Agenda 11/10/2009 Item #16A 3
Agenda Item No. 16A3
hlovember 10, 2009
Page 1 of 13
EXECUT;VF SUMMARY
Recommendation to grant final approval of the roadway (private) and
drainage improvements for the finai plat of Mediterra Parcel 125 Replat,
with the roadway and drainage improvements being privately maintained.
(Fiscal Impact - 0).
OBJECTIVE:
To grant final approval of the infrastructure improvements associated with that
subdivision known as Mediterra Parcel 125 Replat.
CONSIDERA TIONS:
1. On April 12, 2007, Engineering and Environmental Services Department
granted preliminary acceptance of the roadway and drainage
improvements in Mediterra Parcel 125 Replat.
2. The roadway and drainage improvements will be maintained by the
project's community association.
3.
The required improvements have been constructed in accordance with the
Land Development Code. The Engineering and Environmental Services
Department has inspected the improvements and is recommending final
acceptance of the improvements.
,-
4. A resolution for final acceptance has been prepared and approved by the
County Attorney's Office, A copy of the document is attached.
5. This PUD has been found to be in substantial compliance.
FISCAL IMPACT:
The roadway and drainage improvements will be maintained by the project's
community association.
GROWTH MANAGEMENT IMPACT: There is no growth management impact.
LEGAL CONSIDERATIONS:
The County Attorney's Office has reviewed and approved the Resolution for legal
sufficiency. This item is ready for Board consideration and approval. STW
-
Agenda Item No. 16/\3
November 10, 2009
Page 2 of 13
RECOMMENDATION:
That the Board of County Commissioners grant final acceptance of the roadway
and drainage improvements in Mediterra Parcel 125 Replat and release the
maintenance security.
1. Authorize the Chairman to execute the attached resolution authorizing
final acceptance.
2. Authorize the release of the maintenance security.
PREPARED BY: John Houldsworth, Senior Site Plan Reviewer, Engineering and
Environmental Services Department
".-'''.
Item Number:
item Summary:
Meeti ng Date:
1. U5\..- .1 Vl. .1
Agenda Item t'-Jo. 16A3
November 10, 2009
Page 3 of 13
COLLIER CO~T!'~TY
BOARD ,,)!= COUNTY (;(JMMiSSiOi\IERS
16A3
Recommendation tv g,a;->t final appivv'ai of the ioadway (private) and drainage improvements for
the final plat of Mediterra Parcel 125 Replat, with the roadway and drainage improvements being
privately maintained
11/10/2009900:00 AM
Prepared By
John Houldsworth
Community Development &
Environmental Services
Senior Engineer
Date
Engineering Services
10/13/200911:10:31 AM
Approved By
MaryAnn Devanas
Community Development &
Environmental Services
Approved By
William D. Lorenz, Jr., P.E.
Community Development &
Environmental Services
Senior Planner
Date
CDES Engineering
10/13/20094:31 PM
Environmental Services Director
Date
Approved By
Environmental Services
10/14/20099:42 AM
Judy Puig
Community Development &
Environmental Services
Operations Analyst
Community Development &
Environmental Services Admin.
Date
10/15/2009 8:39 AM
Approved By
Steven Williams
Attorney's Office
Assistant County Attorney
Date
Attorney's Office
10/27/20098:37 AM
Approved By
Joseph K. Schmitt
Community Development &
Environmental Services
Community Development &
Environmental Services Adminstrator
Date
Community Development &
Environmental Services Admin.
10/27/200912:54 PM
Approved By
OMS Coordinator
County Manager's Office
OMS Coordinator
Date
Office of Management & Budget
10127/2009 2:38 PM
Approved By
Jeff Klatzkow
County Attorney
County Attorney
Date
County Attorney Office
10/30/2009 3:31 PM
Approved By
Mark Isackson
County Manager's Office
Budget Analyst
Date
Office of Management & Budget
1113120098:58 AM
Cl_./IT'I.\ 4 ~_~~.j_rr__..l..\T"'_.___~.4-\1~O "-T__._.__1-_.. 1/1. .,n.Ar\\1[ ~~""TC1r''l\T'"'''' A"r1t..T~^\1r" nl\~K
11 /It I"')A()O
r0 Ole'>
dOor-
00~
~- 0.J '::J
. .,..,.....
