Agenda 05/26/2009 Item #17B Agenda Item No. 178 May 26,2009 Page 1 of 159 EXECUTIVE SUMMARY PUDA-2008-AR-13792, Naples Botanical Garden, Inc, and the Florida Gulf Coast University Foundation, Inc" represented by R, Bruce Anderson of Roetzel and Andress LPA; and Margaret Perry, AICP, of Wilson Miller, Inc" are requesting an Amendment to Ordinance Number 03-29, The Naples Botanical Garden Planned Unit Development (PUD), by amending Section 4.14, Design Guidelines; Section 6,2, Development Parameters; Section 6.4, Permitted Uses and Structures to allow interim or temporary structures; Section 6,5 Development Standards so the interim or temporary structures have a greater setback distance than the principal structures; revisions to Section 7,2, Transportation Commitments of the PUD Document; and adding Section 7,6 to provide Deviations from the Land Development Code (LDC), The subject property (171.2::1: acres) is located at 4820 Bayshore Drive at the southwest corner of the intersection of Bayshore Drive and Thomasson Drive, in Section 23, Township 50 South, Range 25 East, Collier County, Florida, OBJECTIVE: To have the Board of County Commissioners (BCC) consider an amendment to the Naples Botanical Gardens PUD to revise the design guidelines, development parameters, permitted uses, transportation commitments and add a section for deviations from the Land Development Code (LDC), and ensure the project is in hannony with all the applicable codes and regulations in order to ensure that the community's interests are maintained. CONSIDERATIONS: The petitioner is proposing to amend five (5) sections of the Naples Botanical Gardens PUD and to add a section for deviations from the LDC. The amendment to Section 4.14, Design Guidelines, provides an alternative compliance process for architectural and design standards as outlined in Section 5.05.08 of the LDC, except for the proposed interim or temporary structures and maintenance structures, which will not require architectural and design standard review. The amendment to Section 6.2, Development Parameters, will require the proposed interim or temporary structures to be approved through the site development plan process to ensure the developer will comply with the Collier County Building Code and Americans with Disabilities Act (ADA) regulations. The amendment to Section 6.4, Pennitted Uses and Structures, is to allow interim or temporary structures and to set time limits on the structures for an initial period of three (3) years. If needed, the applicant can request for an extension of the interim or temporary structures beyond the three (3) years administratively utilizing the insubstantial change to the approved SDP. Certificates of occupancy for a pern1anent structure will not be issued until the interim or temporary structure housing a particular use is removed from the site. The amendment to Section 6.5, Development Standards, is to guarantee the intelim or temporary structures will have a greater setback distance than the principal structures. As well, the developer is requesting revisions to Section 7.2, Transpoltation Commitments, of the PUD PUDA-2008-AR-13792 April 30, 2009 Page 1 of (i Agenda Item No. 178 May 26, 2009 Page 2 of 159 Document. In addition to the amendments listed above, the developer requests to add Section 7.6, which will permit Deviations from Section's 5.03.02, and Section 5.05.08 of the LDC. FISCAL IMPACT: The PUD amendment by and of itself will have no fiscal impact on Collier County. There is no guarantee that the project, at build out, will maximize its authorized level of development, however, if the PUD rezone is approved, a portion of the land could be developed and the new development will result in an impact on Collier County public facilities, The County collects impact fees prior to the issuance of building permits to help offset the impacts of each new development on public facilities. These impact fees are used to fund projects identified in the Capital Improvement Element of the Growth Management Plan as needed to maintain adopted Level of Service (LOS) for public facilities. Additionally, in order to meet the requirements of concurrency management, the developer of every local development order approved by Collier County is required to pay 50 percent of the estimated Transportation Impact Fees associated with the project. Other fees collected prior to issuance of a building permit include building permit review fees and utility fees associated with connecting to the County's water and sewer system. Finally, additional revenue is generated by application of ad valorem tax rates, and that revenue is directly related to the value of the improvements. Please note that impact fees and taxes collected were not included in the criteria used by staff and the Planning Commission to analyze this petition. GROWTH MANAGEMENT PLAN (GMP) IMPACT: Future Land Use Element (FLUE): The subject property is located within the Urban Designated Area (Urban Mixed Use District, Urban Coastal Fringe Subdistrict and Bayshore/Gateway Triangle Redevelopment Overlay), and is within the Coastal High Hazard i\rea as identified on the Future Land Use Map (FLUM) of the GrO\vth Management Plan (GMP). This district is intended to accommodate a variety of residential and non-residential uses including parks, open space, recreational uses and community facilities. The Naples Botanical Garden PUD is approved for recreational and open space uses, and accessory commercial uses, which are consistent with those allowed in the Urban Coastal Fringe. Based upon the above analysis, Comprehensive Planning staff finds the proposed PUD amendment consistent with the FLUE. Transportation Element: Transportation Planning staff have reviewed the petition and has determined that the proposed amendment does not present an additional impact on the adjacent roadway network. As such, the road\vay network has sufficient capacity to accommodate this project within the five (5) year planning period, and staff recommends that this project be found consistent with Policies 5.1 and 5.2 of the Transportation Element of the GMP. The proposed changes to the PUD commitments have been reviewed for consistency with conceptual intersection improvements that have been evaluated by the Bayshore Community Redevelopment Agency (eRA) "Bayshore Gateway Triangle Study." Staff has agreed that the PUDA-2008-AR-13792 April 30, 2009 Page 201'6 /\genda Item r~o. 1 iB f\1ay 26, 2009 Paoe 3 of 159 turn lane requirements stated in the Naples Botanical Garden's PUD are not currently required and would constitute greater than the Naples Botanical Garden's proportionate share towards intersection improvements. Transportation Planning staff is also recommending approval of the sidewalk provisions set forth in Section 7.2 of the PUD document. These provisions will provide a sidewalk along the length of the Naples Botanical Gardens property on Thomasson Drive and along Bayshore Drive from Thomasson Drive to the out parcel located on the west side of Bayshore Drive. The developer shall provide a payment in lieu for the un-built 2,280 linear feet of sidewalks along Hamilton Avenue, and for the un-built 845 linear feet of sidewalk along the west side of Bayshore Drive from the out parcel opposite Republic Drive to the preserve area. This payment in lieu will be used for sidewalk improvements along Bayshore Drive as part of the Bayshore Drive South improvement project. ENVIRONMENTAL ISSUES: Environmental Services staff have reviewed this application and have found that the amendment did not affect the previously approved preserve locations of the PUD. For that reason, the PUD remains compliant with the Conservation and Coastal Management Element (CCME), GMP and LDC. ENVIRONMENTAL ADVISORY COUNCIL (EAC) RECOMMENDATION: Since the subject site has already been developed, the applicants were not required to submit an Environmental Impact Statement (EIS) for this petition. As a result, they were not required to have a hearing before the EAC. COLLIER COUNTY PLANNING COMMISSION (CCpe) RECOMMENDATION: The CCPC heard petition PUDA-2008-AR-13792 on April 2, 2009, and by a vote of 8-0 recommended to forward this petition to the Board of County Commissioners (BCC) with a recommendation of approval subject to the foIIov.,ring conditions which have been incorporated into the PUD document: 1. Revise Section 6.4, of the proposed PUD document to remove the language "described above in I -6" that appears in Number seven (7) of the Principal Uses. 2. Accept the new transportation language as read into the record (see attachment 1), and as provided in the attached PUD Ordinance. 3. Accept staffrecommendations. 4. Revise Sections 4.14.B, and 7.5.M of thc PUD document to keep the "overflow park parking" language that was proposed to be eliminated. 5. Include the words" innovative design" in Section 4.l4.A of the proposed PUD document. 6. Include the word "black" in front of the words chain link fence in Section 7.63 of the proposed PUD document. 7. Revise Section 4.14, of the proposed PUD document to remove the last sentence, "to compensate f(x deviating from the Architectural and Site Design Standards of the LDC." PUDA-200R-AR-] 3792 April 30, 2009 Page 3 of 6 item No. 78 May 26.2 09 Page 4 of 59 8. Revise Section 6.2, of the proposed PUD document to remove the sentence "Interim or temporary structures will comply with the Americans with Disabilities Act (ADA) and the Collier County Building Code." 9. Revise Section 6.4.7, of the proposed PUD document to allow only two three-year administrative approvals for extension of the interim or temporary structures and if the applicant needs another extension, they will be required to go before the BCC public process. Because the CCPC approval recommendation was unanimous and no letters of objection have been received, this petition has heen placed on the Summary Agenda. LEGAL CONSIDERATIONS: This is an amendment to the existing Naples Botanical Garden PUD (Ordinance No. 03-29, as amended) which proposes to amend the following: Cover page; Sections 4.14; 6.2; 6.4; 6.5; 7.2; and add a Section 7.6 to provide for deviations from the Land Development Code. This proposed amendment is quasi-judicial in nature kmd as such requires ex parte disclosure. As such the burden falls upon the applicant for the amendment to prove that the proposal is consistent with all of the criteria set forth below. The burden then shifts to the Board of County Commissioners (BCe), should it consider denial, that such denial is not arbitrary, discriminatory or unreasonable. This would be accomplished by finding that the amendment does not meet one or more of the listed criteria. Criteria for pun Rezones Ask yourself the following questions, The answers assi.'i't you in making a determination for approval or 110t. 1. Consider: The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, sun'ounding areas, traffic and access, drainage, sewer, water, and other utilities. 2. Is there an adequacy of evidence of unified control and suitability of agreements, contract, or other instruments or for amendments in those proposed, pm1icularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are !lot to be provided or maintained at public expense? Findings WId recommendations of {his Zvpe shall he 111ade ()!I(V afier consultation liith the COllnty Attorney. 3. Consider: Confonnity of the proposed PUD with the goals, objectives and policies of the Growth Management Plan. 4. Consider: The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. PUDA-2008-AR-13792 April 30. 2009 Page 4 01'6 It'2m No. 78 rilay 20U9 Page 5 of 159 5. Is there an adequacy of usable open space areas in existence and as proposed to serve the development? 6. Consider: The timing or sequence of development (as proposed) for the purpose of assuring the adequacy of available improvements and facilities, both public and private. 7. Consider: The ability of the subject property and of surrounding areas to accommodate expanSIOn. 8. Consider: Conformity with PUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications are justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. 9. Will the proposed change be consistent with the goals, objectives, and policies and future land use map and the elements of the Growth Management Plan? ] o. Will the proposed PUD Rezone be appropriate considering the existing land use pattern? 11. Would the requested PUD Rezone result in the possible creation of an isolated district unrelated to adjacent and nearby districts? 12. Consider: Whether existing district boundaries are illogically drawn III relation to existing conditions on the property proposed for change. 13. Consider: Whether changed or changing conditions make the passage of the proposed amendment necessary. ] 4. Will the proposed change adversely influence living conditions in the neighborhood? 15. Will the proposed change create or excessively increase traffic congestion or create types of traffic deemed incompatible with surrounding land uses, because of peak volumes or projected types of vehicular traffic, including activity during construction phases of the development, or otherwise affect public s({fdy? J 6. Will the proposed change create a drainage problem? 17. Will the proposed change seriously reduce light and air to adjacent areas? 18. Will the proposed change adversely affect propeliy values in the adjacent area? 19. Will the proposed change be a deterrent to the improvement or development of adjacent property in accordance with existing regulations? 20. Consider: Whether the proposed change will constitute a grant (~lgpecial privilege to an individual owner as contrasted with the pubiic welfare. PUDA-200g-AR-13792 April 30, 2009 Page 5 of6 Agenda Item No. 178 May 26, 2009 Page 6 of 159 21. Are there substantial reasons why the property cannot ("reasonably") be used In accordance with existing zoning? (a "core" question.. .) 22. Is the change suggested out of scale with the needs of the neighborhood or the county? 23. Consider: Whether it is impossible to find other adequate sites in the county for the proposed use in districts already permitting such use. 24. Consider: The physical characteristics of the property and the degree of site alteration which would be required to make the property usable for any of the range of potential uses under the proposed zoning classification. 25. Consider: The impact of development resulting from the proposed PUD rezone on the availability of adequate public.flldlWes and services consistent with the levels of service adopted in the Collier County Growth Management Plan and as defined and implemented through the Collier County Adequate Public Facilities Ordinance [Code ch.l 06, art.II], as amended. 26. Are there other factors, standards, or criteria relating to the PUD rezone request that the Board of County Commissioners shall deem important in the protection of the public health, safety, and welfare? The BCe must base its decision upon the competent, substantial evidence presented by the written materials supplied to it, including but not limited to the Staff Report, Executive Summary, maps, studies, letters from interested persons and the oral testimony presented at the BCC hearing as these items relate to these criteria. A supermajority vote of the Board is necessary for approval. (STW) RECOMMENDA nON: Staff recommends that the Board of County Commissioners approve the request for PUDA- 2008-AR-13792 Naples Botanical Gardens PUD, subject to staff and the CCPC conditions of approval. PREPARED BY: Melissa zone, Principal Planner Department of Zoning & Land Development Review PUDA-2008-AR-13792 April 30, 2009 Page 6 of 6 Item Number: Item Summary: Meeting Date: Page lof2 Agenda Item No. 178 May 26, 2009 Page 7 of 159 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS 178 This Item requires that all participants be sworn in and ex parte disclosure be provided by Commission members. PUDA-2008-AR-13792 Naples Botanical Gardens, Inc. and the Florida Gulf Coast University Foundation, Inc.. represented by R. Bruce Anderson, Esq. of Roetzel and Andress; and Margaret Perry, AICP. of WilsonMiller, Inc.. are requesting a PUD Amendment for the Naples Botanical Garden PUD (Ordinance 03-29). The approximately 171.2-acre subject property IS located in Section 23, Township 50 South, Range 25 East, Collier County. Florida ICTS) 5/26/200990000 AM Prepared By Melissa Zone Community Development & Environmental Services Principal Planner Date Zoning & Land Development Review 5/1/200910:15:25 AM MPO Director Date Approved By Nick Casalanguida Transportation Services Transportation Planning 5/1/20092:49 PM Approved By Ray Bellows Community Development & Environmental Services Chief Planner Date Zoning & Land Development Review 5/4/2009 9:30 AM Approved By Steven Williams P-.ttorneyls Office Assistant County Attorney Date Attorney's Office 5/4/2009 ~ 2: 14 prJl Approved By Jeff Kiatzkow County Attorney County Attorney County Attorney Office Date 5/4/20093:34 PM Approved By Susan Istenes, AICP Community Development & Environmental Services Zoning 8. Land Development Director Date Zoning & Land Development Review 5/512009 3:34 PM Approved By Judy Puig Community Development & Environmental Services Operations Analyst Date Community Development & Environmental Services Admin. 5!612009 9:42 AM Approved B}' Najeh Ahmad Transportation Services Director Date Transportation Engineering & Construction Management 5/1212009 9:15 AM Approved By Joseph K. Schmitt Community Development & Date Environmental Services Admfnstiator file://r'\ApenrlJ'\Test\Fxnort\ 1 iO-M:wo/',?O?n %?O?OOq\ 17 %?OSr JMM A RY%?OAnFNOA \ 'i/)O/)OOq Community Development & Environmental Services Page 2 of2 Agenda Item r'.Jo. 178 May 26. 2009 Page 8 of 159 Community Development & Environmental Services Admin. 5/12/200911:03 AM Approved By OMS Coordinator County Manager's Office OMS Coordinator Date Office of Management & Budget 5/12/20093:19 PM Approved By Mark Isackson County Manager's Office Budget Analyst Date Office of Management & Budget 5/14/2009 9:15 AM Approved By Leo E. Ochs. Jr. Board of County Commissioners Deputy County Manager Date County Manager's Office 5/16/200911:35 AM file://C':\ApencJn Te st\ FXllnrt\ 1 ~O-M;1V%)O/h OJ()/()!OOq\ 17 o/r,)OSI IMM A R V%)O A GFNnA \ ,,/)O/)OOq Agenda Item No. 178 May 26, 2009 Page 9 of 159 Transportation Commitment 1. "The developer, his successors, or assigns shall provide a fair share contribution toward the capital cost of a traffic signal and turn lanes (or alternative intersection roundabout design) at the intersection of Bayshore Drive and Thomasson Drive at such time that the improvements are constructed. Payment shall be provided to the applicable Public agency(ies) responsible for designing and constructing the improvements." PUDA-2008-AR-13792 April 30, 2009 Attachment I Agenda Item No. 178 AGENDA if;tIDVlZ~r2009 Page 10 of 159 ....... ;;'~~:tA~:;~, CQIl;ier County l.;J,.<,..~c:,=-~:'7,"";r::''''''''''''\,:;,.;,;;'.l':""~:''~ '-'oI'l:":~. :":": ,.,:.; (". ':,::Cj::r..~:--.-~~:.'''t'''~:;,ii~:_:..:.r~2 STAFF REPORT TO: FROM: COLLIER COUNTY PLANNING COMMISSION DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW COMMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES DIVISION HEARING DATE: APIUL 2, 2009 SUBJECT: PUDA-2008-AR-I3792, NAPLES BOTANICAL GARDENS PLANNED UNIT DEVELOPMENT (PUD) PROPERTY O\\'NERS/AGENTS: Owners: Naples Botanical Gardens, Inc. 4820 Bayshore Drive, Suite D Naples, FL 34] 12 Florida Gulf Coast University, Inc. I 050 I FOCU Boulevard, South FOl't f"fyers, FL 33965 Agents: Margaret Perry, .AJCP Wilson f\.1illcr, Inc 3200 Bailey Lane, Suite 200 Naples, FL 34105 R. Bruce Anderson, Esquire RoetzeI & Andress, LPA 850 Park Shore Drive Naples, FL 34103 REQUESTED ACTION: To have the Collier COllnty Planning Commission (Cepe) consider an llPplication for an amendmcnt to Ordinance Number 03-29, The Naples Botanical Garden Planned Unit Development (PUD). Thc proposed amendment is to revise Section 4.14, Design Guidelines; Section 6.2, Development Parameters; SecLiul1 6.4, Permitted Uses and Structures, to alia\-\' interim or tcmporary structures; Section 6.5 Development Standards, so the interim or temporary structures have a greater setback distance than the principal structures; Section 7.2, Transportation Commitments, of the PUD Document: and add Section 7.6 to provide Deviations -r.."'"'".."".... 11......... T n~~'~ l'\.........01n~...........,..H...+- r'l,-.--1....., (1 -'~0, J1UlU l1JL L,LlllU L..II..:.-\'l..;..J\.JIJI1H..lll \...,Ul...l\"; l.LLJ"--). March 20. 2009 Agenda Item No. 17B May 26, 2009 Page 11 of 159 GEOGRAPHIC LOCA TTON: The 171.2:1: acre subject property is located at 4820 Bayshore Drive at the southwest comer of the intersection of Bayshore Drive and Thomasson Drive, in Section 23, Township 50 South, Range 25 East, Collier County, Florida (see location map on the following page). PURPOSEIDESCRIPTION OF PROJECT: The petitioner is requesting to amend five (5) sections of the Naples Botanical Gardens PUD and to add a section for deviations from the LDC. The amendment to Section 4.14, Design Guidelines, provides an altemative compliance process for architectural and design standards as outlined in Section 5.05.08 of the LDC, except for the proposed interim or temporary stmctures and maintenance stmctures, which will not require architectural and design standard review. To compensate for not following the architectural requirement, the interim or temporary structures \vill have a greater setback Ih)]n the right-of-'way (ROW) than the principal structures set fmth in Section 6.5.B of the PUD document. The amendment to Section 6.2, Development Parameters, will require the proposed interim or temporary stmctures to be approved through the site development plan process to cnsme the developer will comply with the Collier County Building Code and Americans with Disabilities Act (ADA) regulations. The amendment to Section 6.4, Permitted Uses and Structures, is to allow interim or temporary structures and to set time limits on the structures for an initial period of three (3) years. If needed, the applicant can requests for an extension of the interim or temporary structures beyond the tlu"ee (3) years administratively utilizing the insubstantial change to the approved SOP. Certificates of occupancy for a permanent structure will not be issued until the interim or temporary structure housing a particular use is removed from the site. The amendment to Section 6.5, Development Standards, is to guarantee the interim or temporary structures will have a greater setback distance than the principal structures. As \veIl, the developer is requcsting revisions to Section 7.2, TranspOltation Commitments, of the PUD Document, \vhich are explained in detail under the Transportation Review provided on page four (4) of this report. In addition to the amendmcnts Hsted above, the developer requests to add Section 7.6, which will permit Deviations from Section's 5.03.02, and Section 5.05.08 of the LDC, which are explained in dctail under the Zoning Review deviations on page six (6) of this report. SURROUNDING LAND USE AND ZONING: North: Thomasson Drive, Single-Family and Multi-Family homes, and undeveloped property; zoned Residential Multi-Family (RMF-6), and Commercial Intermediate (C-3), and the Bayshore Mixcd Usc Overlay District. East: Bayshore Drive, Single-Family homes, and commercial property; zoned Residential Multi-Family (RMF-6), Village Residential (VR), Residential Single-Family (RSF-3), and Heavy Commercial (C-5), Conm1ercial Intermediate (C-3), Commercial Convenience (C-2) , and the Bayshore Mixed Use Overlay District. March 20, 2009 2 CDCJ>CJ> "- enD ~o".- . N "- o _0 Zr.DN ,...N-.;- c:>- mcoW :::: 2: :Jl co co u a.. c: (!) OJ <l: > r; D , t ~ ~ r-- ~I~ gi~ " t;: ~ ., I c. Cl [)~ l! i~ L g ~ ~ ~ I :;1 ~ r t, J1n5 D.L LO~ I - -.. --r-f-- ~ I ~ ~ I /~}_I r ~J ~I ,,,,,.du.H:.-l1 .~~ i ~.;';;I.I...,,,>. ""J- . . J ;;;J s\,-~ V ~ : "",,~!I~~/ ~ ~n ~B~g ,~ ~a /. i_ J ~~ ~ II,g~ t. ~ h?i=:,~~~;;Y ~ " . " I "o-r ,," /' ' " ~~.~ "1 r r- """ -I e' z/ D! !ijl, ~ ~I ~ ~~ l~-- ~ ~ - -- ~ -1---- ~ \ ~:~ ~ _ .__ ~ ~ J,,_ ~ .~/ i? 0 ~ - ~;<i l.~ ~ ~ " /;' 3~ N c"lS ../. ' /::/ "- 0 ~~,~n~ "\--111' ~5 -;J~- ':~>'//r"; -' ~ ~;;-.~: _~ '-'l... Ill] -~ _ r" \ -..;'/;; ~ ~ ~ lV',. L "I '" .0' ~..),1J1 __ I' \ " < _ --"'!.I!.d '>'", f~~ I I - 'I ~~ I ~ ~ \, ~fi' 5=~ .: "-oTiP JJ -'---.- yb I ~ ~I 1;/- ;-;.~ <;'-' 't{~ ~>- ~ ~...}:J l::~ ~ I i 6~ 1~ . M / f'-c.> ' t ! '! ! r; i't~l ~.".~.:': I!~ t ~ -.J Jl \ , . I\{ ~ ::l ~~ ~ :] ~y;- ~~. J ,,- Ir=::j~~'~ ..iS1t.;;j'W~'!' '-, c-' Y\ '\rf' ["jJb:Lie::J: It'1J''r'''' ~,. ,,~-.'r4-- ,~'7-'}'i" -<:"~ ,,_., '"'''1\-' _ ~+_, ,-"{J ~ r ,~ 1\' ,- -~~~' '-...A'fpr~ _--==-------==,J I'ln,~ ~~~ ._~'~ ,;';~-'b,~hrj-::.r \C. j~h "~" / ~ ~ 'II \\:::j[~j C::JZ:~ -.\ "j \ \ I ~, ~"-<--.:J~JJ~~~f--.'~ I[ >- ~ H.J~ _" . _ " ' ~__. _~')l. 7, fC~ !:: ur V I , '? /' (.1' ::-- CJ ~ J - (.r' I r-/"'0 -_/;:), -- -~- t._~./~~~ - --- '___~I =-'C:L~.::=r...s' c-'-/ _ ,,,,-, ~ .,<.'11CO l_\1.' Of " u. " '" '" U. 01 '" 0... <( ~ <.9 z z o N NI ~l 0: <:( , co o o N , <:( o ::> (L ~~I ~i t-i ~I I 0... <( 2 ~I "'-- o I- <( o () .::JI I /\genda Item f\Jo. 178 May 26, 2009 Page 13 of 159 South: Single-Family homes, and Conservation property; zoned Residential Single-Family (RSF-3), and Residential Multi-Family (RMF-6), and the Bayshore Mixed Use Overlay District. West: Hamilton Avenue, Single-Family and Multi-Family homes, Golf Course and Conservation prope11y; zoned Windstal' PUD, Southpointe Yacht Club PUD, Sabal Bay MPUD. Aerial View GROWTH MANAGEMENT PLAN (GMP) CONSISTENCY: Future Land Use Element (FLUE): The subject property is located within the Urban Designated Area (Urban Mixed Use District, Urban Coastal Fringe Subdistrict and Bayshore/Gateway Triangle Redevelopment Overlay), and is \""ithin the Coastal High I-Iazard Area as identified on thc Future Land Use Map (FLUJ\.'f) of the Oro'wth I'vfanagement Plan (GMP). This district is intended to accommodate a variety of residential and non-residential uses including parks, open space, recreational uses and community facilities. '~!itI1in tile Urban Coastal Fringe Subdistrict, and in order to facilitate hurricane evacuation and to protect the adjacent environmentally sensitive Conservation designated area, March 20,2009 3 J\genda Item No. 178 May 26, 2009 F'age14of159 residential development is permitted at a maximum density of four (4) units per acre, except as allo\ved by eeltain FLUE Policies and in the Bayshore Triangle Redevelopment Overlay. However, properties in the Naples Botanical Garden PUD are limited to non-residential uses, except for caretaker, dormitory, and other housing related to the Botanical Garden or other institutional and/or recreational open space uses. The Naples Botanical Garden PUD is approved for recreational and open space uses, and accessory conuncrcial llses, \','hich are consistent \vith those allowed in the Urban Coastal Fringe. Based upon the above analysis, Comprehensive Planning staff finds the proposed PUD amendment consistent with tlle FT lYE Transportation Element: TranspOltation Planning staff have reviev.,red the petition and has determined that the proposed amendments do not present an additional impact on the adjacent roadv,'ay nenvork. As such, the roadway net\vork has sut1icient capacity to acconunodate this project within the live (5) year planning period, and staff rcconunends that this project be found consistent with Policies 5.1 and 5.2 of the Transportation Element of the GMP. ANAL YSIS: Staff has completed a comprehensi ve evaluation of this land use petition and the criteria upon which a recommendation must be based, specifically noted in Land Development Code (LDC) Subsections 10.02.13.13.5, Planning Commission Recommendation, and 10.03.05.1, Planning Commission Hearing and Report to the Board (~r County Commissioners, which establish factual bases to support a recommendation. The CCPC usc:s these same criteria as the basis for their recommendation to the Board of County Commissioners (BCC), \vho in turn use the criteria to support their action on the rezoning request. These evaluations are c0111p!eted as palt of this stafl:'report. Environmental RCl'iell': Environmental Services staff have revie\\'ed this application and have found that the amendment did not affect the previously approved preserve locations of the PUD. For that reason, the PUD remains compliant with the Conservation and Coastal Management Element (CCJ\1E), GMP and LDC. Transportation Review: Transportation Planning staff have reviewed the application for Naples Botanical Gardens PUD rclated to roadway impacts and found that no additional traffic impacts arc presented hy the proposed amendments to the PUO commitments. Furthermore, Transportation Planning staff have revie\ved the petition and the proposed TranspOltation Commitments in Section 7.2 of the PUD document. The proposed changes to the PUD commitments have been revicwed for consistency with conceptual intersection improvements that have been evaluated by the Bayshol"e Community Redevelopment Agency (CRA) "Bayshore Gateway Triangle Study" (Attachment A). This study recommends a roundabout design at the intersection of Bayshore Drive and Thomasson Drive with an altcmative of installation of signalization within the limits of the existing conditions. Statl has agreed that the turn lane requirements stated in the Naples Botanical March 20, 2009 4 Agenda Item No. 17B May 26. 2009 Page 15 of 159 Garden's PUD are not cUlTently required and would constitute greater than the Naples Botanical Garden's proportionate share to\",ards intersection improvements. Therefore, Transportation staff has no objection to the amendment of these requirements, to be replaced with a new requirement to provide propOltionate share of the future improvements that are to be eonstructed under the authority of the Bayshore CRA when the improvements are constructed. TranspOltation Planning staff is also reconU11ending approval of the sidewalk provisions set forth in Section 7.2 of the PUD documcnt. These provisions will provide a sidewalk along the length of the Naples Botanical Gardens propelty on Thomasson Drive and along Bayshore Drive from Thomasson Drive to the out parcel located on the west side of Bayshore Drive. The developer shall provide a payment in lieu for the un-built 2,280 linear feet of sidewalks along Hamilton A venue, and for the un-built 845 linear feet of sidewalk along the west side of Bayshore Drive fro111 the out parcel opposite Republic Drive to the preserve area. This payment in lieu will be used for sidewalk improvements along Bayshore Drive as part of the Bayshore Drive South improvement project. Ulilitv Review: According to the Section 7.3 of the approved PUD document, water distribution facilities to serve the project are to be designed, constructed, conveycd, owncd and maintained in accordance with the requirements ofthe City of Naples. Sewage collection facilities shall be designed, constructed and maintained in accordance with Collier County Ordinance No. 2004-31, as amended. ZO/1hUj Review: As previously stated, the proposed uses are consistent with those allowed in the Urban Coastal Fringe Subdistrict set forth in the GMP. To achieve compatibility with adjacent uses, the site has been designed to minimize its impact on the sun'ounding residential neighborhood by providing a masonry wall or prefabricated concrete wal1 for the out parcel located east and \:vest of Bayshore Drive, and along the oul parcel located on Thomasson Drive. Furthermore, the subject site will follow the Landscape requirements of Subsection 4.06.02.CA of the LDC for buffering from the residential and conunercial land uses. Additionally, the PUD provides for 56:1: acres of preserve area, which will provide added buffering to the surrounding land uses along the western, southern and eastern portion of Naples Botanical Gardens. The PUD \vould provide appropriate setbacks f(Jr the interim or temporary structures from the abutting ROWs. To ensure compatibility with the residential and commercial uses that sUlTound it, the interim or temporary structure will be required to be set back a minimum of 300 feet from the propel1y boundary along Bayshore Drive, 500 feet from Hamilton Avenue and the southcm property boundary, and 150 feet from Thomasson Drive. The maintenance structures along Bayshore Drive Vi/ill not be required to meet Section 5.05.08 of the LDC. The distance from the maintenance building to the closest residential property line is 350 feet, and there is a six-foot (6') high wall and landscape buffer at the Naples Botanical Gardens propeliy line, both of which serve to mitigate the impacts of the visibility of the structure. March ]0, ]()09 5 Agenda Item No. 178 May 26, 2009 Page 16 of 159 Staff acknowledges and supports the requested amendment for the maintenance structures not meeting the architectural requirements of the LDC, but that request was not discussed at the Neighborhood Information Meeting (NIM). Staff has requested the applicant to provide foundation plantings around the interim or temporary structures as well as the maintenance structures to mitigate the appearance of the structures for not adhering to the Architectural and Site Design Standards of the LDC, which have bcen incOJ1JOrated into the PUD ordinance. With the remaining development standards contained in the approved PUD, and the sti11ulation for apIJToval recon1Jnended by staff, t11c project \vould renlain cornpatible v~ith the residential and commercial land uses \vhich have coexisted since 2003. Deviations: Section 7.6 of the proposed PUD amendment exhibit, the petitioners seeks approval of three (3) deviations from the LDC, and has provided justification to SUppOlt these deviations. Staff has analyzed these requests and offers the following analyses and recommendations: Deviation 1 seeks relief from LDC Section 5.03.02.A.l.a.i, Fences and Walls Requirements; Chain link and wood fences are prohibited forward of the primary facade and must be a minimum of 100 feet from a public right-of-way. The deviation will allow a chain link fence to be permitted and set back at a minimum of ten (10) feet from a public right-of-way, except when located adjacent to a preserve \vhere the setback shall be a minimum of five (5) feet. Also, a chain link fence may be pennitted at the preserve boundary on the southem Naples Botanical Gardens property line. Pl'Opo.