TISJMB TRAN5P❑RTATI❑N ENGINEERING, INC. TRAFFIC/TRANSPORTATION ENGINEERING & PLANNING SERVICES TRAFFIC IMPACT STATEMENT For Gateway (Vk/A Trio Hotel) (Davis Boulevard & East Tamiami Trail, Collier County, Florida) July 12, 2018 County TIS Review Fees TIS Methodology Review Fee = Previously Paid TIS (Minor Study) Review Fee = $750.00 Prepared by: JMB TRANSPORTATION ENGINEERING, INC. 4711 7TH AVENUE SW NAPLES, FLORIDA 341 1 9 CERTIFICATE OF AUTHORIZATION NO. 27aao�Ml��Bq I���Ie�,,'' �Q� -\OENSFNiS, (PROJECT NO. 16031 6) �. * ; No 43860 STATE OF x'72 20/g JAW M!�.n. \O' \[7 `ATE F IDA RECi4�/��fAte `\\` TABLE OF CONTENTS Conclusions 2 Methodology 3 Scope of Project 4 Table A - Existing/Previous Land Uses 5 Table B - Proposed Land Uses 5 Figure 1 - Project Location & E+C Road Classification 5.1 Site Plan 5.2 Project Generated Traffic 6 Table C - Net New Trips Generated 6 Table IA - Proposed Land Use Trip Computations 6.1 Table 1B - Existing Land Use Trip Computations 6.2 Existing + Committed Road Network 7 Project Traffic Distribution 7 Area of Significant Impact 7 Figure 2A - Project Traffic Distribution 7.1 Table 2A - Area of Impact/Road Classification 7.2 Figure 211 - Project Traffic Assignment 7.3 2017 thru 2021 Project Build -out Traffic Conditions 8 Table 2B - 2017 & 2021 Link Volumes 8.1 Table 2C - 2021 Link Volumes/Capacity Analysis 8.2 Appendix 9 1 Conclusions Based upon the findings of this report, it was determined that the proposed Trio Hotel will not have a negative impact upon the surrounding road network. It was verified that all roadways, within the project's area of influence, currently have a surplus of capacity and can accommodate the traffic associated with the proposed mixed use development. As determined, the road network will continue to operate at acceptable levels of service for 2021 project build -out conditions and will not create any off-site transportation deficiencies that need to be mitigated. Site Access on U.S. 41 The site has an existing access on E. Tamiami Trail (U.S. 41) which is a directional left - in and right-in/out median opening. Within proximity of the site, E. Tamiami Trail is a 6 - lane divided urban corridor having a posted speed limit of 45 MPH. Left -Ingress Turn Lane The existing left turn lane is approximately 280' in length, which is adequate to accommodate the proposed land uses' traffic demands. The Florida Department of Transportation (FDOT) requested that an evaluation of the left turn lane queue be based upon the use of the PPM's formula Q=[(2.0)(DHV)(25)]/N. Using this equation and assuming an N value = 30 and DHV = 11 vph (refer to page 7.3), the results are that a storage of 50' needs to be provided in conjunction with the minimum deceleration + taper per FDOT's standard index 301 which is 185', which gives a total length of 235'. The existing length of the left turn lane exceeds FDOT's minimum standards. Therefore, it is the report's conclusion that no additional improvements to the left turn lane are necessary. Right -Ingress Turn Lane A right ingress turn lane is not warranted and cannot be constructed due to right-of-way constraints. Based upon the low volume of traffic expected to turn right -in (refer to page 7.3), a turn lane is not warranted. It should be noted that E. Tamiami Trail is a 6 -lane divided urban corridor having a posted speed limit of 45 MPH and the outer travel lane is intended to accommodate both thru and right turning movements at low volume driveways. Site Access on Davis Boulevard The site has an existing full access on Davis Boulevard. Within proximity of the site, Davis Boulevard is a 6 -lane divided urban corridor having a posted speed limit of 45 MPH. Left -Ingress Turn Lane A left -ingress tum lane will be constructed based upon FDOT's Standard Index 301 which requires a total deceleration and taper length of 185'. The project's left -in peak demand is 22 vph (refer to page 7.3). Using the PPM's formula Q=[(2.0)(DHV)(25)]/N results in storage of 50' be provided in conjunction with the deceleration + taper which results in a total turn lane length of 235'. Right -Ingress Turn Lane A right ingress turn lane is not warranted and cannot be constructed due to right-of-way constraints. Based upon