Loading...
Agenda 03/10/2009 Item #17B ,\C'snda Item r\Jo. 17B - March 10. 2009 ?age 1 of 54 EXECUTIVE SUMMARY CU-2008-AR-13661, Center Point Community Church, represented hy Matthew McLean, P.E., of Agnoli, Barber and Brundage and Doug Lewis, Esq., of Roetzel and Andress, is requesting a Conditional Use in the Estates (E) Zoning District for a youth ministry sanctuary with supporting offices and youth member social activities relating to the existing religious facility, as specified in Section 2.03.01.B.l.c.l of the Collier County Land Development Code (LDC). The 4.58-acre subject property is located in Tract 85, Golden Gate Estates, Unit 29, in Section 30, Township 49 South, Range 26 East, Collier County. Florida. OBJECTIVE: To have the Board of Zoning Appeals (BZA) consider the above-referenced application tor a Conditional Use of the Estates (E) Zoning District, as provided for in Section 2.03.01.B.l.c.1 of the Collier County Land Development Code (LDC) (Ordinance No. 2004-41, as amended), to permit a church facility; and to insure that the community's interests are maintained. CONSIDERATIONS: Located in the southeastem comer of the Golden Gate Parkway (CR 886) and 66th Street SW intersection, Center Point Community Church is an existing house of worship, which was granted Provisional Use (now called Conditional U,e) approval in 1977 by Resolution No. PU-77-3C. In 1991, a second resolution, No. 91-111, granted Provisional Use approval on the two parcels immediately cast of the church site for church-related facilities; however, as a condition of approval, any future expansions on the parcels were required to seek another, new Provisional Use. Because the Center Point Community Church would now like to construct an approximately 34,551 square-foot youth, worship and administration facility on the site, they are pursuing the requisite Conditional Use approval; and as part of the Conditional Use, would also like to incorporate a third parcel, adjoining the eastem boundary of the prior two in order to locate the site's stormwater management area, septic field, and required native preserve there. Presently the three subject parcels, cumulatively approximately 4.58 acres in area, arc occupied by two single-family dwellings, both of which are proposed for dcmolition. As shown on the Conceptual Site Plan (contained in Exhibit C of the attached resolution) entitled, "Center Point Community Church-Conditional Use Conceptual Site Plan," prepared by Agnoli, Barber and Brundage, Inc., and dated July 2008. as revised through January 28, 2009, vehicular access to the site would be provided from travel aisle connections to two existing access points on the church site's 66th Street SW trontagc, and from a single direct access point proposed along the subject propCI1y's 63'd Street SW frontage. Pedestrian access would be afCorded from a palhway connection to the existing six-foot wide sidewalk along Golden Gate Parkway. The proposed 34,551 square-foot building would be located along the western boundary of the subject propctiy, 58 feet east of the nearest building on the church site. It would be set back a minimum of III feet trom Golden Gate Parkway and 268 feet from 63,d Street SW (its two front yards); and set back CU-2007-AR-13661 Page I of 5 !U:'iTl riD. i (' 8 !1''!:;;lrc;h ~O, 20U9 Fl8;i8 2 ,')f :;.4 230 feet from the site's eastern boundary, its only side yard. These setbacks would far exceed the standards of the E Zoning District, which require 75-foot and 30-foot setbacks, respectively. The structure would be two-story, with a maximum height of 30 feet, as prescribed by the E Zoning Disllict. Parking spaces would surround the building's northern, eastern and southern sides. Along the length of the subject property's eastern boundary, where it abuts a single-family use parcel, a 0.78-acre stormwater management area, 0.38-acre septic lleld and 0.59-acre native preserve would be located in order to further separate the proposed building from the neighboring home. A IS-foot Type B buffer would form a transitional screen along this boundary, and a minimum six-foot high masonry wall or fence would also be required. The remaining perimeter landscaping would be comprised of Type D buffers, 15 feet in width along Golden Gate Parkway, reduced to 10 feet in width along 66lh Street SW and 63,d Street SW, as required by the LDC. FISCAL IMPACT: The proposed church facility, in and of itself, would have no llscal impact on Collier County. There is no guarantee that the project, at build out, would maximize its authorized level of development, however, if the Conditional Use were approved, a portion of the existing land would be developed and the new development would result in an impact on Collier County public facilities. The County collects all applicable impact fees before the issuance of building pem1its to help offset the impacts of each new development on its public facilities. These impact fces are used to fi.md projects identilled in the Growth Management Plan's (GMP) Capital Improvement Element (CIE) needed to maintain adopted Levels of Service (LOS) for public facilities. Additionally, in order to meet the requirements of Section 10.02.f17(C) of the Land Development Code, 50 percent of the estimated Transportation Impact Fees associated with the project are required to be paid simultaneously with the approval of each final local development order. Other fees collected before the issuance of a building permit include building permit review fees. It should be noted that the inclusion of impact fees and collected taxes are for inforn1ational purposes only, and they are not included in the criteria used by staff and the Planning Commission to analyze this petition. GROWTH MANAGEMENT PLAN (GMP) IMPACT: Future Land Use Element (FLUE): The subject propeliy, as identified on the Future Land Use Map of the Golden Gate Area Master Plan (GGAMP), is within the Estates- Mixed Use District, Conditional Uses Subdistrict land use designation. The Conditional Uses Subdistrict in the Estates - Mixed Use District contains specific provisions for Conditional Uses in Golden Gatc Estates, including Conditional Uses on Golden Gate Parkway. The relevant portions of that provision arc below: . Recogni:=ing the existing residential nature (!( the land lIses surrounding the 1-75 interchange at Golden Gale ParA'11'ay, there shall be no fitrlher conditional uses .fc)r propertil's abutting Go/den Gate l'arhvay. hetvticen Lil'ingsfon Road and San/a Barbara Boulevard. except os pennftffd 1-1'i!l1in the Golden Gate Parkv.'ay Institutional Subdisfrict,' CU-2007-AR-13661 Page 2of5 :::\J::::lja ~tei1l lb. 178 f'v1sr::::h 10, 2J09 F'ag'93 of 54 and, except as provided in suhparagraph 1., helovv,. and, except for essential services, as dc.<.,'crihed in paragraph a), abOl'c. . Further, no properties abutting streets accessing Golden Gate Parhvo..v, between Livingston Road and Santa Barbara Boulevard, shall he approved for conditional uses except as permitted within the Goldcn Gate Parkway Institutional Subdistrict; and, except as provided in subparagraph J.. helow," and, except for essential sen.'ices, as described in paragraph a), above. 1, In consideration (?fthe improvements assnciated vFith the interchange at Interstate 75 and Golden Gafe Park-t.vay, the existing conditional use (church and related facilities) located at the southeast cornel' of Goldell Gate Parkway alld 66" Street S, W. may be expallded ill acreage and illtellsity alollg the south side of Goldell Gate Parkway to the east of 66" Street S. /f~, but the total p/'Oject area shall IIOt exceed approximately 9.22 acres (see Golden Gate Parklwy Interchange Conditional Uses Area Map) [emphasis added]. The subject propelty combined with the area of the existing church site comprises the 9.22 acres cited above. In addition, FLUE Policy 5.4 requires new land uses to be compatible with the surrounding area. The Zoning staif is charged with making that determination, pursuant to the criteria set forth in the LDC, in terms of the appropIiateness of the requested uses/densities on the subject site; a review of both the subject proposal and surronnding or nearby properties with regard to the allowed use intensities and densities; development standards (building heights, setbacks, landscape buffers, etc.); building mass; building location and orientation; architectural features; amount, type and location of open space; traffic generation/attraction, et cetera. Finally, in order to promote "smart growth" policies and adhere to the existing development character of Collier County, new development and redevelopment projects must implement policies 7.1 through 7.4 of the GMP. The proposed project fulfills the ohjectives of these policies. Based upon the above analysis, staff concludes that the proposed Conditional Use may be deemed consistent with the GGAMP. Transportation Element: The TranspOltation Services Department has reviewed the applicant's TraffIc Impact Statement (TIS) and has found the site-generated traffic to be consistent with Policies 5.1 and 5.2 of the Transportation Element of the GMP. However, as a condition of approval, has required that the church employ a police presence to control Sunday (or Saturday) peak-hour traffic. The southhound left-in at the project's northerly dIiveway would also need to be closed, either by a ban-icade or the police, during SWlday and/or Saturday peak-hours in order to prevent vehicles from queuing onto Golden Gate Parkway. The TIS did not analyze weekday school activities or dayeare, so such activities have been prohibited in the Conditions of Approval (Exhibit C to the resolution). AFFORDABLE HOUSING IMPACT: Approval ofthis Conditional Use would have no affordable housing impact. ENVIRONMENTAL ISSUES: The Environmental Services Department has reviewed this petition and has recoIfnnenued approval. CU-2007-AR-13661 Page 3 of5 ,!\aenda li2rYi r-.J::J. 1-78 .~ M8rc,h i O. 2009 .4- of 54 ENVIRONMENTAL ADVISORY COUNCIL (EACl RECOMMENDA TION: Pursuant to LDC Section 8.06.03 0.1 Powers and Duties, the EAC did not review this petition because no protected species or wetland impacts were identified on the site. However, as noted, the Environmental Services Department has reviewed this petition and has found no environmental issues associated with it. COLLIER COUNTY PLANNING COMMISSION (CCPCl RECOMMENDATION: The CCPC heard this petition at their February 19, 2008 meeting, and voted 9-0 to forward it to the BZA with a recommendation of approval. subject to the following conditions: I. The Conditional Use is limited to what is shown on the Conceptual Site Plan, identified as "Center Point Community Church-Conditional Use Conceptual Site Plan," prepared by Agnoli, Barber and Brundage, Inc., and dated July 2008, as revised through January 28, 2009. The site plan noted is conceptual in nature for Conditional Use approval only. The final design must be compliance with all applicable federal, state, and county laws and regulations. 2. The maximum area of the proposed building shall be limited to 34,551 square-feet of floor area, as defined in LDC Section 1.08.02. 