Agenda 05/28/2019 Item #16A 7 (Coral Harbor Phase I Conveyance & Bond Release)05/28/2019
EXECUTIVE SUMMARY
Recommendation to approve final acceptance and the conveyance of the potable water and sewer
utility facilities for Coral Harbor Phase I, PL20170000368 and to authorize the County Manager,
or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project
Engineer or the Developer’s designated agent.
OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the
Collier County Water-Sewer District, approve final acceptance and the conveyance of these potable water
and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance
with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31.
CONSIDERATIONS:
1) The Developer of Coral Harbor Phase I, has constructed the potable water and sewer facilities within
dedicated easements to serve this development. (See attached location map).
2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on
April 14, 2017. At that time, the value of these potable water and sewer utility facilities (assets) was
$94,134.56 and $193,318.96, respectively.
3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to
the County in the public records of Collier County, which were reviewed and approved by the
County Attorney’s office as to form and legality. The County acquired its record interest by Utility
Facilities Warranty Deed, and Bill of Sale recorded in Official Records Book 5401, at Page 1135, of
the Public Records of Collier County, Florida (“The Utilities Facilities Deed”).
4) The potable water and sewer utility facilities have been operated and maintained during the required
one (1) year warranty period, following preliminary acceptance.
5) A final inspection to discover defects in materials and workmanship has been conducted by the
Development Review staff on April 11, 2019, in coordination with Public Utilities and these
facilities have been found to be satisfactory and acceptable.
6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation
Bond in the total amount of $4,000. Staff also recommends acceptance of the Utilities Facilities
Deed and the facilities described therein.
7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended.
8) Staff is unaware of any issues that would serve to negate the recommendation to release the
applicable security.
FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact.
However, approval of this Executive Summary will result in the Collier County Water -Sewer District
receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a
total gross value of $287,453.52 (no depreciation applied) and an asset will be recorded in the financial
records of the county.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this
action.
16.A.7
Packet Pg. 466
05/28/2019
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval - HFAC
RECOMMENDATION: To approve final acceptance and the conveyance of the potable water and
sewer utility facilities for Coral Harbor Phase I, PL20170000368, accept the conveyance of the Utilities
Facilities Deed and the facilities described therein, and to authorize the County Manager, or his designee,
to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the
Developer’s designated agent.
Prepared by: Lucia S. Martin, Technician, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Exhibit A (PDF)
3. Assets Sheet (PDF)
4. Warranty Deed and Bill of Sale (PDF)
16.A.7
Packet Pg. 467
05/28/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.7
Doc ID: 8651
Item Summary: Recommendation to approve final acceptance and the conveyance of the potable
water and sewer utility facilities for Coral Harbor Phase I, PL20170000368 and to authorize the County
Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project
Engineer or the Developer’s designated agent.
Meeting Date: 05/28/2019
Prepared by:
Title: Technician – Growth Management Development Review
Name: Lucia Martin
04/12/2019 12:24 PM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
04/12/2019 12:24 PM
Approved By:
Review:
Water Pamela Libby Additional Reviewer Completed 04/12/2019 12:27 PM
Wastewater Beth Johnssen Additional Reviewer Completed 04/12/2019 1:39 PM
Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 04/12/2019 2:24 PM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 04/12/2019 4:14 PM
Water Steve Messner Additional Reviewer Completed 04/14/2019 10:40 AM
Wastewater Steve Nagy Additional Reviewer Completed 04/15/2019 5:31 AM
Growth Management Department Judy Puig Level 1 Reviewer Completed 04/15/2019 10:33 AM
Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 04/17/2019 10:07 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 04/18/2019 9:00 AM
Growth Management Department James C French Deputy Department Head Review Completed 04/18/2019 9:34 AM
Growth Management Department Thaddeus Cohen Department Head Review Completed 04/18/2019 9:53 AM
County Attorney's Office Heidi Ashton-Cicko Level 2 Attorney of Record Review Completed 04/22/2019 2:02 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 04/22/2019 3:23 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/24/2019 1:35 PM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 04/25/2019 10:21 AM
County Manager's Office Geoffrey Willig Level 4 County Manager Review Completed 05/20/2019 9:36 AM
16.A.7
Packet Pg. 468
05/28/2019
Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM
16.A.7
Packet Pg. 469
FFO.E T
LOCATION
ftf-.\r'l I
I t,nt.]t *L,\( ll
rv
L,llrDtnfl\l-t
ut,1\lt
F
iT .\ll(ilrsTtNr
r(srlt l tt.t.l.
