#17-7097 CO (APTIM - Collier Creek) caler _nty Procurement Services Adrrnisralwe Seti+cescwion Change Order Form ® Contract Modification E Work Order Modification ❑ Amendment Contract#: 17-7097 / Change#: 1 ./ Purchase Order#: 45-179398 ', Project#: 195-90072 Contractor/Firm Name: APTIM Environmental & Infrastructure, `�Project Name: Collier Creek Modeling Study Project Manager Name: Gary McAlpin 1 Department: Coastal Zone Management Original Contract/Work Order Amount $ 298,959.30✓7111/17 16A18 Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $ 298,959.30 7/'1/17 16A18 .ast BCC Approval Date; Agenda Item# 1 Current Contract/Work Order Amount $ 298,959.30 ( j 1 11.,Zvi /SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 78,427.00 26.23% Total Change from Original Amount Revised Contract/Work Order Total $ 377,386.30 _ 26.23% Change from Current BCC Approved Amount Cumulative Changes $ 78,427.00 26.23% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 7/20/2017 Original 6/20/2019 Last Approved 6/20/2019Revised Date 6/19/2020 Date Completion Date Date — J(Includes this change) #of Days Added 365 Select Tasks ®Add new task(s) ❑ Delete task(s) ®Change task(s) ®Other(see below) Provide a response to the following: 1.)detailed and specific explanationlrationale of the requested change(s) to the task(s) and I or the additional days added(if requested); 2.)why this change was not included in the original contract;and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional andior Contractor if needed. 1.)This change order will provide for additional time and funds needed to address unexpected comments from the Florida Department of Environmental Protection (FDEP)on the recommended plan to support permitting of a long-term solution for Collier Creek. 2.)The change being requested was not included in the original contract because the comments from FDEP could not be anticipated at the time the original contract was authorized as the project was in an early developmental stage. 3.)If this modification is not processed, permitting for Collier Creek will not be able to move forward because the FDEP has requested additional information in order to continue their review of the project. Prepared by: r /lL (iii" 'tit Date: / a Mc m P. M ana er k/ ry E , U g Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor I Consultant/ Design Professional arising out of or related to the c et forth herein, including claims for impact and delay costs. __ t1 Accepted by t Date: J`^�Q Th2KJ1 / es P.Piers ,PP,EE.. Director r,%q 9t ,�• /'' h Approved by r. �L-'1 t �l_ Date:`//.C'/IY Approved by: i j y 't.�-� (15,( I Date: l^l\\ l Amy Patt son, Division Director vvoLiTha deus L.Cohen, epart ent Head Digitally signed by Approved by: SchneebergerSara Schneeberger5arain I - Date:2019.05.2312:08:30-0400'Date Sara Schneeberger, Procurement Professional L., (Divisions who may require additional signatures may include on separate sheet.) Revised. 10/28/2014 ATTEST: BOARD OF COUNTY COMMISSIONERS Crys K. Kinzel, 'nterini.Clerk Collier Coun -� . 010, ,Attest aS t0•CaTl'S By: ���� Depug Willi/ L. McDaniel, Jr., Chair .n k,` \1� '���affil ATTEST: By: (Print Name/Title Approved as to Form and Legality: Assistant County Atto ney Page 2.of2- APTIM 2481 NW Boca Raton Blvd. Boca Raton, FL 33431 Tel: +1 561 391 8102 Fax:+1 561 391 9116 APTIM www.aptim.corn May 6, 2019 Gary McAlpin, Director Collier County Coastal Zone Management 2800 N. Horseshoe Drive Naples, FL 34104 Re: Collier Creek Modeling Study Change Order for Additional Services (Contract No 17-7097) Dear Gary: In order to address comments from Florida Department of Environmental Protection (FDEP) to support permitting of a long term solution for Collier Creek, APTIM has prepared the attached proposal at your request to modify PO #45-179398. Items 1 through 6 of the original work order have been completed. Attached you will find a revised scope of work and fees to adjust item 7, keep item 8 as is, and add items 9 and 10. In addition, please allow for a revised completion date of June 19, 2020(365 added days). Included as Exhibits are: the Scope of Work (Exhibit A), Fee Proposal (Exhibit B), and the Rate Schedule (Exhibit C). APTIM requests an increase of $78.427.00 to existing Contract No. 17-7097 to cover the additional services proposed in the attached Scope of Work. The revised total contract time and materials value will be $377,386.30. Very truly yours, Thomas P. Pierro, P.E., D.CE Director