Loading...
Agenda 05/12/2009 Item #16B 5 Agenda Item No. 1685 May 12. 2009 Page 1 of 11 EXECUTIVE SUMMARY Recommendation to award RFP 08-5130 for Design and Related Services to be provided by CME Associates, Inc., for the Development of Accelerated Bridge Construction Standards and Pilot Bridge Construction (White Boulevard Bridge and 23rd Street Southwest), in the amount of $395, 012- Project 66066. OBJECTIVE: To award a design contract for the development of Accelerated Bridge Construction Standards and for the final design of two bridges; the White Boulevard Bridge Replacement (034021) and one new bridge at 23rd Street Southwest. CONSIDERATIONS: Request for Letters of Interest (LOI) was posted on September 9, 2008. Three hundred and twenty four (324) notices were sent and a non-mandatory pre- proposal meeting was held on Septcmber 17. 2008. LOIs were received September 30, 2008. Two separate selection committees were appointed. The first evaluated the LOIs and short-listed the top three most qualified firms; HDR Engineering, Graef, Anhalt, Schloemer & Associates, and CME Associates, Inc. The second selection committee evaluated the Technical proposals and on October 30, 2008, conducted oral interviews and ranked the three short-listed finns. On April 10, 2009, final contract negotiations were concluded with CME Associates, Inc., the top ranked finn. The scope of work as identified in the LOI/RFP is for the development of Accelerated Bridge Construction details as part of the design of the White Boulevard Bridge (replacement) and the 23cd Street Southwest Bridge (new). The purpose of this project is to implement a bridge reconstruction/replacement program utilizing prefabricated bridge elements and systems that will facilitate reduced onsite construction time, reduce traffic and environmental impact, possibly lower first and life- cycle costs, improve worker and vehicle safety and enhance the quality of the constructed bridge by minimizing future repairs. Collier County would like to make accelerated bridge construction standard practice in the execution of its bridge program. The County plans to develop standard bridge designs that can he used for the replacement of multiple bridges in Collier County utilizing Accelerated Bridge Construction (ABC) techniques. These standard designs would include prefabricatcd elements of the superstructure system that will be applicable to the majOlity of the County's bridges that are two-lane, four-lane and six-lane. It is not anticipated having one standard design but rather several to address differing system requirements and site conditions. The development of standard bridge designs will he undertaken in a future phase and will be based on the details developed for the two subject bridges. The intent of this phase is to develop details for the two bridges with an eye on future ABC standards. FISCAL IMPACT: Total funds in the amount of $395,012.00 are available in gas tax. The source of funds is Gas Taxes. Agenda Item No. 1685 May 12, 2009 Page 2 of 11 LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is not quasi-judicial and requires no ex parte disclosure, requires only a majority vote for approval, and is otherwise legally sufficient for Board action.-SRT GROWTH MANAGEMENT IMPACT: The development of Accelerated Bridge Construction Standards and replacement of the White Boulevard Bridge (#034021) and the construction of a new bridge at 23,d Street, S.W. is identified on the 2008 Annual Update and Inventory Report (AUIR) and is consistent with the Growth Management Plan. RECOMMENDA nON: That the Board of County Commissioners award Contract No. 08-5130 to CME Associates, Inc., to provide professional design and related services for the development of Accelerated Bridge Construction Standards and the replacement of the White Boulevard Bridge (034021) and a new bridge at 23,d Street S.W. and to authorize the Board Chairnlan to execute a standard County Attorney approved contract. Prepared By: Marlene Messam, Sf. Project Manager, TECM Attachment: Fee Schedule Page] of2 Agenda Item No. 1665 May 12, 2009 Page 3 of 11 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: Item Summary: 16B5 Meeting Date: Recommendation to award RFP 08-5130 for Design and Related Services to be provided by CME Associates, Inc., for the Development of Accelerated Bridge Construction Standards and Pilot Bridge Construction (White Boulevard Bridge and 23rd Street Southwest), in the amount of $395.012 Project 66066. 5/12/2009 90000 AM Prepared By Marlene Messam Senior Project Manager Transportation Engineering & Construction Management Date Transportation Services 4/23/2009 4 :01 :21 PM Approved By Lisa Taylor ManagemenUBudget Analyst Date Transportation Services Transportation Administration 4/24/20099:52 AM Approved By Scott R. Teach Assistant County Attorney County Attorney Office Date County Attorney 4/24/200910:56 AM Approved By Gary Putaansuu Principal Project Manager Date Transportation Services Transportation Engineering and Construction 4/24/2009 4:56 PM Approved By Jeff I<:latzkow County Attorney County Attorney County Attorney Office Date 4/27/2009 1 :08 PM Approved By Norm E. Feder, Alep Transportation Division Administrator Date Transportation Services Transportation Services Admin. 