Agenda 06/25/2019 Item #16A 6 (IslandWalk-Final Acdeptance)06/25/2019
EXECUTIVE SUMMARY
Recommendation to approve final acceptance and accept the conveyance of the potable water and
sewer utility facilities for IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, PL20170001275.
OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the
Collier County Water-Sewer District, approve final acceptance and accept the conveyance of these
potable water and sewer facilities, in accordance with the Collier County Utility Standards and
Procedures, Ordinance No. 2004-31.
CONSIDERATIONS:
1) The Developer of IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, has constructed the potable water
and sewer facilities within dedicated easements to serve this development. (See attached location
map).
2) Preliminary acceptance of these utility facilities was approved by the Development Review staff as
follows: IslandWalk Phase 7A-1 - July 15, 2002; IslandWalk Phase 7A-2 - August 22, 2002;
IslandWalk Phase 7A-3 - September 24, 2002; IslandWalk Phase 7A-4 - March 10, 2003. At that
time, the total value of these potable water and sewer utilities facilities (assets) was $212,323.57 and
$352,468.60, respectively.
3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to
the County in the public records of Collier County, which were reviewed and approved by the
County Attorney’s office as to form and legality. The County acquired its record interest by Utility
Facilities Warranty Deed and Bill of Sale (“The Utility Facilities Deed”) as follows:
• IslandWalk Phase 7A-1 - Bill of Sale OR Book 3110, Page 523, and Warranty Deed OR Book
3110, Page 527
• IslandWalk Phase 7A-2 - Bill of Sale OR Book 3140, Page 3007, and Warranty Deed OR Book
3140, Page 3011
• IslandWalk Phase 7A-3 - Bill of Sale OR Book 3140, Page 3021, and Warranty Deed OR
Book 3140, Page 3024
• IslandWalk Phase 7A-4 - Bill of Sale OR Book 3336, Page 1571 and Warranty Deed OR Book
3336 Page 1576
4) The potable water and sewer utility facilities have been operated and maintained during the required
one (1) year warranty period, following preliminary acceptance.
5) A final inspection to discover defects in materials and workmanship has been conducted by the
Development Review staff on April 25, 2019, in coordination with Public Utilities and these
facilities have been found to be satisfactory and acceptable.
6) Staff recommends final acceptance of the subject utility facilities as described in the Utilities
Facilities Deeds. Staff also recommends acceptance of the Utilities Fac ilities Deeds, and the
facilities described in the Certifications of Contributory Assets, which are attached to this Executive
Summary.
7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended.
16.A.6
Packet Pg. 1087
06/25/2019
8) Staff is unaware of any issues that would serve to negate the recommendation to release the
applicable security.
FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water-Sewer
District receiving title to the utility facilities, which at the time of preliminary acceptance, had a total
gross value of $564,792.17 (no depreciation applied), and an asset will be recorded in the financial
records of the county.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this
action.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval - SAA
RECOMMENDATION: To approve final acceptance and accept the conveyance of the potable water
and sewer utility facilities for IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4, PL20170001275, and accept
the conveyance of the Utilities Facilities Deeds and the facilities described in the Certification of
Contributory Assets.
Prepared by: Lucia S. Martin, Technician, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Assets Sheets Summary (PDF)
3. Assets Sheet - Phase 7-A-1 (PDF)
4. Assets Sheet - Phase 7A-2 (PDF)
5. Assets Sheet - Phase 7-A-3 (PDF)
6. Assets Sheet - Phase 7-A-4 (PDF)
7. Warranty Deed & Bill of Sale - Phase 7A-1 (PDF)
8. Warranty Deed & Bill of Sale - Phase 7A-2 (PDF)
9. Warranty Deed & Bill of Sale - Phase 7A-3 (PDF)
10. Warranty Deed & Bill of Sale - Phase 7A-4 (PDF)
16.A.6
Packet Pg. 1088
06/25/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.6
Doc ID: 8916
Item Summary: Recommendation to approve final acceptance and accept the conveyance of the
potable water and sewer utility facilities for IslandWalk Phase 7A-1, 7A-2, 7A-3 and 7A-4,
PL20170001275.
