Loading...
Agenda 07/28/2009 Item #16A 9Agenda Item No. 16.A9 July 28, 2009 EXECUTIVE SUMMARY page 1 of 7 Recommendation to . approve final acceptance of the water and sewer utility facilities for Mediterra Parcel 108 OBJECTIVE: The Board of County Commissioners, Ex- Officio the Governing Board of the Collier County Water -Sewer District, to accept final and unconditional conveyance of these water and /or sewer facilities. CONSIDERATIONS: 1) The Developer of Mediterra Parcel 108 has constructed the water and sewer facilities within dedicated easements to serve this development. See attached location map. 2) Preliminary acceptance of these utility facilities was approved by the Engineering and Environmental Services Department staff on July 11, 2001. At that time, the value of these utility facilities (assets) was $42,592.90 for the water facilities and $62,527.50 for the sewer facilities (see attachment[s]). This final acceptance is in accordance with Collier County Ordinance No. 2004 -31, as amended. 3) Staff recorded all preliminary acceptance documents in the public records of Collier County, which have been reviewed and approved by the County Attorney's office as to form and legal sufficiency. 4) The water and sewer facilities have been operated and maintained by the Collier County Water -Sewer District during, not less than, the required one (1) year warranty period. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering and Environmental Services Department staff, and these facilities have been found to be satisfactory and acceptable. 6) The PUD Monitoring staff has reviewed this request in relation to possible issues raised by the applicable Home Owners Association (HOA). Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total (undepreciated) value of $105,120.40. GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. Agenda Item No. 16A9 July 28, 2009 Page 2 of 7 LEGAL CONSIDERATIONS: The elements necessary to accept final and unconditional conveyance of those water and /or sewer facilities have been met. This item is legally sufficient for Board action. This is a regular item requiring a majority vote. There is no additional legal review from the County Attorney to complete this final acceptance. - JBW RECOMMENDATION: That the Board of County Commissioners, Ex- Officio the Governing Board of the Collier County Water -Sewer District, authorize final acceptance of these water and sewer utility facilities for Mediterra Parcel 108 and authorize the County Manager, or his designee, to release any Utilities Performance Security (UPS) to the Project Engineer or the Developer's designated agent. PREPARED BY: Jodi P. Hughes, Technician Page 1 of 2 Agenda Item No. 16A9 July 28, 2009 Page 3 of 7 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: 16A9 Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Mediterra Parcel 108. Meeting Date: 7/28/2009 9:00:00 AM Prepared By Jodi Pannullo Administrative Assistant Date Community Development & Environmental Services CDES Engineering Services 6/18/2009 9:14:00 AM Approved By Donald Edwards Operations Manager Date Public Utilities Wastewater 6/22/2009 10:10 AM Approved By Pamela Libby Water Operations Manager Date Public Utilities Water 6122/2009 10:28 AM Approved By MaryAnn Devanas Senior Planner Date Community Development & Environmental Services CDES Engineering 6122/2009 2:00 PM Approved By Judy Puig Operations Analyst Date Community Development & Community Development & Environmental Services Environmental Services Admin. 6123/2009 1 :07 PM Approved By Stephen L. Nagy Wastewater Collections Manager Date Public Utilities Wastewater 612312009 1:08 PM Approved By William D. Lorenz, Jr., P.E. Environmental Services Director Date Community Development & Environmental Services Environmental Services 7/112009 8:45 AM Approved By Phil E. Gramatges, P.E. Sr. Project Manager Date Public Utilities Planning and Project Public Utilities Management Department 712!2009 1:36 PM Approved By Jennifer A. Belpedio Assistant County Attorney Date County Attorney County Attorney Office 7/6!2009 11:55 AM Approved By Jeff Klatzkow County Attorney Date County Attorney County Attorney Office 7/7/2009 11:30 AM file: / /C: \AgendaTest \Export\ 133 -July %2028, %202009\ 16. %20C0NSENT %20AGENDA \1 7/22/2009 Page 2 of 2 Agenda Item No. 16A9 July 28. 2009 Page 4 of 7 Approved By Paul Mattausch Water Director Date Public Utilities Water 71712009 11:44 AM Approved By Environmental Services Adminstrator G. George Yilmaz Wastewater Director Date Public Utilities Wastewater 7/7/2009 2:17 PM Approved By Community Development & Joseph K. Schmitt Date Environmental Services Adminstrator Community Development & Community Development & Environmental Services Environmental Services Admin. 7/7/2009 5:20 PM Approved By OMB Coordinator OMB Coordinator Date County Manager's Office Office of Management & Budget 7/9/2009 9:32 AM Approved By Randy Greenwald ManagementfBudget Analyst Date County Manager's Office Office of Management & Budget 71912009 2:43 PM Approved By Winona W. Stone Assistant to the County Manger Date Board of County Commissioners County Manager's Office 711312009 3:12 PM file: / /C:AAQendaTest \Export\ 133 -Ju1Y %2028, %202009\ 16. %20C0NSENT %20AGENDA \1... 7/22/2009 o� 0 0 �LO z� a d J cz r_ Q --.�.. NNW Ar 5� f W r� V i CL Z 0 U 0 O r J w U Q a w a W `1 z a9 ai ry�Y 5� au.orlaww w w J enr�.aiwa� a smo , sww, ss3aen� S� ;� i �_N n 3 st'31v16a3W1 2k— I G m S F— 0 \ (wa)a trvMastoN ROIO u _ o t� a I >Yg N H' won aoasaiann g'SL2 ab IRV i� lac r�l 6 avoa �anxwluoduv max e Ff -g t lu -rnl $g FF Z vw �wvwv� 8 5� f W r� V i CL Z 0 U 0 O r J w U Q a w a W `1 `contractor's Gerttflcation TOTAL t JST AND QUANTITIES Mediterra Parcel 108 WATER SYSTEM This is a detailed accounting of all cost and afi quantities of materials used and installed in this project per the as -built and record drawings with each Item separatley described by size, quantity, unit price and total cost Include full description and quantity Installed for each category. The mobilization, restoration, pavement repair, testing, etc. is included in the appropriate individual line Item cost listed below. Item Description Size Quantity Unit nit cost Total PVC Watermain (DR18, CL150 PVC Watermain Fire Hydrant Assembly 8" 2" 1909 148 2 LF LF EA $ 13.60 $ 5.50 $ 2,080.00 $ $ $ 25,962.40 819.50 416000 Flushing Fire H rant Assembly Connection to Existin Watermain Double Service Single Service Permanent Sampling Point 8" Gate Valves 1.5" 1" B" 2 1 7 4 2 2 EA EA -0 EA EA EA $ $ $ S $ $ 1,720.00 500.00 439.00 32200 890.00 785.00 $ S $ $ $ $ 3,440.00 500.00 3,073.00 1,288.00 1,780.00 1,570.00 Agenda Item No. 16.A9 July 28, 2009 Page 6 of 7 ' )Contractor's Certification TOTAL L JST AND QUANTITIES Mediterra Parcel 108 WASTEWATER SYSTEM This is a detailed accounting of all cost and all quantities of materials used and installed in this project per the as -built and record drawings with each Item separatley described by size, quantity, unit price and total cost. Include full description and quantity installed for each category. The mobilization, restoration, pavement repair, testing, etc. is included in the appropriate individual line item cost listed below. Total Wastewater System. Page 2 of 2 $62,527.50 ' Agenda Item No. 16A9 July 28, 2009 Page 7 of 7