Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Resolution 2004-227
RESOLUTION NO. 2004-.22L 16A19 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ESTABLISHING A REVISED FEE SCHEDULE OF DEVELOPMENT RELATED REVIEW AND PROCESSING FEES, INCLUDING: PROVIDING FOR A NEW PUD MONITORING FEE AS PROVIDED FOR IN DIVISION 1.10 OF THE COLLIER COUNTY LAND DEVELOPMENT CODE; SUPERSEDING RESOLUTION NO. 2004-97; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Collier County Land Development Code, Section 1.10.1 provides that the Board of County Commissioners (Board) shall establish and adopt by resolution a schedule of fees and charges for application and document processing, public meetings, public hearings, other meetings and hearings, transcripts, approvals, denials, development permits, development orders, development, construction, interpretations, enforcement inspection services, sales of documents review, resubmission, and any other zoning or development related services and any other services provided or costs incurred by or on behalf of the County; and WHEREAS, the Board previously approved Resolution No. 2004-97, establishing a fee schedule of development related review and processing fees on April 13, 2004; and WHEREAS, many operations within the Community Development and Environmental Services Division are supported by user fee revenues; and WHEREAS, it is stafC s intent to continue to conduct annual cost/fee studies In an attempt to balance Fund 113 and Fund 131 operating costs with revenues; and WHEREAS, the new PUD monitoring fee is a one-time fee to be charged at building permit pick-up on new construction only that is intended to offset costs associated with operating this program; and WHEREAS, the fee schedule for development or building review related activities or petition types, including but not limited to, site development plans, rezones, conditional uses, building permit applications and related inspections and monitoring are reflective of the actual cost of processing and reviewing such petitions and performing such activites. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA that: I. The Board of County Commissioners hereby declares that the fees set forth as attached hereto and incorporated by reference herein as "Exhibit A," along with their associated building Page 1 of2 16A19 valuation data table set forth as attached hereto and incorporated by reference herein as "Exhibit B," are all fair and reasonable sums to be assessed to those who receive the benefits of the services, reviews, and inspections required pursuant to the Land Development Code and the County's corresponding development review and permitting processes. 2. The PUD monitoring fee set forth under Item K) 29), is a one-time fee applicable to new construction activity approved after the effective date of this Resolution under then existing and future PUD's that is due and payable at the time of approved building permit pick-up for all said new construction. BE IT FURTHER RESOLVED that this Resolution, relating to fees in the Land Development Code be recorded in the minutes of this Board with an effective date of September 1, 2004, and that Resolution numbered 2004-97 is hereby superseded by the adoption of this Resolution on the foregoing effective date. This Resolution adopted after motion, second and majority vote. Done this 27th day of July, 2004. ATTEST: DWIGHT E. BROCK, CLERK BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA ....../ d~ '. . b/::..J . :;: \":0," :::/,~:'~ ty'~' £k " :- C'>o: ':l.1p',IJ/Hf;'jj . " .', . Musi,~~' t.~,' ri'i' : - ~~.., ,- - '{~~ . 51gnltad'i ~~{:',~\~ ..: :-; , ~ f,. 'i!.b,}¥ . -'''' ~ ,,"'" .. .' '..' Approve~··á;f~Æ.GiiÄ âiid; . Legal Sufficiency:,· ~ctþ,WM Patrick G. White Assistant County Attorney ~'~ì Item # 110 tLL9 Agenda 1- 27' 04 Date _______ Page 2 of2 Datr: /- 2..ß -0'1 Reed ~/k~~ puty Clerk c o ~. I r,ì"f'~ è ... c o It 'tI. t ;¡ 16AILJ \:i\>,.,. EXHIBIT A COLLIER COUNTY COMMUNITY DEVELOPMENT AND ENVIRONMENTAL SERVICES FEE SCHEDULE BeC Approved Versi.on, July 27 2004 Contents: A) ADMINISTRATION ........ú......,......._..............._,........_._.........................-......................................,........................"........................,.......,............................ 2 B) BLASTING PERMIT'S &. INSPECTION .............,..............-,......"....-.........................._..............................".............,.....,...,.....,.,............................,.........2 C) ENVIRONME1\'TAIJLANDSCAPING ....-.....................................................................................,....................,............................................................._ 2 D) EXCAVATION PERMITS .................-.................................,..............-................-.................."....................................................-............,................-........3 E) FIRE CODE REVIEW FEES ....................................,-................................................_...............,.........................._......._................................................_.....3 P) SITE DEVELOPMENT PLANS...............,.......,......................,.....,................-......,........._..,..........._,.....,........,...._,....................,...........,.,................,...........4 G) SUBDIVISION ........,................. -...,..................... ........- - ...,... ,. .....--......... ................. ........ .......,....... .............................. ..._.. ................ ........... ...,...... ..........,_.. 5 H) Engineering Inspection Fees.... -.....................,..................................,. ...... - -........,.. _.................................................................................... ,.......................... 6 I) TEMPORARY USE PERMTI'S ....'.'............-.................-........,.....-.....................,...........,............,............._.....................................'............................._....... 6 J) WELL PERMITSfINSPECTIONS ......'.........................-........-............,................._................_...............,............._,...................................................,.........., 6 K) ZONINGILAND USE PE11TIONS .........................-..,...............,.....-".......,.............._.'........_....................,.............,..............,.....,.....,...............--.,...........,.7 L) MISCELLANEOUS.......,.......,.............................,......._.............................-.........,.....,.........,..........................................................................._................,.... 8 M) BUILDING PERMIT APPLICATION FEE ...............-.....,...............,.......,..........-....................'...'......_.........._.....................,.,...,..............................,.,.... 10 N) BUILDING PERMII' f<EES.,...,.......,.......,...............__.............,.........._.......................,_.......,.,..._........,.............._..........._........................,........,.,.........,.......10 0) ELECI'RICAL PERMI'I' FEES ....... ............-, .,. ...... ,. ............ .... ...... ,. ........ .....- -......__.. .......,....... .....,_......,... ....".. .................., .................... ...,......._.........., ... I 1 P) PLUMBING PERMIT f<EES ...'.........'...'