 2010 olease send all invoices to Finance Department,
3301 Tamiami Tr E. Bldg F 7th Fir, Naples. FL 34112
R..~~::- r ,:0
AUG (I 6 lOW
'" f....." ".""..."... ",,'-'''.J ..... "",."""y.,".IOl., ,i '.",.'", .\1'"'' ;.os.<. .".,....... .,,, ,.,.....,.",. ,.".,.,,~..,...,~ ,., ,I. , - --
p,!'yaOl(A.T
DATE
06[04,12010
CHECK NUMBER
B34708
63~91"]1
670
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY ~
NAPLES. FLORIDA 34112 \!I
~1~T1' Tn j'l,) eAM~
VOID AFTER 120 DAYS
CHECK AMOUNT
.,. r. .......3,963,83.
... THREE THOUSAND NINE HUNDRED SIXTY-THREE USO .'HId ErGllTY.THREE Cents ...
Ch.:!' ~'I!~I~ II) G!lI1i'JI F..r(l
to t':<lllll!f CO\;ot1~y PI;ctl';Oo'Y
""l'Ll\CO":.I!!:C if I OP+" 5!$:5~-0I'
- i
.....~<,: 1 ,.'
~.w,~
CHM1':....,.,~l_ 8DARD Cf CClItny COMM:5...<;IO~jE:I'j;;
6"'.;?~
PAY TO THE
ORDER OF,
HSA ENGINEERS & SCIENTISTS
1520 ROYI~l PALM sa BLVD, STE 260
H MYERS H. 33919
";"j
/" "~
16G31
Board of County Commissioners - Naples, Florid8
Document
Your document
Dota
, 06/23.'2010
Deductions
~''"--O~-OO
Gross amount
5100576653
672115 REVISED ./
-h5Ill(c(5- (\7
6.921.90
Sum tot~r'---
000
6.921.90
Effective January 11, 2010 please send all invoices to Finance Department,
3301 Tamiami Tr E. Bldg F 7th Fir, Naples. FL 34112
" ,
1!1
RECEI\ii::L
AUG 0 9 2010
-
.:Ik-ltol:t::l ~~<II:r.l-;..,"'I{.J ..l;I"II~HJo\:(t"I;I.JlmIY~~ / I.J:~.I~ I t.\I,' f~,'I,j k,1 :.l.s.;::llloln:l~ .'.~;;I ,"~II:l ~~l Of.... ~,.t":.:t.I:'II=-r.' I~
,
.
F'AY"'!J.I,.E- AT
BOARD OF COUNTY COMMISSIONERS
COlLIER COUNTY (i)
NAPlES. FLORlOA 34112 _
.......
FI~H 'l'"HIRt:. F;~.'l:~
63-9171
670
OATE CHEC~ NUM5ER
0810512010 834863
VOID AFTER 120 DAYS
CHECK AMOU NT
.. ........ -6,921.90.
... S11, THOuSAND N1N!; HUNDREO TWENTY-ONE USO and fo;lNETY Cent:. . I'
C",""gij,)t.:CICc;~I"oJIll.,r>C
1.:1 Co,'''.((" Co:N1'l'fY pl!QO:ilt.cr;o
""l~,('1ln<f r,., C-p.""$.u~lC"1
pAY TO TH.
OROER OF:
HS^ ENGINEEl=l:S 6. SCIENTISTS
1520 ROYAL PAlM sa BLVD, STE 280
FT MYEf:lS FL 33919
,.";' ~Ui/;,...
" ".
~MW,~
CI-t,\I;:'V.!.N. 5.:).....0 ,OF CO'J'./T'. COMMI~CH;f":S-
C.6>'-.Je.
\. I
""(~n"'"'
16 G 3 1
Board of County Commis$ioners . Naples, florida
Document
Yom document
Dale
Deductions
Gross amount
0.00
2.397.50
5100579690 673484 'J53ci~(J'l:';6(p0711412010
5100579691 6734857534-[*/1-01 07/14l2010
0.00
980.00
----------------0_00 -------- 3,3i"r50-
Sum total
Effective Januar_y 11, 201 0 ~Iease send all invoices to Finance Department,
3301 Tamiami Tr E, Bldg F Ith FIr. Naples, FL 34112
R.f:CU,!i'D
AUG 1 3 20 W
- .
,
I :U...'1lIli:I:;ItI~" H~\.......-l.IIUI :1::3.11 ~"T~)~J.'I'I'.1~II)[lM.]~.t,,~m.Il::)IiI;;;1.;;1:;j iaJ;Tii".II ;;1;;1'.\ t'l-l;(;.-':1;:1 ::lI~',l"""';hl:o 1'~.l:It.llt;: lolIiIa.l .....~
-
PAY,I;'S'.t. A.
DATE
08/11/2010
CHECK NUMBER
835135
63.9171
670
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY (i)
NAPLES, FLOFUDA 34112 _
.......
flFTM TH:r.D eoVcK
VOID AFTER 120 OA Y S
CHECK AMOUNT
...... ....3.377.50.
... THREE THOUSAND THREE HUNDAEO seVENTY-SEVEN USD and FifTY Cent..;; ....
ChQrge~le ll:I G.elU!I'~ flln<.l
I" Cl>lllllT ClI\Jl"t\y D"ll'Ooi1UT~
,l,uth<:>r~...:llr: {)~e'" Sl!'t"'~
PAY TO THE
ORDER OF;
HSA ENGINEERS & SCIENTISTS
1520 ROYAL PALM sa 9lVD. STE 260
FT MYERS Fl 33;J19
~. l' ';~.,
;-' .~
~w.~
C-lA!AMM,~, El(1AAO OF (;{)'.JNT"l" C!JMMI~C.r~El'IS
6'.;?~
~ ;-;-
~"'~.-.",-,'r:'
. ~;
--.
16G31
Board of County Commissioners. Naples. Florida
Document
Your document
aate
Deductions
Gross amount
5100687643 674752
,?,,";IiA',\ ('/
5100587644 674751
/;1~>3 '--,ii./C- ,\ / (.
08/09.12010
0.00
5.251.00
08lO912010
0.00
353.67
0.00
5,604.67
Department,
Sum total
Effective Je!1uar" 11, 2010
3301 Tamiami Tr E. Bldg F
p'!ease send all invo!ces to finance
7th Fir, Naples, FL 34112
~
,
i:j~~:I::[.;:.:P.l.""i""~'I''''W:.1)lI:",...;.ItI-l.ilW..'l''~.I.II]~''.11~f~t,lII_U:JJI*r;;hUI:lt....:;I:I'~t.tI:]~-a.."l=l;;g:r'~-I:4;;('I:lIll...M.i:
PA'O.l!l....E AT
.-
-11
DATE
09/2212010
CHECK NUMBER
837199
83.9171
670
BOARD OF COUNTY COMMISSIONERS
COlLIER COUNTY n..
NAPLES. FLORIDA 34112 \!I
J'."lnHTftlFlO eA.';(
VOID AFTER 120 DA VS
CHECK AMOUNT
....~. ....5..604.67.
... FIVE THOUSAND SIX HUIlORro FOUR USD Dr'" SiXTY.SEVEIl Cent, ...
Ch'('ll~,*~n~"L-nd'
~~u;;:;:~C;l~X;~.~'C~:;
PAY TO THE
ORDER OF:
HSA. ENGINEERS &. SCIENTISTS
1520 ROYAL PALM SO BLVD. STE 260
Fr MYERS Fl 3391 S
'1uJLw. ~
- ~"; '?~-
f/
CHA.lflM""L 1iI0AnO OF COUlH'I COMM;SSONl;:Ft$
,m.e :.!:;,f.~~~
If-BQA~;CDIoIIMI5S1.oNEAB
"
""(1
16G31
Colll~r County Board of Counly Commissioners . Napl... florid a
Document
5100601611
Your document
Dale
Deductions
Gross amount
000
3,939.25
678406 I /
10/21/2010
i} L, 2,lllJ iI&-- (, ')
Sum lotal
0.00
3,939.25
Effective immediately please send all invoices to - Attn: Accounts Payable,
3299 Tamiami Trl E Ste 700. Naples. FL 34112-5749
BOARD OF COUNTY COMMISSIONERS
CO\.lIER COUNTY
NAPLES, flORIDA
.:I\;:'l":OI;;{IIoj:..;J.l-....-.~.iJll.I =I~ .1;'.~t:I.(e11 t.11I.'1.1'.1~1-:l.ti.lt.t~1IH~~M:~ 1?:::(~'J: I... ~:t~'n I t:I::h-.a-."1::1=v:f~\+I~.;:.]:iI.I'=Il.111ll~
FIFTil llllnD B....II!.: 63-9171
DATE CHECK NUMU.R 670
12102/2010 B42428
'.
J Inll
(i)
VOID AFTER 120 DAYS
AMO NT
......... .'.3.S39,259
... THREE THOUSAND NINE HUNDRED THIRTY.NINE. USD and TVoIENlY.FIVE Cel1l$." .cb3r~3ble1u
t:) Cel\i~r c~:~ 1l'll~1'Y
A'JlM"'..:-otd il'l Gll:"Jt"I S"~1OI1
PAY TO THE
ORDI'R OF:
HSA ENCllNEERS &. SCIENTISTS
1520 ROYAL PALM sa BLVD. STe 260
FT MYERS FL 33919
CH"""'::::' ~Y~""
~ ~" ~r,~:{/,~.
. 6'.'B~
OO'IT EX~~ CLtAI<
liNn' COMMIS$lONEMi
l1'.',.n""!;
.
16G31
Collier County Board of County Commissioners Naples, florlda
Document
5100604158
Your document
Dete
Deductions
Gross amount
679552
11111/2010
0.00
2,887.28
Sum total
._-~_.,._--,._,----,._--_._._.__.~..
0.00
2,887.28
Effective immediately please send all invoices to - Attn: Accounts Payable,
3299 Tamiami Trl E Ste 700, Naples, FL 34112-5749
I
, .(.,
"IL/ L 1.'.
.. ,/
-j j
'I' j .(
t,
- )
--
-
,
I; Il'~"I'tffF!{.j.:!:. :Jo\;:....+l:II..J~I:;;I11 ;"hl;UW.U!lliU.JlH~.!1!JilI,;,'!JlRIMf~~~~~iifITffi'i'J;r:::1!tII]:1 :;:t..."I5.."""I",;II :l.tir."..;t.l:1 .1-.j,ltC::
--.
o
DAle
1211512010
CHECK NUMBER
843014
63.9111
610
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY
NAPLES. FLORIDA
f;Fl'H T"H:f;;O RAM:
VOIO AFTER 120 OA YS
CHECK AMOUNT
.. .... ... '2.887.28'
... TWO THOUSAND EIGHT I-tUHDREO EIGHT\( ,SEVEN USD and n'\l'ENTY-l~.I-GHT CBn~
ej'll'Ii-';II,;O"'O
to COIlltt" Cwnt( o.~~
"'Jtb:~rln~ In OP(f'I Sa",icn
PAY TO THE
ORDER Of,
HSA ENGINEERS &. SCIENTISTS
1620 ROYAL PAlM SO BlVD, STE 2aO
FT MYERS FL 33919
'-:fu.IL W, c+
Ct-:A:.nMA!~, 80,'\1'10 O~ .cO...Nl't co~,.'IlS&O,,*,RS
... ~"Il
"
c" _~ . D::,.?x~~
aOA~COMt,III5:SteN~ilIS
\,
-(",I"
16G3~
Collier County Board of County Commissioners . Naples. florid a
Document
Your document
Date
12114/2010
Deductions
Gross amount
5100606553
681258
0.00
2,867,11
Sum total
0.00
2,867.11
Effective immediately please send all invoices to - Attn: Accounts Payable,
3299 Tamiami Trl E Ste 700, Naples, FL 34112-5749
, .
, ,
,I .'
Ii
.,
lia~.,:j :.::(IIi~...:,.\....,..c'l. Ii:] =l.:N..;t~:{O;INI'.L~~I'Jle.I.I~lt''':'''''''''ll'~i\=''l:t~llU1 ...w >:r'1I If:iOl:-"'S:Il-."1", ;;g;,~t"'l :<4I:.':1i!l3.f'1I&...
.
iIII!Il
BOARD OF COUNTY COMMISSIONERS
COlliER COUNTY
NAPLES, FLORIDA
(i)
DATE
'2/2912010
CHECK NUMBER
843884
63.9171
670
fiftH THiflO e,r.!ll(
VOID AFTER 120 DAYS
CH CK AMO N
... .... ..'2.867.11.
... 1\1'10 THOUSAND EIGHT HUNDRED SIXTY.SEVE.N USD and ELEVEN CEnl,s .....
Ct.;vl.l~a(J:t. to
(il CO~i<!t CwrlY l)~o')r~
~lhiJrill\odlf"i{l~$"$s.lcn
PAY TO THE
ORDER OF:
HSA ENG"IEERS & SCIENTISTS
1520 ROYAL PALM sa BLVD. STE 260
FT MYERS FL 33919
'-1uJL w, ~
CHAIF-J.IllUl. 1!I0oloA.C1 (l~ caur~rv COMMI5Sl~Ef'..s
",..'- '~''''/~
". ~
~6'.'B~
C\.E f UflT EX.~:Cj() CLEAK
.60,101\0 CF UNTY COMMJ5Sl0NERS
~l' j
i~',/; ;":l ,'-
16G3....
SEOLJFNCF NUMBER 711'145674 POST DATE' ,Ian 12.2011
lil,:....~I::I.. ..:._".....~.,I(.l:I:UII"'... 4:e!'(tllIIIfF'llitIM'IIU'" -lOti. jl;t~~I."'I"...,,;:a- u"-,,,,,-~...::I::!I"''':''::I'I:I.I,,,f,ll''''
OAfe
12/2i120 10
CH eelC HUM8IER
1l438B"4
e3-9171
610
BOARD OF COUNTY COMMISSIONEIlS
CClUEF! COUNTY ~
NAPLE'. flORIDA \II
~liT.... n.:~o 1!l.vJ~
VOIO AfTER 120 D....'
.
...........2.847_1'.
... T'lND T*'"QUS.lND E!CHr HLlNOAi:O SiXTY-SEVEN USO a"" ElfVEN C"nl:; '"
~~..~"*"-~ I~
::ll;:;~~~c;"~~"'::-.;:1
flAY TO nti~
OADER Of"
H5". E.'IIG iNEERS &. SCIENTISTS
1520 ROYAl P"'U.l So, 8LVD, S'fE 2150
F< M'rER5 =l 3.39l5
~w. C+.
C"~;ll""",,,,, tl~,,o,l<[, CF eel_'lin CC,"'III'~::ilv"!'l~
.,>,
" ,
'"o....oe-I
UA?:X~~
~"."'('I C':.Ml.,lIS~:>M~S
rr
cr
" ;;0
".
OJ ii!
Q m
0 S;
'" '5f
! '"
"
;;;
0 :l
0
:l rn
.;;.: "
5
0
16G31
..
~."'.l!!Ui ,n
bA"fe
O'-J2.9;W1C1
CHECK MJMIU!"
&2Ji8e.3
n-'171
010
BOARD OF COUNTY COMMISSIONERS
"""IE> COUNT'< n.
..pt" '''''''OA ..". ~
F --"ll'o' .o.r.R[_ a'~,"
VOID AFTffI 120 DAYS
"..0. '''0" --'1
~f~fEEN Tt!QlJSANCI EIGHT HUNDRED SIXTY-FNe IJSO I\nci FORTY Co.:r,Ls ...
..........1..I~S.40..
L_..__...
,:;.-"'~~r.;.()......"',.",....
'tf~C~J~~~'
,"A'l' TO THE
OROff! QF.
H$A ENalN.~EfI~ &. SCIE!1T1STS
152a 1l0~Al PAL>> SO !LVD, SH 250
n JoI'fEI'l:8 rl J3e'~
~(,J.
<=+
c_~.e ~ ~;;A1:~~
eo,,;.~ft.I:;?J""!I~:':"lt"6
i
I
i
I
i
i
_________ .1
c.... A'.loI~, &e~R? o!J' C:C<JI''''~ C"::M~\SSlo.~EMi
-~
..
=
"
'"
" ~
" rn
~
0 "
'" ::r
" '"
0
'" ~
" ffi
0 ::r
0 ~
" ~
'"
~ "
" ~
5
'"
.-
~ ~ =:
=
:- ~
~"'Y"'!..L ~"t
DATE
{)7!2,ll010
CHECk NuMII-eR
8338:iO
63.9111
.70
aOARO OF COUNTY COMMISSIONERS
COLUEII OOUNT'< (i)
NAPLES, FLOAlc;", 34112 .
.....-.
~,m' n;-,'J;! ~."";l
.., rW1JlTY -THREE Tf,.OUSAM,i FORT"- LlSO IlIld FI.=rV-Si:vE.N C'l-1~" ....
VOID AFJEfi 110 DA V.S_
CHECK A~~;;.=l
........~
c"""'''''t>>''''ezor........J-
""Ce,l....<:"'.'l)-r.""""'"P'f
A-A.......:..-1 ;" Cr-"" ~""'.....
PAY TO TrI~
QRDiR OF;
tiSA ENGINi:.!;RS .. SCliO:NT1~HS
15,ZO RO'fAL PALM SO .BLVD. STE 25(-
FT MYERS Fl 3-391')
,?~(,J~
L,,~;:'olML ;E'o.:l") Q;< ,.,;;~..,n' '::0""- ~~Jj),i!~t;
;,~' ~'~"\
~. 6".6f~
C~VI<; ~ n(: CC~\<';'" ::<'W~I~ l,;~t'Ui:
CO!IF~ <:'1' ,".~1 I:Q~"':WJi'l..'.~
J
~""'n--:ol/
16G31
"-
:if
:t
;u
~,
<il
rn
~,
~
(j)
<,
~
~
"
~
~.
Q;
'D
.",
'"8
I~
,,,
'"
~
o
"" "._, ."...., ...1I'~""
.".""....,...:.:rL.......rr.'.':I..,....,..,.
TV COMMISSIONERS
BOARD OF COU~LlI:EA caUNfl' (i)
FLOAIOA :'4112
NAI'1,..U.
,-
1r;;,oll;.A;1,{otllll..::;r7'..
~~"~~c..! J,T
:r..."~ 1'~""'.
F;"fo' C~leCIli.
.
.."!{1l.i......li..l.~"'I.(.JJ~
",..BOi'l.
aJ.."71
DATE
0I:l!1J4JOl(l1~
NVNBEn
i3~100
.70
~[ USD drl;: ElCiHiy-nv;E:.t
j.L;~.::>R{O SI~n.TlIR..
.0<0 .m. ". OA!'!.l
CHI; t;, AMOUN'T
L .:~...:-;~:...,.
{:..........." ',,;';:.,;;;:~
~c....~:;:~",F~-~ S~,
-'OUS,:"NO MIIl~
i}t'l=E .r:'
Glln'~
PAY 1.0 THE
OR.DEN OF;
SClE'lT'1STS
H~A ENl)!'.:EERS & 0 IlLVP. ~n 26C
1520 P:OY A ~ PAU,' S
l:T MYERS fL JJ'HS
~W~<
-~....~., ,); "<;'0''-' l;.c<,.u""~"UHL
""'Y" '.: 6';?......k.
