Agenda 04/09/2019 Item #11D04/09/2019 EXECUTIVE SUMMARY Recommendation to accept the Whippoorwill Lane and Marbella Lakes Drive Interconnection Study and direct staff to pursue the interconnection of Whippoorwill Lane and Marbella Lakes Drive using the Concept Plan to initiate the design phase. (Project# 60219) OBJECTIVE: For the Board of County Commissioners (Board) to approve the interconnection of Whippoorwill Lane to Marbella Lakes Drive and direct staff to pursue the conceptual plan for the design of the interconnection. CONSIDERATIONS: The interconnection of Whippoorwill Lane and Marbella Lakes Drive (the Project) has been contemplated for over 15 years. The Project history includes the following milestones: • The entire Whippoorwill Lane Corridor Study area comprises approximately 578+ acres of varying ownership and zoning designations and was adopted by the Board on July 30, 2002. • Ordinance 03-23 adopting the Livingston Village PUD contemplated the public roadway connection from Livingston Road to the east and specifically mentions Whippoorwill Lane (attached). • In 2006 the Board acknowledged the importance of this connection and approved the original developer contribution agreement (DCA) with Tousa Homes, Inc., that authorized the construction of the Project. As part of the DCA, the developer was given road impact fee credits to reduce the amount of building permit fees in the development. The agreement was recorded in OR book 4124 page 2172 (attached) and contains the following language: o “The County has requested that Developer design, obtain permits for and construct Whippoorwill Way from the main entrance of the Community to the existing southerly terminus of Whippoorwill Lane at Stratford Place." • In 2006, the Board also approved a rezone known as Cayo Whippoorwill through Ordinance 06- 61 (attached). Recognizing the need for the connection and having continued concerns over congestion, the Board approved the rezone with the following conditions: o “The developer, or its successors and assigns, shall pay to Collier County the proportionate fair share of the Whippoorwill Lane to Livingston Road extension and the Pine Ridge Road and Whippoorwill Lane signalization costs as those amounts are determined by Collier County Transportation staff. Payments shall be rendered in accordance with the regulations in effect at the time or as determined by Collier County Transportation staff.” o “Certificates of Occupancy shall not be issued until the roadway connection from Whippoorwill Lane to Livingston Road is fully operational.” • In 2009 the original DCA with Tousa Homes, Inc., was modified to reflect the changes associated with a bankruptcy, new ownership and amended terms. The County took possession of all the plans and permits and deferred the construction until it could be financed as a county project. The amended agreement was approved by the Board in 2009 and is recorded in OR book 4456 page 2209 (attached). In order to further maintain the integrity of the Project, the county required the developer to notify all future buyers of the Project (sales brochure site plan attached) and relinquish claims to noise mitigation. The master concept plan during the sales phase of the development identified the future public road and sales contract (attached) and contained the following language: o “In that regard, Purchaser further acknowledges and agrees that Collier County may 11.D Packet Pg. 139 04/09/2019 extend the portion of Green Boulevard (a/k/a Whippoorwill Way) adjacent to and fronting the northern boundary easterly along and to the north of the Community and connect it to the portion of Green Boulevard on the east side of Interstate 75 with a fly- over over Interstate 75.” In the Spring of 2013, several public meetings were held to notify the residents of the upcoming project to connect Whippoorwill Lane and Marbella Lakes Drive. Extensive public comments were received from residents of Marbella Lakes regarding opposition to the project and the design. During community meetings with staff, Marbella Lakes Board Members expressed specific concerns over the ne w traffic pattern and potential cut-through traffic, safety, crime and the overall need for the Project. At that time, residents remained opposed to the Project but noted that if it should move forward, they would like the County to consider the following modifications to the Project: 1. Signalization at Livingston Road included in the Project. 2. Traffic calming included in the Project and crime prevention. 3. Turn lanes at the Marbella development entrance. 4. Lighting along the Marbella frontage. On May 14, 2013, the Project was presented to the Board. After presentations and public comments, the Board decided not to move forward with the design and construction of the Project at that time. There was discussion by staff, regarding the need for the Project and the likelihood of the Project to return for consideration between the years 2015 and 2022. As part of the annual Capital Improvement Element (CIE)/budgeting process in 2018, the Board allocated funds to fiscal year 2020 in the Schedule of Capital Improvements to construct the interconnection. County leadership directed staff to develop a design concept to interconnect the two roadways that would include enhancements to mitigate the impacts to neighbors, to thoroughly vet the concept with area stakeholders, and to return to the Board with recommendations. In July 2018, the County’s Capital Project Planning, Impact Fee & Program Management Division contracted with Stantec Consulting Services Inc., to facilitate the planning process that would bring forward a concept plan for the Board’s consideration. Staff’s position regarding interconnecting existing developments and encouraging interconnections on local roads has remained consistent. Local roads that establish connectivity provide the following primary benefits: • Improve safety: in the event of emergencies, local road interconnections provide alternative routes, and reduce the response times of first responders. • Reduce travel time: by eliminating circuitous routes and improving connectivity, motorists reduce the travel time needed to reach their destinations. • Reduce vehicle miles of travel: interconnection can reduce the travel distance, thus reduces vehicle miles of travel and the associated fuel consumption and emissions. Staff met with adjacent Homeowner Association (HOA) leadership to discuss the potential interconnection and understand their concerns. The major issues identified by the HOA leadership were safety, traffic issues including speeding and reduced green space. The consultant then began developing the Concept Plan to address the concerns expressed by the HOAs as well as mitigation strategies to improve the potential interconnection. The major features of the Concept Plan include: • Traffic signal at Livingston Road and Marbella Lakes Drive • Narrowing the travel lanes to encourage a reduction in operating speeds and to discourage cut- thru traffic 