Agenda 04/28/2009 Item #16A 2
Agenda Item No. 16A2
April 28, 2009
Page 1 of 49
EXECUTIVE SUMMARY
Recommendation to adopt a Resolution amending the Collier County Administrative Code
Fee Schedule of development-related review and processing fees as provided for in The
Code of Laws and Ordinances, Section 2-11
OBJECTIVE: To have the Board of County Commissioners (BCC) approve a resolution
amending the Collier County Administrative Code Fee Schedule of development-related review
and processing fees as provided for in The Code of Laws and Ordinances, Section 2-11.
CONSIDERATION: The vast majority of operations within the Collier County Community
Development and Environmental Services Division (CDES) are funded by fees in the core
service areas of building permits, building inspections, site plan reviews, and subdivision
reviews. This proposal to amend the fee schedule does not raise the level of any existing
building or land use related fee, but in those areas instead encompasses a variety of fee
clarifications, fees for activities newly enacted in the LDC or Florida Statute, optional fees for
expedited service, and creates lower fees for narrower sections of existing fee covered activities
that require less work.
Included with this Executive Summary are: Attachment "A"- the Resolution, Attachment "B"-
the revised CDES Fee Schedule, Attachment "C"- CDES Fee Schedule Strike-Through and
Underlines, Attachment "D"- Specific Fee Language Side by Side. Also included in a separate
attachment to the fee schedule is the February 2007 Construction Valuation Table referenced by
the Fee Schedule.
The changes in this update are all minor in nature related to general housekeeping of the fee
schedule and/or the addition of new fees related to recent code changes or optional fees related to
the permitting process. The following overview of the fee changes correspond to the numbering
sequence on Attachment "D", the fee side by side, and follows the actual order of changes on the
full fee schedule attachments.
a.
b.
c.
d.
e.
f.
g.
h.
~ 1.
J.
Changes number I (sec A.2) and number 2 (sec C.8.c) are deletions of fees that are
redundant or no longer applicable.
Change number 3 (sec FA.b) creates a fee for new LDC section 5.05.12, which is
related to utility system facilities.
Change numbers 4,5, and 6 (sec F.14, F.15, F.16) creates fees for new LDC sections
10.02.04 BA, 10.02.03 BA.b.i, and 9.03.07.
Fee Schedule change number 7 (sec H.l) clarifies existing language.
Change number 8 (sec K.8) creates a re-submittal fee consistent with other sections
and a minor fee for Statute allowed extensions, versus a full submittal fee.
Change number 9 (see K.15) creates a consistent re-submittal fee.
Change 10 (sec K.21) creates a notification fee consistent with other sections of the
fee schedule, and is reflective of actual production and mailing costs.
Fee Schedule change number II (sec K.30) is lanb'1lage revision for clarification.
Change 12 (sec K.33.a) creates a fee for new LDC section 2.03.07 N.5.
Change 13 (see K.34) is a lanb'1lage revision for clarification.
Agenda Item No 16A2
April 28. 2009
Page 2 of 49
k. Fee Schedule change number 14 (LA) increases the fee for lien searches and related
activities from $5 to $25, reflective of the actual costs incurred in this Fund III
activity.
I. Change 15 (sec L.12) is a language revision for clarification.
m. Change 16 (sec L.l6 and L.18.e) is a removal of redundant fee sections.
n. Fee schedule change number 17 (sec L.25) creates a small fee for Statute allowed
time extensions.
o. Change 18 (sec V.l) removes subsection 1 of Screen Enclosure fees, which is
redundant with subsection 2.
p. Change number 19 (sec TT) allows for the recovery of actual costs for this Fund 111
function.
q. Change 20 creates an optional Temporary Certificate of Occupancy fee to cover the
costs of research and processing of this expedited process.
These proposed fee changes were reviewed by the Development Services Advisory Committee
(DSAC) at their April 1,2009 meeting. By a vote of 13-0, DSAC recOlmnended that these fees
be approved with the recommendation that the following 3 proposed fces be clarified:
a. Change number 3 (sec FA). During discussions, it was asked if this fee was in
addition to the Site Development Plan Insubstantial Change fee. An LDC
amendment was approved to allow the utility system facilities to be submitted under
the SDPl process in lieu of the more costly SDP amendment process. The utilities
SDPl is more complex and takes longer to revicw than a normal SDPI consequently it
warrants slightly higher revicw fee, a normal SDPI would be processed under (sec.
FAa), and an SDPI under Public Utility Systems would be processed under (sec.
FAb).
b. Change number 9 (sec K.15). Additional language was added to this proposed
change to exclude minor revisions as required by staff.
c. Change number 17 (sec. L.25). It was asked if the Time Extension Fee was
duplication to the SOP Extension fee (sec F.15). This change provides staff the
opportunity to charge for services provided when processing extensions where the
code allows for development orders or pennits not specifically defined in this fee
schedule. This fee is for any time extensions allowed by LDC where there currently
is not a fee associated with an extension request. The fee is the same amount for time
extensions request for SOP and Final Plats.
FISCAL IMPACT: This Executive Summary does not require, nor request, any increase in the
current allocation of CDES operating or personnel expenses already approved by the BCC. The
proposed new/revised fees for the recent changes to codes and ordinances as noted below are to
cover costs incurred for staff time related to the processing of pennits and enforcement of new
codes and regulations approved by the Board.
Change 3 - SDPI fee for Public Utility Systems accessory uses. Applicant will have to
undergo the more costly full SDP amendment process until this fee is approved and
implemented.
Agenda Item No. 16A2
April 28. 2009
Page 3 of 49
Change 4 - Town Home SDP review. Applications will be processed under the existing
SDP plan review process until this fee is approved and implemented.
Change 6 - Post Take Site Plan process approved during a recent amendment to the LDC.
Applications for the "Post Take" related to transportation corridor planning process will not be
accepted until this fee is approved and implemented.
Change 12 - Mixed Use Project deviation fee for process approved by the Board.
Applications for the "MUP" deviation process will not be accepted until this fee is approved and
implemented.
Change 13 - Amplified Sound permit as required by the revised Noise Ordinance.
Applications for the "Amplified Sound Permits" related to cnforcement of the Noise Ordinance
are not being accepted until this fee is approved and implemented.
Change 14 - Lien Search fee, increase to cover actual cost incurred by staff for this
process. Lien searches are a service provided to real estate brokers and lending institutions to
research if there are any existing eode enforcement liens on identified properties. Staff continues
to provide the service as requested and the $20 differential between the existing and proposed fee
is currently being passed off to the taxpayer and absorbed by general fund (Fund III) budgeted
operations within the Code Enforcement Department.
GROWTH MANAGEMENT IMPACT: There are no !,'1'owth management impacts.
LEGAL CONSIDERATIONS: This request has been reviewed by the Collier County
Attorney's Office, and is legally sufficient for the Board of County Commissioners consideration
and approval. This item is not quasi-judicial, and ex parte disclosures are not required. This
item requires a simple majority vote. -JW
RECOMMENDATION: To have the Board of County Commissioners (BCC) approve a
resolution amending the Collier County Administrative Code Fee Schedule of development-
related review and processing fees as provided for in The Code of Laws and Ordinances, Section
2-11.
PREPARED BY: Garrett Mullee, Manager - CDES Operations Support
Item Number:
Item Summary:
Meeting Date:
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
16A2
r dbC .1 V.1 .1
Agenda Item No. 16A2
April 28, 2009
Page 4 of 49
Recommendation to adopt a Resolution amending the Collier County Administrative Code
Fee Schedule of development-related review and processing fees as provided for in The
Code of Laws and Ordinances, Section 2-11
4/28/2009 90000 AM
Prepared By
Garrett Mullee
Community Development &
Environmental Services
Financial Operations Manager
Financial Admin. & Housing
Date
3/19/20094:47:47 PM
Approved By
Diane B. Flagg
Community Development &
Environmental Services
Code Enforcement Director
Code Enforcement
Date
Approved By
3125120093:24 PM
Judy Puig
Community Development &
Environmental Services
Operations Analyst
Community Development &
Environmental Services Admin.
Date
413/2009 3:21 PM
Approved By
Jeff Wright
County Attorney
Assistant County Attorney
County Attorney Office
Date
Approved By
41312009 5:01 PM
Jeff Klatzkow
County Attorney
County Attorney
County Attorney Office
Date
416120098:04 AM
Approved By
Mark Isackson
County Manager's Office
Budget Analyst
Office of Management & Budget
Date
4/6/20099:06 AM
Approved By
Joseph K. Schmitt
Community Development &
Environmental Services
Community Development &
Environmental Services Adminstrator
Community Development &
Environmental Services Admin.
Date
4/15/2009 1 :29 PM
Approved By
OMS Coordinator
County Manager's Office
OMS Coordinator
Office of Management & Budget
Date
Approved By
4/17120097:48 AM
Leo E. Ochs, Jr.
Board of County
Commissioners
Deputy County Manager
County Manager's Office
Date
4/20/20092:22 PM
RESOLUTION NO. 2009-
Agenda Item No 16A2
April 28, 2009
Page 5 of 49
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIOERS OF COLLIER COUNTY, FLORIDA,
AMENDING THE COLLIER COUNTY COMMUNITY
DEVELOPMENT AND ENVIRONMENTAL SERVICES
FEE SCHEDULE; SUPERSEDING RESOLUTION NO. 2008-
296; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, on October 14, 2008, the Board of County Commissioners approved
Resolution No. 2008-296, establishing a fee schedule for services performed by Collier County's
Community Development and Environmental Services Division; and
WHEREAS, the proposed changes were reviewed by the Development Services
Advisory Committee (DSAC) at their April 1,2009 meeting and DSAC recommends the Board
of County Commissioners approve the new fee schedule.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA that:
The Board of County Commissioners hereby declares that the fees set forth in the Collier
County Community Development and Environmental Services Fee Schedule, attached hereto,
are all fair and reasonable sums to be assessed pursuant to the Land Development Code and the
County's corresponding review and permitting processes.
BE IT FURTHER RESOLVED that this Resolution be recorded in the minutes of this
Board with an immediate effective date, and the Resolution No. 2008-296 is hereby superseded
by the adoption of this Resolution effective as stated above.
This Resolution adopted after motion, second and majority vote, on this
,2009.
day of
ATTEST:
DWIGHT E. BROCK, Clerk
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
By:
As Deputy Clerk
By:
DONNA FIALA, CHAIRMAN
Approved as t? form and legal sufficiency:
right, Assistant County Attorney
09-CMD~00046/2
o
c*i
I+t:>~ 1\1,., 1t::!:^""l
April 28, 2009
Page 6 of 49
c
e
~
c
o
"
..
<
y
,u
COLLIER COUNTY COMMUNITY
ENVIRONMENTAL SERVICES
DEVELOPMENT AND
FEE SCHEDULE
Bee Proposed version, April 14, 2009
Contents:
A) ADMINISTRATIONnnnmnmmmm.m.nmmnmmnnmmnmmm.m.m.hh.h.hhn........_n.mnnmmnmm.mmmnm2
B) BLASTING PERMITS & INSPECTIONS .m.mnmmnnn________mmmn_......uhhh_mmmmm...m.mmmnnmm.mnnnmm2
C) ENVIRONMENT AULANDSCAPING .mnh_uh...nmhnnm.mnmnnnnnhnm..hnhhnnhhm....h.h.m.....n...mmnmmm2
0) EXCA V A TION PERMITS mmmmnnmnum.um__mmm"_m__.._.nmnn..n...nnmnmnm___mm.nnm.mnnnmmn_nn_.)
E) FIRE CODE REVIEW FEES nnnh.....mmnnm.mnmmmm_nmmmn.....hn.mnmmm......mmmnnnnmn..nmnnmnn4
F) SITE DEVELOPMENT PLANSmh...nmnnnmmmm.m.mnnnnmn_.......m..mnmnmmmmmmmmmnn..m_mnmn..4
G) SUBDIVISION m.mnm___mmmh...._m..mmm.....mmm.nn..nmm_......nh......nm.......mmnnmnnmm.m.mmn.m5
H) ENGINEERING INSPECTION FEES .nm..m.mmn_mmm.mnn.nhnn...m......m.mmnm.mnm.nmmmnm.nmn_n..n.n6
I) TEMPORARY USE FEES mm.n.hmnnnm.mm..m..nnmn.....n.nm............mmnnnmnnmnm..m.m__mmm_nmmm6
J) WELL PERMITS/INSPECTIONS .nmmnmmmm.nmm.n_hnmn._......mm.....mmm_mnm...._m_m__mn_nmu_mn_m__u_}
K) ZONING/LAND USE PETITIONS ..m__m___mm.mh..h....h..........nnnnnmm...__m_mmnmmnnn__mmmm.h_hnmnnn7
L) MISCELLANEOUS nmmnnnh...n..nnmmm..._m.....___mm.n.nnmn......h....m..mnmmnnnnmmmnnmmn..nnnm9
M) BUILDING PERMIT APPLICATION FEE ....________.___.____._____________________________....___..______.oo_______________m_____________m______.11
N) BUILDING PERMIT FEES nn.....".n______________..___.......................nn.n".n____n.n_________________________.__________h.._...~_._____.11
0) ELECTRICAL PERMIT FEES 'mn_m_mm_mmhnm.mh..hhn...nmmnnmn_m......nm_____mmn_....nmn_mnmm.nmul2
P) PLUMBING PERMIT FEES_hm_..mm..mmnnnmnmmnmnm...nn...mnm..nnnmnmmmmm..mnmmn.._m_n_u_m.12
Q) MECHANIC AL PERMIT FEES n..mmmmmn_..mmm.nnnnm.U.......m...nnnn.m.mmmnmmm..mnnmnmnn_nn__ul3
R) FIRE PREVENTION AND CONTROL PERMIT FEES mmmm__mmm_m.m............m..nm..hmnmnn..mmmmmmnm...13
S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES .mmmm_mmhhmhnhhhh.._h.m..._...mm.m.m..11
T) CHICKEES AND SIMILAR STRUCTURES .....mm.....nnmnmmm..nm__mn_m.mmn_m.._mhm__mnnmhnmm......m..13
U) POOL OR SPA PERMIT FEES mn..........m....m.m..mm.mm..___n..__.nmmn.nmm..n.hnh..n....n..Uh_...n..m.mm.m.l3
V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES .hm.mm..mm..mmnmnnnmnmnmnnnnn_nmnnn_n.m...n_.....m.l3
W) SIGN PERMIT FEES mm.nn...nn...mmmnmmmm..mnmmmnmmmmnhh..m.._hh_.._.......h.....nnmmmnm.m..14
X) CONVENIENCE PERMIT FEES .n..mm.mm..m_mn_m__mmmn_h_m.hn...nmnm......mmmnnnnnmmmn_nnm_n_n_14
Y) REVISION ANO AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 'nmnnnhmnnnnmnm..nnnnn.nhh....nm_m.l4
Z) PERMIT EXTENSION n__.nn.h'nn..m.m...mmmnmnm_m..m..nn.nmnnnnmnm_nnnnmn_mn"h'.m'hmmmmm.l4
AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES ...mn..n......__m__m___..m_m_mmmmmm.m_mn.h.h.._..u.l4
BB) PREuMOVING INSPECTION FEES ...m...nn..mmmm..mmn...mmm..n_m.n.............nmh....n......mm..mnnnmm.l4
CC) INS PECTION FEES ..... .......n........_."." _ _._ _______.n_____________..._______........ ____u..onno..n........... ....nnn.....__..__________._n) 4
DD) REINSPECTlON FEES nm..nmmm.mm.mmm.n..m_mnmmmmhh.hh......n..hhm....nm.....mnnnm...nm.._n.....1 5
EE) FAILURE TO OBTAIN A PERMIT mnhh.._..mnnn...m.mn......h_m_m.nnnnmnnmnmmmn.mhnmmnhmnnnn..n.l5
FF) LICENSING onm...nnnnnnnhn.............n..nnn.mnnm.mn..nm__m.mnnnmmnmmnmmh.nmn'hhh...nnmmn.l5
GG) DUPLICATE PERMIT CARDS m__m_h.n.h.....mnnm.m...m..mnmm______n___mnnnnmmmnnmmmnmn..n...........16
HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS _...umh__.mnnmmm.mmmm_mmm_mm.m.mnnm_nmm.n.nuI6
II) PERMIT FEE REFUNOS .m..m..nnnnnnn_m.....h..n...umhn...n..mmnm.m.mh.mnn..mmmmmm..__mn_mnmnnhl6
JJ) RECORD RETRIEV AL ..hn_n..n....mnmmnmm.m..mm...mm__mnmmmhnmhnh__..mmm.mm.h...h..mmmmn..16
KKI COPY FEES m_mmmn.mn.mn...mnn..mn..m.....m_onn...mn__mmmmmmnnnnmmnmmmnnnnn.h........mn.l6
LLi RESEARCH unnnn...mnnnmnmnnm....nn_..m__u.___nnn_mhmmh..._.._h.u..h...nhnh_h..mh....mn...nmnm.mm.16
MM) SUBSCRIPTION SERVICE ................____..._... _._." .____w______._o_.____.__.__________.. _ ......... ..............................................16
NN) ELECTRONIC DATA CONVERSION SURCHARGE ........m........m....._____mmoomoooooom.oooo..mm_mmoo.mum..............16
00) REGISTRATION OF RENTAL DWELLlNGS___.......m....................m.oooommmoooo_...oom...._oo_oo_mm_oooomm.............,17
PP) CERTIFICATE TO BOARD BUILDING oommoo..hm...................nn......mmm.mm.................m.........mmm_hoo.m_u.17
QQ) ADDITIONAL FEE REFUNO PROVISIONS oo__mmmmmmmmm..uoo.........__..................m.._m....__..........m_m___.._n.17
RR) REFUND PROVISIONS ..............m.......mnm......m.m.._m_mmu_oooommmmoooomm.oooooomoo.oooooo.....oo....m..n.......1 7
S5) ADDITIONAL FEE PROVISIONS .......................................n........._unnnn_nnnnnn_n_.n.n_nnnnn___n___n.............)8
TT) PUBLIC VEHICLE FOR HIRE FEES ..m.oo.......h.....mmnmnnn......m.mmm...m_oomn..m..oom_...oo.._oo...oo_............u.18
UU) "PAYMENT IN LIEU OF" FEE FOR PA THW A YS (SIDEWALKS. AND BIKE LANES) oom....h...hh_oo.umu...............moo......._.1 8
VV) OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS ...oonm__m...oommmmmmmmmoo..m_hoo............m........18
WW) FENCES oooooooooooo...h................mm.nn.........mmm..nmm..m_..moooooo_oommmmmmmmmoommooh..mmmm.l9
XX) CERTIFICATE OF OCCUPANCY ...mm..mnnn..mmm..mm_m..__..oo_oom...m..oommoooooooooomoooooooo.oom....n..m.mn.l9
Fees are in bold
CDES Financial Administration, rev 03/18/091w
page 1
/1,..0......,-.1. It~ I r>.1r) 1h^?