..............................-.....,-..........................-.......,............_,..............,.,........................,...................,........................ I 1 Q) MECHANICAL PERMII' FEES ,..............................,.,......................,..................,......................'........_..._.............._......._,................................................ [2 R) ARE PREVENTION A]\'D CONTROL I>ERMIT FEnS .-.............,...::............................................................................................-.......................-......12 S) MOBll..E HOME/OffiCE TRAll..ER AND OTI-IER 1RArr.ER PERMIT FEES .........................................................................................._..............12 1') CI-ßCKEES AND SIMILAR STRUcrURES .'..-.-.'.............,..............-.................-......_,_,....................._.....,........,....._................................................._....12 U) POOL OR SPA PERMIT FEES ....................................................................................................................................._....,_............................................. 12 V) SC1ŒEN ENCLOSURE PERMIT & PAN ROOF f<EES .............................-.....-................_............................._..,_.............................................-...._......13 W) SIGN PERMIT FEES. .......... .... ........ .,............. ............ ............ ...... ....-.., ..... .... ............_...... _........,......_....., .._....._.. .............. ... _............ .........,........_....... ....... 13 X) CO~1ENCE PERMIT FEES -........'.'............,.........,..............,...............-........_.........................'....,_.....,............_..............,.......,...........................,_....13 Y) REVISION AND AS BUILT PLAN REVIEW PEES; CORRECTIONS TO PLANS.........._.................._......................_....................................._....... 13 Z) PERMIT EX1TINSION .., .....",.. ...,........ ,...,.....-.... .....,.... ,... ......-... -.......................... __........... ........... _........... ......,........ ,......._..,....... ,... ,... ........ ..,........ .._.. ....... 14 AA) DEMOLrfION OF BUILDING OR S1RUCi'URE PERMIT' FEES ............-..-...................................._...................._................_................................14 BB) PRE-MOVING INSPECTION FEES ......................................,......-.......-........................_........_.....................,......................................,.................,....... 14 CC) INSPECTIO;-'¡ FEES ...................-............ ............ ............. ...-.......-.......... .....-....... ._............... ,_........ .._,........_.... ....... ..._.. ........ .,.....,......_............,.... ............ 14 DD) REINSPECTION FEES........................._,........_.......................,........-.....'...............,...._..,_.......__......,....................".............,...._,...,...............,...._.........._.. 14 E'E) FAILURE TO OBTAIN A PERMIT -..............-..,......-.......-,....-..,......................._.............'........_........_......,.........._........_,..............................,.........__.,.... 14 FF) LICENSING.. .......... ......-,. .......................,.. .....,....... ,... ......,. ...... .....,............... ,.........,......._ _. ..........................,....... ......__.... .,.....,.. ...._,...._..,... ,.....,............... 14 GG) DUPLICA'I'E PERWI' CARDS......_,......_..............._.__.............................-.-........................,.....,............,_...................,............-.......................-......._....,.15 ml) CHANGE OF CONTRAcrOR OR SL'BCONTRACTORS ...-........................-...................................................._...................................................... 15 IT) PERMIT FEE REFUNDS ...-.......................-...,..................,................................................,...................................._....._............-......,.,....,..........-......-.......15 JJ)-RECORD RETRIEV AL..................,. .....-,........,..................... .-.............. ................_. _...............,............,_,................._.. ..._.......... ..............................._....._ ... 15 KK) COpy FEES ..........'....-'.......,.........--..................-.....-...,..............'.....-........'.......,..,._,.....................,.,..........................'_...,........_.."'.._................._....,.,....... 15 LL) RESEARCH ..-......-....-........................-..,....................................................,............_....................._.........._......._.............-................................................._.15 MM) SUBSCRIPTION SERVICE ......-..'....................,................................,.......'......._........._.....__......._..._..,..................._.............,-.....-............,....................15 NN) ELEC1RONIC DATA CONVERSION SURCHARGE ..--.....-.......-.-......--......-..-...._._........_......,_.................._............_..............._..................._......_...... 16 00) REGISTRATION OF RENTAL DWELLINGS -......---......-.-............-......................._.........................._...._.................._................................................. [6 PP) FEE WANER PROCEDURFB ..---'....-......-........-.--......--.....-.......--..........-..--......._._...._....__.___......__...____......__._.___._._..___..........__......_......_.....__....__....._....__. 16 QQ) ADDITIONAL FEE REFUND PROVISIONS ..---....---....--...-...-.........-.....--........-.........._.........._.__...___........._.._.....................___....___.._.._..........__....___...___ [6 CDES Financial Administration, rev m/27/04 page 1 16A19 FEES ARE ESTABLISHED BY THE BOARD OF COUNTY COMMISSIONERS RESOLUTION, AND CANNOT BE WAIVED OR SUSPENDED WITHOUT AN ACTIONBY THE BOARD OF COUNTY COMMISSIONERS. ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY DETERMINED BY THE DIRECTOR OF THE APPROPIATE DEPARTMENT, AS APPLICABLE. A) ADMINISTRATION 1) Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or Building ConstrUction Administrative Code (Administrative Code). Based on staff hours: Less than 20 hours $1.500.00, 20 to 40 hours $3.000.00, more than 40 hours $5.000.00 2) Interpretation request submitted in conjunction with a land use petition or requested during an application review process. $250.00 3) Determination of Vested Rights. $100.00 (plus the County's out-of-pocket expenses associated with hearing officer and hearings) 4) Appeal of Vested Rights Determination. $100.00 5) Amendment to Land Development Code. $3.000.00 6) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or the LDC). $1000.00 (non-refundable) 7) Appeal to Board of Zoning Appeals or Building Board of Adjustments and Appeals (as may be provided for in the Collier County Administrative Code or the LDC). $500.00 (non-refundable) B) BLASTING PERMITS & INSPECTION 1) 30 day pef[')it fee, non-refundable payable upon application. $250.00 2) 90 day permit fee, non-refundable payable upon application. $600.00 3) Yearly permit fee, non-refundable payable upon application. $1.500.00 4) Renewal permit fee, non-refundable payable upon application. $200.00 5) After-the-fact fee, due to blasting