Loading...
Agenda 07/09/2019 Item #16A12 (Resolution - SFWMD Grant Applications)07/09/2019 EXECUTIVE SUMMARY Recommendation to approve submittal of two (2) Stormwater Management Improvement Project grant applications to the South Florida Water Management District (SFWMD) Big Cypress Basin Local Partnership Grants Program for FY 2020 and a Resolution supporting the County’s application. OBJECTIVE: To receive approval and support from the Board of County Commissioners to submit two (2) grant applications to the South Florida Water Management District for Stormwater Management Improvements for the following projects: Freedom Park Ditch Stormwater Improvements and Phase 1 Griffin Road Area Stormwater Management Improvement. CONSIDERATION: The annual Big Cypress Basin (BCB) Local Partnership Grant submittal process has been announced. The BCB Partnership Grant cycle provides funding support County and City stormwater management/water quality, alternative water supply and water conservation projects. The application deadline is August 16, 2019. The BCB requires that all grant applications be approved by the local government prior to submittal and supported through Resolution. In addition to being approved by the local government, the project should be “shovel-ready” and completed within a 24-month period. The following projects have been prioritized and determined to meet the criteria for BCB funding: 1. Freedom Park Stormwater Ditch Improvements. Proposed improvements will widen the ditch and add spreader swales into the treatment facility to improve water quality prior to stormwater entering the Gordon River. The estimated construction cost is $1,850,000. 2. Phase 1 of the Griffin Road Area Stormwater Management Improvement Project (Barefoot Williams Road Improvements). Proposed improvements will increase flows in the ditch along the east side of Barefoot-Williams Road by upsizing three driveway culverts, upsizing the cross- drain under Price Street, and upsizing the inlet structure to a cross -drain where the ditch ends at the northeast corner of the Artesia development. The estimated construction cost is $450,000. FISCAL IMPACT: The amount of funding applied for from Big Cypress Basin is $975,000 for Freedom Park Stormwater Ditch Improvements with a local match commitment of $975,000 and $225,000 for Phase 1 of the Griffin Road Area Stormwater Management Improvement Project with a local match commitment of $225,000. If funds from Big Cypress Basin are awarded, the local match will be available within the Stormwater Capital Improvement Fund 325. The source of funds is transfers from the Gen eral Fund (001) and Unincorporated Area General Fund (111). LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. - JAB RECOMMENDATION: To approve submittal of two (2) Stormwater Management Improvement Project grant applications to the South Florida Water Management District (SFWMD) Big Cypress Basin Local Partnership Grants Program for FY 2020 and a Resolution supporting the County’s application. Prepared By: Mindy Collier, Project Manager, Capital Project Planning, Impact Fees and Program Management 16.A.12 Packet Pg. 443 07/09/2019 ATTACHMENT(S) 1. REVGriffinRdBCB LPG_SWM_WQ__FY20 (PDF) 2. SFWMD BCB Resolution (PDF) 3. BCB_LPG_Application Guidelines_Final (PDF) 4. REV2Freedom Park Ditch BCB Appl (PDF) 16.A.12 Packet Pg. 444 07/09/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.12 Doc ID: 9197 Item Summary: Recommendation to approve submittal of two (2) Stormwater Management Improvement Project grant applications to the South Florida Water Management District (SFWMD) Big Cypress Basin Local Partnership Grants Program for FY 2020 and a Resolution supporting the County’s application. Meeting Date: 07/09/2019 Prepared by: Title: – Capital Project Planning, Impact Fees, and Program Management Name: Mindy Collier 06/04/2019 2:14 PM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 06/04/2019 2:14 PM Approved By: Review: Capital Project Planning, Impact Fees, and Program Management Gerald Kurtz Additional Reviewer Completed 06/04/2019 3:57 PM Growth Management Department Lisa Taylor Additional Reviewer Completed 06/05/2019 7:22 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 06/07/2019 11:35 AM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 06/17/2019 8:42 AM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 06/18/2019 1:37 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 06/18/2019 3:29 PM Grants Erica Robinson Level 2 Grants Review Completed 06/19/2019 9:34 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/19/2019 11:17 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/21/2019 9:02 AM Grants Therese Stanley Additional Reviewer Completed 06/24/2019 5:57 PM Office of Management and Budget Susan Usher Additional Reviewer Completed 06/26/2019 2:03 PM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/26/2019 2:25 PM Board of County Commissioners MaryJo Brock Meeting Pending 07/09/2019 9:00 AM 16.A.12 Packet Pg. 445 FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 1 of 8  Applications are limited to 25 pages including figures, Resolution, and the Acknowledgment letter. Application submittals must submitted by August 16, 2019 at 5:00 PM. Prior to completing this Application, it is recommended you read the LPG Guidelines. This application is for projects which will be constructed between December 1, 2019 and June 20, 2021. PROJECT SUMMARY Project Name: Phase 1 Griffin Road Area Stormwater Management Improvement Project Project Location: Eastern side of Barefoot- Williams Road County: Collier County Project Type (check all that apply): Water Quality / Quantity Improvement ☐ Infrastructure Improvement ☒ Natural System Restoration ☐ Storage ☐ Flood Protection ☒ Receiving Waters for Project: Rookery Bay and Gulf of Mexico Applicant: Capital Project Planning, Impact Fees and Program Management Authorized Representative: Amy Patterson Project Manager (PM), if different: Robert Wiley Address: 2685 S. Horseshoe Drive, Suite 103 PM Address: 2685 S. Horseshoe Drive, Suite 103 City/Zip: Naples, 34104 PM City/Zip:Naples, 34104 Telephone: 239-252-5721 PM Telephone: 239-252- 2322 Email: Amy.Patterson@colliercountyfl.gov PM Email: Robert.Wiley@colliercountyfl.gov Project Cost (12/1/19-6/30/21): $450,000 Total Project Cost, if multi-year: $7,000,000 N/A ☐ Eligible (Construction) Cost: $450,000 Local Match: $225,000 Requested Funding Amount: $225,000 Requested Funding Percentage: 50 Project Latitude / Longitude: 26°03’38”N 81°42’52”W Is this a multi-year: Yes ☒ No ☐ If yes, Number of Project Phases: 5 If yes, Project Phases Completed to Date: N/A If yes, Expected Total Project Completion Date: Total project completion will be dependent upon funding availability and successful completion of design, permitting and construction If yes, has this project received previous SFWMD funding? Yes ☐ No ☒ If yes, please provide the following information: Agreement No. Year Awarded Amount Awarded Amount Invoiced Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Are there other District programs or other agencies contributing funding to this project? Yes ☐ No ☒ If yes, source(s): Enter text. If yes, amount(s): Enter text. Does any SFWMD employee, Basin Board or Governing Board member, contractor, or other affiliate of the Applicant have a financial interest in this project, the property 16.A.12.a Packet Pg. 446 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 2 of 8  associated with this project or with any party that may profit financially from this project? Yes ☐ No ☒ If yes, list the parties and interests: Enter text. Is the project part of a capital improvement plan? Yes ☒ No ☐ This is a reimbursement program with the entire project scope expected to be completed within the funding period, regardless of amount awarded. There is no guarantee the Applicant will be awarded the amount requested. Are budgeted funds available to pay for the entire scope of the project? Yes ☒ No ☐ Does the applicant understand that if for any reason, the project scope is not fulfilled to 100% completion as outlined in the statement of work, the funding amount will be reduced to match the original percentage of funding in the purchase order that was based on the estimated total initial project cost estimate as provided in the application? Yes ☒ No ☐ Does the applicant understand that if the project scope is completed as outlined in the statement of work and total actual total project costs are below the estimated total project cost, the applicant may not be eligible to receive up to the full award amount? Yes ☒ No ☐ Does the applicant understand that funds are only for expenses incurred or obligated during the funding period (December 1, 2019 – June 30, 2021)? Yes ☒ No ☐ PROJECT DETAILS 1.Provide a high-level description (several sentences) of the project. The Griffin Road Area Stormwater Management Improvement Project (GRASIP) will address recurring flooding problems in the Griffin Road/Barefoot-Williams Road area of east Naples. The project location is south of US-41 and generally includes properties on both the east and west sides of Barefoot-Williams Road. The area is mostly residential with a mixture of mobile homes, recreational travel trailers, low density rural and development with single family lots. The low density rural properties utilize wells and septic systems. The objective of the project is to install infrastructure to enable appropriate and desired stormwater flows to reach wetlands within the Rookery Bay National Estuarine Research Reserve through a specifically permitted and previously constructed bypass channel along the northern perimeter of the Artesia development. This will also reduce the frequency and extent of flooding in the GRASIP area. The construction plans are complete and the SFWMD permit has been obtained. 