Loading...
Agenda 06/25/2019 Item #16A 3 (Madison Park-Release Final Obligation Bond))06/25/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for Madison Park Phase 2A, PL20110000699; Madison Park Phase 2B, PL20110002005, and Madison Park Phase 2C, PL20130000920, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $8,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and accept the conveyance of these potable water and sewer facilities, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Madison Park Phase 2A, 2B, and 2C, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff as follows: Madison Park Phase 2A - May 4, 2006; Madison Park Phase 2B - January 8, 2007; Madison Park Phase 2C - August 13, 2007. At that time, the total value of these potable water and sewer utilities facilities (assets) was $152,682.10 and $497,547.14, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale (“The Utility Facilities Deed”) as follows: • Phase 2A - Warranty Deed and Bill of Sale - OR Book 4033, Page 446 • Phase 2B - Warranty Deed and Bill of Sale - OR Book 4171, Page 752 • Phase 2C - Warranty Deed and Bill of Sale - OR Book 4270 Page 1521 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on August 19, 2014, and re-inspected on May 20, 2019, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities as described in the Utilities Facilities Deeds. Staff also recommends acceptance of the Util ities Facilities Deeds, and the facilities described in the Certifications of Contributory Assets, which are attached to this Executive Summary. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water-Sewer District receiving title to the utility facilities, which at the time of preliminary acceptance, had a total 16.A.3 Packet Pg. 1033 06/25/2019 gross value of $650,229.24 (no depreciation applied), and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAA RECOMMENDATION: To approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for Madison Park Phase 2A, PL20110000699; Madison Park Phase 2B, PL20110002005, and Madison Park Phase 2C, PL20130000920, accept the conveyance of the Utilities Facilities Deeds and the facilities described in the Certification of Contributory Assets, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $8,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet - Phase 2A (PDF) 4. Assets Sheet - Phase 2B (PDF) 5. Assets Sheet - Phase 2C (PDF) 6. Warranty Deed and Bill of Sale - Phase 2A (PDF) 7. Warranty Deed and Bill of Sale - Phase 2B (PDF) 8. Warranty Deed and Bill of Sale - Phase 2C (PDF) 16.A.3 Packet Pg. 1034 06/25/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.3 Doc ID: 9038 Item Summary: Recommendation to approve final acceptance and accept the conveyance of the potable water and sewer utility facilities for Madison Park Phase 2A, PL20110000699; Madison Park Phase 2B, PL20110002005, and Madison Park Phase 2C, PL20130000920, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $8,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 06/25/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 05/20/2019 11:09 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 05/20/2019 11:09 AM Approved By: Review: Wastewater Steve Nagy Additional Reviewer Completed 05/20/2019 1:06 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 05/20/2019 3:16 PM Growth Management Operations & Regulatory Management Rose Burke Additional Reviewer Completed 05/20/2019 4:04 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 05/21/2019 1:26 PM Wastewater Beth Johnssen Additional Reviewer Completed 05/22/2019 9:17 AM Water Steve Messner Additional Reviewer Completed 05/22/2019 9:59 AM Water Pamela Libby Additional Reviewer Completed 05/28/2019 10:36 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 05/28/2019 2:52 PM Growth Management Department Matthew McLean