11.D Packet Pg. 140 04/09/2019 • 10’ wide travel lanes for the existing and new Marbella Lakes Drive segments • Raised median “splitter Islands” within the new roadway segments • 11’ wide travel lanes with widened raised medians on Whippoorwill Lane • Raised median approaches to the roundabouts to encourage a reduction in operating speeds when entering the roundabouts • 4 new roundabouts to encourage a reduction in operating speeds and to discourage cut-thru traffic throughout the entire corridor as well as facilitating turning movements at the community entrances • Street lighting at the new roundabouts • Sidewalk interconnections to complete the pathway network In January 2019, staff and the consultant approached all HOAs adjacent to the Project to discuss the Original 2012 Design as well as the New Concept Plan. After presentations, those in attendance were polled to see their preferences for what was developed. The results of those polled showed strong support for the interconnection from those residents/businesses having direct access to Whippoorwill Lane, with those directly accessing or adjacent to (with no access) Marbella Lakes Drive generally not supporting the interconnection. With respect to those polled about their preference for the Concept Plan (over the original 2012 conventional design) in the event the project moves forward, the vast majority of those choosing to cast a vote were in favor of the proposed Concept Plan. The Whippoorwill Lane and Marbella Lakes Drive Interconnection Study and all report appendices are attached. Staff and the consultant also coordinated with Collier County Sheriff’s Office, the North Naples Fire Department, Emergency Medical Services and the Collier County Public Schools (CCPS). The roundabouts in the New Concept Plan are designed to accommodate the large trucks, buses and vehicles used by these agencies. In addition, the agencies confirmed that the interconnection would decrease their response times to traffic and safety incidents. They also preferred the new concept with the roundabouts as well as the signal at Livingston Road and Marbella Lakes Drive because it lowered speeds and created safer ingress and egress to the area. CCPS indicated that their school buses would be able to board and unload safer in the New Concept with the roundabouts than the existing conditions. The Interconnection Study recommends the County interconnect the two roadways. It is noted that if the County decides not to pursue the interconnection at this time, the Ordinance Requirements of 06-61 (Cayo Whippoorwill) should be addressed. In addition, the County should provide direction regarding the impact fee credits that were given to the developer of Marbella Lakes. FISCAL IMPACT: The construction cost estimate for the 2012 Original Design escalated to 2019 dollars is $1,974,000. The preliminary planning level construction cost estimate for the Concept Plan is $2,970,000. Design and construction of the interconnection of Whippoorwill Lane and Marbella Lakes Drive are included in the adopted Capital Improvement Element. Based on the preliminary cost estimate, anticipated FY20 funding for Whippoorwill Lane, Project# 60219, is sufficient to complete the Project. GROWTH MANAGEMENT IMPACT: The Project and the interconnection improvements are consistent with the Growth Management Plan. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, raises no legal issues at this time, and requires majority vote for acceptance.- JAK RECOMMENDATION: That the Board of County Commissioners accept the Interconnection Study and pursue the interconnection of Whippoorwill Lane and Marbella Lakes Drive using the Conceptual Plan as the basis for the Design Phase. Prepared by: Lorraine Lantz, Principal Planner; Capital Project Planning, Impact Fees and Program 11.D Packet Pg. 141 04/09/2019 Management ATTACHMENT(S) 1. Ordinance 03-23 (PDF) 2. OR book 4124 page 2172 (PDF) 3. Ordinance 06-61 (JPG) 4. OR Book 4456 page 2209 (PDF) 5. Marbella Lakes Brochure (DOCX) 6. Buyer Notification of future roadway (PDF) 7. Final Whippoorwill-Marbella Interconnection Report 031519.1 (PDF) 8. [Linked] Whippoorwill-Marbella Interconnection Report Appendices (PDF) 11.D Packet Pg. 142 04/09/2019 COLLIER COUNTY Board of County Commissioners Item Number: 11.D Doc ID: 7973 Item Summary: Recommendation to accept the Whippoorwill Lane and Marbella Lakes Drive Interconnection Study and direct staff to pursue the interconnection of Whippoorwill Lane and Marbella Lakes Drive using the Concept Plan to initiate the design phase. (Project# 60219) (Lorraine Lantz, Project Manager, Capital Project Planning, Impact Fees and Program Management) Meeting Date: 04/09/2019 Prepared by: Title: Project Manager – Capital Project Planning, Impact Fees, and Program Management Name: Lorraine Lantz 02/06/2019 2:51 PM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 02/06/2019 2:51 PM Approved By: Review: Public Services Department Jennifer Reynolds Additional Reviewer Completed 02/06/2019 2:57 PM Growth Management Department Jeanne Marcella Level 1 Reviewer Completed 02/06/2019 3:22 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 02/12/2019 8:09 AM Capital Project Planning, Impact Fees, and Program Management Trinity Scott Additional Reviewer Completed 02/14/2019 1:11 PM Growth Management Department Gene Shue Additional Reviewer Completed 02/14/2019 1:41 PM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 02/15/2019 9:36 AM Growth Management Department James C French Deputy Department Head Review Skipped 02/19/2019 5:53 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 02/20/2019 2:09 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/20/2019 3:36 PM Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 03/14/2019 11:58 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 03/21/2019 9:38 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 04/02/2019 9:19 AM Board of County Commissioners MaryJo Brock Meeting Pending 04/09/2019 9:00 AM 11.D Packet Pg. 143 11.D.1 Packet Pg. 144 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 145 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 146 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 147 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 148 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 149 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 150 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 151 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 152 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 153 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 154 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 155 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 156 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 157 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 158 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 159 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 160 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 161 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 