3. The church shall provide traffic control by law enforcement or a law enforcement- approved service provider for Saturday and/or Sunday, as applicable, peak hour traffic at loeation(s) to be determined by the law enforcement or law enforcement-approved service provider. 4. The southbound left-in at the project's northerly driveway may be closed dUling Sunday and/or Saturday peak-hours, as deemed necessary by law enforcement or the law enforcement-approved service provider, to maintain efficient vehicular traffic flow on public roadways. This shall be accomplished either by a baITicade or by the law enforcement or law enforcement-approved service provider, as authorized by Collier County. 5. Irrespective of that shown on the Conceptual Site Plan, the property owner shall provide a five-foot wide pedestrian connection to the site from the existing six-foot sidewalk along Golden Gate Parkway, with thc cxact location to be detemlined by the County TranspOliation Planning Depm1ment at the lime of Site Development Plan (SOP) review and approval, pursuant to the requirements of the LDC. 6. Prior to SDP approval, a build-in-Iieu contribution shall be made by the property owner to the County for the otherwise required sidewalks within the abutting 66th Street SW and 63rd Street SW lights-of-way. 7. No schools (821 I) or daycares (8351) shall be pennitlcd on the site, except those accessory uses customarily associated with church uses. CU-2007-AR- I 3661 Page 4of5 ItSin r'Jo. 11B f'AgrcI110. 20[:9 P.:':~:8 5 Df 54 8. Any SDP for the site submitted to Collier County for review and approval shall be a unified plan that includes the Center Point Community Church site, previously approved hy PU 77-3-C. 9. In lieu of a masonry wall or fence, an enhanced Type B huffer shall be provided, which shall consist of an alternating double hedgerow instead of a single hedgerow. Because this item received a unanimous recommendation of approval and the only letter of objection received from the community was rescinded, this petition has heen placed on the BZA's Summary Agcnda. LEGAL CONSIDERATIONS: Before you is a Conditional Use for a church in the E Zoning District. A Conditional Use is a use that is pern1ilted in a pm1icular zoning district subject to certain restrictions. Decisions regarding Conditional Uses are quasi-judicial, and as such, require ex pm1e disclosure. FUl1hermore, all testimony given must be under oath. The attached report and recommendations of the Planning Commission required are advisory only and m'e not binding on you. The petitioner has the burden of demonstrating that the necessary requirements have been met, and you may question the petitioner, or staff, to satisfy yourself that the necessary criteria has been satisfied. In addition to meeting the neeessm'y criteria, you may place such conditions and safeguards as you deem appropriate to allow the use, provided that there is competent, substantial evidence that these additional conditions and safeguards are necessary to promote the puhlic health, safety, welfare, morals, order, comfort, convenience, appearance, or the general welfare of the neighborhood. As a fUl1her condition of approval of the Conditional Use, you may require that suitable areas Jell' streets, puhlic rights-of-way, schools, parks, and other public facilities he set aside, improved, and/or dedicated for public use, subject to appropriate impact fee credits. Approval or denial of the petition is by Resolution, with approval ofthe Conditional Use requiring Jemr af1irmative votes of the Board. -STW RECOMMENDA nON: Staffreeommends that the Board of Zoning Appeals approve petition CU-2008-AR-13661, subject to the conditions recommended hy stafT and the CCPC, contained in the attached resolution PREPARED BY: John-David Moss, AICP, Principal Planner Department of Zoning & Land Development Revicw CU-2007-AR-J366l Page 5 01'5 AGtf>l't5!Ai'l'jt1l,N;\ klq,; 178 , March -1 0, 2009 Page 6 of 54 Co~r County STAFF REPORT TO: COLLIER COUNTY PLANNING COMMISSION FROM: DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW COMMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES DIVISION HEARING: FEBRUARY 19, 2009 SUBJECT: PETITION CU-2008-AR- I 3661, CENTER POINT COMMUNITY CHURCH PROPERTY OWNER/AGENT: Owner: Center Point Community Church of Naples, Inc. 6590 Golden Gate Parkway Naples, FL 34!O5 Agents: Matthew McLean, PE AgnoIi, Barber and Brundage, Inc. 7400 Tamiami Trail North Naples, FL 34 I 05 Doug Lewis, Esquire Roetzel and Andress Trianon Centre, 3rd Floor Naples, Florida 34103 REQUESTED ACTION: To have the Collier County Plalllling Commission (CCPC) consider an application for a Conditional Use of the Estates (E) Zoning District, as specified in Subsection 2,03.01.B.1.c.1 of the Collier County Land Development Code (LDC), to allow a church facility. GEOGRAPHIC LOCATION: The approximately 4.58-acre subject parcels are located on the sonth side of Golden Gate Parkway (CR 886), between 66th Street SW and 64th Street SW, in Section 30, Township 49 South, Range 26 East, CoHier County, Florida (see the location map on the following page). PURPOSE/DESCRIPTION OF PROJECT: Located in the southeastern eorncr of the Golden Gate Parkway (CR 886) and 66th Strcct SW intersection, Ccnter Point Community Church is an cxisting house of worship, which was granted Provisional Use (now called Conditional Use) approval in 1977 by Resolution No. PU- CU-2008-AR-13661 Page 1 019 C00"l7 r--O:.n ...-0,,- .N 0 o ~c- Z;::W :::,....cn -- m ~ED... -m ~2 " (\) 0> <{ , - " "w ~--1 -- . " w Z ~ --------- 3S00H8rllJ SJJ:>MrSJld'l'N and -;s}== w- >--l< <no D ~ . . MS lJ}illS 41t9 . N illS U3l!l.S 'll"9 ~:f u' w m C\l ::> i! MS 133lUS'II99 -r o , . ~ liS. nl~JJS 4199 -1 ~ w ==-==.=:]: " g '""'-"'<>l ''''' / - E- Qt<V'....lr)OO lIJ,,~) .,"'U,) I , ~ . .>- ~ ~~ . ---;;,-J 'I ~ ~~ <5 ~> !J - .. (!) '" ",.".~...'~ "< !j t; z :.- w 2 ~i< "~w,~""oa Y~"'''''''I Vj~'~ 0 0 ~g II I II , i ,I It , '! :, I ~l lr , 'I I 0... II , III <{ 2: !' ![ Z . ~ I ~ 0 i' - . l- ., , ,. I!~ <{ ! OWllIW>'II ^UOIXJ 0 ~," SI ! , ~l ! . :l ~ oW l .'1 b ~ ! I ! w ,- " Cl , ;:I~~ . Iii , . ii' I " If r ~5 ~ g" 'i ~ i I ! m....^~:""c~ ~ -_..::>< ! , " 1 :l;.; 1- l:;fio;! ,- ~ , ~i' t;-- , ..., :::rr-- ~~f.,y ___J___~ I' '1 .! !'j ! ! l,_ , 'I Ii. l ,- I --~ ~! j, . !<~ !! '.. ," I l' - i~ 1W-[ " Ii !(~]'] i r+-i \ o.ou O~,I:,:.~IK>oJU'" ~ ) . _ i~i . .1. bi~ - 0... <{ 2: C) Z Z o N ~ "' co '" 0: , "' '" '" N '" U " Z o f-- f-- W "- '~~---"'--'----'- " . . ! I I 'I' I., i ~ . ~ l " , '1 I I~. ['I -ll ! .[1 , [: ~ , 111~!11 i I:~'hdi I ! ~ ~J I h !q, ' ~ ! 'Ull !"~ ~ if! -. " ]~ ? l!lll'! '11i~ II! i ' 'I Ii! r. ~ .:!~J, ~11!1~1, IIi, fl~ii I~ j I h ! i fliM1 1111!i!flllll IIi I il I If! III .,I!r Ill! ~ i 1 1,. ~ I ~ ~ ~, ~IJ j I ~ ~ i I " h; , . . . . ~~-I ! ._.-i;,!--.-r!,-.::5';;;~~"._---.-;;i'~-' 1 ) . .Ii 'I' Iii! ii HI 'I' !Ii ;'i ::1 !il 'i' i;! 'I' :11 iii J .. !!II~, iiJp': ~ :ill~'---'-"-"-"- -- --_.-- . ...-----..-..-{ ...... ili :11 ;::; :.: 1;1 r..-- ,..-, ~ "1'-: -- , II i 1 ~ -rT1 ~~-ll- I"'. ill:: ~~."il~ !-I-l p.;~ ...... ill I : / .~~ = 0\ f:J Iii: : ~~. '-' <~!: t1'J)) I~ ~ ~ ill h; ...!..- .-.. -..-..-.. ..-.. ("7"-"-"-" I [~ I 5 !i~1 I~! ~ r ~ I , o i III 2 ~~ "I ! o i, !l: ~" % I :1 i i i ~~, ~ ! it! I i \Ii ,,-.., I 1:1 . =:,~ I, Iii I : ,,' ~ . :: I : <} t - ;;;;2 i !ill i =: r-- I ['i II i S 1"-' " '.1, ~ ! :;! i : ~ I i \(]Ii! ~-' '. \:1 \ ( i i : l\, Ii.... :: n '" ,: i '\\! .L:.:.~=--.._.____._.,:,::,:~JL-J_~lbc~_~!CCf-i,;r,,~!...._~._-. - 'tH:! j -.----:: .... n..m-=:'J! CJ~! ";;;sisiii99 .- . ""=-::.-:------=~.=:~~""~W ,':...' ~ - f'AAKl"61\Rt.A LJ v. ---r 'i r:N III ~. t .~ let: :."i :~ !~ hi ii. m~ ~ 3 .0.. f.L1 f-i >-< Ul ~ 8 0.. ~ Z o U f.L1 Ul ~ ~ >-< f-< >-< o z o u ::r; u ~ u >-< f-< ; o U f-i Z >-< o 0.. ~ f.L1 f-< Z f.L1 U Item 1'10. 178 ~'v'~arch 10, 2009 ?age 9 of 54 77-3C In 1991, a second resolution, No. 91-111, granted Provisional Use approval on the two parcels inU11ediately east of the church site for church-related facilities; however, as a condition of approval, any future expansions on the pm-cels were required to seek another, new Provisional Use. Because the Center Point Community Church would now like to construct an approximately 34,551 square-foot youth, worship and administration facility on the site, they are pursuing the requisite Conditional Use approval; and as putt of the Conditional Use, would also like to incorporate a third parcel, adjoining the eastern boundary of the prior two (as seen in the aerial photograph below), in order to locate the site's stormwater management area, septic field, and required native preserve there. Presently the subject parcels, cumulatively approximately 4.58 acres in area, are occupied by two single-fanlily dv./cllings, both of \vhich are proposed for demolition. Aerial View of the Site As shown on the Conceptual Site Plan on the preceding page, entitled, "Center Point Community Church-Conditional Use Conceptual Site Plan," prepared by Agnoli, Barber and Brundage, Inc., and dated July 2008, as revised through January 28, 2009, vehicular access to the site would be provided from travel aisle connections to two existing access points on the church site's 6611, ~trect SW fi'ontage, and from a single direct access point proposed along the subject pl'opelty's 63rd Street SW frontage. Pedestrian access would be afforded from a pathway connection to the existing six-foot wide sidewalk along Golden Gate Parkway. The proposed 34,551 square-foot building would be located along the western boundary of the subject property, 58 feet east of the nearest building on the church site. [t would be set back a minimum of 111 feet from Golden Gate Parkway and 268 feet from 63rd ~treet SW (its two front yards); and set back 230 feet from the site's eastern boundmy, its only side yard. These setbacks would far exceed the standards for the E Zoning District, which require 75-100t and 30-foot setbacks, respectively. The structure would be two-story, with a maximum height of 30 feet, as prescribed by the E Zoning District. Parking spaces would surround the building's northern, eastern and southern sides, Along the CU.2008.AR,13661 Page 2 of 9 Aoenda Item No. 178 " March 10, 2009 Page 10 of 54 length of the subject property's eastern boundary, where it abuts a single-family use parcel, a O.78-acre stormwater management area, 0.38-acre septic field and 0.S9-acre native preserve would be locatcd in order to further separate the proposed building from the neighboring home. A IS-foot Type B buffer would form a transitional screen along this boundary, and a minimum six-foot high masonry wall or fence would also be required. The remaining perimeter landscaping would be comprised of Type D buffers, IS feet in width along Golden Gate Parkway, reduced to 10 feet in width along 66th Strcct SW and 63rd Street SW, as required by the LDC. SURROUNDING LAND USE & ZONING: North: Golden Gate Parkway, then single-family home and vacant lots within the E Zoning District Sin lIe-family home within the E Zoning District 63' Street SW, then single-family homes within the E Zoning District Center Point Community Church within the E Zoning District East: South: West: GROWTH MANAGEMENT nAN (GMP) CONSISTENCY: Future Land Use Element (FLUE): The subject property, as identified on the Future Land Use Map of the Golden Gate Area Mastel' Plan (GGAMP), is within the Estates - Mixed Use District, Conditional Uses Subdistrict land use designation. The Conditional Uses Subdistrict in the Estates - Mixed Use District contains specific provisions for Conditional Uses in Golden Gate Estates, including Conditional Uscs on Golden Gate Parkway, The relevant portions of that provision arc below: . Recognizing the existing residentialnatul'e of the land uses surrounding the 1-75 interchange at Golden Gate Parkway, there shall be no further conditional uses for properties abutting Golden Gate Parkway. between Livingston Road and Santa Barbara Boulevard. except as permilled within the Golden Gate Par!cw(,y Institutional Subdistrict; and, except as provided in subparagraph 1" below; and. except for essential services. as described in paragraph a). above. . Further, no properties abutting streets accessing Golden Gate Parkway, between Livingston Road and Santa Barbara Boulevard, shall be approved for condilionaluses except as permitted within the Golden Gate Parkway Institutional Subdistrict; and, except as provided in subparagraph 1., below; and, exceptfor essential services, as described in paragraph a), above. 