Additional Reviewer Completed 05/28/2019 3:40 PM Growth Management Department James C French Deputy Department Head Review Completed 05/28/2019 6:01 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/30/2019 9:52 AM County Attorney's Office Sally Ashkar Level 2 Attorney Review Completed 05/31/2019 9:29 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/31/2019 10:27 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/06/2019 5:01 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 06/07/2019 9:07 AM 16.A.3 Packet Pg. 1035 06/25/2019 County Manager's Office Heather Yilmaz Level 4 County Manager Review Completed 06/17/2019 9:09 AM Board of County Commissioners MaryJo Brock Meeting Pending 06/25/2019 9:00 AM 16.A.3 Packet Pg. 1036 MADISON PARK PHASE 2A, 2B, AND 2C LOCATION MAP 16.A.3.a Packet Pg. 1037 Attachment: Location Map (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond W/Plat Final Obligation Bond Phase 2A $4,000 2011033618 Final Obligation Bond Phase 2B $4,000 723639 Final Obligation Bond Phase 2C N/A Total Amount $8,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1.Verification of Final Cost 2.Receipt of Payment 16.A.3.b Packet Pg. 1038 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) ORIGINAL PROJECT NAME: VERIFICATION OF FINAL COST MADISON PARK PHASE 2A LOCATION: SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER I ITEM DR-18 TAPPING SLEEVE AND VALVE STEEL CASING SIZE 8" 12"x8" 18" QUAN. UNIT COST 19 LF $20.84 1 EA $4,410.00 18 LF $284.55 TOTAL COST I do hereby certify that the quantities of material and services described above are true and accurate representation of the as-installed cost of the system. CERTIFYING: _jiMofc.MITCHELL, SR. President OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 7th day of March, 2006 by Timothy C. Mitchell, Sr. who is personally known to me and who did not take an oath. TOTAL I $395.96 $4,410.00 $5,121.90 $9,927.86 � �J SEAL: II • LINDA MAHON ,,��v.���,, Lmda Mahon DD 177119 t'f-��� Commission#D01771 19 :;.� .. ��:j Expires: Feb 21, 2007',,%;i<1;�,' Bonded Thru ''1111'' Atl . antic Bonding Co., Inc. 16.A.3.b Packet Pg. 1039 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) I ORIGINAL PROJECT NAME: LOCATION: VERIFICATION OF FINAL COST MADISON PARK PHASE 2-B SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER ITEM SIZE QUAN. UNIT 6" DR-14 375 LF 6" DR-18 6333 LF 8" DR-18 642 LF 6" GATE VALVE 10 EA 8" GATE VALVE 3 EA ARV 1 EA PBSP 2 EA FIRE HYDRANT AS SEMBLY 13 EA SING LE WATER SERVICE-SF 9 EA DOUBLE WATER SERVICE-SF 70 EA TOTAL COST COST 14.81 13.76 20.84 840 1208.36 1143.25 1155 3255.15 315 525 I do hereby certify that the quantities of material and services described above are true and accurate representation of the as-installed cost of the system. TOTAL $5,553.75 $87,142.08 $13,379.28 $8,400.00 $3,625.08 $1,143.25 $2,310.00 $42,316.95 $2,835.00 $36,750.00 $203,455.39 � G: BRENDA K. MERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) \"} The foregoing instrument was signed and acknowledged before me this 13TH day OCTOBER , ��\ \)'\_ 2006 by Bren�a K. Me;:,:nt iJo is personally known to me and who did not take an oath. _ � J\ �: · � \J)j� �SEAL: -v---__ }� ¼ LINA MAHON �'\,� DD 177119 --�w,,, LindaMahon ""; - -. --\.<Y rl'lf ��� Commiss ion #bD2D1 1727010179 tv · /\ ;:;._ ";)):�Expires: Fe , vJ -:.,;..,� .. .