Loading...
Agenda 07/28/2009 Item #16B10Agenda Item No. 16610 July 28, 2009 Page 1 of 10 EXECUTIVE SUMMARY Recommendation to approve a change order to a work order in the amount of $43,950.00 to Post, Buckley, Schuh & Jernigan, Inc. (PBS &J) for contract #06 -3969 "Fixed Term Professional Engineering Services" for the Lely Area Stormwater Improvement Project (LASIP), Whitaker Road Improvements (Project No. 51101) necessary to relocate utility pipelines in conflict with stormwater improvements due to unforeseen conditions. OBJECTIVE: To add services to existing contract by change order to assist the Transportation Services Division, Stormwater Management Section in the identification, relocation, permitting and construction oversight for the relocation of the utility pipelines in conflict with the stormwater improvements. The need for these additional services is described in greater detail on the attached Professional Engineering Services for LASIP Whitaker Road Project - Scope of Work. CONSIDERATION: The purpose of the overall LASIP project is to provide a comprehensive stormwater outfall system for the area of East Naples, which has experienced an increasing level of drainage related problems as growth has continued in the area. The drainage area of LASIP consists of about 11,135 acres and consists of two sub - basins known as the Lely Canal Basin system and the Lely Manor Basin system. The Lely Canal Basin discharges into an estuarine coastal zone along the intercoastal waterway near Dollar Bay. The Lely Manor Canal discharges into an estuarine coastal zone near the headwaters of Sandhill Bay and eventually into Rookery Bay. This segment of the project will provide stormwater design services which include the LASIP improvements for all of Whitaker Road from County Barn Road to the Santa Barbara corridor, including the box culvert located along the western border of Royal Wood Country Club. The scope of work includes data collection, design services, permitting, professional meetings and bid services. The requested change order involves identification, relocation, permitting and construction oversight for the relocation of the utility pipelines in conflict with the stormwater improvements. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is not quasi-judicial and requires no ex parte disclosure, requires only a majority vote for approval, and is otherwise legally sufficient for Board action. —SRT FISCAL IMPACT: Funding in the amount of 543,950.00 is available in the Stormwater Capital Projects Fund (325) LASIP Project (Project No. 51101). GROWTH MANAGEMENT IMPACT: The LASIP Whitaker Road Stormwater Improvement project is in accordance with the goals and objectives of the Drainage Sub - element of the Growth Management Plan for Collier County Stormwater Management.. RECOMMENDATION: That the Board of County Commissioners approve a change order to a work order for the LASIP Whitaker Road project in the amount of`$43,950.00 with PBS &J, Inc., Agenda Item No, 16810 July 28, 2009 Page 2 of 10 necessary to relocate utility pipelines in conflict with stormwater improvements due to unforeseen conditions. Prepared By: Margaret A. Bishop, Senior Project Manager, Stormwater Management Section Attachments: (1) Change Order, Professional Engineering Services for LASIP - Scope of Work. Page 1 of 2 Agenda Item No. 16B10 July 28, 2009 Page 3 of 10 file: / /C: \AgendaTest\ Export\1'13-July %2028, %202009\ 16. %2000NSENT %20AGENDA\ 1... 7/22/2009 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: 16B10 Item Summary: Recommendation to approve a change order to a work order in the amount of $43,950.00 to Post, Buckley, Schuh & Jernigan, Inc. (PBS &J) for contract #06 -3969 Fixed Term Professional Engineering Services for the Lely Area Stormwater Improvement Project (LASIP), Whitaker Road Improvements (Project No. 51101) necessary to relocate utility pipelines in conflict with stormwater improvements due to unforeseen conditions. Meeting Date: 7/28/2009 9:00:00 AM Approved By Margaret A. Bishop Project Manager Date Transportation Services Stormwater Management 6129/2009 4:04 PM Approved By Scott R. Teach Assistant County Attorney Date County Attorney County Attorney Office 711/2009 3:54 PM Approved By Caroline Soto Administrative Assistant Date Transportation Services Transportation Engineering and 71212009 11:40 AM Construction Approved By Norm E. Feder, AICP Transportation Division Administrator Date Transportation Services Transportation Services Admin. 