Agenda 01/27/2009 Item #16C 4 Agenda Item No. 16C4 January 27,2009 Page 1 of 30 EXECUTIVE SUMMARY Recommendation to approve Change Order #2 to Work Order PG-FT-3792-08-01, contract #05-3792, with de la Parte & Gilbert, P.A. for Fixed Term Specialized Legal Services in the amount of $1 00,000.00. OBJECTIVE: The public purpose is to retain legal services to assist Collier County in specialized areas of Florida water law, including acquisition of consumptive use pern1its and regional water supply planning. CONSIDERATIONS: The County is in need of legal assistance to ensure its interests are promoted and protected in matters under the jurisdiction of the South Florida Water Management District. These interests are most critical in the issuance of water consumptive use permits and in the preparation of the Water/Sewer District's long range water supply plans. On September] 3, 2005, under agenda item 16 C 7 the BCC approved contract #05-3792 with de la Parte & Gilbert, P.A. This Work Order is part of this contract and was originally issued on September 13,2007. This change order #2 will exceed the $200,000 threshold for Board of County Commissioners approval. FISCAL IMPACT: Sut1icient funds are available in project #7]058 - "Initial Water Legal Services"; Fund 4 ]2, "Water User Fees". LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is not quasi-judicial and requires no ex parte disclosure, requires only a majority vote for approval, and is otherwise legally sufficient for Board action.-SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATIONS: That the Board of County Commissioners, as Ex-officio the Governing Board of the Collier County Water-Sewer District, approve Change Order #2 to Work Order PG-FT-3792-08-01, contract # 05-3792, with de la Parte & Gilbert, P.A. for Fixed Term Specialized Legal Services in the amount of $100,000.00. Prepared bv: Phil Gramatges, Interim Director, Public Utilities Engineering. Page 1 of 1 Agenda Item No. 16C4 January 27,2009 Page 2 of 30 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: Item Summary: 16C4 Meeting Date: Recommendation to approve Change Order #2 to Work Order PG~FT~3972-08~01, Contract #05-3792, with de 1a Parte & Gilbert, P.A. for Fixed Term Specialized Legal Services in the amount 01 $100,000.00, 1/27/200990000 AM Prepared By Phil E. Gramatges, P .E. Sr. Project Manager Public Utilities Planning and Project Management Department Date Public Utilities 12/24/20089:31 :10 AM Approved B)" Jeff Klatzkow County Attorney Assistant County Attorney County Attorney Office Date 12/24/200810:52 AM Approved By Scott R. Teach County Attorney Assistant County Attorney County Attorney Office Date 12/29120089:45 AM Approved By Jennifer A. Belpedio County Attorney Assistant County Attorney Date County Attorney Office 12/29/2008 11 :43 AM Approved By Thomas Wides Public Utilities Operations Director Public Utilities Operations Date 1/6/2009 1 :01 PM Approved By James W. Delany Public Utilities Public Utilities Administrator Date Public Utilities Administration 119120098:34 AM Approved By OMB Coordinator OMS Coordinator Date County Manager's Office Office of Management & Budget 119/20099:43 AM Approved By Susan Usher County Manager's Office Senior Management/Budget Analyst Office of Management & Budget Date 1115/20094:34 PM Approved By James V. Mudd County Manager Date Board of County Commissioners County Manager's Office 1/15120097:53 PM file:l/C :\AgendaTest\Export\ 122-J anuary%2027, %202009\ 16. %20CON SENT%20AGEND... 1/21/2009 . . . Agenda Item No. 16C4 January 27,2009 Page 3 of 30 Vlvian Arenas-Batties Michael R. Bray Oavid M. Caldevilla Michele M. Cemllo Edward P. dela Parte, Jr. Amy C. Duffey delaParte & Gi1bert, PA. ATTORNEYS AT LAw December 18, 2008 Richard A. Gilbert Christopher j. Lev Daniel]. McBreen Pat"ick .1, McNamara Nicolas O. Porter Kris:in A. Yerkes Louis A. de 13 Parte, Jr. Founder (Retiredj Via U.S. Mail and Email Mr. Phil Gramatges, P.E. Interim Engineering Department Director Collier County Public Utilities 3301 E. Tarniarni Trail Building H 3'd Floor Naples, Florida 34112 Re: de la Patte & Gilbert, FA. - Updated Task Orders jViscellal1eous Utility p"()iects Dear Phil, As you requested, we are submitting the following update to Work Order PG-FT-3972- 08-01. The $100,000 task order previously assigned to the work items identified in my March 17, 2008 letter has or will soon be exceeded and many of these assignments are still ongoing. Pursuant to our discussions, it appears the County would like us to continue work- ing on the following tasks: 1. Freshwater and Brackish Water SO/50 Split 2. Utility Service Concurrency Management System 3. Orange Tree Utility1 4. Special District Protocol 5. Utility Infill Areas 6. Interlocal Agreements 7. FGUA Golden Gate Utility System 8. Future Modifications of Well field/Recharge Protection Areas 9. Water Use Permitting Issues2 10. Water Shortage Issues II. Big Cypress Developmcnt 12. Utility District Expansion Evaluation. 1 A separate task order has been assigned to the lawsuit instituted hy Orangctrcc in August 2007. TIllS item relates to general Orangctree utility matters that may arise em an a..~~necdcd basis. :2 At your suggestion, a st..1'aratc scope and budget has been prepared by for administrative litigation relating to Picayune Strand Reservation Rule and the Water Use Permit Application 060908-9. This item relates to gen- eral water use permit matters that may arjsc on an as~nccdcd basis. JOJ East Kennedy Blvd.) SU!t'2 3.:100 Post Office Box 23S0 Tar:lpa, F<lorlda 33601.2350 T. (813i 229.2775 F. (813) 229-2712 wW'N.dgfirrn.com Agenda Item No. 16C4 January 27, 2009 Page 4 of 30 ,-' de laPARTE & GILBERT, P. A. PROFESSIONAL ASSOCIATION I understand for billing purposes the County will include these 12 assignments in a Miscel- laneous Utility Project Task Order for an amount not to exceed $100,000. As indicated in the two footnotes identified above, this amount does not include separate work we are per- forming for the County in connection with the Orangetree and Water Use Permit Litigation. The scope of service for the Miscellaneous Utility Project Task Order will consist of pro- viding legal service and advise and other assistance to the Collier County Public Utilities Division on the various utility and regulatory matters identified in Items 1-12 above. It is anticipated that our work will continue until these assignments are completed. At present, there are no specific deadlines for the completion ofthese assignments. Please note the scope of service docs not include administrative or judicial litigation. If thcrc is a new Work Order that requires my signature, please forward it to my paralegal Linda Fay. We appreciate the opportunity to work with the Collier County Utilities Division all these interesting and challenging tasks. Please contact me if you have any questions or comments regarding the matters set forth herein. Sincerely Yours; de la Parte & Gilbert, P. A. ~J~5t.