1, In consideration of the improvements as.mciated wilh the interchange at Interstate 75 and Golden Gate Parkway. the existing conditional Ilse (church and related jilcililies) located at the soulheast earlier of Goldell Gille Parkway and 66'" Streel S. W. IIUlY he expanded in acreage and llItellsity along the sOlllh side of Goldell Gate Parkway to the east of 6fi" Slreet S. w., hili the total project areashalll/ot exceed approxl11l11tely 9.22 acres (.,ee Golden Gate Parkway interchange Condilional Uses Area Map) [emphasis added]. The subject property combined with the arca of the existing church site comprises the 9.22 acres noted above, In addition, FLUE Policy 5.4 requires new land uses to be compatible with the sUlTOunding area, Comprehensive Planning leaves tlus determination to 7.oning and Land Development Rcvic\v staff as part of their review of the petition in its entirety, but notes that in reviewing the appropriateness of the requested usesldensities on the subject site, the CU.2008.AR.13661 Page3af9 Agenda item No. 178 r,l1arch 10. 2009 Page 11 of 54 compatibility analysis is to be comprehensive and include a review of both the subject proposal and sun'ounding or nearby propelties with regard to allowed use intensities and densities, development standards (building heights, setbacks, landscape buffers, etc.), building mass, building location and orientation, architectural features, amount and type of open space and location, traffic generation/attraction, et cetera. 111 order to promote "smart growth" policies, and adhere to the existing development character of Collier County, the following policics shall be implemented for new development and redevelopment projects, where applicable. Policy 7.1 The County shall encourage developers and propcrty owners to connect their propclties to fronting collector and arterial roads, except where no such connection can be made without violating intersection spacing requirements of the Land Development Code. (StalfComment: As depicted on the conceptual site pian, the project has access onto Golden Gate Parkway through two access poinls on 66th Street SW.) Poliey 7.2 The County shall encourage internal accesses or loop roads in an effort to help reduce vehicle congestion on nearby collector and arterial roads and minimize the need for traffic signals. (StajJ Comment: As depicted on the conceptual site plan, the project maintains two access points ji'om 66th Street SW for both ingress/egress thai connect to Golden Gate Parkway. The conceplual site plan also indicates that there will be an additional access point along 63rd Street to fi/rther improve ingress/egress.) Policy 73 All new and existing developments shall bc cncouraged to cOlmect their local streets and thcir intercolUlection point with adjoining neighborhoods or other developments regardless of land use type. (StajJComment: As depicted on the conceptual site plan, Ihe pnJject provides connections to adjacent properties.) Policy 7.4 The County shall encouragc new developments to provide walkable communities with a blend of densities, common open spaces, civic facilities and a range of housing prices and types. (Staff Comment: As depicted 011 the conceptual site plal1, there is a six:{oot pedestrian sidewalk fi'011lil1g the l10rthern property bOlll1dalY along Golden Gate Parkway. Pedestrian improvements per the LDC will also be included infuture development plansfor the property.) Based upon the above analysis, staff concllldes that the proposed Conditional Use may be deemed consistent with the GGAMP. TransPoltation Element: The Transportation Services Departmcnt has reviewed the applicant's Traffic Impact Statement (TIS) and has found the site-generated traffic to be consistent with Policies 5.1 and 5.2 of thc Transpor[alion Element of the GMP. Howcver, as a condition of approval, has reqU1rcd that the church employ a police presence to control Sunday (or Saturday) peak-hour traffic. The southbound left-in at the project's northerly driveway would also need to be closed, eithcr by a barricade or thc police, during Sunday and/or Saturday peak-hours in order CU.2008.AR.13661 Page 4 of 9 Agenda Item No. 178 March 10. 2009 Page 12 of 54 to prevent vehicles from queuing onto Golden Gate Boulevard. The TIS did not analyze weekday school activities or daycare, so such activities have been prohibited in the Conditions of Approval (Exhibit C to the resolution). ANALYSIS: Before any Conditional Use recommendation can be offered to the Board of Zoning Appeals (BZA), the Planning Commission must make findings that: 1) approval of the Conditional Use will not adversely affcct thc public interest; and 2) all specific requirements for the individual Conditional Use will be met; and 3) satisfactory provisions have been made concerning tllC following matters, where applicable: 1. Consistency with the Land Development Code and the Growth Management Plan. The proposed expansion of the existing church facility is consistent with the provisions of the Golden Gate Area Master Plan (GGAMP) of the Growth Management Plan. Tn addition, churches/places of worship are allowed as Conditional Uses in the E Zoning District of the LDC. With the conditions of approval recommended by staff, this petition may be found consistent with all of the applicable provisions of the GMP and the LDC. 2. Ingress and egress to the property and proposed structures tbereon, witb partieular refer'ence to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of firc or catastrophe. Transportation Planning staff has reviewed this petition and determined that ade~uate access to and ii'om the propelty would be provided from its direct access point on 63' Street SW and from the church's two existing access points on 66th Street SW. Although the applicant has proposed to build sidewalks elsewhere in the community in-licu of constructing those required within the abutting rights-of-way, pedestrian access to the site would be provided by a connection to the existing six-foot sidewalk along Golden Gate Parkway. Since the exact location of this pedestrian connection has not been specified on tile conceptual master plan, staff has includcd a condition of approval requiring its depiction at the time of site development plan review and approval. Staff has also added a condition of approval requiring the chlll'ch to provide Jaw enforcement (or a law enforcement-approved service provider) to aid in controlling traffic during services and other evcnts of significant traffic generation at any location to be determined necessary by the Collier County Transportation Administrator or his designee. 3. The effect the Conditional Use would bave on neighboring propertics in relation to noise, glare, economic or odor effects. As previously noted, the proposed building would be separated from the neighboring residential use to its north and south by roadways, and fi'om the single-family home parcel to its east by a generous 230-foot setback yard containing the site's stormwater management area, septic field and nativc preserve. In addition, the standards of the LDC would require the provision of vegetative buffcrs around the entire church site's pcrimeter, and a masomy wall or fcnee along the subject property's eastern boundary to reduce the potential impact of noisc and glare on the home located thcre, pursuant to Section 5.03.02.E, Fences and Walls, of the CU-200B-AR-13661 Page 50f9 Agenda Item No. 178 March 10, 2009 Page 13 of 54 LDC, As such, impacts on the surrounding properties would he minimized. However, it should be noted that the applicants have expressed their intent to seek an administrative waiver of the wall requirement at the time of site development plan (SDP) review and approval, as the affected homeowner is repOliedly suppOliive of a chain-link fcnce. Nevertheless, staff will evaluate the appropriateness of the waivcr for the dfects of light and noise at the time the administrative variance is submitted. 4. Compatibility with adjaccnt properties and other property in the district. As previously noted, the house of worship has been in existence since the late 1970s. Furthermore, the proposed building would be separated iI'om the neighboring single-family home parcel by a minimum distance of over 230 feet, and further buffered following the installation of appropriate transitional scrcening and a six-foot high masonry wall or fence (unless an administrative waiver for the wall is granted because of mitigating factors). Because of its location, the limited nature of the proposal, and the provision of the required buffers and wall or fence, any impacts on the surrounding neighbors would be minimized and compatibility insured, as required by Policy 5.4 of the FLUE. ENVIRONMENTAL ADVISORY COUNCIL (EAC) RECOMMENDATION: Pursuant to LDC Section 8.06.030.1 Powers and Duties, the EAC did not review this petition because no protected species or wetland impacts were identificd on the site. NEIGHBORHOOD INFORMATION MEETING (NIM): (Synopsis provided by Cheri Rollins, Administrative Assistant) The meeting was duly noticed by the applicant and held on October 27, 2008 at 6:00 p.m, at the Center Point Community Church. Twelve people from the public attended, as well as the applicant's team comprised of Doug Lewis from Roetzel & Andress and Matt McLean from Agnoli, Barber & Brundage. Mr. Lewis presented an overview of the request to construct a two-story, approximately 34,551 square-foot youth, worship and administration building in the present location of the church's parsonage. Residents expressed concern regarding the increased tramc the new building would generate on 63rd Street, as they claimed it was already congested and a new access