Meeting Date: 06/25/2019
Prepared by:
Title: Technician – Growth Management Development Review
Name: Lucia Martin
05/09/2019 11:46 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
05/09/2019 11:46 AM
Approved By:
Review:
Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 05/09/2019 12:34 PM
Water Steve Messner Additional Reviewer Completed 05/09/2019 3:09 PM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 05/09/2019 3:49 PM
Growth Management Department Judy Puig Level 1 Reviewer Completed 05/09/2019 4:02 PM
Wastewater Steve Nagy Additional Reviewer Completed 05/10/2019 5:33 AM
Water Pamela Libby Additional Reviewer Completed 05/10/2019 6:35 AM
Wastewater Beth Johnssen Additional Reviewer Completed 05/10/2019 11:11 AM
Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 05/13/2019 4:00 PM
Growth Management Department Matthew McLean Additional Reviewer Completed 05/13/2019 4:43 PM
Growth Management Department Thaddeus Cohen Department Head Review Completed 05/14/2019 6:34 PM
Growth Management Department James C French Deputy Department Head Review Completed 05/17/2019 5:37 PM
County Attorney's Office Sally Ashkar Level 2 Attorney Review Completed 05/31/2019 9:16 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/31/2019 10:26 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/06/2019 4:58 PM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 06/07/2019 9:20 AM
County Manager's Office Heather Yilmaz Level 4 County Manager Review Completed 06/17/2019 8:57 AM
16.A.6
Packet Pg. 1089
06/25/2019
Board of County Commissioners MaryJo Brock Meeting Pending 06/25/2019 9:00 AM
16.A.6
Packet Pg. 1090
ISLANDWALK PHASE 7A-1, 7A-2, 7A-3 AND 7A-4
LOCATION MAP
16.A.6.a
Packet Pg. 1091 Attachment: Location Map (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
PHASE 7A-1 - WATER PHASE 7A-1 - SEWER
FUTUNA LANE $18,672.14 FUTUNA LANE $21,001.48
A PORTION OF ISLANDWALK CIRCLE $8,893.50 A PORTION OF ISLANDWALK CIRCLE $51,691.14
SUBTOTAL $27,565.64 SUBTOTAL $72,692.62
PHASE 7A-2 - WATER PHASE 7A-2 - SEWER
A PORTION OF ISLANDWALK CIRCLE $20,209.47 A PORTION OF ISLANDWALK CIRCLE $15,093.04
DOMINICA WAY $10,515.52 DOMINICA WAY $9,567.22
ELLICE WAY $13,756.49 ELLICE WAY $15,815.78
SUBTOTAL $44,481.48 SUBTOTAL $40,476.04
PHASE 7A-3 - WATER PHASE 7A-3 - SEWER
A PORTION OF ISLANDWALK CIRCLE $6,438.32 A PORTION OF ISLANDWALK CIRCLE $45,607.34
CAYMAN LANE $23,198.79 CAYMAN LANE $24,081.57
BARBADOS LANE $10,661.22 BARBADOS LANE $13,432.84
SUBTOTAL $40,298.33 SUBTOTAL $83,121.75
PHASE 7A-4 - WATER PHASE 7A-4 - SEWER
ZANZIBAR WAY $16,606.95 ZANZIBAR WAY $20,458.75
YAKOBI WAY $6,820.21 YAKOBI WAY $7,346.63
EXUMA WAY $23,755.37 EXUMA WAY $32,988.19
BRAVADA WAY $6,035.74 BRAVADA WAY $7,050.30
ANGUILA WAY $14,419.39 ANGUILA WAY $19,677.33
A PORTION OF ISLANDWALK CIRCLE $32,340.46 A PORTION OF ISLANDWALK CIRCLE $68,656.99
SUBTOTAL $99,978.12 SUBTOTAL $156,178.19
TOTAL $212,323.57 TOTAL $352,468.60
ISLANDWALK PHASE 7A-1, 7A-2, 7A-3, 7A-4CONTRIBUTORY ASSETS
16.A.6.b
Packet Pg. 1092 Attachment: Assets Sheets Summary (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2,
16.A.6.c
