Loading...
Agenda 07/09/2019 Item #16A 1 (Meadowood Final Plat)07/09/2019 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Meadowood, (Application Number PL20180003143) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. (This is a companion item to Agenda Item 17.A). Both items must be approved or denied on today’s agenda. _____________________________________________________________________________________ OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Meadowood, a subdivision of lands located in Section 27, Township 48 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Meadowood. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Rushton Pointe PUD, Ordinance No. 18-17. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of Meadowood be approved for recording. FISCAL IMPACT: The project cost is $4,571,742.16 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $ 1,143,662.11 b) Drainage, Paving, Grading $ 3,428,080.05 The Security amount, equal to 110% of the project cost is $5,028,916.38 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $138,347.27 16.A.1 Packet Pg. 291 07/09/2019 The Fees are based on a construction estimate of $4,571,742.16 and were paid in January 2019. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,195.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $ 8,577.47 c) Drainage, Paving, Grading (.75% const. est.) $ 25,710.60 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $ 25,732.40 e) Drainage, Paving, Grading (2.25% const. est.) $ 77,131.80 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee’s recommendation and shall take evidence and testimony in regard to the final subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places condition s on the final subdivision plat, it shall state reasons for such denial or conditions. In accordance with the LDC, the applicant is required to submit the final subdivision plat to the County Manager or designee for recording within 18 months of the date of approval of the final subdivision plat by the Board. However, following approval by the Board, but prior to recordation, the County Manager or designee may approve minor insubstantial changes to the subdivision plat, and the Board may approve any changes that are not minor and insubstantial. This item has been approved as to form and legality, and requires a majority vote for Board approval -- SAA RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Meadowood (Application Number PL20180003143) for recording with the following stipulations: 1. Approve the amount of $5,028,916.38 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney’s office and the Board of County Commissioners or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Technician, Development Review Division 16.A.1 Packet Pg. 292 07/09/2019 ATTACHMENT(S) 1. Location Map (PDF) 2. Opinion of Probable Cost (PDF) 3. Plat Map (PDF) 16.A.1 Packet Pg. 293 07/09/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.1 Doc ID: 9250 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Meadowood, (Application Number PL20180003143) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. (This is a companion item to Agenda Item 17.A). Both items must be approved or denied on today’s agenda. Meeting Date: 07/09/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 06/06/2019 8:34 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 06/06/2019 8:34 AM Approved By: Review: Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 06/06/2019 10:09 AM Growth Management Operations & Regulatory Management Rose Burke Additional Reviewer Completed 06/06/2019 4:33 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 06/06/2019 4:57 PM Growth Management Development