\6U
lc
*
PRo.ECT
LOCAIION
iI
.l
.J
L
\*T N
t JJr
J
I HJ JLHIrJ\[*N{,T-[,ffi*
rt !f_fr
.)
rtn I/s )-"
J
,s
itl
Y\-A)
-Df
Z*J
"i"l s"
I \\
CORAL HARBORPHASE I
LOCATION MAP
/
t !
IL
\
L
n
!
\-
L-\{5 I \.t iI
.g-fr=&\
s
16.A.7.a
Packet Pg. 470 Attachment: Location Map (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
Exhibit A
Utilities Performance Security (UPS) and Fina! Obligation Bond
The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer
utilities being installed for the whole project which includes material and labor. The
contributory assets reflect the cost of materials, not labor and are based on the assets of
which the county will be owning and maintaining.
Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2OO4-3]:
Attachments:
1. Verification of Final Cost
2. Receipt of Payment
Amount Receipt Number
10% UPS Bond WPlat
Final Obligation Bond S4,ooo 20L7384383
TotalAmount S4,ooo
16.A.7.b
Packet Pg. 471 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
PROJECT NAME:
LOCATION:
NAME AND ADDRESS OF OWNER:
TYPE OF UTILITY SYSTEM:
VERIFICATION OF FINAL COST
Coral Harbor Phase I
Section 1 , Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea. CA 92821
POTABLE WATER (Materiat and Services)
GIEE EIEIIIIE IEIL IEEL rr.rrirr
Temp Fire BFP @ Tie in Point
Connec{ to Existing Main
PVC DR-.I4
PVC DR.18
Gale Valve W Box
Fire Hydranl Assembly
Automatic Flushing Device
Permanenl Sample Points
Singlc Scnicc \\' ('urh Srop
[)outrlc \cn'icc l\' ( urh Stop
Water Main Fittings
Testing
$ 3,500.00 $$ 2,136.00 $$ 20.80 $
$ 19.21 $
$ 1,609.30 $$ 4,968.18 $$ 4,995.00 $$ 1,853.20 $$ 1,109.16 S
$ 1,136.36 $$ 1,657.00 $$ 2,26s.00 $
8"
8"
8'
EA
EA
LF
LF
EA
EA
EA
EA
EA
EA
LS
LS
'l
2
74
397
6
2
2
I
a
t{
'l
1
3,s00.00
4,272.O0
1,539.20
7.626.37
9,655.80
9,936.36
9,990.00
1,853.20
7,764.12
15,909.04
1,657.00
2.265.@
TOTAL COST
I do hereby certify that the quantities of material described above are a lrue and accuraterepresenlalion of the system of the as-installed cost of the system.
CERTIFYING:
JayBon
OF. Haleakala Construclion . lnc.
STATE OF FLORIOA
COUNTY OF COLLIER
The
2017 by
and who did take an oath
$ 75,968.09
tnstrument signed and acknowledged before me this 5 63y sf
I
JAN UAAY
who is personally known to me
Public
SEAt
'. rrF014507
-.-
16.A.7.b
Packet Pg. 472 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
PROJECT NAME:
LOCATION:
NAME AND AODRESS OF OWNER:
TYPE OF UTILITY SYSTEM:
VERIFICATION OF FINAL COST
Coral Harbor Phase I
Section 1, Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea, CA 92821
SANITARY WATER (Material and Services)
-
GEEItrI!4IIIEINNIII&EII rcIET
PVC SDR.26 - 6-8'CUT
PVC SDR-26 - 8-10' CUT
PVC SDR.26 - 10.12'CUT
PVC SDR.26. 12-14'CUT
MANHOLE 6.8'
MANHOLE 8.10'
MANHOLE 12.14'
Double Sewer Services
Connecl to Existing Manhole
Lifl Station lmprovements
Blasting for Sewer lnstallation
Testing
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
LF
LS
8"
8"
8"
8"
4',
4'
4',
93
443
171
222
1
2
1
14
1
1
929
1
$ 40.41 $
$ 45.41 $
$ 50.41 $
$ 57.4',1 $
$ 6,206.10 $
$ 6,950.06 $$ 6,987 32 S$ 798.12 $
$ 1,s30.00 $
$ 155,590.72 $
$ 16.16 $
$ 2,085.75 S
3,758.13
20,116.63
8,620.11
12.745.02
6,206.10
13,900.12
6,987.32
11.173.68
1,530.00
155,590.72
15,012.64
2,085.75
TOTAL COST
I do hereby certify that the quantities of material described above are a true and accurale
representation of the system of lhe as-installed cosl of the system.
