Agenda 05/28/2019 Item #16A 8 (Coral Harbor Phase II Conveyance & Bond Release)05/28/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and the conveyance of the potable water and sewer utility facilities for Coral Harbor Phase II, PL20170000914 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and the conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Coral Harbor Phase II has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Developme nt Review staff on May 30, 2017. At that time, the value of these potable water and sewer utility facilities (assets) was $92,126.13 and $96,799.56, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed, and Bill of Sale recorded in Official Records Book 5418, at Page 2460, of the Public Records of Collier County, Florida (“The Utilities Facilities Deed”). 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on April 11, 2019, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release Final Obligation Bond in the total amount of $4,000. Staff also recommends acceptance of the Utilities Facilities Deed and the facilities described therein. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $188,925.69 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.8 Packet Pg. 491 05/28/2019 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - HFAC RECOMMENDATION: To approve final acceptance and conveyance of the potable water and sewer utility facilities for Coral Harbor Phase II, PL20170000914, accept the conveyance of the Utilities Facilities Deed and the facilities described therein, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 4. Warranty Deed and Bill of Sale (PDF) 16.A.8 Packet Pg. 492 05/28/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.8 Doc ID: 8652 Item Summary: Recommendation to approve final acceptance and the conveyance of the potable water and sewer utility facilities for Coral Harbor Phase II, PL20170000914 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 05/28/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 04/12/2019 1:11 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 04/12/2019 1:11 PM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 04/12/2019 1:18 PM Wastewater Beth Johnssen Additional Reviewer Completed 04/12/2019 1:40 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 04/12/2019 4:14 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 04/12/2019 4:42 PM Water Steve Messner Additional Reviewer Completed 04/14/2019 10:40 AM Wastewater Steve Nagy Additional Reviewer Completed 04/15/2019 5:28 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 04/15/2019 10:49 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 04/17/2019 10:06 AM Growth Management Department Matthew McLean Additional Reviewer Completed 04/24/2019 3:53 PM County Attorney's Office Heidi Ashton-Cicko Level 2 Attorney of Record Review Completed 04/25/2019 11:37 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 04/26/2019 11:46 AM Growth Management Department James C French Deputy Department Head Review Completed 05/01/2019 5:41 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/02/2019 8:04 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/02/2019 9:06 AM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 05/07/2019 12:54 PM County Manager's Office Geoffrey Willig Level 4 County Manager Review Completed 05/20/2019 10:56 AM 16.A.8 Packet Pg. 493 05/28/2019 Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM 16.A.8 Packet Pg. 494 FFGECT LOCATION p"lt.Il Bf_{('H r .tl llr ;{lr1l.l /rf i gf.tr tl !ll{i\t I F tr :'t-'NJ n PfrO,ECT LOCATrcfl t.l qrtG,|cafr \* \,\ ^t(,V \V\ ^r $t-. ,r ; ! t.tr ,,. a \:J I \ CORAL HARBORPHASE II LOCATION MAP | *1* //-l; ,/) I I JiI *s-'-x lllt:*llgr.ryl-lt--- ,}\,l -J **.I *:l- f" ) ihSU*(- .