00 .
Z:::~
E ill ('ij
c.J-9CL
~=
:u ill
0;:0:
~ ',""
Q3Z
0)
<:
",I
tXl
fir!
i~l
I~'
J....!
\ \
\ \
\ \ I,
\\\\,
\\ \
)ij
// )
((( !
\',1, >-
\'\\ ~
\, \ ~
\\\\ '"
,\ ,
\ \ '\
\ \ \
1 ~ \
,/ / /
;J!
;!/
~ II'
~ I
~>--ij
\ I, \ ( II i
\Jf----ty--\\ J
\__~.---JJ
"\_-l;",~"
IK~
""
~ ~ to
f-Z
00
w--
,f-
0<(
a:0
11..0
-1
l<J
l<J
-1
s
I f-J ~~~ I
~' ~~fC ~~ lllli::: "'~~ I'
~~~ ~ 0 I ~ CW~" ~ ~ "
';c'C-i!il ':1 "; ill
NO",N"N'N 011~ > II SL'31V1S>alN1
,-- ----rti ~
.n"^,""m'''OCI,"QOH''''~C (~u,~~
SL'31;LS""",1 ~~. ~ --"':~;r-~~ l' -,- J~ ~ h h !.
3' e - 'II ,''"'' >", < ~ ~ ,
~~~ cc ~ 1[;O'fG~ ~g i: ~~~~, > 5 I ;,"
-' ~~ ~f=;! ~""J ~~j. I 1---- E;~i I'
, " ,-===tl.:.i ' __ -- -
.- ~ ~" - - - - - "- T lMNG5TON ROAD
"-,.':J '\1:10)
t__~ ~ ~S~~~~'
~~ lr--'~ N ~
~ ~~ 1J!~_,_~1~ r
r~~rJ~
~// ~II~~~I~ s. ~~;:'1e ~~I
c ii !~II ~;;k,! .' p }d?;ii :.
~:;z~~:~'UrT-:)~ ~ Bp I~'~~
,,"~ ^""- -7-1 I ~1 g)) ~ I d2
~~"L~_ : / ~j~~, --:- ;;;;',-
~~~:::- : ~u ___.--!=--~LJt'~"O",ti"OOQ03""Oar
'''-~:jL=~[':,w -,==--==--- =-:r,f~, -~~ I
;; ~_'UU\' ~V" -"""'0&.......
,'N ~~,~;~; ;;'4-r;/' 3 ""1
(' '" ~ct I ~?co. r'= I.. i -' '.2! g
J ~2.~u', !~~ il<,"Ii!
/' ~~! j ~t 'c~1f .
!
Iri
!I
III
II
f~J
I;j
~
I
I
I
I
/-1
( I
Z
<C
G
~
~------~-
/.-'
/....
<C
Q
Q
i:'
~
~,~,.~
~~~ ,\
ii' j!
]l'lfJS O! lON
~
atlYt.31OOS N"t'OO1
(IMO} ::;
)Il'll'N,QNVlSI
...<
~~'
au
aVQC! NO.tSSlN'^'l
-
~
!~ ~,
5
~'
~ ~
j i '"
0'
g
~
:g
I :~
h='--
I
I-~r ILei-
y; h-- [.J
.h ;~ . >
c .
4!;-.J ~~ ~l
Ik~l I
,""
,
~~[ ~
j~~
i5~::;
(I.';; "}:I"::>)
(J\l'Ol:! ONlT1nd" l.MOdHIV
I',
~zi\
I: i
I;,
~ .
~: i~
ii,
I:
, ~3'
- !~
d~
n3~" I
. I u~ i
"-=--1
tr~:-+
:: I. t ,.1
~~ Ii /'
,,-,c; -1/
;~~
0..1
<(
L
UJ
l-
ei)
jl
n..1
~I
;,
il
fal
::E:
~~
0...
