Loading...
Agenda 05/28/2019 Item #16A 7 (Coral Harbor Phase I Conveyance & Bond Release)05/28/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and the conveyance of the potable water and sewer utility facilities for Coral Harbor Phase I, PL20170000368 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and the conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Coral Harbor Phase I, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on April 14, 2017. At that time, the value of these potable water and sewer utility facilities (assets) was $94,134.56 and $193,318.96, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed, and Bill of Sale recorded in Official Records Book 5401, at Page 1135, of the Public Records of Collier County, Florida (“The Utilities Facilities Deed”). 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on April 11, 2019, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount of $4,000. Staff also recommends acceptance of the Utilities Facilities Deed and the facilities described therein. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $287,453.52 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.7 Packet Pg. 466 05/28/2019 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - HFAC RECOMMENDATION: To approve final acceptance and the conveyance of the potable water and sewer utility facilities for Coral Harbor Phase I, PL20170000368, accept the conveyance of the Utilities Facilities Deed and the facilities described therein, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 4. Warranty Deed and Bill of Sale (PDF) 16.A.7 Packet Pg. 467 05/28/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.7 Doc ID: 8651 Item Summary: Recommendation to approve final acceptance and the conveyance of the potable water and sewer utility facilities for Coral Harbor Phase I, PL20170000368 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 05/28/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 04/12/2019 12:24 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 04/12/2019 12:24 PM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 04/12/2019 12:27 PM Wastewater Beth Johnssen Additional Reviewer Completed 04/12/2019 1:39 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 04/12/2019 2:24 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 04/12/2019 4:14 PM Water Steve Messner Additional Reviewer Completed 04/14/2019 10:40 AM Wastewater Steve Nagy Additional Reviewer Completed 04/15/2019 5:31 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 04/15/2019 10:33 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 04/17/2019 10:07 AM Growth Management Department Matthew McLean Additional Reviewer Completed 04/18/2019 9:00 AM Growth Management Department James C French Deputy Department Head Review Completed 04/18/2019 9:34 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 04/18/2019 9:53 AM County Attorney's Office Heidi Ashton-Cicko Level 2 Attorney of Record Review Completed 04/22/2019 2:02 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 04/22/2019 3:23 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/24/2019 1:35 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 04/25/2019 10:21 AM County Manager's Office Geoffrey Willig Level 4 County Manager Review Completed 05/20/2019 9:36 AM 16.A.7 Packet Pg. 468 05/28/2019 Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM 16.A.7 Packet Pg. 469 FFO.E T LOCATION ftf-.\r'l I I t,nt.]t *L,\( ll rv L,llrDtnfl\l-t ut,1\lt F iT .