of Operations Aptim Environmental & Infrastructure, LLC cc: Tara Brenner, P.G., P.E., APTIM APTIM Exhibit A Scope of Work 2 EXHIBIT A SCOPE OF WORK COLLIER CREEK MODELING STUDY ADDITIONAL PROFESSIONAL SERVICES IN RESPONSE TO FDEP INPUT MAY 2019 Introduction In order to address comments from Florida Department of Environmental Protection (FDEP) to support permitting of a long term solution for Collier Creek, Collier County (County) has requested that APTIM make the following adjustments to the existing scope of work for the Collier Creek Modeling Study (PO#45-179398). These scope of work adjustments are in response to feedback from FDEP, Rookery Bay Aquatic Preserve (RBAP), and local stakeholders that additional modeling, project justification, and regional coordination will be required in order to complete a permit application for the multi-part Tentatively Selected Plan (TSP) for Collier Creek improvements. These comments were received after agency review of the Collier Creek Management Plan and Modeling Report completed in November 2018 by APTIM and subsequent phone conferences. Task 9: Modeling Final Array of Alternatives Under this new Task 9. APTIM will utilize calibrated numerical models to evaluate alternative designs for the proposed new groin, suitable to address FDEP comments described in their March 11, 2019 letter and in a teleconference held on April 5, 2019. The final array of alternatives will refine the TSP and use it to then evaluate a permeable, impermeable and no groin system compared to the existing inlet configuration, as requested by FDEP Comparison of the modeling results will include numerical ranking as used in the Management Plan (APTIM, 2018) and illustrations to explain the coastal and hydraulic processes of interest to FDEP, such as impact on currents, sediment transport, scour, shoreline change and bathymetry. Final Array of Alternatives (subject to minor modification): 1. Existing Configuration (Original Alterative 1 - starting after dredging) 2. Tentative Selective Plan (TSP) Variations a. Optimization of jetty. groin, channel borders, channel cuts, and depth to meet the goals described in the April 5 outline and teleconference. b. Optimized plan with permeable groin or permeable adjustable groin (FAG) c. Optimized plan with small terminal jetty only and no groin (Original Alterative 6) Alternative 2a will be refined in an iterative fashion until the simulated performance has been optimized to a level that aligns with the project objectives. Each alternative will be run for 4 years and compared to Alternative 1 under the same hydraulic conditions. Results will be analyzed to calculate initial, advanced and maintenance cut and fill volumes, to compare resulting velocities, channel width, volume infilled, scour/turbulence intensity. and any impacts landward of the ECL after 4 years. The final optimized alternative will be run through the numerical models for up to 8 years, or to the maximum practical length of time greater than 4 years. If the results show major negative Aptim Environmental & Infrastructure. LLC • impacts landward of the ECL or to other habitat areas, APTIM will consider if the next best performing alternative would have less impacts to State owned lands. These additional modeling efforts and analysis are being conducted to assist in providing reasonable engineering assurances of the expected impacts of the proposed Collier Creek improvements. The modeling results and analysis will be written up and presented in a document that can be used to support permitting efforts and amend the previously completed Management Plan and Modeling Report. Task 10. Stakeholder and Agency Coordination APTIM will assist Collier County in their efforts to coordinate with local stakeholders such as Hideaway Beach, Ville de Marco West, The City of Marco Island, RBAP, the Coastal Advisory Committee (CAC), and the Board of County Commissioners (BOCC), as appropriate. In relation to the Collier Creek Modeling Study and regional sand management. APTIM will prepare for and attend up to 3 in-person meetings in Collier County. As requested by FDEP, a regional sand management plan is to be developed for the Hideaway Beach/Collier Creek permit. APTIM will assist the County in coordinating with the Hideaway Beach community and RBAP to come up with a comprehensive sand management plan. In developing the plan, the following items were specifically requested by FDEP for further investigation and consideration: 1. Alternative disposal options for material resulting from lagoon dredging such as offshore, or South Marco Island. Sand Dollar Island is growing and there is a desire to keep the lagoon open, but current practice of disposing of dredged material onto Hideaway Beach and RBAP may be having a negative impact on Collier Creek. 