Loading...
CLB Agenda 03/20/2019COLLIER COUNTY Board of County Commissioners Contractor Licensing Board AGENDA Board of County Commission Chambers Collier County Government Center 3299 Tamiami Trail East, 3rd Floor Naples, FL 34112 March 20, 2019 9:00 AM Kyle E. Lantz, Chair Matthew Nolton, Vice-Chair Robert P. Meister, III Patrick G. White Michael E. Boyd Terry Jerulle Richard E. Joslin, Jr. Jeffrey Williams NOTICE: All persons wishing to speak on Agenda items must register prior to presentation of the Agenda item to be addressed. All registered speakers will receive up to three (3) minutes unless the time is adjusted by the chairman. Any person who decides to appeal a decision of this Board will need a record of the proceeding pertaining thereto, and therefore may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. If you are a person with a disability who needs any accommodation in order to participate in this proceeding, you are entitled, at no cost to you, the provision of certain assistance. Please contact the Collier County Facilities Management Division located at 3335 East Tamiami Trail, Suite 1, Naples, Florida, 34112 -5356, (239) 252-8380; assisted listening devices for the hearing impaired are available in the Facilities Management Division. 1. ROLL CALL 2. ADDITIONS OR DELETIONS 3. APPROVAL OF AGENDA 4. APPROVAL OF MINUTES 4.A. APPROVAL OF MINUTES - FEBRUARY 20, 2019 5. PUBLIC COMMENTS 6. DISCUSSION 7. REPORTS 8. NEW BUSINESS 8.A. ORDERS OF THE BOARD 9. OLD BUSINESS 9.A. CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE 10. PUBLIC HEARINGS 10.A. PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT 11. NEXT MEETING DATE 11.A. WEDNESDAY, APRIL 17, 2019 Inquiries concerning changes to the Board’s Agenda should be made to the County Manager’s Office at 252-8383. 03/20/2019 COLLIER COUNTY Contractor Licensing Board Item Number: 4.A Item Summary: APPROVAL OF MINUTES - FEBRUARY 20, 2019 Meeting Date: 03/20/2019 Prepared by: Title: – Contractor Licensing Board Name: Lilla Davis 03/11/2019 4:14 PM Submitted by: Title: Supervisor - Operations – Contractor Licensing Board Name: Everildo Ybaceta 03/11/2019 4:14 PM Approved By: Review: Contractor Licensing Board Lilla Davis Review Item Completed 03/11/2019 4:15 PM Contractor Licensing Board Everildo Ybaceta Review Item Completed 03/11/2019 4:49 PM Contractor Licensing Board Everildo Ybaceta Meeting Pending 03/20/2019 9:00 AM 4.A Packet Pg. 3 February 20, 2019 1 MINUTES OF THE COLLIER COUNTY CONTRACTORS’ LICENSING BOARD February 20, 2019 Naples, Florida LET IT BE REMEMBERED that the Collier County Contractors’ Licensing Board, having conducted business herein, met on this date at 9:00 AM in REGULAR SESSION in Administrative Building “F,” 3rd Floor, Collier County Government Complex, Naples, Florida, with the following Members present: Chairman: Kyle E. Lantz Vice Chair: Matthew Nolton Members: Terry Jerulle Richard Joslin Patrick White Excused: Michael E. Boyd Robert Meister ALSO PRESENT: Everildo Ybaceta – Supervisor, Contractors’ Licensing Office Kevin Noell, Esq. – Assistant Collier County Attorney Jed Schneck, Esq. – Attorney for the Contractors’ Licensing Board Lilla Davis – Administrative Supervisor, Contractors’ Licensing Office 4.A.1 Packet Pg. 4 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 2 Any person who decides to appeal a decision of this Board will need a record of the proceedings and may need to ensure that a verbatim record of said proceedings is made, which record includes the testimony and evidence upon which any Appeal is to be made. I. ROLL CALL: Chairman Kyle E. Lantz opened the meeting at 9:00 AM and read the procedures to be followed to appeal a decision of the Board. Roll Call was taken; a quorum was established; five (5) voting members were present. II. AGENDA- ADDITIONS, CHANGES, OR DELETIONS: (None) III. APPROVAL OF AGENDA: Patrick White moved to approve the Agenda as presented. Vice Chairman Matthew Nolton offered a Second in support of the motion. Carried unanimously, 5 – 0. IV. APPROVAL OF MINUTES: JANUARY 16, 2019 Patrick White moved to approve the Minutes of the January 16, 2019 Meeting as submitted. Richard Joslin offered a Second in support of the motion. Carried unanimously, 5 – 0. V. PUBLIC COMMENT: (None) VI. DISCUSSION: (None) VII. REPORTS: (None) VIII. NEW BUSINESS: A. Orders of the Board: Patrick White moved to approve authorizing the Chairman to sign the Orders of the Board. Richard Joslin offered a Second in support of the motion. Carried unanimously, 5 – 0. (Note: The individuals who testified in the following cases under Item VIII, “New Business,” were first sworn in by the Attorney for the Board.) 4.A.1 Packet Pg. 5 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 3 B. Michael Haldie – Review of Experience (d/b/a “Algae Eaters Pool & Pressure Cleaning, LLC”) Chairman Lantz called Michael Haldie to the podium and asked the Applicant to provide his background to the Board. He noted Mr. Haldie had applied for a Roof Coating, Painting, and Cleaning Contractor’s license. Michael Haldie: • He is originally from Ohio and is 41 years of age. • He began power washing as a teen-ager for a family member who owned a power washing company. • He has experience power washing cars, RVs, tractor trailer-semis, to homes. • After the business was sold in 1999, the Applicant moved to Bonita Springs in Lee County. • He worked part-time for Andy’s Pool and Spa maintaining pools as well as continuing with power washing. • He has more than 20 years of experience in the power washing business. • He has been licensed in Collier County as a Swimming Pool/Maintenance Contractor since 2012. Chairman Lantz questioned the Applicant: Q. Are you licensed in Lee County to power wash? A. Yes, sir. Q. And that license is ... A. There isn’t a Roof Coating, Painting and Cleaning Contractor’s license in Lee County – just an “occupational” license. Q. If you have an “occupational” license in Lee County, are you allowed to power wash a roof? A. Yes, sir. Terry Jerulle questioned the Applicant: Q. I thought I heard you say you’re not allowed to coat roofs? A. Well, power washing is essentially ... we use an algicide or a biocide – whatever the customer choses – but it’s a “coating” that goes onto the roof to kill mold and will prevent mold growth for approximately two to three years. Chairman Lantz questioned the Applicant: Q. So, in Lee County – what you want to do here, you can do in Lee County? You’re licensed to do it? A. Yes, sir. Q. We saw a bunch of affidavits verifying your experience --- they are customers? A. They are customers. I also tried to include some before-and-after photos of the work that we do. We’re also accredited by the Better Business Bureau. I’m not sure how ... or what you guys are asking. I’ve been doing this for a long time ... we’re very good at it ... we have a lot of referrals. I can get 50 more recommendations if that’s what you need. 4.A.1 Packet Pg. 6 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 4 Q. And do you have any employees? A. It’s myself and I have one part-time guy who helps me when we do have roof jobs because I have to have to guys onsite for a roof. Terry Jerulle: Evy, why is he here? Everildo Ybaceta, Contractors’ Licensing Office Supervisor: Collier County has a Roof Coating and Pressure Washing License that requires him to take the Business and Law exam as well as a minimum of experience to do the work. He does have the experience in Lee County, but he doesn’t have anything that I can prove here so that’s why ... Terry Jerulle: He hasn’t taken the Business exam? Everildo Ybaceta: Yes, he has. Terry Jerulle: He has? Vice Chair Matthew Nolton: He’s just here for his experience. Patrick White: And it’s not the scope of the license that’s a concern – it’s just the idea that he has no Collier County experience? Everildo Ybaceta: Right. That’s correct. Patrick White: Why would the jurisdiction where the experience is from be a concern? Everildo Ybaceta: It really isn’t – but the recommendations are from homeowners, not from other contractors or other entities. And this is where ... I don’t have heartburn over it ... I just want to make sure that I do cover my bases. Patrick White: Understood. I think that, hopefully, answers your question. Terry Jerulle: Yup. Does the County have any recommendation? Everildo Ybaceta: I believe you can give him the license. I just wanted to make sure that everyone was in favor of it. Terry Jerulle: Thank you. Chairman Lantz questioned the Applicant: Q. I have a couple of questions. Do you have Workers’ Comp coverage? A. We do not. Q. Do you have a Workers’ Comp exemption? A. It’s just one employee essentially ... one part-time employee. Under the law as we understand it, we don’t meet the minimum requirement for coverage. Richard Joslin: That’s not true. Chairman Lantz: That’s not true. Richard Joslin: No. Chairman Lantz: Once you become a construction business, you follow a different set of Workers’ Comp laws. You probably remember this from when you took your Business and Law test. Michael Haldie: When we got our ... for insurance purposes, they haven’t required us ... but I’m more than happy to get that coverage, sure. Patrick White: The issue isn’t required to have coverage ... the issue is you are required to file for and have on record the request for an exemption from the coverage. 4.A.1 Packet Pg. 7 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 5 Michael Haldie: I believe that would be in the packet that I submitted. Richard Joslin: That would cover himself – but that wouldn’t cover his employee ... Chairman Lantz: It wouldn’t cover the employee. Richard Joslin: ... unless it’s a corporation. If you’re a corporation, then you can have that ... Patrick White: They’re an LLC so they’re a business entity but, I think the Board’s concern is correct. If you have an employee – whether – I’m assuming is a W-2 employee? Michael Haldie: It is. Patrick White: In that case – unless he/she’s an officer or manager or some component of the business itself – the exemption does not apply. Michael Haldie: It is my wife. When we do a roof, we must have someone on the ground to spray everything and keep everything wet so we ... Patrick White: So, she’s an employee? Michael Haldie: We are 50/50 owners. Patrick White: She’s also a managing member. That’s Megan Haldie, correct? Michael Haldie: Yes, sir. Patrick White: Yes – she’s a managing member of the LLC. So, under that designation, regardless of being a W-2 employee as well, she is entitled to be classified as part of the request for an approval of an exemption from Workers’ Comp insurance coverage. But you need to have the paperwork correctly filed and in your file which I don’t believe I saw but I may have missed it. Vice Chairman Nolton: I didn’t see it in there. It’s a simple form – you and your wife can get the exemption filed and that would take care of it. Patrick White: Do you have any other questions, Mr. Chairman? Chairman Lantz: I do not. Patrick White: I would like to propose a motion. Patrick White moved to approve the application of Michael Haldie for a Roof Coating, Painting, and Cleaning Contractor’s license subject to providing evidence of the requisite Workers’ Comp exemption to the Licensing Office Supervisor before the license will be issued. Richard Joslin: I have one thing for discussion first. Under the liability policy ... maybe I’m missing some numbers but ... I’m seeing a liability policy where each occurrence is $500.00 – or is it $5,000? And then the total company coverage is $1,000? To be up on top of a roof? Michael Haldie: I believe it’s $500,000 and one million. Chairman Lantz explained the figures were on the side of the form. Richard Joslin: Okay – I’m just making sure. Patrick White: Is that your Second? Richard Joslin: Yes. Chairman Lantz: We have a motion and a second. Is there any more discussion? Terry Jerulle: Do you understand what you are doing? Michael Haldie: I get the proper paperwork for the exemption and then I’m back in business. 4.A.1 Packet Pg. 8 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 6 Terry Jerulle: Right. Chairman Lantz: Or you could get Workers’ Comp insurance – either one. Michael Haldie: Workers Comp ... provide that to Collier County ... Chairman Lantz: Workers’ Comp insurance or an exemption – that’s your decision. If you want insurance on yourself ... if you want to pay for it ... it’s about $50 for each. Michael Haldie: We already got a quote for it ... that’s about what we got. Chairman Lantz: Alright. Any more discussion? Chairman Lantz called for a vote on the motion. Carried unanimously, 5 – 0. Chairman Lantz: As soon as you get the information, you can go to the County Office on Horseshoe and talk to Evy. Michael Haldie: Thank you very much for your time. C. Darleen Rowe – Reinstatement of License, Request to Waive Exam, and Request to Change Name (d/b/a “Rowe Flooring, LLC”) Chairman Lantz called Darleen Rowe to the podium. Lilla Davis, Administrative Supervisor – Contractors’ Licensing Office, provided background information to the Board: • The Applicant has applied for full reinstatement of her Floor Covering Installation Contractor’s license. She has also requested a Waiver of Exams and a change of name. • She also requested to apply the score of the Business Procedures test (86%) that she took in 2012 to this reinstatement. • Ms. Rowe previously appeared before the Board in August 2012 for a review of her credit. • The Board approved a probationary license of one year. She was to present updated business and personal credit reports at six and twelve months. • She appeared before the Board on February 20, 2013. • The Board decided that she was to appear before them in February 2014, but she did not return, and her license was suspended. • Ms. Rowe does not currently hold a license in any other county in Florida. Darleen Rowe stated: • She has been in the flooring industry for more than 25 years between New Jersey and Florida • She incorporated her company in Florida in 2002. • She and her husband separated in 2013-2014 and parted ways professionally. • He former husband opened his own company. • She left the flooring industry and is currently a manager at a Bank of America branch. 4.A.1 Packet Pg. 9 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 7 • Her divorce became final in 2018. • She has decided to return to the flooring industry. Chairman Lantz questioned the Applicant: Q. How long have you been away from the flooring industry? A. Since my license expired ... 2013 ... I think I dissolved my corporation in 2014. Q. You haven’t been in the trade at all? A. In a few years, yes. Q. For the last couple of years. And the test that you say you took, that was in ...? A. 2012. Q. 2012. A. When I moved to Florida, I was in Destin in Okaloosa County and testing wasn’t required there. When I moved to Collier County it was required and I took it. Terry Jerulle questioned the Applicant: Q. How long have you been working for the Bank of America? A. I’ve been in banking the whole time ... five or six years. Chairman Lantz questioned the Applicant: Q. Are you doing a name change or is it a new entity? A. Technically, it’s a new entity with a new tax ID number. It’s because I don’t want to be associated with anything that my ex-husband was associated with ... just, you know ... personal reasons. Q. And he is ... A. My son. Q. Okay. A. He has also been in flooring for two decades. Q. That’s a lot of experience between your name and Joel’s name. A. We’ve both been in it. Q. I thought I saw an experience letter that for Joel for the last few years ... working for Hadinger Flooring doing carpet installation? A. Yes. When I worked in Destin in Okaloosa County, Hadinger’s has relatives in Destin and I worked for them. When I moved to Collier County, I worked for them again and Joel continued to work for them under another company. Q. We have a verification for Darleen Rowe and Joel Rowe ... from the Warehouse Manager for Hadinger Flooring on Airport Road, Naples, from January 2012 to December 2018 with the scope of work as carpet installation. So, you did carpet installation at the same time you were working at the bank? Explain that for me. A. Well, it has Joel’s name on the top. Q. So that’s Joel’s verification? A. Yes, and like I said – I’ve been affiliated with Hadinger for ... I don’t know ... fifteen years in some sort or fashion. And I think in the packet there is also my prior experience affidavits. Q. Yes, yes. There was a brief discussion among the members to clarify that the previously 4.A.1 Packet Pg. 10 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 8 -submitted Affidavits of Good Character and Verifications of Construction Experience from 2012 applied to Darleen Rowe/Dazzling Floors, Inc., and the new Verifications, dated January 2019, labeled as “Darleen Rowe/Joel Rowe,” applied to her son, Joel’s, current experience. Q. One of the things ... for us to waive the exam for you is ... you must prove to us for the Board to be comfortable that taking the exam would be a waste of time because you have been active in the industry ... in your trade. One of the big things is the Business and Law exam. Since you have not been doing anything like running a construction business, it’s hard for us to say that we feel confident that you can do it because you haven’t been active for a while. One of your duties is to convince us that you don’t need to take it again. A. Okay. Richard Joslin: Also, we still have some issues with her credit from what I can gather. Darleen Rowe: There shouldn’t be any issues with my credit. It was noted Ms. Rowe’s current credit score is 648 which is not that below the County’s threshold of 660. Chairman Lantz stated the packet contained Ms. Rowe’s credit report from 2012. Patrick White confirmed the Board at that time did have issues with her credit report. Chairman Lantz asked the members if they had any questions for Ms. Rowe. Terry Jerulle: Right now, I’m not convinced that you have had any experience in the last five years. I think the burden is on you to convince us that you do. You have been working at a bank and Joel is the manager of a warehouse. And you want us to waive an exam that typically everybody else must take. Darleen Rowe: First off – just to clarify – he is not the manager of the warehouse. He is an installer. I don’t know why there is confusing about the papers. I think the warehouse manager is the one who wrote the affidavit. Joel is an installer. Vice Chairman Nolton: Another question we usually ask is why not take the test? Darleen Rowe: Well, I could. It wasn’t fun – you know what I mean? And I still have my books so if I had a question, I could refer to my books. Vice Chairman Nolton: What is the date of the books? Darleen Rowe: I took this exam in 2012. Richard Joslin: Don’t you think things have changed since 2012? Darleen Rowe: Maybe. But do you require people to go back periodically and re- take the test? Vice Chairman Nolton: Not when they’ve stayed in business – because they have been in business, they have had to experience and conform to the changes in the laws. Somebody who has been out of the business for four years or more may not know what those changes are. 4.A.1 Packet Pg. 11 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 9 Darleen Rowe: Okay. Well, it’s floor covering, and I feel confident that I am aware of the laws for floor covering. Chairman Lantz (directed his question to Staff): Are there two tests? There’s the Business and Law. Is there also a floor covering test? Everildo Ybaceta: There is the Business and Law test and I do believe there is a floor covering test, too. Chairman Lantz: One of the things that we tend to take issue with ... Everildo Ybaceta: I’m sorry – I’m mistaken ... it’s just the Business and Law test. Patrick White: It’s just the B&L. Chairman Lantz: ... is the Business. Patrick White: It’s 24-months of experience. Chairman Lantz: I don’t think anyone is questioning that you have twenty-four months of experience doing floor covering work. Patrick White: I’m comfortable that someone who has can operate in the financial world as the manager of a bank probably could handle a balance sheet, reconcile a checkbook, manage to process invoices for Accounts Payable and Accounts Receivable, as well as handle any payment for payroll. Richard Joslin: What are you duties at the bank? Darleen Rowe: I’m the manager. Patrick White: And as the manager, in the past, have you held any of the other positions that are reporting and responsible to you? Darleen Rowe: What? Patrick White: Such as tellers ...? Darleen Rowe: Oh, yes. I started out ... when I was separated from my husband, I started as a part-time teller. I worked at every position at the bank and was promoted pretty rapidly in the past five years. Patrick White: Thank you. Chairman Lantz: Any other questions from the Board? [There were none.] It sounds as if you’re ready to make a motion, Mr. White. Patrick White moved to approve waiving the requirement for the Applicant to re- take the Business and Law exam. Chairman Lantz asked if there was a Second in support of the motion from a Board member. Vice Chairman Nolton offered a Second in support of the motion. Discussion: • Patrick White: I would simply indicate that I think the risk to the consumer in this circumstance is minimal. The credit report having been improved and explained in part because of the divorce which is now concluded, suggests to me that she has figured out how to manage her own finances and in combination with her business experience ... for the prior license and since in the finance industry as a banker ... are adequate to be able to approve the license and waive taking the Business and Law test. 4.A.1 Packet Pg. 12 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 10 • Terry Jerulle: I don’t disagree with anything that Mr. White said. I’m not preventing you from getting your license because I think you could take the test which I think you should do and, in fact, your son should also take the test. • Darleen Rowe: And we had that discussion on the way here – that he should take the test. • Terry Jerulle: It would behoove you, as an entity, for him to take the test. • Darleen Rowe: He’s had possession of the books for the past couple of years because I told him since he was in flooring ... • Terry Jerulle: It would be best for everyone if you did. My point is I think you should take the test, but I don’t disagree with Mr. White. • Patrick White: Let’s see where the vote goes. • Richard Joslin: Is there anything in your divorce decree that ties you to the past debts that you and your husband had? • Darleen Rowe: There debts were all resolved. • Richard Joslin: There were resolved, and you’re not involved any longer? • Darleen Rowe: No, sir. • Vice Chairman Nolton: Obviously, you are an intelligent person and you have the experience in running the business but the things that you may not know is what has changed with the new laws and other components that have nothing to do with running a business or finances. That would be the value of taking the test – to be sure that you knew all the updates and changes. Personally, I don’t think there’s a lot of risk to the public for that business. • Chairman Lantz: Not the business itself. • Patrick White: Exactly. But the books that you have are, in a sense, outdated. Although the fundamentals may be there, the precise points that Matt raised are ones that would behoove you. • Darleen Rowe: Right. • Patrick White: If the motion doesn’t ... • Darleen Rowe: I understand but I’m confident that I know about the current laws ... • Patrick White: It’s not that complicated ... it just requires you to meet the common deadlines and file the proper paperwork. Terry Jerulle questioned the number of votes needed and was told since only five members were present, a majority was needed to pass the motion. Chairman Lantz noted there was a motion and a second. He called for a vote on the motion. Motion carried, 3 – “Yes”/2 – “No.” Mr. Jerulle and Mr. Joslin were opposed. Everildo Ybaceta requested to change the order of the Agenda – for the Board to hear Mr. Bumpus case before hearing Mr. Bowles of Jackson Pools. Chairman Lantz agreed. 4.A.1 Packet Pg. 13 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 11 IX. OLD BUSINESS: (Note: The individuals who testified in the following cases under Item IX, “Old Business,” were first sworn in by the Attorney for the Board.) B. Jeffrey Bumpus: Factual Finding – Were Permits Closed by January 19, 2019 as Ordered by the Board (d/b/a “Northern Breeze Air Conditioning, Inc.”) Patrick White: Are you making a report Everildo Ybaceta: I can make a quick report, yes. Patrick White: I’m suggesting it’s Staff and not Mr. Bumpus who is not here. Everildo Ybaceta: He’s not here. Mr. Bumpus has, to date, four permits that are still in re-activation status. There are nine that have been issued. He has another three that ready for issuance and they are still open and active. Patrick White: And active or inactive? Everildo Ybaceta: Active. Chairman Lantz: What you’re telling us is he has not the deadline to have all permits closed out? Everildo Ybaceta: Yes, sir. Richard Joslin: Is it true that there are still 16 open permits? Everildo Ybaceta: Those are considered “open” – they had been re-activated. Patrick White: So, he hasn’t called for inspections? Everildo Ybaceta: No. Patrick White: And without inspections, they cannot be closed? Everildo Ybaceta: Correct. Richard Joslin: Have you heard from Mr. Bumpus? Everildo Ybaceta: No, sir. Patrick White: Have you attempted to contact Mr. Bumpus? Everildo Ybaceta: Yes, sir, there was an attempt to contact him – he was supposed to be here. Patrick White: A hypothetical ... for example, if the Board today decided that he was done, what happens next? Everildo Ybaceta: That would be up to the Board’s attorney. Jed Schneck, Esq. – Attorney for the Contractors’ Licensing Board: The next step would be for the Board to request that Staff to send the letter of recommendation to the State’s Construction Industry Licensing Board (“CILB”) for further disciplinary action. Chairman Lantz: So, we’ve already determined that it is what we will do if we decide that he didn’t meet the deadline? Attorney Schneck: Correct. Chairman Lantz: If we do nothing, that automatically happens ... or we could reconsider and draw a new “line in the sand.” Patrick White: I think we must make a factual finding. Attorney Schneck: That is correct. The Board could simply make a factual finding that the Respondent has not complied with the Order and therefore Staff should proceed. 4.A.1 Packet Pg. 14 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 12 Chairman Lantz: To make a factual finding ... is that a motion that we make? Patrick White: It is based on the testimony of Staff – have they been sworn? Chairman Lantz: Evy, have you been sworn in? Everildo Ybaceta: Me? Chairman Lantz: Yes. Everildo Ybaceta: No. [Mr. Ybaceta was sworn in by the Attorney for the Board.] Chairman Lantz: Well now that you’re under oath ... Patrick White: Is what you said before, still true? Everildo Ybaceta: Yes, sir. Patrick White: Good. Chairman Lantz: So, you are testifying, on behalf of the County, that Mr. Bumpus has not closed out all of his permits. Everildo Ybaceta: I am, sir. Chairman Lantz: Is that enough? How about anybody else? Any other questions? [There were none.] Does anyone want to make a motion? Patrick White moved to approve finding that Jeffrey Bumpus has not complied with the Order of this Board and a Finding of Fact to that effect. Richard Joslin offered a Second in support of the motion. Chairman Lantz asked if there was any discussion. [There was none.] Chairman Lantz called for a vote on the motion. Carried unanimously, 5 – 0. Chairman Lantz: This case is officially done with us as far as we know it – correct? Everildo Ybaceta: Yes, sir. Chairman Lantz: Yes. Perfect. Richard Joslin: Do you want to read the penalty? Patrick White: No. Chairman Lantz: I think we already did that – last month or two months ago. Attorney Schneck: That’s correct. The Board formalized the recommended penalty last month and now County Staff will send the recommendation to the State. A. Case #2018-10: Update – Stephen Bowles (d/b/a “Jackson Pools”) Misconduct of a State-Certified Contractor Chairman Lantz called Stephen Bowles to the podium and was sworn. Chairman Lantz: The same rules apply from the Public Hearing that we held two months ago. He asked the County to begin. Jack Gumph, Contractor Licensing Compliance Officer was also sworn. 4.A.1 Packet Pg. 15 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 13 Everildo Ybaceta: Mr. Schneck, Mr. Noell has some information to provide ... if you would like to swear him in. Assistant County Attorney Kevin Noell: I don’t think I need to be sworn – I’m not going to provide testimony to the Board ... only a recommendation. I talked with the party ... with Jackson Pools and their representatives ... there were some hiccups with the permitting. If the Board will recall – last time that Jackson Pools was before the Board, the Order was to get a permit, and to have it closed out by today. I talked with both the representatives for Jackson Pools and with Staff. There have been some hiccups with the permit process. It is now all set and ready to be issued – or has been issued – and we would ask that it be rolled over for another thirty days to allow them to close out the permit and this will probably be an issue that I will walk through with Evy to make sure that we have a resolution within thirty days. But they have taken significant steps, including driving to Sarasota to get some engineering records and things of that nature, so they are putting forth a significant effort. I think that our recommendation – issued from the Staff side – and I think from Evy as well – would be to roll it for thirty days to ... Patrick White: You would like the Board to table it for thirty days or do you want to withdraw it and bring it back in thirty days? I’m not clear. Assistant County Attorney Noell: I would ask the Board to table it for thirty days just because the Board had made the previous motion that was agreed upon to bring it back today for completion. I would just ask that it gets tabled until the next meeting. Richard Joslin: What was the “hiccup” with the permit? Assistant County Attorney Noell: There were several different issues that would probably involve a lot of different testimony and things of that nature, so it would probably ... my recommendation would be ... if the Board wants to go through that process, we could. But my recommendation, however, would be just to give it an additional thirty days and we will, hopefully, have it all wrapped up. Chairman Lantz: Well, let me ask you this – let’s just say we decide to give another thirty days, if he finals out the permit tomorrow – then we won’t see him ever again ... correct? Assistant County Attorney Noell: Correct. If that’s the Board’s ... Terry Jerulle: Mr. Bowles, can you convince us? Stephen Bowles: Yes, sir. Well, it’s been a rigorous ... Terry Jerulle: In the same fashion ... can you ... Stephen Bowles: It’s been a ... Terry Jerulle: I don’t care about the process ... looking forward ... Stephen Bowles: We’re right there ... we’re Terry Jerulle: Let me finish ... let me finish ... Stephen Bowles: Oh, okay. Terry Jerulle: ... please. Looking forward ... Stephen Bowles: I thought you were asking a question. Terry Jerulle: I am. Looking forward, can you convince us that what Mr. Noell is saying will happen in the next thirty days? Stephen Bowles: Absolutely, sir. We’re right there – the permits issued ... all the paperwork is in ... they are still probably finishing up on their side. There’s one inspection to come out and do and, like I said, we’re right there. And we’re been 4.A.1 Packet Pg. 16 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 14 we’re getting it done. There’s been some paperwork that they thought they had, and we thought they had ... and both parties found and ... so, we’re right there ... within the next ... Terry Jerulle: Materials ... manpower ... everything is set to ... Stephen Bowles: Yes, sir. Terry Jerulle: ... to be done within the next thirty days? Stephen Bowles: More than likely, within the next week probably ... Terry Jerulle: And you’re very clear about the inspections that you need to call in and to pass? Stephen Bowles: Absolutely. Richard Joslin: Did I see in the packet where there are still three inspections to be called in yet for final? Stephen Bowles: Well, we’re still working that ... I don’t know exactly which three is up to date now because we had some. I would maybe ask Mr. Ybaceta. I know we had the final is what I was under ... assumption that it was down to the final inspection. Richard Joslin: I believe a couple of the inspections would be necessary before the final is given on the permit ... or maybe I’m wrong? Jack Gumph: Mr. Chairman, I would like to defer to Jonathan Walsh, the Collier County Chief Building Official, for any questions as to the permit. Chairman Lantz: Okay. Jonathan Walsh, Chief Building Official for Collier County, was sworn in. Richard Joslin: Mr. Walsh, I’m looking at one of the pages and it says that – from what I can see – there are four inspections that are still pending. It’s showing the pool bonding, the pool final, the pool shell reinforcement, and verify the permit is ready to issue. I assume that one has been done. Jon Walsh: The permit has been picked up. Unfortunately, there seems to have been an issue with the payment, so the permit was placed on an inspection hold. I don’t know the finance element of it ... all I know is ... there are two inspection holds – one is for the Notice of Commencement that has not been recorded yet and they’ll still need to get that done. But that may have been recorded but it just has not been provided to us and that condition resolved. That’s a minor element. The other element is to follow-up with cashiering to resolve whatever the payment issue was – I don’t know ... I’m not a banker. There was something wrong at cashiering when the payment was made ... it says “reversal” on it. I’m not exactly sure what that means. As far as I am aware, the funds were not available. It could have been an error in the transmitting ... it could have been a bunch of different things ... I have no idea. There are three inspections that I am aware of: the shell, bonding, and final. Richard Joslin: And these are the things that he was telling us would be done within a week or ...? Stephen Bowles: Yes. I have all the proper paperwork for all those and I think ... we just found out this morning that everything was on hold because of the $100. I don’t know. We picked up the permit and then, come to find out, there was one hundred dollars that needed to be paid after-the-fact then everything got put on hold. For one 4.A.1 Packet Pg. 17 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 15 hundred dollars? I mean .... (gesturing with his hands in the air) ... I didn’t realize that until this morning and it’s one hundred dollars that’s holding us up ... like I said, we’re so close. Chairman Lantz: But you’ve got it? Stephen Bowles: We’ve got it, yes, sir. We’ve got all the information. Chairman Lantz: Are the inspections that are left to be done, are they being done by the County or a private provider? Stephen Bowles: When they have the proper engineering information ... private providers. Jon Walsh: It’s not technically done by a private provider. In this instance, they have hired a licensed Engineer to perform the inspections that we cannot without some destructive work being done. Chairman Lantz: They will send you a report and then you – or somebody on your staff – will then verify ...? Jon Walsh: A letter was provided by email to me yesterday by the Engineer at 4:17 PM. Unfortunately, it is not completely compliant, and it is in review. I was having conversations with him as early as 8:00 this morning. Chairman Lantz: The ball is rolling? Jon Walsh: Yep. Vice Chairman Nolton: Let me ask a little more in-depth. I hear that there are some questions about it. Mr. Bowles, that’s not satisfactory for those two inspections – because we’re talking about two, and then you have the final. Are you saying to the Board that you’re willing to do whatever it takes to make those two inspections satisfactory? Stephen Bowles: Yeah, I mean ... whatever is required. Vice Chairman Nolton: Even if it includes some further inspection and testing ... Stephen Bowles: Well, I don’t know ... Vice Chairman Nolton: ... ... to satisfy that? Stephen Bowles: ... I don’t know what in depth that he’s going to really need other than ... like he said, he was talking with him as early as this morning. I don’t know if he’s going to get all the information. If he’s not, I think there’s pictures that has surfaced that might help ... because it’s been two years and I’ve been through a lot of phones and I-Clouds so ... I don’t know the exact pictures yet. Vice Chairman Nolton: That’s not my question – right? Let’s say that there isn’t the data ... let’s say that there’s not the pictures. I’m asking the question ... if there’s not, are you – in thirty days – going to do whatever it takes to pass those inspections? Stephen Bowles: Absolutely. Chairman Lantz: Even if it entails some demolition work ... some whatever ...? Stephen Bowles: Well ... I ... I don’t know that ... Patrick White: Which is it, sir? Are you absolutely going to do it, or are you not? Stephen Bowles: I’m going to do, I guess, whatever Jon Walsh and the Building Department requires me to do. Patrick White: That’s a good answer. Stephen Bowles: That’s what I’ll ... yes, sir. Chairman Lantz: All right. Any other questions from the Board? 4.A.1 Packet Pg. 18 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 16 Attorney Schneck: If I may ... just as a recommendation ... after going through the Bumpus case, to leave it cleaner in this situation – as we’re extending it, adding additional time – I would request that the Board amend its Order of December 19, 2018 to change the compliance date. That way we’ll have a new Order, and everything is fresh. So, if there’s any appeal issue ... everything is new and proper. It’s something that we’ve learned going through the Bumpus case – to move things up as these cases go on. Chairman Lantz: So, I guess the motion will be ... instead of saying, ‘we give you thirty days’ ... the motion will be to amend the previous Order to ...? Attorney Schneck: Correct. And I would state March 20, 2019 which is the next meeting date as the new compliance date. Patrick White: And would it also be possible to amend it in a fashion that if the permit is closed out, that the case is closed? Attorney Schneck: Correct. And I would authorize Staff to make that determination if the Respondent has proven that the permit has been properly closed out, then Staff can close out this case. If not, they can bring it back before the Board. Patrick White: Are you comfortable writing that Order and providing it by way of a motion that I’m prepared to make based on what you have suggested? Attorney Schneck: I am. Patrick White: Thank you. So moved, White. Richard Joslin: One last comment. Mr. Walsh, are you comfortable with the engineering that has been provided to you so far regarding these last two major inspections? Jon Walsh: At this moment in time, the only one that I am questioning is the bonding. Richard Joslin: Okay. Jon Walsh: Sufficient information has been provided for the steel reinforcing, but I am questioning the bonding. Richard Joslin: Okay. Vice Chairman Nolton: Second, Nolton. Chairman Lantz stated there was a motion and a second. He asked the members if they had any other questions, comments or discussion. Richard Joslin: This motion is to ...? Chairman Lantz: The motion is to amend the Board’s previous motion to change the date of compliance to March 20, 2019. When the permit is final, then Staff may administratively close the case. Chairman Lantz called for a vote on the motion. Carried unanimously, 5 – 0. Stephen Bowles: Thank you. Terry Jerulle: The clock is ticking. X. PUBLIC HEARING: (None) 4.A.1 Packet Pg. 19 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) February 20, 2019 17 NEXT MEETING DATE: WEDNESDAY, MARCH 20, 2019 BCC Chambers, 3rd Floor – Administrative Building “F, Government Complex, 3301 E. Tamiami Trail, Naples, FL There being no further business for the good of the County, the meeting was adjourned by order of the Chairman at 10:00 AM. COLLIER COUNTY CONTRACTORS’ LICENSING BOARD _____________________________________ KYLE E. LANTZ, Chairman The Minutes were approved by the Chairman or Vice Chairman of the Contractors’ Licensing Board on ______________________, 2019, “as submitted” [___] - OR - “as amended” [___] 4.A.1 Packet Pg. 20 Attachment: February 2019 Minutes (8295 : APPROVAL OF MINUTES - FEBRUARY 20, 2019) 03/20/2019 COLLIER COUNTY Contractor Licensing Board Item Number: 8.A Item Summary: ORDERS OF THE BOARD Meeting Date: 03/20/2019 Prepared by: Title: – Contractor Licensing Board Name: Lilla Davis 03/11/2019 3:41 PM Submitted by: Title: Supervisor - Operations – Contractor Licensing Board Name: Everildo Ybaceta 03/11/2019 3:41 PM Approved By: Review: Contractor Licensing Board Lilla Davis Review Item Completed 03/11/2019 4:16 PM Contractor Licensing Board Everildo Ybaceta Review Item Completed 03/11/2019 4:49 PM Contractor Licensing Board Everildo Ybaceta Meeting Pending 03/20/2019 9:00 AM 8.A Packet Pg. 21 03/20/2019 COLLIER COUNTY Contractor Licensing Board Item Number: 9.A Item Summary: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE Meeting Date: 03/20/2019 Prepared by: Title: – Contractor Licensing Board Name: Lilla Davis 03/11/2019 4:00 PM Submitted by: Title: Supervisor - Operations – Contractor Licensing Board Name: Everildo Ybaceta 03/11/2019 4:00 PM Approved By: Review: Contractor Licensing Board Lilla Davis Review Item Completed 03/11/2019 4:15 PM Contractor Licensing Board Everildo Ybaceta Review Item Completed 03/11/2019 4:49 PM Contractor Licensing Board Everildo Ybaceta Meeting Pending 03/20/2019 9:00 AM 9.A Packet Pg. 22 C,a et Qounty COLLIER COUNTY CONTRACTORS' LICENSING BOARD MARCH 20,2019 9:00 A.M. ADMINISTRATIVE COMPLAINT - CASE 2018.10 STEPHEN L BOWLES _ MISCONDUCT OF A STATE CERTIFIED CONTRACTOR STEPHEN BOWLES is the License holder for his company JACKSON CUSTOM POOLS, LLC (DBA) JACKSON POOL SERVICE. A Contractor Licensing case (CEM1520160021439) was opened due to a report of unpermitted pool construction at 539.1 Tamarind Ridge Drive. A permit application was submltted on 4h812017. This permit was in a Void status, as it was originally rejected, and Mr. Bowles never submitted any corrections. Mr. Bowles was originally in front ol the board on December 19, 2018. The minutes from this meeting are attached. Mr. Bowles was given 60 days to reapply and have the permit finaled. lf he didn't, he needed to return to the Board and his permit pulling privileges from Collier County would be on hold except for this permit plus we would send a letter to the state and recommend the maximum penalty. Mr. Bowles came before the Board again on February 20,2019. The minutes from this meeting are attached. The County asked for an additional 30 days for Mr. Bowles to final the permit as there were some issues with getting the permit issued. The permit application was submitted on February 7th and given permit number PRBD20190205517. The permit had 3 inspections that were needed. Two inspections (700- Pool Bonding & 704 - Pool Shell Reinforcemenl) were passed via an Engineer Letter approved by Jonathan Walsh. The Final Pool inspection was passed on 3/6/2019. The permit received the Certificate of Completion on 3/6/2019, also attached. The permit is considered closed. 