driveway from the site would only exacerbate this situation. They also favored the installation of a traffic signal at the intersection of 66th Street and Golden Gate Parkway (or a right-turn only), and suggested that a police officer be assigned to direct traffic at the intersection if no signal was installed. The petitioners explained that the Collier County Transportation Department would require them to conduct a traffic study to detelwine jf a traffic signal would be necessary at that intersection. Several residents expressed concern about drainage issues the project might cause. One owner claimed that the swales along 66'h Street SW were already not functioning properly (see Appendix 3); however, in an email to the applicant, the propeliy owner to the immediate east, who would end up sharing a boundary with the proposed facility if it were approved, statcd that water from the church site already sheet flows across her yard. Thc petitioners responded by stating that they would have to work within the South Florida Water Management District CU.200B.AR.13661 Page 6 of 9 Aaenda Item No. 178 ~ March 10, 2009 Page 14 of 54 regulations at the time of site development plan review, but believed that the proposal would help the overall drainage issues. Mr. McLean added that he would be more than willing to mcct with homeowners to see what the project might do to ameliorate the area's drainage issues. Finally, some residents complained that the proposed building was essentially a "commercial building" that, if approved, would set a precedent for the conversion of their residential neighborhood into a commercial area. The adjoining property owner to the east made a point to register her opposition to the project because she did not want a 3D-foot tall "commercial" structure next to her house. However, the applicant has since informed staff that a subsequent meeting \.vas held \vith this resident in \.vhich it \.vas revealed that she erroneously believed that the proposed building would be located along her property's boundary. Now understanding that the building will be set back 230 feet from the property boundary, she is rcportedly suppOltive of the project. The meeting ended at approximately 7:15 p.m. Staff has received two letters of SUPPOIt fi'om the Golden Gate Area Civic Association and the Golden Gate Estates Area Civic Association, which have been attached to this report as Appendices 1 and 2, respectively. RECOMMENDA nON: Staff recommends that the CCPC forward Petition CU-2008-AR-13661 to the BZA with a recommendation of approval subject to the following conditions: I, The Conditional Use is limited to what is shown on the Conceptual Site Plan, identified as "Center Point Community Church-Conditional Use Conceptual Site Plan," prepared by Agnoli, Barber and Brundage, Inc., and dated July 2008, as revised through January 28, 2009. The site plan noted is conceptual in nature for Conditional Use approval only. The final design must be compliance with all applicable federal, state, and county laws and regulations. 2. The maximum area of the proposed building shall be limited to 34,551 square-feet. 3. The church shall provide traffic control by law enforccmcnt or a law cnforcement- approved service provider for Saturday and Sunday peak hour traffic at location( s) to be dctermincd and to he based on need; subject to the approval of the Collier County Transportation Administrator or his designee. 4. The southbound left-in at the project's northerly driveway shall be closed during Sunday and/or Saturday peak-hours to provide adequate vehicular storage capacity for traffic entering the site fi'om queuing on Golden Gate Boulevard. This shall be accomplished either by a barricade or by law enforcement or a law enforcement-approved service provider, as authorized by Collier County, 5. Irrespective of that shown on the Conceptual Site Plan, the property owner shall provide a five-foot wide pedestrian connection to the site fi'om the existing six-foot sidewalk along Golden Gate Parkway, with the exaet location to be determined by the County CU-2008-AR-13661 Page 7 of 9 Agenda Item No. 178 iVlarch 10. 2009 Page 15 of 54 Transportation Plmming Department at the time of Site Development Plan review and approval, pursuant to the requirements of the LDC. 6. Prior to Site Development Plan approval, a build-in-licu contribution shall be made by the property owner to the County for the otherwise required sidewalks within the abutting 66th St SW and 63rd Strcet SW rights-of-way. 7. No schools (8211) or daycm-es (8351) shall be permitted on the site, cxccpt those accessory uses customarily associated with church uses. ATTACHMENTS: Exhibit A: Findings of Fact Appendix 1: Golden Gate Area Civic Association lettcr Appendix 2: Golden Gate Estates Area Civic Association lcttcr Appendix 3: Residcnt's cmail regarding stormwater CU-200B-AR-13661 Page 8 of 9 i\genda item No. 178 r,1alTh 10. 2009 Page 16 of 54 PREPARED BY: / Ll-3 J O~l_~ JOHN- VID MOSS, AICP, PRINCIPAL PLANNER DATE ~ DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW REVIEWED BY: ~ ~;!I} / (" k :'/?11,::~=- ___ -1 ! () 01 RAY ~BELLOWS,ZONINGMANAGER / ~TE DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW x1-A 1 A-k~ Y--h. /-;' te/)~ ~-/ zJp 9 SltsANM-.IsTENES, AICP, DIRECTOR DATE DEPARTMENT OF ZONING AND LAND DEVELOPMENT REVIEW ~ 7. w ~_____ STEVEN T. WILLIAMS ASSISTANT COUNTY ATTORNEY _.2:._:;L..Q'L_.____ DATE AI}PR~~~~~ :y: ~ ~___ J( S ~PH K. SCHMITT, ADMINISTRATOR o MUNITY DEVELOPMENT AND VIRONMENTAL SERVICES DIVISION ..z../;2./o1 . , DATE Collier County Planning Commission: .\ 1 I J At-- 1/ j I [<<.....L" I ./0./ - C-,j MARK D. STRAIN, CHAIRMAN z. -( 'i - () r ____+_d_ ~.. DATE Tentatively scheduled for the March 10,2009 Board of County Commissioners Meeting CU-2008-AR-13661 Page 9 of9 Agenda Item No. 178 March 10, 2009 Page 17 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNlNG COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: 1. Scction 2,03.03.C.5 ofthc Land Development Code authorized the conditional use, 2. Granting the conditional use will not adversely affect the public intcrest and will not adversely affect other propcrty or uscs in the same district or neighborhood because of: A. Consistency with the Land Developmcnt Codc and Growth Management Plan: Yes No B. Ingress and egress to propcrty and proposed structures thereon with particular reference to automoti ve and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adcquatc ingress & egress Ycs No C. Affects neighboring properties in relalion (0 noisc, glare, economic or odor effects: No aifect or _ Affect mitigated by ~_~ Affect cannot be mitigatcd D. Compatibility with adjacent properties and othcr properly in tbe district: Compatible use within district Yes No Bascd on the above iindings, this conditional use should, with stipulations, (copy attached) be recommended fi))' approval to the Board of Zoning Appeals. DATE: COMMISSIONER: Exhibit A Ag~~.,.@. Itsm-Wo-c-.:i-78 March 10, 2009 Page 18 of 54 ~.ol~t1t <Sute Area oriule A1UWirtati.ou 9N13..08 Golden Gate Area civic Association 470 1 Golden gate Parl.-way Goldell Gate, FL 34116 Re: ABB PN 08-0010 Conditional Use Application for Center Point Community Church To Whom it may concern: Please place this letter in the record of the rezoning application referenced above. Please use this letter to confl11Il that August 25th 2008, the Golden Gate Area Civic Association Board reviewed details of the plans and voted in favor of supporting this application. The August 25th GGACA Board Meeting Minutes are posted at the associations web site: Httpllwww.goldengateisgreat.com. If you have any further questions call me; Rick Sims GGACA president 2008 ; (CELL 239-494-2228 ). Sincerely, ~~ Rick Sims, GGACA President 2008 APPENDIX 1 Aqenda Item No. 178 . I~arch 10.2009 Page 19 of 54 Goldcll Gatc Estatcs Arca Civk: Associatioll P.O. Box 990596 Naples, FL 34116-6002 October 1, 2008 Re. ABB PN 08-0010 Conditional Use Application for the Center Point Community Church, 6590 Golden Gate Parkway To whom it may concern; Having considered the applkation of the petitioner and the recommendation of the Golden Gate Area Civic Association, the Officers, Board of Directors, and membership of the Golden Gate Estates Area Civic Association have voted in September 2008 in !iiVor of supporting this project and application. GGEACA feels the Center Point Community Church project is a fully compatible use and will be an asset to the community. Tfadditional information is needed please contact me at the above address or my cell at 239-641-5414, Sincerely, Timothy Nance, Pres, GGEACA APPENDlX 2 APPENDlX 3 AgendaHmre iJJ(I)111B March 10.2009 Page 20 of 54 From: Steve Gunden [sgunden@comcast.net) Sent: Tuesday, December 02,20083:00 PM To: Matt McLean Co: 'Nick Klein' Subject: RE: Center Point Community Church Follow-up Attachments: DSC00097.JPE; DSC00100.JPE; DSC00309.JPE; DSC06932.JPE Matt, thank you for your reply. We are painfully aware that the Collier County Stormwater Department is the entity that is responsible for maintaining the roadside swale. Since the completion of the modifications, we have called them requesting that the swales be mowed on numerous occasions. Responses have been given indicating that the mowing cycie is approximately 30 days. Our experience is different from that figure. I have attached some photos of the before, during and after conditions of my swale. Prior to the modifications, I was able to mow the entire area with a riding mower. Now you must use a weed eater or some specialized ditch mowing equipment. Amazingly, because this was a road project, the LDC did not apply. Transportation was allowed to store and treat stormwater in roadside swales steeper than 4: 1. A significant amount of material was removed from the swale. My concern continues to be about safety and maintenance. We pay taxes and assessments for mowing Golden Gate Parkway but the water quality treatment area is left for the iandowners to maintain. Other roadways in the county that have water quality treatment areas (Livingston Road is the closest) have lakes and fountains that are maintained in park-like settings. This design was a mistake, if not illegal, and the ongoing system maintenance required by the District permit a mess. Frankly, I would like to find out if the 3:1 side slope was exceeded. As you get closer to the canal and the swale gets deeper, the numbers have to get close. Ditch maintenance is difficult commencing from my neighbors directly to the north and continues to the canal. I can meet you most anytime you are avallabie. We will continue to support the Church in their pursuit of the ccnditional use permit. We do not expect the Church to "fix" anything that is currently broken, but do not want the existing drainage problem to be exacerbated beyond the mess that exists today. Best Regards, Steve Gunden From: Matt McLean [mailto:mclean@abblnc.com] Sent: Tuesday, December 02, 2008 9:07 AM To: sgunden@comcast.net Cc: Nick Klein SUbject: Center Point Community Church Follow-up Mr. Gunden, We appreciate your support of the Center Point Community Church development plans. I wanted to follow-up with you based on your offsite drainage concern identified at the Neighborhood Information Meeting for the Center Point Community Church Conditional Use Application. Over the past month we have confirmed that Collier County, specifically the Public Works Stormwater Department, is in fact the Operation and Maintenance entity for these swales. The contact at the County for such conceinS is Jenny Kander at 252-8924, I also spoke with one of the field representatives Travis from the County. He indicted that If the swaies have been 1/29/2009 ..o.genda!l!