162 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 163 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 164 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 165 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 166 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 167 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 168 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 169 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 170 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 171 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 172 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.1 Packet Pg. 173 Attachment: Ordinance 03-23 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 174 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 175 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 176 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 177 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 178 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 179 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 180 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 181 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 182 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 183 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 184 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 185 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 186 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 187 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 188 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 189 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 190 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.2 Packet Pg. 191 Attachment: OR book 4124 page 2172 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.3 Packet Pg. 192 Attachment: Ordinance 06-61 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 193 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 194 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 195 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 196 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 197 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 198 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 199 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 200 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 201 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 202 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 203 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 204 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 205 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 206 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 207 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) 11.D.4 Packet Pg. 208 Attachment: OR Book 4456 page 2209 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) Marbella Lakes Sales Brochure Site Plan 11.D.5 Packet Pg. 209 Attachment: Marbella Lakes Brochure (7973 : Whippoorwill Lane and Marbella Lakes Drive 11.D.5 Packet Pg. 210 Attachment: Marbella Lakes Brochure (7973 : Whippoorwill Lane and Marbella Lakes Drive 11.D.6 Packet Pg. 211 Attachment: Buyer Notification of future roadway (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) Whippoorwill Lane - Marbella Lakes Drive Interconnection Study Prepared for: Collier County Capital Project Planning, Impact Fee & Program Management Division February 2019 11.D.7 Packet Pg. 212 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 1 | Page Table of Contents Introduction ........................................................................................................................................... 2 Existing Conditions ............................................................................................................................... 5 Future Conditions ................................................................................................................................. 8 2012 Conventional Design ................................................................................................................ 9 Identification of Issues/Concerns .................................................................................................. 10 2018 Concept Plan Development ................................................................................................ 12 Public Engagement .......................................................................................................................... 21 Public Agency Considerations ....................................................................................................... 25 Recommendations ............................................................................................................................ 26 Appendices ......................................................................................................................................... 27  Traffic Count Reports ...................................................................................................................... 27  Stop Sign Warrant Analysis ............................................................................................................. 90  2012 Design Plans ........................................................................................................................... 94  PowerPoint Presentations ............................................................................................................ 104  Sign-In Sheets ................................................................................................................................ 222  Comments ..................................................................................................................................... 244  Polling Results ............................................................................................................................... 298 11.D.7 Packet Pg. 213 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 2 | Page Introduction Collier County’s transportation network is largely comprised of major multi-lane arterials and collectors that carry significant peak period volumes, especially during the peak seasonal months of the year. Local roadways within and around developments and neighborhoods frequently lack interconnections to neighboring developments and/or supporting land uses, e.g., shopping centers, forcing residents to exit the local streets and use the arterials to simply go an adjacent land use. Through policies in the Growth Management Plan, regulations/requirements in the Land Development Code, and guidance in the Access Management Policy, the County encourages interconnectivity, and has made advances with local road connectivity with successes such as Tree Farm/Massey/Woodcrest Roads, and Wolfe/Predestine Roads, and the new Kraft Road interconnection between Whippoorwill Lane and the Marquesa Plaza shopping center. These interconnections provide neighborhoods with alternative routes and offer adjacent land uses the opportunities to travel to nearby destinations without having to use the arterial network. Local road interconnections provide several benefits to adjacent land uses, including:  Improving safety – in the event of emergency, local road interconnections provide alternative routes, and reduce the response times of first responders.  Reducing travel time – by eliminating circuitous routes, motorists reduce the travel time needed to reach their destinations.  Reduce vehicle miles of travel – interconnection can reduce the travel distance, thus reduces vehicle miles of travel and the associated fuel consumption and emissions. The Whippoorwill Lane-Marbella Lakes Drive interconnection has been “on the books” for over 15 years and has been the subject of numerous studies, agreements, developer commitments, and hearings. The most recent process in 2013 included the Board of County Commissioners consideration of a 2012 design to interconnect Whippoorwill Lane and Marbella Lakes Drive. After hearing from the public on May 14, 2013, the Board decided to not move the project forward at that time. As part of the annual Capital Improvement Element (CIE)/budgeting process in 2018, the Board allocated funds to fiscal year 2020 in the Schedule of Capital Improvements to construct the interconnection. County leadership directed staff to develop a design concept to interconnect the two roadways that would include enhancements to mitigate the impacts to neighbors, to thoroughly vet the concept with area stakeholders, and to return to the Board with recommendations. In July 2018, the County’s Capital Project Planning, Impact Fee & Program Management Division contracted with Stantec Consulting Services Incorporated to facilitate the planning process that would bring forward a concept plan for the Board’s consideration. 11.D.7 Packet Pg. 214 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 3 | Page The planning team, made up of County Staff and the consultant Staff, developed a process that would include:  Preliminary public engagement with stakeholder leadership to identify issues/concerns  Identification of countermeasures to address the issues/concerns  Concept Plan design development  Public engagement with affected stakeholders  Recommendations to the County The project schedule is shown below in Figure 1. FIGURE 1: Project Schedule For the purposes of this study, a planning area was identified to include developments that have access to Whippoorwill Lane or Marbella Lakes Drive. Additionally, the community of Aviano was added to the list of neighboring developments because the community’s southern and eastern boundaries are adjacent to the two corridors. Aviano gains access to the network from Livingston Road and does not directly access either roadway. The study area is shown in Figure 2. At the conclusion of the process, after considering the public input the planning team believes that the Concept Plan will provide the necessary interconnection while implementing traffic calming features that will address the issues and concerns expressed by area residents and businesses. The plan will not only address the potential issues resulting from the interconnection but will also address several existing issues/concerns expressed to the planning team during the study. 11.D.7 Packet Pg. 215 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 4 | Page FIGURE 2: Study Area Avow Seagate Baptist Church Andalucia Gusta Bella Vita Aviano Marbella Lakes Mariposa Naples Nissan Coventry at Stratford Place 11.D.7 Packet Pg. 216 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 5 | Page Existing Conditions Marbella Lakes Drive, and Whippoorwill Lane have two entirely different sets of land use and roadways characteristics. Marbella Lakes Drive currently has two 12-feet-wide undivided travel lanes extending 1,320 feet eastward from Livingston Road, dead-ending at Hermosa Way (Figure 3). Marbella Lakes Drive serves as the entrance road to Marbella Lakes, a community of 490 residential dwelling units. No other development is served by this roadway. FIGURE 3: Marbella Lakes Drive – Looking East Marbella Lakes Drive was originally designed as the first 2 lanes of a future 4-lane roadway that would ultimately cross over I-75 and connect to Green Boulevard (an improvement no longer on the long-range plan). The existing 2-lane roadway has an urban cross section with a curb and sidewalk only along the south side. Along the north side of the roadway is a drainage canal. Along the north side of the canal is a multi-use pathway. For Marbella Lakes residents to access the pathway, they must travel westward from Hermosa Way to Livingston Road where then can cross over to reach the pathway. The Livingston Road Marbella Lakes Drive Whippoorwill Lane 11.D.7 Packet Pg. 217 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 6 | Page pathway extends eastward to the Whippoorwill Lane right-of-way and then north a short distance but does not currently connect to the existing sidewalk on Whippoorwill Lane that terminates at Stratford Lane. Although the northbound exit from Hermosa Way to Marbella Lakes Drive is currently “stop controlled”, due to the lack of crossing traffic, the stop sign is largely ignored. There is currently no eastbound right turn lane serving the project entrance. Traffic data collected in August 2018 recorded a 2-way total of 1,700 vehicles over a 24- hour period (2,074 adjusted for peak season) with a 2-way AM peak hour volume of 132 and a PM peak hour volume of 128 vehicles (161 AM and 156 PM when adjusted for peak season). Traffic along Marbella Lakes Drive is unimpeded, and traffic count machines recorded 47% (n=802) of the vehicles traveling at speeds in excess of 35 m.p.h., 4% (n=70) traveling in excess of 45 m.ph., and 6 vehicles recorded at speeds over 55 m.p.h. Clearly, 12 feet wide travel lanes (the same as I-75) allow drivers to feel comfortable traveling at excessive speeds. Whippoorwill Lane extends southward from Pine Ridge Road a distance of approximately 0.814 miles and dead ends at a cul-de-sac immediately south of Stratford Lane (Figure 4). The roadway cross section generally consists of two undivided travel lanes with associated right- and left-turn lanes varying in width from 11 to 14 feet, separated by yellow-striped “medians”. Right- and left-turn lanes serve each development entrance along the roadway, resulting in pavement widths in excess of 50’ at some development entrances. Whippoorwill Lane has an urban cross section with curbs and gutters on both sides with no paved shoulders or bike lanes. Sidewalks extend along the entire length of the roadway on both sides of the road. Crosswalks extend parallel to the travel lanes across access connections but do not extend across Whippoorwill Lane (except at the Pine Ridge Road intersection). Whippoorwill Lane currently serves as the only means of ingress and egress for a residential area of over 250 acres, and