4/28/20091:18 PM Appro\'ed By Najeh Ahmad Director Date Transportation Services Transportation Engineering & Construction Management 4/28/20092:58 PM Approved By Rhonda Rembert Contract Specialist Date Administrative Services Purchasing 4/30/20098:36 AM Appro\'ed By Kelsey Ward Contract Administration Manager Purchasing Date Administrative Services 4/30/2009 2:58 PM Approved By Pat Lehnhard Executive Secretary Transportation Services Admin Date Transportation Services 5/1/20091:15 PM file://C:\AgendaTest\Export\ 129-Mav%20 12.%202009\ 16.%20CONSENT%20AGENDA \ 16... 5/6/2009 Page 2 of2 Agenda Item No. 1665 May 12, 2009 Page 4 of 11 Approved By Susan Usher Senior Management/Budget Analyst Office of Management & Budget Date County Manager's Office 5/2/20097,50 AM Approved By Leo E. Ochs, Jr. Board of County Commissioners Deputy County Manager Date County Manager's Office 5/2/20098,23 AM file://C:IAgendaTestIExportl 129-Mav%20 12, %202009116. %20CONSENT%20AGENDA 116... 5/6/2009 Agenda Item No. 1665 May 12, 2009 Page 5 of 11 SCHEDULE B BASIS OF COMPENSATION LUMP SUM 1. MONTHLY STATUS REPORTS B.1.1 As a condition precedent to payment, CONSULTANT shall submit to OWNER as part of its monthly invoice a progress report reflecting the Project design and construction status, in terms of the total work effort estimated to be required for the completion of the Basic Services and any then-authorized Additional Services, as of the last day of the subject monthly billing cycle. Among other things, the report shall show all Service items and the percentage complete of each item. B1.1.1 All monthly status reports and invoices shall be mailed to the attention of Marlene Messam, P.E., Project Manager, Collier County Government, Transportation Division, 2885 South Horseshoe Drive, Naples, Florida 34104. 2. COMPENSATION TO CONSULTANT 6.2.1. For the Basic Services provided for in this Agreement, OWNER agrees to make the lump sum payments to CONSULTANT in accordance with the terms stated below. Payments will be made in accordance with the following Schedule; however, the payment of any particular line item noted below shall not be due until all services associated with any such line item have been completed to OWNER'S reasonable satisfaction. ITEM LUMP SUM FEE FOR: FEE PAYMENT SCHEDULE 1. Task 1 - Preliminary Engineering $ 88,044.00 Monthly based upon percent complete 2. Task II - BCB ROW Permit $ 20,048.00 Monthly based upon percent complete 3. Task III - ERP Permit $ 41,428.00 Monthly based upon percent complete 4. Task IV - SFWMD Permit $ 7,064.00 Monthly based upon percent complete 5. Task V - Construction Plans $203,700.00 Monthly based upon percent complete 6. Task VI- ROW $ 14,728.00 Monthly based upon percent complete 7. Task VII - Direct Expenses to $ 20,000.00 Monthly based upon Time and include per diem, airfare, meals, Material rental car, printing, borings, rock corin" and soil testinq TOTAL FEE (Total Items 1-7) $395,012.00 - ~------_..- . -~._--, Agenda Item No. 16B5 May 12, 2009 Page 6 of 11 B.2.2, The fees noted in Section 2.1. shall constitute the lump sum amount of three hundred seventy five thousand twelve dollars ($375,012.00) and twenty thousand dollars ($20,000.00) at time and materials for a total amount of three hundred ninety five thousand twelve dollars ($395,012,00) to be paid to CONSULTANT for the performance of the Basic Services, B.2,3. For Additional Services provided pursuant to Article 2 of the Agreement if any, OWNER agrees to pay CONSULTANT a negotiated total fee and Reimbursable Expenses based on the services to be provided and as set forth in the Amendment authorizing such Additional Services, The negotiated fee shall be based upon the rates specified in Attachment 1 to this Schedule B and all Reimbursable Expenses shall comply with the provision of Section 3.4.1 below. There shall be no overtime pay on Additional Services without OWNER'S prior written approval. B.2.4. The compensation provided for under Sections 2.1 of this Schedule B, shall be the total and complete amount payable to CONSULTANT for the Basic Services to be performed under the provisions of this Agreement, and shall include the cost of all materials, equipment, supplies and out-<lf-pocket expenses incurred in the performance of all such services. B.2.5 Notwithstanding anything in the Agreement to the contrary, CONSULTANT acknowledges and agrees that in the event of a dispute concerning payments for Services performed under this Agreement, CONSULTANT shall continue to perform the Services required of it under this Agreement, as directed by OWNER, pending resolution of the dispute provided that OWNER continues