\1r6 ~cvf:1B Marcll10, 2009 Page 21 of 54 blocked or not maintained to call him at the same number. The swales should be constructed with a side 3: 1 side slope and a 1.5 It flat bottom. If the swale in your front yard has slopes steeper, then the County is responsible for restoring them to them to the approved design. Please let me know if you wO\lld ilke to meet at your residence to review the swale system from your house to the canal. We appreciate your input and look forward to your continued support of the Church. Matt/Jew 0. McLean. PE Agnoli. Barber & Brundage, Inc. 7400 Tamiami Trail North. Suite 200 Naples, FL 34108 239-597-3111 ext.262 239-566-2203 fax http://www.abbinc.com mciean@abbinc.com No virus found in this incoming message. Checked by AVG - http://www.avg.com Version: 8.0.1761 Virus Database: 270.9.1211824 - Release Date: 1212120089:31 AM 1/29/2009 Item Number: Item Summary: Meeting Date: Page 1 of 2 Agenda Item No. 178 March 10, 2009 Pa;Je 22 of 54 COLLIER COUNTY BOARD OF COUNTY COMMiSSIONERS 178 This item requires that all participants be sworn in and ex parte disclosure be provided by Commission members CU-200S-AR-13661. Center Point Community Church. represented by Matthew McLean. PE.. of AgnaiL Barber and Brundage and Daug Lewis, Esq., of Roelzel and Andress. is requesting a Conditional Use in the Estates (E) Zoning District for a youth ministry sanctuary with supporting offices and youth member social activities relating to the existing religious facility. as specified in Section 2.03.01.8.1 ,c.1 of the Collier County Land Development Code (LOC). The 4.58-acre subject property is located in Tract 85. Golden GFlte Estates. Unit 29, in Section 30, Towllship.:19 South, Range 26 East, Collier County, Florida CTS 3(10(20099:00:00,<l.M Prepared By John-David Moss Community Development & Environmental Services Senior Planner Date Zoning & Land Development 9/22f2008 9:35:45 AM Approved By Judy Puig Community Dev~lopnlerlt & Environmental Services Operations Anal}'st Date Community Development & Environmental Services Admin. 2i23f2Q09 3:31 PM A pproved By Steven Williams Attorney's Office Assistant County Attorney Date Attorney's Office 2/24/200911:09 AM Approved By Joseph K. Schmitt Community Development & Environmental Services Community Development & Environmental Services Adminstrator Date Community Development & Environmental Services Admin. 2f24!2009 11:56 AM Approvcd By Susan Istenes, AICP Community Development & Environmental Services Zoning & Land Development Director Date Zoning & Land Development Review 2f24/2009 4:27 PM Approved By Ray Bellows Community Development & Environmental Services Chief Planner Date Zoning & L;:nd Development Review 2:25l2009 1 :47 PM A ppruvcd By Jeff Klatzkow County Atto"ney Assistant County Attorney Date County Attorney Office 2:26,120094:40 PM Approved B)' OMS Coordillator County Manager's Office OMS Coordinator Date Office 01 Management & Budget 2/27/2009 9:4S AM filp.J(r.\ A npnrl",T...d\ Pvnr...t\ 11 ,_lI.II'l"f'hO/~ '1() 1 11 O/~ 111'1n110\ 17 o/... '111~T 11\111\,1 ^ D VOlA 111 ^ r.r.l\.Jn ^ 1/111,(\(10 Page ~ of 2 .t.::.;e:1da Ite:-n ~~o, '178 y r\,~arch 10, 2009 Pa09 :'3 of 54 ;\ pprond B),' Mark Isackson Budget Analyst Date County Manager's Office Office of Management & 3udget 2/27/20095:28 PM Appro,'cd By James V. Mudd County Manager Date Board of County Commissioners County Manager's Office 3/3/20095:23 PM filp.//,'.\ ^ w"nrl ,-"T",d\1=' "",-.".t\ 17':::;_T\A'wr-ho,-;" ,n 1 () o/~ ,n')()(IO\ 1 7 o/~ ,n<;;;:l ,l\AI'\l1 A D VO/n ,n A r. h'l\ln A 1.//1nnno .. Agenda item r-Jo. 17B.. PAarch 10, 2009 Page 2~ of 54 COLLIER COUNTY GOVERNMENT DEPT. OF ZONING 11 LAND DEVELOPMENT REVIEW WWW.COLLlERGOV.NET (i) 2800 NORTH HORSESHOE DRIVE NAPLES, FLORIDA 34104 (239) 403.2400 FAX (239) 643.6968 ~ - APPLICATION FOR PUBLIC HEARING FOR: CONDiTiONAL USE PETITION NO (AR) PROJECT NAME PROJECT NUMBER DATE PROCESSED ASSIGNED PLANNER To be completed by staff ABOVE TO BE COMPLETED BY STAFF APPLICANT INFORMATION 1 NAME OF APPLICANT(S) CENTER POINT COMMUNITY CHURCH ADDRESS 6590 GOLDEN GATE PARKWAY CITY NAPLES STATE FLZIP 34105 TELEPHONE # 261-7486 CELL # 252-9210 FAX # 261-2434 E.MAIL NICK@CPCCNAPLES,COM NAME OF AGENT MATIHEW D. MCLEAN, P.E. FIRM AGNOLl. BARBER & BRUNDAGE ADDRESS 7400 TAMIAMI TRAIL NORTH CITY NAPLES STATE FL ZIP 34108 TELEPHONE # 597-3111 CELL # FAX # 566-2203 E-MAIL ADDRESSMCLEAN@ABBINC.COM BE AWARE THAT COLLIER COUNTY HAS LOBBYIST REGULATIONS. GUIDE YOURSELF ACCORDINGLY AND ENSURE THAT YOU ARE IN COMPLIANCE WITH THESE REGULATIONS. APPUCAnON fOR PUBLIC HEARING FOR CONDIrIONAllJSe - 4/1 4/03, rev 5/20/2005, TOI' 2/1 2/0B l\genda item t'-Jo. 178 March 10, 2009 Page 25 of 54 l ASSOCIATIONS Complete the following for all registered Association(s) that could be affected by this petition. Provide additional sheets if necessary. Information can be found on the Board of County Commissioner's website at http://www.collierqo...nelllndex.aspx?pa~e=774 NAME OF HOMEOWNER ASSOCIATION: N/A MAILING ADDRESS CITY STATE ZIP NAME OF HOMEOWNER ASSOCIATION: N/A MAiliNG ADDRESS CITY STATE ZIP NAME OF HOMEOWNER ASSOCIATION: N/A MAILING ADDRESS CITY STATE ZIP NAME OF MASTER ASSOCIATION: NIA MAILING ADDRESS CITY STATE ZIP NAME OF CIVIC ASSOCIATION: PLEASE SEE ATTACHED ADDRESSES MAILING ADDRESS CITY STATE ZIP 1- - - DISCLOSURE OF INTEREST INFORMATION .J a. If the property is owned fee simple by an INDIVIDUAL, tenancy by the entirety, tenancy in common, or joint tenancy, list all parties with an ownership interest as well as the percentage of such Interest. (Use additional sheets If necessary). Name and Address Percentage of Ownership b. If the property is owned by a CORPORATION. list the officers and stockholders and the percentage of stock owned by each. APPUCATlON FOR PUBLIC HEARING FOR CONDmONA~ liSf- 4/14/03, rov 5/20/2005, r{tV 2/1 2/0B Agellda Item No.. 171;L. March 10. 2009 Page 26 of 54 Name and Addl"ess Percentage of Ownership Rob Buckel Chairman, 925 2nd Ave S Naples, Fl 34102-5941 Jeff Erickson Vice Chairman, 3100 Regatta Rd Naples, Fl34103-4125 Nick Shaffer Secretary, 324 Selina Dr Apt 8 Naples, FL 34104-5485 ** NOTE: Non-Profit Non Stock Corporation N/A N/A N/A c. If the property is in the name of a TRUSTEE, list the beneficiaries of the trust with the percentage of interest. Name and Address Percentage of Ownership d. If the property is in the name of a GENERAL or LIMITED PARTNERSHIP, list the name of the general and/or limited partners. Name and Address Percentage of Ownership APPLICATION FOR PUBLIC HfAkfNG FOR CONOITIONAL USf - 4( 14/03, rlW 5/20/2005, rey 2fT '2/08 Displaying ColliBr COlll1ty Association Information Agenda Item No. 17B March 10, 2009 Pfi'@I~ ?:''i'i'f 54 SC:ll'l':h the Collier County As~{)elntlnn.; Llsting GUJjo;j}~~~.d&I.!J1n:A~s_~ill1iml!i~Ji!.Ig. ~_.11,Lfu'.arcl1..fuL<l.rl.lJ1hITJ::Q}lier Coullt~<ltiUIl. Association Details Organlmthm Nalll~: Golden Gate Estates ArCIl Civic Astiociation Type: Civic District: 5 Association Officer InformAtion: Mr. 'rim Nrmce, President PO Box 990596 Naples, FL 34116 PbGne: (239}641-5t\14C F,., (239) 455-5811 Emnl\: ~~fitlhlink~hJjp~9li.carlhlink ncl/l htlp: // ap1's, colliergov .net/bcc/vci vic/Oi spAssocsDetai Is. cfrn 'II ON br~ I 72 7/23/2008 Displaying Conicr County Association Information Agenda Item No. 17B March 10, 2009 --- P&,gogf e~ pi 54 Sca,'ch the Collier County Associations Ltstlng h.'fu!;..b~I~J.2-gQJl1J('.I( t~~MSO.R.i.tl.li.mLliMi!!g. Qi.9kll.!,IJ1L!Q.fu.Hrrll5\N.ltllli!.h,.:r Collier C'(}untv A~~u~iutl~.I1. AsscciatiQD Details Orgll"imtion Nlmu~: Golden Gate Arcl1 Civic Association T)'pe~ Civic DIs.trlct; 0 AssociaUon Olfice.- (nformatlon: Mr. Rick Simms, Vice Presidont 539119th Place SW Naples, PL 34116 Plione: 239-455-7062 Fax: Emlltl: hltp:l lapps. co II iergov, netlbcclvcivi clD ispAs goes Delails .cfm ?lDNbr=66 7 7/23/2008 Displaying Collier County A,"ocialionlnformaliol1 ,\genda Item No. 17B I~arch 10. 200'9" Pi!j:,Qg~ Q~ jJf 54 SeBrch the Collic!" COllnty Assuclnilon~ J,istillg Cl[c.k.i.l!.a.tl<tgQ...I!ll1:.!!.JfLJht:..QillkLC\l~w1X..Asg!fimloI}Ji~g. Pick herefu~LfurJmillller C'91licr C'OUlllv A~~ AssodltLtonDetlli15 Orglllll'lll.t1on Nome: Golrlen Gate Area Civic Association Type: Civic lllstrkt: 0 Ass[)C.iation Officer [nformRtlon: Mr. Keilh Denny, President 31534JstSlreetSW Nllples, FL 34113 Pho\!e: 239-353.7836 Fox: EmRU: hup:/ 1 apI's. colliergov. net/bcc/vci v i cl DispAssocsDetails, cfm'llDN br=666 7113120'0'8 Agenda item No. ~17B March 10. 2009 Page 30 of 54 e. If there is a CONTRACT FOR PURCHASE, with an individual or individuals, a Corporation, Trustee, or a Partnership, list the names of the contract purchasers below, including the officers, stockholders, beneficiaries, or partners. Name and Address Percentage of Ownership Date of Contract: f. If any contingency clause or contract terms involve additional parties, list all Individuals or officers, if a corporation, partnership, or trust. Nama and Address g. Date subject property acquired [gJ leased 0 Term of lease If, PetItioner has option to buy, indicate the following: yrs.lmos. Date of option: Date option terminates: or Anticipated closing date: Febuary, 1989 Parcel 1 I Febuary,1989 Parcel 2 I September, 2000 Parcel 3 as defined under Evaluation Criteria "a", APPlICATION FOR PUBLIC HEARING fOR CONDITJONAL USE - 4/14/03, re~ 5/20/2005, rey 2/12JrlB Agenda Item No. 178_ March 10. 2009 Page 31 of 54 h. Should any changes of ownership or changes in contracts fol' plII'chase occur subsequent to the date of application, but prior to the date of the final public hearing, it is the responsibility of the applicant, or agent on his behalf, to submit a supplemental disclosure of interest !'orm. L PROPERTY LOCATION Detailed leqal description of the property covered by the apPlication: (If space is inadequate, attach on separate page.) If request involves change to more than one zoning district, include separate legal description for property involved in each district. Applicant shall submit four (4) copies of a recent survey (completed within the last six months, maximum 1" to 400' scale) if required to do so at the pre- application meeting. NOTE: The applicant is responsible for supplying the correct legal description. If questions arise concerning the legal description, an engineer's certification or sealed survey may be required. SectlonlTownship/Range 30/49/26 Lot: Block: Subdivision: Golden Gate Estates Plat Book 7 Page #: 57 Property 1.0.