Packet Pg. 1093 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.c
Packet Pg. 1094 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.c
Packet Pg. 1095 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.c
Packet Pg. 1096 Attachment: Assets Sheet - Phase 7-A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.d
Packet Pg. 1097 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.d
Packet Pg. 1098 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.d
Packet Pg. 1099 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.d
Packet Pg. 1100 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.d
Packet Pg. 1101 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.d
Packet Pg. 1102 Attachment: Assets Sheet - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A3
A PORTION OF ISLAND WALK CIRCLE
DATE: APRIL 26, 2019
THIS IS A: WATER SYSTEM X SEWER SYSTEM
ITEM DESCRIPTION
C900 DR18 PVC
C900 DR14 PVC
GATE VALVE
AIR RELEASE V Al VE ASSY
FIRE HYDRANT ASSEMBLY
w:,5i!if;;S nior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE QUANTITY
6" 555 LF
6" 40 LF
6" 2EA
l EA
2EA
----
UNIT COST TOTAL COST
5.56 3,085.80
5.99 239.60
24 5.96 491.92
676.00 676.00
972.50 1,945.00
TOTAL 6,438.32
I
16.A.6.e
Packet Pg. 1103 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A3
CAYMAN LANE
DATE: APRIL 26, 2019
THIS IS A: WATER SYSTEM X -- --SEWE� SYSTEM. ___ _
ITEM DESCRIPTION
C900 DR18 PVC
GATE VALVE
FIRE HYDRANT ASSEMBLY
AIR RELEASE VALVE ASSY
SINGLE WATER SERVICE
DOUBLE WATER SERVICE
Senior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd .. #300
Naples, FL 34108
SIZE QUANTITY
10" 1230 LF
10" 2 EA
4EA
IEA
314" & I'' 12 EA
1· & 1.5" 12EA
UNIT COST TOTAL COST
9.35 11,500.50
498.00 996.00
972.50 3,890.00
676.00 676.00
140.66 1,687.86
211.83 4,448.43
TOTAL 23,198.79
I
16.A.6.e
Packet Pg. 1104 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY COSTS
SYSTEM NAME: ISLAND WALK PHASE VII-A3
BARBADOS LAN E
DA TE: APRIL26, 2019
THIS IS A: WATER SYSTEM __ X __ SEWER SYSTEM ___ _
ITEM DESCRIPTI ON
C900 DRl 8 PVC
GATE VALVE
FIRE HYDRANT ASSEMBLY
AIR RELEASE VALVE ASSY
SINGLE WATER SER VICE
DOUBLE WATER SERVICE
nior Project Manager
Stantec Consulting Services, Inc.
5801 P,elican Bay Blvd. #300
Naples, FL 34108
SIZE QUANTITY
6" 730 LF
6" 3 EA
2 EA
lEA
3/4" & I" 8 EA
1· & u· lOEA
UNIT COST TOTAL COST
5.56 4,058.80
245.96 737.88
972.50 1,945.00
676.00 676.00
140.66 1,125.24
211.83 2,118.30
TOTAL 10,661.22
I
16.A.6.e
Packet Pg. 1105 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A3
A PORTION OF ISLAND WALK CIRCLE
DATE: APRIL26,20l9
THISISA: WATER SYSTEM __ _ SEWER SYSTEM_X __ _
ITEM DESCRIPTION
SDR26 PVC 6'-8' CUT
SDR26 PVC 8'-10' CUT
MANHOLE 6'-8' CUT
MANHOLE 8'-10' CUT
PUMP STATION #10
C900 DR25 PVC
PLUG VALVE
----
�if on arcia, PE, CFM
Senior Project Manager
-
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE
8"
8"
4"
4"
--
QUANTITY UNIT COST TOTAL COST
240 LF 13.71 3,289.20
414 LF 15.31 6,336.27
I EA 1,270.00 i,270.00
2 EA 1.501.5 7 3,003.13
I LS 25,407.50 25,407.50
1424 LF 4.26 6,066.24
lEA 235.00 235.00
-
TOTAL 45,607.34
I
16.A.6.e
Packet Pg. 1106 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
FLORIDA STATE UNDERGROUND, INC.