9.A.1 Packet Pg. 23 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 Gontents December 19,2018 CLB Minutes February 20,2019 CLB [\rlinutes Permit PR8D2019020551 7 Certificate of Completion 9.A.1 Packet Pg. 24 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19.2018 MINUTES OF THE COLLIER COUNTY CONTRACTORS' LICENSING BOAR.D December 19, 2018 Naples, Florida LET IT BE REMEMBERED that the Collier County Contractors' Licensing Board, having conducted business herein, met on this date at 9:00 AM in REGULAR SESSION in Administrative Building 66F," 3rd Floor, Coliier County Govemment Complex, Naples, Florida, with the following Members present: Chairman: Vice Chair: Members: Michael E. Boyd Kyle E. Lantz Terry Jerulle Richard Joslin Robert Meister Matthew Nolton Excused: Patrick White ALSO PRESENT: Everildo Ybaceta - Supervisor, Contractors' Licensing Office Kevin Noell, Esq. - Assistant Collier County Attomey Jed Schneck, Esq. - Attomey for the Contractors, Licensing Board Jack Gumph - Contractors' Licensing Compliance Officer Reggie Smith - Contractors' Licensing Compliance Officer 9.A.1 Packet Pg. 25 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19. 2018 stating if the permits are not closed out within the next thirty days, we will recommend to the County that he is to be reported to the State with terms like a suspension ofhis license and a $10,000 fine. Vice Chairman Lantz: You are saying to recommend that if the permits are not closed out within the next thirty days, we request the maximum penalty possible? Matthew Nolton: Something like that so that we're done with it and we haven't just left it to chance to someone else - we've put in a penalty to the options. Vice Chairman Lantz: Is that a Second with the amendment? Matthew Nolton: It would be. Vice Chairman Lantzz I will modify my motion. Chairman Boyd called for a vote on the motion. Carried unanimously, 6 - 0. Chairman Boyd stated the case was closed. X, PUBLIC HEARING: A. Case 201E-10: Board of County Commissioners, Plaintiff, vs. Stephen Bowles, dlbla Jackson Pools, Respondent - Misconduct of a State-Certified Contractor (Np1!s: The individuals who testified in the following case under ltem X, "Public Hearing," h,ere rtr sworn in by the Attorney for the Boaril.) Terry Jerulle: Mr. Chairman, my company has used Jackson Pools in the past. I don't believe I know Mr. Bowles. I don't know if you know me. Stephen Bowles: No, sir. Terry Jerulle: It's been ten years or longer since I've used them. I am disclosing this fact - I don't know that it would have any impact on my decisions or my thought process. Richard Joslin pointed out there are two "Jackson Pools" in business. There was a Jackson Pool Construction and a Jackson Pool Service. Stephen Bowles: We are Jackson Pool Service. Terry Jerulle: Oh, then I take it back. My mistake. Thank you for pointing that out. 2t Vice Chairman l-antz moved to: . Continue the restrictions on the permit pulling pivileges of Jeffrey Bumpus cunently in efJect in Collier County until the remaining permits are closed; . Approve concluding the Board's heafing of this case, and . Approve directing Collier Count! Staff to send. a written recommendation to the Slale's Construclion Industry Licensing Board ("CILB") requesting enforcement of ,he maximum penalties possible, i.e., suspension oJ Jeffrey Bumpus' license and imposing afine of $10,000 if the remaining permits are not closed out teithin thirty days. Matthew Nolton offered a Second in support oj the motion. 9.A.1 Packet Pg. 26 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19,2018 Chairman Boyd requested a motion to open the Public Hearing for Case #2018-10: Board of County Commissioners, Plaintiff, vs. Stephen L. Bowles, dlbla Jackson Pool Semice, Misconduct of a State-Certified Contractor. Richard loslin moved to approve opening the Public Heaing for Case #2018-10 as previously referenced. Matthew Nolton olfered a Second in support of the motion. Carried unanimously, 6 - 0. Chairman Boyd outlined the process for the Hearing: 1. This Hearing will be conducted pursuant to the procedures set forth in Collier County Ordinance #90-105, as amended, and Florida Statutes Chapter 49. 2. The Hearing is quasi-judicial in nature and the Formal Rules of Evidence will not apply. 3. Fundamental faimess and due process shall be observed and shall govem the proceeding. 4. Irrelevant, immaterial, or inconclusive evidence shall be excluded but all other evidence of the type commonly relied upon by reasonably prudent persons in the conduct of their affairs shall be admissible whether or not such evidence would be admissible in a trial in the courts of Florida. 5. Hearsay evidence may be used for the purpose of supplementing or explaining any evidence but shall not be sufFrcient by itself to support a Finding unless such hearsay would be admissible or objected to in civil actions in coun. 6. The Rules of Procedure shall be effective to the same extent that they would now be hereafter recognized in civil actions. 7. The general purpose ofthe proceeding is for the County to set out its Opening Statement which details its charges against the Respondent. 8. A Respondent may or may not make his/her Opening Statement setting out in general terms the defenses to the charges. 9. The County then presents its Case in Chief, calling witnesses and presenting evidence. 10. The Respondent may cross-examine these witnesses. Jack Gumph, Contractor Licensing Compliance Officer, presented the County's Opening Statement: o The Respondent is a State-certified General Contractor and holder of License Number CPC1456438. . He is also registered in Collier County (#LCC20120001055) as a Certified PooVSpa Contractor.. On December 29,2016, Contractor Licensing Compliance Officer Rob Ganguli performed a site visit at 5391 Tamarind Ridge Drive, Naples, Florida 341 19, in response to a complaint of unpermitted pool construction.o Mr. Ganguli observed renovation work to an existing pool as well as construction of a new spa unit. Chairman Boyd confirmed the Public Hearing was open. 9.A.1 Packet Pg. 27 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19. 2018 . No permit had been issued. After it was determined that a permit was required, Officer Ganguli posted a "Stop Work" Order at the site. . The Contractor was Jackson Custom Pools. LLC d,rbla Jackson Pool Service and Stephen L. Bowles was the Qualifier.. Jackson Poo[ Service was notified of the violation and the "Stop Work" Order. o A Notice of Non-Compliance was personally presented to Stephen Bowles who signed the form on February 14,2017 acknowledging he had been informed by Officer Ganguli of the permit violation against his license. . In April 2017, a permit application was submitted. It was later rejected, and a Correction Letter was sent. . In June 2017, the permit application was still in rejected status;corrections were submitted, and the permit was under review. o In August 2017, the permit was still in rejected status; corrections were submitted, and a Corrections Letter was sent. o In October 2017, Stephen Bowles was sent a letter requesting a resolution of the rejected smtus of the permit. . In November 2017, Mr. Bowles indicated during a phone conversation that he was attempting to resolve the matter with the Building Department. . In March 2018, the permit application had expired and a notice was sent to the license holder. r In April 2018, the director ofJackson Pool Service stated the County had been supplied with engineering reports in an effort to resolve the correction request. o On August 10, 2018, a Notice to Appear was sent via certified mail to the Qualifier. The hearing date was scheduled for October 17, 2018. . On August 14,2018, the mailing was "undeliverable" per the USPS. . On August 15, 2018, a site visit to 5291 Tamarind Ridge Drive was conducted and the work to the pool had been completed. Later the homeowner called and stated the work has been completed by Jackson Pool Service because they had told the homeowner the issues with the Stop Work Order had been resolved. o On August 20,2018, the Notice to Appear was delivered and delivery was confirmed by USPS. . On October 16, 2018, Stephen Bowles requested a copy ofthe information packet to review and the case was rescheduled to December 19, 2018.o The permit remains in VOID status because corrections were never submitted.. Stephen Bowles is in violation of Collier County Ordinance 2006-46, as amended, Section 4.2.2 which states "Willfully violating the applicable Building Codes or laws of the state, city, or Collier County,,, Chairman Boyd asked Stephen Bowles if he had a response Stephen Bowles stated:o He has been a pool contractor in Florida since 1994.o He has built approximately 8,000 to 10,000 pools - permitted 23 9.A.1 Packet Pg. 28 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19. 2018 . ln25 years, he has never been involved in "anyhing like this." . On July 12,2016, he signed a contract with the homeowner to remodel an existing pool and spa that had been built in 1982. . The spa was flush with the pool deck, but the homeowner wanted to raise the existing spa by eighteen inches. . The spa was raised, the plumbing was extended, and new tile was installed on the deck. New lights, a new pump and hlter were also installed. o "lt's a cut and dry situation that has been done hundreds of time in this County." o He did not think a permit was required to remodel an existing pool. . Other remodeling work was being done to the to the home at the same time. . The inspector saw the pool and said a permit was required. . He was contacted and told a permit was necessary. He did not understand why a permit was required to remodel an existing pool and spa. There was no new construction. . He began the process to pull a permit. . The work was completed so there was nothing to inspect but he tried to accommodate the Building Department. He supplied letters irom an engineer and other documentation. r He felt his attempts to come into compliance were being "stonewalled" by the County. He spent thousand ofdollars and is "in the red on the project." He hired engineers to supply letters and to inspect the site. . He has had "zero" complaints made against his company. o He has no idea what else he can do to satisfy the Building Department. Richard Joslin questioned the Applicant: Q. How did you change the bonding? A. We didn't change the bonding. p. You raised it? A. No, sir. Q. You said it was flush. A. The spa was. Q. The spa. How did you raise it? A. We formed it and poured concrete around it? Q. Did you put sealant around it? A. Yes, sir. Q. You said this was an existing pool with a flush spa? A. Yes, sir. Q. How did you change the plumbing? A. We extended it up. Q. You had to pre-plumb it ro do that? A. tught. Q. How did you do the pressure test? A. We pressure tested it. Q. Who inspected it? A. There was no inspection. 24 9.A.1 Packet Pg. 29 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19, 2018 0. My point. There was also a sun shelf added to it or was it already there? A. Well, the pool was there. The sun shelf was put inside the pool. No, there was no sun shelf there. We added it there - it's all one big chunk with no sealing - it's just sitting inside the pool. Q. So that was part of the pool at one point? A. Right, but not a sun sheli Q. You raised up the spa? The beam? A. Right, yes, sir. Terry Jerulle: Excuse me, Mr. Joslin. Mr. Bowles, did you go to the County at the beginning of the project and ask if you needed a permit? A. No, sir. Q. It would seem to me - and I'm not an expert in pools - that you're notjust remodeling the pool ... you're adding to the pool. By raising the beam ofthe spa, you're adding to the it. A. Yes, sir. Q. And in remodeling, it's incumbent upon us, as contractors, to know that we need permits. A. Well, that's a grey area. Q. You can argue that, okay. But to me, it's not so much of a grey area and if it was a grey iuea as you admitted - the frst step is to go to the County and ask if a permit is needed. A. Right -- you're absolutely right. Q. It's black and white. Maybe you don't. Butif it's a grey area, you go to the County and ask. A. Based on my building pools and pulling permits since '94, this is done hundreds of times. Even here - it's probably being done right now as we're talking. p. And you know the Codes have changed in the last ... A. Yes, sir. Q. ... since you got your license, the Codes have changed several times. A. Right. Q. Okay? So, you can't say what you did ten or twenty years ago is the same thing that you can do today. Richard Joslin: Q. Also, on the permitting section of it - years ago you didn't have to have the hydraulic plumbing engineered and today you do. A. Well, all the plumbing is under the ground. I cannot do - it's existing. Q. Not all of it. A. Just the spa - the spa - yes, you're right. Q. l'm talking about an engineer coming in and telling you ifthe line sizes are right for the volume that is going to go through to the jets which would be part of the ... the engineer would do that when you apply for a permit. They would look at that. This is the reason why it's a grey area because things have changed since '94. Andthat's the reason why you're here. Like Terry said, I think it is up to youto take a little more responsibility - to go in there and get the permit ... or at ieast ask 25 9.A.1 Packet Pg. 30 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19.2018 the question - do I need a permit or is it just like any other renovation? There area a lot of people now who are draining pools and resurfacing. Some of them need a permit. That's the way I would treat any kind of ... A. And I did evaluate that like you said. But based on the criteria of today and I came to the conclusion there as no permit involved ... based on - not back then - but on what's going on today. And I'm paying the price for it because I comply. I comply. I'm notthe guy out there who's not complying. Andthisone- obviously, I missed it - I slipped and I'm paying the cost for it. But I did not "willfully" do that. [t was not intentional or willful. I did not try to defraud the permit - it's just not that situation. Now I'm trying to comply, but I don't know how to satisfy the Building Department unless I tear the pool to pieces and let them see the steel. Jack Gumph requested to submit the information pack presented to the Board in Case #2018-10 into evidence as Counw's Exhibit "A." Vice Chairman l-antz moved to approve accepting the Counry's information pocket in Case #2018-10 and entering it into evidence. Terry Jerulle offered a Second in support of the motion. Carried unanimously, 6 * 0. Richard Joslin continued: Q. Since you found out a long time ago -- months ago - that you did need a permit, or you were asked to obtain a permit for thisjob to complete, but you didn't. A. Yes, sir, I have. Q. This has gone on... A. I have. Ifyou would see the paper trail ... you would see that I have been trying to resolve this matter. And you're right ... the last permit application ... I got to a wall and they wanted ... I don't know what they want now ... if I can get clarification of exactly what is needed ... l'm here to comply ... I mean, there's no reason not to. Terry Jerulle: Q. When did the homeowner starr the renovation - before you started the pool or after? A. He started the renovations on his house about the same time... a little before, I guess. Q. So, that leaves me to believe thar you, at that time, didn't willfully try to do anything wrong because you knew there would be inspectors there. A. Yes, sir. Q. That leaves me to believe that you thought you were doing the right thing at the time. But the problem is when the County did inform you that you did need a permit and you didn't follow through the steps to get it. To me, that,s the problem. A. I did. Q. Before that, I don't think you "willfutly" - in my opinion - didn,t willfully try to cheat but what I think you didn,t do is what the County has been asking you 26 9.A.1 Packet Pg. 31 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19, 2018 to do after the fact. And another question is - if you had found out before you started that you needed to get a permit, would you not have charged the client more money? A. Would I have charged the client more money ... Q. Correct. A. ... for a permit ... absolutely. p. So why wouldn't you go back to the client now and ask him for more money? A. Because... Q. Because if it wasn't included - and I apologize -A. We'd gotten to the point where ... Q. ... but if it wasn't included in the price in your bid to begin with because you didn't know and now it is ... that may be enough ... and ['m saying that because you need to comply. A. Yes, sir. Q. You need to go through the steps and it's going to cost you more money and that may be one of the reasons why you gave up. A. We've not sent him a bill for this - we're eating it - I would not do my client like that because it fell on me, not him. Q, That's your business decision. A. Right. Q. But the point is that we have an outstanding permit that needs to be taken care of and you kind of gave up on it. A. You're right - I did give up ... Q. And you can't do that. A. See, Igaveup-notreallygaveup-Ijustgottoawall. I didn't know what else to submit. Q. Well, they listed it for you and it was pretty clear. A. I got it. I gave everything ... everything that they've wanted, I've complied with. And the last - to my recollection - the last correspondence with them was, 'we want to know how the inspector or engineer came to his conclusion.' I don't know if they want him to radar the steel or what - but that's where I'm at. Vice Chairman Lantz: Q. The pictures that you show here show the pool clearly under construction - right? A. Yes. sir. Jack Gump noted Jonathan Walsh, the Chief Building Official, was in attendance and could address the issue. Chairman Boyd stated the Applicant was presenting his case and after the Board could hear from the County. Q. We have pictures here of the pool under construction. This is about the point when you got the 'Stop Work" Order - right? And they said you need to pull a permit to continue. A. Yes, sir. Q. How did we get here to pictures later showing a beautiful pool and beautiful 27 9.A.1 Packet Pg. 32 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19.2018 deck without getting a permit? How do we get from don't do any work until you get a permit to a completed pool and we still don't have a permit? How? That's my question. A. The "Stop Work" Order was lifted once we applied for a permit. Q. So. when you applied for a permit ... A. Because I would never have kept going with that - it was lifted, or I would never ... so, the "Stop Work" was lifted once we applied for the permit. There are no more inspections left from that point untii the hnal. Once we pulled the permit, we had to get an Engineer's lefter to get to what you saw before it was finished. There's no more permit other than the final permit and the hnal plumbing. We went ahead and finished the pool because there were no more inspections until the end. All the other - the previous inspections that we didn't get were going to be in the Engineer's letter, so we went ahead and finished the customer's pool. I mean, it's a beautiful pool. Q. This "Stop Work" Order says in Remarks, "Must obtain required permits prior to continuing any funher work." lt doesn't say, "Must apply for" - it says, "Must obtain." Ifyou had to expose something, it would be pretty easy to do it when you were in - clearly, you wouldn't want to chip up any concrete, but it would be a lot less expensive to chip concrete before you had any product on top of it - right? Richard Joslin: 0, At that time, the actions should have stopped because you did not obtain the permit - you just applied for it. A. Well, we did obtain a permit. p. The permit was applied for on April 28,2017 . Then it went into "rejected status." Did you bother to check to see if the permit - why was it rejected? A. It was because we didn't get inspected before we raised the spa, and that was rejected - you're right. And then I was told we needed a letter from the Engineer saying the steel and plumbing were correct. p. There is something on June 26'h -the permit was still in "rejected status" for corrections that were sent to you. Meanwhile, the pool was still continuing to be built. A. Right. Vice Chairman Lantz: Q. You said the permit was issued? A. It was issued. It's been two years ... I might be ... my memory. So, then that was another rejection because we didn't have a barrier ... a barrier affidavit with the pool. That don't exist - the pool was built in 1982. The Department found out that's in age [the term is "grandfathered"] ... we can't make them put up a cage or put a barrier up on a pool that was already buitt in 1982 - and the yard is fenced around. That went on for a couple of months. Richard Joslin: p. But if you were going to re-permit or submit a permit for a brand-new 28 9.A.1 Packet Pg. 33 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19,2018 spa - basically that's what happened and why you are here - the you would have to comply with today's laws - not whatever happened to the pool in whatever year you're talking about. A. I can't say fbr sure on that - that's what I was told - that's why to this day there is no barrier, there is nothing... the County dropped that. They said, 'okay. we're not going to push the barrier.' [t was out. I don't know where I'm at or what I need to do. I mean, we can go back - the damage is done, like you said - I made a mistake. I wantto correct it because I comply. ['mapool guyandlhavea passion for this. And when we don't comply with each other - that's what breaks the whole system down. I'm that guy who complies and thrives on that. And in 25 years - with this one, I got zapped - and there's nobody to blame but me and I accept that. I want to make it right. We could go back and forth we "he said/she said" but I'm here at your mercy - I screwed up and that's the bottom line. I should have done better - that falls on me. About my work, I know far as it comes to procedures here - I've built ten thousand pools and Collier County literally has more pools that are literally brand new that falling apart - cracking in half. This guy [indicating Richard Joslin] knows what I'm talking about. I have never seen nothing like it in my life. I've done ten thousand pools and none of them have cracked - none of them have fallen apart. I put twice the rebar - they don't even put seven bars anymore with a wrap around them. They don't put on six inches center - two feet down - that's why all the pools crack from the top. When it comes to the structure and the rebar of this pool, it's unsurpassed - that's what I do. The weakest part of the pool is the top ofthe pool. And that's where I'm at, guys - whatever you come up with. I just ask you to look at that. I've been a licensed pool builder here for 25 years and never had a complaint. Chairrnan Boyd: Thank you, sir. Are there any questions for Mr. Bowles? [There were none.] Jack, any rebuttal? Jack Gumph: I'd like to call Jonathan Walsh and Tim Riegle for the Board to question. Jonathan Walsh, Chief Building Official, stated the case started from an inspection of the residence. The inspector noticed that the pool was being remodeled and I believe we asked Contractors' Licensing to send an lnvestigator out to open the case and subsequently asked if a permit was required. A ''Stop Work" Order was issued. As it stated, the permit was to be issued - not applied for. It has never been applied for. If anything, he would have been given an allowance to make the site safe while the permitting process was underway. He never should have moved forward without the permit being issued. Chairman Boyd: So, a permit has never been issued? Jonathan Walsh: Not for the pool. Richard Joslin: As of today? Jonathan Walsh: Today it is in "void" status. Richard Joslin: Did the inspector for the home renovation know that pool was being renovated as well as the illegal spa? 29 9.A.1 Packet Pg. 34 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19, 2018 Jonathan lValsh: To begin with, the spa would be a separate permit. It would not be included in the house permit. Richard Joslin: If it was just a plan renovation, a permit would not have been necessary - correct? Jonathan Walsh: A pool can be re-surfaced without a permit - that's allowed. But they added steel and concrete - they affected the plumbing - all require a permit. My largest concem on this construction is the steel not being grounded - not being bonded. Since this pool is also an older pool - as you know - it probably doesn't have the proper suction requirements which is also another concern. Regarding the barrier requirement, we did agree that the property's fence provided a level of protection, the existing pool not being modified. We agreed there were no increases regarding life/safety concems, so we allowed the barrier requirement not to be applied because it wasn't a new pool - it was an existing pool. Matthew Nolton: Why was the permit never issued - what was missing? What data was missing? Jonathan Walsh: I didn't do the review, so I'm going to let Tim answer that question. Tim Riegle: I did the second review which was initially rejected because an affidavit was submitted and not an Engineer's letter. I tried to be as clear as possible in the Corrections Letter concerning what was required to be included in the Engineer's letter, i.e., the date and time when the Engineer performed the site inspection and how he performed the inspection to resolve the issues. It was a steel inspection and there are multiple methods of inspection that could be used. I spelled it out as specifically as I could. As you know, we haven't received anything back after I send the second rejection. Matthew Nolton: How would that prevent you from issuing a permit? That's a missed inspection that would need some kind of investigation to do the inspection after-the-fact. Would that prevent you from issuing a permit? Tim Riegle: [n this case because it was an after-the-fact permit, we were asking for what inspection the Engineer's letter was going to cover and ifany additional inspections were going to be needed and added to the permit. Matthew Nolton: So. you treated it as an after-the-fact process at that time? Tirn Riegle: Yes. Matthew Nolton: Ald is that where it fell apart - when you didn't get any additional information or data? Tim Riegle: There was never a response to the second correction letter. At that point, the plans would sit in a folder waiting for a response from the contractor before it would be sent out for a second review. Matthew Nolton: Mr. Bowles, what prevented you from responding or submitting additional information? Stephen Bowles: To be honest with you, I really can't recall. I went down there over and over, and I thought we were in compliance and then he sent this back. I don't ... it got to be such a mess. I guess why I went ahead and finished the pool - to be honest with you - if I hadn't, it would probably be sitting there with that Ii.e.,unfinished] today because I would have been waiting on the permit. That's no excuse 30 9.A.1 Packet Pg. 35 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19. 2018 but it slipped - I'm not going to make an excuse. I don't know how I didn't get ... I was at a stonewall ... Matthew Nolton: Excuse me but that's a separate issue - whether you continued to work when you should not have continued to work. What I'm trying to understand is - no, I don't hear "stone wall" - I hear they said, 'this is what you need to have.' and then there was no further communication ... is what I hear. Chairman Boyd: By the looks of it, you had it done. All you had to do was to go back to the Engineer and stamp the letter with the date he inspected it. Ray Allen Electric Service said it performed an electrical inspection. Atlas Design and Engineering did an inspection of the pool plumbing equipment and the rebar. But then the County asked them for the specific dates when it was done. So, it was all done - you just didn't lollow up on it. Stephen Bowles: And then, again, I don't know how that slipped right there. I'm not going to blame it on nobody but me. I don't have an answer for you on why that last notice he sent - why I didn't - I don't have an answer. Iwon'tmakeupan excuse. For some reason - it must have been something because if it would have been that simple - what we j ust talked about - I would have done it. It makes no sense to me and like I said - it's been two years. According to him, if I had just one more letter from the Engineer with the date, time, and how he did it- this would have all been over? Chairman Boyd: Basically, yes. Matthew Nolton: Is that correct? Jonathan Walsh: It's not that simple ... Chairman Boyd: In the last corrections letter, all you asked for ..."The Engineer's letter must include ( I ) the Permit number and site address " -- that's no big deal. " (2) Specific ircpection performed with the corresponding Collier County lrspection number; (3) Date and time the inspection was performed; (4) Method of inspection to justify determination and resolution of the missed inspection-" Jonathan Walsh: This letter did not state'how.' Chairman Boyd: If the Engineer did the inspection, he should know how he did it. Jonathan Walsh: The way it's written curently, this leaer did not state that. Chairman Boyd: I understand that. Matthew Nolton: Let me ask the County - if Mr. Bowles would have followed up and if he would have done whatever he needed to, we wouldn't be here right now. Jonathan Walsh: The letter from the Engineer would have resolved - for practical purposes - the rough inspections and then we would have followed up with the finals. Matthew Nolton: Right. As you know, I'm an Engineer and we've done inspections like this. We send photos, and we send when we did it, and we send biometric testing for continuity, and we send all that, so we can justib/ that it was built the way it was supposed to be built. Vice Chairman Lantz: So, if he gets his Engineer to do a good inspection or a fixer inspection - whatever that is - and if he calls the Engineer and gets a letter that satisfies what you need, then what's the process from there? Jonathan Walsh: He would have to re-apply for the permit and pay whatever outstanding fees there are; the old permit would go into ..cancelled., statusi the new 3t 9.A.1 Packet Pg. 36 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19, 2018 permit application would still need to address the comments; the Engineer's inspection and, unfortunately, I'm not too sure how he would do a continuity test on something that is finished. But that's not my problem. Vice Chairman Lantz: Let's just say the Engineer does all that - he pays the fees and re-applies. Then does the County go back out and perform a final inspection? Jonathan Walsh: Yes, because the letter was only to cover the "rough" inspection. Vice Chairman Lantz: He'll get the letter from the Engineer and he'll do whatever he has to do, then the permit will be issued, and he will call in for a final inspection. Jonathan Walsh: Yes. Vice Chairman Lantz: Mr. Bowles, do you understand that? Stephen Bowles: Absolutely. Yes, sir. Vice Chairman Lantz: I'm sure there's more than one Engineer in town who knows how to do that. Stephen Bowles: We've got the Engineer's letter already, but it wasn't written with the date and time and so forth. Vice Chairman Lantz: Theoretically you've already paid for itand youjusthave to ask him ... Stephen Bowles: Yes, sir. ISeveral comments were made concerning how the Engineer would conduct the different required tests - the speakers were talking over each other. The homeowner stated the only thing he wanted was a Code-compliant pool.l Stephen Bowles: Can I just make one more statement now that calmness has prevailed. If this was a simple as we are sitting here saying and everybody is saying, I am looking you guys [Staffl in the eye and I am telling you, I would have done that. If this is why it came to this point - why I am at this hearing - because of some discrepancies on a letter? We're missing something. You can tell that I'm the type of guy that - man - I would have been all over that - if thaf s all itwas. But I'm not going to get into a bunch of"stuff'that is not going to change an),thing. I am telling you guys - if that was as simple as it is now - when this was going on - it would have been a done deal. It's too easy - it'sjust too easy to be true, but if it is, I can have that done before the day is out. Matthew Nolton: Mr. Bowles, it is true that we're here because the permit had not been taken care of and ... Stephen Bowles: Right. Matthew Nolton: ... communication with the County had stopped. The County had no way to move this forward other than by this methodology - this process - that we're going through right now. Is it a simple process? It is basically a simple process to do what is asked. You do not have to tear out the whole poo[. you may have to jackhammer some stuff, you may have to expose or reinforce some steel. There are ways to do it and do the continuity testing. There are ways to do it but you stopped. You didn't pursue. What we're hearing is you didn,t figure out how to do this because you don't remember it. The County says there was no communication from you. Chairman Boyd: Sir, you are out of order. Ifyou want to address the Board, 32 9.A.1 Packet Pg. 37 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19. 20t8 you can come up and be sworn in. Thank you. And you are? Come up and be sworn in, please. State your name, please. Richard Hudec, General Manager, Jackson Pool Service: What Steve is trying to say is we were at the County. What we don't want to do is get into odds with the Permitting Department in a "he said/she said." I personally met with Rob Garguli, I tried to see Jon probably three times - Jon would not come out of his office. I spoke to Fred, I spoke to the County Zoning Commissioner, but he Uonathan Walshl is impossible to talk to. Impossible. The guy will never, ever talk to you. I don't want to air dirty laundry - I just want to build pools and renovate pools and clean pools and fix pools. I have personally been down there no less than hve times. Steve has been down there how many times? Ten times. If you want to get into it, then let's get into it. I saw Jack, I just called Andy - my County Commissioner ... you know Andy, right? Terry Jerulle: Excuse me a second ... we not getting into it... you're providing testimony to ... Richard Hudec: I'm a contractor... Terry Jerulle: Now calm down and provide it. We have nothing to do with it... [Mr. Hudec was visibly upset.] Richard Hudec: All Jon had to do was call us ... there's a thing ... Terry Jerulle: Calm down. Richard Hudec: ... person called a gentleman .... be a gentleman - call us and say, 'all you need is this letter.' Do you guys really think ... we've built thousands of pools. Some ofyou guys sitting here are sophisticated guys ... do you really believe that we would be here over a letter from an Engineer that I could have had in twenty minutes? Here's the homeowner, Todd Jacobs. How many times have I ever not called you back, Todd? Terry Jerulle: We can't take testimony ... Richard Hudec: Here's the homeowner - we've talked to him several times and he's a contractor. His family has been in this town for fifty years. We've never not complied with one thing. I just had a situation with Jon Walsh - a family was moving into their home last Friday - weren't they, Jon? They needed a temporary C ofO to move into their house and you said you were too busy to do it. So, I got Dick to do it and he did it in five seconds because you didn't want to come out ofyour office. Terry Jerulle: That has nothing to do with this case. Chairman Boyd: Enough, it has nothing to do with this case. Richard Hudec: Do you want me to file a formal complaint with the County Commissioner when I leave here? Terry Jerulle: That is separate and not testimony for this case. Richard Hudec: That is my testimony. You guys should know as the Board how things are being handled in your County. Chairman Boyd: Most of us are contractors. Richard Hudec: Well - so you know. If you apply for a permit, it should be handled professionally. Richard Joslin: I'm a pool contractor, sir. Richard Hudec: Iknow who you are. 33 9.A.1 Packet Pg. 38 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19. 2018 Richard Joslin: Thirty-five years - right here - there's never been a time when you should not know and check your permits to see if they have been issued - that's number one. Richard Hudec: I know but when you make a mistake - no, we made a mistake Richard Joslin: You can't wait for Jon to come and tell you ... Richard Hudec: ... and then we tried to fix it, but we couldn't get it fixed after the fact. I admit to the mistake. I'm not blaming Jon for the mistake - we made the mistake without question. But we could not get it fixed. I went down there five times. I talked to the plumbing guy. I said. 