~ : f.::" "'t';.,.,
i'~-:~;:'C(.~;r.",-;'rn(
J:l.
g-",
I el
t,'} I'tI
-n '""m
g rn Co!
o ~~ 5:
.g ::::s (/)
~g;~~
o tv n
" 0 ~
'" -g-
~ ?l
3
""
\
16G31
~~
fI~'l~Brj 1Jllf~ .1:) "~j
G~D
~0&1 'M'J 0
~r NAPtrt A ~
rO"'il)' ,.
~ . . ," ,
." . 111 j'~' ~ .' ...
.~ f ;.: " '. ;i
."if" , ...~, 'll~, _,"NOfl:ll\. 'JDR
i''''O"'''I.''
("'Ii~.. .'JI."
A "1.21
. . OA~ tIP.-' @
I
~w.~
(.,-'J4M"'!, !")....1G'C' ~<':!..>~r'i .::':tM",rsS"'"N[A5
,,,fidft:!:~~~
",~~..::J f!.i _,."",... (v\......UI~[tE.
0.
or
~
IS?
0:
."
~
o
'"
"8
'"
~
~
-<
m
~
SO
'"
Q
".
~
o
",.
~
rn
~_ 1i
~
"'
lil"""""",;":~":<J'.'I("'.llt.]:j"'I'r.14ol HI.'~'" ...""... .t~I..!."."!I..lr:.l.:iI'"l::(..., ;11..~.,..-UI,-I~D"....... '" ...:.I"..:::Ifl'.,
''':'''A.lI'~ ....
ClArE
00/1 ~!:il{l10
C~:f.C~ ftNMAE~
83-5135
!!-:lHI171
.'0
BOARD OF COUNTY COMMISSIONERS
CO~lIEA C:O;,UHY ~
NAPLES, ,,-o,mA"'" \!I
,,:'f_ -"~I~t. P~I>o~
VOle> AFTIEA 120 DAYS
CHeCK AMOUN7
.. ........:t317.50.
... ltl:=-,EE: TI.f.OUSANO THREE Kl1NDREO SE\'ElIlrY.SE'l[t4 USD &-"1(] FIFTY Clt1t1. ...
:t..,-~.tt40,;r:_'" ..
"';;....".c<....'..o""".~.,
~"''''''',O<l"" a~"Sri"'.-.
PAY TO Tttf.
QftP~A 01":
hS,s, ENGINIO.ERS .& 'SCIHrT'ISTS
l~:/O flQY^L PAl~ SO el.....c.. ,fOlE leC
fT M....tH$ FI. 'JJ-!I19
'1ult... w ~
..... ~.....~. j,:l~~) .;~ ~<.: ~N I Y COWl.... H 01'00:10::;
""fl-l!:.1:~~~
Rn_1I:l:l 0" ~~." {o......$.;-;MM
16G31
0.
cr
w ;.u
:r.,
fl~~
'" "
~ ~ ~
~ g
-< a; I/l
~~
5
""
~.
i~I.~..:ll. ... "".. ....,...'"'''"..0.... n'-'..L!KI!UiJ,I..., ,....11........ '11l101,:lI>>''l;lo!Ij:II.1IlE '1';;;~__"1'1=1:r.'" .:.,.... ""r"._
UY~IU ~T
DATE
0812.2..'2010
'C~i:CIt HUMifffi
837799
I5J-i111
.JO
BOARD OF COUNTY COMMISSIONERS
CQlUER caumY" Q)
""Pl.E5. F1.0"lPA 34112: 1#
--
""IN T~'i1') U~,
... .fWE TFO;J&AND SI)( HuNOA€D rami usn et>tJ S!XTY.SEvE.', Cema ~...
YOlO AFTI!R 12D DAYS
L~HECK AMOUNT
L_~_~=.~~.SG4,61.
(:__....wli........fV>1
~~':"'t,~n:-.~.
,.
;., ,:
~ - (..). C",cr4-
C~,.,fWM so.u~ b' ~~Jqr-.. <20t.'l,l1~5.rt,E~S
tlu3 ~. ~:~1:~~
6:o~~~Il;a\I"1O~O'lU.s
PAY TQ THE
ORtM;R ot:,
HS.~ E:1o.;<3INEEfl;S ~ f;CIVn-I$TS
1620 ROYAL PAL'" SO BLVD. SiE 2M
FT MYHIS H 3J,19
0.
cr
ru ;0
:r"
~I~i.
-g 500
~ m~.
o "'''
::J O?;\
'< (tI'/J
~~
5
'"
16G31
1:,I:floiI:-~"'''''' "'........,.~Tofi'iW',..I.. {....'.,I'I"Pl'I...ot.I~.f.I',t.:..,' i!~'~~~"'j;a."11 _.....,:1' 'nJ'I=__""""'~'" ."..,-_.r",'_l'_.
BOARD Of COUNTY COMMISSIONERS
COllrm COUNTY
NIl.Pll;;I5. FLORIO"",
(i)
DATE
'2i02/1QI~
CHeCII: HUMIiIll
114;Z.41II
~J..111
010
"'11 ,--tiC":
... Thl:\cc l:-j(."U!:i,lND N:II:F H"JNr)Kl<p r~i~T"( NII',;,( USD 8.,,, TWENr.....fi\'f ~\llnUl ...
VOID AF1iFl 120 tlAn
, . . j :~:.~~~T;H'~
~C]n......c~...;" \.0'1'1
..,'ij.~",o:.:l\'",Q_~v
PAY TO HfE
OftClEFI OF:
HSA [~GtNEfI1S. 6. SCI~HIS~~
15~O RO'fJ.L ;:.....LI\'! SO lHIID s....e 2€'J
F:' fllVEM Fl 33~H'
'1c./i. w, Gctt....
C'-..~I.'M .'~^~"Cl~ C~.N'< ~~J.lIoI'~~I)""~'i
,
",.~fl..,~~
.~"~'C:JJ""'W?"1jj~~
'>"
"-
"
.' '"
I ~
"' rn
'I m
" '" ~
Q
" " ",
o '"
~ '" "
(; fit ffi'
~
"
~ rn
,.. "0 "
. "
~ ~
"
"
<0
16G31
. ,......... ,...... ,~.1F."l{I].I["'.'.I"~1II "I~I':II~I"";I'''~';.H .,,{..... "jlflft~--,;"""""".,"",u""',It~--=~'1.....r.. .....OJ-..."'. I_a:
60ARO OF COUNTY COMMISSIONERS
COlltal COUNTY
NlloP-LI!S. FlCAlO/I
(i)
OAH;
'l.',S:,l'O'O
(;HECK NIJM!U4
1.43074
l!::MiI"."
01.
'<'T'.
~,np ~~~~
VOID AFT ER 120 DIi. '(S
.
.'.II"'"21!1312S"
iWO THOUSAND E1GI-f; ,",It;OFlH. 'El3HT't'.SE'le/i uSe. ilM ~NTY.!;JGI-r CtMh
L'....'JoO.;...~
h c"",,", c.....,.:,. <:;tooH~trt
.....""......CF...s.u.o)1
PAY TC ToE
OROE1l (]F~
HSA f~..aI~eE~.$ '" S.c,iEf.-T1STG
1621) FlOY,IIl P,l"lJ S:i aiVl:l HE 2~1)
H IY'n.~s R J39'9
'1uJL W. CocA-
.:............. ~'~~~:~;: ~'J';.,.v r;')'f"Si:i-::"'~~
,~ 8 . ~,~,fu~~
l:::..:~<,I1C~"''''~o:J>d~:!
"-
<T
'" '"
:r: ~
.,., I a
~ rr,
ru
0 "-
" ""
-g co,
~ n
(fi
0 ::l'"
C
" "
.". -c "
"
iiL 'i"
c
;;
"'
16 G 3 1
INDEPENDENT CPA'S REPORT
r250 Tamiami Irail ~ Sle 301
Naples, Florida 34102
Hayshore Gateway Triangle Community
J{edevelopmcnt A~ency
Scullin & Sobelman, P.A.
Certified Puhlic Accountants
t-.Iembi'fs of
.r\merican ln~titnte of CeJ11fie:d Public Ac(oumamsc
Flilrida InSlillttc nf Certiti-ed Public Accountants
16G3
,
1
Pbum'; (239/-L;S-353(i
Fa\:: r 1.:;914.;:,-90(;r;
SCULLIN & SOBELMAN, P.A.
Certified Public ACCOUlIWIlt...
mq T.~MIAMI TRAIL ~ORTII. SUITE 3'l2
NAPLUS, !-LOIUD,\. JUll2
16G3
'1'J.::LLP1IONE
FAX
(239} 435.35.M
(23ol}I43S-90(i(,
J.i....\lU, J. SCULLIN, CPA.
JERRY SOBELMAN. rPA-
.UL:i::r:l'il.':d i1i FL &: 1\l~
......'Licensc:d in~:L &. P A
ML'rIlIH.nuf:
Am!:rkJ.D lnH.iu.Hc llfC.::.rI,tkd Pu.h1ir;: AaCtLml.lllH
FI{Jrw;jI In.ritute Qf Cerrifi~d Public ACO:;O:!,U1t3ma
13ayshore Gateway T riallgle Community Redevelopment Agcney
Napl~~, FL
\l./e have performed the proc~dure, enumerated below, which were agreed to by Gut~wuy Triangle
CRA, solely to assist them with the IIling or a Voluntary Cleanllp Tax Cmdit Application (the
Application P,lckage) related to the Gateway Triangle eRA site rchabilitation project with th~ FIOJida
Depaltmcll! of Environmental Protection for the calendar year ending December 31. 20 ill. Gateway
Triangle CRA's managemcnt is responsihlc !,)r th~ Ii ling or a Voluntary Clcanu"' Tax Credit
Application rdOlled 10 th~ Gateway Trianglc CRA site rchabilitation project with lh~ Florida
Depal1111cllt of Environmental rmt~Clion. This ;llp.~ed-upon procedur~ engagement was conductcd in
accon.lance with attestation standards cstablished by the i\mcrican lnstiulte of Certifi~d Public
Aeeountatlls. The suniciency or the procedures is solely the responsibiliiy 01' lh~ pOlrl) specified in this
report. Consequcntly, wc make no representatinn regarding (he sufficiency of the proccdures described
h~low ~1l11er for the pillpose for which this rcp0l1 has beell requcsted or for any other pU'11Ose.
Our procedures and tllldillgS are as follows:
1. ProecdufI: - Vcri(y the accuracy and "alidity of th~ payment. request Ilumbers, paylnellt request
dates, paymcnt request amounts and mathcmatical accuracy of the payment r~quesls included in
the ApplicOllion POlckage.
Findiug - No exceptions were found as a result of applying the pr'H;~dur~. The s,im~
pmchase order numb~r is used on all payment requests.
') Procedure - Verify that the sitc rehabilitation costs included in thc Application Pachg~ were
I')f ~xpenses incuJT~d Olnd paid within the 2010 calendar year.
Findilli! - No exceptions were found as a reSllh of applying the procedure.
T ota1 applicable costs - $ 56,337.11
3. Procedure - Verif)' that thc payment requests or cost, t(lr the project wcre not duplicated in the
Applicalion Packag~.
Findin~ - No exc~p!jons were found as a result of applying thc proecdure.
4. Proc~dure. Obtain copies of paymcnt records and the' related endorscments from Bayshore
Gateway Triangle eRA lor lhe calendar y~ar payable 10 HSA. COll1par~ lhese payment records
10 the payment requests providcd by HSA.
Finditli! - No exceptions wcre found as a result orapplying lhe procedure.
CiZ)
h.~ ~)'-. ~..." '_"''''~.' ....IM "., ',. ....
16G31
Procedures & I1mlings - continued:
5. Procedure - Obtain an independem conlirrnalion li-mll HSA 01" the inl(ml1(ll;On being testcd to
verifY that th" cosls induded in the Application Package were related to Bayshore Gateway
Triangle eRA site rehabilitation projecl, Lhat the work was performed, and Lh.lt the payments
were received during the calendar year end 20 I O.
Finding - No exceptions were fOllnd as a result of' applying the procedure.
6, Procedure . Obtain a representation letter Ii-om mamtgemenl cnnllrming they have made
available to u~ <Ill relevant infonnation and rhey have responded fillly to all inquilies made by
us dUling the engagement.
Findill(! - A signed representation leller was obtained.
\Ve were not engaged lo, and did not, conduct an audit, the objective of which would be the
expression of an opinion, on the accounting records. Accordingly, we dl! nol express such an opinion_
Had we perlllmled additional procedures, other matters mighr have come to our attention that would
have been reported 10 )'ou.
This report is intended solely for the informatiorl and us" of Elayshore Gateway Triangle eRA and is
not intended to be, and $hould not be. lIsed by anyonc othcr than the specified party.
_~~_""- "'---~-~h-~, /';;/1.
Scullin & Sobelman. P.i\..
January 20, 20 J 1
@D,
.
~ ~;, r.;,..,..... ~;..v.'~~".y~ T' ~ .~. .~.
16G31
.
\
iNDEPENDENT CONFIRMATION OF INFORMATION TESTED FROM HSA PER BULLET 5 ON PAGE 4 OF "A
GUIDELINE FOR AGREED-UPON PROCEDURES ATTESTATION SERVICE FOR THE VOlUNTARY CLEA
TAX CREDIT (VCTC) PROGRAM" PROVIDED BY CPA
(:t.~J:'::J'ord
.,:>". .'J
~- ,"1 - ~
F ~ \. I:
,',"'...:\.;1.-;'::'
",::J;'-;'
r - , ~' :'
(-~ ,f. -: "~'
~ "
;.(['i",,:y
f~yJ
C!,~",-,-,.l'l
L' .:, -:' ~ 1'.
\..,.c.f:n!,.
.c
~,,; ,.
l'.t,..., .
r'-;,' ""'"
::'~'" :' ~; .
,." ,I.
I:.,'
~Jj/!.;;rd~
I I ,':;.:~';'
!.,. I -:r,";
I ~. .': r'
''''';.';: "';',,,:.
~',~ ~'. c
;-',,:':,:,1,1,--';'_:;
(I, \1 E OJ ;'i.-.; ~
:'1, ,,_ .: ll.~,- _"':l~
I-.~, . f Co:,,-,- I_
I', t Ls: [.~., :.,' i I'
16G 3 1
1m o~.~;f.:~At~~:J
,
JUlIlIn,.y 18.20 I r
;. ;,
HSA Engilleers & Scientist,
I S20 Iloy'nl Pnlm SljUllrc Iloulev~rd. Suil" 260
Fort Myers, Florida :l3919
Jo ""nn"elior, with our Vululllury CI"~nllp Tn); Credit (VCTC) "pplicatiun, our
independent certified puhlic u~counlillg Cirm. Scullin & Sohclmun. P.A.. leqllesls
eonlirmulioll or ecrlnill information regurdiJlg' uur Irall,uctions with your Jirm.
Plcl..lSC ilHlil.:atc on the Iwxl pilgC whclh~r lhls 11lform:llion 1.1\ 111 agn.'clll~lll with your
record" If there ure lIny differences, pleus,' provide UlIY informatio" you have thill
willlldp reconcile Ilw dinerellCC'.
I'lcn,e ,iglll1l1d II"te your re'fxlII;c und Ill"n your reply dire,.tly III Sculliu &
Suhelmall, PA, 12~OTl1minml Trail Nonh. Suite ,Hl2. Naples, FL .14102.111
additioulo llIailillg youl reply. lI'e rc;pcclfully fCljUCSlllwl you nlso i'llx your reply
direclly III Sculli/l & S"hch/lan. P.A 111 (2J9) 43~.9(16fi
Very Iruly y,'urs,
(L\"rl1;~;e!,L~P ,(
Bnysh{)r~ OntewllY Triollglr C'IlA
ilij~;!;1 fJJ)'si;::rr- 0'1\''':.. ");j~,!~:" n.li~);, ~i.:' u
F ~23~'} ~.'\111 ~:'. r. (2:l~1! Tl:;..l,lU'
..,', t:',:';'__1'.',':, {;(',"
I ..' I BAys H 0 R f
. G"TEW.
~al ~~~t,;..., . no A N G ~._
f:.f";.'\X.:::...:\_'_~'
C:;"-.;::.
'V'w .:...."
"
.... ~ ~
'.'~' \- .'
In
Agreement
(Ye,) (No)
,-
~', " ~ .:-\~:::
l ,.'~ . ~: .;
,.",',
...:r.--;:.
'-'l.P 'J
, ~ C/l
\ ,Il--)
I."' ~/)
,~r ,".,
.,
'--'I.of')
\ } Il')
,
\-,d~.,,/)
I
:L l (..-'1
---~~ J) \
I
\.~ G (,I
A.j.i~,.):.t
~~5:~,r";:
r:~'~! T~r'
'''',.;~'.Ch;:;.r
,,;,
i 1,":
~ -:, ,,' '. ".
.... '.;:; i:' '-,
'--l\i!
,.hi)
"rJJ..I:-)
\ \\1'[)
~
.. .~ t,'-:
\",
Invoice"
Invoice Date
16G3
1
Amount
666918
670361
672114
672115
673484
673485
674751
674752
678406
679552
681258
3/17/2010
5/19/2010
6/23/2010
6/23/201 0
7/14/2010
7/14/1010
8/9/2010
8/9/2010
10/11/2010
11/11/2010
12/14/'010
$
$
$
$
$
S
$
$
$
S
$
6,185.00
21,490.57
2,963.83
6,921.90
2,397.50
980.00
353.67
5.251 00
3,939.25
2,887.28
2,867,11
All work was related to Bayshore Gateway Triangle eRA.
All worle was for their ,ite rehabilitation proJeC1.
Ail work for the above invoi (<5 wa, performed by HSA.
All of the above invoices have been paid by BGTCRA
~~~J
!;Jgnature: Roxanne Gause
t:!~_~~".:
't_. _;',
:: -~ : -
"\. , -, ,,",
r.).' ~ 5,
. :;~:' '. '~.' ,c.:;:"
I'.~ ( ." ': ~ '.,
.'<:' ,',
.~>~;:' t;"l,sf,,;,,; Lli' ~. . ~.:;::-;.;;;.;:, F., '::'1:' 11:;-
p "}';:f, i,,1;; ! t :'_ . r i?:of! n~-{;.~'5
'", " ','. :.::~' f!'::1 i::;~(:('
//;p/;;
Today', Date
16G 3"'
WORK ORDERS, CHANGE ORDERS, PURCHASE ORDERS. SCOPES OR WORK, AND NOTICES TO PROCEED
16G3
~
HSA
ENGINEERS & SCIENTISTS
.\ f1'10mber of ttlo!"! CR'" FiTTlily of C(lnW8Iilej
AuguSt 2 L 20fl9
Collier COllllt, Redelelopmenl AgcIIC)
([laysoure A~enQ Gnle\\ll' 1'1"iangle)
-1069 Ib).shore Dri,e
Nuples. Florida 3-1112
i-\ll~ntion:
\ 1~-_ 5'111.:' 7innc
Sub;.:et
IJnder~mumI Slurnge 1'nlll; Remo, ~ll
4315 BaJ shore- Dri\'~
Napb. I-"Iorid.t 341 12
1l1,1' I-"adlit)" 1'8629388
ColliLT Cl1l1ll1} COlllrad Ir (J{i-J970
/fSll'm/,o.w/ YUiIl!>C/" 75-}.J(,(,,\'
Il"ar I\'ls. Trolle:
USA Engineers & Scicntists IIISA) is ple_lSeJ III suhmit a C05IIlJ'l'posallill" a lan~ ('Iosm" and the
rel11o\"al "I' a hydraulic liH slalilln at the abolc rekn:nced properl) "hieh \\ill indud" soil and
g.rollndwater 5~rnpling imd analysis a~ wdl as e[lgill('~riJ1g SCf\ ices. l'hr:ll1nk CtOS'lr< \\'ill ht'
pcrronncd according to the l'iorida State Statutes. Chapter 62-761 l'iorida I\dm;nislralh e Code
II:AC1.