2.Please attach the following: a.At least one letter-sized figure that depicts the project location in relation to the nearest major road intersection b.At least one letter-sized figure that depicts project details and illustrates information provided in the Statement of Work c.A GIS shapefile or AutoCAD dwg file per Florida State East Zone, NAD83 HARN, US Survey feet of the project location or latitude/longitude: 26°03’38”N 81°42’52”W 16.A.12.a Packet Pg. 447 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 3 of 8  3.Provide a description for the project, which may be used to create contract documents if selected, that includes: a.Relevant Background Information The GRASIP concept was initiated years ago between the Florida Department of Environmental Protection Rookery Bay National Estuary Research Reserve (RBNERR), South Florida Water Management District and Collier County as the Artesia development was under conceptual design and permitting with SFWMD. Lack of available funding along with the construction slowdown in the mid-2000’s interrupted the coordination and continuity of the GRASIP concept. The result was partial construction of some components, alteration of historical flow direction and volume, and increased flooding potential within the overall GRASIP project area. b.Purpose or Objective(s) The GRASIP Phase 1 project addresses flood control by providing for increased flow capacity in the Barefoot-Williams Road east side ditch, thus reducing peak stormwater stages in the ditch and reducing overbank flooding of adjacent properties. The natural system/water quality benefit is achieved as that additional flow is able to enter into the Artesia bypass flowway system. While passing through the bypass system it is able to enhance a wetland preserve area and receive water quality treatment via nutrient uptake of wetland vegetative species along the channel as well as residence time within two lakes before discharging via a lake spreader system into additional wetlands on RBNERR property. c.Statement of Work The Griffin Road Phase 1 project consists of increasing flows in the ditch along the east side of Barefoot-Williams Road by upsizing of three driveway culverts, upsizing the cross-drain under Price Street, and upsizing the inlet structure to a cross-drain where the ditch ends at the northeast corner of the Artesia development. 4.Explain how the project aligns with the District’s mission. The GRASIP Phase 1 project aligns with the Big Cypress Basin Strategic Plan in the areas of flood control and natural systems/water quality. The project is the initial County construction project to redirect the distribution of stormwater flows in the desired quantities and locations to the RBNERR. 5.Explain how the project aligns with other applicable plans such as a watershed protection plan, basin management plan, total maximum daily load allocation, or stormwater improvement master plan. The GRASIP project aligns with the Southwest Florida Comprehensive Watershed Plan for water quality and directing fresh water flow to a freshwater-starved estuary. 6.Describe measurable community or environmental benefits of this project with respect to relevant considerations (improvement of water quality and/or quantity and benefits to natural systems; degree of flood protection and/or resource protection). Please include specific details such as estimated mass of nutrient/contaminant reductions (parts per billion, pounds per day/year) or removal efficiencies, area of natural systems to be restored or enhanced (acres), level of service attributes, conveyance capacity (CFS), and/or volume of storage (acre-feet). Please include all calculations. 16.A.12.a Packet Pg. 448 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 4 of 8  The degree of flood protection provided by the GRASIP Phase 1 project will bring the Barefoot-Williams Road ditch capacity up to approximately the 10-yr/72hr design storm level. Subsequent phases, with their additional capacities to distribute stormwater into other RBNERR wetlands, are intended to bring the area up to approximately the 25- year/72hr design storm level. The GRASIP Phase 1 project is intended to pass 30 cfs into the Artesia bypass flowway system, which aligns with the current permitted intent. The areas of natural systems to be restored, estimated nutrient reductions, etc. were all part of the Artesia development process and were not specifically calculated by the GRASIP Phase 1 project. 7.If applicable, provide the name and reference (i.e., page number) of the related project in the relevant plan associated with the proposed work: Enter text. PROJECT READINESS 1.Does this project have approval from your Commission or Council? Yes ☒ No ☐ When did approval for this project occur or when is approval expected to occur? July 9, 2019 When was a resolution approved by your Commission or Council approve a resolution committing funding to this project and application? (Please attach your resolution).: July 9, 2019 2.Is design of this project complete? Yes ☒ No ☐ If no, is design of this project currently underway? Yes ☐ No ☐ If yes, what percentage of design is complete? 100% If yes, when will design of this project be complete? completed If no, explain: Enter text. 3.Are the necessary land acquisitions for this project complete? Yes ☒ No ☐ If no, when will land acquisition be complete? Enter text. Additional space for further explanation: Enter text. 4.Have the necessary access agreements, right-of-way permits, and/or easements for this project been finalized? Yes ☐ No ☒ If no, when will these items be finalized? 1/2020 Additional space for further explanation: County staff are working to finalize acquisition of small drainage easements adjacent to the existing right-of-way. 5.List requisite federal, state, and/or local permits in the following table and provide applicable information. Agency Permit No.Permit Obtained? Permit 16.A.12.a Packet Pg. 449 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 5 of 8  Permit Type (Water/WW, ERP, CUP, Building) Yes No Date (expected date if not obtained yet) SFWMD 11-02311- P-02 Construction Yes Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. 6. Has a contractor been selected for this project? Yes ☐ No ☒ If no, when will a contractor be selected? Additional space for further explanation: The construction bidding process will be initiated upon determination of availability of funding 7. Describe the project timeline and identify significant project milestones and associated dates. Enter text. A Gantt chart may be attached for additional illustration. When will construction for this project begin? 1/7/2020 What is the duration of construction activities in months? 7 Months When will this project be complete? 6/1/2021 SUBMITTAL CHECKLIST ☒ The Acknowledgment Form, on Applicant letterhead, has been completed and notarized and attached as a pdf ☒ Project maps have been included in the application or attached separately ☒ Measurable community or environmental benefits have been sufficiently discussed and quantified (as applicable) ☒ Cost calculations, as requested in 2e, have been included in the application ☒ A resolution from your governing commission/council has been executed and is attached 16.A.12.a Packet Pg. 450 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 6 of 8  Applicant Letterhead ACKNOWLEDGMENT Before me, the undersigned authority, personally appeared ____________________________, (Authorized Representative of the project owner) this _______ day of ___________, 2019 who, first being duly sworn, as required by law, hereby acknowledges: 1. The statements contained in this project information package are true, correct and complete to the best of his/her knowledge and that the undersigned has the authority from the project owner to make the representations contained herein. 2. The undersigned represents the described deliverables for this phase of the project will be completed and invoiced no later than June 30, 2021. 3. The undersigned represents that the project owner intends to begin construction of the project by this _______ day of ___________, in the year _______. 4. The undersigned represents that the project owner understands the project contract expiration is July 31, 2021, and further understands that if the project is not completed by that date, the South Florida Water Management District reserves the right to rescind or reduce cost-share funding which are not completed by this date. _________________________________ __________________________________ Authorized Representative Print Name STATE OF FLORIDA COUNTY OF __________________ SWORN TO and subscribed before me _______ day of ___________, 2016. Such person(s) (Notary Public must check applicable box): [ ] is/are personally known to me. [ ] produced a current driver license(s). [ ] produced as identification: _________________________. (NOTARY PUBLIC SEAL) _________________________ Notary Public 16.A.12.a Packet Pg. 451 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 7 of 8  16.A.12.a Packet Pg. 452 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 8 of 8  SAMPLE RESOLUTION A RESOLUTION APPROVING THE SUBMISSION AND RANKING OF Enter Number CAPITAL IMPROVEMENT PROJECTS TO THE BIG CYPRESS BASIN/SOUTH FLORIDA WATER MANAGEMENT DISTRICT LOCAL PARTNERSHIP GRANT PROGRAM FOR THE FY2020; AND AUTHORIZE THE CHAIRMAN TO EXECUTE THE APPLICATION IN THE AMOUNT OF $XXXX; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Enter Entity Name applies for annual grant funding from the Big Cypress Basin/South Florida Water Management District (BCB/SFWMD) to reimburse a portion of the eligible construction ꞏcost for stormwater management (SWM) projects; and WHEREAS, as part of the grant eligibility requirements, BCB/SFWMD requires projects to be "shovel ready" in the year they are funded and for enter entity name to rank the projects; and WHEREAS, if funding is granted to the below ranked projects, the enter entity name is committed to funding the construction project(s) in the upcoming fiscal(s) year budget. WHEREAS, the projects have been ranked in the following order: Enter Project Names and rankings; NOW, THEREFORE, BE IT RESOLVED BY THE ENTER ENTITY NAME, FLORIDA: Section 1. That the following number SWM projects that are eligible and recommended for Big Cypress Basin/South Florida Water Management District grant funding in FY2020 are ranked as follows: 1. Project Name 2. Project Name Section 2. This resolution shall take effect immediately upon adoption. PASSED IN OPEN AND REGULAR SESSION OF THE ENTER ENTITY NAME, FLORIDA, THIS DAY OF , 20 . Attest: Name of Clerk Name of Agency Approved as to form and legality: Attorney ________________________ Chairman, XXXXXXXXXXXXX Date filed with the Entity Clerk:________   16.A.12.a Packet Pg. 453 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications)  PROJECT LOCATION MAP 16.A.12.aPacket Pg. 454Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Replace Exist. 36" CMP with Dbl. 36" HDPE850 B-W Road (northe rn driveway) Replace Exist. 24" HDPE with Dbl. 36" HDPE850 B-W Road (so uthe rn driveway) Replace Exist. 36" CMP under Price Street with Dbl. 36 " HDPE Replace Exist. 