<;al The applicants are of the opinion that since there is an existing recorded conservation easements within tcn (10) fcct of the property line on Thomasson Drive and Hamilton Avenue, a minimum setback of five (5) feet is needed to allow the fence to be mcandered to avoid as much existing vegetation as possible and al1m\' the fenee to blend more seamlessly \:vith the sUlTounding preserve vcgetation. if needed the developer would like the option to construct a fence along the southern boundary at the property line. Staff's Determination: Sinee the site has an existing recorded conservation easements within ten (10) feet of the properLy line 011 Thomasson Drive and Hamilton Avenue, staff has recommended the alternative noted above so as not to disturb the existing vegetation. All fences and walls shull be maintained in a manner that \villnot detract from the neighborhood or COnUl1Ulllty. To achieve the intent of the fences and \valls requirement staff is requesting the chain link fence be the color of black (0 mitigate the impact of the height and look of a chain link fence closer to the ROW. Also, statT is requesting the applicant to limit tIle chain link fence to Thomasson Drive, Hamilton A venue, and the preserve area of Bayshore Drive. It should be noted that tbe applicant bas already installed an aluminum picket fence aiong Buyshore Drive adjacent to the Naples Botanical Gardens. March 20, 2009 6 Agenda Item No. 178 May 26, 2009 Page 17 of 159 Deviation 2 seeks relief from Section 5.03.02.A.1.a.ii. ea), Fences forward of the primary facade, excluding chain link. and v'lood are permitted under the following conditions: (a) Fences must not exceed four feet in height. The deviation will allow a chain link fence to be permitted at a height of five (5) feet. Proposal: A four-foot (4') high fence will not provide adequate security for this facility. The Naples Botanical Garden functions as an outdoor museum and as such requires that admissions be controlled and the facilities secured when the Garden is not open. The applicant proposes to install a five-foot (5') high, chain !ink fence along its perimeter in order to adequately secure the facility. The additional height will assist in providing better security for this facility and adjoining residential property. Stqif's Determination: \Vhen this deviation was presented during the NIM, the neighbors agreed that tlus is a reasonable alternative. Staff has reconm1ended approval because of the unique security issues associated with an outdoor museum. The additional foot will not obstruct views nor will it detract from the neighborhood or community. Deviation 3 seeks relief fro111 LDC Section 5.05.08, Architectural and Site Design Standards; The pUll)ose of these standards is to supplement existing development criteria in order to complement, enhance and enrich the urban fabric of Collier County with an abundant variety of architecture. The deviation \vill allow maintenance, intcrim or temporary structures to be exempt from the required architectural and design standard revie\"l. Proposal: Due to the nature of the use and/or duration of the use it is not appropriate to require maintenance, interim or temporary structures be reviewed for architectural standards. Pcnnanent structures are still required to comply \vith the Purpose and Intent Section 5.05.08, Architectural and Site Design Standards, of the LDC. Staff's Determination: The proposed deviation would fulfill the LDC requirement relative to the Florida Building Code and ADA compliance, while at the same time comply \"lith the site development plan process. Furthermore, these structures wiiI be setback farther from the ROW than the principal structures, and for those reasons staff supports this deviation. To achieve the intent of the Architectural and Site Design Standards, the applicant intends to comply with Section 4.06.05, Foundation Plantings of the LDC. Compliance with Sub-section 10. 02. 13.B.5. of" the IDC: Plamling COmnllSSlOn recommendation. The platU1ing commission shall make written findings as required in section 10.02.08 of the LOC, and shall reconU11end to the Board of County Commissioners (BCC) either approval of the POD rezoning as proposed; approval with conditions or modifications; or delual. In support of its recommendation, the planning commission shall March 20, lUUY 7 I\genda Itern No. 17B May 26, 2009 Page 18 of 159 make findings as to the pun master plan's compliance with the folIoV\:ing criteria 111 addition to the findings in section 10.02.08. a, The suitability of the al,ea for the f1'pe and pattern of dcyelopment proposed in relation to physical characteristics of thc land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. The proposed amendment \vill not adversely impact the approved mitigation measures that are contained in the Naples Botanical Gardens PUD Ordinance, and will assure compliance with all the Level of Service (LOS) as recommend by the GMP. The subject petition has been reviewed by the appropriate staffs that are responsible 1'01' oversight of the LOS spelled out in the GMP. Additionally, a Transportation Impact Statement (TIS) was not required as part of the PUD amendment application. A TIS Waiver for the PUD Amendment \\'as granted at the Pre-Application Conference on July 24, 2008. The applicant was not asked to resubmit the previously submitted SDP TIS for October 2007. The only update that was required for this petition was a supplemental narrative supplied on July 2008 for the FGCU-Botanical Garden pnrcel SDP. b. Adequacy of evidence of unified control and suitability of any proposl'd agreements, contmct, or other instruments, or for amendments in those proposed, particularly ~lS they may relate to arrangements or provisions to be made for thc continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense. Findings and recommendations of this type shall be made only after consultation with the county attorney. Documents submitted with the application provide evidence of unified control. c. Conformity of the proposed PlJD ,,.'ith the goals, objectives, policies and thc Fnture Land Use Elcmcnt of the growth management plan. On page three (3) of this staff rep011, the Comprehensive Planning Department provided a detailed analysis of I1mv this project meets the goals, objectives, policies and FLUE of the GMP. d. The internal and cxtl~mal compatibility of proposed uses, which conditions may include l'estdctions on location of improvements, restrictions on design, and buffering and screening requil'ements. The Naples Botanical Gardens PUD has been designed to optimize internal and external land use because of the development standards, landscape, buffering requirements contained in the PUD Ordinance. Furthermore, the PUD's approved land uses are consistent with the land uses permitted in Section 2.03.07.1, of the LDC, Bayshore/Gateway Triangle Redevelopment Overlay. e. The adequacy of usabie open space areas in existence and as proposed to serve the deveiopmcnt. March 10,2009 8 Agenda Item No. 178 May 26, 2009 Page 19 of 159 The amount of usable open space for the Naples Botanical Garden PUD is 66.8:!: acres. This project exceeds the minimum requirement of the LDC. f. The timing or sequence of development for the purpose of assuring the adequacy of available improvements and facilities, both public and private. Development has already commenced, and has been through concurrency requirements which were triggered during the site development process, Additionally, any future development will have to adhere to the transportation commitments contained in the pun Ordinance as well as be in compliance with all other applicable conCUlTency management regulations when the developmcnt approvals are sought. g. The ability of the subject property and of surrounding areas to accommodate expansion. Comparative to this petition and the development of the subject site is timely because Supp0l1ing infrastructure such as capacity of roads, wastewater, and utilities which are currently available. When the developer comes in to expand the project, it will be reviewed again for SUPP011ing infrastructure, and must be in compliance with all LOS to accommodate the expansion. h. Conformity with pun regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications are justified as meeting public pm'poses to a degree at least equivalent to literal application of such regulations. The development standards and deviations proposed are similar to the design standards for the Bayshore/Gateway Triangle Redevelopment Overlay Bayshore Mixed-Use District (BMUD) Neighborhood Commercial Subdistrict development standards set f01th in Section 4.02.16, of the LDC. Conmliance with Sub-seclion 10.03.05.1 of the LDC: Nature of requirements of plmming commission report. When pe11aining to the rezoning of land, the report and recommendations of the planning commission to the Board of County Conunissioners required in 10,02.12 D. shall show that the plmming conunission has studied and considered the proposed change in relation to the following, when applicable: 1. '''hether the proposed change will be consistent with the goals, objectives, and policies and future land use map and the clemcnts of tbc growth management plan. The Comprehensive Planning Department has provided a detailed analysis on page three (3) of this report, on how this petition is consistent with all applicable elements of the GMP. The prope11y is located within the Urban Designated Area (Urban Mixed Use District, Urban Coastal Fringe Subdistrict and Bayshore/Gateway Triangle Redevelopment Overlay), and is within thc Coastal High Hazard Area, as identified on the Future Land Use Map (FLUM). This March 20. 2009 9 ,L\.genda Item No. 178 May 26, 2009 Page 20 of 159 district is intended to accomnlOdate a variety of land uses including recreational uses, and community facilities. 2. The existing land use pattern. The subject 171.2:f: acres site is approved for recreational and open space land uses with commercial accessory land use. The Naples Botanical Gardens provide an education center, exhibition gallery, nursery and maintenance structures. The existing land to the north is Single-Family and Multi-Family homcs and undeveloped property. The existing land to the cast is Single-Family homes and Deli's grocery store. The existing land to the south is Singie-Fmnily homes and conservation/preserve land. The existing land to the west is Single-Family and Multi-Family homes, conservation/preserve land and a golf course. The Bayshore/Gatev,,ray Triangle Redevelopment Overlay permits commercial, residential, recreational and open space development. 3. The possible creation of an isolated district unrelated to adjacent and nearby districts. The approved Naples Botanical Gardens PUD (Ordinance No. 03-29) v,,ras deemed to be of sufficient size (171.2::l: acres) and did not result in an isolated district unrelated to adjacent and nearby districts. fUi1hennore, the amendment request does not change the projects consistency V'lith the FLUE. 4. Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. The Naples Botanical Gardens PUD boundaries have not changed since June 24, 2003 when the original approval of the subject PUD was decmcd to bc logically drawn when the Ordinance No. 03-29 was approved. 5. Whether changed or changing conditions make the passage of the proposed amendment necessary. The applicant is seeking to modify the PUD to alter that provision that require the applicant to pay proportionate share for any future improvements when deemed necessary by the Count}'. The applicant feels the turn-lane commitments in the CUITent IJUD allo\^/s the C~ounty the right to conle back to the Na})les Botanical Gardens at any time in the future to ask for intersection improvements when the County deems it necessary. This would require the applicant to pay for improvements that may be triggered by another development. Furthermore, the applicant is modifying the Naples Botanical Garden PUD language to reflect partial payment-in-lieu for the perimeter sidewalks. The payment-in-lieu will be earmarked for improvements to the Bayshore Drive South improvement project. Additionally, because u[ 1he etHiCal ccullomy, the Naplcs Botanical Gardens are unable to procurc funding to complete the construction of the principal structures. March 20. 2009 10 Agenda Item No. 178 May 26, 2009 Page 21 of 159 For that reason, the applicant is requesting to include interim or temporary structures as a permitted use until the applicant is able to construct the pelmanent structures, at whieh time, the interim or temporary structure will be removed prior to the issuance of the certificate of occupancy. 6. Whether the pr'oposed change will adversely influence living conditions in the neighborhood. The proposed amcndmcnt should not adversely influence living conditions in the neighborhood because the setbacks for the interim or temporary structures are greater than the principal and accessory structures. Also, the current development standards and landscape buffering requirements contained the PUD are designed to ensure the least amount of adverse impact on the adjacent developments. 7. Whether the proposed change will create or excessively increase traffic congestion or create types of traffic deemed incompatible with sOl'munding land uses, because of peak yolnmes or projected types of \'ehicular traffic, including activity during construction phases of the development, or other'wise affect public safef)'. The Naples Botanical Gardens PUD is planned to incorporate natural systems for water management purposes in accordance with their natural functions and capabilities as required by the Drainage Sub-Element of the Public Facilities Element of the GMP. In addition, all final development orders for this project are subject to the Concurrency Management System of the Adequate Public Facilities Ordinance. 8. Whether the pmposed change will create a drainage problem. Section 7.4 of the PUD document requires the developer to adhere to all County Ordinances related to paving, grading, site drainage and utility plans. The developer is also required to provide a copy of the South Florida Water Management District (SFWMD) permits prior to any construction drawing approvals. 9. Whether the proposed change will seriously reduce light and ail' to adjacent arcas. The clevelopment standards for Naples Botanical Gardens PUD are not being amended other than to allow maintenance, interim or temporary structures, which have a greater set-back from the ROW than the principal and accessory structures. The pemlitted maximum height is three (3) habitable stories; ho\vever, the Tropical Rainforest Conservatory \vas approved to be eighty-five (85) feet to the eave and one-hundred twenty feet (120) to the peak. Accessory structures are permitted at a maximum height of twenty-five (25) feet. It should also be noted that the subject site is located near preserve tracts of the Sabal Bay PUD to the south and west. March 20, 2009 11 Agenda Item No. 178 rv1ay 26, 2009 Page 22 of 159 10. \Vhether the proposed change will adversely affect property values in the adjacent area. The Naples Botanical Gardens PUD was approved June 24, 2003 and was found during the original approval that the rezone should not adversely affect property values. However, this is a subjective determination based upon anticipated results \vllich may be internal or external to the subject property. Since property valuation is affected by several factors including zoning, zoning by itself may 01' may not affect the values of the adjacent area. 11. \Vhethcr the proposed change will he a deterrent to the improvement or development of adjacent property in accordance with existing regulations. The current landscape and buffer requirements in conjunction with the preserve area and setbacks, and the proposed development standards combined with the site development p13n approval process, providcs assunmce the previously approved PUD will not result in a detenence to the adjacent properties. 12. 'Whether' the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public ,,'eIfare. On June 24, 2003 tbe Board of County Commissioners (BCC) approved the Naples Botanical Gardens PUD (Ordinance No. 03-29), at that time, the BCe determined that this PliD will not constitute a special privilege. On page three (3) of this report, the PUD amendment request did not alter the land use and \-\'as found consistent with the FLUE. 13. \"hether there are suhstantial reasons why the PI'opcl.ty cannot be used in accordance with existing zoning. The property is being used in accordance \vith the existing zoning which is Naples Botanical Gardens PUD. 14. '''hcther the change suggested is out of scale with the needs of the ncighborhood or the county. Naples Botanical Gardens PUD \'\'as designed to meet the intent of the 13ayshore/Gate\vay Triangle Redevelopment Overlay District. The PUD is pedestrian-oriented, with a mix of land uses including gift shop, offices and civic amenities that complement each other. Additionally, the proposed interim or temporary structures will be set-back from the ROW at a greater distance than the principal structures and will not be out of scale \vith the existing neighborhood. 15. '''hethel' it is impossible to find other adequate sites in the county fOl' the proposed use in districts already permitting such use. This crikrion Joes not apply since the Naples Botanical Gardens PUD has existed since June 24, 2003 (Ordinance No. 03-29). March 20, 2009 12 .Agenda Item No. 178 May 26, 2009 Page 23 of 159 16. The physical characteristics of the property and the degree of site alteration which would be required to make the property usable for any of the range of potential uscs under the proposed zoning classification. The extent of the site alteration will be required to go through extensive evaluation by federal, state, and local development regulations during any site development plan approval process. 17. The impact of development on the availability of adequate public facilities and sen'iees consistent with the levels of sen,ice adopted in the Collier County gro'wth management plan and as defined and implemented through the Collier County Adequate Public Facilities Ordinance [Code ch. 106, art. II], as amended. The project will have to meet all applicable criteria describe in the PUD Ordinance, as well as all thc regulations set forth in the LDC and the Adequate Public Facilities Ordinance. 18. Such other factors, standards, or criteria that the Board of County Commissioners shall deem important in the protection of the public health, safety, and welfare. This will be dctermined by the BCC during the advertised public hearing. ENVIRONMENT AL ADVISORY COUNCIL (EAC): Since the subject site has already been developed, the applicants were not required to submit an Environmental Impact Statement (EIS) for this petition. As a result, they \:\,'ere not required to have a hearing before the EAC. NEIGHBORHOOD INFORMATION MEETING (NIM): The meeting was duly noticed by the applicant and held on January 6, 2009 at 5:30 p.m. at the Naples Botanical Gardens, Twenty (20) people from the public attended, as well as the applicant's team (Margaret Perry, Jared Bro\vn and Jeff Pen-y of Wilson Miller, Inc., and Brian Holley, Executive Director of the Botanical Gardens) and county staff. Margaret Perry presented an overview of the requested PUD amendments and deviations their client is seeking. There was no opposition from those in attendance on the requested amendments or deviations; however below are suggestions and comments: 1. One resident suggested adding more stops for the Collier County Area Transit (CAT) public transportation service along Bayshore Drive in Ihl1lt of the Naples Botanical Gardens to help those who want to visit the facility, and to lead to less traffic in the area. 2. Most in attendance seemed very pleased with the installation of sidewnlks on Thomasson Drive and Bayshore Drive. 3. The residents did not have concerns with the revised turn lane requirements added to the PUD. llIarch 20. 2009 13 i'\genda Item No. 178 f\1ay 26, 2009 Page 24 of 159 4. The neighbors were supp0l1ive of the deviations from the LDC requirement for fences and walls by allowing a fence height of five (5') feet, instead of the required four-foot (4') requirement. 5. The neighbors also supported the interim or temporary facilities until the permanent structures are built. COUNTY ATTORNEY OFFICE REVIEW: The County l\ttorney Office bas rcvic\vcd the staff report for PlJDJ^~~2008-i^l.R-13792 revised on March 20, 2009. RECOMMENDATION: Staff recommends that the CCPC forward Petition PUDA-2008-AR-13792 to the Board of County Commissioners (BCC) with a recommendation of approval subject to the deviations requested by the applicant contained in Section 7.6 of the PUD amendment and the following recommendation: 1. Fences and Walls are su)Jject to all LDC requirements except the applicant has the option to use a black chain link fence not to exceed five feet (5') in height. If the applicant opts to use chain link, it shall be black and only be used along Thomasson Drive and Hamilton j\ vcnue and the pOliion of Bayshore Drive where the preserves are located. A TT ACHMENT: A. Bayshore Gateway Triangle Study March 20, 2009 ]4 Agenda Item No. 178 May 26, 2009 Page 25 of 159 PREPARED BY: /)"y! j// ~ I I / (fic~l>& r'~~ _ B / / dJ) t1CE:5'9 MELISSA ZONE, PRlBCTP AL PLANNER / / DATE ' DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW REVIEWED BY: d / \ ~j/ // :~',I I \) //-~,~, /~.__/" RA YMOND V~ BELLOWS,20NING MANAGER DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVlEW ~~ " ,,/ n t( ) i DATE ~JJ.u:.-,) C;t--:~J. / -5t~/f'1~e ,t-'l :~ /'7 {- /e '7 "SUSAN M. ISTENES, Alep, DIRECTOR ;' /bATE DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW APPROVED BY: 11 .#' ~ ./"/ . / ,/f~ * :1 ~4..../~ JD$PH K. SCHMITT ADMINISTRATOR C9MMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES DIVISION I / -1/..2,,10 <1 I / ' DATE Tentatively scheduled for the May 26, 2009 Board of County Commissioners Meeting COLLIER COUNTY PLANNING COMMISSION: 'i r '2 --0 ~ MARK P. STRAIN, CHAIRMAN DATE March 20, 200U9 15 Agenda Item No. 17B May 26, 2009 Page 26 of 159 7.0 RECOMMENDED TRANSPORTATION IMPROVEMENTS The transportation improvements recommended for the PIA included but not limited too, mobility improvements and traffic calming measures These impmvement measures are discussed in this section. 7.1 Mobility Improvement Measures in addition to the intersection improvements discussed In Section 6.5. Improvements recommended to improve overall traffi.c mobility include the instaliation of a new roundabout Implementation of access management policy recommendations, and modifications to access at Shadowlawn Elementary School. These improvements, and their potential benefits and impacts, are discussed in detail below 7.1.1 Roundabout Installation of a roundabout at the Bayshore DnvelThomasson Dnve intersection is recommended to enhance mobility and provide traffic calming. The roundabout would have two circulatory lanes and would serve all traffic movements. Based on the gUidelines presented in the Federal Highway Administration (FHWA) publication "Roundabouts: An Informational Guide". the minimum inscribed circle diameter for a roundabout should be 150 feet (Figure 7-1). Currently, neither Collier County nor the City of Naples requires specific design guidelines for the construction of a roundabout Preliminary analysis Ind icates that such a roundabout would require right-of- vvay acquisition in one or more quadrants of this intersection Instaiiation of a roundabout is not expecred to deteriorate the traffic operations at this intersection and Table 7-1 shovvs the results of the LOS analj'sis Table 7-1 Roundabout Level of Service Analvsis , I MaXlnlUrr Vie Lovl/ I, ',. InMscctmn r,ne ,:,,,'~~T~~~:;:~~: h'shore Drive <> ihomassc.n Dnve !~=IZ~1I1d 00 - ___oom n -- 0- -1----:-:-.:0 0 10 - c-:-~~, 0 I ',. CO I c T'< t.stt'JUf1(J -p I rl~tl j! ~I~ )'l~!'rJlwcl ~ TLO i ": I r,' ~T" )(Jlrlt ~1.jtld _~___ l__~~~~~J_~_~' ',:) _ __ L T~ nIP....""".~Ii"nl 1~\:1'"' I (.,-r' .h,~,r'n' I I . - -" I A ,~ I " ~ r,' ,-. ~'" c.,",, I tt rSBctlon Level of Servi::e . )\cs = [;'.It 'urn T = 7"rO.I<.1I:. R = F':ol'j Tin [;dL = [iel:i.~I(\ I (:flli1,r) L';~; = ie..,.,' of ~'er\'I(.t en [) i 7 GA2 0_51 c -,-:; c Ci' o 19 (j (1 C C7 r. '=I 1 U U I ,~ I~:e C:~l~,c:r & ::U:CWS::, :nc -. ."] Agenda Item No. 178 May 26, 2009 Page 27 of 159 7.1.2 Access Management Through the community involvement efforts. several specific locations were identified as present safety or mobility Issues in regards to access. ThIs study recommends develDpment of guidelines for future developments to prevent such issues in the future Gulfgate Plaza, identified area of concern, at the southwest corner of the 8ayshore/US 41 intersection has one access point onto US 41 and one access point onto Bayshore Drive. The Bayshore Drive access point allows all movements in and out, while the US 41 access point does not allow left turns outbound. The left turn movement at the Bayshore Drive access point causes traffic conflicts as vehicles often make the movement in two steps, stopping in the med;an before proceeding into northbound traffic The PIA recommends [making the necessary regulatory or process changes] to · Encourage or allow the use of single points of access for multiple destinations. even if the properties are not under the same ownership. and · Encourage the use of side-street access points to minimize new access points on eXisting major facilities, especially along Ba}'shore Drive. ~"... -,I .....- Agenda Item No. 176 May 26, 2009 Page 28 of 159 7.1.3 School Access at Shadowlawn Elementary During school pick-up and drop-off times, vehicles currently park in undesignated areas in front of the school. This creates turbulence in the traffic flow on Bayshore Drive and increases the potential for vehicle/pedestrian conflicts. The PIA suggests moving the automobile drop-off/pick-up point to the northern side of the school (current bus pick-up point) and switching the bus plck-up/drop-off location to the horseshoe driveway adjacent to Shadowlawn Drive. While this measure was recommended by the PIA, additional coordination would be required bet\^_'een the schoo! district and the County. 7.2 Traffic Calming Measures PrevIously mentioned in Sections 1.0 through 3.0. there is a perception that of the roads wIthin study area are being used by vehicles to bypass congestion on nearby arterials. This cut-through traffic can produce increased pedestrian/vehicle conflicts for those living on local streets In 1995, the Collier County MPO developed the Neighborhood Traffic Management Program (NTMP) and established the Traffic Calming Task Force to provide the resources for local neighborhoods to combat cut-.through traffic issues. The program's intent is to make: '.. . strategic changes to streets in order to reduce vellicle speeds and to (Jecrease the cars' dommance in the neighborhood. Traffic calming devices. such as those included in this program, are designed and located to keep througli traffic on major roads" - Collier County MPO I\JTrvlP (1995) Following is a description of several recommended traffic calming techniques, the goals of each technique, and the qualitative effect under the PiA Ea::h of the subsequent traffic calming techniques were developed through the public outreach effort. 7.2.1 Gateway Treatments and Neck-downs Gateway Treatments are street amenities that Include Signs. banners. landscaping or other structures that communicate a sense of place or identify a nelqliborhood. r-Jeck-downs are the physical reduction of a roadway iane widt!i through the Lise of curbing rr",duction or center median Goal The combination of a center median gateway treatment and lane narrowing tnr:::>ugh a neck-dovm is intended to accomplish two goais: 1) to create a sense af place With slgnage and landscaping: 2) to siow speeds by constraining roadway lane width. The piacement o{ elements at the entrance to streets, as highlighted In Table 5-1, is intended to Indicate to motons:s usrng local streets as a cut-though that they rIave entered a residential neight;orhood Th:s change IS intended to reduce the number- of through vehicles The ph)tsical neck-down in lane width is intended to slow vehi:::le speeds on local streets and to fUliher jeter through traffic. providing incentive for these trips to stay on the major arter-ial It should be noted that the ga:e\lvay ireatnlents recomm,:::ncied along Bavshore/Shadowlawn Dnves do not inclUde median qateway lre2itrnents or reductiO!": in lane Width in these areas, the gatevva)' treatment :onslsts of aesthetlc amenities located at the Side of tne roadway only Theoretical Effect of Recommended Measure Under the PIA Studies have shOVlin a reductIon in speeds (of up Ie 7 mpr:) correlatIng With a reduction In lane width Rc-adway naiTOWing also often resuiis in high (8C/'(+) ieveis of pub:lc s3tlsfacllon wi:n trH:' traffiC calming technique, while resu!ting in no change in thro~gh \/E:tj:Cl'2 vDlunl[.:;. .:::v1cC:ourt, .Sut'~:ey t.)f fJsjghtJorn\)od Traffic i\r1anagetnent Pen'"orrnance and ,~e.su/t.s, '1 S197 ) Agenda Item No. 178 May 26, 2009 Page 29 of 159 It could be expected that the lane-width reduction due to the neckdown, combined with the visual gateway treatment, would result in reduction in vehicle speeds in the vicinity of the treatments. In comparison to other recommendations in PIA, this particular technique is likely to have the greatest impact of reducing cut-through traffic within the study area. Figures 7-2 and 7-3 graphically suggest the potential appearance of Linwood Avenue before and after the construction of gateway treatments and neck-downs. C/'> . ... .. . ;e~, Gateway Treatment Source: Carter g. 8lHQ2S~, In::. [20(6) '"7, I\genda Item No. 178 May 26, 2009 Page 30 of 159 7.2.2 Speed Enforcement An increase in speed enforcement activities was suggested by the public during the workshop. As a result, the PLll, recommends increased speed enforcement activities in conjunction with other traffic calming measures in order to achieve the greatest effectiveness Another recommendation with public support is the reduction of the posted speed limit along Bayshore Drive from 35 miles per hour (mph) to 30 mph. However, during the December 2006 public meeting, participants indicated that there may not be general support for this measure. Goal The goal of speed enforcement efforts and postej speed I:mit changes would be to reduce through-vehicle speeds and cut-through traffic volumes Theoretical Effect of Recommended Measure under the PIA Enforcement activities generally achieve some short-term reduction of vehicle speeds. The reduction in the posted speed limit in coordination with speed enforcement \Nould also generally achieve a short-term reduction of vehicle speeds. If combined with the installation of other permanent features, the effect could be Ionger- term. - :h- A.genda Item No. 178 May 26, 2009 Page 31 of 159 8.0 RECOMMENDED AESTHETIC IMPROVEMENTS A.esthetic amenities incorporate various elements along streets within the study area, pnmarily within the neighborhood streetscape. Streetscaping lies in the public right-of-way between building facades and the roadway. It includes the street. sidewalks, lighting, planting, furniture, public art, and other elements. As a result of the public outreach effort several aesthetic amenities were identified as recommended improvements under the PIA (described in detail below): all result in creating a sense of place and connectivity between the neighborhoods. north and south of US 4-1. 8. 1 Landscaping and Sidewalk Furniture Suggested landscaping improvement recommendations consist of plantings within the streetscape. The maintenance of these improvements can be costly and therefore only native species are recommended under the PIA. Sidewalk furniture includes benches. bike racks, trash cans, and other similar elements Below are descriptions and recommended locations of the landscaping and sidewalk furniture elements included in the PIA. Further study is recommended to design the appearance. structure, and placement of these landscaping or sidewalk furniture amenities. 8.1.1 Purpose and Goal The intention oftllis amenity can be defined as providing enhanced community character and a sense of place. Through the use of consistent design elements. the 8ayshore/Shadowlawn corndor can be quickly identified as one community by visitors and restdents alike. Street furniture elements invite and promote a lively street where residents and visitors feel comfortable. 8.1.2 Shadowlawn Drive Currently, Shadowlawn Drive does not have any landscaping improvements. The PIA recommends landscaping amenities to promote pnde and a strong sense of place '..vhile providing a visual connection to the areas along Bayshore Drive. Roadway medians are not recommended; however, landscaping is suggested along Shadowlawn Drive to provide a buffer between Ule sidewalk and moving vehicles. These landscaping improvements should not impede the line of sight for drivers Sidewalk furniture would be placed uniformly along the corridor with particular attention to areas near Shadowlawn Elementary School. Figures 8~1 and B-2 graphically depict the potential appea,ance af Shadowlawn Drive before and after the construction of landscaping and sidewalk furniture treatments. 8.1.3 Bayshore Drive Bayshore Drive south of US 41 has recently Implemented several landscaping elements and no further Improvements are recommended. However, street furniture amenities are recommended, specifically at bus stop locations where benches and bike racks wCiuld benefit patrons of the local if ansit system. 8.1.4 Linwood Avenue, Andrew Drive, and Other Local Streets Based on community input. several local streets \I':ithin the study area were not recommended for additional landscaping or street furniture Improvements - ./ ,/- Agenda Item tJo. 178 May 26, 2009 Page 32 of 159 ..'.,. -. c"'>Aesth'etlc Amenities Treatment ScurC!~: Cart€t & B.urQe~~, '1'1C _ U006 -7~~.- Agenda Item No. 178 May 26, 2009 Page 33 of 159 8.2 Themed Lighting Themed lighting is the use of aesthetically pleasing lights which illuminate pedestrian sidewalks. These lights generally range in height from 15 to 20 feet and aesthetically signify the corridor's sense of neighborhood or community. They may include banners with the community's name that further enhance a sense of place for the neighborhood. Additional study would be required to determine the appearance of the themed lighting scheme and to coordinate it with other aesthetic amenities. 8.2.1 Purpose and Goal The intention of implementing themed lighting amenities within the study area can be defined as providing enhanced community character and a sense of place. Through the use of consistent lighting schemes and neighborhood banners, residents and visitors would quickly identify the 8ayshore/Shadowlawn corridor as one community. 8.2.2 Bayshore/Shadowlawn Corridor Currently, there is themed lighting in place along Bayshore Drive south US 41. However, there are no themed lighting elements along Shadowlawn Drive. It is recommended thata consistent lighting scheme be implemented for both Bayshore Drive and Shadowlawn Drive. Consistency would enhance neighborhood connectivity and distinguish the study area as a whole community. Themed lighting is recommended for Shadowlawn and Bayshore Drives only, signifying the central corridor of the study area, whereas side-streets would not merit the implementation of themed lighting. Figures 8-1 and 8-2 graphically suggest the potential appearance of Shadowlawn Drive before and after the construction of themed lighting treatments. 8.3 Visual Screening During the May 2006 public outreach efforts an existing water tank located north of the Lois Avenue intersection (along the western edge of Shadowlawn Drive) was identified as a neighborhood "eye-sore" or an aesthetically unappealing structure. 