Review Chris Scott Additional Reviewer Completed 06/07/2019 12:36 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 06/07/2019 4:31 PM Growth Management Department Matthew McLean Additional Reviewer Completed 06/10/2019 3:40 PM Growth Management Department James C French Deputy Department Head Review Completed 06/12/2019 5:50 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 06/13/2019 12:17 PM County Attorney's Office Sally Ashkar Level 2 Attorney Review Completed 06/18/2019 3:23 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/18/2019 4:49 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/19/2019 8:27 AM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 06/20/2019 8:34 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/25/2019 1:38 PM Board of County Commissioners MaryJo Brock Meeting Pending 07/09/2019 9:00 AM 16.A.1 Packet Pg. 294 MEADOWOOD LOCATION MAP 16.A.1.a Packet Pg. 295 Attachment: Location Map (9250 : Final Plat - Meadowood) Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 Calculation Summary SUB-TOTAL Earthwork 1,667,990.50$ Paving 654,625.95$ Drainage 414,438.60$ Sanitary Collection System 805,650.20$ Potable Water 338,011.91$ Miscellaneous 691,025.00$ Total Probable Construction Cost 4,571,742.16$ Estimated 110% Bond Amount 5,028,916.38$ NOTES: 1) 2) 3) 4) 5) 6) This cost estimate does not include the cost of any building construction. MEADOWOOD PERMIT AND INSPECTION FEES OPC The Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost and may require adjustments to delete, decrease, or increase portions of this Opinion of Probable Cost. This Opinion of Probable Cost shall be used for applicable Review Fee Calculation Purposes only. All costs provided in this OPC are based on recent contract prices, or the Engineers’ latest known unit costs. These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, etc. or the availability of materials and labor. FL Registration #60746 Daniel F Waters, P.E. Peninsula Engineering FL CA No. 28275 This cost estimate assumes dry utilities (power, cable and telephone) will be installed at no- cost to the developer. Review Fees for lake excavation provided in separate Review Fee, with the lake exvacation permit. P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 1 of 7 16.A.1.b Packet Pg. 296 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood)Daniel F. Waters, P.E. 60746 State of Florida Digitally signed by Daniel F. Waters, P.E. 60746 State of Florida DN: cn=Daniel F. Waters, P.E. 60746 State of Florida, o=Printed copies of the document are not considered signed and sealed and all SHA-1 authentication code must be verified on any electronic copies., ou=The item has been electronically signed and sealed using a SHA-1 authentication code., email=dwaters@barroncollier.com, c=US Date: 2019.06.06 08:26:56 -04'00' Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 EARTHWORK ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 SILT FENCE (SINGLE ROW)5,839 LF 1.50$ 8,758.50$ EW-2 SILT FENCE (DOUBLE ROW)516 LF 2.00$ 1,032.00$ EW-3 LAKE EXCAVATION (NOT INCLUDED FOR FEE CALC.)82,000 CY -$ EW-4 EMBANKMENT - (ONSITE)82,000 CY 2.50$ 205,000.00$ EW-5 EMBANKMENT - (IMPORT FILL)118,000 CY 11.00$ 1,298,000.00$ EW-6 CLEARING 30.1 AC 3,500.00$ 105,350.00$ EW-7 PRESERVE EXOTIC REMOVAL 3.0 AC 1,500.00$ 4,500.00$ EW-8 BAHIA SOD*13,950 SY 3.00$ 41,850.00$ EW-9 TURBIDITY BARRIER 100 LF 35.00$ 3,500.00$ EW-10 -$ EW-11 -$ EW-12 -$ EW-13 -$ EW-14 -$ EW-15 -$ EW-16 -$ SUB-TOTAL EARTHWORK =1,667,990.50$ Assumptions: MEADOWOOD PERMIT AND INSPECTION FEES OPC *SOD QUANTITIES ASSUME THE AREA TO BE SODDED CONSISTS OF THE 20 FOOT LAKE MAINTAINANCE EASEMENT AND TWO FEET OFF BACK OF CURB