42" CMP with Dbl. 36" HDPE1000 B-W Road driveway Install new Slotted Inlet Bo x for Artesia Bypass Flowwa y Tall Oak RD Cre ek B e d D R G r eyW in g PTFuller LN Co r m o r a n t C VGrizzlyBearRDAmericusLN C y p r essViewDREagleCreekDRBlack Bear RD Crestw oodLNBarefoot Wi l l i ams RDG r e yWing P T Price ST G r iff in R D LC-4 C4C-00 C4C-00 C 4 C -0 0 SAE-413 SAE-415 Barefoot-Williams Road/Artesia Bypass Coordinated Capacity Improvements p 0 230 460115 Feet 16.A.12.a Packet Pg. 455 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Price Street Pay Item No.Description Unit Qty Unit Price Total Alt 1 Total Unit Price Total Alt 1 Total Unit Price Total Alt 1 Total 101-1 MOBILIZATION LS 1 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 20,520.00$ 20,520.00$ 20,520.00$ 102-1 MAINTENANCE OF TRAFFIC LS 1 14,000.00$ 14,000.00$ 14,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,940.00$ 5,940.00$ 5,940.00$ 104-10-3 SEDIMENT BARRIER LF 420 4.00$ 1,680.00$ 1,680.00$ 8.00$ 3,360.00$ 3,360.00$ 3.00$ 1,260.00$ 1,260.00$ 107-1 MOWING LS 1 600.00$ 600.00$ 600.00$ 4,000.00$ 4,000.00$ 4,000.00$ 900.00$ 900.00$ 900.00$ 110-1-1 CLEARING AND GRUBBING LS 1 4,765.00$ 4,765.00$ 4,765.00$ 3,000.00$ 3,000.00$ 3,000.00$ 7,482.00$ 7,482.00$ 7,482.00$ 120-1 REGULAR EXCAVATION LS 1 11,000.00$ 11,000.00$ 11,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 121-7 FLOWABLE FILL CY 10 300.00$ 3,000.00$ 3,000.00$ 300.00$ 3,000.00$ 3,000.00$ 205.00$ 2,050.00$ 2,050.00$ 120-6 EMBANKMENT LS 1 15,465.00$ 15,465.00$ 15,465.00$ 22,770.00$ 22,770.00$ 22,770.00$ 1,800.00$ 1,800.00$ 1,800.00$ 339-1 MISCELLANEOUS ASPHALT PAVEMENT TN 12 460.00$ 5,520.00$ 5,520.00$ 320.00$ 3,840.00$ 3,840.00$ 243.50$ 2,922.00$ 2,922.00$ 400-1-2 CONCRETE CLASS I, ENDWALLS CY 12 1,100.00$ 13,200.00$ 13,200.00$ 1,160.00$ 13,920.00$ 13,920.00$ 782.50$ 9,390.00$ 9,390.00$ 430-175-136 PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ROUND, 36"S/CD LF 8 500.00$ 4,000.00$ 4,000.00$ 280.00$ 2,240.00$ 2,240.00$ 179.00$ 1,432.00$ 1,432.00$ 430-175-236 PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP, 36"S/CD LF 140 235.00$ 32,900.00$ 32,900.00$ 300.00$ 42,000.00$ 42,000.00$ 137.00$ 19,180.00$ 19,180.00$ 530-1 RIPRAP, SAND-CEMENT CY 25 430.00$ 10,750.00$ 10,750.00$ 240.00$ 6,000.00$ 6,000.00$ 505.00$ 12,625.00$ 12,625.00$ 530-3-4 RIPRAP, RUBBLE, F&I, DITCH LINING TN 90 130.00$ 11,700.00$ 11,700.00$ 200.00$ 18,000.00$ 18,000.00$ 138.00$ 12,420.00$ 12,420.00$ 536-7-3 SPECIAL GUARDRAIL POST-ENCASED POST FOR SHALLOW MOUNT EA 8 360.00$ 2,880.00$ 2,880.00$ 320.00$ 2,560.00$ 2,560.00$ 240.00$ 1,920.00$ 1,920.00$ 536-85-22 GUARDRAIL END ANCHORAGE ASSEMBLY/END TREATMENT- FLARED EA 1 3,500.00$ 3,500.00$ 3,500.00$ 3,780.00$ 3,780.00$ 3,780.00$ 3,360.00$ 3,360.00$ 3,360.00$ 536-85-24 GUARDRAIL END ANCHORAGE ASSEMBLY/END TREATMENT- PARALLEL EA 3 3,675.00$ 11,025.00$ 11,025.00$ 3,780.00$ 11,340.00$ 11,340.00$ 3,360.00$ 10,080.00$ 10,080.00$ 536-1-0 GUARDRAIL -ROADWAY, GENERAL TL-2 LF 294 31.00$ 9,114.00$ 9,114.00$ 26.00$ 7,644.00$ 7,644.00$ 22.25$ 6,541.50$ 6,541.50$ 570-1-2 PERFORMANCE TURF, SOD SY 100 6.00$ 600.00$ 600.00$ 37.00$ 3,700.00$ 3,700.00$ 9.75$ 975.00$ 975.00$ TOTAL 170,699.00$ 170,699.00$ 186,154.00$ 186,154.00$ 129,797.50$ 129,797.50$ PAY ITEM NOTES: 102-1 104-10-3 120-1 121-7 430-175-136 430-175-236 530-1 and 530-5-1 570-1- 2 COST OF FILTER FABRIC IS INCIDENTAL TO THESE PAY ITEMS. COST OF WATERING TO ESTABLISH GRASS IS INCIDENTAL TO THIS PAY ITEM. FLOWABLE FILL AND ROADWAY RESTORATION IS INCIDENTAL TO THESE PAY ITEMS. GRASIP 2 ARTESIA FLOWWAY-PRICE STREET DRAINAGE IMPROVEMENTS - BIDS RECEIVED Haskins Mitchell and Stark (late)Quality Enterprises INCLUDES COST OF INSTALLING AND MAINTAINING TRAFFIC CONTROL DEVICES AND OTHER TRAFFIC RELATED COSTS SPECIFIED IN THE TRAFFIC CONTROL PLAN. 104-10-3 INCLUDES COST OF INSTALLING DEVICES IDENTIFIED IN THE PLANS AND INCLUDES COST OF PREPARATION OF THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTANANCE AND REPAIRS REQUIRED FOR THE CONTROL AND ABATEMENT OF WATER POLLUTION. INCLUDES THE COST OF MAINTAINING STORM POLLUTION DEVICES UNTIL SURROUNDING VEGETATION HAS BEEN ESTABLISHED. INCLUDES SWALE GRADING AS SPECIFIED IN THE PLANS IS INCIDENTAL TO THESE PAY ITEMS, AS APPLICABLE. REMOVAL OF EXISTING MES AND FLOWABLE FILL TO BLOCK EXISTING 36" CMP, AS APPLICABLE. CONCRETE COLLAR IS INCIDENTAL TO THESE PAY ITEMS. 16.A.12.a Packet Pg. 456 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) 850 Barefoot-Williams Road Pay Item No.Description Unit Qty Unit Price Total Alt. 1 Total Unit Price Total Alt. 1 Total Unit Price Total Alt. 1 Total 101-1 MOBILIZATION LS 1 10,250.00$ 10,250.00$ 10,250.00$ 8,000.00$ 8,000.00$ 8,000.00$ 10,725.00$ 10,725.00$ 10,725.00$ 102-1 MAINTENANCE OF TRAFFIC LS 1 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 3,420.00$ 3,420.00$ 3,420.00$ 104-10-3 SEDIMENT BARRIER LF 128 5.00$ 640.00$ 640.00$ 11.00$ 1,408.00$ 1,408.00$ 3.00$ 384.00$ 384.00$ 110-1-1 CLEARING AND GRUBBING LS 1 3,000.00$ 3,000.00$ 3,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,940.00$ 5,940.00$ 5,940.00$ 120-1 REGULAR EXCAVATION LS 1 1,400.00$ 1,400.00$ 1,400.00$ 5,500.00$ 5,500.00$ 5,500.00$ 1,800.00$ 1,800.00$ 1,800.00$ 120-6 EMBANKMENT LS 1 1,400.00$ 1,400.00$ 1,400.00$ 5,590.00$ 5,590.00$ 5,590.00$ 1,800.00$ 1,800.00$ 1,800.00$ 286-1 TURNOUT CONSTRUCTION (NORTHERN DRIVEWAY)SY 38 155.00$ 5,890.00$ 5,890.00$ 180.00$ 6,840.00$ 6,840.00$ 56.00$ 2,128.00$ 2,128.00$ 286-1 TURNOUT CONSTRUCTION (SOUTHERN DRIVEWAY) ALT. 1 SY 36 155.00$ 5,580.00$ 180.00$ 6,480.00$ 57.00$ 2,052.00$ 526-1-1 PAVERS, ARCHITECTURAL, ROADWAY (SOUTHERN DRIVEWAY)SY 36 110.00$ 3,960.00$ 95.00$ 3,420.00$ 85.00$ 3,060.00$ 430-175-242 PIPE CULVERT, OPTIONAL MATERIAL, ELLIP/OTHER, 42"SD LF 72 326.00$ 23,472.00$ 23,472.00$ 325.00$ 23,400.00$ 23,400.00$ 174.00$ 12,528.00$ 12,528.00$ 430-984-640 MITERED END SECT, OPTIONAL /ELLIP/ARCH, 42" SD EA 4 5,215.00$ 20,860.00$ 20,860.00$ 5,700.00$ 22,800.00$ 22,800.00$ 3,400.00$ 13,600.00$ 13,600.00$ 530-3-4 RIPRAP, RUBBLE, F&I, DITCH LINING TN 11 305.00$ 3,355.00$ 3,355.00$ 200.00$ 2,200.00$ 2,200.00$ 134.00$ 1,474.00$ 1,474.00$ 570-1-2 PERFORMANCE TURF, SOD SY 10 20.00$ 200.00$ 200.00$ 30.00$ 300.00$ 300.00$ 9.75$ 97.50$ 97.50$ TOTAL 79,427.00$ 81,047.00$ 89,458.00$ 92,518.00$ 56,956.50$ 55,948.50$ PAY ITEM NOTES: 102-1 104-10-3 120-1 286-1 430-175-242 530-3-4 COST OF FILTER FABRIC IS INCIDENTAL TO THESE PAY ITEMS. GRASIP 2 ARTESIA FLOWWAY-850 BAREFOOT WILLIAMS ROAD DRIVEWAY DRAINAGE IMPROVEMENTS - BID DOCUMENT INCLUDES COST OF INSTALLING AND MAINTAINING TRAFFIC CONTROL DEVICES AND OTHER TRAFFIC RELATED COSTS SPECIFIED IN THE TRAFFIC CONTROL PLAN. INCLUDES COST OF INSTALLING DEVICES IDENTIFIED IN THE PLANS AND INCLUDES COST OF PREPARATION OF THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTANANCE AND REPAIRS REQUIRED FOR THE CONTROL AND ABATEMENT OF WATER POLLUTION. INCLUDES THE COST OF MAINTAINING STORM POLLUTION DEVICES UNTIL SURROUNDING VEGETATION HAS BEEN ESTABLISHED. INCLUDES SWALE GRADING AS SPECIFIED IN THE PLANS IS INCIDENTAL TO THESE PAY ITEMS, AS APPLICABLE. INCLUDES RECONSTRUCTION OF EXISTING CONCRETE DRIVEWAY. EXISTING PIPE REMOVAL AND ROADWAY RESORATION IS INCIDENTAL TO THESE PAY ITEMS. 16.A.12.a Packet Pg. 457 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) 1000 Barefoot Williams Road Pay Item No.Description Unit Qty Unit Price Total Alt 1 Total Unit Price Total Alt 1 Total Unit Price Total Alt 1 Total 101-1 MOBILIZATION LS 1 10,000.00$ 10,000.00$ 10,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 7,890.00$ 7,890.00$ 7,890.00$ 102-1 MAINTENANCE OF TRAFFIC LS 1 4,000.00$ 4,000.00$ 4,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 2,580.00$ 2,580.00$ 2,580.00$ 104-10-3 SEDIMENT BARRIER LF 125 4.00$ 500.00$ 500.00$ 8.00$ 1,000.00$ 1,000.00$ 3.00$ 375.00$ 375.00$ 110-1-1 CLEARING AND GRUBBING LS 1 1,600.00$ 1,600.00$ 1,600.00$ 3,000.00$ 3,000.00$ 3,000.00$ 2,340.00$ 2,340.00$ 2,340.00$ 120-1 REGULAR EXCAVATION LS 1 2,800.00$ 2,800.00$ 2,800.00$ 6,000.00$ 6,000.00$ 6,000.00$ 1,800.00$ 1,800.00$ 1,800.00$ 120-6 EMBANKMENT LS 1 1,500.00$ 1,500.00$ 1,500.00$ 6,600.00$ 6,600.00$ 6,600.00$ 1,800.00$ 1,800.00$ 1,800.00$ 286-2 TURNOUT CONSTRUCTION-ASPHALT TN 4 1,275.00$ 5,100.00$ 5,100.00$ 230.00$ 920.00$ 920.00$ 488.25$ 1,953.00$ 1,953.00$ 430-175-248 PIPE CULVERT, OPTIONAL MATERIAL, ELLIP/OTHER, 54"SD LF 40 440.00$ 17,600.00$ 17,600.00$ 400.00$ 16,000.00$ 16,000.00$ 241.25$ 9,650.00$ 9,650.00$ 430-984-642 MITERED END SECT, OPTIONAL /ELLIP/ARCH, 54" SD EA 2 7,600.00$ 15,200.00$ 15,200.00$ 7,960.00$ 15,920.00$ 15,920.00$ 4,640.00$ 9,280.00$ 9,280.00$ 530-3-4 RIPRAP, RUBBLE, F&I, DITCH LINING TN 6 510.00$ 3,060.00$ 3,060.00$ 200.00$ 1,200.00$ 1,200.00$ 147.00$ 882.00$ 882.00$ 570-1-2 PERFORMANCE TURF, SOD SY 10 25.00$ 250.00$ 250.00$ 30.00$ 300.00$ 300.00$ 9.75$ 97.50$ 97.50$ TOTAL 61,610.00$ 61,610.00$ 67,940.00$ 67,940.00$ 38,647.50$ 38,647.50$ PAY ITEM NOTES: 102-1 104-10-3 120-1 286-2 430-175-248 530-3-4 COST OF FILTER FABRIC IS INCIDENTAL TO THESE PAY ITEMS. GRASIP 2 ARTESIA FLOWWAY-1000 BAREFOOT WILLIAMS ROAD DRIVEWAY DRAINAGE IMPROVEMENTS - BID DOCUMENT INCLUDES COST OF INSTALLING AND MAINTAINING TRAFFIC CONTROL DEVICES AND OTHER TRAFFIC RELATED COSTS SPECIFIED IN THE TRAFFIC CONTROL PLAN. INCLUDES COST OF INSTALLING DEVICES IDENTIFIED IN THE PLANS AND INCLUDES COST OF PREPARATION OF THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTANANCE AND REPAIRS REQUIRED FOR THE CONTROL AND ABATEMENT OF WATER POLLUTION. INCLUDES THE COST OF MAINTAINING STORM POLLUTION DEVICES UNTIL SURROUNDING VEGETATION HAS BEEN ESTABLISHED. INCLUDES SWALE GRADING AS SPECIFIED IN THE PLANS IS INCIDENTAL TO THESE PAY ITEMS, AS APPLICABLE. INCLUDES RECONSTRUCTION OF EXISTING DRIVEWAYS. EXISTING PIPE REMOVAL AND ROADWAY RESTORATION IS INCIDENTAL TO THESE PAY ITEMS. 