8.3.1 Purpose and Goal The PIA recommends a strategy for reducing the visual impact of the water tank structure by planting mature trees or palms to bllffer the appearance of the water tank from Shadowlawn Drive. However. due to the height of the structure, landscaping alone could not fully buffer the visual appearance of the water tank. It is also recommended that the structure be painted to camouflage or subdue the visual appearance. A meta! link fence used to secure the grounds around the water tank is also visible from Shadowlawn Drive and the construction of an aesthetically pleasing fence would further reduce the visual impact of the water tank. Figures 8-1 and 8-2 graphically suggest the potential appearance of Srladowiawn Drive before and after visuai screening treatments. -79- Aaenda Item No. 178 ~ May 26, 2009 Page 34 of 159 8.4 Landscaping Line of Sight Issues During the public outreach process, several sections of the landscaped median along Bayshore Drive were identified as an obstruction to motorists' line of sight The PIA recommends that the landscaping in question be either trimmed or removed to reduce line of sight obstructions This recommendation does not include the complete removal of landscaping within the center median. ~ ~-: n- Agenda Item No. 178 May 26, 2009 Page 35 of 159 9.0 RECOMMENDED MODAL AMENITY IMPROVEMENTS Modal amenities in the PIA are elements related to transit facilities, pedestrian facilities, and other multi-modal types of infrastructure. These amenities focus on facilitating and promoting alternate modes of travel by providing connectivity to transit while promoting a safe, pedestrian-friendly environment. 9.1 Extended Transit Service As identified in Sections 1.0 and 2.0 the Collier Area Transit (CAT) bus service operates the Orange Route 2 northbound only along 8ayshore drive between Thomasson Drive and US 41. The PIA recommends that CAT consider adding additional transit service southbound along the same portion of Bayshore Drive. As new commercial and mixed-use development occurs along Bayshore, many study area residents are likety to make short trips up and down the corridor. However, these distances may be too far to walk, especially for individuals with mobility Impairments. Extension of transit service to include both directions along Bayshore would provide transit options for these reSidents to circulate throughout the area without relying on an automobile. Additional transit service would also provide area residents with greater connectivity to the City of Naples and Collier County. In the Collier MPO's LRTP, the 2006-2015 Transportation Development Plan Update (Section 8.1.1) recommends expanding service hours and operations As future development intensifies in the study area, the PLA. also recommends additional study to determine ifincreased frequency of bus service along Bayshore Drive is warranted. During the course of this study, the public identified that CAT is currently considering this recommended measure and the PIA would coordinate with any and all recommendations brought forth by Coiiier County. 9.2 Bus Shelters An important consideration for all transit patrons is the condition of transit stop amenities. The PIA recommends the construction of bus shelters at each CAT bus stop along the Orange Route 2 on 8ayshore Drive. These bus stop shelters would proVide cover from the elements and proVide comfort and convenience for patrons, promoting the use of transit. It is recommended that these shelters emulate the characteristics of the bus shelter located at the northeast corner of Bayshore Dnve and Thomason Drive. These shetters would be designed to enhance or integrate into the corridors streetscape and remain consistent with other COrridor amenities. 9.3 Bike Paths The LRTP, Section 8.2, "Pathways" indicates that Shadowlawn Drive between Davis Boulevard and US 41 is designated as a top priority for addition of bike lane faciHties f'v1ore than ten participants in the public workshop indicated the need for similar facilities along the corridor Therefore. bike lanes and paths have been incorporated into the PLA. 9.3.1 Purpose and Goal Bike paths provide residents and visitors With a designated corridor where they can safely ride their bicycles. The provision of such a facility separates bicycle traffic from vehicle traffic for Increased safety. Due to the presence of a safe bicycling environment, reSidents and visitors are more likely to utilize bicycles for making stlort trips within the study area This type of bike faciiity is recommended for Shadowlawn Drive between C1av:s Boulevard and US 41, .XI- P,genda Item No. 178 iday 26, 2009 Page 36 of 159 Figures 8-1 and 8-2 graphically suggest the potential appearance of Shadowlawn Drive before and after the construction of bike path amenities. 9.4 New and Widened Sidewalks Several public outreach participants, dunng the rv;ay 2006 meetings expressed major concerns with the condition of existing sidewalks Within the study area. Over 26 ;Jarticipants supported the impiementation or construction of new or widened sidewalks 9.4.1 Purpose and Goal The construction or widening of sidewalks within the study area is intended to provide residents and visitors a comfortable and safe walking environment The sidewalk IS an Integral part of any neighborhood's streetscape and functions as a meeting place for reSidents and visitors moving aiong the corridor. More importantly. the sidewalk provides a safe place for pedestrian travel separated from vehicle traffic If no sidewalks are available, residents and visitors are forced to walk within tile street in direct confilct moving vehicles. 9.4.2 BayshorelShadowlawn Corridor Study Area The Pl.", recommends the construction of sloewalk Infrastructure. The majonty of these sidewalk Improvements are recommended for streets located north of US 41. Baysho~e Drive. south of US 41 generally provides ample sidewalks that integrate an aesthetically pleasing bnck paver design, enhancing the eXisting streetscape. For locations where sidewalks improvements are recommended, a similar aesthetic quality could be integrated to enhance neighborhood character ana aesthetics. To reduce construction cests, alternatives to the bricK oa\./ers deSign could be considered';lternatives include colored or textured cancr'ete 01 stamped asphalt. The PIA recommends the foliowing sidewalk HllprOVeme:lts . Construction of a new flve- foot wide sidewalk along both sides of ConnecticutAvenue between Shadowiawn Drive and Airport Pulling ~oad, · Construction o~ a new five-foot wide sidewalk along bOTh sides of Linwood ,A,venue between Pine Street and Airport Pulling Road, · Construction of a nevv five-foot \Nlde Slde'Naik along both sides of Fr-an::s Avenue. Construction of a nev, five-foot ''-''.'Ioe side'll/alk along both sides of ,t.,ndrew Dm/e rEJlih of US 41, . CO'1struction of a new five-Tocit wide sldew2:k along both sides of Caledonia Avenue be!'"veen .Andrew Drive and Airport Pulling Road. e CO~istruction of a ne\J\1 five--Toot \f~i~de sldevva!k along ~oth si:-Jes of Pi;jelanj A,venue betvveen .b~ndrevy' Drive and Airport Pulling ;:;oad. · Construction of a new five-foot VI/ide Sidewalk along both sioes of Call1sa p,venu8 between Andrew Drive and .L'.IIpori Puliing Road; and · 'Widen the eXisting five-bot wide sidewalk to eight-feet wide along Doth sides or ShadowI8wn Drive bst\.'V8en [iavis Bouievard and L;S 41. Figures 9-1 and 9-2 graplllcally suggest the potential appearance of Linwood ,A,venue before and after the construction of sidewalk amenities -}-~ = - Agenda Item No. 178 May 26, 2009 Page 37 of 159 ;,< ',>,,-:.-,-,-:-,.., Aftet .. Sidewalk Amenities Source: CJ7"ter & Bureless, :nc. .:2006' -x.-:;' Agenda Item No. 17B May 26, 2009 Page 38 of 159 9.5 Pedestrian Refuge Pedestrian refuge areas are constructed within the roadway median to provide a safe location for pedestrians to wait before crossing the remaining lanes of vehicle traffic These refuge areas are highly visible and shield or protect the pedestrian from vehicles traveling along the corridor or turning onto local side streets and driveways. 9.5.1 Purpose and Goal Crossing streets at uncontrolled (i.e., no traffic signal or STOP sign) intersection locations can pose a serious risk to pedestrians. Adequate crossing gaps may be relatively infrequent on wide streets where vehicle volumes and speeds are high. In addition, the driver may not see the pedestrian because the pedestrian is obscured by a vehicle in another lane or other visual obstru:::tions. At night, crosswalks and pedestrians can be extremely difficult for motorists to see in time to stop. 9.5.2 Bayshore Drive The pedestrian refuge area is of particular importance along Bayshore Drive where pedestrians must cross across four lanes of high-speed traffic, separated by a landscaped median. ;.,S indicated in Sections 2.0, the majority of vehicles are traveling at or above the posted speed limit and none of the unsignalized intersections on Bayshore drive provide pedestrian refuge in the median. The PIA recommends the construction of pedestrian refuge areas that are clear of elements that might obscure the presence of the pedestrian and that are lighted (theme lighting appli:::able) for visibility after dark. These pedestrian refuges should also integrate seamlessly into the high-visibility crosswalk infrastructure described in subsequent sections. Use of pedestrian refuges is not appropriate for Shadowlawn Drive or other streets that do not have a center median. Construction Df pedestrian refuge areas are recommended for the following locations under the PIA: . Bayshore Drive at Week .Avenue . Bayshore Drive at Bayview Drive, · Bayshore Drive at Gulfview Drive, . Bayshore Drive at Lakeview Drive, . Bayshore Drive at Barrett Avenue, .. Bayshore Drive at Van Buren Avenue, . Bayshore Drive at VVindstar Boulevard: and. · Bayshore Drive at Thomasson Drive It should be noted that the pedestrian refuge areas at the intersection of Bayshore and Thomasson Drives would be incorporated into the design of the recommended roundabout Figures 9-3 and 9-4 graphicaliy suggest the potent,31 appearance of Bayshore Drive before and after the construction of pedestrian refuge treatments \, 1 -'l~r- Agenda Item No. 178 May 26, 2009 Page 39 of 159 Refuge Amenities .,'-,., ."." '," . ." '":, '--"-'."'".. >'-'" ,.' "'~"'i"_ 'Pe'des!:rfa'., Refuge Amenities Source: Ci:lrter & r~l.Jrqe'5';., inc (2006) -S5- j:,genca Item No. 178 May 26,2009 Page 40 of 159 9.6 Pedestrian Safety Buffer During the May 2006 public outreach efforts participants indicated a need for a pedestrian safety buffer. The PI.A recommends the construction of a pedestrian guardrail along the western edge of the Andrew Drive and Calusa Avenue intersection. This recommendation is intended reduce pedestrian/vehicle conflicts between students and residents walking to the entrance of Shado\lvlawn Elementary School and vehicles traveling along Calusa Avenue and Andrew Drive. 9.7 Pedestrian Yield Signs Pedestrian yield signs are intended to alert motorists to the presence of pedestrians. especially at locations where motorists may not expect to see pedestrians These signs increase the likelihood that a pedestrian would have the benefit of a motorist yielding to him or her. 9.7.1 Purpose and Goal The use of advanced pedestrian warning signs and yield signs are intended to reduce the number of vehicle and pedestrian accidents with the study area These efforts to redu::e accidents, enhances the pedestrian walking environment with safer neighborhood streetscapes that add to community character. 9.7.2 BayshoreiShadowlawn Corridor The PI!e.. recommends the use of pedestrian yield signs at all unsignalized Intersections with pedestrian crosswalks The sign Itself should be offset from the intersection to provide ample warning time for motorists A.long the multi-lane 8ayshore Drive another sign at the Intersectian with lane markings should aiso indicate advance stop lines, encouraging motorists to stop farther back from a crosswalk. When motorists stop too close to a cross\J\,ta!k, their vehICles blod, the v!ew of pedestrians to drivers in adjacent lanes, and a multiple-threat pedestrian crash could result VVhen motorists stop farther back. sight distances improve between pedestrians and drivers in adjacent lanes, aiiowing them a better opportu:-Iity to avoid a crash. It is recommended that each Intersection wllere pedestnan crosswalk facilities are located would include additional lighting to Illuminate the crosswalks at night. .Additional signage should also be prOVIded to alert peclestnans to be aware of oncoming vehicle traffic. reduc;ng the false sense of safety a pedestrian may experience at higt1 visibility crosswalk locations 9.8 Lighted School Crosswalk ;:', lighted pedestrian cross....Jalk IS Intended to aiert motorists of the presence of pedestrians. especially at school crosswalk locations where motorists may not expect to 8ee children crossing the street This crosswalk element consists of flashing lights embedded into the roadway on both Side of the crosswalk and should be coordinated vvith peak school activity' periods. 9.8.1 Purpose and Goal L~ghted school cross\.\'s!ks are intended to reduce the nurr.ber of \/ehlc:e and pedestrian accidents \vlth the study area. These efforts enhance the pedestnan walking environment by providing safer neighborh::Jod streetscapes. - ~)I), Agenda Item 1\10. 17B May 26, 2009 Page 41 of 159 9.8.2 Bayshore/Shadowlawn Corridor The PIA recommends replacing the existing school crosswalk in front of the Shadowlawn Elementary School with a lighted crosswalk. Flashing, strobe-like, lights would be activated when a pedestrian trips sensors at either entrance to the crosswalk. These sensors could be calibrated to be actuated by elementary-school-aged children and during peak school activity periods. Power supply to operate the flashing lights and sensors can be supplied to the unit via a small solar panel array connected to a battery located within the vicinity of the crossvva!k. It should be noted that this recommended improvement vIas identified in the final public meeting on December 14, 2006, as a measure that should be implemented in several other locations where high visibility crosswalks have been recommended. Figures 9-5 and 9-6 graphically suggest the potential appearance of Shadowlawn Drive before and after the construction of a lighted school crosswalk. 9.9 High Visibility Crosswalks High visibility crosswalks are defined as pedestrian crosswalks that use high visibility markings on the roadway to alert motorists to the presence of a pedestrian crossing. It is recommended that textured or stamped asphalt also be used to further enhance the visual impact and aesthetic appeal of the crosswalk. 9.9.1 Purpose and Goal Similar to other modal amenities identified, the purpose of the high visibility crosswalk is to reduce the number of vehicle and pedestrian accidents. These efforts to reduce accidents enhance the pedestrian walking environment and provide safer neighborhood. The recommended use of textured or stamped asphalt provides increased awareness to the presence of the crosswalk while adding an additional aesthetic amenity that can significantly enhance the streetscape. 9.9.2 Bayshore/Shadowiawn Corridor The use of high visibility crosswalks is recommended at several intersections along the corridor. At the recommended implementation of a roundabout style intersection at Thomason Drive at Bayshore Drive, these crosswalk elements would be incorporated Into the deSign of the roundabout. High-visibility crosswalk elements are recommended at the following locations: · Davis Boulevard and Shadowlawn Drive, · Linwood ,cwenue and Shadowlawn Drive. · Francis Avenue and Shadowtawn Drive, · Caledonia Avenue and Shadowtawn Drive. . Calusa Avenue and Shadowlawn Drive · US 41 and Shadowlawn Drive, · Week Avenue and Shadowlawn Drive. · Bayview Drive and Shadowiawn Drive, · Gulfview Avenue and Shadowlawn Drive. · Lakeview Avenue and Shadowlawn Drive. · Barrett';venue and Shadowlawn Drive. and. · Van Buren Avenue and Shadowlawn Drive. Figures 9-7 and 9-8 graphically suggest the potential appearance of Shadowlawn Drive before and after the construction of high visibility crosswalks. -;;)7- Aaenda Item No. 17B ~ May 26, 2009 Page 42 of 159 l'\.l -l"n~- Agenda Item No. 17B May 26, 2009 Page 43 of 159 ter Crosswalk Amenities Source: C~ner &. Burqes~, lnc (2006\ -WI- Agenda Item ~~o. 178 May 26, 2009 Page 44 of 159 10.0 RECOMMENDED DRAINAGE IMPROVEMENTS In an effort to maintain consistency with the transportation analysis, the following drainage section and the resultant recommendations are based on comparisons between the eXisting condition and two future condition assessments. The following describes the three conditions in detaiL .fn -f r::~:_.,.:_~ r'__-J;.,.:~_~ A ________4 IV.' '-A,;:tU"!:I ....VtlUIUUIl;;:, M:;":;,,t::::';;:'IIIt::lfL 1 0.1.1 Study Area North of US 41 The study area north of US 41 is defined as the area bounded by US 41 (Tamiami Trail) to the south. Davis Boulevard to the north and Airport-Pulling Road to the east. Over the past several years, this area has been identified as experiencing significant flood events during even routme rainfall events. Development over the years has hydraulically isolated this area from pOSitive drainage discharge. There are several small connections to the piped systems along Davis Boulevard and US "11, but these systems do not provide significant discharge since they are over capacity. In the eastern portion of this area including and adjacent to Shadowlawn Drive, drainage of the existing roadways is accomplished by either closed storm drain systems or existing roadside ditches. Shadawlawn Drive, between DavIs Boulevard and US 41, utilizes roadside ditches. ditch bottom inlets, storm drain segments and side drains to collect and convey stormwater runoff south to the US 41 offsi:e outfall system that runs parallel to the US 41 storm drain system. The ultimate outfall is ~~aples Bay The majority of side streets in the study area utilize roadside swales to convey the,r minor runoff ta these larger systems. No stormwater management is presentl}' prOVided (treatment or attenuatiOn) for S'iadowlawn Drive or side streets within the iMmedia:e study area 10.1.2 8ayshore Drive Bayshore Drive, from US 41 south to Thomasson Dt-iv8, utiilzes a closed storm drain system. conSisting of cUI-b inlets and pipes to collect and convey stormwater runoff to its outfall Lake Kelly Ditch. The majority of side streets In the study area utilize roadSide swales to convey their minor runoff to these larger systems No stormvvater management is presently piovided (treatment or attenuation) for 3ayshore Drive or Side streets v/ithln the immediate study area. 10.2 2015 Future Baseline Condition 10.2.1 Study Area North of US 41 In 20GS, HDR Inc conducted an ar~alysis of the eXisting CJndltlons (Histone Dramage Conditions AnalYSIS F<:eport) and proposed improvements for the existing drainage system within thiS area (Gateway Triangle Draina[l(? ImprovemRnt f~er)ort) of C:oiiier C:ou1ty. Proposed :;T1provements Included ut)grading the existing stor:Twater conveyance system and the construction of a regional storlllwater facility In an effort to allev,ate the extreme flooding III the C';ateway Trian;;le. Collier County has purchased property to cor.struct a 6-acre pond and ;s seeking to expand thiS faciiity In the future to provide additional stormwater relief In order to provlde positi'v'e discharge frorn the .jete~tio'l/retention facility to ~\~3p!es Bay, the facility \.vill include a duplex pump station. This pump station wiP convey stormwater rundf via a 3D-inch force mai0 outfall. which is to r.le c:nn~trurted \Mithin the Pin'? Str'eet :3:~d ~!nv\'cod .l:,\'enu~ ;igh~~-of-v.',3Y. The 30,in~h f8ice :T1z:n v..'il! :hen tee at the intersection of Linwood Avenue and Conmerc:al Drive The northern branch \,'Jill con1inue as a 24- inch fmce main aiong the east slce 0': Commerc:a! Drive cress Davs Boulevard. 2nd outfall int::! the eXisting . q: l_ Agenda Item No. 17B May 26, 2009 Page 45 of 159 gravity system on the west side of Brookside Drive. The southern branch of the outfall (14-inch force main) will continue south down Commercial Drive, cross US 41, and outfall into the existing gravity system on the west side of Palm Avenue. Future projects are planned to improve the stormwater collection and gravity conveyance system to the pond. The current design of the regional stormwater facility would alleviate flooding conditions primarily in the western and central portions of this area. However, it is expected to have minimal impact on the immediate study area. 10.2.2 Bayshore Drive The only significant drainage improvement project proposed for Bayshore Drive and the surrounding area is the Haldeman Creek Dredging project. Forty thousand cubic yards of material will be dredged. leaving 2 to 3 feet of water at low tide on the west side of the Bayshore Drive Bridge. The dredging project will run from U.S. 41 East, including the finger canals, to where Haldeman Creek connects with Naples Bay. The primary purpose of the project is to improve boater navigation and access and enhance water quality and flow. The expected completion date is February 2007. 10.3 2015 Future Development Condition 10.3.1 Preferred Improvement Alternative (PIA) Drainage improvements are limited to the infrastructure necessary to construct the recommended improvement elements included in the PIA. These improvements are primarily reiated to the addition of curb and gutter along Shadowlawn Drive and valley gutter along Connecticut, Linwood, Francis, Andrew Drive, Pineland, Calusa and Caldonia Avenues. Converting from open to closed conveyance systems will require the construction of inlets and pipes in order to collect the stormwater and convey it to the approphate outfall Although no additional travel lanes are proposed under the PIA. an environmental resource permit will likely be required to meet water quality and quantIty standards. Under water quality requlf'ements, the project should compensate for filling in the existing ditches. The loss of treatment volume within these ditches must be replaced. Under water quantity standards, the project should provide attenuation for the slight increase in discharge due to the increased impervious area (curbing and Sidewalk). It is estImated that a stormwater management facility (SMF). approximately 2.0 acres In Size, would be required. 8ased on Laser Imaging and Detection and Ranging (UDAR) contour information, the most hydraulically appropriate locations for this SMF would be west of Shadowlawn Drive, along Francis .A.venue or Linwood Drive. AdditionaHy, the possibility of expanding the Regional Stormwater Facility d!s:::ussed previously could be explored. 10.3.2 Further Analysis Required As the PIA moves toward design, additional information would be required to properly design the storm drain systems, outfalls and stormwater management facility: · Utility information, including riOrizontal and vertical location, would be required in order to determine the location of the storm draIn system and the need for utility relocation · Survey Information and geotechnical data (soil borings and seasonal high water elevation) would be required to properly design the stormwater management facUity. once an appropriate site is chosen · Location and elevatIOn of outfaHs would be required in order to properly deSign the storm drain systems along Shadowlawn Drive and the side streets it should be noted that the drainage elements in-:::.luded in the PIA dO not address the current flooding probienis 'Nithm the immediate study area. A detailed study would be reqUIred in order to propose improvements which _ (i I - p,genda item f'>Jo. 178 May 26, 2009 Page 46 of 159 would alleviate flooding in the future. The drainage improvements proposed in the PIA, ensure that the elements of the PIA can be constructed and permitted. -(;~- Agenda Item No. 17B May 26, 2009 Page 47 of 159 11.0 CONCLUSION The PIA uses recommended improvement strategies, developed through public participation, to decrease the volume and speed of cut-through vehicle traffic within the study area. The PIA also aims to maintain mobility along the Bayshore/Shadowlawn corrrdor and reduce the likelihood of vehicle/pedestrian conflicts. The primary goal of these improvement measures is to provide a more livable and cohesive neighborhood. 11.1 Summary of Recommendations After evaluating public comments, travel demand forecasts, and intersection LOS analyses; the PIA includes the physical re-configuration and signal timing plan revisions to all signalized study area intersections. These recommendations would effectively increase intersection capacity, improving operations and mobility along the BayshorelShadowlawn Drive corridor. The identification of future parking needs is also included in the PIA. The PIA qualitatively and quantitatively considers the impact of recommended transportation improvements and traffic calming measures. As a result, the construGtion of a roundabout, access management guidelines, and school access strategies are recommended. Traffic calming techniques recommended by the PIA include gateway treatments with roadway neck-downs and speed enforcement. The PIA identifies several aesthetic amenities which would create a sense of place and connectivity between neighborhoods, north and south of US 41 These recommendations include landscaping, street furniture, themed lighting, and others. Modal amenities such as transit service, bus shelters, bike paths, sidewalks. and crosswalks in conjunction with aesthetic amenities would provide a safe. pedestrian-friendly, and cohesive neighborhood. 11.2 Implementation of Recommendations The implementation of the PIA improvement measures requires careful consideration to design, capital cost, drainage, and maintenance. .A cost consideration combined with the improvement measure's perceived effectIveness provides a basis for prioritization 11.2.1 Capital Cost Table 11-1 summarizes a few of the approximate capital costs for several improvement measures. The approximate cost ranges have been extrapolated from information provided by the Florida Department of Transportation (FDOT) and do not include the cost of acquiring parcels of land or right-of-way. Appendix o provides a detailed description of approximate cost by location and specific element. Each capital cost estimate is based on approximate infol"1"nation wtlich was readily available in December 2006 and does not reflect future market driven cost changes. These capital cost estimates would also reqUire detailed engineering and design considerations to determine actual cost. Recommendations not described in the table are generally elements that have too great a range of cost to accuratety approximate. Factors that influence this rnability to approximate cost include design, quality of materials used, andior iabor. Special Cost Considerations for Roundabout P.s Indicated In Tables 11-1 and Table D-3 (Appendix D). the approximate cost for the construction for a roundabout at this intersection would be between $135.000 and $150,000. This cost estimate does not Include right-of-way acqUisition costs. .t\s indicated by Collier County Property Appraisers Office. the current average (2006) cost per acre of iand within thiS portion of the study area is approximately $15 per square foot L'srng a conservative v/orst case scenario. it has been assumed that an additional 1/4 acre of right-of- _l){_ Agenda Item r~o. 176 May 26, 2009 Page 48 of 159 apl a os ummary Improvement Measure Total Approximate Cost ($) VVlden SJdewa!ks 108.000-257.000 Cons1rucl New Sidewalr:s -- ~- 75000. 201000 Bike Paths 1.018000 - 1 .272 .500 Speed Er1fo~cer'T2~t--=-==~==- 2.0CiO iper monthmer locatloni Pedestrian Safety Buffer ------,2.506 - 15.500 Drainaoe (construction of retentI9~JiJ__ ,86000 - 232.500 "-~------_."--_._-_...__._--_.._----,._---- Pedestrian Yield Slqns 12.500 - 15.500 Drainaoe (curb & Qut,!,ElrL_______________ ____:Ie 811c~r~Q_-_Z.?_6LQQQ______. J?~~n5g.~_( '/a lIel'_~~~~L_____ ---.--..-.- 4.218.000 - :'.272 500 '-~-----._--_._--- _f:il~_\:,I!:!~~!tx.f!D~.S,,!21~~ -'----."---'- ~5}_,~QQ_~_.~.~~:_~.<J~______ Lane Resuipinq 5.000, 6.5DO Turnlnq Lane Capacity 75.000. 100.000 Roundabout 134.500 - 159.000 Table 11-1 Recommended Improvements' C "t let s Source Car.er & Burgess >:2005) way would need to be acquired to successfully implement the proposed roundabout and all its approaches. A multiplier of six to eight is generally applied to the cost of acquisition to cover damages and litigation. As a result the total approximate cost to Implement the proposed roundabout at this location would be between $1.000,000 and $1,130,000 (10.890 sq. ft. @ $15 x 6 + construction cost). Comparatively, a signal with mast arm at this intersection location would cost approximately S250.000. 11.2.2 Prioritization of improvement Measures The identification of an improvement measures impact on the PiA and subsequent cost to implement are the basis for prioritizing each measure. .,0.-5 shown in Table 11-2, each measure was ranked by comparing its potential benefit to cost ratio. The improvement measures which require the least capital and have the greatest benefit to the study area are recommended to be implemented fIrst and are shown at the top of Table 11-2. The improvement measures which require the most capital and have the least effect on the study area are located toward the bottom of Table 11-2. The more costly Improvement measures could be implemented last or constructed in phases over longer time periocls The potentia! benefits of each improvement measure were given qualitative numerical rankings for the fo!lowing categories: · Safety impact. · Enhance vehicle mobility. . Enhance vehicle access, . Bike and pedestrian mobility, · Aesthetic enhancement, · Traffic catnling benefIt: and, · Pubiic support. The public support category was completed by publiC participants In attendance at the final public presentation, held December 14, 2006. At thls final public presentation, participants were asked to indicate their improvement measure preferences. Results were then added to Table 11-2. The potential costs associated With each irnpr 0\Jernent measure were qualitatively ranked by a capita! cost and m:::')int,::::.,n::.nr;::. ("'-~t~n("')rio~ .. .-.. ..-. .-. .~- --.-::;,-' '--- .q~- Agenda Item No. 178 May 26, 2009 Page 49 of 159 rt is important to note that drainage improvements (see Section 10.0) are required to support the construction of several improvement measures. For example, improvement measures such as improved streetscapes with landscaping, street furniture, sidewalks, and other aesthetic or modal amenities described in Sections 8.0 and 9.0 would all require drainage infrastructure support. As a result drainage improvement measures described in Section 10.0 are not included in Table 11-2. In summary (Table 11-2), improvement measures are recommended for ImplementatIon according to cost! benifit ranking as follows: 1) School Access 2) Pedestrian Yield Signs 3) Access Management 4) Reduce Speed Limit 5) Landscaping Line of Sight 6) Pedestrian Safety Buffer 7) Lighted School Crosswalk 8) Gateway Treatments/f\leckdowns 9) Pedestrian Refuge 10) High \jisability Crosswalks 11) Construct Sidewalks 12) Themed Lighting 13) Bike Paths 14) Speed Enforcement 15) Widen Sidewalks 16) Bus Shelter 17) Roundabout at Thomasson/ Bayshore 18) Landscaping and Sidewalk Furniture 19) V,sual Screening 20) Extended Transit Route -',)':;- rY'i:.J)G) ~OL() ~o~ 0":'0 z~o _ LD a3 ~ (J) :::=:2 g' C1l 0... ~ OJ ::n <( If) ~ ;; <II <l> ::e C <l> E Q) :> o ~ 't:I Q) "E ~ E o U ll> 0:: '0 o ~ a:: ~ c: Q) CD en o u N ~ ~ ll> :3 '" I- <;; 0 u .2 <> <> '" :;l 5 <> <0 - '" g C> '"' m "" .., ., '" "' ;e Ri '" '" .., ~ N <> ... C> '" '" '"' <> ,- 1! ~ :! :: wi g g ...: ..; wi ,..; ... ,.; ,.; ,.; ".; ,.; ... a:: OJ; ID <;; <;; Q ~ c, ~ - " " '" " 0, ~ In '0 '0 '" "- '" ~ '" ,-", "- m ~ 0> ~ - U '" u c: ro <;; 0 c: 01 0 S!- o 0 '" 0 r~ r-" " I, '" ~ ~, " I"'~ ill C.. " v v v v c: u 'n; :E "3 - c;- 5- <to ("J '" " c., N ,,; " v l.f) 0:', v ~. N I.V r, .n <.:. I 0 S!- O'- J u ~ "" C;- ., '"' '" .., - '"' '" '" ,., ~, " ..., In ..,. '" In " '" u, '" ..... '" 0> .,. '" .,. ,.., f?; ~ ~ '" "" ,. ;; g; '" ~:j 0; ~ .- 0> ;: ~ r, .., ,.., .., .., " ... .., ., '" '" '" ., - .... '" ID ."' t: 0 c;- ,,. N ~ (~" '"'J C( ~ .-. '" '.' ,. ~ - .:'1 ,. ~ :s Q. .... r. " c:) ID ~0 "" (f) " .....-;. '" ", 'D 0 ::-.:. 0.-:1 :::> :;, 6 .. a ,. n "- V; .. U .~ ;;:: c;- :E ~ - I" '..0 ~... "' C" ~ '.f: ~. "' ,. .0 Iw"'"; '" ' (~ "' m " ,.., ~. '" ;;:; 2- u' .'" r, ...., U'1 :,:, .= '" u III .;2 .;, ~ u i: u:;- C Ln ,,-, ..", U' "' U' ~. Ln on "' <;; -E '" 2- 0 ~ u c.' 1'1 " c, r, ~ ,~ Ct c.J ., ... lJ: ... 0 '" E <( Li:i "C ~ I I 01 u:;- CL. "' u ", IF " ~'.' .- IJ"; Q; :.0 I ... I' -' c. ("J \~', ", ,,-; ,n c., ,.."; .' "" 0 2- ("'; '---J ". f'"" ., .' -. or", '_:;l ., 2i ::;; 01 '" '" u I ~ '" u:;- ~ 01 ", ;::' f'': U, ". u' .:- " . Lt. . . ~. .:" .- ...-' ',C> - .n .. [.,.., .. U S!- ,~ r, n f":,-) ,...~ r '. .. "" :.-, ~ .:; .. UJ'> I i::' I :-= tt;' .0 . -, 0<::> :;: I ! ;"J ,n , C> ~ OJ -~ ~ -"tl I~ > I I I I I I i ,r, ". ('< i:'wo Il' ~ (""W ~ES .~ :;" ,~ ~ o:.d.~ l~:'-: ,:r! C'") -T r_, r'J '--..I :Y) ....J Ln 'c:: ,~ .E "'"' .0 ~, 50 a' S "2 i '" .~ g 0 u ~ OJ ex:: <:( I '" '" ~ ;J"J I ~ :; ~ c. '" QJ ~ if' -0 C .g C' .. ~ I '" '" l':~ ~ ~ if.' u: ,n a> ~~ ". I'" ~ ,'.::: '!:' 1 (.l In ;:-) IL 7-. .", Q) IY' '-' r-; <:> cv <:. cy 7- a-." i..:". :i:- t" ::J ~,:' '':j 1D - ~ r ~T' 2 2 ~: ~'0 c '!! O::J n -,,,, l ~ '(u Q\ If if, 'J! T -;;, ~ - ;:~ -~ (-h ;;:) t,', ~: ",. ~l~ ~> c',') .. ~ .:r; :~ q, :q - ::;, _l_)h_ I I I .,1 .~ ..J ~ ;"r, ~ '" 'J) :-~ ~ ,....j :~ - comm r~::::>1.[) _-o~ N_ . 0 -~.,- I.[) E >. (!) CllCCC)) ==2:cc CC n.. :;2 Q; 01 <t: ,...- =\ t--.. III Ii,> ~l-~ 8 ~)' ~~_i! z -7 \...,-, === == :::::= ~ H -= = = = = 1= ~8-<-:iT'~ iiiT ,T T T T rr , ;;: "0 ::> :! .. '" .. :! '" ~d "-~ < '" ~ ~ r .,. "II IX: ,~ ~ ~ ~ .. ~~ ~ ~ ~ : i r-- Z -.r ~~ ~l= en 0 4f: 9 1-, '-- == 0 ! OJ '" < g . gg o " " ~ :0 ::> ~ "1 Cl. ~ ~ @ " II Cl. '" I ).A.II:lO 3tlOHSAva I ' z " ::> ~ .~ ~.~~ ~ 3 8 (OVOII A11])I '+g ~~<(t\ a: ~ ~- ~ :; ~ 0\ \1 ~ I 6 LV.t1 ~~; ~ ~(c=J. ) A'" ~.;=l= 1-- I- A "n.... ~<~~ - c:<.~ - ...P 'i . / /' I ---e 1-1- <I- - 51- / 1--"1- L I L~ an 8-. ~ H ~t= @: g~I---"" "! I- "il- .In r\ Llj- f\ I ! r I I Iii ';n~". . . ~ ~ ~ /1'0(~~'O ",i ~t\\ i~;'~ \ ~~ ::>~, ~~~ /N :::c<'\~\{(\'---. ~ "~~ I '-' ":~~ C..):J ~ ii' ; j I~ 11 ~. I, , r- I , ~ 111,1.1 g ~ Q.. t -L ---If ~ .. J, c, ::> CI. :0 1-- ~I ~ ~I ,=====t:: =====1= = == == ~ ===:;::=1= ,=~- -i-fii--zr- 0 <+--:r- [ :; ~ .. "' '" I~ ~. ~ I I/O ]1I0HSA...e ~ lli zr= <~ r:::: ., u:. '" '" ; i ~ ."". f-' ~, ~ ~ L_I '" r---- ::> c. I f' I I ::; I :;;1 ..... ~~ ~I~ I [(i. f1 I I .; g ~Ii I llBi I Q.. ~I:Z: I I I -- ~ 5~. ~~~ ., - " Oti3BftlllJ.ll-W !lIf3BN3ll..... '!lNIQHY1 <V~~ ISII3lIdSO ~~~ ~5~ ,-- ;,~ - ~ 5l~~ ~88~ 1Il ~ ~~5 ~~ ;3~ ~ gg "" ~~ ~S ~ G1J1J ]l'<f:>5 0.. iON / - z- ~ ~ w ~ :!l /---- )1.1CO j,\f. of - a.. <( ~ CJ z z o N N Cl r- '" , a:: <( , co o o N II <( o. ::J CLI =It I 21 ~I twl o.i I I a.. <( ~ z o I- <( u SI j..genda item No. i 78 May 26. 