SYSTEM NAME: ·ISLAND WALK PHASE VI I-A3
CAYMAN LANE
DA TE: JULY 22, 2002
THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM_X __ _
ITEM DESCRIPTION
SDR26 PVC 0'-6' CUT
SDR26 PVC 6'-8' CUT
SDR26 PVC 8'· JO' CUT
MANHOLE 0'-6' CUT
MANHOLE 6'-8' CUT
DOUBLE SEWER SERVICE
Wi n Ga cia, PE, CFM
Senior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE QUANTITY
8" 379 LF
8" 585 LF
8" 182 LF
2 EA
2 EA
6" 27 EA
UNIT COST TOTAL COST
8.48 3,212.03
13.71 8,017.43
15.31 2,785.51
993.10 1,986.20
1,270.00 2,540.00
205.20 5,540.40
TOTAL 24,081.57
I
16.A.6.e
Packet Pg. 1107 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A3 BARBADOS LANE DATE: AP RI L26, 2019
THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM_X ---
ITEM DESCRIPTION
SDR26 PVC 0'-6' CUT
SDR 26 PVC 6'-8' CUT
MANHOLE 0'-6' CUT
MANHOLE 6'-8' CUT
DOUBLE SEWER SERVICE
--
nior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE
8"
8"
6''
QUANTITY
515 LF -
142 LF
3 EA
1EA
14 EA
-
UNIT COST TOTAL COST
8.48 4,364.63
13.71 1,94 6.11
993.10 t979.30
1,270.00 1270.00
205.20 2,872.80
-
TOTAL 13,432.84
I
16.A.6.e
Packet Pg. 1108 Attachment: Assets Sheet - Phase 7-A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE Vll•A4
ZANZIBAR WAY
DATE: APRIL 26, 2019
THIS IS A: WATER SYSTEM X SEWER SYSTEM
ITEM DESCRIPTION
C900 DR 18 PVC
FIRE HYDRANT ASSEMBLY
AIR RELEASE VALVE ASSY
DOUBLE WATER SERVICE
Wjl n Gar a, PE, CFM
�enior Project Manager
St antec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
----
SIZE QUANTITY
1 O" 1260 LF
l EA
I EA
l"15 EA
UNIT COST
9.35
972.50
676.00
211.83
TOTAL
----
TOTAL COST
11,781.00
972.50
676.00
3,177.45
16,606.95
I
16.A.6.f
Packet Pg. 1109 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIB TORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
YAKOBI WAY
DA TE: APRI L 26, 2019
THIS IS A: WATER SYSTEM __ X __ SEWER SYSTEM
ITEM DESCRIPTION
C900 DRl8 PVC
C900 DR14 PVC
GATE VALVE
FIRE HYDRANT ASSEMBLY
AIR RELEASE VAL VE ASSY
PERMANENT SAMPLE PTS
SfNGLE WATER SERVICE
DOUBLE WATER SERVICE
Senior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE
6"
6"
6"
3/<i"& \"
l" & 1.5"
QUANTITY UNIT COST
300 LF 5.56
30 LF 5.99
1 EA 245.96
l EA 97 2.50
!EA 67 6.00
I EA 47 0.00
8 EA 140.66
7 EA 21 l.83
TOTAL
----
TOTAL COST
1,668.00
17 9.7 (
245.96
97 2.50
67 6.00
47 0.00
1,125.24
1,482.81
6,820.21
/
16.A.6.f
Packet Pg. 1110 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
·
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE Vll-A4
EXUMA \\'AV
DA TE: APRIL 26, 2019
THIS IS A: WATER SYSTEM __ X_ SEWER SYSTEM ___ _
ITEM DESCRIPTION SIZE QUANTITY UNIT COST TOTAL COST
C900 DR 18 PVC 6" 1540 LF 5.56 8,562.40
C900 DR\4 PVC 6" 70 LF 5.99 419.30
GATE VALVE 6" 3 EA 245.96 737.88
FIRE HYDRANT ASSEMBLY 6 EA 972.50 5,835.00
AIR RELEASE VALVE ASSY l EA 676.00 676.00
PERMANENT SAMPLE PTS l EA 470.00 470.00
SINGLE WATER SERVICE 3/4" & )" 11 EA 140.66 1,547.21