'okay - what exactly do you want?' I could never get a straight answer. Then it was the barrier and we got the barrier waived. Jon was kind enough to waive that. But I'm telling you - whatever you want us to do. we'll do it. Jack drove the packet to my office the other day. We don't duck anybody - we're not hiding from anybody. I spend 520,000.00 a month in advertising. We don't hide from anybody. But if we need to fix it, we'll fix it. Richard Joslin: We're not trying to tell you how to run your business or how you do run your business - we're only saying that the permit was not issued. Numberone- that's the priority. And as many pools as you've told us that you've built - and I'm not doubting that you have - they all had the same inspection cards - they all had the same things that are necessary for inspection - rhat's what you missed. Those inspections were not done. Richard Hudec: I understand that ... Richard Joslin: You go after-the-fact and try to get them done. There is a way. You find a way to get them done. If you would have stopped as the "Stop Work" Order said, you could have followed through, went back in there and asked, 'how do I get this done ... what does my Engineer need?' It's not up to him to call you. He gave you the scenario of why you needed it - you guys should have planned to get it done. And you did not. Richard Hudec: But that's not true - it's not true. Richard Joslin: It is, sir, otherwise you would have done it. Steven Bowles: [He was not standing close enough to the microphone for his comments to be fully recorded.l ... what you see here looks deceiving. If that was really all it was - we wouldn't be here - we would have done that. If you look at that, you will see that something is not right. You mean to tell me, guys, y,all spent thousands ofdollars and y'all went through all of this and then youjust stopped at that last letter? It don't add up. Terry Jerulle: Excuse me, sir. The only thing that we can think is what you present. What you are presenting .... Assistant County Attorney Noell: Sir, sir, sir- if you can not speak over the Board members as they are addressing you. And if you can wait until the Board addresses you with a question so we can have proper decorum, okay? Thank you. Terry Jerulle: The only thing that I have in front of me is the rast letter from the County stating what you needed to do to complete the permit application. I have nothing else from you. If I had documentation from you or a letier from you, it courd help you with your case. But I don't have anlthing. Richard Hudec: I'll find some stuff - I didn,t look ... we didn,t think it was going to be a big deal ... all we need to do is get the letrer from the Engineer and ifJJn " 3.1 9.A.1 Packet Pg. 39 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19,2018 says, 'good luck with that' ... like you said, it's not hard to do. Terry Jerulle: Certain parts of it aren't hard, I understand the pressure ... (Mr. Hudec and Mr. Jerulle are talking at the same time - difficult to separate the comments.) Assistant County Attorney Noell: Sir, sir, sir- please, the same instruction for you as a witness. When you testify before this Board, you cannot speak over the Board member as he is addressing you. Wait until he is finished talking and if you have a comment or if he asks a question and you want to respond, then you may do so at that time. We're making a record of this proceeding and for it to be clear, we can't speak over each other. Okay? Richard Hudec: Okay. Assistant County Attorney Noell: Thank you. Terry Jerulle: What I believe Mr. Nolton was referring to is the steel in the bottom and I think there's still the pressure test that must be done - from my understanding. Richard Hudec: That's easy enough. Stephen Bowles: (He was too far from the microphone - his comments were not recorded in full.) .... it should be cut and dry ... (his remaining comments were not captured.) Terry Jerulle: From our point of view, sir, we have the history that you've agreed to - that you made a mistake. You needed to get a permit to remove the "Stop Work" Order which you didn't get. Work proceeded - which was another mistake. That's two mistakes. All we have is a letter saying what you must do to get the permit. I have no documentation that you have done anything after that. As I said earlier, it appears that you gave up. I'm not saying that you did or didn't - I'm just saying trom the information that was presented to us in this case, it appears that you had given up. It is incumbent upon you to provide testimony or evidence that you didn't. Stephen Bowles: (He was too far from the microphone - his comments were not recorded in futl.) ... you guys are absolutely right ... you guys are seeing what you're seeing ... I gave up, kinda/sorta because ... ['m not going to go there ... but anylvay, we're all on the record - no matter how this winds up today - we're all on the record stating ... Terry Jerulle: That record has been there for a while ... ifyou understand what I'm saying. Stephen Bowles: (He was too far from the microphone - his comments were not recorded in full.) ... I don't want to do that ... I don't know if he accepts everything. Chairman Boyd: Gentlemen, are you done presenting your case. Jonathan Walsh: That's all the County has. Chairman Boyd: May I have a motion to close the Public Hearing? Richard Joslin moved, to approve closing the Public Hearing for Case #2018-10. Matthew Nolton offered a Second in support of the motion. Carried unanimously, 6 - 0. Vice Chairman Lantz: (dtected to the Respondent and the witness) Please have a seat. You can't leave but you can sit. 35 9.A.1 Packet Pg. 40 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19,2018 Chairman Boyd: I guess we can start our deliberation on whether or not he's guilty. Case #2018-10: Stephen L. Bowles, Jackson Pool Service. Matthew Nolton: Well, for me, personally, it's fairly simple if he's guilty or not. Yes, he did work without a permit and continued to do work without a permit. A permit still has not yet been issued. I don't know why we have to deliberate. Terry Jerulle: The first stage is finding whether he is guilty or not guilty. Vice Chairman Kyle Lantz moved lo approve finding the Respondent, Stephen L. Bowles, guilty of the violation of County Ordinance 2006-46, as amended, Section 4.2.2, "Misconduct of a Slale-Certified Contractor," as slated in the Administrative Complaint for "Wilfulb violating the applicable Building Codes or laws of the state, city, or Collier Counly." Matthew Nolton offered a Second in support of the motion. Chairman Boyd asked if any discussion was needed. With no response from the Board, he called for a vote on the motion. Caried unanimously, 6 - 0. Chairman Boyd deferred to the Board's Attorney. Attorney Schneck: For the penalty phase for a State-certified contractor, as in the Bumpus case, the Board is limited to denying, suspending, or revoking his permit- pulling privileges in Collier County or limiting his ability to pull permits under specific conditions. The second part ofthe penalty phase is the recommendation that the Board can sent to the Saate's Construction Industry Licensing Board ("CILB") for further action. When considering these penalties, the Board should also consider the testimony and all the evidence presented, as well as: o The gravity of the violationl . The impact ofthe violation on the public health/safety/welfare; . Any actions taken by the violator to correct the violations; o Any previous violations committed by the violator; and o Any other evidence presented at the Hearing relevant to the Sanctions which are appropriate to the case, given the nature of the violation. Terry Jerulle: Mr. Bowles, do you want to complete the permit application? Stephen Bowles: Yes, sir. Terry Jerulle: And if you complete the permit application, do you think you can comply with the terms written on the permit? Stephen Bowles: Yes, sir. Terry Jerulle: How long do you think it will take you to complete it? Stephen Bowles: Thirty days - by the end ofJanuary. Terry Jerulle: Thirty days and by the end ofJanuary are two different time frames I do know that Christmas is coming. I'm asking you. Stephen Bowles: By January 3l't. Terry Jerulle: Thank you. Stephen Bowles: And I want to comply - I don't want this hanging - I like 36 9.A.1 Packet Pg. 41 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December I9,2018 my license to be clean. There's a stain on it and I want to clean it up. Matthew Nolton: Mr. Bowles, I assume you are still active in business. Do you have active permits for pools that you are currently building or renovating? Stephen Bowles: Yes, sir. Vice Chairman Lantz: How many permits would you say you have out there? I don't need an exact number - 5 - 10 -100? Stephen Bowles: Probably ten ... eight to ten. Terry Jerulle: And in the future - in any grey areas, you are going to do what? Stephen Bowles: I will take my paperwork to the Building Department and ask to talk about it because ['ve never been through this and I don't want to go through this again. Hindsight is 20i20 - these are self-inflicted wounds. But I comply - I'm a guy who, like I told you, I have a passion for my industry and that's what it's about... to comply. Terry Jerulle: Thank you, sir. Vice Chairman Lantz: Personally, when I break down the five criteria: First, the gravity of the situation - the gravity of the situation is it didn't fall apart -- it's an issue but not a huge one, so I'd put that on the low side. The impact of it- he didn't get a permit and should not have continued with the pool, but he did. Theoretically, I don't think any public health/safety/welfare was in danger. so I'd put that very low. Actions taken after - actions that were taken -- l'd put that about as high as you can get as far as what he did wrong. He just gave up. He had plenty of opportunities to make it right and he didn't- he continued working on the pool before the permit was issued. I'd say that's very high. As far as previous violations, he doesn't have any so that's very low. And other evidence ... there's no change. So, overall, on a scale of onetoten: Gravity - I or2; Impact - 1or2; Actions - l0or 12 if Icouldgothat high; Previous violations - 0; and Evidence - 0. Averaging it out on a scale of 1 to 10, it's a 2 or 3 ... maybe. We've definitely seen a lot worse going on - it's the fact that it happened. I don't think it's a super-bad crime but it's something that needs to be resolved. Richard Joslin: I disagree with you as far as the public healthisafety/welfare goes only because the spa was built up without any bottom steel and without an inspection. It's one ofthe first inspections that's done because ofthe electrical factor. How it's going to be resolved is if there was steel tied to the top beam that he poured and if it was grounded. It will be a challenge to an Engineer to find out and get it done. That's an imponant factor and inspection. Terry Jerulle: Does the County have an opinion? Everildo Ybaceta: The County will defer to the Board's decision. Matthew Nolton: He will have to re-apply for the permit and there's the opportunity to pay penalty of "x" times the permit fee in that process? Everildo Ybaceta: Yes. The cost is four times the original permit fee because the permit wasn't issued, because it is an active case, and because the contractor of record was involved. It is to be done from issuance through completion. Vice Chairman Lantz: I have a question for Jonathan Walsh. Mr. Bowles said he could have everything done by January 3 I't. My definition of "done" is a final permit. Knowing the workload of the County and what need to be done between 31 9.A.1 Packet Pg. 42 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19, 2018 now and getting finished product - in your opinion, what is the latest date to get the Engineer's letter to you? Jonathan Walsh: We're starting from scratch. He must apply for a new permit. Vice Chairman Lantz: So, if he comes in with a new permit application and the new letter on January l5d, is it possible the permit could be issued by January 3 I " or no? Jonathan Walsh: Not knowing the current load of the Planning Reviews, we could probably facilitate a quicker turn-around. Ifyou're looking for a date, I would probably say five to ten days, give or take. Vice Chairman Lantz: Business days? Jonathan Walsh: Yes. We're currently 30 to 45 days for permit reviews. We could probably facilitate turning this one around a little bit quicker. Ifthe letter that's in lieu of County inspections is acceptable, then the only requirement would be three inspections - final plumbing, final electric, and final pool. Vice Chairman Lantz: Those inspections could be done in a day. Jonathan Walsh: Theoretically, they could be done in one day once the permit is issued. Vice Chairman Lantz: Realistically, Mr. Bowles needs a good letter fiom an Engineer as well as a new permit application package. Are you still saying you can be done by January 31't -- because it's notjust getting the letter - it's getting the whole process done. Stephen Bowles: The permitting process might throw it back a linle bit - maybe February l5s? I don't want to say something and then we're still ... Vice Chairman Lantz: That's exactly the point. I want to make sure you understand its notjust obtaining a letter from an Engineer - there's more ... Stephen Bowles: Yeah, we've got to get - start over, basically, and push everlthing through. Matthew Nolton: Mr. Walsh, I'm a little confused. Would this be a permit by affidavit process or would this be that he is to submit plans and submit Engineer's letters for the missed inspections? Jonathan Walsh: We treated the rough on this permit knowing the history of it and we will try to facilitate turning the permit around by getting the Engineer's letters in case there are any concerns, they can be fixed before it is finished. But his permit will still be considered a partial after-the-fact. For the inspections that I cannot perform, they must be done by an Engineer with supporting documentation and the Engineer must document how he came to his conclusions. Matthew Nolton: The packet would be the full site plan with the elevation ... Jonathan Walsh: All the piping requirements, all the reinforcing steel ... Matthew Nolton: ... all the bond connections - you'd have a[[ that and the equipment ... it would have all that, just as ifyou were going to start this job from scratch. You'd need to get a permit and a packet with all the documents which I am sure you are aware ofsince you do this all the time. You would need that plus the Engineer's letters to cover the inspections that were missed. Stephen Bowles: Yes, sir. I don't know if January 3 I st might be pushing it. I know I can get the letters but, like he said, I don't really know about the plumbing review ... 38 9.A.1 Packet Pg. 43 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19, 2018 Jonathan Walsh: Our plumbing plan reviewer is ... if we're informed that the permit is in ... we wiII do our best to facilitate a quicker turn-around, but I don't want to ... Matthew Nolton: I understand... with the holidays and with ... it's not as simple as you think with the Engineer's letters. I happen to know that firm was sold, so whoever was involved is even there. I think you will probably need two months - sixty days - to get this done. Stephen Bowles: That sounds more reasonable. But it will get done. And I have started over before - first it was the barrier, and the pool has been there since 1982. I just want to submit everything so it goes through without something that I have no control over. Matthew Nolton: I understand. Thank you. Back to our deliberations. Vice Chairman Lantz: What I'm proposing - I'm ready to make a motion but I want to hear how everyone feels - we give him until the February meeting ... provided that the permit is final before then, we will take no more action. However, if the permit is not final by then, we will cancel his permit-pulling privileges until it is final. It's giving you a lot of leeway but if you fail, there will be a lot of repercussions. Stephen Bowles: I understand. yes. sir. Chairman Boyd: In essence, you are going to continue it until the February meeting? Vice Chairman Lantz: No. Matthew Nolton: No - I would like the motion to be right now - we're in the penalty, so we're recommending to the County that they pull his - the company's permit pulling privileges and inspection privileges at that point in time unless the permit has been closed out properly. Vice Chairman Lantz: If he closes it out by the February meeting, he will go on his way. If he doesn't, he will have a world of problems for his business. Matthew Nolton: And this way, he would not have to come back before the Board. Yice Chairman Lantz: Does anybody have any - does this sound reasonable? Terry Jerulle: Mr. Bowles? Stephen Bowles: It sounds reasonable. Terry Jerulle: And that may - I think the homeowner is here - you may have to ... in the worst-case scenario, you may have to drain the pool and chip the bonding on the spa to get verification. I don'tknow- I'm not apool contractor. Stephen Bowles: Verification of the bonding? Richard Joslin: One of the engineers may have an ex-ray machine. Matthew Nolton: It won't show the bonding. There will have to be continuity testing. And you're going to need to be able to contact the steel in two places - the original beam on the pool and on the spa- you have to do conrinuiry testing. Stephen Bowles: Was the original beam on the pool in 1982? [t didn'r require that. Matthew Nolton: Code may not have required it but, to build the spa, you would have had to connect to that steel. And you would have had to ground it, so ... Stephen Bowles: I bonded the whole pool and I bonded the spa, so whether it shows up on radar ... but that's the most important thing that you can do. Forget everything else - bond that baby. Richard Joslin: Lots of things happen it you don'r. 39 9.A.1 Packet Pg. 44 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 December 19. 2018 Stephen Bowles: Bond that baby - your handrails, your lights ... so, the pool is bonded and grounded. How we're going to get to making sure they know that ... like you said ... Terry Jerulle: As I said, think worst-case scenario in that sixty-day time frame. Stephen Bowles: Yes, sir. Terry Jerulle: And you can do that in the worst-case scenario. Stephen Bowles: I think so - I think so. Richard Joslin: Weren't permit pulling privileges part of the motion? Vice Chairman Lantz: Well, I didn't make the motion yet... but my suggestion is permit pulling privileges are good now but if he fails to meet the deadline, they're gone. Richard Joslin: Okay. Terry Jerulle: Any recommendation to the state? Vice Chairman Lantz: No. Terry Jerulle: If he doesn't complete this pool, he will not have any permit pulling privileges. So, what happens with the state? Vice Chairman Lantz: Then there's a recommendation to the state. Vice Chairman Kyle ltntz moved to approve granting a period of srl/y days to Stephen Bowles to final out the permit duing which time the permit is to be issued in final status and the job completed with a C of O. If the sixty-day deadline is missed, his permit pulling privileges and inspection pulling privileges in Collier County will be immediately cancelled except for this specific permit, and the County will be aulhorized lo send a letter to the State's Conslruction Industry Licensing Board ('CILB") recommending imposition of the maximum penalties. Richard Joslin offered a Second in support of the motion. Assistant County Attorney Noell: The Board's February meeting is scheduled for February 20ft which is four days later than your deadline. If the Board is considering taking away the Respondent's permit and inspection pulling privileges, I would be more comfortable if the deadline was February 20th. If it is complied with and closed out, the matter is done. If not, then he is to come before the Board. Vice Chairman Lantz: That is against my motion. And the reason is that I don't want to have another Jeffrey Bumpus here every month. 'Here's the line and we're not crossing it.' Assistant County Attorney Noell: I understand. From my perspective with possible due process considerations, etc., my fear is if the Board makes - and whatever the Board does, respectfully, the Board does, and I understand that, but I am telling you the County's position. Ifthe Board makes his suspension pending on a future event and that automatically happens, the Respondent will have the ability to appeal that in Circuit Court, I don't necessarily want to go through all those hoops when we,re talking aboutjust four days. Ifhe's not in compliance and it,s the automatic suspension, he would have the right to be heard before that is finally taken - if that makes sense. Terry Jerulle: It does to me now. Ifthere,s a flood in the County and nobody can pull permits for two weeks, that puts him injeopardy. 40 9.A.1 Packet Pg. 45 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : December 19, 2018 Vice Chairman l-antz agreed to amend his motion to extend the deadline to February 2Oh and Richard Joslin agreed to amend his Second. Chairman Boyd called Jor a vote on the amended motion. Carried unanimously, 6 - 0. Terry Jerulle: And just for my record - I know you guys were upset but Jonathan Walsh didn't create the problem. In my experience with Jonathan Walsh, he helps solve problems. But he is extremely busy with thousands and tens of thousands of permits and inspections, and even I can't get ahold of him ... a lot ofpeople ... it's not just you, singularly, that can't get an answer from him - nobody can Chairman Boyd stated: o This cause came for a Public Hearing before the Contractors' Licensing Board on December 19, 2018 for consideration of the Administrative Complaint filed against Stephen L. Bowles, d./b/a "/cckson Pool Service. . Service of the complaint was made by certified mail, personal delivery, or publication in accordance with Collier County Ordinance lE0-105, as amended.o The Board having heard testimony under oath, received evidence, and heard arguments respecrive to all pertinent matters hereupon issues its Findings of Facts, Conclusions of Law and Order of the Board as follows: Conclusions of Law, Findings of Fact, and Orders of the Board: . Stephen L. Bowles, dlbla Jacl<son Pool Service, is the holder of record of a Collier County Certificate of Competency, License Number LCC20120001055. o Mr. Bowles is also a State-certified PooVSpa Contractor and holder of License Number CPC1456458. e The Coliier County Board of County Commissioners is the Petitioner in this matter and Stephen L. Bowles is the Respondent. . Mr. Bowles was present at the December 19, 2018 Public Hearing and was not represented by counsel. o All notices required by Collier County Ordinance #90- 105, as amended, have been properly issued or personally delivered.. The Respondent acted in a matter that is in violation of Collier County Ordinance and is the one who committed the act.o The allegation set forth in the Administrative Complaint as to Collier County Ordinance #2006-46, as amended, Section 4.2.2 - Misconduct of State Certified Contractor states: "Wilfu y violating the applicable Building Codes or law of the State, City, ot Collier County. " o The allegation was supported by the evidence presented at the Hearing. Conclusions of Law: o The allegations set forth in the Administrative Complaint as to Count One is approved, adopted, and incorporated herein, to wit: 4I 9.A.1 Packet Pg. 46 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 o December l9- 2018 The Respondent violated Ordinance #2006-46, as amended, Section 4.2.2 in Count One in the performance ofhis contracting business in Collier County by acting in violation of the Section set out in the Administrative Complaint with particularity. Orders of the Board: o Based upon the foregoing Findings of Fact and Conclusions ofLaw, and pursuant to the authority ganted in Florida Statutes, Chapter 49, and Collier County Ordinance #90-105, as amended, by a vote of six (6) in favor and zero (0) opposed, a majority vote ofthe Board members present, the related Sanctions and following Order are hereby imposed upon the holder of Certificate of Competency #LCC20120001055: o The deadline for the Respondent, Stephen L. Bowles, to final out the permit is February 20,2019, during which time, the permit is to be issued in final status and the job completed with a C of O. o If the deadline is missed, the Respondent's permit pulling and inspection pulling privileges in Collier County will be automatically cancelled except for this specific permit. o Ifthe deadline is missed, the County will be authorized to send a letter to the State's Construction Industry Licensing Board ("CILB") recommending position of the maximum penalties. Chairman Boyd: The hearing is concluded Matthew Nolton: The case that we didn't hear [Melvin Alfaro, d.hla"Oasis Builders of SWFZ" - Contesting Citationl- can we do something and not have that guy come back? Everildo Ybaceta: He's not coming back. His time has been allotted. Matthew Nolton: So, we don't need to take action on it? One question to Mr. Schneck ... is the Citation being tabled or ...? Everildo Ybaceta: No, he had ten days to contest the Citation. He requested a Hearing to contest the Citation and he didn't show for the hearing. Matthew Nolton: So, he can't contest it. Attorney Jeb Schneck: I would recommend that the Board hold a hearing, have the Contractors' Licensing Compliance Officer enter documentary evidence into the record as well as a brief summary of the case just to establish a substantial evidentiary standard. Everildo Ybaceta: The Ofhcer is no longer here but I can make a brief statement if you wish. Attorney Jeb Schneck: It's an Administrative Hearing process, in the sense that you have witnesses and take testimony, deliberate and make a finding. Everildo Ybaceta: We don't - well, no. Attorney Jeb Schneck: The process for contesting a Citation is: the alleged violator receives a Citation and has ten days to notify the County in writing that heishe wants to contest the Citation at hearing before this Board. He has nodrled the county and there is correspondence verifying the date of the hearing. That takes care of the notification 42 9.A.1 Packet Pg. 47 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : February 20, 2019 MINUTES OF THE COLLIER COUNTY CONTRACTORS' LICENSING BOARI) February 20,2019 Naples, Florida LET IT BE REMEMBERED that the Collier County Contractors' Licensing Board, having conducted business herein, met on this date at 9:00 AM in REGUI-LR SESS/ON in Administrative Building "F," 3'd Floor, Collier County Govemment Complex, Naples, Florida, with the following Members present: Chairman: Vice Chair: Kyle E. Lantz Matthew Nolton Members:Terry Jerulle Richard Joslin Patrick White Excused'.Michael E. Boyd Robert Meister ALSO PRESENT: Everildo Ybaceta - Supervisor, Contractors' Licensing Office Kevin Noell, Esq. - Assistant Collier County Attomey Jed Schneck, Esq. - Attorney for the Contractors' Licensing Board Lilla Davis - Administrative Supervisor, Contractors' Licensing Office 9.A.1 Packet Pg. 48 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 February 20,2019 Chairman Lantz: To make a factual finding ... is that a motion that we make? Patrick White: It is based on the testimony of Staff - have they been swom? Chairman Lantzz Evy, have you been swom in? Everildo Ybaceta: Me? Chairman Lantz: Yes. Everildo Ybaceta: No. [Mr. Ybaceta was swom in by the Attorney for the Board.] Chairman Lantz: Well now that you're under oath ... Patrick White: Is what you said before, still true? Everildo Ybaceta: Yes, sir. Patrick White: Good. Chairman Lantz: So, you are testifying, on behalf of the County, that Mr. Bumpus has not closed out all of his permits. Everildo Ybaceta: I am. sir. Chairman Lantz: Is that enough? How about anybody else? Any other questions? [There were none.] Does anyone want to make a motion? Chairman Lantz asked if there was any discussion. [There was none.] Chairman l-ant7 called for d vote on the motion. Carried unanimously, 5 - 0. Chairman Lantz: This case is officially done with us as far as we know it - correct? Everildo Ybaceta: Yes, st. Chairman Lantz: Yes. Perfect. Richard Joslin: Do you want to read the penalty? Patrick White: No. Chairman Lantzt I think we already did that - last month or two months ago. Attorney Schneck: That's conect. The Board formalized the recommended penalty last month and now County Staff will send the recommendation to the State. A. Case #2018- l0:Update - Stephen Bowles (d,/b/a "lackson Pools,') Misconduct of a State-Certified Contractor Chairman Lantz called Stephen Bowles to the podium and was swom. chairman Lantz: The same rules apply from the public Hearing that we held two months ago. He asked the County to begin. Jack Gumph, Contractor Licensing Compliance Officer was also swom. t2 Patrick White moved to approve ftnding that leffrey Bumpus has not complied with the Order of this Board and a Finding of Fact to that effect. Richard Joslin offered a Second in support of the motion. 9.A.1 Packet Pg. 49 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : February 20,2019 Everildo Ybaceta: Mr. Schneck, Mr. Noell has some information to provide... if you would like to swear him in. Assistant County Attorney Kevin Noell: I don't think I need to be swom - I'm not going to provide testimony to the Board ... only a recommendation. I talked with the party ... with Jackson Pools and their representatives ... there were some hiccups with the permitting. If the Board will recall - last time that Jackson Pools was before the Board, the Order was to get a permit, and to have it closed out by today. I talked with both the representatives for Jackson Pools and with Staff. There have been some hiccups with the permit process. It is now all set and ready to be issued - or has been issued - and we would ask that it be rolled over for another thirty days to ailow them to close out the permit and this will probably be an issue that I will walk through with Evy to make sure that we have a resolution within thirty days. But they have taken significant steps, including driving to Sarasota to get some engineering records and things of that nature, so they are putting forth a significant effort. I think that our recommendation - issued from the Staff side - and I think from Evy as well - would be to roll it for thirty days to ... Patrick White: You would like the Board to table it for thiny days or do you want to withdraw it and bring it back in thirty days? I'm not clear. Assistant County Attorney Noell: I would ask the Board to table it for thirty days just because the Board had made the previous motion that was agreed upon to bring it back today for completion. I would just ask that it gets tabled until the next meeting. Richard Joslin: What was the "hiccup" with the permit? Assistant County Attorney Noell: There were several different issues that would probably involve a lot of different testimony and things of that nature, so it would probably ... my recommendation would be ... if the Board wants to go through that process, we could. But my recommendation, however, would be just to give it an additional thirty days and we will, hopefully, have it all wrapped up. Chairman Lantz: Well, let me ask you this - let's just say we decide to give another thirty days, if he finals out the permit tomorrow - then we won't see him ever again ... correct? Assistant County Attorney Noell: Correct. If that's the Board's ... Terry Jerulle: Mr. Bowles, can you convince us? Stephen Bowles: Yes, sir. Well, it's been a rigorous ... Terry Jerulle: In the same fashion ... can you ... Stephen Bowles: It's been a ... Terry Jerulle: I don't care about the process ... looking forward ... Stephen Bowles: We're right there ... we're Terry Jerulle: Let me finish ... let me finish ... Stephen Bowles: Oh, okay. Terry Jerulle: ... please. Looking forward ... Stephen Bowles: I thought you were asking a question. Terry Jerulle: I am. Looking forward, can you convince us that what Mr. Noell is saying will happen in the next thirty days? Stephen Bowles: Absolutely, sir. We're right there - the permits issued ... all the paperwork is in ... they are srill probably finishing up on their side. There,s one inspection to come out and do and, like I said, we're right there. And we,re been l3 9.A.1 Packet Pg. 50 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 February 20, 2019 we're getting it done. There's been some paperwork that they thought they had, and we thought they had... and both parties found and ... so, we're right there ... within the next ... Terry Jerulle: Materials ... manpower ... everything is set to ... Stephen Bowles: Yes, sir. Terry Jerulle: ... to be done within the next thirty days? Stephen Bowles: More than likely, within the next week probably ... Terry Jerulle: And you're very clear about the inspections that you need to call in and to pass? Stephen Bowles: Absolutely. Richard Joslin: Did I see in the packet where there are still three inspections to be called in yet for final? Stephen Bowles: Well, we're still working that... I don't know exactly which three is up to date now because we had some. I would maybe ask Mr. Ybaceta. I know we had the hnal is what I was under... assumption that it was down to the final inspection. Richard Joslin: I believe a couple of the inspections would be necessary before the f,rnal is given on the permit... or maybe I'm wrong? Jack Gumph: Mr. Chairman, I would like to defer to Jonathan Walsh, the Collier County Chief Building Official, for any questions as to the permit. Chairman Lantz: Okay. Jonathan Walsh, Chief Building Official for Collier County, was swom in. Richard Joslin: Mr. Walsh, I'm looking at one of the pages and it says that - from what I can see - there are four inspections that are still pending. It's showing the pool bonding, the pool final, the pool shell reinforcement, and verify the permit is ready to issue. I assume that one has been done. Jon Walsh: The permit has been picked up. Unfortunately, there seems to have been an issue with the payment, so the permit was placed on an inspection hold. I don't know the finance element of it ... all I know is ... there are two inspection holds - one is for the Notice of Commencement that has not been recorded yet and they'll still need to get that done. But that may have been recorded but it just has not been provided to us and that condition resolved. That's a minor element. The other element is to follow-up with cashiering to resolve whatever the payment issue was - I don't know ... I'm not a banker. There was something wrong at cashiering when the payment was made ... it says "reversal" on it. I'm not exactly sure what that means. As far as I am aware, the funds were not available. It could have been an error in the transmitting... it could have been abunchof different things... Ihavenoidea. There are three inspections that I am aware of: the shell, bonding, and final. Richard Joslin: And rhese are the things that he was telling us woutd be done within a week or...? Stephen Bowles: Yes. I have all the proper paperwork for all those and I think ... we just found out this moming that everything was on hold because of the $100. Idon't know. We picked up the permit and then, come to find out, there was one hundred dollars that needed to be paid after-the-fact then everything got put on hold. For one 1.1 9.A.1 Packet Pg. 51 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 : February 20, 2019 hundred dollars? I mean .... (gesturing with his hands in the air) ... I didn't realize that until this moming and it's one hundred dollars that's holding us up ... like I said, we're so close. Chairman Lantz: But you've got it? Stephen Bowles: We've got it, yes, sir. We've got all the information. Chairman Lantz: Are the inspections that are left to be done, are they being done by the County or a private provider? Stephen Bowles: When they have the proper engineering information ... private providers. Jon Walsh: It's not technically done by a private provider. In this instance, they have hired a licensed Engineer to perform the inspections that we cannot without some destructive work being done. Chairman Lantz: They will send you a report and then you - or somebody on your staff - will then verify...? Jon Walsh: A letter was provided by email to me yesterday by the Engineer at 4: l7 PM. Unfortunately, it is not completely compliant, and it is in review. I was having conversations with him as early as 8:00 this moming. Chairman Lantz: The ball is rolling? Jon Walsh: Yep. Vice Chairman Nolton: kt me ask a little more in-depth. I hear that there .ue some questions about it. Mr. Bowles, that's not satisfactory for those two inspections - because we're talking about two, and then you have the final. Are you saying to the Board that you're willing to do whatever it takes to make those two inspections satisfactory? Stephen Bowles: Yeah, I mean ... whatever is requted. Vice Chairman Nolton: Even if it includes some further inspection and testing ... Stephen Bowles: Well, I don't know ... Vice Chairman Nolton: ... ... to satisfy that? Stephen Bowles: ... I don't know what in depth that he's going to really need other than ... like he said, he was talking with him as early as this moming. I don't know if he's going to get all the information. Ifhe's not, I think there's pictures that has surfaced that might help ... because it's been two years and I've been through a lot of phones and I-Clouds so ... I don't know the exact pictures yet. Vice Chairman Nolton: That's not my question - right? Let's say that there isn't the data... let's say that there's not the pictures. I'm asking the question ... ifthere's not, are you - in thirty days - going to do whatever it takes to pass those inspections? Stephen Bowles: Absolutely. Chairman Lantz: Even if it entails some demolition work ... some whatever ...? Stephen Bowles: Well ... L.. I don't know that ... Patrick White: Which is it, sir? Are you absolutely going to do it, or are you nor? Stephen Bowles: I'm going to do, I guess, whatever Jon Walsh and the Building Department requires me to do. Patrick White: That's a good answer. Stephen Bowles: That's what I'll ... yes, sir. Chairman Lantz: All right. Any other questions from the Board? l5 9.A.1 Packet Pg. 52 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 February 20, 2019 Attorney Schneck: If I may ... just as a recommendation ... after going though the Bumpus case, to leave it cleaner in this situation - as we're extending it, adding additional time - I would request that the Board amend its Order of December 19, 2018 to change the compiiance date. That way we'1l have a new Order, and everything is fresh. So, if there's any appeal issue ... everything is new and proper. It's something that we've leamed going through the Bumpus case - to move things up as these cases go on. Chairman Lantz: So, I guess the motion will be ... instead of saying, 'we give you thirty days' ... the motion will be to amend the previous Order to ...? Attorney Schneck: Correct. And I would state March 20, 2019 which is the next meeting date as the new compliance date. Patrick White: And would it also be possible to amend it in a fashion that if the permit is closed out, that the case is closed? Attorney Schneck: Conect. And I would authorize Staff to make that determination if the Respondent has proven that the permit has been properly closed out, then Staff can close out this case. If not, they can bring it back before the Board. Patrick White: Are you comfortable writing that Order and providing it by way of a motion that I'm prepared to make based on what you have suggested? Attorney Schneck: I am. Patrick White: Thank you. So moved, While. Richard Joslin: One last comment. Mr. Walsh, are you comfortable with the engineering that has been provided to you so far regarding these last two major inspections? Jon Walsh: At this moment in time, the only one that I am questioning is the bonding. Richard Joslin: Okay. Jon Walsh: Sufficient information has been provided for the steel reinforcing, but I am questioning the bonding. Richard Joslin: Okay. Yice Chairman Nolton: Second, Nolton. Chairman Lantz stated there was a motion and a second. He asked the members if they had any other questions, comments or discussion. Richard Joslin: This motion is to ...? Chairman Lantz: The motion is to amend the Board's previous motion to change the date of compliance to March 20, 2019. When the permit is final, then Staff may administratively close the case. Chairman Lantz calledfor a vote on the motion, Carried unanimously, 5 - 0. X. PUBLIC Hr.q.nlNc: (None) t6 Stephen Bowles: Thank you. Terry Jerulle: The clock is ticking. 9.A.1 Packet Pg. 53 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 GOLLIER GOUNTY BOARD OF COUNTY GOMMISSIONERS CERTIFICATE OF COMPLETION This Certificate is issued pursuant to the requirements of the Florida Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances of the county regulating building construction or use. For the following: PERMIT NBR PR8D2019020551701 CONBR: STATUS: Finaled COMP ISSUED DATE: March 06,2019 5391 Tamarind Ridge DR, Naples CO TYPE: ADDRESS: SUBDIVISION: LOT:BLOCK T.R.S SLUC CODE UTILITY COMPANY JOB DESC: renovation ofexis ting pool and spa, including height ofspa shell with no change to pool or deck footprint /pool barrier /na pool constructed in 1982 5321 Tamarind Ridge Dr.NUMBER OF METERS: OWNER: JACOBS, TODD LEGAL DESCRIPTION GOLDEN GATE EST UNIT 32 W l 80FT OF TR 33 0R 1685 PC 134 Note: A new certificate is required if the use of the building or premises is changed, or if alterations are made to the building or properfy described. A new certificate voids any certificate or prior date. 9.A.1 Packet Pg. 54 Attachment: CASE: 2018-10 – STEPHEN BOWLES – JACKSON POOLS – MISCONDUCT OF A STATE CERTIFIED CONTRACTOR – UPDATE (8292 03/20/2019 COLLIER COUNTY Contractor Licensing Board Item Number: 10.A Item Summary: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT Meeting Date: 03/20/2019 Prepared by: Title: – Contractor Licensing Board Name: Lilla Davis 03/11/2019 4:12 PM Submitted by: Title: Supervisor - Operations – Contractor Licensing Board Name: Everildo Ybaceta 03/11/2019 4:12 PM Approved By: Review: Contractor Licensing Board Lilla Davis Review Item Completed 03/11/2019 4:15 PM Contractor Licensing Board Everildo Ybaceta Review Item Completed 03/11/2019 4:50 PM Contractor Licensing Board Everildo Ybaceta Meeting Pending 03/20/2019 9:00 AM 10.A Packet Pg. 55 Aftrcovtn ty MARCH 20,2019 9:00 A.M. ADMINISTRATIVE COMPLAINT - CASE 2019-02 PETER E. WOZNIAK_ MISCONDUCT OF A STATE CERTIFIED CONTRACTOR PETER E. WOZNIAK is the License holder for his company FLORIDA ROOF SERVICES, LLC. There are 5 separate Code Cases against Mr. WOZNIAK: Case #cEMts20190002317. EXPIRED PERMTTS (4) - PR8D20180533950 , PR8D20180104959, PR8D20180105389, and PR8D20170936849 Case # CEM1S20180015337, Reves - Com plaint from the property owner was submitted on 12/1012018 regarding a deposit that was paid to the contractor, the work commenced before the permit was issued, and the permit later expired. The rool is now leaking, as shown by photographs attached. The permit (PR8D20180529401) was reactivated and inspected on 31712019. Case # CEM|S201 80014738, Quiqley - Com plaint f rom the property owner was submitted on 1112812018 regarding roof work that started, but has not been completed since the last inspection on 811312018. The permit (PRBD2o180745475) expired and was later reactivated on 212012019. Case # CEMlS201 80008081 R. Simon -Complaint f rom the property owner was submitted on 61612018 regarding money that was paid to the contractor and uncompleted roof work with the last inspection being on 51312018. The permit (PR8020180422436) expired, was later reactivated on 212012019, and inspected on 31712019. Case # CEM1S20190002603, V. Simon - Complaint from a site visit to address 5329 Mitchell St. by Contractor Licensing Supervisor, Evy Ybaceta. This address has a permit application (PRBD2O181266458) that was submitted on 1211012018, that currently sits in Rejected status. Roof work has already commenced as shown by the pictures attached. Mr. WOZNIAK is in violation of the Collier County Ordinance 2006-46, as amended, Section 4.2.2, Misconduct ol a State Certified Conlractor, which states "Willfully violating the applicable building codes or laws ol the state, city or Collier County" f or having expired permits (FL Building Code 105.1 ), commencing work prior to the issuance of a building permit (FL Building Code 1 05.1 ), taking a deposit of more than lOo/o and didn't apply for the permit within the time limit (FL Statute 489.126(2)), and abandoning a project and failed to perform work for ninety (90) consecutive days (2006-46, Section 4.1 .3). He is going in front of the board to hear possible disciplinary actrons due to his violation(s). COLLIER COUNTY CONTRACTORS' LICENSING BOARD 10.A.1 Packet Pg. 56 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Table of Contents Administrative Complaint FormalComplaint. State of Florida, Department of Business & Professional ReBulation Licensee Detail Collier County Contactor Licensing Section Registration Detail State of Florida, Division of Corporations, Limited Liability Company Detail Notice of Hearing sent via Certified Mail Signed Return Receipt for accepted Certified Mail Case Detail Reoort(s) for current Misconduct Violation (s). Case f CEM1S20190002317, ExPIRED PERMITS (4) EXPTRED P ERM tTs-P R 8D20180533950, PR8D20180104959, P R8D20180105389, and PR 8D20170936849. Case fl CEM1S20180015337, Reves PERMIT APPLICATION fl PR8020180529401 (Reyes) Contracts/Check copies Emails NOTICE OF NON COMPLIANCE- (Reyes) Photographs (Reyes residence) Case # CEM|520180014738, Quigley PERMIT APPLICATION fl-PR8D20180745475 (Quigley) Contracts/Check copies Emails NOTICE OF NON COM PLIANCE-(Quigley) Case # CEM1S20180008081 R. Simon PERMIT APPLICATION f PR8020180422436 (R. Simon) Contracts/Check copies Case fl CEM1S20190002603 V. Simon Permit Application # PR8D20181266458 (V. Simon) Corrections Letter Photogra phs 10.A.1 Packet Pg. 57 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF TABLE OF CONTENTS Collier County Ordinance 2005-46, as amended, Section 4.2.2., for MISCONDUCT- State Certified Contractors and 4.1.3. for abandoning a construction project. Florida Building Code (A) 105.1, "PERMlT5". Florida Building Code (A) 105.3.2, "Time Limitations of Application". Florida Building Code (A) 105.4, "Conditions of Permlt". Florida State Statute, Chapter 489, Section 489.126(2) lall lor... - took more thon 70% oI the controct price ond did not apply for the permit within the 30 doy limit 10.A.1 Packet Pg. 58 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF BEFORE THE COLLIER COUNTY CONTRACTORS, LICENSING BOARD BOARD OF COUNTY COMMISSIONERS, COLLIER COUNTY, FLORIDA, CONTRACTORS, LICENSING BOARD Petitioner, Case Number: 2Ol9 - 02 License Number: CCC1331225 WOZNIAK, PETER EDWARD FLORIDA ROOF SERVICES tLC Respondent ADMINISTRATIVE COMPLAINT Collier County (County) files the Administrative Complaint against Peter Edward Wozniak (Respondent), a State of Florida, Certified Roofing Contractor (CCC1331226) registered in Collier County (license # 1CC20170002115), and states the following facts and allegations in support of the cited violations below: 1. The Respondent is currently licensed by the State of Florida as a Certified Roofing Contractor with License number CCC1331225 and registered in Collier County with license 1CC20170002115. 