-~~ Edward P. de la Parte, Jf. 2 . .. - - '"' '"'..... - CONTRACTIWORK ORDER MODIFICATION CHECKLIST FORM Page 5 of 30 'j7J f:, CU PROJECT NAME: Water Leoal Services PROJEcT#:710581 PROJECT MANAGER: Phil Gramatoes Old PO 4500089685 BIDIRFP #: ~ MOD #: L N_ POI: 4500100181 WORK ORDER #: PG-FT-3792-08-01 DEPARTMENT: Public Utilities Enoineerinc CONTRACTOR/FIRM NAME: De ia Parte & Gilbert P.A. Ortglnat Ccntract Amount: $ 100.000.00 (Starting Point) Current BCC Approved Amount: $ 190,000.00 (Last Total Amount Approved by the Bee) Current Contract Amount: $190.000.00 (Induding All Changes Prior To This Modification) Change Amount: $100,000.00 Reviled ContractIWor!< Order Amount: $290,000.00 (including This Change Order) Cumulative Dollar Value of Changes to this ContracllWor!< Order: $190.000.00 Date of Last BCC Approval _ Agenda Item # Percentage of the changG-Under current contract amount 190% Formula: (Revised Amoun~ Bee approved amount)~ 1 CURRENT COMPLETION DATE IS): ORIGINAL: tn accordence wlih schedules recuired bv the Circuli Couri Describe the change(s):An increase in work order's amount in order to add additional funds to cover the unanlicipated hiah level of effort reaulred to handle several Miscellaneous Utility Proiects, consultina and leaal services. advice and other tasks related to Utilities and reaulatorY matters Specify the reasons for the change(s) r 1. Planned or Elective r 2. Unforeseen Conditions r 3. Quantity Adjustments " 4. Correction of Errors (Plans, Specifications or Scope of Work) r. 5. Value Added r 6. Schedule Adjustments Note: One Dr more may be checked, depending on the nature of the change(s). Identify all negative impacts to the project if this change order were not processed: Failure to authorize the chanae order will impede de la Parte & Gilbert. P ,A. representation in several Miscellaneous Utility Prolects as listed In the attached proposal. This change was requested by: n Owner PI Contractor I Consultant n Using Department C CDES COesign Professional nRegulatory Agency (Specify) r Other (Specify) CONTRACT SPECIALIST PARTlclPATIO r Yes r;1 No Dale: I'Z. 11'1/0'8 la/fLit! REVtEWED Date: Contract Specialist Revised 11.19.2007 Agenda Item No. 16C4 January 27,2009 Page 6 of 30 TO: Edward P. de la Parte, Jr President De la Parte & Gilbert, PA 101 East Kennedy Blvd, Suite 3400 Tampa, FI 33601 CHANGE ORDER TO WORKORDER # 2 FROM: Public Utilities Engineering Department Public Utilities Division Collier County Government 3301 East Tamiami Trail, Building H Naples, Florida 34112 Project Name: Water Legal Services Contract # 05-3792 Work Order Dated: December 7, 2007 Change Order No.: 2 Work Order No.: PG-FT-3792-08-01 Date: December 17, 2008 Change Order Description:This change order is to add additional funds to cover the unanticipated high level of effort required to hendle several Miscellaneous Utility Projects, consulting and legal services, advice and other tasks related to Utilities and regulatory matters. Original work order amount...... ........... ................... ..$100,000.00 Change Order NO. 1.................e. ...................................... ... $ 90,00000 This Change Order No.2 Amount (add r subtract)...... ...... ......... ...... ...... ...........$100,000.00 Revised Work Order Amount....... .............................................................$290,000.00 Origtnal work order time in calendar days................................................. .......365 days Adjusted number of calendar days due to previous change orders..............................., NiA days This change order adjusted time is............................................................................... 365 days Revised Work Order Time In working days ............................................................... 730 days Original Notice to Proceed date .................................................................. September 17, 2007 Completion date based on originat contract time .................................................................... NfA Revised completion date due to change order(s).......................................... September 17, 2009 Your acceptance of this change order shall constitute a modification to our Agreement and will be perfonned subject to all the same terms and conditions as contained In said Agreement indicated above, as fully as if the s e were repeated in this acceptance. The adjustment, to this Agreement shall constitute a fu and al settlement of any and all claims arising out of, or related to, the change s~ forth her In, I ding claims for impact and delay costs. Prepared by: ~ . Date: Ict/17 /.J(J() 4' . tant Approved by: Date: \ 2J \'9. k:R. Approved by: Date: Jim Delony, Administrator, Public Utilities Division Reviewed b ~ ~-R~ Date: \<3-~~,0~ Accepted by: Date:#! I . . . Agenda Item No. 16C4 January 27, 2009 Page 7 of 30 Richard A. Gilbert Christopher J. Lewis Daniel J. McBreen Patrick]. McNamara Nicolas Q Porter K1istin A Yerkes Louis A de la Parte, Jt Founder (Retired) VIvian Arenas.Battles Michael R. Bray David M. Caldevi1la Michete M. Cerullo Edward P deta Parte, Jr. Amy C. Duffey de la Parte & Gilbert, PA ArroRNEYS AT lAw December 18, 2008 Via U.S. Mail and Email Mr. Phil Gramatges, P.E. Interim Engineering Department Director Collier County Public Utilities 3301 E. Tamiami Trail Building H 3'd Floor Naples, Florida 34112 Re: de la Parte & Gilbert, FA. - Updated Task Orders Miscellaneous Utility Projects Dear Phil, As you requested, we are submitting the following update to Work Order PG-FT-3972- 08-01. The $100,000 task order previously assigned to the work items identified in my March 17, 2008 letter has or will soon be exceeded and many of these assignments are still ongoing. Pursuant to our discussions, it appears the County would like us to continue work- ing on the following tasks: 1. Freshwater and Brackish Water 50/50 Split 2. Utility Service Concurrency Management System 3. Orange Tree Utility1 4. Special District Protocol 5. Utility Infi11 Areas 6. Interlocal Agreements 7. FGUA Golden Gate Utility System 8. Future Modifications of Wellfield/Recharge Protection Areas 9. Water Use Permitting Issues2 10. Water Shortage Issues 11. Big Cypress Development 12. Utility District Expansion Evaluation, ~ '3 = 0 :I' ....., ('""') C ~~ :'.) I'TI ::.::- ~~ Cl 9 C> C> 1 A separate task order has been assigned to the lawsuit instituted by Orangetree in Augnst 2007. This item relates to general Orangetree utility matters that may arise on an as-needed basis. 