~ April 28. 2009
Page 7 of 49
FEES ARE ESTABLISHED BY THE BOARD OF COUNTY COMMISSIONERS RESOLUTION, AND CANNOT
BE WAIVED OR SUSPENDED WITHOUT AN ACTION BY THE BOARD OF COUNTY COMMISSIONERS.
ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY
DETERMINED BY THE DIRECTOR OF THE APPRO PIA TE DEPARTMENT, AS APPLICABLE. WHERE AS
PART OF A REZONING, PLAT OR SIMILAR APPLICATION TYPE, mE BOARD OF COUNTY
COMMISSIONERS DIRECTS APPROY AL OF FUTURE DEVELOPMENT ORDERS DIFFERENT FROM mE
STANDARD TYPE OF APPROY AL PROCESSES REQUIRED. mE DIRECTOR OF THE APPROPRIATE
DEPARTMENT SHALL DETERMINE THE FEES TO BE APPLIED TO mE PROCESS NECESSARY TO MEET
THE BOARDS REQUIREMENTS. THE APPLICABLE FEES SHALL BE THOSE WHICH MOST CLOSELY
RESEMBLE THOSE CHARGED FOR SIMILAR PROCESSES INCLUDING EXTRA FEES FOR ADVERTISING
AND THE LIKE.
A) ADMINISTRATION
1) Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or
Building Construction Administrative Code (Administrative Code). Based on staff hours: Less than 20 hours
$1,500.00,20 to 40 hours $3,000.00, more than 40 hours $5,000.00
2) N/A
3) Determination ofYested Rights. $100.00 (plus the County's out-of-pocket expenses associated with hearing
officer and hearings)
4) Appeal of Vested Rights Determination. $100.00
5) Amendment to Land Development Code. $3,000.00
6) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or
the LDC). $1000.00 (non-refundable)
7) Appeal to Board of Zoning Appeals or Building Board of Adjustmenls and Appeals (as may be provided for in
tlle Collier County Administrative Code or the LDC). $1,000.00 (non-refundable)
B) BLASTING PERMITS & INSPECTION
I) 30 day permit fee, non-refundable payable upon application. $250.00
2) 90 day permit fee, non-refundable payable upon application. $600.00
3) Yearly permit fee, non-refundable payable upon application. $1,500.00
4) Renewal permit fee, non-refundable payable upon application. $200.00
5) After-the-fact fee, due to blasting without a permit. $10,000.00
6) Fine fee, per detonated shot with after-the-fact permit. $200.00
7) Handler fee, for handler who assists the user or blaster in the use of explosives. $100.00
8) Blasting Inspection Fee. $200.00 (per inspection)
9) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts.
Upon completion, fees will be adjusted to reflect actual number ofblaslS.
C) ENVIRONMENT ALILANDSCAPING
I) Site Clearing Permit, first acre or fraction of an acre. $250.00 each additional acre or fraction of an acre.
$50.00 ($3,000.00 maximum)
2) Agricultural Land Clearing
a. Land Clearing Notification $250.00
CDES Financial Administration. rev 03/18/09 Iw
page 2
b.
Land Clearing Permit $250.00 each additional acre or fraction of an acre. $50.00 ($3,000.00
maximum)
It, ", 11';A?
April 28, 2009
Page 8 of 49
3) Landscape Tree Removal Fee $250
4) Environmental Impact Statement (EIS) $2,500.00 for 1st submittal and 2"' submittal if applicable, 3rd
submittal $1,000.00, 4th and subsequent submittals $500.00 each
5) Landscape Re-inspection I" $50.00. 2"' $75.00, eve!)' inspection afterward $100.00
6) Vehicle on the Beach Permit Application. $250.00 (Permit fee shall be waived for public and non-profit
organizations engaging in environmental activities for scientific, conservation or educational purposes).
7) Beach Nourishment Permits. $400
8) Special Treatment Review
a. First five acres or less. $400.00
b. Each additional acre, or fraction thereof. $50.00 ($5,000.00 Maximum)
c. n/a
9) Coastal Construction Setback Line (CCSL):
a. CCSL Permits $400.00
b. Variance - Petition. $1000.00
10) Sea Turtle Permit-
a. Sea Turtle Handling Permits. $25.00
b. Sea Turtle Nesting Area Construction Permit. $200.00
c. Sea Turtle Nest Relocation. $100.00
11 ) Vegetation Removal Permit
a. First acre or fraction of an acre less. $250.00
b. Each additional acre, or fraction thereof. $50.00 ($3,000.00 Maximum)
12) After-the-fact Environmental or Landscape Permits
a. CCSL Variance Petition. 2x normal fee
b. All other Environmental or Landscape Permits. 4x normal fee
13) Informal Wetland Jurisdictional determination for single family parcels up to 5 acres - $300.00
14) Conservation Easement review fee - $300.00 application fee plus the following additional site fee:
$200.00 for CE acres less than 5 acres; $400.00 for CE area between 5 acres and 10 acres; $600.00
for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between 20 and 50
acres; and an additional $200.00 for eve!)' 40 acres of CE area over 50 acres.
15) Listed or Protected Species review fee (when an EIS is not required) - $1000.00
D) EXCAVATION PERMITS
1) Annual Renewal. $300.00
2) Application (Private). $400.00
3) Application (Commercial). $2,000.00
4) Application (Development). $400.00
5) $200.00 per inspection paid in advance for 12 months
6) Reapplication: $300.00 plus $200.00 per month inspection fee
7) Cubic Yardage Review Fee: $200.00 first 5000 cy. plus $10.00 per additional 1000 cy with a maximum of
$20,000.00
8) Time Extension. $150.00 plus $200.00 per month inspection fee
9) After-the-fact Excavation Permit. 4x application fee
10) Over excavation penalty fee per yard. Plus PermiUReview $0.05 per cubic yard fee, unless maximum
have been paid.
CDES Financial Administration, rev 03/18/091w
page 3
It", ~I, 1~^?
April 28, 2009
Page 9 of 49
E) FIRE CODE REVIEW FEES
I) Fire Code Review fees associated with each of the following processes;
a. SDP - Site Development Plan
b. SDP A - Site Development Plan, Amendment
c. SDPI - Site Development Plan, Insubstantial
d. SIP - Site Improvement Plan
e. SIPI - Site Improvement Plan, Insubstantial
f. PSP - Preliminary Subdivision Plans
g. PSP A - Preliminary Subdivision Plans, Amendment
h. PPL - Plans & Plat, Subdivision
1. FP - Final Plat
J. CONSTR - Construction Plans, Subdivision/Utilities
k. ICP - Constmction Plans. Insubstantial
1. DRI - Development of Regional Impact
m. DOA - Development Order. Amendment
n. PUDZ - Planned Unit Development, Rezone
o. PUDA - Planned Unit Development, Amendment
p. PDI - Planned Unit Development, Insubstantial
q. RZ - Rezone, Regular Zoning
r. CU - Conditional Use
F) SITE DEVELOPMENT PLANS
J) Site Development Plan Review (SDP). $5000.00
$200.00
$150.00
$100.00
$150.00
$100.00
$150.00
$100.00
$100.00
$100.00
$100.00
$100.00
$200.00
$150.00
$150.00
$150.00
$100.00
$100.00
$150.00
a. plus $40.00 per DIU
b. plus $100.00 per residential building structure
c. plus $.10 per square foot for non-residential except that structures designed exclusively for parking
(parking garages) shall be calculated at $.05 per square foot.
d. plus $200.00 per building for non-residential
e. Additional fees for 3'" review $1,000.00, 4'" review $1,500.00, 5'" review $2,000.00, 6'" and subsequent
reviews $2,500.00
When a building consist of both residential and non-residential (commercial, retail, office) uses, the following
fees will apply.
a. $5000.00 base fee plus $40.00 per DIU
b. $200.00 per building for non-residential
c. plus $0.10 per square foot of non-residential floor area
d.. Additional fees for 3'" review $1,000.00, 4'" review $1,500.00, 5'" review $2,000.00, 6'" and
subsequent reviews $2,500.00
2) Pre-application fee. $500.00 (to be credited toward application fee submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staft's request will be held at no charge to the applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
3) Simultaneous Review Fee (planning review of simultaneous building permit applications) $100.00 per
building permit application.
4) Site Development Plan Insubstantial Change
a. Site Development Plan Insubstantial Change. $400.00 for fIrst sheet, $100.00 for each and every
additional sheet submitted.
CDES Financial Administration, rev 03i18/091w
page 4
^
,~oltc~"n 1"^'"
April 28, 2009
$500.CIll3ge 10 of 49
b.
Site Development Plan Insubstantial Change for Public Utility System Accessory Uses.
for the flIst sheet, $125.00 for each and every additional sheet.
c. Additional fees for 3'" review $1,000.00, 4th Review $1,500.00, 5th and subsequent review
$2,000.00
5) Site Development Plan Conceptual Review (CSP), Unified Development Plan (UDP), Neighborhood Park Site
(NPSP) $750.00
6) Site Improvement Plan Review (SIP). $1000.00 (plus Engineering review fees)
7) Utility Plan Review & Inspection Fees-
a. Construction Document Review. 0.75010 of probable water and/or sewer construction costs
b. Construction Inspection. 2.250/0 of probable water and/or sewer construction costs
c. Construction Document Resubmission or Document Modification, submit as insubstantial change.
$150.00 for flIst sheet, $75.00 for each additional sheet
8) Engineering Site Plan Review Fee
a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code
Minimum Landscaping, and any other appurtenant cost of construction
b. Construction Inspection 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum
Landscaping, and any other appurtenant cost of construction
9) Site Development Plan Amendment (SDP A) $2,500.00,
a. Plus $40.00 per DIU plus $100.00 per residential building structure
b. plus $.10 per square foot
c. plus $200.00 per building for non-residential
d. Additional fees for 3rd review $1,000.00, 4th Review $1,500.00, 5th and subsequent review $2,000.00
10) SBR Fees
a. Pre-Acquisition Meeting $500.00 (no refunds or credits)
b. Pre-application fee. $500.00 (to be credited toward application fee upon submittal) (all normal pre-
application provisions apply)
c. SBR Fee $5000.00 with hourly reconciliation at project completion for hourly variation greater than 10%,
final project charges at $100.00 per hour for all associated staff hours
1 I) Violation of the conditions of approval of the SDP/SIP or installation of improvements, clearing, or other
land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP. 4x the SIP/SDP
application fee
12) Request for alternative architectural design $500.00, no separate or additional fee for appeals to, or requests
for assistance from, the Architectural Arbitration Board.
13) Site Development Plan Sheet change out (per CDES policy !,'llidelines) $35.00 per page.
14) Town Home Site Plan Review - $6,000.00 base fee, additional fees for 3m review $1,000.00, 4th review
$1,500.00, 5th review $2,000.00. 6th and subsequent review $2,500.00.
15) SDP Extension - $150.00
16) Post Take Site Plan- Base Fee $1,000.00, Resubmittal Fee $250.00 each submittal, $3,000.00 additional if
objection filed.
G) SUBDIVISION
1) Lot Line Adjustment (LLA) and Lot Split Review $250.00
2) Subdivision Review Fees (PPL), (PPLA) -
CDES Financial Administration, rev 03il8/09 lw
page 5
Itc.~ II.I~ 1C:A"
April 28, 2009
a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting,~ 11 of 49
Minimum Landscaping and any other appurtenant cost of construction
b. Subdivision Inspection Fee 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum
Landscaping, and any other appurtenant cost of construction
c. Construction Document Resubmission or Document Modification ~Submit as Insubstantial Change
$400.00 for fIrst sheet, $100.00 for each additional sheet
d. Subdivisions - 3rd and subsequent additional reviews ~ $500.00
e. Subdivisions - Substantial deviations from approval construction documents $500.00
3) Suhdivision, Preliminary Plat (PSP)-
a. Petition Application $1000.00 plus $5.00 per acre (or fraction thereol) for residential, plus $10.00 per
acre (or fraction thereof) for non-residential; (mixed use is residential)
4) Subdivision Final Plat (FP) $1,000.00 plus $5.00 per acre (or fraction thereol) for residential, $1000.00 plus
$10.00 per acre (or fraction thereol) for nonresidential; (mixed use is residential)
5) Additional review of construction plans for phased construction of subdivision improvements. $1000.00 per
phase
6) Two-year Extension $150.00
7) Water and Sewer Facilities Construction Document Review 0.750/0 ofprohable water and/or sewer
construction costs
8) Construction Document Resubmission or Document Modification 0.250/0 of probable water and/or sewer
construction costs
a. 3rd and subsequent re-submittals - $500.00
9) Water and Sewer Facilities Construction Inspection Fee 2.250/0 of probable water and/or sewer construction
costs
10) Violation of the conditions of approval of approved construction plans or installation of improvements,
clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved
construction plans or permit. 4x the PPL, PPLA, PSP, CNSTR or Final Plat Review Fee (FP).
I I) Administrative Amendment $250.00
H) ENGINEERING INSPECTION FEES
1) Engineering Inspection Fee $150.00 per set of required engineering inspections charged at time of building
permit issuance.
2) Re-inspection Fees: 1 Sf re~inspection $75.00, 2nd re~inspection $100.00, 3rd and thereafter re-inspection
$125.00
I) TEMPORARY USE PERMITS
I) Beach Events Permits-
a. Individual Permit $100,00
b. Block of25 calendar days $2,250.00
c. Block of 50 calendar days $4,500.00
d. Block of75 calendar days $6,750.00
e. Block of 100 calendar days $9,000.00
f. Block of 125 calendar days $11,250.00
g. Block of 150 calendar days $13,500.00
CDES Financial Administration, rev 03/18/091w
page 6
2) Temporary Use Permit Special Sales & Events. $200.00
. "om "n '''~,)
April 28, 2009
Page 12 of 49
3) Model Homes and Sales Centers $500.00
4) Construction and Development, Mobile home, Agricultural Zoning, and Temporary use for "Coming Soon"
sign $125.00
5) Residential and Non.Profit Garage and Yard Sale Permits No Charge
6) Temporary Use Amendment. $100.00
7) Renewals or extensions requested after the expiration date $200.00.
8) Temporary Use Permit for Special Events requiring BCC approval, including Circus and Carnival Permits.
$275.00
9) Political Signs (Bulk Temporary Permit) $5.00
10) Fees for Temporary Use permits issued After the Fact, ATF: 2x normal fee
J) WELL PERMITS/INSPECTIONS
1) Hydraulic elevator shaft permit $300.00
2) Test hole permit (including 1st six holes) $300.00, each additional hole $20.00
3) Well permit (abandonment) $50.00
4) Well permit (construction, repair, or combined construction and abandonment at one site) $300.00
5) Well permit (monitoring) $150.00
6) Well Permit (modification of monitor/test well to a production well) $75.00
7) Well Reinspections
a. First Reinspection $75.00
b. Second Reinspection $100.00
c. Third Reinspection $150.00
8) After the fact well permits 4x normal fee per violation.
NOTE: Multiple wells may be allowed on one permit, but each well must be accounted for aud the appropriate fee
shall be charged for each well in accordance with the above listed schedule.
K) ZONING/LAND USE PETITIONS
1) Pre-application meeting fee $500.00 (to be credited toward application fee upon submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staffs request will be held at no charge to tbe applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
2) Alcobolic Beverage or Service Station Separation Requirement Waiver $1000.00
3) Boat Dock Extension Petition $1,500.00 Boat Lift Canopy Administrative Review $500.00
4) Conditional Use Permit $4,000.00 when filled with Rezone Petition ($1,500.00) Additional fee for 5" and
subsequent reviews - 200/0 of original fee.