2. U nder the provisions of Collier County Ordinan ce 2006-46, as amended, Section 4.2 M isconduct - State Certified Contractors, the following actions by a holder of a State Certified Roofing Contractor / Collier County registered Contractor (s 1CC20170002115) shall constitute misconduct and grounds for discipline pursuant to Section 4.3 (Disciplinary proceedings). 3, ltem #1 ExDired Permit{s) - Four I4) count Case f CEM1520190002317 4.2.2. - "Willfully violating the applicable building codes or laws of the state, city or Collier County." - EXPIRED building permits (State Building Code violotion 105.1). b Peter Wozniak has willfully allowed multiple building permits PRgD2018053j950, PR8D20180104959, PR8D20180105389, ond PR8O20170936849)to become ExPIRED in a. 10.A.1 Packet Pg. 59 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Collier County. As a result, Case f CEM 1520190002317 was opened. As per Collier County Building Official, Jonathan Walsh, this contractor has committed willful code violations. 4. Collier County brings the below charges in this formal complaint against the Respondent. See count 1. 5. ltem#2-f cEMrs2018001s337 a On December 10, 2018, Jack Gumph, Collier County Contractor License Officer received the written complaint (Case # CEM 1S20180015337) through Contractor Licensing Office, Customer Service from homeowner, Josephine & George Reyes,4484 Dunlin Ct., Naples, FL against the roofing contractor. The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward wozniak, State License # CCC7337226 (Certified Roofing contractor). A contract was siened 3/25/2oL8 for 542,500.00 with deposit of S14,200.00. b. Florida Roof Services LLC made application for permit on 5/l/2O18. c,Florida Roof Services LLC commenced work on 5l9l2OLB (tear off & underlayment) d. Research indicated Permit# PRBD20180529401 was issued 5/2412018 (15 days AFTER work commenced. e lnspection verified on 6/7 /20L8 with a FAILED status f. The permit EXPIRED on 17/21/2078 g. Several attempts were made to contact the Iicense holder and other representatives of the company (Mr. Jeff Rayl). i. No attempt to resolve the issue has been taken by the contractor. j, On the dale of f/15/2079, I observed the contractor working on the roof while the permit was listed in EXPIRED status. A Stop Work Order was issued and contractor was notified through voice mail. m. The Permit was Re-Activated on the date of 2/20/2019 h. A Notice of Non-Compliance was sent on the date of 72/13/2018. k. A Notice of Hearing was sent on the date of l/L5/2079. l. The contractor did subsequent work in while permit still in EXPIRED status and under Stop Work Order. 10.A.1 Packet Pg. 60 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF The EXPIRED permit violation was then abated by the contractor The contractor commenced the work prior to the original building permit being issued. p. The contractor took more than 10% ofthe contract price and did not apply for the permit within the 30 day limit. 6. Thereafter, pursuant to Collier County Ordinance 2005-46, as amended, Section 4.3.2. and Section 4.3.3., the complaint was investigated and found sufficient cause to file formal charges. 7. Collier County brings the below charges in this formal complaint against the Respondent. See counts 2,3, and 4. On November 28, 2018, Tim Meulenberg, Collier County Contractor License Officer received the written complaint (Case # CEM 1S20180014738) through Contractor Licensing Office, Customer Service from homeowner, Thomas & Angela quigley, 1965 lsla De Palma Cr Naples, FL against the roofing contractor. The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State License f CCC1331226 (Certified Roofing Contractor). A contract was signed 5/2812018 for S34,250.00 with deposit of $11,520.00. n o a b. Research indicated Permit # PR802018O745475 was issued 7/31/2078. e A Notice of Non-Compliance was sent on the date ot ),L/3O/2OL8. f. Several attempts were made to contact the license holder Wozniak and other representatives of the company (Mr. Jeff Rayl). g. No attempt to resolve the issue was been taken by the contractor h. A Notice of Hearing was sent on the date of 7/15/2OI9 i. The permit expired on 2/1L/20f9 j. The Permitwas Re-Activated onthe date o12/2012079. 9. Thereafter, pursuant to Collier County Ordinance 2000-4G, as amended, Section 4.3.2. and Section 4.3.3., the complaint(s) were investigated and found sufficient cause to file formal charges. 8. ltem S 3 - Quiplev - Case S CEM1S20180014738 c. Work commenced on 8/9/2018 and 'Dry-ln' lnspection on 8/73/2OL8. d. NO WORK has been completed from the date o18lL3l2O!8 (lnspedion Date) to present, 10.A.1 Packet Pg. 61 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF 10. Collier County brings the below charges in this formal complaint against the Respondent. See count 4. a. On June 5, 2018, Juan Guzman, Collier County Contractor License Officer received the written complaint (Case # CEM 1S20180008081) through Contractor Licensing Office, Customer Service from homeowner, Rolex Simon,4841 12th St NE Naples, FL against the roofing contractor. The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State License # CCC1331226 (Certified Roofing Contractor). A contract was signed 4/3/2Ot8 for S38,650.00 with deposit of S12,984.00. The homeowner paid an additional S12,983.00 on 412512ot8. b. Research indicated Permit # PR8D20180422435 was issued O4/04/2OL8. c. Work commenced in April 2018 and '0ry-ln' lnspection on5/3/20L8 (PASS with notes). d. No woRK was completed from the date of June 2018 (after inspection Date) to December 2018. e. The permit Expired on t0/3L/2O18. f. Several attempts were made to contact the license holder Wozniak and other representatives of the company (Mr. Jeff Rayl). g. ln mid-January 2019, the contractor applied a second underlayment as the first had exceeding the exposure limits per the "NOA". h. The work was conducted while the permit was in Expired Status. l. A Notice of Hearing was sent on the date of Ll15/2O19. j. The Permit was Re-Activated on the date of 2/2012019. k. A second 'Dry{n' lnspection took place on 3/7/2019 (Pass Status). 12. Thereafter, pursuant to Collier County Ordinan€e 2006-46, as amended, Section 4.3.2. and Section 4.3.3., the complaint(s) were investigated and found sufficient cause to file formal charges. 13. Collier County brings the below charges in this formal complaint against the Respondent. See count 4. 11. ltem fr 4 - R. Simon - case # c8M1S20180008081 14. ltem fl 5-V. Simon-CaseS CEM1S20190O02503 a. On March 7, 2019, Jack Gumph, Collier County Contractor License Officer received the written complaint (Case S CEM 1S20190002503) through Contractor Licensing Office, Supervisor, E. 10.A.1 Packet Pg. 62 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Ybaceta reference the residence at 5329 Mitchell St. Naples, tL. The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State Ljcense # CCC1331226 (Certified Roofing Contractor). b. Florida Roof Services LLC made application for permit on t2/lO/2O18 Permit S PR8020181266458, Application ONLY in REIECTED Status with roof work commenced.c d. I researched the application and found the application date to be listed as 12/10/2018. The application was rejected, and a Corrections Letter sent out to the contractor of record, Florida Roof Services LLC (State License # CCC133L226,Mr. Peter Wozniak, License Holder). Supervisor Evy Ybaceta personally drove to the address in question, 5329 Mitchell St. At the location, he found a single family detached structured (house). Mr. Ybaceta observed that the roof work had commenced prior to the issuance of the permit # PRBD201AtZ66458. f. Supervisor Evy Ybaceta observed that approximately one half ofthe roof had been torn off and new underlayment placed installed. Supervisor Evy Ybaceta took photographs of the roof work (which are attached to this case report). g. The contractor commenced the work prior to the buildint permit being issued. 15. Thereafter, pursuant to Collier County Ordinance 2006-46, as amended, Section 4.3.2. and Section 4.3.3., the complaint was investigated and found sufficient cause to file formal charges. 16. Collier County brings the below charges in this formal complaint against the Respondent. See count 2. 17. Below are the counts Collier County is bringing against the Respondent 18. Collier County Ordina nce 2006-46, as amended, Section 4.2.2., M iscond uct - State Certified Contractors, states: "Willfully violating the applicable building codes or laws of the state, city or Collier County." - EXPIRED building permits PR8D2018053i950, PR8D201.80104959, PR8D20180105i89, ond PR8D20170936849 (stote Building Code violation 105.7). COUNT 2 19. Collier County Ordinance 2006-46, as amended, Section 4.2.2., Misconduct - State Certified Contractors, states: "Willfully violating the applicable building codes or laws ofthe state, city or collier county." - commence work prior to issuonce of o building permit (stote Building Code violotion 105.7). Permits Applicotions involved ore PR8D20180529401 for Reyes ond PR8D20181266458 for V. Simon. e COUNT I 10.A.1 Packet Pg. 63 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF COUNT 3 20. Collier County Ordinance 2006-46, as amended, Section 4.2.2., Misconduct - State Certified Contractors, states: "Willfully violating the applicable building codes or laws of the state, city or Collier County." - took more thon 70% of the controct price ond did not opply for the permit within the i0 doy limit (Florido Stote Stotute, Chapter 489, Section 489.126(2) (o)). Cose involved is Reyes. COUNT 4 21. Collier County Ordinance 2006-46, as amended, Section 4.2.2., Misconduct - State Certified Contractors, states: "Willfully violatinB the applicable building codes or laws of the state, city or Collier County." - Abondoning o construction project in which he/she is engoged or under controct as d controctor. A project moy be presumed abondoned il the controctor terminotes the project without just cause, or foils to no fy the owner in writing oI terminotion of the controct ond bosis for some, or foils to perform work for ninety (90) consecutive doys without just couse ond no soid notice to the owner (Collier County Ordinonce 2006-46, os omended, Section 4.1.j.). Coses involved ore Reyes, Quigley, ond R. Simon. WHEREFORE, the Petitioner asserts the above facts and charges are grounds for disciplinary action under Collier County Ordinance 2006-46, as amended, Section 4.2., as amended, and WHEREFORE, in consideration of the foregoing, the Petitioner respectfully requests the Collier County Contractors' Licensing Board to find the Respondent guilty of the violations charged. Oated:Ze 5igned: .n9h Cdll.r County Con tr.cto.r' tic6EinE Supawilor o. Olri3rEe 10.A.1 Packet Pg. 64 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Contractors' Licensing Board 2800 North Horseshoe Dr. Naples, Fl. 34104 Complainant: Any person who believes that a Contractor holding a State Certification or Certificate of competency has violated Collier County Ordinance 2006-46, as amended, may submit a sworn complaint to the Contractor Licensing supervisor, or his / her designee. The complaint shall be in substantially the form prescribed by the Contractor Licensing Supervisor. The complainant shall pay a fee of S50.00 to defray the costs of administering the complaint, at the time of filing the complaint. The complaining party shall state with particularity which section(s) of this Ordinance he or she believes has been violated by the contractor and the essential facts in support thereof. Complaint: Please print or type and return signed copies of the complaint. Date: EsblssEAE-Zq!!! Aga inst: Contractor's Name: WOZNIAK, PETER EDWARD Phone: 877-844-8300 Business Name: FLORIDA ROOF SERVICES ttc License Number if known: Certified Roofins Contractor (State license fl CCC1331226) Collier County Registration number: LCC20170002U5 Contractor's Business Address: 2605 FOREST PARKWAY N LARGO, Ft 33771 Filed By: Com plaint N umber- 29!9102 10.A.1 Packet Pg. 65 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES PRBD 20180533950. pRgD701 0495 PR8D2018010538901 and BD80qol1PR 20170916849O1. Have you communicated by letter with the licensee? YES Date: 1/15/2019. Do you have a reply? YES Please attach to this form all copies of the purchase agreement, building contract, home improvement contract, copies of receipts and/or cancelled checks available and any additional evidence to substantiate your allegations. List any subsections of Section 4 of Collier County Ordinance number 90- 105, as amended, which, in your opinion, have been violated by the contractor which is the subject of this complaint, (list subsection number): Collier County Ordinance 2006-46, as amended, Section 4.2.2., Misconduct - State Certified Contractors, states: "Willfully violating the applicable building codes or laws of the state, city or Collier County." Name: Collier Countv Contractors' Licensinq Office (rack Gumph) Address: 2800 N. Horseshoe Dr., Naples, FL 34104 Business Phone: 239-252-2468 Address(s) where work done:4484 Dunlin Ct (Reves), 1965 lsla De Palma Cir (Quislev),4841 12th St. NE (R. Simon), 5329 Mitchell ST (V. Simon) and multiple addresses concernine multiole oermits City: NAPIES, FL 34U9 County: COLLIER Date of contract(sl:3l25(2OLB (Reyes), 6/2812018 (QuiCley), a/3/2018 (R. Simon), N/A (V. Simon) and multiple permits dating from 2017 to 2018 (Permits) Date job started: 5/9/2018 (Reves). 8/9/2019 (Quielev). 5/2018 (R. Simon). Unknown (V. Simon) and 2017 (Permitsl Date job completed or new home occupied: NOT Complete Were there plans and specifications? Unknown ls there a written contract? ves. lf yes, amount of contract: s42.600.00 {Reves). s34.260.00 (Quiqlev). S38,650.00 (Simon) & Unknown for Exoired Permits, Has Contractor been paid in full? No. lf not, what amount? 328,400,00 (Reves), 523,040.00 (Quislev), S25.967.00 {Simon} & Unknown for Expired Permits. Was a Building Permit obtained? YES Building Permit number if known: PR8D20180529401 {Reves). PR8D20180745475 (Quiglev), PR8D20180422435 (R. Simon), PR8D20181266458 (V. Simon) and EXPIRED PERMITS- 10.A.1 Packet Pg. 66 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Please state the facts which you believe substantiate your charge of misconduct against the subject contractor. List facts separately for each subsection number above: A. Peter Wozniak has willfully allowed multiple buildinS permits to become EXPIRED in Collier County Case f C8M1520190002317. As per Collier County Euilding Official, Jonathan Walsh, this contractor has committed will code violations. L On December 10, 2018, Jack Gumph, Collier County Contractor License Officer received the written complaint (Case I CEM1520180015337) throu8h Contractor LicensinB Office, Customer Service from homeowner, Josephine & George Reyes,4484 Dunlin Ct., Naples, FL against the roofing contractor. The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State License S CCCl331225 (Certified Roofing Contractor). A contract was signed fl25l2OLB for $42,600.00 with deposit of S14,200.00. Florida Roof Services LtC made application for permit on 5lL/2018. Florida Roof Services LLC commenced initial work on5l9l20Lg (tear off & underlayment). Research indicated Permit f PRBD20180529401 was issued 5124/a0tg l,-s days AFTER work commenced. lnspection verified on 6/7 tzOtB with a FAILED status. The permit EXPIRED on L,.l27l2OL8. Several attempts were made to contact the license holder and other representatives of the company (Mr. Jeff Rayl). A Notice of Non-Compliance was sent on the date oI 721L312O18. No attempt to resolve the issue has been taken by the contractor. On the date of 1/LS|aOL9,l observed the contractor working on the roof while the permit was listed in EXPIRED status. A Stop Work Order was issued and contractor was notified through voice mail, A Notice of Hearing was sent on the date ot ].lLslz0l9.fhe contractor did subsequent work in while permit still in EXPIRED status and under Stop Work Order. The Permit was Re-Activated on the date of 2/2O12079. The EXPIRED permit violation was then abated by the contractor. The contractor commenced the work prior to the original building permit being issued. The contractor took more than 10% of the contract price and did not apply for the permit within the 30 day limit. Permit remains Open. C. On November 28, 2018, Tim Meulenberg, Collier County Contractor License Officer received the written complaint (Case S CEM1520180014738) through Contractor Licensing Office, Customer Service from homeowner, Thomas & Angela Quigley, 1965 lsla De Palma Cr Naples, FL against the roofing contractor. The contractor is listed as Florida Roof services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State License # CCC1331226 (Certified Roofing Contractor). A contract was signed 6/2812Of8 tor $34,260.00 with deposit of $11,520.00. Research indicated Permit fl PR8O20180745475 was issued 7 /3712018. Work commenced on 8/9/2018 and 'Dryln' lnspection on 81L312018. NO WORK has been completed from the date of 8/13/2018 (lnspection Oate) to present. A Notice of Non-Compliance was sent on the dale ol7Ll3Ol2O18. Several attempts were made to contact the license holder Wozniak and other representatives of the company (Mr. Jeff Rayl). No attempt to resolve the issue was been taken by the contractor. A Notice of Hearing was sent on the date ol ,.llsl20L9. The permit expied on 2/7U2OL9. The Permit was Re-Activated on the date of 2120l2Of9. Permit remains Open. 10.A.1 Packet Pg. 67 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF D On June 5,2018, Juan Guzman, Collier County Contractor License Officer received the written complaint (Case # CEMl52018q)08081) through Contractor Licensing Office, Customer Service from homeowner, Rolex Simon, 4841 12th St NE Naples, FL against the roofing contractor, The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State License f CCCl331226 (Certified Roofing Contractor). A contract was signed 413l2OL8lor S38,650.00 with deposit of S12,984.00. The homeowner paid an additional S12,983.00 on 412512OL8. Research indicated Permit f PR8O20180422436 was issued 04/(N/2018. Work commenced in April,2018 and'Dry-ln'lnspectionon5l3l2Ol8 (PASS with notes). NO WORK was completed from the date of June, 2018 (after inspection Date) to December, 2018. The permit Expired on 10/31/2018. Several attempts were made to contact the license holder Wozniak and other representatives of the company (Mr. Jeff Rayl), ln midJanuary, 2019, the contractor applied a second underlayment as the first had exceeding the exposure limits per the "NOA". The work was conducted while the permit was in Relected Status. A Notice of Hearing was sent on the date of 1/15/2019. The Permit was Re-Activated on the date of 2/ZOl2Ol9. A second 'Dry-ln' lnspection took place on 3/7l2OL9 lPass Status). Permit remains Open. On March 7, 2019, Jack Gumph, Collier County Contractor License Officer received the written complaint (Case f CEM1S20190002503) through Contractor Licensing Office, Supervisor, E. Ybaceta reference the residence at 5329 Mitchell St. Naples, FL. The owner listed as VLADMIR SIMON. The contractor is listed as Florida Roof Services LLC with License Holder/Qualifier listed as Peter Edward Wozniak, State License f CCC[33L226 (Certified Roofing Contractor). Florida Roof Services LLC made application for permiton LZl7Ol2018. Permitfl PRBD20181265458, Application ONLY in RUECTED Status with roof work commenced. I researched the application and found the application date to be listed as !2/lO/2018. The application waslgjgg[g! and a Corrections Letter sent out to the contractor of record, Florida Roof Services LLC (State Lic. fl CCC1331226, Mr. Peter Wozniak, License Holder). Spv E. Ybaceta personally drove to the address in question, 5329 Mitchell St. on March 7, 2019. At the location, he found a single family detached strusture (house). Mr. Ybaceta observed that the roof work had commenced prior to the issuance of the permit fl PR8D20181256458. Spv E. Ybaceta observed that approximately one half of the roof had been torn off and new underlayment placed installed. Spv E. Ybaceta took photographs of the roof work (which are attached to this case report). The contractor commenced the work prior to the building permit being issued. E. 10.A.1 Packet Pg. 68 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF (Complainant's signature) State of FLORIDA County of COLLIER Sworn to (or affirmed) and subscribed before me this I ffic,r*t 2ot1lq,day of by kl- (signature of Notary Public) Print, type or stamp commissioned name of Notary Public: Personally known llnuon or produced identification ffi: Iuloflr 5f ooslrcilrrFffoqrrE&rrte IfllIIt*aErm (signature of person making statement). 10.A.1 Packet Pg. 69 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF DBPR - WOZNIAK, PETER EDWARD; Doing Business As: FLORIDA ROOF SERVI... Page 1 of 1 1 18:22 PM Y12019 Licensee Details Licensee Information Name:WOZNIAK, PETER EDWARD (Primary Name) FLORIDA ROOF SERVICES LLC (DBA Name) 2605 FOREST PARKWAY NORTH LARGO Florida 33771 PINELLAS Main Address: County: License Mailing: LicenseLocation: License Information License Type: Rank: License Number: Status: Licensure Date: Expires: Special Qualifications construction Business Certif ied Roof ing Contractor Cert Roofing ccc1331226 Current,Active 06/L6/2OL7 oa/3L/2O2O Qualification Effective 06/L6/2Or7 Alternate Names View Related License Information View License Complaint 2601 Blair stone Road. Tallahassee FL 32399 :: Emall: customer Contact center :: Customer Contact Cente 8S0.487.1395 The State of Florida ts an AAIEEO emptoyer. Copvrioht 2OOZ-2OlO State of Ftorida, privacv Statem.nt Under Flonda law, emaal addresses are public records. If you do not want your email address released rn response to a public-records.equest, do not send electronic mail to this entity. Instead, contact the offlce by phone or by traditionat matf. ffyou'nave any- -_ questrcns, olease contact 850.487.1395. rPursuant ro section 455.275(t), Flodda Statutes, effeclve occoue. r, ioiz,l,."*J".l,censed under chapter 455, F.s. must provrde the Department with an em;it address if they have one. The emaits provided m;; beused for offrcial communtcation with th€ licensee. However emait addresses are pub|c record. tf y* ao not *"n ro iuppiylp".joi"raddress, please provide the Department with an emait address which can be made avaitabte to the oubiia. h@s:/iwww.myfloridalicense.com/LicenseDetail.asp?SID=&id=8117795D405C845C4FA0... 311/201g 10.A.1 Packet Pg. 70 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF License Application Status - Cityview Portal License Application Status - Licens. Applic.tion summary GMD Public Poftal Page I of 1 Noter Yoe ca. colhps. and axDrDd individu.lscctions by clicting tha h.ader of the s..troo you wrsh to oll.ps€/.$r.d Appllc.tion Number: Business Name: ucense Typei Application Status: Descrlption of Business: M.ilin9 Address: 1CC20170002115 FLORIDA ROOF SERVICES LLC 4505 9TH STREEI EAST 2605 FORESI PARKWAY NORTh LARGO fL ELUNGTON FL ]4222 ]WRAYL@YAHOO,COM 437 /1 ROOFING CONTR..CERf IFIEO 09/25/20rA oa/31/2020 201700001091 There are no submittals tor this license appli.iton Therp are no reviews for this license application. PLYMOUTH INS, AGENS wc7L949 01/01/2018 0L/ot/2024 $0.00 Expiration Processedr Producer Phone Number: No 7279372134 PLYI,IOUTH INS AGENCY 3AA1410304 o7/2t/20t7 07/21,/201,9 Explration Processed: P.oducer Phone Number: NO 7276824040 http:/i$portal.colliergov.nevcityviewweb/License/Status?licenseld=150619 31112019 10.A.1 Packet Pg. 71 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Detail by Entity Name Detail by Entity Name Florida Limited Liability Company FLORIDA ROOF SERVICES LLC Filino lntormation DocumentNumber L16000102116 FEUEIN Number 8l-3988250 Date Filed O5D5DO16 Effective Date 06/01/2016 State FL Stahts ACTIVE Last Event REINSTATEMENT Event Date Filed 11lO1f2O1A Princloal Address 2605 FOREST PARKWAY N LARGO, FL 337/1 allino Address 2605 FOREST PARKWAY N |-ARGO, FL 33771 ReoisGred Aoent Name & Address WOZNIAK, PETER E 2605 FOREST PARI(WAY N LARGO, FL 3321 Name Changed: 1 1 101 t2O1 I Authorized Person(s) Detail Name & Address Title MGR \A/OZNIAK, PETER E 2605 FOREST PARKWAY N LARGO, FL 33771 Annual Reports Report Year 2017 2014 Filed Date o5n1t2017 11t01t2018 Document lmaoes 11O1l2018 REINSTATEMENT view iBage in POF fmar o5t21t2O17 Mew image rn PDF iomat 05/25/2016 Frorida Lrmrted Liabit[v View image rn POF tomal http://search.sunbiz.orgfiaqwy/corporationSearch,/SearchResultDetail?inquirytype:Entity...3t1t2019 Page 2 of 2 10.A.1 Packet Pg. 72 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES e'r Cotrtt-3rt Gro'*'th l\I anageurcnt Divisiorr Planning & Ikgulation Opcrations f)cpurtmrnt [,iccns ing Scctio n Certified Mail #7017 0530 0000 8339 6286 Date: January 15, 2019 Peter Edward Wozniak d/b/a - Florida Roof Services LLC 2605 Forest Parkway N Laryo,FL3377l RE: PERMIT # PRBD2Or80529401, PR8D20180422436, PR8D20180745475 Dear Mr. Wozniak, A complaint has been filed against you by the above referenced entity. A hearing of this complaint will be held by the Contractors' Licensing Board on Wednesday March 20,2019 at 9:00 AM in the Board of County Commissioner's Room, Third Floor, Administration Building (W. Harmon Tumer Bldg.), at 3301 East Tamiami Trail, Naples, Florida 34112. Your presence before the Collier County Contractors' Licensing Board is required at this time. In the event the Contractors' Licensing Board finds you in violation ofSection(s) 4.2 of Collier County Ordinance # 2006-46, as amended, the range ofdisciplinary sanctions which may be imposed are from an oral reprimand to a suspension or revocation ofyour Collier County Certificate issuance (N/A), and/or suspension or revocation ofyour permit privileges against your State license # CCCl33l226. Sincerely, ump h (239-2s2-2468) L ing Compliance Officer, Collier County Contractors' Licensing tions and Regulatory Management, Growth Management Department 2800 N. Horseshoe Dr. Naples, FL. 34104 Growth Management Division'plannioB & Regotation'2800 North Horserh oe OnverNaplet Florida 34104'239-252,24O0rwww.coIier8ov net The packet conceming your case marked composite exhibit "A" will be delivered to the members of the Contractors' Licensing Board one week prior to the hearing. If you wish to receive acopy of this packet, please notifo the Contractor Licensing Customer Service Office. If you wish to prepare a defense packet and have it delivered in conjunction with composite exhibit "A", you must make fifteen copies and have them in our office by 8:00 AM on Wednesday, one week prior to the hearing. In your packet, you may give a summary ofevents. At this meeting, you may presenl evidence and be represented by an aftorney ofyour choice. 10.A.1 Packet Pg. 73 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES / -'T- - r Completo lt6ms 1, 2, and 3. r Prlnt your nams and address on lha lBvera€ so lhat wo can rBtum tho cad to You.r Attach this cad to tho back oI the mallplocE, or on the tront lf spac€ Permlts. 1. Arllclo Addrsss€d to:D. ls dolk€ry sdd.6a dtfioont fom lf YES, €ntor dolivory addr@s b€low: 3. S.rvloo IYp6 D Adu[ Slqflltllr tr AAit shllrtu/r F..lrlct d o.lh.rlO{rtt d M.ilO L tr C. Date of D€li I kldz Wloz Nt4<- Fwetp^ Pottr f€tz,tr cc;';*;, i";;,; i*e c-' ^ 7 t't' Lne4$, trL a571 ililil] ill llllltllill lt |l illl |! ilil ill I I ill 9590 9402 3463 7275 0756 52 t? E Yeo ENo El ftlodty Mall Etprer0 O n.gbl.rd MdlB O R€cblrld Mdl Aodrtclcd Dofl$tic Betum Reoslpt 2. Atllcle Numb€a Alal,sl€r fion aa l., t'te,r ?01,? 0530 t]000 8333 teSE ; es Form 381 1, July 2015 PsN 7530-04-000-9053 o Do C..irLd Mlll F6ldci.d Oetv€.y O Fdum A€colpt lor Co[.cion D.lh€rv Mdcitrdho couel d Ddiv; B.rtlci€d Dr.llrcry tr Slgn tul! Csflinallon hr O SlgMtul! Co.'idu!,on 'rll8..tticl.dD.llvsy B"tld!'dotilvtry A.S x byffAt u) COMPLE|E IHIS SECTION ON DEUVENYSENDEB: COMPLETE THIS SECrION 10.A.1 Packet Pg. 74 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER lillililill illtfiflilililtil 1ilil! Flrstclass Mall Postage & F€es Pald USPS Pormil No. G-i0 ln this box' 1530 1q0e rl ?475 075h 5a prlnt your name, address, Growth Management Divison Planning & Regulation Contractor Licensing Section 2800 N. Horseshoe Drive Naples Fl. 34104 57 tt,t,, lil llt llt N,, llt, ilil,, tll,, t l,t ltlil,l,il ilt t tht ilt,t, l United States Postal Sorvico # 10.A.1 Packet Pg. 75 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER oa,net Report Title:Code Case Details Date 3/4/2019 '11:28:55 AM CaseNumber: CEM1S20190002317 Case Number:cEMts20190002317 Case Type Misconduct Normal lnspector:JackGumph Jurisdiction Collier County Origin Complaint Detail Description Multiple Building Permits are EXPIRED in violation of Florida Building Code. Location Comments Status lnvestigation Date & Time Entered 3/1/2019'12:30:09 PM JackGumph Case Disposition Case Pending Contractor FLORIDA ROOF SERVICES LLC 1 Business Management & Budget Office Priority: Multiple locations Entered By: 10.A.1 Packet Pg. 76 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Execution Dale 31412Q19 1 1 :28:55 AM Desc Assigned Required Completed Outcome Preliminary lnvestigation JackGumph 3t1t2019 3t4t2019 On or about December '10, 2018, while conducting the investigation of case file # CEMlS201 8001 5337 (Reyes residence roofng rssues). l(Jack Gumph) had occasron to speak to both Juan Guzman and Tim Meulenberg (Collier County Contractor Lrcensing) who both advised me of on€oing cases of a similar nature with Florida Roof Services LLC (Peter Wozniak, State License # CCC1331226 (Certified Roofing Contractor). and respectively. lwas also advised of several other expired permits on record for the contractor. lnvestigation JackG um ph 3t4t2019 Pending Florida Roof Services - Four (4) Expired Permits Cont. lnvestigation Jackcumph 3t4DAI9 3t4t2019 Complete I (J. Gumph) researched the Collier County Permitting database and found several permits listed as Status- Expired for contractor, Florida Roof Services LLC. These expired permits included the three cases assigned to myself, Tim Meulenberg (Case # CEM1S20180014738) and Juan Guzman (Case # CEM1S20180008081). All three investigators indicated they had attempted several times to have the contractor abate the expired permits, but have been unsuccessful. Notices of Non-Compliance were forwarded to Oualifier, Wozniak and were NOT returned with signature. Vvhen voice mails were left for either Peter Wozniak or company representative Jetf Rayl, it was related the scope of Expired status pemits and the need to re-activate and complete the roofing iobs. Cont. lnvestigation JackGumph 3t4t2019 3t4t2019 Complete Having been unsuccessful at any contact with contractor Wozniak or company representative, Rayl, on the date of 111512019,I (J. Gumph) drafted a "Notice of Hearing' to Peter Wozniak for a requirement before the Contractor Licensing Board on the date of March 20, 2019. The letter was sent USPS, Certified Mail (#7017 0530 0000 8339 6286) on the date of 1/15/2019. The letter was also forwarded to both Mr. Woznaak and Mr. Rayl by email. Cont. lnvestigation JackGumph 3t4t2019 3t4t2019 Complete 2/5i2019: Received the USPS database for delivery (returned'GREEN CARD') for# 7017 0530 0000 8339 6286. Research revealed successful delivery signed Contractor, Peter E. Wozniak. USPS 'GREEN CARD' attached to the file. The card was signed for by Peter Wozniak on 113012019. 2Business Management & Budget Office Code Case Details Comments Needs lnvestigatio n 10.A.1 Packet Pg. 77 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Dale 31412019 11:28:55 AM Desc Assigned Required Completed Outcome Comments Cont. lnvestigation JackGumph 3t4t2019 3t4t2019 Complete 2127l2O'19: Research revealed that the following permits were reactivated and issued an Extension on the dale ot 212012019. Permit # PRBD20180529401 - Case # CEM1S20180015337 (J. Gumph case) Permat # PRBD2018O745475- Case # CEMlS201 800'14738 (T. Meulenberg case) Permrt # PR8D2018U22436 - Case # CEM1S20180008081 (J. Guzman case) Although the contractor has abated those specific permit violations of Expired Status listed above, research revealed that there were four (4) permits still listed in Expired Status: PR8D2018010495901. 5975 Green BLVD. Expiration Date- 07i28l201 8 PR8D2018010538901, 4430 18th ST NE, Expiration Date - 08/2012018 PRBD2018053395001, 2545 39rh AVE NE, Expiration Date - 1112112018 PRBD20'17093684901. 2322 54th AVE NE, Expiration Date - 07116/2018 Violation Description Status Entered Corrected Amount C om me nts 4.2 Misconduct State Certified Contractors Open 3t1t2019 50 Title Reason Result Compliance Fine/Day Condition 3 usiness Management & Budget Office 10.A.1 Packet Pg. 78 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES Permit Application Status - CityView Portal Permit Application Status In order to schedule inspedions, you need to be signed in. Applicatio. Oate lssued Oate Explratioo oate 1-2 Famity or comm Page 1 of2 GMD Public Portal PR4D20180533950 Building FLORA, ROEERT R &TAMMY DEE R€sid€ntial, One and Two Family New or Guest Bous€ 375QS CONCRETE TIIE OVER POLYGLASS TU-MAX UNDERTAYMENT 5:T 2 PITCH 2545 39TH AVE NE 05/23tzo\a 05/25/2OlA lttz\/zot8 1-2 Family Qualifier: FLORA, ROBERT R &TAMMY OEE, Addr€ssr2545 39TH AvE NE WOZNIA(, PEIER EDWARO, Add.ess:2605 FORESI PARXWAY NOR H , Phone:(877) 844-8300, rl.ensee r 1CC20170002114 Llcense Status FLORIDA ROOF SERVICES LlC, Address:4505 9TH STREET EAST, Phone {877) E44'8300, State Reg *',s CCCI131226. ricensee * 1CC201700021r5 I]ll!5eltillrl Pe.mits (click to See Revlews) Structural - Appll.ation fee $50.00 $50.00 05/25/20rA $90.00 t90.00 05/25/20rA Structural - Review Fee $50.00 $50-00 05/25/20t8 6CAi $2.85 $2.8s a5/25/20t8 $2.00 92.00 05/25l2013 t194.45 $194.45 lo.oo PLEASE DO NOT SUBMIT ANY PAYTIENTS UNTII A COLLIER COUNTY PAYMENT SUP I5 OTSTRIBTITED 169 - Dry-in/Flashl.g lim tleisberger ((239) 292-3954) S.nd Emait 6/t5/20ta 6/t5/2018 06/t5/2AtA http://cvportal.colliergov.nevcityviewweb/pennit/Status?permitld=263 g00 3/U2019 Application Number: Application Type: Application Status: Property owner's Full Name: Category of wo.k: Occupancy Coder OescnpLion of Workr 10.A.1 Packet Pg. 79 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES Permit Application Status - Cityview Portal Page 2 of 2 Oocuments & tmag6 Correction 1 Status Oate Status Changed Comments 06/15/2018 Iospector Notes: Pdpemork Not Dosted at gate. Gate locked . 2:55 pm. Pecl and stick ok. Call ln 169 .nd 170 the same ttme with Aftidavit complete. lCM, http://$portal.colliergov.net/CityViewWeb/PermiVStatus?permitld=263800 3n/2019 10.A.1 Packet Pg. 80 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF ler Cowfit BU I LDING PERMIT APPLICATI ON 2800 N. HORSESHOE DR., NAPLES, tL 34104 I TEL \2391.252-2400G.r*Or fr*6€enEr{ Depa,ffi Dircctions: Appliconts nlun complete oll ield, Pleose folhw the Petnit lnstructions to complete this Applbotion. B.z Master Permlt ! F/o,,yI 6\&zrantint dvl.lir9tno*r,t *r" Q tuoa4Manuhctured hsne O Reidential3. uniG/Multitamiv ffir,uoo, 8.3. SiJndrETyp€ S.4. Permltee TVpe Ptoperty lnformation 8.5. Parcel/Foliod: B 6. lob Street Address: 8.7. Owner Name: 8.8. Owner Phone: 8.9. Subdivision: LoVBlocly'Unit: B.10.SDP/PL#: 8.11.'PL{ Fllename: ?qqa -1e,oooG O oesign Professional Cortrador lrformatbn g.12.l,icense#: B.1jl. Compa.ry Name: 8.14. Qualifier Name: 8.15. Contact Name: 8.16. CompanyAddress: cc Q omer Builder 2f Co.nmeroal 4eil-t e /.LrZ4 n ia;ktg/ (D !a.4a c.,*t t/foft- .4 {o E7/catd>L, Fz e1??2 8.17. Company Phonei 8.18. tax $: B.19.a. "Email 1: 8.19.b. "Email2: a"Do notrf,c EntuNs) os ptitgty contcrt npM. El Septic E LowVoltage C.8. Fire Sprinkled: C9. Permit by Affidavit: C10. Pri te Prcir'ide.: C.11. Threshdd Building: C.12. Ve8efdtion Oea.ing: E Shutten E EtfcT from house E Gas c.13. Retated ro DAMAGES TNCURRED By HURR|CANE tRilA: Qves Qruo ' OprioNl - *orch odniry fi lenon6 on EA!@t@!. DELEC EIPLUMB fl MECH C2. Permit Type C.3. Fire PermitType: C4. Constructjon Type: C.5. Ocorpancy: C.6. Water SeMce: C7. SewerSeMce: Sectk n C &Dncatim lnbrme$on D.1. Des.ription of Work (p'o,*,.trt:,y).. D.2. Project Name dorl.,:D.3. kared Value: O.4. Airidertialsq. Ft: NewConSL {Co.,rbie ar a S A4h) Addiliot', (cun*E U4.a 8, D.4.ht Alteratjon tcdnpbE oa.rl D.5. orrhme{q?Fq. F!: ; New Conn /Gnpkea5a & oj.bl Addition l.znpkte 0.5o. & D.S.b. ) AlterdEon r/co.4DleE 05., D.4,a, Nee/ Consl D.4.b. Wqk Arca (q. Ft) o 4 [i Uving: o.a.b.r. No.living: _TOTAL O D.a.c Wqt Aea (Sq, FL) D a.c-j tivin8: o 4.cii. Non-lMng: _TOTAL O D.4.d. Totals W Area IOTr,r lFEj 0 rcTAtNolr\rE 0 S Stori6: f Units: fl Bedrooms # Bathrooms: 05.a, Nfl/ ConsL { Stories: i Units: Ds.b. Wo*ArEa (Sq- Ft) lnterioc €xterion TOTAI: 0 E.2. Nunlber ofPlan sets.8.3. Review Days: WT 1 10 155 Setdm E. StaffSedion E.1. Final Review Date: Reesed OBle: 11/29117 v2 This is pate I oI3 pages ofthe Building permit Applicetion. please submit all3 pates when rornpleted 8i7- t'/4' rSoa 5 l.4,.mn I D.S.cWo*&ea (&. FL) lnterior: -- Exterior: _TOTAL O 10.A.1 Packet Pg. 81 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF .1f,;.