Agenda 05/28/2019 Item #16A12 (Brentwood Lakes Phase I Final Plat)05/28/2019
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Brentwood Lakes - Phase One, (Application Number PL20180001880)
approval of the standard form Construction and Maintenance Agreement and approval of the
amount of the performance security.
_____________________________________________________________________________________
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat
of Brentwood Lakes - Phase One, a subdivision of lands located in Sections 29, 30, 31 and 32, Township
48 South, Range 27 East, Collier County, Florida, following the alternative procedure for approval of
subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat
and associated construction documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has
completed the review of the construction drawings, specifications, and final plat of Brentwood Lakes -
Phase One. These documents are in compliance with the County Land Development Code and Chapter
177, Florida Statutes. This project is zoned A-MHO; RFMUO-Receiving. All fees have been paid.
Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any
remaining improvements, together with a Construction and Maintenance Agreement for Subdivision
Improvements, shall be provided and accepted by the County Manager or his designee and the County
Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section
10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Brentwood Lakes - Phase One be
approved for recording.
FISCAL IMPACT: The project cost is $7,588,529.32 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $ 2,560,403.10
b) Drainage, Paving, Grading $ 5,028,126.22
The Security amount, equal to 110% of the
project cost, is $8,347,382.25
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $231,472.88
16.A.12
Packet Pg. 571
05/28/2019
The Fees are based on a construction estimate of $7,588,529.32 and were paid in August, 2018.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac) $ 3,817.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.) $ 19,203.02
c) Drainage, Paving, Grading
(.75% const. est.) $ 37,710.95
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.) $ 57,609.07
e) Drainage, Paving, Grading
(2.25% const. est.) $113,132.84
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and
construction and maintenance agreement. The Board shall consider the County Manager or designee’s
recommendation and shall take evidence and testimony in regard to the final subdivision plat
requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well
as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it
shall state reasons for such denial or conditions. In accordance with the LDC, the applicant is required to
submit the final subdivision plat to the County Manager or designee for recording within 18 months of the
date of approval of the final subdivision plat by the Board. However, following approval by the Board,
but prior to recordation, the County Manager or designee may approve minor insubstantial changes to the
subdivision plat, and the Board may approve any changes that are not minor and insubstantial.
This item has been approved as to form and legality, and requires a majority vote for Board approval --
SAA
RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Brentwood
Lakes - Phase One (Application Number PL20180001880) for recording with the following stipulations:
1. Approve the amount of $8,347,382.25 as performance security for the required improvements; or
such lesser amount based on work completed, and as is approved by the Growth Management
Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager
or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney’s office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: Lucia S. Martin, Technician, Development Review Division
16.A.12
Packet Pg. 572
05/28/2019
ATTACHMENT(S)
1. Location Map (PDF)
2. Opinion of Probable Cost (PDF)
3. Plat Map (PDF)
16.A.12
Packet Pg. 573
05/28/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.12
Doc ID: 8731
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the final plat of Brentwood Lakes – Phase One, (Application Number
PL20180001880) approval of the standard form Construction and Maintenance Agreement and approval
of the amount of the performance security.
