Loading...
Agenda 05/28/2019 Item #16A 6 (Lely Resort Boulevard/Wildflower Way 4-Way Stop)05/28/2019 EXECUTIVE SUMMARY Recommendation to accept a Multi-Way Stop Warrant Study and approve the installation and operation of a 4-Way Stop control at the intersection of Lely Resort Boulevard and Wildflower Way, at an installation cost of approximately $400 with an annual maintenance cost of approximately $100 (Cost Center 163630). OBJECTIVE: To request the Board accept a Multi-Way Stop Warrant Study and approve that a 4-Way Stop control be constructed, activated, and maintained at the intersection of Lely Resort Boulevard and Wildflower Way in accordance with any and all applicable Federal, State, and County standards and specifications governing such traffic control devices. CONSIDERATIONS: Florida Statute §316.006 provides that the County “may place and maintain such traffic control devices which conform to the manual and specifications of the Department of Transportation upon all streets and highways under their original jurisdiction as they shall deem necessary…to regulate, warn or guide traffic.” A traffic engineering study, performed and approved by a Professional Engineer registered to practice in the State of Florida, has concluded with the determination that the subject intersection meets the minimum warrants for a Multi -Way Stop, as set forth in the Manual on Uniform Traffic Control Devices (MUTCD). Installation of a 4 -Way Stop at this location is within Collier County Access Management Guidelines. The traffic engineering study was performed at the request of concerned residents. The study report was completed April 16, 2019, in accordance with guidelines promulgated by the Florida Department of Transportation and the MUTCD. The investigation of the need for a multi-way stop includes an analysis of various factors related to the operation and safety at the intersection and the determination if specific warrants identified within the MUTCD are met. FISCAL IMPACT: We estimate the cost of this work to be $400 with an annual maintenance cost of approximately $100. In the future, the Lely Community Development District may change the signage to be on decorative posts at which time they would be responsible for all future maintenance. Funds are available in the Traffic Operations Cost Center (163630) within Transportation Services Fund (101). GROWTH MANAGEMENT IMPACT: This action will result in no growth management impact. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality, and requires majority vote for approval. -JAK RECOMMENDATION: That the Board accept the findings of the Multi-Way Stop Warrant Study and approve that a 4-Way Stop control be constructed, activated, and maintained at the intersection of Lely Resort Boulevard in accordance with any and all applicable Federal, State, and County standards and specifications governing such traffic control devices. Prepared by: Daniel G. Hall, P.E., Transportation Engineering Division, Growth Management Department. ATTACHMENT(S) 1. Final Report (PDF) 16.A.6 Packet Pg. 439 05/28/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.6 Doc ID: 8705 Item Summary: Recommendation to accept a Multi-Way Stop Warrant Study and approve the installation and operation of a 4-Way Stop control at the intersection of Lely Resort Boulevard and Wildflower Way, at an installation cost of approximately $400 with an annual maintenance cost of approximately $100 (Cost Center 16360). Meeting Date: 05/28/2019 Prepared by: Title: Project Manager, Senior – Transportation Engineering Name: Daniel Hall 04/18/2019 3:53 PM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 04/18/2019 3:53 PM Approved By: Review: Growth Management Department Christine Arnold Level 1 Reviewer Completed 04/19/2019 8:44 AM Growth Management Department Anthony Khawaja Additional Reviewer Completed 04/19/2019 10:52 AM Transportation Engineering Jay Ahmad Additional Reviewer Completed 04/19/2019 1:06 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 04/24/2019 8:50 AM Growth Management Department Gene Shue Additional Reviewer Completed 04/24/2019 5:24 PM County Attorney's Office Jeffrey A. Klatzkow Level 2 Attorney Review Completed 04/25/2019 8:59 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 04/30/2019 9:36 AM Growth Management Department Jeanne Marcella Deputy Department Head Review Skipped 05/01/2019 2:17 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/02/2019 8:16 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/02/2019 9:07 AM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 05/07/2019 9:02 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/19/2019 9:25 AM Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM 16.A.6 Packet Pg. 440 16.A.6.aPacket Pg. 441Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 442Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 443Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 444Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 445Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 446Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 447Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 448Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 449Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 450Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 451Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 452Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 453Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 454Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 455Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 456Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 457Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 458Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 459Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 460Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 461Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 462Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 463Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 464Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way) 16.A.6.aPacket Pg. 465Attachment: Final Report (8705 : Multi-Way Stop at Lely Resort Blvd and Wildflower Way)