the low volume of traffic expected to turn right -in (refer to page 7.3), a turn lane is not warranted. It should be noted that Davis Boulevard is a 6 -lane divided urban corridor having a posted speed limit of 45 MPH and the outer travel lane is intended to accommodate both thru and right turning movements at low volume driveways. Potential Queuing Conflicts with WB Traffic at U.S. 41 & Davis Boulevard FDOT requested that the applicant evaluate potential queuing conflicts based upon peak season peak hour conditions. In order to do so, traffic counts at Davis/U.S. 41 and at the proposed project's (Gateway of Naples) access on Davis Blvd, which is aligned with IHOP's median opening were collected as well as observations of the occurrence of westbound vehicles stacking back into the IHOP median opening. Traffic counts and the observations were performed on Wednesday, February 22nd, 2017. Attached you will find the traffic counts and the queuing demand observations (refer to pages Al thru A5 in the appendix). As observed between 7 - 9 AM and 4 - 6 PM only once did the westbound queue at Davis/41 extend into the IHOP median opening for a period of 16 seconds. It did happen a second time but that was due to a bus stopped for pick up/drop off. It can be concluded that a queuing conflict is an infrequent occurrence and not a significant issue. Methodology The study's methodology was reviewed by Mr. Stephen Baluch and Chad Sweet with Collier County's Transportation Planning Department. The accepted methodology is attached (refer to pages M1 thru M12). Due to a change in land uses, the TIS methodology was amended per Mr. Baluch's email below. BaluchStephen <Stephen.Baluch@colliercountyfl.gov> Sent: Tuesday, June 26, 20181:54 PM To: Chris Lascano <clascano@phoenix-associates.com> Cc: VargaCecilia <Cecilia.Varga@colliercountyfl.gov>; FleishmanPaula <Paula.Fleishman@colliercountyfl.gov>; Clark, Mark <Mark Clark@dot. statefl. us> Subject: FW.- PL20180002049, Gateway of Naples fka Trio Hotel Chris, Based on discussion with Paula Fleishman, we will be treating the reduced areas for retail and restaurant as incidental to the hotel/condo use, so only the hotel rooms and condo units need to be used for the revised trip generation. Pass this info along to Jim Banks or whoever is doing the updated TIS Check with Mark Clark on anything else he may want to see in the TIS. I expect that turn lane lengths need to be reevaluated because of increased trip generation. 3 From: BaluchStephen Sent: Tuesday, June 26, 20181:48 PM To: 'Clark, Mark' <Mark.Clark@dot.state fl.us> Subject: FW PL20180002049, Gateway ofNaples fka Trio Hotel Marr This is back in for review with substantial changes to the number of hotel rooms and increased trip generation. I have requested a new TIS to reflect the latest development plan. The restaurant and retail uses have been reduced to the point that we are proposing to treat them as incidental to the hotel/condo units, even lower than as shown in the attached architectural plan (see below for the proposed change in units). Trips would be based on the 150 hotel rooms and the 24 condo units. Let me know if you agree. I have asked that the new TIS be provided to you. Scope of Project Trio Hotel is a proposed multi -story structure and parking structure that will consist of a 150 -room resort hotel and 24 multi -family dwelling units. In addition to the project's primary land uses, there will be incidental land uses that will be restaurant and retail/office space. The site, which is an acute triangle shaped parcel, is located on the east side of the Davis Boulevard & E. Tamiami Trail intersection, within Collier County. The site was previously developed with a fast food restaurant (i.e., Burger King) and a 4 - bay bre and auto service shop. The Burger King has been razed and the auto service shop will be also be razed as part of the proposed redevelopment. Access to the site will be maintained via the site's existing easternmost access to E. Tamiami Trail and its easternmost access to Davis Boulevard. The westernmost accesses to the site will be removed as part of the project. Table A Existing (or previous) Land Uses Previously Constructed Land Uses Size Fast Food w/ Drive Thra (razed) 3,200 +/- sf. Tire & Auto Service 4 -Service Bays Table B Proposed Land Uses Proposed Land Use Size Resort Hotel 150 Rooms Multi -Family 24 d.u.'s Incidental Uses (restaurant & retail/office) 1 1 a l 1 I I a' a Longboat Drive 1 Clipper Way Mercantile Avenue I II Outrigger Lane v v ' Ischmonn Blvd Progress a us ¢ I Horseshoe Or N. I o' v I 0 Domestic Xv, nue 'm ' I Horseshoe Or S. 0 I 0 m m I of Enterprise Ave Enterprises o nue I I m NORTH I No Airport Exchange Av nue 0 a' vl Propspect Ave I ai I Va' Radio Road 0 Naples Airport I LEGEND 6 -LANE ARTERIAL 4 -LANE ARTERIAL/COLLECTOR — — — — — 2 -LANE ARTERIAL 2 -LANE COLLECTOR/LOCAL RAIL ROAD — JJMBTRANSPORTATION ENGINEERING, INC. Gateway of Naples Project Location & io, 2018 Roadway Classification 9.1 FIGURE 1 o I0 Davis Boulevard `Caicos I Blvd \GS ` N I m o Harrison Rdm a d a o o E 0 V1 Of d N . o a t N a N U 1 O m O N � N ` a 6 -LANE ARTERIAL 4 -LANE ARTERIAL/COLLECTOR — — — — — 2 -LANE ARTERIAL 2 -LANE COLLECTOR/LOCAL RAIL ROAD — JJMBTRANSPORTATION ENGINEERING, INC. Gateway of Naples Project Location & io, 2018 Roadway Classification 9.1 FIGURE 1 IPI N a � Xz, w � t rr,.. DAVIS BOULEVARDµiffik iR 04) —'—`"— ®. ----6W Ull mom® Project Generated Traffic Traffic that canbe expected to be generated by the project was estimated based upon the guidelines established by the Institute of Transportation Engineers, Trip Generation Manual, 10th Edition. That is, historical traffic data collected at similar land uses was relied upon in estimating the project's traffic. It was concluded that Land Use Codes "Multi -Family" (LUC 220) and "Hotel" (LUC 310) were most appropriate in estimating the proposed land use trips; and "Tire Store" (LUC 848) was used to estimate the existing land use trips. In order to determine the project's net new traffic, the estimated trips for the previous land use were subtracted from the estimated total trips for the proposed land uses. That is, Proposed Development Trips less Previous Development Trips = Net New Trips Table I provides a detail of the estimated total trips for the proposed land uses and Table 1B for the existing land uses. The following is a summary of the results. Table C Net New Trips Generated (Proposed Trips Less Existing Trips) The report concludes that the project will generate less than 100 net new trip ends during the weekday highest peak hour. As such, the report investigates the traffic impacts associated with the project based upon the criteria set forth by the Collier County Government's Traffic Impact Statement Guidelines for developments generating "less than 100 trips", which is identified as a minor study. New AM New PM New Daily Peak Hour Peak Hour (ADT) ( h) (v h) Existing Trips N/A 8 14 (Refer to Table IB) Proposed Trips 1,407 82 103 (Refer to Table IA) Net New Trips N/A 74 89 The report concludes that the project will generate less than 100 net new trip ends during the weekday highest peak hour. As such, the report investigates the traffic impacts associated with the project based upon the criteria set forth by the Collier County Government's Traffic Impact Statement Guidelines for developments generating "less than 100 trips", which is identified as a minor study. TABLE 1A TRIP GENERATION COMPUTATIONS Gateway of Naples Land Use Code Land Use Description Build Schedule 220 Multi -Family 24 Units 310 Hotel 150 Rooms Land Use Trip Generation Equation Code Trip Period (Based upon S.F.) Total Trips Trips Enter/Exit LUC 220 Daily Traffic (ADT) = T = 7.56(X) - 40.86 = 141 ADT AM Peak Hour (vph) = Ln(T) = 0.95Ln(X)-0.51= 12 vph 23% Enter/ 77% Exit = PM Peak Hour (vph) = Ln(T) = 0.89Ln(X)-0.02 = 17 vph 63% Enter/ 37% Exit = ********************************************************************************* LUC 310 Daily Traffic (ADT) = T= 11.29(X)-426.97= 1,267 ADT AM Peak Hour (vph) = T= 0.50(X)-5.34 = 70 vph 59% Enter/ 41% Exit = PM Peak Hour (vph) = T= 0.75(X)-26.02 = 86 vph 51% Enter/ 49% Exit = ********************************************************************************* Total New Trips Daily Traffic (ADT) = 1,407 ADT AM Peak Hour (vph) = 82 vph PM Peak Hour (vph) = 103 vph 3 / 9 vph 10/6 vph 41 /29 vph 44 /42 vph 44 / 38 vph 55 / 49 vph EXISTING LAND USES Land Use Code