5) Conditional Use Monitoring Review: $750.00
.-
6) Conditional Use Extension $3,000.00
CDES Financial Administration, rev 03/18/09Iw
page 7
^ e ~. Item ~In 1hL\~
April 28. 2009
7) DRI Review (In addition to cost of rezone) $]0,000.00 plus $25.00 an acre (or fraction thereof) Addflligaal fuof 49
for 51h and subsequent reviews - 200/0 of original fee Amendments deemed to be minor in nature, that is
requiring minor strike thru and underline text amendments of no more than 10 different lines of text changes
in the DRl will be capped at $13,000.00. Any amendment which includes a map and text change will be
assessed the full fee (no cap).
8) DRlIDO Amendment $6,000.00 plus $25.00 per acre (or fraction thereof). The acreage charge does not apply
for amendments which only change the build-out date of the DO for a time period of less than five years.
Additional fee for 5th and subsequent reviews - 20% of original fee.
a. DRl Extension - $]00.00
9) DRlABN - DRI Abandonment $],500.00
10) Flood Variance Petition $]000.00
1 I) Interim Agriculture Use Petition $350.00
12) Non-Conforming Use Change/Alteration $],500.00
13) Parking Exemption $],500.00. Additional fee for Sili and subsequent reviews - 20% of original fee.
14) Parking Reduction (Administrative) $500.00
IS) Rezone Petition (PUD to PUD): $8,000.00 plus $25.00 an acre (or fraction thereof) (Requires a submittal ofa
new PUD document), additional fee for Sib and subsequent reviews - 20% of original fee (excludes minor
revisions as required by staff).
16) Property owner notifications: $1.50 non-certified mail, $3.00 certified return receipt mail (Petitioner to
pay this amount prior to advertisement of petition)
17) Planned Unit Developmeut Amendments (PUD) $6,000.00 plus $25.00 an acre or fraction of an acre.
(Substantial changes to the text and Master Plan), Additional fee for 5" and subsequent reviews - 20%
of original fee. Text changes that do not impact the Master Plan $6,000.00 (the $2S.00 an acre fee will not
apply. Amendments deemed to be minor in nature that is requiring minor strike thru and underline
amendments of no more than 10 different lines of text changes in the PUD will be capped at $9,000.00.
Any amendment which includes a map and text change will be assessed the full fee (no cap).
18) Planned Unit Development Amendment -lusubstantial (PDI) $],500.00 requires a hearing by the CCPC only
for a miuor change to the PUD Master Plan. PUD Minor Change (PMC) $],000.00 (Administrative Review
for minor change to the Master Plan)
19) Rezone Petition (Regular) $6,000.00 plus $25.00 an acre (or fraction thereof), Additioual fee for Sili and
subsequent reviews - 200/0 of original fee.
20) Rezone Petition (to PUD) $]0,000.00 plus $25.00 an acre (or fraction thereof), Additional fee for S" and
subsequent reviews - 200/0 of original fee.
21) Street Name Change (Platted) $500.00 plus $1.50 for each property owner requiring notification of proposed
street name change
22) Un-platted street name or project name change: $]00.00 per application fee plus $50.00 per additional hour or
Partial hour of research required to process application, not to exceed $500.00
23) Variance petition: $2,000.00 residential, $5,000.00 non- residential, Additional fee for 5/h and subsequent
Reviews - 200/0 of original fee.
24) Variance (Administrative) $],000.00
2S) Zoning Certificate: Residential: $50.00, Commercial: $125.00
CDES Financial Administration, rev 03/18/09 \w
page 8
Anomb ItP~ "n ",^"
t\pril 28. 2009
Page 14 of 49
26) PUD Extension - Sun Setting: $1000.00
27) Sign Variance Petition: $2000.00
28) Stewardship Receiving Area Petition (SRA): $7000.00 per SRA plus $25.00 per acre for. Stewardship
Sending Area Petition (SSA): $9,500.00, Stewardship Receiving Alternative Deviation Design (SRDD)
$500.00. SRA Amendments deemed to be minor in nature, that is requiring minor strike thru and
underline text amendments of no more than 10 different lines of text changes in the SRA will be capped
at $10,000.00.
29) After.the.Fact Zoning/Land Use Petitions 2x the normal petition fee
30) Land Use Petition Continuances Including Appeal of an Administrative Decision and Appeal to Board of
Zoning Appeals
a. Requested after petition has been advertised $500.00
b. Requested at the meeting $750.00
c. Resultant additional required advertising charged in addition to continuance fees.
31) PUD and SRA.Monitoring (one.time charge at time of building permit pick.up)
a. $100.00 per dwelling unit for residential construction within a POD and SRA ($3,000.00 maximum
fee per building permit application)
b. $0.12 per square foot for non.residential construction within a PUD and SRA ($3,000.00 maximum fee
per building permit application)
32) Any legal advertising required during any CDES activity or approval process will be charged in addition to
stated fees, at actual costs. CDES reserves the right to charge an estimated amount with the initially required
project fees, and will reconcile and adjust such charges against actual legal advertising recording billings at
at the completion of the project.
33) Mixed Use Project (MOP) $2,500.00
a. Mixed Use Project Deviation $1,000.00
34) Amplified Sound Permit $300.00.
35) Planned Unit Development (PUD) closeout application and processing:
a. POD's up to 50 acres: $5,000.00
b. POD's over 50 acres up to 250 acres: $7,000.00
c. PUD's over 250 acres; $9,500.00
36) Development of Regional Impact (DRI) closeout application and processing $10,000.00
L) MISCELLANEOUS
I) Reserved
2) Reserved
3) Official Zoning Atlas Map Sheet Publications, maps, and reports shall be copied at actual cost.
4) The following fee shall be assessed for all Lien Search Requests and Payoff Requests: $25.00/per request.
5) The fee for researching records, ordinances, and codes shall be at no charge for the fIrst hour, then at the base
salary hourly rate of the staff member conducting the service for time in excess of 1 hour.
6) The fee for creating and designing special computer generated reports that are not a part of regular standard
reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member
conducting the service for time in excess of 1 hour.
CDES Financial Administration, rev 03/18/09 Iw
page 9
7) CD Burning: $5.00
^ Itpm ~In '''~,)
April 28, 2009
Page 15 of 49
8) Complete sets of Official Zoning Atlas Map Sheets $100.00 per set.
9) Staff shall charge the following fees for duplication of public records:
3. $0.15 for each one sided photocopy of documents less than I 1 x 17 inches.
b. $0.20 for each two sided photocopy of documents Jess than 11 x 17 inches.
c. $1.00 for each certified copy of a public record.
10) Property Notification Address Listing:
a. MS Excel spreadsheet on Disc $70.00
b. Print out on Paper $75.00 + $0.05 for every record over 1500
c. Mailing Labels $80.00 + $0.06 for every record over 1500
d. Print out on Paper'" Mailing Labels $85.00 + $0.11 for every record over 1500
11) Comprehensive Plan Consistency Review
a. CU's $300.00
b. Rezoning $750.00
c. PUD's or PUD Amendments: $2250.00
d. Letter of GMP consistency to outside agencies: $250
e. SRA - Stewardship Receiving Area - $2,250.00
f. DRl - Development of Regional Impact - $2,250.00
g. FlAM - Fiscal Impact Analysis - $4,000.00
12) Plan Review Fee (for planning review of all building permit applications)
3. Permit Application - Complex (more than one trade): $125.00 per building permit application, 2nd review
500/0 of fee, yd and subsequent 250/0 of fee (2]]d and subsequent review fees related to Zoning approvals
only)
b. Permit Application - Basic (no trade or one trade): S50.00 per building pennit application, 2nd review
500/0 of fee, yd and_subsequent 250/0 of fee (2nd and subsequent review fees related to Zoning approvals
only)
13) Project Meetings: Active applications under review for the following project types will be afforded one inter-
departmental meeting at no charge: Planned Unit Development re-zonings and Site Development Plan
applications (except for conceptual site plan approval and insubstantial change approval). Meeting requests
for all other application types and additional meetings will be subject to the following fees:
a. Meetings with Departmental Project Approval StafTmember per applicant request, reviews and petitions
in progress, $150.00 per one hour minimum, $75.00 per 12 hour thereafter. Additional Department staff
attending meeting per applicant request $75.00 per 12 hour per staff member.
b. Inter-Departmental Project Meeting per applicant request, site plan reviews and land use petitions in
progress, $500.00 per one hour minimum, $250.00 per ~i hour thereafter.
14) Adequate Public Facilities
a. Planning Applications requiring COA process review (such as FP's, PPL's & SIP's, SDPs) $200.00 +
25.00 per residential dwelling unit or + 25.00 per 1000 sq ft commercial ($5000.00 maximum)
b. Building permit applications requiring COA process review not covered under J 2.a above $100.00 per
building permit application.
15) Zoning Confirmation Letters
a. Standard Response $100.00 (includes up to I hour research)
b. Extended Research $100.00 per hour (any response with research in excess of 1 hour)
16) N/A
17) CDD
a. Community Development District $15,000.00
CDES Financia] Administration. rev 03/]8/09]w
page 10
b. Chapter 189 Special District, Independent or Dependent, $15,000.00
lfp P\ln 1h^"
April 28, 2009
Page 16 of 49
18) GMP Amendment
a. Small Scale $9000.00
b. General $16,700.00
c. Legal advertising in addition to sub-sections a and b fees, and subject to applicable fee schedule
provisions.
d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions:
$250
e. n/a
19) Application for issuance TDR, $250 (non-refundable); plus $25 per lDR issued and recorded (total fees not to
exceed $2,750.00)
20) Engineering Services
a. Vacation of Easements: $2.000.00
21) Building Board of Adjustments and Appeals $250.00
22) Early Work Authorization (EW A) permit: $500.00 (does not include site clearing fee).
23) Legal Non-conforming Lot (LNC) $100.00
24) Vested Rights Determination (VRD) $1,500.00
25) Time Extension $150.00
M) BUILDING PERMIT APPLICATION FEE
I) A permit application fee shall be collected at time of applying for a building permit. The permit application
. fee shall be collected when the plans are submitted for review. The fee shall be applied toward the total
permit fee. The applicant shall forfeit the application fee if the application is denied or if the application is
approved and the permit is not issued within the time limitation as stated in Section 103 .6, 1.1 of the
Collier County Ordinance No. 91-56, as amended.
2) Application fee will be computed as follows:
a. 25% of total Building Permit Fee ($.15/sq ft new residential and commercial, $.075 shell and
warehouse)
3) Minimum fee of$75.00 for each of the following: plumbing; mechanical (AlC); electrical; fire; and building,
Minimum fee for all other applications ~ $50.00
4) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any
fee adjustments necessary.
N) BUILDING PERMIT FEES
I) The fee for a building permit shall be computed as follows: Such fees shall be either based on the contractor's
valuations of construction cost or based on square footage. Minimal accepted calculated costs of construction
are set forth on the attached Building Valuation Data Table - ICC Building Valuation Data Table, produced
February, 2007. Valuation of construction costs ofless than $750.00 - No permit or fee is required, but
construction must comply with all County Codes and Ordinances. If inspections are required by the Building
Official or requested by the applicant, the appropriate fees shall be paid.
EXCEPTION: All work involving structural components and/or fire rated assemblies requires permits and
inspections regardless of construction cost, signs must secure permits as stated in Collier
Collier County Ordinance No. 2002-01, as amended.
CDES Financial Administration, rev 03/18/09 lw
page 11
llrll::mrl." If~ . "I, 1 RA?
April 28, 2009
a, Valuation of construction costs of $750.00 through $4,999.99 - $50.00 plus $50.00 applicatio~e 17 of 49
inspection as~required.
b. New construction greater than 500 square feet
L residential at $0.29 per square foot (living area)
ii. warehouse/shell at $0.145 per square foot (total area)
111. build-out at $0.145 per square foot (total area)
IV, commercial/institutional at $0.29 per square foot (total area)
c. Alterations, other construction, and new construction under 500 square feet (both residential and
commercial) minimum fee of$100.00 for one required inspection, plus $50.00 for each required
additional inspection, $100 plus 0.30% of declared valuation in excess of $5,000
0) ELECTRICAL PERMIT FEES
1) The fees for electrical permits for new structures or placement or relocation
of structures shall be computed as follows:
a. $0.40 per ampere rating of all single-phase panel boards.
b. $0.15 per ampere rating for switch or circuit whichever is greater, ifitem
#1 above does not apply.
c. When not a complete installation, all switch and circuit breakers ahead of
panel boards shall be computed at $0.15 per ampere,
d. Permit fees for any change in electrical installation shall be computed at
the above rates for that portion of new and/or increased fees in existing
electrical facilities.
e. The minimum for any electrical permit shall be $75.00 per unit or tenant
space
f Fifty percent (50%) in additional fee costs shall be added to all above fees
for three phase installations.
EXCEPTION: Ordinary repairs limited to a $200 value or less may be made without a permit. Repairs must comply
with all County Codes and Ordinances. If inspections are required by the Building Official or
requested by the applicant, the appropriate fees shall be paid.
P) PLUMBING PERMIT FEES
I) The following fee calculations shall be applied separately when the permit
involves mixed occupancies.
a, Residential occupancies: The fee for a plumbing pem1it shall be computed at the rate of$75.00 to be
charged for each living unit with one to three bathrooms. An additional fee of$10.00 will be assessed for
each additional bathroom
b. Nonresidential occupancies: The fee for a plumbing permit shall be computed by the following methods,
whichever is calculated to be the greatest fee:
I. The rate of $3.00 per 425 square feet of floor area, or fraction thereof; or
2. Institutional facilities, hospitals, schools, restaurants and repairs in any occupancy classification shall
be charged at the rate of$1.00 per fIxture unit or
3. Minimum of$75.00 for each occupancy or tenant space.
2) Grease traps: An additional fee of $50.00 shall be assessed for each grease trap.
3) The cost for retrofIt piping shall be computed at the minimum fee of$50.00
per floor for each main riser.
4) The cost of a permit for lawn sprinkler systems shall be computed using the dollar valuation as shown under
Section M of this Resolution.
5) The minimum plumbing permit fee shall be $75.00.
CDES Financia] Administration, rev 03/] 8/09 ]w
page 12
^..-.n.....,..,l.... ItA "I" 1(::l'.")
April 28, 2009
Q) MECHANICAL PERMIT FEES Page 18 of 49
I) The following fee calculations shall be applied separately when the permit involves mixed occupancies.
a. Residential occupancies: The mechanical permit fees shall be computed at the rate of$75.00 for each
living unit up to three tons of air conditioning. Each additional ton or part thereof shall be $3.00 per ton.
b. Nomesidential occupancies: The mechanical permit fees shall be computed by one of the following
methods, whichever is calculated to be the greatest fee: The rate of $75.00 for the first three tons or three
horsepower of air conditioning or other mechanical systems per tenant space, each additional ton of air
conditioning or horsepower shall be $3.00; or The rate of$3.00 per 425 square feet of floor area, or
fraction thereof.
2) The cost of retrofit piping shall be computed at the minimum fee of$50.00 per floor for each cooling tower, or
$50.00 for the first 3 horsepower and $3.00 for each additional horsepower, whichever is greater.
3) The minimum mechanical permit fee shall be $75.00.
4) A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the
minimum fee whichever is greater.
R) FIRE PREVENTION AND CONTROL PERMIT FEES
I) The fees and exemptions set forth in the "Exhibit B" affIxed hereto and made a part of this Schedule of
Development Review and Building Permit Fees shall apply to Fire Prevention and Control Permits for both
the independent and dependent fire districts.
S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES
I) The permit fee shall be $50.00 to set-up a single-wide trailer or mobile home on an approved site plus
electrical, plumbing, mechanical and fire protection fees as applicable.
..
2) The permit fee shall be $75.00 to set-up a double wide or larger mobile homes on an approved site plus
electrical, plumbing, mechanical and fire protection fees as applicable.
T) CHICKEES A.,"ID SIMILAR STRUCTURES
I) The permit fee will be based upon a calculated cost of construction of $4.00 per square foot under roof or the
contractor's estimated cost of construction, whichever is greater. The fee will then be calculated in accordance
with Section N of this Resolution. Additional permit fees for electric, plumbing, mechanical, fire, etc., will be
charged when applicable.
U) POOL OR SPA PERMIT FEES
I) For construction of each public pool or spa the fee shall be-
a. Valuation of construction costs of up to $4,999.99. $100.00
b. Valuation of construction costs of $5000.00 through $49,999.99: $80.00 plus $7.00 per thousand dollars,
or fraction thereof, of building valuation in excess of$2,000.00.
c. Valuation of construction costs of $50,000.00 through $1,000,000.00: $333.00 plus $3.00 per tbousand
dollars, or fraction thereof, of building valuation in excess of $50,000.00.
d. Valuation of construction costs over $1,000,000.00: $3,474.00 plus $3.00 per thousand dollars, or fraction
thereof, of building valuation in excess of $ 1,000,000.00.
2) For construction of each private pool or spa the fee shall be: $50.00 application plus $50.00 per inspection as
required.
V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES
I) N/A
2) The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution.
CDES Financial Administration, rev 03/18/091w
page 13
^, 0 ~, Itom" 1R1\~
April 28, 2009
Page 19 of 49
W) SIGN PERMIT FEES
I) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical
Permit Fees outlined in this document, the Collier County Development Fee Schedule, The minimum
building permit fee for sign shall be $75.00,
2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit,
however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the
above subsection 1 of Sign Permit Fees.
X) CONVENIENCE PERMIT FEES
1) Convenience permits are issued in blocks of 10 each. Only licensed contractors are eligible to purchase
convenience permits are limited to the use specified on the permit. The fee for a book of 10 convenience
permits is $500.00 ($50.00 fee per inspection, ] inspection only)
Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS
I) PERMIT AND PLAN REVISIONS The fee for each permit revision submitted after permit issuance shall be
calculated using fee schedules outlined in Sections N through R above. The minimum permit fee for revisions
to permitted projects shall be $50.00.
2) AS BUILT PLANS The fee for "As Built" plan review shall be ten (10%) percent of the original building
permit fee or $150.00, whichever is greater, but shall not exceed $500.00. The fee is intended to cover the cost
of reviewing amended building plans in the office to determine that change orders and various field changes
are in compliance with the minimum construction and fire codes of Collier County. The following are required
for as-built drawings review:
a. A..n itemized list of all changes made after permit plan approval.
b. As-built plans that have all changes made after permit plan approval "clouded".
c, As-built plans and changes shall be signed and sealed by the engineer and/or architect of record,
3) CORRECTIONS TO PLANS
a. First Correction to Plans. No charge
b, Second Correction to Plans. $75.00
c. Third & subsequent correction to plans. $100,00
Z) PERMIT EXTENSION
I) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or $100.00,
whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing
existing or amended building plans to determine and verify code compliance
AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES
I) The permit fee shall be $25.00 application for the demolition of any building or structure; plus $50.00 per
inspection as required.
BB) PRE-MOVING INSPECTION FEES
I) The fee shall be $150.00 for the pre-moving inspection of any building or structure.
CC) INSPECTION FEES
1) A charge of $20.00 per inspection shall be assessed for inspections for which a permit is not necessary.
2) A user fee of$120.00 shall be assessed for all inspections on a time specified basis.
3) First Partial inspection for single-family & tenant buildout. No charge
4) Second & subsequent partial inspections for single-family & tenant buildout. $25.00
CDE$ Financial Administration, rev 03/] 8/091w
page ]4
^
Itom"~ 1"^?
April 28. 2009
Page 20 of 49
DD) REINSPECTION FEES
1) Re-inspections for any type of building permit, or required Engineering re-inspections, shall result in an
additional fee of $75.00 per inspection for the first re-inspection, $100.00 for the second re-inspection and
$125.00 for the third and each successive re-inspection.
EE) FAILURE TO OBTAIN A PERMIT
1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where such action was cited by Code Enforcement or by Contractor Licensing and resulted in a fmding of
violation from either the Code Enforcement Board, the Special Magistrate, or the Contractor LicensinR.Board,
or as directed by the Board of County Commissioners the fees herein specified shall be 4x the regular fee.
2) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where a contractor or agent/provider where the building official or zoning director (for cases involving land
development) deems that the contractor/provider should have known that a permit was required but
voluntary seeks compliance by obtaining the necessary permits to abate the violation the fees herein
specified shall be 2x the regular fee.
3) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where an ownerlbuilder seeks voluntary compliance by obtaining said permit the fees assessed will be 2x
the regular rate as defined in this fee schedule.
4) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where the unpermitted work was completed by other or prior to the current ownerlbuilder's ownership
of the property an where the current ovmerlbuilder seeks voluntary compliance by obtaining said permit to
assure compliance with all applicable codes the fees will be assessed at the regular rate as defined in this
fee schedule.
5) The payment of such fee shall not relieve any person from fully complying with the requirements of any
applicable construction code or ordinance in the execution of the work, or from any penalty prescribed
within any construction code, law or ordinance of Callier County.
FF) LICENSING
I) The fee for licensing items is as follows:
a. Letters of Reciprocity. $25.00
b. Contractors Change of Status. (active to dormant) $10.00
c. Voluntary Registration of State Certified Contractors. $10.00
d. Pictures. $2.00
e. Laminating $1.00 (per license)
f. Fee for a 6 month temporary contractor's license $25.00
g. Certified copies of Experience letters $35.00
h. Duplicate or replacement (of Competency cards) $25.00
I. Second entity application fee $50.00
2) Certificated of Competency (Annual)
a. Contractor
Initial License Fee
Renewal Fee
b. Specialty Contractor
Initial License Fee
Renewal Fee
c. Journeyman
Initial License Fee
Renewal Fee
$150.00
$100.00
$135.00
$ 85.00
$ 50.00
$ 25.00
3) Dormant Certificates of Competency (Annual)
CDES Financial Administration, rev 03/18/09 lw
page 15
^
",om ", 1~bry
April 28, 2009
Page 21 of 49
a. Contractor
b. Specialty Contractor
c. Penalty fees after 9/30
$100.00
$ 85.00
$ 10.00 per month nntil 12/31
4) Reinstatement of Delinquent License
a. Contractor
b. Specialty Contractor
c. Journeyman
d. Examination Administrative Fee
$150.00 pIns back years
$135.00 plus back years
$ 50.00 plus back years
$100.00 good for 6 months
GG) DUPLICATE PERMIT CARDS
1) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason.
HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS
1) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $50.00.
This fee includes the issuance of a new permit card.
II) PERMIT FEE REFUNDS
1) If requested, in writing by the o\\rner or his authorized agent, 500/0 of the fees charged, other than the
application fee, may be refunded provided that a permit has been issued, construction has not commenced, and
the refund is applied for prior to the cancellation of the permit.
JJ) RECORD RETRIEVAL
1) No charge for retrieving records from inactive or remote storage including microfilmed documents
KK) COPY FEES
1) The fee for blueprint and miscellaneous copying shall be as follows:
a. Microfilm copies, of documents less than I Ix 17 inches: $0.15 other sizes at cost of production.
b. Microfilm or Blueprint copies:
18 X 24 $1.25 per page
30 X 36 $2.50 per page
30 X 42 $3.25 per page
34 X 44 $5.00 per page
c. Community Development self-service copier, public access and not related to public record retrieval or
public record copies: documents less than 14x8.5 inches $0.15 per page inclusive of sales tax.
LL) RESEARCH
1) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base
salary hourly rate of the staff member conducting the service for time in excess of I hour
2) The fee for creating and designing special computer generated reports that are not part of the regular standard
reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member
conducting the service for time in excess of I hour.
MM) SUBSCRIPTION SERVICE
The fee for one-year subscription service to be mailed quarterly shall be $15.00 per year. The subscription
year is from Oct. 1 through Sept. 30.
NN) ELECTRONIC DATA CONVERSION SURCHARGE
1) A surcharge in the amount of 30/0 of the building permit application fee, with
the minimum surcharge being $3.00 and the maximum being $150.00, will be
CDES Financial Administration, rev 03/18/09 Iw
page 16
applied to every building permit application submitted. A flat fee of $3.00
per permit will be cliarged for those permits for which an application fee is
not required per item (M) of this Schedule.
!tom fl.1", 1c:.11'J
April 28, 2009
Page 22 of 49
00) REGISTRATION OF RENTAL DWELLINGS
I) The fee for registration of rental dwellings is as follows:
a. Initial Registration Fee - $30.00/per property
b. Annual Renewal - $20.00(per property
c. Annual Late Fee - $IO.OO/per day per property up to a maximum of$80.00
d. The term "property" means a parcel or contiguou-" parcels with any number of rental units located
thereupon under common ownership and/or management.
2) Rental Inspection
a. Rental Inspection - $200.00 per unit
b. Re-inspection Fee. $50.00 per re-inspection per unit.
c. Rental inspections shall not be required for rental units on property covered by a Florida Department of
Business and Professional Regulation ("DBPR") license. A copy of the cnrrent DBPR license
shall be provided with the initial rental registration and all subsequent rental renewal applications.
3) Any nnpaid fees may be pursued by the Collier Manager or designee througb a collection agency.
PP) CERTIFICATE TO BOARD BUILDING
I) Initial Boarding Certificate - $0
2) Boarding Certificate Extension - $150
QQ) ADDITIONAL FEE REFUND PROVISIONS
1) Requests for fee waivers may only be approved by the Board of County Commissioners. Waiver requests for
development review and building permit fees shall be submitted in writing directly to the appropriate
Community Development & Environmental Services Division Staff, who will prepare an executive summary
for consideration by the Board. Such requests shall include a statement indicating the reason for the fee
waiver request and, if applicable, the nature of the organization requesting the fee waiver.
RR) REFUND PROVISIONS
I) PAYMENT OF FEES: Full payment of fees is reqnired for a complete application. Department policy
requires full payment offees at the time of application submittal. No work will begin on staff review of the
application until all fees are paid in full. If full payment of fees is not received within 14 calendar days of
application submittal, the application will be considered void. At this point, a new application and full
payment of fees will be required to proceed with a project.
2) There will be no refund of Planning, Environmental, or Engineering related fees, except those applications
which have been deemed not sufficient for staff review and are withdrawn within 30 days of notification will
be entitled to a 50% refund. After 30 days from such notification, there will be no refund of submitted fees.
3) In no cases will there be refunds for pre-application fees, data conversion fees, appeals of administrative
decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment.
4) If staff error causes the inappropriate or nnnecessary filing of an application and payment of fees, lOa percent
of all inappropriate fees, shall be refunded upon written request and with the concurrence of Department
management.
CDES Financial Administration, rev 03/] 8/09 \w
page 17
SS) ADDITIONAL FEE PROVISIONS
^. ". ItQ~ ", "'~,)
April 28, 2009
Page 23 of 49
1) In those cases where alternative methods or timing of payments for CDES services and! or fees listed in this
schedule associated with SBR reviews are deemed to best serve the public good, the Community Development
and Environmental Services Administrator will have the authority to approve such alternatives. Such
alternative must be in writing and si,gned by all principals involved. In no case shall final e.O. or such
certifications of project completeness be issued until payments due CDES are received in full.
2) All hourly fees are computed and charged from actual Divisional time tracking records.
3) All acreage totals used in fee calculations will be rounded up to the nearest whole acre.
4) When deemed essential for project review or approval, there will be no additional charge for any meetings
requested by CDES staff.
TT) PUBLIC VEHICLE FOR HIRE ~'EES
I) The following fees shall be assessed for the Public Vehicle for Hire Program: (In the event that the
background check fee charged to the county exceeds the minimum fee established by the county,
the applicant(s) shall be responsible for the actual cost oflhe search).
a. Initial Application fee (new Companies) - $200
b. Initial Certificate to Operate (Feb I-Jan 31) - $325.00
c. Annual Certificate to Operate Renewal $325.00
d. Late Fee for CTO Renewal $200.00
e. Sub-Certificate Application Fee (New Companies) - $100.00
f Sub-Certificate - $162.50
g. Annual Sub-Certificate renewal - $162.50
h. Late Fee for Sub-Certificate Renewal - $100.00
1. Vehicle Decal - $50.00
J. Temporary Vehicle Decal $5.00 per vehicle/per day
k. Temporary Vehicle Decal (In case of inoperable decaled vehicle) - $5.00/per vehicle
1. Driver Identification Card (Initial/Renewal) - $75.00 per driver
m. 2"' Driver Identification Card - $25.00
n. Replacement Driver 1D - $10.00
o. On-site Vehicle Permitting - $I5.00 per vehicle
UU)"PAYMENT IN LIEU OF" FEE FOR PATHWAYS (SIDEWALKS, AND BIKE LANES)
1) Calculated using the current Florida Department of Transportation (FDOT) construction costs or an
engineering estimate not to exceed twenty-five percent (25%) of the submitted application request's total
project cost.
VV) OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS
I) Optional expedited building permit plan review fee shall be 30% of the building permit fee (additional to full
building permit fees) with a minimum fee of$50.00
a. Participation in the optional expedited review program is subject to limited availability, applications will
be accepted on a first come first served basis.
b. Review completion times are guaranteed to equal, or be less than, one half of the normal advertised
completion timeframes. Should the expedited review exceed this guaranteed completion time, the 30%
optional expedited building permit review fee will be refunded to the applicant. and all normal permit fees
will apply. Such guarantee and refund provisions shall apply to reviews, and do not infer or relate to
approvals.
c. Optional expedited building permit review fees shall be due at the time of building permit application
submission.
CDES Financial Administration. rev 03/] 8/09 Iw
page 18
, "pm "A '''^~
April 28, 2009
d. Any required re-submissions of permit applications' leading to re-reviews, when due to applic~ge 24 of 49
insufficiencies, shall be subject to additional optional expedited building permit plan review fees if an
additional expedited review is requested by the applicant for the re-review, and shall be calculated against
re-submission charges.
WW) FENCES
I) $50.00 application fee plus $50.00 per inspection as required.
XX) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY (TCO)
I) Commercial structures under 30,000 square feet - $250.00
Commercial structures 30,000 square feet and over - $500.00
2) Extension of existing TCa for commercial structures - $500.00
3) Residential structures - $100.00
This is the last page of the CDES Fee Schedule
CDES Financial Administration, rev 03,/18/09 Iw
page 19
c
o
c~~
e
y
c
^ >nrb Itom hi, h~0
April 28, 2009
Page 25 of 49
o
K
K
< y
STRIKE-THROUGH AND UNDERLINE
COLLIER COUNTY COMMUNITY
ENVIRONMENTAL SERVICES
DEVELOPMENT AND
FEE SCHEDULE
Bee Proposed version, April 14, 2009
Strike-through and Underline
Contents:
A) ADMIN ISTRA TION .. __ _. nhh____.. _..h.Un _ _ _..... _ _ n__n.... __ _n_....... _ _ ___ ...... _ _ _ _ "...... .______....h. _ _ _ u,,____". __n..nOhn.o..o__ _ n.n.2
B) BLASTING PERMITS & INSPECTIONS 2
C) ENVI RONMENT AULANDSCAPING _ __~~~~::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::2
0) EXCA V A TION PERMITS ...hhnn............n.....nn.........nn..........nn.....nnn....h.......................n...........n......h......3
E) FIRE CODE REVIEW FEES 4
F) SITE DEVELOPM ENT PLANS~::::::::::::: ::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::4
G) SUBDIVISION Uhh______. ...h_____.n. U..n___......__ __ _ _. .....hn _ _ _.... ...h. _ _ _..no..n_.u.... _____._..Oh_____ _.no..___ __......Un __.....__u__5
H) ENGINEERING INSPECTION FEES .........nn.........n......h.......................hnn...........n......hn............................h....6
I) TEMPORARY US E FEES __....___ _ _ ___n.... _ _ _ _ _ _ ...Uhn___ __..oo _ _______nu________..... _ _______...________.....______.... .______..... .______... ...___6
J) \lv' ELL PEM1ITS/INSPECTJONS n________ _____________ .... _ _ _ _ ______... _______ _ _.... __ _____....._ _ _ __ _ _ _.... _______....... _____...... _ _ _ __....______......7
K) ZON lNG/LAND USE PETITIONS .. _ _ _ _____...._____ _...... .______...... _ _ _ _ _ _ _ _..... ______...... _. _ _ __ ........____... ...______.... _ ._____... ...._____....7
L) MISCELLANEOUS ...................h................................................h...................................................................9
M) BUILDING PERMIT APPLICATION FEE _____.....______......._______......______....._______.....______......_____......______........___......____.J J
N) BUILDING PERMIT FEES ....................h..........................................................................................................11
0) ELECTRICAL PERMIT FEES ......_________.._________..__________....._________....._____.._.......____......._____......_______..._______.._..._____..)2
P) PLUM BING PERM IT FEES .__ ___......__.__ _ _ _ _.. ...____...... __. ___ _._......_______... ....___ ___....._____ _. .... .______. ..... .____........ _____.....____.12
QJ MECHANICAL PERMIT FEES ......................................................................................................h..........h......] 3
R) FIRE PREVENTION AND CONTROL PERMIT FEES h.................................................h............................................13
S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES o.-------..______________________.m..______m_____________..______..13
T) CHICKEES AND SIMILAR STRUCTURES ___ __......_____ _ _. _...__._____......_____. ....._.___ ___.. .... ____ __.......__ _ __....._.__ ___ ........___._....13
U) POOL OR SPA PERMIT FEES ...........h..............................................................................................................]]
V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES...........................................h..............................................h...I]
W) SIGN PERMIT FEES ..................................................................................h..................................................14
X) CONVENIENCE PERMIT FEES ...........................................................h..................................h.........................1 4
YI REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS........................h......................................]4
Z) PERMIT EXTENSION ......h.............h...............................................h.............................................................14
AA) OEMOLlTION OF BUILDING OR STRUCTURE PERMIT FEES .........................................h......................................]4
BB) PRE-lvl0VING INSPECTION FEES ______....h________....._________...._______..___________....______......______......00_____......_______.......__14
CC) INSPECTION FEES ................................................................................................h..........h..........................15
DD) REINSPECTION FEES .....................hhh....................................................................h..................................1 5
EE) FAILURE TO OBTAIN A PERMIT ....h.................................................................h.....................................h.....15
FF) LICENS ING .__ _ ____....______ _.. ....______ __ ...... _ ______....__ _ _ _____......________.... ...______.....__ _ _ _..... ..______..... ._____._.... .._ _____..... ..__ 15
GG) DUPLICATE PERMIT CARDS .............................................................................h....................................h....16
HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS .............................h...........h...............................................16
II) PERMIT FEE REFUNDS .............................................h................................................h.........................hh.....16
JJ) RECORD RETRIEVAL .....................................................................h.............................................................1 6
KK) COPY FEES ...........................................................................................................................h..................16
LL) RESEARCH ......................h...................................................h.........h..................................................h....1 6
M M) SUBSC R] PTION S ER VICE n_ _ _ _00..______ _ _... .___________.... __ ______._.... .______ _ _ _.. _ _ ________00...______ _. ....________.. ..__________ _ _......__ __.17
NNJ ELECTRONIC DA TA CONVERSION SURCHARGE ----........-------------------......----.----....-----___..__.____._m.._____.._.____m.____.17
00) REGISTRATION OF RENTAL DWELLINGS ._...._______________.________..__________...._______.___.___________..._________..._____________.....__.17
PP) CERTIFICATE TO BOARD BUILDING ..........................................................................................................h..] 7
QQ) ADOITIONAL FEE REFUND PROVISIONS .................................h.............h........................h.............................]7
RR) REFUND PROVISIONS .........h............h......................................h.................................................................1 7
SS) ADDITION AL FEE PROVISIONS .____.........____ _....._ _____...... _.__ _ _.._..... ______....... _ _. -............___.........___............_______......1 8
IT) PUBLIC VEHICLE FOR HIRE FEES ..._____........_____......________....__._______....______.__......_______......._____._....___________.......__.)8
UU) "PA YMENT IN LIEU OF" FEE FOR PATHWAYS (SIDEWALKS, ANO BIKE LANES) .......................................................]8
VV) OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS -------___.._______________________......_______........_________..........._____.18
WW) FENCES .........h..........h..................................h.........................h............................h..............................19
XX) CERTIFICATE OF OCCUPANCY ......................................................................h..............h..............................19
Fees are in bold
CDES Financial Administration. rev 03/18/09 Iw
page I
. Itom "n 1"A,)
April 28, 2009
Page 26 of 49
FEES ARE ESTABLISHED BY mE BOARD OF COUNTY COMMISSIONERS RESOLUTION, AND CANNOT
BE WAIVED OR SUSPENDED WImOUT AN ACTION BY mE BOARD OF COUNTY COMMISSIONERS.
ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY
DETERMINED BY THE DIRECTOR OF THE APPRO PIA TE DEPARTMENT, AS APPLICABLE. WHERE AS
PART OF A REZONING, PLAT OR SIMILAR APPLICATION TYPE. mE BOARD OF COUNTY
COMMISSIONERS DIRECTS APPROVAL OF FUTURE DEVELOPMENT ORDERS DIFFERENT FROM mE
STANDARD TYPE OF APPROVAL PROCESSES REQUIRED, THE DIRECTOR OF THE APPROPRIATE
DEPARTMENT SHALL DETERMINE THE FEES TO BE APPLIED TO THE PROCESS NECESSARY TO MEET
mE BOARDS REQUIREMENTS. mE APPLICABLE FEES SHALL BE THOSE WHICH MOST CLOSELY
RESEMBLE THOSE CHARGED FOR SIMILAR PROCESSES INCLUDING EXTRA FEES FOR ADVERTISING
AND THE LIKE.
A) ADMINISTRATION
I) Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or
Building Construction Administrative Code (Administrative Code). Based on staff hours: Less than 20 hours
$1,500.00,20 to 40 hours $3,000.00, more than 40 hours $5,000.00
:2) IRt0rpretatillIl [cque.'! .;ablHitted in eORjuection ';.'1tl1 fi lana 1:1.'12 fletitilJR or r2~H~,'te8 El:'''lliHt; .~ite Ele'. e18f'FHeRt
p laB re.. ion ~roce":. $250.00
3) Determination of Vested Rights. $100.00 (plus the County's out-of-pocket expenses associated with hearing
officer and hearings)
4) Appeal of Vested Rights Determination. $100.00
5) Amendment to Land Development Code. $3,000.00
6) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or
the LDC). $1000.00 (non-refundable)
7) Appeal to Board of Zoning Appeals or Building Board of Adjustments and Appeals (as may be provided for in
the Collier County Administrative Code or the LDC). $1,000.00 (non-refundable)
B) BLASTING PERMITS & INSPECTION
I) 30 day permit fee, non-refundable payable upon application. $250.00
2) 90 day permit fee, non-refundable payable upon application. $600.00
3) Yearly pennit fee, non-refundable payable upon application. $1,500.00
4) Renewal permit fee, non-refundable payable upon application. $200.00
5) After-the-fact fee, due to blasting without a permit. $10,000.00
6) Fine fee, per detonated shot with after-the-fact permit. $200.00
7) Handler fee, for handler who assists the user or blaster in the use of explosives. $100.00
8) Blasting Inspection Fee. $200.00 (per inspection)
9) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts.
Upon completion, fees will be adjusted to reflect actual number of blasts.
C) ENVIRONMENTALILANDSCAPING
1) Site Clearing Permit, first acre or fraction of an acre. $250.00 each additional acre or fraction of an acre.
$50.00 ($3,000.00 maximum)
2) Agricultural Land Clearing
a. Land Clearing Notification $250.00
CDES Financial Administration, rev 03./] 8/091w
page 2
b. Land Clearing Permit $250.00 each additional acre or fraction of an acre. $50.00 ($3,000.00
maximum)
^ ",. "A "~,,,^ry
April 28. 2009
Page 27 of 49
3) Landscape Tree Removal Fee $250
4) Environmental Impact Statement (EIS) $2,500.00 for I st submittal and 2"' submittal if applicable, 3rd
submittal $1,000.00, 4th and subsequent submittals $500.00 each
5) Landscape Re-inspection 1m $50.00, 2'" $75.00, every inspection afterward $100.00
6) Vehicle on the Beach Permit Application. $250.00 (Permit fee shall be waived for public and non-profit
organizations engaging in environmental activities for scientific, conservation or educational purposes).
7) Beach Nourishment Permits - $400
8) Special Treatment Review
a. First five acres or less. $400.00
b. Each additional acre, or fraction thereof. $50.00 ($5,000.00 Maximum)
~. Pre apr!ii::ation fI1ZetiH; ~:l~O.OO (tEl bt' creaited tc?,;;1rI:1 aflJ'llizati8i1 fee Hf)(JA .'l:lAAlittal)
9) Coastal Construction Setback Line (CCSL):
a. CCSL Permits $400.00
b. Variance - Petition. $1000.00
10) Sea Turtle Permit-
a. Sea Turtle Handling Permits. $25.00
b. Sea Turtle Nesting Area Construction Permit. $200.00
c. Sea Turtle Nest Relocation. $100.00
II ) Vegetation Removal Permit
a. First acre or fraction of an acre less. $250.00
b. Each additional acre, or fraction thereof. $50.00 ($3.000.00 Maximum)
12) After-the-fact Environmental or Landscape Permits
a. CCSL Variance Petition. 2x normal fee
b. All other Environmental or Landscape Permits. 4x normal fee
13) Informal Wetland Jurisdictional determination for single family parcels up to 5 acres - $300.00
14) Conservation Easement review fee - $300.00 application fee plus the following additional site fee:
$200.00 for CE acres less than 5 acres; $400.00 for CE area between 5 acres and 10 acres; $600.00
for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between 20 and 50
acres; and an additional $200.00 for every 40 acres ofeE area over 50 acres.
15) Listed or Protected Species review fee (when an EIS is not required) - $1000.00
D) EXCAVATION PERMITS
I) Annual Renewal. $300.00
2) Application (Private). $400.00
3) Application (Commercial). $2,000.00
4) Application (Development). $400.00
5) $200.00 per inspection paid in advance for 12 months
6) Reapplication: $300.00 plus $200.00 per month inspection fee
7) Cubic Yardage Review Fee: $200.00 first 5000 cy, plus $10.00 per additional 1000 cy with a maximum of
$20.000.00
8) Time Extension. $150.00 plus $200.00 per month inspection fee
CDES Financial Administration, rev 03118/09 lw
page 3
L.
l1.-.nn"j.,. Itn......, fl.1,.." 1c.^1j
April 28, 2009
9) After-the-fact Excavation Permit. 4x application fee Page 28 of 49
10) Over excavation penalty fee per yard. Plus PermitlReview $0.05 per cubic yard fee, unless maximum
have been paid.
E) FIRE CODE REVIEW FEES
1) Fire Code Review fees associated with each of the following processes:
a. SDP - Site Development Plan $200.00
b. SDP A - Site Development Plan, Amendment $150.00
c. SDPI - Site Development Plan, Insubstantial $100.00
d. SIP - Site Improvement Plan $150.00
e. SIPI - Site Improvement Plan, Insubstantial $100.00
f. PSP - Preliminary Subdivision Plans $150.00
g. PSP A - Preliminary Subdivision Plans, Amendment $100.00
h. PPL - Plans & Plat, Subdivision $100.00
1. FP - Final Plat $100.00
j. CONSTR. Construction Plans, Subdivision/Utilities $100.00
k. ICP - Construction Plans, Insubstantial $100.00
1. DR! - Development of Regional Impact $200.00
m. DOA - Development Order, Amendment $150.00
n. PUDZ - Planned Unit Development, Rezone $150.00
o. PUDA - Planned Unit Development, Amendment $150.00
p. PDI - Planned Unit Development, Insubstantial $100.00
q. RZ - Rezone, Regular Zoning $100,00
r. CU - Conditional Use $150.00
F) SITE DEVELOPMENT PLANS
1) Site Development Plan Review (SDP). $5000.00
a. plus $40.00 per DIU
b. plus $100.00 per residential building structure
c. plus $.10 per square foot for non-residential except that structures designed exclusively for parking
(parking garages) shall be calculated at $.05 per square foot.
d. plus $200.00 per building for non-residential
e. Additional fees for 3"' review $1,000.00, 4'h review $1,500.00, 5"' review $2,000.00, 6"' and subsequent
reviews $2,500.00
When a building consist of both residential and non-residential (commercial, retail, office) uses, the following
fees will apply.
a. $5000.00 hase fee plus $40.00 per DIU
b. $200.00 per building for non-residential
c. plus $0.10 per square foot afnon-residential floor area
d.. Additional fees for 3,d review $1,000.00, 4"' review $1,500.00, 5'h review $2,000.00, 6"' and
subsequent reviews $2,500.00
2) Pre-application fee. $500.00 (to be credited toward application fee submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staft's request will be held at no charge to the applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
3) Simultaneous Review Fee (planning review of simultaneous building permit applications) $100.00 per
building permit application.
.
4) Site Development Plan Insubstantial Change
a. Site Development Plan Insubstantial Change. $400.00 for flIst sheet, $100.00 for each and every
CDES Financial Administration, rev 03/18/09 Iw
page 4
additional sheet submitted.
1+0 ~In 1hA?
April 28, 2009
Page 29 of 49
b. Sit<: Lk\ c]uPTllCrlt Pbo IU'iub-;t:lIltial Ch~llH.!(, rOT Puhlic UtiIil\ System Accessorv Uses. $500.00
for the flr,l sheel. S125.00 lc)r ('(\'..:11 and ncn additi'lllal shce!.
c. Additional fees for 3rd review $1,000.00, 4th Review $1,500.00, 5th and subsequent review
$2,000.00
5) Site Development Plan Conceptual Review (CSP), Unified Development Plan (UDP), Neighborhood Park Site
(NPSP) $750.00
6) Site Improvement Plan Review (SIP). $1000.00 (plus Engineering review fees)
7) Utility Plan Review & Inspection Fees-
a. Construction Document Review. 0.750/0 ofprohable water and/or sewer construction costs
b. Construction Inspection. 2.250/0 of probable water and/or sewer construction costs
c. Construction Document Resuhmission or Document Modification, submit as insubstantial change.
$150.00 for first sheet. $75.00 for each additional sheet
8) Engineering Site Plan Review Fee
a. Construction Documents Review Fee 0.750/0 of probable Paving, Grading, Drainage, Lighting, Code
Minimum Landscaping, and any other appurtenant cost of construction
b. Construction Inspection 2.250/0 of probable Paving, Grading, Drainage, Lighting, Code Minimum
Landscaping, and any other appurtenant cost of construction
9) Site Development Plan Amendment (SDP A) $2,500.00,
a. Plus $40.00 per DIU plus $100.00 per residential building structure
b. plus $.10 per square foot
c. plus $200.00 per building for non-residential
d. Additional fees for 3rd review $1,000.00, 4th Review $1,500.00, 5th and subsequent review $2,000.00
10) SBR Fees
a. Pre-Acquisition Meeting $500.00 (no refunds or credits)
b. Pre-application fee. $500.00 (to be credited toward application fee upon submittal) (all normal pre-
application provisions apply)
c. SBR Fee $5000.00 with hourly reconciliation at project completion for hourly variation greater than 10%,
final project charges at $100.00 per hour for all associated staff hours
11) Violation of the conditions of approval of the SDP/SlP or installation of improvements, clearing, or other
land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP. 4x the SIP/SDP
application fee
12) Request for alternative architectural design $500.00, no separate or additional fee for appeals to, or requests
for assistance from, the Architectural Arbitration Board.
13) Site Development Plan Sheet change out (per CDES policy guidelines) $35.00 per page.
14) Town Home Site Plan Rc\ic'w - $().OOO.()(1 h<-lse fcc. additiorul f~'~'~ for 31<1 H.'yicw $1.000.00. 4111 rcyiew
n.snn.oo. Slh review S2.0nO.Oo 6th and suhseonent review S2.5llO.00.
]51 SDP Exten,,,,n - $150.00
16) Post Take SHe Plan - na," Fce $1.000.00. Resubmittal Fee $250.lJO each submittal. $3.000.00 additional if
ohic-Cli()n filed.
G) SUBDIVISION
I) Lot Line Adjustment (LLA) and Lot Split Review $250.00
2) Suhdivision Review Fees (PPL), (PPLA) .
CDES Financial Administration, rev 03/l8/09Iw
page 5
"nonrb Itom "n 1 ~ ^ 0
April 28, 2009
a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting,RiI!Jle 30 of 49
Minimum Landscaping and any other appurtenant cost of construction
b. Subdivision Inspection Fee 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum
Landscaping, and any other appurtenant cost of construction
c. Construction Document Resubmission or Document Modification -Submit as Insubstantial Change
$400.00 for first sheet, $100.00 for each additional sheet
d. Subdivisions - 3rd and subsequent additional reviews - $500.00
e. Subdivisions - Substantial deviations from approval construction documents $500.00
3) Subdivision, Preliminary Plat (PSP)-
a. Petition Application $1000.00 plus $5.00 per acre (or fraction thereof) for residential, plus $10.00 per
acre (or fraction thereof) for non-residential; (mixed use is residential)
4) Subdivision Final Plat (FP) $1,000.00 plus $5.00 per acre (or fraction thereof) for residential, $1000.00 plus
$10.00 per acre (or fraction thereof) for nonresidential; (mixed use is residential)
5) Additional review of construction plans for phased construction of subdivision improvements. S1000.00 per
phase
6) Two-year Extension $150.00
7) Water and Sewer Facilities Construction Document Review 0.750/0 of probable water and/or sewer
construction costs
8) Construction Document Resubmission or Document Modification 0.250/0 of probable water and/or sewer
construction costs
a. 3rd and subsequent re-submittals - $500.00
9) Water and Sewer Facilities Construction Inspection Fee 2.250/0 of probable water and/or sewer construction
costs
10) Violation of the conditions of approval of approved construction plans or installation of improvements,
clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved
construction plans or permit. 4x the PPL, PPLA, PSP, CNSTR or Final Plat Review Fee (FP).
11) Administrative Amendment $250.00
H) ENGINEERING INSPECTION FEES
1) Engineering Inspection Fee $150.00 p2r r2J.'idcntial s';, ellill'; udt cr a~:oe,;,'ory :;tn:etarc to rOc;ideH~:1:l1 d'l. elhng
ani! (:iH.;1e or dupIe:r cnI;.), ner set of required engineering inspections charged at time of building pennlt
lSStlanct?
2) Re-inspection Fees: 1 sf re-inspection $75.00, 2nd re-inspection $100.00, 3rd and thereafter fe-inspection
$125.00
I) TEMPORARY USE PERMITS
I) Beach Events Permits-
a. Individual Permit $100.00
b. Block of 25 calendar days $2,250.00
c. Block of 50 calendar days $4,500.00
d. Block of75 calendar days $6,750.00
e. Block of 100 calendar days $9,000.00
f Block of125 calendar days $11,250.00
g. Block of 150 calendar days $13,500.00
2) Temporary Use Permit Special Sales & Events. $200.00
CDES Financial Administration, rev 03/18/09 Iw
page 6
3) Model Homes and Sales Centers $500.00
Itom ", 1"'~,)
April 28, 2009
Page 31 of 49
4) Construction and Development, Mobile home, Agricultural Zoning, and Temporary use for "Coming Soon"
sign $125.00
5) Residential and Non-Profit Garage and Yard Sale Permits No Charge
6) Temporary Use Amendment. $100.00
7) Renewals or extensions requested after the expiration date $200.00.
8) Temporary Use Permit for Special Events requiring BCC approval, including Circus and Carnival Permits.
$275.00
9) Political Signs (Bulk Temporary Permit) $5.00
10) Fees for Temporary Use permits issued After the Fact, A IF: 2x normal fee
J) WELL PERMITS/INSPECTIONS
I) Hydraulic elevator shaft permit $300.00
2) Test hole permit (including 1st six holes) $300.00, each additional hole $20.00
3) Well permit (abandonment) $50.00
4) Well permit (construction, repair, or combined construction and abandonment at one site) $300.00
5) Well permit (monitoring) $150.00
6) Well Permit (modification of monitor/test well to a production well) $75.00
7) Well Reinspections
a. First Reinspection $75.00
b. Second Reinspection $100.00
c. Third Reinspection $150.00
8) After the fact well permits 4x nonnal fee per violation.
NOTE: Multiple wells may be allowed on one permit, but each well must be accounted for and the appropriate fee
shall be charged for each well in accordance with the above listed schedule.
K) ZONINGILAND USE PETITIONS
I) Pre-application meeting fee $500.00 (to be credited toward application fee upon submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staft's request will be held at no charge to the applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
2) Alcoholic Beverage or Service Station Separation Requirement \Vaiver $1000.00
3) Boat Dock Extension Petition $1,500.00 Boat Lift Canopy Administrative Review $500.00
4) Conditional Use Permit $4,000.00 when filled with Rezone Petition ($1,500.00) Additional fee for 5'h and
subsequent reviews - 200/0 of original fee.
5) Conditional Use Monitoring Review: $750.00
6) Conditional Use Extension $3,000.00
7) DRI Review (In addition to cost of rezone) $10,000.00 plus $25.00 an acre (or fraction thereof) Additional fee
for 5th and subsequent reviews - 200/0 of original fee Amendments deemed to be minor in nature, that is
requiring minor strike tluu and underline text amendments of no more than 10 different lines of text changes
CDES Financial Administration, rev 03/18/09 lw
page 7
ltc.rY\ f\l", 1c;'^')
April 28. 2009
in the DRI will be capped at $13,000.00. Any amendment which includes a map and text change \Wlbge 32 of 49
assessed the full fee (no cap).
.k.
8) DRI/DO Amendment $6,000.00 plus $25.00 per acre (or fraction thereof). The acreage charge does not apply
for amendments which only change the build-out date of the DO for a time period ofless than five years.
AddJtional fee 1~~H' SIll and ~ubf'cquent revicv,rs 20%, of ori2inal fee.
a) DR] Extension - S10n.nO
9) DRIABN - DRI Abandonment $1,500.00
10) Flood Variance Petition $1000.00
II) Interim Agriculture Use Petition $350.00
12) Non-Conforming Use Change/Alteration $1,500.00
13) Parking Exemption $1,500.00. Additional fee for Sili and subseqnent reviews - 20% of original fee.
14) Parking Reduction (Administrative) $500.00
IS) Rezone Petition (PUD to PUD): $8,000.00 plus $25.00 an acre (or fraction thereof) (Requires a submittal ofa
new PUD document), Additional fee for 51h and subsequent revie\vs 20~{) of ofl2:inal fee (excludes minor
revisions as rC(lulred bv staft).
16) Property owner notifications: $1.50 non-certified mail, $3.00 certified return receipt mail (Petitioner to
pay this amount prior to advertisement of petition)
17)
Planned Unit Development Amendments (PUD) $6,000.00 plus $25.00 an acre or fraction of an acre.
(Substantial changes to the text and Master Plan), Additional fee for Sth and subsequent reviews - 20%
of original fee. Text changes that do not impact the Master Plan $6,000.00 (the $2S.00 an acre fee will not
apply. .Amendments deemed to be minor in nature that is requiring minor strike thru and underline
amendments of no more than 10 different lines of text changes in the PUD will be capped at $9,000.00.
Any amendment which includes a map and text change will be assessed the full fee (no cap).
18) Planned Unit Development Amendment -Insubstantial (POI) $1,500.00 requires a hearing by the CCPC only
for a minor change to the PUD Master Plan, PUD Minor Change (PMC) $1,000.00 (Administrative Review
for minor change to the Master Plan)
19) Rezone Petition (Regular) $6,000.00 plus $25.00 an acre (or fraction thereof), Additional fee for Sth and
subsequent reviews - 200/0 of original fee.
20) Rezone Petition (to PUD) $10,000.00 plus $25.00 an acre (or fraction thereof), Additional fee for S'h and
subsequent reviews - 200/0 of original fee.
21) Street Name Change (platted) $500.00 plus &-hOO $1.50 for each property owner requiring notification of
proposed street name change
22) Un-platted street name or project name change: $100.00 per application fee plus $50.00 per additional hour or
Partial hour of research required to process application, not to exceed $500.00
23) Variance petition: $2,000.00 residential, $5,000.00 non- residential, Additional fee for Sth and subsequent
Reviews - 200/0 of original fee.
24 ) Variance (Administrative) $1,000.00
2S) Zoning Certificate: Residential: $50.00, Commercial: $125.00
26) PUD Extension - Sun Setting: $1000.00
CDES Financial Administration, rev 03/18/09 lw
page 8
27) Sign Variance Petition: $2000.00
Ifp f\!n 1RA?
!o.,pril 28, 2009
Page 33 of 49
28) Stewardship Receiving Area Petition (SRA): $7000.00 per SRA plus $25.00 per acre for. Stewardship
Sending Area Petition (SSA): $9,500.00, Stewardship Receiving Alternative Deviation Design (SRDD)
$500.00. SRA Amendments deemed to be minor in nature, that is requiring minor strike thru and
underline text amendments of no more than 10 different lines of text changes in the SRA will be capped
at $10,000.00.
29) After-the-Fact Zoning/Land Use Petitions 2x the normal petition fee
30) Land Use Petition Continuances Includin!! Apnea] of ,ill Administrative Decision 3nd Apnea I to Board of
Zoninl.! Appea):.;
a. Requested after petition has been advertised $500.00
b. Requested at the meeting $750.00
c. Resultant additional required advertising charged in addition to continuance fees.
31) PUD and SRA_Monitoring (one-time charge at time of building permit pick-up)
a. $100.00 per dwelling unit for residential construction within a PUD and SRA ($3,000.00 maximum
fee per building pcrmit application)
b. $0.12 per square foot for non-residential construction within a PUD and SRA ($3,000.00 maximum fee
per building permit application)
32) Any legal advertising required during any CDES activity or approval process will be charged in addition to
stated fees, at actual costs. CDES reserves the right to charge an estimated amount with the initially required
project fees, and will reconcile and adjust such charges against actual legal advertising recording billings at
at the completion of the project.
33) Mixed Use Project (MOP) $2,500.00
a. Mixed Use Proiect Deviation - $1.noo.oo
34) OLltdcQr ~'l~T in.; .\re& P2rmit Anmlified Sound Pern1it $300.00.
35) Planned Unit Development (PUD) closeout application and processing:
a. PUD's up to 50 acrcs: $5,000.00
b. PUD's over 50 acres up to 250 acres: $7,000.00
c. PUD's over 250 acres; $9,500.00
36) Developmcnt ofRegionallinpact (DRI) closeout application and processing $10,000.00
L) MISCELLAl'lEOUS
I) Reserved
2) Reserved
3) Official Zoning Atlas Map Sheet Publications, maps, and reports shall be copied at actual cost.
4) The following fee shall be assessed for all Lien Searches Title Searcli,,' and or Payoff Requests: j;&OO
lliJlli!per request.
5) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base
salary hourly rate of the staff member conducting the service for time in excess of 1 hour.
6) The fee for creating and designing special computer generated reports that are not a part of regular standard
reports shall be at no cliarge for the first hour, then at the base salary hourly rate of the staff member
conducting the service for time in excess of 1 hour.
7) CD Burning: $5.00
CDES Financial Administration, rev 03/18/09 Iw
page 9
8) Complete sets of Official Zoning Atlas Map Sheets $]00.00 per set.
, Itom "n 1~^0
April 28, 2009
Page 34 of 49
.-
9) Staff shall charge the following fees for dnplication of public records:
a. $0.15 for each one sided photocopy of documents less than llx17 inches.
b. $0.20 for each two sided photocopy of documents less than 11 xl7 inches.
c. $1.00 for each certified copy of a public record.
10) Property Notification Address Listing:
a. MS Excel spreadsheet on Disc $70.00
b. Print out on Paper $75.00 + $0.05 for every record over 1500
c. Mailing Labels $80.00 + $0.06 for every record over 1500
d. Print out on Paper + Mailing Labels $85.00 + $0.11 for every record over 1500
11) Comprehensive Plan Consistency Review
a. CU's $300.00
b. Rezoning $750.00
c. POO's or PUD Amendments: $2250.00
d. Letter of GMP consistency to outside agencies: $250
e. SRA - Stewardship Receiving Area - $2,250.00
f. DRI- Development of Regional Impact - $2,250.00
g. flAM - Fiscal Impact Analysis - $4,000.00
12) Plan Review Fee (for planning review of all building permit applications)
a. I.-CJl'lc f8nn,_' Permit Apvlication Conmlex (more than one trade); $125.00 per building permit
application, 2nd review 500/0 of fee, 3rd and subsequent 250/0 affee (2nd and subsequent review fees related
to Zoning approvals only)
b. ~=::fm-::. rCT1:lJit~. Permit /\PDlicatiol1 - Basic (no trade or one trade): $50.00 per building permit
application, 2nd review 500/0 affee, 3rd and_subsequent 250/0 affee (2nd and subsequent review fees related
to Zoning approvals only)
13) Project Meetings: Active applications under review for the following project types will be afforded one inter-
departmental meeting at no charge: Planned Unit Development re-zonings and Site Development Plan
applications (except for conceptual site plan approval and insubstantial change approval). Meeting requests
for all other application types and additional meetings will be subject to the following fees:
a. Meetings with Departmental Project Approval Staff member per applicant request, reviews and petitions
in progress, $]50.00 per one hour minimum, $75.00 per Y, hour thereafter. Additional Department staff
attending meeting per applicant rcquest $75.00 per Y, hour per staff member.
b. Inter-Departmental Project Meeting per applicant request, site plan reviews and land use petitions in
progress, $500.00 per one hour minimum, $250.00 per 'h hour thereafter.
14) Adequate Public Facilities
a. Planning Applications requiring COA process review (such as FP's, PPL's & SIP's, SDPs) $200.00 +
25.00 per residential dwelling unit or + 25.00 per 1000 sq ft commercial ($5000.00 maximum)
b. Building permit applications requiring COA process review not covered under 12.a above $]00.00 per
building permit application.
15) Zoning Confirmation Letters
a. Standard Response $]00.00 (includes up to 1 hour research)
b. Extended Research $]00.00 per hour (any response with research in excess of I hour)
16) Zonill~ Letter .\~~eal $2:;0.00
17) CDD
a. Community Development District $]5,000.00
b. Chapter 189 Special District. Independent or Dependent, $]5,000.00
18) GMP Amendment
CDES Financial Administration, rev 03/1 8/09 lw
page 10
^. Ita ~I, 1F',1I.,)
April 28, 2009
a. Small Scale $9000.00 Page 35 of 49
b, General $16,700.00
c. Legal advertising in addition to sub-sections a and b fees, and subject to applicable fee schedule
provisions.
d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions:
$250
~'. Pre ar;'~iei;lTi:m mCL'liR",,: f.x '~JPfP :.mL'l1Jmenl pztitiDA,': $::!~g (to ~lZ ereditcG tl)','-arEi aflfllieatioR fc: ldf'OR
""ffil/lel)
19) Application for issuance TDR, $250 (non-refundable); plus $25 per TDR issued and recorded (total fees not to
exceed $2,750.00)
20) Engineering Services
a. Vacation of Easements: $2.000.00
21) Building Board of Adjustments and Appeals $250.00
22) Early Work Authorization (EWA) permit: $500.00 (does not include site clearing fee).
23) Legal Non-conforming Lot (LNC) $100.00
24) Vested Rights Determination (VRD) $1,500.00
'5) Time Extension $150.00
M) BUILDING PERMIT APPLICATION FEE
I) A permit application fee shall be collected at time of applying for a building permit The permit application
fee shall be collected when the plans are submitted for review, The fee shall be applied toward the total
permit fee. The applicant shall forfeit the application fee if the application is denied or if the application is
approved and the permit is not issued within the time limitation as stated in Section 103.6.1.1 of the
Collier County Ordinance No, 91-56. as amended.
2) Application fee will be computed as follows:
a, 25% oftotal Building Permit Fee ($,15 /sq ft new residential and commercial, $.075 shell and
warehouse)
3) Minimum fee of$75.00 for each of the following: plumbing; mechanical (NC); electrical; fire; and building,
Minimum fee for all other applications ~ $50.00
4) The balance of the total permit fee will be collected at the time of issuance of the pemlit and will include any
fee adjustments necessary.
N) BUILDING PERMIT FEES
I) The fee for a building permit shall be computed as follows: Such fees shall be either based on the contractor's
valuations of construction cost or based on square footage. Minimal accepted calculated costs of construction
are set forth on the attached Building Valuation Data Table -ICC Building Valuation Data Table. produced
February, 2007. Valuation of construction costs ofless than $750.00 - No permit or fee is requiredl but
construction must comply with all County Codes and Ordinances. If inspections are required by the Building
Official or requested by the applicant, the appropriate fees shall be paid,
EXCEPTION: All work involving structural components and/or fire rated assemblies requires permits and
inspections regardless of construction cost, signs must secure permits as stated in Collier
Collier County Ordinance No, 2002-01, as amended.
CDES Financial Administration, rev 03/18/09Iw
page 11
,~
^ , 1"-............. "I..... ~ c""
April 28, 2009
a. Valuation of construction costs of $750.00 through $4,999.99 ~ $50.00 plus $50.00 application'P<!!Je 36 of 49
inspection as_required.
b. New construction greater than 500 square feet
1. residential at $0.29 per square foot (living area)
11. warehouse/shell at $0.145 per square foot (total area)
111. build-out at $0.145 per square foot (total area)
IV. commercial/institutional at $0.29 per square foot (total area)
c. Alterations, other construction, and new construction under 500 square feet (both residential and
commercial) minimum fee of$100.00 for one required inspection, plus $50.00 for each required
additional inspection. $100 plus 0.30% of declared valuation in excess of $5,000
0) ELECTRICAL PERMIT FEES
I) The fees for electrical permits for new structures or placement or relocation
of structures shall be computed as follows:
a. $0.40 per ampere rating of all single-phase panel boards.
b. $0.15 per ampere rating for switch or circuit whichever is greater, if item
#1 above does not apply.
c. When not a complete installation, all switch and circuit breakers ahead of
panel boards shall be computed at $0.15 per ampere.
d. Permit fees for any change in electrical installation shall be computed at
the above rates for that portion of new and/or increased fees in existing
electrical facilities.
e. The minimum for any electrical permit shall be $75.00 per unit or tenant
space
f. Fifty percent (50%) in additioual fee costs shall be added to all above fees
for three phase installations.
., EXCEPTION: Ordinary repairs limited to a $200 value or less may be made without a permit. Repairs must comply
with all County Codes and Ordinances. If inspections are required by the Building Official or
requested by the applicant, the appropriate fees shall be paid.
P) PLUMBING PERMIT FEES
1) The following fee calculations shall be applied separately when the permit
involves mixed occupancies.
a. Residential occupancies: The fee for a plumbing permit shall be computed at the rate of$75.00 to be
charged for each living unit with one to three bathrooms. An additional fee of$10.00 will be assessed for
each additional bathroom
b. Nonresidential occupancies: The fee for a plumbing permit shall be computed by the following methods,
whichever is calculated to be the greatest fee:
1. The rate of $3.00 per 425 square feet of floor area, or fraction thereof; or
2. Institutional facilities, hospitals, schools, restaurants and repairs in any occupancy classification shall
be charged at the rate of $1.00 per fIxture unit or
3. Minimum of $75.00 for each occupancy or tenant space.
2) Grease traps: An additional fee of$50.00 shall be assessed for each grease trap.
3) The cost for retrofIt piping shall be computed at the minimum fee of$50.00
per floor for each main riser.
4) The cost of a permit for lawn sprinkler systems shall be computed using the dollar valuation as shown under
Section M of this Resolution.
5) The minimum plumbing permit fee shall be $75.00.
CDES Financial Administration, rev 03il8/091w
page 12
, ItQ~",. 1~^~
April 28, 2009
Page 37 of 49
Q) MECHANICAL PERMIT FEES
1) The following fee calculations shall be applied separately when the permit involves mixed occupancies.
a. Residential occupancies: The mechanical permit fees shall be computed at the rate of $75.00 for each
living unit up to three tons of air conditioning. Each additional ton or part thereof shall be $3.00 per tOTI.
b. Nonresidential occupancies: The mechanical permit fees shall be computed by one of the following
methods, whichever is calculated to be the greatest fee: The rate of $75.00 for the first three tons or three
horsepower of air conditioning or other mechanical systems per tenant space, each additional ton of air
conditioning or horsepower shall be $3.00; or The rate of$3.00 per 425 square feet of floor area, or
fraction thereof.
2) The cost of retrofit piping shall be computed at the minimum fee of$50.00 per floor for each cooling tower, or
$50.00 for the first 3 horsepower and $3.00 for each additional horsepower, whichever is greater.
3) The minimum mechanical permit fee shall be $75.00.
4) A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the
minimum fee whichever is greater.
R) FIRE PREVENTION AND CONTROL PERMIT FEES
I) The fees and exemptions set forth in the "Exhibit B" affixed hereto and made a part of this Schedule of
Development Review and Building Permit Fees shall apply to Fire Prevention and Control Permits for both
the independent and dependent fire districts.
S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES
1) The permit fee shall be $50.00 to set-up a single-wide trailer or mobile home on an approved site plus
electrical, plumbing, mechanical and fire protection fees as applicable.
2) The permit fee shall be $75.00 to set-up a double wide or larger mobile homes on an approved site plus
electrical, plumbing, mechanical and fire protection fees as applicable.
T) CHICKEES AND SIMILAR STRUCTURES
1) The permit fee will be based upon a calculated cost of construction of $4.00 per square foot under roof or the
contractor's estimated cost of construction, whichever is greater. The fee will then be calculated in accordance
with Section N of this Resolution. Additional permit fees for electric. plumbing, mechanical, fire, etc., will be
charged when applicable.
U) POOL OR SPA PERMIT FEES
I) For construction of each public pool or spa the fee shall be-
a. Valuation of construction costs of up to $4.999.99. $100.00
b. Valuation of construction costs of $5000.00 through $49,999.99: $80.00 plus $7.00 per thousand dollars,
or fraction thereof, of building valuation in excess of $2,000.00.
c. Valuation of construction costs of $50,000.00 through $ 1,000,000.00: $333.00 plus $3.00 per thousand
dollars, or fraction thereof, of building valuation in excess of $50,000.00.
d. Valuation of construction costs over $1,000,000.00: $3,474.00 plus $3.00 per thousand dollars, or fraction
thereof. of building valuation in excess of$I,OOO,OOO.OO.
2) For construction of each private pool or spa the fee shall be: $50.00 application plus $50.00 per inspection as
required.
CDES Financial Administration, rev 03/18/09 lw
page 13
+.
V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES
1) Con;'(ructi III C::,'L: .'kdl ~l2 c:llcl..lbll,C ~:.' fu]hv:.,;:
:1. ~'::_Tccn En(lf. ~'~.9g fJ2T :q. n. (d- IhlJr ~Ir,::a. (~'crC'en \'VaIL' (\111:;:)
b, Plln J~~l:f. 5:.1.00 per .lj. fL of floor ;uea, (S::.T20fl 'raIL Only)
c. Exictiue Roof. $2JHI per ,'l;.}. ft. of [lolT area. (Sere0H~VuIL Onl:,')
^ ~" Ham"~ "'^"
April 28, 2009
Page 38 of 49
2) The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution.
W) SIGN PERMIT FEES
I) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical
Permit Fees outlined in this document, the Collier County Development Fee Schedule. The minimum
building permit fee for sign shall be $75.00.
2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit,
however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the
above subsection 1 of Sign Permit Fees.
X) CONVENIENCE PERMIT FEES
1) Convenience permits are issued in blocks of 10 each. Only licensed contractors are eligible to purchase
convenience permits are limited to the use specified on the permit. The fee for a book of 10 convenience
permits is $500.00 ($50.00 fee per inspection, I inspection only)
Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS
1) PERMIT AND PLAN REVISIONS The fee for each permit revision submitted after permit issuance shall be
calculated using fee schedules outlined in Sections N through R above. The minimum permit fee for revisions
to permitted projects shall be $50.00.
.
2) AS BUILT PLANS The fee for "As Built" plan review shall be ten (10%) percent of the original building
permit fee or $150.00, whichever is greater, but shall not exceed $500.00. The fee is intended to cover the cost
of reviewing amended building plans in the office to determine that change orders and various field changes
are in compliance with the minimum construction and fire codes of Collier County. The following are required
for as-built drawings review:
a. An itemized list of all changes made after permit plan approval.
b. As-built plans that have all changes made after permit plan approval "clouded".
c. As-built plans and changes shall be signed and sealed by the engineer and/or architect of record.
3) CORRECTIONS TO PLANS
a. First Correction to Plans. No charge
b. Second Correction to Plans. $75.00
c. Third & subsequent correction to plans. $100.00
Z) PERMIT EXTENSION
1) The filing fee for each permit extension shal1 be equal to 10% of the original building permit fee or $100.00,
whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing
existing or amended building plans to determine and verify code compliance
AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES
1) The permit fee shall be $25.00 application for the demolition of any building or structure; plus $50.00 per
inspection as required.
BB) PRE-MOVING INSPECTION FEES
I) The fee shal1 be $150.00 for the pre-moving inspection of any building or structure.
CDES Financial Administration, rev 03/18/09 lw
page 14
l::", p. 1~'" f+.am "'In 1R/\0
April 28, 2009
CC) INSPECTION FEES Page 39 of 49
I) A charge of $20.00 per inspection shall be assessed for inspections for which a pennit is not necessary.
2) A user fee of$120.00 shall be assessed for all inspections on a time specified basis.
3) First Partial inspection for single-family & tenant buildout. No charge
4) Second & subsequent partial inspections for single- family & tenant buildout. $25.00
DD) REINSPECTlON FEES
I) Re-inspections for any type of building permit, or required Engineering re-inspections, shall result in an
additional fee of $75.00 per inspection for the first re-inspection, $100.00 for the second re-inspection and
$125.00 for the third and each successive re-inspection.
EE) FAILURE TO OBTAIN A PERMIT
1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where such action was cited by Code Enforcement or by Contractor Licensing and resulted in a finding of
violation from either the Code Enforcement Board, the Special Magistrate, or the Contractor Licensin&.Board,
or as directed by the Board of County Commissioners the fees herein specified shall be 4x the regular fee.
2) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where a contractor or agent/provider where the building official or zoning director (for cases involving land
development) deems that the contractor/provider should have known that a permit was required but
voluntary seeks compliance by obtaining the necessary permits to abate the violation the fees herein
specified shall be 2x the regular fee.
3) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where an owner/builder seeks voluntary compliance by obtaining said permit the fees assessed will be 2x
the regular rate as defined in this fee schedule.
4) \\There work for which a permit is required is started or proceeded with prior to obtaining said permit and
where the unpermitted work was completed by other or prior to the current ownerlbuilder's ownership
of the property an where the current ownerlbuilder seeks voluntary compliance by obtaining said permit to
assure compliance with all applicable codes the fees will be assessed at the regular rate as defmed in this
fee schedule.
5) The pa)TI1ent of such fee shall not relieve any person from fully complying with the requirements of any
applicable construction code or ordinance in the execution of the work, or from any penalty prescribed
within any construction code, law or ordinance of Collier County.
FF) LICENSING
1) The fee for licensing items is as follows:
a. Letters of Reciprocity. $25.00
b. Contractors Change of Status. (active to domlant) $10.00
c. Voluntary Registration of State Certified Contractors. $10.00
d. Pictures. $2.00
e. Laminating $1.00 (per license)
f Fee for a 6 month temporary contractor's license $25.00
g. Certified copies of Experience letters $35.00
h. Duplicate or replacement (of Competency cards) $25.00
1. Second entity application fee $50.00
2) Certificated of Competency (Annual)
a. Contractor
Initial License Fee
Renewal Fee
b. Specialty Contractor
Initial License Fee
$150.00
$100.00
$135.00
CDES Financial Administration, rev 03/18/09Iw
page 15
Renewal Fee
c. Journeyman
Initial License Fee
Renewal Fee
$ 85.00
Up ,"n '''~?
April 28, 2009
Page 40 of 49
$ 50.00
$ 25.00
3) Dormant Certificates of Competency (Annnal)
a. Contractor $100.00
b. Specialty Contractor $ 85.00
c. Penalty fees after 9/30 $ 10.00 per month until 12/31
4) Reinstatement of Delinquent License
a. Contractor
b. Specialty Contractor
c. Journeyman
d. Examination Administrative Fee
$150.00 plus back years
$135.00 plus back years
$ 50.00 plus back years
$100.00 good for 6 months
GG) DUPLICATE PERMIT CARDS
I) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason.
1111) CHANGE OF CONTRACTOR OR SUBCONTRACTORS
I) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $50.00.
This fee includes the issuance of a new permit card.
11) PERMIT FEE REFUNDS
I) If requested, in writing by the owner or his authorized agent, 50% of the fees charged, other than the
application fee, may be refunded provided that a permit has been issued, construction has not commenced, and
._ the refund is applied for prior to the cancellation of the permit.
JJ) RECORD RETRIEVAL
1) No charge for retrieving records from inactive or remote storage including microfilmed documents
KK) COPY FEES
I) The fee for blueprint and miscellaneous copying shall be as follows:
a. Microfilm copies, of documents less than 11 x 17 inches: $0.15 other sizes at cost of production.
b. Microfilm or Blueprint copies:
18 X 24 $1.25 per page
30 X 36 $2.50 per page
30 X 42 $3.25 per page
34 X 44 $5.00 per page
c. Community Development self-service copier, public access and not related to public record retrieval or
public record copies: documents less than 14x8.5 inches $0.15 per page inclusive of sates tax.
LL) RESEARCH
I) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base
salary hourly rate of the staff member conducting the service for time in excess of 1 hour
2) The fee for creating and designing special computer generated reports that are not part of the regular standard
reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member
conducting the service for time in excess of I hour.
COES Financial Administration, rev 03/] 8/091w
page] 6
-'- ltorn 1\1<'"\ 1~li')
April 28, 2009
MM) SUBSCRIPTION SERVICE Page 41 of 49
The fee for one-year subscription service to be mailed quarterly shall be $15.00 per year. The subscription
year is Irom Oct. I through Sept. 30.
NN) ELECTRONIC DATA CONVERSION SURCHARGE
1) A surcharge in the amount of 3% of the building permit application fee, with
the minimum surcharge being $3.00 and the maximum being $150.00, will be
applied to every building permit application submitted. A flat fee of $3.00
per permit will be charged for those permits for which an application fee is
not required per item (M) of this Schedule.
00) REGISTRATION OF RENTAL DWELLINGS
I) The fee for registration of rental dwellings is as follows:
a. Initial Registration Fee - $30.00/per property
b. Annual Renewal - $20.00/per property
c. Annual Late Fee - $10.00/per day per property up to a maximum of $80.00
d. The term "property" means a parcel or contiguous parcels with any number of rental units located
thereupon under common ownership and/or management.
2) Rental Inspection
a. Rental Inspection - $200.00 per unit
b. Re-inspection Fee - $50.00 per re-inspection per unit.
c. Rental inspections shall not be required for rental units on property covered by a Florida Department of
Business and Professional Regulation ("DBPR") license. A copy of the current DBPR license
shall be provided with the initial rental registration and all subsequent rental renewal applications.
3) Any unpaid fees may be pursued by the Collier Manager or designee through a collection agency.
PP) CERTIFICATE TO BOARD BUILDING
I) Initial Boarding Certificate - $0
2) Boarding Certificate Extension - $150
QQ) ADDITIONAL FEE REFUND PROVISIONS
1) Requests for fee waivers may only be approved by the Board of County Commissioners. Waiver requests for
development review and building permit fees shall be submitted in writing directly to the appropriate
Community Development & Environmental Services Division Staff, who will prepare an executive summary
for consideration by the Board. Such requests shall include a statement indicating the reason for the fee
waiver request and, 1f applicable, the nature of the organization requesting the fee waiver.
RR) REFUND PROVISIONS
1 ) PAYMENT OF FEES: Full payment of fees is required for a complete application. Department policy
requires full payment of fees at the time of application submittal. No work will begin on staff review of the
application until all fees are paid in full. If full payment of fees is not received within 14 calendar days of
application submittal, the application will be considered void. At this point, a new application and full
payment of fees will be required to proceed with a project.
2) There will be no refund of Planning, Environmental, or Engineering related fees, except those applications
which have been deemed not sufficient for staff review and are withdra~n within 30 days of notification will
be entitled to a 50% refund. After 30 days from such notification, there will be no refund of submitted fees.
3) In no cases will there be refunds for pre-application fees, data conversion fees, appeals of administrative
decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment.
CDES Financial Administration, rev 03/18/09 lw
page 17
t:..r",:::>.nl"l.:::. Itom 1\1,." 1C:A0
April 28. 2009
Page 42 of 49
4) If staff error causes the inappropriate or unnecessary filing of an application and payment of fees, 100 percent
of all inappropriate fees, shall be refunded upon written request and with the concurrence of Department
management.
SS) ADDITIONAL FEE PROVISIONS
I) In those cases where alternative methods or timing of payments for CDES services and / or fees listed in this
schedule associated with SBR reviews are deemed to best serve the public good, the Community Development
and Environmental Services Administrator will have the authority to approve such alternatives. Such
alternative must be in writing and signed by all principals involved. In no case shall fmal C.O. or such
certifications of project completeness be issued until payments due CDES are received in full.
2) All hourly fees are computed and charged from actual Divisional time tracking records.
3) All acreage totals used in fee calculations will be rounded up to the nearest whole acre.
4) When deemed essential for project review or approval, there will be no additional charge for any meetings
requested by CDES staff.
TT) PUBLIC VEHICLE FOR HIRE FEES
1) The following fees shall be assessed for the Public Vehicle for Hire Program: (111 the eyent that the
backizround check fee chanzed to the county excccd~ the minimum fee established hv the county.
the Cioolicant(sJ shall be resPPlbible t~)r IJIC <lCfU,d ee,s! of the search).
a. Initial Application fee (new Companies) - $200
b. Initial Certificate to Operate (Feb 1-Jan 31) - $325.00
c. Annual Certificate to Operate Renewal $325.00
d. Late Fee for CTO Renewal $200.00
e. Sub-Certificate Application Fee (New Companies) - $100.00
f. Sub-Certificate - $162.50
g. Annual Sub-Certificate renewal - $162.50
h. Late Fee for Sub-Certificate Renewal - $100.00
i. Vehicle Decal - $50.00
J. Temporary Vehicle Decal $5.00 per vehicle/per day
k. Temporary Vehicle Decal (In case of inoperable decaled vehicle) - $5.00/per vehicle
l. Driver Identification Card (Initial/Renewal) - $75.00 per driver
m. 2"' Driver Identification Card - $25.00
n. Replacement Driver ID - $10.00
o. On-site Vehicle Permitting - $15.00 per vehicle
UU)"PAYMENT IN LIEU OF" FEE FOR PATHWAYS (SIDEWALKS, AND BIKE LANES)
1) Calculated using the current Florida Department of Transportation (FDOT) construction costs or an
engineering estimate not to exceed twenty-five percent (25%) of the submitted application request's total
project cost.
VV) OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS
1) Optional expedited building permit plan review fee shall be 30% of the building permit fee (additional to full
building permit fees) with a minimum fee of$50.00
a. Participation in the optional expedited review program is subject to limited availability, applications will
be accepted on a first come first served basis.
b. Review completion times are guaranteed to equal, or be less than, one half of the normal advertised
completion timeframes. Should the expedited review exceed this guaranteed completion time, the 30%
optional expedited building permit review fee will be refunded to the applicant, and all normal permit fees
will apply. Such guarantee and refund provisions shall apply to reviews, and do not infer or relate to
approvals.
c. Optional expedited building permit review fees shall be due at the time of building permit application
submission.
CDES Financial Administration, rev 03/18/09 lw
page] 8
^. ..J~ Ita".., ,.,1,.. 1 hA?
April 28. 2009
d. Any required re-submissions of permit applications' leading to re-reviews, when due to applic~ge 43 of 49
insufficiencies, shall be subject to additional optional expedited building permit plan review fees if an
additional expedited review is requested by the applicant for the re-review, and shall be calculated against
re-submission charges.
WW) FENCES
1) $50.00 application ree plus $50.00 per inspection as required.
XX) Optional Tempol'3rv Certificate of Occupancv (TCO)
1) Commercial structures under ~O.OOO square j~:d - S25tl.OO
Commercial structures .:;0.000 square feet and ()vcr - $:'00.00
2) Extensions of existing TeO for commercial stnlclUres -$500.00
3) Residential st11lctures -S 1 00.00
This is the last page of the CDES Fee Schedule
CDES Financial Administration, rev 03/l8/09Iw
page 19
."",
Agenda Item No. 16A2
April 28, 2009
Page 44 of 49
IAttachment D - Listin of Fee Schedule Chan es
I"" ... "i." . ." .
hange 1: Zoning Oep! - Fund 131 - Removal of existing fee
eason: Official Interpretations submitted in conjunction with a land use
petition or with a SDP require the same amount of staff effort and resources as
a normal separately submitted official interpretation and as such the fee
associated with the application should be the same as a regular interpretation in
order to cover the annlicable costs. There is no change to the process.
Existina Fee Schedule Section Prooosed Fee Schedule Section
A A
2) Interpretation request submitted in conjunction with a land use petition or
requested during site development plan review process. $250.00 2)nJa
-=
.........." . I I . ....
Change 2: Zoning Dcpt - Fund 131 - Removal of existing fee
Reason: For consistency. this is an Environmental fee. Redundant fee removed.
Exislina Fee Schedule Section Prooosed Fee Schedule Section
C C
Bc) Pre~application meeting $250.00 (to be credited toward application fee
upon submittal) Bc) nla
.. . .C ...... I I .
Change 3: Zoning Oept - Fund 131 - Proposed new fee
Reason: Public Utilities proposed amendment to LOC Section 5,05.12 will
allow utility system facilities to be submitted under the SOPI process in lieu of
the more costly SDP amendment process. This process fee is slightly larger
than the routine SOP] note in F4a) as the review required is more complex and
- ;'lvolves an additional utility review. Briefly, thissccliol1 <l]ready allows a
ique SOPl to add wellfields_ expediting the process for Utilities but resulting
, more work than a typical SOPl for the reviewers. mainly Zoning and DSAC Clarification: An LDC amendment was approved tn allo\>" the utility
Engineering. The LOC section actually allows the review of multiple well sites system facilities to be submitted under the SDP] process. however it is more
at different locations, but through one SDI'I. The approved amendment also complex and takes longer to review than a nonnal SOP! consequently it
allows other, similar utility system facilities to use the salTle process, resulting warnmts a slightly higher review fee. (A nonnal SOP] would be processed
in an increase in the number and complexity of SOPls submitted through this under F4a). An SOP] under Public Utility Systems would be processed
process. under this fee-- F4b).