without a permit. $10,000.00 6) Fine fee, per detonated shot with after-the-fact permit. $200.00 7) Handler fee, for handler who assists the user or blaster in the use of explosives. $100.00 8) Blasting Inspection Fee. $200.00 (per inspection) 9) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts. Upon completion, fees will be adjusted to reflect actual number of blasts. C) ENVIRONMENTALlLANDSCAPING 1) Site Clearing Permit, first acre or fraction of an acre. $250.00 Each additional acre or fraction of an acre. $50.00 ($3,000.00 maximum) 2) Agricultural Land Clearing a. Land Clearing Notification $250.00 b. Land CJearing Permit $250,00 Each additional acre or fraction of an acre. $50.00 ($3,000.00 maximum) CDES Financial Administration, rev 07/27/04 page 2 16 Al 9 3) Landscape Tree Removal Fee $250 4) Environmental Impact Statement (EIS) $1600.00 5) Landscape Re-inspection 1 st $50.00, 2nd $75.00, every inspection afterward $100.00 6) Vehicle on the Beach Permit Application. $250.00 (permit fee shall be waived for public and non- profit organizations engaging in environmental activities för scientific, conservation or educational purposes). 7) Reserved 8) Special Treatment Review a. First five acres or less. $400.00 b. Each additional acre, or fraction thereof. $50.00 ($5,000.00 Maximum) 9) Coastal Construction Setback Line (CCSL): a. Permit - Dune Walkover. $150.00 b. Permit - Dune Restoration. $200.00 c. Variance - Petition. $1000.00 10) Sea Turtle Permit- a. Sea Turtle Handling Permits. $25.00 b. Sea Turtle Nesting Area Construction Permit. $200.00 c. Sea Turtle Nest Relocation. $100.00 11) Vegetation Removal Permit a. First acre or fraction of an acre less. $250.00 b. Each additional acre, or fraction thereof. $50.00 ($3,000.00 Maximum) 12) After-the-fact Environmental or Landscape Permits a. CCSL Variance Petition. 2x normal fee b. All other Environmental or Landscape Permits. 4x normal fee D) EXCAVATION PERMITS 1) Ammal Renewal. $300.00 2) Application (private). $400.00 3) Application (Commercial). $2.000.00 4) Application (Development). $400.00 5) Monthly inspection fee (commercial, development & private) $200.00 per month 6) Reapplication: $300.00 plus $200.00 per month inspection fee 7) Cubic Yardage Review Fee: $200.00 first 5000 cy, plus $10.00 per additional 1000 cy with a maximum of $20,000.00 8) Time Extension. $150.00 plus $100.00 per month inspection fee 9) After-the-fact Excavation Permit. 4x al1plication fee E) FIRE CODE REVIEW FEES 1) Fire Code Review fees associated with each of the following processes: a. SDP - Site Development Plan $200.00 b. SDPA - Site Development Plan, Amendment $150,00 CDES Financial AdministratiŒl, rev 07/27/04 page 3 c. SDPI - Site Development Plan, Insubstantial d. SIP - Site Improvement Plan e. SIPI - Site Improvement Plan, Insubstantial f. PSP - Preliminary Subdivision Plans g. PSPA - Preliminary Subdivision Plans, Amendment h. PPL - Plans & Plat, Subdivision 1. FP - Final Plat J. CONS1R - Construction Plans, SubdivisionlUtilities k. ICP - Construction Plans, Insubstantial L DRI - Development of Regional Impact m. DOA - Development Order, Amendment n. PUDZ - Planned Unit Development, Rezone o. PUDA - Planned Unit Development, Amendment p. PDI - Planned Unit Development, Insubstantial q. RZ - Rezone, Regular Zoning r. CU - Conditional Use $100.00 $150.00 $100.00 $150.00 S100.00 $100.00 $] 00.00 $100.00 $100.00 $200.00 $150.00 $150.00 $150.00 $100.00 $100.00 $150.00 16A19 F) SITE DEVELOPMENT PLANS 1) Site Development Plan Review (SDP). $5000.00 a. plus $40.00 per DIU b. plus $100.00 per residential building structure; c. plus $.10 per square foot for non-residential d plus $200.00 per building for non-residential. e. Additional fees for 3rd review $1.000.00, 4th review $1.500.00, 5th review $2.000.00. 6th and subsequent reviews $2,500.00 2) Pre-application fee. $500.00 (to be credited toward application fee upon submittal.) a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards application fees. b. Second and subsequent pre-app meetings at staffs request will be held at no charge to the applicant. c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited towards application fees and a new pre-application meeting will be required. 3) Simultaneous Review Fee (planning review of simultaneous building permit applications) $100.00 per building permit application 4) Site Development Plan Insubstantial Change a. Site Development Plan Insubstantial Change. $400.00 for fIrst sheet, $100.00 for each and every additional sheet submitted. b. Additional fees for 3rd review $1.000.00, 4th Review $1.500.00, 5th and subsequent review $2,000.00 5) Site Development Plan Conceptual Review $750.00 6) Site Improvement Plan Review (SIP). $1000.00 (plus Engineering review fees) 7) Utility Plan Review & Inspection Fees- a. Construction Document Review. 0.75 % of probable water and/or sewer construction costs b. Construction Inspection. 2.25% of probable water and/or sewer construction costs c. Construction Document Resubmission or Document Modification, submit as insubstantial change. $150.00 for fIrst sheet, $75.00 for each additional sheet 8) Engineering Site Plan Review Fee CDES Financial Administration, rev 07/27/04 page 4 lIt .. t~ .If ( -~ ....';, l <J ~ j"'~ ..iL. a. Construction Documents Review 0.75% of probable cost of construction of roadways, drainage & stormwater management system b. Construction Inspection 2.25% of probable cost of construction of roadway, drainage & stormwatcr management system 9) Site Development Plan Amendment $2.500.00, a. Plus $40.00 per Dru plus $100.00 per residential building structure b. plus ~per square foot c. plus $200.00 per building for non-residential d. Additional fees for 3rd review $1,000.00, 4th Review $1,500.00, 5th and subsequent review $2,000.00 10) SBR Fees a) Pre-Acquisition Meeting $500.00 (no refunds or credits) b) Pre-application fee. $500.00 (to be credited toward application fee upon submittal.) (all normal pre- application provisions apply) c) SBR Fee $5000.00 with hourly reconciliation at project completion for hourly variation greater than 10%, final project charges at $100.00 per hour for all associated staff hours 11) Violation of the conditions of approval of the SDP/SIP or installation of improvements, clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP. 4x the SIP/SDP application fee G) SUBDIVISION 1) Lot Line Adjustment $250.00 2) Subdivision Review Fees- a. Construction Document $0.75% of probable cost of construction b. Construction Document Resubmissionor Document Modification -Submit as Insubstantial Change $150.00 for first sheet. $75.00 for each additional sheet c. Subdivisions - 3rd and subsequent additional reviews and substantial deviations from approval construction documents $500.00 d. Subdivision Inspection Fee 2.25% of probable cost of construction for construction inspection. 