2009 ?age 52 of 159 COLLIER COUNTY GOVERNMENT DEPT. OF ZONING & LAND DEVELOPMENT REVIEW WWW.COLLlERGOV.NET (i) 2800 NORTH HORSESHOE DRIVE NAPLES, FLORIDA 34104 (239) 252-2400 FAX (239) 252-6968 APPLICATION FOR PUBLIC HEARING FOR: ~ AMENDMENT TO PUD (PUDA) 0 PUD REZONE (PUDZ) (PUDZ-A) o PUD TO PUD REZONE PETITION NO (AR) PROJECT NAME PROJECT NUMBER DATE PROCESSED ASSIGNED PLANNER To be completed b.v stafr APPLIeANT INFORMATION NAME OF APPLlCANT(S) Naples Botanical Garden, Inc. ADDRESS 4820 Bayshore Drive, Suite D CITY Naples STATE FL ZIP 34112 TELEPHONE # 239-643-7275 CELL # FAX # 239-649-7306 E-MAIL ADDRESS: bholley@naplesgarden.org NAME OF APPLlCANT(S) Florida Gulf Coast University Foundation, Inc. ADDRESS 10501 FGCU Boulevard South CITY Fort Myers STATE FL ZIP 33965 TELEPHONE # (239) 590- 1067 CELL # E-MAIL ADDRESS: jshepard@fgcu.edu FAX # (239) 590-1070 1 l\ppllcatlDn For Public lJeanng For PlID Rezone OJ') H'07, rev 2'12lJH. rev 7'IIOS Agenda Item No. 17B May 26, 2009 Page 53 of 159 NAME OF AGENT R. Bruce Anderson; Roenel and Andress ADDRESS 850 Park Shore Drive, Third Floor CITY Naples ST ATE FL ZIP 34103 TELEPHONE # 239-649-2708 CELL # FAX # 239-261 -3659 E-MAIL ADDRESS:banderson@ralaw.com NAME OF AGENT Margaret Perry, AICP; WilsonMiller, Inc. ADDRESS 3200 Bailey Lane, Suite 200 CITY Naples STATE FL ZIP 34105 TELEPHONE # 239-649-4040 CELL # FAX # 239-643-5716 E-MAIL ADDRESS:margaretperry@wilsonmiller.com BE AWARE THAT COLLIER COUNTY HAS LOBBYIST REGULATIONS. GUIDE YOURSELF ACCORDINGLY AND ENSURE THAT YOU ARE IN COMPLIANCE WITH THESE REGULATIONS. ASSOCIA TIONS Complete the following for all registered Association(s) that could be affected by this petition. Provide additional sheets if necessary. Information can be found on the Board of County Commissioner's website at http://www.collien::Jov.net/lndex.as px?paQe=77 4 NAME OF HOMEOWNER ASSOCIATION: East Naples Civic Association, Inc. MAILING ADDRESS Aftn: Mr. Tom Cannon, President; 3823 Tamiami Trail East, PMB 284 CITY Naples STATE FL ZIP 34112 Disclosure of Interest Information a. If the property is owned fee simple by an INDIVIDUAL, tenancy by the entirety, tenancy in common, or joint tenancy, list all parties with an ownership interest as well as the percentage of such interest. (Use additional sheets if necessary). Name and Address Percentage of Ownership 2 Application For PublIc Hcanng For PL,O Rezone 01:18/07, rev 2/12/08, rev 7/1 1/08 Agenda Item ~~o. 178 fv'lay 26, 2009 Pace 54 of 159 b. If the property is owned by a CORPORATION, list the officers and stocknolders and the percentage of stock owned by each. Name and Address Percentage of Ownership Naples Botanical Garden, Inc., a not-for-profit corporation: N/A Directors: Lindo White, Richard Benson; Catherine Ware, Charles Berger, Juliet Sproul, James lagrippe Florida Gulf Coast University Foundation, Inc., 0 not-for-profit N/A rnrnnrntinn --" ,--- -..-.. Duane Stranahan, President; Peter Sulick, Vice President; Donald lesch, Secretory; Stephen Mcintosh, Treasurer; Joseph Catti, Director; Fay Biles, Director c. If the property is in the name of a TRUSTEE, list the beneficiaries of the trust with the percentage of interest. Name and Address Percentage of Ownership d. If the property is in the name of a GENERAL or LIMITED PARTNERSHIP, list the name of the general and/or limited partners. Name and Address Percentage of Ownership e. If there is a CONTRACT FOR PURCHASE, with an individual or individuals, a Corporation, Trustee, or a Partnership, list the names of the contract purchasers below, including the officers, stockholders, beneficiaries, or partners. Name and Address Percentage of Ownership Date of Contract: f. If any contingency clause or contract terms involve additional parties, list all individuals or officers; if C! corporation, partnership, or trust. Name and Address 3 Application Fell Public I Iealillg For pun Rezone 011 f),Oj. rev 2,' i 2'()8. rev 7:'11/08 g. Date subject property acquired ~ April, 2000 and February, Term of lease yrs.fmos. Agenda Item No. 17B May 26, 2009 Page 5?-.qf 159 2006 leased U If, Petitioner has option to buy, indicate the following: Date of option: Date option terminates: , or Anticipated closing date h. Should any changes of ownership or changes in contracts for purchase occur subsequent to the date of application, but prior to the date of the final public hearing, it is the responsibility of the applicant, or agent on his behalf, to submit a supplemental disclosure of interest form. PROPERTY LOCATION Detailed le2al description of the propertv covered hv the application: (If space is inadequate, attach on separate page.) If request involves change to more than one zoning district, include separate legal description for property involved in each district. Applicant shall submit four (4) copies of a recent survey (completed within the last six months, maximum 1" to 400' scale) if required to do so at the pre-application meeting. NOTE: The applicant is responsible for supplying the correct legal description. If questions arise concerning the legal description, an engineer's certification or sealed survey may be required. Section/Township/Range 23/ 50 South /25 East Lot: Plat Book Block: Subdivision: Page #: Property 1.0. #: 00395560200 Metes & Bounds Description: Please see attached legal description. Size of property: ft. X ft. = Total Sq. Ft. Acres 171 Address/generallocation of subject property: 4820 Bayshore Drive; Naples, FL 34112 PUD District (LDC 2.03.06): D Residential L8J Community Facilities D Commercial D Industrial 4 Application For Public Hearing For PUD Rezone 0 II 18/07, rev 2/1 2108, rev 7/11108 f'\genda Item No. 17B May 26, 2009 Page 56 of 159 ADJACENT ZONING AND LAND USE Zoning land use N RMF-6-BMUD-Rl & R2 RMF-6-BMUD-NC; C-3-BMUD-NC S MPUD, RMF-6-BMUD-R 1 RSF-3-BMUD-R 1 E RMF-6-BMUD-Rl, R2, multi-family and single family units; undeveloped property single family residence; undeveloped property commercial, residential, church VR-BMUD-R3, RSF-3-BMUD-R 1 & R4, C-2, 3 & 5-BMUD-NC W PUD, RMF-6, RSF-4-BMUD-Rl, C-3 residential (Palmetto Court, Southpointe Yacht Club & Windstar); vacant commercial Does the owner of the subject property own property contiguous to the subject property? If so, give complete legal description of entire contiguous property. (If space is inadequate, attach on separate page). No. SectionJT owns hip JRange J J lot: Block: Subdivision: Plat Book Page #: Property 1.0. #: Metes & Bounds Description: REZONE REQUEST This application is requesting a PUD amendment to allow for modifications to the PUD document, deviations from the LDC and providing an updated PUD Master Plan. Present Use of the Property: Naples Botanical Garden Proposed Use (or range of uses) of the property: No changes to the approved uses are proposed. Original PUD Name: Naples Botanical Garden Ordinance No.: 03-29 and 04-38 EVALUATION CRITERIA Pursuant to Section 10.02.13 of the Collier County land Development Code, staff's analysis and recommendation to the Planning Commission, and the Planning Commission's recommendation to the Board of County Commissioners shall be based upon consideration of the applicable criteria noted below. Provide a narrative statement describing the rezone request with specific reference to the criteria noted below. Include any backup materials and documentation in support of the request. PUD Rezone Considerations (lDC Section 10.02.13.B) 5 Application For Pubiic Hearing Por PLJD Rezone 011 g,'Oj, rev 2;' i 2,'08, rev 7'] ]:08 Agenda Item No. 178 May 26, 2009 Page 57 of 159 1. The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. This less intensely developed location within the urban area has been the ideal location for the creation of the Naples Botanical Garden. As a result of the early success of the Naples Botanical Garden (NBG), there is momentum to continue the development of this previously approved PUD and provide programs and resources to accommodate the growing County population, tourists and visitors. The Naples Botanical Garden PUD was approved in 2003. At that time, it was determined that this location was suitable for construction of a botanical garden and associated uses. A great deal of community education and activity has occurred on this site over the past few years. This current request for a PUD amendment will allow for modifications to the current PUD document to revise design guidelines and transportation-related conditions. Additional changes proposed include deviations from the LDC related to fencing and walls and revisions to the PUD Master Plan. The proposed amendment remains compatible with the surrounding community and other existing land uses. There will not be an increase in density or intensity as a result of these proposed modifications. The Garden will continue to be compatible with the surrounding neighborhood and there will be no increase in noise, lighting, odor or infrastructure needs as a result of these requested deviations and mod ifications. 2. Adequacy of evidence of unified control and suitability of any proposed agreements, contract, or other instruments, or for amendments in those proposed, particularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense. Findings and recommendations of this type shall be made only after consultation with the county attorney. The applicant believes that the submittal documents provide evidence of unified control. 3. Ccmformity of the proposed PUD with the goals, objectives and policies of the growth management plan. (This is to include identifying what Sub-district, policy or other provision allows the requested uses/density, and fully explaining/addressing all criteria or conditions of that Sub-district, policy or other provision.) The existing Naples Botanical Garden (NBG) PUD was determined to be in conformance with the Growth Management Plan (GMP) at the time of PUD approval in 2003. The proposed modifications to this existing PUD are compatible with the adjacent Sub-district Bayshore/Gateway Triangle Redevelopment Overlay. NBG is outside of and adjacent to the Bayshore/Gateway Triangle Redevelopment Overlay. The NBG attracts visitors and residents to the Bayshore arts corridor and redevelopment area. The NBG has established strong partnerships with the CRA and other organizations in the neighborhood including Avalon Elementary School and East Naples Community Park. The GMP Future Land Use Element F. Bayshore/Gateway Triangle Redevelopment Overlay states that "The intent of the redevelopment program is to encourage the revitalization of the Bayshore/Gateway Triangle Redevelopment Area by providing incentives that will encourage the private sector to invest in this urban area." Although NBG is outside of and adjacent to the Bayshore 6 Application For Public Hearing For PUD Rezone 0]iI8/07, rev 2/12/08, rev 7/11/08 Agenda Item No. 17B fvlay 26, 2009 Paoe 58 of 159 overlay district, it has triggered a large amount of private investment and improvements that have brought benefit to the CRA and surrounding neighborhoods. In addition to being consistent with the Bayshore/Gateway Triangle Redevelopment Overlay, the NBG is consistent with FLUE Policy 4.7 and Policy 5.4, compatible and complementary to surrounding land uses and the Bayshore redevelopment area. The proposed modifications will not change the current compatible and complimentary nature of the NBG and the surrounding neighborhood. 4. The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. This previously approved PUD is a compatible neighbor to the existing single-family and multi-family homes that surround the Gorden. In addition, NBG serves as the southern anchor of the County's Bayshore Drive redevelopment efforts. NBG is a unique and peaceful neighbor and will continue to provide design, buffering and screening that blends seamlessly between the gorden's tropical vegetation and the adjacent residential neighborhood. Property improvements will be designed to enhance the diverse tropical and sub-tropical gardens and the overall neighborhood. No changes are proposed with regard to the location of improvements. Deviations are requested regarding design guidelines and transportation-related conditions. However, there will be no negative impacts from noise, lighting or odors and the proposed deviations will enhance the serene, peaceful environment within and adjacent to the garden. As an example, the applicant's request to locate fencing within five feet of the property line will provide better security for the Garden and the adjacent neighbors by discouraging the establishment of homeless camps within the preserves and heavily vegetated areas of this lorge, 171 acre site. S. The adequacy of usable open space areas in existence and as proposed to serve the development. Only small tracts of this 171 acre botanical garden ore developed with structures for education and research facilities, parking lots and maintenance buildings. The vast majority of the acreage will remain as usable open space for the benefit of the garden visitors and the adjacent neighborhood. 6. The timing or sequence of development for the purpose of assuring the adequacy of available improvements and facilities, both public and private. This PUD amendment does not impact the timing or sequence of development. Adequate public and private facilities hove been built and will continue to be provided as outlined in the PUD document with the exception of requested changes to transportation-related conditions H., H. 1-3. and J., J.1 - 4 in the PUD document 7. The ability of the subject property and of surrounding areas to accommodate expansion. The Naples Botanical Garden PUD is 171 acres which provides the ability to continue its growth and expansion. There is adequate property to expand and meet the growing needs of the community, provide for educational research, generate tourism and meet others goals of the NBG. There is no physical expansion of the PUD proposed in this amendment. 7 Applicallon For PubliC Jleanng For I'll!) Ronne 01 IK07. rcv 2 12 ilK. rev 7, II,UK Agenda Item No. 17B May 26, 2009 Page 59 of 159 8. Conformity with PUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications of justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. This PUD amendment requests modifications to the 2003 PUD document and deviations from the LDC in order to address changing conditions. The applicant is requesting modifications to the traffic-related conditions in the PUD document. A Traffic Impact Statement (TIS) was prepared in October 2007 which accompanied a site development plan application. The TIS indicates that the "only turning movement volumes that meet the County's turn lane warrant criteria are the southbound right- turning volumes along Bayshore Road, and only when the total southbound right-turning traffic volumes are considered in the aggregatej..." The applicant purposes to provide a turn lane for southbound right-turning vehicles at the primary access point on Bayshore Drive (main visitor parking area). The applicant requests elimination of transportation conditions J.1., J. 2., and J. 4 as these are not warranted based upon the 2007 TIS. The turn lone described in existing condition J.3. has been re-written as J. and will be provided pursuant to the LDC and the SDP approval. In addition, the applicant requests the elimination of H. 1-3. which requires a 5-foot wide sidewalk along the length of the property on Hamilton Avenue and Thomasson Drive. A sidewalk exists on the north side of Thomasson Drive adjacent to existing residential developments. A sidewalk also exists on the west side of Hamilton Avenue adjacent to existing residential. There will not be any additional residential developed on the east side of Hamilton Avenue or on the south side of Thomasson Drive. The existing sidewalks have been and continue to be adequate to serve pedestrians in this neighborhood. Pedestrians have access to sidewalks adjacent to existing residential development along Hamilton Avenue and Thomasson Drive. NBG is accessible by pedestrians at both the Thomasson Drive entrance and on the west side of Bayshore Drive. The applicant would also request that the transportation condition requiring a sidewalk along the west side of Bayshore Drive (the PUD's eastern property line) be reconsidered. A sidewalk placed on the east side of Bayshore Drive, located adjacent to existing residential homes, would provide better pedestrian access and safety for local residents. The Naples Botanical Garden will pay its proportionate payment in lieu of a sidewalk on Bayshore Drive but believes that pedestrian access and safety would benefit greatly by locating the sidewalk to the east side of Bayshore Drive. Two residential developments have been approved by the Board of County Commissioners on the north side of Thomasson Drive both west and east of Bayshore Drive. The applicant has indicated a willingness to coordinate with these approved developments and the Bayshore CRA to address safe pedestrian travel in the immediate vicinity of the NBG. The Garden has offered payment in lieu to the Bayshore CRA for future sidewalks to be coordinated by the CRA and County Transportation with the development of new residential communities on the north side of Thomasson Drive at Bayshore Drive. The applicant is requesting three deviations from the LDC for decorative wall/fence material, height and location placement. The NBG requests a deviation from LDC Section 5.03.02. A.1.a.i to allow chain link fence setback five (5) feet from the public right-of-way. A deviation from Section 5.03.02.A.1.a.ii.(a) to allow a chain link fence to be permitted at a height of five (5) feet and a deviation from Section 5.03.02.E.2. requiring a masonry wall or prefabricated concrete wall and/or fence next to the out-parcel located on the west side of Bayshore Drive. The adjacent property owner, Mr. Scott Kapnick, does not wish to have a 8 Application For Public Hearing For PlID Rezone 01/18/07, rev 2/12/08, rev 7/] 1/08 Agenda Item No. 178 ["1ay 26. 2009 Paqe 60 of 159 wall/fence installed around his property, therefore a deviation is requested. Enclosed'is a letter from Mr. Kapnick concurring with this requested deviation. See Exhibit A. A masonry wall or prefabricated concrete wall and/or fence is required for the out-parcel located east of Bayshore Drive if that property is developed as part of Naples Botanical Garden and for the outparcel on Thomasson Drive. See the separate sheet for requested deviations from the LDC. Deed Restrictions: The County is legally precluded from enforcing deed restrictions, however, many communities have adopted such restrictions. You may wish to contact the civic or property owners association in the area for which this use is being requested in order to ascertain whether or not the request is affected by existing deed restrictions. Previous land use petitions on the subject property: To your knowledge, has a public hearing been held on this property within the last year? D Yes ~ No If so, what was the nature of that hearing? Official Interpretations or Zoninq Verifications: To your knowledge, has there been an official interpretation or zoning verification rendered on this property within the last year? 0 Yes ~ No If so, please provide copies. Attached is a copy of Administrative Variance AVA-2008-AR-13075 for an alternative fence design approved on April 15, 2008, Exhibit C. NOTICE: This application will be considered "open" when the determination of "sufficiency" has been made and the application is assigned a petition processing number. The application will be considered "closed" when the petitioner withdraws the application through written notice or ceases to supply necessary information to continue processing or otherwise actively pursue the rezoning for a p""riod of six (6) months. An application deemed "closed" will not receive further processing and an application "closed" through inactivity shall be deemed withdrawn. An application deemed "closed" may be re-opened by submitting a new application, repayment of all application fees and granting of a determination of "sufficiency". Further review of the project will be subject to the then current code. (LDC Section 10.03.05.Q.) 9 Application For Public Hearing For PUD Rczone OJ IS/07. rev 21208. rev 71 !"()8 ........- ST A TEMENT OF UTILITY PROVISIONS FOR PUD REZONE REQUEST Agenda Item No. 17B May 26, 2009 Page 61 of 159 APPLICANT INFORMATION NAME OF APPLlCANT(S) Naples Botanical Garden, Inc. ADDRESS 4820 Bayshore Drive, Suite D CITY Naples STATE Fl ZIP 34112 TELEPHONE # 239-643-7275 CELL # FAX # 239-649-7306 E-MAIL ADDRESS: bholley@naplesgarden.org NAME OF APPLlCANT(S) Florida Gulf Coast University Foundation, Inc. ADDRESS 10501 FGCU Boulevard South CITY Fort Myers STATE Fl ZIP 33965 TELEPHONE # (239) 590- 1067 CELL # FAX # (239) 590-1070 E-MAIL ADDRESS: jshepard@fgcu.edu ADDRESS OF SUBJECT PROPERTY (IF AVAILABLE): 4820 Bayshore Drive, Naples, Fl 34112 LEGAL DESCRIPTION Section/Township/Range 23 / 50 South / 25 East Lot: Plat Book Block: Subdivision: Page #: Property I.D. #: 00395560200 Metes & Bounds Description: Please see attached legal description. TYPE OF SEWAGE DISPOSAL TO BE PROVIDED (Check applicable system): a. COUNTY UTILITY SYSTEM b. CITY UTILITY SYSTEM c. FRANCHISED UTILITY SYSTEM PROVIDE NAME c. PACKAGE TREATMENT PLANT (GPD capacity) d. SEPTIC SYSTEM LR1 D D D D TYPE OF WATER SERVICE TO BE PROVIDED a. COUNTY UTILITY SYSTEM b. CITY UTILITY SYSTEM c. FRANCHISED UTILITY SYSTEM PROVIDE NAME d. PRIVATE SYSTEM (WELL) o LR1 D D 10 Application For Public lIearing for PUD Rezone 0]/18/07, rev 2'12/08, rev 7/1l/08 STATEMENT OF UTILITY PROVISIONS - page 2 Aaenda item No. 17B ~ May 26, 2009 Page 62 of 159 TOTAL POPULATION TO BE SERVED: 1500 visitors/day PEAK AND AVERAGE DAilY DEMANDS: A. WATER-PEAK 21 gpm AVERAGE DAilY 7550 gpd B. SEWER-PEAK 21 gpm AVERAGE DAilY 7550 gpd IF PROPOSING TO BE CONNECTED TO COLLIER COUNTY REGIONAL WATER SYSTEM, PLEASE PROVIDE THE DATE SERVICE IS EXPECTED TO BE REQUIRED Not Applicable, potable water service provided by City of Naples Utilities NARRATIVE STATEMENT: Provide a brief and concise narrative statement and schematic drawing of sewage treatment process to be used as well as a specific statement regarding the method of affluent and sludge disposal. If percolation ponds are to be used, then percolation data and soil involved shall be provided from tests prepared and certified by a professional engineer. Not Applicable, sanitary sewer service provided by Collier County Utilities COLLIER COUNTY UTILITY DEDICATION STATEMENT: If the project is located within the services boundaries of Collier County's utility service system, written notarized statement shall be provided agreeing to dedicate to Collier County Utilities the water distribution and sewage collection facilities within the project area upon completion of the construction of these facilities in accordance with all applicable County ordinances in effect at the at time. This statement shall also include an agreement that the applicable system development charges and connection fees will be paid to the County Utilities Division prior to the issuance of building permits by the County. If applicable, the statement shall contain shall contain an agreement to dedicate the appropriate utility easements for serving the water and sewer systems. Not Applicable, all onsite water and sewer facilities will be owned and maintained by the Naples Botanical Garden, Inc. STATEMENT OF AVAilABiliTY CAPACITY FROM OTHER PROVIDERS: Unless waived or otherwise provided for at the pre-application meeting, if the project is to receive sewer or potable water services from any provider other than the County, a statement from that provider indicating that there is adequate capacity to serve the project shall be provided. See enclosed availability of service letter from the City of Naples; Exhibit B. 11 '\pplication For Public Hearing For I'LL) Rezone 01) g'07. rev 212'()g. rev 7'1] 'Og AFFIDA VIT Agenda Item No. 17B May 26, 2009 P.go 03 of /159 We, Brian Holley, Executive Director, Naples Botanical Garden, Inc. and Dr. Joe Shepard, Assistant Treasurer, Florida Gulf Coast University Foundation, Inc. being first duly sworn, depose and say that we are the owners of the property described herein and which is the subject matter of the proposed hearing; that all the answers to the questions in this application, including the disclosure of interest information, all sketches, data, and other supplementary matter attached to and made a part of this application, are honest and true to the best of our knowledge and belief. We understand that the information requested on this application must be complete and accurate and that the content of this form, whether computer generated or County printed shall not be altered. Public hearings will not be advertised until this application is deemed complete, and all required information has been submitted. As property owners we further authorize R. Bruce Anderson of Roetzel & Andress and Margaret Perry of WilsonMiller. Inc. to act as our representative in any matters regarding this Petition. Signature of Property Owner Signature of Property Owner Brian Holley. Executive Director Naples Botanical Garden, Inc. Typed or Printed Name of Owner Dr. Joe Shepard. Assistant Treasurer Florida Gulf Coast University Foundation, Inc. Typed or Printed Name of Owner The foregoing instrument was acknowledged before me this day of 200----, by who is personally known to me or has produced as identification. State of Florida County of (Signature of Notary Public - State of Florida) (Print, Type, or Stamp Commissioned Name of Notary Public) 12 Application For Public Hearing For PLIO Rezone 0\!18/07, rev 2/12108, rev 7/1 1/08 .Agenda Item r'Jo. 17B Iv1ay 26, 2009 Page 64 of 159 The foregoing instrument was acknowledged before me this day of 200------, by who is personally known to me or has produced as identification. State of Florida County of (Signature of Notary Public - State of Florida) {Print, Type, or Stamp Commissioned Nnm.. nf Nntnrv P"hlir\ . .-...- -. . --.--. I . --..-, 13 Application For Public Hearing For I'UD Rezonc OlilK07. rev 2'12c'OB. rcv 7"1 ji()B COVENANT OF UNIFIED CONTROL Agenda Item r~o. 17B May 26, 2009 Page 65 of 159 The undersigned do hereby swear or affirm that we are the fee simple titleholders and owners of record ofpropeliy commonly known as Naples Botanical Garden 4820 Bayshore Drive, Naples. FL 34112 (Street address and City. State and Zip Code) and legally described in Exhibit A attached hereto. The property described herein is the subject of an application for community facility planned unit development (CFPUD) zoning. We hereby designate Brian Holley. Executive Director. Naples Botanical Garden. Inc.. and Dr. Joe Shepard, Assistant Treasurer. Florida Gulf Coast University Foundation. Inc., legal representative thereof, as the legal representatives of the property and as such, these individuals are authorized to legally bind all owners of the property in the course of seeking the necessary approvals to develop. This authority includes, but is not limited to, the hiring and authorization of agents to assist in the preparation of applications, plans, surveys, and studies necessary to obtain zoning approval on the site. These representatives will remain the only entity to authorize development activity on the property until such time as a new or amended covenant of unified control is delivered to Collier County. The undersigned recognize the following and will be guided accordingly in the pursuit of development of the project: 1. The property will be developed and used in conformity with the approved master plan including all conditions placed on the development and all commitments agreed to by the applicant in connection with the planned unit development rezoning. 2. The legal representative identified herein is responsible for compliance with all terms, conditions, safeguards, and stipulations made at the time of approval of the master plan, even if the property is subsequently sold in whole or in part, unless and until a new or amended covenant of unified control is delivered to and recorded by Collier County. 3. A departure from the provisions of the approved plans or a failure to comply with any requirements, conditions, or safeguards provided for in the planned unit development process will constitute a violation of the Land Development Code. 4. An terms and conditions of the planncd unit development approval will be incorporated into covenants and restrictions which run with the land so as to provide notice to subsequent owners that all development activity within the planned unit development must be consistent with those terms and conditions. 5. So long as this covenant is in force, Collier County can, upon the discov'ery of noncompliance with the terms, safeguards, and conditions of the planned unit development, seek equitable relief as necessary to compel compliance. The County will not issue pennits, cel1ificales, or licenses to occupy or use any part of the planned unit development and the County may stop ongoing construction activity until the project is brought into compliance with all terms, conditions and safeguards of the planned unit development. Owner Owner Brian Holley. Executive Director. Naples Botanical Garden, Inc. Printed Name Dr. Joe Shepard. Assistant Treasurer Florida Gulf Coast University Foundation. Inc. Printed Name 14 Application For Public Hearing For PUD Rezone Ol/l8.!07. rev 2!l2/O8, rev 7/1l/08 STATE OF FLORIDA) COUNTY OF ~ Agenda Item No. 178 May 26, 2009 F'age 66 of 159 Sworn to (or affirmed) and subscribed before me this day of ,200_ by who is personally known to me or has produced as identification. Notary Public (Name typed, printed or stamped) (Serial Number. ifany) STATE OF FLORIDA) COUNTY OF Sworn to (or affimled) and subscribed before me this day of ,200_ by who is personally known to me or has produced as identification. Notary Public (Name typed, printed or stamped) (Serial Number, if any) 15 Application For Public Heanl1g For PU!) ReZllI1t' 0]'18:07. rev 2.12'08. rev 711:08 PUD AMENDMENT (PUDA) Agenda Item No. 17B May 26, 2009 Page 67 of 159 PUD REZONE (PUDZ) PUD to PUD REZONE (PUDZ-A) APPLlCA TION SUBMITTAL CHECKLIST THIS COMPLETED CHECKLIST IS TO BE SUBMITTED WITH APPLICATION PACKET IN THE EXACT ORDER LISTED BELOW WfCOVER SHEETS ATTACHED TO EACH SECTION. NOTE: INCOMPLETE SUMBITTALS WILL NOT BE ACCEPTED. #OF NOT REQUIREMENTS COPIES REQUIRED REQUIRED STANDARD REQUIREMENTS: 1 Additional set if located in the BayshorefGateway Triangle Redevelopment Area) Copies of detailed description of why amendment is necessary 24 [8J 0 Completed Application with list of Permitted Uses; Development Standards Table; List 24 ~ 0 of proposed deviations from the LDC (if any); List of Developer Commitments and Statement of Compliance narrative (download application from website for current form) Pre-application meeting notes 24 ~ 0 PUD Conceptual Master Site Plan 24" x 36" and One B V2" x 11" copy 24 ~ 0 Revised Conceptual Master Site Plan 24" x 36"and One B V2" x 11" copy 24 ~ 0 Original PUD document/ordinance and Master Plan 24" x 36" - ONLY IF 24 ~ 0 AMENDING THE PUD Revised PUD application with changes crossed thru & underlined 24 [8J 0 Revised PUD application w / amended Title page w /ord #'s, LDC 10.02.1 3.A.2 24 [8J 0 Justification/Rationale for the Deviations (must be on a separate sheet within the 24 [8J 0 application material; please DO NOT include it in the PUD documents) 2 Copies of the following: Deeds/Legal's & Survey (if boundary of original PUD is amended) 2 ~ 0 List identifying Owner & all parties of corporation 2 ~ 0 Owner/Affidavit signed & notarized 2 [8J 0 Covenant of Unified Control 2 [8J 0 Completed Addressing checklist 2 [8J 0 4 Copies of the following: Environmental Impact Statement (EIS) and digital/electronic copy of EIS or exemption 0 [8J justification 4 Historical Surveyor waiver request 4 0 [8J Utility Provisions Statement w / sketches 4 [8J 0 Architectural rendering of proposed structures 4 0 [8J Survey, signed & sealed 4 [8J 0 Traffic Impact Statement (TIS) or waiver (with applicable fees) 7 0 [8J Recent Aerial Photograph (with habitat areas defined) min scaled 1 "=400' S [8J 0 Electronic copy of all documents in Word format and plans (CDRom or Diskette) 1 [8J 0 Copy of Official Interpretation and/or Zoning Verification 1 i [8J 0 If located in RFMU (Rural Frinae Mixed Use) Receivina Land Areas Applicant must contact Mr. Gerry J. Lacavera, State of Florida Division of Forestry @ 239-690-3500 for information regarding "Wildfire Mitigation & Prevention Plan", LDC Section 2.03.0B.A.2.a.(b)i.c. ]6 Application For Puhlic Hearing For PUD Rezone 01/18/07, rev 2112/08, rev 7111!08 Applicant/Agent Signature Date i\genda Item i'~o. 178 May 26, 2009 Page 68 of 159 Exhibit B LIST OF REQUESTED DEVIATIONS FROM LDC A deviation is requested from LDC Section 5.03.02. A.1.a.i to allow a chain link fence setback five (5) feet from the public right-of-way. Rationale A need exists to install a chain link fence within 5-feet of the property line in order to minimize the number of homeless camps that have been established on this heavily vegetated property. Fencing within 5-feet of the property line will provide better security for the garden and the adjacent neighbors by discouraging the establishment of homeless camps within the preserves. In addition, the use of a chain link fence will allow for a vegetated buffer to blend more seamlessly with the existing vegetation than a solid fence. A deviation from Section 5.03.02.A.1.a.ii.(a) to allow a chain link fence to be permitted at a height of five (5) feet Rationale A four -foot (4') high fence will not provide adequate security for this facility. The Naples Botanical Garden functions as an outdoor museum and as such requires that admissions be controlled and the facilities secured when the Garden is not open. The applicant proposes to install a five-foot (5') high, chain link fence along its perimeter within five (5) feet of the property line in order to adequately secure the facility. The additional height will assist in providing better security for this facility and adjoining residential property. A deviation from Section 5.03.02.E.2. which requires masonry wall or prefabricated concrete wall and/or fence between residential and nonresidential. The applicant proposes to provide a masonry wall or prefabricated concrete wall and/or fence next to the out-parcel located on Thomasson Drive. A masonry wall or prefabricated concrete wall and/or fence is required for the out-parcel located east of Bayshore Drive if that property is developed as part of Naples Botanical Garden. No masonry walls or prefabricated concrete walls and/or fences are required along the out-parcel located on the west side of Bayshore Drive. Rationale An adjacent property owner, Mr. Scott Kapnick, does not want a wall/fence installed around his property. The applicant would request a deviation from the installation of a wall or fence on the southeast side of the Garden adjacent to Mr. Kapnick's property. Enclosed is a letter from the property owner concurring with this requested deviation. 17 /\pplication For Public Hearing FUi pun Rt:ZUiH: OL'lS,'07, rev 2:12/()8. ICV 7:1 LOS Agenda Item No. 17B May 26, 2009 Page 69 of 159 ORDINANCE NO. 09 - AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AMENDING ORDINANCE NO. 03-29, THE NAPLES BOTANICAL GARDEN PLANNED UNIT DEVELOPMENT (PUD), BY AMENDING SECTION 4.14, DESIGN GUIDELINES; SEenON 6.2, DEVELOPMENT P AR..A....METERS; SECTION 6.4, PERMITTED USES AND STRUeTURES; SECTION 6.5 DEVELOPMENT STANDARDS; AND SECTION 7.2, TRANSPORTATION OF THE PUD DOeUMENT FOR THE NAPLES BOTANICAL GARDEN; BY ADDING SECTION 7.6 TO PROVIDE FOR DEVIATIONS FROM THE LAND DEVELOPMENT CODE AND PROVIDING AN EFFECTNE DATE. WHEREAS, on June 24, 2003, the Board of County eommissioners approved Ordinance No. 03-29, which established the Naples Botanical Garden Planned Unit Development (PUD); and WHEREAS, said Ordinance Number 03-29 was previously amended by Ordinance Number 04-38 and approved by the Collier County Board of County Commissioners on June 22, 2004 to correct a scrivener's error. WHEREAS, R. BRUCE ANDERSON, representing Naples Botanical Garden, Inc., petitioned the Board of County Commissioners of Collier County, Florida, to amend Ordinance 03-29, as amended, the Naples Botanical Garden Planned Unit Development. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA that: SECTION ONE: Section 4.14, Design Guidelines, of the PUD Document for the Naples Botanical Garden is amended as follows: 4.14 Design Guidelines Words struck through are deleted; words underlined are added. Page 1 A,genda Item ~Jo. 17B May 26. 2009 Page 70 of 159 A. Development of structures wIthin the Naples Botanical Garden PUD, due to their unique characteristics in a natural setting, shall comply with the Purpose and Intent Section of Di','ision 2.8 Section 5.05.08, Architectural and Site Design Standards of the LDC~ amended, only. Structures within the Naples Botanical Garden PUD will not be consistent with the actual architectural guidelines of Diyision 2.8 Section 5.05.08 as amended. The applicant will follow the alternative compliance process for review of architectural and design standards as outlined in Section 5.05.08.F. of the LDC as amended, to allow for innovative design of structures within Naples Botanical Garden, except that maintenance, interim or temporary structures do not require architectural and design standard revie\\'. The applicant shall comoly \s/lth Section 4.06.05 FOll...TJ.dations Plantings of the LOC for interim or temporary structures as well as the maintenance structures. HO'Never, the following requirements saaH apply: 1. Structures shall comply with Section 2.8.2.5, Non Commercial Development of the LDC. 2. Struetures Ghall comply '.vith Sctltion 2.8.5, ExeeptionG and Interprtltaiions of the LDC ""here necessary to allo'.\' for innovative design of struetures within Naples Botanieal Garden. B. Decorative walls and/or fencing shall be provided in accordance ""ith the standards of Section 2.6.11.4.2 5.03.02.E.2 of the LDC. At a minimum, the two out-parcels depicted on the PUD Master Plan and the overflow parking and/or potential future expansion area on the east side of Baysnore Drive shall meet the requirements of Section 2.6.11.1.2 5.03.02.E.2 of the LDC for a decorative wall. SECTION TWO: SectIOn 6.2, Development Parameters, of the PLID Document for the Naples Botanical Garden is amended as follows: 6.2 Development Parameters The POO Master Plan, Exhibit "A", depicts the proposed use areas. The maximum development intensity is based on a floor area ration (F.A.R.) of .05 which translates to a maximum square footage of 372,438 square feet. Institutional, recreational, administrative, research and educational facilities, accessory retail and housing uses including other support facilities are included uses within the 372,438 square feet. Within the allotted development intensity there will be a 200 seat cafe within a 5,000 square foot structure and indoor and outdoor seating areas. An accessory retail use area of up to 5,000 square feet shall also be permitted within the entrance building. Dormitory housing for the research center also is included within the total maximum permitted floor area. Interim or temporary structures may be used to provide the facilities described in Section 6.4. A temporary use permit is not required, and the interim or temporary structures shall be approved through the site development plan process. SECTION THREE: Section 6.4, Permitted Uses and Structures, of the PUD Document for the Naples Botanical Garden IS amended as follows: 6.4 Permitted Uses and Struchlres No building or structure, or part thereof, shall be erected, altered or used, or land use, in whole or in part, for other than the foIlo\ving: Words struck through are deleted; words underlined are added. Page 2 Agenda Item No. 17B May 26, 2009 Page 71 of159 A. Principal Uses: 1. Arboretta and botanical garden (group 8422) 2. Amusement and recreational services (natural wonders and tourist attraction: commercial only) and exhibition operation (group 7999) 3. Non-commercial research organizations (group 8733) 4. Commercial, physical and biological research (group 8731) 5. Commercial, economic, sociological, educational research (group 8732) 6. Auditoriums 7. bterim or temporary structures to provide the principal and accessory uses. The interim or temporary structures shall be allowed for an initial period ofthree (3) years. If needed. requests for extensions for uses of the interim or temporary structures beyond three (3) years may be approved administratively for two (2) three (3) year extensions utilizinl!: the insubstantial change to the approved SDP process. Requests for additional extensions may be approved by the Board of County Commissioners through the public petition process. Certificates of occupancy for a permanent structure will not be issued until the interim or temporary structure housing: a particular use is removed from the site. SECTION FOUR: Section 6.5, Development Standards, of the PUD Document for the Naples Botanical Garden is amended as follows: B. Minimum Setbacks A minimum setback of fifty (50) feet shall be maintained on all sides of the property for principal structures. However, the existing administration building located at the intersection of Bayshore Drive and Thomasson Drive shall be permitted a minimum setback of fifteen (15) feet from Bayshore Drive after the optional conveyance of right- of-way for the widening of Bay shore Drive. The interim or temporary structures shall be set back a minimum of three hundred (300) feet from the property line along Bavshore Drive. five hundred (500) feet from the property line along Hamilton Avenue and the southern property boundary and one hundred fifty (50) feet from the property line along Thomasson Drive. Maintenance structures along Bayshore Drive shall be permitted a minimum setback of thirty (30) feet. Accessory structures shall be set back twenty (20) feet from property lines where landscaping buffers are required. SECTION FIVE: Section 7.2, Transportation, of the POO Document for the Naples Botanical Garden is amended as follows: H. The developer shall provide 5-foot wide sidewalks inclusive of bike lanes along the length of its property limits on Fern Street, Thomasson Drive and along Bayshore Drive from Thomasson Drive to the out parcel located on the west side of Bayshore Drive opposite Republic Drive consistent with LDC provisions and the following: 1. All sidewalk and bike lane design criteria used shall be in accordance with the Minimum Standards, as adopted by the Florida Department ofFDOT - Design Standards, as amended, as required by Florida Statutes - Chapter 316, Uniform Traffic Control Law. Words struck through are deleted; words underlined are added. Page 3 Aasnca item NO.1/'8 ~ May 26, 2009 72 of 159 2. The developer shall provide a 5-foot wide sidewalk along the length of its property limits on Fern Street, Thomasson Drive and on Bayshore Drive from Thomasson Drive to the out parcel located on the west side of Bavshore Drive Ii point opposite the overflow parking lot. Pursuant to the provisions of the Land Development Code, the developer shall provide a payment of $78,125.00 (based upon FDOT standards) in lieu of constructing a sidewalk along the east side of Hamilton Avenue and a sidewalk along the west side of Bavshore Drive from the out parcel opposite Republic Drive to the preserve area. This payment in lieu will be used for sidewalk improvements along Bavshore Drive as part of the Bavshore Drive South improvement proiect. Five-foot wide sidewalks shall be constructed in accordance with County Standards. No sidewalk nor sidewalk mitigation shall be required where Bayshore Drive abuts a preserve area. 3. Phase I \vill include a side';lalk aleRg the '."lest side of Bayshore Drive fr'6ffi Bayshere Drive and Thomasson Drive te the pr-ojeet's mam entranEle. Another side\\'alk ""rill be pro'ridea along the south side of Thomasson Driye from the interseotion of Thomasson Driye and Bayshore Dflye to the existing eHtranee into the })arking lot. All other sidewalks shall be pro'.<iaed in two (2) year increments as each phase is oompleted and not to eXl:leed a total period of six (6) years. I. The developer. his successors, or assigns shall provide a fair share contribution toward the capital cost of a traffic signal and turn lanes (or alternative intersection roundabout design) at the intersection of Bavshore Drive and Thomasson Drive at such time that the improvements are constructed. Payment shall be provided to the applicable Public agencv(ies) responsible for designing and constructing the improvements. if justified by appropriate traffic '..varrants. J. The developer(s) shall provide a separate right turn Jane on Bavshore Drive for the southbound to westbound traffic movement into the Main EntranceNisitor Parking Area. aRe! all site related traRsportatian im}'lrovement(&) m.eluding, but Bot limited to, any and all TIeeessary turn lane(s) improvemclflt(s) at the development entrantJe(s) prioc to the issuanoe of the fIrst permaneFlt CO. Said improvements are considered site related, and therefore, do not qualify for impact fee credIts. When sald turn lane improvement(s), whether left turn lane(s) and/or right turn lane(s), are determined to be necessary, right- of-way and/or compensating right-of-way, shall be provided in conjunction with said improvement(s), as determined by the Collier County Transportation Staff. Tho subject development turn lane impro':ements shall be as follows: 1. On the Viest approach of ThomasseB onve, the separate left turn lane for the eastbound to northbound traffic movement onto Bayshore Drive shall be lengthened as required to facilitate left turns at this interseotion for vehicles exiting onto Thomasson Dri ','e. 2. On the south approach of Bayshore Driye, un additional lane for northbound traffio shall be provided to faciiitate through, left turn and ri;ht tU!Tl movemeFlts at ~0m&G:;an Dri';e. 111is additionallttne :o.h.i:lll e.1{tond south from Thomasson Drive to the Main Entranoe/Visitor Parking ,'\rea (approximately 960 feet). 3. On thc north approach of Bay shore Driye. a sepfi1ate rigk turn lane for the southbound to westbound traffic movement into the M.ain Entrance/Visitor Parking Area shall be pro':idcd. Words struck through are deleted; words underlined are added. Page 4 Agenda Item No. 17B May 26, 2009 Page 73 of 159 4. On the south approach of Baysnare Drive, a i'leparate left turn lane for the northbound to \vestbound traffic movement into the Main Entnmee/Visitor Parking :"rea shall be provided if said improvement 15 detemLmed neeesso:ry after the overflow parkmg faoility on the east side ofBaysflore Dri'le is improveGlepened. .b-K. All turn lane design criteria shall be in accordance with the minimum standards as adopted by the Florida Department of Transportation (FDOT) - Design Standards, as amended, as required by Florida Statues - Chapter 316, Uniform Traffic Control Law. The turn lane queue length determinations shall be in accordance with the criteria/calculations within the Highway Capacity Manual- Chapter 17. M-1. All work within the Collier County right-of-way shall meet the requirements of Collier County Right-of-Way Ordinance. N-M. Ifa gate is proposed at any and/or all development entrance(s), the gate shall be designed so as not to cause vehicles to be backed up onto any and all adjacent roadways. Gates shall be recessed a minimum of 50 feet from the edge of the public roadway for the main/visitor's entrance; the research/education entrance and overflow parking entrances and/or potential future expansion area. Gates at other locations shall be a minimum of 25 feet from the edge ofthe roadway. SECTION SIX: The PUD Document for the Naples Botanical Garden is amended to include new Section 7.6, Deviations from the LDC, as follows: 7.6 Deviations from the LDC 1. Deviation from LDC Section 5.03.02.A.I.a.i. Chain link fence shall be permitted to be constructed at the preserve boundary on the southern property line and chain link fence shall be permitted and set back a minimum of ten (J 0) feet from the public right-of-way. except when located adiacent to a preserve where the setback shall be a minimum of five (5) feet. 2. Deviation from LDC Section 5.03.02.A.1.a.ii.(a). Black chain link fence shall be permitted at a height of five (5) feet. If the applicant opts .to use the black chain link fence it may be used along the southern property line. Thomasson Drive and Hamilton Avenue. and the portion of Bay shore Drive where the preserves are located. 3. Deviation from LDC Section 5.05.08. Maintenance. interim or temporary structures do not require architectural and design standard review. SECTION SEVEN: The POO Master Plan for the Naples Botanical Garden PUD is as indicated on Exhibit "A," attached hereto. SECTION EIGHT: Effective Date. This Ordinance shall become effective upon receipt of notice from the Secretary of State that this Ordinance has been filed with the Secretary of State. Words struck through are deleted; words underlined are added. Page 5 Aoenda item f'lo. 178 ~ May 26, 2009 Page ~'4 of i 59 PASSED MTI DUL Y ADOPTED by the Board of County Commissioners of Collier County, Florida, this day of ,2009. A TIEST: DWIGHT E. BROCK, Clerk BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY: , Deputy Clerk DONNA FIALA, Chairman Approved as to Form and legal Sufficiency STEVEN T. WILLIAMS '5"~ Assistant County Attorney 1{.7'Oq, Attachment: Exhibit A - PUD Master Plan Words struck through are deleted; words underlined are added. Page 6 COClJ(j) I'-OLD ..-..0"'- "'\1- _ 0 ;,!) -N~ E >>Cl) Cl)coO) ==~co ~ Q.. c Cl) 0) <{ g ~ ~ II~ ~ ~ : II r "I" ~, !! fj' i ~~..I....~ !!.~~:;~~~~ ~i '-..-l: i ~ ~ I il !.'l!~ I ~13 i.:ll! : ~ : II ,;'< >l .". Ii Ii I ~Ai: ::::1 3 :i~ 1ft ......: - !I f' _..:~ ~ I ! II; I~i h~n2 ~g ~ n ~ f l:J ~~ a E:i'l!:ll ,., ~ ~ wl/l ~ ~ ~= i ~ r~d ,.l!i .y" iil 'd ~ F~ ~ ~ Sfili ll! ~ ~I~d!h ~ ~ ~h~::! ~ ~ r.. ~ ~ ~ i i ~ ~ liB I ~dHIII mDD~~~~ --'=' z- 'I '..... i --~~- ~ ~ ~ I ~ ~ ~ ~ ~ if s~lh h ~ u ~~ I ~i:; ~~ !, U !i! i~~ ~i ~ a~:al ~~ I " " " r ti i i. " . J_ I -I ,'1 , ...; a I :J. i ~f .1.. 8' 3 ' . , CL . ' 0: a' '" l- i c:i :;; a: ~ u :;:; g i ~ 5 ~ ~ ~ g o '" III III ~ i z ! I ; I ! kll ., ~ IH! . I f I I I . I I : I I I ;- , I" jf ! I II I Ii Agenda item No. 17B fv'1ay 26, 2009 Page 76 of 159 c.o'1lt:-r c.oUff.t:y ~ ~-~ Memorandum To: John David Moss, AICP, Principal Planner, Department of Zoning & Land Development Review From: Carolina Valera, Principal Planner, Comprehensive Planning Department Date: October 6, 2008 Subject: Future Land Use Element (FLUE) Consistency Review. PETITION NUMBER: PUDA-2008-AR-13792 PETITION NAME: Naples Botanical Gardens REQUEST: An amendment to the Naples Botanical Gardens PUD document to modify Section 4.14, Design Guidelines, and Section 7.2, Transportation. In addition, this amendment petition seeks approval of three deviations from Sections of the Land Development Code (LDC) that regulate fence material, height and setbacks. LOCATION: The subject PUD, consisting of :t161 acres, is located at the southwest corner of the intersection of Bayshore and Thomasson Drives and 10.:t acres of the site is located on the east side of Bayshore Drive approximately 2,200 feet south of the intersection of Bayshore Drive and Thomasson Drive, in Section 23, Township 50 South, Range 25 East. COMPREHENSIVE PLANNING COMMENTS: The subject property is located within the Urban designated area (Urban Mixed Use District, Urban Coastal Fringe Subdistrict and Bayshore/Gateway Triangle Redevelopment Overlay), and is within the Coastal High Hazard Area, all as identified on the countywide Future Land Use Map of the Growth Management Plan (GMP). This district is intended to accommodate a variety of residential and non-residential uses including parks, open space, recreational uses, and community facilities. Within the Urban Coastal Fringe Subdistrict, and in order to facilitate hurricane evacuation and to protect the adjacent environmentally sensitive Conservation designated area, residential development is permitted at a maximum density of four (4) units per acre, except as allowed in the by certain FLUE Policies and in the Bayshore Triangle Redevelopment Overlay. However, properties in the Naples Botanical Garden PUD, as described in the Bayshore/Gateway Triangle Redevelopment Overlay of the FLUE, are limited to non-residential uses, except for caretaker, dormitory, and other housing integrally related to the Botanical Garden or other institutional and/or recreational open space uses. The subject PUD is approved for recreational and open space uses, and accessory commercial and residential uses, which are consistent with those allowed in the Urban Coastal Fringe. Future Land Use Element (FLUE) Policy 5.4 states: "New developments shall be compatible with, and complementary to, the surrounding land uses, as set forth in the Land Development Code." Comprehensive Planning leaves this determination to Zoning and Land Development Review staff as part of their review of the petition in its entirety. However, staff would note that in reviewing the appropriateness of the requested uses/densities on the subject site, the compatibility analysis might include a revievv of both the subject proposal and surrounding or nearby properties as to a!!o'v'ved use intensities and densities, development standards (building heights, setbacks. landscape buffers, etc.). Agenda Item No. 178 May 26, 2009 building mass, building location and orientation, architectural features, amount and type of o~!Spcicef 159 and location, traffic generation/attraction, etc. Based upon the above analysis, Comprehensive Planning staff finds the proposed PUD amendment consistent with the FLUE. PETITION ON CD PLUS cc: Randall Cohen, AICP, Director, Comprehensive Planning Department Susan Murray Istenes, AICP, Director, Department of Zoning and Land Development Review David Weeks, AICP, Planning Manager, Comprehensive Planning Department Ray Bellows, Planning Manager, Department of Zoning & Land Development Review CD/FLUE File CD PUDA-2008-AR-13792 Naples Botanical Gardens 08 G: ComplConsisteney Reviews\2008 ev/10-6- 2 AFFIDA vir Agenda item No. 178 fJ1ay 26, 2009 F ,,"C T~ uC 1'59 We, Brian Holley, Executive Director, Naples Botanical Garden, Inc. and Dr. Joe Shepard, Assistant Treasurer, Florida Gulf Coast University Foundation, Inc. being first duly sworn, depose and say that we are the owners of the property described herein and which is the subject matter of the proposed hearing; that all the answers to the questions in this application, including the disclosure of interest information, all sketches, data, and other supplementary matter attached to and made a part of this application, are honest and true to the best of our knowledge and belief. We understand that the information requested on this application must be complete and accurate and that the content of this form, whether computer generated or County printed shall not be altered. Public hearings will not be advertised until this application is deemed complete, and all required information has been submitted. As property owners we further authorize R. Bruce Anderson of Roetzel & Andress and Margaret Perry of WilsonMiller, Inc. to act as our representative in any matters regarding this Petition. 9~ Signature of Property Owner Brian Holley. Executive Director Naples Botanical Garden, Inc. Typed or Printed Name of Owner Dr. Joe Shepard. Assistant Treasurer Florida Gulf Coast University Foundation, Inc. Typed or Printed Name of Owner The foregoing instrument was acknowledged before me this ! S day of 62PTEI--\.EJ(3z. . 200~ by :]3\2.IA10 ~Dl.-l.GY who is personally known to me or has produced i?EJ2I=,D~;:J f::-Uo (;) W as identification. State of Florida County of Co u..U;\2.. cJ -f-' ~ 7-- ~-I-: )~tu2./ _ \(;j; lMYL" (Signature of Notary Public - State of Florida) c.Jct(2{<:>--nG L. Bi2-IG.\+lOI'J (Print, Type, or Stamp Commissioned Name of Notary Public) ~/...""{.#:: ~ D 0 4 {) 5(" '70 by." P I i2E: oS ifll '2. (p I '2-DcA Application For Puhlic I-Iearill[' For PI in Rezone 01/1 8!1l7 rev )/12/08, rev 7/11/08 :!!I......... ...... II.. ..... IU ........ ,. .... ...... : CHRISTIE L. BRIGHTON : : ~""'", CommS 000438670 : i !l E"".rell 612llJ2009 ~ : '0 ~ Bonded lhru (llOO)4:l2-4254: : """"'1 Flonda Notary Assn _, lnc : =-....11............ ......" ,. .11.... .'1 ",.. ."...A: Agenda Item No. 178 May 26, 2009 Page 79 of 159 The foregoing instrument was acknowledged before me this /$1# day of S&PT. 200~ by JosepH :7J-1/if-PA-P.D who is personally known to me or has produced as identification. . State of Florida County of I-cE. cf~ In. rf~ (Signature of Notary Public - State of Florida) P,4fP. /C./11l Iv!. PA ? () GtJ (Print, Type, or Stamp Commissioned Name of Notary Public) C.OrJH# 1)[)13.!J211 exf/R~~'; ,p~/'./~ Application For Public Hearing For PUD Rezone () 1/1 R/07. rev 2/12108. rev 7/ll/08 ~\\\\\\l!t!IIIIi;; ~~'o.\C\'" M. P.4 jlll/,.; s: 't-...:<'" ........ u(:? ~ ~~':..~\JI\SSION~...~~ ;:: 'c:.,<:l yl'<:f:o' ..... .:: ..~ ~~a~ I.1,d ~'. ~ ~ :~4..;a %~\-: :*: .... :*= - . . :: ~ ~ " #DD 725299 ... ~ ~ ~;;.'I'1;.. M'~;:: ~ ~ ".~<$~~aedr:,("~<""'" <:)' ~ ~ rA.,'public\Jnd~.,';<r.v~ ~ (ie. ....... c::r '* "II; lIe sn:'i't. ~\"" ~11"/i """\\\\\ COVENANT OF UNIFIED CONTROL A.aenda item No. 17B ~ May 26. 2009 Page 80 of 159 The undersigned do hereby swear or affinn that we are the fee simple titleholders and owners of record of property commonly known as Naples Botanical Garden 4820 Bavshore Drive. Naples, FL 34112 (Street address and City, State and lip Code) and legally described in Exhibit A attached hereto. The property described herein is the subject of an application for community facility planned unit development (CFPUD) zoning. We hereby designate Brian Holley, Executive Director. Naples Botanical Garden. Inc., and Dr. Joe Shepard, Assistant Treasurer, Florida Gulf Coast University Foundation, Inc., legal representative thereof, as the legal representatives of the property and as such, these individuals are authorized to legally bind all owners of the property in the course of seeking the necessary approvals to develop. This authority includes, but is not limited to, the hiring and authorization of agents to assist in the preparation of applications, plans, surveys, and studies necessary to obtain zoning approval on the site. These representatives will remain the only entity to authorize development activity on the property until such time as a new or amended covenant of unified control is delivered to Collier County. The undersigned recognize the following and will be guided accordingly in the pursuit of development of the project: 1. The property will be developed and used in confonnity with the approved master plan including all conditions placed on the development and all commitments agreed to by the applicant in connection with the planned unit development rezoning. 2. The legal representative identified herein is responsible for compliance with all telms, conditions, safeguards, and stipulations made at the time of approval of the master plan, even if the property is subsequently sold in whole or in part, unless and until a new or amended covenant of unified control is delivered to and recorded by Collier County. 3. A departure from the provisions of the approved plans or a failure to comply with any requirements, conditions, or safeguards provided for in the planned unit development process will constitute a violation of the Land Development Code. 4. All terms and conditions of the planned unit development approval will be incorporated into covenants and restrictions which run with the land so as to provide notice to subsequent owners that all development activity within the planned unit development must be consistent with those tenns and conditions. 5. So long as this covenant is in force, Collier County can, upon the discovery of noncompliance with the terms, safeguards, and conditions of the planned unit development, seek equitable relief as necessary to compel compliance. The County will not issue permits, certificates, or licenses to occupy or use any part orthe planned unit development and the County may stop ongoing construction activity until the project is brought into compliance with all tenns, conditions and safeguards of the planned unit development. Brian Hollev. Executive Director, N<ml?s Botanical Garden. Ine, Printed Name ,! /(1 /1 /~/. .A' #,,,,0"" /1 /.1;/' : / /",) ..../", / Ow'ncr / Dr. Joe Shepard. Assistant Treasurer Florida Gulf Coast University Foundation, Inc. Printed Name ~-0~r~ Application For Public Hearing For PUD Rezone 01/18/07. rev 2!12/08. rev 7/J 1/08 STATE OF FLORIDA) COUNTY OF C.m.LIGi2- Agenda Item No. 178 May 26, 2009 Page 81 of 159 Sworn to (or affirmed) and subscribed before me this (~ day of 6e:f'-rGMf>'El~ , 200.6.. by {)~IAN rmu.e<' ~~~~'< ~O(,Uc-J who is personally known to me or has produced as identification. ~~.~ Notary Public (Name typed, printed or stamped) c..i+\Z\~--rI(;. l.-. BP-~H-ro0 (Serial Number, if any) ~fvtl{b 1)'~D43B~1o ~)(Pl \ZCS '. (p ( 1-~ 11? ocA ,... ... ... .... ..... .t...... .,... .............. : CHRISTIE L. BRIGHTON : : .......'''.... CommII 0D04:Ja670 I . "'~. '~ : "..'to ExpirM 1IlltI200t i i IIonded lhnI(800)432-4254i : 'mil' Ftortda Notary Aun., Inc J i... I' ... .1. ......... ... ... ........ ....... .1. STATE OF FLORIDA) COUNTY OF Le.e Sworn to (or affirmed) and subscribed before me this Jg tU day of 5i/Pr, , 200s.. by J tiS ~fJt.f 7 ftltPA'R{) who is personally known to me or has produced as identification. J ~ /rJ. J~ Notary Public (Name typed, printed or stamped) (l(.(J~~~'~., /!;y( 115bW C/J 11M JI. DTJ1j.!i 11'1 &" xFI R 13 $: #-/3- / :;.. Application For Public Hearing For PlID Rezone 01/18/07. rev 2/12/08. I'CY 7/1\/08 . \\\\\\lllII IIlflll, ~"''-<~\C\A M. p;lll0. ~ <'l~\ ...... '"1& ~ ~'...O\!.~\SSI04:...~~~ . :if .'.;", CJ ~lia!Y 'S ~'. "t- ~ - . ~ ~ ~~ ..%. ~ ~ * : ,-,fli ~ ~.. : :: . r.,,)w. :: ::: ".'10 :*= - % . /Inn . - ~ '3 00 LolLI 725299 : ~ ~~..~~ B__ _ ,,;:$~ ~ --?- -/"';;&.77(fedtt\{\\ 'i-.~...r.,.. .-.~~ ~ ..0/, ..;t'b/ic Unde(ill'..~",<J<:.~ '1'. vQI ........ '"" ~ ~II</C, STA1\: (,l" ",.... 11""", ""1111\' List identifying Owner & all parties of Corporation Both Applicants are not-for-profit corporations. Naples Botanical Garden, Inc., not-for-profit corporation Directors: Linda White, Richard Benson, Catherine Ware, Charles Berger, Juliet Sproul and James Lagrippe Florida Gulf Coast University Foundation, Inc., not-for-profit corporation Directors: Duane Stranahan, Peter Sulick, Donald Lesch, Stephen McIntosh, Joseph Catti and Fay Biles Agenda item No. 17B May 26, 2009 Page 82 of 159 " Agenda Item ~~o. 17B May 26, 2009 Page 83 of 159 .1 ; ttt 2624884 OR: 2667 PG: w10 tn - Ja 1lZlmI.... at....... II. f41Zl1J11t It 1J11III_ I. .-a, GIll _ Z1Il111M De !II t.. ".11 mu.H --............-.. ~~:1..:t " kI:hsI: r.g lIot ...u- ..,.. ~ - _to. 'DO -.a.-. no .- _. E~J '''..-D -- _"TIN' _'21~ IIlI: _1- 1IlI1/II:_Il:llll1llllll IIl'IIlK 1M ,..-. Warranty Deed na hoIelo&Ion,. ....... 17th dqclf ~.... r...ms-_ ....... A:pl:U , 2000 .uI.. ....._.. CoUs._ . _":Florida ".. !!lI>tal:r;ica1 GlIZ'da, In..., . _-po:cnt =rpacat1011 __" 3584 ___ __, aut=- c, lIapl_, IT. SUOB , ........" ... .....~... C0111er _Ii Iloricla ,era- ~ ....-......io___... -------- -...... (f:I.O)----------- ........ ... .... .... ... -. __ .. __ .. IooiI ... .. ~ .. ..... ......;, ....... _ ... -~..............,_..- .....----..---- """......."'..~... COJ.ll.r _ .. non. ..... . J.ot. sa, 51, f2 lllDCl Q, IlILJ!LI:I GRO\IE llIID ftO:II: CClIIIIWtt'S LJ'n'I.& _ 110. 2, a. ~.ia nat __ t. Page 21. 01: tile PDloUc -.s. or Ca1.1.1_ Cnnt:y. I'1or.l.da, I.e.. ..... ~ _ _10 5 e-..t of: Lot. 61 .... tlIe ...t 24'0 t_~ OIl! I.lcrto 60 _ Gl.. "'"' ~ .,-., .........,...s DClIr.Ii Hl1: _1:itlla. l:IM IIlaClISaD ~ or u. _. '!bo G:no.bslL". IRHIaftM -... b 4228 CoftIotI Dd_. ...~... I'L :a.UCl!2. l , . _ ezcept tOI:' the ...t ! r_t o.r I.ot R, l!:l lUl4 63, _.. ..... .....~ lab ........, fit! ... . ... IIll.4. ... .... .w.t tie _ ...... IHrtIW _.. II.., ~ ........ .. WIIIIaIw.::-r'~ -...:=:.. -........ 72"2?- ;y .",- .iO~ COal! ,.$).~__................._"",..,.....h.~.... STATE OF Flot'ida C01lrITY 01' CDUJ._ ".. ......................~ ......... 170 ~.r ~p-~ Apz:il ,2000 ., ...~~..-.,.......~ Flqrida ~1."'r'. ""'.....""-'ollC..S"Ote''t1f1io1da ~ ''7~-'::'''..'~ f _~~. ~l.?:101t - ~~II:~..._N._fOtlJ~r_Ill........ Agenda Item No. 178 May 26, 2009 Page 84 of 159 :,'-~""'" ,his o.cummf Pn:parcd By IUld RdQm to: . 'l. ".f:frey Cecil, m..q;. PC:l;te~, Wright, Mcr~is & Artbur LLP 5801 P..l.i....n Bay Boul""'..rd - Suit. 300 Napl...., FL 34109 Phone: [9411 593-2900 r.rallD Number, GrOll'" 11 TIN: Gro.nte. ~2 TIN; Warranty Deed This lndenture, Made thi~ 17th day of Jam$5 P. Lennana APril , 2000 A.D.. Bttween of Iho CoUll!)' or Collier , S"I<> of Florida The Botanical Garden, Inc., a non-profit corporation ,gr:tnto.., ond ~~~I~ 3564 Exchange Avenue, Suite C, Naples, FL 34108 of Ih. C<>unty of Collier SI... of Florida , grAn t~e. Witnesseth ht Ih. GRANTOR, !'or _nd in .0...ldo"ui"" of d.. ..n, of ------------------------TEN DOLLARS ($10) ----------------------- DOLt-MS, nnd 0_ sood ...d vola_bl. _''''''tion (0 ORANTOR. In h.nd paid by GRANTEE. the: I1O:cipl ""*",,f I. hereby od:nowl.dsod, bo. gronrod, buJ.in~ II1Jd ,old Ie tho sold GRANTEr, Nld GRANTEB'll hein: _ors nnd .""'.. r_, lhe follo,,"n, ..",,11"': Innd. "hlOle, Iylll,g.nd bejllll in rt", CowlIy of Collier s..te of Florida 10w;1: Lot 60, 61, 62 and 63 r NAPLES GROVE AND TRUCK COMPANY I S LITTLE FARMS NO.2, as recorded in Plat Book 1, Page 27, oC the Public Records of Collier County, Florida, less and except ~he East S'feQt of Lot 61 and the West 260 feet of Lots 60 and 61. The property herein conveyed DOES NOT constitute the HOMESTEAD property of thQ Grantor. The Grantor's HOMESTEAD address is 4228 Gordon Drive, . Naples , FL 34102. and except for the east 5 feet of Lot 60, 62 and 63, lI!1t the ar:mtor d()e$. 'hereby :Ulli' Warrant (he 1/(le to 1:lord lAnd. and will d.efeud the J.AtII~ jlie.h1~t hr:wrul e\lIi.o.~ of aU pr.nofl,l; wll1)I'l1~\ler. .n Witness Whereof, Ih. ,renlor has here\llllo "" hI.. ho", .nd ,ealed and ddifercd in UT presence' f? '/:-/J ad/ . ; e ames P. Lennane P.O. Add"",: ,",2(1 Boys"""OM.', Sulf.!), Norleo. FL ~'1l2 (Seal) I ' Lf" '~'TATE OF Florida ~OUNTY OF Collier 17th d;l~ of April ,2000 by - ~ - ~ ~ . ~ ~ r p I :......._.'"1:'-......:,.......:"'..,.,. -~r.. _<....~........l.......... ."~ :-to;..... Agenda Item No. 17B May 26, 2009 Page 85 of 159 Graolee S.S. No. 65-0511429 . ....,. ~ Property Appraiser's Parcel Identif'lCatlon No. 6 I 836720001 This instrUment was prepared . without opinion of title by and after recordillg R:tum 10: Do oil A. Lewis, Esq. Roetzel &. Andress, A L~gal ProfessiOl1llI Association Trlanon Cem:re, Third Ploor 850 ParI: Shore Drive Naple$. Florida 34103 (941) 649-5200 (SollCe above tbi. line l"onecordlno data) ''"''ARRANTI' DEED . nus WARRA.NTY DEED, mlldethe {.!/: clay of rr7RQeh ,2001, by .JBmesP. L"nnane, a married 1lIllll, whose post omc:e address is 200 Patriot Way. Naples, FL 3<tlO4 (singularly Dr eoDectively "Grantor"), to The Botank:aI GlITden, Inc.,. a Florida Dllt-(or.pront CW')loratlon, whose post office addresf Is 4820 Bayshore Drive, Suite D, Naple$, PL 34112 (singularly or col1ecllvely .Or~tee"): (Wherever used herem, the ImllS 'GranlOr" and "Grantee" include III partia 10 this metroment and the heirs. legal repreaenratives a.nd Usillll8 of mdlvidullll, and !he successors and assigDa of corpomtlons) WITNBSSBTH: Thatlhe Grantor. for and in consideration of the sum of Ten Dollars ($10:00) and other valuable eonsideratiOO3. receipt of whlcb. is berelly acknowledged, Itereby grants. bargains. sells. aHcos. remises, releases. conveys and couflrnlB unto the Grantee, aU thai certain land situated in CoIliCl County, Florida. vlx.: The East 100 feet ofw West 260 feet ofLolS 60 and 61. Jess the SOUlItS34 feellhereof. NAPLES GROVES AND TRUCK COMPANY'S LlTrLB FARMS NO.2, accordlng to !be plat tbereor, recordell In Plat Book I, Page 27-T, of !be Public Recordi of eo Iller County. Florida. TOOrntER with all the \l:nements. hereditaments and appurtenances thereto belonging or In anywise appertaining. TO HAVE AND TO HOLD, !be same in fee simple forever. Neither GrllllOr nor his Immedilllc family rC$kIe on the subject property wblch Is t vacant lot. Ilia not the homestead property nor doetl it adjoin lhe homes1ead of Ihe Granlor. 'The Grmtor presently resides at the address stated above. AND. the Orantor hereby covenants witl! said Grantee thst the Gran/or is lawfully seized of said land In fee simple; . that the Gramor has good right and lawful authority 10 8ell and cOIlvey said land: rl1al the Grantor hereby futly warrants the title 10 said land and will defend the 8ame againsl the lawful claims of all persons whomsoever; and that said land ill free of all encumbl'lUlces, except lllltes for tlte current lnd subsequent years. zoning 8J1d use restrictions imposed by governmental . authority, restrictiOl1f and easements common 10 the mbdlvislon, and olllstarnling oil, gas and mineral Interests of record, If any. IN WITNESS WHEREOP, Graotor hll6 signed and sealed these pCClK:nts the day and year first abovc WritlCll. STATE OF FLORIDA ) ) st: ) COUNTY OF COLLIER ( (:- :r!}1 I TIle foregoing instrument was acknowledged before me tIus , .~. K James P. Lennane, who () is persoll3lly known to me or (~has produced ~;,~. 0~~ 1-'5 L 1 ( v/~e... . .. . as identlfication. ,2001, by (NOTARY SEAL) ......,- , I (> J. ' ~...J .... h LC e,j e.. .0(1 e~'lc6 NOTARY P1JBUC Notary Name: (Type or Print) My Commission Explrcs: JANET de CARDENAS IK'I COMIo'SSIllHI!C()~2 ElCI'1RES' ,\JIrIll!, 2IIIl1 'OIldod1lwU HolIty I'tlll!o l>1doOW1lIo" Grante. 3.3. No. 65-0511429 Grantee 3.S. No. Agenda Item No. 17B May 26, 2009 *** 2746718 OR: 2773 PG: 307~~~6 of 159 RlCORD!P in OmCrAt !BCORDS ot COLLlIR COl1HT!, FL o2/06/2D~1 at 08:l9AH DYIGII1I. BRoel, mar CORS IfZ12UO HIC 111 Lot DOC-. TO 719.60 Retn: Ronm i AI!JlIBSS m PAl( SHORI DR m nOOK ,mm n )410) Property Appraiser's PaIt:el ldelltification No. 61837520006 Thi.$ wstllllnenl was prepared . wilbout opiniQn oftitle by alld after recording return 1&: Doug A. Lewis. Esq, Roetzel & Andress, A Legal Professional Association Trianon Centre, Third Floor 850 Park Shore Drive Naples, Florida 34W3 (941) 649 -6200 (Soace above this line frq recording dlII!lI;} WARRANTY DEED q/>t ~ THIS WARRANTYDEEl>, madcthe '. dayof ~ '[L.("i5'fiM , 2ool,byLabanB.LeBall" and Im"llene LeBulr, husband and wife, whDlle post office address is 6024 Bayshore ve, Naples, FL 34112 (singularly or collectively "Orantor"), 10 The Botanical Garden. lilt., a Florida Dot-for-prolll c:orperatlon, whose post office address is 4820 Baysbote Drive, Suite D, Naples, FL 34112 (singularly or collectively "Gnuitee"): (Wherever used herein. the temlS "Grantor" 8ud "Grantee" include all pa.rties to this iJl~tI\lme:nt a.nd the heits, legal repmsentatives and a&llgus'of irIdividuBI.s, and the 8Uccesso~ and assigns of corporations) WT1NESSETH: That the Gl'llntor, fOf and in con.idetlltion of tbe sam ofTen Dollars ($10.00) and o1ber valuable considentions. receipt of which is hereby aclcnowledged. hereby gnnts. bargains, sells, aliens, rerniaes, releases, conveys and confilll1S unto !be Grantee, a\l lbat certain 18l1d situated in Conier County, Florida, viz: The West l>S oCtile North !