Loading...
Agenda 05/28/2019 Item #16A 5 ( Contract #16-7011 Change Order No.1)05/28/2019 EXECUTIVE SUMMARY Recommendation to approve Change Order No. 1 with Jacobs Engineering Group, Inc. (formerly CH2M Hill Engineers, Inc.) to add 730 days to the project schedule for design and post-design services on Project No. 66066.14, “Palm River Boulevard Bridge Replacement.” (No additional funds are requested). OBJECTIVE: To obtain the Board’s approval for a Change Order to increase the duration of Agreement No. 16-7011 by 730 days with Jacobs Engineering Group, Inc. (formerly CH2M Hill Engineers, Inc.) on Project No. 66066.14, “Palm River Bridge Replacement.” CONSIDERATIONS: On January 9, 2018, the County and CH2M Hill Engineers, Inc. (n/k/a Jacobs Engineering Group, Inc. entered into Agreement No. 16-7011 for design and post-design services on Project No. 66066.14, “Palm River Boulevard Bridge Replacement.” The scope of services under that agreement included tasks performed post design and during construction, which include bidding assistance, construction meeting preparation and attendance, const ruction assistance, field reviews, response to contractors’ requests for information, shop drawing review, survey services, as-built drawing reviews, and project completion certifications. The additional days needed for services during construction were not included in the original contract time because the construction schedule for this project was not known at the time the original contract was executed. The intent was to add the post design contract time once the County determined a construction schedule for the project. Additionally, the County has maintained open channels of communication with community leaders and area residents to lock in a suitable construction time frame. These efforts include a public meeting that took place on January 15, 2019. During that meeting, residents expressed their support for this project but suggested that Collier County should hold off on the start of construction activities until the Summer of 2019, thus reducing traffic congestion during season. FISCAL IMPACT: Approval of this item does not result in a direct fiscal impact. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: Approval of this item will not have an impact on Growth Management operations. RECOMMENDATION: To approve Change Order No. 1 to increase contract duration in the amount of 730 days to Agreement No. 16-7011 with Jacobs Engineering Group on Project No. 66066.14, “Palm River Bridge Replacement. Prepared by: Mario A. Puente, PE-CGC, Sr. Project Manager, Transportation Engineering Division, Growth Management Department. ATTACHMENT(S) 1. 16-7011 Signed Change Order Form (PDF) 2. (Linked) 16-7011 CH2MHill_Contract (PDF) 16.A.5 Packet Pg. 434 05/28/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.5 Doc ID: 8669 Item Summary: Recommendation to approve Change Order No. 1 with Jacobs Engineering Group, Inc., (formerly CH2M Hill Engineers, Inc.), to add 730 days to the project schedule for design and post-design services on Project No. 66066.14, “Palm River Boulevard Bridge Replacement.” (No additional funds are requested). Meeting Date: 05/28/2019 Prepared by: Title: – Transportation Engineering Name: Mario Puente 04/16/2019 2:36 PM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 04/16/2019 2:36 PM Approved By: Review: Growth Management Department Lisa Taylor Additional Reviewer Completed 04/16/2019 2:42 PM Transportation Engineering Marlene Messam Additional Reviewer Completed 04/16/2019 3:24 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 04/17/2019 8:05 AM Growth Management Department Christine Arnold Level 1 Reviewer Completed 04/17/2019 9:07 AM Transportation Engineering Jay Ahmad Additional Reviewer Completed 04/18/2019 9:00 AM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 04/24/2019 8:53 AM Growth Management Department Gene Shue Additional Reviewer Completed 04/24/2019 5:23 PM Procurement Services Sara Schneeberger Additional Reviewer Completed 04/29/2019 3:12 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 04/30/2019 8:16 AM Procurement Services Ted Coyman Additional Reviewer Completed 05/03/2019 2:12 PM Growth Management Department James C French Deputy Department Head Review Completed 05/06/2019 9:45 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/07/2019 5:18 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 05/09/2019 4:24 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/10/2019 8:38 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/15/2019 1:17 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 05/16/2019 5:09 PM 16.A.5 Packet Pg. 435 05/28/2019 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/19/2019 9:20 AM Board of County Commissioners MaryJo Brock Meeting Pending 05/28/2019 9:00 AM 16.A.5 Packet Pg. 436 16.A.5.a Packet Pg. 437 Attachment: 16-7011 Signed Change Order Form (8669 : Project No. 66066.14 Palm River Bridge Replacement - Change Order 1) Acceptance of this Change Order shall constitute a modification to contract I work order identified above and will be subject to all the sameterms and conditions as contained in the contract/ work order Indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor I Vendor I Consultant IDesign Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: 0v:J f � 'JA.c..i, � s Date: 4/ {3 / I 9 (Contractor I Vendor/ Consultant/ Design Professional and Name of Firm, if project applicable) ate:¥}J'f Digitally signed by SchneebergerSara SchneebergerSara Date: 2019.04.12 14:26:08 -04'00' Appro ved by: _____________________________ _(Procurement Professional) ATTEST Date: ______ _ CRYSTAL K. KINZEL,CLERK Approved as to form and legality BY: _______ _ Scott R. Teach, Deputy County Attorney Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) f'ROCUR!loll!lfT USE ONLY Admln ecc Rpt 8CCES BOARD OF COUNTY COMMISSIONERSCOLLIER COUNTY, FLORIDA _____________________________________William L. McDaniel, Jr., Chairman 16.A.5.a Packet Pg. 438 Attachment: 16-7011 Signed Change Order Form (8669 : Project No. 66066.14 Palm River Bridge Replacement - Change Order 1)