Agenda 06/25/2019 Item #16A 6 (IslandWalk-Final Acdeptance)06/25/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, PL20170001275. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and accept the conveyance of these potable water and sewer facilities, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff as follows: IslandWalk Phase 7A-1 - July 15, 2002; IslandWalk Phase 7A-2 - August 22, 2002; IslandWalk Phase 7A-3 - September 24, 2002; IslandWalk Phase 7A-4 - March 10, 2003. At that time, the total value of these potable water and sewer utilities facilities (assets) was $212,323.57 and $352,468.60, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale (“The Utility Facilities Deed”) as follows: • IslandWalk Phase 7A-1 - Bill of Sale OR Book 3110, Page 523, and Warranty Deed OR Book 3110, Page 527 • IslandWalk Phase 7A-2 - Bill of Sale OR Book 3140, Page 3007, and Warranty Deed OR Book 3140, Page 3011 • IslandWalk Phase 7A-3 - Bill of Sale OR Book 3140, Page 3021, and Warranty Deed OR Book 3140, Page 3024 • IslandWalk Phase 7A-4 - Bill of Sale OR Book 3336, Page 1571 and Warranty Deed OR Book 3336 Page 1576 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on April 25, 2019, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities as described in the Utilities Facilities Deeds. Staff also recommends acceptance of the Utilities Fac ilities Deeds, and the facilities described in the Certifications of Contributory Assets, which are attached to this Executive Summary. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 16.A.6 Packet Pg. 1087 06/25/2019 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water-Sewer District receiving title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $564,792.17 (no depreciation applied), and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAA RECOMMENDATION: To approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, PL20170001275, and accept the conveyance of the Utilities Facilities Deeds and the facilities described in the Certification of Contributory Assets. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Assets Sheets Summary (PDF) 3. Assets Sheet - Phase 7-A-1 (PDF) 4. Assets Sheet - Phase 7A-2 (PDF) 5. Assets Sheet - Phase 7-A-3 (PDF) 6. Assets Sheet - Phase 7-A-4 (PDF) 7. Warranty Deed & Bill of Sale - Phase 7A-1 (PDF) 8. Warranty Deed & Bill of Sale - Phase 7A-2 (PDF) 9. Warranty Deed & Bill of Sale - Phase 7A-3 (PDF) 10. Warranty Deed & Bill of Sale - Phase 7A-4 (PDF) 16.A.6 Packet Pg. 1088 06/25/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.6 Doc ID: 8916 Item Summary: Recommendation to approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, PL20170001275. Meeting Date: 06/25/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 05/09/2019 11:46 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 05/09/2019 11:46 AM Approved By: Review: Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 05/09/2019 12:34 PM Water Steve Messner Additional Reviewer Completed 05/09/2019 3:09 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 05/09/2019 3:49 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 05/09/2019 4:02 PM Wastewater Steve Nagy Additional Reviewer Completed 05/10/2019 5:33 AM Water Pamela Libby Additional Reviewer Completed 05/10/2019 6:35 AM Wastewater Beth Johnssen Additional Reviewer Completed 05/10/2019 11:11 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 05/13/2019 4:00 PM Growth Management Department Matthew McLean Additional Reviewer Completed 05/13/2019 4:43 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/14/2019 6:34 PM Growth Management Department James C French Deputy Department Head Review Completed 05/17/2019 5:37 PM County Attorney's Office Sally Ashkar Level 2 Attorney Review Completed 05/31/2019 9:16 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/31/2019 10:26 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/06/2019 4:58 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 06/07/2019 9:20 AM County Manager's Office Heather Yilmaz Level 4 County Manager Review Completed 06/17/2019 8:57 AM 16.A.6 Packet Pg. 1089 06/25/2019 Board of County Commissioners MaryJo Brock Meeting Pending 06/25/2019 9:00 AM 16.A.6 Packet Pg. 1090 ISLANDWALK PHASE 7A-1, 7A-2, 7A-3 AND 7A-4 LOCATION MAP 16.A.6.a Packet Pg. 1091 Attachment: Location Map (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) PHASE 7A-1 - WATER PHASE 7A-1 - SEWER FUTUNA LANE $18,672.14 FUTUNA LANE $21,001.48 A PORTION OF ISLANDWALK CIRCLE $8,893.50 A PORTION OF ISLANDWALK CIRCLE $51,691.14 SUBTOTAL $27,565.64 SUBTOTAL $72,692.62 PHASE 7A-2 - WATER PHASE 7A-2 - SEWER A PORTION OF ISLANDWALK CIRCLE $20,209.47 A PORTION OF ISLANDWALK CIRCLE $15,093.04 DOMINICA WAY $10,515.52 DOMINICA WAY $9,567.22 ELLICE WAY $13,756.49 ELLICE WAY $15,815.78 SUBTOTAL $44,481.48 SUBTOTAL $40,476.04 PHASE 7A-3 - WATER PHASE 7A-3 - SEWER A PORTION OF ISLANDWALK CIRCLE $6,438.32 A PORTION OF ISLANDWALK CIRCLE $45,607.34 CAYMAN LANE $23,198.79 CAYMAN LANE $24,081.57 BARBADOS LANE $10,661.22 BARBADOS LANE $13,432.84 SUBTOTAL $40,298.33 SUBTOTAL $83,121.75 PHASE 7A-4 - WATER PHASE 7A-4 - SEWER ZANZIBAR WAY $16,606.95 ZANZIBAR WAY $20,458.75 YAKOBI WAY $6,820.21 YAKOBI WAY $7,346.63 EXUMA WAY $23,755.37 EXUMA WAY $32,988.19 BRAVADA WAY $6,035.74 BRAVADA WAY $7,050.30 ANGUILA WAY $14,419.39 ANGUILA WAY $19,677.33 A PORTION OF ISLANDWALK CIRCLE $32,340.46 A PORTION OF ISLANDWALK CIRCLE $68,656.99 SUBTOTAL $99,978.12 SUBTOTAL $156,178.19 TOTAL $212,323.57 TOTAL $352,468.60 ISLANDWALK PHASE 7A-1, 7A-2, 7A-3, 7A-4CONTRIBUTORY ASSETS 16.A.6.b Packet Pg. 1092 Attachment: Assets Sheets Summary (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 16.A.6.c Packet Pg. 1093 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.c Packet Pg. 1094 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.c Packet Pg. 1095 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.c Packet Pg. 1096 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.d Packet Pg. 1097 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.d Packet Pg. 1098 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.d Packet Pg. 1099 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.d Packet Pg. 1100 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.d Packet Pg. 1101 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.d Packet Pg. 1102 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A3 A PORTION OF ISLAND WALK CIRCLE DATE: APRIL 26, 2019 THIS IS A: WATER SYSTEM X SEWER SYSTEM ITEM DESCRIPTION C900 DR18 PVC C900 DR14 PVC GATE VALVE AIR RELEASE V Al VE ASSY FIRE HYDRANT ASSEMBLY w:,5i!if;;S nior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE QUANTITY 6" 555 LF 6" 40 LF 6" 2EA l EA 2EA ---- UNIT COST TOTAL COST 5.56 3,085.80 5.99 239.60 24 5.96 491.92 676.00 676.00 972.50 1,945.00 TOTAL 6,438.32 I 16.A.6.e Packet Pg. 1103 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A3 CAYMAN LANE DATE: APRIL 26, 2019 THIS IS A: WATER SYSTEM X -- --SEWE� SYSTEM. ___ _ ITEM DESCRIPTION C900 DR18 PVC GATE VALVE FIRE HYDRANT ASSEMBLY AIR RELEASE VALVE ASSY SINGLE WATER SERVICE DOUBLE WATER SERVICE Senior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd .. #300 Naples, FL 34108 SIZE QUANTITY 10" 1230 LF 10" 2 EA 4EA IEA 314" & I'' 12 EA 1· & 1.5" 12EA UNIT COST TOTAL COST 9.35 11,500.50 498.00 996.00 972.50 3,890.00 676.00 676.00 140.66 1,687.86 211.83 4,448.43 TOTAL 23,198.79 I 16.A.6.e Packet Pg. 1104 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY COSTS SYSTEM NAME: ISLAND WALK PHASE VII-A3 BARBADOS LAN E DA TE: APRIL26, 2019 THIS IS A: WATER SYSTEM __ X __ SEWER SYSTEM ___ _ ITEM DESCRIPTI ON C900 DRl 8 PVC GATE VALVE FIRE HYDRANT ASSEMBLY AIR RELEASE VALVE ASSY SINGLE WATER SER VICE DOUBLE WATER SERVICE nior Project Manager Stantec Consulting Services, Inc. 5801 P,elican Bay Blvd. #300 Naples, FL 34108 SIZE QUANTITY 6" 730 LF 6" 3 EA 2 EA lEA 3/4" & I" 8 EA 1· & u· lOEA UNIT COST TOTAL COST 5.56 4,058.80 245.96 737.88 972.50 1,945.00 676.00 676.00 140.66 1,125.24 211.83 2,118.30 TOTAL 10,661.22 I 16.A.6.e Packet Pg. 1105 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A3 A PORTION OF ISLAND WALK CIRCLE DATE: APRIL26,20l9 THISISA: WATER SYSTEM __ _ SEWER SYSTEM_X __ _ ITEM DESCRIPTION SDR26 PVC 6'-8' CUT SDR26 PVC 8'-10' CUT MANHOLE 6'-8' CUT MANHOLE 8'-10' CUT PUMP STATION #10 C900 DR25 PVC PLUG VALVE ---- �if on arcia, PE, CFM Senior Project Manager - Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE 8" 8" 4" 4" -- QUANTITY UNIT COST TOTAL COST 240 LF 13.71 3,289.20 414 LF 15.31 6,336.27 I EA 1,270.00 i,270.00 2 EA 1.501.5 7 3,003.13 I LS 25,407.50 25,407.50 1424 LF 4.26 6,066.24 lEA 235.00 235.00 - TOTAL 45,607.34 I 16.A.6.e Packet Pg. 1106 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) FLORIDA STATE UNDERGROUND, INC. SYSTEM NAME: ·ISLAND WALK PHASE VI I-A3 CAYMAN LANE DA TE: JULY 22, 2002 THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM_X __ _ ITEM DESCRIPTION SDR26 PVC 0'-6' CUT SDR26 PVC 6'-8' CUT SDR26 PVC 8'· JO' CUT MANHOLE 0'-6' CUT MANHOLE 6'-8' CUT DOUBLE SEWER SERVICE Wi n Ga cia, PE, CFM Senior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE QUANTITY 8" 379 LF 8" 585 LF 8" 182 LF 2 EA 2 EA 6" 27 EA UNIT COST TOTAL COST 8.48 3,212.03 13.71 8,017.43 15.31 2,785.51 993.10 1,986.20 1,270.00 2,540.00 205.20 5,540.40 TOTAL 24,081.57 I 16.A.6.e Packet Pg. 1107 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A3 BARBADOS LANE DATE: AP RI L26, 2019 THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM_X --- ITEM DESCRIPTION SDR26 PVC 0'-6' CUT SDR 26 PVC 6'-8' CUT MANHOLE 0'-6' CUT MANHOLE 6'-8' CUT DOUBLE SEWER SERVICE -- nior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE 8" 8" 6'' QUANTITY 515 LF - 142 LF 3 EA 1EA 14 EA - UNIT COST TOTAL COST 8.48 4,364.63 13.71 1,94 6.11 993.10 t979.30 1,270.00 1270.00 205.20 2,872.80 - TOTAL 13,432.84 I 16.A.6.e Packet Pg. 1108 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE Vll•A4 ZANZIBAR WAY