-S of Lot 64, Naples Grove and Truck Company Little Falms. No.2, according to tbe plat thereoC, recorded in Plat Book I, Page 27, ofthe Public Records ofColJier County, Florida. subject 10 restrictions, reservations and covenanlS of record. TOGETHER with all the tenement;, hereditaments and appurtelWlces thcreto belonging or jll anywise appertaining. TO HAVE AND TO HOLD. the same io ree simple forever. AND, lne Gl'lmttlr hereby CO\"~"20\S witb.s'Olid GI11.'lt::c that !he Granto! is laWf'ull" sei;;ed of said lalld in fee simple; that thc GrAntor has good right and lawful authority to sell and convey Baid land; that Ibe Gtantor hereby fully warrants the title to said land and '11m defCl!d the same against the lawful claims of all persons whomsoever; and that said land is free of all encumbrances, except taxes for the current and subsequent yea~~ zoning and use restrictions imposed by governmental authority, restrictions and elIsemenl3 common to !he sllbdivision, Bud outstanding oil, gas and mineral interests of record, if any. IN WITNESS WHEREOF, Grantor has signed and sealed lliesc presents the day and year flJ'St .bove written. L~~f3. .17/~ L.b.llf B LeBuf! ) . ,>.;J?1%-~,J<.~ ~ ~ iLa::$ Imogene Le2uff ' STATE OF FLORIDA ) ) ss: COUNTY or COLLIER ) . . . 3(St: '-J-~~ l''1 rll The foregomgJnslmment w", acknowledged before me tlus _ day of" a Itl.. , If~~.B. !-e1?u!fand !:nogcne Le~uff, who () are personally known to me QrM bave produced.fJIrr1d 8 '1:-:;1 11i~ r5kl I c'r. nSe> _ as lden!lficallon. ,2001, by (NOTARY SEAL) ----- -J BIUJ.. d <- NOT ARY PUBUC Notary Narne: '"' , Lar(/.(?nB~ (Type or Print) My Commiasion Expjms: JmeT de CARDENAS MY COMIoll561ON , CG 6394.5? WIlleS, Bp,1l 16, \'001 a_1MIIl.1llIy MlIo Uodo""'''''' ~ ffi cr'l /,-OL(; ~.-O~ N_ _ 0 -~/'- C>,ex::. (Gro(J) ::= 2 i? ro CL "0 C (J) OJ <{ Gnnt.ee S.S. No. SC51]429 ~~'Ihrcd ~~ No. 61837560008 11IiI iIIIb:umem wu ~ widDlt apiDkm of TJdt by md atcr I'lI!ICOa:ti:lI retm2l1O: Sicpbecl E. ~ &quim Raesze1 A ~ A Lepl Pro1i:ssioaal ACIOdaticIu ISO Pet: Sbcn Dnvo. 'I'hhd Ploor N.IpIm. Fkx:ida 541001 (94J) 649-QOO ttt 2624138 OR: ~o66 PG: 1300 t~* !JCDilIIII 111 OllIC!.U IICQW Of caum l:OlIlllt, n 04/2Jf2~01J It t:~26l'1ll1tGn l. 1I1Il:t, CUU ~s mm.GJ DC m [.04 DOe-.n IUU' Ubt: !limn i lBUSS 15G fm ~ Pi JIB II.llOI mr.n n 3U03 .'ISn ~ ~ thb fm..mr IIlenrlHnIo Ibm, W4RR.lN"l'V' ..... 'I1DS WAb.A.NTY DEED. --- ~ o! Ap:n. :zooo. by P..a w. BanIwIdt. ........ -.d ..... F. Tt.l~ a ....., _. 1l'baIe J.lOIt olBce ~ fa S340 W. WiDdIor It.VCIIa. Apt..3L, CIIIclIIo. IL <<lOO ~ 01' colIecziveIy -Orauriar"). tG n. --~ c.ra.., __, . JiPlarida ".I.r~...a~ wllaeJlC*otne.addnscll3S84 F....~ A___.SalICC.~, F'Iorid& 34104 (daIaIa1)' Of ClllIIecdYefy '<:in1:aeW): ~ IUCCf ~ - -- wGarrIIor' -' -Otal:llleew iIId1tde all paic:a 10 dIU Imu_ aad Ulc bt:!r.I. hpl n.pi .Ii.... aad UIIIps OJ(~ aDd.... ~ laid ~ ot~) WttNIiSSETH: 'IlIItChc~. firm!! Ill.~ ofmeSllmaf'T_~(S10.00)"" otbec' -w.&e~ RCeipt ot'Wbfr::lail1lereby ~ bI=b;y ~ ~ acUs. oIIica$. ~ ~ aom>eylIlIKt -=- '-'Iber Onmee. aD dIlIt cenalR Lmd ~ .lA CoIIIw ~. .fIIoridA. vb:: S 1/2 Lot 64 IDd N 1/2 Lac 65. NIpIes GrovflS:Illd 1'nIc.\: Company', lJt!fc F'erms No. 2- IICCOl'dina lii:l die plat 1bcmoC, IS !IIi:orrlr=:[ In "'- Book I, at Pate 'rJ. of tba fabric ~ cf Collier COumy. PloriclI. . TOCmTH:E:1t wtdJ all die -ms. 1~'p.rU....~ aIIlC1 ~ ~ helO11,1iD;c or: in IIIl)"Wi:rc ~~ TO HAVEl AND TO HOLl). die __ ill tl!e llirnpa. f'~. AND. die 0I:aaar 1>enlt7~..m& IIlld 0Ilace that tile GI:aaxr Is ~ -..a.ote:aicl./.-i as !.be tizIptc; d-. ... ar....- .. I/OCld. rIIbC llrld IawiltI ~ II) lIllI1 ad. -'"'1 Illid laid; ... die GaaIar ...." fbQy ~ ... ddI: to ..." 1ad ad ril cSetead 121II _ lip&. IbIt JawId d.tIiaII of aD JlIQCIIl$ .... w 1 .-; laid 'dIrIIC IUd :i.Im:f la fme of IIll ~llUlllL__ CIlICqll UseI SW .. c:mrcat ad ..~ ~ ...... -S .. ~~ ~ by &lIYOfI>t''''1ltd mIbority. ~lo..do..... IIIDd ~- -"I~ COIDIDClQ so 1llo ~ ad ~ aiL..,...wad IUbn1 ~ ot~ it.uy. IN WJ:I'.NE!S$ wm!REoP. 0r:aar0T lias ~ &%ld aetIt:cl u-e ~ dle.,. .wad ,.... fit'a above wzIal:Q. . ~~.. :::::~~~ !:rA'm OJ: IU.Jl'<<Xs ) )u: COUNTYoFC~k ) . T1fe "--6. .IIlA._ -1ICbo~ botbco _1Idt /:.2rN 4a)' ot April.:zooo.1ly PIal W. ~ 'II1MI ( ) II; per...ay Jc:Jmw 10 ... 01' 4tS .. '" ll. . ~.LAIIL~ ~~~~ ~~~A! F. TcaaIZIllt (SEA.L) aJ8A.I.) (-, \ ='3 Agenda Item No. 17B May 26, 2009 Page 88 of 159 \. Pn:pamd f& zmd mum tl): 2627206 OR: .2668PG: tl32 UCOJIlIItl umcm IDIII ef c:owu CGIIft. ftC. f4!21Izt" It fI:54f111t'IGft I. .lIaCIt ~ eaa Z?5IfMt III: . IUt 1lC..71 2l2i.~ {J .~ ... ~ .. SdIIdt. P Jl.. SeIiIe c. 110$ 0Ipc Ceral .......1 Cape~~ 339M ....1.$.tD-1097 Fde~: (IO.UlM '5\0"111 ~a:l ~o : lite ~ amm i JIDIIIf m fIB _ H 3D !iIll1I IUW B :JIll! 0r.lIw:I! 5.S. No. 6..~nm ParccI fd::ntif'JC::I!ion No. orIOl1l\611:t76OOt"'7 cI: (1OO(l()t;1Jl':li64(J(1l1!l 1~.~n.o.l_,...Jt~~ Warranty Deed II;T.\11 -nlll\'I'IlI!\l.lOJ.l'TlO' <.11') u:"1 !>, ibis l..deltlUn made Ihi$. :lhc day or April.z_ bChn:m 8~ Dnt.Iapt:amt COIpM..tA.. f10ridz ~ ~Ihorc J.U' office addr= is s.ite 7. UIa~ Weods Dml:. Fori M,en. Roridl.1J!lt!' or lbc Couaty of Lt:c. 5Udc; or Florida. ,~. a'IlI:l TIte ~ ..~ c.nsas. hIc.. . Florida 1ICJ[-fot\oprDf"It CIIC]lO.~ v.ilo5:,post ofT'r::: add=z is !SU t~ A'I'1:MC.s.ite C. J.lICU oftbe: COUJlI)' of Collier. Stale: fA A.orida.. gnI____ Wimesseth that said l\PInllJl'. 1'01' ;me! in <X>D:Sidcr:alioa of [he sum ofTEN AND NO/)()O DOlLARS lSltl.fJO) and otJ1cr gOOCl alMI ,,-aI~ ~ions '0 said p;mt<< it! ha.:l paid ":l' said grantee. In; ICtT:ipr wbercor is ~ acbtow~ bas ganlCd. barpirI:d. and sokl.o th: said gntntee.. and gramee's heirs and assigns for'C\'Cl'. the following described land. riluate-. ~ ad bl:in; III Colii;r C~. to-'~it: The South JI2 ot'Lol liS. and:>1l of'Lol (>G. Napics Gtll'\'C <It Tmck Co's Lilllc t':>rnlS; No.2. p<:T pbc2 thereof rccorck:cl m Plat 80ak 1. P1::r:e :17. P1>blic: Jlt::corck or Collier C"cn:sat;., Florida and .he gramor .hereb}' ~'CtIlmlS v.ith gmr.cc. that 1m: Vlntor has good rigfu JlIId bt\ful alIlbolit). &0 sell :alld ~ saki hmd. and ~ ~ lh:: 1i11c to ~ land far 811)" ;IdS or pamor and \ifill dcl'cnd the same ag;ai.1Jsl &be: bwfut claims. of all JX:ZSDR.o; claiming by. ~ end lDHb't.hco said gr.1Dlor. .. -c.~~ ...a"~. It1C;..-d f... ~ w pIo;;;l....~ f"""'itc:<. In Wituen WbeN!Cf'. ~ has hercul'llo Sl:t gmntc>r's: ImJId one! seal fhe cbly mtO ~~r li~ llbD>-e Wl'inCII. Sipacd. sealal and 4eli\-en:d in OW' pres=:::: Blacld'orcsl !>e\.-clopmclll COrponltion. II Florida CO!JICmltion -~ ,. . I'. , .- I .l'~: t :/.: { iII;"',;7;:)-:' 'lllEil:;;~ , ~ . ./ -_ )S' ~.7- t/~~'- - .~ " ' .... /'" .' / '.',>" .. . {COilj(b~lC ~-#} ..... ~.' -.. :.~ ~ . . '. .....-.. ,. OouIMTimIIa I ~ ."" ( L Aaenda Item No. 17B ~ May 26, 2009 Page 89 of 159 ". . -ttt OR: 2668 PG: 2733 1C't~ ~orF.Jorida CalII~' of'come 'f(t+- ne rore,pnJ 1n&1J\1mCftt was adeJIowlalced tleIotc: me Ibis;:" d3y or April. 2DOl1 b)' Joc:rr B. Maier. PlIlll:idcnt or BlcIcttoresl I>ewJr:lpn:nI CorpadoD. a Flodda co.rpoRl1ian. on bcbaU of' lhe corporlltirln. He, j i$ peI'IOMlfy known 10 me or rXJ ha& produc:cd a clrk'l;fs.licalK lIS itbnific:a1ion. lNolary ScalI --' -: .i,Vt: t 1: (~;, NoCal)' Public- PrUrtcd NlIm<< .~\. " .INS....... :'!~ Q"";.\ ..,~IIlClC_ '\ 1!DIe:.". ':t' .....,....,.............. My ConnmssiOR Expires: lI'~DN.I 1SIMu,...."J.__,- ~~ . , 1;~~ ~r_ Aaenda item No. 17B ~ May 26, 2009 Page 90 of 159 CJ"""<< s..-:. N... 6~ oS 1t42CJ 0-,... S:.S. No. tit 2611440 OR: 2660 PG: 275~ ttt IICllJIIU 11 omcm .... tI. C'G1.l.lJl Cl7II'l1, PI. u/l;fUU 4 L'~2UI DllIll' I. UllC%, CUft aa lJf5....t DC III "" JOe-.n lillJt ~ AJlllRiser'$ Pan:d JdonlUiwiDC No. 61137680001 lttl: aamn I uum 1st P1II .. . 3D ntlO1 lUllS '" .mil Thls iDmu_ __ prcpa~ 1I'tthcut llpiDloo of ,,* by nd.JJll:r JUoam~ lI:lUllI W Slcphal E. Thomp::.. Esq, J\.DcrzI:I.to IuI<II=. .-\ l..tpll'lokssioaal Ml<<illi0l2 TXimml Cemrc, ThIrd FIocr 8SO Pmr: Sbcft ~ NapI~ FtOlida 34''13 (1I41} 6>49-6200 (SDaCc.bcmo lJu. H... I"..-.dl.... .....1 TlUJSTEE'S .DEED 'THIS nUSTEE'S OEa> _cld lhe ~ <lay of ;.1 t~., I 2000. by JtleJ:a,41 FIldl. T_ _ _ ~.LuoI TJWl o4~,dllell 04"","'%7,1"2, ..bo:le _, aItlc....ddocs,. <19'0 Golden Ode PIlm1. Naples. f1. 34ll6, willi filII ~ ud ~lJ' I>elDz plBlllo sat.:! 7_10 prolel:l, COl:ISC1'Yt. sdL lea<<. ~ tl<' <IlbI:niise lQ ~:aad dio:poc o/.l&o- leal ...... (Jr" ,.... 0( il {.........tl<r caIlcd die V/'3IIlDr'";, co 11Ie ..1IIal GJrtln, JIl:.. I Jllol1dI 1IOt-ler-prtlfit ewpcII'.tliall. 'IIbClsc posI oIi"lCC ~ is 35.... s..d"8~ ^""_ Soil< Co NopIn.1lorida 34104 (honislotler c:oIlml.."" <2l1collhc -o.a-'~ lWbelC'Icru.edurd'llbe u:nm"Gn$lr" &ad "GrarIIa:"irx:llloutllbl!:]lIIlieA,,, Ibis illSI'l1lJllelIU"""'" loom. lep! It'~livcs.nd .'!Kips or iDdivJcllrab, and tht -=sarr ad 1Uip$.( corporatignsJ WITNESSETH: Tlral tl>c OrUltor,lbr _ iD c.....doaoIlo;a g( ILc ""'" o/'Ta Dollarned <lIhu y.o!llabJe conU.lcr.>!~ n:t:d;>c wbc:.GJ' is ~ ~ beroby pxns, borpiDs. 5clL:, aJlellS. r.~ ..I....... c::<mY/:YS..d eoa:Iimn \J1Il0 ca.. Cln~ III 0Ilt eenm lo&4 aa... in CoIlic:r c.....,t)'. Flc>ricla, yf:t: Lot 67. N&JIe< aro....",d Tnock Q,', UI1lo Fanno.1-lt.. 2. KOOJdboslc> .....pb<d.._f.........dctl ;,. J>l>rl '&d ), Page 27. aflhe l'~lic; ~ of Coll~ C_. FloomIa. TbI$ <<l~ is .abject 10 =1 .R11I. -. rill' ~ <1IITCnI .1Id .~ yaro: ""tricti.... ..,.; <a!Cl'I>ClU ~o......- Ie the suW-rislorr. OlII5Ianding oQ, ps;>>CllZlillCR! im...... ofn:ta'd. If;my. AND 1he Gr_ bl!reby co....,_ wltlI G__1bl1 "'" Glul... bas soocl ritflllSld laM..! ........ti,y III ...n uod ,*""cy ..id lllld.llhd bmb:r _the ritlt 10 ..id Iond (Of UIy K1> of Gr.aoor ."" wDl ""fcDd rb! """" og.iDst lhe )awryl cb-ims of <Ill ~ ~tai",lIle l>:r. IlIrousb or ww:les- Us. raid Gtomor. m WrrnE..t'S WHEREOF, 0.,. aid Cbfttor bas accllled lbe"" 'l"='I>IS CD .he do)' lJld ,..... fm:l .""". ."nnC1:L SiJPtd. snled aocl ddinTed ;.."""~: j II :111 /111ft!! Jtichznl Fasl, TRIl llIlder llat cerIlIift wild T nul AIJI=lCIll. dat=l.AlJllfIS1 rT. 19B1 {. t-J ,'i. 'j'. {. t. . ~ I. t!1 I., ",-,Id'/~(-' WiIuess N.mc: i" I ,'l,.,j~ l . /, f) ,.( , --I. f' I .......J ,:mIl ri I ~. ~ W;_No..... .1 .:~ ~.. S'l' An; OF :Flori<b ) )<.: COUNTY OF CoII~ ) f' f1. I 'The~.. ~ """ ~J.dgJ:dl>of.......liUs ~ day.f I) ~ t .2!lOO, by lUcliardF_ T....lGcllllClcrtbatcona!!LmdTNfl~dalocl....upsl i7. 1981. wbo ( ) is pe=a!ly l:llowo '" I'IlI: <<(Xl '.laolw produ=l ..\nnQ,a "''il'' 1_i1.'tit ...lclentl5aillon. (SEAL} .~~. ( . I ..,. ( (1 { 1-,1: ( NOTAJ:Y .I'UllUC - Nowy Name: O)'pe or P'rlml My ~ClO. ElipJn:f: Ii 1";/\ t I I; L CQmm r~ 0 l.D ,_. " 0 -r- ~a (!)~ -Nm E >- (i) (i) CO 0)' ==2 co CO CL "0 C (i) en <C .i nm~PREPAJU5VBY: a-J_1iawu'lI ~J..'''''''''~ld ~ "'-U-~SlIIk:JO ~'rs..na.:mq 2768767 OR: 219 J; 0916 ie .\l'1mW 1Il:lIII;s of ow.m allin, ll. lttl It Ia:UIlI'MIC17 I. ilia. !:!.1U ClIU ,tIffO.1t _m 11.5. IOC-.n an." IU!tOOJIDAND RE:'J"t1ltN TO: "De.......... c:-a... -. .. ~ Drh:SIio!I) ~FJMIU Jl!l )"AJtCS.ID.,., 1Ill'll'Ea'S'nNo TRUSTEE DEED nus 'I"JltJ!:J'Q: OEm is ........ tJoW. fi 01.1)' Cll m.a.tdt ,.:lG\:)( b,f... ~.... ~~~="=~ ,..J~~'::...~.~'::'i;::i CW'JIIIlI1IIIee J.crdaa("", called Grall_ aM whosC addn:sa is ... ........, ~ .- D, ......... I%. ~ ........._ 11oo _ -__ _ ~ _.....,......... _ __ _..... ~ ..., ~ .cb...r,. -- ~ - ~ 1PIIlII ... ....... ... ..... 01 1Glv- ......, WITN'EsSE1"H= 11U.T lJoc> GI'llIdIIr. ~ sa d.e ~ 1Uttl.........a"'P.acd by 1J.e...............r ___ or die ~ T.- ~.. ""'" m. c:amicIcioII:ia ut ,. _ <Ii Tea .IOCI NO/UlII J:IoIbait ....... 1IlI.... ..... .... ~ ~... G_ ill haad pald ..,. Cl......CiI, 0Ic: r~ ~ is ~ ~..ba JIl1IIlII:lf.. ~ .......suJd to IIr; 0...."" (he ~ dcoScribe4"-l sinI:oIt; ~.... DcO.s ia c.au.- c.-.:r. ..,.... (0 wit: Loc ... NAI'U!:s GIlOVES ....t 'I1l.UCk c:o.wPAN'r.S UTn.E FARMS No.. :it, ~ I. ..., ~ _ ,a.t ......., - --.w .. ... ..... to .. rtT ,or ., ~ .... III o..arc.- c....,.. ......... I 1'11oe ...r ~ ~ ill Ods ~f .. _ .... c: tIl~--, r.-:.-.. __ Ik ..........,. ~ .r Doe C--... --.1 ~ b.1Ot u... II-..rlkb....... . _ he. . ~ .. IIIlr.e -- ":rs lIIno. ....111I -.l CW$ D-ft, _ ................ 16, DIll, .. 0IlI'kW: __ ...... I...., ....... -... ...4_.... J_ 23, .". .. c:MIlcW ~ a...t: 13a. ....... 417........ CZI. .......,..... .."'.ha.....a.ue ... CWS ....- reaow.e SopkaL. 29, J", lit 0IIlcW ---.Ie ... DII. ... ~ ........ 1m;. ........... ... or 11.... ~ ..... CWS S2-I7, r--.r .....,. 1. Iftt. la 0Ind.l ~ ~_ !'131. ~ 17H ~ 1'nc. ......... - ...... ........, ~ 01 Cll>lMorC~, P'IcrWa. SIJIQEcr'lt)~~1i11I~ kI~:n,~ SUJr.lECr "J'O ~ rcs:lridioas alMf ~ ,4' 1'l:mTc!, if any; ~wcr. om n:f~ rhcn:t.o WlI no! DpC:I<lrI:~_c. . ..nd. lIlr tbe Icnemcnl:l, Ix:n::cii......~ :..... .JlPIlI1C'Rl1lla::S I!=.;u",,, ~ or i~ ....~....u.. a~ . TO '"-VI:: A.I\U) l'OHOlJ) lbc _t:m fee s.!llaipJe f_r. AHD G__ J.anJw ~ 10 """ wilIo ... 0"..,."" tbr G.r:o.lor .. die dilly ~ 'P"dOcd ...... lIId.iIlg Tnala: IUIdeT rho: "'~'Tr= ~CIII., aod ia ;rlI1!da8s ~_i:wy ID Idld u. IIlIIIl .. Iho:':ah ad ~ of !he p:tqaeny ~ ladn, the It:1llla, ~ aad JIf~ DfIAe ~ TItlSt. ~nt, ..lid the; ~ of .. SWc:: 01 l'kJrida Is2ve beeII rou-.r lI:lld ~ wlth ... ..Il """JlCI:U, aDd _ !be~ OIllll4CX' bs. 'k ftlll - ad ~ to ~e lbi5 <l:ol::d for Ilo:i ..... -.l r............... hc:n:izt ~ IIftIl 1_ ~ laud ;. r...... of ..u ~brb~_lUari ~ ~ !be 1i1&c 10 Sliid bZld for ..., ~ 0{ O....!ItCJr':miI...w dcJ'<*oI tLc same ~ ~ bwfllt dolira.s oflllll pc.".,.,. ~b:l'. t~... ~ lbe....id G~_ -. ~_.._--_...,--.- -- '-.... ..... ..-..... .------------ ttt OR: 2796 F D917 t'tt I . IN WI?:'NIE:SS WImJlEoI". <he. ...u 0_.... '= ~c:d aood ~ li>oc PCSC:w tbe day ..Dd 1"= C'q: """""" WIIIll:I1. ! , t2.<<...) t:i:~ ^"" ~ '""_ i....... ofib!: IWorit:z "->iIf'Tntll Ulldcr ~..s...:.t0d0lxr 11. '19T.Z lMIIR:iJ._ 'W ilnc:lJ t'nnted ~'J1lal &are STAT!! Of'FLORIIM COUNTY OI"DUVAL rIM: f~ ---._ .... .dc~ Ildarc -=!.his: ("~ day of ~. .,:Icc.( by..... Scarn-... S- T..... el u.e Mmtb: F=- Tr.d ooakr~..... l~ u. 17f%; kc:pIIr: ... ~ bowa 10 lIIe at' has prodlllttd f'-lon \'I~~ Lt~~ .. ~ ~q~~ (1111<:......._> r ~J.1IIIiIWIo -.,.t'~~...." (5""'" ~n.. ~ IIIIY) (I .-.l.-. 1ft_.Q;n1OG ...;, _1IIlIIa.lIIlZ . _...-,-- -~ ---...----- ---- - Agenda Item No. 178 May 26, 2009 Page 92 of 159 I CD (j) O'l 1 r--OL() --~: _ 0 -~(") E >- O'l (l)CO~ ==:2: CO co 0.. u r- iii OJ <:{ t GzaIJ:e s..s. No. li5-OSU0 ~ .AJlIPai='s ~1 ~Nc.6Iam6lll102 Tlds ___ Wb~ ~.,.... oIll6eby .oa4AJber RMadiDa ~ tII: $lqlfam!!. ~ Eaq. ~tk.Mllrllrc. A I.epl ~~ Tn- CaIlI:. 'l1IiaI Floor a5lJ hdr SIIaee .om.. NIpla...FJadd. 341 Cl3 f~l) 649.6200 Iv 2655431 OR: 269, tG: 0280 - 11'ClRICW, .... of OIWD ClIIIIn. & DIf1l/ma ." 1~:U"" 1. IIIXt, tuI( eaQ i21U2.Jt lie In JUt 1<<'.1. tU.U Itta: 1lIJrm. i.aaass .,. fJIr IIIlD n 111I PWIt W1ZS 11. 2&153 I~-~ --., 11II, I. r.... __ ....1 TRtJS'l.'EEts DEED nus: ~DBI!!I> ....._ ..iil.C. ~ 01 ~ t L IlL . 2Oln. by """"1.--. ~ a-.. -..l..."x-..IIIdI~ ...1IS____c..'1~or ..~J. '--T.-- ..........-17.1.... ........................... idOO~ ~ II&1li-., MD 11230. willa rull..-.... -1IDIiIariIy beiDa P*d Ie aid T... III ~ ~ sell. Ieue. CIlCIlDlb:r or ClIb:nrtiR Ie ~ IIDd ........"..... ... -... '""'0' r-t fill II ~...no.t.. ~ .. ,... ........, ~.... .. ftoHlIa ... '" ... ~ wIaoaf: pba ofIice IlWn:sI is .wo ~ Drive. !luIat D. N'Ipict. Ro.ida 34j~ (loa....... ~Iy CIIled b "tlnaMc"): ~bcIlliQ1he___~ HCI. ~iadoldcaUJb:pu.tia1Dehir. ~_..b:ia.1q;d '>04'1~.~.... -icm .r 1Ddiwidr..b,..., the _1lIl4 aaips of CGIlJOlatio-l) ~ TIart... GIaaIDr. farad ill ~ ortloe ""'" al'T;:a DIlU_ &IIlI.I~....1uUII", -- -. ....,... -i.Pt..........,.. ~ ....s..-~1Iacby IDIIt$. ~ KlIs...................--. ~.... ~ - ..... Go-...u... .........luoI__,.,... Con;",.~. Plooridoo. viz: "J':Ioc>Nadl.liz ofl.oat 6!>, NIIfM:o o.a.. aadTNCI: CD's l.IIIle '- No. 2. ~... Got '*" ........, I-o..l ill fJ8a Bocok t. I'Ioae 27. et.. _11= ........ vi" CoII>er Co.loG;y. FIcriIoo Nchbcr_ ..-- _'0 IlpDUR .. UO' - _y -....bo:r ........... _ 1\oe f'"'PCrt1 <lclocriI>td ~ ... ....,............. ad dc>oes --'-Iift _itone ~ pq>erI)'. 'ThiI-..q-... is ~ ID "'"''''''' _ fa die __ aad ~ ~ ftlItrietiooos -r ~ - - - suWiviolaa; ~ ei1, ..._ __I ia-.moc:crxd, if..-y. AND tbI: am.... ~ _II'/rh ~ lbd..... GwtIar..~ ri,IIlMd JawNl ~ '" xJI &lid -..,. sUlJoaoc!. oacl ~""""'Ille ~ 10 Mid IaDd fGl"'lltI)'_e(~ -' will ~ lIK-;am: .....lbe bwfiIl. cbi:laIo; of an ~ c:bift~ by. thouoop cr 1IIldn'tbc sai4 ar-c. . IN WrrNESS WlmIU:oF. ... Did GIuIlat ... ~ ...... ~ .... doe ....7 aRd :r- 6rol ...... w.ritII:n. ~ w.W1lDd deliYa'tG ia. UIl' pltsI:tIo:: wl~~ : . ~r~ 't-d. .:;ol..c../ . W"- "\ 11-,..1 ~v. ..ff1V ~ ~J.s ns- J.1.wn:nTnlsl ~"apsl: 1'1.I!lIl4 STAn m"-l1/ J.. . -.J ~~b. ) s:c ~~OFh.lh. ) "I1le ~ ~ wii~Y4sedbd"oc; me lhi:!fl,;hJ.. ...,~ ~~: . 2000., br ~ L.....:... ~~fll' Co-T__llftlle ~ J, r..u,.". d;ucdJ.upat 17, 19$4. -..bo C ) h~by tc:iiIetir( v.~- pIClduc:ed f4l)ClItlA .11. _C__~ ~ .~ ..' "~--;:;";':-;"'" r ~'~~~!1r. ~.,f;%~ .~.; " r'; :of.;;!.: ~ 1.~~'.:;~: :..;~ -, . .It -~ j"'-;n~!.f:~:: ~ ''''';."f-.l- ..0 -- -'P_:.:.r,/:. '..-~~.;..: (XEAL) ~-- , . OR~ 26gZ ~: 0281 IN W1TNESS WBSREOF. tile u:i4 ~ Us na:IIIl::d IIat pr=ms "'" lito day.aId ycu r....-o.bo.c ~ Sipea. -Wllllllcl.:livcm! --- ~ vr_~-~ & ~ w.1+~~d,"~Q~ - hi c>..~ kuo!/ Milad........ ~ ._ s--.:.o..1'nIsI:c: ......IboJooepill. Lan... TIU$I doIedAIIJJUSl17. 19&4 STATE OF .:...",..,.. I )cr. COUNTY Of ","-(on:- } Tk~~_~Ic4p.d~_Ibis~.yor Jr~ .1IlDO, ~~=:=~=..t~~;~~~~ ~ n:::alr"B cr.flf'J::n,..\ (SE.4.L) (T:YJll' ... PriDt) My (" . I.... tixplR:: I\)~ lleI:IlE U. HIIIllDN ...,fl\Mr...III.... \WI .... SG:I5aSt ~.--~ ~'- ~r...,:llml I .....;. , . __.-l.L - Agenda Item No. 17B May 26, 2009 Page 94 of '159 :,r tit OR: 2692 PG: 0282 it. m WITNESS WJIER.EOF. 1Ioe.aId GcIalIlT bas l'lCCcaIlI:4U-: pma2lSoa the day ucl. ysr fim I~ ~ Sipc4, -w...a~ ....-P<-= 'Ji' /1' , .' I' ,.",," .-" I '''"7''': ,.. t:' .I. .. w~~ 'ilt ~'! . ..:-,; .', /-.~. ~~ lJlI01I JUly __ Co-TJ1J$ll::O ~ Trostdlded.A>opd17.!lll4 Agenda Item No. 17B May 26, 2009 Page 95 of 159 . ~!'t";{. (r". /. ~ .. ~~f.,~.. '... ~....... f"l"'. i ." I STA'B OF AiirioIor- ) ,..,,1. I' )8: COUNTYOF~ ".'..) ..... 'no! ___-- ""'*--l.......__ -:...:.........L _ or .." , 2CIOO. ""ZIy~~..sas$dt:asmreo.~urIbl:JoKpbJ.lAuKan-liIIlcd"'..... 17. 19M. who ( )ia~bawII'''M'''(,>Qwilo'-~ ,,' ..'" ,.. . ....., as .~~ . , !': (~ ". . f. "t. ; l ~.."\ ...: :.., 0"\ . NCTAkY PUIlUC . N-,,)l_: .,. '" \ (T)'pC cr ~ Ny ('-""'- &p;r..s, .' 1: .' ~ .' . ".t., '1 t ..- Agenda Item r'~o. 17B May 26. 2009 Page 96 of 159 l'ropt>ly ~'J Patttl ~ticMlNc. 61C7lOVOOl 1'his ~_peponld wiOlaaI ... or titIc ~ ad AI\er!b=n1ir>rballll ro: So:pIa I!. ~ Esq. :a-I-,," MoIora. ^ l.lIpl J'wfeaIoaoI ~ TriDou CeDe. 11rird FiG<< uo !'IIIl: SIooIe nn.... .,..., Fiorilk :UIOJ 1M I) 649-6ZIXJ 268492S Oi: 2717 PG: 3:. .~ 1UnIClIl..mM<<uum ~ n ttmm.. .11 11:11"- __ 1.1IIICl, Clii57 c.f tJm.M '-:'11I n." I*DIG I.... 1Ot-.n m.n tft&~ II'/Z l JDIUI 15l1Ul .. Jl lID naot. arus n MID t5Dft:to.booo: Iblr IiIr fvr rcc~ dml TRUSTEE''S DEED noS11tI/$"/llE'S D11Iil>~n.......3.C!I!lytlf ]./,,'l...s.t. .2[!l!),!:y J~I--.... ........ "--1lIlIl""" "-.... "'~aIIII.__c..~.r .....~s. L_ Tr_ ...... .....1'7. I!IM, -- pall afli;c UIlIaail laOS. "'-'erBllrff. BIfl~ MD 212Jl). widllillJ pont _8IIdIadcy~JR*d1O alcl'l_tO pl'lllect.~lIl:Ilb....~...~,..-se_ -.-cl'___ ClfCllYpot\of'lt l....tIuca11od Iloc ~").loTlle.....' Ga....llll:... ....... _....,...nt ewptr..... --lIClIt cotr~..... it oCGO BIyshore r>riwe. S..ne D. Haplct.. l"\arida 34104~~ly.llod_ ~.}: (lVMIt."'0...4........._ "w....". "Or8Ilcl:"iolI:tacleall ~pI&1i"lDsbi'lJlSlnRlll.'7flancllhc 1oein..1q.1 .....Il.uw.._..s..... or~ UlII 1M -=-n lIId -iPIl or CClZpCIlIltiansI wrTNESSElll: na ~ 0.-, lorud m ~1ioD oflhe II.Im of Te. 00I1ats and .,. nhlot!lle ~.,..r,''Ii fI, -apt wiw:leof;. Imfty IC~ Ioo'"'r I""*- ~ _ih.. .liens. """isoR. ..e-. .--.-It-a.-...... 0.. o.-e.aD.... _lo.. __ ... ("0111..-C'-,.. ~ "IT- tlIc 5aaIh 112. on.. ~ NepIa GreIm _ TNCk Co's Utdt f,""" l'l~ 2.lCCOI1IiPi III ~ pDl __lCCIlIllcd iIll'i1t BIlllI: 1. hie 27, of\IJ: l'IlbIic ltealIfI of CllllitrclIllllI)'. fltIricb, neqJI tk &Ml ~ rm-...orlilr ~, l*'JlII*$. LESS "NO .EJCCEnm<:j the Wnt 21.S fteI of"" Belt 220 feel ur ~ Jo/1Ilwlt\s dercJibed pIl1!d: llte s.- '112 .r Lot 69, Naples o-"s _ 'l'nd ~'J UtIk n.m,. No. 2. u m:anlcd in Plat BoDlI. hie n. ~ k-.d:s or Cdtier ea..,. FhridI, ~ IiIc Eatt ;!S r. ftltomIf lbr ~ purpoon. 1..1l>e NoIfh .to feel d1ll: SlIllIlII1.2 e( IIIid !.al69. A.'NO l.E.SS ANIl EXCEPT IIIc Wczt r7Cl red cd !be FAst 660 h.:t rk Ii.e s...w. 112 oriA 69, NIflb c:no- 0Pd TAd:. COI'Ilf'IIl:Y'J Liulr FIU1II5 No. 2. "' -a../1n,1&I Il.ool; I, "",.17, ...1IIio 11_ o(Collier Counry.l'IoriiSo. 1laitDl~ llIlI_, DOrbolilCYe1lot-:1l~~Drllle~_;11t ~101ll)'~of1be ~ 11:io ~;. ~l 1.. raI _ _ Nr lIw: CIImId eM ~ ,..on: ",!Ilri<lions 1M eo......".. _Io"'~ ~ <Ill, pt..s~ ....-1Ofm:ml If.1\)'. AND \he Oletor \len!lIy _ wllh Clnalee lila, tho 0.- .. Soocl "~... ond '-ful ...,\oorit)> 10 Mll_ .......ey..o.i IalM, ..a ioctd>r........... tkk: 10.... _ ,. &IlJ' _.,.,. a.._ and..ru "'fcad eM """'" ......* kwtUt =-- a( .d1 ~ ~ 1Jy, ......,.. << VDoIrr tlo> ailt GtuI<<. IN wrna::ss W1fEJ(COI'......., ar- IIa ~ Ibcae ~.... u.e <Ny IOld ~... flTSl .be... ~ Sipeot, ..w ad ~r..-d. iG__~ "-i.. ~s. ~~"-- ~. wu- ~ r~7- Lu....cMt STA7E.IY ~ ~~~~ : ~ '"""'-t"lOU oc~wr-lAt llRa~ 6.y of a-1~ f .2000. h)'~lDcImciaaJIyaod-s--arc..7",*",ar_~J. \..aurt:llT_ 6tAJlfAlIJ1ltR 17. I~, """" <.-rlii ~I:J........ ... ...=e,,' )..too.. ~ ( "" io~ /J J__/. ~~l=~~~ M1~~~j/2~"?f l:sEAL) Agenda Item No. 17B May 26, 2009 Page 97 of 159 , ' OR: 2717 PC: 3301 tN WllNE.SS wmnUlOf.lhe ..id(la_... .~.lCd.......,.".."..l1ft tl>: day"'" ~ 11m >>-c ....n-. Sipcd. -w_ de~ loo__ / W~N_, , . e . L I I I,M .L ) \ J....,,;.' N ....... '---.I........ly .._.s-- t'c>- T_ llftd:rlhl' lI11C'p111.l.nRn 1'l\15t daznJ A1IpSI17. 19U I .. ~ -:\.......7 'c<'~ WI_ .: __ STA.7E ctF rAhv)(~ ) , 1 u:: C'OlJl'CTT OF ~;fv-t- I ..:Ja f. A n.. ~ __ _lIClcIHlllllcllaecll>cf1on..... ... .:::J-. ., ut H\. ,'" 1 r . ZllOQ, ..,. WiclIal La-.~,. mI as Solo._t'..T_.oflloc IGOCph J. "- TlllJldI eel AIlJU1I7. f9llol. . ( ) k ~11y bIcIwn III ~ IIIf { ). -1IfOIhIo:d P~. ; lJ J..(, IV I. ,Ii.!,- II -'w",.,,- i<IeMl....... . ,seAL, ""~~~ ~}oI ~~ s t;.,v(l. _ (1yPo -. . My C"0lItlniaie0I 'ExplIn; l.~ t' ,';genda item No. 17B May 26, 2009 Page 98 of 159 ~tt OR: 2717 PG: 3302. IN WTTNI!SS 'WKF.'REOF. Ill< .ald Gnullot luIs ~ ~ rment:: ClII 1ho r1ay..-i )'tilt Ii'" ah.,\'<; ......-. Siped. -.Jed ad !k1t_6 ...-,...,......,.,. .~II..~.(~ .~~ w;.....w-: K~t~. 40. .....<: I ~'oI_.. "'Dy _...~('..T"'-" uader~ 1N&ldllll:lSA1lfUSll1.I'134 -~ .'7 . -'f. --..--- ~ ;i" ,- ,u.A1~,~,,~.,~-ru /" ~. STAn Of-:l'l:J. ,lJlf../;( ,,\ )N: C'OtJNTY~_, 'tk fort..... __ ..... '"""""ltIIp4 wren _ lIlia ~ ciIly .r '" JilIy 1--. ~ly JIIlll.. SUc:cioAoIrC... ,....,"" af1loc ~ TtDll ( I it ~ kMWII '" IIIe or I ) ""'" ... pntduc:od ~ .. ,..........,. ~ .' . JIllI!l. 17. t_. ",1Ia ., .::..... ~".I ........-. . .' , ~~// I'/~// ~ ~lty PlJ~ ." NNlyNome, A..., (J ;(hAt fT)F",1"nlrIl ./ My,CllllltnilSllIIl Expirea: d/ ".) Ij ~()~ v ,. ,........ . .... ...~ ..... .. ~....'I... I ,( . :-...... 1 I. . l Agenda Item No. 17B May 26, 2009 Page 99 of 159 f i ......... loop c...-.....d~ TTc..... 471. ...T....., n.JIIa.... .....rutla AdII:.t. ....... ....:tG3J.5...l 2606814 01: 2651 PG: 2846 . .... iI amcw, ... tf amm ~. Jl 111lf/21ft It U:M _m I. JIXI. ~ at ztiHII... DC' III H." ~-.71 mil.. WI: IrI!m 1_ 15I___Jllna IIRII a JiIll Warranty Deed ThiI Wan:aaty Deed made OD Marda 8, 1000, IJf COLLIER DEVELOPMENT CORPORA nON, . corpor:a6m:a olplriDd and nistiarllllder thot ....... f41br: Sbn ~ I'Ierida, Iurriar ill priDdpal pilla: of f1!qiaeu. at 3OU3 TIi.m..t TrailNGrtb HIO>> Naples, FJMida 34113, GRANTOR, ta THE BOTANICAL GARDEN, INC.. . FIoridJI D~fIo. pIWIIt e.rponIiea, Iaa'ri.aC its prir:tcipal place of ~ at is 35B4 E:a:dlallCe A,,,eII1Ieo Saite C, N~ Florida 34104. GRANTEE. Gi'aJljor. ia eouidenIfiott or TeD DoJIlan ($18.00) paid b;r gratu,. puats aud a8"". to p-aIIRc'" .....eeJs auc:ce:asDl"II alld atISIpd fore'Rrl daat ~! propeny located ill die c~ otCoIIier, Sate or Florida, IUId mctn: puticalariy described .. follcnn ~. "'Pr.perty"): SEE EXB.uJIT-A" An-ACHED lIERETO AND INCORPORATED HEREIN BY . .eWrbtNCE Subject to .l'C:lII atlte tau tar 2000; ZODiIlJ md use nstrlttiOlu _posed by .....aaama autllorlty; ratziGtioau aDd ~b celia.OII to the ..iH:IiridOll; alMl ~ 011. au ami mbN:nI hmtrut or ncord,.1t -way aDd the follir'lrin& COTICUIlta .... awricdoaa w~ shall beCOVQUlta I'1nI1ZiDc with tbe ..... biudiJlc..paD ....aac:ee:uon ... 2r.l[O I. Vile. UlSe 01 tiae Property shaD be. liadted to- d"'pxnet bd 11M.. . ~~"' pr4ca, aDd andl1u)' IIlItS diredI;y related to ... ~'zdal pnlm. JJ' dais 1IIIe ratriedoa iI ~ U4f radtvItJlldorl UDol cund'wjtbht.30'd:aysafter p~. ....J ...... ........ ~'.. T.IlorlllPn_~ ~A'~ A.~lufl U'lIIllMu.eiad. ell' . &5O;~IDIcn:~",,3tO: ~13; ( p',genda Item No. 178 May 26, 2009 Page 100 of 159 r I. f OR: 2651 PG: 2847 Gramee ....... .written DOike of die .pecl& ."iolatJoD, Granlor .haII haYe, 10 additiDII to the ~mcdizs described ia ~pb 5 beta_. the ript to J"epurcJu.u the Property ud the iJllllro~ tbereoll for the tbal fair market .........~ dctenaiDed as daerlbed below, lUC!h value .. be no J!U tbaa the amount DwIted ill th~ Property. If IUell ript it ~, GnaDler shaD Ja.Ye tbe Property aDd =PI"In-u:e:= app."':i:.ed by == :PF:';Iise,. Id=ted by Cnu~:o:r. If Grantee d'"Dp'iita the ".rue .. ___bled by sudt appniser, Grantee may ave th~ Property Hd izap,.,._call awailed by aIt .ppnbcr ftled:ed by Gruice. 1f file putic:s AiD call-. azree - tb~ \'Ale, rhe two apprailen JlJaU joiDtiy sekct . tlriri appnlsu, wlaose delc:naiDatioa of VJIlae shall CGlltJ"Ol. 2. Bddiaa Hdp1l.. BlIDdiDg beigIAs OJ) the Pnperty .1uIii ~ limited to two (2) stories qd hi be eveDt 180n! ths:rr 36 feet measured from tht flood ekfttioa to the bigbat poiat 011 tile lnalldiag, iuchrdiag witItout 1baUatios, lips, CUlfJp~ b&lllllen, ~ ad any otiJao atnIdun wbtsoever. 3. Suadacrty 'I1drd. TIn: MUCbc:riy ODe thirII or t~ Propa1y(tbe "Southerly hr=I"): (1I) 1'he bllildlag lei back Hae aleag tht: saathCrl, bo.lllduy of'thc Property.baD be 50 feet. (b) . 1'l1) IIJAhIkmma: fadUty 0... fiat ..-1 buildi:ap may be c:QDS1rvcicd ill lhl!! So.th.erly P.Rd. A2ay lInc:mre: ill the Southerly Pand, other thullJllll: m~ 01 ~Ct (2) .d.I:lP dory strll2c:tD1!"eS or DQ mare tlllu.!: 2..DOO ~an: feet each wftIa -.terior ..~,.. e"'~ .dmIIa.. to diaR o.f Cbe VDitor'1 Cater aad oilier dCftlopllleat OIl the Prapeny fa the aorth. .1aalI require tJa~ 'WIi:tRJI appronl of'Grntor prior to the arlin- f4' tL~ appUcatioD for allY pcnatr or the '<<J.~C4'.!DWI. of evadrUdioa thereof: Gnmtol"'s appnrval "U aot be u.uu_ably withhekl OJ" de-byfll after dbeuuioD behweaa G....tee aDd Gl"8l!or.. G....io!".1riD prburily be eou~ed with viIuat 1I0iR, odor, Jicblhag, ud embPous iulSJaCb whicb any lut;h de..eklplacar in ae Soalllerty f'an:d may have upon Gnmtor"s raIl'~"""'& property to tiI~ IOIltIL 0lIet: ....-_.fteed '1'l'itb nspeet 1-0 any partkr.tbr area. uy ~eat ~..dWl H-coatiDued diligently ~ eolltpletiO!L ~::t""5 ~ Agenda Item No. 17B May 26, 2009 Page 101 of 159 '" . OR: 2651 PG: 2848 4. Southerly A~ GraalOr and the pests,. '1ICCC:ISOIS .... asdps.of GrutCIr ,ltall be cnmted auess Ie tIte botaakal pnka from G~tor". pnperty to the IOa'fh 011 tlae ..me knDa as ..y pabtic ~ pnwhled Gr.aa~01' Ibs1l PtI1 tile COSf or ilmaBatid .... JUiJdcB1l>>ee of rile point 01 mtry imp~lIMDb for the at::eeU a.1:HI dae c:otIb Gf c::DJdro1lillC mdl e"AtJ:Y. 50 ~ecliM. Jf aay or tb.. deed rlCStl'iedou are ,..kUfcd. .met nJdI 'rioIariCllI is Dot CQnd lrit.biB 30 d~ after pI'OVidJ-c G.r.lIUtee 'Iri6. ..rittea ~ of the apedf"ac ~ Gnutar..1uIU Iulw tllc rigbt to CDforce tIaac dl:Cd n:strieti_ by ad lor apeciIic pcrf'onIwIce, iajuactive ~ udfor dalDaFl- I GRANTOR raerYl!:lI wrtu iW:If Cbe oil, ~ IIIId __nls ~ed 0111, w1t1aia Uld IIIIIIIer die PJ'OloCrty deRribed h~ wIdch riptl aan: c:prasly .DOt iDduded (lIlI this eo~ provided lurweverfbllt GRANTOR ..baD iIMIf blrW! _ay rlgbt of eJdIy vpoa the PloIlip... t;7 to ~ Uid I'eSI:I'ftd ripts.. &del G:R.ANTOR doa hereby fully WSI'J";lmt die Ude to Did 1aDd, aDd 'I'riU dd'CIKi the -.a! apilllt Js:wfW cbiaa of aJI JRDGU whcnroeem'. IN WITNESS WHEREOF1 GRANTOR has he"ltWD.to .... GRANTOR'S bod :llId IIaIIl die d.,. aIId :var flnt abotre writ1ea. (sipature aDd adm~r;maat amtiDue 0Ja the foJlowma Pie) ~oF.> ~ I -.... Agenda Item No. 17B May 26, 2009 Page 102 of 159 ~ ... . \ . r OR: 2651 PG: 2849 I'V\~ l. ~'oJ21 \ Pdat N... .~ L. Ball . ~~-tk{~ COlLIER DEVELOPMENT CoRPORAnON,. FI.ricla an:ponaiae Pri:Iat Name ~ 'h]~ ~/2 .' . -.. .L ~L~ '>" .....1.. ,,'" ~.'" ,.. .l :w-.,. Terry L V"1Ce r'-:"iml ~... '..: l,.;.- . .. , 1..~. ~: '. i'.~."" .," ':" I _... ..... .... .,. ~SmI ,>,'.;> .' .~ :! C1 . J STAn: OF FLORIDA !I COUNTY OF COLLIER f The: ~butrameIlt..... ~ W-= JBetJu. 8e.fa day of' M*-I'dI, 2tOt,. by Terzy 1... FJ6n. .. Vice ~ or COLI..I:ER DEVELOI'MENT C02PORAT10N,.!1oridR carporadoa, 011 ~of-= eorpol1dio!i. He b peI'IOIdDy .....tGme.. , -.5~~,,- ~:lWaoI) N~ l'abIic- ~ BaIr.hria c..___ Nmabea-: CC66Ol7J Com.... Expfratka Date= Aug. 20, z001 ..,Jo"'itL ~ ~'" y A "Y,~"O:66OII7J '\~ ~~2D01 IF ~JlQrQHQ<:O~1NC. ;;.. ,..."... .c!5 ......... ." --- Agenda Item No. 17B May 26, 2009 Page 103 of 159 " . ~t* OR: 2651 PG: 2850 ~t EXHIBIT "A" n..w...,t>>..r..... ofSc:ctlo. Z3, TGWJllblp!O ScnItb. Rule 25 EMI, Callier COIl1li1. Florida ('lJIc BoUDicaI Ganicna) All 'dNIt pari 01 SICtlaD 23, Towullip 58 So. RMge 2S East, Collier eo.DIy, Florida, 1NIaE IlIlOre plll'timlariy ~ed as.~ C_dqatthe DOI'tb ~.conrer 114..w Scdio. ~ ..... So" .a'.,-' EMt so.OO feet to the Poiat oIBcgiDuing oftbc pual oiled: .... dacribId; . 8leaa:~. Satb .42''''7" lAd 2348.72.feet; a.waee Se1:dIl89'24'lJ5 West 980.26 led; CbeIIce NariflGCrS'l7" Welt aoo fat; 1heue SoatJa ~'85" West 3GOJJD led; a... Nor1II er33'1?" W.-t!113..15 feet; ~ N..... 80"28'25" waS 1251.15 feet; ihIaa: ~erlJ 78.30 fcc:t aIaas the an or. tanptlal~r cu"e eoneave te the ~ ~. r.adJ1II of SOl ,_ tlaraup I eeIItr.d u&le Or..f3'~" au beiDg .....dcd by a dIo~ wIdch bQnr N.... 4M3'IT'" East 105f fed; thaec Nor1b .1.('59" E.t J222.17 feet to the FoiDt etflkiiamg 't1l the pared GrlaDd .... tIesc:ribed; . iSaldec:t 'tD aaea..a.lIIId ft:Stric:6eas or neord. C--hi...C 68.S6 lIQU IlIIOft or lea. .... ~.,." ......... ,Agenda Item No. 17B May 26, 2009 Page 1{)4 of,t 58-- Strap No.: 3002004 OR: 3058 PG; 2877 RICOlWBD in omCIAL RlClIRDS of ClltLIIR ~amT, F1 D6/20/2Q02 at 08:39A! DiIGBT E. BRaCI, C1lRl CORS 215m.OO REC UIl 18.0U OIDBIIIlG 13.00 DDC~.lO 1505.0D PREPARED'BY AND.RETURN TO: THCM...s G. ecKERTY. ESQUIRE 12734 K.nwood Lane, SultrU Fort ill\yBB, R.. 33907 4i83Il Reconfing:$ DDCumtlntary Stamps:-$ Retn: RDETZIL i ANnRJS5 8,~ PARt SHOll DR 3RD E1001 IlAPtiS !L 341113 , 2002, by THIS WARRANTY DEED made this /.s2 day of Iv; "" '1 .KELL Y ROAD ASSOClA TEa, 8 Florida general partnership, whose post office address is 142 Johnny Cake Drive. Naples, Florida 34110, hereinafter called the Granter, to NAPLES BOTANICAL GARDEN INC., a Florida nDt~for~proflt corporation. whose post office address is 4820 BaYShDre Drive, Sui.t:e D hereinafter called the Grantee; . Naples, Flonda 34112. , WITNESSETH: That the Grantor, for and in consideration of the sum of Ten Dollars ($10.0D} and other valuable considerations, receiptwhereofis hereby acknowledged, hereby grants, bargains, sells, aliens, remises, releases, conveys and confirms unto the Grantee all that certain land. sltuate in Collier County, State of F!orida, viz: . , ( . All of Lot 95. NAPLES GROVE AND TRUCK COMPANY'S UTTI..E FARMS NO.2, according to the Jjlat thereaf, as recorded in Plat Book 1. Page 27, of the Public Records of Cc llier County, Florida ' SUBJECTTO EASEMefIt'TS, RESTRICTIONS AND RESERVATIONS OF RECORD. THIS PROPERTY IS NOT NOW NOR HAS IT EVER seEN THE HOMESTEAD OF GRANTOR. TOGETHER with aU the tenements, hereditaments and appurtenances thereto belonging or in anywise appertaining; TO HAVE AND TO HOLD the same In fee simple forever. AND the Grantor hereby covenants with said Gra ntee that the Grantor is lawfully seized of sald land is fee simple; that the Grantor has good right and IaVlrful authority to sell and convey said land, and hereby war.~ts the title to said ~and and Will defend the ~ame against the lawful claims of aU per.>ons whomsoever; and that said land Is free of all encumbrances. IN WITNESS WHEREOF, the said Grantor has signed and sealed Ih'ese presents the day and year first above written. , , - Agenda item No, 17B May 26, 2009 Page 105 of 159 OR: 3058 PG: 2878 ~~'~L , ' pm~4/~~Dke, ~ Lucill Clancey STATE OF FLORIDA COUNTY OF COLLIER The ~ foregoing instrument was acknowiedged t:lefcre me this 1.---. day of , 2002. by Lucille Clancey, Who Is DI!IfSonallv knewn to ~l OR who produced as identification, and who did/did not take an oath. NOfa~ Jl .13~ Commission No.: My cOmmission Expires: (il' s,hicl18llDka ~ . MVCOMMISllQif a::RQi1 tmlIES ~ ~17.~ ~ . - toIlllED_tIClYrM.Il!lOUllCE.1NC. ( ( /i ~~d ( ;.:'U-n . . -fi(.Lf ' Printed name: (:;;;11 - ~ D/ K;;L-'-f ~I~. ~ :/ ~', Print name: -- '" ~,..."el' Agenda Item No. 17B r,1ay 26, 2009 Pa;]e 106 of 1 59 OR: 3D58 PG: 2879 !:df / I~~Q t/l - ' Robert Bliven STATE OF FLOR,IDA COUNlY OF COLLIER The foregoing instrumentwas acknoWledged before me this~r day of ~ 2002, by Raberf Bliven. who is personally known to me, OR who as identification, and who eNd/did not take an oath. . produced N~~/J ~ Commission No.: My Commission Expires: r~ ltSUf:A. OLNi l,_ .. My c..mm [xp. 5125.'04 . .,.. P'U8tJC .... ~ . ~N", a;!l3594! i' 1.. ~- 'lothorU.. ( ( - ( ( Agenda Item No, 17B May 26, 2009 Page 107 of 159 OR: 3058 PG: 2880 ~ Bra} B. Jain, Trustee for Sanjiv Jain STATE OF I l-L COUNTY OF ~~ The fgregoing instrumentwas acknowledged before me this -,/1: '6tday of r-r ~ , 2002, by Braj B. Jain, Trustee for Sanjiv Jain, who is psrsonally known to me, OR who' produced as Identification. and who didfdid not take an oath. NotaryPublic ~ ~ Commission No.: My Commission Expires: 9 /;r j;. ~'t.') ,,' I p"n~~~~ . d OR: 3058 PG: 2881 ~;kRsmpn~ "... ~ 6~ p~ SyJvi~ J!:;o&Jke::'(" STATE OF FLORIDA COUN1Y OF COLLIER The foregoing instnJmentwas acknowledged beforemethjS~day of ~ It: ~ ' 2002, by Mike Stephen, _who is pt!'!rsonally known in m~ OR who pro uced as identification, and who did/did nat take an oath. :\f'laY "'Ii 6FRCl;\LHOTMY 0.<:0 'lWll:nJTAYI.Ctl &;iAL ~... ~ ~"lSllOi~ ~o of" LlYOJN~~ F F~ ._.9<?7'.1 2004 Notal)' Publi Commission No_: My Commission Expires: (' , ( Agenda Item No, 17B May 26, 2009 Page 109 of 159 p~~~ ~~ 6Z<r-:- Printed na : -rt=.1V~' RYAN OR:305B PG: 2882 ~~ STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was acknowledged before me this.2..E1L day of A P'R \ l- 2002. by A. James Keyser, who Is personally known to me, OR who FI.OJ!:f'bA, "bR\Vetr 's L.Il:.t~?-l~e. as Identification, and who did/did at take an oath. . produced "B'RA U.l L.LG'TT"e. \J.PoM Mv ~Tli-" ,'::-;:.1' ,;,B~;:~J.;~::X:::b;,. :~ ~r" -/l'"1"f':if!..4~ r;~'f. ~..tt..: t ... ~.' ,..'It,. '., ",t:J:- '. i,'~,*' .. .. r."r, I ""... . '" ,~~. #f!<O. .;. .l . .~!;P'_'~ ~- I~..", "'../,t. "........;, .I, ~.. , I ~". - r.'~~' . '1.../-)..'...,"'......\0- " u.;: ",..' ','. IA"', .:..'(''::'~ ~ ' #; . }1T;' . ,,~, ..,,:,.,r,.. \,.r:.. , : ,; .'f'. :' ;, ,;;;->'~,;,. !' .J..': ,-:I, .:; . - : . _.....~ ...'