Meeting Date: 05/28/2019
Prepared by:
Title: Technician – Growth Management Development Review
Name: Lucia Martin
04/23/2019 11:15 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
04/23/2019 11:15 AM
Approved By:
Review:
Growth Management Development Review John Houldsworth Additional Reviewer Completed 04/23/2019 11:32 AM
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 04/23/2019 3:34 PM
Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 04/24/2019 8:06 AM
Growth Management Development Review Chris Scott Additional Reviewer Completed 04/24/2019 8:34 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 04/24/2019 11:38 AM
Growth Management Department Jeanne Marcella Level 1 Reviewer Completed 04/26/2019 11:05 AM
Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 04/29/2019 8:39 AM
Growth Management Department Thaddeus Cohen Department Head Review Completed 04/30/2019 9:37 AM
Growth Management Department James C French Deputy Department Head Review Completed 05/01/2019 5:42 PM
County Attorney's Office Sally Ashkar Additional Reviewer Completed 05/16/2019 10:12 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/16/2019 10:28 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/17/2019 8:18 AM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 05/17/2019 11:43 AM
County Manager's Office Geoffrey Willig Level 4 County Manager Review Completed 05/20/2019 12:16 PM
Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM
16.A.12
Packet Pg. 574
BRENTWOOD LAKES
(FKA TWIN EAGLES SOUTH)
LOCATION MAP
16.A.12.a
Packet Pg. 575 Attachment: Location Map (8731 : Final Plat - Brentwood Lakes - Phase One)
Total
Wastewater $1,627,186.88
Water $882,665.22
Off-site $50,551.00
SUBTOTAL =$2,560,403.10
Earthwork $209,103.61
Paving $2,357,253.70
Drainage $1,848,954.00
Off-site $91,814.91
SUBTOTAL =$4,507,126.22
Lighting $221,000.00
Landscape & Irrigation $300,000.00
SUBTOTAL =$521,000.00
TOTAL =$7,588,529.32
10% O&M =$758,852.93
GRAND TOTAL =$8,347,382.25
Notes:
1)
2)
3)
Mica S. Jackson, P.E.
Date
Florida License # 86615
COA #8636
All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. These costs cannot be
guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of
materials and labor.
Twin Eagles South
PPL
Opinion of Probable Cost
Rev02
May 17, 2019
SUMMARY
This Opinion of Probable Cost (OPC) shall be used for permitting purposes only.
This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in effect on
the date of this document. Interpretations of these construction costs may affect this OPC, and may require adjustments to delete,
decrease, or increase portions of this OPC.
Electronic Signature Text
Mica S. Jackson, P.E. State of Florida Professional Engineer License No. 86615This item has been electronically signed and sealed by Mica S. Jackson, P.E. on
05/17/2019 using a digital signature.Printed copies of this document are not considered signed and sealed and the signature
must be verified on any electronic copies.
16.A.12.b
Packet Pg. 576 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
On-site
WW-1 8" PVC Sanitary Sewer SDR-26 (0-6')5,002 LF $30.00 $150,060.00
WW-2 8" PVC Sanitary Sewer SDR-26 (6-8')2,304 LF $35.00 $80,640.00
WW-3 8" PVC Sanitary Sewer SDR-26 (8-10')1,634 LF $40.00 $65,360.00
WW-4 8" PVC Sanitary Sewer SDR-26 (10-12')2,481 LF $45.00 $111,645.00