I'I~OJHT IllSTOIn
. A I'has" I [ 1m irolll11cnlal Sitc Assessmcnl II :SA) "3, c<'nducled b) Ln, ironmenlal Risk
Managemellt. Inc. (FRI\.lIl in Ma) 2008 Ihm idclllilicd Ilm:e underground stoHlg" lanks
tUS I s) located onlhe suhjccl property. ERMI conduClcd a rcgulatory s~arch !in Ihe LiSTs
and condud"d that Ih~ lank, "crc clos~d in plac~ prior lO 19X(, \Ih"n a hlllk Closure
.1""\\II"'I1II1<,/'''I'II1("AIII r"quir"I11~lllllnd~r Chapl~r 1i2-761ca11lc inlo efkc1. Ih"r~ \1<"
no additiorml information regarding th" USI s a'ailahl~. According 10 IJUvll" a hydraulic
lift station \\ilS ol1served on the sih.' prorcn~ as \\ell. COllcrclr; staining \\as ohserveJ in
conncction II ith th~ i1ydr;llIlic Ii n stali"n. .1 he conclus;ons I" the I.:RMI 1'113S" II I.S^ report
[lfC as folto\\ s:
I.aboratof') analytic'll r"sult, for soil sample SB-5 (:Ollcclcd al 7 li:ctl>eio\\ lalld surrac"
indimtcd concclllralions or b~nf~n". lOluene. Willi 'y I~n"". ami m~lh) I tcn-but) I clher
www.hsa-enll.com
1520 Royal Palm Square Boulevard, Suite 260 I Fort Myers. Florida 33919
Tel: (239) 936-4003/ Fax: (239) 936-0819
Tampa. OrlatKJo. FI.)!"I MYL!(~. v.JcstPalm Beach III Pensacola. Savannah. Charleston. HillQn Head
Client Focused SolutIon Orrented Quality Driven
16G 3
Underground Slula;#.j,' T~nk Rcl1ln\:lI
.BI~ H~~shOl'e Drin~
Clllli"f Cuunty (\~IIHiII.'t ,:.U(J-.~o;nu
If":\ "75.3..l(j~)R
:\IL:eIL'~I':: L ]OlN
p,(g'."':: vIti
-.........'_.
ailE
Ih"l e.,,,eeded the commercial Soil C1e,lI1\lp I "rgel Le\,'IISC II I per Chapter (,1-777
I':\C
I.anordtor\ annlyticHI results lor the ground\\ mer samr k' ro[l('c[cd jj.om temporary
11wnitor \\ell rMW-1 indicmed concen('<ltions or I-Melh) Imlplnhakllc, 2-
Meth) Inaphthaklle. amj naphlhakne Ihal eweeded 11ll' GrL1uIldllater rargel Cleanup
le,els ((i(Tls) per Chapte,. 61-777 1:/\('. laho,.."I") anal)liml res"lts Il,r Ihe
g.roundwater .sample:> ('olk.C'lI..-'d )i"Olll h.~1llporal': lH(Hlitor \\;;:,,11 l"'i\1\\'.~ indicah.....,i
L:ollt:"e'fllralions or b(,J\/l'n~. ctliylbell/;'!l-e. total \.: !C'Ilt'~;. i.mll I1h.:.th)] lcrl.lHltyl elh.er that
e'ceed the Oell ,
. On "'10) 1<).100~" l>i5;charge Report h,un in conjunction \lilh the Phase II s:Jlllplillg reporl
\\a~ senllo Ihe: Collit."r Cnunl~ Pollution COlll!'fJl & Pr~\'t."ntjo-n I )~raltlll~l1L
. Collia Counly Pollulinl1 Control & PI'''' cntion f)cpi1r!fnenl. :.1Llthl)ri.ll:U by thi..... Do:partrnent
or h1\inllll11":-r1I~ll Pl"Ot~clion has f'~qtlt'::)l~d ,[ Silt:' Ass~s;;;m~l1t l S:\) to be conducted on th~
'l,o.ien site and sllomill~d to Ille depanlll~1I1 b) May 03. 211 I II
I'I~OI'OSE() SCOPE OF WORK
Prior to conducting the Silt;' ^'S.~cs-;l1h:'llL as a rllor(;: t~OSl "lkcII'e \"a~ to dt:'~lt wilh the p~lrotcllm
contaminatkm du!,.:umenleu a[ tht:' suhjcl.'t P(\)~K:r[y, llS,I\ rropns:."s to rt:'l111we rht:' three (3) US I's ami
tl)nll~r hydraulic liil sysl~m-s lanh and nCaI"'c Il1c impacted soil. Iile I allk Closure and hydraulic
liIl Syst~11l II ill be p-~rJl1fl11ed according to Ih.. r1,)[id" Sial'; ~laILlt~s. Chapte,. (,1-7(' I FM-' IIS!\
"ill conduct the following reqLtir~J11~nb for tli;: tant.. closure:
l ,:nd~r~nlund Swra!:!c I'anks
Iniliall) lh~ lIt\dergrolllld slOl:1ge lanhs and h) dmuli,' Ii It lanh \\ ill b~ e.,calated and rem,,, ed h) the
IIS/\ ';,,; Iit:t:'n~~d tank comracwr. IIS.!\ \\ ill conJucl allg~r horings. on eacb sick or the e\:c(l\(Hitln
pits and in 111~ i1re.as \\hert' the- l'onlaminaled Sooil..; IJ3.\c bC~ll (Io":-lIIl1ented. I he soil ,I.jarnrks.
ohluin~d 1rol11 the 3ug~r boring.s \\ ill L~ ~(r~~n~d for \ i.~ulll Eiigll$ oj" stains, odor. and tC',,:,teu u...ing an
organic 'apor analYIL'r (OVA) ill a~co..dance \lith Chapler 61-770.200. I.AC.. to determine the
\Olall1e organic content or the soils n~ \\ay of a s,Ctil-gas analysis.. Based on II,~ rt:':L,ponse or Ih~
OVA. all impa~l~d so;ls \I ill be relllowd unlillimd OVA results m~ l1cloll tile HWI' delinition or
C'\ct"ssi\-dy (ontaminUlcd soOils for the !..crosene l'lnal) tical grotlr as thn~t' s('1ils that relurn un OVA
lIm.lergrouml Sluragt' Tllllk Rl'wmal
"~15 "=-~~h()re ()rin~'
CLllli..:-r County Ctllllrtl;;1 ;';'IIQ~,N70
Il~_,\ . 7~.J.J.(;(,}l
AUglhT : 1. .zon~!
P.tgl.::':' oI.1J 6
-'-'--"'-
16G3
:1
-
\'aluc in ~\J:C:~:S ul'SO ppm and Ibr th~ gasoline analytical group as lllOSt::' that rt'lLIm an OVA "ahl~ in
C\Ce5S I) I' 51111 pp.m Kh"ptcr 62-770 FAC)
10lk1\\in1' the OVA an"lysiso lin' soil samples \lill b~ colkcted. as required n) Chaptcr 62.761
11\(", I"rom each side or the e\c;l\ation pit and OllC li'Olll the bottom based on the screcning results
obtatned durin!? tht.' e,c<lYatiOJ1, Sinc~ lhc l) p~ or I1.JeI sold is t.l!1kno\\ n. lh~ ~~)iI sampk~ \\ ill be sent
to the labonlto!") It)f th~ Kerosene An"I~lical (;I"O"p according It) FI'A Methud R020. 8100. and
!'I.PRO. 101" 11)\\ \ol.ati1e- prganics aromalic~. polycyclk~ al"olHalic hydrocarbons anu [O(al
reco\~rablr: pr;;trolc"wn h:~dr\ll:arh-oll~. lrl addili\'~n since clHH~min~it.:d soil" Ilan' bt.'t'l1 id.2'1I1ilicd. 0n~
soil s~mpk m(l~ nc~d to he t:illkt..'(l.d p..ior t':l dispO:;;'ll Ji)1' .111.1lysi, :.L't required 11) \Vas~("
r\'ttllag\...tll~l1t.
111 nnkr to address C'oncern:-. for grollllJwlltt'r nmlamillalioll ft\JJ1l lll~ l,:S r. 115 rr:quir-.::'u. \\'~ r"opOS~
thi.:' installation or one l~mpl.lr;,"r: monitor well in the' "lo('(\tiol1 bl'lJ...~\ cd lO he mos.t likel)' to han'
cotltHminnliotl b;1.sed on lht' M.:rt:'ening result:'. obtained prior t(!~ or during. e\:t.:~-l\:;,llioll". ['0110\\ iug
in,tallation 01" the \I ell. groundll;\l~r ,amples \lill he wlkclcd alld sell! to the laboratol, Ji"o
~nalysi,. according to U't\ Melhod Hmll. H 1011 ;!Ild I.I.I'RO lill ,olalile- aromatic Ofgnnics.
I hdraulic I.iil
I'ollo\\ing lh~ ren1\l,alnl" Ihe small hydraulic lili Ian,. il" ~oil ,i,u"lI) slained or ,"lufiltcd I\ilh
hydraulic oil j, idclltilicd and e\c.1I".\l~d. al I~a,t one soil "ll1lpk \lill bc oblained IrQm Ih~
exc8\'ation in lh~ mt:'fllhal reprcsclllS ll1c "\\or::;! case" cnnlalllil1~lIioll. In addilioll ircomaminalion
is iJ~JltiliC'd and rcmo\cd one 1ll011ilor \\ell \\ill he instalit'd in th~ arc~ that l'epr~sr;-1l1s the- '\\or",!
I' '.
l'aSC' (.;(il1(amlnaUt1n.
IISA \I ill nlllil) lh.: Collier Count) Politlli"n ("""lml &. Pre, ~Tlli"n I)cpat1melll priClr 1(\
COl1lm(nC~Il1C'J1l, O\'t~TSe~ and mHllagl.: the t':\Ca\ 3lioll activitit":-> 01" the' lil't:"n~LJ lank COlltr3Cior.
tll'mngC' klr dispo':\al OflhC' imp:u:led ~nil:\, pn.H ide- tll~ manifesh 1<11' Ih~ suil cli"ro~al and O\Cr:'iC~ the
backlilling "I" Ihe projctl. (lualil) 'ls;.urance ((lA I proc~dllres [(lr the c(llkelioll 01 samples and
decontamination oi' samplin~ LlpparatU:'i prior to and during ll'je in Ihe lidd "US conducted in gC'I11:mt
Conll,rmance \lith th~ l'lorida Departmcllt 01" Fill iro/lInenl<l1 l'nJl~ction Iield sampling and
lahora!oC' anal~ ,is qualit~ assurance protocol codi lied in Chapler 62-160 FAC Standat\1 Opcration
Proc~d"res lor I.ield Activit'"' (FDEI' SOP-()OI....nI ). I'ngineerillg and t~C"hnic,,1 slIpporl scnices
will atso be required 10 anal:- Ie the dala obLainc-ti and pr~par~ an engineering report
16G3'1f
l'nderg.omllJd Storage.> Tank Rt.'lIIo\'lIf
43J5- 8..~:s1Ion: Drh c
CollK'r ('Wilt: CmHrm{ ,Io{;.o- JI}](1
II~,," ,::75- Q6hJoi
AUglbt :: i. ~onii
r.lg~ ~ ('If (}
--....--..-
SCIIElllll.E
IISA is prt:'part'o lO h~gin \\ork llpilll rL'C\.'ipl of\\f'ilten 3Lllhuri/Ulrllll.
Cust E-stilUuh.' --
Se r\ ice AClirih Cus.1 PU\IIIt.'UI
R':'TIlwal and disposal "flh" 3 liSTs 51 !,fH~'t I.ump SUI11
lic.:ns.:d lan, !!'!~_Lh~.!1!,!lIli~_!ili.lank _
-
C'OrllfaCIOr Disposal Ol'lall"" COlllc"lS - a,>um.:d sln.non Lump ~lllm
to be concr~l~ (\\(lrsl ra.st' :--l:'t'l1aril))
\\'ush: I ranspurtalinn and disp\)sa! or estimate
t\'laIla~~II1Lll[ or leD IOn; orilllp~~lcd s(1il alld cI~~lIl Si<,nrIO I ,lilliI' Sum
haeklill mat~ri~1 (iI S75.00 pcr 1011
Organi/ing and maf13ging tl1..."' prl_~j("('l.
!:nginC"cring soil and groundwater :-.alllr1ing. S I i<.~(lil I limp SUIlI
Sel"\ ic.:s lahoratory anal) sis and litl~ll
el1!2illlXring. n:pnn
~~di1imHlI Scr\'k.~_...IX') lIDd th",-, Scope of '''or\... '>I.ono T&!\I'
I Total: S49,200
.. rink' & ~ li1Lcrials
Ill': 1<:.:; qllot.:d ah'l\~ arc' valid Ie,,. go da:; li'om th.: datc 01' Ihis p,.o['mal'wnlracl kllcr. II
allthoril<l!ion i, rec.:iv~d ,tilcr Ihc 90-Jay pcri"JI"" ~\pi,.ed, IIS.A l>:tail15 th.: righllO r.:vi", Ilw lee
sch~dllk.
,.\11 item; ;1,ccitic,1 in Ih.: ahow Sc"pe "r Sl'rI il'e; ,hall he PI\}I idcd on.: (] llilll~ lelf ea~h item,
,'\;sumplions arc thalther.: ar.: ol1l~ thr.:.: I:S h and one h~drauhc lill tan',lhallhe Im1" 11111l~nt' arc
conerel':. Ihallhe soil and gn1undllJ1Cr sampling is required nt Ih.: hydrmtlk tili ~nd thm tlll'r~ is
121110lb ol'illlpaet.:d soH that "ill '" r~m",~d li'011\ Ih~ Sil~, Should Ihis ~ror.:menli<ll1ed lee he
di!l(,flnillcd inaccurate. 114.jA \\ ill 1l11tit~ Yl.1U hctfw{' tht" abo\,c: IlllIit is. r~ached. rHh.1 indii,?~ut;;' lht:
[lfllOunt oCwork lO be cOll1plet~J~ lhe amount oJ" nod." ~Cl to perfi.lml. Ihe appn.l\.imalc \:ost~ of[h..:
n:maining \\orh.. and a \\rjut:1l c:'planatiul1 J~s.crihjng rhe: cin::lIIllSlatlCCS th~H caused th..: t'stimulc' to
lX'inal:curalC. \\'rilh.'"U ullthori/illion to proceed !()r aJJill0l1"! \'.llrk is. ('equired,
SCf\icc, not spccilic~lI) describ.:d abow and not inclllded j" Ihi; I'rop 0&1 1 \\ill b.: p.:rle1nn.:d "-,
additional '':1"\ ices on an hourly ba,is, plus r.:imhursabl~ e'p"'he,. in accordance \I ith Ihe t'tlllier
COWlt) rate schedule. Services anu J'et.'s providl'd in this ^gi'rtCm~iH ,lre bas.ed Llprl1l .g.o\'t'mmt:'ntal
IUks, rcglllalilln, and policies in eneet allh.: till1~ oj" e,eclltion l1i' Ihis Agreement. Should chal1g~,
lindcrgrollod Slnragt' Tl1n~ Ilemmal
"31~ 1J.;,I:.\:thun: Urh~
Collier Cl1tlnt.y ('(.'!llmel ':":(~1~3CJ7Il
IIS,\ "1; ;~66~
AlJgLiSt ~ I. ~O(~
Pi.3g..:: 5 016
1 6 G 3'"
----'<'
:IE
take elkc! during tile period :;en ice> are beillg pellllfllled alld result in additional J/Si\ \\Olk
r~qlfir~mell1s. this ^gr~~Ill~nt \\ illlh: modilkd by app"o\ ~I 01' ~II ill\ohed parlies III additillll. IISA
\\ill p~rtoOll miditional s~nicc<j bl:"yond the \\orl..; Ocsl..'rihcJ \\ilhin (hi:; ;\gn.:clIll..'llL as r..:qucsl..:-d alld
aUlhori/ed b: the Client. \\ihen such \Iork can he idenlilJed in advance. IISA I\ill provide a
rtaSOllabk Cs,tim,1ll' fbr sucll \\olk and \\jll proc~r;d \'.ith the \\OTk UpOIl \uitlen authorintlilm h) the
Clielll.
EXCI.USIONS
I he proiCssional s~n ices 10 1><: pro\'ided b: 11';1\ ~re lim ite" 10 (llll: those ,IS de~cribed ill the Scope
of S~nic~~. Plel:ht:' h'\i~" AlIachrnGIH /\. 1,\!Jicl1 illcludes a lisl or Scl'\ ices sp~cilicall) e\dudcd
Irom tl1 is proposal
IISA apprC'dalt"s the tlppprtunil~ to p..(l\id..... ~ ('lli \\ ilh lh'\?~;,; scn ice:; Should )00 Illl\"re all~
quesliol1s. please ICclli'~c to ~onlacl1l5 at (BY) \).,(,-07kY.
IIS^ ENGINEERS & SCIENTISTS
I{o'ann~ I . Gau~e. I'.L.
';enior I 'mirolll11clllall ngineer
AtlClChmelHs: AHachll1~nt ^ - S~r\'ice-" nOllll;..ILldcJ ill ConlnlL"l Propos-al
f ndcrgroumJ Stvnagc T:mk R"nJllul
4Jl~ OOl..\shore Drh.....
COIlll:f ('(}lLI\~ ('tlfH[,ll.:1 ;.;Ofl-:1971)
IISo,.\ ,;.;.75-3466~
i\UgUSI ~ I . 2(11)1.)
P,1bl-:> fo ,~rf'
_'__O'~_
16G31
ATTAC'HMF.!'iT A - Sen ires nollnduded in Clllltl1lrll'rnlms.1
. Concrete Sl~b I{eplacemenl
. G~ol("chnical S(.n l~~'S ,:' Soil Compaction.
. l'cnlogicall:01\ irolHllemai 1\\etli\l1d\\ildlilc) ser\ ice>. slLIdics. rcpol1s & ~)enniltillg.
. I.t'gal advke lH' ~lssblanc~,
. I.and SUryeyillg. ~r\ Ices,
. Utility (11' ulility rdol.:alioll ue-:sign.
. land>eapc design. (M,," be perl(.nned b) l'lorida registered 111lld>cape Archilecll
. /)c\\L1h:ring pcl'ltliuing.
. l>t:sign oi'olr..site imprO\Cll1enlS.