2 At your suggestion, a separate scope and budget has been prepared by for administrative litigation relating to Picayune Strand Reservation Rule and the Water Use Permit Application 060908-9. This item relates to gen- eral water use permit matters that may arise on an as-needed basis. to I East Kennedy Btvd., Suite 3400 Post Office Box 2350 Tampa, Florida 33601.2350 T. (8t3) 229.2775 F. (8]3) 22927]2 www.dgfirm.com Agenda Item No. 16C4 January 27,2009 Page 8 of 30 /--- de laPARTE & GILBERT, P. A. PROFESSIONAL ASSOCIATION I understand for billing purposes the County will include these 12 assignments in a Miscel- laneous Utility Project Task Order for an amount not to exceed $100,000. As indicated in the two footnotes identified above, this amount does not include separate work we are per- forming for the County in connection with the Orangetree and Water Use Permit Litigation. The scope of service for the Miscellaneous Utility Project Task Order will consist of pro- viding legal service and advise and other assistance to the Collier County Public Utilities Division on the various utility and regulatory matters identified in Items 1-12 above. It is anticipated that our work will continue until these assignments are completed. At present, there are no specific deadlines for the completion of these assignments. Please note the scope of service does not include administrative or judicial litigation. If there is a new Wark Order that requires my signature, please forward it to my paralegal Linda Foy. We appreciate the opportunity to work with the Collier County Utilities Division on these interesting and challenging tasks. Please contact me if you have any questions or comments regarding the matters set forth herein. Sincerely Yours; de la Parte & Gilbert, P. A. ~ ~J.,~.f>~ Edward P. de la Parte, Jr. 2 "i;~~'?:'~~' View, i~~;mfu~it~~~~Tilr~--im7,r~",.:n~-~Jt1;~~~:='~';~~~"G.~;'I\'*~.;>:~~,/~.~~~ ~",. jill. ,~~L___ ,,_.~iJ~.m~Y~~~iM:~~~J!;i.~~~~~~~~~~iE!~M~L~j~~'~)t:~I~;~;f;:' "~~_'c Ado/Amd/ACl/ComlAval ITi1'~'" """ft1,*IF.t1~~' "'IIIli' ;G:GJ~D"'~' '~'" '.."',""'"'''''-=-OIJll'''''!'ho"",,,,,''-''''C''':!''''I'''''''_"''''~''1l'~_"-".e.",.,.,.,,,w,,, ,:.:', "; _' ~i1l!!J,lclf~"',~: '"I~ ,.Columo_!'ii -:-~"H wI,I' ""';._~~~;':I;".::,",~:,,;J~I:.~r_:::"';";';i!,~::'-"'*''.'f1;~-~i;t?",!~3:-",:;~,~,;:c,i';li'>ili' ~~'t~~: ., ',___,_"", ..0........ .._ _" ",' _."" "". _" ".~._ , , _ ::.,," , "...~~;..,.....~.,.-..,\...n""-i:;~~,~"".~.;l.,~,.w<~",'_...,,-""". '"',.,"....,,,,.._, -',',= .._ _~,".'~__ COI Y_DEV':'.J2a,80,~28 rrfn,~<D8t,e .1211612808 In1ti~' ~rt8r LegaTS~r...icil$ VaflatiDrl:ObJect i~L..e~El~@~~ ~t~D8L~i'rvti!~~ i '.':<f,.Q:~!r~1()~8 i,n.~I!l;~~iL~v~:(~,~MH"i;,:./ "'i'; "".a WSB 710sei1,:ltIl1i1fWIlerLegOll (Cum,): I,"~: - "--- - -s7iii5i 1 -Initial Waler LegOlI ' . prpj8ct R'eport., 'selectedPrO.1Rcts Selected lias 71958",;:: ~~~1Zr.,"'i . ~11 cost elelentl 12,Q5BJB 12,IlIiB.38 BJ, 6B~ 99 BJ.681,9g 96,6!iO.37- 96,650,37- Pf'Oj'~t~S,,E,j 1l.'~~t';;{-~Ii:j"i1'e~8 ,1<<i,prJJ:$i\)l:e.Cott'ttr' Cost€lMent6roup Co,t ..ltilnt IIroup f1scafVurlPenod 2ge9! 1 to 12 Fund.. ..' ..... ...,., .... ....... ...........'....n "Startlng 1 010112988., \Ioi1t YBCS_BUD_ TO_ACTUAL uH ..,H..., .u.....'..,.". .......~. .....,.... ~,~!jL I.......'me _.i!mO!llill_'~a.!!IIII__ ---"~ 6f\A,I'IATSESf', 121111/290B H:8B:H ~D Ys - IODlg/ ? Y Dje.<!--\- 1-1 05CO ' J- ~ IOOI~ 10,5 t)(.~ "'1 ~... ./'/ j 3 3 1&lI0G :=.:':":::.::.,~.._:__.~17 Agenda Item No. 16C4 January 27, 2009 Page 10 of 30 December 15, 2008 Via U.S. Mail and Email Mr. Phil Gramatges, P.E. Interim Engineering Department Director Collier County Public Utilities 3301 E. Tamiami Trail Building H 3'd Floor Naples, Florida 34112 Re: de la Parte & Gilbert, P.A. - Updated Task Orders Miscellaneous Utility Projects Dear Phil, As you requested, we are submitting the following update to Work Order PG-FT-3972- 08-01. The $100,000 task order previously assigned to the work items identified in my March 17, 2008 letter has or will soon be exceeded and many of these assignments are still ongoing. Pursuant to our discussions, it appears the County would like us to continue work- ing on the following tasks: 1. Freshwater and Brackish Water 50/50 Split 2. Utility Service Concurrency Management System 3. Orange Tree Utilityl 4. Special District Protocol 5. Utility Infill Areas 6. Interlocal Agreements 7. Pelican Bay Community Development District 8. FGUA Golden Gate Utility System 9. Future Modifications of Wellfie1d/Recharge Protection Areas 10. Water Use Permitting Issues 11. Water Shortage Issues2 12. Picayune Strand CERP Water Reservation 13. Big Cypress Development 1 A separate task order has been assigned to the lawsuit instituted by Orangetree in August 2007. This item relates to general Orangetree utility matters that may arise on an as-needed basis. 2 At your suggestion, a separate scope and budget has been prepared by for administrative litigation telating to Picayune Strand Reservation Rule and the Water Use Permit Application 060908-9. This item relates to gen- eral water use permit matters that may arise on an as-needed basis. Agenda Item No. 16C4 January 27, 2009 Page 11 of30 de laPARTE & GILBERT, P. A. PROFESSIONAL ASSOCIATION 14. Utility District Expansion Evaluation. I understand for billing purposes the County will include these 14 assignments in a Miscel- laneous Utility Project Task Order for an amount not to exceed $100,000. As indicated in the two footnotes identified above, this amount does not include separate work we are per- forming for the County in connection with the Orangetree and Water Use Permit Litigation. The scope of service for the Miscellaneous Utility Project Task Order will consist of pro- viding legal service and advise and other assistance to the Collier County Public Utilities Division on the various utility and regulatory matters identified in Items 1-14 above. It is anticipated that our work will continue until these assignments are completed, At present, there are no specific deadlines for the completion of these assignments. Please note the scope of service does not include administrative or judicial litigation. If there is a new Work Order that requires my signature, please forward it to my paralegal Linda Foy. We appreciate the opportunity to work with the Collier County Utilities Division on these interesting and challenging tasks. Please contact me if you have any questions or comments regarding the matters set forth herein. Sincerely Yours; de la Parte & Gilbert, P. A. Edward P. de la