Agenda 05/28/2019 Item #16A 6 (Lely Resort Boulevard/Wildflower Way 4-Way Stop)05/28/2019
EXECUTIVE SUMMARY
Recommendation to accept a Multi-Way Stop Warrant Study and approve the installation and
operation of a 4-Way Stop control at the intersection of Lely Resort Boulevard and Wildflower
Way, at an installation cost of approximately $400 with an annual maintenance cost of
approximately $100 (Cost Center 163630).
OBJECTIVE: To request the Board accept a Multi-Way Stop Warrant Study and approve that a 4-Way
Stop control be constructed, activated, and maintained at the intersection of Lely Resort Boulevard and
Wildflower Way in accordance with any and all applicable Federal, State, and County standards and
specifications governing such traffic control devices.
CONSIDERATIONS: Florida Statute §316.006 provides that the County “may place and maintain
such traffic control devices which conform to the manual and specifications of the Department of
Transportation upon all streets and highways under their original jurisdiction as they shall deem
necessary…to regulate, warn or guide traffic.” A traffic engineering study, performed and approved by a
Professional Engineer registered to practice in the State of Florida, has concluded with the determination
that the subject intersection meets the minimum warrants for a Multi -Way Stop, as set forth in the Manual
on Uniform Traffic Control Devices (MUTCD). Installation of a 4 -Way Stop at this location is within
Collier County Access Management Guidelines.
The traffic engineering study was performed at the request of concerned residents. The study report was
completed April 16, 2019, in accordance with guidelines promulgated by the Florida Department of
Transportation and the MUTCD. The investigation of the need for a multi-way stop includes an analysis
of various factors related to the operation and safety at the intersection and the determination if specific
warrants identified within the MUTCD are met.
FISCAL IMPACT: We estimate the cost of this work to be $400 with an annual maintenance cost of
approximately $100. In the future, the Lely Community Development District may change the signage to
be on decorative posts at which time they would be responsible for all future maintenance. Funds are
available in the Traffic Operations Cost Center (163630) within Transportation Services Fund (101).
GROWTH MANAGEMENT IMPACT: This action will result in no growth management impact.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to
form and legality, and requires majority vote for approval. -JAK
RECOMMENDATION: That the Board accept the findings of the Multi-Way Stop Warrant Study and
approve that a 4-Way Stop control be constructed, activated, and maintained at the intersection of Lely
Resort Boulevard in accordance with any and all applicable Federal, State, and County standards and
specifications governing such traffic control devices.
Prepared by: Daniel G. Hall, P.E., Transportation Engineering Division, Growth Management
Department.
ATTACHMENT(S)
1. Final Report (PDF)
16.A.6
Packet Pg. 439
05/28/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.6
Doc ID: 8705
Item Summary: Recommendation to accept a Multi-Way Stop Warrant Study and approve the
installation and operation of a 4-Way Stop control at the intersection of Lely Resort Boulevard and
Wildflower Way, at an installation cost of approximately $400 with an annual maintenance cost of
approximately $100 (Cost Center 16360).
Meeting Date: 05/28/2019
Prepared by:
Title: Project Manager, Senior – Transportation Engineering
Name: Daniel Hall
04/18/2019 3:53 PM
Submitted by:
Title: Division Director - Transportation Eng – Transportation Engineering
Name: Jay Ahmad
04/18/2019 3:53 PM
Approved By:
Review:
Growth Management Department Christine Arnold Level 1 Reviewer Completed 04/19/2019 8:44 AM
Growth Management Department Anthony Khawaja Additional Reviewer Completed 04/19/2019 10:52 AM
Transportation Engineering Jay Ahmad Additional Reviewer Completed 04/19/2019 1:06 PM
Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 04/24/2019 8:50 AM
Growth Management Department Gene Shue Additional Reviewer Completed 04/24/2019 5:24 PM
County Attorney's Office Jeffrey A. Klatzkow Level 2 Attorney Review Completed 04/25/2019 8:59 AM
Growth Management Department Thaddeus Cohen Department Head Review Completed 04/30/2019 9:36 AM
Growth Management Department Jeanne Marcella Deputy Department Head Review Skipped 05/01/2019 2:17 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/02/2019 8:16 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/02/2019 9:07 AM
Office of Management and Budget Laura Zautcke Additional Reviewer Completed 05/07/2019 9:02 AM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/19/2019 9:25 AM
Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM
16.A.6
Packet Pg. 440
16.A.6.aPacket Pg. 441Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 442Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 443Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 444Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 445Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 446Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 447Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 448Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 449Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 450Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 451Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 452Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 453Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 454Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 455Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 456Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 457Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 458Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 459Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 460Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 461Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 462Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 463Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 464Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)
16.A.6.aPacket Pg. 465Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)