-*, NOTICE OF COLLIER COUNTY ADDITIONAL REGULATIONS NOTICE OF ADDITIONAL RESTRICTIoNS: tn alditirin tst'h,b iebuir6mentr.b!ifis dermit, there may be additional restrictions applicable to th is property th;t may be found in the public records ofthis County, and there may be additional permits required from other governmental entities such as the Water Management District, State agencies, or Federal agencies. WARNING OF POSSIBLE DEED RESTRICTIONS: The land sub.iect to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide Iegal or business advice to the pu blic relative to these restrictions. The landowner or any applicant acting on behalf of the landowner is cautioned to seek professional advice. WARNING OF WORK lN THE COUNTY RIGHT-OF-WAYS: This permit does not authorize construction or installation of any structure or utility, above or below ground, lvithin any right of way or easement reserved for access, drainage or utility purposes. This restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit for that purpose must be obtained from the Growth Management Department. NOTICE OF CLEARING RESTRICTIONS: The issuance of a building permit for a single-family dwelling allows up to one (1) acre of native vegetation to be cleared. Clearing more than one (1) acre may be allowed for accessory structures and requires a separate Vegetation Removal Permit. Properties located in the following zoning district overlays may not be allowed to clear one (1) acre: Rural Fringe Mixed Use District (RFMU), Big Cypress Area of Concern (ACSC), and Special Treatment Overlay (ST). There may be additional restrictions related to clearing native vegetation and impacts to wetlands or protected species found on the property. State and Federal agency permits may be required. Contact the Growth Management Department's Environmental Services at (239) 252-24OO for additional information. lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint of the structure. A Demo Permit is not a clearing permit. WORK lN THE SPECIAI FLOOD HAZARD AREA: Be advised that Substantial Da mage/Substa ntia I lmprovement requirements will apply to structures located in the Special Flood Hazard Area with Finished Floor Elevations below the Base Flood Elevation. By initialing, I am acknowledging that I have read and understand this Notice of Collier County Additional Regulations. lnitia Own or Agent of Ownet's or Controctor's initiols ore required Rev 11-29_2017 v2 BUII.DING PERMTT APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 | TEL: (239) 252-2400 Thit is paBe 2 of 3 pages ol the guilding Permit Application' Please submit all 3 pages when completed- 10.A.1 Packet Pg. 82 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF o,18,.-*,BUII.DING PERMIT APPUCA]ION 2800 N. HORSESHOE DR., NAPLES, FL 34104 | TEL: (239) 252'2400 ACKNOWLEDGEMENT OF COLI-IER COUNTY REGULATIONS Application is hereby made lo obtain a permit to do the work and installatio.s as indicated. I certify that no work or installation ha! commenced prior to the issuance of a permit and that all work wrll be performed to meet the standards of all ,ews regulating const.uction in this jurisd;ction. The permit or application fee may have additional fecs imposed for failing to obtain permits prior to commencement of construction- The approved permit and/or permit application expires if not commenced within 180 days from the date of issuance. The permittee further understands fhat only licensed contractors may be smployed and that the structure will not be used or occupied until a certificate of occupancy is issued. By signing this permit application, I agree that I have been retained by the owner/permittee to provide contracting services for the trade for which I am listed. Furthermore, it is my responsibility to notify the Building plan Review and lnspection Division should I no lonBer be the contractor responsible for providing said .ontracting services. I further agree that I understand that the review and issuing of this permit does not exempt me from complying with all Counly 6o6"r "n, Ordinances. tt is further understood that the property owner/permittee is the owner oI the permit. Note: An Owner-EuildeI must complete sections A and B and the Own€t-Builder Affidavit form. SECIION A. OWNER or AGENT OF OWNER ACKNOWLEDGEMENT. The Contractor m ay sign as the Agent of Owner so long as Co ,s ntract with Owne r permits such action: ignature of Owner o The f nt of twa erJ s acknowledged before me this /./diy oforesoinp in stru?tt"r t)o|i ci/,(name ol person) who (Print name of Owner or Agent of Cwner) men cation (type of identificatl ACKNOWTEDG EM ENT l5 ,2otz_6y produced identifi Notary SiBnature sEcTto 8. CONr si f Contra b)a ral The for oing instrument was acknowledBed before me this u{l day ol ak name of erson)who (Print name ot Contractor) t5 zo /f by has produced identification (typ eof tifac Notary Signature NOTICE OF COMMENCEMENT INFORMATION Per Florida statutes 713.135 a Nottce of commencement (Noc) is required for construction of improvements totaring more than S2,500, with certain etceptaon 5. For A/C Repairs or Replace ments a n otice of com m encement is requ ired for imp rovemen ts more than or equal to S7,500. The applicant shall file with the jssuing authority prjor to the firsl inspectjon either a certrfied copy of the recorded NOC or a notarized statement that the NOC has been filed for recording, alonB with a copy thereof. tn order to comply with the state requirement, permits will be placed in inspection hold until proof of the Noc is filed with the buildinB permittrng and inspe.tion department. The issuing authoraty shall not perfo.m or approve subsequent inspectaons until the applicant files by mail, fac5imile, hand delivery, email or any other means such as cenified copy with the issuing autho.lty. WARNING To owNER: YouR FATLURE To REcoRD A NoflcE oF COMMENCEMENT MAy RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR TENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. Aev l1'29 2017 v2 rhis i5 paEe 3 or 3 pates of the Suildins Permit Application. please submit 3ll3 page, when completed. na JEFFERY W RAYL UY COMMISSION I FF?06995 exorars rni8f,li:. zo,g JEFFERY W RAYL MY COMMTSSTON f FF206995 ExPrR€S March fFibrs D+*t)k who has 10.A.1 Packet Pg. 83 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF PERMIT #: PR8D2018053395001ISSUED: BY:MASTER#: COA: JOB ADDRESS: 2545 39th AVE NE PERMIT PER\'IIT TYPI]: RO APPLIED DATE: 05-23-18 APPROVAL DATE: 05-25-l 8 JOB DESCRIPTION: 375QS CONCRETE TILE OVER POLYGLASS TU-MAX JOB PHONE; LTNDERLAYMENT 6: I 2 PITCH 2545 39TH AVE NE SUBDI\'ISION #BLOCK: ELEVATION: LOT: FLOOD MAP ZONE: FOLIO #: 39893680006 SECTION-TOWNSHIP-RANGE: I 8-48-28 Q'dD{E&INFORMATION CONTRACTOR INFORMATION FLORA, ROBERT R & TAMMY DEE 2545 39TH AVE NE NAPLES, FL 34120- FCC ODE CONSTRUCTI O^* CODE: 0220 JOB VAIUE: $33,000.00 SETBACKS FRONT:REAR: FLORIDA ROOF SERVICES LLC 4505 9TH STREET EAST ELLINGTON, FL 34222 CERTIFICATE #: .NoucENsEb PHONE: TOTAL RES SOFT| 0 TOTAL CO]T{M SOFT:0 RIGHT: SEWER: CONTACT NAME: FLORA, ROBERT R & TAMMY DEE CONTACT PHONE: <NO PRIMARY PHONE> Per Collier County Ordinance No. 2002-01, as it may be amended, all work must comply with all applicable laws, codes, ordinances, and any additional stipulations or conditions ofthis permit. This permit expires if work authorized by the permit is not commenced within six (6) fionths from the date of issuance ofthe p€rmit. Additional fees for failing to obtain permits prior to the cornmenc€ment ofconstruction may be imposed. Permittee(s) further understands that any contractor that may be employed must be a licensed contractor and that the structure must not be used or occupied until a Certificate of Occupancy is issued. .T"OTICE: PRIOR TO THE RENIOVAL OF ASBESTOS PRODUCTS OR THE DEMOLITION OF A STRUCTURE, FEDERA,L AND STATE LAWS REQUIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A NOTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVTRONMENTAL PROTECTION (DEp). FOR IUORE TNFORMATION, CONTACT DEp AT (239) 344-5600. In addition to the conditions of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal ageocies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT, COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS LEFT: WATER: 10.A.1 Packet Pg. 84 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - Cityview Portal Permit Application Status In order to s.hedule inspections, you need to be signed in. GMD Public Portal Page 1of2 APPlication Number Application Type Appllcation Status Property Owne.'s Full Name Category of Work Occlpancy Cod€ Oescrlption of Work PRBD2018010,(959 Buildio9 Expired KIBURN ESTi MARY EUZABETH Residentlal, One and Two Family New or Guest House RE-ROOF SHINGLE ROOF OVER PEEI & STICK MAIN HOUSE ONLY 5:12 PITCH Application Dale: Isssed Date: Expi.ation Dat€: 1-2 Family or Comm: 5975 GREEN BLVD ot/24/2Ot8 0t/29/2OLa 07 nat2ola 1-2 famlly Qualine.: KIIBURN EST, MARY ELIZABETH, Address:5975 GREEN BLVO WOZNIAK, PETER EOWARO, Address:2605 FOREST PARKWAY NORTH , ft one:(877) 844-8300, ti€ense€ t 1CC20170002114 License Status FLORIDA ROOF SERVICES ItC, Address:4505 9TH STREET EAST, Phone (877) 844-8300, State Res *'s CCC1331226, Ucensee * tcc20170002t,15 Li.ense Status Permitr (Click to See Reviews) Structural - Application Fee $50.00 $50.00 o\/26/20tA $90.00 $90.00 ot/26/2ALA Structural - Review Fee $50.00 $50.00 0t/26/2ALA ACAI $2.85 92.85 ot/26/20tA t2.00 $2.00 oll26/2ota No outstandrn9 lees, 1194.45 4194.85 to.oo PLEASE DO NOT SUBMIT ANY PAYMENTS UNT]! A COLUER COUNTY PAYMEt,IT SLIP IS OISTRIBUTED There are no inspections for this apDlication Docu.n.nts & Imaq.r http://cvportal.colliergov.net/CityViewWeb/PermiVStatus?permitl d=238249 3n/2019 10.A.1 Packet Pg. 85 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Qouttw Go.vh r,fanagerrEr( Departnert BUITDING PERMIT APPLICATION 2800 N. HoRSESHOE DR., NAPLES, FL 34104 | TELi (239)252-2400 Directbns: Appliconts mun complete ol Jieds. Please folhw the tion lrstructbns to a:: uast"i Pi#i this Applicotion. Mobile/Manufactured home O Resjdential3+urits^lulti-fam./ O Cornmercial eropefi lrifomiiti6n 85. Parcel/Folio f: 8.5. lob Street Addressi h6a 8.7. Or'rneJ Name: 8.8- Owner Phone: 83. SubdMsion: l-ovglodvunit: 8.10. SDP/PL#: 8.11. 'PLs Fllename: 'Opt:toral -borch e\ining filenomes ot1 9!!!42q!9!. O oesign nrofessionat Contractor lnf oimation 8.12. LicerBe* 8.13. Company Name: B.14. QualifierName: -r4 8.15. Contact Name: 8.15. Compahy Addrqrs: C2. Permit Type: C3. Fire Permit Type: C4. Cor6truction Type: CJ. Occupancy: C5. WaterSeMce: C7. Sewer Service: 1& 2 Family dwellnglTo\rnhcuse gd.oo, tr] ELEC EPLUMB D MEO1 Rooi 8.1.7. Company Phone 8.18. Fax t: B.19.a. "Email 1: B.l!) b. "Email ?: J"b not ose En,oil(s) ds ptiiey cotltoct nethd- E Septic E lowvolbge E Shutters E E[Cf fromhouse EGas C8. Fire Sprinkled: C9. Permit by Affidrvit C10. Private Pror'ider C11. Ihreshold Building: C12. Vegetation Oearing: c13. Related to DAMAGEs TNCURRED Sy HURRTCANE IRMA: oyes o No D.1. Description ofwo* lsa e@: D.2. P.oject Name afdy,/:D.3. Declared Value: S t/€:, +e . D_:4tiiixiidj:iithlsil.Et,r - New C@rst. {CorrpbeA4.o & 046l Additic/.' (csty*re oad 8, Dah) l\keGtion (con*t o4c) Pd; Co_rr.lmeld-41.,E: Fr. i., New ConsL /compkE A5a & oib./ Addinon (dn*E asa & o.td) Alteration /Conplre OJ c./ E.1. Final Review Date: D.4.a. New Consl 0.4.b. Worii Area {Sq. FL) D.4.bi. Living: D.4t.i. Non-lMng: _ TOTAL: 0 D.4.c Work Area (q. Ft.) D 4.ci. Living: 0.4.c[ NoG]Mng: _ TOTAL O 0.4.d. Totals by Area fOIAt virEr 0 IOT&N{ntuiE: 0 # Stories: S Units: Bedrooms: # Bathroomsr S Stodesi # Units: Ds-a. Net.\,/ Cor]'t.Ds.b. Work Area (Sq. Ft ) loterior: Exerior: TOTAL: D.s.c Work Area (5q. FL) lnterior _'- Exterior: O TOTAL E.2. Numb€rof Plan kt5:E.3. Review Day5 51015 Revised Oater 1il29/17 v2 is i5 page 1of3 pagesofthe Blil ng Permi'l Application_ Please submi.! all 3 pages when comDleted . 83: Birlldih8:rype: . B.a, Per.,inlii6e Typq O Owrer Euilder 10.A.1 Packet Pg. 86 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF _?f._ BUII.DING PERMTT APPUCATION 2800 N. HORSESHOE DR., NAPLEs, FL 34104 | rEt: (239) 252-2400 NOTICE OF COLLIER COUNTY ADDITIONAL REGULATIONS NOTICE OF ADDITIONAI RESTRICTIONS: ln addition to the requirements of this permit, there may be add itional restrictions a pplica ble to this property th at may be fou nd in th e pu blic records of th is County, and there may be additional permits required from other governmental entities such as the Water Management District, State agencies, or Federal agencies. WARNING OF POSSIBLE DEED RESTRICTIONS: The land subject to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide legal or business advice to the public relative to these restrictions. The landowner or any applicant acting on behalf of the landowner is cautioned to seek professional advice. WARNING OF WORK lN THE COUNTY RIGHT-OF-WAYS: This permit does not authorize construction or installation of any structure or utility, above or below ground, within any right of way or easement reserved for access, drainage or utility purposes. This restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit for that purpose must be obtained from the Growth Management Department. NOTICE OF CIEARING RESTRICTIONS: The issuance of a building permit for a single-family dwelling allows up to one (1) acre of native vegetation to be cleared. Clearing more than one (1) acre may be allowed for accessory structures and requires a separate Vegetation Removal Permit. Properties located in the following zoning district overlays may not be allowed to clear one (1) acre: Rural Fringe Mixed Use District (RFMU), Big Cypress Area of Concern (ACSC), and Special Treatment Overlay (ST). There may be additional restrictions related to clearing native vegetation and impacts to wetlands or protected species found on the property. State and Federal agency permits may be requtred. Contact the Growth Management Department's Environmental services at (239) 25?-2400 for additional information. lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint ofthe structure. A Demo Permit is not a clearing permit. WORK lN THE SPECIAL FLOOD HAZARD AREA: Be advised that Substantial Da mage/Su bstantial lmprovement requirements will apply to structures located in the Special Flood Hazard Area with Finished Floor Elevations below the Ease Flood Elevation. By initialing, I am acknowledging that I have read and understand this Notice of Collier County Additional Regulations. lnitial o wner or 8ev i1-2+2017 v2 This is page 2 of 3 pager ofthe Euilding Permit Application. Plea5e submit all3 page5when completed Agent of Owne/s or Controctor's initiols ore required. 10.A.1 Packet Pg. 87 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF _16_ Notary Signature SECTI of Cont 4+ of'person) { who n/F q BUII.DING PERMITAPPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 I TEt: (239) 252-2400 ACKNOWLEDGEMENT OF COLLIER COUNTY REGUTATIONS Application is hereby made to obtain a perrnit to do the work and installations as andicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. The permit o. apptication fee may have additional fees imposed for failing to obtain permits prior to commencement of construction. The approved permit and/or permit application expires if not commenced within 180 days from the date of issuance. The permittee further understands that only licensed contractors may be employed and that the structure will not be used or occupied until a certificate of occupancv is issued. By signin8 this permit application, I agree that i have been retained by the owner/permittee to provide contracting services for the trade for which I am Iisted. FUrthermore, it is my responsibility to notifY the EuildinE Plan Review and lnspection Division should I no longer be the contractor responsible fo. providing said contracting services. lfurther agree that I understand that the review and issuing of this permit does not exempt me f.om complying with all CountY Codes and O.dinances. lt is further understood that the property owner/permittee is the owner ol the permit Note: An Owner-guildet mun complete sections A and I and the Owner-Builder Affidavit form, SECTTON A. OWNER or AGENT OF OWNER ACXNOWLEOGEMENT. The Contractor may sign as the Agent ol Owner so long a5 Contr rontract Owne,r permits such adionl re ofowner or produced identification (ty (Print name ofOwner o. Agent of owner) e fore8oin instrument was acknowledBed before me this day of rsona lly known to r who has ON R ACK LEDG EMENT:/rn ^),,o, JEFFERY IY RAYL MY CO\l[rrSSlON ' FF206995 ExtlRES Match 13 2019 4 v fi icat i (Pnnt name of ContractorJ e foreg c {neme of person)who or who has produced identification (nti Notary Signature Sea I NOTICE OF COMMENCEMENT INFORMATION per tlorida Statutes 713.135 a Notice of Commencement (NOC) is required for construction of improvements totaling more than S2,5OO, with certain exceptions. For A/C Repairs or Replacer.ents a notace of commencement is required for imp.ovements more than or equal to 57,500. The applicant shall file with the issuing a uthority prior to the l;rst inspection either a cenified copy of the recorded NOC or a notarized stalement that the NOC has been filed for recording, along with a copy thereof. ln order to comply with the state requirement, permits will be placed in inspedion hold until proof of the NOC is filed with the building permittjng and inspection department. The issuing authority shall not perform or approve subsequent nspections until the applicant files by mail, facsimile, hand delivery, email or any other means such as certified copy with the issuinB authorrty. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERry. IF YOU INTEND TO OBTAIN FINANCING, CONSULTWITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. 8ev 1r-29'2017 v? This is page 3 of 3 pages ofihe Building Perrnit Application. ptea5e submit all 3 pages when compieted. B instrument was acknowledged before me this 3/day of zo/y' ay er5onal y known to JEFFERY W RAYL Y CO\{.rlssloN I EF206995 ExPIRES March 13 2019 i:U o, Owner) (name Seal: 10.A.1 Packet Pg. 88 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS PERMIT PERMIT TYPE:RO APPLIED D.ATE: 0l-24-18 JOB ADDRESS: 5975 Green BLVD JOB DESCRIPTION: RE-ROOF SHINGLE ROOF O\.ER PEEL & STTCK MAIN JOB PHONE HOUSE ONLY 5:12 PITCH 5975 GREEN BLVD SLIBDIVISION #: O\\NER INFORIT4ATION: KILBIIRN EST, MARY ELIZABETH 5975 GREEN BL!'D NAPLES, FL 34I I6. FCC COD CONSTRUCTION CODE: 0220 JOB VALUE: $ 15,300.00 SETBACKS FRONT:REAR SHIP-RANGE t7 -49-26 CONTRACTOR INFORMATION FLORIDA ROOF SER\'ICES LLC 4505 9TH STREET EAST ELLINCTON, FL 34222 ICATE # TOTAL RES SQFT: O APPROVAI DATE:0l -26-18 PHONE: ZONE: BLOCK: ELEVATION:FLOOD MAP: FOLIO #: 38336880005 S SEWER: CONTA NAME: CONTACT PHONE Per Collier County Ordinarce No. 2002-01, as it may be arnended, all work must comply with all applicable laws, codes, ordinances, and a.ny additiona! stipulations or conditiorN ofthis permit. This permit expires ifwork authorized by the permit is not commenced within six (6) months fiom the date of issuance ofthe permit. Additional fees for failing to obtain permits prior to the commencement ofconstruction may be imposed. Permittee(s) further understands that any contractor thal may be employed must be a licensed contmctor and that the structure must not be used or occupied until a Certificate ofOccupancy is issued. PERMIT#: PRBD2018010495901ISSUED: BY: MASTER #: PR8D20180104953 COA: LOT: TOTAL COMM SOFT: 0 RIGHT:LEFT: WATER: NOTICE: PRIOR TO THE REMOVAL OF ASBESTOS PRODUCTS OR THE DEMOLITION OF A STRUCTURE, FEDERAL AND STATE LAWS REQUIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A NOTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVTRONMENTAL PROTECTION (DEp). FOR IttORE TNFORMATION, CONTACT DEp AT (239) 344-5600. In addition to the conditions of this permit, there may be additionrl restrictions applicable to this property that may be found in the public records ofthis county' and there may be additional permits required from other governmental entities such as wrter management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE oF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. 10.A.1 Packet Pg. 89 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Permit Application Status In order to schedul€ inspections, you need to be signed i.. Application Dat€ Issued Oate Explration Oat€ 1-2 Famlly or Comm Page I of2 GMD Public Portal Aooll.ation Number: Apptacation Typ€: Application Status: Propedy Own€r's Full Name: Calegory of work: Occup.ncy Code: DesolpUon of work: PRBD20180105t89 Bulldlo9 Explred RAVELO, CARTOS YAIIITE LEAL ResldenUal, Ona.nd Two F;mily Ncw or Gulst House REROOF SHTNGLES OVER PEEL & SnCl( 5:12 PTICH 27 SQ 4430 lEth ST NE o1/25/zOtA ot/29t2ota oa/20/zotg !-2 Famlly Quallner: RAVELO, CARLOS YArrIlE LEAL, Address:4430 ISTH 5T NE WOZNIAK, PETER EDWARO, AddTess:2605 fOREST PARKWAY NORTH , Phone:(877) 844-8300, Lacensee * tCC20l70002l14 lEllselldlJr FLORIDA ROOF SERVICES LLC, Address:4505 9TH STREEI EAST, Phone (877) 844-8100, State Reg t s CCC1331226, Ucensee * 1CC20170002115 License Status Permits (Click to Sec Reviews) Strudural - Appll€alion Fee $50 00 $50.00 ot/29/20ra s90.00 $9o.oo 0r/29/20tA Strudural - Review Fee $s0.00 $50.00 ot/29/2018 ACAI 12.85 s2.85 ot/29/2018 DAPR Surcharge t 2.00 $2.00 at/29/2ArA No outstandrn9 fees. 9194.45 t194.85 to,oo PLEASE DO NOT SUBMIT ANY PAYI4ENTS I]NTIL A COLLIER COUNTY PAYI.4ENT SLIP IS DISTRIBUTED 170 - Re-root Final lim Meisberger ((239) 292-39sa) SslllE@al 2/24/2014 02/24/2OtA2/2412018 http://cvportal.colliergov.neVCityViewWeb/Permit/Status?permitld=238615 311t2019 10.A.1 Packet Pg. 90 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Page 2 of 2 Corection l: status: Date st.tus Changed: Comments; 02/2At20rA Inspedo. Noles: No damD on power pole boot at top. Jcll. 169 - Ory-in/flashing 2/2t/20ta 2/21,/20tA a2/2t/2AtA Steve Belyea ((239) 438-5163) Send Emell Correction 1: Status: Date Status Changed: Comments: P.sE wlth lnspedor Notes 02/21/2478 Pass wath hspector Notes: Peel-n-stick, 6090 shingled, Aff. to nle. - Documents & lm.ges http:/icvportal.colliergov.neUCityViewWeb,/PermiVStatus?permitld=238615 3nt2019 10.A.1 Packet Pg. 91 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF PERMIT #: PRBD2018010538901 ISSUED: BY; MASTER #; PR8D20180105383 COA: O\\NER INFORMATION RAVELO, CARLOS YAMILE LEAL 4430 I8TH ST NE NAPLES, FL 34120- FCC CODE: CONSTRU ON CODE: 0220 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS PERMIT PERMIT TYPE: RO APPLIED DATE:0t-25- r 8 BLOCK TION FLORIDA ROOF SERVICES LLC 4505 9TH STREET EAST ELLINGTON, FL 34222 CERTIFICATE #:,.ro ucexs*, AILROYAL DATE: 01-28-l 8 LOTSLIBDIMSION #: FLOOD MAP: FOLIO #: 39655960003 ZONE: ELEVATION: SECTION-TOWNSHIP-P-,NGE: I 2-48.27 P}tONE: TOTA, RES SQFT: 0 TOTAL COMM SOFT: 0JOB VALUE: $ 10,000.00 SETB,{CKS FRONT:LEFT; WATER: RICHT: SEWER: CONTACT NAME: CONTACT PHONE Per Collier Couoty Ordinance No. 2002-01, as it may be amended, all work must comply with all applicable laws, codes, ordinances, and any additional stipulations or conditions oflhis permit. This permit expires ifwork authorized by the permit is not commenced within si\ (6) months fiom the date of issuance ofthe permit. Additional fees for failing to obtain permits prior to the commencement ofconstruction may be imposed. Permittee(s) further understands that any contractor that may be employed must be a lic€nsed contractor and that the structure must not be used or occupied until a Certificate of Occupancy is issued. NOTICE; PRIOR TO THE REMOVAL OF ASBESTOS PRODUCTS OR THE DEMOLITION OF A STRUCTURE, FEDERAL AND STATE LAWS REQUIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A I.OTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP). FOR MORE INFORMATTON, CONTACT DEp AT (239) 344-5600. In addition to the collditions of this permit, there may be additional restrictions applicable to this property that may be found in the public records ofthis county, aDd there may be sdditional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTTCE OF COMMENCEMENT MAY RESULT IN YOIJ'R PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. JOB ADDRESS: 4430 I8th ST NE JOB DESCRIPTION: REROOF SHINGLES OVER PEEL & STICK 5:12 PITCH JOB PHONE: 27 SQ 4430 l Sth ST NE REAR: 10.A.1 Packet Pg. 92 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF C,owtty Glufi lildEe.rEi Dep.rtrE i I md @n*te ol fP.lds- Pl@se the Emit Applit tirl lnsbuctiru to BUI 1DING PERMIT APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 | TEL: (239)252-2400 thbDircf,tia,s E.3jE {dii'ETiH 6rr*"nr n"*rt ",rrn-*6**,O r.,rotne/il.rrf.*n"dtr-r* O nesUenue +uitvfvrr:frftmfu Q C--r-.U O ou<***oro*l O om€r&r der B.12" tkense * 8.1:!.oompany Narne: 8.14. Qualifier NanE: 8.15. Contact Narne; 8.16. CompanyAddress; 85. Parcel/Folio S ,qL{iqhbn 8.6. Job Sred Addre-is:o 8.7. O,vner N ne: 8.8. O^/ner Phone 8.9. Subdivisim: . LovBlody'UniL 8.10. SDP/Ptif B.1l- 'Pt"S tilename: C2. PermitType: C3, Flre Permil C4. Construct-on Type: 6 5t' l'ioile,t Go* Eotlx 4", / I,o < 7,ffr .J Al t {, h fe // L t-t- t a 4 , 2 2/ f'/ &17, Comp3fly Phone &1& Faxtr 8.1!,i. -Emall I 8.19.b. -Emafl 2: J'otX,Av t I y'r}n. t"- C5. O(rupancy: C5. Water Servke: C7. Ser,ver 9rvte- l"u tt u* tn4 s1 a Nntuy @1M mtu. EETEC EPLUMB O MEo]E Roof tr Septt El bvrvoltace E shutters E El.Egrfrom hous€ E cas C8. tire Sprinlded: C9. Permit byAfidaviE C10. Priyate Prq/iJen Cl]. ThrEstpH EuiHirB: C12" Vege6ion Oearing: C13. Relatedto DAMAGES INClJRRED 8Y HURRICANE IRMA: Section A, Pemit Number Section B. General Permit lnformation dwo* lsolb tu): D.2. Proje[t Narnedd,yI D3. fuared Value:S /O? DOID ' -o,c.O;w"* rr9" 1q. ri) , '.,1b.4,q\1/"rk Ar"ils. o irj :D.4.d. Totals bJ Area . D.5; commerd;lso;R: " Nev,/ Const- lorrpfuoiaE o5n, A iho{]. (c-*E os.a e o5d) Alteration $odpbtosci $ Storiet # Units S Bedrooms: # Bathrooms: o.1.b,I tivir€: D.4.hi NorF{iling; TOTAI.: D.4.ct Livlng: D4ci Non-lMng: TOT** lnterior: IOIAI.U*f: lIIUrr&|t!iE 0 0 00 Ds.a- NEvConst Ds.b.WorkArea [Sq. Ft.)-D5.c Wo,*Area(Sq. lt.) S Storles: # Units: lnterior: Exterion TOTAI.: Exterion o TorAL 0 WI 1E.1.. Flnal Revie.r,/ Date:E.2. Number of P{ao Sets:510t5 Revlsed oare: 8/10/17 Ve6lol 1.0 &o* D.1. ..- _...__.1 .. " _ -".- -Q.4 Reslde4$l$.ftr: , . =. Ns^? Con*. {6rpka4d.& oatJ Mdi6(Ii (cd@ a4,.&btb) pJj.eralion (cd*n aa.cl EJ. R9./iew Daysi This is page 1oI3 pages oi i5e Building Permit Application. Pleasi submlt al,3 pages when completed. 10.A.1 Packet Pg. 93 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF .$;."*,zuIIDING PMM]T APPUCATION 2800 N. HoRSESHOE DR., NAPLES, rL 34104 | TEL: (239) 2s2-2400 lnitia Is Owner, or Agent of Owner, or Contractotls initiols ore tequired. This is page 2 of 3 pages o1 the 6uild:ng Permit Application. Please submit all 3 pa:es when compteted NOTICE OF COLLIER COUNTY ADDIT]ONAL REGUTATIONS NOTICE OF ADDITIONAL RESTRICTIONS: ln addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this Cou nty, and there may be additional permits required from other governmental entit;es such as the Water Management District State agencies, or Fed,:ral agencies. WARNING OF POSSIBIE DEED RESTRICTTONS: The and subject to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide legal or business advice to the public relative to these re!;trictions. The landowner or any applicant acting on behalf of the landowner is cautioned to seek profe:,sional advice. WARNING OF WORK lN THE COUNW RIGHT-OF-WAYS: This permit does not authorize construction or installation of any structure or utility, above or below ground, within any right of way or easement reserved for access, drainage or utility purposes. Tl is restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit fcr that purpose must be obtained from the Growth Ma nagement Department. NOICE OF CLEARING RESTRICTIONS: The issuanr;e of a building permit for a single.family dwelling allows up to one (1) acre of native vegetation to t,e cleared. Clearing more than one (1) acre may be allowed for accessory structures and requires a separate Vegetation Removal permit. properties located in the following zoning district overlays may not be allowed to clear one (1) acre: Rural Frihge Mixed Use District (RFMU), Big Cypress Area of Concern (ACSC), and special Treatment overlay (ST). There may be additional restrictions related to clearing native vegetation and impacts to wetlands or protected species found on the property. State and Federal agency permits may be required. Contact the Growth Management Department's Environmental Services at (239) 252-?4OO for additional information. lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint of the structure. A Demo Permit is not a clearing permit. By initializing, I am acknowledging that I have read and understand this Notice of Collier County Additional Regulations. Revlsed Date:8/r0117 Verion 1.0 10.A.1 Packet Pg. 94 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF ..#..***BUITIXI\IG PERMTAPNPqTION 2800 N. HORSESHOE DR., NAPLES, FL 34104 | IEL: (239) 252-24OO s Ow Agen of Owner , ACKNOWTEDGEMENT OF COLLIER COUNTY REGUI-ATIONS Application i5 hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced bribr to the issuance of a permit and that atl wort will be performed to meet the standards of all laws regulating construaion In ihis lurisdiction. The permit or application fee may have additional fees imposed for failing to obtain permits prior to commencement of construction. The approved pJrmit and/or permit application expires if not commenced within 180 days from the date of issuance. The permittee further understands that only licensed contradors may be employed and that the structure will not be used or occupied until a certificate of occupancy is issued. By siSning this permit application, I agree that I have been retained by the owner/permittee to provide contrirctln6 services for the trade for which I am listed. Furthermore, it is my responsibility to notifu the Building Plan Review and lnspection Division should I no longer be the contractor responsible for providing said contracting services. I further agree that I understand the review and issuing of this permit does not exempt me mplyinB with allCounty Codes and ordinances. lt is furth th rty owner/permittee is the owner of it. Sign: e of county of The foreSoin8 instrument was aclno\,yledged before me this The fore8oing instrument was acknowledged before me this ,2 day of .fr, r or,zot{-W ,4 4 a"v ot (name of person) who i or who has (name of person) who i t6-.-6ii"lty---iiin-id--'dorr^lhoh", (type produced of identification) as identificr entifi cation) as identifi cation MY COMmSSTON l f/aii,h .A//r", stateot F/o*iab the County of RrlYL r;20G995 EXPIRES March 13.2019 t kr.r.fb:n\5s,.o .m Notary Signature:ry SiSnature: Notary (Seal)Notary (Seal) For change of contractor, please provide the following: Permit Number: Email: Phone: per Frorida statutes 713.13s " "",,.":,o.t"'::;t":"tf#tii:H:l:HffiL'I or improvements totarins more than 52,500, with certairi exceptions. For A"/C Repairs or Replacements a notice of commencement is required for improvements more than or equalto 57,500. The applicant shall file with the issuing authority priorto the first inspection either a certified copy ofthe recorded NOC or a notari.ed ttatement that the NOC has been filed for recording, alonS with a copy thereof. ln order to comply with the state requirement, permits will be placed in inspection hold until proof of the NOC is filed with the building permitting and inspection department. The issuinB authority shall not perform or approve subsequent inspections until the applicant files by mail, facsimile, hand deliuery, email or any other means such as certified copy with the issuing authority. WARNING To owNER: YouR FAILURE To REcoRD A NoIcE oF COMMENCEMENT MAy RESUTT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION, rsonally known JEFFERY VJ RAYLof cor\rllnssroN, FF206995 EXPTRES M.rch 13.?019 ,!: N Revased Dare:8/10/17 Ve6ion 1.0 Ihis is page 3 of 3 pates ofthe Buildlnt Permit Appllcation, please submit all 3 paSes when .ompleted. C//;,., 20)t-by produced - 10.A.1 Packet Pg. 95 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Permit Application Status In order to schedule rnspections, you need to be signed in. GMD Public Portal Page 1 of2 appllcation Numb€r: Appllcatlon Typ.l Application Status: Property Owne/s full Nam.: Category or Wo.k: Ocorpancy Cod€: Description or Work: PRBO2o170936a49 Auildhg Explr€d MARQUEZ, RUOOLPH ] & DORA Residential, One and Two Famlly New or Guest Hous€ REIIOVE AND REPTACE TITE ROOF 2322 54th AVE NE 09/2912017 09/29/201,7 oTtrStzotS Apglication Date: Issued Date: Expa.ation oate: 1-2 Family or Comm: Property Owner: contrador: Historical: Qualifier: MARQUEZ. RUDOLPH J & DORA, AddTess:2322 54TH AVE NE MARQUEZ, RUOOLPH .] & OORA, AddTess:2322 54TH AVE NE WOZNIAK, PETER EDWARD, Address:2505 FORESI PARKWAY NORIH , Phone:(877) 844-8300, Licensee * 1CC20170002114 llllDse-staur FLORIDA ROOF SERVICES !!C, Address:4505 9TB fREET EAST, Phone (877) 8,!r-8300, Star€ R€9 *'s CCC1331225, Ucensee * 1CC20170002115 Llcense Status Permits (Cllck to Sec Revlews) srrudur.l Fee - Residential AFplic.tion (Viluation =<$s000) 150.00 $50.00 09/29/20t1 $100.00 ,100.00 09/29/ZOL7 Strudural fee Residentlal -t60.00 $60.00 09/29/24t7 BCAI $3_ 15 $3.1s 09/29/20r7 DAPR Surcharge $2.10 $2.10 09/29/2Or7 Change of Contractor or sub $40.00 $40.00 04/19/2018 Reinspedion F€e for Buildi.g t65.00 $65.00 04/19/20rA $100.00 1100.00 04/t9/20rA J420.25 t420_25 lo.oo PlEAsE DO NOT SUBI'!IT ANY PAYMENTS UNTIL A COLUER COUNTY PAYMEITT SUP 1S DISIRIAUTED http://cvportal.colliergov.neVCityViewWeb/PermiVStatus?permitl d=219472 31112019 l 10.A.1 Packet Pg. 96 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - Cityview Portal Page 2 of 2 169 - ory-lnlFlashinq 3/r/20rA 3/7/20rA 03/01/20tA Jim Meisberqer ((239) 292-3954) send Em.il Corection r: Status: oate Status Changed: Comments: 03to1t20La tnspector Notes: No Afiidavit or permit Post€d o. Job gte. FBC 107.3.1 .rCM. Documents & Imag6 http://cvportal.colliergov.net/CityViewWeb,/Permit/Status?permitl d:219472 3/12019 10.A.1 Packet Pg. 97 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF JOB ADDRESS: 2322 54th AVE NE JOB DESCRIPTION: REMOVE AND REPLACE TILE ROOF 2322 54th AVE NE ZONE; FCC CODE: CONSTRUCTION CODE: 0218 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS PERMIT BLOCK ELEVATIO^N: SECTION-TOWNSHIP-RANGE: 6-48-28 JOB VALLIET $20 ,000.00 PRBD2017093684901 BY: COA: PERMIT TYPE: RO APPLIED DATE: 09-29-17 PHONE: TOTAL RES SQFT: 0 TOTAL COMM SOFT: 0 APPROVAL DATE: 09-29-17 RIGHT OWNER INFORMATION: MARQIJ'EZ, RI'DOLPH J & DORA 2322 54TH AVE NE NAPLES, FL 34I20- REAR;LEFT: WATER: NOTICE: PRIOR TO THE REMOVAL OF ASBESTOS PRODUCTS OR THE DENIOLITION OF A STRUCTURE, FEDERAL AND STATE LAWS REQUIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A NOTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP). FOR MORE TNFORMATTON, CONTACT DEp AT (239) 344-s600. PERMIT #: ISSUED: N{,{STER #: SETBACKS FRONT: SEWER: CONTACT NAME: CONTACT PHONE: JOB PHONE: CONTRACTOR INFORMATION: CERTIFICATE #: LOT:SI1BDTVISION #: FLOOD MAP: FOLIO #: 38960200006 Per Collier County Ordinance No. 2002-01, as it may be amended, all work flust comply with all applicable laws, codes, ordinances, and any additional stipulations or conditions ofthis permit. This peftnit expires if work authorized by the permit is not commenced within six (6) months ftom the date of issuance ofthe permit. Additional fees for failing to obtain permits prior to tle commencement ofconstuction may be imposed. Permittee(s) further understands that any contractor that may be employed must be a licensed coltractor aod that the structure ftust not be used or occupied until a Cenificate ofOccupancy is issued. In additior to the conditions of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this coutrty, and there may be additional permits required from other governmental entities such as lrater management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. 10.A.1 Packet Pg. 98 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF c,iE Coutttjt RECEIVED APR I 0 2018 l)"\? f 2600 N. Horseshoe Dr Naples. FL 34104 Main 239-252-2400: Direct 239-252-2493 cancellahonsaMExlension@colliercountyfl . govGro.dh MarEgement Departrnenl EXTENSION OR REACTIVATION FORTVI Date of Request: -....-Permit No, PROPERW INFORMATION: Property/ob Address:a Parcel/Tax Folio No.:o o Company Name Qualifier Name: EmailAddress: Primary Permit No, (if applicable): FORM COMPLETED BY TYPE OF QUAL|F|ER: {r*r,"rro, Q qUAtIFIER INFORMATION: Owner-Euilder Design Professional LLC_ Phone:Q44- rq4- gD Justification {or extension request: . Number of previous requests: fuHas work commencedl Qv"r Qn Qu r State License No.:cc/ o Type ofldetiication p Extension/Reactiva6on D APPROVED , Extension Period _ days ? (Printed Name of Oualifi er/Owner-Builder) , who i5 perronally known or p ced identific.ton _ f Florida) (Print. Type, or Stamp Commissioned Name of Notary) OEFICE U5E ONLY a ner'Builder ure) by {Qualifa Namel EXPIRES March 13.2019 J Staff lnitials Pate I of 1 F .r*a ?49 Aabr NOTARY State of FI,ORIDA CouotyofCOLU€R The forego,rg ;nstrument was SWORN TO {or AFFIRMEO)and SUBSCRIgED before me this _ day of _ ZO_ ! DENIED - Reason: extentionandreactivation 01-16 2018 v2 10.A.1 Packet Pg. 99 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF G.o^ri' IkBgcnErr Dq-fn nl BUI1DING PERMTT APPUCATION 28OO N. HORSESHOE DR., NAPLES, Ft 34104 | TEL: (239)252-2400 Pbae the hr-nnJdirls to thl.sOiedions: A1. Permit f /sdrbpudl 0 -?o 1 8,1 . Primary Permit f t/oiyl PR 8D20170936509 82 Master Permitf fa.'yi O I & 2 Famity dudlineffol^f,|house Q Reiiential 3 or more units^4uttifamiv Q C-t "a". Q Oedgn erofesdonaf Contrrtor lnformatbn 8.12. License fr 8.13. CompanyName: 8.14. QualifierName: 8.15. C-ontadName: 8.16. Comtrany Addr€ss: Qco--"rcirt Orrner &rib6 2322 flth ave n6 Naolas FL 34120 8.7. OrrE Narne: 8.8. O^nEr PID.E: 8.9. Subdivisbn: Lcd/Blody'uniL 8-10- SDP/flJt 8.11. 'Ptfl Filenarne: Rudolph Marquez cell 480-272-4563 Golden Gate Estates Unit 44 N 260FT of TR 5 ' q*vd - tu diatg Flean . crt gjlyj!!!jj@! 8.17. cornpany PhorE: 8-1& Far f: B.19.a. "Ernail1: B-19.b. "Email2: marquezrm@yahoo.com D"b Nt ue Enrnl{ osptii-y@1tod iprtu. Section A. Fern$t Number Secion C. Apy'iration lnldrtstion CL Srbonffi.s: C2. PermitType: C3. Fire Permit Type: C4. Condnrtir Type: C5. Ocurpancy: C5. Water Service: C7. S€\ rer Service: O ELEC trIRUMB Roof E MEGI EIR6f E Septic El Lo\./Voh€e tr Stutters E ElEcffrom horse EGas Residontial, 1 & 2 Family New or Guest Hou C& Fire sp.inkl€d: C9. Permit bry Arffdavit: ClO Pri\6te P.orld€r: C11. Ihrghold guilding: C12. Veaebtion Oearing: C,13. RCIAICd tO DAMA6TS II']CUFRED 8Y H1JRRICANE IRMA @ve' Qruo Sedion D. Prdecr lrfsrfiation D.1. Dg.ription of Wo.t lpw,x'.1t/,tr. D.2. Projed tleme ftdryI Marquez Residence D.4. Resuential 5q. FL: Ntrv Crnst lc-r'dlt a4 a a aarrJ &tlit,\ lco& D.'. aa1'b) l{rr,atbn.(WAacl D5. Cornmercial Sq. Ft.: N6 , Consl lcrrplE a5a & a5b) Additifir tc6d.rD5.a a olh) Alt6rati6 fcarlfi?an, D.4.a. Neh/ Cor6t D.4.b. Wqk tua (sq. ft.) o4.b,i Living: o..ht NcGlMn$ _ IOTAI: o D.4.c. Wdt Area (S+ Ft.) o4.c.i Living: o4.ci Nc.Flivirts: _ TOTAL: o O.4.d. Totak hry Arla tolnuiS 0 tunriElti!: 0 # Stori6: C UriE: f 8.dr6rnt: # Bathrooms: 0.5.a. Ne+,/ Const 05.b. WqI Area (5q. Ft.) lnterior: ErHor: _TOTAL.: 0 D.5.c Work Area {Sq. Ft) lntenbr: _ Efterica: _ I[nA! 0 f Sto.ie.: { Urits: Section E stafl Section E.1. Final R6ri5,./ Date;E.2. Nu.nber of Plan Sets:E.3- Re{ew Days:1510L5 R!vi!.d D.t i8/10/17 Vcttktn 1.0 This is page 1 of 3 paSs of the guildin8 Permit Appli.rtion. Pl€ate submil allf paSerwhen completed -18",-",*,* -^,^.-a---- 8.3. EuidirE Type: 8.4. Pennitt€e Tlfe: Property lnbrmatbn 85. Parcsl/Folio #: 8.6. lob Street Addre.s: D.3. OedaredValue: S 20,0O0 1 10.A.1 Packet Pg. 100 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF ffi,y:!Repoft Title: Code Case Details CaseNumber: CEM|S20180015337 cEMts201800 t 5337 Misconduct Priority Normal JackGumph Jurisdiction Collier County Origin Complaint Detail Description On the date of December 10, 2018, ( J. Gumph) received the written complaint through Contractor Licensing Office, Customer Service from homeowner, Josephine & George Reyes, 4484 Dunlin Ct., Naples, FL against the roofing contractor. The contractor is listed as Florida Roof Services LLC (877-844-8300). The homeowner stated that a contract was signed on 312512018 with a deposit paid. Location Comments 4484 Dunlin Ct., Naples, FL 341 19 (Folio # 56105511901) Status lnvestigation Date & Time Entered 121'i.212018 1 0:54:36 AM Entered By JackGumph Case Disposition Case Pending Propedy Complainant REYES, GEORGE E & JOSEPHINE C Contractor FLORIDA ROOF SERVICES LLC Business Management & Budget Office Dale 31112019 2:37i38 PM Case Number: Case Type: lnspector: s610551 1901 1 10.A.1 Packet Pg. 101 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Date 3/1/2019 2:37:38 PM Desc Assigned Required Completed Outcome Comments Preliminary lnvestigation JackGumph 12112t2018 12t12t2018 Needs lnvestigatio n 12t5t2018 On the date of December 10, 2018, (J. Gumph) received the written complaint through Contractor Licensing Offi ce, Customer Service from homeowner, Josephine & George Reyes, 4484 Dunlin Ct., Naples, FL against the roofing contractor. The contractor is listed as Florida Roof Servrces LLC (877-844-8300). The homeowner stated that a contract was signed on or about 3/2512018 with deposits paid in the amount of $28,3p0. lnformation supplied by the homeowners indicate that they hired 'Florida Roof Services LLC" (Florida Roof) on or about 3/2512018 fot a total of $42,600. The homeowner paid a deposit at that time of $14,200. On 05/09/2018, the old roof tiles were removed and the'underlayment' put down. The inspection on the underlayment failed (subsequently found to be dated 06/07/2018).There have been water leaks occuning after the undedayment installed. The company came back and said they 'fixed" the problem however the leaks still exist. Homeowner, George Reyes spoke to company representative, Jeff Rayl in October, 2018 who told him the company would come to the home to resolve. There has been no work since that time with communication with Florjda Roof being unsuccessful. I loc€ted Permit # PR8D20180529401, Applied for on 05/01/20'18, lssued on 05/2412018 and listed as STATUS: EXPIRED The contractor is listed as Peter Edward Wozniak, (dba) Florida Roof Services LLC (877-844-8300), Certified Roofing Contractor, # CCC1331226. As noted in the permit, the "Dry-ln' lnspection has FAILED on o6t07t2018. Business Management & Budget Ofllce 2 10.A.1 Packet Pg. 102 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Date 3/1/201 9 2:37:38 PM Desc Assigned Required Outcome Comments Cont. lnvestigation JackGumph 12113t2018 12/13t2018 Complete 12t13t201A On the date of December 12, 2018, I (J. Gumph) traveled to 4484 Dunlin Ct., Naples, FL. I observed the home to be a single family dwelling. I met vvith homeowner, Ms. Josephine Reyes. Ms. Reyes showed me to several areas inside the home where I photographed water stains in the ceiling reportedly from the leakage of the roof work previously done by Florida Roof. I explained to Ms. Reyes that the permit was now expired and that I would be contacting the roofing company to re-activate the permit and complete the work. On the date of December 13, 2018. I placed a telephone callto the phone number on record for Qualifier, Peter Edward Wozniak, (dba) Florida Roof Services LLC (877-844-8300). There was no answer and I left a message reference the expired permit, to re-contact me. On this same date, ldrafted a Notice of Non- Compliance for the violation of Building Code, Expired Permit. I emailed the notice to the company under the email for Jeft Rayl at iwrayl@yahoo.com. Cont lnvestigation JackGumph 1t2t2019 1t2t2019 Complete 11212019 I (J Gumph) reviewed permit and found no change. Vvill need to attempt contact again with contractor. JackGumph 1t10t2019 1t10t2019 Complete 1/9/2019: On the date of January 9, 2019, I placed a telephone callto the phone number on record for Qualifier, Peter Edward Wozniak, (dba) Florida Roof Services LLC (877-844-8300). There was no answer and I left a message reference the expired permit, to re-contact me. Business Management & Budget Office 3 Completed continues... Cont. lnvestigation 10.A.1 Packet Pg. 103 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Date 3/112019 2:37:38 PM Desc Assiqned Required Completed Outcome Comments Cont. lnvestigation JackGumph 1115t2019 Complete 01t15t2019 I (J. Gumph) have had follow up contact with the homeowner who related they have not been contacted by Florida Roof Services about completing therr roof project There rs still leak damage from the underlayment that has FAILED inspection. As I have had no response trom Peter Edward Wozniak, (dba) Florida Roof Services LLC, I did on this date ofJanuary 15, 2019, drafted a 'Notice of Hearing'to Mr. Wozniak (Qualifier) to answer the complaint of the EXPIRED permit and FAILED inspection. The letter was sent certified mail (7017 0530 0000 8339 6286) to Peter Edward Wozniak, (dba) Florida Roof Services LLC, 2605 Forest Parkway North, Largo, FL 3377 1. continues Cont. lnvestigation JackGumph 1t15t2419 1t15t2019 Complete 01115t2019 On the date ofJanuary 15, 2019, I 9J Gumph) placed a telephone call to homeowner, Ms. Josephine Reyes to alert to the issuance of the Notice of Hearing to Qualifier, Peter Edward Wozniak. At the time, Ms. Reyes related that at the present time, Florida Roof Services is on her roof doing work. I immediately travelled to the Reyes home, 4484 Dunlin Ct., Naples, FL where I observed two (2) men working on the home roof. I identified the workers as Juan Gonzalez and Abdiel Rodriguez who stated they worked for Florida Roof Servic€s. Mr. Gonzalez related that they were sent to the home by Jeff Rayl (Florida Roof Services)to complete repairs for the re-inspection of the underlayment. I attempted phone contact to Mr. Rayl (727417 -2719) at a phone number supplied by Juan Gonzalez but went to voice mail. It should be noted that research of Permit # PR8D20180529401 indicated an EXPIRED Permit (dated 1112012018). Noting that there was work ongoing. I issued and posted a Stop Work Order for working on an expired permit. Cont. lnvestigation JackGumph 1t23t2019 Complete 112312019. Researched the USPS database for delivery for # 7017 0530 0000 8339 6286 Found attempted delivery, "No Authorized Recipient Available". A slip \,,/as left at door. Cont. lnvestigation JackGumph 1t28t2019 1t28t2019 Complete Business Management & Budget Of{lce 4 1t15t2019 1t23t2019 112812019: Researched the USPS database for delivery for # 7017 0530 0000 8339 6286. Found attempted delivery, "No Authorized Recipient Available". A slip was left at door. - on this date, a RE-Delivery was scheduled. 10.A.1 Packet Pg. 104 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Date 3/1/2019 2:37:38 PM Desc Assigned Required Completed Outcome Com ments Cont. lnvestigation JackGumph 2,1t2019 2/1t2019 Complete 113112019 Researched the USPS database for delivery for # 7017 0530 0000 8339 6286. Research revealed successful delivery. USPS Tracking sheet attached to the file. Cont. lnvestigation 2t5t2019 2t5t2019 Complete 2/5/2019: Received the USPS database for delivery (returned 'GREEN CARD') for # 7017 0530 0000 8339 6286. Research revealed successful delivery signed by contractor, Peter E. Wozniak. USPS 'GREEN CARD' attached to the file. Cont. lnvestigation JackGumph 2t20t2019 2t20t2019 Complete 2t20t2019 On this date I (J. Gumph)did observe the perm( (#PRBD20180529401) was re- activated this date. Icontacted Ms. Desiree Suarez, daughter of the homeowner to notify. Ms. Suarez related information that the company had come back to the home and installed some new underlayment a "couple weeks ago" (still under a Stop Work Order for Expired Permit). She related they still have not scheduled a re-inspection of the FAILED original underlayment. ladvised that no inspections could take place with an expired permit. Cont. lnvestigation JackGumph 2t27 t2019 2t27t2019 2t27 t2019. Research revealed that the permit (# PRBD20180529401) was reactivated and issued an Extension on lhe dale of 212012019 lnvestigation JackGumph 3/20t2019 Pending Violation Description Status Entered Comments 4.2 Misconduct State Certified Contractors Open 12112t2018 $0 Title Reason Compliance Fine/Day Condition Business Management & Budget Office 5 JackGumph Complete THIS CASE IS SCHEDULED FOR THE CONTRACTOR LICENSING BOARD MARCH 20, 2019 FOR Reyes, 4484 Dunlin Ct - Contractor lS Florida Roof Services LLC Corrected Amount Result 10.A.1 Packet Pg. 105 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Cott*txy Growih Management Deparh-nent /.Contractor Licensing 2800 N. Horseshoe Dr. Naples, FL 34104 Phone - 239-252-2437 Fax - 239 -252-2469 PRETIMINARY COMPLAINT FORM Please complete this form to the best of your abilities. Also include with this form any documents you would like to be reviewed as evidence forthis case. This can include Contracts, Copies of Checks, Permits, Liens, etc. rO Home address .rtir.., C-+-.llt"-L Street City zip Email R.-Z des I cr'L . C{>i'a1 Telephone a Ar't> Address of Complaint 8 f,)"...\.,, L+ N Vs ?L Lill Street City rUi(,_STt-.tla- R*P S"L-L(- State ?A.- O. r,xz^;(*. r J.+f, Er.y u Contractor/Person in Charge S+a.- QZ+- ccc t 13 | ZzU License #: Lrc 2Dl1 D cr> 2 rl -J a+-+V* l erepnone 1J-l- Ltll-.>1tq [ll- g{q- g:Do tle..:i,t €"L-' 111->'i t- l'?11 Date of Contract )I D"ul.l r' bu.ilE.le./ 6., Q',r-t, {;,r ylo Z - r+ c,L,+,-,.,..-+t J.*l L 1l fbi,L U' 4 lco'wi<--.g w+.,,-,.<A. +1*t.*l.,-l-. --+ M?!l v-,* ().* i^;g**i-a.JL-l \'c 4*-.f;.t- s'l*\ h4,<- C-'*.-.),r-!. ,1".) -,t:-t.le ,{ ,l*t..1 ( o"y- li\,-i+S+r,tt lq>w 4+1_--. (*^-\-nt-A rb+ t^)l- * ;( ;t l) ?t") .dilJ{ A \l 1211..,-- 1,. L, > a-A V- 94"t ---lt1 x t^*.- l.---l - =trv<, \" -/]+(.?l D L.^L4 .f Qt- <.z-\ $hish +Lr- -o*. H- als' F,, D.+a-d-.<r' aJ insleri iz.) L. r,ocr-\A DriL /. t.-t-t-^ S i"..s tL..t-<,a- Co aJ h-t,-.L l., rryj;E.Wc,J-^'-t Lt^.- .t&a DF+ e*.,\ a-b i ^1 !,v\- +z..'--S Ar,<*n--*Ys +,r-,|.:.e-.L +1*-lY"<- JP !o-+q 2tr. h.I,J '3;P L.x4 r15.'14^q ,'nc*, I SIG NATU RE 1 PRELIMINARY COMP rNT FORM REV 4112/18J.-++f..',wr.,.-t t r'> a-F'rv--'D^-. tr .^-r. .\z ,WL .{.ov-', a^., .va "** ('**-'L---LU Complainant's Name:Josr+l.,, ^* . + Ce.cr1n- P-,r*-t Date: 0 Siate COMPLAINT INFORMATION: zip Company Name: COMPLAINT DETAILS (ATTACH ADDITIONAL SHEETS IF NECESSARY) t- t--r L4- WL.a- A w-..+-) 10.A.1 Packet Pg. 106 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Directions: Cort,,tty GDlrrh l,lrBqe.rsr Depa-trrEd m05t complete Pleote folbw llP 8.2. Master Pemiit f fforyf @fr a z rarnitya*a[ns,/rrn',],o.lr" O v,o,,"rra"nlt"** trolr* O (fc-*"oo" O oesign erofessio.ar BUITDING PERMIT APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 | rEti (239)252-2400 lnstruct-Dns to comphte thi5 * troiryl S3. BufldingTyre &4, Permittee fFei PrDperty hformation 8.5. Parcel/Folio #: 8.6. lob Street Address: k e9 /] /2t Cont6ctor lrrbrmatbn 8.12. License * 8.13. Company Name: 8.14. Quali,fierName: 8.15. Contact Name: B-15. CompanyAddress: 'Optidnl - k-di d&g Ftefirn6o!1CTNVEW Pdlol. O EIEC EPLUMB E MECH C2. Permit Type C.3. Fire Permit Type: C.4. Construction Type: C.5- Occupancy: C6. Water Se ,/i.e: C7. Sewer Service: 0.1. Description ofWork lpoeide&?b\t . D-2. Project Name fy'aq,l: tusid€ntial 3+ units/vluhi-la mily Commeroal O Owner Builder aclt'33t 9ct-,floi o(a Ra€sztli,z< 511a,71an-, Ft .?{23* 8.17. Company Phone: <7r- 6{c/ - q? 8.18. Fax f: B-19.a. "Email 1: 9.19.b. "Email2: l"U,ot;6e frrqsl os Fri,aycottoct ncthd. E S€ptic E l-o,Voltate E Shutters E EtIcT hom houle EGas c8. Fire Sprinkled: C9. Permit byAffdavit: C1O Private Prq,ridec C11. Threshold Building: C12. Vetetatioo Oearing: C,13. Related to DAN4AGES INCURREDBY HURRICANE IRMA D.3. DeclaredValue: 5 cb O*o _D.4. Re5identhlsq ft: . ,. NewConst. (Coa,rbte A4o & oa.b.l Mditon lcdn*re D4o. & o 1.n) Alteration fcrynpbk oac) D.sj &inmerdalsi. tu Ne:N CffsL lcdn*E O.to. & Dib) Mditio,r lcoq*E D.Sa & D-Sb ) Alteratjon /Ca'nplere a5c/ D.Aa. Ne\ ,Consl D4"b. WdkAEs{&. FL) D 4.b.i Ljving: o 4 b.i Nm]MnB _ TOTAL O O.4.e Wo*AI€a (Sq. Ft) D.4.ci. Living: O.4-c.i Non-lMng: _ TOTAIT o 0.4.d. TsEls by &ea I(,TAUunEr 0 TOIANdltJis: 0 g Stories: # Units: f Bedroorns: I Bathroomg Ds-a Nalrconst D5!. WorkArEa (Sq. Ftl lnterioc Exterior: _TOTAL O DS.c WorkArea (5q. tt) lnterior: _ Exterior: TOTAL 0 {Stories: I Units: E.1. FlnalRe\aee Date E.2- Number ofPlan Sets: _ E.3. RBr'iew Days:1510 15 Revrsed 0ater 1l129/17 v2 This is page 1 of 3 pages of the Surlding permit Application. please submil all 3 pages when completed 8.7. owner Name: 8.8. O^ner Phone: 8.9. SubdMsion: LoVE ock/Unit 8,10. SDP/Pu: 8.11.'PLfl Filename: 10.A.1 Packet Pg. 107 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF o*sg...,BUII.DING PERMTT APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 I TEL: (239) 252-2400 NOTICE OF COTLIER COUNTY ADDITIONAL REGULATIONS NOTICE OF ADOITIONAL RESTRICTTONS: ln addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this County, and there may be additional permits required from other governmental entities such as the Water Management District, State agencies, or Federal agencies. WARN,NG OF POSSIBtE DEED RESTRICTIONS: The land subject to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide legal or business advice to the public relative to these restrictions. The landowner or any applicant acting on behalf ofthe landowner is cautioned to seek professional advice. WARNING OF WORK lN THE COUNTY RIGHT-OF-WAYS: This permit does not authorize construction or installation of any structure or utility, above or below ground, within any right of way or easement reserved for access, drainage or utility purposes. This restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit for that purpose must be obtained from the Growth Management Department. NOTICE OF CLEARING RESTRICTIONS: The issuance of a building permit for a single-family dwelling allows up to one (1) acre of native vegetation to be cleared. Clearing more than one (1) acre may be allowed for accessory structures and requires a separate Vegetation Removal Permit. Properties located in the following zoning district overlays may not be allowed to clear one (1) acre: Rural Fringe Mixed Use District IRFMU), Big Cypress Area of Concern (ACSC), and Special Treatment Overlay (ST). There may be additional restrictions related to clearing native vegetation and impacts to wetlands or protected species found on the property. State and Federal agency permits may be required. Contact the Growth Management Department's Environmental Services at (239) 252-2400 for additional information. lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint of the structure. A Demo Permit is not a clearing permit. WORK tN THE SPECIAL FIOOD HAZARD AREA: Be advised that Substantial Damage/Su bstantial lmprovement requirements will apply to structures located in the Special Flood Hazard Area with Finished Floor Elevations below the Base Flood Elevation. By initialing, I am acknowledging that I have read and understand this Notice of Collier County Additional Regulations. lnitials Ownet or Agent oI Owne/s or Controctor's initiols ore required BPv 11.29-2017 v2 This is page 2 of 3 pa8es of the Building Permit Application Plea!e 5ubmit all 3 pa8€s when completed' 10.A.1 Packet Pg. 108 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF _rf _ roduced identification (tYP of identifi SE B. CO ACKNOWLEDGEMENT: BUII.DING PERMIT APPUCAIION 28OO N. HORSESHOE DR., NAPLES, FL 34104 | IEL: {239) 252'24OO SECT|ON A. OWNER or AGENT OF OWNER ACKNOWTEDGEMENT. The Contractor may siSn as the Agent of owner so long as Co r contract with Owner permits such action:2e*/r-bz-r) e /r ature Owner or nto e.)(Print name of Owner or Agent of Owneri The fore8oing instrument was acknowledged before me this day oI 20 /i by AP 4?(name of person) who rs pe r who _has p /t+-n u,.i af ature of Cont The fore8oing ins ument was acknowledged before me this day of /efur ./^hzh)cl3 (Print name of Contractor) lname ol person) who 1y'$ly known zo/9 at n me, or who --has produced identification (iden n NOTICE OF COMMENCEMENT INFORMATION per Florida Statutes 713.135 a Notice of Commencement INOC) is required for construction of improvements totaling more than 52,500, with certain exceptions. For A/C Repairs or Replacements a dotice of commencement is required for improvements more than or equal to S7,SOO. The applicant shall file with the issuing authority prior to the first inspection either a certified copy of lhe .ecorded NOC or a notarized statement that the NOC has been filed for recordin8, along with a copy thereof. ln order to comply with the state requirement, permits will be placed in inspection hold until proof of the NOC is filed with the buildin8 permittin8 and inspectron department. The issuing authority shall not perform or approve subsequent inspections until the applicant files by mail, Facsimile, hand delivery, email or any other means such as certified copy with lhe issuing authority WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. Rev 1l-29.2017 v2 This is page 3 of I pages ol the Euilding Permit Application. Pleaie submil .ll 3 pa8es when completed. nown to :i:,::'.'."s.:. JEFFERY W RAYL MY COr,rMrSSrON r FF2C$395 ExerRES Ma'ch 13*fl4 Ir-dr'i.;1t.i,Er :.n. EXPIRES t lsrch 13. 20rg , ri,r,.lj!.r:1slY,.! :s- Rt: FF REJ w A YL hl oc r,t SS gd,f 995206 ACKNOWLEDGEMENT OF COILIER COUNTY REGULATIONS Application is hereby flade to obtain a permit to 66 ths 1/e1l 36d installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed lo meet the standards of all laws .egulating construction in thig jurisdiction The permit or application fee may have additional fees imposed for failing to obtain permits prior to commencement of construction- The approved permit and/or permit application expires if not commenced within 180 days from the date of issuance. The permittee further understands that onlv licensed contractors may be employed and that the structure will not be used or occupied until a certificate of occupanry is issued. By signing this permit application, I a8ree that lhave been retained by the owner/permittee to provide contracting services for the trade for which I am listed. Furthermore, it is my responsibility to notifY the Building Plan Review and lnspection Division should I no longer be the contractor responsible for providing said contractinB services. I further agree that I understand that the review and issuing of this permit does not exerhpt me from complying with all County Codes and Ordinances lt is further understood that the property owner/pe/mittee is the owner of the permit' Notei An Owner-Builder must complete sections A and B and the owner-Builder Alfidavit form, Notary Signature: i: Notary SiEnature: 10.A.1 Packet Pg. 109 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF -.4.c,#8",Aovn+W Growth Management Department Building Plan Review & lnspection Division Re-Roofing Mitigation Package To be filled out and included with all Residential Re-Roofingapplications For the purpose ofthis document, sections cited are from Florida Building Code Sixth Edition (20171, Existing Building. Secondary Water garrier: Section 705.7,2 A secondary water barrier shall be installed using one of the following methods when roof covering is removed and replaced: FOR: Asphalt shingles, Metal roof shingles, Mineral-surfaced roll roofing, Slate and slate type shingles, Wood shingles, Wood shakes, Metal roof panels, Photovoltaic Shingles: Outside the High-Velocity Hurricane Zone (Collier County). (Preose CIRCLE 7, 2, ot 3 below, to indicote the uncierloyment occordinq to the attdched FBC Res 6th Ed. Chg Toble R905.1.1.): Underlayment shall comply with Section R905.1.1 of the Florida Building Code, Residential. 1 2 or Specify Secondary Water Barrier: Manufacturer P roduct approval number FOR:ay or Concrete Tile Shall comply with the manu facturer instructions or the FRSA/TRl Florida High Wind Concrete and ) Clay Roof Tile lnstallation Manual,56 Edition{r Specify Seconda ry Water Barrier; Exceptions: 1. Re-Roof Mitigation Peckage 01'29'2018 v4 z Roof slopes < 2:12 having a continuous roof system shall be deemed to comply with Section 706.7.2 requirements for a secondary water barrier' c|ayandconcretetileroofsystemsinstalledasrequiredbytheFloridaBuildingcodeare deemed to comply with the requirements of section 706'7 2 lor Secondary Water Barriers. &JdE HalR(le'r& lr6pedtm DiYiim'2m0 Nqlh tbFe$oeodve' l'@es Fbida 341M'239252'24m 'u$x cdiE.go'r'rct Page 1 ot 2 p,op"rty aaa,"rr, 4/ 6/ fi " t n /r' a (/y', Permit Number: fr 'r q,' ,, , ' brl '/;[ Manul$.ufr' Product approval number 10.A.1 Packet Pg. 110 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Re-Roofing Mitigation Package iv. Any applicable docu ntation specified above. 5t.t{ Sign lder/ Aut d Print Name of Qualifier/Owner Builder/ Authorized Agent Re-Roof Mitigation Pack.Se 01-29-2018 v4 Date Page 2 ol 2 8@l-0!e!necrE Contractor acknowledges that as required by Florida Building Code Sixth Edition (2017), Existing Building Section 707.3.2 the structure's Diaphragm will be evaluated and noted within Re-roof affidavit Roof to wall connections: FBC-E Section 705.8 1. w a s the building permit for the home construction applied for on or after Sefternber 141993?-/'a. YES -NO ,/ 2. lftheanswertoquestionnumber lisYES,thenproceedtosignatureandpermitsubmittal. (Documentation required substantiating th is application). 3. lftheanswertoquestionnumberlisNO,applicantmustprovidedocumentationforthevalueofthebuilding (indicote type provided below): a. - Copy of current home insurance summary sheet b. - Copy of latest tax bill or Property AppBiser office webpage for the home Note: the appraised value ofthe improvement determines the threshold amount. 4. Based on documentation provided, is the value of the building 5300,000 or more? a. YES_NO_ 5. lf the answerto question 4 is NO, proceed to signature and permit submittal. 6. lf the answerto question 4 is YE5, then, willevaluation and connections at prioritized and non-prioritized areas be completed for 15% of the cost of roof replacement? YES-NO- (Hurricane Retro-fit affidavit will be required per FBC-E section 705.8 prior to Certificate of Completion and retro-fit contractor shall be noted on permit) 7. lf the answer to question 6 is NO, provide documentation of the cost of evaluation/installation and indicate "prioritized" areas in which will be enhanced up to 15% of roof replacement, See 8(a) for additional requirements. NOTICE: This documentation will be reviewed for appropriateness, since prescriptive methods of mitigating roof to wall connections provide necessary designs to accomplish roof to wall connection improvements. Misrepresentation of information above may be construed as a willful codeviolation. 8. An additional 15% of the cost ofthe re-roofing must be spent on enhanced connections,but the mitigation is not required to exceed that. The roof to wall connections must be enhanced to comply with FBC'E section 706.8. The priorities for upgrading are outlined in section 706.8.7.7. At least 15% shall be provided to the prioritized elements. a. These items are required to besubmitted: i. Permit description to include notation that Mitigation Retro-fit will be installed (Retro-fit work to be conducted by a residential, building or general contractor) ii. Sub affirmation form for contractor whom will install retro-fit components iii. A plan indicating areas to be retro-fitted, connectors used, and fastener requirements, 10.A.1 Packet Pg. 111 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF 2017 Flotida Building code - Residential, Sixth Edition CHAPTER 9 ROOF ASSEMBLIES SECTION RgO5 REQUIREMENTS FOR ROOF COVERINGS httDs://codes. iccsafe. o tolo Ub lic/documenUFRC20 1 7/chaDter-9-roof-assemblies R905.1.1 Underlayment. Unless otherwise noted underlayment for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slatetype shingles, wood shingles, wood shakes and metal roof panels shall conform to the applicable standards listed in this chapter. Underlayment materials required to comply with ASTM D226, D197O, D4869 and D6757 shall bear a label indicating compliance to the standard designation and, if applicable, type classiflcation indicated in Table R905.1 .1. Underlayment shall be applied and attached in accordance with Table R905.1 .1 . Exception: A reinforced synthetic underlayment that is approved as an altemate to underlayment complying with ASTM D226 fype ll and having a minimum tear strength in accordance with ASTM D1970 or ASTM D4533 of 20 pounds shall be permitted. This underlayment shall be installed and attached in accordance with the u nderlayment attachment methods of Table R905. 1 .1 for the applicable roof covering and slope, except metal cap nails shall be required where the ultimate design wind speed, V",, equals or exceeds '1 50 mph. Table R905.1.1(1) Underlayment Types. Reserved. TABLE R905.1.1 UNDERLAYMENT TABLE Roof covering Section Roof Slope 2:12 and Less Than 4:12 Underlayment Underlayment Attachment'Root Slope 4;12 and Greater Underlayment Underlayment Attachmenf Asphalt shingles R905.2 ASTM D226 Type I or IIASTM D4869 Type ll, lll or IVASTM D6757 1 ASTM D226 Type IIASTM 04869 Type lVASTi, D6757 2 ASTM D1970 3 ASTM D,1970 Concrets and Clay Tile R905.3 See Secl,on R905 3.3 Metal roof shlngleg R905.4 ASTM D226 Type I or IIASTM D4869 Type ll. lll or IVASTM D6757 ASTM D226 Type IIASIM D4869 Type lV 2 ASTM D1970 3 ASTM D1970 3 Minelal-surfaced roll roofing R905.5 ASTM 0226 Type I or IIASTM D4869 Type Il, lll or IVASTM D6757 1 ASTM D226 Type IIASTM D4869 Type lV 2 AST[' D1970 3 ASTM D1970 3 slale and slate- type shingles R905,5 ASTM D226 Type I or IIASTM D4869 Type ll, lll or IVASTM D6757 1 2 ASTM D1970 3 ASTI\,,I D1970 3 Attachment lo: Re-roof Mitigation PackaSe 'January 04, 2018 v2 Page I of2 1 ASTM D226 Type IIASTM D4869 TYPe lV 10.A.1 Packet Pg. 112 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Roof Covering Section RoofSlope 2:12 and Les8 Than 4:12 Underlaymenl Underlayment Attachmene Roof Slope 4:12 and Greater Underlaymenl underlayment Attachmenf ASTM D226 Type I or IIASTM D4869 Type ll, lll or lV 1 ASTM D226 Type IIASTM D4869 Type lV 2 Wood shakes R905.8 ASTM D226 Type IIASTM D4869 Type lV 2 Metal roof panels R905.10 ASTM D226 Type I or ASTM D4869 Type ll, lll or IVASTM 06757 ASTM D226 Type IIASTM 04859 Type IVASTM 067 57 2 ASTM D1970 3 ASTM D1970 3 ASTM D226 Type I or ltAsTM M869 Type ll, lll or IVASTM D6757 1 ASTM D226 rype IIASTM D4mg Type IVASTM D6757 2 ASTM D1970 3 ASTM D1970 3 "Underlayment Attachment 1. Roof slopes from two units vertical in 12 units horizontal (17-percent slope), and less than four units vertical in 12 units horizontal (33-percent slope). Apply a 1g-inch (483 mm) strip of underlayment felt parallel to and starting at the eaves, fastened sufficiently to hold in place. Starting at the eave, apply 36-inchwide (914 mm) sheels of underlayment, overlapping successive sheets 19 inches (483 mm), end laps shall be 6 inches and shall be offset by 6 feet. The underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with one row centered in the field of the sheet with a maximum fastener spacing of 12 inches (305 mm) 0.c., and one fow at the end and side laps fastened 6 inches (152 mm) o.c. Underlayment shall be attached using metal or plastic cap nails with a nominal cap diameter of not less than 1 inch. Metal caps shall have a thickness of not less than 32-gage sheet melal. Power-driven metal caps shall have a minimum thickness of 0.0'10 inch. Minimum thickness of the outside edge of plastic caps shall be 0.035 inch. The cap nail shank shall be not less than 0-083 inch for ring shank cap nails and 0.091 inch for smooth shank cap nails. Cap nail shank shall have a length sufficient to penetrate through the roof sheathing or not less than 3/4 inch into the roof sheathing. 2. Roof slopes of four units vertical in 12 units horizontal (3$percent slope) or greater. Underlayment shall be applied shingle fashion, parallel to and starting from the eave and lapped 4 inches (5'l mm), end laps shall be 6 inches and shall be offset by 6 feet. The underlayment shall be attached to a nailable deck with two staggered rows in the field of the sheet with a maximum fastener spacing of 12 inches (305 mm) o.c., and one row at the end and side laps fastened 6 inches (152 mm) o.c. Underlayment shall be attached using metal or plastic cap nails wth a nominal cap diameler of not less than 1 inch. Metal caps shall have a thickness of not less than 3z-gage sheet metal. Power-driven metal caps shall have a minimum thickness of 0.010 inch, Minimum thickness of the outside edge of plastic caps shall be 0.035 inch. The cap nail shank shall be not less than 0.083 inch for ring shank cap nails and 0.091 inch for smooth shank cap nails. Cap nail shank shall have a length sufiicient to penetrate through the roof sheathing or nol less than 3l inch into the roof sheathing. 3. Roof slopes from two units vertical in 12 units horizontal (17-percent slope) and greater. The entire roof deck sflall be covered with an approved self-adhering polymer modified bitumen underlayment complying with ASTM D1970 installed in accordance with both the underlayment manufacturer's and roof covering manufacturer's installation instructions for the deck material, roof ventilation configuration and climate exposure for the roof covering to be installed. Exception: A minimum 4-inch-wide (102 mm) strip ot self-adhering polymer-modified bitumen membrane complying wilh ASTM D1970, installed in accordance with the manufacturer's instructions for the deck material, shall be applied over all joints in the roof decking. An approved underlayment in accordance with Table R905.1 .1 for the applicable roof covering shall be applied over lhe entire roof over the +inch-wide (102 mm) membrane strips. Attachment to: Re-roof Mitigation Package - January 04, 2018 v2 Page 2 of 2 Wood shingles R905.7 Limited lo roof slopes 4112 and Greater Photovoltaic Shingle3 R905.17 10.A.1 Packet Pg. 113 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Page 1 of 2 GMD Public Poftal Permit Application status In orde. to schedur€ hspedions, you oe€d to b€ signed in. Application Numb.r: PRB020180529401 applicatlonType: Building ApplicationStatus: InspedionsComm€nced P.operty Owner's Full Namer REYES, GEORGE E & IOSEPHINE C Category of workr Alteration Occupanca Coder Residentlal, On! and Two Family New or Guest House Description of Work: CONCRETE TILE OVER POLYGLASS IH 5112 PITCH 45 4484 DUNUN CT Applic.tion Drte: O5l01/2018 Issued Oate: O5/24l2018 Expkation oate: 05/21/2019 l-2 Famlry or Comln: 1'2 ramily Quali6erl Pe.mlts (cUck to See Revlews) Owing $s0.00 $50.00 $90.00 $90.00 05/24/2OtA Strudural - Review Fee $50.00 t50.00 SCAI t2.85 $2.85 os/24/2074 DBPR SUTchaT9e ,2.00 $2.00 05/24/20tA $100.00 $100.00 03/01/2019 Reinspectron Fe€ for Buildinq $50.00 $0.00 i $60.00 s354.as a294.AS s6o.oo SLructural - Application Fee PLEASE DO NOT SUBMTT ANY PAYI4ENTS UNNL A COLLIER COUNTY PAYMENT SLIP I5 DISTRIBUTEO 169 - o.y-in/fl.shing 6/ 7 /2074 5t7/2A14 06/o?/20ra REYES, GEORGE E & )OSEPHINE C, A(i'TES9:4484 DUNLIN CT DAVID A. BuCKNER.lR., Addressr1020 FAIRWAY LANE, Pho6€r(321) 536_ 8302, Ucensee * Q28108 ulel,ssr !s WOZNIaX, PEIER EOWARD, Address:2505 FOREST PAR(WAY NORTH , Phone:(877) 84{-8300, Ucensee * tCC20170002114 Uc€ns€ Status FLORIOA ROOF SERVICES LLC, Address:4505 9TH STREEI EAST, Phone: (877) 8114-8300, State Reg *',s CCC1331226, Ucensee * 1CC20170002115 License sLatus Property Owner: Qualifier - Histo.lcal: http://cvportal.colliergov.net/CityViewWeb/Permit/Status?permitld:259216 3nt2019 05/24/2O\A 05/24/201,8 10.A.1 Packet Pg. 114 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Page 2 of 2 Thomas winkler ((219) 877-2502) slldElodl Cor.ection 1: Stitus: Date Status Changed: Comments: Miscellaneous Corections 06/07 /2OrA l,4iscellaneous Cor€ctions Owne. states Polystlck TU Max unde-l.ym€nt. 1, no nolice ol commencement, 2, no manufadurE p.odud approval on slte- 107,3.1 3, underl.yment does not appe.r to be lnstalled per manufadures installation A, laps have not been rolled, See photos in B, ve.tlcal over laps 1/2'only on right sid. ot garage. see photos ln 6ocuments. 4, mlssing metal ddge, hlp, valley, and drip edge- 107.3.r not per mrnufacture innallalron inskudion. // Tw 6/7/18 170 - R€-roof Final 169 - Ory-in/Flashinq Emailr N/A Corredion 1 5t.aus Date St.tu5 Chanqpd Comments Mtscellaneous Corrections Oulstanding 06/07 /20t8 Miscellaneous Corredions Owner states Polystlck TU Hax unde-layment, 1, no notice ofcommencement, 2, no manufactures orodurt .DDroval on 3, u.derlayment (bes not .ppear to be install.d per manufadur€s lnstallation A, laps have not been roll€d. See photos ln B, v.rti(ll over laps 1/2' only on right srde ofgarage. See photos ln documents. 4, mlssing meLal ndge/ hip, valley/ and drip edge. 107.3.1 not per manufactur€ installation Instrudion. // Tw 5/7/18 oo.uments & tmag.5 D.tc Uplo.d.d 05/01/2018 ost24/20t8 05/24/2AtA 05/24/2ArA 05/24/20tA 06/07t2or8 06/07/2OtA 06/07/20ta oz/20/20t9 02/20/2019 01/0r/2019 PRBD201AO52q40t.ndl Pavment Slin IPR) errllil Insm.tlon tob Ca.d Recelot fortrrnsactloni 2014-045095 lmrde Roofind horlzontrl oao betw.€n seams. .ineo imaoe Roofno l..oe bubbles at rido. ll.e-i.€o 2 inch.ioe EXT, PRAD2ora052a401 - reb 20 201q 14,40-51.ndf Pavment Slio (PRl Receiot lortransactlon: 2019-018553 http:/icvportal.colliergov.net/CityViewWeb/permit/Status?permitl d:259216 3/1t20t9 10.A.1 Packet Pg. 115 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF PERMIT PERMIT TYPE ROPERMIT#: PRBD2Ol8052940l0l ISSUED: BY:MASTER#: COA: JQB ADDRESS: 4484 Dunlin CT JOB DESCRIPTION SLIBDIVISION #: FLOOD \trAP: FOLIO #: 5610551l90l OWNER INFORMA ION REYES, GEORGE E & JOSEPHINE C 4484 DUNLIN CT NAPLES, FL 34I 19. APPLIED DATE: 05-01-18 APPROVAL DATE: 05-24-l 8 CONCRETE TILE O!'ER POLYGLASS TH 6: 12 PITCH 45 44E4 DIJNLIN CT JOB PHO\E: BLOCK ELEVATION SECTION-TOWNSHIP-RANGE: 20-48.26 CONTRACTOR INFORMATION: FLORIDA ROOF SERVICES LLC 4505 9TH STREET EAST ELLINGTON. FL 34222 CERTIFICATE #: .No LrcENsEr>PHONE: TOTAI RES SOFT: 0 TOTAL CO\{M SQFT: O ZONE: FCC CODE: CONSTRUCTION CODE: 0220 JOB VAILTE: $4 2,300.00 1'BA KS FRONT RIGHT: SEWER CONTACT NAME: REYES, GEORGE E & JOSEPHINE C CONTACT PHONE: <NO PRMARY PHONE> Per Collier County Ordinance No. 2002-01, as it may be amended, all work musl comply with all applicable laws, codes, ordinances, and any additional stipulations or conditions ofthis permit. This permit expires if work authorized by the permit is not commenced within six (6) months from the date of issuance ofthe permit. Additional fees for failing to obtain permits prior to the conunencement ofconstruction may be imposed. Permittee(s) further understands that any contractor that may be employed must be a licensed contractor and that the strucfure must not be used or occupied until a Cenificate ofOccupancy is issued. NOTICE: PRIOR TO THE REMOVAL OF ASBESTOS PRODUCTS OR THE DEMOLITION OF A STRUCTURE, FEDERAL AND STATE LAWS REQUIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A NOTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP). FOR MORE TNFORMATTON, CONTACT DEP AT (239) 34+5600. ln addition to the conditions of this permit, there may be additional restrictions applicable to this property that may be fouod in the public records of this county, and there may be additional permits required from other governmeotal entities such as wrter management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYTNG TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. REARI LEFT: WATER: COLLIER GOUNTY BOARD OF COUNTY COMMISSIONERS LOT: 10.A.1 Packet Pg. 116 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF w sTATE CERTIFIED ROOFING CONTRACTOS LICENSE i CCC1331226 sTATE CERTIFIED RESIDENTIAL BUILDING CONTBACTOR LICENSEN CRCl331782 FLORIDA ROOF SERVICES LTC 2605 FOREST PARKWAY NORTH LARGO, FIORIDA 33771 pHoNE 877-844-8300 FAX941_722_8982 SALES AGREEMENT BETWEEN THE CONTRACTOR AND THE CUSTOMER NAMED BELOW fi|-lix'3rs, J'"Y NAME 1ri 2-37 _541- /PH ONE PHONE 44'?1 /t,"l,i^3/t.AODRESS ctTY/zrP EMAIL TfIE CONTRACTOR HERETN AGREES TO FURNISH MATERIALS AND LABOR TO COMPLETE THE FOLLOWING: "EF\U(?) F,.t: "-i /'-6i INSTALL NEW LEAD BOOTS A P!Uinat N 7.1 |NSTAL! llEW s (.) VER EN-TIRE DECK. TI ON5 AND NEIY VENT HOODS AT AIR EXHAUsT PORTs. ROOF SHINGLE, METAL OR TILE ROOF: REMOVE OLO ROOF tO SMOOTH hIORKAALE SUtFACE. REPLACE ANy ROTTED WOO D XfEA a S9O per she.t &S7 per tooi. REI{AII WOOOEI{ ROOF DECI$I'G TO RAFTERS YYITH RING SHANI( NAILS IN ACCORDAI{CE WIIH CUiREI{T CODEs. APPLY NEW eSECOitDARY tyATER RES|STfNT BAFRtER" Ut{OERLAyMENT O tNsraLL NEw FHAva Eave onrp.--wxrte-Jeeowx...sLAcK...caLvANtzEo. INSTALL NEW VALLEY METAL AND MEIAL FLASHING WHERE NECESSARY, t RGI.AsSSHING RIDGE VE'II (cor.oR) coLoR) ,L..' ttlstor-r- '.1- FEET oF RrDGE vENr / 6 ,.., o, ow I.9. ; CLEAI{ UP JOBSIIE OF ALI YIORK RELAIED DEBRTS AND HAUL AITIAY 10. CONTRACTOR YVtL! COORDINATE V'ORX RELAIED TO THE FOLLOWING AT AODITIONAL CHARCES-. SOLAR U ITS, ROOFIOP AIR COrlDlllOtlERS, ROOFTOP l.V. Dls|lEs, SI{YLIG}lTS. AtlrD fALLEt{ SOFFITT & FAsclA DOE TO EXCESSIVE wooD RoT. RE 't. 3, 6, 7. E. INSTALL NEI\I TPO MEMBRAIIE COVER OR GRANULATED TORCH OO\IN...COLOR - WHITE. CLEAN UP JOBSITE OF ALL WORX RELATED DEBRIS AND HAUL AWAY. ,rl1 wort 1o-* Frforh.d ir compl.te ah.l joSsit shall notlneludethej .Fpli6ble! qlit.n w-r.ant!, ...1 insurece miltgation 300-00 11L, .; f -:---7/ )-- '.:' 5 s s'r 11 *' SltE FllilE PRDaT" l. CONI8ACT DOCUMT!iT5. Tli. @oftd co{n6 oI t!! d@ur.dt, r*: -od rutlori:rtjoD plu anI -@d :rpl.ea'dt. i{ rnr, ud iI pryE.n6 r. 6ur.at, rU 6n,.irl dodrarr No proELa otla r lr! lllok rp..incdl] .* t6rt! i! il$ 6!a.e dD.6!rE tAr! l. Hogni&a ),y .i.-hs prr9. 2. l! { vld.stEd lnd .!,dd $.t r-hi, earr..! ndl aot b. hidi"g {!,o. !t. dE!6oi lrtn.ig!!d fud a@pl.d by u .nE 6r rh. @,hdo r, L rn. oohcbr laFs !!. r+Lt to .,htiht. ErtdirL oI lqErl .r srur:r ?.hL ,uy drng6 lrqolrd iy "i J"iriido.d ord6 b., r-ult in .ddjt.lal ci{tB. 'l. r,y ld.r &d.E Aqun.d !. &Ie! 6ocia du. lsda tln.grluar viu b.h.qir i! r Pinlou Cd"r; n!;J.,6!..d d].h..!6 includi,r irr@r ari.rbm.t i6 rh.[ b! rhc ouig.rio! 6l r.L. puEl,rr. TIG @F.do, ffi6 norld oapanrion rld !a.r!.Ilnb it iMnne.pptiEi,l. @ .!? v.* b.ug pqror.d 5. BItYEas llctTlO cAi{cE- tltou do 'or -.n rh. a..<L sa ..-iq r.r dy a,d rhn {,6d by prwiai!! rind ndie & lii clnrEdG; pdio.. !!!d.su b, aril.Tle ldieqd idiaE tLr !d doer H't r.L. aoo& or ,riB rDd ali l. d.tr.,.d or po.h.,lea h.d@ nilnigLl ofrl. l]lrn Suina dtr docuhent3tion sh.ll b. Frovided withan 30 d.ys ol fi.al EALANCE UPOTI COMPIETJOTt, ADD 3!/" IF PAYING BY CREDI'T CARD S ilE Fu .i!! thir .{rar6! . Tf,; ,ork ru.tl .oEEoa dr d rLou!Mn b. co,npl.r.d hy !pfhnh.!.l), BUI'EI I,CKOIILEDGES P.ECEPT OT r{ COPY OT'TBI5 ]{GREXi,IXA'ITEIS Y Ol_. 20_ Do Nor srcN TEIS EolG DdPRoLEunNr coI{TR A,cr IF Brr!.NK. yo u anE Etrrrrl,aD m A copy oF Tffrs coNrnrrcr AT TEE TD{E YOU SIGN. TEIS COYIRACT M1Y CREATE.q.I-EDi ON ON YOUR PAOPERTY IF NOT PA]D (*(DAIE} 6. Tl'. cdHco. rl.[ !r*. dDc .a ]on.y*. i! n ua6hd ..d laEJ Ll[r &. lu:.q hold. !h. co' rrcror hnrnls! aor rn-r, J.eagE !k. Eiy oEur b r'!! &iv rlyruiru otlk' litu or rh. psrcny dui'g rhc d.liv.ry .a ulBj.]l tld t5! lacvd .t d6 n.! cl,rld d.i,rtr F!.drdmr.t r!. 6n;dor n !d! ttfuld rlr u,d.q+a.o ,C l!..! ddi..r tDB, pl!B!i,6liu ud E, otlq 'n..!dial dEpo,gn drrr ur h,v. !d iepEp.i, iqrdl.d e. ctDB r. !h? eE!< i..t -Ei. Jd qilr or re LLa5 6 !a.dE or 6! .r, ol ...a ? CliprE 5,58 oa r!. ll,ridr Srrt.e dui! iEr.tulr r.$;d6b )fl Ec a,Iry !.ton ,ou !ry !.i!g ey rc..] n.ror ror d JL?n sn,h.ti.r d.rEt n ,@,nolu SLtr d:7r b.roE yo! Eilg E, IErl .di!D rd tu d.liE 6 o.sE p..V ro tln 6nBr r ri!6 rotie '.r@in! to chp6 558 of &y .ll.gd oE6u.do! d!lE: Ed b 6.&a E*:tr u oEa b Etrir or lar Gr i!. .t.gst cdlrib. d.aa Y6 !E ro r ohli+rd 6 i6gr .r, ora !!Li.h D.y !. ardL Tift .E rbd dc.dti.d @d6 r.lr! tlo;dr S!!tulr rti..L Ed b. Ea ad touoi.a b DEE r@ i!!.6u. 8. Co,rftdio! I u.Eia n@v*, ruld i'y8an ur L! .-dru. toa ra. C!!p nrou b.. E6!4v 6n . !rcjd F,r idcr.riu ,trour th ,.oo!.r, tund Dd 6ii!g r cl:ib manct r. F.rid. Couh.tio. llautry Lic i'€ B@d .r t!. loU.,i.s rdqrLd? !u!$., uJ ddBr..9o+?2?.6530--. ?960 &linaton Erpr!rys, S;!.300 J t&.!lill. Il.id. 3r2i 1.746?. ^ctisca 7ln42ga5 ,, ECLOS iOATE) J ROOF... (TPO INSULATED ROOF SYSTEM) OR ({.PLYTORCH SYSTEM) REMOVE OLD ROOFTO RENAI! ltOODEl'l RooF SURfACE. REPI.ACE aNY ROTTED WOOO XTRA @ 59o per Eh.Et &57 per foot DECXttiG WIA}| FIIIC SHANK NAILS IN ACCORDANCE WiIH CURFENT COOES. A'gLY I, EYI VSECO!.DARY ovER altneE DEc& ,_ _ trsaAI.I. _ lt{sur.artoN BOARD FOE TPO SYSTEM U II9ER 1.PLY TORCH SYSTEIt], INSIALL NEW fIIS/'VA EAVE DRIP oF cltolcE) __ lr{saal.l- NEtt LEAD BOOTS, AiF VENT HOOOS ANDIOR FLASHINGS WHERE nECESSARY, -,..] 10.A.1 Packet Pg. 117 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Purchaser Copy CASHIER'S CHECK Purchaser Copy May 10,2018 volD rF ovER us $ 14,200.00 NON-NEGOTIABLE Oflice AU I 11-24 121O(8) JOSEPHIRE SUAREZ REYE.S'^^--,..-.- -.' . ^EZ REYES SERIAL #: ACCOUNT#: ?urchoser Accouot Operalot LD.: u612157 ul79t69 Fundt1g Source El.ctrontc [6rnr{3l p.per ,lefnrli)pAyrorHE oRDERoF **"FLORIDA ROOF SERVICES LLC*"* Fffi r' '0066511 \1.;lt1i **$14,200.00"* I "*"Fourteen thousand two hundred dollars and no cents*** ayee Adclress: E'rrO ROOF REPAIR ELLS FARGO 8ANK, A/.A.roSr*,voAryJ''-'..,.... NOTICE rO PURCHASER _ tF THIS TNSTRUMENT lS LOSI, ?LES, FL34110 SToLEN OR DESTROYED, you MAy REOUEST CANCELT_ATTON I rNeu,RrES .ALL (4 Bo) 3s4.3122 liB!5^'^'"?l^,?1ffA:Bi?1,_"1^lir.fli:?t'.Xrl?i llB REOUIRE AN INDEMNITY AGREEMENT AND BOND. 10.A.1 Packet Pg. 118 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER o066511 11-24 CASHIER'S CHECK NOTICE TO PURCHASER - IF THIS INSTRUMENT IS LOST. STOLEN OR DESTROYED, YOU MAY,REOUEST CANCELLATION ANO REISSUANCE. AS A CONDITION TO CANCELLATION AND REISSUANCE, WELLS FARGO BANK MAY IMPOSE A FEE AND REOUiRE AN INDEMNIry AGREEMENT AND BOND. . Purchaser Copy Otrtce AU *121O18) JOSEPHINE SUAREZ REYESi^aeosr!r: sr taREz REYES aotitsza u379169 Reilitler. Purhaser Purchaser Accounl Operalor I D.: Funding Soutce: PaPer rtenls(s) PAY TO IHE ORDER OF *"*FLORIDA ROOF SERVICES LLC*** volD tF ovER us $ 14,20 NON.NEGOTTA "**Fourteen thousand two hundred dollars and no cenfs*** Payee Address: Uemo: ROOF REPAIR \!:?3 SERIAL #: ACCOUNT#: April 20,2018 **$14,200.00** ) VELLS FARGO BANK, N.A, ilo SIRAND BLVO |PLES, FL U110 )R INQU'RIES C LL (480) 394-3122 10.A.1 Packet Pg. 119 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : GumphJack From: Sent: To: Cc: Subject: Attachments: GumphJack Thursday, December 13, 2018 11:34 AM jwrayl@yahoo.com GumphJack RE: Permit # PR8D20180529401, 4484 Dunlin Ct., Naples, FL 12132018112018.pdf Mr. Rayl, Attached please find a violation notice for Permit fl PRBD20180529401, 4484 Dunlin Ct., Naples, FL. The permit is listed as EXPIRED. Pleased re-activate the permit. Please have Qualifier, Peter Wozniak sign the violation form and sent back to me via email. lt is essential you take the necessary steps to resolve the homeowner's issues: Underlayment is expired- leakage lnto the home, completing the roof and finalizing the permit. Thank you, lack Gumph Compliance Offi cer, Contractor Licensing Collier County Growth Management Department 2800 North Horseshoe Drive Naples, FL 34104 239-252-2468 (Office) 239-438-5195 [Cell) Iack.Gumph@CollierCountvFL.gov -,L-c,fiff",Qownty Under Florida Law, e-mail addresses are public records. lf you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. lnstead, contact this office by telephone or in writing. 1 10.A.1 Packet Pg. 120 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES GumphJack From: Sent: To: Cc: Subject: Attachments: GumphJack Tuesday, January 15, 2019 11:40 AM jwrayl@yahoo.com GumphJack; GuzmanJuan; MeulenbergTimothy FW: RE: Permit # PRBD20180529401. 21484 Dunlin Ct., Naples, FL 01152019110722.pdf Mr. Rayl/Woznia k, Attached, please find a 'Notice to Appear' before the Contractor Licensing Board to answer charges of violations on permit B 's PR8D20180529401, PR8D20180422436 and PR8D20180745475. lf you have questions, please don't hesitate to contact me. Thank you, Jack Gumph Compliance Officer, Contractor Licensing Collier County Growth Management Department 2800 North Horseshoe Drive Naples, FL 34104 239-252-2468 (Offrce) 2 39-438-5195 (CellJ Iack.Gumph@CollierCountyFL.gov C'"?ffi,Coanxy From: GumphJack Sent: Thursday, December 13, 2018 11:34 AM To: jwrayl@yahoo.com Cc: GumphJack <Jack.Gumph@colliercountyfl.gov> Subject: RE: Permit # PR8D2018052940L, 4484 Dunlin Ct., Naples, FL Mr. Rayl, Thank you, lack Gumph Compliance Offlcer, Contractor Licensing Collier County Growth Management Department 2800 North Horseshoe Drive Attached please find a violation notice for Permit S PR8D20180529401, 4484 Dunlin Ct., Naples, FL. The permit is listed as EXPIRED. Pleased re-activate the permit. Please have Qualifier, Peter Wozniak sign the violation form and sent back to me via email. lt is essentialyou take the necessary steps to resolve the homeowner's issues: Underlayment is expired- leakage into the home, completing the roof and finalizing the permit. 1 10.A.1 Packet Pg. 121 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Notice of Non-Complia nce BE lT KNOWN THAT l, the person whose signature appears below, do hereby formally acknowledge, agree and consent as follows: THAT a certain case, case S CEM1520180015337, involving me has recently been investigated by the Collier County Contractor Licensing Department. THAT the said Department had made it known to me that, in the Department's view, I violated State (Florida Building code section 105.1) and county {ordinance 2006-46. as amended,4.1.6 & 4.1.18) licensing laws in said case, EXPIRED PERMIT S PR8D20180529i81. receives, as initial payment, money totaling more than 10 percent ofthe contrect price, having failed or refuse to pertorm any work for a 90{ay period that has subjected occupants to potential water damage. Dry-in inspection FAlt€D {on 5h hal, Underlayment erpired over 6 months. Type of Work: CONCRETE TltE OVER POLYGIASS TH 6:12 PITCH 45 Location ofwork: 4484 Dunlin Ct., Naples, FL 34119 Date of Site visit - December 12, 2018 THAT the said Department has explained to me that all contracting work, including BUT NOT tlMlTED TO: home or business improvement, residential or commercial, remodeling, renov3tion, addition, repair, alteration, plumbing, electrical, roofing, pool construction, air conditioninB, sheet metal, aluminum and alarm contractor work,all reouiae the issuance an d m aintenance of a valid Buildins Permit grior to commencement and throushout worki g on a oermit reouired buildins oroiect. THEREFORE, BEING FUTLY ADVISED, I DO AGREE that I will obtain and maintain in current status, all Building Permits required by Statutes and fully understand that if I commence work without obtaining or maintaining necessary Building Permits in the future, the Contractor Licensing Department will consider that a !{illlgllgd9Jiqbli9! where penalties and restrictions to Building Permit privileges may follow. Witness my signature (Contractor)Print Peter Edward Wozniak State of: Florida, lssuance 8:ccc1331 226 WOZNIAK, PETER EDWARD County of: Collier, lssuance f:1CC2017m02115-FLORIDA ROOT SERVICES, LLC. The foresoin8 instrument was acknowledged before me this (date) by ffihotasproduced Signature of Notary Licensint lnvestigator, in lieu of Notary. Date: Tim Meulenberg, Collier County Contractor licensing, 239-252-AOZ3 10.A.1 Packet Pg. 122 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF PHOTOG RAPHS ARE OF 4484 DU N LIN CT - REYES RESIDENCE 10.A.1 Packet Pg. 123 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF /i ,i ,/ W,# ':i. - ,l , .-(r'i 'i1;'t-=$*li'**,. ,#,,|:- : \\" ' .'l ,i.:- z.alt n'ri, i^ .,ltf,'rs. ;"'{mi.,: '* ^ r;ilr'9{ }h**.S..: - rv_,- 'lt ,i 1t-l ' r. ,.1 \- {"ti - \1i -tn - ,:- A,-,i'l-?. \r 10.A.1 Packet Pg. 124 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER rii t! t ,.. ;t', tt':;.\'l '" 1 t l. .a .dl .!a lr i i .' -\ *'. it) ,:,, \ ., -., ,. L,. .:i L,l41 Ill ;W IM r - .'--r.* .-:_ > ''r l. ' ,:.' -1.,,' i'-- I'"a{'NIt L? i- .l .r .t. I , llffi I tv z lt i.$ -n 'yl ,-al ,.ddM J I ,{.r tti / ,i*a 1 10.A.1 Packet Pg. 125 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER I ) , \r! 'rr.Jl i{ryi' II t t l) \*'\7 ( ri' T_ , I2J I ?. t. t )-l li.i!' ., lr,,tr*I'I. *. ..7 F,l tl l ! 10.A.1 Packet Pg. 126 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER \\ I ,.. x .J,* ,r. st I, ;, l$ .-.cir..rB,. 'y ',"1 I ..;'. I li .. . trlr t a lit, /i'"'' fit r. r.i'1";4 r"l: .'; ! :\ /x ,i. :il...! ,j .jw. .1 .1 , .,i :(, I '6i {N':: t i:r a, {I 5r) ::' \ c.'tt' lil\r, t,,- r( ,' ;.1L'',!ii'. ' I 'i:t'il a.',?i. _'1.-..: \ { ':\ frit.5t' I .,:'it '.J t; 2"t ..#ril+'.'.!i:s .. ] , ..'.1'Ir,.,,',; r}: ',ll I lz,1' '., //- , -{a; | ,,ai' i .- 10.A.1 Packet Pg. 127 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER s. aaai trt orlrl t tFa rei r riiad. t, a,-lt !.,*r9r! r.,ral -ii-ia5 .\.r r*.trro,aa{l.--rt*trai..r*r. :-ga.r{E .i rtrlr.X r. {-.;-q,t ..-i a.-rrr !b =- -.i.lED - r- E-i.- rra rr- rlD.,|{ r--i,hi - ,;r.r*El-llanat O+.r!.ranf :* A COa,t !roTtcE al nls Lernoai Gc*.r Caint f.{alil oo ror RESOVE t I ARB APPROVED PROJECT r:Bt*Etr,rL Er rnorill rltr,l6/r rfrltfr -a€.8 thllt-EEilr[t .-!-,-* r- I s 7 i- t- e /\slror tjLi1..nkeLrl\5 10.A.1 Packet Pg. 128 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF I \a 10.A.1 Packet Pg. 129 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF /x / \ \ \I \\'l \ \ 10.A.1 Packet Pg. 130 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF III I I I 10.A.1 Packet Pg. 131 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF / .i ! \- I UL ,/l t 10.A.1 Packet Pg. 132 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Dare. 31112019 2:54:35 ?M Report Title. Code Case Details CaseNumber: CEM1S20180014738 Case Number cEMts20180014738 Case Type M iscon d uct Priority Normal lnspector TimothyMeulenberg Jurisdiction Contractor's Licensing Complaint Detail Description Florida Roof Services has taken two payments of $11,250 and not ordered the tile after 4 months since the permit was issued. Florida Roof Services: Office, Leslie (727)687-7630; JEFF 787 .452.3881i DAVE 239.248.17 71. EMAIL jwrayl@yahoo.com Location Comments QUIGLEY, THOMAS=& ANGELA; 1965 ISLA DE PALMA GIR; NAPLES, FL 341 19: FOLIO # (726s00122431 CELL; 239.784.8250 HOME; 239.596.2420 Status Date & Time Entered 1112812018 3i17:27 PM Entered By TimothyMeulenberg Case Disposition Case Pending Property 72650012243 Contractor Florida Roof Services LLC Qualifier WOZNIAK, PETER EDWARD tu Origin: lnvestigation Busrness Management & Budget Office 1 10.A.1 Packet Pg. 133 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Dale 31112Q19 2:54:35 PM Desc Assigned Required Completed Outcome Comments Preliminary lnvestigation TimothyMeule nberg 11D4t2018 11t29t2018 Needs lnvestigatio n '1 1/29/18: At 8:57 am, I placed a call to Leslie 727 687.7630lefta message wth inquiry as to the status of the tile installation at '1965 lsla Ed Palma ClR. At 9:03 am I called 877.844.8300 and kied to leave a message but mail box is full. At 9:20 am, I called 727.452.3A and left a message with Jeff Rayl and sent an email to jwrayl@yahoo.com regarding re-roof permit at 1965 lsla De Palma ClR. I will be meeting the property owner Thomas Quigley at 10:00 am Cont. lnvestagation TimothyMeule nberg 1U8t2018 12t8t2018 Complete 12108118: I have sent three emails due to a lack of response to phone messages. The first was sent 1 1/29118 documenting a history of poor response to the property owner and no follow through on construction activity since the 8i 13/18 dry-in inspection. Additionally, the owner has made two payments of $11,520 with not evidence of ordering the tile. I further requested a response on the status of tiie delivery. The second email was sent 1 1/30/18 forwarding the email sent on 11/29/18 and the inclusion of an attached Notice of Non- Compliance requesting a signature. I additionally requested an update as to the status of the tile delivery. On 12lMl18t I received a response from Jeff Rayl stating the tile mfgs have been vague and non committal with their response as to tile delivery. The further stated they will make every effort to communicate this infomation to their customers. There was no mention of the Notice of Non-Compliance. lthen investigated by contacting the local distributor of Crown Tile and found the order delivery for 1965 lsla De Palma was processed about a month ago so I followed up with a response to Jeff Rayl statjng I was aware of approximate date they ordered the tile and suggested it placed the tile order well after the two payments of $1 1,520 had been paid. l further requested a return of the signed Notice of Non-Compliance. All emails have been included in DOCS. TM Business Management & Budget Office 2 10.A.1 Packet Pg. 134 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Dale 31112019 2:54:35 PM Desc Assig ned Required Completed Outcome Comments TimothyMeule nberg 12127t2018 12t27t2018 Complete 1427118: I sent another email to Jeff Wrayl requesting he obtain the signature of Peter E. Wosniak and return a signed notice of non- compliance for the case file. lplacedacall to the property owner, Thomas Quigley to update him and he informed me that George, the Crown Tile Distributor estimates the tile delivery aroung March. TM Cont. lnvestigation Timothy[4eule nberg 1t15t2019 1t15t2019 Complete 1/15/19: No response to Notice of Non- Compliance. Notice to Appear before the Contractor Licensing Board on Wednesday March 20, 2019 at 9:00 AM in the Board of County Commissioneis Room was sent to Mr. Rayl and Mr. Wozniak by Contractor Licensing Officer Jack Gumph. Scanned to docs. TM TimothyMeule nberg 2t1t2019 z1t2a19 Complete Z1119: Obtained confirmation that certified mail was delivered to Florda Roof Servrces in Largo FL 33771 on 1/30/19. Scanned to documents. TM Cont. lnvestigation TimothyMeule nberg 2t15t2019 2t15t2019 Complete On 25h9, attached to documents a sign receipt that Peter Wosniak received the notice of Licensing Board Hearing for March. Cont lnvestigation TimothyMeule nberg 3t1t2019 3t1t2019 Complete 3/1/19; at 8:51 am, I spoke with Thomas Quigley to inform him of the March 20, 2019 Contractor Licensing Case with Florida Roof Services that will be submitted to the Contractor Licensing Board. I asked him if he would complete a Sworn Statement sumarizing his experience with the contractor. He expressed concern and stated at this time he would rather not submit a sworn statement because his tiles are scheduled to be in this month. I informed Mr. Ouigley that the case would involve the length of time that has lapsed since the contractor last worked on the roof and that I would let him know the outmme of the case to the board. TM lnvestigation TimothyMeule nberg 3t15t2019 Pending 1965 lsla De Palma NoNC???? The Crown Tile distributor believes that the tile for this job will be in the month of March. 20'19 or so. TM Violation Description Status Entered Corrected Amount Comments 4.2 Misconduct State Certifed Contractors Open 11t28/2018 $0 Tifle Reason Result Compliance Fine/Day Condition Busjness Management & Budget Oflice 3 Cont. lnvestigation Cont. lnvestigation 10.A.1 Packet Pg. 135 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF -RffL, -,/ u $TN 1,L1,LLY Growh N,4anagement Deparh-nent Contractor Licensing 2800 N. Horseshoe Dr. Naples, FL 34104 Phone - 239-252-2431 Fax - 239-252-2469 (- *O-tUco'-rs PRELIMINARY COMPLAINT FORM Please complete this form to the best of your abilities. Also include with this form any documents you would like to be reviewed as evidence for this case. This can include Contracts, Copies of Checks, Permits, Liens, etc. -t'l-hmns Qvr4t<'l Date a6 /€ lqb4 fuh brlnL6 (,s,1<t"o{Ps fL 3y(9 Street City State zip Email Qttt 1y1t\t 0 AoL .cont az\ 1gq- <)so Address of Complaint:/11,s bla be(otnt trkl< tufif/es /L 3y/n Street City State zip Company Name oRna oo (e (//c5 Contractor/Person in Charge bfrve J beK License # Telephone 911-gq(/-83oo Date of Contract: c cc t33l;D6 u/r, f ,s /]4,tpTls t^)AtTir(: Frn f,u. ftteLi ail/ r"T 16/t ,lre w/,ro rterl oloort,D R*kn ul u'7 Apsrr,rr 4p/ cfrlts /ta.,-, ttte tE Ber, { fiLe o 2* rtlho- bts/A)fqL Plz*t a,kfi ll/t< t". /e,.76 o(--,ile fun Ctn,rclruqAat { q //na o fur @ ouf 141t4,tq firt k/2,tr l,aettv 1,ty fl.nt4 . SIGNATU RE PRELIM INARY COMPLAINT M REV 4/t211-8 RECF]I\i ED i\l:]ii "r ,. ;jliii Complainant's Name: Home address: Telephone: COMPLAINT INFORMATION: COMPLAINT DETAILS (ATTACH ADDITIONAL SHEETS IF NECESSARY) 10.A.1 Packet Pg. 136 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF C C,ow4lt Grci(h l{rtagsrEr{ DepatrEnt must @.nplete oll Pleose Jolbw the BU II.DING PERMlT APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 I TEL: (239)252-2400 Diections 83, 8ur'klirETyp€: 8.4 PErinittee Tpe: Property lrformation 8.5. ParceYFolio l: 8.5. lob Street Addr6s: 8.7. OwnerName: 8.8 Owner Phone: 8.9. tubdMsion: LoVBloddunit: 8.10. SDP/Prr: 8.11. 'PLH Filename: ffi z untty twen.gyr o*nxwse @n.ao, J q .17eryrrs € *rncla i)uia /ttt. O oes6n *ofession"t Contrador lnformation B.U. License H: 8.13. Company Name: 8.14. QualifierName: 8.15. Contact Name: 8.16. Company Address lnstruct;ons to thls Appltotbn. 8.2. Master $ (fo'rl: Q vobil{tvtanufactr.red home O Residential3+ oniB/Muhi-famity Q Commeroat Q Owner Builder ZV 4&tr q#- 9. E- to-;;a La l-.rs L4/qf Tarcr lor 44 'Opttorxrl-kqd1 ati*ir,q Ftlerrrt'fs d't GNVa, PatloL 54 ts-/1..)t7a,,L.J./22+ 8.17. Company Phone: 8.18, Faxlt 8.19.a, "Email1: 8.19.b. "Email2: l"W na rne tr*4t1cr, Nirnory @id nethd. Secdon C AnCialbn lnfrmrtion E ELEC EPLUME E MECH -Septic trl Low VoltaEe El Shutters E ELtcTfrom house El6a5 C8. FireSprinkled: C9. Permh by Affidavit: C10. Prirate Pror'ider C11. Threshold BuildinB: C.12. Vegetation Oelrin8: C,L},REIAtEd tO DAIVI,AGES tI'ICURRED BYHURRICANE IRMA C.2. PermitType: C3. Fre Permjt Type: C4. Construction Typ€ C.5. Ocnipancy: C.6. Water Service; C.7. Sewer SeMce:e:l .,1o 0.1.lqavkklrku): D 2. Project Name Ao,y/i D.3. Declared Value 5 jq,^be. '_ D.4 iti*He;tEr sq. Fr: NeN ConsL lcan*E D a-a & oa.h) ^dditc,r lUrp* o.t.o A aa.t) Alteration /co.rph. o4cl D.i|.b. Wq* Ar€B (Sq. Frl o..!i tivingi D.1.hi. NsrlMng: _TOTAI: 0 0.4.L Wor*Area {Sq. Fr) 0.4-ci. Uving: D-a.cii Nol-living: _IOTAL O 0.4.d. Totals by Area IoIAI tiwE 0 IOIArt{o.iaC 0 I Stori6: , Units: S Bedrooms: # Eathrooms D:5. €oiimedatss Fr: New C.Dnst (cohpbtE o.So. & D.5.b) Addi6o^' Eqn*e D.5a & D rh) AJteration /cr4ptsre o 5'./ D''a Ne$, Consl D56.WqkAIea lsq. Fr) lnterior E t"rio. -=--- TOTAfi - o 0.5.c Work Area (Sq. FL) # Stories: # Units: lnterion Exterior IOTAti 0 E.2. Numberof plan Sets:E.3. ReviewDays: WI 5r0r5E.1. FinalReview Date: Revised Date. 11/29l17 v2 This is pa8e 1of 3 pa8es of the Build int Permat Application. plea5e s!bmit all3 pages rrt,en co.pt"t"d '?tbE oo t ai./t@ D.4,a, New Const 10.A.1 Packet Pg. 137 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF ..#..-."BUI[DING PERMIT APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 I TEL: (239) 252-2400 NOTICE OF COLLIER COUNTY ADDITIONAL REGULATIONS NOTICE OF ADDITIONAL RESTRICTIONS: ln addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this County, and there may be additional permits required from other governmental entities such as the Water ManaBement District, State agencies, or Federal agencies. WARNING OF POSSIELE DEED RESTRICTIONS: The land subject to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide legal or business advice to the public relative to these restrictions. The landowner or any applicant acting on behalf of the landowner is cautioned to seek professional advice. WARNING OF WORK lN THE COUNW RIGHT-OF-WAYS: This permit does not authorize construction or installation of any structure or utility, above or below ground, within any right of way or easement reserved for access, drainage or utility purposes. This restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit for that purpose must be obtained from the Growth Management Department. NOTICE OF CLEARING RESTRICTIONS: The issuance of a building permit for a single-family dwelling allows up to one (1) acre of native vegetation to be cleared. Clearing more than one (1) acre may be allowed for accessory structures and requires a separate Vegetation Removal Permit. Properties located in the following zoninB district overlays may not be allowed to clear one (1) acre: Rural Fringe Mixed Use District (RFMU), Big Cypress Area of Concern (ACSC), and Special Treatment Overlay (5T). There may be additional restrictions related to clearing native vegetation and impacts to wetlands or protected species found on the property. State and Federal agency permits may be required. Contact the Growth Management Department's Environmental Services at (239) 252-24OO for additional information. lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint of the structure. A Demo Permit is not a clearing permit. WORK lN THE SPECIAL FLOOD HAZARD AREA: Be advised that Substantial Da mage/Substa ntial lmprovement requirements will apply to structures located in the Special Flood Hazard Area with Finished Floor Elevations below the Base Flood Elevation. By initialing, I am acknowledging that I have read and understand this Notice of Collier County Additional Regulations. ln iti Ownet ar Agent of Owner's or Controctor's initiols ore required Rev 11-29-2017 v2 This is page 2 of 3 pages of the Building Permit Applicalion Please submit all 3 pages when completed 10.A.1 Packet Pg. 138 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF ..f-..*' contraat th Owr permits such action (s ture of Owner or A The for egoing instru ent was acknowledged before me this !-/tG dav ot BUITDING PERMIT APPUCATION 28oo N. HORSESHOE DR., NAPLES, FL 34104 | TEL: (219) 252-2400 a (name of p erson) who !d6,lly known to ner) zoJS-ay me, or who -has Seal )at Sea I sEcIlo owNER or AGENT OF OWNER ACKNOWLEDGEMENT. The Contraclor may sign as the Agent of owner so long as (Print namB of Owner or ABent ot Ow son a produced identification (type of identi fication Notary Signatu SECTI CONTRACTO c I-EOGEMENT: o Bnatu Contra r)(Print name ol Contractor) The fore inE instrument was acknowledged before me this t#day of zo& w /t J),ak (name of person) wh o -=tU$ersonally known to me, or who has cation (tYP e of identification)produced identifi Notary Signature NOTICE OF COMMENCEMENT INFORMATION per Florida Statutes 713.135 a Notice of Commencement (NOC) is required lor constrLlction of improvements totaling more than s2,5OO, with certain etceptions. For A/C Repairs or Replacements a notice of commencement is required {or improvements more than or equal to 57,SOO. The applicant shall file with the issuinB authoritY prior to the first inspection either a certified copy of the recorded NOC or a notarized statement that the NOC has been filed for recording, alonS with a copY thereof. ln order to comply with the state requirement, permitt will be placed in inspection hold until proof of the NOC is filed with the building permitting and inspection department. The issuing authority shall not perform or approve subsequent inspections until the applicant files by mail, facsimile, hand delivery, email or any other means such as certified copy with the issuing authority. WARNING TO OWNER: YOUR FAIIURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSUTT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. Rev 11 29-2017 v2 This ts pa8e 3 of 3 pages of the 8lildtng Permit Application. Plerse submit all I pages when complcred. JEFFERY Tr, RAYL Y COfrt t,ssroN I FF2069-05 EXPIFIES March l3 2t!-o ,:u JEFFERY IV RAYL nY co[rM'SStON # FF206995 E.XPIRES March l3 2cr19 rrfr!rf$ i,,5j.|:r:6 ACKNOWLEDGEMENT OF COLLIER COUNTY REGULATIONS Application is hereby made to obtain a permit to do the work and installations as indicated lcertifY that no work or installation ha5 commenced prior to the issuance of a permit and that all work will be Performed to meet the standards of all law5 regulating construction in this jurisdiction. The permit or application fee may have additional fee5 imposed for fa'lin8 to obtain permits prior to commencement of construction. Theapprovedpermitand/orperm.tapplicationexpiresifnotcommencedwithinl8odaysfromthedateofi5sUance.Thepermittee further understands that only licensed contractors may be employed and that the structure will not be used or occupied until a .ertificate of occupancy is irsued. 8y signing this permit application' lagree that lhave been retained bY the owner/permittee to provide contracting services for the trade for which I am listed. Furthermore, it is my responsibility to notify the Euilding Plan Review and lnspection Division should I no longer be the contractor responsible for providing said contractinB services. I fu her atree that I understand that the review and issuing of this permit does not exempt me from complying with all county codes and ordinances lt is lurther understood that the property owner/permittee is the owner of the permit' Notei An owner-Builder must complete Sections A and B and the owner-Builder Affidavit torm' k 10.A.1 Packet Pg. 139 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Page I of2 GMD Public Portal permit Application Status ln order to scheatule inspections, you need to be signed an. - Sunm.ry Applacation Numbe.: PR8D20180745475 Application Type: guilding Appric.aionStatus: Reactivate ProOerty Owner's Furt Name: QUIGLEY, THOMAS & ANGELA Category or Work: Alteration Ocorpancy Cod€: Regdentialt One and Two Famity New or Gu€st House Descnptioo of Work: tile re{oor 5:12 pitdr 45 sq potygtass tumax undertayment 1965 isla de paho clr Application Date: 0712612018 rssued D.te: 07131/2018 ExptahonDrte: 05/21120!9 1-2 F.mily or Comm: 1-2 Famity Qualifier QUTGLEY, THOMAS & ANGELA, Address:1965 ISLA OE PALMA CIR WOZNIAK, PETER EDWARD, Addressr2605 rOREST PARKWAY NORTH, Phone:(877) 844-8300, Licensee # 1CC20r70002114 License Statu< FLORIDA ROOF SER!.ICE5 LLC, Addr.ss:4505 9TH SIREFI EAST, Phone (877) 844-8300, State Reg *'s CCC1331226, Ucensee * 1CC201700021r5 License Status P€rmlts (Cllck to See Revlews) Owing Structural - Applicaton Fee $50.00 $50.00 o7/3t/20rA $90.00 $9r1.00 07t37/20r4 Structural - Revlew Fee $50.00 *50-oo a7/31/2014 6CAI $2.85 32.85 07/3r/20tB DBPR 5urch.r9e $2.00 $2.00 01/3r/2074 $100.00 $0.00 $100.00 s294.85 t194,45 t100.oo PLEAsE OO NOT SUBMIT AiIY PAYMENTS UNTII A COLUER COUNTY PAYMEI{T SLIP IS DISTRIBUIED Keith Maloney Sen.r Emdil a/ L3l20L8 8/13/2018 08/13/2018 h@://cvportal.colliergov.neVCityViewWeb,/PermiVStatus?permitl d=27 5435 311t2019 t69 - Ory-in/Flashing 10.A.1 Packet Pg. 140 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Page 2 of 2 Oo.uments & I6ages Oate File Type Uplo.d.d o7 /26l20ta 07/27 /2014 o7 /27 t20r8 o7 /27 l20tg 07/3t/2OrA oz/20t2ot9 02/20/2019 rr 003.odr Eeldt Pevm.nt Slip lPRl lnsm.tion lob Card Receipt for tcn$ction: 2018-065896 EXr- PR4D2018074547501 - Feb 20 2019 14-50-16.odf Pavment Slip lPRl Cor.don l: st t!B: o.tc St.tus Ch.ngcd: Commcnts: Pass with Inspector Notes 08/r3/2018 P.ss with Inspedor Notes: - Peel and stid, ridge, valley and edg€ 8.13.18//(M 170 - R.-1661Final I hftp://cvportal.colliergov.neVCityViewWeb/PermiVStatus?permirl d=27 5435 3/t/2019 10.A.1 Packet Pg. 141 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF ISSUED: NTASTER #: PR8D201807454750t BY: COA: PERMIT PERi\{I'I #I JOBADDRESS:1965 Isla De Palma CIR JOB DESCRIPTION: tile re-roof 6il2 pitch 45 sq polyglass tumax underlayment 1955 isla de palmo cir GOLLIER COUNTY BOARD OF COUNTY COMMISSIONERS JOB PHONE BLOCK ZONE:ELEVATION: SECTION-TOWIISHIP-RANGE: 28-48-26 CONTRACTOR INFORMATION: APPROVAL DATE: 07-27-l 8 SEWER: CONTACT NAME O\\NER TNF ORMATION QUIGLEY, THOMAS & ANGELA I965 ISLA DE PALMA CIR NAPLES, FL 34I 19- FCC CODE CONSTRUCTIONCODE: 0220 JOB VALUE: $34,260.00 SETBACKS FRONT: FLOzuDA ROOF SERVICES LLC 4505 9TH STREET EAST 2605 FOREST PARKWAY NORTH LARGO FL 33771 ELLINGTON, FL 34222 CERTIFICATE #:PHONE REAR: TOTAL RES SOFT: 0 LEFT: TOTAICOMM SOFT: 0 RIGHT: WATER: CONTACT PHONE Per Collier County Ordinance No. 2002-01, as it may be amended, all work must comply with all applicable laws, codes, ordinances, and any additional stipulations or conditions ofthis permit. This permit expires if work authorized by the permil is not commenced within six (6) months from the date of issuancr ofthe permit. Additional fees for failing to obtain permits prior to the commencement ofconstruction may be imposed. Permiftee(s) further understands that any cantmctor that may be employed must be a licensed conlractor and that the strucfure must not be used or occupied until a Certificate ofOccuparcy is issued. NOTICE: PRIOR TO THE REI\IOVAL OF ASBESTOS PRODUCTS OR THE DEN{OLITION OF A STRUCTURE, FEDERAL AND STATE LAWS REQUIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A NOTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP). FOR MORE INFORMATION, CONTACT DEP AT (239) 344-5600. In addition to the conditiolls of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this cou[ty, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AI{ ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. STIBDIVISION #: FLOOD MAP: FOLIO #: 72650012243 PERMIT TYPE: RO APPLIED DATE: 07-26-18 LOT: 10.A.1 Packet Pg. 142 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF STATE CtRTtFIED ROOFING CONTRACTOR LICEIISE '" CCC1331226 S-IATE CERTIFIED RESIDENTIAL BUTLDING CONTRACIOB LICENSI T CRC13Ei792 F[.OR[DA RCI@F SERVICES [-{.C 2505 FOREST PARKWAY NORTH LARGO, FLORIDA 33771 PHONE 8?7-844-4300 FAx941-7?2-8982 SALES AGREE|YIENT BETWEEN THE COI\ITRACTOR AND THE CUSTAMER NAMED BELOW PE{@NE Z3 F4-?4o FFtr@NE o ADDR.ESS a clT'Y/zIP EIlflA[[-Dpn q coln TI{E GO CTOR HEREIN AG REES ro F RNTSH MATERIALS aru-o laeoc ro CoMPLETE THE FoLLowtNG: !zuGLE, flIl ETA!-ooF: OLD ROOF TO SMOOTH WORIOABLE SURFACE- REPLACE ANY Ro'rTED wooD XTRA @ S9o Pcr sheet &S7 per foot' RENAIL WOODEN ROOF DECKING TO RAFTER S }YITH RING SHANK NAJLS tN AGCORDANCE WTTH CURRENT CODES. APPLYNEw4sEcoNDARYWATERREStsTANiaARRtER.UNDERLAYMENToVERENTIREDEctc INSTALL NEW FHA.TVA EAVE DRIP..'YiIHITE...BROI/VH...ELACK..'GALVANIZED HERE NECESSARY NS AND NEW VENT HOODS AT AIR EXHAUST NAME Additional conditions- FI BERGLASS SHIN PORTS. . -{coLoR)-- __ (coloR) INSTALL NEW VALLEY METAL AND ME-I AL FLASHING W INSTALL NEW LEAD BOOTS AT PL.UMBING PFNETRATIO;;;;;;u ,u,.'. _cpac& -ru (coLoR) A. INSTALL _ --. FEET OF RIDGE VENT -- - FEET OF OFF RIDGE VENT"'WHITE..'BROWN..'BLACH..' ,G') cleatt up JoBsrrE oF .aLL woRK RELATED DEBRIS AND HAUL awaY' --- aont*otaoR wrr-r cooRDINATE woRK REr-arED To yHE FoLLovuNG ar AoomoNAL cHARGES-' soLAR uHlrs' RooFToF ArR CONDIT|oNERS, ROOFTOP r-v- D!SHE5, SKYLIGHTS. AND FALLEN SOFFlrr & FASC]A DUE TO EXCESSIVE WOOD ROf. OOF "LOW SI-OFE" ROOF.., (-fFO !NST'[-ATED ROOF SYS-TEM) OIE (f -PLY TORCH SYS'rEIV}) REM ROOF TO SMOOTH I,IIIOREAtsLE SURFACE. REPLACE ANY ROTTED WOOD XTRA @ S9O PE ShEEt &S7 PET fOOt' RENAIL WOO F DECKING TO RAFTERS WITH RTNG SHANK NAILS tN ACCORDANCE WTTH CURRENT CODES' APPLY NEW ASECON RESISTANT BARRIEP.' UNDERLAYMEHT OVER ENTIRE DECK. .-- INSiALL- - INSULATI INS-I ALL NEIA, FHS/VA EAVE ONB OR TPO SYSTEM (NO TNSULATTON UNDER t-gLY TORCH SYSTETVI. DRrP -,-lltrlllTE---..ELACK...GALVANIZED...(CTRCLE COLOR OF CHOICE} INS-I ALL NEW LEAD BOOTS' AIR VENT HOODS AND/OR NGS WHERE I'ECESSARY, - INS?ALL NEW TPO MEMBRANE COVER OR GRANULATED TO ,COLOR - WHITE. CLEAN UP JOBSITE OF ALL WORK RELATED DEBRIS AND HAUL AWAY. ill $or}: ro 'oc pcriom,ed ;n i sortrEnlit. nt,rulcr 3,id ilt conrPltaDc. Ni$ starc aDd locrl cod!'i E'OR THE S0)I O R 1. 2- 3. 4. 5- 6. 7. s 4 40P NOTE . completion is when iostallation work is complete and iobsite is cleaned. The term completron shall notinclude thejurisdictional final ;nspection date. tf applicable, written lr.arranty and iosurance mit;gation documentation shatl be provided within 3(] days of final paymeot- MUNICIPLE & PERMTT FEES TO?AL DEPOSIT Coo q o o Roo TII.E DRA}II A3'(DRY-IN' PLUS WOOD CHARGES BALANCE UPON COMPLETION ADD 3i'" !F PAYING BY CREDIT CARD 10.A.1 Packet Pg. 143 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF .?IIE FINE PRIN?" STATE CERNFI€D ROOFING CONTRACTOR UCENSE # CCC1331226 SIATE CEPJNFIED RESIDENTI]AL BUILDING CONTRACTOR UCENSE # CRC],:}31782 FI.ORfiEA R@OF SERV,"$CES [.N.C 2605 FOREST PARI(VUAY NORTH LARGO, FLORIDA 33771 PHONE 8Z-844-8300 FA;(9D.a-722-A982 S/-\LES AGREE14ENT EEIIIJEEN TiiE CO$TRACiOB At\!D TI..IE CUSTOI\'3LB iUAfulED BEI-OW sfter t oB 3t! tLL s5rcolcnt . T1ri .-r: ilsn cosEae or or oloc GEncirl docs6a& fo prcml.c orira tho tLo5..Fci6<.d\ s€I fott!:n dtc corlFct dodecnE erralr b. *coiEi?d br- cirtrG pirE],. 3. ft i. Ed.rttaod .nd .grea thi. tLiB cortEct 5l!ll nol bc l,ildirg upor tlrc corrndoi urril signrd ,!d accrptcd bt, rn otficcr oadrc collrrcroa 3. Thc con=actor rca.i'a t:,e d:J,t to bidrDii o.rrcrinli oI cqual or grcrtcr r=luc. ,.1n1' c\'rgc: equir.d bv n6rjui:diccioa:J mdr= uy {al]t i! .a.tdo!d .}&Ee- ftc shall bc tlc ohl;gadon of (ltc pEdr.9.r- fLe @uu'actor crciec vo*cr coaper=rjoo ord gcocEl l!:5ility iurane appliebtc to rlc !.orl bci'g Ptrfor €C- 5. f U-\:EES ITIGST t0 C-1-\C-EL II jro do not rrat ihc goo& rd *iie:, yoo al..ry crrcd dd, f,:r"-cE.,r by prolldiog Nrirre @!ie ro rlc c.d!'i.ror ir p.rso!. ira t&gno or $' a:!- T]]is:oric. r,o,! ino-icatc l}.aFu do Eot rin! th. goodi r *-ic.- f,nd,Et;. dalii'crcd o, po.tarJrdl 5.foc E;dEi-hr of rt. rid bE;jled- ud bc ooolzed Lr:oD6-i'_r.k 6. aarlror otltr prr6 of t}. IIopcEl auring drc ddn'!D'of natcridr aui thr rcarocnl oltht 1ro!:r Flir.d dcbli1 Fsl.,Bor. rle conaaao: ir lFld trale ic ort- Cm:cr !o -1.|C lilr3. clectn-ot liar-:, pluabins lirE ana any otlr i.cLadel co*po.cne t!"r E:-... L:u bcs ;E5lopcrlv ;Etl]Ica r@ doE. ro tLE t@rDr d...]ll a E to allat ,6-L or s. tladE to D6.t1itc o, 6t ut of rele noac- Sirq'dry: bcfo= you 5r;g anl lcgJ "cEcr t'ou E-5'. drlirrr to oth$prrt}'to lii.ortica a b:irtcJ! Dorie rfcllirs ro chapttr sss of uy rtl.g.a 6ErEaio! d!',.r. od ro dsid-r EiE!S !a ofrc. to rcpa;r o:g:y for tlc ellegcd o":rneion defe-- f'o rc ror obltrr.d !o.cc?p! ey ora dri& ray be rade. ?llt't ari:ti dadliac uder thir Fio;di5t!!o!c slicll EusL bc nrt sod (ollord to plotect l-oEr iot rrjtr- CoD.riucio! IDdui:i.r n.cora)- Fund pa)'trenr mry bE ariilihlc GoEr tlc CIEP if1'or lorc ronrl' oo a pojecr For iafornerior rbont thc rorcr; fuod erd 6liag c cldE coEt ct tl. FloriCu Cortncdor Indus5'IjeEi€ B€rd rr tltc foUotr;g id.?I&,c EEat . !!d :ddrFr-.,90,!-t:7{S30... :960 jrlia3:oo Esprcamn Scitc 3 J.c*ac! . Ftoi& 32:11-?.'6?. AUIEB {CtrO\S'I;EDGES RECEIPTOtr{ COPI OFtf S -:I,GREEUE:\-T:[nS - .D-l.Y OIr-....'...- DO NOT SIGN IIIIS EO}II,] TIIPRO\T]IENT CONTR.{CT IE BLANK. YOU ,.!RE EN'TITLED TO -4. COPY Ol' IIIIS CO]\TR.{(T .,I.T TEE TttTE YOU SIGN. TIIIS CONTRACT }I.{Y CR},,{T1.] ..\ I,DI}i OR FOFF:CI,OSURE ON YO LiN PROPERfi' IF I{OT PAII {purctEser)(DA?E) (sal on)(purchaser)(DAiE) Ravi<-C 7 lrz4lztt'.5 10.A.1 Packet Pg. 144 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Prootor Flnanclal lnc, 5225 Crooks Rdl Troy, Ul !aO€8-2823 BAYVIE\^/' LOARSEnv]CTNO IH' FACE OF TI]IS DodJMENT HAs A COTOBEO SACKO BOU NO ON WII]IE PAPEB Tho Huntington Bank 660 0001056773 DO NOT CONVERT TO ACH 03i7 0721 AMOUNT ***$11,520,00 VOIO IF N OT CASHEO WTIIIN 90 DAYS Da"*-ft^rX' AUTHORIZEO SIGNATURE TO THE ORDER OF THOMAS J QUIGLEY and Florlda Roof Sorvtcss LLC {965 ISLA DE PALMA CIR NAPLES, FL 34119 5 'n55555 luungl@msunaouqfiqnq nlE 8 aR OF TIIS OOCUMEIII CONT TNS AN AnTlFlClA! WATEBI{AR,<-IIOLO Ar A,t ANGLE IOVIEW N (.', ccount mount aak ate outing SD rquence :rial Lta I ta2 ,tllll llh,L Nr.'(\ 1 1017 1012001 [-eEEaRT6.-'l [-m/DAYri R -l 1ifim61 FOR PAYI4ENT OF RESTRICTED ESCROW PAY,.. Elsvon Thousand Flve Hundr6d Tw€nty Dollars and 00 Cents o $11,s20.00 101 20180730 10.A.1 Packet Pg. 145 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF iIE FAC€OF S -\OC' 'C'I HAS A COLOREO EACKGFOIJND ON 9JHIIE PAPEFI ... Srodgr Flnorlclaljnc. , ., ':: 5225 CrookS Rl:, ,'' , .: .., i.oiilt{aros8.r€23' ' .BI\YVIEW' . .The Hunungton Bank , ': ;'- '.-'.669 ,. . ,:...! ,: ;,.000105-6773 ';. ..'.,,oo,ror coNGnliolcH,,,.l0AllSERYlclflB r: Florlda Roof Servlces LLC 0347 0f24 8t09t2018 AI,IQUNT I***$11,520.00 IFNOT CASHEDWTHJN90DA FOR PAYMENT OF RESTRICTED ESCROW PAY ereven rtriusdii{ rlve rlunorau.rw;;il Dd1iirS,11a oo Cr:nts ,r , : TO THOMAS J OUIGLEY and - THE ORDER'oF .. ...".::,. . i, .-, j:. 1 :ij. :i -. j 'I i NAPL,:]ES, f965 ISLA DE PALMA CIR 34119 D**./**y nr€B^ck oF iHls oocuMElrr coM rNs !N ABTlFrclaL warEBMAnK-HoLD Ar AN aNGLEio vlEw :. AUTHORIZEO SIGNATURE MO,DAYI/R t- N.N I., !CCOrlnt \mOunt lank latE -outing sn equence erial alal *a2 $11,520.00 101 720913801 11195 720912196 1012001 ,J. ...: t,; I 10.A.1 Packet Pg. 146 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Gum phJack From: Sent: To: Subject: Attachments: MeulenbergTimothy Friday, November 30, 2018 10:09 AM Jwrayl@yahoo.com' FW: 1965 Isla De Palma CIR. Permit #PBRD20L80745475 Notice of Non-Compliance (Expired Permit)-Florida Roof Services, LLC Wosniak.docx - Peter E Mr. Jeff Rayl (in care of Peter E. Wozniak) Please deliver this Notice of Non-Compliance to Mr. Wozniak for his signature and return. I have included the email sent yesterday that I have yet to receive a response. I am trust this job must have slipped someone's attention with the amount of work allocated to addressing damage related to Hurricane lrma but this case needs to be given greater consideration. ln add ition to the return of this notice, I would a ppreciate an update as to the status of the tile order and planned date of installation. The owner has experienced some leakage and based upon his record of communication and my personal experience, someone needs to take responsibility for improved communication. Respectfully, Tim Meulenberg Licensing Compliance Officer (2391 2s2-8023 C,M, From: MeulenbergTimothy Sent: Thursday, November 29, 2018 9:42 AM To:'jwrayl@yahoo.com' <jwrayl@yahoo.com> Subject: 1965 lsla De Palma ClR. Permit #PBRD201,8O745475 I have been assigned the task to follow up on the status of this perm it with an a pplicatio n date of 7 /26/78 a nd a Dry-in inspection passed with inspector notes on 8/13/78. Since 8/13/18, there has not been any subsequent activity on this project and the owner has made payments of S11,520 each on 7/25/78 and 8/9/L8. I have left a message at 727.687.7630 a nd I have attempted to leave messages on 877 .844.8300 but the mail box is full. Please advise as to the status of tile delivery and installation for the reference subject property. Respectfu lly, Tim Meulenberg Licensing Compliance Officer (239\ Zs?-8O23 Qounty 1 10.A.1 Packet Pg. 147 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF G u m phJack From: Sent: To: Subject: MeulenbergTimothy Thursday, November 29, 2018 9:42 AM Jwrayl@yahoo.com' 1965 Isla De Palma ClR. Permit #PBRD201.80745475 I have been assigned the task to follow up on the status of this permit with a n application date of 7 /26/LB and a Dry-in inspection passed with inspector notes on 8/13/18. Since 8/13/18, there has not been any subsequent activity on this pro.ject and the owner has made payments of S 11,520 each on 7 /25/tg and 8/9/18. I have left a message at 727.687.7630 and I have attempted to leave messages on 877.844.8300 but the mail box is full. Please advise as to the status of tile delivery and installation for the reference sub.ject property. Respectfully, Tim Meulenberg Licensing Compliance Officer (239) 252-8023 nL-, cfiffi,Cownxy 1 10.A.1 Packet Pg. 148 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF GumphJack From: Sent: To: Subject: Attachments: J eff, I checked on the status of the order of Crown Tile for 1965 lsla De Palma Circle and it appears it was placed approximately a month a.go which would place the order well after the date of the owner making a second payment on August 8, 2018. ln the mean time if there is a better phone number for me to use, please let me know. At this end, I will continue to explain to the public, the significant demand on roofing contractors and the shortage of specific tile choices at my end. jeff, as a reminder, lwill still need the attached Notice of Non-Compliance signed by Peter E. Wozniak and returned to me. Tim Meulenberg Licensing Compliance Officer (239) 2s2-8023 -Ac,fiffi,Qovtnty From: jwrayl <jwrayl@yahoo.com> Sent: Tuesday, December 04, 2018 8:14 AM To: MeulenbergTimothy <Timothy.Meulenberg@colliercountyfl.gov> Subject: Re: 1965 lsla De Palma ClR. Permit SPBRD2018O7 45475 Tim, We have been requesting delivery dates on our tile loads on a regular basis. The manufacturers have been vague and non committal with their responses. We have tile orders for 5 jobs on the books right now for the collier county area. The most recent tile order release (oddly enough) has been for the most recent order we placed. lt has created a very frustrating situation for contractor and homeowner alike. We will make an effort to communicate this information to our customers this week. Thanks, Jeff Florida roof services Sent on my Boost Mobile Samsung Galaxy 58 MeulenbergTimothy Tuesday, December 04, 2018 10:45 AM lwrayl' RE: 1965 Isla De Palma CIR. Permit #P8RO20180745475 Notice of Non-Compliance (Expired Permit)-Florida Roof Services, LLC. - Peter E. Wosniak.docx Respectfu lly, 1 10.A.1 Packet Pg. 149 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF I have been assigned the task to follow up on the status of this perm it with a n a pplication dale of 7 /26/1,8 a nd a Dry-in inspection passed with inspector notes o n 8/1,31L8. Since 8/13/18, there has not been any subsequent activity on this project and the owner has made payments of S11,520 each on 7/Z5lLB and 8/9/L8. I have left a message at 727 .687 .7630 and I have attempted to leave messages on 877.844.8300 but the mail box is full. Please advise as to the status of tile delivery and installation for the reference subject property. Respectfully, Tim Meulenberg Lice nsing Compliance Officer (239\ 2s2-8023 Under Florida Law, e-mail addresses are public records. lf you do not want your e-mail address released in response to a public records request, do not send electronic mail to this eotity. lnstead, contact this office by telephone or in writing. 2 ----- Origina I message -------- From: MeulenbergTimothy <Timothv.Meulenberq(acolliercountvfl.sov> Date: !L/29178 8:41 AM (GMT-06:00) To : jwlay@ya_b-q9=!9-!0 EI 10.A.1 Packet Pg. 150 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Gu m phJack From: Sent: To: Subject: jwrayl <jwrayl@yahoo.com> Tuesday, December 04, 2018 8:14 AM MeulenbergTimothy Re: 1965 Isla De Palma CIR. Permit #P8RD20L80745475 Tim, We have been requesting delivery dates on our tile loads on a regular basis. The manufacturers have been vague and non committal with their responses. We have tile orders for 5 jobs on the books right now for the collier county area. The most recent tile order release (oddly enough) has been for the most recent order we placed. It has created a very frustrating situation for contractor and homeowner alike. We will make an effort to communicate this information to our customers this week. Thanks, Jeff Florida roof services Sent on my Boost Mobile Samsung Galaxy S8 ------ Origiral message -------- From : MeulenbergTimothy <Timothy. Meulenberg@colliercountyfl . gov> Date:11129118 8:41 AM (GMT-06:00) To: jwrayl@yahoo.com Subject: 1965 Isla De Palma CIR. Permit #P8RD20180745475 I have left a message at727.687.7630 and I have attempted to leave messages on 877.844.8300 but the mail box is full. Please advise as to the status of tile delivery and installation for the reference subject property. Respectfully, Tim Meulenberg Licensing Compliance Offi cer I have been assigned the task to follow up on the stafus ofthis permit with an application date of 7/26118 and a Dry-in inspection passed with inspector notes on 8/13/18. Since 8/13/18, there has notbeenany subsequent activity on this project and the owner has made payments of $ I I ,520 each on 7 /25/18 and 8/9/1 8. 