Parte, Jr. 2 . . "nand~ 'tam NO. 16r.4 I J~~I)' 27, 2009 q 1.2 f19~ 12 of 30 1~'C, 1 _. EXECUTIVE SUMMARY Recommend approval of short-listed firm and award of contract to de la Parte & GUbert, P.A, for RFP #05-3792 - Fixed Term Utility Specialized Legal Services in the estimated annual amount of 5200,000. OBJECTIVE: The public pwpose of this award is to retain legal services to assist the County in specialized areas of Florida water law, including acquisition of consumptive use permits and regional water supply planning. CONSIDERA nONS: The County is in need of legal assistance to ensure its interests are promoted and protected in matters under the jurisdiction of the South Florida Water Management District. These interests are most critical in the issuance of water consumptive use pennits, and in the preparation of the District's long range water supply plans. The RFP was publicly advertised on April 29, 2005, Notices were sent to 7 finns with 5 vendors requesting full packages. Two responses were received by the due date of May 27, 2005. A Selection Committee meeting was held on July I, 2005 and after review and discussion, and by consensus of the Selection Committee, the following two finns were short-listed in order: - l.de la Parte & Gilbert, P.A. 2. Carlton Fields Staff has negotiated and reached agreement with the top ranked finn, de la Parte & Gilbert, P.A., and recommends award of Contract 05-3792 to that flTID. The time frame of the contract is for one year from the date of execution, with three one year renewals. Each individual Work Order under the Contract shall not exceed $90,000 unless otherwise approved in writing by the Board of County Commissioners, and the total initial compensation for all Work Orders issued under this Agreement shall not exceed $500,000 annually, unless otherwise approve in writing by the Board of County Conunissioners of Collier County. The hourly rates under this Contract are: Professional Hourlv Fee Edward de la Parte, Jr. $225.00 Other Shareholders $]90.00 Associate Attorneys $150.00 Law Clerks $100.00 Paralegals $ 90.00 - . . I~...... "I. 1~r.d January 27,2009 Page 13 of 30 This fixed term contract for professional services is available for review at the County Manager's office, Building F, and the Public Utilities offices, Building H. This will be made part of the record when considered by the Board. FISCAL IMPACT: A Budget Amendment is required to remove money out of water user funds (412) reserves. As specific tasks are identified, necessary funds will be made available. The amount to be used from this fund is $200,000. GROWTH MANAGEMENT IMPACT: While this has no direct impact on the Growth Management Plan, it will provide planning and permitting consistency between the County and the District. RECOMMENDATION: That the Board of County Commissioners, as ex-officio Governing Board ofthe Collier County Water/Sewer District; (I) Approve the Contract #05-3792 with the firm of de Ia Parte & Gilbert, PA, and (2) Authorize the Chairman to execute a standard County Attorney approved contract.(3) and approve necessary Budget Amendment. PreDaTed by: Roy B. Anderson, P.E. Director, Public Utilities Engineering Department. To: 8132292712 10/19/07 04:00 PM From: SainvilusJames January 27,2009 Page 14 of 30 Page 2 of 2 /"'". WORK ORDER # PG.FT.3972.[Jfj..1J1 Agreement for FIXED TERM UTILITY SPECIALIZED LEGAL Dated: September 13, 2007 (RFPIBid 05-3792) This Work Order is for professional PIXED TERM UTILITY SPECIALIZED LEGAL services for work known as: Project NnnlC: Water Legal Services Project No: 7lO5H I The work is specified in the proposal dated Oo,tober 15, 2007 which is attached hereto and made a part of this \~.rork Order. In accordance with Ternu~ and Conditions of the Agreement referenced aboyc, V/nrk Order # PCj"-FT<1::172-0B-01 jg assigned 10: Dc La Parte & Gilhert, P.A Scope ofVvork: See attached price proposal for scope of work for :!VIiscellaneous Utility Project & Utility District Expansion Evaluation. Schedule of Work: There are no specific deadlines for the completion of these assignments. Comnensation: In aCl:ordancc with Ar1icl~ Five or the Agreement, {he County will compensate the Finn in accordance with lime & Material (established hourly rate(s) - Schedule B) as provided in the fix tenn contract. ,~ Tasks 1.12 $100,000 Time & Malerial TOTAL FEE $100,000,00 Any change made subsequent to linal department npproval will hl: c0l1s1dcn.::d un additionaJ service and charged according to Schedule "A'~ of the original Contract Agreement. . PREPARED BY: ames Sainvilus.. Project Manager Associate uhlic Utilities Engineering Department /\UTIlORIZED 13Y: Vi Director !.,Jy, )07 I I Date ACCEPTED BY: Public Utilities Engineering Department ~~~ ~-P..-d:r De La Parte & Gilbel1, P.A. f1vu Ie> (1"\/aoo1 Date REVIEWED BY: (.'A_~1LA- I ,;J - '-f .. 01 Date Dianna Perryman; Contract ecialist Purchasing Department January 27, 2009 Page 15 of 30 . . . Vivian Arenas David M. Caldevilla Edward P de 121 Parte, Jr. Charles R. Retcher Richard A. Gilbert Christopher J. LRWis delaParte&Gilbert,PA. _ ArroRNEYS AT L\w ' , '01 (lei October 26, 2007 '"'n t....:" " 3: 28 Daniel J. McBreen Patrick J. McNamara Nicolas O. Poner Kristin A. Yerkes Louis A. de 121 Parte. Jr. Founder rRelirpd) Mr. James Sainvilus Project Manager Associate Collier County Public Utilities 3301 E. Tamiami Trail Building H 3 rd Floor Naples, FL 34112 Re: Collier County Work Order #PG-FT-3972-08-01 Dear James: Enclosed please find the County's Work Order #PG-FT-3972-08-01 Agreement for Fixed Term Utility Specialized Legal regarding the scope of work dated October 15.2007. Please have the work order signed by the rest of the parties and return a fully-signed copy to me. If YOll have any questions or need further information or material, please do not hesitate to contact me. Sincerely, Enclosure~. cc: Edward P. de la Parte, Jr., Esq. (w/o encl.) ~w PA. RTE & GILBERT, P.A. rjf\c1\~\ Lhr Lind~ K. Foy, Paralegal \01 East Kennedy Blvd., Suite 3400 Post Office Box 2350 Tampa, Florida 33601.2350 T 18131 2292775 F. [813i 229.2712 www.dgfirm.com I January 27, 2009 Page 16 of 30 ",_.. , . . . Vivian Arenas DavldM.Ca1devllla EdwBl'd P. de la Pane, Jr. CJurIes R. Retdler RIchard A. GlIbett delaParte & Gilbert, PA AnDRNEYS AT Wv Daniel 1 McBreen Pamck 1 McNamara NicoIasQPart!r KristIn A. YeItes louisA. de la Parte, Jr -r_ October 15, 2007 Mr. Roy Anderson, P.E. Engineering Department Director Collier County Public Utilities 3301 E. Tamiami Trail Building H, 3'" Floor Naples, Florida 34112 Re: de Ia Parte & Gilbert, P.A. - Updated Task Orders Miscellaneous Utility Projects Dear Roy, ~- As we discussed last Friday, the time has come to update the task order for the items as- signed to us by Collier County Public Utilities. The $110,000 task orders previously assigned to the work items identified in my September 25,2006 have been exceeded and many of these assignments are still ongoing. In fact, the work on certain items such as Water Use Permitting Issues has substantially increased in just the past few weeks. Additionally, the County has assigned new tasks to us not previously contemplated under my 2006 letter. Pursuant to our discussions, it appears the County would like us to work on the follow- ing tasks: I. Executive Lobbying 2. Freshwater and Brackish Water 50150 Split 3. Utility Service Concurrency Management System 4. Orange Tree Utility' 5. Special District Protocol 6. Utility Infill Areas 7. Interlocal Agreements 8. Pelican Bay Community Development District 9. FGUA Golden Gates Utility System 10. Future Modifications of Wellfie1d/Recharge Protection Areas 1 L Water Use Pennitting Issues 12. Utility District Expansion Evaluation I A separate task: order has been assigned to the lawsuit instituted by Orange Tree in August 2007. This item relates to general Orange Tree Utility matters such as the recent issue that arose concerning relocation of Or- ange Treels transmission lines in connection with a County road project. - 10] East Kennedy Blvd, Suite 3400 I Post Office Box 2350 Tampa, F10rtda 33601.2350 T.1813) 229.2775 E(813) 229-2712 www.dgfinn.com January 27, 2009 Page 17 of 30 de IaPARTE& Gll.BERT, P. A. PROFESSIONAL ASSOCIATION I understand for billing purposes the County will include these 12 assignments in a Miscel- laneous Utility Project Task Order for an amount not to exceed $100,000. The scope of service for the Miscellaneous Utility Project Task Order will consist of providing legal advice and other assistance to Collier County Public Utilities Division on the various utility and regulatory matters identified in Items 1-12 above. It is anticipated that our work will continue until these assignments are completed. At present there are no specific deadlines for the completion of these assignments. Please note the scope of services does not include administrative or judicial litigation. Given the current level of work assigned to us by Collier County regarding these matters, we anticipate that this new task order amount will not last through the end of the fiscal year as was the case with the 2006 task order. Additionally, some of the items such as No. 11 Water Use Permitting Areas and No. 12 Utility District Expansion will require a heightened level of service given recent new developments. In fact, the County's comminnent to obtain. ing issuance by the South Florida Water Management District of pending water use permit applications may even require administrative litigation. Therefore, at your request, we will submit a budget covering our anticipated services through end of the 2007-2008 Fiscal Year in the next few weeks. We appreciate the opportunity to work with the Collier County Utilities Division on these interesting and challenging tasks. Please contact me if you have any questions or comments regarding the matters set forth herein. Sincerely Yours; de la Parte & Gilbert, P. A. ~,l ~~ Edward P. de la Parte, Jr. 2 I 10 I Z70<63Page 18 of 30 TO: d. Ie Parte & Gilbert, P.A. 101 East Kennedy Blvd, suite 3400 Tampa, Florida 3360J CHANGE ORDER TO WORKORDER FROM: Collier County PUBLIC UTILITIES ENOlNEERlNO 3301 E. Tamiami Trail3rd fl BI. H Naples, Florida 34112 Water Legal Service 710581 September 13, 2007 PG-FT-3972-08-01 Change Order # ) May 09,2008 Cbange Order Description: An increase in the Work Order amount to provide funds to cover the unanticipated high level of effort required to handle several Miscellaneous Utility projects. consulting and legal services. advice and other tasks related to Utilities and regulatory maners Original agreement amount .............................................................. $ 100,000.00 Sum of Previous Changes... ,........ ... ,... ..... ..........., ..,... ... ..,...$ 0 This Change Order No. I Amount (add or subtract) ....................... $ 90,000.00 Revised Agreemellt AlIWUllt............................................................. $ 190,000.00 Original contract time in calendar days ... ............... ........ ..................... .......N/A days Adjusted number of calendar days due to previous change orders .., .......... ...... .N/A days This change order adjusted time is.................. ,..... .................... ...... ........ ..,N/A days RevisedConrract Time in workingdays......................................................N/A days Original Notice to Proceed date ............................................ September 17, 2007 Completion date based on original contract time ....................... N/A Revised completion date due to change order(s)........................ N/A Your acceptance of this change order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in said Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, to this Agreement shall constitute a full and final settlement of any and all claims arising out of, or related to, the change set forth herein, including claims for impact and delay costs. J Prepared by: ~ kL Date: 0 r /q Je ? Paulo Martins, Adm, Assistant Public Utility Engineering Accepted by: ~ d.e ~ .p~ Edward de la Parte De L arte it.f. il Approved by: ? Phil amatges,.E nterim Director Publi Utility E g' eri epartment ~ Date: ~/<:.r/(}~ Approved by: Date: 5/Q,,/O~ lie Utilities Administrator r Date?} i111XJ ~;/ Approve Date: 5/9 /0 p I Revised 2-22-08 Page 19 of 30 PROJECT NAME: 05-3792 WATER LEGAL SERVICES CONTRACTIWORK ORDER MODIFICATION CHECKLIST FORM 710581 PROJECT #: PHIL GRAMATGES PROJECT MANAGER: BIDIRFP .: DEPARTMENT: PUED MOD': PC>#: 4500089685 WORK ORDER #: PG-FT-3972-08-01 CONTRACTOR/FIRM NAME: DE LA PARTE & GILBERT Original Contract Amount: $ 100,000.00 (Starting Point) Current Bee Approved Amount: $ Current Contract Amount: $ (Last Totat Amount Approved by !he Bee) 100,000.00 (Including All Changes Prior To This Modification) 90,000.00 Change Amount: $ Revised ContractIWork Order Amount: $ (Inctuding This Change Order) 190,00000 Cumulative Dollar Value of Changes to 90,000.00 this ContractlWork Order: $ Date of Leat Bee Approval Agende Item # Percentage of the chonge over/under current contrect amount Formula: (Revised Amount / Last Bee epproved amount)-1 90% % There are no specific deadlines for the completion of these assignments CURRENT: CURRENT COMPLETION OATE (S): ORIGINAL: Describe the change(s): An increase in the Work Order amount to provide funds to cover the unanticipated high level