3) Subdivision, Preliminary Plat (PSP)- a. Petition Application $1000.00 plus $5.00 per acre (or fraction thereof) for residential, plus $10.00 per acre (or fraction thereof) for non-residential; (mixed use is residential) 4) Subdivision Final Plat $1000.00 plus $5.00 per acre (or fraction thereof) for residential, $1000.00 plus $10.00 per acre (or fraction thereof) for nonresidential; (mixed use is residential) 5) Additional review of construction plans for phased construction of subdivision improvements. $1000.00 per phase 6) Two-year Extension $150.00 7) Water and Sewer Facilities Construction Document Rcview 0.75% of probable water and/or sewer construction costs 8) Construction Document Resubmission or Document Modification 0.25% of probable water and/or sewer construction costs - 3rd and subsequent resubmittals $500.00 9) Construction Inspection 2.25% of probable water and/or sewer construction costs CDES Financial Administration, rev 07/27/04 page 5 16A19 10) Violation of the conditions of approval of approved construction plans or installation of improvements, clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved construction plans or pennit. 4x the PSP or Final Plat Review Fee. 11) Administrative Amendment $250.00 H) ENGINEERING INSPECTION _FEES 1) Engineering Inspection Fee $150.00 per residential dwelling unit (single or duplex only), charged at time of building pennit issuance. 2) Re-inspection Fees: 1st re-inspection $75.00, 2nd re-inspection $100.00, 3rd and thereafter re- inspection $125.00 I) TEMPORARY USE PERMITS 1) Beach Events Pennits- a. Individual Pennit $100.00 b. Block of 25 calendar days $2.250.00 c. Block of 50 calendar days $4.500.00 d. Block of75 calendar days $6.750.00 e. Block of 100 calendar days $9.000.00 f. Block of 125 calendar days $11,250.00 g. Block of 150 calendar days $13.500.00 2) Temporary Use Pennit Special Sales & Events. $200.00 3) Model Homes and Sales Centers $500.00 4) Construction and Development $125.00 5) Residential and Non-Profit Garage and Yard Sale Pennits No Charge 6) Temporary Use Amendment. $100,00 7) Renewals or extensions requested after the expiration date $200.00 8) Temporary Use Pennit for Special Events requiring BCC approval, including Circus and Carnival Pennits. $275.00 9) Political Signs (Bulk Temporary Pennit) $5,00 a. A deposit of $500.00 will be posted by political campaigns at the time of securing a Political Sign pennit. Forfeiture from this deposit will be in the amount Of $100.00 per written notice of violation of applicable sign ordinance requirements for the 3rd and following such notices of violation. Such forfeiture shall be based on notices of violation per campaign, and not per individual sign. Deposit. or remaining balance of deposit, will be refunded upon completion of campaign and certification by Code EnfQrcement staff that the campaign is in compliance with all provisions of applicable code requirements. 10) Fees for Temporary Use pennits issued After the Fact, ATF: 2x nonnal fee J) WELL PERMITSIINSPECTIONS 1) Hydraulic elevator shaft pennit $300.00 CDES Financial Administration, rev 07/27/04 page 6 16AI9 2) Test hole pennit (including 1st six holes) $300.00, each additional hole $20.00 3) Well pennit (abandonment) $50.00 4) Well pcnnit (construction, repair. or combined construction and abandonment at one site) $300.00 5) Well pennit (monitoring) $150.00 6) Well Pcnnit (modification ofmonitorltest well to a production well) $75.00 7) Well Reinspections a, First Reinspectîon $75.00 b. Second Reinspection $100.00 c. Third Reinspectîon $150.00 8) After the fact well pennits 4x nonnal fee per violation. NOTE: Multiple wells may be allowed on one pennit, but each well must be accounted for and the appropriate fee shall be charged for each well in accordance with the above listed schedule. K) ZONING/LAND USE PETITIONS 1) Pre-application fee $500.00 (to be credited toward application fee upon submittal.) a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards application fees. b. Second and subsequent pre-app meetings at staffs request will be held at no charge to the applicant. c. Applications submitted 9 months or more after the date of the last pre-app meetîng shan not be credited towards application fees and a new pre-application meeting willbe required. 2) Alcoholic Beverage or Service Station Separation Requirement Waiver $1000,00 3) Boat Dock Extension Petition $1.500.00 4) Conditional Use Pennit $4.000.00 ($1.500.00) when filled with Rezone Petition) 5) Conditional Use Monitoring Review: $750.00 6) Conditional Use Extension $3.000.00 7) DR! Review (In addition to cost of rezone) $10.000.00 plus $25.00 an acre (or traction thereof) 8) DRII DO Amendment $6.000.00 plus $25.00 per acre (or fraction thereof) 9) DRIABN - DRI Abandonment $1.500.00 10) Flood Variance Petition $1000.00 11) Interim Agriculture Use Petition $350.00 12) Non-Confonning Use Change/Alteration $1500.00 13) Parking Exemption $1500.00 14) PUD Amendments (PUD to PUD): $8.000.00 plus $25.00 an acre (or fra,ctionthereof) 15) Property owner notifications: $1.00 non-certified mail, $3.00 certificd return reccipt mail (Petitioner to pay this amount prior to advertisement of petition) 16) Planned Unit Development Amendment (Insubstantial) $1500.00 CDES Financial Administration, rev fYl/27/04 page 7 16 Al 9 17) Rezone Petition (Regular) $6.000.00 plus $25.00 an acre (or fraction thereof) 18) Rezone Petition (to PUD) $10.000.00 plus $25.00 an acre (or fraction thereof) 19) Street Name Change (Platted) $500.00 plus $1.00 for each property owner requiring notification of proposed street name change. 20) Street Name (unplatted) or Project Name Change $500.00 21) Variance petition: $2,000.00 residential, $5,000.00 non- residential 22) Variance (Administrative) $1.000.00 23) Zoning Certificate: Residential: $50.00, Commercial:$125.00 24) PUD Extension - Sun Setting: $1000.00 25) Sign Variance Petition: $2000.00 26) Stewardship Receiving Area Petition (SRA): $7000.00 per SRA plus $25.00 per acre for. Stewardship Sending Area Petition (SSA): $7000.00 per SSA plus $25.00 per acre. 27) After-the-Fact ZoninglLand Use Petitions 2x the nonnal petition fee 28) Land Use Petition Continuances a. Two days or less prior to meeting $500.00 b. Requested at the meeting $750,00 c. Resultant additional required advertising charged in addition to continuance fees. 29) PUD Monitoring Fee (one-time charge at time of building pennit pick-up) a. $75.00 per dwelling unit within a PUD b. $0.10 per square foot for commercial or industrial construction within a PUD L) MISCELLANEOUS 1) Reserved 2) Reserved 3) Official Zoning Atlas Map Sheet Publications, maps, and reports. $,50 as set forth in Resolution 98-498, as amended, 4) Reserved 5) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of I hour, 6) The fee for creating and designing special computer generated reports that are not a part of regular standard reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. 7)CD Burning: ~floppy disk: $.50 CDES Financial Administration. rev 07/27/04 page 8 8)Complete sets of Official Zoning Atlas Map Sheets $100.00 per set. 16 A19 9)Photocopies of documents less than llxl? inches: $0.15 one sided, $0.20 two sided, other sizes at cost of production a. Certified copy of pub lie record $1.00 each. 10) Property Nötification Address Listing: a. MS Excel spreadsheet on Disc $70.00 b. Print out on Paper $75.00 + 0.05 for every record over 1500 c. Mailing Labels $80.00 + 0.06 for every record over 1500 d. Print out on Paper + Mailing Labels $85.00 + 0,11 for every record over 1500 11) Comprehensive Plan Consistency Review a. CU's $300.00 b. Rezonings $750.00 c. Pud's or PUD Amendments: $2250.00 d. Letter of GMP consistency to outside agencies: $250 12) Plan Review Fee (for planning review of all building permit applications) a) Long forms: $75.00 per building permit application b) Express permits: $15.00 per building permit application 13) Project Meetings a. Meetings with Departmental Project Approval Staff member per applicant request, reviews and petitions in progress, $150.00 per one hour minimum, $75.00 per Y2 hour thereafter. Additional Department staff attending meeting per applicant request $75.00 per Y2 hour per staff member. b. Inter-Departmental Project Meeting per applicant request, site plan reviews and land use petitions in progress, $500.00 per one hour minimum, $250.00 per Y2 hOur thereafter. 