7/612009 2:41 PM Approved By Jeff Klatzkow County Attorney Date County Attorney County Attorney Office 7/712009 10:55 AM Approved By Gerald Kurtz Senior Engineer Date Transportation Services Stormwater Management 7/7/2009 5:27 PM Approved By Therese Stanley Grants Coordinator Date Transportation Transportation Administration 7181200912:52 PM Approved By Rhonda Rembert Contract Specialist Date Administrative Services Purchasing 7/10/2009 11:47 AM Approved By Steve Carnell PurchasinglGeneral Svcs Director Date Administrative Services Purchasing 7/10/2009 11:53 AM Approved By Pat Lehnhard Executive Secretary Date Transportation Services Transportation Services Admin 7/1012009 1:29 PM Approved By file: / /C: \AgendaTest\ Export\1'13-July %2028, %202009\ 16. %2000NSENT %20AGENDA\ 1... 7/22/2009 Page 2 of 2 Agenda Item No. 16B10 July 28, 2009 Page 4 of 10 OMB Coordinator OMB Coordinator Date County Manager's Office Office of Management & Budget 7113/2009 8:14 AM Approved By John Wet Roads Maintenance Superintendant Date Transportation Services Road Maintenance 7/14/2009 11:20 AM Approved By Susan Usher Senior Management/Budget Analyst Date County Manager's Office Office of Management & Budget 711612009 10:02 AM Approved By Leo E. Ochs, Jr. Deputy County Manager Date Board of County County Manager's Office 7116/2009 4:15 PM Commissioners file: / /C:1AQendaTest\Export 1133 -July %2028,% 202009 116. %2000NSENT %20AG F,ND A11... 7/221/2009 Agenda Item No. 161310 July 28, 2009 CHANGE ORDER TO WORKORDER Page 5 of 10 _. TO: PBS &J, Inc. FROM: Road Maintenance Department 1514 Broadway, Suite 203 2885 S Horseshoe Drive Fort Myers, FL 33901 Naples, FL 34104 LASIP Whitaker Road Utility Design Project Number 51101 Work Order date: December 23, 2008 Work Order No. PBS -FT- Change Order Number I Date: June 5, 2009 Change Order Description: This change order is to add additional services to the work order to include identification, relocation, pennitting and construction oversight for the relocation of the utility pipelines in conflict with the stormwater improvements. The scope is attached to this change order. No additional time is requested. Original agreement amount ............ ............................... ....................$197,950.00 Sum of Previous Changes ..................... ..............................$ 0.00 This Change Order No. 1 Amount ( add) ....................... .....................$ 43.950.00 Revised Agreement Amount .............................. ............................... $241,900.00 Original contract time in calendar days ................. ............................455 days Adjusted number of calendar days due to previous change orders ............... 0 days This change order adjusted time is ..................... ............................... 60 days Revised Contract Time in working days ............. ............................... 515 days Original Notice to Proceed date ................... ............................... January 5, 2009 Completion date based on original contract time ......................... April 4, 2010 Revised completion date due to change order (s) ......................... June 4, 2010 Your acceptance of this change order shall constitute a modification to our Agrcement and will be performed subject to all the same terms and conditions as contained in said Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, to this Agreement shall constitute a full and final settlement of any and all claims arising out of, or related to, the change set forth herein, including claims for impact and delay costs. Prepared by: Date: Margaret A.3ishop, P.E.. Sr. Project Mtanager Stormwater Management Sec"-'l Accepted by: -� t , 1 Date: firm signature ! PBS &J f Approved b. I f ig %`' _Date: .0, VIiet, Director � (, r ' Road Maintenance Department Chanute Order No. Pat-,e 2 Approved by: Date: Norman Feder. ,'\]C'P. Administrator T=isportation Services Division Approved by:,, Date: P,honda Cummings, CIIIIB, Contr " actS-p'bcjalist Purchasm,(), Department Date: ATTEST: Dwight E. Brock. Clerk BY: Approved As To Form and Legal Sufficiency: Name: A -i4ant County Atiornc\ July 28. 