\ll(ilrsTtNr r(srlt l tt.t.l. \6U lc * PRo.ECT LOCAIION iI .l .J L \*T N t JJr J I HJ JLHIrJ\[*N{,T-[,ffi* rt !f_fr .) rtn I/s )-" J ,s itl Y\-A) -Df Z*J "i"l s" I \\ CORAL HARBORPHASE I LOCATION MAP / t ! IL \ L n ! \- L-\{5 I \.t iI .g-fr=&\ s 16.A.7.a Packet Pg. 470 Attachment: Location Map (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) Exhibit A Utilities Performance Security (UPS) and Fina! Obligation Bond The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2OO4-3]: Attachments: 1. Verification of Final Cost 2. Receipt of Payment Amount Receipt Number 10% UPS Bond WPlat Final Obligation Bond S4,ooo 20L7384383 TotalAmount S4,ooo 16.A.7.b Packet Pg. 471 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: VERIFICATION OF FINAL COST Coral Harbor Phase I Section 1 , Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea. CA 92821 POTABLE WATER (Materiat and Services) GIEE EIEIIIIE IEIL IEEL rr.rrirr Temp Fire BFP @ Tie in Point Connec{ to Existing Main PVC DR-.I4 PVC DR.18 Gale Valve W Box Fire Hydranl Assembly Automatic Flushing Device Permanenl Sample Points Singlc Scnicc \\' ('urh Srop [)outrlc \cn'icc l\' ( urh Stop Water Main Fittings Testing $ 3,500.00 $$ 2,136.00 $$ 20.80 $ $ 19.21 $ $ 1,609.30 $$ 4,968.18 $$ 4,995.00 $$ 1,853.20 $$ 1,109.16 S $ 1,136.36 $$ 1,657.00 $$ 2,26s.00 $ 8" 8" 8' EA EA LF LF EA EA EA EA EA EA LS LS 'l 2 74 397 6 2 2 I a t{ 'l 1 3,s00.00 4,272.O0 1,539.20 7.626.37 9,655.80 9,936.36 9,990.00 1,853.20 7,764.12 15,909.04 1,657.00 2.265.@ TOTAL COST I do hereby certify that the quantities of material described above are a lrue and accuraterepresenlalion of the system of the as-installed cost of the system. CERTIFYING: JayBon OF. Haleakala Construclion . lnc. STATE OF FLORIOA COUNTY OF COLLIER The 2017 by and who did take an oath $ 75,968.09 tnstrument signed and acknowledged before me this 5 63y sf I JAN UAAY who is personally known to me Public SEAt '. rrF014507 -.- 16.A.7.b Packet Pg. 472 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) PROJECT NAME: LOCATION: NAME AND AODRESS OF OWNER: TYPE OF UTILITY SYSTEM: VERIFICATION OF FINAL COST Coral Harbor Phase I Section 1, Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea, CA 92821 SANITARY WATER (Material and Services) - GEEItrI!4IIIEINNIII&EII rcIET PVC SDR.26 - 6-8'CUT PVC SDR-26 - 8-10' CUT PVC SDR.26 - 10.12'CUT PVC SDR.26. 12-14'CUT MANHOLE 6.8' MANHOLE 8.10' MANHOLE 12.14' Double Sewer Services Connecl to Existing Manhole Lifl Station lmprovements Blasting for Sewer lnstallation Testing LF LF LF LF EA EA EA EA EA EA LF LS 8" 8" 8" 8" 4', 4' 4', 93 443 171 222 1 2 1 14 1 1 929 1 $ 40.41 $ $ 45.41 $ $ 50.41 $ $ 57.4',1 $ $ 6,206.10 $ $ 6,950.06 $$ 6,987 32 S$ 798.12 $ $ 1,s30.00 $ $ 155,590.72 $ $ 16.16 $ $ 2,085.75 S 3,758.13 20,116.63 8,620.11 12.745.02 6,206.10 13,900.12 6,987.32 11.173.68 1,530.00 155,590.72 15,012.64 2,085.75 TOTAL COST I do hereby certify that the quantities of material described above are a true and accurale representation of the system of lhe as-installed cosl of the system. CERTIFYING: Jayson OF Haleakala Construction , lnc. STATE OF FLORIDA COUNTY OF COLLIER who is personally known to me lll,, \NA K 10, I 257,726.22 * rFF 044507 w_as srgned and acknowbdged Oaescr.l nltcr berore me tnis 5 oay ot *hN )Flt y and who did take an oath. a- Public SEAL t 16.A.7.b Packet Pg. 473 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM VERIFICATION OF FINAL COST Coral Harbor Phase I - Naples Reserve Circle Extension Seciion 1, Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea. CA 92821 POTABLE WATER (Material and Services) GIEilEntrImlNETTEEIT Temp Fire BFP @ Tie in Point Connecl to Existing Main PVC DR-14 PVC DR.l8 PVC DR-18 PVC DR.14 PVC DR.18 Gate Valve w/ Box Gate Vatue w/ Box Gate Vatve W Box Air Rclcasr'Valvc. Fire Hydrant Assembly Automatic Flushing Device (Relocated) Permanent Sample Points 6" Master MeterlBackflow Assembty Water Main Fittings Testing o o 8" 10" 10" 6" 8" 10" 1 1 40 12 66 51 817 1 2 3 2 2 2 1 1 1 1 EA EA LF LF LF LF LF EA EA EA EA EA EA EA EA LS LS $ 3,5m.00 $ 2,136.00 $ 17.33 $ 16.24 $ 19.21 $ 25.93 $ 23.02 $ 1,236.00 $ 1,609.30 $ 2,137.18 $ 1,954.90 $ 4,888.18 $ 1,250.00 $ 2,376.78 $ 25,067.92 $ 5,660.00 $ 2,265.00 $ 3,s00.00 $ 2,136.00 $ 693.20 $ 194.88 $ 1,267.86 $ 1,322.43 $ 18,807.34 s 1,236.00 $ 3,218.60 s 6,411.54 $ 3,909.80 $ 9,736.36 $ 2,500.00 $ 2,376.78 $ 25,067.92 $ 5,660.00 $ 2,265.00 TOTAL COST I do hereby certiry that the guanlities of material described above are a true and accurate representation of the system of the as-installed cost of the system. CERTIFYING: Jayson OF Haleakala Construclion . lnc STATE OF FLORIDA COUNTY OF COLLIER s 90,303.71 The 201',7bv instrument signed and acknowledged before me this 5 dayor JnNuaR-y who is personally known to me and who did take an oath. Public SEAL: TOTAL K t.