. I-till-time cnnstrut."linll oh."iervution/insrt'ction.
16G3 1
NWRK ORDER
Agreement for Fixed Term Professional Mechanical- Electrical Engineering Services
Dated August S, 2006 (Contract 406 -3970)
This Work Order is for Professional Mechanical- Electrical Engineering Services known as
Pruiect Underground Storage "rank Removal 43 15 BayshoreI)dve
The work is specified in the proposal dated August 21. 20019 which is attached hereto as Exhibit
A, and made a part of this Work Order In accordance with the Terms and Conditions of lite
Agreement referenced above. this Work Order is assigned m HSA Engineers & Scientists.
Scope of Work: As detailed in the attached proposal and the foltowing
• Task I.I Removal & disposal of 3 USTs and 1 hydratdic lift tank
• Task 1.2 Disposal tank's contents
• Task 10 Transportation & disposal of impacted soil & clean back fdl material
• Task 3.1) Organizattonlntana,,emem of project, soil /grottnduvarer sampling & testing
Schedule of Work: Coniplele work (Tasks I Cl through 3.0) within 16 weeks (112 calendar daysl
from receipt of the Notice to Proceed authorizing Stan of work
Substitute Performance [it the event the Contractor fails to perform any required service within
the time schedule under the subsequent contract, the County andior CRA reserves the right to
obtain substitute performance Further, the County`CR.A reserves the right to deduct the cost of
such substitute performance front the Contractor's pavntents- The Contractor coati be exempt
from this provision if such exemption is granted by the Contract Manager or their designee, in
%sriting, prior to am delays or as a result of an .Act of nature.
Compensation: In accordance with Article Fine of the Agreement, the CountpiCRA will
compensate the Firm in accordance with following melhod(s) XXX Negotiated Lump Sum
(LS), ____Lump Sunt Plus Reimbursable Costs XXX I ime & Material (TM) (established
hourly rate — Schedule B) _Cost Plus Fixed f=ee, as provided in the attached proposal
TASK
BUDGET
TYPE
• Task 1.1
$12,000
LS
• Task 1.2
510,000
LS
• Task 2.0
S 8,000
LS
• Task 3.0
518,200
LS
•
S 1,000
1 NJ
TOTAL
549,200
DESCRIPTION
- Removalldispnsal 3 USTs, I Hydraulic Lift
- Disposal tank's contents
- Transportatiowdisposal R till ofmaterial
- Project management & �%aterlsoil sampling
- Coll ineencics
WORK ORDER Continued — Page 2
Underground Storage Tank Removal: 4315 Bayshore Drive
Any change within monetary authority of this Work Order made subsequent to final department
approval will be considered an additional service and charged according to Schedule "B" orthe
Agreement.
APPROVED BY:
David Jackson, Executive D or Date
Bayshore Gateway Triangle
ACCEPTED BY:
Date: /D i(C°
Roxanne L. Gause, P.E.
On behalf of HSA Engineers & Scientists.
By:
Signature
r.0 tobee 8, 2009 -
c�
lvls Roxanne Clause, P.E:
�e,ti'c
HStt Engineers & scientists
1520 [loyal Palm Square Boulevard, $wire 250
Faro .—O mr
Fort Myers, FL 3:1919
Fred w_ cayle
RE': NOTICE- TO- PROCEED FOR Fixed Term Professional Mechanical- Electrical
nenng Fran
Engineering Services: H5i1 PY14wal Number 7j -34668
Contract No. 406.3970 dated August 8, 20061
C RA Project: ubd round Storage Tmlk Removal: 4315 Bayshore Drive
CAVnmiy„,,ye :.
r� t+c�irann
Purchase.Order No:- 45[1011.1875
_.�
Drat MS: U3use
Clyrf:r:on;.
u tom °" `'
This letter,:serves as.Collier County Comnlun "sty Redevelopment Agency`s official
NOTTCE:'7O PROC EED (NfP} to, your Cc/mpalty to cotiunence' with the aiicl e
vr<stt err
eferenot d projeM. TEs N'T P is issued purslrant to H.5:4 Proposal Number 73-34(163:
(attached). 7he:Pun Tlww Order Number is shown above and a copy is attached,
c urckovMna
.., .
This N'fP is Hmitcd to the sco le of work for. Underground Shr
1 8 age Tank"_Rcmoval: -
M e
4315 DaysNire Prive as detailed in H.S.I Propospf Mm "her 75 -34468 fartbe �tOT To
cvanrs
EXC.EE6 rice of $49,200.M. to be paid upon `conlpletivn of wurklservie ,,Any
rex �yrsn
.
modifications or changes to the HSA proposal rifest he pie- approved, by the CRA. :
s�wc¢ +H
Additional, work above +rnd beyond the_14SA proposal will. be based on Hired ensts OR
- Materials based an the HSA proposal fee schedule, and work shall not
commence without written notice to proceed. Please inetudc the. project i ltmber ort°
�'��'"�°
}'our invoicetafacilitateihepaiyntentpruccss.
!
Commencement date for the services nssociatcd hetc%ith shall be consideted to be
odw[S�aaac�
October`:12 ;'2009. rile substaniial completion`dasa shall .be considered to Iw
max
December 18, 2009: Finai Compl #ion of Ali work shall he considered to beFebnlary:<
1,2010.
,.om.lg den
a}1s4Marsazr .
if yew have any qucstigns, please contact nit.
veuttiuyer
Sincerel y.:
David Jackson
Fxeclnive Director
Bayshore Gateway Triangle.CRA
4069 "tlayii ore Onve. Naples, Flor0p 34112
P. (23wY ti43•i i 15 1-. (23%775A456
..
wxvwii!ercra.com -
16G 31
Venoor@ 117377
HSA ENGINEERS & SCIENTISTS AND SCOTT
SIMS & ASSOCIATES
1520 ROYAL PALM SO BLVD, STE 260
FT MYERS FL 73919
Please deliver to
BAYSHORE GATEWAY TRIANGLE CRA
4069 BAYSHORE DR
NAPLES FL 34112
Terma of Payment Net 30 Days
Purchase Order number must appear on all related
corraspondance, shipping papers and invoices:
Purchase order
4500111875 G=` =1010712009
Comm Redev Agency
T«, .' a 239 -643 -1115
Deli eery Date: 09'3012013
Currency U50
Item
Send all Invoices to:
Board of County Commissioners
Price per Unt Net Value
Purchasing Department
_. Board of County Com,missicners
3301 Tamiami Tre:I E
� Ann Accounts Payable
6-
Naples, Florida 34112
PO Bax 413'016
Tax Exempt. 65-801262183CC -2
Naples, Florida 34 10 1 -3016
Venoor@ 117377
HSA ENGINEERS & SCIENTISTS AND SCOTT
SIMS & ASSOCIATES
1520 ROYAL PALM SO BLVD, STE 260
FT MYERS FL 73919
Please deliver to
BAYSHORE GATEWAY TRIANGLE CRA
4069 BAYSHORE DR
NAPLES FL 34112
Terma of Payment Net 30 Days
Purchase Order number must appear on all related
corraspondance, shipping papers and invoices:
Purchase order
4500111875 G=` =1010712009
Comm Redev Agency
T«, .' a 239 -643 -1115
Deli eery Date: 09'3012013
Currency U50
Item
Maternal Description
Order Ory Unit
Price per Unt Net Value
07010
Be-, r cleanu p esr, mrwed
49200 each
1,00 49,20000
Release order agalrsf contract 463000174d net- 00010
4315 Bayshore Dave cleanup and removal of tanks reiwbum34e by Gtewan Title monies in escrow account
Total nahal,l_ escl tax USD 49,200.00
VENDOR Terms and Conditions
Tne VENDOR agrees to comply wth all Purchase Order Terms and Candiiinns as outlined cn lie Coll.er County Purchasing Internet site
http.;,mvw.colhergov. ret +index. aspx7 page= 762 (re v:siDr, date 0 112 2 12 0 0E I. I nclud;ng del; vary and payment terms Further the VE NDOR ag rees to
1. Provide goods and services outlined in this Purchase Order with the prices terms delivery method and
specifications listed above
2. Notify department lmmadiatery if otter fulllmant cannot oraur as specified
3. Send all invoices to
Board of County Commissioners
Attn: Accounts Payable
PO Box 41301 E
Naples, Fladda 34101 -3016
The Purchase Order is ar ✓ahoragd under direction of Collier County Board of County Commissicriem by
_.t. 51ephen Y. Carrell, General Services t Purchasing Director
r. IWJ T., 0AM200512 isl.l!EUS }n3V99 F;"IMI
i
,w
HSA
AN haroHiS 6 tSCtF.JVwrvi1S
Amem�er W Hta r:ItA .arr:ly cfComrsr.:n
October 30, 2009
Collier County Redevelopment Agency
(Bayshore Agency Cateway Triangle)
4069 Bayshore Drive
Naples, Florldv 34112
Attention: 9Ar. David.7ackcnn
Subject: Environmental Engineering Consulting Services
4315 Bayshore Drive
Naples, Florida 34112
PULP t'acility #8629388
Collier County Cuatmo # 06.3970
HSA Proposal Number 75-34668
Dear %lr. Jackson:
We have identified additional services required to finalize the underground storage removal for the
referenced project, The additional services are presented below for your consideration.
According to the contract HSA proposed the removal of an estimated 120 tons of hnpacted soil
that would be removed from the site during the tanks removal, As we discussed during the
excavation, there was a former spill area located north of the dispenser's location with petroleum
impacted soil that was removed and disposed of with the initial estimated tannage At that time
I ISA indicated concern with rcgards to additional soil which would reed to be removed to better
insure a clean groundwater sample. According to the Waste Management Manifests a total of
290 tons of Soil were removed from the site Attached is ti copy of the waste manifests from
Waste Management.
We request that our contract be amended to include the transportation and disposal of an
additional 170 tons or impacted soil and replacement of clean backfill material @ $75.00 per ton,
Out lump sum fee for the combined additional services as described above is $12,750.
We respectfully request your favorable consideration of this request. Please contact Roxanne Gause
should you have questions or need additional information.
HSA ENGIVEERS & SCIENTISTS
Roxanne L. Cause, P.E.
PNlecl Manager
www.has- onv.com
Client Focused . Solution Oriented • Quality Driven
1520 Royal Palm Square Boulevard, Suite 260 . Fort Myers, Florida 33919
Tel. (239) 936AQ03 or (239) 936.0789 . Fax: (239) 936 -0819
offices in, Charleston . R. (Ayers . H&on Head . Orlando . Pensacola 9 Savannah . Tampa . West Palm Beach
16G 3 1
CONTRACTIWORK ORDER MODIFICATION
PROJECT NAME: Underground Storage Tank Removal 4315 Bayshore Drive PROJECT MANAGER: David L - -1—"-
RIDIRFP 0: 983970 MOD 0: 01 POW: 4506111875 WORK ORDER 0: POO 4500111878
DEPARTMENT: Says" Gateway Triangie CRA CONTRACTOR(RRM NAME: HSA Engineers 6 Scientists
Original Contract Amount:
f
,49,296
Yes XX No
This form Is to be sl ed and
(Starting Point)
Current SCC Approved Amount:
f
1) ! A
REVIEWED BY: Date
Total Amount Approved by the SCC)
Current Cordract Amount-
$_49,200
(Including AEI Changes Prior To Thl3 Modification)
Change Amount:
$_12,780
_
Revised Contract/Work Order Amount:
$81,980
(Including This Change Order)
Cumulative Dollar Value of Changes to
th is Contract/Work Order,
f_f2,759
Date of Last SCC Apprdval_NA Agenda Ilem # _NA
Percertlage of the change overlunder current contract amount-25 2tS
Formula: (Revised Amount ! Lest BCC approved amount }l
CURRENT COMPLETION DATE (S) ORIGINAL: FegrUa!y i 2510 CURRENT: February 1, 2010
Describe the change(s): Original Work Order Task 2 Is modified to include an increased amount of contaminated
soil mincived from the project site — above and beyond the original estimate of sod to be removed.
Specify the reasons for the changes) 1. Planned or Elective 2. Unforeseen Conditions XX 3. Quantity
Adjustments 4. Correction of Errors (Plans, Specifications or Scope of Work) XX 8. Value Added
-- 8_ Schedule Adjustments Note: One Or more may be checked, depending on the nature of the change(s).
Identify all negative Impacts to the project If this change order were not processed: To complete the required
environmental cleanup, all Impacted soil has to be removed. This cleanup process, once begun, Is progressive
until all Impacted soil is removed, and the u initial" amount of soil removal Is an estimate.
This change was requested by: (Contractor /Consultant XX Owner I Using Department — CDES
— Design Professional (Regulatory Agency (Specify)
_ Other (Specify)
CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS:
Yes XX No
This form Is to be sl ed and
APPROVED BY: Date.
�� 0
David Jackson, roje n er
REVIEWED BY: Date
4 vz ()
Lyn Mod, Contrail Swalist
6 G
comeM OFMM To W►"QRQFA
TO: HM zqw"" adm" *20M. Gatmwmqj,*&CRA
152D Royal ftht 4069 Bayshom Dive, Nalples M 3402
cl�nrc Blvd, Ste 260
Ft Myers, FL 34134
Undalprowd SWrap Tank ArwKwal: 4315 Ftayshom Drive
10/07109 POWSOItIM
charword"NI
Change Ordtr De*HPH"l
This chaW ordei i -to 4�t� the Alret value of Task #2 of the original Work On.tor and
m
4"eilo P&t; $12j50.60.
Qd&W 89COM411 II'moubt . ................... ................. . ...... $49,200
Sum of PW 'ous do
.. _4 � ...... I-- .............. I ........ ..
This Chmqgs Order No. I Amount (4dd or subtract) ...... ----- $117M
Orighw contract tirm in calendardAys .............................. .......... 112d"3
AdjusW rr tu)See of calendar days due to prtAous change orders ........._O days
T14 change order adjusted time is- ........ "..'Adqys
Revised Cwtfta d That IN %Vrkixg days.... ........ days
Original Nvt= Proceed date .............. . ........... I . ....... Octotm 2009
letion 0 .1 pjptw Contract Ame .... Fobrisary 1 2010
-Ravised.vompiction order(s) .. ...... Fdwip" 1. 20 10
Your acceptance of this cberst -order shall constitute a modificati*n to opr-AVtornerit slid
wifl-be Orromm suboot to all the sane ipms AW COA"*W as OMWned 'ft said
AgreerrWit. Indketed above, as ALUy 4 if die same were repeated in this aoceptance. The
4ustnent, Its this, Agreement s constitute a fW I and final addeinent of any W a cleipis
&d9ing out of, or i0aied to; the cb4Qt set forth hamip, includinz 04ors fi)t irfipkt and delay
costs.
Aooepted,by: ;. Date-,
Romano L. GAuse, P.E.
MA
Date, fr t7
David � hKks^ teway I r"e CRA
Approved by,
Dater A_
:_Lyn WOW, Contract Oxialist
16G3
HSA
"&
A member oT stw CRA Femllyas Cemp®rtlts
February 5, 2010
Collier County Redevelopment Agency
(Bayshore Agency Gateway Triangle)
4069 Bayshore Drive
Naples, Florida 34112
Attention: Mr. DavId Jackson
Subject: Addendum to Work Order . Site Assessment Report (SAR) Services
Underground Storage Tank Removal
4315 Bayshore Drive
Naples, Florida 34112
FDEP Facility 98629388
Collier County Contract k 06 -3970
HSA Proposal Number 75 -34668
Dear Mr. Jackson
HSA Engineers & Scientists (HSA) is pleased to submit this proposal to prepare a Site
Assessment Report (SA) for the above- referenced site. This SA was requested by Collier County
Pollution Control Prevention Department. Initially a Tank Removal and Closure report, in
accordance with Chapter 62 -761 Florida Administrative Code (FAC), was conducted on the site
following a Limited Phase 11 Environmental Assessment (FSA) conducted by ERMI prior to a
real estate transaction. We have identified additional services required to Finalize the
underground storage removal for the referenced project. The additional services for completion
of a formal site assessment (SA) in accordance with the requirements of Chapter 62 -770 PAC,
are presented below:
SITE ASSESS101ENi SCOPE OF WORK
Listed below is an outline of the information required in the SA and the anticipated field,
laboratory, and support services required to complete the individual tasks. All sampling will be
performed in general conformance with the FDEP field sampling and laboratory analysis quality
assurance protocol codified in Chapter 62 -160 FAC Standard Operation Procedures for Field
Activities (II)EP SOP - 001/01). Please note that laboratory analyses are required on equipment
blanks as part of this program.
www.hsa -ero .
1520 Royal Palm Square Boulevard, Suite 2601 Fort Myers, Florida 33919
Tel: (239) 936.4003 i Fax: (2319) 936 -0819
Tampa • 0r1aado • Fn» Ayers • West Palm Bcach • Pensew`.a + Savussxh • (: mit'ston + Ilihan head
Criven
16G3
A. Background: A short site history which describes all current and past petroleum storage
systems and the type of products stored in them, as well as the type and amount of
products that were discharged at the source property, must be provided. A site map
illustrating the locations of all current and past tanks and other potential sources of
contamination at the source property and their associated integral piping and dispensers
must be provided.
B. Potable Well Survey: A well survey will be conducted to locate all private water
supply wells (potable, irrigation. industrial, etc.) within a % -mile radius and public water
supply wells within a :'-milt radius of the contaminated area, included will be the use
and construction details of the wells identified during the well survey and a vicinity map
illustrating the locations of the wells in relation to the subject property must be provided.
C. Soil Asseument: The five soil samples collected from the source aret and documented
in the December 2009 Ttmk 0asure Assesssmem Report will be included within the SAR.
D. Groundwater Assessment: To determine if groundwater has been impacted by
petroleum products, HSA proposes to install permanent groundwater monitoring wells.
Prior to the installation of the monitoring wells. HSA proposes to conduct a groundwater
flow study to determine the direction of groundwater flow on the site. Following the
groundwater flow determination, three (3) monitoring wells will be installed within the
former tank site, in upgradient and down gradient directions. The monitoring wells will
be installed using 3.5 -inch diameter push rods to the approximate depth of 12 feet below
land surface (bls) by a licensed water well contractor. Each monitoring well will be
installed to a depth of twelve (12) feet with ten (10) feet of 0.010 -inch slotted screen, and
pre- packed with 20130 -grade silica sand filter pack. Additional 20)30 -grade silica sand
will be placed around the borehole of all monitoring wells to approximately one foot
above die pre - packed screen. A one -font Fine sand seal, consistutg of 30165 -grade silica
sand, will be placed above the filter pack. After installation of the monitoring wells, the
wells will be developed with a peristaltic pump wail the discharge water was clear of
visible sediment.
HSA proposes to collccL groundwater samples from the newly installed monitoring wells.
Samples will be analyzed for groundwater quality field parameters and natural
attenuation data (e.g., ORP, DO, and pH) while purging the monitor wells by the low -
flow purging Lech nique. Quality assurance (QA) procedures for the collection of samples
and decontamination of sampling apparatus prior to and during use in the field will be
conducted in general conformance with the Florida Department of Environmental
Protection field sampling and laboratory analysis quality assurance protocol codified in
Chapter 62.160 FAC Standard Operating Procedures for Field Activities (FDEP SOP -
001/01). Groundwater samples will be properly packaged and sent to a certified
laboratory and analyzed for the Gasoline Analytical Group, in accordance with EPA
Methods 8020, 8100, and FL -PRO.