2. Environmental and coastal management consequences of allowing Sand Dollar Island to meld onto the beach and eliminate the lagoon. 3. Reducing the permitted template size of the Hideaway Beach project, east of the lagoon opening, to eliminate overfilling of the T-groin field. In addition to local stakeholder coordination, APTIM will assist the County in negotiations and discussions with FDEP and RBAP related to the quantity of anticipated State land loss (if any), appropriate mitigation. and easement type. APTIM will develop graphics and perform analyses to support discussions related to anticipated state lands impacts during- and post-construction of the proposed Collier Creek improvements. Negotiations may include adjustments of the new channel's dredge footprint, minor modifications to the proposed structures and expanded disposal area, and permit or easement conditions as required. Up to three APTIM professionals will accompany the County for one meeting with FDEP in Tallahassee to discuss this project in- person, if needed. Task 7E. Permitting for Selected Plan Task 7A has been previously completed, and Task 7B is currently in progress with no requested changes at this time. This Change Order requests that existing Tasks 7C and 7D be closed and the funds from those tasks be combined into a new Task 7E 'Permitting for Selected Plan'. This task will include professional services to support permitting of the other features of the final selected plan; except for the terminal jetty modification, which is covered in existing Task 7B. Aptim Environmental & Infrastructure, LLC Project features include: altered Collier Creek dredge template, up to one new groin structure, expansion of the existing Big Marco/Capri Pass disposal area, and a regional sand management plan. The permit application will seek to include an expansion of the Big Marco/Capri Pass disposal area both horizontally and vertically, potentially including an extension into the Loggerhead Critical Habitat. This effort will be based on previously collected geological data and may require a longer consultation period due to the involvement of National Marine Fisheries Service (NMFS). This scope assumes that this request is one that can be submitted utilizing existing data and analysis for support, and does not require additional coordination with environmental agencies beyond an initial request for consultation. The additional modeling efforts and justifications developed in other tasks will be utilized to support state and Federal permitting of the selected plan for Collier Creek improvements. APTIM will prepare and submit the relevant state and Federal permit applications by integrating the biological, geological, engineering and modeling components. The project description will be based on the modeling and management plan developed in consultation with local stakeholders and FDEP. Information to be incorporated into the permit application shall include: • A description of the existing conditions • Historical background information • Justification of the maintenance dredging project at Collier Creek • A written description of the project's design features • Anticipated construction methods • Relevant environmental information • Relevant geological data • Permit drawings • Proposed sand management plan • Copies of the Collier Creek Feasibly Report, Modeling Reports. and Management Plan as appropriate APTIM will prepare the permit or permit modification request for submittal by Collier County and assist in reply to limited Requests for Additional Information (RAI) from the permitting agencies to bring the permit request to completion. The County will provide all permit fees directly to the permit agencies and will be responsible for publication of any public notices. APTIM will work closely with the County to support agency staff and their permitting review in order to expeditiously secure final permits, to the greatest extent practical. Task 8: Reimbursable Expenses At the time of the submittal of this change order request, $7,254.41 are unbilled within the reimbursable expenses. APTIM requests that these remaining fees