of effort required to handle several Miscellaneous Utility projects, consulting and legal services, advice and other tasks related to Utilities and regulatory manors Specify the reaeons for the change!s) n 1. Planned or Elective C 2. Unfores'!!Jl Conditions C 3. Quantity Adjustments C 4, Correction of Errors (Plans, Specifications or Scope of Work) (y; 5. Value Added C 6. Schedule Adjustments Note: One or more may be checked, depending on the nature of the change(s). Identify all negative impacts to the project If this change order were not processed: Failla authorize the change order will impede De La Pane & Gilbert, P.A. representation in several Miscellaneous Utility projects as listed in the attached proposal This change was requested by: II71'Contractor/Consultant r; Owner r; Using Department C. CDES COesign Professionel rJRegulatory Agency (Specify) r Other (Specify) CONTRACT SPECIALIST PARTICIPATION IN NEGOTiATIONS: This form Is to be signed and 1:/., PREPARED BY: ~ PAUWMARIINS Ad si t r Yes W' No REVIEWED BY: Date: s/q 10 J' APPROVED BY: Date: €;;.ff.fo9 Date: dq/oe Dianna perryman- Con Revised 2-22-08 I . . . Vivian Arenas fl.vidM.Caldevilla Edward P dela Pane, Jr. Richard A. Gllben ChrIstopher J. Lewts delaParte & Gilbert, PA ATJ'oRNE'r.; fJ J...tiw DanJell McBreen Patrick). McNamara Nicolas Q. Porter Kmtln A. Yerkes Louls A. de]a Parte. Jr. Founder (Retiled! March 17, 2008 Mr, Roy Anderson, P.E. Engineering Department Director Collier County Public Utilities 3301 E. Tamiami Trail Building H, 3"' Floor Naples, Florida 34112 Re: de la Parte & Gilbert, P.A. - Updated Task Orders Miscellaneous Utility Projects Dear Roy, As we discussed in late February and again this past week, the time has come to update the task order for the items assigned to us by the Collier County Public Utilities. The $100,000 task order previously assigned to the work items identified in my October 15, 2007 letter has or will soon be exceeded and many of these assignments are still ongoing. As you recall, I had indicated in my letter that this task order amount would not last through the end of the fiscal year given the high level of effort with respect to several of these tasks, such as water use permitting. Additionally, due to recent changes to the Capital Improvement Budget, the County has asked us to re-prioritize action on certain matters. Finally, the County has assigned new tasks not identified in the previous letter. Pursuant to our discussions, it appears the County would like us to work on the follow- ing tasks: I. Freshwater and Brackish Water 50/50 Split 2. Utility Service Con=ency Management System 3. Orange Tree Utility' 4. Special District Protocol 5. Utility Infill Areas 1 A separate task order has been assigned to the lawsuit instituted by Orangetree in August 2007. This item relates to general Orangetree utility matters that may arise on an as.needed basis. ]01 East Kennedy Blvd., Sulte 3400 I T. IBI3) 229.2775 Post Office Box 2350 E {BI3} 229.2712 Tampa, Flonda 33601.2350 www.dgllrm.com Page 21 of 30 de la PARTE & GILBERT, P. A. PROFESSIONAL ASSOCIATION 6. Interlocal Agreements 7. Pelican Bay Community Development Districr 8. FGUA Golden Gate Utility System 9. Future Modifications ofWellfield/Recharge Protection Areas 10. Water Use Permitting Issues 11. Water Shortage Issues 12. Picayune Strand CERP Water Reservation 13. Big Cypress Development 14. Utility District Expansion Evaluation. I understand for billing purposes the County will include these 14 assignments in a Miscel- laneous Utility Project Task Order for an amount not to exceed $100,000. As indicated in the two footnotes identified above, this amount does not include separate work we are per- forming for the County in connection with the Orangetree and Pelican Bay litigation. The scope of service for the Miscellaneous Utility Project Task Order will consist of pro- viding legal service and advise and other assistance to the Collier County Public Utilities Division on the various utility and regulatory matters identified in Items 1-14 above. It is anticipated that our work will continue until these assignments are completed. At present, there are no specific deadlines for the completion of these assignments. Please note the scope of service does not include administrative or judicial litigation. If there is a new Work Order that requires my signature, please forward it to my paralegal Linda Foy. We appreciate the opportunity to work with the Collier County Utilities Division on these interesting and challenging tasks. Please contact me if you have any questions or comments regarding the matters set forth herein. Sincerely Yours; de la Parte & Gilbert, P. A. ~h~~ Edward P. de la Parte, Jr. 2 At your suggestion, a separate scope and budget has been prepared by for the administrative proceeding insti~ nJted by the Pelican Bay Foundation, loe, against the County's SFWMD Application No. 050225.37 and Permit 1 J~OO52.W for the Pelican Bay/Mule Pen Supplemental Reclaimed Water System and anticipated chaUenge by the Pelican Bay Founda,ion, Inc. to the County's DEP Permit FL0141399-013 DWIP for the Collier County North Water Reclamation Facility. This item relates to general Pelican Bay utility mattes that may arise on an as-needed basis. 2 BUDGET AMENDMENT REQUEST For BudptlFinll1QC Use Only BAlI............................... IEJI................... SARN.............................. A.P.H. o.h............"., ......, J:J; 22 of 30 ~~~ I ~.~ I ~ . " ,f,' .. 412 Fund Nwnber W Blcr Capital Projects Fund Description Date Prepared: Approved by BCC on: Attach Executive Summary Item No.: Expense Budget DetaD Fund Center Title: Water Combined Capital Projects WBS Element Title: NCRWTP RO Process ide Ihc Fund Center or was clcmcnllnfonnltion' it is not to ide both. Fund WBS Commit Commitment Item Center Element Item Descri tion 273512 710571 763100 Improvements FdCtrNo.: 273~ WBS N~0571) Current Revised Bud et Bud et 1,350,000.00 1,050,000,00 Net Change to Budget (300,000.00) Expense Budget Detail Fund Center Title: Water Combined Capital Projects WBS Element Title: Initial Water Legal Services ide the Fund Center or was cJlllment iIlfarnw:lon' it is not lTed to rovide bolb. Fund WBS Commit Commitment Item Increase Center Element Item Descri tion Decrease 273512 710581 631100 Legal Fees 300,000.00 Fd CtrNo,: 273512 .~ WBS N(""71058J,: Current Revised Bud et Bud et o 300,000.00 Net Change to Budget 300,000.00 Expense Budget Detail Fd Ctr No.: WBS No.: Fund Center Title: WBS Element Title: . de the Fund Center or was dement . Fund WBS Commit Center Element Item 'jtiJoot . b;I royj~botb. Commitment Item Increase Des.ri tlon Current Bud et Revised Bud et Net Change to Budget I WORK ORDER. PG-FT -3972-08-02 ('onlIllC1.05-:\792 Utility Spedali"'" l.egal S<:rviccs Daled: SeplC'1l1ber 13. 