16.A.12.a Packet Pg. 458 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) Artesia Inlet Box Pay Item No.Description Unit Qty Unit Price Total Alt 1 Total Unit Price Total Alt 1 Total Unit Price Total Alt 1 Total 101-1 MOBILIZATION LS 1 13,500.00$ 13,500.00$ 13,500.00$ 20,000.00$ 20,000.00$ 20,000.00$ 15,300.00$ 15,300.00$ 15,300.00$ 102-1 MAINTENANCE OF TRAFFIC LS 1 12,000.00$ 12,000.00$ 12,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,260.00$ 4,260.00$ 4,260.00$ 104-10-3 SEDIMENT BARRIER LF 250 4.50$ 1,125.00$ 1,125.00$ 8.00$ 2,000.00$ 2,000.00$ 3.00$ 750.00$ 750.00$ 104-11 FLOATING TURBIDITY BARRIER LF 20 25.00$ 500.00$ 500.00$ 75.00$ 1,500.00$ 1,500.00$ 12.00$ 240.00$ 240.00$ 107-1 MOWING LS 1 600.00$ 600.00$ 600.00$ 2,500.00$ 2,500.00$ 2,500.00$ 900.00$ 900.00$ 900.00$ 110-1-1 CLEARING AND GRUBBING LS 1 2,800.00$ 2,800.00$ 2,800.00$ 3,000.00$ 3,000.00$ 3,000.00$ 5,580.00$ 5,580.00$ 5,580.00$ 120-1 REGULAR EXCAVATION LS 1 6,800.00$ 6,800.00$ 6,800.00$ 7,000.00$ 7,000.00$ 7,000.00$ 4,680.00$ 4,680.00$ 4,680.00$ 120-6 EMBANKMENT LS 1 5,585.00$ 5,585.00$ 5,585.00$ 10,360.00$ 10,360.00$ 10,360.00$ 1,800.00$ 1,800.00$ 1,800.00$ 285-701 OPTIONAL BASE, BASE GROUP 01 SY 120 75.00$ 9,000.00$ 9,000.00$ 51.00$ 6,120.00$ 6,120.00$ 21.50$ 2,580.00$ 2,580.00$ 334-1-14 SUPERPAVE ASPHALTIC CONC, SP 9.5 TN 9 295.00$ 2,655.00$ 2,655.00$ 300.00$ 2,700.00$ 2,700.00$ 215.00$ 1,935.00$ 1,935.00$ 339-1 MISCELLANEOUS ASPHALT PAVEMENT TN 4 490.00$ 1,960.00$ 1,960.00$ 320.00$ 1,280.00$ 1,280.00$ 271.50$ 1,086.00$ 1,086.00$ 425-1601 INLETS, DT BOT, TYPE J, <10'EA 1 19,000.00$ 19,000.00$ 19,000.00$ 19,920.00$ 19,920.00$ 19,920.00$ 5,620.00$ 5,620.00$ 5,620.00$ 530-1 RIPRAP, SAND-CEMENT CY 25 430.00$ 10,750.00$ 10,750.00$ 410.00$ 10,250.00$ 10,250.00$ 505.00$ 12,625.00$ 12,625.00$ 530-3-4 RIPRAP, RUBBLE, F&I, DITCH LINING TN 24 160.00$ 3,840.00$ 3,840.00$ 200.00$ 4,800.00$ 4,800.00$ 131.25$ 3,150.00$ 3,150.00$ 536-7-3 SPECIAL GUARDRAIL POST-ENCASED POST FOR SHALLOW MOUNT EA 3 360.00$ 1,080.00$ 1,080.00$ 320.00$ 960.00$ 960.00$ 240.00$ 720.00$ 720.00$ 536-85-24 GUARDRAIL END ANCHORAGE ASSEMBLY/ END TREATMENT-TYPE II EA 2 3,665.00$ 7,330.00$ 7,330.00$ 3,780.00$ 7,560.00$ 7,560.00$ 3,360.00$ 6,720.00$ 6,720.00$ 536-1-0 GUARDRAIL -ROADWAY, GENERAL TL-2 LF 232 31.00$ 7,192.00$ 7,192.00$ 26.00$ 6,032.00$ 6,032.00$ 22.25$ 5,162.00$ 5,162.00$ 570-1-2 PERFORMANCE TURF, SOD SY 277 6.00$ 1,662.00$ 1,662.00$ 30.00$ 8,310.00$ 8,310.00$ 9.75$ 2,700.75$ 2,700.75$ TOTAL 107,379.00$ 107,379.00$ 118,292.00$ 118,292.00$ 75,808.75$ 75,808.75$ PAY ITEM NOTES: 102-1 104-10-3 120-1 530-1 and 530-3-4 570-1-2 419,115.00$ 420,735.00$ 461,844.00$ 464,904.00$ 301,210.25$ 300,202.25$ Possible Funding Breakout Stormwater Mgmt. GRAND TOTALS GRASIP 1 ARTESIA FLOWWAY BAREFOOT-WILLIAMS RD DITCH INLET BOX - BID SHEET INCLUDES COST OF INSTALLING AND MAINTAINING TRAFFIC CONTROL DEVICES AND OTHER TRAFFIC RELATED COSTS SPECIFIED IN THE TRAFFIC CONTROL PLAN. INCLUDES COST OF INSTALLING DEVICES IDENTIFIED IN THE PLANS AND INCLUDES COST OF PREPARATION OF THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTANANCE AND REPAIRS REQUIRED FOR THE CONTROL AND ABATEMENT OF WATER POLLUTION. INCLUDES THE COST OF MAINTAINING STORM POLLUTION DEVICES UNTIL SURROUNDING VEGETATION HAS BEEN ESTABLISHED. INCLUDES SWALE GRADING AS SPECIFIED IN THE PLANS IS INCIDENTAL TO THESE PAY ITEMS, AS APPLICABLE. COST OF FILTER FABRIC IS INCIDENTAL TO THESE PAY ITEMS. COST OF WATERING TO ESTABLISH GRASS IS INCIDENTAL TO THIS PAY ITEM. 16.A.12.a Packet Pg. 459 Attachment: REVGriffinRdBCB LPG_SWM_WQ__FY20 [Revision 2] (9197 : SFWMD BCB Local Partnership Stormwater Applications) 16.A.12.b Packet Pg. 460 Attachment: SFWMD BCB Resolution (9197 : SFWMD BCB Local Partnership Stormwater Applications) 16.A.12.b Packet Pg. 461 Attachment: SFWMD BCB Resolution (9197 : SFWMD BCB Local Partnership Stormwater Applications) 16.A.12.c Packet Pg. 462 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 2 — This page intentionally left blank. 16.A.12.c Packet Pg. 463 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 3 — CONTENTS 1. APPLICATION DEADLINE AND CONTACTS ........................................................... 4 2. POLICIES AND GUIDELINES ................................................................................... 5 Local Grant Funding Program Objective .............................................................. 5 District Mission ..................................................................................................... 5 General Local Grant Funding Program Overview ................................................. 5 General Requirements ......................................................................................... 6 Project Eligibility Compliance................................................................................ 6 General Cost Considerations................................................................................ 6 Withdrawal of Application/Project ......................................................................... 7 Application Development Costs ............................................................................ 7 Award ................................................................................................................... 7 Funding Compliance Review ................................................................................ 7 Application ............................................................................................................ 8 Funding Commitment ........................................................................................... 9 3. PROJECT TYPES – SPECIFIC GUIDELINES .......................................................... 9 Stormwater Management/Water Quality Projects ................................................. 9 Alternative Water Supply Projects ...................................................................... 11 Water Conservation Projects .............................................................................. 13 DEFINITIONS ............................................................................................................... 18 16.A.12.c Packet Pg. 464 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 4 — 1. APPLICATION DEADLINE AND CONTACTS Deadline: August 16, 2019 at 5:00 p.m. Submittal: Applications must be submitted via email to Brad Jackson at brjackso@sfwmd.gov Inquiries to: Brad Jackson, Basin Engineer Telephone: (239) 263-7615 ext 7619 Email: brjackso@sfwmd.gov Lisa Koehler, Basin Administrator Telephone: (239) 263-7615 ext. 7603 Email: lkoehler@sfwmd.gov 16.A.12.c Packet Pg. 465 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 5 — 2. POLICIES AND GUIDELINES Local Project Grant Program Objective The Big Cypress Basin Board’s (BCBB) objective is to assist local governments, public and private water providers and other entities with the construction or implementation of stormwater management, alternative water supply and water conservation projects that support or compliment the South Florida Water Management District’s (District) mission. There are three types of projects eligible for funding through the program: stormwater management/water quality (SM/WQ), alternative water supply (AWS), and water conservation (WC). SM/WQ projects are typically associated with water quality improvements, infrastructure improvement, natural system restoration, storage, and flood protection. SM/WQ projects focus on improving water quality and the quantity, distribution, or timing of flows. AWS projects are associated with development of non- traditional water sources and/or storage to meet current and future demands for water. WC projects are associated with the use of hardware and/or technology to increase water use efficiency. District Mission The District mission is to safeguard and restore South Florida’s water resources and ecosystems, protect our communities f rom flooding and meet the region’s water needs while connecting with the public and stakeholders . The BCB supports that mission by assisting our local partners with projects that improve stormwater management/water quality, supports alternative water supply development and water conservation. General Local Project Grant Funding Program Overview The following is provided as guidance for applicants to the Basin’s grant program. Each application must be accompanied by a resolution from the appropriate governing board (council/commission) expressing support and funding for the project. If an agency submits multiple projects, the City/County Manager must also submit a letter ranking the importance of the projects for possible funding. Staff will coordinate the review of project applications according to the priorities and guidelines established by the Big Cypress Basin Board and District Governing Board. The BCBB will determine the priorities, the amount of funds to allocate, and the maximum cost-share made available to proposed projects for the program. Agreements will be prepared and forwarded back to the applicant to send to their governing council/commission; then, the agreement will be sent to the District Governing Board for final execution. Applications will be accepted from May 15 - August 16, 2019 for SM/WQ, AWS, and WC proposed projects that will occur between December 1, 2019 through June 30, 2021. The remainder of this section describes the application process, considerations that will be used to review project applications, and potential funding levels. 16.A.12.c Packet Pg. 466 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 6 — General Requirements This section contains general information about the requirements for the LPG. The review process for each project type is explained in subsequent sections. Every applicant must satisfy these requirements. Project Eligibility Compliance Applicants that do not include all required documentation as outlined in the Application may be deemed ineligible by the BCBB. Construction/implementation should be initiated by December 1, 2019 and the project should be completed by June 30, 2021. To be deemed eligible, entities shall comply with all of the following requirements: ✓ Be a public or private entity, including water providers and large users; local governments; water, wastewater and reuse utilities ✓ Adhere to the Application instructions. ✓ Adhere to applicable laws and regulations. ✓ Comply with allowable funding costs. The Basin will take into consideration the Applicant’s past performance history while reviewing the application. Projects should be feasible, fully funded and ready to implement. General Cost Considerations General cost considerations are presented below. Additional allowable cost considerations are presented in Section 3 under project types. Allowable Costs for All Projects: • Funding may only be used for the project identified in the Application. • Construction costs for SM/WQ and AWS projects or implementation costs for WC projects incurred between December 1, 2019 and June 30, 2021. Non-Allowable Costs for All Projects: • Expenses incurred or obligated before or after the funding period • Planning, design and engineering • Regular operations and maintenance costs, such as replacement of utility meters, sewer lines, finished water lines, storage tanks, etc. • Lobbying or attempting to influence federal, state, or local legislation • Bad debts, contingencies, fines and penalties, interest, and other financial costs • Private entertainment, food, beverages, plaques, awards, or scholarships • Projects restricted to exclusive participation, which include restricting access programs based on protected bases under law • Funding used to underwrite other funding programs 16.A.12.c Packet Pg. 467 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 7 — • Expenses associated with the preparation, submission, or presentation of the Application • Contributions or donations to other organizations Withdrawal of Application/Project Applicants may withdraw their submitted application by notifying the Basin either in writing or in person through an authorized representative at any time . Applications, once received, become