DOUBLE WATER SERVICE J" & I 5"26 EA 21 1.83 5507.58
TOTAL 23,755.37
Wilso a ia, PE, CFM
S Ior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
16.A.6.f
Packet Pg. 1111 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRJB UTOR Y ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
BRAVADA WAY
DA TE: APRIL 26, 2019
THIS IS A: WATER SYSTEM __ X __ SEWER SYSTEM
ITEM DESCRIPTION
C900 DR 18 PVC
C900 DR 14 PVC
FIRE HYDRANT ASSEMBLY
AIR RELEASE VALVE ASSY
DOUBLE WATER SERVICE
son Garcia, PE, CFM
Senior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE
6"
6"
\" l.5"
QUANTITY UNIT COST
355 LF 5.56
120 LF 5.99
I EA 972.50
I EA 676.00
8 EA 211.83
TOTAL
----
TOTAL COST
1,973.80
718.80
972.50
676.00
1,694.64
6,035.74
I
16.A.6.f
Packet Pg. 1112 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
ANGUILA WAY
DA TE: APRIL26, 2019
THIS IS A: WATER SYSTEM __ X_ SEWER SYSTEM ___ _
ITEM DESCRIPTION
C900 DR18 PVC
C900 ORl4 PVC
GATE VALVE
FIRE HYDRANT ASSEMBLY
AI R RELEASE VALVE ASSY
PERMANENT SAMPLE PTS
SINGLE WATER SERVICE
DOUBLE WATER SERVICE
Wil§P Gacia, PE, CFM
$'"enior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE QUANTITY
6" 1120 LF
6" 30 LF
6" 2 EA
3 EA
I EA
1 EA
3/4" & I" 5 EA
I" & I 5" 13 EA
UNIT COST TOTAL COST
5.56 6,227.20
5.99 179.70
245.96 491.92
972.50 2,917.50
676.00 676.00
470.00 470.00
140.66 703.28
211.80 2,753.79
TOTAL 14,419.39
16.A.6.f
Packet Pg. 1113 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY SSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
A PORTION OF ISLAND WALK CIRCLE
DA TE: APR IL26, 2019
THIS IS A: WATER SYSTEM_X_ SEWER SYSTEM
ITEM DESCRIPTION
C900 DR 18 PVC
C900 DR 14 PVC
C900 DRl 8 PVC
C900 DR 14 PVC
DOUBLE SERVICE
GATE VALVE
GATE VALVE
FIRE HYDRANT ASSEMBLY
Wil§.P Gar ia, PE, CFM
Serlior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
SIZE
6"
6"
1 O"
JO"
1"
6"
10"
QUANTITY UNIT COST
1080 LF 5.56
180 LF 5.99
930 LF 9.35
80 LF 10.90
14 EA 211.83
4 EA 245.96
6EA 498.00
9EA 972.50
TOTAL
TOTAL COST
6,004.80
1078.20
8,695.50
872.00
2,965.62
983.84
2,988.00
8,752.50
32,340.46
Naples, FL 34108 /
16.A.6.f
Packet Pg. 1114 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
ZANZIBAR WAY
DATE: APRIL 26, 2019
THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM_X __ _
ITEM DESCRIPTION
SDR26 PVC 0'-6' CUT
SDR26 PVC 6'-8' CUT
SDR26 PVC 8'-10' CUT
MANHOLE 0'-6' CUT
MANHOLE 6 1 -8 1 CUT
SINGLE SEWER SERVICE
DOUBLE SERVICE
Wils Garcia, PE, CFM
Senior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE QUANTITY
8" 460 LF
8" 297 LF
8" 284 LF
3 EA
l EA
6" 12EA
6" 8 EA
UNIT COST TOTAL COST
8.48 3,898.50
13.71 4,070.39
15.3 I 4.346.62
993.10 2,979.30
1270.00 1,270.00
18·7. 70 2,252.34
205.20 1641.60
TOTAL 20,458.75
I
16.A.6.f
Packet Pg. 1115 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
YAKOBI WAY
DATE: AP RI L-26, 2019
THIS IS A: WATER SYSTEM __ _ SEWER SYSTEM X --