16G3
F. CONCLUSIONSA "RECOMMENDATIONS
L In this section of the SAR, HSA will summarize the findings of previously
described section of our work.
2. IISA will present an evaluation of the findings and recommend one of the
following actions to be implemented based upon the results of the Petroleum
Contaminated Site Cleanup Criteria, Chapter 62 -770 FAC.
a) No Further Action Proposal
h) Monitoring Only Proposal for Natural Attenuation
F. REFERENCES
A list of references cited in the SAR will be provided.
U. FIGURES
All necessary figures will be presented in a separate section of with report.
H. TARI.ES
All necessary data tables will be presented in a separate section of the report.
1. APPENDICES
The appendices are to include historical documents that have not been previously submitted
to other agencies such as well completionkumtruction reports, boring logs, aquifer
characteristic field data and analysis, and laboratory analytical reports.
FEES AND PAYMENT
The cost to complete the soil- sampling phase of tale site assessment is a lump sum of512r000.00.
The aforementioned amounts are estimates and do not purport to be representative of the final
consulting costs, should urforniation that affects our understanding of the needs of the project
change However, it does represent our best estimate based upon the current knowledge of the
needs for this project. Should the aforementioned fee be determined inaccurate, HSA will notify
you that the above limit has been reached, and indicate the amount of work to be completed, tine
amount of work yet to perform, the approximate cost; of the remaining work, and an explanation
describing the circumstances that caused the estimate to be inaccurate.
Additional client and FDEP communications and meetings, if requested, and responses to
comments, if necessary, will be billed separately on a Time - and - Materials basis.
SCHEDULE
HSA anticipates that the work will be completed within six to eight weeks after authorization to
proceed. HSA will notify you of any conditions that arise that impeded our ability to complete the
tasks before the date stated above.
OWNER RESPONSIBILITIES
16G3 1
The client shall provide HSA with permission to access the site and perform the above- described
services. our work will be directed toward defining the vertical and horizontal extent of petroleum
contaminants on the site
If you have further questions, please Feel free to contact meat (239) 9364003.
HSA ENGINFIERS & SCIENTISTS
j
Y-)
Roxanne Gause P.F..
Environmental Project Manager
16G3 i
CONTRACTIWORK ORDER MODIFICATION
PROJECT NAME Underground Storage Tank Removal. 4315 Bayshore Drive PROJECT MANAGER: David L. Jackson
BIDIRPP K: 06-3970 MOD M e2 POO: 4500111875 WORK ORDER 8: POe 4500111875
DEPARTMENT: Bayshore Gateway Triangte CRA CONTRACTORIFIRM NAMES NSA Engineers & Scientists
Original Contract Amount
Current BCC Approved Amount:
Current Contract AMOa M:
Change Amount:
Revised ConlracNWork Order Amount:
Cumulative Dollar yellm of Changes to
this Contractuvi Order:
$ _49,200
(5tening Point)
$, rJst ot�a
{Laa! Amount Approved by the BCC)
$_61,950
(Including All Changes Prior Io This Modification)
S_73,950
pncl.rding This Change Order)
$_,.24,750!
Date of Last BCC Approval_NA Agenda Item #_I 1A
Percentage of the change oveNUnder current contract amount— .rj (k 3 /O
Formula ( Revised Amount I Last BCC approved emount }t
CURRENT COMPLETION DATE (S) ORIGINAL: Feitnuary 1 2010 CURB : September 90, 2010
Describe the change(s): Original Work Order Task 2 is modified to include an increased amount of contaminated
soil removed from the project site - above and beyond the original estimate of soil to be removed.
Specify the reasons for the changes) 1. Planned or Elective XX 2. Unforeseen Conditions XX 3. Quantity
Adjustments 4. Correction of Errors (Ptans, SpeciflcadonS or Scope of Work) 6. Value Added
XX 6. Schedule Adjustments Note: One or more may be Checked, depending on the nature of the change(s).
Identify all negative Impacts to the project if this change order were not processed: To complete the required
environmental cleanup, ground water must be sampled and tested. This cleanup process, once begun, is
progressive until all impacted soil is removed, and the ground water Is found to be clean.
This change was requested by: IContractorlConsuhaot XX Owner I Using Department — CDES
_Design Professional IRegulatory Agency (specify) Other (Specify)
CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS: Yes XX No
This form Is to be signet rr and dated.
APPROVED BY: f
L ` Date:
4.f 1 �it/ GTE "7i'`. Date: �()
REVIEWED BY: l t
1 .�. CnMrort Cnnciali6i
TO: NSA Engineers & Scieatlsls FROM: Bayshere Gateway Tr
I s20 Royal Palm Sgvam Blvd, Ste 260 4064 Bayshore Drive, Naples
Ft Myers, FL 34134
Underground Storage Tank Removal 4115 Bayshore Drive
16G3
34112
10/07/09 P000001 1187A
Change Order k2 _ 0210512oto
Change Order Description:
This change order is to increase the budget value and contract time of the original Work
Order and increase the price by $12,000 -00.
Original agreemm amount .....:: $49,200
Sum of Previous Changes ..:.......... _.,_- ......:S12750
This Change Order No, 2 Amount (add or subtriact) "" . T t2 9QQ
Rarfsed Agreenrerrt A»wunt....i. .............. $73.450
Original contract time in calendar days 1 12 days
Adjusted number of Calendar days dui to previous change orders 0 days
This change order adjusted time is ... .... _.. ... 240 days
Revised Contra re lime in trw Ahkg 009i r' . .. ..... .:. 352 days
Original Notice to Proceed date October 12, 2009
Completion date based on original contract time February 1. 2010
Revised completion date due to change order(s)• • • September 30, 2010
Your isixglarife of this. - change order shall constitute a modification to our Agreement and
will be performed subject to all the sapwc terms aria conditions as contained in said Agreement
indicated above, as fully as if the tame were repeated In this acceptance. The adjustment, to
this Agreement shall constitute a full and +nal settlement ol'any and all claims arising out of,
or related to, the change so forth e[ , mclud[ng claims for to.pact and delay costs.
Accepted by: �� - -- - - . _ --- Date *�
Rmtanne L. Clause, F E -
HSA rtreera & . i srs:
Approved by- Date Oz IAP 7//0
David t,. Jackson. Baysho ateway Tripngle CRA
Approved by, t . Date.
- --
L Con[wct Speriaiist!
Lei If
Chairman
This letter serves as Collier County Community Redevelopment Agency's official NOTICE
vicu.chalr TO PROCEED (NIT) to your Company to commence with the above referenced project.
This NTT is issued pursuant to Site Assessment Report {SAR} Services dated February 5,
2010: H.SA Proposal Number 75 -34668 (attached). The Purchase Order Number is shown
Pe:.:r o::'.,^ above and a copy is attached.
'this N IT is limited to the scope of work for: Site Assessment Report (SAR) Services -
° Underground Storage Tank Removal: 4315 Bayshore Drive as detailed in H3.4 Proposal
Number 75 -34668 for the NO'f TO EXCEED price of $12,000.00 to be paid upon
completion of work/services. Any modifications or changes to the I ISA proposal must be
pre- approved by the CRA. Additional work above and beyond the HSA proposal will be
a' r+ based on fixed costs OR Time- and - Materials based on the HSA proposal fee schedule, and
work shall not commence without written notice w proceed. Please include the project
number on your invoice to facilitate the payment process,
caA$to Commencement date for the services associattiJ herewith shall be considered to he
rla.la1 1aa_ „” February 11. 2010. The substantial completion date shall be considered to be June 1, 2010.
Eaccu! „� Final completion of all work shall be considered to be Septemher 30, 2010.
Gire,sw
lawn JUVrgan If you have any questions, please contact me.
Frejecl. Mxagc,
Sincerely.
Frupd Manage,
David Jackson
Executive Director
Bayshore Gateway Triangle CRA
4069 Bayshore Drive. Naples, Honda 34112
P (239) 6431115 . F: (239) 77544%
v:.va colhercra Wrn
February 11, 2010
CPA 9a1ad
Ms Rosanne Gause, P.E.
4ammisamxi
Jame, N
HSA Engineers &Scientists
(>air"'
1520 Royal Palm Square Boulevard, Suite 260
ComtmxCiene,
Fort Myers, FL 33919
rr¢rt W C s y4=
RE: NOTTCF3 =FO- PROCEED FOR Fixed Temi Professional Mechanical - Electrical
oon,.a Fm :a
Engineering Services: HS.4 Proposal Number 75 -39668 FDEP Facility #8629388
Contract No. #06 -3970 dated August 8. 2006
Frank Hnta;
CRA Project: Site Assessment Report (SAR) Services
Storage Tank Removal: 4315 Ba shore Dri ve
rwUnderground
Purchase Order No. 4500111875
Adv sort'
a°d
Dear Ms. Gause:
Chairman
This letter serves as Collier County Community Redevelopment Agency's official NOTICE
vicu.chalr TO PROCEED (NIT) to your Company to commence with the above referenced project.
This NTT is issued pursuant to Site Assessment Report {SAR} Services dated February 5,
2010: H.SA Proposal Number 75 -34668 (attached). The Purchase Order Number is shown
Pe:.:r o::'.,^ above and a copy is attached.
'this N IT is limited to the scope of work for: Site Assessment Report (SAR) Services -
° Underground Storage Tank Removal: 4315 Bayshore Drive as detailed in H3.4 Proposal
Number 75 -34668 for the NO'f TO EXCEED price of $12,000.00 to be paid upon
completion of work/services. Any modifications or changes to the I ISA proposal must be
pre- approved by the CRA. Additional work above and beyond the HSA proposal will be
a' r+ based on fixed costs OR Time- and - Materials based on the HSA proposal fee schedule, and
work shall not commence without written notice w proceed. Please include the project
number on your invoice to facilitate the payment process,
caA$to Commencement date for the services associattiJ herewith shall be considered to he
rla.la1 1aa_ „” February 11. 2010. The substantial completion date shall be considered to be June 1, 2010.
Eaccu! „� Final completion of all work shall be considered to be Septemher 30, 2010.
Gire,sw
lawn JUVrgan If you have any questions, please contact me.
Frejecl. Mxagc,
Sincerely.
Frupd Manage,
David Jackson
Executive Director
Bayshore Gateway Triangle CRA
4069 Bayshore Drive. Naples, Honda 34112
P (239) 6431115 . F: (239) 77544%
v:.va colhercra Wrn
16G3
Vendor 9 117377
HSA ENGINEERS & SCIENTISTS AND SCOT
SIMS & ASSOCIATES
1520 ROYAL PALM SO BLVD STE 2 60
FT MYERS FI 33919
Please deliver to.
BAYSHORF GATEWAY TRIANGLE CRA
4069 BAYSFIORE DR
NAPLES FL 34112
fe=rns cl Pa•imem. h =_I ?: Days
Purchase Order number most appear ml all oelatod
correspondence.. shipping payers and invoicus.
Purchase order
4500111875 1010 71200 9
- -.__ Comm Redev Agcncy
..- 239-15431115
Curer : -,
L•ehvu,y Oats
USD
Item Material Descrlpa'on _-
- Order gry Unit Prue Per Unit
bend all Invoices to:
rjard ul 1U.jnI, LO Il 11 SNrI <fi
PN
bad o` Cv r Itr cur :", Ss 3; 1e's
Pu'oh35mq Depa,r- rt
MW Arcr,•un! , Payaale
G 1 Tam: a .-i Trau F
iS
Build ng F r lh Fl or
+' ^.p FL 341-11
e Irrnl!tE tl Esorc:': 0'O:un1
11"1 Tam and Tr il
To, Exempt 31 UQA2 1$3.x, 2
Nop.e_ F, „4117
Vendor 9 117377
HSA ENGINEERS & SCIENTISTS AND SCOT
SIMS & ASSOCIATES
1520 ROYAL PALM SO BLVD STE 2 60
FT MYERS FI 33919
Please deliver to.
BAYSHORF GATEWAY TRIANGLE CRA
4069 BAYSFIORE DR
NAPLES FL 34112
fe=rns cl Pa•imem. h =_I ?: Days
Purchase Order number most appear ml all oelatod
correspondence.. shipping payers and invoicus.
Purchase order
4500111875 1010 71200 9
- -.__ Comm Redev Agcncy
..- 239-15431115
Curer : -,
L•ehvu,y Oats
USD
Item Material Descrlpa'on _-
- Order gry Unit Prue Per Unit
Me[ Value
Fipvms dearwt: Ea:TuWed
49 2r;r3 eit :h l P'n
4L 201r CC
livamtj dlll U Cia de.6vEro1 UF.ach
Releaseurd., aoainst contra 46ir3301744
4315 EaYahcre Cln'r,e fiean un ana renal la: r' Ia�MS iert :b�r,i ; ;. by
e Irrnl!tE tl Esorc:': 0'O:un1
..• :tr'. rnrrplet_ly da.ry =red ..
(lil, ^.7G PC', InCfeasE c 127F:`
1; 7 >0 ed :O I�9 ".
1272:,0.1
Qua n ty sl.11to I>, dg'IVer2d a::iEad.
Delivery Dale Day t5J3,� ?0 m7
Re,e35eoroerana : rSl GJnt act 4GC0001744 acP� G "uGl9
Nlx +. Ord.: ' III id Nat on 4315 E':.ry s r,3 -z Da:c
••• Item parhBlty CCII ✓e'EJ •`
017t131L SP.R Servlrvs Ut TRemoval
12.. UJU cacti 109
12A::300
Oelrtery Date Day 09!'30ticIQ
Se,R Ser4a - LIST Rama:a;
VENDOR Terms, and Conditions
Tho VFNPOR agree6 to r,Cmply mth all f3wcrl3se Orduf I er1115 and CCq'd tpn8 as Cut rtcO rn 11Z Cr her C,oi:ntj Phrchanvv4 1n!a nel sde
htp :9vmiarc0414args': nebindex ospx -,pogc -752 Ire'.,wm data C147:?Q08.r n.::umrg deer :ei; anti p3.vrenl leans Furiner the VENDOR agrees Ir.
1 Provldegcods and ser icea ouhmedm this Par rhase Onto vnlh lt+ p:n:es lu:rns dell,eN mCtlloc and
sfxitcatlom I sled obcve
1 2 Nobly departmanl Ircrr'e Jtalely d order Ufdm rt Carintl cccur as spaNEei
i 3 :fend al invmses to
!. We'd OI cc'u lty c omrn:us one's
AIM F- scants Payable
PO box 41301^
Naples, Flrrs,a 34111 :3010
The Purcllam O,de: IS 2dth0r1,2C0 [ndardL•CCUOn o!fa:I,(CCUrty Rna!l of Cmm y Eoirr-us5 :cnels r'y
1�r. Stepi.ICnV Cnrne.l Genera' Services+ Purchasing n.rncta<
rr. ._r'1 rla 11 4- G1Cyr'
VendnrK 117377
MSA ENGINEERS & SCIENTISTS AND SCOTT
SIMS & ASSOCIATES
1520 ROYAL PALM SO BLVD, STE 2GO
FT MYERS FL 33919
16G3
PO Number 4500111875
Dale 1 010 7120 09
Tr,f,al ref valuF c(d fat USD
79,950.00 I
16G3
w HSA
AP
A maTe« of n,. au roman Of no'noent..
March 18, 2010
Collier County Redevelopment Agency
(Baysbare Agency Gateway Triangle)
4069 Bayshorc Drive
Naples, Florida 34112
Attention: Mr. ,David Jackson
Subject: Addendum to Work Order - Interim Source Removal Services
Underground Storage Tank Removal
4315 Bayshore Drive
Naples, Florida 34112
FDEP Facility 48629388
Collier County Contract # 06 -3970
HSA Proposal M mlber 73 -34668
Dear Mr. Jackson
HSA Engiueen & Selentists (HSA) is pleased to submit this proposal to conduct an Interim
Source Removal (1SR) for the above - referenced site. During the on -going Site Assessment
activities, the down- gradient well, located near the former hydraulic U indicated petroleum
constituents above the Groundwater Cleanup Target Levels (GCTLs) according to 62 -777 FAG In
order to complete the SAR in the most cost effective way. HSA recommends excavating the
petroleum impacted soils identified by the monitoring well. The additional services for the
Interim Source Removal (iSR) are presented below:
INTERIM SOURCE REMOVAL SCOPE OF WORK
Prior to completion of the Site Assessment Report, HSA proposes to excavate the petroleum
impacted soils located in the area of the former hydraulic lift. HSA will conduct the following
requirements for the ISR:
Preliminary soil sampling at the site has indicated the impacted soils are located approximately
nine (9) to ten (10) feet below ground surface (bls). In order to delineate the extent of the
petroleum impacted soil, HSA wilt conduct auger borings with a direct push rig. The soil
samples obtained from the auger borings will be screened for visual signs of stains, odor, and
tested using an organic vapor analyzer (OVA) in accordance with Chapter 62.770.200, FAC., to
determine the volatile organic coutcnt of the soils by way of o soil -gas analysis.
www hs&&nv com
1520 Royal Palm Square Boulevard, Suite 260 / Fort Myers, Florida 33914
Tel: (239) 936.4003 / Fax: (239) 936 -0819
Tampa a Oomdo • For; Mycq 0 West Palm Beach 0 I'mmols - Sa amah • Chalcalw - Hilton Head
16G3
Once the horizontal and vertical extent has been determined HSA will then excavate the area and
remove the contaminated soils. During the excavation activities, field sampling will be
conducted with an OVA to ensue all impacted soils will be removed until final OVA results are
below the FDEP definition of excessively contaminated soils for the kerosene analytical group as
those soils that return an OVA value in excess of 50 ppm and for the gasoline analytical group as
those that return an OVA value in excess of 500 ppm (Chapter 62 -770 F.A.C),
Following the OVA analysis, five soil samples will be collected, as required by Chapter 62 -777
FAC, from eacb side of the excavation pit and one from the bottom based on the screening
results obtained during the excavation. The soil samples will be sent to the laboratory for the
Kerosene Analytical Group according to EPA Method 8020, 8100, and FLPRO, for low volatile
organics aromatics, polycyclic aromatic hydrocarbons and total recoverable petroleum
hydrocarbons. In addition, one soil sample will be collected prior to disposal for analysis as
required by Waste Management.
Following the excavation of the impacted soils, approximately one foot of gravel well then be
placed within the base of the excavation pit and the pit will be left open for a period of several
weeks. HSA will then remobilize and the excavation pit will then be backfilled with clean fill.
Since the impacted soils appear to be at a depth of nine feet, the top five to six feet of soil will be
set aside and replaced into the pit once the contaminated soils have been removed.
Following the backfrlling of the excavation pit, HSA will reinstall the existing monitor well and
may be required by the FDEP to install two additional monitor wells. The monitoring wells will
be installed using 3.54nch diameter push rods to the approximate depth of 12 feet below land
surface (bls) by a licenged water well contractor. Each monitoring well will be installed to a
depth of twelve (12) feel with ten (10) feet of 0.010 -inch slotted screen, and pre- packed with
20130 -grade silica sand filter pack. Additional 20130 -grade silica sand will be placed around the
borehole of all monitoring wells to approximately one foot above the pre - packed screen. A one.
foot free sand seal, consisting of 30165 -grade silica sand, will be placed above the filter pack.