WW-5 8" PVC Sanitary Sewer SDR-26 (12-14'')751 LF $50.00 $37,550.00
WW-6 8" PVC Sanitary Sewer SDR-26 (14-16'')1,026 LF $60.00 $61,560.00
WW-7 10" PVC Sanitary Sewer SDR-26 (16-18'')63 LF $75.00 $4,725.00
WW-8 4' Manhole (0-6')18 EA $5,200.00 $93,600.00
WW-9 4' Manhole (6-8')16 EA $6,300.00 $100,800.00
WW-10 4' Manhole (8-10')6 EA $7,300.00 $43,800.00
WW-11 4' Manhole (10-12')8 EA $8,800.00 $70,400.00
WW-12 4' Manhole (12-14')9 EA $9,900.00 $89,100.00
WW-13 4' Manhole (14'-16')1 EA $11,200.00 $11,200.00
WW-14 4' Manhole (16'-18')5 EA $15,000.00 $75,000.00
WW-15 6" PVC Force Main (C900, DR-18)1,808 LF $18.00 $32,544.00
WW-16 6" PVC Force Main (C900, DR-14)60 LF $21.00 $1,260.00
WW-17 8" PVC Force Main (C900, DR-18)2,826 LF $25.00 $70,650.00
WW-18 8" PVC Force Main (C900, DR-14)192 LF $30.00 $5,760.00
WW-19 6" Plug Valve 2 EA $1,200.00 $2,400.00
WW-20 8" Plug Valve 4 EA $1,500.00 $6,000.00
WW-21 Air Release Valve 6 EA $5,000.00 $30,000.00
WW-22 6" Double PVC Sewer Service 130 EA $1,200.00 $156,000.00
WW-23 6" Single PVC Sewer Service 39 EA $900.00 $35,100.00
WW-24 Television Inspection 13,261 LF $2.00 $26,522.00
WW-25 Pump Station, Complete with Generator 1 LS $260,510.88 $260,510.88
WW-26 Connect to Existing Force Main 1 EA $5,000.00 $5,000.00
TOTAL =$1,627,186.88
WASTEWATER
16.A.12.b
Packet Pg. 577 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
On-site
PW-1 6" PVC Water Main (C900, DR-18)5,465 LF $20.00 $109,300.00
PW-2 8" PVC Water Main (C900, DR-18)5,522 LF $24.76 $136,721.22
PW-3 8" PVC Water Main (C900, DR-14)296 LF $30.00 $8,880.00
PW-4 10" PVC Water Main (C900, DR-18)28 LF $32.00 $896.00
PW-5 10" PVC Water Main (C900, DR-14)47 LF $38.00 $1,786.00
PW-6 12" PVC Water Main (C900, DR-18)4,392 LF $47.00 $206,424.00
PW-7 12" PVC Water Main (C900, DR-14)204 LF $52.00 $10,608.00
PW-9 6" Gate Valve 7 EA $1,500.00 $10,500.00
PW-10 8" Gate Valve 12 EA $1,500.00 $18,000.00
PW-11 10" Gate Valve 1 EA $2,000.00 $2,000.00
PW-8 12" Gate Valve 9 EA $2,250.00 $20,250.00
PW-12 1" Single Water Service, Complete 51 EA $850.00 $43,350.00
PW-13 1.5" Double Water Service, Complete 124 EA $1,000.00 $124,000.00
PW-14 Permanent Bacterial Sample Point 7 EA $2,000.00 $14,000.00
PW-15 Temporary Bacterial Sample Point 15 EA $350.00 $5,250.00
PW-16 Fire Hydrant, Complete 33 EA $4,400.00 $145,200.00
PW-17 Automatic Flushing Devices 1 EA $5,000.00 $5,000.00
PW-18 Temporary Blow-off 6 EA $2,500.00 $15,000.00
PW-19 Air Release Valve 1 EA $5,500.00 $5,500.00
TOTAL =$882,665.22
POTABLE WATER
16.A.12.b
Packet Pg. 578 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
EW-1 Single Row Silt Fence 11,230 LF $1.50 $16,844.46
EW-2 Double Row Silt Fence 8,956 LF $3.00 $26,867.61
EW-3 Sod (1' Behind Curb)3,541 SY $2.50 $8,852.50
EW-4 Clearing & Grubbing 27 AV $5,832.30 $156,539.04
SUBTOTAL =$209,103.61
EARTHWORK
16.A.12.b
Packet Pg. 579 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
On-site
P-1 3/4" Asphaltic Concrete (Type S-III) First Lift 44,984 SY $6.50 $292,396.00
P-2 3/4" Asphaltic Concrete (Type S-III) Second Lift 44,984 SY $6.50 $292,396.00
P-3 6" Limerock Base (Compacted and Primed)44,984 SY $8.55 $384,613.20
P-4 12" Stabilized Subgrade 55,551 SY $5.50 $305,530.50
P-5 Type "F" Curb 11,323 LF $15.00 $169,845.00
P-6 2' Valley Gutter 20,317 LF $13.00 $264,121.00
P-7 ADA Warning Pads 36 EA $500.00 $18,000.00