14) Adequate Public Facilities a. Planning Applications requiring COA process review (such as FP's, PPL's & SIP's, SDPs) $200.00 + 25.00 per residential dwelling unit or + 25.00 per 1000 sq ft commercial ($5000.00 maximum) b. Building permit applications requiring COA process review not covered under 12.a above $100.00 per budding permit application. 15) Zoning Confirmation Letters a. Standard Response S 100.00 (includes up to 1 hour research) b. Extended Research $100.00 per hour (any response with research in excess of 1 hour) 16) Zoning Letter Appeal $250.00 17) CDD a. Community Development District $15.000.00 b. Chapter 189 Special District, Independent or Dependent, $15.000.00 18) GMP Amendment a. Small Scale $9000.00 b. General $16.700.00 c. Legal advertising in addition to sub-sections a and b fees, and subject to applicable fee schedule provisions. d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions: $250 COBS Financial Administration, rev 07/27/04 page 9 16 A19 e. Pre-applicalion meetings for GMP amendment petitions: $250 (to be credited toward application fee upon submittal) 19) Application for iSsuance TDR, $250 (non~refundable);plus $25 per TDR issued and recorded (total fees not to exceed $2750) M) BUILDING PERMIT APPLICATION FEE 1) A permit application fee shall be collected at time of applying for a building permit. The permit application fee shall be collected when the plans are submitted for review. The fee shall be applied toward the total permit fee. The applicant shall forfeit the application fee if the application is denied or if the application is approved and the permit is not issued within the time limitation as stated in Section 103.6.1.1 of the Collier County Ordinance No. 91-56, as amended. 2) Application fee will be computed as follows: a. Single family and duplex $.05 per sq it with minimum of $100.00 b. Multi-Family & Commercial $.05 per sq ft up to 10,000 sq ft, $,025 for over 10,000 sq. ft. 3) Maximum application fee shall NOT exceed $5.000.00. 4) Minimum fee of $50.00 for each of the following: plumbing; mechanical (NC); electrical; fire; and building, when applying for additions/alterations. Minimum fee for all other applications = $50.00. 5) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any fee adjustments necessary. N) BUILDING PERMIT FEES 1) The fee for a building permit shall be computed as follows: Such fees shall be èither based on the contractor's valuations of construction cost or based on calculated cost of construction as set forth on the attached Building Valuation Data Table *(Exhibit B), whichever is greater. Valuation of construction costs ofless than $750.00 _ No permit or fee is required, but construction must comply with all County Codes and Ordinances. If inspections are required by the Building Official or requested by the applicant, the appropriate fees shall be paid. *SBCCI Building Valuation Data Table. produced March 31,:2002 EXCEPTION: All work involving structural cOl11ponentsandlor fire rated assemblies requires permits and inspections regardless of construction cost, signs must secure permits as stated in Collier County Ordinance No. 2002-01, as amended, a. Valuation of construction costs of $750.00 through $4,999.99 - With one or no inspections $50.00, With multiple inspections $100.00 b. Valuation of construction COSts of $5()()0.00 through $49,999.99- With one or no inspections - $30.00 plus ~ per thousand dollars, or fraction thereof, of building valuation in excess of $2.000.00. With multiple inspections - $80.00 plus $5.50 per thousand dollars, or fraction thereof, of building valuation in excess of $2000.00. c. Valuation of construction costs 0[$50,000.00 through $1,000,000.00- $250.00 plus $2.40 per thousand dollars, or fraction thereof, of building valuation in excess of $50,000.00. CDES Financial Administration. rev 07/27/04 page 10 16A19 d. Valuation of construction costs over $1.000,000.00 - $2800,00 plus $2.40 per thousand dollars, or fraction thereof, of building valuation in excess of $1,000,000.00. 0) ELECTRICAL PERMIT FEES 1) The fees for electrical permits for new structures or placement or relocation of structures shall be computed as foHows: a. $0.40 per ampere rating of all single-phase panel boards. b. $0.15 per ampere rating for switch or circuit whichever is greater, if item #1 above does not apply, c. When not a complete installation, all switch and circuit breakers ahead of panel boards shall be computed at $0.15 per ampere. d. Permit fees for any change in electrical installation shall be computed at the above rates for that portion of new and/or increased fees in existing electrical facilities. e. The minimum for any electrical permit shall be $50.00 per unit or tenant space. f. Fifty percent (50%) in additional fee costs shall be added to all above fees for three phase installations. EXCEPTION: Ordinary repairs limited to a $200 value or less may be made without a permit. Repairs must comply with all County Codes and Ordinances. If inspections are required by the Building Official or requested by the applicant, the appropriate fees shall be paid. P) PLUMBING PERMIT FEES 1) The following fee calculations shall be applied separately when the permit involves mixed occupancies. a) Residential occupancies: The fee for a plumbing permit shall be computed at the rate of $50.00 to be charged for each living unit with one to three bathrooms. An additional fee of $10.00 will be assessed for each additional bathroom. b) Nonresidential occupancies: The fee for a plumbing permit shall be computed by the following methods, whichever is calculated to be the greatest fee: a) The rate of $3.00 per 425 square feet of floor area, or fraction thereof; or b) Institutional facilities, hospitals, schools, restaurants and repairs in any occupancy b) classification shall be charged at the rate of $1.00 per fixture unit or c) Minimum of $50.00 for each occupancy or tenant space. 2) Grease traps: An additional fee of $50.00 shall be assessed for each grease trap. 3) The cost for retrofit piping shall be computed at the minimum fee of 50.00 per floor for each main riser. 4) The cost of a permit for lawn sprinkler systems shall be computed using the dollar valuation as shown under Section M of this Resolution. 5) The minimum plumbing permit fee shall be $50.00. CDES Financial Administration, rev 07/27/04 page 11 16A19 Q) MECHANICAL PERMIT FEES 1) The following fee calculations shall be applied separately when the permit involves mixed occupancies. a. Residential occupancies: The mechanical permit fees shall be computed at the rate of $50,00 for each living unit up to three tons of air conditioning. Each additional ton or part thereof shall be $3.00 per ton. b. Nonresidential occupancies: The mechanical permit fees shall be computed by one of the following methods, whichever is calculated to be the greatest fee: The rate of $50.00 for the first three tons or three horsepower of air conditioning or other mechanical systems per tenant space, each additional ton of air conditioning or horsepower shall be $3.00; or The rate of $3.00 per 425 square feet of floor area, or fraction thereof. 