2009 Page 13 of 10 BOARD OF COUNITY CO'.Ivl'\,,IISSIO'.,,ERS OF COIIIER ('0U:NTYFl,OR]D,A BY: Donna Fiala. Chairman Contract 06 -3969 Additional Professional Services Assignment For Whitaker Road Utility Relocations BACKGROUND AND PURPOSE Agenda Item No. 16810 JLJIV 28, 2009 Scope of - e 7 of 10 As requested by Collier County, specific utility adjustments were identified during the data collection and design process for the LASIP project. The purpose of this Work Assignment is to provide professional services for the identification, relocation, permitting, and construction oversight for the relocation of the utility pipelines in conflict with the stormwater improvements. Specifically this includes a 20 -inch reclaimed water main, a 30 -inch wastewater force main, and an 8 -inch potable water main in conflict with the proposed storniwater improvements in the project area. The following scope of work is presented in accordance with Collier County Contract Number 06 -3969 "Fixed Term Professional Engineering Services ". SCOPE OF WORK PBS&J will provide the following professional services: Task F — Record Information Review & Conflict Identification PBS &J will review the available record drawings, provided by Collier County, and identify potential utility conflicts within the LASIP project area. This review is necessary to confirm already identified potential conflicts in certain locations, but also to verify that other utility conflicts are not present within the project corridor, based on available records. This task will identify the specific locations where subsurface utility engineering (SUE) data will be required for designing of pipeline conflict resolutions. PBS &J will contact other local utilities providing electricity, communications, and gas and request their record information in the project area. This information will electronically be integrated into the design base map. Potential utility conflicts will be identified for these utilities, however, this scope of work does not include design or permitting efforts for relocation of these private utilities. Task G — Additional Survey & Subsurface Utility Engineering (SUE) PBS &J will coordinate with the local surveyor to obtain the necessary SUE infomiation needed for the utility resolutions identified in Task F. Specifically, the data needed will include location of utility pipes (horizontally and vertically), confirmation of pipeline diameters, and verification of the materials of construction. This task is included and will be invoiced based on time and material charges with an aggregate not -to- exceed amount. LASIP Utility Relocations Contract 06 -3969 Agenda Item No. 16B10 Jul 28, 2009 Scope of ' n e 8 of 10 Preliminarily, this SUE effort is included for the following pipelines: • 20 -inch reclaimed eater main parallel to Whitaker Road • 30 -inch wastewater force main parallel to Whitaker Road • 8 -inch water main parallel to Nh'hitaker Road & associated connections • 8 -inch water main south of Whitaker Road between developments • Force mains for lift stations at the western project area on Whitaker Road Horizontal and vertical controls are assumed to be present within the site boundaries for the stormwater improvements and will be used to maintain common datum and geometry. Geotechnical reports are also assumed to have been conducted and will be made available for review by the utility design team and are thus not included in this scope of work. Included in this task is a site visit for PBS &J desian engineers and Collier County staff to confirm the relocations, to discuss any potential field conflicts, and to better understand the overall project goals and intents. Task H — Utility Relocation Design Services PBS &J will provide design services for the utility relocations necessary to cornplete the stormwater improvement project. Services under this task include development of plan and profile sheets for the private utilities within the project area, relocated public utilities. Collier County standard detail sheets. Collier County standard technical specifications for utility improvements, and integration into the LASIP stormwater improvement contract documents. PBS &J will subirtit two (2 ) 11" x 17'" sets of 90(C desian plans to the County for review and comment. Upon receipt of comments. PBS &J will revise the utility relocation plans, include applicable County comments, and issue a final set of contract documents for the utility relocations as part of the overall LASIP stormwater improvement project. Task I — Permitting The following utility permits and reviews apply to the utilitti, components of this project: • Wastewater (force main) relocation permit. FAC Form 62 -604 300(8)(a) • As long as the utility relocations are less than 100 linear feet.. relocation permits are not required for the eater main ( per FAC 6?