DATE: APRIL 26, 2019 THIS IS A: WATER SYSTEM X SEWER SYSTEM ITEM DESCRIPTION C900 DR 18 PVC FIRE HYDRANT ASSEMBLY AIR RELEASE VALVE ASSY DOUBLE WATER SERVICE Wjl n Gar a, PE, CFM �enior Project Manager St antec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 ---- SIZE QUANTITY 1 O" 1260 LF l EA I EA l"15 EA UNIT COST 9.35 972.50 676.00 211.83 TOTAL ---- TOTAL COST 11,781.00 972.50 676.00 3,177.45 16,606.95 I 16.A.6.f Packet Pg. 1109 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIB TORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 YAKOBI WAY DA TE: APRI L 26, 2019 THIS IS A: WATER SYSTEM __ X __ SEWER SYSTEM ITEM DESCRIPTION C900 DRl8 PVC C900 DR14 PVC GATE VALVE FIRE HYDRANT ASSEMBLY AIR RELEASE VAL VE ASSY PERMANENT SAMPLE PTS SfNGLE WATER SERVICE DOUBLE WATER SERVICE Senior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE 6" 6" 6" 3/<i"& \" l" & 1.5" QUANTITY UNIT COST 300 LF 5.56 30 LF 5.99 1 EA 245.96 l EA 97 2.50 !EA 67 6.00 I EA 47 0.00 8 EA 140.66 7 EA 21 l.83 TOTAL ---- TOTAL COST 1,668.00 17 9.7 ( 245.96 97 2.50 67 6.00 47 0.00 1,125.24 1,482.81 6,820.21 / 16.A.6.f Packet Pg. 1110 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) · CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE Vll-A4 EXUMA \\'AV DA TE: APRIL 26, 2019 THIS IS A: WATER SYSTEM __ X_ SEWER SYSTEM ___ _ ITEM DESCRIPTION SIZE QUANTITY UNIT COST TOTAL COST C900 DR 18 PVC 6" 1540 LF 5.56 8,562.40 C900 DR\4 PVC 6" 70 LF 5.99 419.30 GATE VALVE 6" 3 EA 245.96 737.88 FIRE HYDRANT ASSEMBLY 6 EA 972.50 5,835.00 AIR RELEASE VALVE ASSY l EA 676.00 676.00 PERMANENT SAMPLE PTS l EA 470.00 470.00 SINGLE WATER SERVICE 3/4" & )" 11 EA 140.66 1,547.21 DOUBLE WATER SERVICE J" & I 5"26 EA 21 1.83 5507.58 TOTAL 23,755.37 Wilso a ia, PE, CFM S Ior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 16.A.6.f Packet Pg. 1111 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRJB UTOR Y ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 BRAVADA WAY DA TE: APRIL 26, 2019 THIS IS A: WATER SYSTEM __ X __ SEWER SYSTEM ITEM DESCRIPTION C900 DR 18 PVC C900 DR 14 PVC FIRE HYDRANT ASSEMBLY AIR RELEASE VALVE ASSY DOUBLE WATER SERVICE son Garcia, PE, CFM Senior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE 6" 6" \" l.5" QUANTITY UNIT COST 355 LF 5.56 120 LF 5.99 I EA 972.50 I EA 676.00 8 EA 211.83 TOTAL ---- TOTAL COST 1,973.80 718.80 972.50 676.00 1,694.64 6,035.74 I 16.A.6.f Packet Pg. 1112 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 ANGUILA WAY DA TE: APRIL26, 2019 THIS IS A: WATER SYSTEM __ X_ SEWER SYSTEM ___ _ ITEM DESCRIPTION C900 DR18 PVC C900 ORl4 PVC GATE VALVE FIRE HYDRANT ASSEMBLY AI R RELEASE VALVE ASSY PERMANENT SAMPLE PTS SINGLE WATER SERVICE DOUBLE WATER SERVICE Wil§P Gacia, PE, CFM $'"enior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE QUANTITY 6" 1120 LF 6" 30 LF 6" 2 EA 3 EA I EA 1 EA 3/4" & I" 5 EA I" & I 5" 13 EA UNIT COST TOTAL COST 5.56 6,227.20 5.99 179.70 245.96 491.92 972.50 2,917.50 676.00 676.00 470.00 470.00 140.66 703.28 211.80 2,753.79 TOTAL 14,419.39 16.A.6.f Packet Pg. 1113 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY SSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 A PORTION OF ISLAND WALK CIRCLE DA TE: APR IL26, 2019 THIS IS A: WATER SYSTEM_X_ SEWER SYSTEM ITEM DESCRIPTION C900 DR 18 PVC C900 DR 14 PVC C900 DRl 8 PVC C900 DR 