[�,:: Bonded Thro tJ. '•,,� .. ,,,, Atlantic Bonding Co., Inc. '\ · � · 16.A.3.b Packet Pg. 1040 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) PROJECT NAME: VERIFICATION OF FINAL COST MADISON PARK PHASE 2-B ORIGINAL I LOCATION: SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER ITEM SIZE QUAN. UNIT 8" SDR-26 4727 LF 4" DR-14 150 LF 4" DR-18 2218 LF 6" DR-18 680 LF 4" PLUG VALVE 2 EA 6" PLUG VALVE 1 EA 4' DIA MANHOLE 21 EA SINGLE SERVICES (I 12 LF OF LATERAL INCLUDED IN COST) 4 EA DOUBLE SERVICES (2139 LF OF LATERAL INCLUDED IN COST) 72 EA COST $68.00 $13.65 $13.13 $20.21 $866.25 $1,050.21 $5,192.35 $665.25 $715.36 LIFf STATION 1 EA $136,500.00 ARV 2 EA $3,570.00 TOTAL COST I do hereby certify that the quantities of material and services described above are true and accurate representation of the as-installed cost of the system. CERTIFYING: � BRENDA K. MERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 11 TH day DECEMBER, 2006 by Brenda K. Merchant who is personally known to me and who did not take an oath. � � SEAL: LINDA MAHON DD 177119 ,, .. .,,, L-• d Mah /b"'-�v-��t';. � _a on �:-�··::� Com!1J1ss10n#DD1771197:-�--�-ii'"f Exp1res: Feb 21, 2007 ',,?f oH(O�,' Bonded Thru 1""11 A.ti . 8 annc onding Co., Inc TOTAL $321,436.00 $2,047.50 $29,122.34 $13,742.80 $1,732.50 $1,050.21 $109,039.35 $2,661.00 $51,505.92 $136,500.00 $7,140.00 $675,977.62 16.A.3.b Packet Pg. 1041 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) I PROJECT NAME: LOCATION: VERIFICATION OF FINAL COST MADISON PARK PHASE 2-C SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER ITEM SIZE DR-14 6" DR-18 6" DR-18 8" GATE VALVE 8" GATE VALVE 6" PBSP FIRE HYDRANT ASSEMBLY SINGLE WATER SERVICE ( 242 LF OF I" POL YTUBING) DOUBLE WATER SERVICE (1332 LF OF I" POLYTUBING) CERTIFYING: QUAN. UNIT COST 95 3028 1636 2 6 2 15 6 47 TOTAL COST LF $14.81 LF $13.76 LF $20.84 EA $1,155.00 EA $840.00 EA $1,155.00 EA $3,255.00 EA $315.00 EA $525.00 �.Merchant Authorized Agent OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 20th day of MARCH, 2007 by Brenda K. Merchant who is personally known to me and who did not take an oath. <7f� � Linda Mahon DD 628677 SEAL: NOTARY PUBLIC· STATE OF FLORIDA.-······"••·•.. Linda Mahon f W }Commissioo#DD628677 ·-.�--- E x p i r e s : F E B . 21, 2011 coNi>°F.o rnRu ATLANTIC BONDING co., INC. TOTAL $1,406.95 $41,665.28 $34,094.24 $2,310.00 $5,040.00 $2,310.00 $48,825.00 $1,890.00 $24,675.00 $162,216.47 16.A.3.b Packet Pg. 1042 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) VERIFICATION OF FINAL COST PROJECT NAME: MADISON PARK PHASE 2-C LOCATION SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 ITEM QUAN. UNIT TOTAL sDR-26 8" DR-14 4" DR-18 4" 4' DIA MANHOLE SINGLE SERVICES ( I97 LF OF LATERAL INCLUDED IN COST ) DOUBLE SERVICES ( 1306 LF OF LATERAL INCLUDED IN COST ) LIF-T STATION ARV 4433 37 1 861 22 7 46 1 1 LF $68.00 LF $13.65 LF $13.13EA $5,192.35EA $31s.00EA $525.00 EA $126,000.00EA $3,570.00 $301,444.00 $505.0s $24,434.93 $114,231.70 $2,205.00 $24,150.00 $126,000.00 $3,570.00 $596,540.68 ?LD 1,1 TOTAL COST I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. CERTIFYING: Brenda K. Merchant Authorized Agent OF: Haleakala Construction, lnc. 5758 Taylor Road Naples, Florida 341 09-1 829 STATE OF FLORTDA ) )SS couNTY oF coLLrER ) The foregoing instrument was signed and acknowledged before me this 20th day of MARCH, 2007 by Brenda K. Merchant who is personally known to me and who did not take an oath. Li Mahon '4li) DD 628677 SEAL: n-9IsI".:*uf; iif,f.fi#'^ i.Wj*ml"igJ,,!:13i1 uoi'itiiiunu iruNllc BoNDING c0'' INc' TYPE OF UTILITY SYSTEM: SANITARY SEWER / FORCE MAIN 16.A.3.b Packet Pg. 1043 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.b Packet Pg. 1044 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) Official Receipt - Collier County Board of County Commissioners CDPR1103 - Official Receipt Trans Number Date Post Date Pavment Slip Nbr 723639 111281200611:28:13 AM 1112812006 AR 10280 Appl Name: WILSONMILLER, lNC. ApplStage/Status: REVIEW STAGE NO. 1/PENDING Address:ADAM HAYES 4571 COLONIAL BLVD FT. MYERS FL33912 Proj Name: MADISON PARK PHASE TWO Type: RSF TAZ:108 Subdiv Nbr: 100 Project Nbr: 2004050061 Payor: CENTEX HOMES Fee lnformation Payments Total Fee Code Description GL Account Amount