After installation of the monitoring wells, the wells will be developed with a peristaltic pump
until the discharge water was clear of visible sediment.
HSA will collect groundwater samples from the newly installed monitoring wells. Samples will
be analyzed for groundwater quality field parameters and natural attenuation data (e.g., ORP,
DO, and pH) while purging the monitor wells by the low -flow purging technique. Quality
assurance (QA) procedures for the collection of samples and decontamination of sampling
apparatus prior to and during use in the field will be conducted in general conformance with the
Florida Department of Environmental Protection field sampling and laboratory analysis quality
assurance protocol codified in Chapter 62 -160 FAC Standard Operating Procedures for Field
Activities (FDEP SOP- 001 /01). Groundwater samples will be properly packaged and sent to a
certified laboratory and analyzed for the Gasoline Analytical Group, in accordance with EPA
Methods 8020, 8100. and FL-PRO.
16G3
HSA will notify the Florida Department of Environmental Protection Department of the ISR
activities, oversee and manage the excavation activities of the licensed tank contractor, arrange
for disposal of the impacted soils, provide the manifests for the soil disposal and oversee the
backfilling of the project. Quality assurance (QA) procedures for the collection of samples and
decontamination of sampling apparatus prior to and during use in the field was conducted in
general conformance with the Florida Department of Environments) Protection field sampling
and laboratory analysis quality assurance protocol codified in Chapter 62 -160 FAC Standard
Operation Procedures for Field Activities (FDEP SUP - 001 101).
Engineering and technical support services will also be required to analyze the data obtained and
prepare an engineering report.
Crests
HSA has completed remedial activities at similar sites and the costs and tirrefrarites provided are
within the range expected for such a site.
Cost Estimate
Service
Activity
Average
Cost
Delineation of I Med Soils_ _ _
52050
Lump
Direct Push Rig
Sum
Installation of up to 3 monitoring wells
$3,500
Mobilization, excavation equipment and load
$5000
trucks X52,500 per dax eat. 2 dam
Lump
Excavation Activities
Sum
Remobilization and equipment for backfilling
$2000
Transportation and disposal of estimate of
Time &
Waste Management
250 tons of impacted soil and clean backftll
518,000
Matcr nts
material @ $75.00 per ton
_
Organizing and managing the project, soil
Lump
Engineering Services
and groundwater sampling, laboratory
$t8.975
Sum
is and final en incerin report
Reimbursable —
Estimated Budget
$1000
Not to
Exceed
Expenses
� _rural:
332,325
The aforementioned costs are estimates and do not purport to be representative of the final
consulting costs, should information that affects our understanding of the needs of the project
change. However, it does represent our beet estimate based upon the current knowledge of the
needs for this project. Assumptions are that there is 300 tons of impacted soil that will be
removed from the site. Should this aforementioned fee be determined inaccuretc, HSA will
notify you before the above limit is reached, and indicate the amount of work to be completed,
the amount of work yet to perform, the approximate costs of the remaining work, and a written
explanation describing the circumstances that caused the estimate to be inaccurate. Wrinen
authorization to proceedfor additional work Is required
16G3
These services vrill be provided on a Lump Sum not -to- exceed, basis per the atlachcd fee
schedule performed under the attached Terms and Conditions, if you have further questions,
please feel free to contact me at (239) 936 -0799.
if you have further questions, please feel free to contact me at (239) 936 -4003.
HSA ENGINEERS & SCIENTISTS
Roxanne Gause P.E.
Environmental Project Manager
4
16G3
CONYRACTJWORK ORDER MODIFICATION
PROJECT NAME: Underground Storage Tank Removal 4315 Bayshore Drive PROJECT MANAGER: David L. Jackson
BIOIRFP a: 0sag70 MOO F 03 POa: 4500111675 WORK ORDER a: PON 4500111875
DEPARTMENT: Bayshore Qataway Triangle CFLA CONTRACTOWFIRM NAME: RSA Englneas 6 Scientists
.............
Original Contract Amount:
Current BCC Approved Amount
Current Contract Amount
Chang* Amount.
Revised ContractlWork Order Amount:
Cumulative Dollar Value of Chanties to
this Contract/Work Order:
$ _49,200
(Starting Pointe
S ?ilF,
(Last Total Amount Anprwed Dy the BCCf
s_ 73ASo
onduding All Changes Prier To Ttus!Ltodiacahcnf
S 32,525 _. .
3106,475
pncluding Ths Change Orderl
S 57
Date of last BCC Approval—NA_ —__ Agenda Item a _ri4_
Percentage of the change overiunder current contract amount-L-1 J
Formula SRevised Amount r Last EGG approved amount) -1 - - - -�
CURRENT COMPLETION DATE (51 ORIGINAL:_ February 1,2010 CURREN( Septemtxv 30, 2010
Describe the change(s): Original Work Order Task 2 is modified to include an increasiaamaunt of contaminated
soil removed from the project site - above and beyond the originat estimate of soil to be removed.
Specify the reasons for the changes) 1. Planned or Elective XX 1. Unforeseen Conditions XX 3. Quantity
Adjustments 4. Correction of Errors (Plans, Specifications or Scope of Work) 8. Value Added
XX 6. Schedule Adjustments Note: One or more maybe chocked, depending on the nature of the change {s).
Identify all negative impacts to the project it this change order were not processed: To complete the required
environmental cleanup, ground water must be sampled and tatted. This cleanup process, once begun, is
progressive until ail impacted soil is removed, and the ground water is found to be clean.
This change was requested by: (Contractor /Consultant XX Owner I Using Department - CDES
design Professional XX Regulatory Agency (Spec ify)_PDEP^,_�_ Other (Specify)
CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS: Yes XX No
This form is to t
APPROVED BY
REVIEWED BY
Dale: 19 Z L l a
rJf
Date
1520 Royal Palm Square Blvd. Ste 260
Ft Mycrs, FL. 34134
16G3
MOM-. Baysbore Gateway Triangle C1t,
4069 Bayshore Drive, Naples FL 34112
Underground Storage Tank Removal: 4315 Bayshore Drive
i t t
Change Order
PO*4500111975
This change order is to increase the budget value and contract time of the original Work
Order and intense the prig by $32,525.00-
original agreement amount ..... ............ ...... ....... _.... .... .........,... ........ 549,200
Sum of Previous Changes... _ .... .......... ... ......... ................. 524,750
This Change Order No, 3 Amount (add or subtract) . ........................532,$7
Refired Agreement Amount ....... ............................... ....................... $106,475
Original contract time in calendar days ............... ..............................1 l2 days
Adjusted number of calendar days due to previous change orders ............ 0 days
This change order adjusted time is. — . ........ ................ ... ............... . 240 days
Revised Contract TYme in working days ................. . . ...........................352 days
Original Notice to Proceed date .................. ............................... October 12, 2009
Completion date based on original contract time ....................... February t, 2010
p
Revised completion date due to change order(s) .................... . September 30, 2010
Your acceptance of this change order shall constitute a modification to our Agreement and
will be performed subject to all the sane terms and conditions as contained in said
Agreement indicated above, as fully as if the same were repeated in this acceptance. The
adjustment, to this Agreement shall constitute a full and final sefdement of any and all claims
arising out of, or related to, the cha set forth herein, including claims for impact and delay
r
COSTS.
Accepted by: 0 r ic_
Roxanne L. Gause, P.E.
HSA Engineers 4.Scr1ntists.,
Approved by:
David L, Jackson, &
Approved by:
Lv(. Contract
Gateway Triangle CRA
Date: 3 ;Z-�2 %7'
Date: c?2-110
[Sate:
I
16G3
BAYSH0RE
Gr,TEW Y
TRIANGLE
kH Eti r°;,
Mar, l? 2> _'11111
M, Rood is (1:tust' P f_
I I' A Eurnleere n Nctemi:t.
15 -'(1 I(u,:I] Pd101 Syu:irc Ii,)ulevar:I. StkI 4,n
I,'rI \titer,. PI ;ai14
RK Vui1(I A(A UH I.IJ) IC)k I Ocd Icntl 1'u,tcs5nalsl til.ah.uu Col -I [cc!Iicat
l nainirrinv_ Smlice, /144 I'llyw"d A'a,r, '� - i4'60 1 I)l l' I a,ilin = rihZt);Kf
Om ml No J16 39711,I,licl . -1 t, 4�ita S- _?Nli,
tKAPloject Iikc:
I1;Jirct,aond tito a c 1,111 Kr,n.,'..d .f;lc It.tr h re I)II\C
lidar:Al>. <.rdu�c:
I hi: kitel nrne, I l'u111 :r f uu fit i t ,.•nnllulit) I"i.iiec1,`htncl11 \gsul'n nflicir' 'N t i I I( I
Itl Phll('l i I) {VI I'i In 3,ml i mripa0 to CWIk:II,nee v,ilIi ve ivteieIIccd Pr,lj::i
i >aui,l put.u,oI1 1,1 I111c1i1u SrnIII:i Itcumla! ije 1 SclviLCI dated AlalcII 1K.
0141 IJS-1 P"011,,,,d .1'utuA, "?- _ *dr,r,r I:nI "h,d1 III, I`un'h-e.c ?vunlI'cI i, ,hnun
IIli; 1I1' i• limited to to }•:ol,, A p.rk Or InrrrIm %uumu V1ta,1„ I IISK1 Same, in
etuljurt.tirinn 16th I?ndetgnnnn) Ssio r,r I:mh Ilmo% 11 J?I� R,oAonr Dmc d,lailcd
in fly i I '"A'' 3J, /)(, 1, ills" NiII iI I f II I I it III lit' nt j:,!,i >,110 G, hi
poi .1 upon ,`Ikil`Ia1., -I of f, 4.'r\ L v \1l1 11h,,'fl`t',i'"n of tll i ?l,ii^ 1, Of'C 11S 1 11joil"
tnl"t hr 1 +1L- aI, ;,IMv 11 h1 111.- 4 K9_ Ad.ir.i•nl.11 v „vII .[o' ,w 1 1 %onJ III, III \ I,ri,f,.';..1
1% IYI,'ll Ou 1!vC,1 OKI, ( )1! 1lInk- Illd A1,11:_fl.l!. h nr^I o!l Iili I I).\ I-nulr.',sl tic
>. . 1111'1 1VVrf hh II ty cu nJhjri v :A"Mah ( to HK it L Ov in p - -nd M"Lv In,hK
tb I,rn'I „1rrn,hel „11jairmv, W, u,11Wl,'i1 Inv' n'„rwtI,
-- l „llllllcR:irnon1 d:Y:.' Int 11 ?c ?Ci11i d I1cCit\n1l S.b!11 hd c„i:',1.Is�rl I-r�' \lerih
1`' _nlii
III, d.,h shall h: e`o,l Ut-d to b, jully I, :'011 _ I III,!,
1,Nn1I,leti,n) of all "orf. ''b"I be 6, hs MIY.:` oh-T On 211114
11 vuu 11;411 nnv 1llteai,'vn;.1l1e.111: Loluaii rai
linCETCI).
1 1,11 id .l uf. >ul1
I_yei tit Ikv 1)ireitnr
f1,.v�hor� (ialrvvu1 I rinnuL CRA
16G3
Please deliver to
BAYSHORE GATEWAY IRIANGL.E CRA Delivery Date
4069 BAYSHORE OR
NAPLES FL 34112
terms Ili! Payment Net 35Days Cwuan::y C'SD
:item Maleatat Description Order qty Unh! Price Per Unit Net value
00010 Berra G'Ban Jp esr,•ov'r: f 49 TT' Eacn 1 00 4. 200 CO
Qu3nidy Ft 11 Un be delvuhJ Beach
Pleease order againit cnnn,act 40W_0174.4 lter^ N "14
4;115 H3y3Rrre L4n•u Jeanup ant remodll a`:9 -k9 aIe,yo,t hpe -)cries .n e5c,o. arx3 ml
"- Ilea cunpiCtcly dCl.aeled ""
Orja2n PC, nc Se £ I ( 741' r. t; 7 ;n each 1 011 17 750 LO
C)uan51y al 11 to be delivered 6Te.a;h
rrel ver j note Day 0gim:2010
Rela�sa or a, agaarl canVact
46,3--X, C) 171.4 ttcw C 1
IiJ -A Qrder Wr.A ficat nn 4a;p Hays'ur.. Li vc
Item parhally delwere l
00436 SAP, Serrv'tces - LIST Remavol 12009 each 100 12
Cuanbhj sHI to he de :iverrJ 5 715e3o11
Delivery Dote Day 0gr3.P7019
SAR Sec nice - LIS (liar'• i,9V a
VENDOR Terms and Conditions
The VFNL9R afire =a to Comply WL) al Purghe5e Order Terms and CcrldlbonS as outlined ol', tre •tea(ler C;auntj Par--- hasing Intunlet SIR'.
http l;)wn: crlliergov netl'Mez asps7page =7e2 treylslon dose OP2212P08t �nnn,dl-,g delivery ead 03yrnenl trrrrs Fudh.er the VENDOR agrees m
prC'vlde9=15 and serv.[ea outlinect'.It'I s Puf.hjse Orde- wit the F.r.rl= term',= ud eve y mtliud arJ
specificalmns Iisled above
2. Nut.1j depali :Pent Immediately Ir nrd2r ru fn rrlen! cannot occur a> SpEPrITd
Al 8erw all m -mices tc
Bard of Ccuuly Comm)*st3ner5
Atrn AcccuiI5 Payable
Budding F 7th Foor
3301 Tamtami Tra I F
Naples FL 3.112
The Purchase order is authcraed under dnecbcn of CCrler fpGnty FFard of County C :cmrrb a5lJnerS Ly
t
_ . ,c.'tCptirl Y. Cor]ell. General Sem ::•Ge.S! Pu¢Has tLg UnCCIOf
Send all Invoices to:
beard or Coin y Go mml donerc,,
E 3 if of CQU I lty CL III "U 5Si0ner5
PUrchasing Cepa-tweril
,j ARn AzroI Payabla
3941 Tar l Tr all E
Bu long F', h Piccr
x'�
Duple, Ft 34 117
3301 To", a rl Tra IF
Tav Femnt 115- 9912E YX -2
N pi.5 F 11
PUrchaae Order number must appear on all related
rerrespondence, shipping papors and invoices'
Vendorp 117377
Purchase order
4600111875 1 "'- 1 010 71 20 0 9
HSA ENGINEERS &SCIENTISTS
15211 ROYAL PALM SO BLVD. STE 260
. _ -.,- Conan Redev Agency I
FT MYERS FL 33919
. •.. • 23"45.1115 ..
Please deliver to
BAYSHORE GATEWAY IRIANGL.E CRA Delivery Date
4069 BAYSHORE OR
NAPLES FL 34112
terms Ili! Payment Net 35Days Cwuan::y C'SD
:item Maleatat Description Order qty Unh! Price Per Unit Net value
00010 Berra G'Ban Jp esr,•ov'r: f 49 TT' Eacn 1 00 4. 200 CO
Qu3nidy Ft 11 Un be delvuhJ Beach
Pleease order againit cnnn,act 40W_0174.4 lter^ N "14
4;115 H3y3Rrre L4n•u Jeanup ant remodll a`:9 -k9 aIe,yo,t hpe -)cries .n e5c,o. arx3 ml
"- Ilea cunpiCtcly dCl.aeled ""
Orja2n PC, nc Se £ I ( 741' r. t; 7 ;n each 1 011 17 750 LO
C)uan51y al 11 to be delivered 6Te.a;h
rrel ver j note Day 0gim:2010
Rela�sa or a, agaarl canVact
46,3--X, C) 171.4 ttcw C 1
IiJ -A Qrder Wr.A ficat nn 4a;p Hays'ur.. Li vc
Item parhally delwere l
00436 SAP, Serrv'tces - LIST Remavol 12009 each 100 12
Cuanbhj sHI to he de :iverrJ 5 715e3o11
Delivery Dote Day 0gr3.P7019
SAR Sec nice - LIS (liar'• i,9V a
VENDOR Terms and Conditions
The VFNL9R afire =a to Comply WL) al Purghe5e Order Terms and CcrldlbonS as outlined ol', tre •tea(ler C;auntj Par--- hasing Intunlet SIR'.
http l;)wn: crlliergov netl'Mez asps7page =7e2 treylslon dose OP2212P08t �nnn,dl-,g delivery ead 03yrnenl trrrrs Fudh.er the VENDOR agrees m
prC'vlde9=15 and serv.[ea outlinect'.It'I s Puf.hjse Orde- wit the F.r.rl= term',= ud eve y mtliud arJ
specificalmns Iisled above
2. Nut.1j depali :Pent Immediately Ir nrd2r ru fn rrlen! cannot occur a> SpEPrITd
Al 8erw all m -mices tc
Bard of Ccuuly Comm)*st3ner5
Atrn AcccuiI5 Payable
Budding F 7th Foor
3301 Tamtami Tra I F
Naples FL 3.112
The Purchase order is authcraed under dnecbcn of CCrler fpGnty FFard of County C :cmrrb a5lJnerS Ly
t
_ . ,c.'tCptirl Y. Cor]ell. General Sem ::•Ge.S! Pu¢Has tLg UnCCIOf
Vendarc 157377
HSA ENGINEERS & SCIENTISTS
1520 ROYAL PALM SO BLVD. STE 260
FT MYERS FL 33918
16G3
PO Number 4500111875
Data 10107!2009
Item Malmal Descroti'on order aty Unif Price Per Unit Net Value
... Ilcrzi paiw ly defi:ered —
01,14' 1venm Source Re,,,, al Sery ;cee ?7 525 eaaa 1.011 32 525 CO
❑w'v'ioaw Dav 0 ° /3G:201G
Hciea;c nrderaoainsl contract 46 D30MUd h=n 0X,10
nw.m SCU'u Ramo,a; Ste: ±¢e ($AI2i
Tctal ret Ya'ue exd tax OfiP
106.415.00
16G3
M HSA
A member p[ the
ENQINEfthe C � SCIENTISTS
aA remlty of Campanics
April 20, 2010
Collier County Redevelopment Agency
(Bayshore Agency Gateway Triangle)
4069 Bayshore Drive
Naples, Florida 34112
Attention: Nfr. David faekeon
Subject: Addendum to Work Order - Interim Source Removal Services
Underground Storage Tank Removal
4315 Bayshore Drive
Naples, Florida 34112
FDEP Facility #18629388
Collier County Contract # 06 -3970
HSA Proposal Nunrher 75.34668
Dear Mr. Jackson:
FISA Engineers &c Scientists (HSA) is pleased to submit this proposal to conduct an Interim
Source Removal (ISR) for the above - referenced site. [luring the on -going Site Assessment
activities, the down - gradient well, located near the former hydraulic lift indicated pclmlcuin
constituents above the Groundwater Cleanup Target Levels (GC1 Ls) according to 62 -777 FAC. In
order to complete the SAR in the most cost et %ctive way, HSA recommends excavating the
petroleum impacted soils identified by the monitoring well. The additional services for the
Interim Source Removal (ISR) are presented below:
INTERIM SOURCE REMOVAL SCOPE OF WORK
Prior to completion of the Site Assessment Report, HSA proposed to excavate the petroleum
impacted soils located in the area of the former hydraulic lift. HSA will conduct the following
requirements for the ISR:
Preliminary soil sampling at the site has indicated the impacted soils are located approximately
nine (9) to ten (10) feet below- ground surface Obls). In order to delineate the extent or the
petroleum impacted soil, HSA will conduct auger borings with a direct push rig. The soil
samples obtained from the auger borings will be screened for visual signs of stains, odor, and
tested using an organic vapor analyzer (OVA) in accordance with Chapter 62- 770.200, FAC., to
determine the volatile organic content of the soils by way or soil -gas analysis.
www1sa- env.com
1520 Royal Palm Square Boulevard, Suite 2601 Fort Mycrs, Florida 33919
Tel: (239) 936 -4003 I Fax: (239) 936.08 N
Tampa • tManda a Ton Myer$ • west Palm Beach a Penmcela a Savuuwh • Chadeslon • Hillon Head
Oriented Quality Driven
16G3
Once the horizontal and vertical extent has been determined HSA will then excavate the area and
remove the contaminated sails. During the excavation activities, field sampling will be
conducted with an OVA to ensure all impacted soils will be removed until final OVA results are
below the FDEP definition of excessively contaminated soils for the kerosene analytical group as
those soils that retum an OVA value in excess of 50 ppm and for the gasoline analytical group as
those that return an OVA value in excess of 500 ppm (Chapter 62 -770 F.A.Q.