2005 This Work Order is for profe><Sional "''' ICCS lilT work known as: Projen N_e: PeIiam Bay AdmillialT1ltiYe LiliplW. Agenda Item No. 16C4 January 27, 2009 Page 23 of 30 The purpose of the work order is 10 provide prot'es:.ionaJ services ",llllod 10 preparing pre-hearings mOlio"" and respon....1O pre-hcIIring motioll5 related to administnllive hearings ..-rved by the Pelican e.y FOUDdation. Inc. The wm is """,ilied In the 1""1"""" dated Man:h 11, 200k whieh is llllllChed hereto and made a part of this Work Order In accordance ",ith Tmns and Conditions of the ^~m rerc""",e<l above. Wor!< Oruer . 1'( i-F I- 1'l72.0H-()2 " ,,-'''gned to de I, Parte & Gilbert, 1''''- SeoDe of Work: As detailed in the atta<.ilcd proposal and the h'ltowmg Task I - l.egal Services S 150,000.00 Task n - ReimbW'Sl<ble E,<pcn...s S45.0(j(l (~) Schedule of Work: The scope of work defined h=in will commence upon nolice 10 proceed. and are estimated to be compleled wilhin six months (180 Calendar days) ComDenSation: The County WIll comrenlillle de I. Parte & (jilOen, P.^ an amount not l(l exceed $195.000.00 based on Time & Motenal as proVIded In the <Iuached 1'1'01"",.1 de la Parte & (filhert. PA will pertlmn tasks undcr .Ilw>-"""l'k ordcr as rt'<lUCsled tw the County's Opernlions and Finan"" Oi=tor. lorn Wides. . PREPARED BY: Javier :raIions SUflC1'\'isor ) -~ APPROVED BY ___~~: ()::2> Thoma.. G. Wid<os, Ope",t",ns I'~I'" - \ t 'f;:~ APPROVf.D BY ~~~~ '(,~; I.f.- /(- -"'-J /' n~', Administrator (,_~~' i1i"6 Ill''''':";) REVn'WElJ BY _~_1{A Lt/:':"X1Md Dianna Perryman, Contmcl SqS*ialilil ACCEPTED BY _~ _ch ~f~ Edward de la Purte. t'rc<idenl Dc I. P~ & Gilbert. I'A -1JiWD12_ Date f'ivr 5{' ,.--., ..) {f.[(('j_C:S Dat(,' . llzlpj7 Dalt: _~tf/~- Date Age"da lien, 1<0. 40C4 January 27.2009 Page 24 of 30 WORK ORDER # PG-FT -3972.08-02 Contract # 05-3792 Utility Specialized Legal Services Dated: September 13, 2005 111is Work Order is for professional services for work known as: Project Name: Pelican Bay AdmiDistrauve Litigaooll The purpose of the work order is to provide professional services related to preparing pre-bearings motions and responses to pre-hearing motions related to administrative hearings served by the Pelican Bay Foundation, Inc. The work is specified in the proposal dated March 17. 2008 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referen~-ed above, Work Order # PG-FT-3972-08-02 is assigned to de la Parte & Gilbert. PA Scope of Work: As detailed in the attached proposal and the following: Task 1- Legal Services $150,000.00 Task II - Reimbursable Expenses $45.000.00 Schedule of Work: The scope of work defined herein will commence upon notice to proceed, and are estimated to be completed within six months (180 Calendar days). Compensation: The County will compensate de la Parte & Gilbert, P.A. Wl amount not to exceed $195,000.00 based on Time & Material as provided in the attached proposal. de la Parte & Gilbert, P.A. will perform tasks W1der~ order as requested by the County's Operations and Finance Director, Tom Wides. "./. ) /" APPROVED BY, ?C~ Thomas G. Wides. Operations ~r~tor APPROVED BY: ...c<:n c:J ;:&~9- . ,. ny, Admini&1ralOr ~ 'lities Division tions Supervisor ~Db Date PREPARED BY, Javier .5/-; I~ , r:5ate L~,bR Datel REVIEWED BY, Dianna Perryman. Contract Specialist Date ACCEPTED BY: Edward de la Parte, President De la Parte & Gilbert, P .A. Date _.........____~...-. ~ .------..- -_._._~----..". -_...~._-_....._--_.- ------.--- ..."--._---.._~- .----.--...-....Ayt::'11Jd ltt::'rll r\JU:-tOezt..__._._--- J~[!~arv 27.200_9 Page 25 of 30 . . . Vi"\-1an Arenas Davk1 M, Caklev!na Edward P deja. Pane, Jr. Rid'.ard A. Gllben C..hristopt'.er .1. Lewis delaParte & Gilbert, PA. Arl'oo-lm !if lAw Daniell M<8reen PaOick l McNamara Nlcow a. pQl1er Krls1In A. Yeltes LiJUlS A de~ Pane.. It Fourtdr- .1:Tirredl March 17, 2008 Mr. Thomas Wides Operations Director Collier Counry Public Utilities 3301 E. Tamiami Trail Building H, 3'" Floor Naples, Florida 34112 Re: de la Parte & Gilbert, P.A. - New Task Order Pehcan Bay Administrative Litigation Dear Tom, ! I On February 23 1 submined a proposal and budgello you, Roy Anderson and George Yilmez for legal fees and costs so that a separate task order can be prepared for thIS maner On March 13, Roy advised me that our proposal was acceptable. The scope of service for the Pelican Bay Litigation will include preparing pleadings reo sponsive 10 the petitions for administrative hearing served by the Pelican Bay Foundation, Inc.; preparing pre-hearing motions and responses to pre.hearing motions; preparing for and participating in pre-hearing discovery: preparing for hearing, including meeting with County staff and consultants; reviewmg documenL< and preparing exhibits for hearing; preparing for and anending the administrative hearings to be held in Naples, Flonda; preparing post- hearing pleadings, including proposed recommended orders, responses to proposed recom. mended orders and exceptions 10 proposed recommended orders; and, appearing before the District Go\'eming Board and the DEP Secretary to advocate entry of favorable final orders. This scope of work does not include any appeal by the County of an adverse final order or the Counry's response to an appeal of a final order by Pelican Bay Foundation, Inc. v-.re estimate our total fees for these services will not exceed $150,000 and we estLmate our reimbursable costs will not exceed $50,000. All other terms and conditions of our legal representation would be consistent with our Agreement with the County. 101 EilSI ~t.'lliledy Blvd., Suitt? 3400 POSl OffiCE' Box. 2350 Tamp~, Ronda 33601235D 1'. !8nl 22(,/.277:.) E i8J3i ZZY.27i2 VlW'^'.jltfi:m:.tom -..---"'- ~~~.__<_._..___<..<.~_.____.____.-__.___.__. --'-'JI;genda Item No< 16C4 January 27, 2009 Page 26 of 30 Mr. Thomas Wides March 17, 2008 Page 2 We appreciate the opportunity to work with the Collier County Utilities Division on these inreresting and challenging tasks. Please contact me if you have any questions or comments regarding the matters set forth herein. Sincerely yours. de la Parte & Gilbert, P< k ~ ~ J4.--PJ1 Edward P< de la Parte, Jr. cc: Roy Anderson George Yilmez ----f\:gemtaitem.f<tcr1tle'l--- January 27, 2009 Page 27 of 30 February 23, 2008 Mr. Thomas Wides Operations Director Collier County Public Utilities 330 I E. Tamiami Trail Building H, 3" Floor Naples, Florida 34112 Re: de]a Parte & Gilben, P.A. -..New Task Order Pelican Bay AdmJnistrat1ve-Litllla.~n Dear Tom. On February 8. 