14 PVC DOUBLE SERVICE GATE VALVE GATE VALVE FIRE HYDRANT ASSEMBLY Wil§.P Gar ia, PE, CFM Serlior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 SIZE 6" 6" 1 O" JO" 1" 6" 10" QUANTITY UNIT COST 1080 LF 5.56 180 LF 5.99 930 LF 9.35 80 LF 10.90 14 EA 211.83 4 EA 245.96 6EA 498.00 9EA 972.50 TOTAL TOTAL COST 6,004.80 1078.20 8,695.50 872.00 2,965.62 983.84 2,988.00 8,752.50 32,340.46 Naples, FL 34108 / 16.A.6.f Packet Pg. 1114 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 ZANZIBAR WAY DATE: APRIL 26, 2019 THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM_X __ _ ITEM DESCRIPTION SDR26 PVC 0'-6' CUT SDR26 PVC 6'-8' CUT SDR26 PVC 8'-10' CUT MANHOLE 0'-6' CUT MANHOLE 6 1 -8 1 CUT SINGLE SEWER SERVICE DOUBLE SERVICE Wils Garcia, PE, CFM Senior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE QUANTITY 8" 460 LF 8" 297 LF 8" 284 LF 3 EA l EA 6" 12EA 6" 8 EA UNIT COST TOTAL COST 8.48 3,898.50 13.71 4,070.39 15.3 I 4.346.62 993.10 2,979.30 1270.00 1,270.00 18·7. 70 2,252.34 205.20 1641.60 TOTAL 20,458.75 I 16.A.6.f Packet Pg. 1115 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 YAKOBI WAY DATE: AP RI L-26, 2019 THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM X -- ITEM DESCRIPTION SIZE QUANTITY UNIT COST TOTAL COST SDR26 PVC 0'-6'CUT MANHOLE 0'-6' CUT SINGLE SEWER SERVICE DOUBLE SERVICE �on Garcia, PE, CFM Senior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 8" 326 LF 2 EA 6" 4 EA 6" 9 EA 8.48 2,762.85 993.10 1,986.20 187.70 750.78 205.20 1,846.80 TOTAL 7,346.63 16.A.6.f Packet Pg. 1116 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 EXUMAWAY DATE: APR IL 26, 2019 THIS IS A: WATER SYSTEM __ _ SEW ER SYSTEM ITEM DESCRIPTION SDR26 PVC 0'-6' CUT SDR26 PVC 6'-8' CUT SDR26 PVC 8'-10' CUT SOR26 PVC I0'-12' CUT MANHOLE 0'-6' CUT MANHOLE 6'-8' CUT MANHOLE 8'-10 CUT S[NGLE SEWER SERVICE DOUBLE SERVICE n Gar a, PE, CFM enior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE 8" 8" 8" 8" 6" 6" QUAN_TITY UNIT COST 594 LF 8.48 536 LF 13.57 299 LF 15.31 70 LF 34.15 2 EA 993,10 3 EA 1,270.00 1 EA 1,501.57 \EA 187.70 30 EA 205.20 TOTAL --- TOTAL COST 5,034.15 7,345.88 4,576.20 2,39b.50 1,986.20 3,810.00 1,501.57 187.70 6.156.00 32,988.1< / 16.A.6.f Packet Pg. 1117 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 BRAVADA WAY DATE: AP RI L26, 2019 THIS IS A: WATER SYSTEM SEWER SYSTEM ITEM DESCRIPTION SDR26 PVC 0'-61 CUT SDR26 PVC 6 1 -8' CUT MANHOLE 0 1 -61 CUT SINGLE SEWER SERVICE DOUBLE SERVICE Wilso arc· , PE, CFM S Ior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 --- SIZE QUANTITY 8'1 300 LF 8" 87 LF IEA 6" 8 EA 6''4EA UNIT COST 8.48 13.71 993.10 187.70 205.20 TOTAL --- TOTAL COST 2,5i2.i> 1.)92.34 993.10 1,:0 I. :6 820.80 7,050.30 I 16.A.6.f Packet Pg. 1118 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) .ONTRIHUTOR ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 ANGUILA WAY DATE: AP R IL26, 2019 THIS IS A: WATER SYSTEM SEWER SYSTEM ITEM DESCRIPTION SDR26 PVC 0'-6' CUT SDR26 PVC 6'-8' CUT SDR26 PVC 8'·10' CUT MANHOLE 0'-6' CUT MANHOLE 6'-8' CUT SINGLE SEWER SERVICE DOUBLE SERVICE Wilson r a, PE, CFM S�� r Proj ct Manager Sfantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 --- SIZE QUANTITY 8" 370 LF 8" 487 LF 8" 80 LF 2 EA 2 EA 6" 11 EA 6" lOEA UNIT COST 8.48 13.71 15.31 993. I 0 1,270.00 187.70 205.20 TOTAL --- TOTAL