- l0 IFF044SOT 16.A.7.b Packet Pg. 474 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: VERIFICATION OF FINAL COST Coral Harbor Phase I - Naples Reserve Circle Extension Section 1 , Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea, CA 92821 SANITARY WATER (Material and Services) f,{Ehl EIIEIIIIII IEIIT IEEL EIEII PVC SDR-26 - 10-12'CUT MANHOLE 10.12' Connect lo Existing FORCEMAIN FORCEMAIN. PVC DR-14 FORCEMAIN. PVC DR-18 Gate Valve w/ Box WETWELL Blasling for Sewer lnstallation Testing LF EA EA LF LF EA EA LF LS 245 4 ,| 128 835 2 1 245 'l 8" 4', 4" 4" I' $ 57.41 $ $ 7,426.30 $ $ 1.530.00 $ $ 12.88 $ $ 12.28 $ $ 957.92 $ $ 31,8t4.00 $$ 16.16 S$ 1.s00.00 s 14,065.45 29.705.20 1.530.00 1 648.64 10.253.80 1,915.84 31,854.00 3,959.20 1,500.00 TOTAL COST I do hereby certify that the quantities of material described above are a true and accurate representation of the syslem of the as-installed cost of the system. CERTIFYING: Jayson OF. Haleekala Construclion . lnc. STATE OF FLORIDA COUNTY OF COLLIER before me ttris 5 oay ot ,.hr,t$qkY and who did take an oath. who is p€rsonally known to me $ 96,432.13 .-..-:t1$3ff;'ZzS js*^$ 2'*1, Z =*: - -.- :*= =r-.'., rFFollsoT L.=%;ffiS Public SEAL The foregorng tnstrument 2017 by &v 5 orv 16.A.7.b Packet Pg. 475 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) Collier County Growth Management Division 2800 Horseshoe Drive N, FL 34104 RECEIPT OF PAYMENT Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Descriotion Utility Performance Refundable Bond Cashier Name: Batch Number: Entered By: 20t7384383 20L7-007859 02/07/2Ot7 $4,000.00 Pavment Method Check Reference Number P120170000368 LeaDerence 6072 melissaalvarez Amount Paid $4,000.00 Check Number L6736 $4,000.00 $0.00 ISTAR, INC 1114 AVENUE OF THE AMERICAS NEW YORK, NY 10036 Orioinal Fee $4,000.00 Amount Paid $4,000.00 GL Account 670-000000-220L13 16.A.7.b Packet Pg. 476 Attachment: Exhibit A (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) CERTIFICATION OF CONTRIBUTORY ASSETS. COUNTY PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: Coral Harbor Phase I Section 1 , Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea. CA 92821 POTABLE WATER (Material Only) ETTTEIEIMIIgTIEilIreEU Temp Fire BFP @ Tie in Point Connecl to Existing Main PVC DR.14 PVC DR-18 Gate Valve W Box Fire Hydrant Assembly Aulomatic Flushing Device Permanent Sample Points Single Senice \\'; Curb Stop Double Sen'icc \\', C'urh Stop Water Main Fittings Testing EA EA LF LF EA EA EA EA EA EA LS LS 1 2 74 397 6 2 2 1 7 l.l 1 1 8" 8" 8" $ 3.500.00 $ $ 265.00 $ $ 8.80 $ $ 7.21 $ $ 9s9.30 $ $ 2,918.18 $ $ 3,445.22 $ $ 986.s0 $ $ 409.'16 $ $ 536.36 $$ 1.007.60 s$-s 3,500.00 530 00 651 20 2.862.37 5,755 80 5,836 36 6,890 rt4 986.50 2,86/'.12 7.509.04 1,007 60 TOTAL COST I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utililies, lnc. CERTIFYING: Jayson OF. Haleakala Construction . lnc STATE OF FLORIOA COUNTY OF COLLIER $ 38,393.43 The 201',7bv anstrument was and acknowledged before me thiso who rs personally known to me and who dic, take an oath \NA{ SEAL 10. t:-'. lFF044507 SI * U ,-'-ta* R lllr*r"r* Notai Publac t - 16.A.7.c Packet Pg. 477 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) CERTIFICATION OF CONTRIBUTORY ASSETS . COUNTY PROJECT NAME: LOCATION NAME AND ADDRESS OF OWNER TYPE OF UTILITY SYSTEM: Coral Harbor Phase I - Naples Reserve Circle Extension Section 1, Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea, CA 92821 POTABLE WATER (Material Only) GIET CIEIEE IlItrI IEEII GIUL Temp Fire BFP @ Tie in Point Connect to Existing Main PVC DR.14 PVC DR.18 PVC DR-18 PVC DR-14 PVC DR-18 Gate Vatue w/ Box Gate Vatue w/ Box Gate Valve wl Box Air Rclcasc Vulrc Fire Hydrant Assembly Automatic Flushing Device (Relocated) Permanent Sample Points 6" Master Meter/Backflow Assembly Water Main Fittings Testing The 201 instrument 7bv so and \ rho did take an oath L K and acknowledged before