ITEM DESCRIPTION SIZE QUANTITY UNIT COST TOTAL COST
SDR26 PVC 0'-6'CUT
MANHOLE 0'-6' CUT
SINGLE SEWER SERVICE
DOUBLE SERVICE
�on Garcia, PE, CFM
Senior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
8" 326 LF
2 EA
6" 4 EA
6" 9 EA
8.48 2,762.85
993.10 1,986.20
187.70 750.78
205.20 1,846.80
TOTAL 7,346.63
16.A.6.f
Packet Pg. 1116 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
EXUMAWAY
DATE: APR IL 26, 2019
THIS IS A: WATER SYSTEM __ _ SEW ER SYSTEM
ITEM DESCRIPTION
SDR26 PVC 0'-6' CUT
SDR26 PVC 6'-8' CUT
SDR26 PVC 8'-10' CUT
SOR26 PVC I0'-12' CUT
MANHOLE 0'-6' CUT
MANHOLE 6'-8' CUT
MANHOLE 8'-10 CUT
S[NGLE SEWER SERVICE
DOUBLE SERVICE
n Gar a, PE, CFM
enior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE
8"
8"
8"
8"
6"
6"
QUAN_TITY UNIT COST
594 LF 8.48
536 LF 13.57
299 LF 15.31
70 LF 34.15
2 EA 993,10
3 EA 1,270.00
1 EA 1,501.57
\EA 187.70
30 EA 205.20
TOTAL
---
TOTAL COST
5,034.15
7,345.88
4,576.20
2,39b.50
1,986.20
3,810.00
1,501.57
187.70
6.156.00
32,988.1<
/
16.A.6.f
Packet Pg. 1117 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
BRAVADA WAY
DATE: AP RI L26, 2019
THIS IS A: WATER SYSTEM SEWER SYSTEM
ITEM DESCRIPTION
SDR26 PVC 0'-61 CUT
SDR26 PVC 6 1 -8' CUT
MANHOLE 0 1 -61 CUT
SINGLE SEWER SERVICE
DOUBLE SERVICE
Wilso arc· , PE, CFM
S Ior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
---
SIZE QUANTITY
8'1 300 LF
8" 87 LF
IEA
6" 8 EA
6''4EA
UNIT COST
8.48
13.71
993.10
187.70
205.20
TOTAL
---
TOTAL COST
2,5i2.i>
1.)92.34
993.10
1,:0 I. :6
820.80
7,050.30
I
16.A.6.f
Packet Pg. 1118 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
.ONTRIHUTOR ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
ANGUILA WAY
DATE: AP R IL26, 2019
THIS IS A: WATER SYSTEM SEWER SYSTEM
ITEM DESCRIPTION
SDR26 PVC 0'-6' CUT
SDR26 PVC 6'-8' CUT
SDR26 PVC 8'·10' CUT
MANHOLE 0'-6' CUT
MANHOLE 6'-8' CUT
SINGLE SEWER SERVICE
DOUBLE SERVICE
Wilson r a, PE, CFM
S�� r Proj ct Manager
Sfantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
---
SIZE QUANTITY
8" 370 LF
8" 487 LF
8" 80 LF
2 EA
2 EA
6" 11 EA
6" lOEA
UNIT COST
8.48
13.71
15.31
993. I 0
1,270.00
187.70
205.20
TOTAL
---
TOTAL COST
3,135.75
6,674.34
·1
1,986.20
2,540.00
2,064.65
2,052.00
19,677.33
;
16.A.6.f
Packet Pg. 1119 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
CONTRIBUTORY ASSETS
SYSTEM NAME: ISLAND WALK PHASE VII-A4
A PORTION OF ISLAND WALK CIRCLE
DATE: APR IL26, 2019
TH IS IS A: WATER SYSTEM ---SEWER SYSTEM_X __ _
ITEM DESCRIPTION
SDR26 PVC 0 1-6 1 CUT
SOR26 PVC 6 1 •8' CUT
SDR26 PVC 81-I O' CUT
SDR26 PVC 10'-12' CUT
MANHOLE 0'-6' CUT
MANHOLE 6'·8' CUT
MANHOLE 8'-10' CUT
MANHOLE I 0'-12' CUT
PUMP ST A TION #9
C900 DR25
PLUG VALVE
SINGLE SERVfCE
DOUBLE SERVICE
Wil� Ga cia, PE, CFM
Se'nior Project Manager
Stantec Consulting Services, Inc.
5801 Pelican Bay Blvd. #300
Naples, FL 34108
SIZE QUANTITY
8" 442 LF
8" 506 LF
8" 600 LF
8" 191 LF