CERTIFYING:
Jayson
OF Haleakala Construction , lnc.
STATE OF FLORIDA
COUNTY OF COLLIER
who is personally known to me
lll,,
\NA K
10,
I 257,726.22
*
rFF 044507
w_as srgned and acknowbdged
Oaescr.l nltcr berore me tnis 5 oay ot *hN )Flt y
and who did take an oath.
a-
Public
SEAL
t
16.A.7.b
Packet Pg. 473 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
PROJECT NAME:
LOCATION:
NAME AND ADDRESS OF OWNER:
TYPE OF UTILITY SYSTEM
VERIFICATION OF FINAL COST
Coral Harbor Phase I - Naples Reserve Circle Extension
Seciion 1, Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea. CA 92821
POTABLE WATER (Material and Services)
GIEilEntrImlNETTEEIT
Temp Fire BFP @ Tie in Point
Connecl to Existing Main
PVC DR-14
PVC DR.l8
PVC DR-18
PVC DR.14
PVC DR.18
Gate Valve w/ Box
Gate Vatue w/ Box
Gate Vatve W Box
Air Rclcasr'Valvc.
Fire Hydrant Assembly
Automatic Flushing Device (Relocated)
Permanent Sample Points
6" Master MeterlBackflow Assembty
Water Main Fittings
Testing
o
o
8"
10"
10"
6"
8"
10"
1
1
40
12
66
51
817
1
2
3
2
2
2
1
1
1
1
EA
EA
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
LS
LS
$ 3,5m.00
$ 2,136.00
$ 17.33
$ 16.24
$ 19.21
$ 25.93
$ 23.02
$ 1,236.00
$ 1,609.30
$ 2,137.18
$ 1,954.90
$ 4,888.18
$ 1,250.00
$ 2,376.78
$ 25,067.92
$ 5,660.00
$ 2,265.00
$ 3,s00.00
$ 2,136.00
$ 693.20
$ 194.88
$ 1,267.86
$ 1,322.43
$ 18,807.34
s 1,236.00
$ 3,218.60
s 6,411.54
$ 3,909.80
$ 9,736.36
$ 2,500.00
$ 2,376.78
$ 25,067.92
$ 5,660.00
$ 2,265.00
TOTAL COST
I do hereby certiry that the guanlities of material described above are a true and accurate
representation of the system of the as-installed cost of the system.
CERTIFYING:
Jayson
OF Haleakala Construclion . lnc
STATE OF FLORIDA
COUNTY OF COLLIER
s 90,303.71
The
201',7bv
instrument signed and acknowledged before me this 5 dayor JnNuaR-y
who is personally known to me
and who did take an oath.
Public
SEAL:
TOTAL
K
t.-
l0
IFF044SOT
16.A.7.b
Packet Pg. 474 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
PROJECT NAME:
LOCATION:
NAME AND ADDRESS OF OWNER:
TYPE OF UTILITY SYSTEM:
VERIFICATION OF FINAL COST
Coral Harbor Phase I - Naples Reserve Circle Extension
Section 1 , Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea, CA 92821
SANITARY WATER (Material and Services)
f,{Ehl EIIEIIIIII IEIIT IEEL EIEII
PVC SDR-26 - 10-12'CUT
MANHOLE 10.12'
Connect lo Existing FORCEMAIN
FORCEMAIN. PVC DR-14
FORCEMAIN. PVC DR-18
Gate Valve w/ Box
WETWELL
Blasling for Sewer lnstallation
Testing
LF
EA
EA
LF
LF
EA
EA
LF
LS
245
4
,|
128
835
2
1
245
'l
8"
4',
4"
4"
I'
$ 57.41 $
$ 7,426.30 $
$ 1.530.00 $
$ 12.88 $
$ 12.28 $
$ 957.92 $
$ 31,8t4.00 $$ 16.16 S$ 1.s00.00 s
14,065.45
29.705.20
1.530.00
1 648.64
10.253.80
1,915.84
31,854.00
3,959.20
1,500.00
TOTAL COST
I do hereby certify that the quantities of material described above are a true and accurate
representation of the syslem of the as-installed cost of the system.
CERTIFYING:
Jayson
OF. Haleekala Construclion . lnc.