#: Tract 86, Golden Gate Estates, Unit 29 38108240006, 38108280008, 38108320007 Metes & Bounds Description: See attached survey and property description SIZE OF PROPERTY: ft. X ft. = Total Sq. Ft 199,504.8 Acres 4.58 ADDRESS/GENERAL LOCATION OF SUBJECT PROPERTY: Parcel 1: 3020 66th Street SW, Parcel 2: No address, Parcel 3:3040 66lh Steet SW as defined in Evaiuation Criteria "a". ADJACENT ZONING AND LAND USE l Zoning . Land use N ROW S E E E W E(PU) Golden Gate Parkway Estates Estates Church Use APPlICATION FOR PUBLIC HEARING fOR CONDrnONA~ USE - 4j14j03, r{lV 5/20j2M5, nil\' 2/1 2j08 ..;genda Item r,o. 17B March "10: 2obt:f. Page 32 of 54 Does the owner of the subject property own proporty contiguous to the subject property? If so, give complete legal description of entire contiguous property_ (If space is inadequate, attach on separate page). Section/Township/Range 30/49/26 Lot: Block: Subdivision: Golden Gate Estates Plat Book 7 Page #: 57 Property 1.0.#: 38108200004 Metes & Bounds Description: Tract 85, Golden Gate Estates Unit 29 , Less that portion for Rrw as Desc, in OR 3210 PG 742, see attached Boundary Survey L CONDITIONAL USE REQUEST DETAIL ] Type of Conditional Use: This application is requesting a conditional use allowed per LOC Section 2.04.03 of the Estates zoning district for CU (type of use). Present Use of the Property: PU (Church Use) for Parcel 1 and Parcel 2 and E/Residential, with a residence for Parcel 3. L EVALUATION CRITERIA ] Evaluation Criteria: Provide a narrative statement describing this request for conditional use, NOTE: Pursuant to Section 10,08.00. of the Collier County Land Development Code, staffs recommendation to the Planning Commission and the Planning Commission's recommendation to the Board of Zoning Appeals shall be based upon a finding that the granting of the conditional use will not adversely affect the public interest and that the specific requirements governing the individual conditional use, if any, have been met, and that further, satisfactory provision and arrangement have been made concerning the following matters, where applicable. Please provide detailed response to each of the criterion listed below. Specify how and why the request is consistent with each. (Attach additional pages as may be necessary). a. Describe how the' project is consistent with the Collier County Land Development Code and Growth Management Plan (include information on how the request is consistent with the applicable section or portions of the future land use element): The Project is comprised of the following three (3) parcels as more particularly described In the Property Location section of this Application (Note: Parcel No. 3810820004 containing approximately 4,63 acres +/- and which abutts the Project to the West is currently zoned Provisional Use for church use under Ordinance PU-77-3C and does not need to be included in this CU Application, as confirmed at the pre-appiication meeting,): AN'UCATION FOR PUBLIC I-IfARlh'GFOR CONDITIONAL USE" - 4/14/03, rav 5/20/2005, fBV 2/i2108 ACl,::nda Item t\1o. 178 - March 10.2009- ?age 33 of 54 Pal-eel No, 38108240006 containing approximately 1.04 acres +/- ("Parcel 1"), Parcel No. 38108280008 containing approximately 1.04 acres +/- ("Parcel 2"), and Parcel No,38108320007 containing approximately 2.5 acres +/- ("Parcel 3"). Parcel 1 and Parcel 2 are zoned Provisional Use for church use under PU 90-20 adopted under Resolution 91-111 and are incuded in this Application as such Provisional Use approval contained a condition that all future expansions to the Provisional Use require the submission of a new Provisional Use request. Parcel 3 is zoned Estates District, and Parcel 1 and Parcel 2 are also within the Estates District. Churches and places of worship (SIC code 8661) are listed in the current Collier County Land Development Code -- Table 2 (e.g. Land Uses that May be Allowable in Each Zoning District as Accessory Uses or Conditional Uses) as a Conditional Use for lands zoned Estates District. The North 330 feet of Parcel 1, Parcel 2 and Parcel 3 are also subject to the Corridor Management Overlay District. However, such overlay district does not prohibit church use or Conditional Use approval of Parcel 1, Parcel 2, and/or Parcel 3. In consideration of the improvements associated with the interchange at 1-75 and Golden Gate Parkway, the Golden Gate Parkway and Collier Boulevard Special Provisions under the Conditional Uses Subdistrict of the Golden Gate Area Master Plan (GGAMP) contemplate and expressly permit the existing conditional use (Grace Bible Church n/kla Center Point Community Church and related facilities) to be expanded in acreage and intensity along the south side of Golden Gate Parkway to the east of 66th Street S,W, b. Describe the existing or planned means of Ingress and egress to the property and proposed structure thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: The Project currently maintains two access points off of 66th Street SW for both ingress/egress that connect to Golden Gate Parkway. There is a pedestrian sidewalk that fronts the northern property boundary along Golden Gate Parkway. The property provides vehicular access completely around the centralized church use facility for increased internal.abllity of traffic flow and control. At the time of original development, 63rd street did not exist. Now that access is available along 63rd street, the applicant has proposed an additional access point along 63rd street to further improve ingressiegress. Pedestrian improvements per LDC requirements will also be included in future development plans for the property. c. Describe the effect the conditional use will have on neighboring properties in relation to noise, glare, economic impact and odor: APPUCAlION FOR PU8ue HEARING fOR CONDITIONAL USE - 4/1-1/03, reI' 5/20/2005, rev 2/12/0B Agenda Item No. 178 March 10. 2009 . Page 34 of 54 rhe church has existed in this location for over 30 years, and no operational changes will result from this conditional use application. There will be no new noise, glare, economic impact, or odor on neighboring properties due to this Application. Careful attention and thought was given to the location of the proposed building. It is the intent of the applicant to centralize the proposed building within the site to provide the maximium distance between the proposed structure in relation to its offsite neighbors. d. Describe the site's and the proposed use's compatibility with adjacent properties and other properties in the district: Golden Gate Parkway is adjacent to and North of Parcel 1, Parcel 2, and Parcel 3. The parcel adjacent to and West of Parcel 1 : (i) fronts 66th Street SW, (ii) is zoned Provisional Use for a church use, (iii) is owned by the Applicant; and (iv) will be incuded as part the Applicant's Site Development Plan, 63rd Street SW is adjacent to and South of Parcel 1, Parcel 2, and Parcel 3. The neighboring properties in this district are primarily residential uses, A church use has exisited in this neighborhood for over thirty years, and provides a place of worship for local residents. The proposed development will improve the pedestrian traffic in the area by providing a sidewalk along the 63rd street frontage, which will provide local residents a safe pathway for walking in the area. e, Please provide any additional information which you may feel is relevant to this request. Center Point Community Church has been part of this neighborhood for over 30 years. There will be no major changes on the site that will adversely impact the surrounding neighborhood, and will not materially change the daily function of the church. Deed Restrictions: The County is legally precluded from enforcing deed restrictions, however, many communities have adopted such restrictions. You may wish to contact the civic or property owners association in the area for which this use is being requested in order to ascertain whether or not the request is affected by existing deed restrictions. Previous land use petitions on the subiect property: To your knowledge, has a public hearing been held on this property within the last year? If so, what was the nature of that hearing? Yes, on July 22, 2008 the BCC approved through Consent Agenda Item 16 A.17: "Recommendation to the Board of County Commissioners to direct staff to add to the existing GMP amendment petition CPSP-2006-13 the revs ion of an acreage figure in the Golden Gate Area Master Plan pertaining to the Center Point Church Conditional Use, and text recognizing two existing exceptions to Conditional Use locational restrictions. .- Additional Submittal reaulrements: In addition to this completed application, the following must be submitted in order for your application to be deemed sufficient, unless otherwise waived during the pre-application meeting. a, A copy of the pre-application meeting notes; APPLICATION FOR PUBLIC HEARING FOR CONDITIONAL VSE- <4/1 4/03, re-v 5/20/2005, NIl' 2/12/08 Agenda Itemr"o. 17B March 10, 2o'J9 Page 35 of 54 b. Twenty (20) copies of a 24" x 36" conceptual site plan [and one reduced 8y," x 11" copy of site plan], drawn to a maximum scale of 1 inch equals 400 feet, depicting the following [Additional copies of the plan may be requested upon completion of staff evaluation for distribution to the Board and various advisory boards such as the Environmental Advisory Board (EAS), or CCPC]; . all existing and proposed structures and the dimensions thereof, . provisions for existing and/or proposed ingress and egress (including pedestrian ingress and egress to the site and the structure(s) on site), . all existing and/or proposed parking and loading areas [include matrix Indicating required and provided parking and loading, including required parking for the disabled], . locations of solid waste (refuse) containers and service function areas, . required yards, open space and preserve areas, . proposed locations for utilities (as well as location of existing utility services to the site), . proposed and/or existing landscaping and buffering as may be required by the County, . location of all signs and lighting including a narrative statement as to the type, character, and dimensions (such as height, area, etc.); c. An Environmental Impact Statement (EIS), as required by Section 3.8. of the Land Development Code (LDC). d. Whether or not an EIS is required, two copies of a recent aerial photograph, (taken within the previous twelve months), minimum scale of one inch equals 400 feet, shall be submitted. Said aerial shall identify plant and/or wildlife habitats and their boundaries, Such identification shall be consistent with Florida Department of Transportation Land Use Cover and Forms Classification System, e. Statement of utility provisions (with all required attachments and sketches); f. A Traffic Impact Statement (TIS), unless waived at the pre-application meeting; g. A historical and archeological surveyor waiver application if property is located witl1in an area of historical or archaeological probability (as identified at pre-application meeting); h. Any additional requirements as may be applicabie to specific conditional uses and Identified during the pre-application meeting, including but not limited to any required state or federal permits. II ~I APPLICATION FOR PU8L1C HEARING FOR CONDITIONAl USE - 4/J 4/03, ~e\' 5/20/2005, rtJv 2/' '2/08 l\genda Item No. 17B March 10. 2009 Page 36 of 54 ~="=>:::.......<;g';'="_.1l.;;;.;~~"g~;~"~~_:r;KE';:(nP":"':::::::::::'::""""-"='""'~'~~"",",""",'. _::0.. APPUCATlON FOR PUB[/C HEARJNG fOR CONDITrONAL USE - 4/) 4/03, rav 5}20/2005, rev 1/12/08 AClenda Item No. 178 ~ rv1arch 10,2009 Page 37 of 54 February 10, 2009 Collier COUllty l3ol.L1'd of County Commissioners 3301 E. Tamiami Trail Naples; FL34112 .RE: Center Point Community Chur~h Conditional tJscAg'plic~tion CtJ-AR#13661 No Objection Letter from Mr. Fred Krauss (JIll 66 St SW) Dear CountY Commissioners: In <:onnectiog with t.Qe abpve referenced Conditional Use Application to be considered by botll the Collier County Planning Commission and tbe Board of Courtty Comssioners, this letter shall 'confun:\ that we have no objection to the proposed Conditi6nal Use Applicatioll and expansion of the existing church facHities. We have attended the local Neighborhood Infpntllltkillal Meeting ror this Conditional Use Application, and we appreciate the cooperation of the applicant in disCllssing with Us and addressing. our concerns with respect to the Conditional Use Application. This leltershall constitute an expression of our full.support fur the Conditional Use Application. Should ypu have any questions Wha1:s0ever with respect to this Letter of No Objection, pl~sedo noth~itate to contact me at the below listed telephone number. Very tntl}' yours, Icf~f~ Photie #239-262.8391 co: Mr. Matt McLeau (Via eJl;)ail) Mt, Nick Klein (via emuil) /\aenda Item No. 178 - March 10.2009' Page 38 of 54 RESOLUTION NO, 09- A RESOLUTION OF TIIE BOARD OF ZONING APPEALS OF COLLIER COUNTY, FLORIDA, PROVIDING FOR TIlE ESTABLISHMENT OF A CONDmONAL USE TO ALLOW A yourn MINISTRY SANC1UARY WITH SUPPORTING OFFICES AND yourn MEMBER SOCIAL ACTIVITIES RELATING TO TIIE EXISTING RELIGIOUS FACILITY WITHIN TIlE ESTATES (E) ZONING DISTRlcr PURSUANT TO SUBSECTION 2.03.0I.B.I.C OF 1m: COLLIER COlJN1,. LAND DEVELOPMENt CODE FOR PROPERTY LOCATED IN SECTION 30, TOWNSHIP 49 sourn, RANGE 26 EAST, COLLIER COUNTY, FLORIDA. WHEREAS, the Legislature of the State of Florida in Chapter 67-1246, Laws of Florida, and Chapter 125, Florida Statutes, has conferred on Co1lier County the power to establish, coordinate and enforce zoning and such business regulations as are necessary for the protection of the public; and WHEREAS, the County purswmt thereto has adopted a Land Development Code (Ordinance No. 2004-41, as amended) which includes a Comprehensive Zoning Ordinance establishing regulations for the zoning of particular geographic divisions of the County, among which is the granting of Conditional Uses; and WHEREAS, the Board of Zoning Appeals (Board), being the duly appointed and constituted planning board for the area hereby affected, has held a public hearing after notice as in said regulations made and provided, and has considered the advisability of a Conditional Use of a youth member sanctuary with supporting offices and youth member social activities related to the existing religious facility within the Estates (E) Zoning District pursuant to Subsection 2.03.01.B.1.c of the Collier County Land Development Code on the property hereinafter described, and the Collier County Planning Commission has made fmdings as described in Exhibit "An that the granting of the Conditional Use will not adversely affect the public interest and the specific requirements governing the Conditional Use have been met and that satisfactory provision and arrangement have been made concerning all applicable matters required by said regulations and In accordance with Subsection 10.08.00.0. of the Land Development Code; and 100 Agenda Item No. 178 March 10. 2009 Page 39 'Of 54 WHEREAS, all interested parties have been given opportunity to be heard by this Board in a public meeting assembled and the Board having considered all matters presented. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ZONING APPEALS OF COLLIER COUNTY, FLORIDA that: Petition Number CU-2009-AR-1366l filed by Matthew McLean of Agnoli Barber and Brundage, Inc., representing Center Point Conununity Church of Naples, Inc, with respect to the property hereinafter described in Exhibit "B", be and the same is hereby approved for a Conditional Use for a youth ministry sanctuary with supporting offices and youth ministry social activities related to the existing religious facility within the Estates (E) Zoning District pursuant to Subsection 2.03.01.B.1.c of the Collier County Land Development Code, in accordance with the Conceptual Site Plan described in Exhibit "C" and subject to the conditions found in Exhibit "0". Exhibits "B", "C" and "0" are attacbed hereto and incorporated herein by reference. BE IT FURTHER RESOLVED that this Resolution be recorded in the minutes of this Board. This Resolution adopted after motion, second, and super-majority vote, this _ day of ,2009. ATTEST: Dwight E. Brock, Clerk BOARD OF ZONING APPEALS COLLIER COUNTY, FLORIDA By: , Deputy Clerk By: DONNA FIALA, Chairman Approved as to form and legal sufficiency: ~' . V . 1l- 7W~ Steven T. Williams Assistant County Attorney 20f3 Aoenda Item No 173 '" 1\..1arch 10. "2009 Paqe 40 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: 1. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Grnnting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood bec!U.\Se of: A. Consistency with the Land Development Code and Growth Management Plan: / Yes r/ No B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingress & egress Yes......':- No C. Affects neighboring properties in relation to noise, glare, economic or odor effects: (' ' I' No affect or ~Affectmitigatedby LiH ,?,bv\~d.",-<, -~. l,,~% J. _ Affect cannot be mitigated ';>v H" \.? 1 h >,: 'I. i' I uJ' J.' l \ i-c, (. P I'\'l'~ N :J D. Compatibility with adjacent properties and other property in the district: Compatible use within district Yes V No Based on the above findings, this conditional use should, with stipulations, (copy attached) be recommended for approval to t.1.C Board of Zoning Appeals. DATE: 2 - 1(1 - 0 i ) Ii COMMISSIONER: ~ l., t.t ( j \' ~ i........., Exhibit A .Agenda Item No. 178 P~arch 10, 2009 Page 41 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: I. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of; A. Consistency with the Land Development Code and Growth Management Plan: Yes~ No B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingress & egress Yes ~ No C. Affects neighboring properties in relation to noise, glare, economic or odor effects : _ No affect or L Affect mitigated by &trrE1!-l t\Jf1. _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible use within district Yes .; No Based on the above findings, this conditional use should, with stipulations, (copy attached) be recommended for approval to the Board of Zoning Appeals. DATE: )//'1/09 / I COMMISSIONER: f/f-n'1t1--. Ie /1/ ( ~~.. Exhibit A t"\oenda Item hJo. 17B ~ March 10, 2009 Page 42 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: I. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency ~and Development Code and Growth Management Plan: Yes_ No_ B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingressY~gress YesL No_ C. Affects neighboring properties in relation to noise, glare, economic or odor effects/' ~No affect or _ Affect mitigated by _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district; Compatible us7ri district Yes_ No DATE: '? - ;q ~ 0 7 Based on the above findings, this conditional use should, with stipulations, (copy attached) be recommended for approval to the Board of Zoning Appeals. COMMISSIONER: {..~( Exhibit A .:;qsnda Item No. 178 ~ fv1arch 10.2009 Page 43 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: I. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency with the Land Development Code and Growth Management Plan: Yes~ No_ B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingress & egress YesL No_ C. Affects neighboring properties in relation to noise, glare, economic or odor effects: ..JL No affect or _ Affect mitigated by _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible use within district Yes~ No Based on the above findings, this conditional use should, with stipulations, (copy attached) be recommended for approval to the Board of Zoning Appeals. DATE: .c./f'. t>1 COMMISSIONER: %~ Exhibit A Agenda Item No. 17B March 10, 2009 Page 44 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: 1. Section 2.03.03.C.S of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency with the Land Development Code and Growth Management Plan: Yes~ No_ B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingress & egress Yes~ No_ C. Affects neighboring properties in relation to noise, glare, economic or odor effects: j No affect or _ Affect mitigated by _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible use within district Yes~ No_ Based on the above findings, this conditional use should, 'th stipulations, (copy attached) be recommended for approval to the Board of Zoning Appe s. DATE: Zll11 COMMISSIONER: [l)1l:O ~If'-~ Exhibit A P.q2nda Item No. 1-rB - f,1arch 10. 2009 Page 45 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: I. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency with the Land Development Code and Growth Management Plan: Yes~ No B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingress & egress Yes1 No~ C. Affects neighboring properties in relation to noise, glare, economic or odor e~: No affect or _ Affect mitigated by _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible ~Tilijn district Yes No Based on the above fmdings, this conditional use should, with stipulations, (copy attached) be recommended for approval to the Board of Zoning Appeals. DATE:.djLqjffL COMMISSIONER: /~9/Ju,(dt Exhibit A ,;genda Item No. 178 f\1arch ~I 0, 2009 Page 46 Df 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: 1. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Gnmting the conditional use win not adversely affect the public interest and win not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency with the Land Development Code and Growth Management Plan: Yes v< B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingress & egress Yes ~ C. Affects neighboring properties in relation to noise, glare, economic or odor effects : ~ect or _ Affect mitigated by Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible use within district Yes~o_ Based on the .above fmdings, this conditional use should, with stipulatj>ns, (copy attached) be recommended for approval to ihe Board of Zoning Appeals. DATE: COMMISSIONER: f Exhibit A A;;8iKia Item r'~o. 178 f\!;arch 10, 2009 Page 47 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: 1. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency 1 the Land Development Code and Growth Management Plan: Yes No B. Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingr7s & egress Yes_ No_ C. Affects neighboring properties in relation to noise, glare, economic or odor effec,: ~ No affect or _ Affect mitigated by _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible use wiyun district Yes --JI No_ Based on the above findings, this conditional use shoul re.commended fo approval to the Board of Zoping App a COMMISSIONER: / stipulations, (copy attached) be DATE: Exhibit A Aoenda Item No. 178 ~ March, 0, 2009 Page ~8 of 54 FINDING OF FACT BY THE COLLIER COUNTY PLANNING COMMISSION FOR A CONDITIONAL USE PETITION CU-2008-AR-13661 The following facts are found: 1. Section 2.03.03.C.5 of the Land Development Code authorized the conditional use. 2. Granting the conditional use will not adversely affect the public interest and will not adversely affect other property or uses in the same district or neighborhood because of: A. Consistency with the Land Development Code and Growth Management Plan: Yes ,/ No B. Ingress and egress to property and proposed structures thereon with particuJar reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe: Adequate ingr~SS 7ess Yes p/' No - - C. Affects neighboring properties in relation to noise, glare, economic or odor effects: ~ affect or _ Affect mitigated by _ Affect cannot be mitigated D. Compatibility with adjacent properties and other property in the district: Compatible use wi~ district YesL No_ Based on the above fmdings, this conditional use shouJd, with stipulations, (copy atta.ch6d) be recommended for approval to the Board of Zoning Appeals. ~ ... ? DATE: -2f/ ~ (J r COMMISSIONER: /) ',.L ,t.< rf ',.! U?z ).. -...- ' L/t.- 1. Exhibit A / J"""'Y- I natel 5/12/2008 ?i~f ~,S, PH !oj . 2~:I5jH Agenda item No. 178 ... ..,,1.. paz i?~9'"rl1 1.0, 2009 "age 49 of 54 ~~..~~.~;~.~::~;,.". ... ,.. p.T~..~~.~-~~ " ........~~;...'...:' :.'..... ~ -. (XX> W"m:rnf,y ~-Ii!"~ INn_ 1)e~J ....01 FebT......J . A.b." If MAJS"CS, Q~.k." .~. Vlf_ .. ""- 1MC.. & r1erida cor,eratloa 2! ~ rutD1 'lU.nO'lt'r au CUK'II A.. .tr. ..uu 1rr ~k. ..tlreU.. QU.CI au1:.t aV~CI. o:r IAl'LU. ... 6\ "".'" llIollr_ ~ I whoM _ oHb....., 6.5'0 GoU.. c.u rarkway. ..,ha. rhrUa .nUt ~ B .............'lhIf..GtMW.IlrWld..ICIN~tQI",lh.lllmslDlOC)lJ.A!SAWDone '" 1:1 v........CCN5IIlIIo\1ICNS........ooId......a-.N.......................j.t ~. G: __...._....._ln~c:-iIy.__.. I -____fb. v..t 75 I..t .1 Lk. v.se 1St I.at of T~.ct 16. Dalt 19, DOua ca.U U'fl.fI,S. ..ecoydUI to tba plat t:.\luuf rDoer'.. ~~ 'lat a..k 1. !at. '7 at t~. r.1rllc I.card. IIIf Col1br C.lNltf. Fl.rS....--- SQJJSC! ta .......ta. ~..trlcti~.. aft. r...~.tl.ft. of racor.. =iU.1ED_ ~ 8 ~~ 5 '" " O.t- Ivr6 1M'" G-ftr" ~ ".4:lo-A. __ thGtlowful .. ........Iight .. CIIaIN'Ilhat ~.. Grwoor. ..., ,.. fhI w...cw hdbr NIIr .............................,.., Iht......... __ io-Iuf ~ III an ..... w..n.. -. .......h..-'" ~~-:;.l})'1':I~ ~~ .......... ,.r-. <IWJ ~ SWI 01' n.D1I'. ~.....~ CICIIInT Of ...uu ...,e~""" ItBllYallDPrlhit_th"cMt,_lon'UI'_I>>MNd before...... ~ _IOf ~ ~.. , ..... __ - ... ....w;. I&. UU" HJ.1SOIET All. c.&JJO:I .... au'CSO.tt ~ 10......... known. be hp.nondlKrlbed ....at....., n whI........ the 10I0D0h:I dud. and _ .,.4. ~'." bdcn........,;d ~.....,.d .... ami ..., and ~it,)*, ~_~ ..;i-""-' . :. c". oj;i~;j.........""....., ....""''''' is .~F "'-{"j'~ :.1..[/" ....\> ""f".l1~"",""""""~-,, _1!.^' b, ).BIN.~, . " '" ......_-' _ . -r:-:t ~>>-~ _f\IWaf: ::,....,..J\,r':1 ( 'I<<t~~: 6~ii(~ ~. H....,.' .~., ..... .." . , , o:~;i~ H lJilI........~loI....;.:.ItO.A ~.... B$ge:t Guna(.WUiDtC.__fII""" -~ _._----~- -= ~t(",.,. i ~,1.~ '. '.. '.' 11~' ~__""':l..o< '~:""':\gN.~_ Q= ='" ~- '" '" CD Q C ~ ~~ '" CSWI ...... Exhibit B o-ke. '/~2/20D8 ~1De1 4,6. PM ~I . U')lj7H Agenda Item I'JO. 178 1.5" 'Napl.. Vax ~'~t:h 10, 2009 . Page 50 of 54 ~l\l.l,II!Ir"'~M .,,"r~"'.,. ,. ,. !F'...:......:,,~ ",:....._'.';-...". I ....., . "... _ " '.. ,. ~ .._ r..,.:..... _ ,'..~ ~'. '. ..:. . ',~ . ,. , .,.( ,.,.:,,,,,; ~;.' ".. ~ W"m:mt,y 1NT__~.... 11:I INO_ m ~1U m.. IAnoe. a _hale ...... . :JJecJ ...01 reln.....t"' .....P." at ~ ~~ ~ 8"" gUCI lULl CIUlCl or UPLlI, IIC.. . 11orU. corlloraU.GD N'I5 ..~ 0 Q N e..... pou ofPb IdIhu ""590 l:oldeD Oat. P.r.....,.. ...,In. nod'" 13999 ::0 C3 Ii! . a:: .......... ... 'M 0.-...-. far II\d ill CllMI~ at ... ... or TfN DOUAIS AND OTHEI tD_ = VAl1WU CllNIaWlONi.. _""Ill lor" G<_. _ - . '-!br..." I do.'" g iii .................._......_..CoIIIw""""',__.. ::><: co ~~~--Tb. E..t 75 t.at of th. V..E 15a f..t of fract '1. cona CAU U'I'UII. hit ... 2'. UCDrd:l... to t.... plat tkar..1 .. ~.eDr4., 1. 'lat IODt 7 at 'o.a "~I .r t'. I..lla "4a~" of Coll1.r C..,t" rl'~1'..----- en>- "'i :8 .... ..... ,VJIICf to ..,E...Ca, raatrtet1... a.4 %...rvot1... Df raeDr4, tAl ID '3IJ'.1'D~O' '" Cl i! m~ ... = 8 -"""-"" ~~~::I ~ ii .ri..;P1SDI1 IUlIA I.It" unDl <IWI OWl ...... ""'......~ yoC .~.- f\Ao!':.;i .........=..","',~... ~..,....."""'.,..... ~~~ l"oHbI ~~to ....1I11f n.OUIli. CDUIItt Of COLLIn ~-,. -:u: !r.~~1. wnwaslllVtt.nf w....1IM ~~jbi~ Mr~~ ii:u.ii2 ~~~~ -. . .. ...-..-.-. ~'--5 _ ;1. >,)..:'-.'.:", rill. ~.KIt ~~.(-.~ .....41..al~.;;..::;.tIW..... ~~ ._.......... Oft"~ toP.....! bo.... .... ....inbRr ...._ tau nlO KUlA. lITol aUto. 10 Ifte wtl k.- lit _ tht PI'IOfI daeribed .. GI.... ... who elle'Med 'M- ~ dnd. W ...~ '-*-...'NlId,.....IIUhfIed...1IIIIIII' """ Md ~ '-..... ~pou 11m'" a;res_ :' /: /0 "tft . 'rl"r1r ....of ..;' ,I '.' , n,-,. L / PU . '. .. , ...... 'NOTM't~l..... . "*.......~... GNWK.WI..3OM.,..,....,..L.- _.-.,.,...~_IfWlMlM,..... , .-., ". . ;.~~ ..';,., ~7 'Iff . ,.~~,=..i.'; . (,:'~ ::~., '. .' , . .. o;7J~~'!7~ .~:rW1\). ''''~'~!l'tJ.'r~ 1_' 'llf I v_?~rL~ IW" , . . (.~-:. '.:.. .. .V.' D~.I 6/1Z/3008 T~I 3:S' PM TOI . 3S357~. B..a lI&plaa Pu. .tw 207314 OIi.r lO PG: OZS2 tit _11__11__.11 uJu'''' .. It:J. ..... IIICL CUll - ....... "'ID 1.11 .." 1"1." "...,.. a. - ....... __, ~. -.. I AK2IU. flU MIl 181aIi.... ~.. J -- ....... -. 141.01 _........ HlOIIIoon -"... -..... ..... __"IL 1III__1II11111111 DIIIlIIIIIII !III WlrrutyDeed 1\1010' . _ _.. bt..o/ lot.. IW .1ClOO >.II.. ...... _ Nttr _ JIo,1.., twlttr. __ _ ftf. II.. ~ II Cll11&elr . _" ........ .. IblllIWa IaIIla .,..., III., a ntr68l ;11'1 .~ _ _ Ie 11I0 ~ ..toe ......... ....-. no lUll olIO ~" CI11i.u ..."ftIdM, .~ WJIMIII6 ....~II!~.............._" _ IIIIU,UI 1.101-----------. IlOlW.I. _......................~.........&WIII..............II...,.............. .................................... ........................................ ..............c;lIIIlf... Ca1lJ.aIo ... rI n-... ... .. "'t. 1.10 _ "" __ .. JIoI~ .. t:t. idat: ..u. __ .. _. IIDLIl H. Ilatl IaeI& ,. .... ". rp' ............... ....__..........w..... ...-...:..............."..............., Ia 'WIIIIII w--... _ .... _.... _.... ........ ... _ _ ......-..-.- LfI"~ .jJ ~:~/1IIItI (, V J:" J,.-V,.;; ~!IIlttr <.... ...- _'. --. I 1- 'fAR Of I'1edA COIJN'I'I( or lloUi.o ....... __.. ............. _ .. 1ft ... " ...~ - Mtltr _ ~ Mttr. "or"" .....u. ._-:._:::=n_~~ ,,,.., ..-=~:- ~~ -.. "- ..........., .... 1"1111...11"_..... - - , 1000 ~ Agenda item No. 17B pol<!.J(cr,51 o. 2009 Page 51 of 54 (") m Z ...., m ;;1:1 '"0 o Z ...., (") o ~ ~ ...., -< (") ~ ::r: (") o Z t;l >-< ...., >-< ~ tTJ ;>> l' c:: en m (") ~ (") m '"0 ~ ;>> l' en >-< ...., m '"0 l' ~ Agenda Item 1\10. 17B r',~OI"::-;r, .~, ~c:~~ Page 52 of 54 tTJ .f fi ! ~ ,,' " -- ..- . --....-..... . .._...._ '___n.....__.~". / .r- ----..- ----.---.--.-.---.--- -..----~~!!!-~!._~~~. . /--2:.__ -:--.._~=::=:~:.:~~-=:~=--::.> i~' ~~'-"-(-----r:-.~--;;;:;;::::tV4>~-:~-_ 1 ::- --ll\ " - -: I]' J i ) - 0 .... l " \~ r i1f. i I ~~cc_~c__~ , ~C, : Iii i AD. i (-:<':''::',:..;':'\ ! I ili I ~ memCCll!!': 'I (\:~!~,~~) " till I ,) L:..:h.J.n.'1 ~~ "_:.'j 'I! III Ii ~ . i ~ I ~ Ii! ,Ii tl .~ I .._oo_oo_~ 700-" .._.._.._ 00_' _.._..:. Ii! ~ II> \.....~ ~ ' , " ,. \;. ~ II: 0 · ~ ~ra"y " j~L:"~g{;::,i:; l ! I,' ~ ~ ........'""0 ~li.ti "..~.;2~~,,~,. :.rl:~ .:.. C tTJ <"s 1'" '. ~ " "" : i i ii :> . 1-2.:; ';.,.\ . '. ." " i(! II! ~ :.L._.._._ .2.._ '_'_n_n_n_ _n__.~n_n_ .-._. - _n_ _.~ /Ii ~ I ~~.. I>;{_II. : I iJ;i jH Ml:!'1 !i!i iiI! =10 .," ;ili liii :)j! 'il: - NlA.~Jll-"" ._-.._oo_.._oo_.._u :!il" ~ ..-..-..-..-..-..-..-..-..-..-..-..-........-..-..-.. 'II I/! :11 ill i" di if! " ~~~~~ ;j;~g~", ~ ~~~ ('" I tTJ ~J i~d ~ .~ N~I tTJ ! ij I I! Iii . . . . U Ii j~mlll; I ilII111i II /:"j ill i i S Io'l iff II !I '~I~il I ~,!III! I ::1' I I _. ~ :1 · ~ II ! I 'I II ~ III -. . i .... 0_. ~q Ill1liWil111lli!ii -0. n 8:'" s. 'ill .i~ In ,~ j I o .. l' i I r I~f : Ii Hi! l ~ '! i I ,I. i j __ ._m_____________ .';oenda Item No. 178 ~ March 10, 2009 Page 53 of 54 EXHffilT D CONDITIONS OF APPROVAL CU.2008-AR.13661 February 19,2009 I. The Conditional Use is limited to what is shown on the Conceptual Site Plan, identified as "Center Point Community Church-Conditional Use Conceptual Site Plan," prepared by Agnoli, Barber and Brundage, Tnc., and dated July 2008, as revised through January 28, 2009. The site plan noted is conceptual in nature for Conditional Use approval only. The final design must be compliance with all applicable federal, state, and county laws and regulations. 2. The maximum area of the proposed building shall be limited to 34,551 square-feet of floor area, as defined in LDC Section 1.08.02. 3. The church shall provide traffic control by law enforcement or a law enforcement- approved service provider for Saturday and/or Sunday, as applicable, peak hour traffic, at location(s) to be detennined by the law enforcement or law enforcement- approved service provider 4. The southbound left-in at the project's northerly driveway may be elosed during Sunday and/or Saturday peak-hours, as deemed necessary by law enforcement or the law enforcement-approved service provider, to maintain efficient vehicular traffic flow on public roadways. This shall be accomplished either by a barricade or by the law enforcement or law enforcement-approved service provider, as authorized by Collier County. 5. Irrespective of that shown on the Conceptual Site Plan, the property owner shall provide a five-foot wide pedestrian connection to the site from the existing six-foot sidewalk along Golden Gate Parkway, with the exact location to be detennined by the County Transportation Planning Oepartment at the time of Site Development Plan (SOP) review and approval, pursuant to the requirements of the LOC. 6. Prior to SOP approval, a build-in-lieu contribution shall be made by the property owner to the County for the otherwise required sidewalks within the abutting 66th Street SW and 63rd Street SW rights-of-way. 7. No schools (8211) or daycares (8351) shall be pennitted on the site, except those accessory uses customarily associated with church uses. Agenda Item No. 17B March W. 2009 Page 54 of 54 8. Any SDP for the site submitted to Collier County for review and approval shall be a unified plan that includes the Center Point Community Church site, previously approved by PU 77-3-C. 9. In lieu of a masonry wall or fence, an enhanced Type B buffer shall be provided, which shall consist of an alternating double hedgerow instead of a single hedgerow.