the property of the Basin. Applications are not returned to the Applicant even if withdrawn from consideration. Application Development Costs Neither the Basin nor its representatives shall be liable for any expenses incurred thro ugh the preparation, submission, or presentation of the funding Application, nor shall said expenses be reimbursed using program funds (see non -allowable costs section above). All information in the Application shall be provided at no cost to the Basin. Aw ard The Applicant understands that the Application does not constitute a contract or purchase order with the District. No contract or purchase order is binding or official until applications are reviewed and accepted by the Basin, approved by the District GB, and the Parties duly execute an official contract or purchase order. The Basin/District reserves the right not to issue any funding whatsoever, if it is in the best interest of the Basin/District. Guidelines for maximum reimbursement cooperative fundin g amounts and percentages for each project type have been established by the Basin and District GB. Funding can generally be up to 50 percent of the project’s construction/implementation cost or the funding maximum, whichever is less. Funds are awarded based on estimated project costs as reported in the Application. The Basin may prorate and reduce the funding amount if the project scope is not 100 percent (100%) completed as outlined in the Statement of Work. In no event shall the Basin’s funding amount exceed percentages of the actual expenditures approved in the agreement/contract by the District GB. If actual construction costs are less than estimated construction costs this may result in a reduced award. During project closeout, actual costs must be accounted for and supported by evidence including, but not limited to, completion/certification letter, vendor invoices/pay applications, check payments, records for all in-kind services and verification project completion. Failure to supply evidence of all financial expenditures will result in the withholding of funds by the Basin/District. Funding Compliance Review The Basin will ensure the proper use of funding by requiring applicants to comply with the terms and conditions of the contract(s) or purchase order(s). Additionally, the Basin will ensure compliance through: 16.A.12.c Packet Pg. 468 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 8 — • Site visits to verify installation and/or progress of the Project. • Reviews of quarterly progress reports required by the contract or purchase order. • Thorough review of deliverables (financial expenditure documentation may include, but is not limited to, certification letter from entity, vendor invoices/pay applications, check payments, in-house labor, materials, and equipment use, and any required District reports/exhibits), and verification of project completion. Periodically, the District will perform financial audits to ensure funding objectives are met. Application Applications must be submitted via email by Friday, August 16 at 5:00 PM. Applications should include detailed project information, timelines, funding commitments, benefit quantifications, and locational data (e.g., GIS shapefile or latitude/longitude data). Section 3 provides specific project guidelines. A realistic project timeline must be included and contain the significant project milestones and dates. The timeline should also include a schedule for project elements associated with the funding request as well as a schedule for the overall project. A full breakdown of project costs will be required. The LGP is a reimbursement program. Any state or federal appropriations or local grant monies received by the applicant for a specific project shall be first applied toward the total cost of the applicant’s proposed project. Matching funds may be re quired, the amount to be determined by the BCBB/District GB and applicable Florida Statutes. Basin staff will review all project applications and present this information to the Basin Board. The Basin Board will make the decision on project selection and funding. The Basin will consider the following elements (no implied priority) when reviewing applications: • District Mission, Resource Management Plans, and Regional Water Supply Plans • Basin Strategic Plan • Environmental, resource, and/or community benefits • Effect of project on impaired water bodies (TMDL’s) • Cost effectiveness • Project readiness • Innovation • Continuation phase of a previously funded project Projects ready for immediate construction will receive higher consider ation than projects that are not construction ready. Projects requiring more than two years to complete are eligible to be funded; however, such projects should be broken into shorter phases that can be funded within the funding period if appropriate. 16.A.12.c Packet Pg. 469 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 9 — Funding Commitment If a third party is providing funding, in-kind services, commodities, or permissions for the Project, a letter indicating such commitment, on the third-party provider’s letterhead, shall be required. The letter must be signed by the person authorized to bind the third party and indicate the person’s title and authority. The Applicant shall be required to obtain all relevant documentation from the third party to support reimbursement. 3. PROJECT TYPES – SPECIFIC GUIDELINES Stormwater Management/Water Quality Projects The focus of the LGP SM/WQ component is to cost-share construction ready projects that address water quality and quantity, distribution, and timing of flows. The Basin seeks applicants who will implement projects that treat stormwater run -off prior to entering surface waters, as well as in-lake or in-stream water quality improvements through implementation of best management practices (BMPs). The Basin seeks to leverage funds and incentivize local governments to address water quality within watersheds and associated natural systems of the region. Priorities for SM/WQ projects include: • Areas discharging to an impaired water body • Areas with Total Maximum Daily Load (TMDL) allocations • Areas identified in a Basin Management Action Plan (BMAP) • Areas identified within a Surface Water Improvement and Management Plan • Projects identified in a local government stormwater master plan • Projects that have major watershed benefits such as regional solutions SM/WQ projects should be designed to reduce the load of nutrients and quantity of water discharging to bays, rivers, lakes, streams, and canals and/or improve the distribution or timing of water discharging to rivers, lakes streams, and canals. Applicants may propose projects that provide additional benefits such as flood protection, infrastructure improvement, natural system restoration, and storage but should address water quality. Allowable Costs for SM/WQ Projects Include: • Construction – including control structures, drainage catch basins, exfiltration trenches, stormwater treatment areas, stormwater catch basin inserts or other stormwater conveyance system features Non-Allowable Costs for SM Projects Include: • Planning, design, studies, modeling, and as-built plans • Wetlands mitigation plans or credits • Projects that are out of compliance with permit conditions or are proposed to bring a facility back into compliance or proposed as settlement for enforcement activities • Projects utilized for compensatory treatment (Environmental Resource Permits) or required by an enforcement and/or compliance action 16.A.12.c Packet Pg. 470 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 10 — • Land acquisition • Maintenance of existing ponds or infrastructure • Recreational improvements that do not provide a net water quality benefit The Basin will review projects based on program considerations and guidelines (no implied priority) as presented in Table 1. Table 1. SM/WQ Considerations and Guidelines Considerations Guidelines Supports mission of the District Proposed project actively supports the District’s mission. Supports goals and objectives of respective plan Proposed project is not just consistent with goals and objectives of the respective plan but actively supports them. Resource benefits The degree to which the project improves water quality and quantity of stormwater entering waters, helps protect local bays and bodies of water and other environmentally sensitive areas. Cost effectiveness Project shows financial and economic effectiveness and efficiency to the degree possible. For example, pollutant removal estimates for TN, TP including methodology for cost per pound removed; number of acres treated. Project Readiness Application demonstrates readiness to be constructed on schedule. For example, design complete; permits in place. Innovation Applicant proposes an innovative solution. Multi-year Project Continuation phase of a previously funded project Quality and detail of project planning Application demonstrates a high level of detail and planning. 16.A.12.c Packet Pg. 471 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 11 — Alternative Water Supply Projects The focus of the LGP AWS component is to cost share on projects that provide alternative water supply. Meeting the growing need for water hinges on our efforts to develop water sources that offer an alternative to traditional fresh groundwater and surface water. Alternative water sources are important to Florida’s future and help communities diversify supply sources and reduce reliance on regional freshwater sources, which in turn make them less susceptible to the effects of drought. One of the objectives of the LGP is to support the Lower West Coast Water Supply Plan. The goal of the LWCWSP is to identify sufficient sources of water to meet existing and projected reasonable and beneficial uses while sustaining water resources and related natural systems. Objectives in the LWCWSP include increase available water supplies, maximize overall water use efficiency, and reduce reliance on traditional water sources through development of alternative water supplies including nontraditional sources . These sources include saltwater or brackish water, reclaimed or recycled water, surface water captured during heavy rainfalls, sources made available through addition of new storage capacity, storm water (for use by consumptive use permittee), and any other source designated as nontraditional in a WSP. Water supply plans contain guidance to meet the plans goals and objectives, which include: • Water users encouraged to develop alternative sources • Increase water use efficiency through effective water conservation • Explore Aquifer Storage and Recovery for storage to extend water availability during peak