- 555.520) or the reclaimed main )per correspondence with FDLP) • Collier County Utility Dc,,?:u-,L—mcnt The Florida Department of Environn;ental Protection has confirmed the need for the wastewater force main permit. PBS &J will prepare the FDEP permit application and supporting documents for signature by the County. In addition, PBS &J will prepare and submit to the Collier County Utility Department for review and comment. PBS&J will respond to up to two (2) requests for additional information (RAIs) during each permitting process. It is assumed that all stormwater, earth - moving, or other permits were covered under the original _tssienment and are therefore. not included in this scope of work. All permit fees are the responsibility of and will be paid for by the County. LASIP Utility Relocations 2 Contract 06 -3969 SCHEDULE Agenda Item No. 16810 Scope of -V\ Poe 9 of 10 Due to the nature of these utility conflicts delaying the overall project timeline, PBS &J will complete the above listed tasks within 120 days of receiving a Notice to Proceed from the County. Obtaining permits from regulatory agencies is always difficult to anticipate their level of cooperativeness; however, PBS &J will show good faith and responsiveness to any RAIs to expedite the pennitting process. In the event a delay has been identified, PBS &J will notify the County immediately. BUDGET In accordance with Collier County Contract Number 06 -3969 compensation for the above scope of work will be based on a billing type listed below. Task F Record Review & Conflict Identification (LS) S 6,980 Task G Survey & SUE (Time Charge / NTE) S11.000 Task Utility Relocation Design Services (LS) S 19,990 Task I Permitting (LS) S 5,980 Total for Work Assignment: 1 $ 43.950 PBS &J reserves the right to re- allocate funds within this project providing that the total lump sum amount is not exceeded. LASIP Utility Relocations 3 _-'sf' g rrda It em No 5 0 ma c 1Y�,f cONTRACTIWORK ORDER MODIFICATION Duly ?8.OG9 11 CHECKLIST FORM Page 10 of 10 PROJECT NAME: LASIP Whitaker Road SW Improvements PROJECT #: 51101 PROJECT MANAGER: Margaret Bishop BID /RFP #: 06 -3969 MOD #: 1 PO #: 4500103688 WORK ORDER DEPARTMENT: Road Maintenance CONTRACTOR /FIRM NAME: PBS &J, Inc. Original Contract Amount: $ 197.950.00 (Starting Point) Current BCC Approved Amount: $197,950.00 (Last Total Amount Approved by the BCC) Current Contract Amount: $197.950.00 (Including All Changes Prior To This Modification) Change Amount: $41950.00 Revised Contract/Work Order Amount: $241,900.00 (Including This Change Order) Cumulative Dollar Value of Changes to this Contract/Work Order: $43.950.00 Date of Last BCC Approval Agenda Item # Percentage of the change overlunder current contract amount 22.2 % Formula: (Revised Amount / Last BCC approved amount) -1 CURRENT COMPLETION DATE (S): ORIGINAL: April 4. 2010 CURRENT: June 4, 2010 Describe the change(s): This change order is to add additional services to the work order to include identification. relocation, permitting and construction oversight for the relocation of the utility pipelines in conflict with the stormwater improvements. Specify the reasons for the change(s) 1. Planned or Elective -h. 2. Unforeseen Conditions 3. Quantity Adjustments 4. Correction of Errors (Plans, Specifications or Scope of Work) - 5. Value Added 6. Schedule Adjustments Note: One or more may be checked, depending on the nature of the change(s). Identify all negative impacts to the project if this change order were not processed: Utility conflicts will not allow the stormwater improvements to move forward. Addressing the relocation of the lines during design and permitting will save time and cost. This change was requested by: (Contractor /Consultant �'I Owner `1 Using Department - CDES Design Professional (Regulatory Agency (Specify) Other (Specify) CONTRACT SPECIALIST PARTICIPATION IN NEGOTIATIONS: Yes No This form is to be signed and dated. APPROVED BY: Proj6;ct M6na er REVIEWED 'BY. t�4,��i Cc' ritraict Specialist Revised 11.19.2007 Date: Date: