Resolution 2003-117RESOLUTION NO. 2003- 1 ]. 7 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ESTABLISHING A FEE SCHEDULE OF DEVELOPMENT RELATED REVIEW AND PROCESSING FEES INCLUDING: PROVIDING FOR NEW AND REVISED BUILDING PERMIT, INSPECTION, AND LAND USE PETITION FEES; REFLECTING REVISED FEES FOR FIRE CODE PLAN REVIEW AND PREVENTION PERMITS ESTABLISHED AND ADOPTED BY THE INDEPENDENT FIRE DISTRICTS OF COLLIER COUNTY, AND UPDATING CONSTRUCTION VALUATION TABLES USED IN THE PROCESS OF DETERMINING BUILDING PERMIT FEES; AS PROVIDED FOR IN DIVISION 1.10 OF THE COLLIER COUNTY LAND DEVELOPMENT CODE; SUPERSEDING RESOLUTION NO. 2000-455, AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Collier County Land Development Code, Section 1.10.1 provides that the Board of County Commissioners shall establish and adopt by resolution a schedule of fees and charges for application and document processing, public meetings, public hearings, other meetings and hearings, transcripts, approvals, denials, development permits, development orders, development, construction, interpretations, enforcement inspection services, sales of documents review, resubmission, and any other zoning or development related services and any other services provided or costs incurred by or on behalf of the County; and WHEREAS, the Board of County Commissioners approved Resolution No. 2000-455, establishing a fee schedule of development related review and processing fees on December 12, 2000; and WHEREAS, many operations within the Community Development and Environmental Services Division are supported by user fee revenues; and WHEREAS, it is staff's intent to continue to conduct annual cost/fee studies in an attempt to balance Fund 113 operating costs with revenues; and WHEREAS, the new or increased fees for certain development or building review related activities or petition types, including but not limited to, site development plans, rezones, conditional uses, building permit applications and related inspections are reflective of the actual cost of processing and reviewing such petitions; and WHEREAS, the Building Review and Permitting Department is updating construction valuation tables, used in permit fee determinations, to a standard and accepted version reflective of the actual and most current values available at the time of this resolution. 1 NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA that: The Board of County Commissioners hereby declares that the revised fees set forth as attached hereto and incorporated by reference herein as "Exhibit A," as well as the schedule of Fire Prevention and control fees also attached hereto and incorporated by reference herein as "Exhibit B," and the Building Valuation Tables attached hereto and incorporated by reference herein as "Exhibit C," are all fair and reasonable sums to be assessed to those who receive the benefits of the services, reviews, and inspections required pursuant to the Land Development Code and the County's corresponding development review and permitting processes. BE IT FURTHER RESOLVED that this Resolution relating to fees in the Land Development Code be recorded in the minutes of this Board and that Resolution numbered 2000- 455 is hereby superseded by the adoption of this Resolution, effective the 15t~ of April 2003. This Resolution adopted after motion, second and majority vote. Done this 1~'44X day of ~~ ,2003. ATTEST: DWIGHT E. BROCK, CLERK Approved as to Form and Legal Sufficiency: 101 BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA TOM HENNING, CHAIRMAN Patrick G.'7~rhite Assistant County Attorney 2 COLLIER COUNTY COMMUNITY DEVELOP NT AND ENVIRONMENTAL SERVICES FEE SCHEDULE Exhibit A: BCC Approved Version- March 11, 2003 Contents: A) ADMINISTRATION ................................................................................................................................................................................................. 2 B) BLASTING PERMITS & INSPECTION .................................................................................................................................................................. 2 C) ENVIRONMENTAL/LANDSCAPING .................................................................................................................................................................... 2 D) EXCAVATION PERMITS ........................................................................................................................................................................................ 3 E) Reserved ..................................................................................................................................................................................................................... 3 F) SIIE DEVELOPMENT PLANS ................................................................................................................................................................................ 4 G) SUBDIVISION .......................................................................................................................................................................................................... 5 H) Reserved .................................................................................................................................................................................................................... 5 I) TEMPORARY USE PERMITS .................................................................................................................................................................................. 5 J) WELL PERMITS/INSPECTIONS .............................................................................................................................................................................. 6 K) ZONING/LAND USE PETITIONS ........................................................................................................................................................................... 6 L) MISCELLANEOUS ................................................................................................................................................................................................... 7 M) BUILDING PERMIT APPLICATION FEE ............................................................................................................................................................. 8 N) BUILDING PERMIT FEES ...................................................................................................................................................................................... 8 O) ELECTRICAL PERMIT FEES ................................................................................................................................................................................. 9 P) PLUMBING PERMIT FEES ...................................................................................................................................................................................... 9 Q) MECHANICAL PERMIT FEES ............................................................................................................................................................................. 10 R) FIRE PREVENTION AND CONTROL PERMIT FEES ......................................................................................................................................... 10 S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES ................................................................................................... l 0 T) CHICKEES AND SIMILAR STRUCTURES .......................................................................................................................................................... 10 U) POOL OR SPA PERMIT FEES ............................................................................................................................................................................... 11 V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES ........................................................................................................................................ l 1 W) SIGN PERMIT FEES ............................................................................................................................................................................................. 11 X) CONVENIENCE PERMIT FEES ........................................................................................................................................................................... I 1 Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS ............................................................................................ 11 Z) PERMIT EXTENSION ............................................................................................................................................................................................ 12 AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES .................................................................................................................... 12 BB) PRE-MOVING INSPECTION FEES .................................................................................................................................................................... 12 CC) INSPECTION FEES ............................................................................................................................................................................................. 12 DD) REINSPECTION FEES ........................................................................................................................................................................................ 12 EE) FAILURE TO OBTA1N A PERMIT ..................................................................................................................................................................... 12 FF) LICENSING ........................................................................................................................................................................................................... 13 GG) DUPLICATE PERMIT CARDS ........................................................................................................................................................................... 13 HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS ................................................................................................................................ 13 II) PERMIT FEE REFUNDS ........................................................................................................................................................................................ 13 J J) RECORD RETRIEVAL .......................................................................................................................................................................................... 13 KK) COPY FEES ......................................................................................................................................................................................................... 13 LL) RESEARCH .......................................................................................................................................................................................................... 13 MM) SUBSCRIPTION SERVICE ................................................................................................................................................................................ 14 NN) ELECTRONIC DATA CONVERSION SURCHARGE ....................................................................................................................................... 14 OO) REGISTRATION OF RENTAL DWELLINGS ................................................................................................................................................... 14 PP) FEE WAIVER PROCEDURES ............................................................................................................................................................................. 14 QQ) ADDITIONAL FEE REFUND PROVISIONS ..................................................................................................................................................... 14 CDES Financial Administration, rev 03/04/03 page 1 A) ADMINISTRATION 1) Appeals & Interpretations - Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or Building Construction Administrative Code (Administrative Code). $750.00 2) Interpretation request submitted in conjunction with a land use petition or requested during an application review process. $250.00 3) Determination of Vested Rights. $100.00 (plus the County's out-of-pocket expenses associated with hearing officer and hearings) 4) Appeal of Vested Rights Determination. $100.00 5) Amendment to Land Development Code. $1,200.00 6) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or the LDC). $1000.00 (non-refundable) 7) Appeal to Board of Zoning Appeals or Building Board of Adjustments and Appeals (as may be provided for in the Collier County Administrative Code or the LDC) . $500.00 (non-refundable) B) BLASTING PERMITS & INSPECTION 1) 30 day permit fee, non-refundable payable upon application. $125.00 2) 90 day permit fee, non-refundable payable upon application. $300.00 3) Yearly permit fee, non-refundable payable upon application. $750.00 4) Renewal permit fee, non-refundable payable upon application. $100.00 5) After-the-fact fee, due to blasting without a permit. $5000.00 6) Fine fee, per detonated shot with after-the-fact permit. $100.00 7) Handler fee, for handler who assists the user or blaster in the use of explosives. $50.00 8) Blasting Inspection Fee. $100.00 (per inspection) 9) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts. Upon completion, fees will be adjusted to reflect actual number of blasts. C) ENVIRONMENTAL/LANDSCAPING 1) Agricultural Clearing Permit, first acre or fraction of an acre. $150.00 Each additional acre or fraction of an acre. $50.00 ($1,500.00 maximum) 2) Environmental Impact Statement (EIS) $1600.00 3) Landscape Re-inspection 1st $50.00, 2nd $75.00, every inspection afterward $100.00 4) Vehicle on the Beach Permit Application. $250.00 (Permit fee shall be waived for public and non-profit organizations engaging in environmental activities for scientific, conservation or educational purposes). CDES Financial Administration, rev 03/04/03 page 2 6) Special Treatment Review (ST) a. First five acres or less. $150.00 b. Each additional acre, or fraction thereof. $50.00 ($1,500.00 Maximum) 8) Coastal Construction Setback Line (CCSL) : a. Permit - Dune Walkover. $150.00 b. Permit - Dune Restoration. $200.00 c. Variance - Petition. $1000.00 8) Sea Turtle Permit- a. Sea Turtle Handling Permits. $25.00 b. Sea Turtle Nesting Area Construction Permit. c. Sea Turtle Nest Relocation. $100.00 $200.00 9) Vegetation Removal Permit- a. First acre or fraction of an acre. $150.00 b. Each additional acre or fraction thereof. $50.00 ($1,500.00 maximum) 10) After-the-fact Environmental or Landscape Permits a. CCSL Variance Petition. 2x normal fee b. All other Environmental or Landscape Permits. 4x normal fee D) EXCAVATION PERMITS 1) Annual Renewal. $150.00 2) Application (Private). $200.00 3) Application (Commercial). $1000.00 4) Application (Development). $200.00 5) Permit for private and development excavations: $100.00 per month inspection fee 6) Reapplication: $150.00 plus $100.00 per month inspection fee 7) Road Damage Fee: $0.000 per cubic yard for material removed from site 8) Cubic Yardage Fee: $100.00 first 5000 cy, plus $5.00 per additional 1000 cy with a maximum of $10,000.00 9) Time Extension. $150.00 plus $100.00 per month inspection fee 10) After-the-fact Excavation Permit. 4x application fee E) FIRE CODE REVIEW FEES 1) Fire Code Review fees associated with each of the following processes: a. SDP - Site Development Plan b. SDPA - Site Development Plan, Amendment c. SDPI - Site Development Plan, Insubstantial d. SIP - Site Improvement Plan e. SIPI - Site Improvement Plan, Insubstantial f. PSP - Preliminary Subdivision Plans g. PSPA - Preliminary Subdivision Plans, Amendment h. PPL - Plans & Plat, Subdivision i. FP - Final Plat j. CONSTR - Construction Plans, Subdivision/Utilities $200.00 $150.00 $100.00 $150.00 $100.00 $150.00 $100.00 $100.00 $100.00 $100.00 CDES Financial Administration, rev 03/04/03 page 3 101 k. ICP - Construction Plans, Insubstantial 1. DRI - Development of Regional Impact m. DOA - Development Order, Amendment n. PUDZ - Planned Unit Development, Rezone o. PUDA - Planned Unit Development, Amendment p. PDI - Planned Unit Development, Insubstantial q. RZ - Rezone, Regular Zoning r. CU - Conditional Use $100 O0 $200 00 $150 00 $150 00 $150 00 $100 00 $100 00 $150 00 F) SITE DEVELOPMENT PLANS 1) Site Development Plan Review (SDP). $1500.00 a. plus $10.00 per D/U b. plus $25.00 per residential building structure; c. plus $.03 per square foot for non-residential d. plus $25.00 per building for non-residential. 2 Pre-application fee. $300.00 (to be credited toward application fee upon submittal.) 3 Site Development Plans, including amendments and insubstantial changes - 3rd and subsequent additional reviews. $500.00 4 Site Development Plan Insubstantial Change. $150.00 for first sheet, $75.00 for each additional sheet Site Development Plan Conceptual Review $500.00 Additional review of construction plans for phased construction of Site Development/Improvement Plan improvements. $1000.00 per phase. Site Improvement Plan Review (SIP). $1000.00 (plus Engineering review fees) Utility Plan Review & Inspection Fees- a. Construction Document Review. 0.75% of probable water and/or sewer construction costs b. Construction Inspection. 2.25% of probable water and/or sewer construction costs c. Construction Document Resubmission or Document Modification, submit as insubstantial change. $150.00 for first sheet, $75.00 for each additional sheet 9) SDP Review Fee a. Construction Documents Review 0.75% of probable cost of construction of roadways, drainage & stormwater management system b. Construction Inspection 2.25% of probable cost of construction of roadway, drainage & stormwater management system c. Third and Subsequent Resubmittal Fee $500.00 10)Site Development Plan Amendment $1,000.00, a. Plus $10.00 per D/U plus $25.00 per residential building structure b. plus $.03 per square foot c. plus $25.00 per building for non-residential, which ever is greater. 11) Violation of the conditions of approval of the SDP/SIP or installation of improvements, clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP. 4x the SIP/SDP application fee CDES Financial Administration, rev 03/04/03 page 4 i01 G) SUBDIVISION 1) Lot Line Adjustment $250.00 2) Subdivision Review Fees- a. Construction Document $0.75% of probable cost of construction b. Construction Document Resubmission or Document Modification -Submit as Insubstantial Change $150.00 for first sheet, $75.00 for each additional sheet c. Subdivisions - 3rd and subsequent additional reviews and substantial deviations from approval construction documents $500.00 d. Subdivision Inspection Fee 2.25% of probable cost of construction for construction inspection. 3) Subdivision, Preliminary Plat (PSP)- a. Petition Application $1000.00 plus $5.00 per acre (or fraction thereof) for residential, plus $10.00 per acre (or fraction thereof) for non- residential; (mixed use is residential) 4) Subdivision Final Plat $1000.00 plus $5.00 per acre (or fraction thereof residential, $500.00 plus $10.00 per acre {or fraction thereof) for nonresidential; (mixed use is residential) for 5) Additional review of construction plans for phased construction of subdivzsion improvements. $1000.00 per phase 6) Two-year Extension $150.00 7) Water and Sewer Facilities Construction Document Review 0.75% of probable water and/or sewer construction costs 8) Construction Document Resubmission or Document Modification 0.25% of probable water and/or sewer construction costs - 3rd and subsequent resubmittals $500.00 9) Construction Inspection 2.25% of probable water and/or sewer construction costs 10) Violation of the conditions of approval of approved construction plans or installation of improvements, clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved construction plans or permit. 4__x the PSP or Final Plat Review Fee. 11) Administrative Amendment $250.00 H) Reserved I) TEMPORARY USE PERMITS 1) Beach Events Permits- so Individual Permit $100.00 Block of 25 calendar days $2,250.00 Block of 50 calendar days $4,500.00 Block of 75 calendar days $6,750.00 Block of 100 calendar days $9,000.00 Block of 125 calendar days $11,250.00 Block of 150 calendar days $13,500.00 2) Temporary Use Permit Special Sales & Events. $125.00 3) Model Homes and Sales Centers $250.00 CDES Financial Administration, rev 03/04/03 page 5 4) Construction and Development $125.00 5) Residential and Non-Profit Garage and Yard Sale Permits No Charge 6) Temporary Use Amendment. $100.00 7) Renewals or extensions requested after the expiration date $200.00 8) Temporary Use Permit for Special Events requiring BCC approval, including Circus and Carnival Permits. $275.00 9) Political Signs (Bulk Temporary Permit) $5.00 a. A deposit of $500.00 will be posted by political campaigns at the time of securing a Political Sign permit. Forfeiture from this deposit will be in the amount of $100.00 per written notice of violation of applicable sign ordinance requirements for the 3rd and following such notices of violation. Such forfeiture shall be based on notices of violation per campaign, and not per individual sign. Deposit, or remaining balance of deposit, will be refunded upon completion of campaign and certification by Code Enforcement staff that the campaign is in compliance with all provisions of applicable code requirements. 10) Fees for Temporary Use permits issued After the Fact, ATF: 2x normal fee J) WELL PERMITS/INSPECTIONS 1) Hydraulic elevator shaft permit $200.00 2) Test hole permit (including 1st six holes) $200.00, each additional hole $10.00 3) Well permit (abandonment) $100.00 4) Well permit (construction or repair) $200.00 5) Well permit (monitoring) $100.00 6) Well Permit (modification of monitor/test well to a production well) $50.00 7) Well Reinspections a. First Reinspection $75.00 b. Second Reinspection $100.00 c. Third Reinspection $150.00 8) After the fact well permits 4__x normal fee per violation. NOTE: Multiple wells may be allowed on one permit, but each well must be accounted for and the appropriate fee shall be charged for each well in accordance with the above listed schedule. K) ZONING/LAND USE PETITIONS 1) Pre-application fee $300.00 (to be credited toward application fee upon submittal.) 2) Alcoholic Beverage or Service Station Separation Requirement Waiver $1000.00 3) Boat Dock Extension Petition $1000.00 CDES Financial Administration, rev 03/04/03 page 6 101 4) Conditional Use Petition $2000.00 ($750.00 when filed with Rezone Petition) 5) Conditional Use Monitoring Review: $750.00 6) Conditional Use Extension $1000.00 7) DRI Review (In addition to cost of rezone) $5000.00 plus $25.00 an acre (or fraction thereof) 8) DRI/ DO Amendment $3000.00 9) Flood Variance Petition $1000.00 10) Interim Agriculture Use Petition $350.00 11) Non-Conforming Use Change/Alteration $1500.00 12) Parking Exemption $1500.00 13) PUD Amendments (PUD to PUD): $3000.00 14) Property owner notifications: $1.00 non-certified mail, $3.00 certified return receipt mail (Petitioner to pay this amount prior to advertisement of petition) 15) Planned Unit Development Amendment (Insubstantial) $1500.00 16) Rezone Petition (Regular) $2500.00 plus $25.00 an acre (or fraction thereof) 17) Rezone Petition (to PUD) $5000.00 plus $25.00 an acre (or fraction thereof) 18) Street Name Change (Platted) $500.00 plus $1.00 for each property owner requiring notification of proposed street name change. 19) Street Name (unplatted) or Project Name Change $500.00 20 Variance Petition $1000.00 21 22 23 Variance for encroachment of easements: $1000.00 Variance (Administrative) $500.00 Zoning Certificate: Residential: $50.00, Commercial:S125.00 24 PUD Extension - Sun Setting: $1000.00 25 Sign Variance Petition: $2000.00 26 Stewardship Receiving Area Petition (SRA): $7000.00 plus $25.00 per acre (or fraction thereof) Stewardship Sending Area Petition (SSA): $7000.00 plus $25.00 per stewardship credit applied for. 27) After-the-Fact Zoning/Land Use Petitions 2__x the normal petition fee L) MISCELLANEOUS 1) Data Conversion Fee (to cover the cost of converting graphic and narrative information into electronic format) a. per site plan or land use petition $25.00 b. per amendment (PUD, site plan, etc.) $15.00 2) Official Zoning Atlas Map Sheet Publications, maps, and reports. $.50 as set forth in Resolution 98-498, as amended. CDES Financial Administration, rev 03/04/03 page 7 3) Requests for formal written zoning/land use verification or similar such request for written staff responses. $100.00 per property 4) Research: The fee for researching records, ordinances, and codes that are no longer current shall be $40.00 per hour with a one half hour minimum charge. 5) The fee for creating and designing special computer generated reports that are not a part of the regular standard reports shall be $25.00 per hour with a one half hour minimum charge 6) CD Burning: $25.00 7) Complete sets of Official Zoning Atlas Map Sheets $100.00 per set. 8) Photocopies of documents less than 14x8.5 inches: $0.15 one sided, $0.20 two sided. 9) Property Notification Address Listing: a. MS Excel spreadsheet on Disc $70.00 b. Print out on Paper $75.00 + 0.05 for every record over 1500 c. Mailing Labels $80.00 + 0.06 for every record over 1500 d. Print out on Paper + Mailing Labels $85.00 + 0.11 for every record over 1500 M) BUILDING PERMIT APPLICATION FEE 1) A permit application fee shall be collected at time of applying for a building permit. The permit application fee shall be collected when the plans are submitted for review. The fee shall be applied toward the total permit fee. The applicant shall forfeit the application fee if the application is denied or if the application is approved and the permit is not issued within the time limitation as stated in Section 103.6.1.1 of the Collier County Ordinance No. 91-56, as amended. Application fee will be computed as follows: a. Single family and duplex $.05 per sq ft with minimum of $100.00 b. Multi-Family & Commercial $.05 per sq ft up to 10,000 sq ft, $.025 for over 10,000 sq. ft. Maximum application fee shall NOT exceed $5,000.00. Minimum fee of $50.00 for each of the following: plumbing; mechanical (A/C); electrical; fire; and building, when applying for additions/alterations. Minimum fee for all other applications = $50.00. 5) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any fee adjustments necessary. N) BUILDING PERMIT FEES 1) The fee for a building permit shall be computed as follows: Such fees shall be either based on the contractor's valuations of construction cost or based on calculated cost of construction as set forth on the attached Building Valuation Data Table *(Exhibit C), whichever is greater. Valuation of construction costs of less than $750.00 - No permit or fee is required, but construction must comply with all County Codes and Ordinances. If inspections are required by the Building Official or requested by the applicant, the appropriate fees shall be paid. *SBCCI Building Valuation Data Table, produced March 31,2002 CDES Financial Administration, rev 03/04/03 page 8 EXCEPTION: Ail work involving structural components and/or fire rated assemblies requires permits and inspections regardless of construction cost, signs must secure permits as stated in Collier County Ordinance No. 2002-01, as amended. a. Valuation of construction costs of $750.00 through $4,999.99 - With one or no inspections $50.00, With multiple inspections $100.00 b. Valuation of construction costs of $5000.00 through $49,999.99 - With one or no inspections - $30.00 plus $7.00 per thousand dollars, or fraction thereof, of building valuation in excess of $2,000.00. With multiple inspections - $80.00 plus $7.00 per thousand dollars, or fraction thereof, of building valuation in excess of $2000.00. c. Valuation of construction costs of $50,000.00 through $1,000,000.00 - $333.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $50,000.00. d. Valuation of construction costs over $1,000,000.00 - $3474.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $1,000,000.00. O) ELECTRICAL PERMIT FEES 1)The fees for electrical permits for new structures or placement or relocation of structures shall be computed as follows: a. $0.40 per ampere rating of all single-phase panel boards. b. $0.15 per ampere rating for switch or circuit whichever is greater, if item ~1 above does not apply. c. When not a complete installation, all switch and circuit breakers ahead of panel boards shall be computed at $0.15 per ampere. d. Permit fees for any change in electrical installation shall be computed at the above rates for that portion of new and/or increased fees in existing electrical facilities. e. The minimum for any electrical permit shall be $50.00 per unit or tenant space. f. Fifty percent (50%) in additional fee costs shall be added to all above fees for three phase installations. EXCEPTION: Ordinary repairs limited to a $200 value or less may be made without a permit. Repairs must comply with all County Codes and Ordinances. If inspections are required by the Building Official or requested by the applicant, the appropriate fees shall be paid. P) PLUMBING PERMIT FEES 1) The following fee calculations shall be applied separately when the permit involves mixed occupancies. a) Residential occupancies: The fee for a plurabing permit shall be computed at the rate of $50.00 to be charged for each living unit with one to three bathrooms. An additional fee of $10.00 will be assessed for each additional bathroom. b) Nonresidential occupancies: The fee for a plumbing permit shall be computed by the following methods, whichever is calculated to be the greatest fee: a) The rate of $3.00 per 425 square feet of floor area, or fraction thereof; or b) Institutional facilities, hospitals, schools, restaurants and repairs in any occupancy b) classification shall be charged at the rate of $1.00 per fixture unit or CDES Financial Administration, rev 03/04/03 page 9 C) Minimum of $50.00 for each occupancy or tenant space. 2) Grease traps: An additional fee of $50.00 shall be assessed for each grease trap. 3) The cost for retrofit piping shall be computed at the minimum fee of 50.00 per floor for each main riser. 4) The cost of a permit for lawn sprinkler systems shall be computed using the dollar valuation as shown under Section M of this Resolution. 5) The minimum plumbing permit fee shall be $50.00. Q) MECHANICAL PERMIT FEES 1) The following fee calculations shall be applied separately when the permit involves mixed occupancies. a. Residential occupancies: The mechanical permit fees shall be computed at the rate of $50.00 for each living unit up to three tons of air conditioning. Each additional ton or part thereof shall be $3.00 per ton. b. Nonresidential occupancies: The mechanical permit fees shall be computed by one of the following methods, whichever is calculated to be the greatest fee: The rate of $50.00 for the first three tons or three horsepower of air conditioning or other mechanical systems per tenant space, each additional ton of air conditioning or horsepower shall be $3.00; or The rate of $3.00 per 425 square feet of floor area, or fraction thereof. 2) The cost of retrofit piping shall be computed at the minimum fee of $50.00 per floor for each cooling tower, or $50.00 for the first 3 horsepower and $3.00 for each additional horsepower, whichever is greater. 3) The minimum mechanical permit fee shall be $50.00. 4) A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the minimum fee whichever is greater. R) FIRE PREVENTION AND CONTROL PERMIT FEES 1) The fees and exemptions set forth in the "Exhibit B" affixed hereto and made a part of this Schedule of Development Review and Building Permit Fees shall apply to Fire Prevention and Control Permits for both the independent and dependent fire districts. S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES 1) The permit fee shall be $50.00 to set-up a single-wide trailer or mobile home on an approved site plus electrical, plumbing, mechanical and fire protection fees as applicable. 2) The permit fee shall be $75.00 to set-up a double wide or larger mobile homes on an approved site plus electrical, plumbing, mechanical and fire protection fees as applicable. T) CHICKEES AND SIMILAR STRUCTURES 1) The permit fee will be based upon a calculated cost of construction of $4.00 per square foot under roof or the contractor's estimated cost of construction, whichever is greater. The fee will then be calculated in accordance with CDES Financial Administration, rev 03/04/03 page 10 101 Section N of this Resolution. Additional permit fees for electric, plumbing, mechanical, fire, etc., will be charged when applicable. U) POOL OR SPA PERMIT FEES 1) For construction of each public pool or spa the fee shall be - a. Valuation of construction costs of up to $4,999.99. $100.00 b. Valuation of construction costs of $5000.00 through $49,999.99: $80.00 plus $7.00 per thousand dollars, or fraction thereof, of building valuation in excess of $2,000.00. c. Valuation of construction costs of $50,000.00 through $1,000,000.00: $333.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $50,000.00. d. Valuation of construction costs over $1,000,000.00: $3474.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $1,000,000.00. 2) For construction of each private pool or spa the fee shall be: $100.00 V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES 1) Construction costs shall be calculated as follows: a. Screen Roof. $2.00 per sq. ft. of floor area. (Screen Walls Only) b. Pan Roof. $3.00 per sq. ft. of floor area. (Screen Walls Only) c. Existing Roof. $2.00 per sq. ft. of floor area. (Screen Walls Only) 2) The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution. W) SIGN PERMIT FEES 1) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical Permit Fees outlined in this document, the Collier County Development Fee Schedule The minimum building permit fee for sign shall be $75.00. 