.)V' e '\t!" ..~.. .-, 1, . ';{' :!",.. " :/, / ~.'~ ":::)':!j.;'J;,:':'" /. , ,.' . .".IV/'-J . ,"'_1....".,.., ' , ~,. , '.'F JI . 'il,.,;'. .' '. ' .f:" ~,1>''''' "./0J;"rJ';',' :'." ! . ~;.7"",: /::'", ~'; ~T."l.~."~ ;..~ I' ..:"" .t.',"""":: ';,;........" /')i ~'1 ~I"." .~;~;*,J (:;~:~y~:~.\, ,....C:~ . " ." tt ~,.r!...",' ,':pc, ~~...!~t'lt~i;t. .-:.~.: 'f,'fi(C !p:'".{~:' j/ 't,' ~ . ( Agenda 11em ~'Jo, 178 fv1ay 26, 2009 Page 11 C of 159 ~. f . 1l....1L~. Printe name: ~Ut;" -'U ,..It::,. ~~~H~ STATE OF FLOR1D,c., COUNTY OF COLLIER The foregoing instrumentwas acknowledged berore me this 2."fJh day of MIJrvi. 200..2:n by rJim Merpohl. who is personally known to me, OR who ~na.Jlv /-<!tlown ;as identification. and who did/did not take an oath. , . produced Q/IZlId. MfrV Notary Public Commlssion No,: {!C 82'78'55 My Commission Expites: April /q/ :l/)tJ3 <~ DIane L Hallon *.:*My ~ CC!!27655 '=..:;V ~~ '11. m:l3 ( Agenda Item No, 17B May 26. 2009 OR 3 05 P~e 111 of 159 : 8 Pu: 2884 ~~~ Co ,...J tl r\ L. B P 1;1 k.a.t' Prifl~ ~~,~O~ kor . ~..~ Robert eym STATE OF FLORIDA COUNTY OF COLLlER , Theforegolng instnJmentwaucknowledged beforemeth~ Z 7 dayof..1}1a.rU1 2002, by Robert Heym, who is personally known to me, OR who P L [)L as identification, and who did/did not take an oath. , produced .:i~", , ,~.*;:'~ ,1 ~ .... \""1'" JUtu.." ., to:''' D~ '., t ." ,:-", ,,<\1Co.... C f ,'. ':- : :J'" ,:-............. i "fI~.~..:~" -.",;:'IT . ,. '~ '.~ --.l "" c. . 7/"'M.J I 'Z.~, .'}: ~~\.'''l\--:' . "!,:: -- ,.~. () '. '~. I':, no." C>" 1 ,- -<< ..... ". tI'.,., << t r :; '=' :. :-:;;".~() " ~l : I t,.::-.....!fl "o::o.~ f L '"' '" j .~ 'I~ r','-J .' '" .. 2 ~; i\ .....~ t"t .~ .~~.". ...../ f' '.E. ~t....,....... '\ . J-t/. tJ",,;: f,.\ 'it:. ~,,;.,:, ,~ ,. h-t JtJ'..u.n.1'''~'''J:''..l. ~ . 4i~'r, o:.-..!fl' -. \i; ,~. . ~ ~t:.t" ( ( ,- /L/J,lj / The foregoing Instrument was acknowledged before me this ~ day of /Yl"" > 2002, J>y Dr, Herman Goldberg. who is personally known to me, OR who produced mO P^- as "."';fica"on, and....o aJd;?2::;::~ '!L4L-- Nola". "'b'" ff Comm!SSlOO No.: My Commission Expires; . ~I ~ /O-?-- ~' (l~iA- . Printed name: I-Z:Ju I!. E.,D/l.l1=C"U7 Printed~' iff;.., .-1 u STATE OF COUNTY OF r/4- " 0'/// E'/2. ~~ IolERlUeullZALoNE ti i:t MY COMMlSSfClff , CO 7:f.l383 - ~ EXPIRES'MaY"" "'o\\'..Ili .. 1lutJl.~T1w~~U::~.. ( ( Agenda Item f-.Jo, 17B May 26, 2009 Page 112 of 159 OR: 3058 PG: 2BBS /1 t Agenda Item No. 17B May 26, 2009 Page 113 of 159 3058 PG: 2886 STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrumentwas acknowledged before meth~ day Df~ 2002. by Teny Haft'. who Is personallv knmatn tru:ne, OR who produced as lden_n....."" dldl... nnt lake an nelh. ~ 71rt/,_~ otary Pu Ie Ccrnrnisslon No.: My Commission Expires: ( ( I ;: J\. """1It IOIIIIBr - ?JI..i Illy CarmiIIIr&llJi!.lClB37'Q ~..;; ~""""111._ ... ~~~Q. STATE OF FLORIDA COUNTY OF COLLIER Agenda Item No, 17B f\;1ay 26, 2.0Q;L Page 114 of 159 c~ r,- OR: 3058 PG: 2-887 '/i~ \-L a--- Dan Dunnigan _ ...... r The foregoing instrumentwasacknowledged before meti1is ~day of rn ~ 2002. by Dan Dunnigan, who is "personallv knc.wn to me, OR who produced as identification, and who did/did not take an oath. ROBIN GOOD Notary Public. Slate of Florida My ccmm. up. May 28,2003 Comm. No. CC823084 " ~~ Notal)' Public Commission No.: ~L E Z- 3 0 kL./ My Commission Expires: .5 - ~ ,. - e> ~ ( ( ~Q~ ~ 0,:- :,H: Printed name: . _ . ,.. . ... ~lai.?t' A. ~.e,4~ ~~;~ E t>~Tb~' Agenda Item No, 17B May 26, 2009 Page 115 of 159 OR: 3058 PG: 2888 U~~..~~h Wlfli;:ml Graham -- STATE OF '-Plo rO. iJ,p.. COUN1Y OF Co \ \ ~ Cl!.... The foregoing instrumentwas acl<nowledged before me this~ day.of M~ , 2002., by William Graham. who is oersonallv known to me, OR who produced as identification, and who did/did not take an oath. ~ (l B~ Nota ubllc V Commission No.: My Commission Expires: ~~ Sylvia 3- 8CIllbIr ... ,... MYCDMMlSSDlt, c::D'3691 a:PIiB , ;. May 17, 2004 IONIIiO 1IilIlI1IICIl' fMI MJlWC(, Ie. Agenda Item No, 17B May 26, 2009 Page 116 of 159 3058 PG: 2889 OR: ~(J)~ Printed na~~1 ~~t:. {"k~ t \C.v.-v....L Rosemary am mar ~,;z2: ~~ Printed me: ;, I '.Q, cr: & c> ICe,:., STATE OF FLORIDA COUNTY OF COLUER i'f/h ~ The foregoing instrumentwa.. acknowledged before me this -'-- day of , by Rosemary Hammar, who is personally known to me, OR who produced N / A-- as identlficaUon, and who did/did not take an oath. / ~~~ P~' NO~liC Co Ion No.: My CommIssion Expires: 2002, ,. ~ ,:~ Printed rt.;me: " A )/ 17 I ~ A. ,.rwI Agenda Item No, 17B May 26, 2009 OR: 305.8 Pri:e 289~ 159 ~,~ J-~ Sudha Jain ~'S.. ~ .J~ ' Printed name: ~lU ~ \L:.. a{I.\-N STATE OF FLORIDA COUNTY OF COLLIER The foregoillglnstrumentwas acknowledged before me th~ day of ~ 2002, by Sudha Jain, who I~ pF-H'!llonBllv known to me, OR who produced as identification, and who did/did not lake an oath. . ~-flI3~ Commission No.: My Commission Expires: ( ( item No, 17B rvlaj' 26, 2009 OR~ 3058 rrrr?EZ89ff 159 ~ ChOt S me -'-to F' . ted name: ~ :; "'" \cz; prin~~ ~yf~oo~~~ STATE OF FLORIDA 4/'.1. ~,~. J COUNTY OF-OOLL-fER -.TLQ~ The foregoing lnstrumentwas acknowiedged lQre.TfIe,thi~~, r day of 7n. tV"I... c..A . 2002, by Chet Surmaczewicz., who is arsonal! known - "l:o---rrTe- OR who produced as identification, an 0 did/did not take an oath. ~/Lo" '/~ Notary PUbhc CommIssIon No,: My Commission Expires: ~ JUNE T. LEMIS MY COM~ISSION #' 00049962 EXPlflEs: ~r 2, l2OD5 I~NtT FL__l<.~I"" ( ( C1t.,~~~ P"~~~~ '4.T--r ~44~ Pnnted ame: "I v : ',-.:r; /1 D T> k~ of STATE OF FLORIDA COUNTY OF COLLIER Agenda Item No, 178 May 26, 2009 Page 119 of 159 OR: 3058 PG: 2B92 t1~iC!l~ Morris Glatt - A jJ~-, - The foregoing instrument was acknowledged beforemethis ~ day of M~ 2002, by Morris Glatt, who is DersoQall'l known to me. OR who produced as idenllfication, and Who'didJdld not - an oath, ' ~dr- ~ Notary Public Commission No.: My Commission Expires: # T.ny..-y I.iC>PK *' * Wl'CDm_........,.jf1l3 . ''''~ f>I!lI""".hI....2'", 2004 ( / "t''I\ "'j{ Agenda Item No. 17B fv'lay 26,2009 OR: 3058 ,~g~2~9':rit~ z::;< Printed name: " ~~ = ~,~ Dudley Goodlette ~ -- :)/ J>>",(-/A-~ Printed name: -::Lec. '. . Pa,An..n 2002, olary Public Commisslon No.: My Commission Expires: ;"; ~ Vor:Id 40n GItllhur *~ "* My CDImliMkln CCBD:lD4e ......~ e.pr. Jllf'IIa'y 1B, 2DO~ ( COOJm f'- C) l.") .",<"-~- O-or-- N-.- _ 0 -~~ ~ N t:: >.~ OJro ::::2 ~ ro ro D n.. t:: OJ OJ <( o ~ z w c tt: c( (' '\ ,.J ~ ;5 o !Xl (I) UJ -' a. c( E z a. !l o -' c c c ~o ~ g "iii. "iii. B . Gl ~ ~ ~o m , ~g ~g ~g Bd ~d Bd o 0 ,~ g 1:1 .~ g .- c - g lil Gl ~~ Cll CI) -- c - c .- c c.5i t: t: c_ c_ c_ c _ c_ c_ c_ c- c_ c_ c_ Cll_ ~ffi 'sc .!!l c .mc ::~ (!).r;:. J!le:: .Bc ~lii J9c Be: oS c J!le:: ~5i 15 c -I- o Gl o Gl o cu .~ g B v .~ g o QJ o III o III Oll) ocu o cu IX! 1II 1m 'E! mE lXl"t:l tD'E! coE co'E! m'E! m-e CDE alE m-e mE (Il"E! ... -c;; .l!l GI cu tV III tIl III C'G !C'G c- c- j- cu C'G .!tV III ltl Gl C'G .!C'G .!(1l III C'G CI) GI {5.<!J ~C> ~C> S ~ ~(!) ~" {:.C!> ~(9 ~(!) 0.C) I-C!> 0 0 I-<!J 1-(9 1-(9 III IX! IX! U) Z ;: = 0:: ~ "'It 0 .... 19 ~ Z ~ .5 iii U) u ~l j I E 'Cl E 3/ 0 iii Q ~ u Ui 'Cl .. aI aI C + Q. 0 lG ml :: II) 4::= ml :/ ~I CI) Lt') .! '0 UJ ~I $1 It! ! (/) .9 = <!: .9 .9 lJl II) C'l 3 ... Il) 10 - ... .... N 0 0 ~I 0 0 (!) ::! ;:: w w ;;:: ~ ~ W 0- 0 0) III .... .... U II:! ~ 0 ~ ;::: co I/) 0 z z <( II:! f,C) 10 .!! .2 CD .!! <0 <0 It) C'\I .... + + 1.0 C'/ 3: 3: w ~ ~1 3: 0 ~I ~I ; ~, ml ~UJ ~ U 00- III .... <( -1- o. (/) 0 .m 0 .... 0- .s~ 11/ ;::: Z 0 -,0 .!!! = .... ..- ....CD li~ 0 ~ .... .... 0 .... .... .... ~ ~ '0 ou> ~l 0 0 <:I 0 0 0 alOl ~I CI) 0 ~ NW M t:! t:! .... t:! N t:! N '011I - - - ... ...0 w ... .... w .... .... ".. .... .... .... 0 3: roo Z fn fn tr.I fn Z (1)- 0.0 tt:i 10- .0 Iri .0 t.ti tti .0 Lt')- ~- ~ t{)- .- (l)W 1(")- N N I(") l.Oo C . N N N C'l C'l N C'l N N C'l.... 01 co N 0 0 g 0 0 0 0 0 0 0 0 (;) (;) oM 'EO 0 I(") I(") Lt') 10 10 10 Lt') 10 1.0 Lt) LO Lt) U'>3: CUO- Ll') C') C') M ('t) C') C') M M M C') ('t) C') M M (.';)0 C') N N_ N N N N N N C'\I N N C'\I N N:l N N.... - - N N N N N N N N N N N N Nell lIJlt:: N It) .!lo 0 Ow 0 0 0 0 0 0 0 0 0 0 0 0- CLt') 0 Z Z19 Z Z :z z :z: z z :z z z z z~ ~Cf) Z LL IJ.. CIl u.. IJ.. u.. l.L. l.L. IJ.. u.. ~ U. l.L. lL l.L.N lL -I -I CI) -I -I -I -I -I ..J -I ..J -I -I -I.... lDc-ri -I U 0- () U (j 0_ ~ U ~ ~ U U 0 Ot!) 1OC'l ~ l- I-Oo!l l- t- l- I- 0 l- I- l- t- I-a. 1;\10 + + =: + + + + e + + + + + + + + oQJ + lOW (!) C!)O (!) C!l Cl (!) CD (!) (!) C> (!) (!) C> (!) (.!)co ~5 (!) z Z~ Z Z z z:5 :z z z :z z z z Z~ Z <Xl 0 CO') 10 I"- .... M 0;) t- al .... 0 N .... 0 ..... 0 0 (;) 0 0 g 0 0 0 0 0 0 0 (;) 0 0 0 0 0 0 0 .... 0 0 0 0 0 0 8 g 0 (;) (;) 0 0 0 0 0 0 0 0 ~ ~ 0 0 0 ~ 0 ~. co N N (0 0 V (0 0 (0 N (0 to i! ;! ...... LO ll) to (0 <0 I"- 0:. ll) C') to <0 ...... <0 ...... ...... ,.,.. ...... ...... I'- I"- ...... ll) co M ('t) M ('t) CO') C') M M f") C'? M M ('<) C') en M 0:. <Xl co <Xl <:0 co <Xl CXl CIO co co !Xl I~ <Xl C') CIO .- .... .... .... ~ .... .... .... ~ ~ .... .... ..- 0 ~ <0 to <0 <0 <0 <0 <0 <0 to co (0 to <0 0 co i.. 'j! i e ::i Cl. o z .2 0: u.. "- .7 :::0 J:i ::J) r-- 0 l{) ~O--- .N~ o .0 Z"'N ,-NN = >,.~ (j) CO (j)1 =201 CO CO -0 CL C (j) 01 <t ~!ui c c: 0 ::J:~Z II -c ~ EI .c 0 u .. .... ... = Q, co N ..,j- L{) o ~ <ll c: III c: c: <ll ...J Ql c: C\J c: c: al -1 ~ ,_ o~ lIloac::OlC ::lOCD .:::.sot::!~ ~~E~~ Q, c(vr-,f ~ to en oi <ll C tlI C lij ...J co C1l ..,j- <ll c: a:l c: c: (\) ...J c: ~i ~ cj~ o"ij o~ o~ ell ~.- c.- c .- C'- c: Cll ~1Il c_c::_c::_c_",m II> .- .= .!l c.!l c.!l c .!l c "" .r: e==OlUOI1l0QlO<ll'iijl- o .~ co 'E crl1:? CD ~ CIl1:?~ g ti:.c(-I <lllll<llC\Jalal<llCll1ji- .cC).cC).cC).c::C).... l- l- l- I- ~ ( o ~ Z IJJ Q c:: -< Cl -l 0::( ~ Z c( t- O ca rn w ...I 0.. c( :z <ll ... c E en <ll .... (,) cr: &Q ..,. ~ ..... t-- ..... iIi II) ... -< .... C1) ... c.. In :3 ~I ~I Li:t s: 12 ..9:! ~ 31 -c c C\J ~ f5~ ~ 31 tn _ .3 0 ~ ~ o o &Q 10 <D ~ ~ .... o ~ III III ..9:! ~ .n..o tQ- N N N o 0 0 l{) <r.I tQ ...., ~ - ...., ~ ('J;;; ~ o Ow 0 22m2 ll. u.. III U. 2 g; ~ + ~ + rn 0 rn Z ~ Z o o o o <;j' <D <D ...., co .- (0 ~I ~ + (9 2 CO o o o o m co rn co ,- to == 10 W CIl III ~ C') o o o 1""\ ~ rf'\ OS .- u.. ~ &a W lI;I (I) .!!! ; - o ~ .... :z tD N o 10 <"I N N o Z u.. ...J o l- + C) 2 l[) o o o - .q. ['-. '" 05 .... (Q co (J) ..,j- IlJ ai::::- LPClll U') ~; g N d CD c :! c -3 ....0 00 00 '" - - <0 ....'" MER- ::: t: <D 'E CB~ -I- .~ g "'- III '5 CO ::: ~ M I.Q en (/) rn .!!! wi + ~I ~I - o ctl W III III .!!! ; .... o ~ .... UJ -.o- N o LO (") ('J N o Z u.. ...J o :- ::: o to N ~ .... o =: o o ..... w tD N o l{) (0') '" N o Z ll. ...J ~- o + ~ Cl ~ 2;:: + C) Z I'- o o ~ ~ co <<; 1.0 .... ci III c:: C\J c: C Ql ...J ~ N :t: :::I CO al ...J ....00000 ONOOOO ~1'-~02q :;::N~$D~lO ('t)o~r--Nr-- --"~:;;;r"----('f) oER-oER-~tA- c: Ql '"C [ij m ~~ .~ g c: - (lJ '5 CO o .... o .... ,s:; o .;; ~ ltl (f) o .... (;i ~ ~ o ClI in L{} :ffi ,g l[) .... (;i ~ .E "'" ~ in o .... o .... (;i :::I 1tI l.L ~ o .... to ..- .0 .... <<l + lO c-.i to <l) a:i to ('t) a:i (0 o .... - CD '" .><: <ll 0 ... .- ::l C j~ - c III ' ~E '''0 ,_ Q" Q" 0:: 0 =a.20~0 (j~O~.g: <ll Cl ~ o~ <.i~ o~ o~ o~ (,dLjro u 'c: .5 'c: .5 'c: .s c: .5 'c: .5 '2 .E 'c: .5 .~ .s Scl!lcSc::l!lc::lllcl!lc:l!lc.sc o <ll C Q) 0 Q) 0 <ll 0 (l) 0 Ql 0 CD 0 Q) ID'Em'EID"ElXl"ECD'Em'ECD'ECJ'E al tI:I III ltl <ll m <ll m W llJ Q) ro al llJ (l) aJ ~~~0~O~c)~~~0~G~~ o ..- U') 0:: o .E u IA a; 't:l (ij U ... III Q" (/) en .J! ;t::,~ ~ N W In en .J! ~.e ZC m~ m E'5' E ClI o (I) ()~ Uj C1) C\l (:; u ro <J) <1) Ql-o '0 c oS!! ~w N~ ~~ u., C ro tOo.. ~2. OCLU OF- cy -<'>I (J~ ~ g> "00 ~g O,U) III aim 'Co ffi!l. (DB ~I .... C ~ .... Z .... o ~ ~ ;: LO ('J o lO (") ('J N o Z LL ...J 2 + C) Z ~I ... o ~ .,.. Z + ~I - o ~ .... (/J LO N o 10 (") N N o Z LL ...J (.) i- + C) ;:;:: ~I .... o ~ ... Z + ~I .... o ~ .... U) IO- N o to ("J N N o Z IJ.. ...J (.) i- + C) Z ~ (; ~ c ~ ;j <II -l ooC;o8Rg:g oOooo...Occi Ol.O~O~I'D~m ~(:)O)(:)(O.......o comil2 l")C'?....O!:::!'rl")oO<"l~ID..- ~ N M '<:t (0 ~ co (0 (;') N- N -otF.>0~06'70~ f) ~ U) ~l .... o N - .... en .0 N o l{) (') N N o Z U. ...J ~ + C> Z o <{ o .... ~ LO- N a lO (") N N o Z l.L -l ~ + C) Z ;= ~l ol~ ...1(0 '0 '0 co NNW - -- ..... .... 0 :z rn_ ~ ~ ~ ~ (:) (:) f? U') to s: (") (") N N III N N ~ o 0 z Z <0 LL LL~ ...J -l..... ~ 0 '''I r-o: + + C) C9 Z Z ~ co~o ,Q o,l!!, t:IOO .s en l5. o _ llJ r:oi->- ~C':I~ i......, IV ~ olDro <nen.o co ... ltl ~ ~ 5~ I @ I 18 u> ("') C) o "<2' '<t ...; l'- Nc::; ZO fI)'C lJ) lD ~m .... () -- 0 0- ('")>- W~ ~ g- 20: ~;:: ~~ cr:::q! ~S ~ 00 cogjal ~-l.2: o1?Ci ...J m c:: ~~ LO::;-O C'l<:(/) 00::: Kl W r.n '" E 0.. ~ ~ g ~ N c;; t= c.. o ;:: '0 :J. Z..... -= Z LL 0 -::: 0 ...J -l 9 ,^ (,)"0 ~ .." i-lij~ ffi + 4:: '':; a.. (!) LO 0 Ui ZNw!ii c:, i,g (5 -l__tnZ OOm <: Wi;::CIl l- - cc cry 0') I) r~ -::> L{) -.- -::> ,,- N~ ,0 - ~ ("') x )< X l( )( " x ~ N ~ " .. ;:; .. ... ... ., == >.~ ~ :; ~ d) '" N s: CllCl'l ~ .. ::i ... '::::::2~ CI'l CI'l ~ ~ ~ .i " ,; ~ ~ "Q 0.. .. '"' "" a; ... !! ! if if ~ ~. oK ::< 0'" :; ... :: '"! woc rn .. ... .,; ~-< <.t: .. '" .. ~ <> rdi i I :z: i xj ! i t ~ l2 .. I "Ii! ! ~ :z; ..< :::, ~ .. l< i~ .... '" .. .. <> -<0 i e B tl :: <!It ! <>'" ;:'j a ~ i j IS ail! :~ oj ,~ g " i: :: %< ~ '" B !l 9 l a; :l <... ~ < l': '" u :z: ~ ..... Ci ~ ~ E; "''' 0.", vel ... Ua: ~c :s ... '"'z c ~rn~D~I~D .. ~I " >- :;;::$ .. :z; ~9 ~ 0 .. '" u ... tl ::I ... a ~i ~ %0 ~ Ii! fi ..... ~ ~ ~~ "'- " e ..Jl . W <. !1i .. ... :; -:> ;:;; .. 0 .. .. ~.2. ,. .. '" ( \ ~, <> ~ -<:(2) :: it <> ~ ~ II' -0 l' t ... . ;g I . - , I ; -< t g l ~ i :II ht ~h % < ...J . c- o :::ffi "'l- ll? < :::;; ::-=,"'" "'~wf~ l~gd ! ;f~ f - ilU ,'g= ~f ) ~~ , ~g I Zz UJ<t 0-1 - (Yo.. <t -<t~ :: V) Ow I ill I r- _.1' -l r- ffiQ<tlJ) -<tU< :1:z-~ ! I X z , I WJ -<t. l-O I \ III II I 0::) 'III \1'1 II en · ! 1\) i I Q. Agenda Item No, 17B f'Aay 26, 2009 Page 124 of 1 59 EXHIBIT <<B" PROPERTY DESCRIPTION LOTS 60, 61,62,63,64,65,66,67,68,69 AND 95 OF NAPLES GROVE AND TRUCK COMPANY'S LITTLE fARMS NO, 2 ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 1 AT PAGE 27 OF THE PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA, LESS AND EXCEPT THE EAST 5.00 FEET OF SAID LOTS 60,61,62 AND 63; AND LESS AND EXCEPT THE WEST 260.00 FEET OF THE SOUTH 534.00 FEET OF SAID LOTS 60 AND 61; AND LESS AND EXCEPT THE WEST 160.00 FEET OF SAID LOT 60; AND LESS ANn EXCEPT THE NORTH 50.00 FEET OF SAID LOT 60 FOR ROAD RlGHT- . OF-WAY; AND LESS AND EXCEPT THE EAST 663.62 FEET OF THE NORTH HALF OF SAID LOT 64; AND LESS AND EXCEPT THE EAST 220.00 FEET OF THE SOUTH HALF OF SAID LOT 69, LESS THE NORTH 40.00 FEET THEREOF; AND LESS THE WEST 370.00 FEET OF THE EAST 660.00 FEET OF TIrE SOlITH HALF OF SAID LOT 69. AND A PORTION OF THE NORTHWEST QUARTER OF SECTION 23, TOWNSHIP 50 SOUTH, RANGE 25 EAST, COLLIER COUNTY, FLORIDA, BEING MORE Pl~'..RTICULARLY DESCRIBED AS FOLLOWS: [' COMMENCE A T THE NORTH QUARTER CORNER OF SECTION 23, TO\VNSHIP 50 SOUTH, RANGE 25 EAST, COLLIER COUNTY, FLORIDA; THENCE RUN SOOQOO'OTE,. ALONG THE EAST LINE OFTRE NORTHWEST ,QUARTER OF SAID SECTION 23, FOR A DISTANCE OF 50.00 FEET TO A POINT ONTRE SOUTHERLY RlGHT-OF-WAY LINE OF THOMASSON DRlVE, A 100.00 FOOT RIGHT-OF-WAY, AS THE SAME IS SHOVlN ON THE STATE OF FLORIDA STATE ROAD DEPARTMENT PJGHT-OF-WAY MAl' FOR STATBROPill 5-858, SECTION 0353-150, COLLIER COUNTY, FLORIDA, AND THE POINT OF BEGINNING 'OF THE PARCEL OF LMTD HEREIN DESCRIBED; THENCE RUN S.89058'53"W., ALONG THE SOUTHERLYIUGHT-OF-WAYLINE OF THOMASSON DRIVE, FOR A D1ST ANCE OF 1222.48 FEET TO THE BEGINNmG OF A TANGENTIAL CIRCULAR CURVE, CONCA VE SOUTHEASTERLY; THENCE RUN SOUTH\VESTERL Y, ALONG SAID RlGHT -OF~ WAY LINE AND ..<\.LONG THE ARC OF SAID CURVE TO THE LEFT, HAVING A R.ADPJS OF 50,00 FEET, TI-IROUGH A CENTRAL ANGLE OF ~ 89C>54 '49", SUBTENDED BY A CHORD OF 70.66 FEET AT BEARING OF S.45001 '28''W" FOR A DISTANCE OF 78.46 FEET TO A POll\1T ON THE EASTERLY RIGID -OF- WAY LINE OF FERN STREET, A 100,00 FOOT RlGHT-OF-WAY; THENCE RUN 8.00004'04"W., ALONG THE EASTERLY RIGHT -OF- WAY LINE OF FERN STREET, FOR A DTST ANCE OF 1252.48 FEET; THENCE RUN" S.Ooo20'3S"W., ALONG THE EASTERLY RIGHT-OF- \1.f A Y Ln\~E OF FERl..J STREET, FOR A DISTAl~CE OF 983.71 FEET TO A pon~T 30.00 FEET NORTHERLY OF, AS MEASURED AT RlGHT ANGLES TO, THE EASTERLY PROLONGATION OF THE CENTERLINE OF BAY STREET AS THE SAME rs SHOVlN ON THE PLAT OF NAPLES BA YVIEW ADDITION NO.1 ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 4 AT PAGE 20 OF THE Pl]BLIC RJ~CORDS OF ~ 20 ;:-\'01 T.... r.._ ~ Agenda Item r~o, 17B May 26, 2009 Page 125 of 159 COLLIER COUNTY, FLORIDA; THENCE RUN S.89048'55''E, FOR A DISTANCE OF 300.00 FEET; THENCE RUN S.Ooo20'38"W. FOR A DISTANCE OF 60.00 FEET; THENCE RUN S.89048'55"E. FOR A DISTANCE OF 98.0.30 FEET TO A POINT ON THE EA.ST LINE OF THE NORTHWEST QUARTER OF SAID SECTION 23, SAID POINT BEING LOeA TED 30.00 FEET SOUTHERLY OF, AS MEASURED ALONG THE EAST LINE OF THE NORTHWEST QUARTER OF SAID SECTION 23, THE NORTHWEST CORNER OF LOT 67 OF NAPLES GROVE AND TRUCK COIMPANY'S LITTLE FARMS NO, 2 ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 1 AT PAGE 27 OF THE PUBLIC RECORDS OF COLDER COUNTY, FLORIDA; THENCE RUN N.OOoOO' 07"W., ALONG THE EAST LINE OF TIlE NORTHWEST QUARTER OF SAID SECTION 23, FOR A DISTANCE OF 2350.64 FEET TO THE POINT OF BEGINNING. BEARINGS REFER TO THE EAST LINE OF THE NORTHWEST QUARTER OF SECTION 23, TO'\iVNSHIP 50 SOUTH, RANGE 25 EAST, COLLIER COUNTY, FLORIDA, AS BEING N.OooOO'07"W, PROPERTY AREA: } 71.245 ACRES, MORE OR LESS. ( \ " 21 F.\PT Jf) r'tnru,.,..."nl..\t\.I.......I..... n....__:. I....... I . - .... . Agenda item No, 17B May 26,2009 Page 126 of 159 This Instrument prepared by: Scott W. Duval, Esq. Brennan, Manna & Diamond, PL 3301 Bonita Beach Road, Suite 202 Bonita Springs, Florida 34134 (239) 992-6578 SPECIAL WARRANTY DEED THIS SPECIAL WARRANTY DEED is made this 30th day of January, 2006, between NAPLES BOTANICAL GARDEN, INC., a Florida not.for.profit corporation, Grantor, and FLORIDA GULF COAST UNIVERSITY FOUNDATION, INC., a Florida not-for-profit corporation, Grantee, whose post office address is 10501 FGCU Boulevard South, Fort Myers, Florida 33965. The Grantor, in consideration of the sum of Ten Dollars ($10.00), and other good and valuable consideration paid by the Grantee to the Grantor, the receipt of which is hereby acknowledged, hereby conveys to Grantee the following described real property in Collier County, Florida: See Exhibit "A" attached hereto and made a part hereof (the "Property") Subject to: ad valorem taxes for the current year; East & South Sewer District assessment; restrictions, requirements and limitations imposed by government authority; outstanding oil, gas and mineral rights, if any; and the Restrictions and Right of Repurchase set forth on Exhibit "B" attached hereto and made a part hereof. Grantor fully warrants title to said land and will defend the same against the lawful claims of all persons claiming by, under, ,or through Grantor. NOTE: PURSUANT TO SECTION 12B-4.014 {2} (a) OF THE FLORIDA ADMINISTRATIVE CODE, MINIMUM DOCUMENTARY STAMP TAXES ARE BEING AFFIXED HERETO AS THIS TRANSACTION INVOLVES THE CONVEYANCE OF UNENCUMBERED REAL TV AS A GIFT FOR NO CONSIDERATION. -1- Property 1.0. Number: Grantee T[N: Agenda Item No. 17B May 26, 2009 Page 127 of 159 Witnesses: ~, WIT~ESS It/. TAL(c.. (/<'0 c./~~~ PRINTED NAME -----c;:U -~ -C":) /~ WITNESS ~o.;l i-J. ])uvc...1 PRINTED NAME ------- STATE OF FLORIDA COUNTY OF LEE NAPLES BOTANICAL GARDEN, INC., a Florida not-for-profit corporation B~c:7f~ ~ Brian Holley Its: EXElcutive Director -- (CORPORATE SEAL) The foregoing instrument was acknowledged before me this 30th day of January, 2006, by Brian Holley, as Executive Director of Naples Botanical Garden, Inc., a Florida not- for-profit corporation, who is ~sOf'fally known to me-:::: or who has produced (type of identification) as identification and who did (did not) take an oath. 1.~,~"IUlfll',.... SCOTT w~ DtltIH. ~"A~~~ MY COMMISSION' DD 362307 ~~~ - EXPIRES: Oclober23, 2008 "~II";-';'~ ~ThnlNOW)IPubl1o:Ur>:lelwlft... , IIU\l\ ~_.~ Signature C2 ~ ,/ Printed Name -2- Agenda Item No, 17B May 26, 2009 Page 128 of 159 Exhibit "Au Being part of Lot 61 of Naples Grove and Trucking Company's little Farms No. 2, Plat Book 1, Page 27, Collier County, Florida. Commencing at the North 11.1 corner of Section 23, Township 50 South, Range 25 East, Colller County, Florida; Thence South 00012'51" East 49.97 feet to a point on the South rIght-at-way of Thomasson Drive; Thence along said South right-at-way North 89"46'23" East 1317.21 feet to a point on the West right-of- way line of Bayshore Drive; Thence South along said West right-ot-way of Bayshore Drive South 00042'39" East 340.00 feet to the POINT OF BEGINNING; Thence continuing along said right-ot-way South 00"42'39" East 280.00 feet; Thence leaving said right-of-way South 89045'23" West 360.00 feet; Thence North 00042'39" West 280.00 feet; Thence North 89045'23" East 360.00 feet to the POINT OF BEGINNING. Bearings are based on the South right-of-way of Thomasson Drive, being North 89046'23" East. Agenda Item No, 17B May 26, 2009 Page 129 of 159 EXHIBIT "B" RESTRICTIONS AND RIGHT OF REPURCHASE Naples Botanical Garden, Inc., as Grantor, and Florida Gulf Coast University Foundation. Inc., as Grantee, hereby agree to the following terms and conditions of the restrictions and right of repurchase, which shall burden and run with the Property according to such terms: 1. Intended Purpose. Naples Botanical Garden, Inc. (hereinafter "NBG") and Florida Gulf Coast University Foundation, Inc., its successors and or assigns (hereinafter "FGCIJ") acknowledge and agree that the Property and the facility to be constructed thereon (the "Center"), is to be used as a research and education facility focused primarify in, but not limited to, the areas of ethnobotany, botanical and environmental science, ecology, entomology and COrlservation biology (the "Intended Purpose"). 2. Commencement of Construction and Operations. Subject to the additional terms and conditions set forth in that certain Land Transfer Agreement dated January 30, 2006 (the "Transfer Agreement") and that certain Operational Memorandum of Understanding dated January 30, 2006 (the "MOU"), both of which are incorporated herein by reference, the parties hereby agree as follows: a. FGCU shall diligently proceed with the permitting and construcUon of the Center pursuant to the terms and conditions set forth in the Transfer Agreement. b. FGCU shall maintain the Center pursuant to the terms and conditions set forth in the Transfer Agreement and the MOU. 3. Riqht of Repurchase. From the date of recording of this deed to the Termination Date, as defined below, NBG shall have a continual right to repurchase the Property as follows: a. In the event FGCU desires to sell, abandons the Center, fails to construct or operate the Center, or fails to maintain the Center, all as required by the Transfer Agreement or the MOU, beyond any applicable notice and cure periods provided therein, NBG shall have a continual right to repurchase the Property, including the Center. If NBG elects to exercise its right to repurchase the Property, the purchase price shall be equal to the stated book value for the Center (assuming a basis in the Property of zero dollars ($0.00) and taking into consideration straight line depreciation assuming a useful life of the Center of fifty (50) years, as shown on the most recent financial records of FGCU) less Two Million Dollars ($2,000,000.00). Such purchase price of the Property shall, in no event, be less than Ten Dollars ($10.00). Other than the fixtures that are deemed -3- Agenda Item No. 17B May 26, 2009 Page 130 of 159 to be a part of the realty, any such purchase shall not indude the contents of the building owned by the Foundation and/or FGCU. b. In the event, for any reason, FGCU is required to return any contributions or Courtelis Fund grant funds received for the construction of the Center, such that the Center will not be constructed within the timeframe set forth in the Transfer Agreement, then FGCU shall immediately deed the Property back to NBG (by Special Warranty Deed) for no consideration and without any notice required by NBG or arbitration between the parties. It being the intent of the parties that without the ability to construct the Center. all parties should be returned to their status as it existed immediately prior to this transfer. c. In the event NBG elects to exercise its right of repurchase as set forth herein, NBG shall provide written notice to FGCU of its intent to repurchase the Property. FGCU shall have thirty (30) days from receipt of such notice to demand mediation of the issue, by a court certified mediator, whose determination shall be binding on the parties, and the cost of such mediation shall be split equaHy between the parties. If mediation is demanded by FGCU, then FGCU shall provide the name of no less than five (5) mediators and NBG shall select a mediator from such list, or otherwise provide five (5) alternative selections to FGCU, which shall then select the mediator. If the parties cannot agree on a mediator, the parties shall petition the court to appoint a mediator. 4. Duration. The restrictions and right of repurchase set forth in this Exhibit "B" shall be valid and shall constitute a covenant running with the Property for a period of Fifty (50) years from the date of recording of this deed (the "Termination Date"). Upon expiration of these restrictions and the right of repurchase, they shall be of no further force or effect without the need to record any additional documentation. FGCU, by it's execution below, hereby acknowledges the reasonableness and acceptance of the above restrictions and the right of repurchase for NBG. FLORIDA GULF COAST UNIVERSITY FOUNDATION, INC., a Florida not-for-profit corporation By: A ,<-+ Steve Magiera Its: Executive Director -4- FGCU @ NAPLES BOTANICAL GARDENS SITE DEVELOPMENT PLAN SUPPLEMENTAL TIS NARRATIVE Prepared For: FGCU Prepared By: WilsOnMiller '" New Directiofls In Planning, Design & Engineering Wilson Professional Center 3200 Bailey Lane, Suite 200 Naples, FL 34105 July 1, 2008 Prepared by Jeffory L Perry, AICP Agenda Item No. 17B May 26. 2009 Page 131 of 159 Agenda Item No, 17B iv1ay 26, 2009 Pa;je 132 of 159 Table of Contents . Narrative........,......"...,.......,. ........,.,....,.,.,.......,.., ..........,...,." ......,......, ................... ......"......2 . Naples Botanical Garden SDP TIS .....................................................................................4 7/1/2008 - 203735. Ver: 1 - JPERRY 25555-555-555 - - 00000 Agenda Item No, 17B May 26, 2009 Page 133 of 159 2 FGCU Research Laboratory at Naples Botanical Gardens Supplemental Traffic Impact Statement Background The FGCU Research Laboratory is located on a 2,3:t acre outparcel within the Naples Botanical Gardens PUD. Although referenced on the approved SDP for the Naples Botanical Gardens (NBG), the SDP excluded the FGCU site for site planning purposes, however, the FGCU site gains access thru the approved NBG driveway connections. A research facility is an ancillary use customarily found at a botanical garden, and is frequently associated with a local university or community college. Activities are usually limited to infrequent visits by student or professorial researchers, and academic facilities are less likely to be "open to the public", except for "thru-the-glass" viewing exhibits. Additionally, a multi- purpose use facility planned for the site can accommodate the occasional "special event", although those types of events are infrequent and associated impacts do not usually coincide with the peak hour of the adjacent street. The average daily activities do not generally generate any measurable traffic due to the limited number of "researchers" that might occupy the premises at anyone time, and since the entering and exiting traffic frequently does not correspond to the peak hours of the adjacent street nor for that matter the hours of operation of the botanical garden, The original Traffic Impact Statement provided for the PUD rezone, and subsequently for the NBG SDP (attached), included the impacts for entire 171:t acre site. Traffic impacts that were estimated could reasonably be associated with all patron activities, employees, maintenance, etc. The County Transportation Department has requested that as part of the FGCU SDP application, the approved TIS and this supplemental narrative be provided. Staff has also requested that we estimate what portion of the approved total traffic impact would be associated with the FGCU facility. For the purposes of this supplement, we have estimated that the FGCU site would generate four (4) p,m. peak hour trips based upon an average of four (4) researchers occupying (and exiting) the site during the peak hour. While certainly on some days there may be more than four researcher on site during the peak hour, and on some days there will be less (or none) exiting during the peak hour. Based upon the size of the facility proposed, four researchers would appear to be a reasonable estimate. Using the approved TIS as a basis for quantifying the total project impacts, and further, the individual FGCU/NBG components of the total, the following table estimates what portion of the total approved project traffic previously identified can be reasonably associated 'v"lith each component. 7/1/2008.203735. Ver: 1 - JPERRY 25555-555.555 - - 00000 Agenda Item t'Jo, 17B iv'1ay 26, 2009 Page 134 of 159 3 Estimated Total rrafficfa't Build-Out As stated above, access to FGCU and the associated parking area for the facility will obtain access through the approved NBG site access connections. The FGCU site will be interconnected through the NBG site in order to access both the Thomasson Drive access (serving employee parking) and the main Bayshore Road access point. Conclusions The FGCU Research Laboratory is being constructed as an integral part of the NBG site. The TIS originally prepared for the Naples Botanical Gardens PUD anticipated the potential development of a research facility on the site, The PUD traffic forecast included the development of the entire 171:t acre site, and accounted for the impacts of the research facility in the forecast estimate of total traffic. The applicant has estimated that less than 5% of the total p,m, peak hour traffic will be generated by the FGCU research facility. 7/112008 - 203735 - Ver' 1 - JPERRY Z5555-555-555 - 00000 NAPLES BOTANICAL GARDENS SITE DEVELOPMENT PLAN TRAFFIC IMPACT STATEMENT Prepared For: Botanical Gardens, Inc. 4820 Bayshore Road Naples, FL 34112 Prepared By: WilsDnMiller r New DirectiDns In Planning, Design & Engineering Wilson Professional Center 3200 Bailey Lane, Suite 200 Naples, FL 34105 August 8, 2007 Revision 1, October 24, 2007 Prepared by Jeffory L Perry, AICP Agenda Item No, 17B May 26, 2009 Page 135 of 159 Agenda Item ~Jo, 17B May 26, 2009 Page 136 of 159 Table of Contents . Project Location & Description .......... .............. ...... ....... ........ .... .... .... ................ ... ....1 . Methodology...................................,.....,.................................................................2 . T ri p G en e ra ti 0 n ........... . . .. . .. . .. . .. . .. . .. . .. . .. .. .. .. . .. . .. . .. . .. . .. . .. . .. . . .. .. . .. . . . .. . .. .. . .. .. . . .. .. .. . . .. . .. 3 . Site Access & Project Trip Distribution ...................................................................3 . Internal Capture .............,........................................................................................6 . Pass-by Capture.....................................................................................................6 . Arterial/Collector Level of Service Analysis ............................................................6 . Intersection Level of Service Analysis ....................................................................7 . Turn Lanes................................................................................................ ..............8 . Conclusions & Recommendations .........................................................................9 . Append ix ....................................................,........,...,.............................,................1 0 Aqenda Item No. 17B ~ May 26, 2009 Page 137 of 159 Naples Botanical Gardens Site Development Plan Traffic Impact Statement Project Location & Description Site Location The subject property is a 171 +/- acre parcel located in the southwest quadrant of the intersection of Bayshore Road and Thomasson Drive. A site location map is shown in Figure 1. Project Description The site is the location of the existing Naples Botanical Gardens facilities. The proposed expansion included in the Site Development Plan (SOP) application would provide for the expansion of internal exhibit space as well as the expansion of exterior garden spaces. Figure 1 ,,".': 1C:lI_ II,,. ..'.;.,~:.~ III IiIIIIII .-.-=. .'-..... .. .- .. ..- III .. ... III' _ III - .. .. !,..~ ,-,. ~~ .... .. ill ...... .. . .- BiZ'JII . . .. . ,~.;~. :,.1.. ,;;:. :..,'t ;::,?\,!I~~~. "J 1II!!t1i, :tU!d' .... ;'~.r.r7~~A~ .,.",. ..I.- .P... II. IIIiJl ..... - ... . ....,... ., IIllI -- .. . -. .. I. ...... L'~..' '. _ ... , .... .-... I. J.-._ -'..11".""" · 11- II 1& .1- .-.....:. - - .. .l'!! DoII11I . IZllI - - ..-. II I ""II" -:.... __1Iw-' ill.. JI ... - "I!III .. - - -. II' ...-- · .. III _._ _._ 1."- III .B .. .. .' . ---- I ..... . ... _ 11I".-::- ..... I!II .. .....__ _._ _.......I!l'. .. . ",11 _II ~ - Ill.. ....... ..-::,.... .... 11I."11 .. ..~ .--1_' - ... - IiIIl rE.. II II II .. .-. 'II 1iIiI" - III .E III II .....-1...--...... 1IIi: · _ _11II.. .-If'I!. .. ..... .IB __.. 1- IflI!! _II ...- 11-- !l!I!III 1li!IR" " -- DIll .- _ Il'IIIIII!IJ III...... 11I-"" -.-..-. IlIIIIlI:i:iI ~"'41',~ '..",,:.;,"..._,;~ 8/24/2007 - 192501 - Ver: 2 ~ JPERRY CA#43 Z5555~555-555 - .00008/8/2007 - 192501 - Ver: 1 - JPERRY CA#43 25555,555-555 - . OOOOCA#43 '. .. I" ...~". :!. -.. '-~:~i' ~ .. III .. rt~ .~..,J1J II --._ .. 1 ,~ ,~ .. - - ~~*.. JF '14 Agenda item i\lo. 17B rv'lay 26, 2009 Page 138 of 159 In addition to the expansion of the buildings, site improvements will also involve the reconfiguring of the existing driveways and parking lots. What is today the "visitor's lot" with access from Thomasson Drive, will in the future become parking for employees and volunteers, and the parking area that is currently utilized on the Bay Shore Drive side of the site as employee parking will become the main visitor's parking area. Methodology An SDP Pre-Application meeting for this project was held on January 10, 2007, and a follow-up transportation methodology meeting was held on January 16, 2007. During the methodology meeting an appropriate trip generation methodology \tvas discussed since an equivalent of Transportation Engineers Land Use does not exist for this type of project. The previously approved Rezone TIS included a Trip Generation Analysis developed using a similar botanical garden facility. Trip rates (vehicle occupancy rates) were used as factors to calculate build-out trips assuming 181,000 visitors per year, in order to quantify the a,m. and p.m, peak hour weekday trips. Even though the Botanical gardens has revised it's estimated annual visitors (at build-out) to 142,000, it was agreed that the original estimate of build-out traffic used in the Rezone TIS would form the basis for computing the anticipated increase in traffic over what currently exist today. It was also agreed that the directional distribution of traffic would also be consistent with that previous analysis. Traffic volumes at the two existing driveway connections were counted for three days in early April 2007. The maximum a.m. and p.m. peak hour volumes recorded for any of the three days are shown in Table 1. Table 1 . Bayshore Road (In/Out) 18 (12/6) 14 (9/5) Thomasson Drive (In/Out) o (0/0) 22(11/11) 18 (12/6) 36 (20/16) Build-out traffic volumes expected as a result of the expansion, based upon the previously approved Rezone TIS, and the resulting Net New increase in traffic are shown in Table 2. Table 2 B.m, Pk +-Ir (2-Way"Trnffic) lp.m. PkiHr (2-Way"Tra'ffic) , . Estirnated TraffjcatBuild-Out ExistiJl9 Traffic' Net New Traffic 47 (31/16) 18 (12/6) 29 (19/10) 89 (45/44) 36 (20/16) 53 (29/24) Based upon the expected increases in traffic resulting from the proposed expansion, this project will qualify as a "Minor Study" pursuant to the guidelines adopted by Collier County. 