Waived l2BOND DEPOSITS-COMM DEV (CASH BOND 6700000002201 1 300000 $4000.00 $4000.00 Payment Code AccounUCheck Number Amount CHECK 5056306 $4000.00 Total Cash Total Non-Cash $0.00 $4000.00 Memo: Collier County Board of County Commissioners CD-P/us for Windows 95/NT Total Paid $4000.00 Cashier/location: MCCAULEYKATY / I User: EATON_S Printed:1 1 12812006 1 1 :29:09 AM 16.A.3.b Packet Pg. 1045 Attachment: Exhibit A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) ORIGINAL CERTIFICATION OF CONTRIBUTORY ASSETS-COUNTY PROJECT NAME: LOCATION: MADISON PARK PHASE 2A SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) I ITEM SIZE QUAN. UNIT COST TOTAL I DR-18 TAPPING SLEEVE AND VAL VE STEEL CASING 8" 12"x8" 18" 19 LF $8.00 1 EA $2,423.30 18 LF $35.00 $152.00 $2,423.30 $630.00 TOTAL COST $3,205.30 I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. CERTIFYING: ���)'!'MOT G.MITCHELL, SR. President OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 ST ATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 7th day of March, 2006 by Timothy C � personally known to me and who did not take an oath ef_�� LINDA MAHON SEAL: DD 177119 \''"''' 1· d M .:-1��".��- � .a ahon �.(�\� Com!1J1ss1on#DDl77l 19��-. �-�..-g Expires: Feb 21 2007',,Jo;i,i_o�,, Bonded Thnl , , '"' '' Atlantic Bonding Co., Inc. 16.A.3.c Packet Pg. 1046 Attachment: Assets Sheet - Phase 2A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) I CERTIFICATION OF CONTRIBUTORY ASSETS -COUNTY PROJECT NAME: LOCATION: MADISON PARK PHASE 2-B SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM QUAN. UNIT COST 6" OR-14 375 LF $6.00 6" DR-18 6333 LF $5.00 8" DR-18 642 LF $8.00 6" GATE VALVE 10 EA $500.00 8" GATE VALVE 3 EA $726.00 ARV 1 EA $723.58 PBSP 2 EA $632.20 FIRE HYDRANT ASSEMBLY 13 EA $1,925.32 SINGLE WATER SERVICE-SF 9 EA $230.64 DOUBLE WATER SERVICE -SF 70 EA $326.98 TOTAL COST I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. �: BRENDA K. MERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) TOTAL $2,250.00 $31,665.00 $5,136.00 $5,000.00 $2,178.00 $723.58 $1,264.40 $25,029.16 $2,075.76 $22,888.60 $98,210.50 The foregoing instrument was signed and acknowledged before me this 27TH day OCTOBER � Y �renda � o is personally known to me and who did not take an oath. �SEAL: LIDAMAHON DD 177119 .. --i��ltJ,,,, Linda Mahon ,=-�-�-�= Commission#DDl771 19 �;:._ '1J.=:f Expires: Feb 21, 2007 ',,��oif�o�,;;-Bonded Thru ,,,,.,,,,, Atlantic Bonding Co., Inc. 16.A.3.d Packet Pg. 1047 Attachment: Assets Sheet - Phase 2B (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) I CERTIFICATION OF CONTRIBUTORY ASSETS -COUNTY PROJECT NAME: LOCATION: MADISON PARK PHASE 2-B SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER/ FORCE MAIN (MATERIALS ONLY) ITEM QUAN. UNIT COST 8" SDR-26 4727 LF $5.00 4" DR-14 150 LF $5.79 4" DR-18 2218 LF $4.25 6" DR-18 680 LF $5.28 4" PLUG VALVE 2 EA $459.87 6" PLUG VALVE 1 EA $623.21 4' DIA MANHOLE 21 EA $3,254.25 SINGLE SERVICES (112 LF OF LATERAL INCLUDED IN COST) 4 EA $401.20 DOUBLE SERVICES (2139 LF OF LATERAL INCLUDED IN COST) 72 EA $487.51 LIFT STATION 1 EA $109,258.59 ARV 2 EA $2,602.00 TOTAL COST I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. CERTIFYING: TOTAL $23,635.00 $868.50 $9,426.50 $3,590.40 $919.74 $623.21 $68,339.25 $1,604.80 $35,100.72 $109,258.59 $5,204.00 $258,570.71 � BRENDA K. MERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 11 TH day DECEMBER , 2006 by Brenda K. Merchant who is personally known to me and who did not take an oath. �� LIDAMAHON SEAL: DD 177119 ,,, .... ,,, LindaMahon ::�"'-�"-���<J:.s Commission #0D1771 l 9 �•:�:;�Expires: Feb 21, 2007 � .. �� .... 