STATE OF FLORIDA
COUNTY OF COLLIER
before me ttris 5 oay ot ,.hr,t$qkY
and who did take an oath.
who is p€rsonally known to me
$ 96,432.13
.-..-:t1$3ff;'ZzS js*^$ 2'*1, Z
=*: - -.- :*=
=r-.'., rFFollsoT L.=%;ffiS
Public
SEAL
The foregorng tnstrument
2017 by &v 5 orv
16.A.7.b
Packet Pg. 475 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
Collier County
Growth Management Division
2800 Horseshoe Drive N,
FL 34104
RECEIPT OF PAYMENT
Receipt Number:
Transaction Number:
Date Paid:
Amount Due:
Payment Details:
Amount Paid:
Change / Overage:
Contact:
FEE DETAILS:
Fee Descriotion
Utility Performance
Refundable Bond
Cashier Name:
Batch Number:
Entered By:
20t7384383
20L7-007859
02/07/2Ot7
$4,000.00
Pavment Method
Check
Reference Number
P120170000368
LeaDerence
6072
melissaalvarez
Amount Paid
$4,000.00
Check Number
L6736
$4,000.00
$0.00
ISTAR, INC
1114 AVENUE OF THE AMERICAS
NEW YORK, NY 10036
Orioinal
Fee
$4,000.00
Amount
Paid
$4,000.00
GL Account
670-000000-220L13
16.A.7.b
Packet Pg. 476 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
CERTIFICATION OF CONTRIBUTORY ASSETS. COUNTY
PROJECT NAME:
LOCATION:
NAME AND ADDRESS OF OWNER:
TYPE OF UTILITY SYSTEM:
Coral Harbor Phase I
Section 1 , Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea. CA 92821
POTABLE WATER (Material Only)
ETTTEIEIMIIgTIEilIreEU
Temp Fire BFP @ Tie in Point
Connecl to Existing Main
PVC DR.14
PVC DR-18
Gate Valve W Box
Fire Hydrant Assembly
Aulomatic Flushing Device
Permanent Sample Points
Single Senice \\'; Curb Stop
Double Sen'icc \\', C'urh Stop
Water Main Fittings
Testing
EA
EA
LF
LF
EA
EA
EA
EA
EA
EA
LS
LS
1
2
74
397
6
2
2
1
7
l.l
1
1
8"
8"
8"
$ 3.500.00 $
$ 265.00 $
$ 8.80 $
$ 7.21 $
$ 9s9.30 $
$ 2,918.18 $
$ 3,445.22 $
$ 986.s0 $
$ 409.'16 $
$ 536.36 $$ 1.007.60 s$-s
3,500.00
530 00
651 20
2.862.37
5,755 80
5,836 36
6,890 rt4
986.50
2,86/'.12
7.509.04
1,007 60
TOTAL COST
I do hereby certify that the quantities of material described above are a true and accurate
representation of the system being contributed to Collier County Utililies, lnc.
CERTIFYING:
Jayson
OF. Haleakala Construction . lnc
STATE OF FLORIOA
COUNTY OF COLLIER
$ 38,393.43
The
201',7bv
anstrument was and acknowledged before me thiso who rs personally known to me
and who dic, take an oath
\NA{
SEAL
10.
t:-'. lFF044507
SI
*
U ,-'-ta* R lllr*r"r*
Notai Publac t -
16.A.7.c
Packet Pg. 477 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
CERTIFICATION OF CONTRIBUTORY ASSETS . COUNTY
PROJECT NAME:
LOCATION
NAME AND ADDRESS OF OWNER
TYPE OF UTILITY SYSTEM:
Coral Harbor Phase I - Naples Reserve Circle Extension
Section 1, Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea, CA 92821
POTABLE WATER (Material Only)
GIET CIEIEE IlItrI IEEII GIUL
Temp Fire BFP @ Tie in Point
Connect to Existing Main
PVC DR.14
PVC DR.18
PVC DR-18
PVC DR-14
PVC DR-18
Gate Vatue w/ Box
Gate Vatue w/ Box
Gate Valve wl Box
Air Rclcasc Vulrc
Fire Hydrant Assembly
Automatic Flushing Device (Relocated)
Permanent Sample Points
6" Master Meter/Backflow Assembly
Water Main Fittings
Testing
The
201
instrument
7bv so
and \ rho did take an oath
L K
and acknowledged before me lnrs 5 day of ^lwho is personally knorn to me
SEAL
6"
6"
8"
10"
10"
6"
8"
10"
1
1
40
12
66
51
EA
EA
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
LS
LS
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
3,500.00
265.00
5.33
4.24
7.21
13.93
11.02
636.00
959.30
1.487 18
704.90
3.500.00
265 00
213.?0
50.88
475.86
710.43
9,003.34
636.00
1,918.60
4,461.54
1,409.80
5,836.36
1,849.20
986.50
20,067.92
4,356.50
55,741.13
$
$
$
s
s
$
$
$
$
$
$
$
$
$
$
$
$
$
817
1
2
3
2
2
2
1
1
1
1
91 8.1 82
924.60
986.50
20.067.92
4.356.50
c
TOTAL COST
I do hereby cenrry thal the quantities of material described above are a true and accurale
representation of the system being contributed to Collier County Utilities, lnc.