8/24/2007 - 192501 - Ver 2 - JPERRY CA#43 Z5555-555-555 - - ??oo818:2007 - 192501 Ver: 1 . JPERRY CA#43 :::5555-555--555. .OOOOCA#43 2 Agenda Item No, 178 May 26, 2009 Page 139 of 159 Trip Generation As stated above, no equivalent trip generation rates are available from the Institute of Transportation Engineers Trip Generation, 7th ed. Trip generation for the build-out was assumed to be as previously approved (during the rezoning of the property), and is shown in Table 3. The existing traffic volumes from Phase I of the project have already been accounted for in the County's Concurrency System, and in fact, those trips already exist in the travel stream; therefore the projects estimated "net new trips" are calculated to determine what project traffic needs to be added to background traffic to form the basis for the future conditions. The trip generation characteristics are shown in Table 3. Table 3 Visitors per Year Visitors per Vehicle Vehicles per Year Vehicles perWeekday (Peak Season) Estimated Traffic at Build~dut. ,. Existh'lg Traffic Net New Traffic 47 (40/7) 18 (12/6) 29 (28/1) 89 (45/44) 36 (20/16) 53 (25/28) Site Access & Project Trip Distribution Access to the project site is from Bayshore Road on the east side of the site and Thomasson Drive on the north side. As mentioned previously, the expansion projects calls for the rearranging of the parking areas in such a way that the future traffic distribution at the driveway connections will be different than it is today, As such, the build-out conditions analysis, which includes an analysis of the intersection of Bayshore Road and Thomasson Drive, assumes the modified parking program. The Rezone analysis assumed a distribution of 70% project traffic traveling N/S along Bayshore Road to US 41 and 30% traveling E/W along Thomasson Drive to US 41. Due to the "dead end" nature of both Bayshore Road to the south and Thomasson Drive to the west, no project traffic was distributed to either of those directions, and therefore for analysis purposes, all of the project traffic was assumed to impact the Bayshore/Thomasson intersection. Existing traffic entering and exiting the site does so at two driveway locations. The driveway connection on Thomasson Drive, today serves as the primary access to/from the visitor's parking area while the driveway connecting to Bayshore Road serves as the employees/volunteers access. Today, about 39% of the total p.m. peak hour traffic enters/exits the site via Bayshore Road while 61 % uses the Thomasson Drive access. The distribution of existing p.m. peak hour traffic is shown in Figure 2. 8/24/2007 - 192501 - Vsr: 2 - JPERRY CA#43 Z5555-555-555 - - 000081812007 - Hl2501 - Ver 1 - JPERRY CA#43 25555-555"555 - - OOOOCAtt43 3 Agenda Item ~,Jo, 17B May 26, 2009 Page 140 of 159 Figure 2 - Existing P.M. Peak Hour Project Traffic Bayshore Dr. 25 70% i It 11 114 {I. 1 ! ; d II 4' 11 ~ 3 4' 2 ~ 5 Thomasson Dr. i {I. 61%: 11 8 ,p 3 ~ ~!J2 ~31:~_. ~ 5 ~ 9 ,p ----- 14 1130% 6 ~ It fP 6 3 SITE It 9 16 Entering 20 Exiting 36 2-Way Trips As proposed, the build-out SDP land plan reconfigures the parking facilities and re-designates the parking lot accessed via Bayshore Road for use by visitors (and FGCU staff), and the lot accessed via Thomasson Drive for NBG employees (and volunteers). The traffic utilizing Bayshore Drive will access either through the main entrance or may use a second auxiliary driveway at the south end of the parking lot (1), Based upon the size of the parking lots this analysis assumes 85% of the total project traffic at build-out will access the site via Bayshore Road and the remaining 15% via Thomasson Drive, In addition to assessing and evaluating the link impacts, this distribution was used to conduct the intersection analysis of Bayshore Road and Thomasson Drive. Figure 3 reflects the distribution of p,m, peak hour project trips at build-out. (1) Revision 1, October 24. 2007 B/24/2007 - 192501 - Ver: 2 - JPERRY CA#43 Z5555-555-555 - - 0000818/2007 - 192501. Ver 1. JPERRY CA#43 25555-555-555. . OOOC:;A#43 4 Agenda Item No, 17B May 26, 2009 Page 141 of 159 Figure 3 - P.M, Peak Hour Project Traffic (Build-out) (1) #" 7 5 ,p 2 c::> '.(). ~:J 15%! 7 7! 36 SITE!:i~ _ _ <! 36,3 <:=0 45 Entering 33 ,p 44 Exiting -.--] 89 2-Way Trips _ _ _ _ o <:=0 4 ,p ----11 (1) Revision 1, October 24. 2007 Bayshore Dr, 63 (70%) I iI 32 : 31 .(). I I I 5 27 I <! .().I <:=0 2 <:=0 13 #" 11 Thomasson Dr. .------------ 26 (30%) 13 0:;> I iI I 26 I I I iI I 37 I I I I . ~ 11 Existing project traffic is already accounted for in the County Concurrency Management System, and therefore, for the purposes of this application it is necessary to identify the "net new" project traffic. Under normal conditions, it is simply a matter of subtracting the existing volumes from the build-out volumes. With respect to the volumes along segments north and east of the intersection that is the case, however, because the proposed land plan modifies the access priorities, a different set of turning movements at the intersection of Bayshore Road and Thomasson Drive result, so volumes along the segments south and west of the intersection are proportionately different in the build-out case. The distribution of the "net new" p.m. peak hour traffic is shown in Figure 4. 8/24/2007. 192501 . Ver: 2 - JPERRY CA#43 Z5555-555-555. - OOOOBtBl2007 - 192501- Ver: 1 - JPERRY CA#43 25555-555.555 - - OOOOCA#43 5 Agenda Item No, 17B fv1ay 26, 2009 Page 142 of 159 Figure 4 - P.M. Peak Hour Net New Project Traffic (Build-out) (1) Bayshore Dr, 37 (70%) I if 18 : 20 11., II ~ ~i # 4 3 ,p 1 ~ '-I} if'] 15%! 4 4 I 21 SITE : BE~ _ _ ()' 21 4:> 25 Entering 20,p 28 Exiting . - - - -I] 53 2-Way Trips. _ _ __ o 4:> 4 ,p .----11 ", Revision "1, October 24, 2007 Internal Capture There is no internal capture being assumed, Pass-by Capture There is no pass-by capture being assumed. Arterial/Collector Level of Service Analysis 4:> 1 4:> 8 # 6 Thomasson Dr, ------------ 16 (30%) 8 ~ I if 117 I I I iJ I 24 I I I I if 7 Using the standards in the TIS Guidelines. project traffic is significant for the purposes of the TIS analysis if the net new trips equal or exceed 2% of the peak hour service volume on 'directiy accessed" iink(s) or the next adjacent iinks, or equal to or greater than 3% of the peak h_.,,,, ,..._"""i__ ,,_ll'~_ ,....; ""1 Ih"",..._1l_t'"'O.f. li.....I..-..... ..._ ..,h;_h _........;............. ......_U"i_ :..... ,..,......:_-_..... IIUUI "vi v IvC;; VUIUIII'V' UI ,:;)UU~C'YUt:;;lll III If\.;::) LU VYllllvl1 tJl UJC;vl 1I GlIII....... t.:::> a;:";;:'I!:::::fIIC'U. 8/24/2007 - 192501 - Vel' 2 - JPERRY CA#43 25555-555-555 - - 0000818/2007 - 192501 - Ver: 1 - JP:::RRY CA#43 Z5555.555-555. .OOOOC:AIJ43 6 Agenda Item No. 17B May 26, 2009 Page 143 of 159 Table 4 shows the conditions on Bayshore Road and Thomasson Drive. Project traffic creates an insignificant impact on all segments except for the portion of Bayshore Road fronting the site, south of the intersection to the project entrance. It should be noted that this is a dead end road that carries only 87 southbound trips and 75 northbound during the p.m. peak hour. It should also be noted that even though the project generates insignificant impact on the other directly accessed roadway and all adjacent roads, all roads are operating at acceptable levels of service. Table 4 5rvc, ;Project % nf AUIR# Lane Vol 2% 'Pk Dlr Trips Std -5 West of Bayshore NA 2 760 15 WB 4 ,5% Road ,." East of Bayshore 108 2 760 15 EB 8 1% Road North of Thomasson 7 4 1950 39 SB 18 .9% Drive South of Thomasson NA 2 760 15 SB 21 2.8% Drive g~'i?~;r:%;;/'t;j'.,.;:~;1~T'\t.:)'~':; ',' Intersection Level of Service Analysis During the methodology meeting, County staff requested an analysis of the intersection of Bayshore Road and Thomasson Drive, a 4-way stop-controlled intersection in the PM peak period. Wilson Miller collected turning movement counts on April 5, 2007 (copy attached in the Appendix). An examination of historical traffic count information provided by Collier County indicates an annual decline in volumes on Bayshore Road over the past five (5) years (2006 Report included in the Appendix), so for the purposes of this analysis, no growth rate was applied to the existing approach volumes. Because the existing volumes counted passing through the intersection include existing Botanical Garden traffic, it was necessary to "back out" the existing project trips occurring during the p.m. peak hour from the total traffic in order to create a true background traffic volume before adding back in all of the project traffic at build-out. This was done in order to account for the shift in the turning movements resulting from the changes in the land plan (parking area assignments). The existing intersection geometry is shown below in Figure 5. A review of the intersection analysis indicates that adequate turn-lanes currently exist. 8/24/2007.192501. Ver: 2. JPERRY CA#43 Z5555-555.555 - - 00008/812007 - 192501 - Vsr, 1 - JPERRY CA#43 Z5555-555-555 - .OOOOCA#43 7 Agenda Item No, 178 May 26, 2009 Page 144 of 159 Figure 5 The existing unsignalized conditions and the "full-build" unsignalized conditions were analyzed using the SYNCHRO 6 software. SYNCHRO quantifies the performance of unsignalized intersections with an "Intersection Capacity Utilization" (ICU) percentage and level of serv'ice grade. Table 5 shows the level of service summary for this intersection with and without the additional project traffic. The SYNCHRO reports are included in the Appendix. Table 5 , Intersection 'Capacity :utilization {ICU) ,?A:, lClI l'BVeI o'f Setivoe " Existing Conditions< Build-Out Conditions 36,1% 36,6% A A Turn Lanes Collier County turn-lane policies require project entrance lanes when the highest hourly right turning volume equals or exceeds 4% of the service volume (at LOS "C") or 40 or more vehicles. Left turn lanes are required when the highest hourly volume of left turns is equal or exceeds 2% of the LOS or is 20 or more vehicles, LOS "C" directional service volume for both Bayshore Road and Thomasson Drive at the project's entrances is 480. The turn lane warrant analysis is shown in Table 6. 8124/2007 - 192501 - Ver: 2 - JPERRY CA#43 Z5555~555-555 - - 00008l8l2oo7 - 192501 - Ver 1 - JPERRY CA#43 25555-555-555 - .OOOOCA#43 8 Agenda Item No, 178 May 26, 2009 Page 145 of 159 Table 6 Srvc, % of % D'f Project Req'd Project VDL @ Btd Std'RT "Tnps (Y/N) :tntr-ance .Lanes .LOS "C" 1.'T (2%) (4%) . ~~~~:?j.~?/;;':~? Thomasson ." . ' Drive.;:.;'........ ~~~~f?~~.;......'..... . Bayshore . . Roael '.' West of Bayshore Road West of Bayshore Road South of Thomasson Drive South of Thomasson Drive 2 480 10 4 N 2 480 19 o N 2 480 10 o N 2 480 19 21 Y The only turning movement volumes that meet the County's turn lane warrant criteria are the southbound right-turning volumes along Bayshore Road, and only when the total southbound right-turning traffic volumes are considered in the aggregate; however, because the land plan is proposing multiple access connections on Bayshore Drive, when disaggregated, the volumes at each driveway would not likely meet the warrants. That being said, the applicant is constructing a southbound turn lane for the first (and primary) access point which is expected to serve 90- 95% of all entering vehicles. Any remaining entering vehicles that use the secondary access at the south end of the parking area will not trigger the warrants for an additional turn lane. Conclusions & Recommendations The net new project traffic at build-out will not adversely impact any area roadways, nor require any additional improvements to the adjacent roadway network. With project traffic, all adjacent facilities (links and intersections) continue to operate at acceptable levels of service. A turn lane for southbound right-turning vehicles will be provided at the primary access point on Bayshore Road that serves the main visitor parking area (and the proposed FGCU research facility). Employee (and volunteer) traffic will be served by a secondary access point on Thomasson Drive that serves the employee parking area. 8124/2007 - 192501 - Ver: 2. JPERRY CM43 Z5555-555-555 - - 00008/8/2007 - 192501 - Ver: 1 - JPERRY CA#43 Z5555-555-555 - - OOOOCA#43 9 Agenda Item No, 17B May 26, 2009 Page 146 of 159 APPENDIX 8/24/2007 - 192501 - Ver: 2 - JPERRY CA#43 25555-555-555 - - 00008/8/2007 - 192501 - Ver: ~ - JPERRY CA#43 Z5555-555-555 - - OOOOCA#43 10 Florida Transportation Engineering, Inc. 8250 Pascal Drive Punta Gorda, FL 33950 Ph# (941)6392818 File Name Site Code Start Date Page No Agenda Item No, 17B rvlay 26, 2009 Page 147 of 159 Bayshore Blvd and Thomason Drive 00004370 4/5/2007 :2 App, i Inl Total Total 15',tS I .oJ I ;"s I 42 f,'j ~::5 J 3I<J ~ ;: ii .m :'ll ~. ;2 .. !l ~r. n ':1 .:; tee ,:.,; i;: .. .... ~, 13.2 16,0 70,8 0,0 65,5 20,3 14,2 0,0 16,0 81,3 2,7 0,0 10.5 35,5 53,9 0,0 13 9 62 0 B4 31 21 8 0 60 1 19 0 0 20 1 8 6 0 13 177 0,941 17:15 13 o 16:45 85' 31 0,935/ 14 58 21 17:00 60 I 5 0,821 24 8 o 17:15 o 30 4 0,625 11 18 o 33 I 0.576 I Counter: 4370 Counted By: Nash Weather: Good Other. Bayshore Blvd Southbound Start Time Ri ht Tnru Left I Peds 07:00 6 5 18 0 07:15 6 4 15 0 07:30 3 3 18 0 07:45 4 7 18 0 Total 19 19 69 0 08:00 6 3 14 Q 08:15 4 1 15 0 08:30 3 2 21 0 08:45 2 4 24 () Total 15 10 74 01 .~ BREAK ... Florida Transportation Engineering, I nc, 8250 Pascal Drive Punta Gorda, FL 33950 Ph# (941 )6392818 Agenda Item No, 178 fJlay 26, 2009 Pa;)e 148 of159 File Name Site Code Start Date Page No : Bayshore Blvd and Thomason Dri" : 00004370 : 4/5/2007 : 1 Groups Printed- Cars, Trucks and Ped Thomason Drive Bayshore Blvd Westbound Northbound Ri -fil' I Thru Left T Peds Ri hl Thru Left 22 4 3 0 6 17 1 20 4 4 0 3 14 0 8 10 2 0 1 11 1 15 4 0 0 2 7 0 65 22 9 0 12 49 2 Peds () o 0, 01 0: Int TOl8l' 97 88 64 66 315 14 1 3 0 0 12 4 01 1 3 7 0 68 22 3 5 () 1 11 0 oj 0 4 10 0 76 26 8 3 0 :2 9 1 ~I 1 6 10 0 92 21 5 1 0 1 10 1 5 8 5 0 87 83 i7 ;2 01 4 42 6 01 7 21 32 0 323 16:00 16:15 16:30 16:45 Total 12 10 7 13 42 11 50 ~ 43 ~ _;~ ~. __ ~L, 9 62 0 31 34 --~- 0 --122 12 4 5 21 42 9 0 I ,. ~ .-~I 28 0 I ~.,-~~ - ___ ~ ~ I l,~ _L___1i-,~" ~11-,_ m 18 60 1 + 8 28 34 J:t 609 17:00 17:15 17:30 . '17'45 Total 9 13 7 15 .<<- 12 55 0 36 6 '-l 5 24 1 j 2 4 11 0' 172 14 58 0 32 6 7 0 2 8 0 4 11 16 01 173 16 50 0 30 _~_J... ~_ 4 10 1 1 6 6 0.L_ 144 12."'- 32 0 40 u 3 5 5 2 9 --.&--+1, ~~ 54 195 0 138 28 27 0 u 14 47 7 9 30 117 530 Q,g I 406 109 78 0~1 48 196 16 o.g I 24 110 124 o,g I 1880 15.3 69.1 68,8 18.4 12,6 16.3 75,6 6.1 9.3 42,6 48.1 6.2 28,2 0,0 21,7 5,8 40 0,0 2,6 10,5 0,9 0,0 1.3 5,9 6,6 0,0 "aysnore I Out In Total L~ C;rm I 14971 I-'-~."I Ll2QL 1171 5301 -~ Ri~ht Tnru Le1'l Peds I ..... .l. ... Grand Tolal Apprch % Total % 120 15,6 6.4 ]j~~ ~~"" j ~ 'l-I~- ~ ;!: O2 ~ -sr I;:~F-'~ L.I ~"'.<: i.nl i~"l. 8i~1 0 Ih l..J I~ _._J i North t <!ll! .-{Q ... ::.TIOI .....llXl1 ..-~I: 20 to ,I ! ~(tl I ,j. :::>...., 1m; ~r-i UI~ 14/512007 7:00:00 AM-~. 14/512007 5:45:00 PM I ',Cars, Trucks anel Peel ~ ~.. ,,J ,...... 0 I~ i[ · - i I ~ ..1~_ Thru Right Pe~ ......._1~ L_~_ ,~_..9_ i-2m r-262 I ; 4791 Cllil. . '-in -Tolai~ Counter: - Counted By: Neather: Other: 4370 Nash Good Bayshore Blvd Southbound Start Time Ri ht . Tnru Left Peds ... BREAK - 08:30 -* BREAK .*", Total ***BREAK." 17:15 ... BREAK - Total Grand Tolal Apprch % Tolal% - Florida Transportation Engineering, Inc. 8250 Pascal Drive Punta Gorda, FL 33950 Ph# (941)6392818 Agenda Item No, 17B May 26, 2009 Page 1LJ9 of 159 File Name: Bayshore Blvd and Thomason Drive Site Code : 00004370 Start Date : 4/512007 Page No : 1 Grou s Printed- Trucks and Bikes Thomason Drive I Bayshore Blvd VVe~bound I Northbound Thru Left Peds Ri ht Thru Left Peds Thomason Drive Eastbound Ri hI Thru ... Left Peds 0 0 01 0 0 0 01 0 2 0 01 0 0 0 01 3 0 0 01 0 0 0 01 0 2 0 -01 0 0 0 01 3 0 0 0 01 0 0 0 01 0 0 0 01 0 0 01 () 0 0 01 0 0 0 01 0 0 0 01 0 0 01 0 0 1 o.~ I 0 0 0 o,~ I 0 2 0 o.~ I 1 0 0 01 4 0.0 0,0 100.0 0,0 0,0 0,0 0.0 100.0 0.0 100.0 0,0 0,0 0,0 I 0,0 0,0 25,0 0,0 0,0 0,0 0,0 0,0 0,0 50,0 0.0 0.0 25,0 0,0 0,0 0,0 aye ore I Out In Total ~ 9 ~ , l.r~-l 01 CLOI 01 :tt Thru Left Peds 1 '-+ I ...J T North .~ D L,5' 0 .-1 0 g +~" ~ 10 '0 I II> ~I i~ fil-o _!!!. . e15!2007 7:00:00' AM 'J 1:1512007 5:45:00 PM , Trucks and Bikes ...., I-~-- Florida Transportation Engineering, Inc, 8250 Pascal Drive Punta Garda, FL 33950 Ph# (941 )6392818 Agenda Item No, 17B May 26, 2009 Pa;je 150 of 159 File Name Site Code Start 0 ate Page No : Bayshore Blvd and Thomason Drlv" : 00004370 : 4/512007 :2 r'--- --- ----- ------..-- I Start Time Right I Thru App, Right L~h~U 1 left L--_, __,_ Tota/ Peak Hour From 07:00 to 17:45 - Peak 1 of 1 I ~tersectlon 07:45 Volume 0 0 1 0 0 0 0 0 0 0 2 0 0 ,2 0 0 0 0 0 3 Percent 0,0 0,0 100, 0,0 0,0 0,0 0,0 0,0 0,0 100, 0.0 0.0 0.0 0.0 0,0 0,0 0 0 08:30 0 0 1 0 0 0 0 0 01 0 2 0 0 2 ; 0 0 0 0 0 3 Volume Peak Factor 0.250 High int G8:30 1 16:45~OO AM 0 ' u6:3u 6:45:00 AM Volume 0 0 0 0 0 01 0 2 0 0 2 Peak Factor 0,250 0,250 Agenda Item No, 17B May 26,2009 FLORIDA TRANSPORTATION ENGINEERING, INC. Page 151 of 159 8250 PASCAL DR. Page 1 PH# (941) 639 2818. (800)-639-4851 Site Code: 140132600000 FAX# (941) 6394851 Station ID: 038001521100 COLLIER Date Start: 03-Apr-07 BAYSHORE DR DRIVEWAY BOTANICAL GARDENS Date End: 05-Apr-07 SB ..---------.-- Sta rt :,~,:<."i:pl,':'O, Hour Totals ~NB Combined T atals Time "(uc Mom! i Mor' n in Afternoon 12:00 0 0 1 12:15 0 0 1 12:30 0 0 2 12:45 0 0 12 0 2 '0 6 0 18 01:00 0 0 3 u",:i5 0 .~ I I 0 1 01:30 0 1 I 0 0 01:45 0 1 j 0 13 I 0 01 0 4 0 17 02:00 0 41 j 0 2 I 02:15 0 0: 0 o I 02:30 0 01 I 0 01 02:45 0 :: ! {) 6 \ 0 01 {; ... 0 8 .: 03:00 0 1 I 0 1 1 I 03:15 ,\," v 0 11 I 0 , I 03:30 0 01 4/ 0 01 1 03:45 \\~ 0 21 0 0 1 I 0 ~I 0 i 04:00 0 !4l A I 0 m I 04:'15. '\ 0 i ~ lJ I 0 1; , I '1 04:30 ("\,~ .~-r 0 I 0 LO,n p "I 04:45 '1'\ It 0 "Oi 0 51 0 0 0 L , 0 7 05:00 'th'~" 0 ) '~;C 0 0 :\ I t \If 05:15 \-" "L '," 0 2 lv, 0 0 ;~i 05:30 ,y' ,~\ 0 'I a i ( I 0 l! I 05:45 \ ' .'. 0 o! 0 61 0 0 0 o i 0 6 06:00 '- ~' 0 01 I 0 01 1 \)5:15 0 01 I 0 o I i 06:30 . 0 01 I 0 01 o I CH5:45 0 Oi 0 01 0 01 0 {) 0 07:00 0 ~I I 0 o I I 07:15 2 , 1 01 I v' i 07:30 1 01 I 0 o I ... ! ,)7'45 -,-- Oi 8 01 _4.. 01 5 v I 13 0 08:00 I ~'l ~l I 1/ 01 I -1'\0."';: v, I , o I n '.,: LJ~ I ~J 10 I 08:30 /Y g, J 01 b o 1 1 ~t:45 " ' 12 01 _4_ . " , () 01 is 0 I VI 09:00 '~4 OJ 2 01 1 09:15 6 fl, 3 01 1 09:30 2 ~I 01 1 ~I - I 09:45 -4 1C 1 i ...- 0 v, VI ~,., 10:00 4 1 1 ~I I 10:15 ~ v, () 0' 10:30 1 01 J 3 gl 01 10:45 3 D; 'Ii 2 " 17 0 \J v 11:00 5 01 I 1 ~I ,.-..- ...r t. 1 11.li.I C' , I 11:30 3 01 J 0 ~ I 1, ~ :45 10 (I' ~."j I' I 5 li ? 0 30 (l Total 70 46 31 17 101 63 Percent 60.3% 39,7% 64.6% 35,4% 61.6% 38.4% II" 413 FLORIDA TRANSPORTATION ENGINEERING. INC, 8250 PASCAL DR. PH# (941) 639 281 B. (800)-639-4851 FAX# (941) 639 4851 C2A.E, 03:00 03:15 03:30 03A5 04:00 04:'!5 04:30 04:45 05:00 05:15 05:30 05:45 06:00 06:15 06:30 GGA~ 07:00 07:15 07:30 07A5 08:00 vU~15 08:30 ()c:t.5 09:00 O~15 09:30 0945 10:00 H):16 10:30 :0'45 11 :00 "i is 11:30 11:45 Total Percent 5 ;> 31 43,7% o 3 1 4 Q 1 1 o o o o [,i 40 56,3% 11 " 9 0 " 0 0 0 0 0 - 0 0 0 0 0 0 I 2, -, I , ! 0 I I 7 0 r, , I : .,1 I J..::'I 'I 0 C: ',) 0 {} 2 c (J 1 - 0 () 1 f:' (I I 0 0 3 f; (; 16 55.2% 2q o o [.1 o o 13 44,8% Aaenda item ~Jo, '178 ~ Mav 26,2009 152 of 1 59 Page 2 Site Code: 140132600000 Station 10: 038001521100 Date Start: 03-Apr-07 Date End: 05-Apr-07 o o o () o o (} J. :} .: L I 3i I , j 4 I 1 i I 01 I I I 1 : I I 51 I I I 01 I I I 01 I I (J ~9 (! () o 4 o 7 t/ o 14 tf o o I) o I] o 1i I I I - I ~ i I I t, o i o! I ~ .? :) I 0, I 'I 8 G ~; j i :~ o 53 53.0% 47 47.0% Agenda Item No, 17B May 26, 2009 FLORIDA TRANSPORTATION ENGINEERING, INC. Page 153 of 159 8250 PASCAL DR. Page 3 PH# (941) 639 2818, (800)-639-4851 Site Code: 140132600000 FAX# (941) 639 4851 Station 10: 038001521100 COLLIER Date Start: 03-Apr-07 BAYSHORE DR DRIVEWAY BOTANICAL GARDENS Date End: 05-Apr-07 SB i8""~---Hour Totals . ----jH!W& Start 05-Apr-07 Hour Totals Combined Totals Time Thu Morning After(lQQD.. M flem Morning _AftlilI!!.Qon r n _Q.rJ Morning ,.Aftemoon 12:00 0 2 0 0 12;15 0 2 0 0 12:30 0 4 0 4 12:45 0 6 0 14 0 2 0 6 0 20 01:00 0 3 0 4 01:15 0 2 0 1 01:30 0 2 0 0 01:45 0 5 0 12 0 2 0 7 0 19 02:00 0 0 0 ~I 02:15 0 2 0 02:30 0 1 0 02:1,;5 0 6, 0 9 J (i 0 3 0 12 03:00 0 : I I 0 1j ((~~l(. 0 .... , 0 2 , 03:30 0 OJ I 0 01 I 03~4;5 0 3i 0 91 0 , , () 4 i 0 "i3 04:00 0 t~tl1 I 0 01 '0 04:15, 0 . 0 r: I 0 . t) I 04:30 0 141'f 0 I 0 I ~~"..z.5 0 '-0 j 0 S 0 . 0 i 0 0 10 05:00 0 , i ' 0 01 _ I 05:15 0 o I 0 O!V 05:30 0 0 1 I 0 el oi 05:45 0 () .t () 0 -01 /) 0 06:00 0 01 I 0 01 I 06:15 0 01 I 0 01 I 06:30 0 ~I 01 0 ~I Gv~45 1 UI 2 v, 2 01 3 0 07:00 0 01 I 0 01 J G7:i5 1 01 I .. 01 07:30 , 1 01 I 0' 01 , 07:45 :J , 01 <I o! () 01 co , 5 0 08:00 i:q ..., 01 1 I 21 - 01 1 QS:i5 0 ", I 0 01 OJ v, 08:30 ! 2 I 01 1 I 01 01 I GINS () 0' ~~ 01 0 ,,' " o ; '7 0 l,J i 09:00 2 01 1 2 01 I 09:i5 2 OJ I 1 01 , 09:30 4 ~I - I 2 01 1 09:45 !1 '" 8 UI 0 0, () o : 1 ;} 0 10:00 1 ?I I 0 61 I 10:15 , II I 0 (J , 10:30 3 ~I 1 2 01 I 10:45 1 0, 0 Q ~, o . 8 0 ~I '" 11:00 6 I 2 01 1 11:15 1 , , 01 1 0 11:30 2 ~I 1 ----1L 01 11:45 0 9 1 . 5 14 0 Total 33 54 17 21 50 75 Percent -~~--. 37.9% u62.1 % . ,_~I%.... 55.3% 40.0% 6.0 ,Qo/.o.... Grand 134 140 64 51 198 191 Total Percent 48,9% 51.1% 55.7% 44.3% 50.9% 49,1% ADT Not Calculated ~7 Jf /\qenca item hlo, 178 May 26, 2009 FLORIDA TRANSPORTATION ENGINEERING, INC, Page 154 of 159 8250 PASCAL DR. Page 1 PH# (941) 639 2818, (800)-639-4851 Site Code: 140130200000 FAX# (941) 639 4851 Station ID: 038002121100 Date Start: 03-Apr~07 Thomasson dr Driveway Date End: 05-Apr-07 --.-----..- - ._~~~--,._--- Start 03-Apr-07 NB Hour Totals SB Hour Totals Combined Totals - Time .Tue Morning AfternQQ.Q .. Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon 12:00 0 12 'T 0 13T-- i- 12:15 0 7 , 0 14\ 12:30 0 8 ~' i 0 16 I 12:45 0 7 0 ~41 ;:- 71 0 50 i 0 84 01:00 0 2 0 61 01 :15 0 15 0 ,2 I 01:30 0 9 ~ I 0 8 I I 01:45 0 31 0 ,,9, 0 31 0 29 , 0 58 02:00 0 JI I 0 11 I I 02:15 0 0 13 I I 02:30 0 I 0 10 I I 02:45 0 :.1 0 ::6 1 0 2 I 0 :~(; j 0 62 03:00 0 91 I 0 9 I 03:15 0 1 ! 0 2 I I 03:30 0 ~ I 0 7 I I 03:45 0 0 213 I 0 7 I 0 25 i 0 51 04:00 0 I 0 I S- II I If 04:15" 0 ~I 61 0 1 I I -ill/to I e i 04:30 0 0 ,L~.I\D 04:45 0 ~L () 0 tl () 0 14 05:00 0 ~i^ ) 0 :l I 05:15 0 I {} 0 I C> 05:30 0 1'1 0 0 I --.-,. 05:45 0 v 0 0: 0 6 0 [) I 0 0 06:00 0 0 I 0 0 I 06:15 0 0 0 .. I 06:30 0 0 01 0 0 I 06:45 0 0 0 i} 0 0 0 I 0 0 07:00 0 0 0 0 I 07:15 0 2 {} I 07:30 0 4 0 3 j 07:45 0 0 () " !) .: " .n b , v ',,- F"d 08:00 0 0 10 0 08:\5 . :j tf 1(\ I 0 I - , 08:30 10 f 0 101 0 oe:~;;, n 0 (! (\ [1 (1 0 ~ 0 (' " v 09:00 'i 0 1 0 i;~;~1 ~1 J (I ^ u v 09:30 0 0 0 0 08;~;~5 i 0 ~, (} 9 G 10 () 19 0 10:00 3 0 11 0 ~O..15 P, 0 " 0 ,0 10:30 7 0 11 0 ~f'!:J::~, I (' "'!j; 0 ,3 (1 :;:l (1 75 v " ~..../ 11 :00 13 0 24 0 "1'15 i7 (I :~1 () 11 :30 9 0 12 01 11:45 5 (,; 44 (\ (5 (i GJ 0 i\.i'l D " Total 78 127 123 152 201 279 Percent 38.0% 62,0% 44.7% 55,3% 41.9% 58,1% 20( 21S Agenda item No, 17B May 26, 2009 FLORIDA TRANSPORTATION ENGINEERING. INC. Page 155 of 159 8250 PASCAL DR. Page 2 PH# (941) 639 2818. (800)-639-4851 Site Code: 140130200000 FfJ\XJI. (941) 6394851 Station 10: 038002121100 Date Start: 03-Apr-07 Thomasson dr Driveway Date End: 05-Apr-07 ---,._----" .--. ..--- ~.._--_.~~ ".-.- . -.--..-..-. --,. Start 04-Apr-07 NB SB Hour Totals Combined Totals Time Wed Moming AftemQQfi., ,Momi Morning n _ M9ming, Afternoon 12:00 0 11 0 10 12:15 0 9 0 3 12:30 0 5 0 11 12:45 0 9 0 34 0 6 0 30 0 64- 01:00 0 3 0 9 01:15 0 14 0 14 01:30 0 10 0 13 01:45 0 8 0 35 0 13 0 49 0 84 02:00 0 2 0 5 02:15 0 7 0 5 02:30 0 3 0 5 02:45 0 7: 0 19 0 10 0 25 0 44 03:00 0 A~ I 0 7 02:;5 0 n ; fl I I..> ~ I v .J 03:30 0 91 I 0 13 I 0345 0 2_1 (i 3S I 0 3: {I "': , 0 75 04:00 0 "5'11 0 -'-2--1 I~ 04:15 0 fI' 0 ..., 1'lt\? \." . -~ 04:30 0 6 ! 0 1 I ,... .... .L~C" 0 01 0 0 -71 0 10 0 16 ~''''''i;J I 1 I 05:00 0 4'" 0 )i ,q nt:;~"'~ 0 2 I 0 1 I 1 ..,~..~ 05:30 0 2J v I 0 e, I I ,: DS~45 0 n, I) 81 0 -'o'i c 4 ) 0 12 06:00 0 ~i I 0 ~I :je~';5 0 , 0 u' 06:30 0 ~I 91 0 1 I 7 ) .uf,:4 5 0 VI 0 d 0: 0 I) i6 07:00 0 01 I 0 ~I ,I 07:15 0 o! I 0 ,} 07:30 0 01 1 0 0 07:45 0 1')1 (! 01 0 " r. () 0 21 " v J, 08:00 to' I \ 0 1 I ' I 08:15 v 01 0 0 I 08:30 I 01 01 1 I 0 0 1 I OB:4!i 4 01 , ,., ~ 0 0 I) 4 3 ,.:.,l i 09:00 '0 01 1 '-e-:;'~ 0 09:;;:' () (J I I () 0 09:30 0 01 I 0 0 I 011:45 0 01 0 01 1 0 (I 0 10:00 2 g! I 2 0 1 10:15 2 I " 0 <.' 10:30 5 01 10 0 I 10:45 5 !'Ii . , -"'j"'t. 0 4:1 o I 57 0 ,.. ..." 11 :00 6 ~ ! I 14 0 1 11 :15 7 16 0 I 11:30 7 01 01 8 0 '" ~ ~:~5 6 0: 20 7 0 45 VI 71 () Total 44 146 89 168 133 314 Percent 23.2% 76,8% 34.6% 65.4% 29.8% 70.2% /qD 257 FLORIDA TRANSPORTATION ENGINEERING, INC, 8250 PASCAL DR. PH# (941) 639 2818, (800)-639-4851 FAX# (941) 639 4851 Thomasson dr Driveway Start Time 12:00 12:15 12:30 12:45 01:00 01:15 01:30 01:45 02:00 02:15 02:30 02:45 03:00 G3, ;5 03:30 08:30 08:45 09:00 09:1;:; 09:30 09:45 10:00 10:15 10:30 10:45 11:00 11:15 11 :30 11:45 Total Percent Grand Total Percent 05-Apr-07 Thu Gj:4& 04:00 {14;iE- 04:30 r<4 ~45 05:00 05:15 05:30 i):;;.1S 06:00 06:15- 06:30 OGA~ 07:00 07:15 07:30 07'(::, 08:00 ~~:~5 (j G o 4 3 7 1 3 3 5 10 18 54 28,9% o o o o o o o o o o 133 71,1% 176 406 30,2% 69,8% ADT Not Calculated I i1l" JOrl. o o o c) o o (I o ':} 4 14 0 36 0 f\aenda item No, 17B - fv1ay 26, 2009 Page 156 of 159 Page 3 Site Code: 140130200000 Station ID: 038002121100 Date Start: 03-Apr-07 Date End: 05-Apr-07 28 Morn'n o o o o o o o o o o o o o o o NB Hour Totals MornLQS....... Aftemoon Morning Afternoon o 7 o 9 o 6 o 6 o 5 o 13 o 5 o 6 g ~I o 12 o .3 I o 31 o 2 i o 9] o 31 o ~-6"1I o 1 1 o ! ~.III! o --2. o 4 ," o 2 o , o 01 o 41 o .. I o 61 o 01 o 01 [) 01 o 0 I !) O! o 0 I I _, _ I .,) V! ! q 0 I o 1\ '" 29 I 26 I , I .J II , I I .. " 11 1 ,I I 8 I : 1 iJ " i 8 10 9 29 90 35,~p- . 302 38,3% o () '0, o o o 4 4 1, 7 S8 n V o o o Ii o (I o o o o o (t o o o 12 9 3 14 9 10 12 6 11 6 4 1~ I v. 12 I 4; 71 1 1 I, 2 -J \I ~l -2 i ,f\ 2\ t')t 2 i 81 OJ 1 , 'I I 01 ; I 01 "I 01 01 01 {I] 11 Oi 01 (I I 01 () I 01 o ~I 0' o 166 n. 64,8% 486 o -~) 61,7% 1YY I V . o o o o () o o r. " lJ -1 3~ 56 Combined Totals Morning Aftemoon 38 o 66 37 o 66 31 o 59 31 o 48 z,:t 11 o 22 ",?v 6 o 14 ,- , III . I ! o 21 " ~. I) " v o 0 B 2 () L.4 D o 92 0 144 299 32,5%,_ 67.5% 478 892 34.9% 65,1% / Collier County A verage Daily Traffic (ADT) Counts (Five Year History Listed Alphabetically) Agenda Item No, 17B May 26, 2009 Page 157 of 159 S A T t n y 0 2006 a p m ADT t a e Location 2002 2003 2004 2005 Change i I ADT ADT ADT ADT (Based on 05-06 Available 0 i Counts) n e s 613 H Q 111 th Ave North east of Vanderbilt Dr (CR 901) 8,493 8,383 9,292 '(,j,./?:,;';'.O 7,721 585 H Q 111 th Ave North west of Vanderbilt Dr (CR 901) 4,593 4,774 5,500 ' "1\' ;~;"';'O 4,402 665 A 29 ISR) north of Farm Worker's Villaqe 9,919 9,940 10,131 9,875 9,915 0.41% 591 A 29 (SR) north of SR 82 7,601 7,540 8,117 8,335 8,275 -0,72% 615 C A 29 (SR) north of US 41 (SR 90) (Tamiami Trail E.) 3,072 3,198 2,591 2,620 582 A 29 (SR) south of US 41 (SR 90) 3,940 3,679 3,419 3,177 3,316 4,38% 661 A 82 (SR) west of SR 29 11,624 11,144 11 ,225 11 ,531 13,846 20,08% 619 Q 846 IDevil's Garden Rd) east of SR 29 4,242 3,317 3,269 2,853 3,114 9,15% 553 H Q Airport Rd (CR 31) north of Davis Blvd (SR 84) 45,883 47,870 50,029 I;,":,' :i'f' 0 49,519 501 CCCC Q Airport Rd (CR 31) north of Golden Gate Pkwv, (CR 886) 50,748 43,412 42,784 """<',',0 693 Q Airport Rd (CR 31) north of North Road 52,148 55,416 53,860 54,560 54,203 -0,65% 599 CC Q Airport Rd (CR 31) north of Oranqe Blossom Dr 45,664 48,896 46,144 39,444 38,347 -2,78% 503 CCCC Q Airport Rd (CR 31) north of Pine Ridge Rd (CR 896) 44,288 49,634 46,179 "">"".,'0 40,698 543 H Q Airport Rd (CR 31) north of US 41 (SR 45) (Tamiami Trail) 27,572 27,919 29,607 '''''' . n 28,494 "',"',".' 659 Q Airport Rd (CR 31) north of Vanderbilt Beach Ext (CR 862) 34,986 35,742 36,331 31,088 29,500 -5,11% 552 Q Airport Rd (CR 31) south of Davis Blvd (SR 84) 36,031 37,000 37,895 36'9m -1,38% 533 C C/H C Q Airport Rd (CR 31) south of Golden Gate Pkwv (CR 886) 55,412 50,809 53,637 '" "" 554 H Q Airport Rd (CR 31) south of Immokalee Rd (CR 846) 31,899 32,518 33,601 ';;;:;"ik 26,829 502 HN Q Airport Rd (CR 31) south of Pine Ridqe Rd (CR 896) 49,877 46.331 46,970 'i','," 'ii; 717 S Bald Eaqle Dr (CR 953) north of Heathwood Dr 13,354 12,915 13,370 Discont. Discont. 700 S Bald Eaqle Dr (CR 953) north of Barfield Dr 9,250 7,105 8,505 Discont. Discont. 539 Q Bald Eaqle Dr (CR 953) north of Collier Blvd (SR 951) 11 ,1 73 11 ,388 13,233 Discont. Discont. 540 Q Bald Eaqle Dr (CR 953) south of Collier Blvd (SR 951) 11,314 10,978 11,805 Discont Discont. 622 Q Barfield Dr south of Collier Blvd (SR 951) 8.578 8,349 8.938 Discont. Discont. 701 S Barfield Dr east of Bald Eaale Dr ICR 953) 4,950 4,548 5,196 Discont Discont 621 Q Barfield Dr north of Collier Blvd (SR 951) 3,546 3,405 3,601 Discont Discont 718 S Barfield Dr north of San Marco Rd (CR 92) 9,166 9,122 8,480 Discont Discont 711 S Barfield Dr north of Winterberrv Dr 6,619 6,384 6,081 Discont Discont 713 S Barfield Dr south of Winterberrv Dr 3,802 3,941 4,267 Discont Discont. 521 Q Bayshore Dr north of Week Ave 16,352 ' 15,377 14,636 14,271 14,012 -1.82% 626 A Camp Keais Rd south of Immokalee Rd (CR 846) 3,089 3,267 3,027 3,854 3,783 -1,84% 660 A Capri Blvd west of Collier Blvd (SR 951) 5,135 4,250 4,276 4,780 4,585 -4,08% 610 Q Carson Rd north of Lake Trafford Rd (CR 890) 5,656 5,703 5,927 5,472 5,797 5,93% 618 A Chokoloskee Causeway south of Plantation Parkway 2,173 2,209 2,172 2,075 1,834 -11.61% 573 Q Collier Blvd (eR 951) north of Davis Blvd (SR 84) 45,4 75 46,582 53,866 56,180 57,314 2.02% 584 HC Q Collier Blvd (CR 951) north of Golden Gate Blvd 18,042 18,538 18,518 , 0 525 Q Collier Blvd (CR 951) north of Golden Gate Pkwv (CR 886) 26,518 27,409 29,570 31,943 32,040 0.30% 536 Q Collier Blvd (CR 951) north of Pine Ridae Rd (CR 896) 31,031 33,549 35,421 37,304 36,939 -0,98% 602 Q Collier Blvd (CR 951) north of Rattlesnake Ham Rd (CR 864) 30,288 31,626 33,926 38,709 39,767 2,73% 532 Q Collier Blvd (CR 951) north of US 41 (SR 90) (Tamiami Trail) 22.828 23,920 21,918 23,061 28,323 607 Q Collier Blvd (CR 951) south of Golden Gate Pkwy(CR 886) 22,415 23,232 25,815 29,160 30,060 3.09% 655 CC Q Collier Blvd (CR 951) south of Immokalee Rd (CR 846) 19,125 1 9,484 21 ,796 21,792 1.69% 657 Q Collier Blvd (CR 951) south of Lelv Cultural Blvd 25,016 26,284 29,365 32,477 32,739 0,81% 603 C Q Collier Blvd (CR 951) south of Rattlesnake Ham Rd (CR 864) 27,713 27,928 31,462 34,013 0.46% 557 cc Q Co!lier Blvd (CR 951) south of US 41 (SR 90) (Tamiami Trai!) 34,288 34,132 35,556 , 0 555 Q Collier Blvd (SR 951) east of Bald Eaqle Dr (CR 953) 18,995 18,914 20,627 Discont Discont 624 Q Collier Blvd (SR 951) north of San Marco Rd (CR 92) 17,721 16,656 18,348 Discont. Discont 708 S Collier Blvd (SR 951) north of Winterberry Dr 12,464 12,627 13,056 Discont. Discont. 627 Q Collier Blvd (SR 951) south of Capri Blvd (CR 952) 26,386 26,178 27,814 28,598 27,198 -4,89% 556 Q Collier Blvd (SR 951) south of Marco Bridge (Jolley Bridqe) 26,493 26,271 27,743 Discont. Discont. 716 S Collier Blvd (SR 951) south of San Marco Rd (CR 92) 17.335 17,951 18,885 Discont Discont 710 S Coliier Blvd (SR 951) south of Wlnterberry Dr i 0,8 i 8 ii, i 60 i i ,035 Discont Discont 623 Q Collier Blvd (SR 951) west of Bald Eaale Dr (CR 953) 22.664 21,281 23,519 Discont Dlscont. Note: All 2005 zero entries are either construction or hurricane related anomalies. All 2006 anomalies are due to construction. Pages 3-8 of 15 February, 2007 .Agenda Item No, 17B r\~av 26. 2009 Naples Botanical Garden 158 of 159 Thomasson Dr I Bayshore Dr 6/14/2007 .",. -+ " f"" -+- "- "\ t ". "" + 4' Lane..Group\:C;.. ese' err; ..... EBB WBC . War WSR NBL .1\18T NBR--- SBLL, SBT; SaR Lane Configurations "1 ... 4' r 'k "'l A '!I II ,: ideaJ Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 t900 1900 1900 1900 1900 Storage Length (ft) 0 150 0 200 0 0 300 300 Storage Lanes 0 1 0 1 0 0 1 1 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1,00 1,00 1.00 1.00 1,00 1.00 1.00 1,00 Frt 0.964 0.850 0.978 0.850 Fit Protected 0,950 O~980 0.999 0,950 Satd. Flow (prot) 1770 1796 0 0 1825 1583 0 1820 0 1770 1863 1583 FIt Permitted 0.950 0.980 0,999 0.950 Satd. Flow (perm) 1770 1796 0 0 1825 1583 0 1820 0 1770 1863 1583 Headway Factor 1,00 1.00 1,00 100 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 Link Distance. (ft) 556 750 691 245 Travel Time (s) 12.6 17.0 15.7 7.8 Volume (vph) 41 27 8 28 40 129 2 61 12 225 51 42 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj, Flow (vph) ,~5 29 9 30 43 140 2 66 13 245 55 46 Lane Group Flow (vph) 45 38 0 0 73 140 0 81 0 245 55 46 Sign Control Stop Stop Stop Slop Intersection Summary" . Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.1 oi~ ICU Level of Service A Analysis Period (min) 15 Baseline Wilson Miller, Inc. Ey,islin9 Conditions Report Page 1 Naples Botanical Garden Thomasson Dr / Bayshore Dr "I- [ana'Sroijpr~rnT;0i,~1;'Yfq.;i~"'~~Ef3E:fi:~. Lane Configurations ~ Id~al Flow (vphpl) 1900, Storage Length (ft) 0 Stc>rag~ Lclne~.. 0 Turning Speed (mph) 15 Lane Uti!. FaCtor 1,00 Frt Fit Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Headway F~"ct~r Link Speed (mph) Llfik Distance(ft) Travel Time (s) Volume {vph) Peak Hour Factor Adj; Flow (\i'ph) Lane Group Flow (vph) Sign Control 0.950 1770 0.950 1770 1.00 38 0.92 41' 41 -+ ~ ., <If- '- '" t ~ "EaT~};~ EaSt:;;; WB8f'.WBb;',/WBRli%7NI38;ZF NBr';;;NBaZ~Esa~;i~;.'ssr;';c saR ~ +.1; r' .. ~,., r'i 1900 190q 1900 1900 1900 1900 1900. 190.0: 1900 1900 1900 150 0 200 0 0 300 300 1 0 1 0' 01 1 9 15 9 15 9 15 9 1.00 1,00 1.00 '.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.970 0.850 0.973 0.850 0.999 0.950 o 1811 0 1770 1863 1583 0,999 0.950 1583 0 1811 0 1770 1863 1583 1.00 1.00 1.00 1.00 1.00 1.00 1.00 30 30 691' 345 15.7 7.8 81 20 225 75 0.92 0.92 0.92 0.92 88 22 245 82 112 0 245 82 Stop Stop 1807 1807 1.00. 30 556 12.6 26 0.92 28 35 Stop 0 0 0 0 1.00 1.00 6 0.92 7 o 0:976 1818 0.976 1818 1,00 30 750 17.0 37 0.92 40 o 0.92 42 82 Stop Agenda Item No, 17B May 26, 2009 Page 159 of 159 8/8/2007 \. + ../ 1583 39 129 0.92 140 140 2 0.92 2 o 39 0.92 42 42 Unslgnalized Intersection Capacity Utilization 366% Analysis Period (min) 15 leu Levei 01 Service A Baseline Wilson Miller, Inc. Revised Conditions Repor1 Page 1