Following the OVA analysis, five soil samples will be collected, as required by Chapter 62 -777
FAC, from each side of the excavation pit and one from the bottom based on the screening
results obtained during the excavation. The soil samples will be sent to the laboratory for the
Kerosene Analytical Group according to EPA Lfethod 8020. 8100, and FLPRO, for low volatile
organics aromatics, polycyclic aromatic hydrocarbons and total recoverable petroleum
hydrocarbons. In addition, one soil sample will be collected prior to disposal for analysis as
required by Waste Management.
Following the excavation of the impacted soils. approximately one foot of grdvcl well then be
placed within the base of the excavation pit and the pit will be left open for a period of several
weeks. IISA will then remobilize and the excavation pit will then be backfilled with clean fill.
Since the impacted soils appear to be at a depth of nine feet, the top five to six feet of soil will be
set aside and replaced into the pit once the contaminated soils have been removed.
Following the backfilling of the excavation pit, HSA will reinstall the existing monitor well and
may be required by the I DEP to install two additional monitor wells. The monitoring wells will
he installed using 3.5 -inch diameter posh rods to the approximate depth of 12 feet below land
surface (his) by a licensed water well contractor. Each monitoring well will be installed to a
depth of twelve (12) feet with ten (10) feet of 0.010 -inch slotted screen, and pre - packed with
20/30 -grade silica sand filter pack. Additional 20/30 -grade silica sand will be placed around the
borehole of all monitoring wells to approximately one foot above the pre- packed screen. A one -
foot fine sand seal, consisting of 30,165 -grade silica sand, will be placed above the filter pack.
After installation of the monitoring wells, the wells will be developed -with a peristaltic pump
until the discharge water was clear of visible sediment.
HSA will collect groundwater samples from the newly installed monitoring wells. Samples will
be analyzed for groundwater quality field parameters- and natural attenuation data (e.g., ORP,
DO, and pH) while purging the monitor wells by the low -flow purging technique. Quality
assurance (QA) procedures for the collection of samples and decontamination of sampling
apparatus prior to and during use in the field will be conducted in general conformance with the
Florida Department of Environmental Protection field sampling and laboratory analysis quality
assurance protocol codified in Chapter 62 -160 FAC Standard Operating Procedures for Field
Activities (FDEP SOP - 001/01). Groundwater samples will be property packaged and sent to a
certified laboratory and analyzed for the Gasoline Analytical Croup, in accordance with EPA
Methods 8020, 8100, and FL -PRO.
1663
HSA will notify the Florida Department of Environmental Protection Department of the ISR
activities, oversee and manage the excavation activities of the licensed tank contractor, arrange
for disposal of the impacted soils, provide the manifests for the soil disposal and oversee the
backfilling of the project. Quality assurance (QA) procedures for the collection of samples and
decontamination of sampling apparatus prior to and during use in the field was conducted in
general conformance with the Florida Department of Environmental Protection field sampling
and laboratory analysis quality assurance protocol codified in Chapter 62 -160 FAC Standard
Operation Procedures for Field Activities (FDEP SOY - 001 101).
Engineering and technical support services will also be required to analyze the data obtained and
prepay an engineering report.
Costs
HSA has completed remedial activities at similar sites and the costs and tintcframes provided are
within the range expected for such a site.
Cost Estimate
Service
Activity.
Average
Cost
_
A. Delineation of Impacted Soils_
$2,050
B. Installation of up to 3 monitoring
tSum
Dare t Push Rig
wells
53,500
A. Mobilization, excavation equipment
and load trucks ($2,500 per day est. 2
$5,M)
Task 2 -
Lump
Excavation Activities 1
B Remobilization and equipment for
Sum
SZ,000
backtillin
_
Transportation and disposal of 168 tons of
Task 3 —
Impacted soil and clean backfill material n
$12,620
Time &
Waste Management
$75.00 per ton
Materials j
Task 4 —
_
Organizing and managing the project, soil
Lump
Engineering Services
and groundwater sampling, laboratory
515,300
Sant
analysis and final en gimetin, report
Fxpensrsable
Fstimated Budget
$1,000
Time al
F.x arses
Materials
- -- Total:
541,470
The aforementioned costs are estimates and day not purport to be representative of the final
consulting costs, should information that affects our understanding of the needs of the project
change. However, it does represent our best estimate based upon the current knowledge of the
needs for this project. Our assumption is that a total of 168 tons of clean soil will replace the
impacted soil that was removed frnm the site. Should this aforementioned fee be determined
inaccurate. HSA will notify you before the above limit is reached, and indicate the amount of
work to be completed, the amount of work yet to perform, the approximate costs of the
16G3
remaining work, and a written explanation describing the circumstances that caused the estimate
to be inaccurate. 1;'rtiten uulhorizeltion to proceed_(or additional work is required.
These services will be provided on a Lump Sum not -to- exceed, basis per the attached fee
schedule performed under the attached Terms and Conditions. if you have further questions,
please feel free to contact me at (239) 936.0789.
if you have further questions, please feel free to contact me at (239) 936 -4003.
LISA ENGINEERS & SCIF MSTS
Roxanne (iause P.E.
Environmental Project Manager
16G3
cONTRACTMIORK ORDER MODIFICATION
CHECKLIST FORM
PROJECT NAME: Underarou nd SWARe Tank Removal• 4315 Bavahorg Drive PROJECT MANAOER:Dsvld Jackson
CONTRACTtt 053970_MOD V. 4 POe:4500111875 WORK ORDER 0:_45W1li875
DEPARTMENT:Baya1`101e0stsway Triangle CRA CONTRACTOMFIRM NAME:HSA Enalneore 8 Scientists
Ortginal Contract Amount: s _19200
{;Farting Point)
I
Current BCC Approved Amount: s_ NIA
(Last Total Amount Approved by the BCC]
Current Contract Amount: $106,475
(Including A t Changes Print To This Modification)
Change Amount: f 6•
Revised ContractMork Order A scum: $_715.420
(Inciudwg This Change Order)
Cumulative Dollar Value of Changes to
this CortractJwork Omer. S_ 66,220
Date of Last 8CC Approval N!A—_ Agenda Item a —tvA
Percentage of the change overtunder Current contract amou nt_135. 59_ %
Fonnuta: (Revised Amount 1 Last BCC approved ambuntFI
CURRrt4T COMPLETION DATE (SI ORIGINAL;_ February 1 2010 CURRENT: Seolembet 20,2010
This change order wifl: D Adds new Task for S U Increase Task Number._ILfS R_ by ;_8,945_
Other - --
Describe the change(s):_Adjusted Task #3 ISR scope of work to correct an addition error on original ISR scope
of work and associated war% order, This increased amount is for the purchase order (Line 40) in total for ISR
scope from $72,525 to $41,470 to cover the cost of contaminated soil removal.
Specify the reasons for the change(s) 1. Planned or EieAiva 2. Unforeseen Conditions 3. Quantity
Adjustments rc. 4. Correction of Errors (Plans, specifications or Scope of Work) ' 5. Value Added
6. Schedule Adjustments Note: One or more maybe checked, depending on the nature of the change(s).
tden0ty all negative impacts to the project If this change order were not procassed: CRA would not be able to
comply with FDEP directives to remediate all contamination for subject site.
This change was requested by: - lC00traCt0f /Caneukt8nt 'I Owner I Using Department ' CDES
Design Professional I (Regulatory Agency (Specify) Other tSpecify)
CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS: Yes ~ No
This form is to h
APPROVED BY:
REVIEWED BY:
Date: os- o 7 //U
Date: /
a
0
HSA EnSineers & Scierdets
1520 Royal Palm Square Blvd. Ste260
Ft Myers, FL 33919
uST Removal: 4315 Bayshom Drive
16G3
Bayshore Drive, Naples, Fl 34112
Interim Source Removal (fSR) Services
October 5. 2009 POkt4500111675
Catanae A4 __. April 10, 2010
Charge Order Description
This change order is to adjust the Interim Source Removal (ISR) Scope of Work and increase
the 'total" amount of the purchase ordei s Line 40, Original [SR scope's Task 03 was not
added in correctly and the total scope value was in error. This MOD is to correct an addition
error and adequately cover the cost of contaminated soil removal - a Time & Material Une.
Original agreement amount ......... ................. ...................... ............... 34Y.ZUU
Sum of Previous changes ........................... ........................557,275
77ds Change Order No. 4 Amount (add or subtract) .........................56.945
Revised Agreement Amount ....... ............................... .......................$115,420
Original contract time in calendar days ... ............................... _.........112 days
Adjusted number of calendar days due to previous change orders ............. 241 days
This change order adjusted time is ........ ........................ ................... 0 days
Revised Conoud Time in working days ..................... ............................353 days
Original Notice to Proceed date .......................... ........................ October 12, 2009
Completion date based on original contract time ........................ February I, 2010
Revised completion date due to change order (s) ......................... September 30, 2010
Your acceptance of this change order shall constitute a modification to our Agreement and
will be performed subject to all the same terms and conditions as contained in said
Agreement indicated above, as fully as if the same were repeated in this acceptance. The
adjustment, to this Agreement shall constitute a full and final settlement of any and all claims
arising out of, of related to, the ch forth herein, including claims for impact and delay
costs. //;
Accepted by: . Date: rSlile)
Roxanne Gause, P.B., Project Manager
iiSAA gineers & cIt"iiqs
Approved by: M.ly' C:4 Dater ? %l I U
tlavid lacks. n. BayshortAbs6wav Trianaie CRA
Approved by: y�� Date: ✓ /� rU
Lyn W . contract spxialist
16G3
CONTRACT/WORK ORDER MODIFICATION
CHECKLIST FORM
PROJECT NAME: underground Storage Tank Removal' 4915 Bayshors Dllre PROJECT MANAGER:Davld Jackson
CONTRACT p: 08 -3970 MOD#t 5 poYA5d011t8T5__„ WORK. ORDER #= 4550011187S
DEPARTMENT:Sayshore Gateway Triangle CRA CONTRAC:TORIFIRM NAM F: HSA Eno ineers B Scientists
Oetglnei Contract Amount: S T49,204,_- -
!(Sladjny Point;
t
Current OCC Approved Amount: S_ - WA _ -- _ - -_, `
(Last Total Anrod]M Approved tv the PC;,i i
i
I
I Current Contract Amount: -
ftnriud rg Al ::names F':or TO ih:s A1!:drFUaDnj
I Ctnange Amount: 5 rw
I
'lr
Revtsod ContradJKork Order Amount: S X9;948-• /. «.? -- - - --
IIncludingTn;sCcaggstM err
i
cumulative Dollar Value Df charges to _
this ContractNJork Order.
Date of Last SCC Approval MIA_ - -_ Agenda Rem 9
r °IN
Porcenage of the change overfUnder current contrail amou It
Fcm- �:.ia (Rovised Amount 1101 t3CC. appro," arnDuntj -f
Gt.fRrtEtiT C Mok.F I ION DATE (Si ORIGINAL_ - -- Feb, :., - ___'-) 10 __- . CURRENT. _ Fehn,ary 2[. 29t0
This change order wile [j Add a near Tauk for£ _[l Irrreasn t ask NumL <r,- _ISR_by S_4,7
Describe the change(s)'.—Adjusted Task 94 ISR scope of erork to ccmpiy with FDEP orders for turth
ad�quamty cover cost of eonlaminated soil removal: the increased amount Is for (Line 40) $4,700.
Specify the reasons for the change(s) 1. Planned or Etectivc X 'T.. Unfnreseen Conditions - 3. Quantity
�Akkd/justments 4. Correction of Errors (Plans, SpecHications or Scoplg of Mork) 5. Value Added
A 6. Schedule Adjustments Note: One or more may to checked, dapeading on the nature of the change(s).
identify all negative impacts to the project iT this change order were not processed: CRA vrouid not he able to
comply with FDEP directives to remediate all contamination for subject site.
This change was mcluasted by: )Contractor /Consullant 'i Ormei i Using Deparbnent - CDES
- Design Professional IRegulatoty Agency (Specify)_,__. Other (Specify)_ ._
CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS: Ve::, ~ Nc
This fort is to be signed and da -� 7 )
�i
APPROVED BY: _.,s- R.frT'� �sr — _ Dato.���
r
r -
REViEWED BY
16G3
MEMORANDUM
Date: January 19, 2012
To: David Jackson, Executive Director
Bayshore Gateway Triangle CRA
4069 Bayshore Drive
From: Ann Jennejohn, Deputy Clerk
Minutes & Records Department
Re: 2011 CRA Brownfield Voluntary Cleanup
DEP Tax Credit Application
Attached for your records is a copy of the application referenced above, (Item #16G3)
approved by the Board of County Commissioners on Tuesday December 1, 2009.
The original will be held with the Minutes and Record's Department for the
Board's Official Record.
If you have any questions, please contact me at 252 -8406.
Thank you.
Attachment
.. ■/
.■ ..
Memorandum
BAYS Hb61�"�
GATEW Y
TRIANGLE
RECEIVED
JAN 17 2012
Board of Count Commissioners
To: Ian Mitchell !\
From: Sue Tr(�e�
Date: 1/17/2012
Re: Request your help in obtaining Commissioner Coletta's notarized signature
Enclosed is the original and a copy of the Brownfield Voluntary Cleanup Tax Credit
(VCTC) application for 2011 for the Bayshore Gateway Triangle CRA. As
Commissioner Coletta is the chairman of the CRA, this application requires his
notarized signature to be complete.
Ian, could you please help me with getting Commissioner Coletta's signature and
notarize it for me on the original application and the copy? When you are finished
you can let me know and I can walk the applications up to Minutes and Records.
I apologize again for the inconvenience I caused about my confusion this morning.
Thank you for your continuing support.
(r
♦ X
!M4
o r '
ITEM NO.: AI �hq FD:
9
FILE NO.:
ROUTED TO:
I I - C"
DO NOT WRITE ABOVE THIS SPACE (Orig. 9/89; Rev. 6/97)
REQUEST FOR LEGAL SERVICES 3% 2
(Please type or print)
Date: Dec. 29, 2011 To: Office of the County Attorney, At Tammy Altho e
From: Sue Trone Project Manager
(Name) (Title)
CRA Bayshore Gateway
(Division) (Department)
Telephone 4 (Very Important): 643 -1115 P91Vi
Re: Brownfield Voluntary Cleanup Tax Credit: SRCO Bonus VCTC 5 J J J
(Subject) 5-1,Z J
BACKGROUND OF REQUEST/PROBLEM: ('213c e
am
(Describe problem and give background information - be specific, concise, and articulate.)
The Collier County CRA designated a brownfield site by resolution (Resolution 09 -273). In 2009 and 2010 the CRA
applied for Voluntary Cleanup Tax Credits (VCTCs) to the FL Dept. of Environmental Protection (DEP) for cleanup
costs of $51,580.40 and $56,337.11 each year respectively. VCTCs are worth 50% of expenses; therefore, the VCTC value
expected to the CRA is $54,093.76. On January 20, 2011 the CRA received a Site Rehabilitation Completion Order
(SRCO) from DEP. The SRCO indicates that the CRA has completed the remediation of the site to the satisfaction of
DEP and no more remediation is required.
Having received the SRCO, the CRA is now eligible for the SRCO VCTC Bonus. The VCTC Bonus is 25% of qualified
expenses, or 25% of $108,187.51 ($27,046.88).
(Are there documents or other information needed to review this matter? If yes, attach and reference this information.)
This item has/has not been previously submitted.
(If previously submitted provide County Attorney's Office File No.) No.
ACTION REQUESTED:
(Be very specific. Identify exactly what you need in the way of legal services.)
Please review the VCTC SRCO Bonus application for legal sufficiency. This application
requires the signature of the CRA Chairman on page 11.
OTHER COMMENTS:
16G3
cc: David Jackson
(All requests must be copied to your appropriate Division Head or Constitutional Officer.)
PR�IECiION 41 G3
Department of
W
t FLOR A' Environmental Protection pill
VOLUNTARY CLEANUP TAX CREDIT
APPLICATION AND AFFIDAVIT
Pursuant to the provisions of s. 376.30781, F. S., application for a Voluntary Cleanup Tax Credit (VCTC) is
hereby made. The following information is submitted in support of this application. Please complete the
applicable sections of this form, draw a diagonal line through inapplicable sections, and submit the entire
application form along with any other required documentation.
SECTION I. - APPLICANT INFORMATION
A. APPLICANT'
Name: Collier County Community Redevelopment Agency
Address: 4069 Bayshore Drive
(Street or P.O. Box)
Na les Florida 34112
(city) (State) (Zip Code)
Applicant's Point of Contact: Sue Trone
Telephone Number: (239) 643 -1115 E -mail: suetrone °,collier y.net
Application Number
(FDEP Use Only)
I request that all correspondence related to this application be sent to the applicant's point of contact at their:
❑ postal address ® e -mail address (Choose one)
Federal Employment Identification Number (FEID), if applicant is a business: 59- 6000558
-OR- (9 -digit number)
Social Security Number, if applicant is an individual: _ _ _ - - _ _ _
digit mum er
B. APPLICANT'S AUTHORIZED AGENT OR REPRESENTATIVE (OPTIONAL)
Name:
Address:
(Street or P.O. Box
(City) (State) Zip Code)
Telephone Number: () - E -mail:
I request that, in addition to the applicant's point of contact, all correspondence related to this application be sent to
the applicant's authorized agent or representative at their:
❑ postal address ❑ e -mail address (Choose one)
I If multiple tax credit applicants are submitting a joint application for one site, please make copies of this page and
have each tax credit applicant complete Section I, Applicant Information of this application.