2008. tbe-'Pe1ican Bay FOlmdation, Inc. filed a petition for adminimauvc hearing with the South .f'loridaV(~ter Management District ("DistrIct") challenging issu- ance of Application Nd;"050225-37 and Permit 11-0052-W for the Pelican Bav/Mule Pen Supplemental Reclail\i'1I(t':!?{arq:)?YS1Cln,We'leamed on Fridav, Fenruary 22 ~he Distncr plans to refer this petilioriiPftlie Divisioribf Administrative Hearing fill' the appollHment of an admillistrj\9'~7Wi)i~)udgeiQjl:qIlduct a formal evidemiarv heanng. We undemand (he Pelican BilyCPiluriaauii,Kk Inc. alS~Jp1'ms on filing a petitioll tor admimst1'atlve hearlng chal- lenginK.\he renewal oj'~eparnnem of Environmental Protection ("DEP") PeI111lt FLOk4p99-013 DW Ipforlhe Collier County Nonh Water Rec!,lmation FaCIlity. when that;i5~.~jn,ij is issued in t~e next few weeks. The DEP attorney assigned to rhis maller has told us th&~g~ncy willp10st probably reter this petition to the division of administtatJve hearing for't"~purp~e of conducting a f(lImal eYidenriary hearing. Thus, it appears likely that within the'on,efit'several mOlllhs [he County wiJlneed to defend two formal administra- tive hearings brolight by the Pelican Bay Foundation. Inc. challenging vital permits required for operation ofrhe warer-st'\\'cr utility system. I understand the COUIllY would tike LIS to represenr Its interests In these tWO administra- tive proceedmgs. When I discussed th,S marter with Roy Anderson on Thursday, February 20. he requested that I submit a proposal and budget to YOll for legal fees am! costs so that a separate task order can be prepared !()r these cases. Please accept this letter as our proposal. --------------.----Agenda It"", r~u. ItlC4- January 27, 2009 Page 28 of 30 de la PARTE & GILBERT, P. A.. PROFESSIONAL ASSOCIATION The scope of service for the Pelican Bay Litigation will include preparing pleadings re- sponsive to the petitions for administrative hearing served by the Pelican Bay Foundation, Inc.; preparing pre-hearing motions and responses to pre-hearing motions; preparing for and participating in pre-hearing discovery; preparing for hearing, including meeting with County staff and consultallts; reviewiIlg documents and preparing exhibits for hearing; preparing for and anending the administrative hearings to be held in Naples, Florida: preparing post- hearing pleadings, induding proposed recommended orders. responses t~"Vcf)?posed recom. mended orders and excepnons to proposed recommended orders; and, <!.ppl"a~lng before the District Governing Board and the DEP Secretary to advocate entry 5l~~vorable final orders. This scope of work does mlt include any appeal by the Counry of,i!f:n}Vf;rse final order or the Counry's response to an appeal of a final order by Pelican B!l.tFourtl!J:~~9n, Inc. "':h "'''"~~-, r"~',_ "'::',Ll::i: We estimate our total fees for these services will not e~tdl$I50,000 and~i1;13lltlmate ,'!iii' .",..,-,."''" our reimbursable costs will not exceed $50,000. All oth.eFterms. and conditions j!)f our legal :.r~" . :,t_". :,:':' representation would be consistent with our Agreen,d:with ~$;'~,?unty. " "':~, _.~~1j We appreciate the opportuniry to work with the Colh these interesting and challenging tasks, Please contact me menrs regarding the matters set forth her~. cc: Roy An~~@ Ge"...:li."Cyum'e" . ~.,;e{; .:",,;r~'l, ,{!'\;;' -':'.i-i$~, ~~:;; unry Utilities Division on hav,~ any questions or com- ":t'!' ,.)"c$j~rely Yours; ~'~:'~'~~1:!;'1" ~"f '"de la Parte & Gilbert. P. A. Edward P. de la Palte, Jr. """': .~~ ::IV "'>~~#,,",~ iiF~- " 2 "000 000') ,-,,0_ ~NO . r--~01 ~NN Q} Ecrn Q} m m _ :::>[L - c: . mm '0' c: Q} 0) <( , ~ 11)12 i5 .ll .. ilia> 115 ~ I~ ~~~ ifltl~ '" "- ~ ~ ~19 1i - "- "- ~ " ~ ~ 0];: C> . ~ -' " ~ ~ ~ :7:l';o(( ~'" ~ .. :;j o " o Q o ill " .,; " :? .. oj ~, :ll M '" .. " N irl N ~ " ~, .. ;oJ; '" o '" ei .. co "- " o '" .. ... ...: ~ "', '" .. ei '" N o o " o irl .. ..... ~ :2 '" Pi N ... N ..; '" " '" ~ N ei .. ~ ... OJ ... .. " '" ~ N ei ... ~ '" " ~ '" ~ :;: ,- '" 1>: co "- u V1 ~ll. ~(3 __0 ~ u'~ .~ ~ .i,_l .... .... 0 . 15 O::s 'if.i C :li:t:g~~ ,.. Ue "-5 0: ... N :; N :;: "" '#- o Q '" " '" '" Q o g " ei o o " " " " "" '" " " " 15, o " co "- '#- " r;j '" ~ ~ ~ o '" o. "', '" :ll ..... o .. ... ~ '" ~ M '" " '" "" N '" ~ ~ " '" ~ .. ~ ;;; " ~ '" '" ~ N oj '" ~ ~ " N ... '" '" " r;j .. :Ii ~; Sl o " " " o o " '" o Q '" ~ " co "- co "- co "- E " .. " E " a ~t;; ~E '" 0 ~ e '" 2 c: Q) I,l". G:l c: 5! CO ~ g > 5! :u l'1.s. ~"R.2 -;) 0:=1 U; ~ 11'I a l1'i.ff N,j 11:I :i: t-- t-.. o::E ,l! N ... N ... N :; N :;: " - - ~ ;i .. ... '" '" '" " $ .,; ... ~ Q N '" .. ~ N N " o "', ..... ... N co "- ~ .. ~ N ~ "" " lB. "' N " " $ "" N " .. '" '" '" N " ~, " " '" " " ~, "! o ~ N ei - " '" N ei a' N .. -.:t ~--'.'-~,,:i~;o-;j r-!. c:c: 0":1: N " "' ~; "', ~ "; :<! ~ v'; .... N ~ Q '" CO "- ~~~ ~ ~ ...-J MH~ r-.~~~ '" :; O! " " :!l ~ Ii " ~ ei - " " " N '" '" ,,; .... " N '" ~ Gi .... '" 1h. .... 3i .. ~ Q y; CO "- '::! '" :;: '" :;: '" :;i~ I~ ~, Ni ... ---' Agenda Item No. 16C4 January 27, 2009 Page 30 of 30 December 15, 2008 Via u.s. Mail and EmaiI Mr. Phil Gramatges, P.E. Interim Engineering Department Director Collier County Public Utilities 3301 E. Tamiami Trail Building H 3'd Floor Naples, Florida 34112 Dear Phil, Re: de la Parte & Gilbert, PA. - Updated Task Orders Miscellaneous Utility Projects <;.'6 1,0 'b"-- ..1-':\'" h --\~ I As you requested, we are submitting the following update to Work Order PG-FT-3972- 08-01. The $100,000 task order previously assigned to the work items identified in my March 17, 2008 letter has or will soon be exceeded and many of these assignments are still ongoing. Pursuant to our discussions, it appears the County would like us to continue work- ing on the following tasks: 1. 2. X- 4. 5. 6. ,;::K 8. 9. 10. 11. 12. 13. Freshwater and Brackish Water 50/50 Split Utility Service Concurrency Management System Orange Tree Utility 1, Special District Protocol Utility Infi11 Areas Interlocal Agreements Pelican Bay Community Development District FGUA Golden Gate Utility System Future Modifications ofWellfie1d/Recharge Protection Areas Water Use Permitting Issues Water Shortage Issues2 Picayune Strand CERP Water Reservation Big Cypress Development 1 A separate task order has been assigned to the lawsuit instituted by Orangetree in August 2007. This item relates to general Orangetree utility matters that may arise on an as-needed basis. 2 At your suggestion, a separate scope and budget has been prepared by for administrative litigation relating to Picayune Strand Reservation Rule and the Water Use Permit Application 060908-9. This item relates to gen- eral water use permit matters that may arise on an as-needed basis,