demand periods • Construct storage of reclaimed water to extend use of seasonal water supplies and interconnects • Utilize membrane treatment concentrate water beneficially including blending it with reclaimed water • Increase reuse through construction of additional reclaimed water lines for landscape irrigation • Construct new or retrofitted surface water storage systems for agricultural operations • Lower West Coast – Development of alternative sources to minimize saltwater intrusion potential Allowable Costs for AWS Projects Include: • Alternative water supply raw water transmission lines • Reclaimed water storage tanks • Reverse osmosis (RO) trains, pumps, and associated appurtenances • ASR wells, brackish water production wells, concentrate disposal wells associated with development of an AWS source 16.A.12.c Packet Pg. 472 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 12 — Non-Allowable Costs for AWS Projects Include: • Design, permits, as-built plans, videos, early completion bonus, bonds, insurance, etc. • Finished water storage tanks and finished water transmission lines • Operations and maintenance work (lift stations, meters, etc.) • End user service line connections • Backup generators • Replacement landscaping The Basin will review projects based on program considerations and guidelines (no implied priority) as presented in Table 2. Table 2. AWS Considerations and Guidelines Considerations Guidelines Supports mission of the District Proposed project actively supports the District’s mission Supports goals and objectives of respective regional water supply plans Proposed project is not just consistent with goals and objectives of the regional water supply plan but actively supports them. Environmental benefits The degree to which the project enhances natural systems including MFLs, helps protect environmentally sensitive areas, facilitates aquifer protection or reduces saltwater intrusion. Supports 2008 Ocean Outfall legislation Does the project implement reuse that assists in the elimination of domestic wastewater ocean outfalls, as provided in Section 403.086(9), F.S Project Readiness Application demonstrates readiness to be implemented on schedule. For example, design complete; permits in place. Multi-year Project Continuation phase of a previously funded project Efficient reuse Proposed project increases efficient use of reclaimed water as a source; from a regional perspective, contributes to the use of reclaimed water where it is currently under utilized Contributes to AWS development in resource limited areas Contributes to AWS development in resource limited areas such as restricted allocation areas Reduces dependence on Traditional Resources Proposed project replaces or reduces dependence on a traditional water source and/or reduces competition with other water users for the same source. Consistent with consumptive use permit limiting conditions addressing specific water resource issues, if permitted Proposed project fulfills water resource goals contained in limiting conditions of an applicant’s existing water use permit, if permitted. Provides a dependable, sustainable supply of water Alternative supply is consistently available year-round, may be met in conjunction with other sources. 16.A.12.c Packet Pg. 473 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 13 — Water Conservation Projects The focus of the LGP water conservation project is to cost share on water conservation efforts of public and private water providers or users. As discussed in the AWS section above one of the objectives of the LGP is to support the Lower West Coast Water Supply Plans. Projects that use hardware and/or technology to implement water conservatio n are eligible for funding consideration. General requirements are: • Projects must provide at least 0.5 million gallons per year (MGY) in water savings. • Total project costs must be at least $15,000 in total expenditures for water supply utilities, municipalities, or government agencies. • Verification of hardware installation is required, and proof includes an invoice indicating hardware installation or a signed statement by the Recipie nt stating that all products were visually inspected in their final state of installation. • Applicants are responsible for the proper disposal of all inefficient hardware/ technology replaced as part of the Project. All water-using devices must meet the standards outlined in Table 3. Table 3. Plumbing and Appliance Fixture Retrofit or Replacement Standards for Water Conservation Projects Device Standard Toilets, Tank (Residential) EPA WaterSense approved with a MaP rating of ≥ 500 grams Toilets, Commercial Flushometer (Flushvalve) 1.6 gallons/flush bowl/valve combination with listed MaP rating of ≥500 grams1; 1.28 gallons per flush models not required at this time Toilets, Commercial Tank 1.6 gallons/flush with a MaP rating of ≥ 500 grams1 Showerheads EPA WaterSense approved: Flow rate of 2.0 gallons/minute or less (1.75 gallons/minute is suggested) Bathroom Faucets EPA WaterSense approved: Flow rate of 1.0 gallons/minute or less for residential fixtures; 0.5 gallons/minute for commercial fixtures. Urinals EPA WaterSense approved: Flush volume of 0.5 gallons/flush or less (0.125 gallons/flush is suggested) Kitchen Faucets EPA WaterSense approved: Flow rate of 1.5 gallons/minute or less (1.0 gallons/minute can also be used) Commercial Kitchen Pre-Rinse Spray Valves EPA WaterSense approved: Flow rate of 1.28 gallons/minute or less Clothes Washers & Dishwashers Must be ENERGY STAR rated2 1 – Please refer to www.map-testing.com/, click on “MaP Search” (at left). 2– ENERGY STAR (www.energystar.gov) maintains a list of efficiency-qualified clothes washers, which include the Water Factor Rating. 16.A.12.c Packet Pg. 474 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 14 — Specific Requirements for Plumbing Retrofit Projects: • Fixture exchange programs cannot function as a give -away project (i.e., an inefficient fixture must be collected for each high efficiency fixture distributed). Recipients’ names and addresses are required as part of the closeout package. • For toilets in a commercial setting, WaterSense has yet to create a specification for 1.28 gallons per flush Flushometer toilet for use in commercial applications. Therefore, it is recommended to replace older models (pre-1994, flushing at greater than 1.6 gallons per flush) with models flushing at 1.6 gallons per flush with a MaP rating of ≥500 grams. For more information, see www.allianceforwatereffiency.org and refer to High-Efficiency Flushometer Toilets in Non-Residential Applications or at www.epa.gov/WaterSense/products/flushometer-valve-toilets.html refer to the Notice of Intent (NOI) to Develop a Draft Specification for Fl ushometer-Valve Toilets. • China and flushvalve ‘gallon per flush’ ratings must match. • All toilet retrofit projects involving toilets with flappers must include an educational component that addresses leak detection and proper flapper replacement selection and installation. The educational aspects of this component should include the following information: o Flappers degrade and leak due to chlorine compounds used in water treatment. o A leaking flapper valve in a toilet can leak at a rate of five drops per second. o At five drops per second, the amount of water lost per day is 43.2 gallons, 1,296 gallons per month, and 15,552 gallons per year. Specific Requirements for Irrigation Efficiency Improvement Projects: • Irrigation controllers must be approved by WaterSense. A list of allowable models can be found on the product search page of the WaterSense website, www.epa.gov/watersense. • Applicants engaging in irrigation efficiency improvements must meet the minimum (prerequisite) standards of “Florida Water Star” in areas where the irrigation system is affected by the Project. Parts of the irrigation system not affected by the Project are not required to meet Florida Water Star standards, as stated on the Florida Water Star website at www.sjrwmd.com/floridawaterstar. • To receive reimbursement, projects involving irrigation technology devices (i.e., soil moisture sensors, rain sensors, etc.) must show proof that these items are installed and/or inspected by a professional who is a member of a recognized irrigation professional trade organization such as, but not limited to, the Irrigation Association, the Florida Irrigation Society, or the Florida Nursery, Growers and Landscape Association. A professional who has received certification in irrigation efficiency from these agencies or another agency (such as the EPA’s WaterSense program) is also admissible. An invoice showing charges for project hardware installation or a signed statement indicating an inspection of devices installed by a professional is required with the closeout package. 16.A.12.c Packet Pg. 475 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 15 — • For projects involving soil moisture sensors, the use of the Field Guide to Soil Moisture Sensor Use in Florida (IFAS, 2008) for the installation, calibration and maintenance of soil moisture sensors; targeting of customers with high, inefficient irrigation water use; and development of an education program for pa rticipants to ensure long-term, effective soil moisture sensor operation are required. Allowable Costs for Water Conservation Projects Include: • High efficiency toilet retrofits and/or rebates • Automatic line flushing devices and/or hydrant flushing devices • Pre-rinse spray valves • Irrigation retrofits, including soil moisture sensors, rain sensors, irrigation head upgrades, etc. • Other hardware and/or technology-based project that increases water efficiency Non-Allowable Costs for Water Conservation Projects Include: • Water conservation projects for individual residences • Waterless urinals, toilet retrofit kits to replace internal tank components, toilet retrofits for toilets currently flushing at 1.6 gallons/flush or less, dual flush valves for commercial buildings • Installation of new irrigation systems, irrigation wells, pumps, or the extension of an existing irrigation system to an area not previously irrigated • Indoor fixtures for new construction • Indoor/Outdoor water use evaluations • Landscape materials • Automatic meter reading, fixed network, mobile meter reading, etc. type projects • Projects that are out of compliance with permit conditions or are proposed to bring a facility back into compliance or proposed as settlement for enforcement activities • Ineligible in-kind services include non-paid volunteer hours; educational programs and materials, such as coloring books, stickers, etc.; waived fees; or an individual’s entire annual salary. Exception is the required educational component for flapper toilets. For questions on whether an in-kind service would be accepted, contact Stacey Adams ([561] 682-2577, sadams@sfwmd.gov) or Jim Harmon ([561] 682- 2777 or jharmon@sfwmd.gov). Funding support for the purchase and installation costs for common conservation fixtures/devices are shown below in Table 4. 