1 of 12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX /XX /XXYX
SECTION II. - SITE INFORMATION
A. SITE IDENTIFICATION
Brownfield Site /Drycleaning Facility Name: Hubert's Welding
Address: 4315 Bayshore Drive
(Street or P.O. Box)
Na les Florida 34112
(City) (State) (Zip Code)
Brownfield Site Identification Number: B F 110901001
(9 -digit number)
16G3
Is there more than one contaminated site, as defined by Department rule, covered by the above Brownfield Site
Rehabilitation Agreement (BSRA)? NO (Yes/No)
•U
DEP Drycleaning Facility Identification Number:
(9 -digit number)
If this application is for a Drycleaning Solvent Cleanup Program (DSCP) site and the Real Property Owner is not the
applicant, please provide Real Property Owner information.
Name:
Address:
(Street or P.O. Box
Telephone Number: ( ... )
B. TYPE OF SITE
(State) Zip Code)
E -mail:
❑ (1) A drycleaning solvent contaminated site eligible for state - funded site rehabilitation under s.
376.3078(3), F.S. The applicant must complete Section II.C. on page 3;
❑ (2) A drycleaning solvent contaminated site at which cleanup is undertaken by the real property owner
pursuant to s. 376.3078(11), F.S., if the real property owner is not also, and has never been, the
owner or operator of the drycleaning facility where the contamination exists. The applicant must
complete Section II.D. on page 3; or
® (3) A brownfield site in a designated brownfield area under s. 376.80, F.S.
2of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX /XX/XXYX
C. DSCP SITES ELIGIBLE FOR STATE - FUNDED SITE REHABILITATION
See paragraph 62- 788.300(3)(d), F.A.C.
If box B.(1) is checked on page 2, the applicant must submit with this application a copy of the
Department's eligibility order for the DSCP and the appropriate deductible payment, as indicated in the
order. Please include a cashier's check or money order (DO NOT SEND CASH, PERSONAL CHECKS,
OR CORPORATE CHECKS) made payable to the Water Quality Assurance Trust Fund. This check or
money order must be separate from the $250 non - refundable application review fee required by Section VIII
of this application. Please check the appropriate box below to indicate the amount enclosed or previously
paid:
❑ $1,000 (complete DSCP applications submitted by June 30, 1997)
❑ $5,000 (complete DSCP applications submitted July 1, 1997, through September 30, 1998)
❑ $10,000 (complete DSCP applications submitted October 1, 1998, through December 31, 1998)
❑ Deductible previously paid in (year) VCTC application
D. REAL PROPERTY OWNER AFFIDAVIT
See paragraph 62- 788.300(3) (b), F.A.C.
If box B.(2) is checked on page 2, the following affidavit must be signed by the real property owner and
notarized:
The undersigned, under penalties of perjury, does solemnly swear that the applicant is the real property
owner of the property containing the drycleaning solvent contaminated site at which the applicant is
voluntarily conducting site rehabilitation, and that the applicant is not, and has never been, the owner or
operator of the drycleaning facility where the contamination exists.
Signature of Real Property Owner or Authorized Corporate Real Property Owner Representative Date
Print Name of Real Property Owner or Corporate Real Property Owner
Print Name of Authorized Corporate Real Property Owner Representative Title
STATE OF FLORIDA
COUNTY OF
Sworn to (or affirmed) and subscribed before me this
Personally known OR Produced Identification
Type of Identification Produced
day of , 20 , by
Real Property Owner's Name
Signature of Notary Public - State of Florida
(Print, type, or stamp Commissioned Name of Notary Public)
3of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
16G3
SECTION 111. - DOCUMENTATION
For more detail, seeparagraphs 62- 788.300(3)0 and.330(3)(d), F.A.C.
This application package must include copies of documentation sufficient to demonstrate that the tax credit
applicant, which must be the signatory to a Voluntary Cleanup Agreement or BSRA, incurred and paid the
costs that were either integral to site rehabilitation or that were for solid waste removal (applies to BSRAs
only). Costs for site rehabilitation must have been incurred between January 1 and December 31 of the
year for which the application is being submitted and paid prior to submittal of the tax credit application;
costs for solid waste removal must have been incurred and paid since July 1, 2006.
The documentation must clearly describe the goods or services and associated costs that are being claimed in
the application. Copies of documents for goods or services that are being claimed must be sufficient to
demonstrate a link between the contractual records, the payment requests associated with the contractual
records, and the payment records for the claimed portions of the payment requests, as required by each of
the following three paragraphs:
1. Contractual records that describe the scope of work performed during the applicable time period that
was either integral to site rehabilitation or for solid waste removal. Examples include: contracts,
documentation of contract negotiations, proposals, work orders, task orders, and change orders; and
2. Payment requests that describe the goods or services provided in support of the above scope of
work. Examples include: invoices, sales tickets, and account statements. Payment request
documents that include costs for goods or services that are not being claimed in the VCTC
application must clearly identify which costs are being claimed; and
3. Payment records that describe the actual costs incurred and paid for the goods or services above.
Examples include: cancelled checks, or other payment records from purchases, sales, leases, or other
transactions.
The Certified Public Accountant (CPA) and Technical Professional Certifications are not required if the
applicant is claiming only an Affordable Housing, Health Care, and /or SRCO VCTC, because the tax credit
applicant will have previously provided this documentation in the annual site rehabilitation application(s).
4of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX /XXXX
16G3
SECTION IV. - TAX CREDIT CLAIM AND CALCULATION
A. TYPE OF TAX CREDIT CLAIMED (Check all that apply and complete additional sections as directed)
❑
(a)
Site Rehabilitation; requires completion of Section IV.B.
❑
(b)
Site Rehabilitation Completion Order bonus; requires completion of Section IV.C.
❑
(c)
Affordable Housing bonus; requires completion of Section IV.D.
❑
(d)
Health Care bonus; requires completion of Section IV.E.
❑
(e)
Solid Waste Removal; requires completion of Section IV.F.
B. SITE REHABILITATION
See Rule 62- 788.300, F.A. C.
Complete this section to claim a credit in the amount of 50% of the cost of voluntary cleanup activity that was
integral to site rehabilitation conducted during the calendar year for which this tax credit application is being
submitted.
1. Total site rehabilitation costs incurred and paid
by the applicant for this calendar year
2. 50% of the amount on line 1. or $500,000
whichever is less
3. Joint applicant — The percentage and
corresponding amount of site rehabilitation costs
on line 1. contributed by the joint applicant for
this calendar year
$ Site Rehabilitation tax credit claimed
Joint applicant name
C. SITE REHABILITATION COMPLETION ORDER BONUS
% contributed
Amount contributed
See Rule 62- 788.300, F.A.C.
If the Department issued a "No Further Action" (NFA) order (i.e., Site Rehabilitation Completion Order - SRCO)
for the contaminated site, complete this section to claim the SRCO bonus in accordance with the dates and
percentages in the table below.
1. Total eligible site rehabilitation costs incurred
and paid by the applicant from July 1, 1998
through June 30, 2006
2. 10% of the amount on line 1. or $50,000 -
whichever is less
3. Total eligible site rehabilitation costs incurred
and paid by the applicant on or after July 1, 2006
4. 25% of the amount on line 3. or $500,000 -
whichever is less
5. Joint applicant — The percentage and
corresponding amount of total eligible site
rehabilitation costs on lines 1. and 3. contributed
by the applicant
$ SRCO bonus claimed before
July 1, 2006
$ _108,187.51
$ 27,046.88 SRCO bonus claimed on or after
July 1, 2006
Joint applicant name
% contributed
Amount contributed
If multiple tax credit applicants are submitting a joint application for one site, please have each applicant indicate
that applicant's percentage and amount contributed to payment of site rehabilitation costs on a copy of this page and
have each applicant complete a separate copy of the affidavit in Section VII.
➢ The combined SRCO bonus amount claimed for site rehabilitation conducted before and after June 30, 2006 cannot
exceed $500, 000.
5of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
E�3
D. AFFORDABLE HOUSING BONUS
See Rule 62- 788.310, F.A.C.
If use of the brownfield site identified in the BSRA is limited to affordable housing, complete this section to
claim a tax credit in the amount of 25% of the eligible cost of voluntary cleanup activity that was integral to
site rehabilitation and incurred on or after July 1, 2006.
1. Total eligible site rehabilitation costs incurred
and paid by the applicant on or after July 1, 2006
2. 25% of the amount on line 1. or $500,000 -
whichever is less
3. Joint applicant — The percentage and
corresponding amount of total eligible site
rehabilitation costs on line 1. contributed by the
applicant
$ Affordable Housing bonus claimed
Joint applicant name
% contributed
$ Amount contributed
In accordance with Rule 62- 788.310(2), F.A.C., please provide a certification letter from the party to the use
agreement that is identified below.
❑ (a) Florida Housing Finance Corporation
❑ (b) Local housing authority
❑ (c) Other government agency
(Name of Agency)
(Name of Agency)
If multiple tax credit applicants are submitting a joint application for one brownfield site, please have each applicant
indicate that applicant's percentage and amount contributed to payment of site rehabilitation costs on a copy of this
page and have each applicant complete a separate copy of the affidavit in Section VII.
6of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX /XX /XXXX
E. HEALTH CARE FACILITY OR HEALTH CARE PROVIDER BONUS 16 G3
See Rule 62- 788.320, F.A.C.
If use of the brownfield site identified in the BSRA includes a health care facility or a health care provider,
pursuant to Sections 408.032, 408.07, or 408.7056, F.S., complete this section to claim a credit in the
amount of 25% of the eligible cost of voluntary cleanup activity that was integral to site rehabilitation and
incurred on or after January 1, 2008.
1. Total eligible site rehabilitation costs incurred
and paid by the applicant on or after January 1,
2008 S
2. 25% of the amount on line 1. or $500,000 -
whichever is less
3. Joint applicant — The percentage and
corresponding amount of total eligible site
rehabilitation costs on line 1. contributed by the
applicant
Health Care Facility/Provider
bonus claimed
Joint applicant name
% contributed
$ Amount contributed
Please check the category of health care facility or health care provider and specify the type of
facility /provider in the space provided.
IN
(a) Health Care Facility pursuant to Section 408.032, F.S.,
(b) Health Care Facility/Provider pursuant to Section 408.07, F.S.,
(c) Health Care Provider pursuant to Section 408.7056, F.S.,
Health Care Facility/Provider claimed in this application:
Doing Business As:
Address:
City:
Telephone Number: ()
County:
In accordance with Rule 62- 788.320(2), F.A.C., please provide a copy of one of the required supporting
documents listed below.
❑ (a) Certificate of Occupancy
❑ (b) License for the operation of the Health Care Facility or Health Care Provider
❑ (c) Certificate for the operation of the Health Care Facility or Health Care Provider
➢ If multiple tax credit applicants are submitting a joint application for one brownfield site, please have each applicant
indicate that applicant's percentage and amount contributed to payment of site rehabilitation costs on a copy of this
page and have each applicant complete a separate copy of the affidavit in Section VII.
7of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX /XX /XXYX
no K09�
F. SOLID WASTE REMOVAL TAX CREDIT
See Rule 62- 788.330, F.A.C.
Complete this section to claim a credit in the amount of 50% of the costs incurred and paid by the applicant
on or after July 1, 2006 for solid waste removal from within the boundary of the eligible brownfield site
identified in the BSRA.
1. Total costs for solid waste removal incurred and
paid by the applicant on or after July 1, 2006
2. 50% of the amount on line 1. or $500,000 -
whichever is less
3. Joint applicant — The percentage and
corresponding amount of the solid waste removal
costs on line 1. contributed by the applicant
$ Solid Waste Removal tax credit
claimed
Joint applicant name
% contributed
$ Amount contributed
In accordance with 62- 788.330(2), F.A.C., I have consulted with the following local government and DEP
officials. With this application, I certify that, to the best of my knowledge, the Brownfield site as identified
in the BSRA was never operated as a permitted solid waste disposal area or for monetary compensation.
Name of local government official consulted:
Title:
Name of DEP representative consulted:
Title:
Telephone Number: () -
Telephone Number: ( ...)
If multiple tax credit applicants are submitting a joint application for one brownfield site, please have each applicant
indicate that applicant's percentage and amount contributed to payment of solid waste removal costs on a copy of
this page and have each applicant complete a separate copy of the affidavit in Section VII,
8of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
16 ?-"�
SECTION V. - TECHNICAL PROFESSIONAL CERTIFICATION
For more detail see paragraphs 62- 788.300(3)0 and.330(3)(e), F.A.C.
The following certification shall serve as proof that the voluntary cleanup activities have been conducted
under the observation of, and related technical documents have been signed and sealed by, an appropriate
professional registered in the State of Florida in each contributing technical discipline associated with the
documentation listed in Section III of this application for either annual site rehabilitation or for solid waste
removal that has occurred since July 1, 2006, in accordance with department rules and regulations.
Under penalties of perjury, I declare that I have read and understand the requirements of Chapter 62 -788,
F.A.C., and Sections 376.30781 and 220.1845, F.S. In addition, I certify that I have read the foregoing
Voluntary Cleanup Tax Credit application, including all the backup documentation; that I understand and
have adhered to the requirements stated on page 4 of this tax credit application; and that the costs incurred
and paid by the applicant and claimed in this application were integral, necessary, and required for either
site rehabilitation or for solid waste removal, as applicable.
Site Rehabilitation Period Covered by Application Solid Waste Removal Period Covered by Application
(SEAL)
Signature of Registered Technical Professional Date
Print Name
Technical Professional Information:
Name:
Address:
(Street or P.O. Box
Print Title (e.g., Professional Engineer, Professional Geologist)
(city) rate (Zip Code)
Telephone Number: ()
State of Florida License Number:
Expiration Date:
9of12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX /XX/XXXX
16 G3
SECTION VI. - CERTIFIED PUBLIC ACCOUNTANT CERTIFICATION
For more detail, see paragraphs 62- 788.300(3)(h) and.330(3)0, F.A.C.,
and subsections 62- 788.300(4) and .330 (4), F.A.C.
The following certification shall serve as proof that the documentation submitted in accordance with Section III of
this application has been reviewed by the undersigned independent CPA in accordance with standards established
by the American Institute of Certified Public Accountants. Specifically, the undersigned CPA is attesting to the
accuracy and validity of the costs incurred and paid by the applicant after having conducted an independent
review of the data presented by the applicant; that the costs included in the application form are not duplicated
within the application; and that the application contains only those costs that were incurred during the timeframe
represented in the tax credit application and paid prior to submittal of the tax credit application. In addition, a
copy of the Independent CPA's report must be completed whenever an annual site rehabilitation or solid waste
removal application is submitted. The CPA is not responsible for attesting to whether the costs claimed are for
site rehabilitation or solid waste removal.
Under penalties of perjury, I declare that I have read A Guideline for Agreed -Upon Procedures for Attestation
Service for the Voluntary Cleanup Tax Credit (VCTQ Program], Chapter 62 -788, F.A.C., and Sections
376.30781 and 220.1845, F.S., and that I understand the accounting requirements associated with these
documents. In addition, I attest that I have read the foregoing Voluntary Cleanup Tax Credit application and that
the facts stated in it are true to the best of my knowledge and belief.
For Site Rehabilitation applications: For Solid Waste Removal applications:
Total Site Rehabilitation Amount Claimed in Application Total Solid Waste Removal Amount Claimed in Application
Total Site Rehabilitation Amount Approved by CPA Total Solid Waste Removal Amount Approved by CPA
Time Period Covered by Site Rehabilitation Application
Signature of CPA
CPA Information:
Name:
Address:
(Street or P.O. ox
(City)
Telephone Number: ()
License Number:
Expiration Date:
Original Issue Date:
Time Period Covered by Solid Waste Removal Application
Date
(State) Zip Code)
I DEP has developed guidance to assist CPAs in the review of VCTC applications. This guidance is entitled A
Guideline for Agreed -Upon Procedures Attestation Service for the Voluntary Cleanup Tax Credit (VCTC) Program
October 2010, and may be obtained by calling the VCTC program manager at (850) 245 -8927.
10 of 12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXXX
16G3
SECTION VII. — APPLICANT CERTIFICATION AFFIDAVIT
The undersigned applicant, under penalties of perjury, certifies that (s)he has read and understands the
requirements of Chapter 62 -788, F.A.C., and Sections 376.30781 and 220.1845, F.S., and that all
information contained in this application, including all records of costs incurred and paid and claimed in this
tax credit application were by the applicant, and are true and correct.
The following sections of this application have been completed and the appropriate documentation to
support these claims is transmitted with this application.
(Check all that apply)
❑ Section II.C. Drycleaning Solvent Cleanup Program Sites eligible
for State - funded Site Rehabilitation
❑ Section ILD. Real Property Owner Affidavit
❑ Section IV.B Site Rehabilitation Tax Credit
® Section IV.C. Site Rehabilitation Completion Order Bonus
❑ Section IV.D. Affordable Housing Bonus
❑ Section IV.E. Health Care Facility or Health Care Provider Bonus
Time Period Covered by the
Application
❑ Section ME Solid Waste Removal Tax Credit
2oI2_
igna re of App t Date
JIM N. CoL_E7-T(-A CIAAtO_AiAr�1 C(�A
Print Name Print Title
ATTEST:
Print Company Name (if applicable)
DWIGHT E. BROCK, CLERK
Notary Seal for Applicant's Certification A Aa #rlNlrt'
i'glnat�re a,�,
STATE OF FLORIDA
COUNTY OF CO L L I G(2,
Sworn to (or affirmed) and subscribed before me this I day of�ANUA , 201 't- , by J ( M N. . Co L. G=q
Applicant's Name
Personally known OR Produced Identification
Signature ofNPWPAflic I St4rVbfflorida
» u o.............. ............ ...............
Type of Identification Produced NI "t+ AN MITCHELL
(Printgtyp� �fnmmis o e e c o ary u ic) :
Expires 7/29/2012 e
- y/ .
��i, o °�� Florida Notary Assn., Inc
—4 L-7 7
1�
11 of 12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX/XX/XXYX
16 G3
SECTION VIII. - NON - REFUNDABLE APPLICATION REVIEW FEE
For more detail see paragraphs 62- 788.300(3)(e), 310(3)(c), 320(3)(c) or 330(3)(c) F.A.C.
Please include a cashier's check or money order made payable to the Water Quality Assurance Trust Fund
in the amount of $250 to cover the administrative costs associated with the Department's review of the tax
credit application. The $250 application review fee is non - refundable. Failure to submit the non - refundable
application review fee as required by s. 376.30781(6)(a), F.S., shall result in the application being deemed
"incomplete ", in accordance with Rule 62- 788.400, F.A.C.
Send Completed Applications to:
Department of Environmental Protection
Division of Waste Management
Voluntary Cleanup Tax Credit
2600 Blair Stone Road, Mail Station 4505
Tallahassee, Florida 32399 -2400
�
Hand Deliver to:
Department of Environmental Protection
Division of Waste Management
Bureau of Waste Cleanup
2600 Blair Stone Road
Room 309
Tallahassee, Florida
Attn.: Voluntary Cleanup Tax Credit
KEEP A COPY OF THE COMPLETED APPLICATION FOR YOUR RECORDS.
12 of 12
DEP Form# 62- 788.900(1) - Voluntary Cleanup Tax Credit Application - Effective Date XX /XX/XXXX