to pay to CONSULTANT all amounts that OWNER does not dispute are due and payable, 3. SCHEDULE OF PAYMENTS: B.3.1. CONSULTANT shall submit, with each of the monthly status reports provided for under Section 1.1 of this Schedule B, an invoice for fees earned in the performance of Basic Services and Additional Services during the subject billing month. Notwithstanding anything herein to the contrary, the CONSULTANT shall submit no more than one invoice per month for all fees earned that month for both Basic Services and Additional Services. Invoices shall be reasonably substantiated, identify the services rendered and must be submitted in triplicate in a form and manner required by Owner. Additionally, the number of the purchase order granting approval for such services shall appear on all invoices. B.3.2, Invoices not properly prepared (mathematical errors, billing not refiecting actual work done, any signature, etc.) shall be returned to CONSULTANT for correction. Invoices shall be submitted on CONSULTANT'S letterhead and must include the Purchase Order Number and Project name and shall not be submitted more than one time monthly. Agenda Item No. 1665 May 12, 2009 Page 7 of 11 8,3.3 Payments for Additional Services of CONSULTANT as defined in Article 2 hereinabove and for reimbursable expenses will be made monthly upon presentation of a detailed invoice with supporting documentation. 8,3.4 Unless specific rates have been established in Attachment 1, attached to this Schedule 8, CONSULTANT agrees that, with respect to any subconsultant or subcontractor to be utilized by CONSULT ANT for Additional Services, CONSULTANT shall be limited to a maximum markup of 5% on the fees and expenses associated with such subconsultants and subcontractors, 8,3.4.1 Reimbursable Expenses associated with Additional Services must comply with section 112.061, Fla. Stat., or as set forth in the Agreement, be charged without mark-up by the CONSULTANT, and shall consist only of the following items: 8.3.4.1.1 Cost for reproducing documents that exceed the number of documents described in this Agreement and postage and handling of Drawings and Specifications. 8.3.4.1.2.Travel expenses reasonably and necessarily incurred with respect to Project related trips; to the extent such trips are approved by OWNER. Such expenses, if approved by OWNER, may include coach airfare, standard accommodations and meals, all in accordance with section 112,061, F.S. Further, such expenses, if approved by OWNER, may include mileage for trips that are from/to destinations outside of Collier or Lee Counties. Such trips within Collier and Lee Counties are expressiy excluded. 8,3.4.1,3, Permit Fees required by the Project. 8.3.4.1.4 Expense of overtime work requiring higher than regular rates approved in advance and in writing by OWNER. 8.3.4.1,5 Expense of models for the County's use, 8,3.4.1.6 Other items on request and approved in writing by the OWNER. 8.3.4.2 Should a conflict exist between the dollar amounts set forth in Section 112.061, F.S" and the Agreement, the terms of the Agreement shall prevail. Agenda Item No. 1665 May 12, 2009 Page 8 of 11 SCHEDULE B BASIS OF COMPENSATION ATTACHMENT I Task 1: Preliminary Engineering Lump Sum Not to Exceed $ 88,044.00 .' a. Kick off Meeting b. Investment East 951 Horizon Study Sites c. Environmental Assessment d. Geotechnical e. Surveying f. Preliminary Bri~e Layouts g, Report of findinqs Task 2: BCB ROW Permit Lump Sum Not to Exceed $ 20,048.00 a, Grady Minor Tasks b. CME Tasks Task 3: ERP Permit Lump Sum Not to Exceed $ 41,428.00 a. Grady Minor Tasks b. Passarella Tasks c. CME Tasks Task 4: SFWMD Permit Lump Sum Not to Exceed $ 7,064.00 a. Grady Minor Tasks b. CME Tasks Task 5: Construction Plans Lump Sum Not to Exceed $203,700.00 a. Roadway Design b. Bridge Design c. Utilities d. MOT Plans e. Public Information Meeting f. Submit Plans for review g. Meet with County h. Respond to comments i. Submit final plans Task 6: ROW Lump Sum Not to Exceed $ 14,728.00 . a. Support County activities Task 7: DIRECT EXPENSES (Time and Materials) $ 20,000.00 a. Per Diem (hotel, meals, etc.) per day Agenda Item No. 16B5 May 12, 2009 Page 9 of 11 b. Airfare (coach class) c. Rental Car (per day) d. Printin TOTAL FOR TASKS 1 - 7 NOTTO EXCEED $395,012.00 . Agenda Item No. 16B5 May 12, 2009 Page 10 of 11 SCHEDULE B BASIS OF COMPENSATION ATTACHMENT II CONSULTANT'S EMPLOYEE HOURLY RATE SCHEDULE Principal $ 18800 Project Manager $153.00 Senior Engineer $129.00 Engineer $112,00 Administrative $ 60.00 END OF SCHEDULE 8 SCHEDULE C PROJECT MILESTONE SCHEDULE Agenda Item No. 1665 May 12, 2009 Page 11 of11 Schedule is based on the number of calendar days from issuance of Notice to Proceed, 1, TASK 1- Preliminarv Enaineerina 60 Days 2. TASK 11- BCB ROW Permit 180 Days 3. TASK 111- ERP Permit 150 Days 4. TASK IV - SFWMD Permit 180 Days 5. TASK V - Construction Plans 120 Days 6. TASK VI- ROW 100 Days 7, TASK VII- Direct Expenses As Needed