over 1,220 residential dwelling units along both sides of the roadway. Whippoorwill Lane also serves as the only means of access for the intuitional uses of Avow Hospice and Seagate Baptist Church. Traffic volume and speed data was collected in August 2018 at three locations along Whippoorwill Lane. Immediately south of Pine Ridge Road, south of Dudley Drive, and south of Night Hawk Drive. South of Pine Ridge Road intersection, the 2-way 24-hour volumes was 10,461 (12,762 when adjusted for peak season) with a 2-way AM peak hour total of 770 vehicles (939 adjusted for peak season) and a PM peak hour total of 978 (1,193 adjusted for peak season). South of Dudley Drive the volumes dropped to 8,167 over the same 24-hour period (9,964 peak season) with AM and PM peak hour volumes of 598 and 826 respectively (730 and 1,008 when adjusted for peak season). South of Night Hawk Drive the 24-hour 2-way 11.D.7 Packet Pg. 218 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 7 | Page volumes were 3,749, with AM and PM peak hour volumes of 151 and 441 respectively (184 and 538 when seasonally adjusted). FIGURE 4: Whippoorwill Lane – Looking South With respect to travel speeds along Whippoorwill Lane, south of Pine Ridge Road only 2% (n=220) of the vehicles were recorded in excess of the 35-m.p.h. posted speed limit due in large part to the location of the counter with respect to the Pine Ridge Road intersection. South of Dudley Drive, 20% (n=1,606) vehicles were recorded at speeds in excess of 35 m.p.h., while south of Night Hawk Drive, over 40% (n=1,528) of the vehicles were recorded in excess of the posted speed limit of 35 m.p.h., with 100 vehicles recorded in excess of 45 m.p.h., and 3 in excess of 55 m.p.h. Like Marbella Lakes Drive, except for vehicles turning into or out of an access point, drivers along Whippoorwill Lane enjoy little or no impedance, and due to the wide travel lanes and painted medians, feel “comfortable” traveling at speeds well in excess of the posted speed limit. Traffic count reports are included in the Appendices. Pine Ridge Road Whippoorwill Lane Marbella Lakes Drive Kraft Road Dudley Drive Reserve Way Night Hawk Drive Andalucia Way Stratford Lane 11.D.7 Packet Pg. 219 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 8 | Page Future Conditions Assuming the interconnection of Whippoorwill Lane and Marbella Lakes Drive is completed, some motorist within the Whippoorwill Lane area can be expected to use the interconnection to access Livingston Road; traveling along the extension of Whippoorwill Lane and Marbella Lakes Drive, and south on Livingston Road, rather than traveling north to use Pine Ridge Road to reach Livingston Road. The Collier Metropolitan Planning Organization 2040 Travel Demand Model was used to evaluate the traffic with and without a new connection. The model network was modified to eliminate traffic from Marbella Lakes along Marbella Lakes Drive to only assign traffic resulting from the Whippoorwill interconnection. Without the interconnection, peak season daily traffic volumes at the north end of Whippoorwill Lane registered 11,982, with 0 trips on Marbella Lakes Drive. With the interconnection in place, the peak season daily volumes at the north end of Whippoorwill Lane registered 11,181 (a net reduction of 801 trips), with 2-way volumes on Marbella Lakes Drive registering 1,886. These volumes occur over a 24-hour period, and using a default peak hour factor of 0.09, the peak hour 2-way volume would be 170, or less than 3 additional cars per minute during the peak hours of the day. When combined with the existing Marbella Lakes Drive peak season daily 2-way traffic volumes, the total traffic is estimated to be 3,960. With a capacity of 10,700 vehicles per day yielding a volume-to-capacity (V/C) ratio of 0.37, the roadway can be expected to operate at level of service “A”. A preliminary signal warrant study indicates that a traffic signal would be warranted with the addition of the new traffic facilitated by the interconnection, most of which can be expected to turn south onto Livingston Road. With the 2040 model’s prediction 1,886 more vehicles would travel along the newly connected Marbella Lakes Drive, the fear of many along both corridors is the potential for a significant increase in “thru-traffic” generated by motorists with neither origins or destinations along either of two roadways, using the roads to avoid the Pine Ridge Road/Livingston Road intersection. Left unimpeded, this is a real possibility given the vehicle speeds noted in the traffic data. Motorists will generally follow the path of least resistance, and if it is quicker to cut through a residential neighborhood, some motorist will do it to shave a few seconds/minutes off their travel time. An all-way stop warrant analysis was conducted by Collier County, indicating that the future Marbella Lakes Drive/Hermosa Way intersection volumes would not meet the warrants for an all-way stop. The Documentation is provided in the Appendices. While the benefits to the area residents may outweigh the negative impacts, none the less they are real impacts that should be addressed through a context sensitive design to the maximum extent practical. The objective is to provide an interconnection that offers route choice to area residents while discouraging speeding and cut-thru traffic. 11.D.7 Packet Pg. 220 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 9 | Page 2012 Conventional Design In July 2012 Collier County received a final set of construction plans for the Whippoorwill Lane Extension project. The project included the extension of Marbella Lakes Drive from the current dead end at Hermosa Way eastward to a point where the roadway would turn northward and extend to the existing dead end of Whippoorwill Lane. The total length of the project was 0.718 miles made up of 0.419 miles of new roadway and 0.299 miles of additional shoulder and curbing of existing roadway (Marbella Lakes Drive). The conventional design called for the addition of 4 feet (to the existing 24) of pavement along the northern edge of Marbella Lakes Drive from Livingston Road to Hermosa Way and 28 feet of new roadway cross section east of Hermosa Way to the curve. The entire length of the roadway from Livingston Road to the curve would have curbs and marked with 11 feet wide travel lanes with 3 feet wide paved shoulders. A sidewalk along the south side of the roadways would connect to the existing sidewalk west of Hermosa Way. The posted speed was to be 30 m.p.h. North of the curve, the roadway cross section would drop the paved shoulders in order to match the existing Whippoorwill Lane cross section further north. The new section of Whippoorwill Lane north of the curve would include 11 feet wide travel lanes and new sidewalks on both sides of the roadway connecting to sidewalks along Marbella Lakes Drive. The new roadway segment would terminate with the reconstruction/elimination of the existing cul-de-sac immediately south of Stratford Lane. No additional improvements to Whippoorwill Lane north of Stratford Lane were contemplated by the project. The roadway plan sheets are included in the Appendices. While the design provided the necessary interconnection, no “traffic calming” measures were contemplated as part of the project. The construction cost of the 2012 design was estimated at $1.50M, or $1.97M in 2019 assuming a 4% annual increase in construction costs. 