Loading...
Agenda 06/11/2019 Item #11A (Companion to #9A)06/11/2019 EXECUTIVE SUMMARY Recommendation to approve a Developer Agreement with BCHD Partners II, LLC., (Developer) and Collier County (County) to reserve capacity within the Transportation concurrency system and allow a traffic signal and specific access points in exchange for the Developer donating land and easements to the County and receiving stormwater for a future overpass at Collier Boulevard and Immokalee Road. (This is a companion to agenda item 9.A, PUDR-PL20170000768). OBJECTIVE: For the developer to accept and treat the stormwater run-off from the future intersection improvements at Immokalee Road and Collier Boulevard, donate 1.34 acres along Immokalee Road and grant easements for Public Utilities and Stormwater in exchange for reserving capacity wit hin the transportation concurrency system and agreeing access points on Immokalee Road and to permit a traffic signal at the Developments access point on Collier Boulevard. CONSIDERATIONS: The County has a planned future overpass at the intersection of Immokalee Road and Collier Boulevard. The proposed Baumgarten Mixed Use Planned Unit Development (MPUD) is located at the southeast corner of this intersection. The conceptual plans for the overpass will require addition right-of-way and stormwater management on the south side of Immokalee Road. The Developer has agreed to accept and treat the stormwater created by the overpass as well as install manholes and piping along the south side of Immokalee Road. A construction easement, as well as a maintenance easement, will be granted to the County at no cost to the County. The Developer shall convey, at no cost to the County, 1.34 acres and a 20-foot Utility Easement along Immokalee Road to accommodate future FPL transmission lines and other utilities. The County will allow two access points along Immokalee Road and one signalized access point on Collier Boulevard across from the existing directional access into the Shoppes at Pebblebrook. The Developer shall be responsible for the design, permitting, and constr uction costs of the traffic signal and intersection improvements. The County shall reserve capacity within its concurrency management system for the entire development as initially approved within the Baumgarten MPUD. FISCAL IMPACT: The County will not be responsible for any costs associated with the traffic signalization on Collier Boulevard. The Developer will be responsible for all design, permitting, and construction costs of the traffic signal. No impact fee credits will be given for the Agreement. LEGAL CONSIDERATIONS: This proposed Agreement was drafted by the County Attorney, is approved as to form and legality, and requires majority vote for approval. -JAK GROWTH MANAGEMENT IMPACT: The proposed Agreement is consistent with the GMP. RECOMMENDATION: To approve the Developer Agreement to accept and treat the stormwater run - off from the future intersection improvements at Immokalee Road and Collier Boulevard, donate 1.34 acres along Immokalee Road and grant easements for Public Utilities and Stormwater in exchange for reserving capacity within the transportation concurrency system and agreeing access points on Immokalee Road and to permit a traffic signal at the Developments access point on Collier Boulevard. Prepared By: Trinity Scott, Transportation Planning Manager, Capital Project Planning, Impact Fees and Program Management Division 11.A Packet Pg. 215 06/11/2019 ATTACHMENT(S) 1. Location Map (PDF) 2. Baumgarten DCA (PDF) 3. Richland PUD Ord 02-07 signal commitment (PDF) 11.A Packet Pg. 216 06/11/2019 COLLIER COUNTY Board of County Commissioners Item Number: 11.A Doc ID: 9140 Item Summary: Recommendation to approve a Developer Agreement with BCHD Partners II, LLC., (Developer) and Collier County (County) to reserve capacity within the Transportation concurrency system and allow a traffic signal and specific access points in exchange for the Developer donating land and easements to the County and receiving stormwater for a future overpass at Collier Boulevard and Immokalee Road. (This is a companion to agenda item 9.A, PUDR-PL20170000768). (Trinity Scott, Transportation Planning Manager, Capital Project Planning, Impact Fees and Program Management Division) Meeting Date: 06/11/2019 Prepared by: Title: Project Manager – Capital Project Planning, Impact Fees, and Program Management Name: Laurie Beard 05/28/2019 2:41 PM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 05/28/2019 2:41 PM Approved By: Review: Growth Management Department Judy Puig Level 1 Reviewer Completed 05/28/2019 2:59 PM Transportation Engineering Laurie Beard Additional Reviewer Skipped 05/29/2019 9:50 AM Transportation Engineering Robert Bosch Additional Reviewer Completed 05/29/2019 2:23 PM Public Services Department Jennifer Reynolds Additional Reviewer Completed 05/29/2019 2:51 PM Capital Project Planning, Impact Fees, and Program Management Trinity Scott Additional Reviewer Completed 05/30/2019 9:10 AM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 05/30/2019 9:17 AM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 05/30/2019 10:16 AM Growth Management Department James C French Deputy Department Head Review Skipped 05/30/2019 6:49 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/31/2019 3:27 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/31/2019 3:38 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/03/2019 2:40 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 06/03/2019 2:42 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 06/05/2019 11:24 AM 11.A Packet Pg. 217 06/11/2019 Board of County Commissioners MaryJo Brock Meeting Pending 06/11/2019 9:00 AM 11.A Packet Pg. 218 11.A.1 Packet Pg. 219 Attachment: Location Map (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 220 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 221 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 222 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 223 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 224 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 225 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 226 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 227 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 228 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 229 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 230 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 231 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 232 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 233 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 234 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 235 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 236 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 237 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 238 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 239 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 240 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 241 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 242 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 243 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 244 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 245 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.2 Packet Pg. 246 Attachment: Baumgarten DCA (9140 : Baumgarten Developer Agreement) 11.A.3Packet Pg. 247Attachment: Richland PUD Ord 02-07 signal commitment (9140 : Baumgarten Developer Agreement) 11.A.3Packet Pg. 248Attachment: Richland PUD Ord 02-07 signal commitment (9140 : Baumgarten Developer Agreement)