Loading...
Backup Documents 03/26/2019 Item #16A 9 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 A 9 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office SRT /� 4/15/19 4. BCC Office Board of County Commissioners 3t+ 5l t/' /6—Fi 5. Minutes and Records Clerk of Court's Office PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Pam Lulich/Landscape Operations Contact Information 239-597-6291 Contact/Department Agenda Date Item was March J//,2019 Agenda Item Number J, ` teAl Approved by the BCC a(p'µ` 1� Type of Document Change Order to address redesign changes Number of Original 1 Attached and add 112 days to the final completion Documents Attached date for Agreement No. 18-7316"Collier Boulevard(Golden Gate Boulevard to Immokalee Road)Landscape and Irrigation Installation"(Project No.60206) PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column . • _•-ver is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP 0 SRT 2. Does the document need to be sent to another agency for add 'onal s'••.tures? If yes, SRT provide the Contact Information(Name; Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be SRT signed by the Chairman, with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's SRT Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the SRT document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's SRT signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip SRT should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 03/26/2018 and all changes made during SRT the meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes, if applicable. 9. Initials of attorney verifying that the attached document is the version approved by the ��►° BCC,all changes directed by the BCC have been made, and the document is ready for the Chairman's signature. ?c,;(146, .Q-rnrr {n;in l 11 1 a?Q.46- 1 6 A 9 Ann P. Jennejohn From: Ann P.Jennejohn Sent: Tuesday, April 16, 2019 3:31 PM To: lulich P Subject: Item #16A9 (3-26-19 BCC Meeting) Attachments: Backup Documents 03_26_2019 Item #16A 9.pdf HI Pam, An executed copy of Item #16A9, from the March 26, 2019 13CC Meeting, is attached for your records. Thank you! Ann Jennejohn Senior Deputy Clerk Office: 239-252-8406 r Fax: 239-252-8408(if applicable) Ann.Jennelohn@CollierClerk.com Office of the Clerk of the Circuit Court &Comptroller of Collier County 3299 Tamiami Trail,Suite#401 Naples, FL 34112-5324 www.CollierClerk.com 1 1 6 A 9 fr .__, .. „ te r , pivay Procurement Services (.. Change Order Form IW Contract Modification 0 Work Order Modification ID Amendment Contract#: 18-7316 Change#: 1 Purchase Order#: 4500188344 Project#: 60206.3 Contractor/Firm Name: Hannula Landscaping and Irrigation,Inc. Contract/Project: Collier Blvd. (Golden Gate Blvd. to Immokalee Rd.) Katherine Chachere, PLA Project Manager Name: Division Name: Road Maintenance Original Contract/Work Order Amount S 1,061,960-67 7/10718 11 J Onginal BCC Approval Date Agenda Item# Current BCC Approved Amount S 1.06196067 7/10/18 11 J Last BCC Approval Date, Agenda Item # Current Contract/Work Order Total $ 1,061,960 67 3/4/2019 SAP Contract Expiration Date (Master) Dollar Amount of this Change S 56,319 99 5 30% Total Change from Original Amount Revised ContractiWork Order Total S 1,118 280 66 5 30% Change from Current BCC Approved Amount _. Cumulative Changes , $ 56,319 99 5,30% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 9-5-18 Original 3-4-19 Last Approved 3-4-19 Revised Date 6-24-19 Date Completion Date Date (Includes this change) #of Days Added 112 Select Tasks I:1 Add new task(s) CI Delete task(s) o.. Change task(s) El Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and 1 or the additional days added(If requested); 2.)why this change was not included in the original contract;and,3.) describe the Impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1. This change order will add and increase line items as described below resulting in a change order increasing the project cost by $56,319.99 and increase the contract time by 112 days. 2. These changes were not included in the original contract for the following reasons: ).4 Plant Material Changes: Plant numbers changed due to potential sightline issues, availability of materials, design continuity, and median revisions for future turn lanes. - Locating Directional Bores: Existing directional bores required for the irrigation system need to be located by the contractor before mainline installation. Also, additional sleeves need to be located due to design changes. County staff had located some sleeves, but additional work was required to complete the task. The contractor was issued a work directive to complete this work. '0- Adding Directional Bores: Irrigation design changes required additional bores that were not in the original design. Also, existing directional bores were not located by the contractor or by County Staff; therefore, these additional directional bores need to be drilled to connect the irrigation system. :•• Sidewalk Replacement: A 5'x5' portion of sidewalk was removed and replaced by the contractor due to the directional bore drilling. The contractor was issued a work directive to complete this work. :.> 112 Days Added: Adding 108 days to the project will give the contractor time to locate existing sleeves, drill the additional directional bores, and locate utilities in these areas. We are also adding four(4) days due to rain events. The Notice to Proceed's final completion date will change from March 4, 2019, to June 24, 2019. 3. If these modifications are not processed, the plantings will not be complete, the irrigation system will not be gfs connected or run properly, and the contractor will not have time to complete the work. Revised:10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY BCC Admin BCC ES Rpt 1 6 A 9 , C.,....,..._ ,..... , ..... Dc-- ate: ____2 - i____• - --- ,,' Prepared Pr./ ----1_,_ -, •••,, ‘•„-_, N._ % Katherine Chachere, PLA,Project Manager Acceptance of this Change uraer snail(=smite a moaiticauon to contract/woric oroer mentalea above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as If the same were stated in this acceptance. The adjustment, if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor I Consultant/ Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs. ,„, / I 7/ Accepted by: '..--___-••-•-:,-t-,,,7 , J. ,, -- ,•" --- Date: VOL' °I q Dale Owner, Hannula Landscaping and Irrigation Inc, ,, -•., ) . Approved by: • --' ''''', i Date. Pamela Lulich, PLA,Landscape Operations Manager,Growth Management Department / / I' Approved by: — -- , ', el /.. .' Data: JoSeph Delete, PLA, Interim Road Maintenance Director, Growth Management Department -t- -.? I / , e,•') , , , ger, Approved by: ; 1 1 Y `'Ll'`'-'... Date: \)\\ - \1 c k Thaddeus Cohen,Department Head,Growth Management Department Digitally signed by SchneebergerSara SchneebergerSara Date:2019.02.19 16:16:00-0500' Approved by: Date: Sara Schneeberger,Procurement Strategist, Procurement Services Division V-eeeti BOARD OF OUNTY COMMISSIONERS IA enda3 _ii,ict c,Ae coLL4•16, • 1 LORIDA 66). 240, AA Dp.t1 cf-tt —tat Ar_ Rea'd .c. \V i iam L. McDaniel, Jr., Chairman Deputy ....' ,, A I II'S I' - A .-..troy...s top, d legality ('R -TU 1\ I\INtid„CLERK .. d SCo . . eacn, 0 puty County Attorney ,,:c.est c3 to Chai •n's • sIgneture only. '.........„ Revised: 10)2812014 (Divisions who may require additional signatures may include on separate sheet) PROCUREMENT USE ONLY BCC 1 . Admire BCC Ell Rpt ------- � �� � �� �� i� �� � Hannula Landscaping and Irrigation,Inc. ` ' 7050 Pennsylvania Street Fort Myers,Florida 33912 Office 239-437-9666 Fax 239-437-9665 Change OrdeNumber One 18-7316 Collier Boulevard North(Golden Gate Blvd. To Immokalee Road) Date: February 4, 2019 P.O.4500188344 ' - ITEM QTY ADD DESCRIPTION Spec. Unit Total DELETE COST Cost - ' 7 -11 Delete Lagerstroemia indica Muskogee Crape Ea. $527.00 -55,797.00r Myrtle l2'l4' 6'spd.#45Gal. [ont.Mu|h- Trunk3(ancMinimum ]"[a|\p. 8 -5 Delete Lagerstroemia °�in�icaNa��hczCrape Ea. �520�5O '$2'632.58 ~" Myrtle lZ-14' 6'spd.#4SGal. CunLMu|h- Tn/nk ]faneMinimum}" [a|ip. 9 '6 Delete UOusrumjaponicum ] Japanese [a. $620.00 '$3,720.00 � Ligustrum 10'I2'ht O'spd 3" cal min' Specimen ,Multi-trunk � 12 -30 Delete [hamo*ropshumilis European Fan Palm Ea. 504I0^~ '$2'828.00 7 gal. 3 clump mm , heavy cal.Single � 13 -5 Delete Phoenixnedinata xDacNifemx Hybrid [A. $5'850.00 -$29'250.00 17Wood 4'5'' cal. D8H 14 7 Add Phoenix Sylvestris Robusta Sylvester Ea. $3,18210.e 522'274.00 / Palm, 24' Ht. 16' wd. Straight Trunk 15 -4 Delete Sabal Palmetto 12', 18', 22', Std [o� $22Z.00 '�88-5888.00 /,r ht. FG Booted 16 -14 Delete Sabal minor#7Gal. 5dumpmin� heavy [a� �l40�0O1 '�-$1,960,00 �� cal. 17 -53 Delete Hamelia nodosa Dwarf Firebush 3 gal. Ea. $1120 '5593.60 ~r lD^x24^ Ht. x24'' Sr. � 18 -14 Delete Serenoa repens Saw Palmetto 7Gal. Ea. $94.00 -$1'91600 24'''50^ Ht. x36" spr. 19 -36 Delete Viburnum obovatum Walters Viburnum Ea. $12.30.1' '5442.80 / 3gal. lD"'24" Ht. xJ4" Spr. � 20 -55 Delete Dianelia tasmanicnVahegataVariegated Ea. $9.95 -$547.25 ". Flax Lily 3gal. l8"'Z4'' HtxZ4^ Spr. 22 34 Add MuhlenbeqgiacapiUahs3gal. I8"'24" Ht. [a. $I120 / $380,80 / x24'' Spr. 23 1I4 Add Knuhbnbergiacap.UahsWhite Cloud Ea_ $12,90 ~ 51'470,60 3gal. 18'''24" Ht. xZ4'' 3p,. 25 28 Delete AQapanthvs africanus x Peter Pan [a. 514D0/ '$392.00 / Dwarf Blue Lily Of The Nile 3 gal. mm . � � � �� � �� �� �� 1B" Ht, x 18" Spr. 26 12,I15 Add EA. $5.30-") $64209.50 ~/ Peanut Igal.4'' ht. x6'' spr, 27 '9402 Delete Mimosa strigillosa/ Powderpuff 1.gal. Ea. $5.25 / -$49,833.00 ~� 12" ^ h O �� x �pr� ' ~ C/O 1 Add Kemove & Kepboe[oncn�eVVa|kTo L.S. $50800 $500.00 /' Install Directional Bore [/0 1 Add Contractor Mark Up At 5% 5% $25,00 $25.00 / - ' C/O Add Locate Existing Sleeves 40 Add Backhoe Excavator Hrs. $75.00 $3,000.00 / 80 Add Din�� Labor Hrs. $32.00 $2,560,00~/ 1 Add Labor Burden 39% $998.40 $098.40 r � l Add OverheadAndProfi� 10% $655.84 5665.84 - - . Subtotal = $7'I14.24 ^~ 35 2262 Add 3" HOPE Class l50SDR 11Extra Molecular LF 523I0/ $52.026.00 "" weight HDPE Irrigation casing to be used as main lineat existing paved surface crossing 42" +/-depth � � 37 626 Add 4" HDPE Class 150 SDR 11 Extra Molecular Li 527.00 $16,902.00 "" weight HDPE Irrigation casing to be used for 2" submainandoon�vo|vvive4or multiple lateral line crossing at existing pavd surfaces without existing sleeves 42" +/- depth 38 -220 Delete HDPE Large Casing HDPE Class 150 SDR 11 LF $27I0^/ '$5'940.00 /- extra molecular weight HOPE Irrigation ^px,mmo|ecubrwei8h, HDPE |rh0adon casing to be used for 2" submain, spare vvire'(s) conduit, and control wires, or multiple lateral line crossing at existing paved surfaces without existing sleeves 4Z^ +/-depth. 45 -150 Delete 2'' HDPE-Class 150 SDR11 Extra molecular LF $17l01 '$2,55000 ^~ weight HDPE irrigation casing to be used at existing paved surface crossings for landscape triangles |otem| |ines� 16 .A9 C/O Add Extend Time Line For Locate Tickets(10) Days N/C N/C Days, Locate Existing Sleeves(14) Days, Directinal Bores Over Contract Amount (30) Days, Electrical Components And FP&L Service (30) Days,Change Order Processing • '••• Days, Toa4 Rain Days To Date. Total = 112 Days 1 Total Additions= $165,002.14 Total Deletions= $108,682.15 Net Change = $56,319.99 a