<-f\=s{ \-I 16.A.8.a Packet Pg. 495 Attachment: Location Map (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) Exhibit A Utilities Performance security (ups) and Fina! obligation Bond The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance ZOO4-3L Attachments: 1. Verification of Final Cost 2. Receipt of Payment Amount Receipt Number 10% UPS Bond WPlat Final Obligation Bond S+,ooo 20L7392200 TotalAmount S4,ooo 16.A.8.b Packet Pg. 496 Attachment: Exhibit A (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) TYPE OF UTILITY SYSTEM VERIFICATION OF FINAL COST Coral Harbor Phase ll Section 1 , Township 51S, Range 26E SFI Naples Reserve, LLC 2427 East lmperial Way Brea, CA 9282'l POTABLE WATER (Material and Services) ITEM EIEEIEUIEIilUILIEEL Temp Fire BFP @ Tie in Point Connecl to Existing Main PVC DR-18 Gate Valve M Box Fire Hydrant Assembly Automatic Flushing Device (RELOCATED) Single Service W/ Curb Stop Double Service W Curb Stop Water Main Fittings Testing 'l 91 3 7 1 26 62 1 ,| 2 EA EA LF EA EA EA EA EA LS LS $ 3,000 $ 2,136 $ 19 $ 1,609 $ 4,868 $ 1,285 $ 1,109 $ 1 ,136$ 1,657 $ 2,265 00$ 00$ 21 $30$ 18 $60$ 16 $ 36$ 00$ 00$ 3,000.00 4,272.OO 56,073.99 4,827.90 u,o77.26 1.285.60 28.838.16 70,454.32 1,657.00 2.265.00 $ 206,751.23TOTAL COST I do hereby ceiiry that the quantities of material described above are a true and accurate representation of the system of the as-installed cost of the system. CERTIFYING: Jayson O ch OF: Haleakala Construclion . lnc STATE OF FLORIDA COUNTY OF COLLIER The foreg oino inskument . Jav sorv wls signed and a O ec scl-tnl t<_1L cknowledged before me this .l)day of ,'nA 2017 by who is personally known to me and who did take an oath ,':.-t^iit'?'ir% 4,,ffi Public a^...-'SEAL: PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TOTAL 8' o 16.A.8.b Packet Pg. 497 Attachment: Exhibit A (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: VERIFICATION OF FINAL COST Coral Harbor Phase ll Section 1 , Township 51S, Range 26E SF! Naples Reserve, LLC 2427 East lmperialWay Brea, CA 92821 SANITARY WATER (Materiat and Services) EIEET EEEIIIry ]NL NEil EIEEI PVC SDR.26 - O€'CUT PVC SDR-26 - 6{, CUT PVC SDR-26 - 8-lO CUT MANHOLE G6' MANHOLE ffi' MANHOLE E-10' Double Sewer Services Connect to Existing Manhole Testing 8n E' 8" c 4', 4', 1,396 785 401 7 4 2 75 2 1 LF$ LF$ LF$ EA$ EA$ EA$ EA$ EA$ LS$ 45.4',t $ 50.41 $ 57.41 $ 6,206.10 $ 6,950.06 $ 0,987.32 $ 798.12 $ 1,530.00 $ 2,085.75 $ 63,392.36 39,571.85 23,021.41 43,&2.70 27,800.24 13,974.U 59,859.00 3,060.00 2,085.75 TOTAL COST I do hereby ced'tfy that the quantities of material described above are a true and accurate representation of the system of the as-installed cost of the system. CERTIFYING: Jayson OF: Haleakala Construction , lnc. STATE OF FLORIDA COUNTY OF COLLIER The instrument wgg signed and before me ttris ./ 9 oay or furcmW 2017 by wtro is pesonally knorun to me and wtro did take an oath. SEAL: I 27e,207.95 16.A.8.b Packet Pg. 498 Attachment: Exhibit A (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 RECEIPT OF PAYMENT Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Descriotion Utility Peformance Refundable Bond Cashier Name: Batch Number: Entered By: 2017392200 20t7-0L5676 03/L4/2077 $4,000.00 Pavment Method Check Reference Number P120170000914 AlinaHarris 6182 melissaalvarez Amount Paid $4,000.00 Check Number t94402 $4,000.00 $0.00 |STAR INC 1114 