P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 2 of 7 16.A.1.b Packet Pg. 297 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood) Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 PAVING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT)13,323 SY 4.95$ 65,948.85$ PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIFT)13,323 SY 4.95$ 65,948.85$ PAV-3 6" LIMEROCK 16,533.0 SY 6.50$ 107,464.50$ PAV-4 12" SUBGRADE 16,957.0 SY 1.55$ 26,283.35$ PAV-5 CONCRETE SIDEWALK 48,330 SF 3.75$ 181,237.50$ PAV-6 ADA CURB RAMPS 200 LF 450.00$ 90,000.00$ PAV-7 WHEELSTOPS 52 EA 35.00$ 1,820.00$ PAV-8 TYPE "D" CURB 577 LF 9.00$ 5,193.00$ PAV-9 TYPE "F" CURB 3,870 LF 12.50$ 48,375.00$ PAV-10 2' VALLEY GUTTER 6,302 LF 7.95$ 50,100.90$ PAV-11 BLUE-BLUE REFLECTORS 13 EA 15.00$ 195.00$ PAV-12 SIGNING AND STRIPING 1 LS 6,500.00$ 6,500.00$ PAV-13 3' VALLEY CROSSING 218 LF 25.50$ 5,559.00$ PAV-14 -$ PAV-15 -$ PAV-16 -$ PAV-17 -$ PAV-18 -$ PAV-19 -$ SUB-TOTAL PAVING =654,625.95$ Assumptions: MEADOWOOD PERMIT AND INSPECTION FEES OPC * PAVING QUANTITIES CONSIST OF ONSITE IMPROVEMENTS ONLY. REVIEW COSTS FOR OFFSITE PAVEMENT IMPROVEMENTS ARE INCLUDED IN THE RIGHT OF WAY PERMIT APPLICATION FEES. P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 3 of 7 16.A.1.b Packet Pg. 298 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood) Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 6" HDPE 58 LF 15.00$ 870.00$ DRA-2 10" HDPE 2,946 LF 18.00$ 53,028.00$ DRA-3 12" HDPE 1,775 LF 21.00$ 37,275.00$ DRA-4 15" RCP STORM SEWER 687 LF 25.80$ 17,724.60$ DRA-5 18" RCP STORM SEWER 285 LF 40.00$ 11,400.00$ DRA-6 24" RCP STORM SEWER 788 LF 45.00$ 35,460.00$ DRA-7 36" RCP STORM SEWER 382 LF 70.00$ 26,740.00$ DRA-8 42" RCP STORM SEWER 557 LF 80.00$ 44,560.00$ DRA-9 JUNCTION BOX (ROUND)4 EA 3,000.00$ 12,000.00$ DRA-10 THROAT INLET 9 EA 2,500.00$ 22,500.00$ DRA-11 VALLEY GUTTER INLET (DOUBLE)11 EA 3,546.00$ 39,006.00$ DRA-12 GRATE INLET 12 EA 2,750.00$ 33,000.00$ DRA-13 TYPE "X" INLET 11 EA 1,125.00$ 12,375.00$ DRA-14 YARD DRAIN 50 EA 500.00$ 25,000.00$ DRA-15 CONTROL STRUCTURE FOR 15" RCP 1 EA 3,000.00$ 3,000.00$ DRA-16 CONTROL STRUCTURE FOR 30" RCP 1 EA 4,000.00$ 4,000.00$ DRA-17 FLARED END FOR 24" RCP 7 EA 2,500.00$ 17,500.00$ DRA-18 FLARED END FOR 36" RCP 3 EA 2,900.00$ 8,700.00$ DRA-19 FLARED END FOR 42" RCP 2 EA 3,500.00$ 7,000.00$ DRA-20 REMOVE EXISTING 30" RCP 1 LS 3,000.00$ 3,000.00$ DRA-21 12" HDPE MITERED END CUT WITH RIP RAP AROUND PIPE ENDS 4 EA 75.00$ 300.00$ DRA-22 -$ DRA-23 -$ SUB-TOTAL DRAINAGE =414,438.60$ MEADOWOOD PERMIT AND INSPECTION FEES OPC P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 4 of 7 16.A.1.b Packet Pg. 299 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood) Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 SANITARY COLLECTION SYSTEM ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE SS-1 8" PVC GRAVITY SEWER MAIN (0'-6' CUT)361 LF 28.70$ 10,360.70$ SS-2 8" PVC GRAVITY SEWER MAIN (6'-8' CUT)587 LF 35.00$ 20,545.00$ SS-3 8" PVC GRAVITY SEWER MAIN (8'-10' CUT)1,305 LF 40.00$ 52,200.00$ SS-4 8" PVC GRAVITY SEWER MAIN (10'-12' CUT)690 LF 45.00$ 31,050.00$ SS-5 8" PVC GRAVITY SEWER MAIN (12'-14' CUT)663 LF 52.50$ 34,807.50$ SS-6 8" PVC GRAVITY SEWER MAIN (14'-16' CUT)667 LF 89.00$ 59,363.00$ SS-7 8" PVC GRAVITY SEWER MAIN (16'-18' CUT)231 LF 110.00$ 25,410.00$ SS-8 SINGLE SANITARY SEWER SERVICE 1 EA 700.00$ 700.00$ SS-9 DOUBLE SANITARY SEWER SERVICE 114 EA 900.00$ 102,600.00$ SS-10 4' SANITARY SEWER MANHOLE (0'-6' CUT)3 EA 4,000.00$ 12,000.00$ SS-11 4' SANITARY SEWER MANHOLE (6'-8' CUT)1 EA 4,668.00$ 4,668.00$ SS-12 4' SANITARY SEWER MANHOLE (8'-10' CUT)4 EA 5,500.00$ 22,000.00$ SS-13 4' SANITARY SEWER MANHOLE (10'-12' CUT)2 EA 7,050.00$ 14,100.00$ SS-14 4' SANITARY SEWER MANHOLE (12'-14' CUT)2 EA 8,814.00$ 17,628.00$ SS-15 4' SANITARY SEWER MANHOLE (14'-16' CUT)3 EA 10,680.00$ 32,040.00$ SS-16 4' SANITARY SEWER MANHOLE (16'-18' CUT)3 EA 12,551.00$ 37,653.00$ SS-17 TELEVISION INSPECTION 4,504 LF 5.00$ 22,520.00$ SS-18 TESTING 1 LS 3,500.00$ 3,500.00$ SS-19 SANITARY PUMP STATION 1 LS 275,000.00$ 275,000.00$ SS-20 4" PVC FORCE MAIN (DR 18)643 LF 15.00$ 9,645.00$ SS-21 DIRECTIONAL DRILL (FORCE MAIN)208 LF 45.00$ 9,360.00$ SS-22 4" PLUG VALVE 1 EA 3,500.00$ 3,500.00$ SS-23 AIR RELEASE VALVE 1 EA 2,500.00$ 2,500.00$ SS-24 HOT TAP EXISTING FORCE MAIN 1 LS 2,500.00$ 2,500.00$ SS-25 -$ SUB-TOTAL SANITARY COLLECTION SYSTEM =805,650.20$ MEADOWOOD PERMIT AND INSPECTION FEES OPC P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 5 of 7 16.A.1.b Packet Pg. 300 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood) Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE PW-1 8" PVC WATER MAIN (C900, DR-14)403 LF 16.00$ 6,448.00$ PW-2 8" PVC WATER MAIN (C900, DR-18)3,588 LF 18.01$ 64,610.91$ PW-3 10" PVC WATER MAIN (C900, DR-14)101 LF 18.00$ 1,818.00$ PW-4 10" PVC WATER MAIN (C900, DR-18)431 LF 20.00$ 8,620.00$ PW-5 12" PVC WATER MAIN (C900, DR-14)31 LF 22.00$ 682.00$ PW-6 12" PVC WATER MAIN (C900, DR-18)376 LF 24.00$ 9,024.00$ PW-7 8" GATE VALVE 10 EA 1,300.00$ 13,000.00$ PW-8 10" GATE VALVE 4 EA 1,550.00$ 6,200.00$ PW-9 12" GATE VALVE 1 EA 1,800.00$ 1,800.00$ PW-10 FIRE HYDRANT ASSEMBLY (COMPLETE)*13 EA 3,573.00$ 46,449.00$ PW-11 TEMPORARY BLOW-OFF 3 EA 2,105.00$ 6,315.00$ PW-12 12" HOT TAP OF EXISTING 24" WATER MAIN 1 LS 7,500.00$ 7,500.00$ PW-13 TESTING 1 LS 2,500.00$ 2,500.00$ PW-14 PERMANENT BACTERIAL SAMPLE POINTS 2 EA 1,900.00$ 3,800.00$ PW-15 TEMPORARY SAMPLE POINT 7 EA 175.00$ 1,225.00$ PW-16 1-1/2" DOUBLE WATER SERVICE (LONG SIDE)62 EA 1,250.00$ 77,500.00$ PW-17 1-1/2" SINGLE WATER SERVICE (LONG SIDE)22 EA 1,000.00$ 22,000.00$ PW-18 1-1/2" DOUBLE WATER SERVICE (SHORT SIDE)36 EA 970.00$ 34,920.00$ PW-19 1-1/2" SINGLE WATER SERVICE (SHORT SIDE)12 EA 925.00$ 11,100.00$ PW-20 AUTOMATIC FLUSHING DEVICE 2 EA 2,500.00$ 5,000.00$ PW-21 TEMP BACKFLOW DURING CONSTRUCTION 1 EA 7,500.00$ 7,500.00$ PW-22 -$ PW-23 -$ SUB-TOTAL POTABLE WATER =338,011.91$ MEADOWOOD PERMIT AND INSPECTION FEES OPC P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 6 of 7 16.A.1.b Packet Pg. 301 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood) Project: Task: Prepared By:AA Date:3/6/2019 Checked By:DFW Date:3/6/2019 MISCELLANEOUS ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE MSC-1 IRRIGATION (ALLOWANCE)*1 LS 110,000.00$ 110,000.00$ MSC-2 LANDSCAPING (ALLOWANCE)1 LS 500,000.00$ 500,000.00$ MSC-3 LIGHTING (ALLOWANCE)1 LS 55,000.00$ 55,000.00$ MSC-4 VINYL COVERED CHAIN LINK FENCE 6,150 LF 3.50$ 21,525.00$ MSC-5 PRESERVE AND LITTORAL SIGNAGE 1 LS 4,500.00$ 4,500.00$ MSC-6 -$ MSC-7 -$ MSC-8 -$ MSC-9 -$ MSC-10 -$ MSC-11 -$ MSC-12 -$ MSC-13 -$ MSC-14 -$ MSC-15 -$ MSC-16 -$ SUB-TOTAL MISCELLANEOUS =691,025.00$ MEADOWOOD PERMIT AND INSPECTION FEES OPC P:\Active_Projects\P-DRHT-002\001_Rushton_Point\Budgets\Cost_Estimates\Rev02\OPC for Fee Calc_04-30-19.xlsx 7 of 7 16.A.1.b Packet Pg. 302 Attachment: Opinion of Probable Cost (9250 : Final Plat - Meadowood) 16.A.1.cPacket Pg. 303Attachment: Plat Map (9250 : Final Plat - Meadowood)David S. Dagostino, PSMDigitally signed by David S. Dagostino, PSM Date: 2019.05.24 10:03:41 -04'00' 16.A.1.cPacket Pg. 304Attachment: Plat Map (9250 : Final Plat - Meadowood) 16.A.1.cPacket Pg. 305Attachment: Plat Map (9250 : Final Plat - Meadowood) 16.A.1.cPacket Pg. 306Attachment: Plat Map (9250 : Final Plat - Meadowood) 16.A.1.cPacket Pg. 307Attachment: Plat Map (9250 : Final Plat - Meadowood)