Land Use Description 848 Tire Store Land Use Code Trip Period LUC 848 Daily Traffic (ADT) _ AM Peak Hour (vph) = PM Peak Hour (vph) _ TABLE 1B TRIP GENERATION COMPUTATIONS Gateway of Naples Build Schedule 4 bays Trip Generation Equation N/A T=2.1(X)= 64% Enter/ 36% Exit = T = 3.54(X) = 42% Enter/ 58% Exit = 6.2 Total Trips Trips Enter/Exit 8 vph 5 /3 vph 14 vph 6 /8 vph Existing + Committed Road Network Figure 1 and Table 2A provide a detail of the surrounding E + C road network. Table 2A depicts the minimum level of service performance standards and capacity for the roads within the project's are of influence. There are no planned capital improvement projects within the project's area of impact. Project Traffic Distribution The project's traffic was distributed to the surrounding roadway network based upon logical means of ingress/egress; current and future traffic patterns in the area; location of surrounding businesses and commercial centers. Figure 2 and Table 2A provide a detail of the traffic distributions based on a percentage basis and by volume. The project traffic assignments were agreed to as described in the attached methodology report. Area of Significant Impact The area of significant impact was determined based upon Collier County's 2%, 2% and 3% criteria (i.e., if the project's traffic is 2% or more of a roadway's adopted level of service capacity, then the project has a significant impact upon that link). Table 2A describes the project traffic distributions and the level of impact on the surrounding roadways. Roads that were identified as being within the projects area impact are shown in Table 2A. 7 o I o+ I I I ¢ ' I _1■_______ Longboat Drive 1 1 Clipper Way Mercantile Avenue I ' Outrigger Lane ao o ' Fleischmann Blvd Progress 0 ue t ' Horseshoe Dr N. I o a I 0 0 Domestic Xv, nue 'm ' I Horseshoe Dr S. - 0 I m° I I Enterprise Ave Enterprise -9. nue 75 I v o a �I No s Airport Exchange Av nue E I Co 0 U Propspect Ave I NORTH N.T.S. (n -o' Radio Road Naples Airport I v Estey Ave 4\ m I 40i Davis Boulevard I I `Qg Galdes � � I d m E m in Harrison Rdd -0 0 0 0 a o E Y a a r o 0 m � W a LEGEND 4 00% 0 PROJECT TRAFFIC DISTRIBUTION BY PERCENT \ y JMB TRANSPORTATION ENGINEERING, INC. Gateway of Naples PROJECT -GENERATED io, zoia TRAFFIC DISTRIBUTION FIGURE 2A 11 TABLE 2A PROJECT'S AREA OF IMPACT Ito Net New Trips Project "Net New" Traffic Peak Direction (vphpd) _ (55 enter- 6 enter) = 49 Entering Project "Net New" Traffic Non -Peak Direction (vph) _ (49 exit - 8 exit) = 41 Exiting LOS Service Project Project PK Dir. PK Direction Project Pk Hr Project Pk Hr Project Road Serv. Vol. Volume Traffic PK Dir Pk Hr Non -PK Dir Non -Pk Impact Percent Significant Class LOSv( phpd) % Dist.v( phpd) Pk Dir (vph) DiR Standard Impact Impact Davis Boulevard 12.0 Tamiami Trail to Airport Rd 6D D 2700 40.0% 20 W 16 E 2% 0.73% NO E. Tamiami Trail W. of Davis Blvd 6D E 2900 40% 20 E 16 W 2% 0.68% NO 91,0 Davis Blvd to Airport Rd 6D E 2900 20% 10 W 8 E 2% 0.34% NO Ito Davis Boulevard 20 JMS TRANSPORTATION ENGINEERING, INC. NORTH N.T.S. 22 F TPM PEAK ENTER/EXIT = 55 VPH/49 VPH oho '�7' T Gateway of Naples July 10, 2018 -7.3 LEGEND 34 —► PM Peak Hour Project Traffic PROJECT -GENERATED TRAFFIC ASSIGNMENT IFIGURE 2B 2017 thru 2021 Project Build -out Traffic Conditions In order to establish 2017 thru 2021 project build -out traffic conditions, two forecasting methods were used. The first traffic forecasting method was the County's traffic count data was adjusted for peak season conditions, peak hour conditions, peak direction, and an annual growth rate was then applied. The peak season/peak hour/peak direction factor and annual growth rate were derived from the 2017 Collier County AUIR Report. Using the annual growth rate, the 2021 background traffic conditions were determined, which are depicted in Table 2B. The second traffic forecasting method was to add the vested trips (trip bank) identified in the 2017 AUIR report to the adjusted peak season, peak hour and peak direction traffic counts. The 2021 vested trips 'Y' background traffic volumes are depicted in Table 213. The greater of the two values produced by the two forecasting procedures was then considered to reflect the 2021 background traffic. The net new project generated traffic was then added to the background traffic. Table 2C provides a summary of the 2017 thru 2021 traffic conditions and the roadways' level of service and remaining available capacity. As shown, all project impacted roadways will continue to operate at the County's adopted minimum level of service thresholds at project build -out. Davis Boulevard E. Tamiami Trail N 12.0 Tamiami Trail to Airport Rd W. of Davis Blvd 91.0 Davis Blvd to Airport Rd TABLE 2B 2017 & 2021 ROADWAY LINK VOLUMES Per Vested Trips Method (vphpd) 2021 Per Growth Rate Method Peak Hour PK Direction 2021 2017 Bank Per Vested Trips Peak Hour AUIR AUIR AUIR PK Direction Traffic Pk Growth Background (vphpd) DiR Ratev( phpd) 1550 E 2,00% 1678 1700 E 2.00% 1840 1700 E 2.00% 1840 Per Vested Trips Method (vphpd) 2021 Peak Hour PK Direction Trip Background Bank Per Vested Trips (ypilpd) 33 1583 70 1627 70 1627 TABLE 2C 2021 ROADWAY LINK VOLUMEXAPACITY ANALYSIS 2021 2021 2021 2021 2017 Peak Hour Project Project Build -Out Serv. Vol. Build -Out Build -Out Peak Hour PK Direction Bkgd Pk Hr Prjct Pk Hr Prjct Peak Hour Pk Hr Peak Hour Peak Hour PK Direction Background Pk PK Dir Pk Non -PK Dir Non -Pk PK Dir PK Dir PK Direction PK Direction (yphpd) v h d Dir (vphpd) Dir (vph) Dirvl phpd) (vohpd) v/c Ratio LOS Davis Boulevard 12.0 Tamiami Trail to Airport Rc 1550 1678 E 20 W 16 E 1694 2700 0.63 C E. Tamiami Trail W. of Davis Blvd 1700 1840 E 20 E 16 W 1860 2900 0.64 C 91.0 Davis Blvd to Airport Rd 1700 1840 E 10 W 8 E 1848 2900 0.64 C Support Documents APPENDIX Lel Quality Counts _Ja Order Number: 139146 Location: IHOP Median Access & Davis Blvd Date: 2/22/2017 Time: 7:00 AM - 9:00 AM, 4:00 PM - 6:00 PM 8407 Laurel Fair Cir. STE 400 Tampa, FL 33610 813-374-0110 www.gualitycounts.net Queueing Start Queueing End Duration (minutes, seconds) Notes (0:00:00) (0:00:00) 7:43:32 AM 7:43:48 AM 00:16 8:13:00 AM 8:13:13 AM 00:13 Originating from bus stop. A► Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: IHOP Median Access — Davis Blvd OC JOB #: 13914603 CITY/STATE: Naples, FL DATE: Wed Feb 22 2017 a 40 9 0 1s Peak -Hour: Peak 15 -Min: 7:45 AM -- 8:45 AM 8:30 AM -- 8:45 AM a.o z.s a 11.1 0.0 0.0 1048« 19 4 IL 22 ~1061 ✓ * y 5.5 « 0.0 � t 4.5 « 5.5 499 ~ 0.94 4`1036 5.8 + OW 4- 518 + 0 5180 71 * rr 1516 a-1 0 0 Fa: r .0 r 5.6 0.0 r 00 53 + * Quality Counts �0.0 0o 0.0F * 0 0 00 0.0 J4Jp�� Fe!��1,1 II J✓ a �� 0J 6q^ - t 2 rt .,� « 4 ♦y 0F FNA rYWr T o - r 0 NA �✓ �' �✓ a r.� « y�« « � a �I� IL 1n4r NA NA NA ~ «NA r ' �* NA 7 1 * rF NA *� 15-MinCouln Period IHOP Median Access (Northbound) IHOP Median Access (Southbound) Davis Blvd (Eastbound) Davis Blvd (Westbound) Total Hourly Totals Be inning At L Thru Right U Le Thru Ri UL Thru Ri U Thru Wight U 7:00 AM 0 0 0 0 4 0 1 0 2 63 0 0 0 129 3 0 202 7:15 AM 7:30 AM 0 0 0 0 0 0 0 0 5 9 0 1 0 0 3 0 3 81 0 1 1 61 0 1 0 0 187 2 0 233 7 1 260 316 7:45 AM 8:00 AM 0 0 0 0 0 0 0 0 5 5 0 2 0 0 1 0 5 125 0 0 2 110 0 0 0 0 267 2 0 226 4 0 406 348 1204 1350 8:15 AM 0 0 0 0 4 0 4 0 2 127 0 0 0 279 6 1 423 1493 0 09 3 7 0 1. 0 266 10 07 04 8:45 AM 0 0 0 0 1 7 0 2 0 2 116 0 3 0 266 4 1 401 1599 Peak 15 -Min Northbound Southbound Eastbound Westbound Flowrates Lek TbrM Right U Lek Thru i ht U L Thru i ht U Lek Thr Ri ht taI All Vehicles Heavy Trucks 0 0 0 0 0 0 0 8 0 0 S 0 0 0 38 548 0 4 0 32 0 0 0 1064 40 0 84 0 1708 116 Pedestrians Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 Railroad Stopped Buses Comments: Report generated on 3!12017 1:13 PM SOURCE: Quality Counts, LLC (hftp:/A ww.qualitycounts.net) 1-877-580-2212 IE Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: IHOP Median Access -- Davis Blvd QC JOB* 13914604 CITY/STATE: Naples, FL DATE: Wed Feb 22 2017 42 39 a * L 4 0 31 Peak -Hour: 4:15 PM -- 5:15 PM Peak 15 -Min: 4:15 PM -- 4:30 PM 2.4 5.1 a r J J i V 0.0 0.0 3,2 839 ~ 41 J t 18 ~ 830 J 411 L t2 ~ 4.9 J t 0.0 ~ 1.2 1186 0.9T ~ 808 2.4 ~ 4. 1.2 1227" 0 * rr P 4 *1223 0 0 z 70 2 F duality Counts 24 •ooI� r rr oo~z.s —1 o.o 50.01 o z a f 4 0.0 50.0 L J J✓ i 4 0 J t a 6 • M 3 0 1� ♦ O� o OF NA L 1 NA L ✓ i 4 F J t '�' I f57.f.1 VIW J J { V J t NA ~ � ~ NA NA * ■■ ~ NA ♦ 1 ! ♦ A 1 4r A r f, i 15 -Min Count Period IHOP Median Access (Northbound) IHOP Median Access (Southbound) Davis Blvd (Eastbound) Davis Blvd (Westbound) Total Hourly Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 0 0 0 0 5 0 0 0 3 255 0 4 0 193 8 3 472 '1 0 0 7 0 ills 4 0 543 4:30 PM 0 0 0 0 6 0 1 0 1 271 0 3 0 208 4 1 495 4:45 PM 5:00PM 0 0 2 0 0 0 0 0 6 12 0 0 0 0 6 0 7 6 274 0 4 316 0 5 0 0 228 6 2 184 4 1. 529 2039 .534 2101 5:15 PM 0 0 0 0 15 0 2 0 4 289 0 3 0 181 2 1 497 2055 5:30 PM 545 PM 0 0 0 0 0 0 0 0 7 13 0 1 0 0 1 0 9 6 224 0 1 233 0 9 0 0 202 1 3 160 3 0 448 2008 425 1904 Peak 15 -Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Ri ht U Left Thru Right U Left Thru Ri ht u Left T ru Right U Total All Vehicles Heavy Trucks 0 0 0 0 0 0 0 28 0 0 16 0 0 0 28 0 1300 0 32 44 0 0 0 752 16 0 4 0 2172 48 Pedestrians Bicycles 0 0 0 0 0 4 0 0 0 0 0 0 0 0 1 0 4 1 Railroad Stopped Buses Comments: Report generated on 3/1/2017 1:13 PM SOURCE: Quality Counts, LLC (hftp://www.qualitycounts.net) 1-877-580-2212 A3 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: Tamiami Trail -- Sandpiper St/Davis Blvd QC JOB #: 13914601 CITY/STATE: Naples, FL DATE: Wed Feb 22 2017 1203 2558 a * 03669 434 Peak -Hour: 8:00 AM -- 9:00 AM Peak 15 -Min: 8:15 AM -- 8:30 AM s ✓ a ` 58 4.0 60 140 ♦ 187 J 11074 *1074 ✓ i V 4.3 ~ 1.6 � t 4.2 ~ 4.2 54 0.95 0 0 00 *' 4. 0.0 r 417r 280 39 � * r 0 502 47129615UB�Iy �♦ ¢11 COuntJ a:Q ~00 ^ 00 ~54 �0.0 3.6 6.7� }I 718 1358 + 3.8 3.5 2 3 I I �� 0 t 11' 0 ° y� 0 u �I 0 ltl �y L 7 ° ♦ r ° 0 5 O F i ♦ NA 1 s* NA ~NA'✓ t ♦ 4. NA 7rrrrr� I' 1✓�f. NA ~ �S t NA y '� C ♦ NA � C NA R'=RTOR 15 -Min Count Tamiami Trail Tamiami Trail Sandpiper St/Davis Blvd Sandpiper St/Davis Blvd Total Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Totals Be innin At Left Thru Right U R* Left Thru Ri M U R* Left Thru Ri ht U R* Left Thru Ri ht U R* 7:00 AM 1 206 2 1 0 59 102 11 0 2 16 5 2 0 3 0 0 117 0 0 527 715 AM 4 270 3 0 0 71 105 9 0 2 11 11 1 0 5 0 0 195 0 0 687 7:30 AM 6 361 1 0 0 50 121 14 0 8 32 10 1 0 4 0 0 218 0 0 826 7.45 AM 15 341 3 2 0 103 155 13 0 1 36 20 4 0 2 0 0 257 0 0 952 2992 8:00 AM 5 309 4 0 0 84 143 12 0 6 45 15 4 0 5 0 0' 236 0 0 866 3333 '1AM 9 336 1 3 1 114 166 7 1 1034 36670 8:30 AM 13 361 6 7 0 124 172 15 0 8 41 12 2 0 6 0 0 243 0 0 1010 3664 8:45 AM 10 290 3 0 0 111 188 24 1 6 55. 11 3 0 9 1 0 0 295 0 0 1006 3918 Peak 15 -Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U R* Left Thru Right U R* Left Thru Right U R. Left Thru Right U R` I Total All Vehicles 36 1344 4 12 4 456 664 100 0 28 184 64 6 0 32 0 0 1196 0 4 4136 Heavy Trucks 0 48 0 28 12 4 4 0 0 0 0 36 132 Pedestrians 0 0 4 4 8 Bicycles Railroaa 0 1 0 0 0 0 0 0 0 0 0 0 1 Stopped Buses Comments: Report generated on 3/1/2017 1:13 PM SOURCE: Quality Counts, LLC (http:/Aw .qualitywunts.net) 1-877-580-2212 M Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: Tamiami Trail — Sandpiper St/Davis Blvd QC JOB M 13914602 CITY/STATE: Naples, FL DATE: Wed Feb 22 2017 3192 2061 +* 0 187 19041091 Peak -Hour: 4:30 PM -- 5:30 PM Peak 15 -Min: 4:45 PM -- 5:00 PM a J i 7.0 1.8 1.9 244 « 163 -t t- 787 4. 787 J O 0.8 � 1.8 � - t 47 0.97 ♦ o 2.1 ~ � ~ 0.0 258 46 1 * r4r 0 1168 49 1130 31 —14 +- Counts VaLl1_y l-.1)Dt�3.2S aQ 1s •0.0 �,� * r� ooh 2.0 700 05 I f 1952 1210 i 1.6 0.6 L L J �♦ J i V ,9 12 I I2 �J 0 0 _. 0 4 F 111 4 0 1 * r 0 0 3 0 L ♦ ♦ NA 1 �i Z NA L NA ~ � ~ NA NA ~ � ~ NA ♦ ii ♦ NANA o i R =RTOR 15 -Min Count Tamiami Trail Tamiami Trail Sandpiper SUDavis Blvd Sandpiper SUDavis Blvd Total Hourly Period (Northbound) I (Southbound) (Eastbound) (Westbound) Totals Be inning At Left Thor Ria ht U R' I Left Thur Right U R' Le Thru Right U R' Left Thm Right U R' 4:00 PM 12 307 9 1 0 244 501 35 0 11 32 14 10 0 2 0 0 183 0 0 1362 415 PM 15 252 6 0 0 320 484 35 0 14 30 9 1 0 6 0 0 185 0 1 1358 4:30 PM 15 251 4 1 0 260 442 30 0 24 42 10 4 0 6 0 0 199 0 0 1288 4'45 PM 4 2Z7 10 0 0 254 507 42 0 18 60 14 6 0 6 0 0 1 5:00 PM 17 312 12 0 0 299 472 28 0 14 23 8 0 0 6 0 0 179 0 0 1372 5427 5:15 PM 11 290 5 1 0 277 483 26 1 15 48 15 10 0 6 0 0 188 D 0 1376 5445 5:30 PM 6 296 6 0 0 206 393 45 0 16 43 10 4 0 5 0 0 172 0 0 1202 5359 5:45 PM 19 252 10 1 0 231 388 34 0 27 38 8 7 0 4 0 0 176 0 1 1196 5146 Peak 15 -Min Northbound Southbound Eastbound I Westbound Fiowrates L!M._ThM Right. U R' L9ft Thm Right Left Thru Right U R- Le Thru Right W Total All Vehicles 16 1108 40 0 0 1015 2026 168 0 72 200 56 24 0 24 0 0 680 0 4 5638 Heavy Trucks 0 8 4 4 24 8 4 4 0 0 0 0 56 Pedeshians 0 0 32 24 56 Bicycles Railroad Istopped 0 1 0 0 1 0 0 0 0 0 0 0 2 Buses Comments: Report generated on 3/1/2017 1:13 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 R5 JMB TRANSPORTATION ENGINEERING, INC. TRAFFIC/TRANSPORTATION ENGINEERING & PLANNING SERVICES TRAFFIC IMPACT STATEMENT METHODOLOGY REPORT For Trio Hotel (Davis Boulevard & Tamiami Trail East, Collier County, Florida) April 6, 2016 Revised April 13, 2016 Prepared by: JMB TRANSPORTATION ENGINEERING, INC_ 471 1 7TH AVENUE SW NAPLES, FLORIDA 341 19 (239) 227-2355 CERTIFICATE OF AUTHORIZATION NO. 2783❑ (PROJECT No. 16031 6) 4->'3�zoiG JAMES KS, P.E. DATE Fero RIO REG. No. 43860 Ml a� i !;schmann Blvd 1 I 'v1 t sl c 1 �I �I o � � �I m a'I I �I LEGEND 6 -LANE ARTERIA - 4 -LANE ARTERIAL/COLLECTOR ----- 2-LANE ARTERIAL 2-1ANE COLLECTOR/LOCAL RAIL ROAD TRANSPORTATION ENGINEERING, INC. Trio Hotel e I �- Davis Boulevard _' 6, 2016 Harrison ) 01 NORTH N.T.S. ;adi=Road Project Location & Roadway Classification I FIGURE 1 M2 DAV) S iE Scope of Project Raze existing 4 -bay tire & auto service land use Construct the following uses: Table A Proposed Land Use Proposed Land Uses Size Residential Condo/Townhouse 24 d.u.'s Resort Hotel 12 Rooms Single -Tenant Office 3,145 s.f. Quality Restaurant 11,798 s.f. M Project Generated Traffic Trips will be estimated based upon the Institute of Transportation Engineers, Trip Generation Manual, 9a' Edition. In order to determine the project`s net new traffic, the estimated trips for the existing tire/auto service center were subtracted from the estimated total trips for the proposed land uses. That is, Proposed Development Trips less Existing Land Use Trips = Net New Trips Table B Net New Trips Generated (Proposed Trips Less Existing Trips) M5 New AM New PM New Daily Peak Hour Peak Hour ADT h h Existing Trips N/A 8 14 (Refer to Table 1B Proposed Trips N/A 39 83 (Refer to Table lA Net New Trips N/A 31 69 M5 TABLE 1A TRIP GENERATION COMPUTATIONS Trio Hotel PROPOSED LAND USES Land Use Code Land Use Description Build Schedule 230 Residential Condo/Townhouse 24 Units 330 Resort Hotel 12 Rooms 715 Single -Tenant Office 3,145 s.f. 931 Quality Restaurant 11,798 s.f. Land Use Trip Generation Equation Code Trip Period (Based upon S.F.) Total Trips Trips Enter/Exit LUC 230 Daily Traffic (ADT) = Ln(T) = 0.87Ln(X)+2.46 = 186 ADT AM Peak Hour (vph) = Ln(T) = 0.80Ln(X)+0.26 = 16 vph 3 / 14 vph 17% Enter/ 83% Exit = PM Peak Hour (vph) = Ln(T) = 0.82Ln(X)+0.32 = 19 vph 12/6 vph 67% Enter/ 33% Exit = LUC 330 Daily Traffic (ADT) = N/A AM Peak Hour (vph) = T= 0.35(X) + 7.42 = 72% Enter/ 28% Exit = 12 vph 8/3 vph PM Peak Hour (vph) = T= 0.49(X) = 43% Enter/ 57% Exit = 6 vph 3/3 vph LUC 715 Daily Traffic (ADT) = T= 11.65(X) = 37 ADT AM Peak Hour (vph) = T=1.8(X) = 6 vph 5 /1 vph 89% Enter/ 11% Exit = PM Peak Hour (vph) = T= 1.74(X) = 5 vph 1/4 vph 15% Enter/ 85% Exit = *#****#*********#**####*#####*********#*******#**#******#**###*######*###*#####*# LUC 931 AM Peak Hour (vph) = T= 0.81(X) = N/A 10 vph PM Peak Hour (vph) = T= 7.49(X) = 67% Enter/ 33% Exit = 88 vph 59 /29 vph Pass -by Trips per ITE= 44% 40% Pass -by Rate per Collier County New AM Peak Hour (vph) = (AM) x (%of New Trips) 6 vph 3/3 vph New PM Peak Hour (vph) = (PM) x (% of New Trips) 67% Enter/ 33% Exit = 53 vph 36 / 17 vph Total Proposed Land Use New Trips AM Peak Hour (vph) = 39 vph PM Peak Hour (vph) = 83 vph 51 / 31 vph 0 EXISTING LAND USES Land Use Code Land Use Description 848 Tire Store Land Use Code Trip Period LUC 848 Daily Traffic (ADT) _ AM Peak Hour (vph) = PM Peak Hour (vph) = TABLE 16 TRIP GENERATION COMPUTATIONS Trio Hotel Build Schedule 4 bays Trip Generation Equation N/A T=2.1(X)= 64% Enter/ 36% Exit = T = 3.54(X) = 42% Enter/ 58% Exit = M-1 Total Trips Trips Enter/Exit 8 vph 5 /3 vph 14 vph 6/8 vph Project Traffic Distribution The project's net new traffic was distributed to the surrounding road network based upon logical means of ingress/egress, current traffic patterns in the area and population densities. The distribution assignments