AVENUE OF THE AMERICAS 39TH FLOOR NEW YORK, NY 10036 Orioinal Fee $4,000.00 Amount Paid $4,000.00 GL Account 670-000000-220t13 16.A.8.b Packet Pg. 499 Attachment: Exhibit A (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) CERTIFICATION OF CONTRIBUTORY ASSETS. COUNTY Coral Harbor Phase ll Section 1 , Township 5'1S, Range 26E SFI Naples Reserve, LLC 2427 Easl lmperial Way Btea, CA 92821 POTABLE WATER (tvlaterial Only)TYPE OF UTILITY SYSTEM ITEM IIILNEilEIT Temp Fire BFP @ Tie in Point Connect to Existing Main PVC DR-18 Gate Valve W Box Fire Hydrant Assembly Automatic Flushing Device (RELOCATED) Single Service W/ Curb Stop Double Service W Curb Stop Water Main Fittings Testing I 1 2 ,91 7 1 26 62 1 1 2 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ .'*i:t$i#Z =- ;'>t.Er ai|*". -= =*: --.- :t= 'rr,ffi"us' 1,500.00 265.00 7.21 959.30 2,918.18 845.00 409.16 536.36 '1,007.50 $ 92,126.13TOTAL COST I do hereby certify that the quantities of material described above are a true and accurate representataon of the system being contributed to Collier County Utilities, lnc. CERTIFYING: Jayson Ore dN who is personally known to me and who did take an oath STATE OF FLORIDA COUNTY OF COLLIER The foregoang instrument 2017 by was signed anOffvH d acknowledo ^ttdL eo oetore me ttris 23 o", o, l\A\ Nota Public SEAL PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TOTAL OF: Haleakala Constructton . lnc EA EA LF EA EA EA EA EA LS LS 8' 8', 1,500.00 530.00 21,045.99 2,877.90 20,427.26 845.00 10,638.16 33.2U4.32 1,007.50 16.A.8.c Packet Pg. 500 Attachment: Assets Sheet (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) CERTIFICATION OF CONTRTBUTORY ASSETS. COUNTY PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: Coral Harbor Phase ll Section 1, Tornship 51S, Range 26E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea, CA 92821 SANITARY SEWER (Material Only) FErr cEEtrfir.z INL -EEL EEL PVC SDR-26 - O€'CUT ryc sDR-26 - 6-8,CUT PVC SDR-26 - 8-10',CUT MANHOLE O€' MANHOLE 6-8' MANHOLE 8-10' Double Sewer Services Connect to E{sting Manhole Testlng LF LF LF EA EA EA EA EA LS 1,396 785 401 7 4 2 75 2 1 80 8" 8', 4 c 4', 5.41 5.41 5.41 3,906.10 4,400.06 4,422.00 373.12 530.00 7,552.38 4,28.85 2,169.4',1 27,v2.70 17,600.24 E,844.00 27,984.00 1,060.00 $ 96,799.56 $ $ $ $ $ $ $ $ $ TOTAL COST I do hereby cailiry that the quantities of matorial described above are a true and accurate representation of the system being contributed to collier county Utilltes, lnc. OF: Haleakala Construclion , lnc. STATE OF FLORIDA COUNTY OF COLLIER The instrument and before me tnis t Ll day ot FeB?urlL\ 2017 by who is personally knoivn to me and wtro dU take an oath K SEAL: Notary #FF 044507 $ $ $ $ $ $ $ $ $ . 16.A.8.c Packet Pg. 501 Attachment: Assets Sheet (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) 16.A.8.d Packet Pg. 502 Attachment: Warranty Deed and Bill of Sale (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) 16.A.8.d Packet Pg. 503 Attachment: Warranty Deed and Bill of Sale (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) 16.A.8.d Packet Pg. 504 Attachment: Warranty Deed and Bill of Sale (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) 16.A.8.dPacket Pg. 505Attachment: Warranty Deed and Bill of Sale (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) 16.A.8.d Packet Pg. 506 Attachment: Warranty Deed and Bill of Sale (8652 : Final Acceptance of Utilities - Coral Harbor Phase II) 16.A.8.d Packet Pg. 507 Attachment: Warranty Deed and Bill of Sale (8652 : Final Acceptance of Utilities - Coral Harbor Phase II)