11.D.7 Packet Pg. 221 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 10 | Page Identification of Issues/Concerns In order to thoroughly understand the issues and concerns of the neighborhoods abutting the Whippoorwill Lane and Marbella Lakes Drive corridors, the planning team met with HOA/stakeholders’ leadership on August 22, 2018 and October 18, 2018 to discuss the potential interconnection and to learn about the neighborhood concerns. Through the HOA leadership discussions, the team identified the core issues/concerns, e.g., increased traffic, speeding, noise, safety, etc., and correspondingly developed a set of countermeasures that would help mitigate those concerns to the maximum extent practical. The Issues/Countermeasures Matrix shown in Table 1 was developed to allow the planning team to review the issues/concerns raised and evaluate all the corresponding countermeasures. Each corresponding countermeasure identified to address one or more issues/concerns was evaluated for its positive and negative attributes. A selection set of appropriate “enhancements” was developed in consultation with County Staff to be formulated into a draft proposed design concept plan. Following a review of the draft concept plan by County Staff, adjustments/changes were made, and the proposed concept plan was vetted with the neighboring HOAs and representatives from area businesses/institutions. 11.D.7 Packet Pg. 222 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 11 | Page Table1: Issues & Countermeasures Matrix 11.D.7 Packet Pg. 223 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 12 | Page 2018 Concept Plan Development Following the guidance generated by the planning team and the County Staff, a design concept was developed incorporating the enhancements recognized as the most important in mitigating the concerns of the neighboring developments. The most significant difference between the 2012 design and the 2018 Concept Plan is the proposed Concept Plan implements improvements along the entire length of Whippoorwill Lane north to immediately south of Kraft Road. As mentioned previously, in addition to offering no overall “traffic calming” benefit, the 2012 design stopped immediately north of Stratford Lane, leaving the remaining portion of Whippoorwill Lane as it exists today. The traffic calming elements incorporated into the Concept Plan are intended to work together, to specifically target the traffic-related issues/concerns (e.g., speeding, cut- thru traffic, trucks, etc.) expressed by the stakeholders. The Concept Plan takes advantage of the opportunities presented in the design of the new roadway sections and the ability to modify the existing cross sections of both Marbella Lakes Drive and Whippoorwill Lane, without major alterations to the curb lines or disruptions to stormwater management and roadside utilities. Along the existing segments of Whippoorwill Lane, except for the proposed intersection modifications, all of the proposed roadway improvements occur within the existing paved median areas. The major features of the Concept Plan include:  Traffic signal at Livingston Road and Marbella Lakes Drive  Narrowing the travel lanes to encourage a reduction in operating speeds and to discourage cut-thru traffic  10’ wide travel lanes for the existing and new Marbella Lakes Drive segments  Raised median “splitter Islands” within the new roadway segments  11’ wide travel lanes with widened raised medians on Whippoorwill Lane  Raised median approaches to the roundabouts to encourage a reduction in operating speeds when entering the roundabouts  4 new roundabouts to encourage a reduction in operating speeds and to discourage cut-thru traffic throughout the entire corridor  Street lighting at the new roundabouts  Sidewalk interconnections to complete the pathway network Additionally, the recommendations include conducting the appropriate speed studies to evaluate the appropriateness of reducing the posted speed limit, and to consider implementing “no thru trucks” and/or truck weight limit restrictions on the roadways. Lastly, while the median and roundabout features are intended to add impendence to the roadway, thus calming the traffic, they also afford opportunities to enhance the appearance of the roadway through supplemental lighting and landscaping treatments. Vertical landscaping also increases the “visual resistance” experienced by 11.D.7 Packet Pg. 224 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 13 | Page drivers as they travel along the roadway, encouraging motorists to travel at a safe speed. During the public engagement efforts, the potential to add landscaping to the project that would ultimately have to be maintained by the property owners benefitting by the landscaping, was discussed with stakeholders. The specific enhancements developed as part of the study effort and vetted through public engagement efforts are detailed in the figures that follow. The estimated construction cost of the enhance Concept Plan is $2.97M excluding design, permitting and optional landscaping treatments. 11.D.7 Packet Pg. 225 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 14 | Page FIGURE 5: Marbella Lakes Drive – Livingston Road to Hermosa Way N 11.D.7 Packet Pg. 226 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 15 | Page FIGURE 6: Marbella Lakes Drive – Hermosa Way to “The Corner” N 11.D.7 Packet Pg. 227 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 16 | Page FIGURE 7: Whippoorwill Way – “The Corner” to Stratford Lane N 11.D.7 Packet Pg. 228 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 17 | Page FIGURE 8: Whippoorwill Way – Stratford Lane to Mariposa Circle N 11.D.7 Packet Pg. 229 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 18 | Page FIGURE 9: Whippoorwill Way – Mariposa Circle to Night Hawk Drive/Andalucia Way N 11.D.7 Packet Pg. 230 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 19 | Page FIGURE 10: Whippoorwill Way – Night Hawk Drive/Andalucia Way to Reserve Way N 11.D.7 Packet Pg. 231 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 20 | Page FIGURE 11: Whippoorwill Way – Reserve Way to Pine Ridge Road N 11.D.7 Packet Pg. 232 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 21 | Page Public Engagement After vetting the proposed concept design internally with County Transportation Planning and Traffic Operations Staff, the planning team scheduled a series of stakeholder meetings with those residents and business owners that would be most affected by the proposed interconnection. Seven meetings were held with individual home owner associations (HOAs) and a group of business/institutional