16.A.12.c Packet Pg. 476 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 16 — Table 4. Allowable Funding Limits for Common Conservation Fixtures/Devices Conservation Fixture/Device Allowable Funding Limit Automatic line flushing devices Up to $3,000 each High-efficiency toilets Up to $145 each High-efficiency showerheads Up to $20 each High-efficiency aerators Up to $1 each High-efficiency urinals Up to $140 each Soil moisture sensors Up to $145 each Rain sensors Up to $120 each Pre-rinse spray valves Up to $55 each Clothes washers Up to $100 each Dishwashers Up to $100 each Projects will be reviewed based on program considerations and guidelines (no implied priority) as presented in Table 5. Table 5. Water Conservation Considerations and Guidelines Considerations Guidelines Supports mission of the District Proposed project actively supports the District’s mission Environmental and/or community benefits Provides environmental water quality improvements or other resource benefits, such as habitat improvement, and/or benefits a low-income or affordable housing community in addition to meeting other considerations. Cost effectiveness, expressed as dollars per 1,000 gallons saved ($/kgals) Demonstrates cost effectiveness in installation, design, and use. Project Readiness Application demonstrates readiness to be implemented on schedule. For example, design complete; permits in place. Innovation Showcases innovation using new technology or the method in which the Project or technology is being implemented. Past Performance The Applicant has no record of failing to complete work under a project within the funding period of the respective fiscal year. Quality and detail of project planning Application demonstrates a high level of detail and planning. Quantity of water saved Estimated number of gallons saved per year compared to other Applicants Water source being conserved Savings of potable water are more valuable than savings of non-potable water, etc.* The order of source-water value is as follows, with 1 being the most valued: 1. Potable water from a utility at risk for saltwater intrusion based on elevated chloride levels in monitoring wells or within a Restricted Allocation Area (Section 3.2.1 of the Applicant’s Handbook for Water Use Applications). 16.A.12.c Packet Pg. 477 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 17 — 2. Potable water from a utility not at risk for saltwater intrusion or not in a Restricted Allocation Area. 3. Surficial well water in the service area of a utility at risk for saltwater intrusion based on elevated chloride levels in monitoring wells. 4. Surficial well water in the service area of a utility not at risk for saltwater intrusion. 5. Water from a canal or stormwater catchment area (such as a man-made lake within a housing development). 6. Reclaimed water. 16.A.12.c Packet Pg. 478 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) LPG Guidelines — 18 — DEFINITIONS “Applicant” – All governmental entities, including water providers and large users; local governments; water, wastewater and reuse utilities; municipal, industrial, commercial, institutional, and agricultural water users; and homeowners’ or condominium associations submitting an Application to seek an award from the Basin pursuant to this Funding Program. “Application” – A written document from an applicant seeking an award from the Basin pursuant to this reimbursement program. “Approved Funding” – The allocation of monies to an Applicant based on estimated costs as presented in the Application. “Basin” – The Big Cypress Basin, a part of the South Florida Water Management District. “Capital” – Part of a public water provider or user’s capital improvement program. “District” – The South Florida Water Management District. “Funding or Actual Funding” – An allotment of monies disbursed toward the payment based on actual costs incurred and the percentage of scope of work fulfillment for the construction/implementation of an alternative water supply, conservation or stormwater management project. “Ineligible” – A determination by the Basin Board that the Application does not comply with the material requirements of this reimbursement program. “Non-Capital” – Not part of a public water provider or user’s capital improvement program. “Participant” – The Recipient and end user of the conservation hardware. May or may not be the same as the Applicant. “Project” – The written description included in the Application that determines the eligibility for funding. “Project Cost” – The total cost of the project located within the Big Cypress Basin. “Recipient” – The Applicant that has been awarded funding in support of a project. 16.A.12.c Packet Pg. 479 Attachment: BCB_LPG_Application Guidelines_Final (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 1 of 7  Applications are limited to 25 pages including figures, Resolution, and the Acknowledgment letter. Application submittals must submitted by August 16, 2019 at 5:00 PM. Prior to completing this Application, it is recommended you read the LPG Guidelines. This application is for projects which will be constructed between December 1, 2019 and June 20, 2021. PROJECT SUMMARY Project Name: Freedom Park Stormwater Ditch Improvements Project Location: Freedom Park Naples FL County:Collier County Project Type (check all that apply): Water Quality / Quantity Improvement ☐ Infrastructure Improvement ☒ Natural System Restoration ☐ Storage ☐ Flood Protection ☒ Receiving Waters for Project: Gordon River and Naples Bay Applicant: Capital Project Planning, Impact Fees and Program Management Authorized Representative: Amy Patterson Project Manager (PM), if different: Mindy Collier Address: 2685 S. Horseshoe Drive, Suite 103 PM Address: 2685 S. Horseshoe Drive, Suite 103 City/Zip: Naples, 34104 PM City/Zip:Naples, 34104 Telephone: 239-252-5721 PM Telephone:239-252-6139 Email: Amy.Patterson@colliercountyfl.gov PM Email:Mindy.Collier@colliercountyfl.gov Project Cost (12/1/19-6/30/21): $1,850,000 Total Project Cost, if multi-year: Enter text. N/A ☒ Eligible (Construction) Cost: $1,850,000 Local Match: $975,000 Requested Funding Amount: $975,000 Requested Funding Percentage: 50 Project Latitude / Longitude: 26°10’32”N 81°47’21”W Is this a multi-year: Yes ☐ No ☒ If yes, Number of Project Phases: Enter text. If yes, Project Phases Completed to Date: N/A If yes, Expected Total Project Completion Date: Total project completion will be dependent upon funding availability and successful completion of design, permitting and construction If yes, has this project received previous SFWMD funding? Yes ☐ No ☒ If yes, please provide the following information: Agreement No. Year Awarded Amount Awarded Amount Invoiced Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Are there other District programs or other agencies contributing funding to this project? Yes ☐ No ☒ If yes, source(s): Enter text. If yes, amount(s): Enter text. Does any SFWMD employee, Basin Board or Governing Board member, contractor, or other affiliate of the Applicant have a financial interest in this project, the property 16.A.12.d Packet Pg. 480 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 2 of 7  associated with this project or with any party that may profit financially from this project? Yes ☐ No ☒ If yes, list the parties and interests: Enter text. Is the project part of a capital improvement plan? Yes ☒ No ☐ This is a reimbursement program with the entire project scope expected to be completed within the funding period, regardless of amount awarded. There is no guarantee the Applicant will be awarded the amount requested. Are budgeted funds available to pay for the entire scope of the project? Yes ☒ No ☐ Does the applicant understand that if for any reason, the project scope is not fulfilled to 100% completion as outlined in the statement of work, the funding amount will be reduced to match the original percentage of funding in the purchase order that was based on the estimated total initial project cost estimate as provided in the application? Yes ☒ No ☐ Does the applicant understand that if the project scope is completed as outlined in the statement of work and total actual total project costs are below the estimated total project cost, the applicant may not be eligible to receive up to the full award amount? Yes ☒ No ☐ Does the applicant understand that funds are only for expenses incurred or obligated during the funding period (December 1, 2019 – June 30, 2021)? Yes ☒ No ☐ PROJECT DETAILS 1. Provide a high-level description (several sentences) of the project. Freedom Park is a 50-acre natural water quality treatment facility on the west side of the Gordon River that provides flooding relief and tertiary treatment of stormwater runoff from surrounding neighborhoods. During heavy rain events stormwater accumulates in residential areas due to inadequate stormwater conveyance structures to move the stormwater toward the treatment facility and eventually the Gordon River. The Freedom Park Stormwater Ditch which runs along the northern border of the treatment facility needs improvement in order to move stormwater more efficiently into the natural wetlands on the east end of the property before entering the Gordon River. 2. Please attach the following: a. At least one letter-sized figure that depicts the project location in relation to the nearest major road intersection b. At least one letter-sized figure that depicts project details and illustrates information provided in the Statement of Work c. A GIS shapefile or AutoCAD dwg file per Florida State East Zone, NAD83 HARN, US Survey feet of the project location or latitude/longitude: 26°10’32”N 81°47’21”W 3. Provide a description for the project, which may be used to create contract documents if selected, that includes: a. Relevant Background Information 16.A.12.d Packet Pg. 481 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 3 of 7  To help reduce loading to Naples Bay, the Freedom Park was constructed in 2009 as a water quality park consisting of ponds, wetlands, polishing marshes, habitat restoration, and man-made passive recreational park features. The project was funded by grants from SFWMD/BCB and Florida Communities Trust. b. Purpose or Objective(s) The objective is to increase water management efficiency of into the Freedom Park Ditch and create a spreader swale system allowing better distribution of stormwater flow into the natural wetland system on the east end of the park prior to entering the Gordon River. c.Statement of Work Improvements include widening the ditch, installing a new larger weir and constructing a spreader swale from the ditch into the natural wetlands.. 