2) The cost of retrofit piping shall be computed at the minimum fee of $50.00 per floor for each cooling tower, or $50.00 for the first 3 horsepower and $3.00 for each additional horsepower, whichever is greater. 3) The minimum mechanical permit fee shall be $50.00. 4) A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the minimum fee whichever is greater. R) FIRE PREVENTION AND CONTROL PERMIT :FEES 1) The fees and exemptions set forth in the "Exhibit B" affixed hereto and made a part of this Schedule of Development Review and Building Permit Fees shall apply to Fire Prevention and Control Permits for both the independent and dependent fire districts. S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES 1) The permit fee shall be $50.00 to set-up a single-wide trailer or mobile home on an approved site plus electrical, plumbing, mechanical and fire protection fees as applicable. 2) The permit fee shall be $75.00 to set-up a double wide or larger mobile homes on an approved site plus electrical. plumbing, mechanical and fire protection fees as applicable. 1) CHICKEES AND SIMILAR STRUCTURES 1) The permit fee will be based upon a calculated cost of construction of $4.00 per square foot under roof or the contractor's estimated cost of construction, whichever is greater. The fee will then be calculated in accordance with Section N of this Resolution. Additional permit fees fOf electric, plumbing, mechanical, fire, etc,. will be charged when applicable. U) POOL OR SPA PERMIT FEES 1) FOf construction of each public pool Of spa the fee shall be- a. Valuation of construction costs of up to $4,999.99. $100.00 CDES Financial Administration, rev 07/27/04 page 12 16 Al 9 b. Valuation of construction costs of $5000,00 through $49,999.99: $80.00 plus $7.00 per thousand dollars, or fraction thereof, of building valuation in excess of $2,000.00. c. Valuation of construction costs of $50,000.00 through $1,000,000.00: $333.00 plus S3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $50,000.00. d. Valuation of construction costs, over $1,000,000.00: $3474.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $1,000,000.00, 2) For construction of each private pool or spa the fee shall be: $100.00 V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES 1) Construction costs shall be calculated as follows: a. Screen Roof. $2.00 per sq. ft. of floor area. (Screen Walls Only) b. Pan Roof. $3.00 per sq. ft. of floor area. (Screen Walls Only) c. Existing Roof. $2.00 per sq. ft. of floor area. (Screen Walls Only) 2) The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution. W) SIGN PERMIT FEES 1) Sign permit fees will be calculated in accordance with all applicable Building Pennit Fees and Electrical Permit Fees outlined in this document, the Collier County Development Fee Schedule The minimum building pennit fee for sign shall be $75.00. 2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit, however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the above subsection 1 of Sign Permit Fees. X) CONVENIENCE PERMIT FEES 1) Convenience pennits are issued in blocks of 10 each. Only licensed contractors are eligible to purchase convenience permits. Convenience permits are limited to the use specified on the pennit. The fee for a book of 10 convenience pennits is $400.00. Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 1) PERMIT AND PLAN REVISIONS The fee for each pennit revision submitted after pennit issuance shall be calculated using fee schedules outlined in Sections N through R above. The minimum pennit fee for revisions to pennitted projects shall be $50.00. 2) AS BUlL T PLANS The fee for" As Built" plan review shall be ten 00%) percent of the original building permit fee or $150.00, whichever is greater, but shall not exceed $500.00. The fee is intended to cover the cost of reviewing amended building plans in the office to determine that change orders and various field changes are in compliance with the minimum construction and fire codes of Collier County. The following are required for as-built drawings review: a. An itemized list of all changes made after pennit plan approval. b. As-built plans that have all changes made after permit plan approval "clouded". c. As-built plans and changes shall be signed and sealed by the engineer andlorarchitect of record. 3) CORRECTIONS TO PLANS a. First Correction to Plans. No charge b. Second Corrcction to Plans. $75.00 CDES Financial Administration, rev 07/27/04 page 13 16 A19 c.Third & subsequent correction to plans. $100.00 Z) PERMIT EXTENSION 1) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or $100.00, whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing existing or amended building plans to determine and verify code compliance AA) DEMOLITION OF IJUILDING OR STRUCTURE PERMIT FEES 1) The permit fee shall be $50.00 for the demolition of any building or structure. BB) PRE-MOVING INSPECTION FEES 1) The fee shall be $150.00 for the pre-moving inspection of any building or structure. CC) INSPECTION .FEES 1) A charge of $20.00 per inspection shall be assessed for inspections for which a pennit is not necessary. 2) A user fee of $40.00 per inspection shall be assessed for inspections on a time specified basis. 3) A user fee of $120.00 per inspection shall be assessed for inspections requested after nonnal working hours. (Nonnal working hours for inspections are Monday through Friday, 8:00 AM to 3:00 PM, excluding holidays.) 4) First Partial inspection for single-family & tenant buildout. No charge 5) Second & subsequent partial inspections for single-family & tenant buildout. $25.00 DD) REINSPECTION .FEES 1) Re-inspections for any type of building permit, or required Engineering re-inspections, shall result in an additional fee of $75.00 per inspection for the first re-inspection. $100.00 for the second re- inspection and $125.00 for the third and each successive re-inspection. EE) FAILURE TO OBTAIN A PERMIT 1) Where work for which a permit is required is started or proceeded with prior to obtaining said pennit. the fees herein specified shall be four times the regular fee not to exceed $1000.00 for permits costing $250.00 and less. The penalty for failure to obtain a permit when one is required having a cost greater than $250.00 shall be two times the regular amount. The payment of such fee shall not relieve any person from fully complying with the requirements of any applicable construction code or ordinance in the execution of the work, or from any penalty prescribed within any construction code, law or ordinance of Collier County, FF) LICENSING 1) The fee for licensing items is as follows: a. Letters of Reciprocity, $3.00 b. Contractors Change of Status. $10.00 c. Voluntary Registration of State Certified Contractors. $ I 0.00 CDES Financial Administration, rev 07/27/04 page 14 16A19 d. Pictures. $2.00 e. Laminating $1.00 (per license) GG) DUPLICATE PERMIT CARDS 1) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason. HIt) CHANGE OF CONTRACTOR OR SUBCONTRACTORS 1) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $50,00. This fee includes the issuance of a new pennit card. II) PERMIT FEE REFUNDS 1) If requested, in