leaders. Additionally, the planning team discussed the study objectives with a representative of The Reserve at Naples; the representative declined to have a meeting/presentation, offering “no opinion” as to the merits of the project. Late afternoon/early-evening meetings were held with the follow groups: • Marbella Lakes • Mariposa • Gusto Bella Vita • Andalucia • Coventry at Stratford Place • Area Businesses/Institutions • Aviano Each meeting lasted from 1 to 2 hours in length and incorporated large displays of the proposed Concept Plan as well as handout copies of the exhibits, and a detailed PowerPoint presentation that included interactive “preference” polling (multiple-choice questions), followed by a questions and answers session. Two PowerPoint presentations were prepared, customized for the two separate corridors, but both having identical content and polling questions. Attendees were encouraged to provide additional comments in writing on forms provided as attendees signed in and were advised of the project schedule and the eventual consideration of the proposal by the Board in March 2019. Attendees were told by providing contact information they would be notified of the Board’s hearing schedule. A copy of the PowerPoint presentations, the sign-in sheets and comment forms are included in the Appendices. 11.D.7 Packet Pg. 233 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 22 | Page At the conclusion of each presentation, attendees were asked four multiple choice questions, and invited to anonymously record their preference in each case using a polling device (a.k.a. “clicker”) that was provided to each attendee when signing in. Following each question, the tally of votes was immediately displayed, allowing the attendees to see how the group responded to the questions. The questions asked were as follows: Q1 – What Roadway Do You Use to Access Your Home or Place of Work? • Whippoorwill Lane • Dudley Drive or Livingston Road • Marbella Lakes Drive Q2 – Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? • Yes • No • No Opinion Q3 – Do You Prefer the Concept Plan as Shown or the Original Conventional Design? • New Concept Plan • Conventional Design • No Opinion Q4 – Optional Landscaping – Support for On-Going Maintenance of Roadway Landscaping? • Minimal by County • Enhanced by MSBU Question #1 was intended to allow the correlation of the results with the roadway primarily accessed by the attendees. Question #2 was intended to gauge the audience’s over-all support (or lack thereof) for the project, regardless of how the interconnection was designed. Notwithstanding an attendee’s objection to the interconnection, Question #3 was intended to identify the level of support for the proposed Concept Plan as opposed to the original 2012 conventional design, if the Board decided to move forward with the project. Lastly, Question #4 was intended to gauge the attendee’s level of interest in pursuing enhanced landscaping that would ultimately be maintained by the area property owners, e.g., through a beautification district. Summaries of the polling results are provided below. Copies of the individual reports for each meeting are included in the Appendices. When asked about their support for the interconnection, the results show a clear division by corridor. As shown in Table 2, approximately 80% of the attendees from the Marbella Lakes community do not favor the interconnection. 11.D.7 Packet Pg. 234 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 23 | Page Table 2: Overall Support for the Interconnection Viewed another way, in Table 3, the results of those residents/businesses polled having direct access to Whippoorwill Lane show strong support for the interconnection, with those directly accessing or adjacent to (with no access) Marbella Lakes Drive not supporting the interconnection. Table 3: Overall Support by Access Corridor With respect to those polled about their preference for the Concept Plan over the conventional 2012 design, in the event the project moves forward, the over 80% of those choosing to cast a vote were in favor of the proposed Concept Plan (Table 4). WhippoorwillDudley / LivingstonMarbella LakesTotal No OpinionTotal Marbella Lakes 76 490 2 0 70 72 14 19%61 81%0 75 Mariposa 23 180 22 0 0 22 14 61%7 30%2 23 Gusto Bella Vita 10 160 10 0 0 10 7 70%1 10%2 10 The Reserve at Naples 1 300 1 0 0 1 0 0%0 0%1 1 Andalucia 52 167 50 0 0 50 42 81%9 17%1 52 Stratford 33 460 33 0 0 33 21 64%12 36%0 33 Businesses 5 3 5 0 0 5 5 100%0 0%0 5 Aviano 32 212 0 31 0 31 13 42%17 55%1 31 TOTAL 232 1972 123 31 70 224 116 107 7 230 Yes NoParticipants Units Q-1 Roadway Used to Access Home/Business Q-2 Support for Connecting Whippoorwill Ln. to Marbella Lakes Dr.WhippoorwillDudley / LivingstonMarbella LakesTotal No OpinionTotal Whippoorwill Lane 124 1270 121 0 0 121 89 72%29 23%6 124 Marbella Lakes Drive 76 490 2 0 70 72 14 19%61 81%0 75 Adjacent w/No Access 32 212 0 31 0 31 13 42%17 55%1 31 TOTAL 232 1972 123 31 70 224 116 107 7 230 Yes NoParticipants by Corridor Units Q-1 Roadway Used to Access Home/Business Q-2 Support for Connecting Whippoorwill Ln. to Marbella Lakes Dr. 11.D.7 Packet Pg. 235 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 24 | Page Table 4: Support for New Concept Plan When asked about the attendee’s interest in pursuing landscaping in the event the proposed Concept Plan moves forward, with the long-term maintenance responsibility becoming an obligation of the surrounding land owners, e.g., in an MSBU, the reactions were mixed, with approximately 55% of the votes in support for future consideration (Table 5). This is understandable given the lack of specificity that could be provided as to what the on-going costs to individual property owners might be. WhippoorwillDudley / LivingstonMarbella LakesTotal New ConceptConventionalNo OpinionTotal Marbella Lakes 76 490 2 0 70 72 56 1 19 76 Mariposa 23 180 22 0 0 22 15 5 2 22 Gusto Bella Vita 10 160 10 0 0 10 8 2 0 10 The Reserve at Naples 1 300 1 0 0 1 0 0 1 1 Andalucia 52 167 50 0 0 50 47 5 0 52 Stratford 33 460 33 0 0 33 24 6 2 32 Businesses 5 3 5 0 0 5 5 0 0 5 Aviano 32 212 0 31 0 31 26 3 2 31 TOTAL 232 1972 123 31 70 224 181 22 26 229 Participants Units Q-1 Roadway Used to Access Home/Business Q-3 Support for Original Design or New Concept Plan 11.D.7 Packet Pg. 236 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 25 | Page Table 5: Interest in Optional Landscaping Public Agency Considerations In addition to improving access/route choice for residents and businesses along Whippoorwill Lane and Marbella Lakes Drive, the interconnection also serves in much the same way to improve access and response time for first responders and to provide route choice opportunities in the event of emergencies that may impede the flow of traffic on the adjacent arterial network. It is not uncommon for vehicular crashes on Pine Ridge Road at or near the Whippoorwill intersection to cripple the roadway. Residents and business/institution operators in the Whippoorwill Lane area