2 EA
2 EA
2 EA
2 EA
l LS
4" 367 LF
4" I EA
6" 8 EA
6" 8 EA
UNIT COST TOTAL COST
8.48 3,745.95
13.71 6,934.73
15.31 9;183.00
34.15 6,522.65
496.55 1,986.20
1,270.00 2,540.00
1,501.57 3,003.13
2,006.13 4,012.25
25,787.50 25,787.50
4.26 1,563.42
235.00 235.00
187.70 1,501.56
205.20 1,640.60
TOTAL 68,656.99
I
16.A.6.f
Packet Pg. 1120 Attachment: Assets Sheet - Phase 7-A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.g
Packet Pg. 1121 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.g
Packet Pg. 1122 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.g
Packet Pg. 1123 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.gPacket Pg. 1124Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk
16.A.6.g
Packet Pg. 1125 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.g
Packet Pg. 1126 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.g
Packet Pg. 1127 Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.gPacket Pg. 1128Attachment: Warranty Deed & Bill of Sale - Phase 7A-1 (8916 : Final Acceptance of Utilities - IslandWalk
16.A.6.h
Packet Pg. 1129 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.h
Packet Pg. 1130 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.h
Packet Pg. 1131 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.hPacket Pg. 1132Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk
16.A.6.h
Packet Pg. 1133 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.h
Packet Pg. 1134 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.h
Packet Pg. 1135 Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.hPacket Pg. 1136Attachment: Warranty Deed & Bill of Sale - Phase 7A-2 (8916 : Final Acceptance of Utilities - IslandWalk
16.A.6.i
Packet Pg. 1137 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.i
Packet Pg. 1138 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.i
Packet Pg. 1139 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.i
Packet Pg. 1140 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.i
Packet Pg. 1141 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.i
Packet Pg. 1142 Attachment: Warranty Deed & Bill of Sale - Phase 7A-3 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1143 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1144 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1145 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1146 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1147 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1148 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1149 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1150 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1151 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)
16.A.6.j
Packet Pg. 1152 Attachment: Warranty Deed & Bill of Sale - Phase 7A-4 (8916 : Final Acceptance of Utilities - IslandWalk Phase 7A-1, 7A-2, 7A-3, 7A-4)