me lnrs 5 day of ^lwho is personally knorn to me SEAL 6" 6" 8" 10" 10" 6" 8" 10" 1 1 40 12 66 51 EA EA LF LF LF LF LF EA EA EA EA EA EA EA EA LS LS $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,500.00 265.00 5.33 4.24 7.21 13.93 11.02 636.00 959.30 1.487 18 704.90 3.500.00 265 00 213.?0 50.88 475.86 710.43 9,003.34 636.00 1,918.60 4,461.54 1,409.80 5,836.36 1,849.20 986.50 20,067.92 4,356.50 55,741.13 $ $ $ s s $ $ $ $ $ $ $ $ $ $ $ $ $ 817 1 2 3 2 2 2 1 1 1 1 91 8.1 82 924.60 986.50 20.067.92 4.356.50 c TOTAL COST I do hereby cenrry thal the quantities of material described above are a true and accurale representation of the system being contributed to Collier County Utilities, lnc. Jayson STATE OF FLORIDA COUNTY OF COLLIER ( l0 -O {FF 044507 SI Notary Public *t OF. Haleakala Construction . lnc 16.A.7.c Packet Pg. 478 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER TYPE OF UTILITY SYSTEM Coral Harbor Phase I Section 1, Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea, CA 92821 SANITARY SEWER (Material Only) EIEEI EUIEII ]NL IEEI- r-r.rimr PVC SDR-26 - 6.8'CUT PVC SDR-26 - 8-10'CUT PVC SDR-26 - 10-12'CUT PVC SDR-26 - 12-',t4'CUT MANHOLE 6.8' MANHOLE 8.10' MANHOLE 12-14' Double Sewer Services Connecl to Existing Manhole Lift Station lmprovements Blasting for Sewer lnstallation Testing The instrument 201 7 by 93 443 171 222 'l 2 1 't4 1 1 929 1 before me this 5 day who is or JnNunF'Y personally known to me 123,550.30 LF LF LF LF EA EA EA EA EA EA LF LS 8" 8" 8" 8" 4', 4'. 4' $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5.41 5.41 541 5.41 3,906.10 4,400.06 6,227.50 373.12 530.00 123,550.30 503.1 3 2,396.63 925.11 1,?01.02 3,906.10 8,800.12 6,227.50 5,223.68 530,00 $ 'rs3,263.59TOTAL COST I do hereby certiry that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, lnc. CERTIFYING: Jayson OF: Haleakala Construc{ion , lnc. STATE OF FLORIDA COUNTY OF COLLIER and ES 10, - 044507 \NA {FF G*> l'l * and who did take an oath. Un;nt-i- K flr,,,,,r* Notaly Public ' SEAL: 16.A.7.c Packet Pg. 479 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) CERTIFICATION OF CONTRIBUTORY ASSETS. COUNTY PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER TYPE OF UTILITY SYSTEM: Coral Harbor Phase I - Naples Reserve Circle Extension Section 1, Township 51S, Range 25E SFI Naples Reserve, LLC 2427 Easl lmperial Way Brea, CA 92821 SANITARY SEWER (Materiat Onty) EETElEIroUIIIEEIIrcIGII PVC SDR-26 - 1O-12'CUT MANHOLE 10.12' Connect to Existing FORCEMAIN FORCEMAIN. PVC DR-14 FORCEMAIN. PVC DR-18 Gate Valve w/ Box WET WELL Blasting for Sewer lnstallation Testing LF EA EA LF LF EA EA LF LS 8" 4', 4" 4" 4" 8' 245 4 1 128 835 2 ,| 245 1 $ 5.41 $ 4,568.30 $ 530.00 $ 2.76 $ 2.16 $ 457.92 $ 16,854 00 1,325.45 18.273.24 530.00 353.28 1,803.60 915.84 16,8s4.00 $ $ $ $ $ $ $ s $ TOTAL COST I do hereby certi! that the quantities of malerial described above are a true and accurate representation of lhe system being contribuled to Collier County Utilities, lnc. CERTIFYING Jayson OF Haleakala Constructron . lnc STATE OF FLORIDA COUNTY OF COLLIER and YYho did take an oath. c>SEAL t 40,055.37 The foregorng-rnstrument was srgned and acknowredged before me this 5 day ot JA N LtALy 2017 by . /flvSon/ C)Pe.scrf n//cJ( who i3 personaily knoxn to me ( *t - 044507 O {FF tc. Public ,t, 16.A.7.c Packet Pg. 480 Attachment: Assets Sheet (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 481 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 482 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 483 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 484 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 485 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.dPacket Pg. 486Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 487 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 488 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 489 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I) 16.A.7.d Packet Pg. 490 Attachment: Warranty Deed and Bill of Sale (8651 : Final Acceptance of Utilities - Coral Harbor Phase I)