4. Explain how the project aligns with the District’s mission. The Freedom Park Ditch project aligns with the Big Cypress Basin Strategic Plan in the areas of flood control and natural systems/water quality. 5. Explain how the project aligns with other applicable plans such as a watershed protection plan, basin management plan, total maximum daily load allocation, or stormwater improvement master plan. The project aligns with Collier County’s Watershed Management Plan (WMP) which aims to protect water resources by reducing excessive fresh water discharges into Naples Bay. 6. Describe measurable community or environmental benefits of this project with respect to relevant considerations (improvement of water quality and/or quantity and benefits to natural systems; degree of flood protection and/or resource protection). Please include specific details such as estimated mass of nutrient/contaminant reductions (parts per billion, pounds per day/year) or removal efficiencies, area of natural systems to be restored or enhanced (acres), level of service attributes, conveyance capacity (CFS), and/or volume of storage (acre-feet). Please include all calculations. The degree of flood protection provided by the Freedom Park Ditch improvements will bring capacity up to approximately the 25-year/3-day design storm level. As part of a comprehensive Gordon River Master Plan, the combination of stormwater improvements are estimated to bring a flood stage reduction of 2.18 feet at the Freedom Park Ditch location. 7. If applicable, provide the name and reference (i.e., page number) of the related project in the relevant plan associated with the proposed work: Enter text. PROJECT READINESS 1. Does this project have approval from your Commission or Council? Yes ☒ No ☐ When did approval for this project occur or when is approval expected to occur? July 9, 2019 16.A.12.d Packet Pg. 482 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 4 of 7  When was a resolution approved by your Commission or Council approve a resolution committing funding to this project and application? (Please attach your resolution).: July 9, 2019 2.Is design of this project complete? Yes ☐ No ☒ If no, is design of this project currently underway? Yes ☒ No ☐ If yes, what percentage of design is complete? 20% If yes, when will design of this project be complete? Enter text. If no, explain: 12/1/2019 3.Are the necessary land acquisitions for this project complete? Yes ☒ No ☐ If no, when will land acquisition be complete? Enter text. Additional space for further explanation: Enter text. 4.Have the necessary access agreements, right-of-way permits, and/or easements for this project been finalized? Yes ☐ No ☒ If no, when will these items be finalized? 9/1/2019 Additional space for further explanation: Enter text. 5.List requisite federal, state, and/or local permits in the following table and provide applicable information. Agency Permit No. Permit Type (Water/WW, ERP, CUP, Building) Permit Obtained? Permit Date (expected date if not obtained yet) Yes No SFWMD Enter text.No 1/2020 Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. Enter text. 6.Has a contractor been selected for this project? Yes ☐ No ☒ If no, when will a contractor be selected? Additional space for further explanation: The construction bidding process will be initiated upon determination of availability of funding 16.A.12.d Packet Pg. 483 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 5 of 7  7. Describe the project timeline and identify significant project milestones and associated dates. Enter text. A Gantt chart may be attached for additional illustration. When will construction for this project begin? 1/7/2020 What is the duration of construction activities in months? 7 Months When will this project be complete? 6/1/2021 SUBMITTAL CHECKLIST ☒ The Acknowledgment Form, on Applicant letterhead, has been completed and notarized and attached as a pdf ☒ Project maps have been included in the application or attached separately ☒ Measurable community or environmental benefits have been sufficiently discussed and quantified (as applicable) ☒ Cost calculations, as requested in 2e, have been included in the application ☒ A resolution from your governing commission/council has been executed and is attached Applicant Letterhead ACKNOWLEDGMENT Before me, the undersigned authority, personally appeared ____________________________, (Authorized Representative of the project owner) this _______ day of ___________, 2019 who, first being duly sworn, as required by law, hereby acknowledges: 1. The statements contained in this project information package are true, correct and complete to the best of his/her knowledge and that the undersigned has the authority from the project owner to make the representations contained herein. 2. The undersigned represents the described deliverables for this phase of the project will be completed and invoiced no later than June 30, 2021. 3. The undersigned represents that the project owner intends to begin construction of the project by this _______ day of ___________, in the year _______. 4. The undersigned represents that the project owner understands the project contract expiration is July 31, 2021, and further understands that if the project is not completed by that date, the South Florida Water Management District reserves the right to rescind or reduce cost-share funding which are not completed by this date. _________________________________ __________________________________ 16.A.12.d Packet Pg. 484 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 6 of 7  Authorized Representative Print Name STATE OF FLORIDA COUNTY OF __________________ SWORN TO and subscribed before me _______ day of ___________, 2016. Such person(s) (Notary Public must check applicable box): [ ] is/are personally known to me. [ ] produced a current driver license(s). [ ] produced as identification: _________________________. (NOTARY PUBLIC SEAL) _________________________ Notary Public 16.A.12.d Packet Pg. 485 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) FY20 BIG CYPRESS BASIN LOCAL PARTNERSHIP GRANTS PROGRAM  STORMWATER MANAGEMENT/WATER QUALITY APPLICATION  Page 7 of 7  SAMPLE RESOLUTION A RESOLUTION APPROVING THE SUBMISSION AND RANKING OF Enter Number CAPITAL IMPROVEMENT PROJECTS TO THE BIG CYPRESS BASIN/SOUTH FLORIDA WATER MANAGEMENT DISTRICT LOCAL PARTNERSHIP GRANT PROGRAM FOR THE FY2020; AND AUTHORIZE THE CHAIRMAN TO EXECUTE THE APPLICATION IN THE AMOUNT OF $XXXX; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Enter Entity Name applies for annual grant funding from the Big Cypress Basin/South Florida Water Management District (BCB/SFWMD) to reimburse a portion of the eligible construction ꞏcost for stormwater management (SWM) projects; and WHEREAS, as part of the grant eligibility requirements, BCB/SFWMD requires projects to be "shovel ready" in the year they are funded and for enter entity name to rank the projects; and WHEREAS, if funding is granted to the below ranked projects, the enter entity name is committed to funding the construction project(s) in the upcoming fiscal(s) year budget. WHEREAS, the projects have been ranked in the following order: Enter Project Names and rankings; NOW, THEREFORE, BE IT RESOLVED BY THE ENTER ENTITY NAME, FLORIDA: Section 1. That the following number SWM projects that are eligible and recommended for Big Cypress Basin/South Florida Water Management District grant funding in FY2020 are ranked as follows: 1. Project Name 2. Project Name Section 2. This resolution shall take effect immediately upon adoption. PASSED IN OPEN AND REGULAR SESSION OF THE ENTER ENTITY NAME, FLORIDA, THIS DAY OF , 20 . Attest: Name of Clerk Name of Agency Approved as to form and legality: Attorney ________________________ Chairman, XXXXXXXXXXXXX Date filed with the Entity Clerk:________   16.A.12.d Packet Pg. 486 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) Conceptual Opinion of Probable Cost - Freedom Park Bypass Ditch & Spreader Swale 6/13/2019 Item Description Quantity Unit Unit Price Total Cost 1 Mobilization 1 LS $ 30,000 $ 30,000 2 Construction Survey Layout 1 LS $ 25,000 $ 25,000 3 Excavation 12,503 CY $ 25 $ 312,575 4 Haul 12,503 CY $ 15 $ 187,545 5 2" Crushed Shell 3,500 SY $ 24 $ 84,000 6 4" Limerock Base 3,500 SY $ 10 $ 35,000 7 Geoweb Stabilization (6") 1,800 SF $ 6 $ 10,800 8 57 Stone Gravel (6") 1,800 SF $ 3 $ 5,400 9 Triple 5x9 box culverts 2 LS $ 300000 $ 600,000 10 Fabric-Form Concrete Revetment 200 SY $ 50 $ 10,000 11 Silt Fence 4,160 LF $ 5 $ 20,800 12 Clearing and Grubbing 1 LS $ 30,000 $ 30,000 13 Landscape Restoration 10,900 SY $ 10 $ 109,000 Subtotal $ 1,460,120 Unforseen Conditions (20%) (allowance, water, sewer, electric, cable, conduits, rock excavation) $ 172,024 Design Cost $ 103,214 C.E.I. $ 113,536 Total $ 1,848,894 16.A.12.d Packet Pg. 487 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Overflow during largerainfall eventsOverflow during largerainfall eventsNatural WetlandsExistingDitch LineASRPumpHouseDeepWellSplitterBoxSplitterBoxASRPumpHouseDeepWellSplitterBoxASR RehydrationLineASR RehydrationLineSplitterBoxFlow DirectionLEGENDFlow DirectionLEGENDGoodlette-Frank RoadDitch Pump HouseGoodlette-Frank RoadDitch pumped @ 1 cfs14 ac. RoadwayDrainage in 48” RCPCombined Drainagein 60”± RCPGolden Gate ParkwayGolden Gate ParkwayGordon RiverGordon RiverGoodlette-Frank RoadGoodlette-Frank Road 22nd Ave. North22nd Ave. NorthNScale in Feet0100200WB012006001TPAFreedom Park Wetland Treatment Facility FlowpathDeep Lake “A”Wetland “B”Wetland “D”Wetland “C”Deep Lake “A”Wetland “B”Wetland “D”Wetland “C”16.A.12.dPacket Pg. 488Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) 16.A.12.d Packet Pg. 489 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) 16.A.12.d Packet Pg. 490 Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater Applications) 05101520253035404550AMIL Gate Weir Replacement Goodlette-Frank SupplementalOutfall & AMIL Gate WeirReplacementFreedom Park StormwaterPump Station & AMIL GateWeir ReplacementFreedom Park Bypass Ditch &Spreader Swale & AMIL GateWeir ReplacementSolana/Burning Tree BoxCulvert Extension & AMIL GateWeir ReplacementMaintenance Access Road/Seawall & AMIL Gate WeirReplacementForest Lakes Rock WeirReplacement & AMIL Gate WeirReplacement20161847151123Gallons ReducedCost Benefit Analysis - Estimated Volume of Flooding Reduced per Dollar Spent16.A.12.dPacket Pg. 491Attachment: REV2Freedom Park Ditch BCB Appl (9197 : SFWMD BCB Local Partnership Stormwater