were agreed to at the project's methodology meeting. Table 2A and Figure 2A provide a detail of the traffic distributions based on a percentage basis. Area of Significant Impact The area of significant impact was determined based upon Collier County's 2%, 2% and 3% criteria (i.e., if the project's traffic is 2% or more of a roadway's adopted level of service capacity, then the project has a significant impact upon that link). Table 2A describes the project traffic distributions and the level of impact on the surrounding roadways. Roads that were identified as being within the project's area impact are shown in Table 2A. 2015 thra 2018 Project Build -out Traffic Conditions In order to establish 2015 thru 2018 project build -out traffic conditions, two forecasting methods were used. The first traffie forecasting method was the County's traffic count data was adjusted for peak season conditions, peak hour conditions, peak direction, and an annual growth rate was then applied. The peak season/peak hour/peak direction factor as shown on Table 213 was derived from the 2015 Collier County AUIR Reports. The annual growth rate was also obtained from the 2015 AUIR Report. Using the annual growth rate, the 2016 background traffic conditions were determined, which are depicted in Table 2B. The second traffic forecasting method was to add the vested trips (trip bank) identified m the 2015 AUIR report to the adjusted peak season, peak hour and peak direction traffic counts. The 2018 vested trips 'Y' background traffic volumes are depicted in Table 213. The greater of the two values produced by the two forecasting procedures was then considered to reflect the 2016 background traffic. The net new project generated traffic was then added to the background traffic. 3 M$ bn oat — —---__—_� clipper WaDrive Yl Mercantile Avenue Outrier Lana E v npnn i Progress c ue rc i Horseshoe Or N. 'o v Domestic nue ' I Horseshoe Or S. •c ' I Este rise Ave Enterprise -9N pnue — NORTH ' QI No Airport Exohan a Am mue E ' N.rs. 0 U Propspect Ave 0 Radio Road r_ LEGEND Naples Airport 0 I Q� a I48 Davis Boulevard I \ Og Goldes Blvd �°S 4 Q N I in a Harrison Rdc 0 o E a a c a 0 ` a° ` N . N L C 6 a 0�► PROJECT TRAFFIC DISTRIBUTION BY PERCENT JMB TRANSPORTATION ENGINEERING, INC. Trio Hotel _\ PROJECT -GENERATED 2016 FIGURE 2A TRAFFIC DISTRIBUTION 0 Project Traffic Peak Direction (vphpd) = Project Traffic Non -Peak Direction (vph) _ Davis Boulevard 12.0 Tamiami Trail to Airport Rd E. Tamiami Trail W. of Davis Blvd 91.0 Davis Blvd to Airport Rd TABLE2A PROJECT'S AREA OF IMPACT 51 Entering 31 Exiting LOS Service Project Project PK Dir. PK Direction Project Pk Hr Project Pk Hr Project Road Serv. Vol. Volume Traffic PK Dir Pk Hr Non -PK Dir Non -Pk Impact Percent Significant Class LOSv( phpd) % Dist.vl phpd) Pk Dir (vph) DiR Standard Impact Impact 6D D 2700 40.0% 20 W 12 E 2% 0.76% NO 6D E 2900 40% 20 E 12 W 2% 0.70% NO 6D E 2900 20% 10 W 6 E 2% 0.35% NO Davis Boulevard E. Tamiami Trail �3 12.0 Tamiami Trail to Airport Rd W. of Davis Blvd 91.0 Davis Blvd to Airport Rd TABLE 2B 2015& 2018 ROADWAY LINK VOLUMES AUIR 2016 2014 AUIR AUIR Traffic Traffic fvohodt (vi)hodl 1380 1480 1580 1700 1580 1700 AUIR Calc Pk Years of Growth Growth DIR Growth mgt Rate E 1 7.25% 2.00% E 3 2.47% 2.00% E 3 2.47% 2.00% Per Growth Rate Method 2018 Peak Hour PK Direction Trip Background Bank v/ Dhodl iyDhpd) 1871 14 1804 47 1804 47 Per Vested Trips Metho 2018 Peak Hour PK Direction Background Per Vested Trips v h 1494 1747 1747 Davis Boulevard 12.0 Tamiami Trail to Airport Rd E. Tamiami Trail W. of Davis Blvd 91.0 Davis Blvd to Airport Rd TABLE 2C 2018 ROADWAY LINK VOLUME/CAPACITY ANALYSIS 2015 Peak Hour PK Direction (vahodl 1480 2018 2018 2018 Serv. Vol. Peak Hour Pk Hr Peak Hour PK Dir Peak Hour Project 1583 Project PK Direction Bkgd PK Direction Pk Hr Piet Pk Hr Piet Background Pk Background PK Dir Pk Non -PK Dir Non -Pk SOSv( Dhod) Dir LOSv{ shad) Dir (vph) Dir C 1571 E C 20 W 12 E 2018 2018 Build -Out Serv. Vol. Peak Hour Pk Hr PK Dir PK Dir NOW) (yDhpd) 1583 2700 1700 C 1804 E C 20 E 12 W 1824 2900 1700 C 1804 E C 10 W 6 E 1610 2900 2018 2018 Build -Out Build -Out Peak Hour Peak Hour PK Direction PK Direction v/c Ratio LOS 0.59 C 0.63 C 0.62 C