<(
~
"
z
o
-
I-
<(
U
o
...J
=
~
Agenda Item No. 1 tlAj
November 10, 2009
Page 5 of 13
RESOLUTION NO. 09-_
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY,
FLORIDA AUTHORIZING FINAL
ACCEPTANCE OF CERTAIN ROADWAY AND
DRAINAGE IMPROVEMENTS IN MEDITERRA
PARCEL 125 REPLAT, ACCORDING TO THE
PLAT THEREOF RECORDED IN PLAT BOOK
42, PAGES 55 THROUGH 56; RELEASE OF THE
~TENANCE SECURITY; AND
ACCEPTANCE OF THE MAINTENANCE
RESPONSIBILITY FOR THE ROADWAY AND
DRAINAGE IMPROVEMENTS THAT ARE NOT
REQUIRED TO BE MAINTAINED BY THE
MEDITERRA COMMUNITY ASSOCIATION,
INC., OR THE LUCARNO VILLA
ASSOCIATION,INC.
WHEREAS, the Board of County Commissioners of Collier County, Florida, on
March 8,2005, approved the plat of Mediterra Parcel 125 Replat for recording; and
WHEREAS, the Developer has constructed and maintained the roadway and
drainage improvements in accordance with the approved plans and specifications as
required by the Land Development Code (Collier County Ordinance No. 04-41, as
amended); and
WHEREAS, the Developer is requesting final acceptance of the roadway and
drainage improvements and release of his maintenance security; and
WHEREAS, the Engineering and Environmental Services Department has
inspected the roadway and drainage improvements, and is recommending acceptance of
said facilities.
NOW, TIffiREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that fmal acceptance is hereby
granted for those roadway and drainage improvements in Mediterra Parcel 125 Replat,
pursuant to' the plat thereof recorded in Plat Book 42, pages 55 through 56, and the Clerk
is hereby authorized to release the maintenance security.
,,-
,A,genda Item l\io. 10);..:)
, November 10,2009
Page 6 of 13
BE IT FURTHER RESOLVE'/) AND ORDERED that the County accept the
future maintenance and other attendant costs for t.~ose roadway and drainage
improvements that are not required to be maintained by the Mediterra Community
Association, Inc., or the Lucarno Villa Association, Inc. All of the drainage and roadway
facilities within this subdivision will be privately maintained.
TIlis Rc:solution adopted after motion, second and majority vote favoring same,
this day of . 2009.
DATE:
A TrEST:
DWIGHT E. BROCK, CLERK
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
, Deputy Clerk
By:
DONNA FIALA, CHAIRMAN
Approved as to form and legal
sufficiency:
~t~AA 7W~
Steven T. Williams ,t> 'W'lI,
Assistant Collier County Attorney
-,
Agenda Item NO.1 bAJ
November 10, 2009
Page 7 of 13
,,-..c
Mediterra Phase Three East Unit One - Parcel 125
Engineer's Opinion of Probable Cost, 9/04
WjlsonMDler, Ine. Drawing No. D-2934-195
Docs #141566
Drainage
Item Units Quantity Unit Price Total Price
15" RCP LF 853 $26.84 $22 895
18" RCP LF 245 $28.00 $6,860
24" RCP LF 228 $40.00 $9,120
15" Concrete Headwall EA 2 $1,000.00 $2,000
18" Concrete Headwall EA 2 $1,200.00 $2,400
24" Concrete Headwall EA 2 $1,300.00 $2,600
Junction Box EA 1 $1,700.00 $1.700
Catch Basins (Tvoe R) EA IS $1,600.00 $24,000
Control. Strnctnre EA 1 $3,300.00 $3.300
Remove Plug and Connect to IS" RCP EA 2 $408.00 $816
Total
575.691
&'311:!OOS ./132002
N0442~
-
,ft.