remain available to support reimbursable expenses related to meetings and coordination. Caveats No additional field data collection efforts are planned for in this scope of work. Geological investigation and development of additional disposal sites, and pre-, during-, and post- construction support can be provided by APTIM under separate work assignment and are not included within this change order request. Aptim Environmental & Infrastructure, LLC APTIM 104. Exhibit B Fee Proposal 3 114847 8 FEE PROPOSAL FOR COLLIER CREEK 00041►00 STUDY COWER COUNTY BEACH 5E00000010 NT PROJECT.Contract N..17.1041 Pop.I 612 I AMR POSTS TIN CON Sortie,Senior iW Om PrvNgy rq.M ProjM PInn4R B0M1 M4Nne ...., Sawyer and Senior Neer Sunk Clew NYM5m0 OM CNrful Original Change Cedar Taal Burger Namr IteaMr 9bb0Nt Engineer 5014.110 TecAnkHn 14me Iobyl t 12.61211M C.n6461 S1 5210010 Blom) (Hoary (Nwe! IN11.) (Hee./ (Hemel (Hour.) (Awe) (Norm) (Nan) INeee1 (Neg.! Pteee] 1 CaeNpuNn 814311.00 70.00 814.718.0 6 9 20 20 32 8 6 • 2 Feld Wert E Analysis 34313.04 10.00 144,211.0 2 28 16 120 4 78 12 3 NORM OMI AulwH 4 NC.twm Bldg.? 15,71700 $0.00 115777.00 1 2 4 4 18 16 4 • 4 MebOno A2.0241N.. 170421.0 00.0 0704206 8 12 24 412 74 4 Meal,Report $17371.00 04.00 111,271.0 2 6 16 BO 2 4 12 0 0 6.Ng.A171 Phan 13104.0 8.00 132.08401 4 0 36 72 48 40 0 18 8 7 P.M..,Moneta NbT.N.S.IOw) 110111.0 40.0 310.11104 4Ps-4p7lonon N..N, 51375000 3000 213700 2 t 24 32 32 e P.n..T.nr.n.I Jolly LmM.oam 440.00 3000 146e40 2 12 90 0 1 72 100 12 16 40 4 2223400 1822!4001 3000 I �1-Pmmemg-6.wpenee 120031.0 (5209]0001 30.0... .P.nMp torr SMecIM W . Pen SO ]715 00 l 143 7160 4 24 72 16 7 12 _ Pontotoc52 16 16 4 50 12 ! 2 RNNY012.064.221 neers. . 15.50510 00. ✓4 steam,Feel Amy M Ahamebw. 10.00 121,0100 142,01.00 2 12 4 192 J10 Sa4NeE....d Marna),Ceo74CMbn 4.11 14,10,04 ✓J 511.41.11 5 70 67 — 92 1 AO 20 2 II 24 2 435101040 320,114.30 $71.021.00 237134.2 40 207 409 84 1 296 260 80 64 128 76 32 166 34 3207 7' 5173 / 5140 / 1140 n 5139/ 5111 I 5121/ 3119. 358"' 5138^ 594. 5103• 163/ 142,341.2 18.250 335.811 560.532 3118.160 141.144 128.880 17.280 57816 411038 510.338 13.008 117.098 32,142 0RONAL CONTRACT VALUE 301.150.30 CHANGE ORDER 41 AMOUNT 170427 00 REVISED TIME 41141ERMLS TOTAL 1377,24.21 • 7OS...e_mnant..0....44S.10.CRn w rra mar nramercven or w4'.Pw..coria EMIR 0 FEE PROPOSAL FOR COLLIER GREEK 340001.010 SWOT COLLIMI COUNTY SGC11011001.1111111110.10 PROTECT,Conked Nw 1MOW PPOs 2 el REIMMIMILMINPAI SQU1PMEN1 1...•.Ptah unftrostor T•at{.m M•Na LNNnI 11010r• Many RIMINICI T.S. Bass 4.l.ly.1. MCP Sonny Beal R1X OPS Hyp.et R.1 4euna4r Tit MAW Co panYlar 111RS•1M..E1) 1Gl4Sl,, I f0824l (o.ya) ID.T.) I13.241 MOM O PURI Weft a Ana** 2 1 3 4_.—__-2 1 1 3 *work 0.4.MOW.1114.414*BWOM 4 4 34.9.6010 40•.n44e•11 �_ $ 6.41111 Roped • • • t N...Pme,n Plan T P•.mM;n, •pra.App4ul.r, e Parm,mn,Terminal 134,M•EAeaene P.as ieN•.••e 1.4*-01•••aM•./Ap.. 00100eT•mNM004a0.M 1 P..r+mMC•.i.rl..er •.Permillug for O•Ma•O PWr I R•Im.ua M.. 34 15 B 1.1340 2 7 I MOW{q PM.lAlny.141.01x44• 10 SYblrelder and Agway Ceer4rueen —_- 34 15 B 1,940 _.1111_2_._.... 7 4 2 1 3 4 2 1 1 338.00 018500 0800.00 SO445 980.00 112.00 99500 $2,000.00 0900.00 179000 1495.00 1200.00 $215.00 0180.00 31.224.00 22,475.00 04400.00 $43.30 $180.00 994.00 8300.00 510.000.00 8900.00 02.370.00 01.090.00 082000 1215.00 3180.00 e..........w.o-a..,Me..mrn.�.,...#...w.re,oa wa.r.n...00t Exhibit C Rate Schedule Attachment 1 SCHEDULE B CONSULTANT'S RATE SCHEDULE Job Title Hourly Rate Principal $207.00 Senior Project Manager $173.00 Project Manager $148.00 Senior Planner Modeler $140.00 Senior Marine Biologist $139.00 Planner $111.00 Surveyor and mapper $121.00 Senior Scientist $119.00 Senior Technician $86.00 Survey Crew- 2 Man $136.00 Scientist/Geologist $94.00 GIS Specialist $103.00 Clerical $63.00 Sieve Analysis $95.00 Equipment Unit of Measure Rate ADCP per month $5,000.00 Underwater Tide Gauge per month $900.00 Survey Boat per day $790.00 RTK GPS per day $495.00 HYPACK per day $260.00 Heave, Pitch, Roll Compensator per day $215.00 Sounder per day $160.00 The above rates are applicable to Time and Materials task(s) only. The above list may not be all inclusive. Additional hourly rates for other personnel may be added upon mutual agreement in advance and in writing by the Project Manager and the Consultant, without further Board approval. END OF SCHEDULE B. { 13.4 Contract#17.7097"Collier Creek Modeling" C881 Environmental&Infrastructure,Inc.