Jayson
STATE OF FLORIDA
COUNTY OF COLLIER
(
l0
-O
{FF 044507
SI
Notary Public
*t
OF. Haleakala Construction . lnc
16.A.7.c
Packet Pg. 478 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY
PROJECT NAME:
LOCATION:
NAME AND ADDRESS OF OWNER
TYPE OF UTILITY SYSTEM
Coral Harbor Phase I
Section 1, Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea, CA 92821
SANITARY SEWER (Material Only)
EIEEI EUIEII ]NL IEEI- r-r.rimr
PVC SDR-26 - 6.8'CUT
PVC SDR-26 - 8-10'CUT
PVC SDR-26 - 10-12'CUT
PVC SDR-26 - 12-',t4'CUT
MANHOLE 6.8'
MANHOLE 8.10'
MANHOLE 12-14'
Double Sewer Services
Connecl to Existing Manhole
Lift Station lmprovements
Blasting for Sewer lnstallation
Testing
The instrument
201 7 by
93
443
171
222
'l
2
1
't4
1
1
929
1
before me this 5 day
who is
or JnNunF'Y
personally known to me
123,550.30
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
LF
LS
8"
8"
8"
8"
4',
4'.
4'
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5.41
5.41
541
5.41
3,906.10
4,400.06
6,227.50
373.12
530.00
123,550.30
503.1 3
2,396.63
925.11
1,?01.02
3,906.10
8,800.12
6,227.50
5,223.68
530,00
$ 'rs3,263.59TOTAL COST
I do hereby certiry that the quantities of material described above are a true and accurate
representation of the system being contributed to Collier County Utilities, lnc.
CERTIFYING:
Jayson
OF: Haleakala Construc{ion , lnc.
STATE OF FLORIDA
COUNTY OF COLLIER
and
ES
10,
-
044507
\NA
{FF
G*>
l'l
*
and who did take an oath.
Un;nt-i- K flr,,,,,r*
Notaly Public '
SEAL:
16.A.7.c
Packet Pg. 479 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
CERTIFICATION OF CONTRIBUTORY ASSETS. COUNTY
PROJECT NAME:
LOCATION:
NAME AND ADDRESS OF OWNER
TYPE OF UTILITY SYSTEM:
Coral Harbor Phase I - Naples Reserve Circle Extension
Section 1, Township 51S, Range 25E
SFI Naples Reserve, LLC
2427 Easl lmperial Way
Brea, CA 92821
SANITARY SEWER (Materiat Onty)
EETElEIroUIIIEEIIrcIGII
PVC SDR-26 - 1O-12'CUT
MANHOLE 10.12'
Connect to Existing FORCEMAIN
FORCEMAIN. PVC DR-14
FORCEMAIN. PVC DR-18
Gate Valve w/ Box
WET WELL
Blasting for Sewer lnstallation
Testing
LF
EA
EA
LF
LF
EA
EA
LF
LS
8"
4',
4"
4"
4"
8'
245
4
1
128
835
2
,|
245
1
$ 5.41
$ 4,568.30
$ 530.00
$ 2.76
$ 2.16
$ 457.92
$ 16,854 00
1,325.45
18.273.24
530.00
353.28
1,803.60
915.84
16,8s4.00
$
$
$
$
$
$
$
s
$
TOTAL COST
I do hereby certi! that the quantities of malerial described above are a true and accurate
representation of lhe system being contribuled to Collier County Utilities, lnc.
CERTIFYING
Jayson
OF Haleakala Constructron . lnc
STATE OF FLORIDA
COUNTY OF COLLIER
and YYho did take an oath.
c>SEAL
t 40,055.37
The foregorng-rnstrument was srgned and acknowredged before me this 5 day ot JA N LtALy
2017 by . /flvSon/ C)Pe.scrf n//cJ( who i3 personaily knoxn to me
(
*t -
044507
O
{FF
tc.
Public
,t,
16.A.7.c
Packet Pg. 480 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 481 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 482 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 483 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 484 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 485 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.dPacket Pg. 486Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 487 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 488 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 489 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)
16.A.7.d
Packet Pg. 490 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)