2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit, however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the above subsection 1 of Sign Permit Fees. X) CONVENIENCE PERMIT FEES 1) Convenience permits are issued in blocks of 10 each. Only licensed contractors are eligible to purchase convenience permits. Convenience permits are limited to the use specified on the permit. The fee for a book of 10 convenience permits is $4O0.00. Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 1) PERMIT AND PLAN REVISIONS The fee for each permit revision submitted after permit issuance shall be calculated using fee schedules outlined in Sections N through R above. The minimum permit fee for revisions to permitted projects shall be $50.00. 2) AS BUILT PLANS The fee for "As Built" plan review shall be ten (10%) percent of the original building permit fee or $150.00, whichever is greater, but shall not exceed $500.00. The fee is intended to cover the cost of reviewing amended building plans in the office to determine that change orders and various field CDES Financial Administration, rev 03/04/03 page 11 changes are in compliance with the minimum construction and fire codes of Collier County. The following are required for as-built drawings review: a. An itemized list of all changes made after permit plan approval. b. As-built plans that have all changes made after permit plan approval "clouded". c. As-built plans and changes shall be signed and sealed by the engineer and/or architect of record. 3) CORRECTIONS TO PLANS a. First Correction to Plans. No charge b. Second Correction to Plans. $75.00 c. Third & subsequent correction to plans. $100.00 Z) PERMIT EXTENSION 1) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or $100.00, whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing existing or amended building plans to determine and verify code compliance AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES 1) The permit fee shall be $50.00 for the demolition of any building or structure. BB) PRE-MOVING INSPECTION FEES 1) The fee shall be $150.00 for the pre-moving inspection of any building or structure. CC) INSPECTION FEES 1 A charge of $20.00 per inspection shall be assessed for inspections for which a permit is not necessary. 2 A user fee of $40.00 per inspection shall be assessed for inspections on a time specified basis. 3 A user fee of $120.00 per inspection shall be assessed for inspections requested after normal working hours. (Normal working hours for inspections are Monday through Friday, 8:00 AM to 3:00 PM, excluding holidays.) 4 First Partial inspection for single-family & tenant buildout. No charge 5 Second & subsequent partial inspections for single-family & tenant buildout. $25.00 DD) REINSPECTION FEES 1) Reinspections for any type of building permit shall result in an additional fee of $75.00 per inspection for the first reinspection, $100.00 for the second reinspection and $125.00 for the third and each successive reinspection. EE) FAILURE TO OBTAIN A PERMIT 1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit, the fees herein specified shall be four times the regular fee not to exceed $1000.00 for permits costing $250.00 and less. The penalty for failure to obtain a permit when one is required having a cost greater than $250.00 shall be two times the regular amount. The payment of such fee shall not relieve any person from fully complying with the requirements of any applicable construction code or ordinance in the execution CDES Financial Administration, rev 03/04/03 page 12 of the work, or from any penalty prescribed within any construction code, law or ordinance of Collier County. FF) LICENSING 1) The fee for licensing items is as follows: a. Letters of Reciprocity. $3.00 b. Contractors Change of Status. $10.00 c. Voluntary Registration of State Certified Contractors. d. Pictures. $2.00 e. Laminating $1.00 (per license) $10.00 GG) DUPLICATE PERMIT CARDS 1) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason. HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS 1) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $50.00. This fee includes the issuance of a new permit card. II) PERMIT FEE REFUNDS 1) If requested, in writing by the owner or his authorized agent, 50% of the fees charged, other than the application fee, may be refunded provided that a permit has been issued, construction has not commenced, and the refund is applied for prior to the cancellation of the permit. J J) RECORD RETRIEVAL 1) The fee for retrieving records from inactive or remote storage including microfilmed documents shall be a minimum of $15.00 or $3.75 per file whichever is greater. KK) COPY FEES 1) The fee for blueprint and miscellaneous copying shall be as follows: a. Microfilm copies, standard documents $2.00 each. b. Microfilm copies, of plan $5.00 each. c. Blueprint copies, size 24 X 36 $3.50 each, size 36 X 48 $5.00 each. d. Charges for reproducing a complete set of plans shall be $2.00 per page for 24 X 36 and $2.50 per page for 36 X 48. LL) RESEARCH 1) The fee for researching records, ordinances, and codes that are no longer current shall be $40.00 per hour with a one half hour minimum charge. 2) The fee for creating and designing special computer generated reports that are not a part of the regular standard reports shall be $25.00 per hour with a one half hour minimum charge. CDES Financial Administration, rev 03/04/03 page 13 101 MM) SUBSCRIPTION SERVICE The fee for one-year subscription service to be mailed quarterly shall be $15.00 per year. The subscription year is from Oct. 1 through Sept. 30. NN) ELECTRONIC DATA CONVERSION SURCHARGE 1) A surcharge in the amount of 3--% of the building permit application fee, with the minimum surcharge being $3.00 and the maximum being $150.00, will be applied to every building permit application submitted. A flat fee of $3.00 per permit will be charged for those permits for which an application fee is not required per item (M) of this Schedule. OO) REGISTRATION OF RENTAL DWELLINGS 1) The fee for registration of rental dwellings is as follows: a. Initial Registration Fee - $30.00 b. Annual Renewal - $20.00 c. Late Fee - $10.00 PP) FEE WAIVER PROCEDURES 1) Requests for fee waivers may only be approved by the Board of County Commissioners. Waiver requests for development review and building permit fees shall be submitted in writing directly to the appropriate Community Development & Environmental Services Division Staff, who will prepare an executive summary for consideration by the Board. Such requests shall include a statement indicating the reason for the fee waiver request and, if applicable, the nature of the organization requesting the fee waiver. QQ) ADDITIONAL FEE REFUND PROVISIONS 1) There will be no refund of Planning, Environmental, or Engineering related fees, except at the discretion of Department Directors in cases where applications have not yet been deemed sufficient for staff review, or such staff review has yet to begin. In no cases will there be refunds for pre- application fees, data conversion fees, appeals of administrative decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment. CDES Financial Administration, rev 03/04/03 page 14 Exhibit B - Fire Review and Inspection Fees A) Fire Plan Review Fees. Architectural Reviews: <= $120,000.00 > $120,000.00 <= $600,000.00 > $600,000.00 <= $1,200,000.00 > $1,200,000.00 Fire Sprinklers Fire Pumps Underground Fire Line Pre-Engineered Fire Suppression Sys. Fossil Fuel Storage Systems Hoods LP Gas Fire Alarms Standpipes Tents .57% of Job Value .054% of Job Value .079% of Job Value .034% of Job Value $50 + $.95 Per Head $275 Each $100 + $.20 Per Foot New - $65 + $20 Per Bottle of Suppression Agent Existing - $65 + $2 Per Added or Altered Head Install, Removal or Abandonment - $70 + $50 Per Tank $85 Each Install, Removal or Abandonment - $55 + $10 Per Tank Zoned Systems - $90 + $15 Per Zone Intelligent Systems - $90 + $.65 Per Device Monitoring Only - $100 Residential Systems - $50 Each $50 + $5 Per Riser $50 Per Tent Minimum Permit Fee Re-Review Fees $100 Unless Otherwise Listed Above 2nd Re-Review - 20% of Original Fee - $75 Min. 3rd Re-Review - 35% of Original Fee - $125 Min. 4th Re-Review - 60 % of Original Fee - $200 Min. 5th Re-Review - 100% of Original fee - $300 Min. 6th or Subsequent Re-Review 150% of Original Fee - $500 Min. 7th Re-Review - Notify Business and Professional Regulation B) Fire Code Compliance Inspection Fees: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) New ~ Remodels: Monitoring: HOODS All: BUILDINGS - Square footage is defined as the total area of the structure(s) under roof. Construction Types I, II, III, IV & V: New single story: $300.00 + $0.02 per square foot New multi story: $150.00 per floor, per tower + $0.02 per square ft Construction Type VI: All: $300.00 per floor + $0.03 per square foot Remodels & Alterations: All: $250.00 per floor, per tower + $0.15 per square ft FIRE SPRINKLERS New: $300.00 per floor, per tower + $0.65 per head Remodels: $200.00 per floor, per tower + $1.00 per head FIRE ALARM SYSTEMS $300.00 per floor, per tower + $0.65 per device $200.00 per floor, per tower + $1.00 per device $100.00 per system $200.00 + $1.00 per foot of duct SUPPRESSION SYSTEMS Total Flood & Pre-Engineered: $50.00 per bottle + $2.00 per head SPRAY BOOTHS (total square foot of booth) All: $0.50 per square foot UNDERGROUND FIRE LINES All: $100.00 + $1.00 per linear foot STANDPIPES All: $100.00 per independent riser FIRE PUMPS All: $300.00 each pump LP GAS INSTALLATIONS Above Ground: $50.00 per tank Under Ground: $100.00 per tank FUEL STORAGE INSTALLATIONS Above GroundS 100.00 per tank Under Ground $150.00 per tank HYDRANT RESTRAINTS All: $50.00 per restraint ALTERNATIVE WATER SUPPLY / DRAFT HYDRANTS All: $250.00 STREET NAME CHANGE 2 101 16) 17) 18) 19) All: $120.00 MISCELLANOUS & MINIMUM PERMIT FEE Fire Retardant: $100.00 each structure SpecialEvent Tent: $100.00 each Emergency Access / Electric Gates: $100.00 Minimum Permit Fee (not otherwise noted) $100.00 TIME SPECIFIC INSPECTIONS All: $75.00 each inspection - subject to availability OCCUPATIONAL LICENSE INSPECTIONS Inspection and one re-inspection: 2nd re-inspection: 3rd re-inspection: 4th re-inspection: 5th and subsequent re-inspections: YELLOW TAGS (re-inspections) 1st Fail; per unit $50.00 2nd Fail; per unit $75.00 3rd Fail; per unit $100.00 4th Fail; per unit $250.00 5th Fail & each subsequent fail $500.00 per unit RED TAGS (each incident) · Working without Permit Card on Site. · Safety violations on site. $75.00 $50.00 additional $75.00 additional $100.00 additional $200.00 additional · Combustibles on site without water supply (hydrants / approved alternative water supply). · Job sites inaccessible to fire apparatus. Working without Collier County Building Permit. EXCEPTIONS: 1) Structural permits for detached one and two family dwellings are exempt from fire prevention permit fees. 2) Permits that, in the opinion of the Fire Code Official, do not present a fire protection concern, i.e., swimming pools, concrete deck radio transmission towers, etc. shall be exempt from fire prevention inspection fees. *Note: Fire Districts may have additional fees, duly adopted by their local board of fire commissioners, for other various services such as open burning permits, fireworks display, etc. Please refer to the appropriate resolution of the fire district. 3 Exhibit C: Building Valuation Tables 101 BUILDING VALUATION DATA As a service to our members, SBCCI offers the following building valuation data for the Standard Building Code© and the International Building Code®. The building valuation data represents the current average construction costs per sq. ft. The average costs include structural, electrical, plumbing, mechanical, interior finish, normal site preparation (excavation and backfill for building), architectural and design fees, overhead and profit. When using this data, it should be noted that these are "average" costs based on typical construction methods for each occupancy group and type of construction. These figures should be adjusted as appropriate. Occupancies are divided into two categories: "good''6 and "average,''? to reflect the broad range of construction values. This data was compiled by SBCCI using the Marshafl Valuation Service as published by the Marshall and Swift Publication Company, Los Angeles, California. Note: Alabama is the base state for this table. Building Valuation Data produced Mamh 31,2002. Data in the tables must be multiplied by the appropriate regional modifier. STANDARD BUILDING CODE© Type of Construction4 Occupancy I II IV5 V5 VI5 1-HR UNP 1-HR UNP Assembl Auditorium - Good 131 126 101 64 62 100 96 66 62 - Average 96 93 73 45 42 72 68 46 42 Church - Good 127 122 103 89 87 102 98 81 92 - Average 93 90 75 65 63 74 70 70 66 Gymnasium - Good 104 104 83 76 73 82 78 79 75 - Average 77 77 61 54 52 60 56 57 53 Restaurant - Good 108 108 89 82 80 88 85 85 81 - Average 81 ,? 81 70 62 ,~ 59 69 65 66 62 Theater - Good 123 119 86 78 76 85 81 81 77 - Average 92 90 62 55 53 61 57 58 54 Business Office - Good 113 109 89 80 77 88 84 85 81 - Average 86 82 65 56 53 64 60 62 58 Research/Engineering - Good 72 69 63 57 55 62 58 59 55 - Average 53 51 45 39 37 44 40 41 37 Service Station - Good 108 104 87 85 82 86 82 72 68 - Average 98 94 73 70 68 72 68 61 57 Educational School - Good - Average 104 81 104 I 87 81 68 80 I 77 61 58 Factory4ndustrial - Good 44 - Average 30 29 33 27 Hazardous (Sprinkler System Included)4 Hazardous - Good - Average 46 32 43 3O 46 I 40 35 29 67 I63 I 64 I 60 36 25 32 30 26 38 27 34 I30 I I 28 101 Occupancy III Type of Construction4 iV= Vs VIs UNP UNP Institutional Convalescent Hospital - Good 139 135 106 89 87 105 N/P~ 101 N/Pt - Average 114 111 82 68 66 81 N/P~ 78 N/P~ Hospital N/Pi - Good 199 195 159 89 87 158 N/P~ 151 - Average 151 149 119 68 66 119 N/Pt 114 N/P~ MercanTile Department Stores - Good 89 87 76 56 54 75 71 59 55 - Average 68 67 62 43 40 61 57 46 42 Mall Stores - Good 102 102 74 67 64 73 69 70 66 - Average 83 83 61 54 52 60 