Existino Fee Schedule Section Pronosed Fee Schedule Section
F4 F4
a) Site Deveiopment Plan Insubstantial Change $400.00 for first sheet, a) Site Development Plan Insubstantial Change. $400_00 for first sheet,
$100.00 for each and every additional sheet submitted. $100,00 for each and every additional sheet submitted.
bl Site Develooment Plan Insubstantial Chanoe for Public Utilitv Svstem
b) Additional fees for 3rd review $1 ,000.00, 4th Review $1,500.00, 5th and Accessorv Uses. $500.00 for the first sheet $125.00 for each and every
subsequent review $2,000.00 additional sheet.
c) Additional fees for 3rd review $1 ,000.00, 4th Review $1,500.00, 5th and
c) nfa subsequent review $2,000,00
Change 4: Zoning Dept - Fund ]31 - Proposed new fee
Reason: Previously when dealing with town home type prodUCL the plat and
plan process required the submittal of a separate SOP. To streamline the
process for the town home type product where homes arc constructed on "fee
simple" lots. the SDP was combined with the Final Plat submittal. therefore
requiring review of requirements for both the SOP and a Final Plat (LOC
10.02.048.4)
Existina Fee Schedule Section Prooosed Fee Schedule Section
F F
. 14) Town Home Site Plan Review - $6 000_00 base fee additional fees for
3rd review $1 000,00 4th review $1 500.00 51h review $2 000.00 6th and
~) nla subseauent review $2 50000.
1
Att9chmsntO SummBryofpmposadc:l1BngestolheCDESfesschedule
BMBO_lw
updated4i20/200g
Agenda Item No. 16A2
April 28, 2009
Page 45 of 49
Change 5: Zoning Dt:pl Fund 131 Proposed new fee
Reason: New fee due to LDe amendment. (LOe ]0.02.03 R 4hi)
Existino Fee Schedule Section Prooosed Fee Schedule Section
F F
15)nla 15) SDP ElCtension - $15000
I I
Change 6: Zoning Dept - Fund 131 - Proposed new fee
Reason: Fee for new LD(' requirement LDC 9.03.07
Existino Fee Schedule Section Prooosed Fee Schedule Section
F F
16) Post Take Site Plan - Base Fee $1000.00 Resubmittal Fee $250,00
16) nla each submittal $300000 additional if obiection filed.
I
Change 7: Engineering Dcpl . Fund 131- Adjustment & c1Olrificalion to an existing fee
Reason: The currel1l language narrowly restricts this fee to just rcsidell1ial
dwelling units or accessory structures to single family or duplex dwelling units.
There afC times when inspections are required of other types of facilities "'here
the current fee would nOl apply and without this fee identified staff would not
be able to rollect a fee to cover the costs ofsc,,"ices provided.
Existino Fee Schedule Section Prooosed Fee Schedule Section
H H
1) Engineering Inspection Fee $150,00 per residential dwelling unit or
accessory structure to residential dwelling unit (single or duplex only), charged 1) Engineering Inspection Fee $150,00 per set of reauired enaineerina
at time of building permit issuance. insoectlons charaed allime of buildina Dermit issuance.
I r '.
Change 8: Zoning Dept. Fund 131 . Clarification to existing fee and addition for State Statute requirements
Reason To be consistent wid] other fees An extension process is allowed pursuant to Stale Statute 380.06( I 9)'(<' Revicw time is minimal.
Exislina Fee Schedule Section Prooosed Fee Schedule Section
K K
8) DRlfDO Amendment $6.000.00 plus $25.00 per acre (or fraction thereof)
8) DRI/DO Amendment $6,000.00 plus $25.00 per acre (or fraction thereof) The acreage charge does not apply for amendments which only change the
The acreage charge does nol apply for amendments which only change the build-out date of the DO for a time period of less than five years Additional
build-out date of the DO for a time period of less than five years fee for 5th and subseauent reviews - 20% of oriainal fee
a)nJa a) DRI Extension. $100,00
AI\achm~nl 0 Summa'yofproposed ch.ngesto\h..::DES feeschedu",
BMBO.lw
updalM4iZO/Z0CI9
Agenda Item No. 16A2
April 28. 2009
Page 46 of 49
I I
,_JChangf.> 9: Zoning Dept. . Fund 131 - Clarification to existing fee.
nSAC Clarification: Minor revisions which are required by staff at the 5th
-ason 10 be consistent with other fees. or subsequent review are exempt from the additional fee nravision.
Exislina Fee Schedule Section Prooosed Fee Schedule Section
K K
15) Rezone Petition (PUD to PUO): $8,000.00 plus $25.00 an acre (or
fraction thereof) (Requires a submittal of a new PUD document), Additional
15) Rezone Petition (PUD to PUD): $8,000.00 plus $25.00 an acre {or fraction fee for 5th and subseauent reviews - 20% of oriainal fee (excludes minor
thereof) (Requires a submittal of a new PUD document) revisions asreauired bvstaffl
," " "", ".'Y""",".' " , ..' " , , ' ".' ., " , . "
Change to: Zoning Depl. - Fund 131 - Fee consistency
Reason- To be consistent with other pronertv owner notifications shown in section K. item 16
Existino Fee Schedule Section Prooosed Fee Schedule Section
K K
21) Street Name Change (Platted) $500,00 plus $100 for each property owner 21} Street Name Change (Platted) $500,00 olus $1.50 for each property
requiring notification of proposed street name change owner requiring notification of proposed street name change.
Change 11: Zoning Dept. - Fund I 31 ~ Adjustment & clarification to an existing fee
Reason' Current fee schedule states "Land Use Petitions Continuance" hut should include Appeals as well Revise lan!,'lJage forclaritv.
Existino FAe Schedule Section Prooosed Fee Schedule Section
K K
30} Land Use Petition Continuances Includina Aooeal of an Administrative
30) Land Use Petition Continuances Decision and Aooeal to Board of Zonina Aooeals
I I
Change 12: Zoning Dept - Fund 131 - Proposed New Fee
Reason: Fee for recently annroved process defined in the LDC Section 2.03.07 N.5 and 2.03.07 1.5
Existino Fee Schedule Section Prooosed Fee Scheduie Section
K33 K33
a) nta a) Mixed Use Proiect Deviation - $1000.00
.,
3
AttechmenlD SummaryofproposedchangestolheCOESfeeschedule
ElMBO_O;,
updated 4120.12009
<"..u,___,.._,,~.,_ -------~--
Agenda Item No. 16A2
April 28. 2009
Page 47 of 49
Change 13: Zoning Dept. - Fund 13] - Language clarification to an existing fee
Reason: In preparation for the approval of an olltdoor seating ordinance this
fee was approved during the last fee schedule update. Subsequent to the
approval oClhe fec.lhe outdoor sealing pcnnit requirement \'\,lS climinakJ and
essentially replaced by an Amplified Sound Permit requirement as defined in
the recently approved Noise Ordinance. This is a one time pennil requirement
for any private or commercial establishment desiring to nave an outdoor
amplified sound system as defined in the cocte. The pcnniUing process
requires a zoning verification review and the administrative maintenance of
pennit database.
Existina Fee Schedule Section ProDosed Fee Schedule Section
K K
34) Outdoor Serving Area Permit $300,00 34) Amolified Sound Permit $300,00
I
Change 14: Miscellaneous - Fund] 1]
Reason Reflective of the actual co,ts incurred by the Code Enforcement Department for this process
Existino Fee Schedule Section Prooosed Fee Schedule Section
L L
4) The following fee shall be assessed for all Lien Searches. Tille Searches 4) The following fee shall be assessed for all Lien Search Reauests and
and/or Payoff Requests: $S,OOfper request Pavoff Requests: $2S.00foer reouest
I I
Change IS: Zoning Dept. Fund 13] - Language clarification 10 an existing fee
Reason: Bui]ding Department no longer refers to their apolications as Long Fann or Exprcss PermiL~ Langual!e chal1[!c only.
Existina Fee Schedule Section Prooosed Fee Schedule Section
L12 L12
a) Long forms: $12S.00 per building pennit application, 2nd review 50% of fee. a} Permit Aoolication - Comolex (more than one trade): $12S.00 per building
3rd and subsequent 25% of fee (2nd and subsequent review fees related 10 permit application, 2nd review SO% of fee, 3rd and subsequent 2S% of fee
Zoning approvals only) (2nd and subsequent review fees related to Zoning approvals only)
b) Express permits: $SO.OO per building permit application. 2nd review 50% of b) Permit Aoolication - Basic Ino trade or one tradel: $50.00 per building
fee, 3rd and subsequenl25% of fee (2nd and subsequent review fees related permit application, 2nd review 50% of fee, 3rd and subsequent 25% of fee
to Zoning approvals only) (2nd and subsequent review fees related to Zoning approvals only)
Change 16: Zoning Dept.- Fund ]31 - Removal of fees
Reason: Fee L ]6) ~- Removal of a redundant fee. The appeal fee listed under
Administration is the same pmccss. Fee LIRe) n Removes the S250 fee for
the pre-application meeting. The fee isno jO[Jgercredited to the app]icillion
fee.
Existina Fee Schedule Section Prooosed Fee Schedule Section
L L
16) Zoning Letter Appeal $250.00 16) nla
18e) Pre-application meetings for GMP amendment petitions $250.00 (to be
credited toward application fee upon submittal) 18elnla
Attacnm@ntD SummBryofprOf>O...dch"ngBsto\haCDESf.e"c"edu~
BMBO_Mi
urdilted4/20i2009
Agenda Item No. 16A2
April 28. 2009
Page 48 of 49
I
~hange 17; En!,>-ineering Dept - Fund 131 - Proposed new fee
.cason: Presently there is no fee to cover administrative cost incurred in
processing such request. This change provides staff the opportunity to charge DSAC Clarjfication: This fee is for any time extensions allowed hy LOe
for services provided when processing extensions were the code allows for where there currently is not 11 fee associated with an extension request The
development orders or pennits not snecificallv defined in this fee schedule. fee is the same amount for time extension requests for SOP and Final Plats
Existina Fee Schedule Section Prooosed Fee Schedule Section
L L
25) nfa 25) Time Extension $150.00
..
Change 18: Building Review & Permitting Dept - Fund 113 ~ Language clarification to an existing fee
Reason: Removes subsection I of Screen Enclosure fees. which is redundant with subsection 2.
Existina Fee Schedule Section Prooosed Fee Schedule Section
V V
1) Construction costs shall be calculated as follows 1\n/a
a. Screen Roof. $2.00 per sq. ft. of floor area (Screen Walls Only)
b Pan Roof. $3.00 per sq. ft. of floor area (Screen Wails Only)
c. Existing Roof. $2.00 per sq. ft. of floor area (Screen Walts Only)
. ..
Change 19: ('DES Operations - Fund 111 - Adjustment & clarification to an existing fee
Reason: To cover the costs oflhis contrdcted strvice
Existina Fee Schedule Section Prooosed Fee Schedule Section
TT TT
1) The following fees shall be assessed for the Public Vehicle for Hire
Program: (In the event that the backaround check fee charaed to the county
1) The following fees shall be assessed for the Public Vehicle for Hire exceed.:: the minimum fee establi hed b the count. the ~icantlS\Shall b
Program: resoonsible for the actual cost of the search.)
.
Change 20: Building Review & Pennitling Dept. - Fund 113 - Proposed new optional fee
Reason: This is an optional proCtSS and essentially is a convenience to the
applicant to gain operational access to a facility prior to the issuing of a final
certificate of occupancy. The TeO process is not pan of the initial building
pennit and as sU(:h it is appropriate to assess a fee for the sl:rvices provided by
staff 10 close out the inspection logs, to perfonn tht: needed additional
inspections <lnd for the administration and issuing of an optional Tempornry
Certificate of Occupancy.
EKistina Fee Schedule Section Prooosed Fee Schedule Section
XXnla XX Oolional Temoorarv Certificate of Occuoancv
1) nla 1) Commercial structures under 30 000 sauare feet $250.00
Commercial structures 30 000 sauare feel and over -- $500.00
2)n/a 2) Extension of eKistina TCO for commercial structures - $500.00
3) nla I 3) $100.00 for residential
I
5
Altach"",n\D_Summaryofproposadchanga.tolhaCPESfaesch-edule
BMilO-lw
LJpdated4i2012009
Building Valuation Data
Square Foot Construction Costs table does not reflect accurate
values for that purpose. However, the Square Foot Construc-
tion Costs table can be used to determine the cost of an addi-
tion that is basically a stand-alone building which happens to
be attached to an existing building. In the case of such addi-
tions, the only atterations to the existing building would involve
the attachment of the addition to the existing building and the
openings between the addition and the existing building.
. For purposes of establishing the Permtt Fee Multiplier, the es-
timated total annual construction value for a given time period
Agenda Item No. 16A2
April 28. 2009
Page 49 of 49
(1 year) is the sum of each building's value (Gross Area x
Square Foot Construction Cost) for that time period (e.g., 1
year).
. The Square Foot Construction Cost does not Include the price
of the land on which the building is bultt. The Square Foot Con-
struction Cost takes into account everything from site and foun-
dation work to the roof structure and coverings but does not
Include the price of the land. The cost of the land does not
affect the cost of related code enforcement activitles and Is not
Included in the Square Foot Construction Cost.
Square Foot Construction Costs.... '..
Group (2006 International Building Coda) Type of Construction
IA IB IIA liB IliA IIIB IV VA VB
A-1 Assembly, theaters. with stage 190.99 184.82 180.21 172.74 16021 159.43 167.13 148.15 142.63
Assembly, theaters. without stage 176.23 170.05 165.44 157.97 145.44 144.66 152.37 133.39 127.86
A-2 Assembly. nightclubs 147.10 142.97 139.34 133.91 12428 124.03 129.21 114.30 110.46
A-2 Assembly, restaurants, bars, banquet halls 146.10 141.97 137.34 132.91 122.28 123.03 128.21 112.30 109.46
A-3 Assembly, churches 176.78 170.61 165.99 158.53 145.96 14S.18 152.92 133.90 128.38
A-3 Assembly, general, commmty halls, 150.51 144.34 138.73 132.26 118.68 118.90 126.65 106.63 102.10
libraries. rooseums
A-4 Assembly, arenas 17523 169.05 163.44 156.97 143.44 143.66 151.37 131.39 126.86
B Business 152.75 147.34 142.69 136.02 121.77 120.96 130.77 108.80 104.41
E Educatbnal 162.06 156.56 152.07 145.29 1 34.Q7 130.89 140.53 119.73 115.17
F-1 Fadrny and industrial, moderate hazard 90.96 86.79 82.13 79.44 68.74 69.66 76.24 58.56 55.46
F.2 Factory and i1dush1al. low hazard 89.96 85.79 82.13 78.44 68.74 68.66 75.24 58.56 54.46
H-1 Hah Hazard, explosives 8S.25 81.08 77.42 73.73 5421 54.13 70.53 54.03 N.P.
H234 l-ligh Hazard 85.25 81.08 77.42 73.73 5421 54.13 70.53 54.03 49.93
H-5 H'M 152.75 147.34 142.69 136.02 121.77 120.96 130.77 108.80 104.41
1.1 Institutional, supervised environment 150.33 145.20 141.34 135.63 124.49 124.44 134.70 114.51 109.96
1-2 Institutional. hospitals 253.93 248.S2 243.87 237.20 222.34 N.P. 231.9S 209.39 N.P.
1-2 Instftutional, nursing homes 177.55 172.14 167.49 160.82 147.00 N.P. 155.S8 134.05 N.P.
1-3 Institutional, restrained 173.39 167.98 163.32 156.66 143.67 141.88 151.41 130.72 124.33
1-4 Institutional. day care facilties 150.33 14520 141.34 135.63 124.49 124.44 134.70 114.51 109.96
M Mercantile 109.31 105.19 100.56 96.13 86.08 86.83 91.43 76.10 73.26
R-1 Residential, hotels 150.84 145.71 141.85 136.14 125.10 125.05 135.31 115.12 110.57
R-2 Residential, multiple talTity 126.43 121.30 117.44 111.73 100.81 100.77 111.02 90.83 86.28
R.3 Residential, one- and two-falTily 119.76 116.47 113.63 110.52 105.39 105.13 108.54 99.79 94.06
R-4 Residential, care/assisted living laclities 150.33 14520 141.34 135.63 124.49 124.44 134.70 114.51 109.96
S-1 Storage, moderate hazard 8425 80.08 75.42 72.73 62.21 63.13 69.53 52.03 48.93
S.2 storage, low hazard 83.25 79.08 75.42 71.73 6221 62.13 68.53 52.03 47.93
U Ulillty, miscellaneous 64.30 60.80 57.19 54.31 4722 47.22 50.70 38.76 36.91
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (aU use group) ;:: $15.00 per sq. tl
c. For shell onty buildings deduct 20 percent.
d. N.P. = nol permll1ed
54 Building Safety Journal February 2007
.~