P-8 4" Concrete Sidewalk w/ 4" Limerock Base 17,511 SY $32.00 $560,352.00
P-9 Signing & Marking 1 LS $70,000.00 $70,000.00
TOTAL =$2,357,253.70
PAVING
16.A.12.b
Packet Pg. 580 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
On-site
D-1 12" PVC 532 LF $21.00 $11,172.00
D-2 15" RCP 549 LF $37.00 $20,313.00
D-3 18" RCP 1,587 LF $48.50 $76,969.50
D-4 24" RCP 3,177 LF $65.00 $206,505.00
D-5 30" RCP 785 LF $90.00 $70,650.00
D-6 36" RCP 1,323 LF $116.75 $154,460.25
D-7 48" RCP 3,324 LF $180.00 $598,320.00
D-8 60" RCP 146 LF $200.00 $29,200.00
D-9 38" X 60" ERCP 54 LF $190.00 $10,260.00
D-10 24" X 38" ERCP 71 LF $100.00 $7,100.00
D-11 14" X 23" ERCP 257 LF $90.00 $23,130.00
D-11 15" Flared End 2 EA $1,778.00 $3,556.00
D-12 18" Flared End 7 EA $1,940.00 $13,580.00
D-13 24" Flared End 11 EA $2,174.00 $23,914.00
D-14 30" Flared End 2 EA $2,649.00 $5,298.00
D-15 36" Flared End 6 EA $3,057.00 $18,342.00
D-16 48" Flared End 17 EA $4,200.00 $71,400.00
D-17 60" Flared End 2 EA $8,150.00 $16,300.00
D-18 Control Structure 2 EA $5,500.00 $11,000.00
D-19 Junction box 13 EA $3,375.00 $43,875.00
D-20 Yard Drain 6 EA $1,000.00 $6,000.00
D-21 Type 9 Inlet 24 EA $4,452.47 $106,859.25
D-22 Grate Inlet 14 EA $3,250.00 $45,500.00
D-23 Valley Gutter Inlet 57 EA $3,500.00 $199,500.00
D-24 Inlet Protection 101 EA $750.00 $75,750.00
TOTAL =$1,848,954.00
DRAINAGE
16.A.12.b
Packet Pg. 581 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
L-1 Decorative Street Lighting (Entry Only)26 EA $8,500.00 $221,000.00
L-2 FPL Street Lights (All Remaining)1 LS $0.00 $0.00
TOTAL =$221,000.00
LIGHTING
16.A.12.b
Packet Pg. 582 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Item #Description Estimated
Quantity Unit Unit Price Amount
Parcel L
L-1 Code Minimum Landscape & Secondary Irrigation 1 LS $300,000.00 $300,000.00
TOTAL =$300,000.00
LANDSCAPE
16.A.12.b
Packet Pg. 583 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Paving
P-1 1.5" Structural Course (Type SP 12.5) First Lift 678 SY $7.00 $4,745.57
P-2 1" Structural Course (Type SP 12.5) Second Lift 678 SY $7.00 $4,745.57
P-3 1" Friction Course (FC-9.5)678 SY $8.00 $5,423.51
P-4 Base (Optional Group 9)678 SY $18.25 $12,372.38
P-5 12" Stabilized Subgrade 814 SY $5.50 $4,474.89
P-6 Type "F" Curb 408 LF $11.00 $4,488.00
P-7 Concrete Sidewalk (6" Thick)334 SY $30.00 $10,005.00
P-8 Signing and Marking 1 LS $2,500.00 $2,500.00
P-9 MOT 1 LS $4,000.00 $4,000.00
P-10 Curb Removal 475 LF $3.80 $1,805.00
P-11 ADA Dectectable Warning Strips 2 EA $350.00 $700.00
SUB-TOTAL =$55,259.91
Drainage
D-1 Remove and replace existing top slab 2 EA $1,500.00 $3,000.00
D-3 Remove existing 60" RCP 30 LF $75.00 $2,250.00
D-2 Remove existing 48" RCP 75 LF $35.00 $2,625.00
D-4 Remove existing 24" RCP 52 LF $18.00 $936.00
D-3 Remove Mitered End 3 EA $500.00 $1,500.00
D-5 Remove Existing Control Structure (OCS-4)1 EA $750.00 $750.00
D-4 24" RCP 24 LF $46.00 $1,104.00
D-6 Saw-cut and connect to existing structure 2 EA $3,500.00 $7,000.00
D-5 FDOT "5" Inlet 1 EA $4,500.00 $4,500.00
D-7 FDOT "6" Inlet 1 EA $5,500.00 $5,500.00
D-6 Junction Box 2 EA $3,375.00 $6,750.00
D-8 Riprap (Bank and shore protection)32 SY $20.00 $640.00
SUB-TOTAL =$36,555.00
Wastewater
WW-1 Directional Drill 8" PVC Force Main w/ 16" Casing 143 LF $300.00 $42,900.00
WW-2 8 " Plug Valve 1 EA $1,500.00 $1,500.00
SUB-TOTAL =$44,400.00
Potable Water
PW-1 12" PVC Water Main (C900, DR-18)83 LF $47.00 $3,901.00
PW-2 12" Gate Valve 1 EA $2,250.00 $2,250.00
SUB-TOTAL =$6,151.00
Off-site
16.A.12.b
Packet Pg. 584 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
Plat Review Fees:
Residential only: $1,000.00 Plus $5.00 per acre (round up to the next acreage)
Number of Acres =563.42 3,820.00$
Non-Residential only: $1,000.00 Plus $10.00 per acre (round up to the next acreage)
Number of Acres =N/A
$100 Fire review 100.00$
COA application fee $200 + $25 per D.U. or per 1,000 sq. ft. commercial ($5,000 max.)
Dwelling Units=299 -$
(See Approved COA)
N/A
$2,500 Environmental Impact Statement review 2,500.00$
$1,000 Listed Species Survey (when EIS is not required)1,000.00$
$250 Site Clearing fee (first acre or fraction of an acre, round acres up to next whole acre)
$250 for the first Acre 250.00$
plus $50 for each additional acre or fraction of an acre :($3,000 maximum) # of acres 1,300.00$
Total Acres to be Cleared = 26.84
Utility Modeling and Analysis fee $1,000 (only applies if zoned PUD or DRI)1,000.00$
Utility Plan Review & Inspection Fees
Water + Wastewater Cost Estimate =$2,560,403.10
Utilities document review – 0.75% of probable water/sewer construction costs
0.75% x Cost Estimate =$19,203.02 19,203.02$
Utilities Inspection Fee –2.25% of probable water/sewer construction costs
* 100% of Construction Inspections fees to be paid prior to Pre-Construction meeting
2.25% x Cost Estimate =$57,609.07 -$
Paving, Grading, Landscape, Lighting, & Drainage Review & Inspection Fees:
Cost Estimate =$5,028,126.22
Construction document review – 0.75% of probable roadway, paving & drainage construction costs
0.75% x Cost Estimate =$37,710.95 37,710.95$
Construction inspection – 2.25% of probable roadway, paving & drainage construction costs
* 100% of Construction Inspections fees to be paid prior to Pre-Construction meeting
2.25% x Cost Estimate =$113,132.84 -$
Excavation Review Fees
$400 Application Fee (Private Development)400.00$
Prepaid 12 Month Inspection Fee 2,400.00$
$200 first 5000 c.y.; $10 per additional1000 CY;maximum of $20,000.00
Cubic Yardage 1,118,532.0 11,335.32$
SUB-TOTAL:81,019.29$
PRE-APP CREDIT:500.00$
TOTAL:80,519.29$
FEE CALCULATION
Environmental Health Review Fee (if applicable)
16.A.12.b
Packet Pg. 585 Attachment: Opinion of Probable Cost (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 586Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 587Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 588Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 589Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 590Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 591Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 592Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 593Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 594Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 595Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 596Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 597Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 598Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 599Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 600Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)
16.A.12.cPacket Pg. 601Attachment: Plat Map (8731 : Final Plat - Brentwood Lakes - Phase One)