writing by the owner or his authorized agent, 50% of the fees charged, other than the application fee, may be refunded provided that a pennit has been issued, construction has not cQmmenced, and the refund is applied for prior to the cancellation of the pennit. JJ)-RECORD RETRIEVAL 1) No charge for retrieving records from inactive or remote storage including microfilmed documents KK) COPY FEES 1) The fee for blueprint and miscellaneous copying shall be as follows: a. Microfilm copies, of documents less than 1lx:17 inches: $0.15 other sizes at cost of production. f. Microfilm or Blueprint copies: 18 X 24 $1.25 per page 30 X 36 $2.50 per page 30 X 42 $3.25 per page 34 X 44 $5.00 per page g. Community Development self-service copier, public access and not related to public record retrieval or public record copies: documents less than 14x8.5 inches $0.15 per page inclusive of sales tax. LL) RESEARCH 1) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour 2) The fee for creating and designing special computer generated reports that are not part of the regular standard reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. MM) SUBSCRIPTION SERVICE The fee for one-year subscription service to be mailed quarterly shall be $15.00 per year. The subscription year is from Oct. 1 through Sept. 30. CDES Finanda) Administration, rev 07/27/04 page 15 16 Al 9 NN) ELECTRONIC DATA CONVERSION SURCHARGE 1) A surcharge in the amount of 3% of the building permit application fee, with the minimum surcharge being $3.00 and the maximum being $150,00, will be applied to every building permit application submitted. A flat fee of $3.00 per permit will be charged for those permits for which an applìcation fee is not required per item (M) of this Schedule. 00) REGISTRATION OF RENTAL DWELLINGS 1) The fee for registration of rental dwellings is as follows: a. Initial Registration Fee - $30.00 b. Annual Renewal - $20.00 c. Late Fee - $10.00 PP) FEE WAIVER PROCEDURES 1) Requests for fee waivers may only be approved by the Board of County Commissioners. Waiver requests for development review and building permit fe~s shall be submitted in writing directly to the appropriate Community Development & Environmental Services Division Staff, who will prepare an executive summary for consideration by the Board. Such requests shall include a statement indicating the reason for the fee waiver request and, if applicable, the nature of the organization requesting the fee waiver. QQ) ADDITIONAL FEE REFUND PROVISIONS 1) PAYMENT OF FEES: Full payment of fees is required for a complete application. Department policy requires full payment of fees at the time of application submittal. No work will begin on staff review of the application until all fees are paid in full. If full payment of fees is not received within 14 calendar days of application submittal, the application will be considered void. At this point, a new application and full payment of fees will be required to proceed with a project. 2) There will be no refund of Planning, Environmental, or Engineering related fees. except those applications whích have been deemed not sufficient for staff review and are withdrawn within 30 days of notification will be entitled to a 50% refund. After 30 days from such notification, there will be no refund of submiued fees. 3) In no cases will there be refunds for pre~applieation fees, data conversion fees, appeals of administrative decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment. 4) If staff error causes the inappropriate or unnecessary filing of an application and payment of fees, 100 percent of all inappropriate fees, shall be refunded upon written request and with the concurrence of Department management. 5) In those cases where alternative methods or timing of payments for CDES services and I or fees listed in this schedule associated with SBRreviews are deemed to best serve the public good, the Community Development and Environmental Services Administrator will have the authority to approve such alternatives. Such alternative must be in writing and signed by all principals involved. In no case shall final e.O. or such certifications of project completeness be issued until payments due CDES are received in full. 6) All hourly fees are computed and charged from actual Divisional time tracking records. 7) All acreage totals used in fee calculations will be rounded up to the nearest whole acre. CDES Financial Administration. rev 07/27/04 page 16 16A19 8) Any legal advertising required during any CDES activity or approval process will be charged in addition to stated fces, at actual costs, CDES reserves the right to charge an estimated aIllount with the initially required project fees, and will reconcile and adjust such charges against actual legal advertising billings at the completion of the project. 9) When deemed essential for project review or approval, there will be no additional charge for any meetings requested by CDES staff. CDES FinancíaI Administration. rev 07/27/04 page 17 BUILDING VALUATION DATA 16A19 As a service to our members, SBCCI offers the following building valuation data for the Standard Building COOe@ and the International Building Cod8®. The building valuation data represents the current average construction costs per sq. ft. The average costs include structural, electrical, plumbing, mechanical, interior finish, normal site preparation (excavation and backfill for building), architectural and design fees, overhead and profit. When using this data, it should be noted that these are "average" costs based on typical construction methods for each occupancy group and type of construction. These figures should be adjusted as appropriate. Occupancies are divided into two categories: "goOOo6 and "average,"7 to reflect the broad range of construction values. This data was compiled by SBCCI using the Marshall Valuation Service as published by the Marshall and Swift Publication Company, Los Angeles, California. Note: Alabama is the base state for this table. Building Valuation Data produced March 31,2002. Data in the tables must be multiplied by the appropriate regional modifier. Type of Constructlon4 Occupancy I II III IVS VS VI' 1-HR I UNP 1-HR I UNP 1-HR T UNP STANDARD BUILDING CODE© Assembly Auditorium -Good 131 126 101 64 62 100 96 66 62 - Average 96 93 73 45 42 72 68 46 42 Church - Good 127 122 103 89 87 102 98 81 92 - Average 93 90 75 65 63 74 70 70 66 Gymnasium - Good 104 104 83 76 73 82 78 79 75 - Average 77 77 61 54 52 60 56 57 53 Restaurant - Good 108 108 89 82 80 88 85 85 81 - Average 81 81 70 62 59 69 65 66 62 Theater - Good 123 119 86 78 76 85 81 81 77 - Average 92 90 62 55 53 61 57 58 54 Business Office - Good 113 109 89 80 77 88 84 85 81 - Average 86 82 65 56 53 64 60 62 58 Research/Engineering - Good 72 69 63 57 55 62 58 59 55 - Average 53 51 45 39 37 44 40 41 37 Service Station - Good 108 104 87 85 82 86 82 72 68 - Average 98 94 73 70 68 72 68 61 57 Educational School - Good 104 104 87 80 77 86 82 83 79 - Average 81 81 68 61 58 67 63 64 60 Factory-Industrial Factory (light MGF) - Good 44 42 44 38 36 43 39 41 37 - Average 30 29 33 27 25 32 28 30 26 Hazardous (Sprinkler System Included)4 Hazardous - Good 46 43 46 40 38 45 41 42 38 - Average 32 30 35 29 27 34 30 32 28 Type of Construction· Occupancy II III IVS VS VI' 1-HR UNP 1-HR UNP 1-HR UNP Institutional Convalescent Hospital - Good 139 135 106 89 87 105 NIP' 