56 57 53 Mall-Concourse - Good 80 80 59 56 54 58 54 58 54 - Average 63 63 46 43 41 45 41 45 41 Retail Store - Good 70 69 62 56 54 61 57 59 55 - Average 56 54 48 43 40 48 44 46 42 Apartments - Good 84 80 70 63 61 69 65 65 61 - Average 66 63 55 48 46 54 50 51 47 Dormitories - Good 99 97 84 77 74 83 79 78 74 - Average 77 75 65 58 56 64 60 61 57 Homesfor Eldedy - Good 100 98 88 82 80 87 83 85 81 - Average 79 77 68 62 60 67 63 65 61 Hotel - Good 105 102 89 68 66 89 85 84 80 - Average 82 80 76 50 48 75 71 71 67 Motel - Good 105 102 73 68 66 73 69 71 67 - Average 82 80 55 50 48 54 50 53 49 Single Family Residence3 - Good 90 87 77 70 68 76 72 70 66 - Average 68 65 57 51 49 56 52 52 48 Auto Parking Structure - Good 39 37 N/D2 N/D2 N/D2 N/D2 N/D2 N/D2 N/D2 - Average 30 29 N/D2 24 21 N/D2 N/D2 N/D2 N/D2 Private Garage - Good 39 37 45 37 35 44 40 41 37 - Average 30 29 36 29 27 35 31 32 28 Repair Garage - Good 48 45 48 38 36 47 43 42 38 - Average 35 33 36 28 26 35 31 32 28 Warehouse - Good 49 47 39 33 31 38 34 35 31 - Average 36 34 29 23 21 28 24 26 22 Notes: 1. N/P-Not permitted by code. 2. N/D-Insufficient data to determine average cost. 3. Unfinished basements $11.81/sq. ft. 4. For sprinklered buildings in other than hazardous occupancies add $1.75/sq. ft. 5. In Type IV, V, and VI, add $41,000 per elevator 6. A good building will normally have some components which are only average, but many will be better than average. A good building is well insulated to utility standards, with packaged or zoned air conditioning; and has more than the INTERNATIONAL BUILDING CODE® Type of Construction4 Occupancy I II ill A A B minimum code required plumbing fixtures, and lighting and electric outlets, with good quality fixtures, interior and exterior finishes, and carpets. 7. An average building has minimum model energy code insulation levels, with a forced air system, contains the minimum code required plumbing fixtures, lighting, electric outlets; and has average quality interior and exterior finish and minimum carpet. B V B Assemmy Auditorium - Good 131 126 64 62 100 96 101 66 62 - Average 96 93 45 42 72 68 73 46 42 Church 92 - Good 127 122 89 87 102 98 103 81 - Average 93 90 65 63 74 70 75 70 66 Gymnasium - Good 104 104 76 73 82 78 83 79 75 - Average 77 77 54 52 60 56 61 57 53 Restaurant - Good 108 108 82 80 88 85 89 85 81 - Average 81 81 62 59 69 65 70 66 62 Theater - Good 123 119 78 76 85 81 86 81 77 Average 92 90 55 53 61 57 62 58 54 Office - Good 113 109 80 77 88 84 89 85 81 - Average 86 82 56 53 64 60 65 62 58 Research/Engineering - Good 72 69 57 55 62 58 63 59 55 - Average 53 51 39 37 44 40 45 41 37 Service Station - Good 108 104 85 82 86 82 87 72 68 - Average 98 94 70 68 72 68 73 61 57 Educational School - Good - Average Factory4ndustrlal I Factory (light MGF) ~ - Good I - Average Hazardous (Sprinkler System Included)4 Hazardous - Good - Average 104 I 104 I 8O 77 81 81 61 58 44 30 42 29 38I 46[43140 38 32 30 29 27 36I 67 63 68 64 60 43 32 45 41 46 34 30 35 32 28 Occupancy A II 101 Type of Construction~ III V B B B Institutional Convalescent Hospital NIP1 - Good 139 135 89 87 105 N/Pi 106 101 - Average 114 111 68 66 81 N/P1 82 78 N/Pi Hospital 151 N/P~ - Good 199 195 89 87 158 N/Pi 159 - Average 151 149 68 66 119 N/Pi 119 114 N/P1 Mercantile Department Stores 55 - Good 89 87 56 54 75 71 76 59 - Average 68 67 43 40 61 57 62 46 42 Mall Stores 66 - Good 102 102 67 64 73 69 74 70 - Average 83 83 54 52 60 56 61 57 53 Mall-Concourse 54 - Good 80 80 56 54 58 54 59 58 - Average 63 63 43 41 45 41 46 45 41 Retail Store 55 - Good 70 69 56 54 61 57 62 59 - Average 56 54 43 40 48 44 48 46 42 I~esiclen~lal Apartments 61 - Good 84 80 63 61 69 65 70 65 Average 66 63 48 46 54 50 55 51 47 Dormitories 74 - Good 99 97 77 74 83 79 84 78 - Average 77 75 58 56 64 60 65 61 57 Homes for Elderly - Good 100 98 82 80 87 83 88 85 81 - Average 79 77 62 60 67 63 68 65 61 Hotel - Good 105 102 68 66 89 85 89 84 80 Average 82 80 50 48 75 71 76 71 67 Motel - Good 105 102 68 66 73 69 73 71 67 - Average 82 80 50 48 54 50 55 53 49 Single Family Residence3 - Good 90 87 70 68 76 72 77 70 66 - Average 68 65 51 49 56 52 57 52 48 Auto Parking Structure - Good 39 37 N/D2 N/D2 N/D2 N/D2 N/D2 N/D2 N/D2 - Average 30 29 24 21 N/D2 N/D2 N/D2 N/D2 N/D2 Repair Garage - good 48 45 38 36 47 43 48 42 38 - Average 35 33 28 26 35 31 36 32 28 Warehouse - Good 49 47 33 31 38 34 39 35 31 - Average 36 34 23 21 28 24 29 26 22 Occupancy Type of Construction* I II III A B B Utility and Miscellaneous Private Garage 40 45 41 37 - Good 39 37 37 35 44 - Average 30 29 29 27 35 31 36 32 28 Greenhouse N/D2 N/D2 N/D2 5.70 - Good N/D2 N/D2 11.90 N/D~ N/D2 N/D2 N/D~ 5.53 N/D~ N/D~ N/D~ N/D~ N/D2 3.71 - Average Notes: 1. N/P-Not permitted by code. 2. N/D-Insufficient data to determine average cost. 3. Unfinished basements $11.81/sq. ft. 4. For sprinklered buildings in other than hazardous occupancies add $1.75/sq. ft. 5. In Type II, III, and V, add $41,000 per elevator 6. A good building will normally have some components which are only average, but many will be better than average. A good building is well insulated to utility standards, with packaged or zoned air conditioning; and has more than the minimum code required plumbing fixtures, and lighting and electric outlets, with good quality fixtures, interior and exterior finishes, and carpets. 7. An average building has minimum model energy code insulation levels, with a forced air system, contains the minimum code required plumbing fixtures, lighting, electric outlets; and has average quality interior and exterior finish and minimum carpet. REGIONAL MODIFIERS (For use with SBC and IBC) ALABAMA 1.00 IDAHO Birmingham 1.05 Mobile 1.04 ILLINOIS Opelika 0.95 INDIANA ALASKA 1.67 iOWA ARIZONA 1.09 KANSAS ARKANSAS 0.97 Little Rock 1.03 KENTUCKY West Memphis 1.04 Covington New Port CALl FORN IA 1.27 LOUISIANA COLORADO 1.13 Baton Rouge Aspen 1.49 New Orleans Shreveport CONNECTICUT 1.25 MAINE DELAWARE 1.23 MARYLAND DISTRICT OF Baltimore COLUMBIA 1.19 MASSACHUSETTS FLORIDA 1.03 Jacksonville 1.03 MICHIGAN Miami 1.00 Orlando 1.09 MINNESOTA Tampa 1.08 MISSISSIPPI GEORGIA 1.02 Jackson Atlanta 1.11 Columbus 1.01 MISSOURI HAWAII 1.61 MONTANA 1.11 NEBRASKA 1.22 NEVADA TENNESSEE Knoxville Memphis Nashville 1.09 1.19 1.15 NEW HAMPSHIRE 1.09 TEXAS 1.16 NEW JERSEY 1.30 Amarillo Corpus Christi 1.06 NEW MEXICO 1.03 Dallas/Ft. Worth Gallup 1.17 El Paso 1.11 Taos 1.21 Houston 1.14 Victoria 1.14 NEW YORK 1.20 Waco Wichita Falls 1.02 NORTH CAROLINA 1.03 1.02 Charlotte 1.05 UTAH 1.04 Raleigh 1.06 1.02 VERMONT NORTH DAKOTA 1.13 1.11 VIRGINIA OHIO 1.14 Alexandria 1.13 Fredericksburg 1.21 OKLAHOMA 0.99 Richmond Oklahoma City 1.08 1.24 WASHINGTON OREGON 1.21 1.16 WEST VIRGINIA PENNSYLVANIA 1.17 1.20 WISCONSIN RHODE ISLAND 1.23 0.98 WYOMING 1.00 SOUTH CAROLINA 1.02 Columbia 1.03 1.09 Myrtle Beach 1.05 1.09 SOUTH DAKOTA 1.10 1.03 1.08 1.05 1.07 0.99 1.02 0.95 1.05 0.99 1.03 0.95 1.00 1.02 1.06 1.14 1.02 1.18 1.15 1.05 1.24 1.17 1.19 1.08