Aqenda Item No, 16A3
~ November 10. 2009
Page 8 of 13
Mediterra Phase Three East Unit One - Parcel 125
Engineer's Opinion of Probable Cost, 9/04
Wilson Miller, Inc. Drawing No. D-2934-195
Paving
Docs #141566
Item Units Qwmtity Unit Price Total Price
Paver Bric.kslHardscanc SF 115.445 $5.00 $577,225
6" Limc:rock Base SY 5,552 $5.30 $29 426
12" Stabilized Subl!I'lldc SY 6,119 $1.76 $10,769
2' Rolled Curb LF 2,486 $16.34 $40 621
12" Ribbon Curb LF 2,052 $16.34 $33,530
Install PCP's ffivWilsonMiller) LS 1 $2 000 $1,000
SUzna~c LS 1 $1,500 $1,500
Total
$695,071
etJll2OO6.t32002
N04.c z.soc.ooo
Agenda Item No. 16A3
November 10, 2009
Page 9 of 13
Mediterra Phase Three East Unit One - Parcel 125
Engineer's Opinion of Probable Cost, 9/04
WilsonMfller, Ine. Drawing No. D-2934-19S
Landscape
Docs #141566
Estimated
Rem Unit - Unit Prioe Total Price
Planting Matcr:ia1 & JrrillBtion SVIltemAllowanoe 1 LS $50000.00 S50 000.00
Landscape Total
$50.000.00
Notes:
1. Planting Material and Irrigation System estimate Is for code minimum only.
, 1131_._
N0442-II04.QOO
-~
Aqenda Item No, 1 GA3
~ November 10, 2009
Page 10 of 13
I
I
!
Mediterra Phase Three East Unit One - Parcel 125
Engineer's Opinion of Probable Cost, 9/04
WiIsonMiller, Inc. Drawing No. D-2934-195
Docs #141566
Lighting
Item
Units
Allowance
LS
Unit Price
Total Price
1
$35.000.00
$35,000
Total
$35,000
&'31J2000 -132002
N0442..&04-OOO
I
Agenda Item No. 16A3
November 10,2009
Page 11 of 13
Mediterra Phase Three :F.3st Unit One - Parcel 125
Engineer's Opinion of Probable Cost, 9/04
WilsonMiller, Inc. Drawing No. D-2934-195
Docs #141566
Irrigation
Item Units Quantity Unit Price Total Price
4N pve Irrigation Main (C-900 Class-1S0) LF 2,056 $U.OO $22,616
4N Blow-oWwl Gate Valve BA 2 $1,200.00 $2.400
4" Gate Valve EA 3 $500.00 $1,500
. 2" Irrigation Meter EA 2 $ 1,000.00 $ 2 000.00
Total
$%8,516
--
813112008 -132Oll2
N0442.e04-<<lO
Mediterra Phase Three East Unit One - Parcel 125
Engineer's Opinion of Probable Cost, 9/04
WilsonMiller, Inc. Drawing No. D-2934-195
Aaenda Item r~o, 16A3
~ November 10, 2009
Page 12 of 13
Docs #141566
Potable Water
Item Units Unit Price Total Price
OfiSite Hot. Tap existinj;t 10" Main BA 1 $ 4,300 $ 4,300
81t pve Water Main. C900, Oass 150 LP 280 $ 20 $ 5.600
10" pve Water Main. C900, Oass ISO LF 1,882 $ 25 $ 46.109
8" Gate Yalvewl Box EA 1 $ 1,100 $ 1100
10" Gate Valve wi Box EA 3 $ 1,170 $ 3,510
Fire HYdrant Asscmblv EA 7 $ 2,750 $ 19,250
Fire HVdlant Assemblv EA 3 $ 2,750 $ 8,250
Pcunancnt Bacterial Sample Point EA 3 $ 1,125 $ 3.375
Temoorarv Bactcria1 SamDle Point EA 2 $ 200 $ 400
Sinde Wake Service EA 3 $ 540 $ 1,620
Double Water Service EA 23 S 650 $ 14,950
8" x 6" Reducer EA 1 $ 700 $ 700
10" x 6" Reducer EA 1 $ 800 $ 800
10" Back Flow Pr~enter EA 1 $ 35,000 $ 35.000
Ol.lorination and Testin2 LS 1 $ 500 $ 500
Total
$145,464
III ~12OOil -1/32002
NCl442-604.000
Agenda Item No, 16A3
November 10. 2009
Page 13 of 13
Mediterra Pha!e Three East Unit One - Pareel125
Engineer's Opinion of Probable Cost, 9/04
WnsonMiller, Inc. Drawin& No. D-2934-195
Wastewater
Docs #141566
Units Qu.
BA 3
BA 7
BA 4
BA 1
LP 589
LP 814
LP 229
EA 2
BA 45
EA 3
Total $134,098.24
1/3112l1OS .n2llClZ
N)6Q.104~
-. ---