COST 3,135.75 6,674.34 ·1 1,986.20 2,540.00 2,064.65 2,052.00 19,677.33 ; 16.A.6.f Packet Pg. 1119 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) CONTRIBUTORY ASSETS SYSTEM NAME: ISLAND WALK PHASE VII-A4 A PORTION OF ISLAND WALK CIRCLE DATE: APR IL26, 2019 TH IS IS A: WATER SYSTEM ---SEWER SYSTEM_X __ _ ITEM DESCRIPTION SDR26 PVC 0 1-6 1 CUT SOR26 PVC 6 1 •8' CUT SDR26 PVC 81-I O' CUT SDR26 PVC 10'-12' CUT MANHOLE 0'-6' CUT MANHOLE 6'·8' CUT MANHOLE 8'-10' CUT MANHOLE I 0'-12' CUT PUMP ST A TION #9 C900 DR25 PLUG VALVE SINGLE SERVfCE DOUBLE SERVICE Wil� Ga cia, PE, CFM Se'nior Project Manager Stantec Consulting Services, Inc. 5801 Pelican Bay Blvd. #300 Naples, FL 34108 SIZE QUANTITY 8" 442 LF 8" 506 LF 8" 600 LF 8" 191 LF 2 EA 2 EA 2 EA 2 EA l LS 4" 367 LF 4" I EA 6" 8 EA 6" 8 EA UNIT COST TOTAL COST 8.48 3,745.95 13.71 6,934.73 15.31 9;183.00 34.15 6,522.65 496.55 1,986.20 1,270.00 2,540.00 1,501.57 3,003.13 2,006.13 4,012.25 25,787.50 25,787.50 4.26 1,563.42 235.00 235.00 187.70 1,501.56 205.20 1,640.60 TOTAL 68,656.99 I 16.A.6.f Packet Pg. 1120 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.g Packet Pg. 1121 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.g Packet Pg. 1122 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.g Packet Pg. 1123 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.gPacket Pg. 1124Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk 16.A.6.g Packet Pg. 1125 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.g Packet Pg. 1126 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.g Packet Pg. 1127 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.gPacket Pg. 1128Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk 16.A.6.h Packet Pg. 1129 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.h Packet Pg. 1130 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.h Packet Pg. 1131 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.hPacket Pg. 1132Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk 16.A.6.h Packet Pg. 1133 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.h Packet Pg. 1134 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.h Packet Pg. 1135 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.hPacket Pg. 1136Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk 16.A.6.i Packet Pg. 1137 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.i Packet Pg. 1138 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.i Packet Pg. 1139 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.i Packet Pg. 1140 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.i Packet Pg. 1141 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.i Packet Pg. 1142 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1143 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1144 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1145 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1146 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1147 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1148 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1149 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1150 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1151 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4) 16.A.6.j Packet Pg. 1152 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)