1 10.A.1 Packet Pg. 151 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Notice of Non-Compliance BE lT KNOWN THAT l, the person whose signature appears below, do hereby formally acknowledge, agree and consent as follows: THAT a certain case, case S CE M 1520180014738, involving me has recently been investigated by the Collier County Contractor Licensing Department. THAT the said Department had made it known to me that, in the Department's view, lviolated State (Florida Building code section 105.1) and county (ordinance ?006-46, as amended,4.1.6 & 4.1.18) licensing laws in said case, by neglecting oversite of a re-roof permit, receiving money in excess of the value of work performed and having failed or refuse to perform any work for a 90-day period that has subjected occupants to potential water damage. Dry-in inspection passed with inspector notes on 8/13/18 no work since and no proof of tile order as of the date of this notice, Type of Work: Tile re-roof 6:12 pitch 45 sq. Polyglass Tumax Underlayment and Tile that must conform with HOA requirements of Crown Tile Tuscany Style - Tan, (specifically) Sand Dollar ATSS011. THAT the said Department has explained to me that all contracting work, including BUT NOT LIMITED TO: home or business improvement, residential or commercial, remodeling, renovation, addition, repair, alteration, plumbing, electrical, roofing, pool construction, air conditioning, sheet metal, aluminum and alarm contractor work,all reouire the issuance and nalntenance of a valid Building Permit prior to mencement and thro hout workin on a rmit re uired bu ild in P rint r Signature of Notary ffi :iff J ffi:', "x%l.l'ii 311,"" " " " Location of work: 1965 lsla De Palma CIR; Naples, FL 34119 Date of Site visit - November 29, 2018 THEREFORE, BEING FULLY ADVISED, I DO AGREE that I will obtain and maintain in current status, all Building Permits required by Statutes and fully understand that if lcommence work without obtaining or maintaining necessary Building Permits in the future, the Contractor LicensinB Department will consider that a willful code violation where penalties and restrictions to Building Permit privileges may follow. Witness my signature (Contractor) Peter Edward Wozniak State of: Florida, lssuance f: CCC1331225, WOZNIAK. PETER EDWARD County of: Collier, lssuance f: 1CC20170002115, FtORIDA ROOF SERVICES. LtC. The foregoing instrument was acknowledged before me this _ (date) by ., id"ntifi..ti-lnd *ho diliii-t. k" r'l'hohas ProoJced - 10.A.1 Packet Pg. 152 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF C Date 3/7/20'19 3:18:28 PM .net Report Title:Code Case Details CaseNumber: CEM1S20180008081 Case Number cEMts20'180008081 Misconduct Normal JuanGuzman Contractor's Licensing Origin Complaint Homeowner reports that roofing company, Florida Roof Services, LLC' installed the underlayment improperly and now has several leaks. Homeowner is requesting another 169' Dry-in/Flashing inspection, before the roofing company proceeds with job' Permit# PRBD201 80422436 EXPIRED as ot 1?J2U18 4841 1xh ST NE, Naples (FLN 39597840003) lnvestigation 6/6/2018 10: :01 AM Entered By JuanGuzman Case Disposition Case Pending Address 4841 l2th ST NE, Naples Complainant SIMON, ROLEX N NATACHA C SIMON Contractor Prope(y Owner SIMON, ROLEX N NATACHA C SIMON Oualifier WOZNIAK, PETER EDWARD Business Management & Budget Offlce Case Type: Priority: lnspector: Jurisdiction: Detail Description: Location Comments: Status; Date & Time Entered: Propedy 139597840003 FLORIDA ROOF SERVICES LLC 1 10.A.1 Packet Pg. 153 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Oale 31712019 3:18:28 PM Desc Assigned Required Completed Outcome Comments Preliminary lnvestigation JuanGuzman 6t6t2018 6t6t2018 Unfounded Complaint ot roofing company installing underlayment improperly, causing several leaks on roof. On 6/6/18 I called homeowner Rolex Simon, he indicated that he has called the roofing company, Florida Roof Servrces. LLC. and they will not return his calls. I spoke to Jeffrey Rayl of Florida Roofing Services, LLC. her stated that he was surprised that irr. Simon filed a complaint with this office, since, he (Jeffrey) has had crews at Mr. Simon's house, attempting to identity the leak He said that he understands Mr. Simons frustration and believes they have made the proper corrections. He said he would be more than willing to call for another inspection before moving forward on the roof, if that satisfies Mr. Simon. At this time I am unable to establish a Conkactor Licensing Violation, ladvised Mr. Simon acf,ordingly, (GuzmanJuan 06/06/2018'12r56 PM) this case is submitted as unfounded pending any further developments. Generate Closure Documentation JuanGuzman 6t6t2018 6/6/2018 Complete Preliminary lnvestigation JuanGuzman 12t26/2018 12t26t2018 Needs lnvestigatio n On 12126118 Homeowner, stopped by GMD office to advise that his roof has not been completed and the dryway is starting to appear mold. lrr. Simon left his contact information with contractor licensing front desk. Research shows that permit #PRBD2018022436 is expired. lcalled Mr. Simon and anformed him that lwould reopen his case and would also contact the contractor to inform of the expired permit. I contacted Florida Roof Services. LLC. at 1- 877-844-8300 (Guzm anJuan 1212612018 '12:33 PM) and left a detailed message regarding this matter. Cont. lnvestigation JuanGuzman 12t28t2018 12t28t2018 Complete I emailed contractor and advised him oI expired permit status, also on Mr. Simon's new complaint on the mold. Cont lnvestigatjon JuanGuzman 1t3t2019 1t3t2019 Complete Called Peter Wozniak, qualifier of Florida Roof Services and left message. Cont. lnvestigation luanguzman 1t24t2019 1t24t2019 Complete Mr. Simon called inquiring about case, he has submitted complaint to DBPR. I advised him that Florida Roof Services, LLC., has not returned our calls. I also called Florida Roof again and left another message. Business Management & Budget Office 2 10.A.1 Packet Pg. 154 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Dale 31712019 3:'18:28 PM Desc Assigned Required Comploted Outcome Comments Cont. lnvestigation JuanGuzman 2t5t2019 2t5t2019 Complete After several attempts to contact Mr. Wozniak, by myself, CLO Jack Gump and Tim Meulenberg; all who have cases on Florida Roof Services, LLC, CLO Jack Gump sent qualifier Mr. Wozniak a Notice to Appear before the Contractor Licensing Board to answer to charges of violations on permit #'s PRBD201 80529401, PRBD20'l 80422436 and PR8D20180745475 The notice was sent certified mail on 1/15/19: USPS records show that letter was delivered on 1/30/19 at 1 l:52 am. Green Card return receipt, received on 2/5/19 confirmed by Mr. Woznrak's signature. Cont. lnvestigation JuanGuzman 2t21t2019 2t22t2019 Complete Florida Roof Services, LLc, has not contacted our office regarding this complaint or 2 others, however records show that they submitted an Permit Extension form which was processed on 2120119. Cont lnvestigation JuanGuzman 2t22t2019 2t25t2019 Complete On2l22l19l did a site visit and spoke to Rolex Simon. He stated that Jeffrey Rayl had been in contact with him, and delivered several pallets of roof tile. He said, he was informed by Mr. Rayl that the tile would be going up in the next few days. JuanGuzman 3t712019 3t7t2019 Complete Mr. Simon emailed me copy of contract, payment and DBPR complaint confirmation Records show that he signed contract with Florida Roof Services LLC on, 4/3/18 and made an initial payment of 12,984, then on 4/25118 an additional payment of $'12,983. A permit application was submitted on 4i3l18 and issued the next day. Once he was satisfied of Florida Roof Services response to his complaint, and the contractor was in compliance this case was closed. On '12126118 Mt. Simon requested case reopen, as it had been over 180 days that Florida Roof Services LLC. had not been at his house, and permit was expired. Several attempts to contact Florida Roof Services LLC have gone unanswered Subsequent to scheduling board hearang, FRS, LLC, has done a second layer underlayment in January 2019, during which time permit was expired. The tiles were delivered and the permit was reactivated on 21221'19. On 3/7/19 a scheduted and passed '169 - Dry-in/Flashing inspection was made, however they have not made contact with this offlce. 3 Cont. lnvestigation Business Management & Budget OfFlce 10.A.1 Packet Pg. 155 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Code Case Details Execution Dale3l7l2O19 3:18:28 PM Desc Assigned Required Completed Outcome Comments lnvestigation JuanGuzman 3t20t2019 Pending PRBD201 80422436 Reactivated permit, Florida Roof Servic€s, LLC. Contractori '1-877 -844-8300 4821 12th St NE, Naples, Rolex Simon property owner. Pending Board hearing 312012019 Entered Corrected Amount CommentsFI'ft?IViolation Description IE ConditionTitleReasonResultCompliance@@ Business Management & Budget Office 4 10.A.1 Packet Pg. 156 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF &3.8uIdrBlype 8.4- P€tmitt€e Tlpe: Property lnbrmation 8.5. Parce/Folio : 8.6. lob Street Address: CounL! C.o,r0t ira16oorYE f DopsrfiEar must . Prlmary Pennft f O',y, BUI IDING PERMII APPUCANON 2800 N. HORSESHOE DR., NAPLES, Fl 34104 I TEL: (239)252-2400 8.7. O\rner Name: 8.8. G^,ner Phqle: B.9.SubdMsion: Lot/8lod,/Unit: 8.10.sDP/Prr: 8.11. 'Pff Filena.ne: 'Opt tpl -ssqch t,ittiv FktunB@ 5tvvew Pottol. lnstructiJrls to &2. Master Pennit { doryI Motile,4vlanulactured horn€ O Design erolesslonal O Residentiallunts,/irult-family QCo.nmerc'at Q Our,er SriU.t Contractor lnformatbn 8.12. Ucene fr: 8.13. Conpany Name: 8.14. Qualifier Name: 8.15. Contact Nam€: 8.15. Conpany Addreis: f//?-1l7tw .i/aec. Pleose (t'r a z ran,ity owetr,,E no,rnhoose @cIx,tGla* ''%1't84oooJ 491/ nrt ..f/r tt€ Slry,Eazl /to Ftl oi fi l3 ;r rlTo 4 7 / 8.17. Corrparry Phoe: 8.18. Fax f: B.19.a. "Email 1 B.19.b. "Email2 tr "lb rd o* EnlE,;lls)6 yinory cdltxt n*M Sectim C Aldicatifi lrfonnation Ltc EPLUMB Cl MEcr-l L2. c3. C4. CqEtuction TWe: C5. Occupancyi C5. Water S€rvice: C7. s€\rer S€rvice: D.1. Desqiptron of Work le,a**btu|: D.2. Project Name ay'diyl: o E s€ptic E Lor./vdtage E shutters E EtECtlrom hou!€ EGas C8. tire SprinkH: C.9. Pemit byAffid it C1O. fti!.ate Pro,/ir6: C.11, Ihreshold Building: C-12. Ve8etation Oearing: c.13.Reiared ro 0AMAGES |NCURREDSy HURRTCANE |RMA: or* o D.3. Declared Value: S S€diorl D. Pr*rt lnfnmatiot D,4. R€sHertbl S+ ft.: New Const (colrpbre o4o e a4h, Mditio^' lb"'dete DAa a a1.h) AJteration rcry,pbk D, ( , 05. Cor rt€ ddsq. Ft: New Const. /Conpk P a5 a & o-tb, Ad,diltcrfl lcd'r*t osa &Dtb.) Alteration larnpElE asc,l D.4.a. New Const.Or.b. Wort Area (Sq. ft) D t h, Living: D.4.hr Noo.lMnS: _ TOTAI O 0.4.c Wo* Area {5a. FL) o.4c' ti\ring D.4.i. Non-livinS: _ TOTAI-: 0 O.4.d. Tota& by Area fuI^lNclii,g 0 f Sto.i6: f Unitsi f Bedrooms: I gathrooms: 0.5.a. N6./ Consl Ds.b. wolk &ea (5q. FL) lnterio.l Exterioc TOTAi o O.5.c Wod( &ea {5C, Fl) lnterior: _ Exterior: TOTAL: , Stories: f Unats: S€rdon E, Stafi Secudt E.2. Number of Plan S€ts . - E.3. Review Days:wr 1510 15 E.1. FinalReview Date: qev!:ed 0atei 1ll29/17 v2 Thrs rs page 1 oi f pages of the Buildin8 Permrt Applicalion Plea5e submit all 3 paSet when completed Diedbns: LL Pe,Irili 6db p.ei ?7? 8*/ R3@_ 10.A.1 Packet Pg. 157 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF o6.::..'BUII.DING PERMIT APPIJCA]]ON 2800 N. HORSTSHOE DR., NAPLES, FL 34104 | IEL: (239) 252'2400 NOTICE OF COLLIER COUNTY ADDITIONAL REGULATIONS NOTICE OF AODITIONAL RESTRICTIONS: ln addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this County, and there may be additional permits required from other governmental entities such as the Water Management District, State agencies, or Federal agencies. WARNING OF POSSIBLE DEED RESTRICTIONS: The land subject to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide legal or business advice to the public relative to these restrictions. The landowner or any applicant acting on behalf of the landowner is cautioned to seek professional advice. WARNING OF WORK lN THE COUNTY RIGHT-OF-WAYS: This permit does not authorize construction or installation of any structure or utility, above or below ground, within any right of way or easement reserved for access, drainage or utility purposes. This restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit for that purpose must be obtained from the Growth Management Department. NOTICE OF CLEARING RESTRICTIONS: The issuance of a building permit for a single-family dwelling allows up to one (1) acre of native vegetataon to be cleared. Clearing more than one (1) acre may be allowed for accessory structures and requires a separate Vegetation Removal Permit. Properties located in the following zoning district overlays may not be allowed to clear one (1) acre: Rural Fringe Mixed Use District (RFMU), Big Cypress Area of Concern (ACSC), and Special Treatment Overlay (ST). There may be additional restrictions related to clearing native vegetation and ,mpacts to wetlands or protected species found on the property. State and Federal agency permits may be required. Contact the Growth Management Department's Environmental Services at (239) 252-24OO for additional information. lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint of the structure. A Demo Permit is not a clearing permit. WORK lN THE SPECIAL FLOOD HAZARD AREA: Be advised that Substantial Da mage/Substantial lmprovement requirements will apply to structures located in the Special Flood Hazard Area with Finished Floor Elevations below the Base Flood Elevation. By initialing, I am acknowled8ing that I have read and understand this Notice of Collier County Additional Regulations. ln it ia o er or Aqent of Owner's or Controctor's initiols ore required. n€v 1l 29 2Or7 v2 This '5 page 2 ol 3 pager o, the Eurlding permit Application. please ,ubmit all 3 pa8e5 when completed_ 10.A.1 Packet Pg. 158 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF .1L..-.-"BUII.DING PERMIT APPt'CANON 2800 N. HORSESHOE DR., NAPtEs, tl 34104 | IEL: (2191152-24oO ACKNOWLEDGEMENT OF COTTIER COUNTY REGULATIONS Application is hereby made to gbtain a permat to do the work and installations as indicated. I certity that no work or installation har commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws re8ulating construation in thi5 iurisdiction. The permit or application fee may have additional fees imposed for failing to obtain permits prior to commencement of construction. The approved permit and/or permit applacation expire5 if not commenced within 180 days from rhe date o, issuance. The permittee further understands that only licensed contractors may be employed and that the structure will not be used or occupied until a certificate of occupancy is igsued, By signinS this permit application, I a6ree that I have been retaaned by the owner/permittee to provide contractjng services for the trade for which I am listed. Furthermore, it is my responsibility to notify the Suilding Plan Review and lnspection Division should I no lon8er be the contractor responsible for providing said contracting services. I further agree that I understand that the review and issuing of this permit does not erempt me from complvinB with all County Codes and Ordinances. lt rs rurther understood that the propeny owner/permittee is the owner of the permit Note: An owner-8uild€r must complete Sectionr A and I and the owner-Suildei Aftidavit form. SECTI . OWNER or AGENT OF OWNER ACKNOWLEDGTMTNT. The contractor rrlay sign as the Agent of owner so long as Co sco act Owner pe its su.h action:?a+u tlt 2t\a ll/ 6r Ow Ag Th regoinB instrument was acknowledged before me thas ame of Owner o, Agent ofOwner)lPr'nt n /n) o"r* cation of identifici (name of person) who ersonall , zo1$_oy kn to me, or who hasrs. JEFFERY W RAYL MY COMMTSSTON ' FF206995 d8trhes u",.r, r: zo,s tLrrlfi.ri 1*(, ,.r : dr produced identifi Notary Signature SE CONTRACTOR OWLEOGEMENT: gnature o f Contract "/(Prini name of Cont.actor) The foregoing instrument was acknowledged belore me this ,{o/ a"y ot ,. zotjS av (name kn to ha5 produced identific Notary Signature: ation (type of dentific NOTICE OF COMMENCEMENT INFORMATION Per tlorida Statutes 713.135 a Notice of Commencement (NOC) is required ior construction of improvements totaling more than 52,5O0, with certain exceptions. For A/C Repai15 or Replacements a notrce of commencement rs required for ,mprovementt more than or equal to S7,S0O. The applicant shall file with the is5uing authority prior to thc Iirst inspection either a certified copy of the recorded NOC or a notarited statement that the NOC has been filed for recording, along with a copy thereof. ln order to comply with the state requarement, permits will be placed in inspection hold until proof ol the NOC is filed wrth lhe building permitting and inspection department The assuing authority shall not perform or approve sub5equenl inspectrons until the applicant files by mail, fa(sloile, hand delivery, email or any other means such as certified copy with the issuing ai.rthorrty WARNING TO OWNER: YOUR FAILURE TO RECORD A NoTlcE oF COMMENCEMENT MAY RESUTT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN AfiORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST 8E RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. rlpv 1t iq 2ot 7 v2 This is page 3 ot I paSes of rhe EurldinS Permit Appli.arrr . pleasc submrl all 3 page! when completed JEFFERY W RAYL €xPlftguarch 13 2019 ri,6r\.i rSc'.r!..n 995 of Owner) /)? I 10.A.1 Packet Pg. 159 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Permit Application Status - CityView Portal Permit Application Status In order to schedule inspections, you need to be signed in. application Datei Issued Dale: Expir.tion Date: l-2 Family or Comml GMD Public Portal Applacalion Number: Appllcation Typ€: Applicatlon Status: Prop€rty Owner's Full N.me: Category of work: Occupanc, Cod€: O€ssiption of work: PR8020r80422436 Buildin9 hspedions Commenced SIMON, ROIEX N NATACHA C SIMOIT Resid€ntial, One and Two Family New o. Guest Hous€ 50 SQFT COI{CREIE TILE OVER POLYGL SS r.lAx PEEL N' STICK 6: 12 PTTCH 4841 12TH ST NE o4lo3l2ot8 04to4l2ot8 09to3t2ot9 1-2 Eamily Qualrfler SIMOll, ROLEX N NATACIIA C SIHON, address:4841 l2IH ST NE !1IOZNIAX, PETER EDWARD, Address:2605 FOREST PARKWaY NORTH , Phone:(877) 844-8300, Licens€€ I ICC20170002rl4 ti.€ns€ Status FLORIDA ROOf SERVICES LLC, Addr€ss:4505 9TH STREET EAST, Phone (877) 844-8300, Stat€ R€9 '',s CCC1331225, U.ens.e * 1CC20170002115 u!!0rs.St4trl Permllr (Clack to S.. Rcvlcw3) 169 - Ory-ln/fl.shlrg 169 - Dryin/Flrshlng r7O - R.-root Final 3/7/20t9 o3/o7 /2Ot9 Alejandro Pnntoja ((219) 272-96ss) SroAEEril 3t7/2019 5/3/2OtA 05/03/2018 Outstanding 03/o7l20L9 (rBcto7.6) Provide updated altidavit for s€cond layer of undenayment-.. 03/07lr9 "Tumax underlayment match.s NOA'S provided,, ok to contjnue hav€ amdavit on site for 170-.. 03/07l19 AP LEGACY| Thomas Decram VEN S.nd Email 5/3/zotA Corre.tion I Status Oate Status Cha.ged Comments Conecuon 1 Status oate Status Changed Comments o5/o3t20La Inspe.tor Notes: Affidavit to trlel/oEGRAM http://cvportal.colliergov.neVCityViewWeb/Permit/Status?permitl d=2527 56 3/812019 Page I of2 Irvr*r:" l 10.A.1 Packet Pg. 160 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF JOB ADDRESS: 484I I2Ih ST NE JOB DESCRIPTION: 50 S COLLIER COUNTY BOARD OF GOUNTY COMMISSIONERS PERMIT PERMIT TYPE: R o APPLIED DATE: 04-03-18 QFT CONCRETE TILE OVER POLYGLASS MAX JOB PHONE PEEL N'STICK 6:12 PITCH 48.II I2TH ST NE APPROVAL DATE: 04-04- l 8 LOT ZONE: ELEVATION: SECTION-TOWNSHIP-RANGE: I l-48-27 OWNER INFORMATION SIMON, ROLEX N NATACHA C SIMON 484I I2TH ST NE NAPLES, FL 34I20- FCC CODE CONSTRUCTIONCODE: 0220 JOB VALUE: $40,700.00 BLOCK TOTAL COMM SQFT: 0 SETBACKS FRONT: SEWER: CONTACT NAME: LEFT: WATER: RIGHT: CONTACT PHONE Per Collier County O.dinance No- 2002-01, as it may be amended, all work must comply with all applicable laws, codes, ordioances, and any additional stipulalions or conditions ofthis permit. This permit expires ifwork authorized by the permit is not conmenced within six (6) monlhs from the date of issuance oflhe permil. Additional fees for failing to obtain permils prior lo the commencement ofconstruction may be imposed. Permittee(s) furrher understands that any contmctor that may be employed must be a licensed contractor and that the structure must not be used or occupied until a Certificate ofOccupancy is issued. NOTICE: PRIOR TO THE REMOVAL OF ASBESTOS PRODUCTS OR THE DEMOLITION OF A STRUCTURE, FEDERAL AND STATE LAWS REQTIIRE THE PERMITTEE (EITHER THE OWNER OR CONTRACTOR) TO SUBMIT A NOTICE OF THE INTENDED WORK TO THE STATE DEPARTMENT OF ENVIRONJ\IENTAL PROTECTION (DEP). FOR MORE INFORMATION, CONTACT DEp AT (239) 344-5600. In addition to the conditions of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. REAR: PERMIT #: PRBD20t 8042243601 ISSUED: BY: MASTER#: PRBD20180422433 COA: SUBDIVISION #: FLOOD MAP: FOLIO #: :19597840003 CONTRACTOR INFORMATION: FLORIDA ROOF SERVICES LLC 4505 9TH STREET EAST ELLTNGTON. FL 34222 CERTIFICATE #; .NoucENsEb PHONE: TOTAL RES SOFT: 0 10.A.1 Packet Pg. 161 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF STATE CERTIFIED ROOFING CONTRACTOR TICENSE S CCC1331226 SIATE CERTIFIED RESIDENTIAL BUILDING CONTRACTOR LICENSE # CRC1331782 FLORIDA ROOF SERVICES LLC 2605 FOREST PARKWAY NORTH TARGO, FLORIDA 33771 pHoNE 877-844{300 FAX941-722-8982 SALES AGREEMENT BETWEEN THE CONTRACTOR AND THE CUSTOMER NAMED BETOW NAME PHONE PHONE ADDRESS 4t GITY/ZIP EMAIL THE CONT RACTOR HER REES T FURNISH MATERIALS AND LABOR TO COMPLETE THE FOLLOYYING: REROOF OH|NOLE, METAL OR T|LE ROOF; REMOVE OLD ROOF TO SMOOTH WORXABLE SURFACE. REPLACE ANY ROTTED WOOD XTRA @ $90 per sheet &97 per toot,RENAIL WOODET{ ROOF DEGXING TO RAFTERS WITH RIt{G SHANK NAILS IN ACCORDANCE APPLY I{EU' TSECOT{DARY WATER IIIT BARRIEN' UNDERLAYMENT OVER E TTRE D WITH CURRENEcK. al)T COOES, ,!tINSTALL NEW FHAJVA EAVE ITRIP BROWI{.,.BLACK,..GALVAt{rZED. INSTALL NEW VALLEY METAL AND L FLASHING WHERE NECESSARY. AT MBING PENETRATIONS AND NEW VENT HOODS AT AIR EXHAUST PORTS, BERGLASS SHINGLESINSTALL N ttl 5 (coLoR (coLoR, (coLoR 1. 2, 3. 4, 5. 6. 7. 8 Additional conditions BROlt N...BL.ACl(.. REMOVE OLD R OOF T O SMOOTH WORKABLE SU ACE. REPLACE ANY ROTTET' WOOD XTRA @ $90 pe.r sheet &97 per foot.RE WOODEN ROOF D ING TO RAFTE RING S}IANX LS IN ACGORDANCE WITH CURRENT CODES.APPLY "sEcot{oA RESISTA ND YME}IT OVER ENTIRE DECX.INSTALI ULATION UNDER I.PLY TORCH SYSTEM.INSTALL NEW F ..G NtzED...(crRGLE coLOR OF CHOTCE)INSTALL N HOO INGS NECESSARY.INSTALL N TPO MEIIIB ER OR GRAN EO TORCH DOWN,.,CO R - WI TE.CLEAN U JOASITE OF ALL RELATED DEBRIS AND HAUL AWAY. All work to be pcrfonnad fu a workmonlike rnamcr atrd in complisnce with stalc aod local cod6 FOR TEESUM OF o F msrALL ........ - FEEI oF RrDGE VENT F ,.* o CLEAN UP JOBSITE OF ALL WORN NEIATEO OTANIS AND HAUL10' coNTRAcToR wlLL cooRDl ATE woRK RELTATEII ro rHE FolLowtr{c AT ADDtTtol{AL CHARGES.,. soLAR ut{tTsr RooFTo,AIR CONDITIOT{ERS' ROOFTOP T'V; DISHES, SXYLIGHTS. AND FALLEN SOFFITT & FASCIA DUE TO EXCESSIVE WOOD ROT. REROOF ..LOW SLO PE" ROOF... (TpO aNSULATED ROOF SYSTEM) OR ({-PLY TORCH SYSTEM)'t. 2, 3. 4. 5. 5, 7. a, s NOTE: Completion is when insta[ation work Igc9Tplot? and jobsite is cte.ned. The t rJtl comptetionshall notinctud-etheiuiisdictionatfinal inspeciio;eat;. i;applicable, written warranty and insuranco mitigafio;documentatigh shall be provlded wlthin 30 days of tinalpalment. rTHE FINE PRINT! S1 ?egDE MUNICIPLE & PERMIT FEES s 300.oo TOTAL 3 t ranr the Elooda and !eryjc.!.may qlcel rhi. a€tlcDrcr! by idin g writtcn rotice to the coutractor ur penor, bys! hdicrrc thar you do not want the ces ud murt be detivered or t\ratked before drlnight ofttre ttr az. POSIT DRAW T(D LUS WOOD CHARGES 5 lrcE uPoN GOMPLETTON $..--.-.......-.' -.-....--''--- l. CONTRACT DOCUIIEIITS. Thir contract consirt. otthis at €xtra vood authorizsriom plur aay wood replucemeut, iI a,ly, and ifpaymclt,are fiuanccd, allfinancial docutuenr!. No promilc! ottrer than tholc rpccincdly 66t fortL ir tte conrracr documeuts slull bc rcognizcd by eirher panyItir undecrood and ag6d rlar tLi! contacr.Lalt rot Lc birdiD8 upo! LLc colrrsclo! uDtit signed and accepted by ax officer of the contmctor.lhe cootmctor recrves th. right to !ubEriturc naterials of equal or geater value. Ar y clongcr requircd by ucs iurildicrioasl codc! EAy r:ruh in additioaal c[argcsAay Icgat actious required to coltect oonics du c urdcr drir ogrcencrt wiU b. bmugLt h a Pirdla! County lrlorida vcnue and all charger induding i,rtdart ald artorre. 2. 4. 5. fe6 sl,al be tLe obligarion ofthe pu BU.r-ERS RIGHT TO CANCEL.if rcl'aso. Tl !e contractor crrries \sorkerr coraperxa tior oDd geDerll liabiliry iDsursrce appticrble to t[a work bcing pcrforned. telegram or by mail. TLir noticc mu after you rigu dris agreemeut . Thir F RIDGE TPO SYSTEM ..BROWN.,.B BARRI D/O DRIP ...WHEAVE LATION B AIR VE E work cLaI comD,ence on o. nbout and be colrpletcd by td busiuers dr INSTALL NEW LEAD +L w lifc TILE ADD 3% IF PAYTNG BY CREDIT GARD 10.A.1 Packet Pg. 162 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Carse + zolE- ov+2L\ 1908 o+f ozf aor& F rl l s *Iiffi $ tzjt+ ROLE( N. SIMON NATACHA SIMON-CI'ERY aaal l?rH sr NE NAn ES t!gra, 10.A.1 Packet Pg. 163 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES Qnse # obY2z3 $e\.O EI(^ -t- Yp R.\j6h. 10.A.1 Packet Pg. 164 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF C n.e + 20 16 ' }bVzz3 19'10 d-&5- tx--.-_---.-_-.r /idri. S{ncoast rl $ /?983: ROLEX N. SIMON NATACIIA SIMON<HERA atal l2fH st NE N/tlLEs, tt- 3,rrz 10.A.1 Packet Pg. 165 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF CRse S 2or's- obtf 223 $r ss h'\ s \ 10.A.1 Packet Pg. 166 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF fu'y"Report Title:Code Case Details Date. 3/8/2019 11:24:13 AM CaseNumber CEM1S20190002603 TII Case Number:cEMts20't 90002603 Case Type Misconduct Priority Normal lnspector:JackGumph Jurisdiction Collier Cou nty Origin Complaint Detail Description Received the packet from Permitting Department reference Permit # PRBD20181266458, Application ONLY in REJECTED Status with roof work commenced. Location Comments 5329 Mitchell ST (Folio # 62254640005) Date & Time Entered 31812019 11:04i27 AM Case Disposition Case Pending Property 62254540005 Contractor FLORIDA ROOF SERVICES LLC Business Management & Budget Office Status llnvestigation Entered By.lJackGumph 1 10.A.1 Packet Pg. 167 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES Code Case Details Execution Date 3/8/201 9 1 1 :24:1 3 AM Oesc Assigned Required Completod Outcome Comments Preliminary lnvestigation JackGumph 318t2019 3t8t2019 Needs lnvestigatio n 0310712019: On the date of 3rl2019 I (J. Gumph) received a packet from Spv E Ybaceta, reference Permit Application # PR8O20181266458. I researched the application and found the application date to be listed as 1211012018. The application was rejected and a Corrections Letter sent out to the contractor of record, Florida Roof Services LLC (State Lic. # CCC1331226, Mr. Peter Wozniak, License Holder). lnvestigation Jac.kGumph 3t8t2019 Pending Florida Roof Services -- Mltchell Street Cont. lnvestigation JackGumph 3t8t2019 Pending CommentsViolation Description Status Entered Corrected EEM Commencing Work Wthout A Permit Open 3t8t2019 IE @E Fin6/Day ConditionTitleReason I Result 2 Business Management & Budget O{fice Compliance 10.A.1 Packet Pg. 168 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF Qowutl Gll,rh tvkEgs.YEri D€partrEnl must com*te Plfuse the a $frb ) 8.1 . Prlmbry Perm,t # ttr',y} @r a z ra.rya^aigro,,r,tor!€ Q rr,r**vvaufaauear,or: O p.-uoo. BUI1DING PERMIT APPUCANON 28OO N. HORSESHOE OR., NAPLES, FL 34104 I TEt: (239)252-2400 lnnnrlk lsto this t 5 8.3. EuiHing Type: 8.4. Permitt€e Tlfe: Property lnformation 8..5. ParEeYFolio Hl 8.5.lob Street Mdress: 8.7. OrnerN ne: 8.8. Owner Phone: 8.9. tubdvision: LoVBody'Unit: 8.10. SOP/Ptf: 8.11. 'PLt Filename: /./APt I 4U 9 [ 12/4L v 00aJ' 8.2 Master Permit I 6ory) O oesgn eroiessiona Contractd lnfoamatbn B 12. Ucense #: 8.13. C-oripany Name: 8.14. OualifierName: 8.15, Cmtact Narie: 9.16. Cornparry Address: 8.17. Cornporry Phme: 8.18. Fax t: 8.19i. -E nail 1: 8.19.b. "Ema[ 2: l" U,* r* *rag c ptay a*oct nc$d. fir)1tr1.aL EV'/rt/4-,? t//Al tl f ) )rrol ilap'liJ mA lt Dtr l,-o/ 24 ,'utta u ) P wz/vo.t *, ' Optu - tu1 c,dJnj{g Fle.f,nts on @Wegg! secti'on A. P€miii Number Secion B- Gerirral Pemii lnfumatiqn Seaion C. Apdicabon lnfrmration It C2. PetmitType: Re - fuo f C.3. Fire PermitTlpe: C4. Constmctim Type: C5. ocsipancy: C6. W*er Seryice: C7.Sorer Sewice: ,. E EtEc EPLUMB E MEC}I O septii O Lo^,vat"g. E $utt6s trl ELECr from ho.re O Gas ves Qtto D.3. kared Value: S ooo g D.1. Dessipdql ofworl lsr,riktuvt O.2. Proiect Narne dqvl D.5. Commercbl 5q' FL: New Consl /CoTplt O5d A AsD/ Addit gl ltunpbEasd &asa, Alteration rrozptE Dsc/ E.1. Final Revierr Date: O.4.a. New Cohst D,4"b. wdk Are, (Sq. FL) D.4.br tiving: o.ahi. Nm.living: _ TOTAU O Dr4.c WorkA.eo (5q. FL) D,1.cl. tivhgi o.4r.ii Noftlivin8: _TOrAI: 0 o.4.d. Totds by Area IOTAL!ts: IolAltcrilg- 0 0I Stories: I Urits: f gedrooms: f Batitooms: D.sr. New Const.Ds.b. WorkAEa (5q. Ft) lnterior: Exterioa _-IOTAL O D.5.c Wor* Area {&. Ft) lnterio.: _ Extedo|: TOTAL # St6i6: f Unilrs: E.2. Number of Pbn Sets:510 15 Revscd Oate: 1l/29/17 v2 Thr5 ii p.te 1 oI3 p.8rs of the Buildi4 Permil Application. Please submit all 3 pate5 when completed Diectbrs: fa?q neiiknC}+uiq/lt b{..rt Qc-.t-r.r Q on er errue, CJ. Fre Sprir{ded: C9. P€rmit bv Affdevit C10. Prh/ate Pruvider C1l- Tkesttdd Euiuitf: C12. V€getatim OeatinB: C 13, REIAIEd tO OAMAGES INCURRED 8Y HURRICAN E IRMA D.4. ResldentblSq Ft: Net ,/ Co.tst. (@€ Aaa A Oah.) ,dd,iljor. (t-d#aaa AD.ah) t&q io.\(cq& o4.c) E3. Reliew Day5: 10.A.1 Packet Pg. 169 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES .-ff-..**BUII.DING PERMIT APPIJCATION 28OO N. HORSESHoE DR., NAPLES, Ft 34104 | TEt: (239) 252-2400 NOTICE OF COLLIER COUNTY ADDITIONAT REGULATIONS NOTICE OF ADDITIONAL RESTRICTIONS: ln addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this County, and there may be additional permits required from other governmental entities such as the Water Management District, State agencies, or Federal agencies. WARNING OF POSSIBLE DEED RESTRICTIONS: The land subject to this permit may be subject to deed, and other restrictions that may limit or impair the landowner's rights. Collier County is not responsible for the enforcement of these restrictions, nor are Collier County employees authorized to provide legal or business advice to the public relative to these restrictions. The landowner or any applicant acting on behalf of the landowner is cautioned to seek professional advice. WARNING OF WORK lN THE COUNTY RIGHT-OF-WAYS: This permit does not authori2e construction or installation of any structure or utility, above or below ground, within any right of way or easement reserved for access, drainage or utility purposes. This restriction specifically prohibits fencing, sprinkler systems, landscaping other than sod, signs, water, sewer, cable and drainage work therein. lf such improvements are necessary, a separate permit for that purpose must be obtained from the Growth Management Department. NOTICE OF CLEARING RESTRICTIONS: The issuance of a building permit for a single-family dwelling allows up to one {1) acre of native vegetation to be cleared. Clearing more than one (1} acre may be allowed for accessory structures and requires a separate Vegetation Removal Permit. Properties located in the following zoning district overlays may not be allowed to clear one (1) acre: Rural Fringe Mixed Use District (RFMU), Big Cypress Area of Concern (ACSC), and Special Treatment Overlay (ST). There may be additional restrictions related to clearing native vegetation and impacts to wetlands or protectdd species found on the property. State and Federal agency permits may be required. Contact the Growth Management Department's Environmental Services at (239) 252-2400 for additional information, lssuance of a Demolition Permit for a structure does not authorize removal of vegetation beyond the footprint of the structure. A Demo Permit is not a clearing permit. WORK lN THE SPECIAL FTOOD HAZARD AREA: Be advised that Substantial Da mage/Substantial lmprovement requirements will apply to structures located in the Special Flood Hazard Area with Finished Floor Elevations below the Base Flood Elevation. By initialing, I am acknowledging that I have read and understand this Notice of Collier County Additional Regulations. lnitials Owner ot Agent of Owner,s or Controctor,s initiols ore required. Acv l1-29.2017 v2 Thi5 it paSe 2 of 3 pages of the guilding permat Application Please sublrlit all3 patel when completed 10.A.1 Packet Pg. 170 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES .l&se",, (Sisnature ot Owner or nt of Owner) The foreS o'n instrument was acknowledted belore me this produced identifi Notary SiEnaturc cati on (tvpe of identification) SECIION OR owtE MENT: ure of Th fo instrument wa s acknowledged befo.e ae lhis /A day of BUITDING PERM]T APPUCATION 2800 N. HORSESHOE DR., NAPLES, FL 34104 | TEL: (239) 252-2400 /rr* L./rzu ,,h)( {Priot name ofOwner o. Agent ofOwner) day of /)u-*,b",a zo /r? ty (name of person) who y'{r.rsonally known to me, or who _has (Print name of Contractor) ACKNOWLEDGEMENT OF COLIIER COUNTY REGUTATIONS Applicatioh is hereby made to obtain a permit to do the work and installations as indicated. I certifY that no work or installation has commenced prior to the issuance of a permit and that a,l work will be perfotmed to meet the standards of all laws reBulating constru.tion in this jurisdiction. The permit or application fee may have additional fees imposed for lailing to obtain permits prior to commencement of construction. The approved permit and/or permit application erpires if not commen€ed within 180 days from the date of issuance.Ihe p€.mittee further understands that only licensed contractorg may be emploYed and that the structu.e will not be used or occupied until a certificate of occlpancy is issued. By signing thas permit application, I agree that I have been retained by the owner/Pe.mittee to provide contracting 5ervices for the trade for whjch I am listed. Furthe.more, it is my responsibility to notify the Building Plan Review and lnspection Division should lno tonger be the contractor responsible ror p.ovidint said contracting services. I further agree that I understand that the review and issuing of this permjt does not exempt me from complying with all CountY Codes and Ordinances. lt i5 further understood that the property owner/permittee is the owne/ of the permit Note: An Owner-Builder must complete Sections A and B and the owner-Sulldel Aflidavit form, SECIION A. OWNER or AG OWNER AC(NOWLEOGEMENT. The Contractor may si8n a5 the Agent oI Owner so lont a5 Contraator'5 contiacl its actlon: (name of person)*noGI"ally known to me, or wh grrr^o,La,20Ji-by o_has produced identif ication (tYP eof cation) Notary SiSnature: NOTICE OF COMMENCEMENT INFORMATION per Florida statutes 713.135 a Notice of cqmmencement (NOC) is required for construction of improvements totalinB more than s2.5OO. with certain exceptions, For A/C Repairs or Replacements a notice of commencem€nt is .equired for improvements more than or equal to 57,5oo. The applicant shall file with the issuinB authority prior to the first inspection either a certified copy of the recorded NOC or a notarized statement that the NOC ha5 been filed for recording, alonB with a copy thereof ln order to comply with the 5tate requirement, permits will be placed in inspection hold until proof of the Noc is filed with the buildinS permittin8 and inspection department. The issuing authority shall not perform or approve subsequent rnspections until the applicant filet by mail' facsimilc' hand delivery, email or any other means such 's certilied copy with the issuinB authoritY WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TOOBTAINFINANCING,CONSULTWITHYOURLENDERORANATTORNEYBEFORERECORDING YOUR NOTICE OF COMMENCEMENT. A NOTICE OF COMMENCEMENT MUST 8E RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. Rev 11-292017 vz This is page 3 of 3 pages of the Suilding Permit Application. Please submit all 3 pages when comoleted EFJ RYFE RAw YL MY IrssroNCOMM F206995 xE s !9PIREm3 ': MY COMMTSSTON f FF206995 EXPIRES Mircn 13.2019 W RAYL 10.A.1 Packet Pg. 171 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES COLLIER COUNTY GOVERN M ENT GROWTH MANAGEMENT DIVISION / BUILDING REVIEW & INSPECTION 28OO N. Horseshoe Drive, Naples FL 34104 * Phone (239) 252-24OO Outstanding Corrections Oate: December 14, 2018 Contact Name: FLORIDA ROOF SERVICES LLC Address: 4505 gTH STREET EAST, 2605 FOREST PARKWAY NORTH LARGO FL 33771 City, State Zip: ELLINGTON, FL 34222 Fax: <NO FAX NUMBER> Dear Applicant: Plans submitted with the referenced permit have been reviewed. We are unable to approve your permit application for the reason(s) indicated below. For Applicatiorc Submitted on Paper: . Review the conections below to identify each document you will need to submit.. All corrections must be clouded.. Corrections to paper documents must be submitted in person; the GMD office receiving corrections is open until 4:30 pm. . Submit 2 sets of corrected documents.. Submit 2 copies of the Letter of Response summarizing the changes made to address each correction comment below. JOB DESCRIPTION: MASTER RIB METAL RE-ROOF OVER PEEL & STICK. 17 SQS 4:12 PITCH 1-PLY MEMBRANE ROOF ON FLAT AREA 8 SOS LOW SLOPE 5329 I/itchell ST Rejected Review: Residential Review Reviewed By: Ada Mejia VEN Phone: Email:Ada.Mejia@colliercountyfl.gov Correction Comment 1: MISSING THE INSTALLATION INSTRUCTION FOR THE METAL ROOF, I HAVE EMAIL SEVERAL TIME BEFORE REJECTING THIS PERMIT. PLEASE DOWNLOAD THE INFORMATION AND BRING IN TO THE CORRECTION DEPARTMENT; HERE lS THE LINK: https://www.floridabuilding.org/prlpr_app_srch.aspxFLl27'13-R4 THERE ARE .I1 DIFFERENT ryPES ATTENTION: Collier County Plan Review and lnspections routinely reviews all outstanding permit applications in order to determine their status. The review process includes appropriate responses from the permit applicant when the permit cannot be approved. When the applicant is advised of deficiencies and does not respond within 180 days with corrected plans or an appeal to the Code Enforcement Board, the permit application will be canceled as pet Collier County Ordinance 2002-01, Section, 104.5.1.1 to 101.5.1.4 (as amended). PERMIT NO: PR8D2018126645801 APPLIcATION NO: PR8D20181266458 JOB SITE ADORESS: 5329 Mitchell ST Email: JWRAYL@YAHOO.COM 10.A.1 Packet Pg. 172 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF tt d I iI I 7 j 'f. { ,i t: ^ 1, ? |,;t' X:i:-n/ r \ -il Ua i{I,.il - tr .{it I ll / ;,, 10.A.1 Packet Pg. 173 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : 10.A.1 Packet Pg. 174 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER COLLIER COUNTY ORDINANCE NO. 2006-46 AN ORDINANCE AMENDING COLLIER county ordinance NO. 90- 105, AS AMENDED, THE COLLIER COUNTY CONTRACTORS' LICENSING BOARD ORDINANCE PART FOUR: STANDARDS OF CONDUCT AND DISCIPLINE 4.2, Misconduct - State Certified Contractors The following actions by State Certified Contractors shall constitute misconduct and grounds for discipline pursuant to Section 4.3 of this Ordinance. 4.2.2. Willfully violating the applicable building codes or laws of the state, City or Collier County. 4.1.3. Abandoning a construction project in which he/she is engaged or under contract as a contractor. A project may be presumed abandoned ifthe contractor terminates the project without just cause, or fails to notify the owner in writing of termination of the contract and basis for same, or fails to perform work for ninety (90) consecutive days without just cause and no said notice to the owner. 10.A.1 Packet Pg. 175 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES SECTION ,I O5 PERMITS required permit. SECTION 105 PERMITS mechanical or pl shall flrst maka alter, install,alter, repair,v Friday, Mar01,2019 03:19 PM 10.A.1 Packet Pg. 176 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF 2O17 Florida Building Code - Building, Sixth Edition trECHAPTER 1 SCOPE AND ADMINISTRATION Thursday, Jan 04, 2018 12:'17 PM Y IAJ 105.32 Time limitation of application. An application ior a permit for any proposed work shall be deemed to have been abandoned 180 days aflerthe date offiling, unless such application has been pursued in good iaith or a permit has been issued: except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. t) 10.A.1 Packet Pg. 177 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF SERVICES 2017 Florida Building Code - Building, Sixth Edition CHAPTER 1 SCOPE AND ADMINISTRATION PART 1-sCOPE AND APPTICATION SECTION 1O1 GENERAL 105.4 Conditions of the permit. 105.4,1 Permit intent. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any of the provisions of the technical codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction or violations of this code. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of six months after the time the work is commenced. 105.4.1.1 lf work has commenced and the permit is revoked, becomes null and void, or expires because of lack of progress or abandonment, a new permit covering the proposed construction shall be obtained before proceeding with the work. 705.4-7.2lf a new permit is not obtained within 180 days from the date the initial permit became null and void, the building official is authorized to require that any work which has been commenced or completed be removed from the building site. Alternately, a new permit may be issued on application, providing the work in place and required to complete the structure meets all applicable regulations in effect at the time the initial permit became null and void and any regulations which may have become effective between the date of expiration and the date of issuance of the new permit. 105.4.1.3 Work shall be considered to be in active progress when the permit has received an approved inspection within 1.80 days. This provision shall not be applicable in case of civil commotion or strike or when the building work is halted due d 10.A.1 Packet Pg. 178 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF The zor8 Florida Statutes Titte xxxll Chapter 489 View Entire Chapter REGULATION OF PROFESSIONS AND OCCUPATIONS CONTRACTTNG 489.176 Moneys received by contractors.- (1) For purposes of this section, the term 'contractor" includes att definitions as set forth in s. 489.105(3), and any person performing or contracting or promising to perfoml work described therein, without regard to the licensure of the person. (2) A contractor who receives, as initial payrnent, money totaling more than I0 percent of the contract price for repair, restoration, improvement, or construction to residential real property must: (") Appty for pernrits necessary to do work within 30 days after the date payment is made, except rvhere the viork does oot require a permit under the applicable codes and ordinances, and (b) Start the rvork within 90 days after the date a[[ necessary permits for work, if any, are issued, unless the penon who made the payment agreed, in writing, to a longer period to apply for the necessary permits or start the vrork or to [onger periods for both. Friday, Mar01,2019 03:21 PIU 10.A.1 Packet Pg. 179 Attachment: PETER WOZNIAK - FLORIDA ROOF SERVICES - CASE 2019-02 MISCONDUCT (8294 : PETER WOZNIAK - FLORIDA ROOF 03/20/2019 COLLIER COUNTY Contractor Licensing Board Item Number: 11.A Item Summary: WEDNESDAY, APRIL 17, 2019 Meeting Date: 03/20/2019 Prepared by: Title: – Contractor Licensing Board Name: Lilla Davis 03/11/2019 4:00 PM Submitted by: Title: Supervisor - Operations – Contractor Licensing Board Name: Everildo Ybaceta 03/11/2019 4:00 PM Approved By: Review: Contractor Licensing Board Lilla Davis Review Item Completed 03/11/2019 4:15 PM Contractor Licensing Board Everildo Ybaceta Review Item Completed 03/11/2019 4:50 PM Contractor Licensing Board Everildo Ybaceta Meeting Pending 03/20/2019 9:00 AM 11.A Packet Pg. 180