101 NIP' - Average 114 111 82 68 66 81 N/P1 78 NIP' Hospital -Good 199 195 159 89 87 158 N/P1 151 NIP' - Average 151 149 119 68 66 119 N/P1 114 NIP' Mercantile Department Stores - Good 89 87 76 56 54 75 71 59 55 - Average 68 67 62 43 40 61 57 46 42 Mall Stores - Good 102 102 74 67 64 73 69 70 66 - Average 83 83 61 54 52 60 56 57 53 Mall-Concourse - Good 80 80 59 56 54 58 54 58 54 - Average 63 63 46 43 41 45 41 45 41 Retail Store - Good 70 69 62 56 54 61 57 59 55 - Average 56 54 48 43 40 48 44 46 42 Residential Apartments - Good 84 80 70 63 61 69 65 65 61 - Average 66 63 55 48 46 54 50 51 47 Donnitories - Good 99 97 B4 77 74 83 79 78 74 - Average 77 75 65 58 56 64 60 61 57 Homes for Elderly - Good 100 98 88 82 80 87 83 85 81 - Average 79 77 68 62 60 67 63 65 61 Hotel - Good 105 102 89 68 66 89 85 84 80 - Average 82 80 76 50 48 75 71 71 67 Motel - Good 105 102 73 68 66 73 69 71 67 - Average 82 80 55 50 48 54 50 53 49 Single Family Residence3 - Good 90 87 77 70 68 76 72 70 66 - Average 68 65 57 51 49 56 52 52 48 Storage Auto Parking Structure - Good 39 37 N/[J2 N/[J2 N/[J2 N/[J2 N/[J2 N/[Ý N/D2 - Average 30 29 N/[J2 24 21 N/[J2 NfD2 NfD2 N/[J2 Private Garage - Good 39 37 45 37 35 44 40 41 37 - Average 30 29 36 29 27 35 31 32 28 Repair Garage - Good 48 45 48 38 36 47 43 42 38 - Average 35 33 36 28 26 35 31 32 28 Warehouse - Good 49 47 39 33 31 38 34 35 31 - Average 36 34 29 23 21 28 24 26 22 16A19 Notes: 1. NIP-Not pennitted by code. 2. N/D-Insufficient data to determine average cost. 3. Unfinished basements $11.81/sq. ft. 4. For sprinklered buildings in other than hazardous occupancies add $1.75/sq. ft. 5. In Type IV, V, and VI, add $41,000 per elevator 6. A good building will normally have some components which are only average, but many will be better than average. A good building is well insulated to utility standards, with packaged or zoned air conditioning; and has more than the minimum code required plumbing fixtures, and lighting and electric outlets, with good quality fixtures, interior and exterior finishes, and carpets. 7. An average building has minimum model energy code insulation levels, with a forced air system, contains the minimum code required plumbing fixtures, lighting, electric ouUets; and has average quality interior and exterior finish and minimum carpet. Type of Construction· Occupancy I II III IV V A I B A I B A I B A I B INTERN A TlONAL BUILDING CODE® Assembly Auditorium - Good 131 126 64 62 100 96 101 66 62 - Average 96 93 45 42 72 68 73 46 42 Church - Good 127 122 89 87 102 98 103 81 92 - Average 93 90 65 63 74 70 75 70 66 Gymnasium - Good 104 104 76 73 82 78 83 79 75 - Average 77 77 54 52 60 56 61 57 53 Restaurant - Good 108 108 82 80 88 85 89 85 81 - Average 81 81 62 59 69 65 70 66 62 Theater - Good 123 119 78 76 85 81 86 81 77 - Average 92 90 55 53 61 57 62 58 54 Business Office - Good 113 109 80 77 88 84 89 85 81 - Average 86 82 56 53 64 60 65 62 58 Research/Engineering - Good 72 69 57 55 62 58 63 59 55 - Average 53 51 39 37 44 40 45 41 37 Service Station - Good 108 104 85 82 86 82 87 72 68 - Average 98 94 70 68 72 68 73 61 57 Educational School - Good 104 104 80 77 86 82 87 83 79 - Average 81 81 61 58 67 63 68 64 60 Factory-Industrial Factory (light MGF) - Good 44 42 38 36 43 39 44 41 37 - Average 30 29 27 25 32 28 33 30 26 Hazardous (Sprinkler System Includedt Hazardous - Good 46 43 40 38 45 41 46 42 38 - Average 32 30 29 27 34 30 35 32 28 Type of Construction· Occupancy II III IV v A B A B A B A B Institutional Convalescent Hospital - Good 139 135 89 87 105 NIP' 106 101 NIP' - Average 114 111 68 66 81 NIP' 82 78 NIP' Hospital - Good 199 195 89 87 158 NIP' 159 151 NIP1 - Average 151 149 68 66 119 NIP' 119 114 NIP1 Mercantile Department Stores - Good 89 87 56 54 75 71 76 59 55 - Average 68 67 43 40 61 57 62 46 42 Mall Stores - Good 102 102 67 64 73 69 74 70 66 - Average 83 83 54 52 60 56 61 57 53 Mall-Concourse - Good 80 80 56 54 58 54 59 58 54 - Average 63 63 43 41 45 41 46 45 41 Retail Store - Good 70 69 56 54 61 57 62 59 55 - Average 56 54 43 40 48 44 48 46 42 Residential Apartments - Good 84 80 63 61 69 65 70 65 61 - Average 66 63 48 46 54 50 55 51 47 Dormitories - Good 99 97 77 74 83 79 84 78 74 - Average 77 75 58 56 64 60 65 61 57 Homes for Elderly - Good 100 98 82 80 87 83 88 85 81 - Average 79 77 62 60 67 63 68 65 61 Hotel - Good 105 102 68 66 89 85 89 84 80 - Average 82 80 50 48 75 71 76 71 67 Motel - Good 105 102 68 66 73 69 73 71 67 - Average 82 80 50 48 54 50 55 53 49 Single Family Residence3 - Good 90 87 70 68 76 72 77 70 66 - Average 68 65 51 49 56 52 57 52 48 Storage Auto Parking Structure - Good 39 37 N/IÝ N/IÝ N/IÝ N/IÝ N/IÝ NIIÝ N/IÝ - Average 30 29 24 21 N/D2 N/IÝ NIIÝ NIIÝ N/IÝ Repair Garage - Good 48 45 38 36 47 43 48 42 38 - Average 35 33 28 26 35 31 36 32 28 Warehouse - Good 49 47 33 31 38 34 39 35 31 - Average 36 34 23 21 28 24 29 26 22 Occupancy Utility and Miscellaneous A B Type of Construction· II A B III A IV B A v B Private Garage - Good 39 37 37 35 44 40 45 41 37 - Average 30 29 29 27 35 31 36 32 28 Greenhouse - Good N/02 N/~ 11.90 N/~ N/~ N/02 NIIÝ N/02 5.70 - Average N/~ NJ~ 5.53 N/~ N/~ N/~ NIIÝ ~ 3.71 Notes: 1. NIP-Not permitted by code. 2. N/D-Insufficient data to determine average cost. 3. Unfinished basements $11.81/sq. ft. 4. For sprinklered buildings in other than hazardous occupancies add $1.75/sq. ft. 5. In Type II, III, and V, add $41,000 per elevator 6. A good building will normally have some components which are only average, but many will be better than average. A good building is well insulated to utility standards, with packaged or zoned air conditioning; and has more than the ALABAMA Birmingham Mobile Opelika ALASKA ARIZONA ARKANSAS Little Rock West Memphis CALIFORNIA COLORADO Aspen CONNECTICUT DELAWARE DISTRICT OF COLUMBIA FLORIDA Jacksonville Miami Orlando Tampa GEORGIA Atlanta Columbus HAWAII 1.00 1.05 1.04 0.95 1.67 1.09 0.97 1.03 1.04 1.27 1.13 1.49 1.25 1.23 1.19 1.03 1.03 1.00 1.09 1.08 1.02 1.11 1.01 1.61 minimum code required plumbing fixtures, and lighting and electric outlets, with good quality fixtures, interior and exterior finishes, and carpets. 7. An average building has minimum model energy code insulation levels, with a forced air system, contains the minimum code required plumbing fixtures, lighting, electric outlets; and has average quality interior and exterior finish and minimum carpet. REGIONAL MODIFIERS (For use with SBC and IBC) IDAHO ILLINOIS INDIANA IOWA KANSAS KENTUCKY Covington New Port LOUISIANA Baton Rouge New Orleans Shreveport MAINE MARYLAND Baltimore 1.11 1.22 1.15 1.16 1.06 1.11 1.14 1.14 1.02 1.02 1.04 1.02 1.11 1.13 1.21 MICHIGAN MASSACHUSETTS 1.24 1.16 MINNESOTA MISSISSIPPI Jackson MISSOURI MONTANA 1.20 0.98 1.00 1.09 1.09 NEBRASKA NEVADA 1.09 1.19 NEW HAMPSHIRE 1.09 1.30 NEW JERSEY NEW MEXICO Gallup Taos NEW YORK 1.03 1.17 1.21 1.20 NORTH CAROLINA 1.03 Charlotte 1.05 Raleigh 1.06 NORTH DAKOTA OHIO OKLAHOMA Oklahoma City OREGON PENNSYLVANIA RHODE ISLAND 1.13 1.14 0.99 1.08 1.21 1.17 1.23 SOUTH CAROLINA 1.02 Columbia 1.03 Myrtle Beach 1.05 SOUTH DAKOTA 1.10 TENNESSEE Knoxville Memphis Nashville TEXAS Amarillo Corpus Christi Dallas/Ft. Worth EIPaso Houston Victoria Waco Wichita Falls UTAH VERMONT VIRGINIA Alexandria Fredericksburg Richmond WASHINGTON WEST VIRGINIA WISCONSIN WYOMING 1.03 1.08 1.05 1.07 0.99 1.02 0.95 1.05 0.99 1.03 0.95 1.00 1.02 1.06 1.14 1.02 1.18 1.15 1.05 1.24 1.17 1.19 1.08