0:f � Bonded Thru ,,,,,���,,,' A.tlantic Bonding Co., Inc 16.A.3.d Packet Pg. 1048 Attachment: Assets Sheet - Phase 2B (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) I CERTIFICATION OF CONTRIBUTORY ASSETS-COUNTY PROJECT NAME: LOCATION: MADISON PARK PHASE 2-C SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT DR-14 6" 95 LF DR-18 6" 3028 LF DR-18 8" 1636 LF GATE VALVE 8" 2 EA GATE VALVE 6" 6 EA PBSP 2 EA SINGLE WATER SERVICE ( 242 LF OF I" POLYTUBING) 6 EA DOUBLE WATER SERVICE (1332 LFOF I" POLYTUBING) 47 EA TOTAL COST COST $6.00 $5.00 $8.00 $726.00 $500.00 $632.20 $230.64 $326.98 TOTAL $570.00 $15,140.00 $13,088.00 $1,452.00 $3,000.00 $1,264.40 $1,383.84 $15,368.06 $51,266.30 -;?S G: Brenda K. Merchant Authorized Agent OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 20th day of MARCH, 2007 by Brenda K. Merchant who is personally known to me and who did not take an oath. �/11� inda Mahon DD 628677 SEAL: NOTARY PUBUC • STATE OF FLORIDA $'ij'._ Llnda Mahon \ ) Co�ssion # DD628677 ',,,,.,..... Expires: FEB. 21 2011 BONDED THRU ATLANTIC BONDING CO., INC. 16.A.3.e Packet Pg. 1049 Attachment: Assets Sheet - Phase 2C (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) I CERTIFICATION OF CONTRIBUTORY ASSETS-COUNTY PROJECT NAME: MADISON PARK PHASE 2-C LOCATION: SECTION 4, TOWNSHIP 50 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME & ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER/ FORCE MAIN ( MATERIALS ONLY) ITEM SIZE SDR-26 8" DR-14 4" DR-18 4" 4' DIA MANHOLE SINGLE SERVICES (197 LF OF LATERAL INCLUDED IN COST) DOUBLE SERVICES(l306 LF OF LATERAL INCLUDED IN COST) LIFT ST A TION ARV CERTIFYING: Brenda K. Merchant Authorized Agent OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) QUAN. UNIT COST 4433 LF $5.00 37 LF $5.79 1861 LF $4.25 22 EA $3,254.25 7 EA $401.20 46 EA $487.51 1 EA $109,258.59 1 EA $2,602.00 TOTAL COST The foregoing instrument was signed and acknowledged before me this 20th day of MARCH, 2007 by Brenda K. Merchant who is personally known to me and who did not take an oath. of� � Linda Mahon DD 628677 SEAL: NOTARY PUBLIC. STATE OF FLORIDA............... Linda Mahon g W �Commission#DD628677 --;,,'ft¥1..·· Expires : FEB. 21, 2011 BO;o'io'rHRU ATLANTIC BONDING co., INC. TOTAL $22,165.00 $214.23 $7,909.25 $71,593.50 $2,808.40 $22,425.46 $109,258.59 $2,602.00 $238,976.43 16.A.3.e Packet Pg. 1050 Attachment: Assets Sheet - Phase 2C (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.f Packet Pg. 1051 Attachment: Warranty Deed and Bill of Sale - Phase 2A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.f Packet Pg. 1052 Attachment: Warranty Deed and Bill of Sale - Phase 2A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.f Packet Pg. 1053 Attachment: Warranty Deed and Bill of Sale - Phase 2A (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.fPacket Pg. 1054Attachment: Warranty Deed and Bill of Sale - Phase 2A (9038 : Final Acceptance of Utilities - Madison 16.A.3.g Packet Pg. 1055 Attachment: Warranty Deed and Bill of Sale - Phase 2B (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.g Packet Pg. 1056 Attachment: Warranty Deed and Bill of Sale - Phase 2B (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.g Packet Pg. 1057 Attachment: Warranty Deed and Bill of Sale - Phase 2B (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.gPacket Pg. 1058Attachment: Warranty Deed and Bill of Sale - Phase 2B (9038 : Final Acceptance of Utilities - Madison 16.A.3.h Packet Pg. 1059 Attachment: Warranty Deed and Bill of Sale - Phase 2C (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.h Packet Pg. 1060 Attachment: Warranty Deed and Bill of Sale - Phase 2C (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.h Packet Pg. 1061 Attachment: Warranty Deed and Bill of Sale - Phase 2C (9038 : Final Acceptance of Utilities - Madison Park Phase 2A, 2B and 2C) 16.A.3.hPacket Pg. 1062Attachment: Warranty Deed and Bill of Sale - Phase 2C (9038 : Final Acceptance of Utilities - Madison