have expressed concerns over being unable to leave or return to the area because of a crash that has stymied the flow of traffic on Pine Ridge Road. Blocked access also means that first responders would have difficulty reaching residents or businesses in the event of an emergency. Interconnecting Whippoorwill Lane and Marbella Lakes Drive would benefit the North Naples Fire Control & Rescue District (NNFCRD), the Collier County Sheriff’s Department (CCSO), Collier County Emergency Services (EMS) and the Collier County School District by providing the agencies’ operations a second means of entering/existing the area, thus reducing travel distance and response time. Today, residences served by Whippoorwill Lane and Marbella Lakes Drive are in separate school zones, so school bus operations are independent of each other. Buses must travel WhippoorwillDudley / LivingstonMarbella LakesTotal Minimal by CountyTotal Marbella Lakes 76 490 2 0 70 72 35 74 Mariposa 23 180 22 0 0 22 11 22 Gusto Bella Vita 10 160 10 0 0 10 6 10 The Reserve at Naples 1 300 1 0 0 1 0 0 Andalucia 52 167 50 0 0 50 15 51 Stratford 33 460 33 0 0 33 14 31 Businesses 5 3 5 0 0 5 0 5 Aviano 32 212 0 31 0 31 21 32 TOTAL 232 1972 123 31 70 224 102 225 11 123 11 4 0 36 17 5 Q-4 Interest in Optional Landscaping Enhanced39 Participants Units Q-1 Roadway Used to Access Home/Business 11.D.7 Packet Pg. 237 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 26 | Page along the roadways in one direction and turn around to exit the area. School bus operations prohibit students from crossing the road so students are picked up on both sides of Whippoorwill Lane, stopping traffic in both directions when a bus is loading/unloading. The Concept Plan would provide for safer school bus operations during the loading and unloading of students where raised medians would prohibit illegal passing of a stopped school bus, while allowing opposing traffic on the other side of the raised median to proceed. Additionally, the roundabouts allow bus drivers to easily reverse directions to pick up students at stops on the opposite side of the street. Recommendations As a direct result of the public outreach efforts, a Concept Plan was developed to address what the planning team believed were the issues/concerns most relevant to the adjoining neighborhoods with respect to potential impacts of interconnection of the two roadways. The Concept Plan features a context sensitive design to achieve the objectives of reducing the speeds of vehicles using this interconnection. In addition to reducing speeds for safety reasons, the design features will have the added benefit of making the corridor less convenient, thus discouraging cut-thru traffic. There is a significant benefit to the residents and businesses within the study area gained by interconnecting the two roads. The Concept Plan is being recommended over the original 2012 design, because of the positive effects it will have by reducing travel speeds and discouraging cut-thru traffic. 11.D.7 Packet Pg. 238 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) WHIPPOORWILL LANE – MARBELLA LAKES DRIVE INTERCONNECTION STUDY 27 | Page Appendices  Traffic Count Reports  Stop Sign Warrant Analysis  2012 Design Plans  PowerPoint Presentations  Sign-In Sheets  Comments  Polling Results 11.D.7 Packet Pg. 239 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) February 2019 11.D.7 Packet Pg. 240 Attachment: Final Whippoorwill-Marbella Interconnection Report 031519.1 (7973 : Whippoorwill Lane and Marbella Lakes Drive Interconnection) Whippoorwill Lane - Marbella Lakes Drive Interconnection Study: Appendices Prepared for: Collier County Capital Project Planning, Impact Fee & Program Management Division March 15, 2019 Appendices 27 Traffic Count Reports 28 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 8 3 0 14 11 1 0 0 0 0 0 0 0 0 37 26-35 25 1:00 AM 1 1 1 8 1 1 0 0 0 0 0 0 0 0 13 21-30 9 2:00 AM 4 0 3 1 0 0 0 0 0 0 0 0 0 0 8 21-30 4 3:00 AM 1 1 1 4 3 0 0 0 0 0 0 0 0 0 10 27-36 6 4:00 AM 0 0 5 7 15 4 1 0 0 0 0 0 0 0 32 26-35 22 5:00 AM 3 0 8 22 29 10 0 0 0 0 0 0 0 0 72 26-35 50 6:00 AM 12 26 53 58 36 6 0 0 0 0 0 0 0 0 191 21-30 110 7:00 AM 32 53 115 123 72 12 0 0 0 0 0 0 0 0 407 21-30 238 8:00 AM 28 82 120 139 84 7 4 0 0 0 0 0 0 0 464 21-30 259 9:00 AM 27 67 95 108 54 9 0 0 0 0 0 0 0 0 360 21-30 203 10:00 AM 16 48 96 85 50 11 1 0 0 0 0 0 0 0 307 21-30 181 11:00 AM 32 47 97 104 34 6 0 0 0 0 0 0 0 0 320 21-30 201 12:00 PM 23 52 98 73 44 5 0 0 0 0 0 0 0 0 295 21-30 171 1:00 PM 10 47 106 88 40 18 4 0 0 0 0 0 0 0 313 21-30 194 2:00 PM 17 47 100 90 42 10 1 0 0 0 0 0 0 0 307 21-30 190 3:00 PM 14 50 100 85 38 12 0 0 0 0 0 0 0 0 299 21-30 185 4:00 PM 27 54 114 110 51 11 1 0 0 0 0 0 0 0 368 21-30 224 5:00 PM 34 86 154 125 48 10 4 1 0 0 0 0 0 0 462 21-30 279 6:00 PM 13 37 78 112 62 15 8 0 0 0 0 0 0 0 325 21-30 189 7:00 PM 7 39 77 117 42 11 0 0 0 0 0 0 0 0 293 21-30 193 8:00 PM 10 23 42 75 32 4 0 0 0 0 0 0 0 0 186 21-30 117 9:00 PM 8 10 23 51 19 10 0 0 0 0 0 0 0 0 121 21-30 74 10:00 PM 7 9 18 31 16 5 1 0 0 0 0 0 0 0 87 21-30 49 11:00 PM 3 4 3 11 11 1 1 0 0 0 0 0 0 0 34 26-35 22 Day Total 337 786 1507 1641 834 179 26 1 0 0 0 0 0 0 5311 21-30 3147 Percent ADT 5311 6.3% 14.8% 28.4% 30.9% 15.7% 3.4% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 7:00 AM 8:00 AM 8:00 AM 8:00 AM 8:00 AM 7:00 AM 8:00 AM 8:00 AM Volume 32 82 120 139 84 12 4 464 PM Peak 5:00 PM 5:00 PM 5:00 PM 5:00 PM 6:00 PM 1:00 PM 6:00 PM 5:00 PM 5:00 PM Volume 34 86 154 125 62 18 8 1 462 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 29 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 337 786 1507 1641 834 179 26 1 0 0 0 0 0 0 5311 21-30 3147 Percent 6.3% 14.8% 28.4% 30.9% 15.7% 3.4% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 6.3% 21.1% 49.5% 80.4% 96.1% 99.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 5311 85th Percentile: Mean Speed(Average): Median Mode: 31 MPH 24 MPH 25 MPH 28 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 30 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 1 27 5 0 0 0 0 0 0 0 0 0 0 4 37 1:00 AM 0 10 1 1 0 0 0 0 0 0 0 0 0 1 13 2:00 AM 1 5 1 0 0 0 0 0 0 0 0 0 0 1 8 3:00 AM 0 8 1 0 0 0 0 0 0 0 0 0 0 1 10 4:00 AM 0 28 4 0 0 0 0 0 0 0 0 0 0 0 32 5:00 AM 0 65 6 0 0 0 0 0 1 0 0 0 0 0 72 6:00 AM 7 127 48 0 5 1 0 0 0 0 0 0 0 3 191 7:00 AM 6 316 69 0 7 0 0 0 0 0 0 0 0 9 407 8:00 AM 5 391 55 0 3 0 0 2 0 0 0 0 0 8 464 9:00 AM 4 290 42 1 14 0 0 4 0 0 0 0 0 5 360 10:00 AM 6 237 41 0 12 0 0 1 0 0 0 0 0 10 307 11:00 AM 9 249 38 0 10 1 0 0 0 0 0 0 0 13 320 12:00 PM 4 234 34 0 10 0 0 0 0 0 0 0 0 13 295 1:00 PM 3 252 44 0 5 0 0 1 0 0 0 0 0 8 313 2:00 PM 5 239 47 0 8 0 1 0 0 0 0 0 0 7 307 3:00 PM 2 225 59 2 7 0 0 2 0 0 0 0 0 2 299 4:00 PM 2 300 47 1 5 0 0 2 0 0 0 0 0 11 368 5:00 PM 6 366 70 0 9 1 0 1 0 0 0 0 0 9 462 6:00 PM 5 274 35 0 4 0 0 0 0 0 0 0 0 7 325 7:00 PM 2 251 37 0 0 0 0 1 0 0 0 0 0 2 293 8:00 PM 4 150 27 0 2 0 0 0 0 0 0 0 0 3 186 9:00 PM 0 111 7 0 0 0 0 0 0 0 0 0 0 3 121 10:00 PM 3 78 2 0 1 0 0 0 0 0 0 0 0 3 87 11:00 PM 0 28 5 0 0 0 0 0 0 0 0 0 0 1 34 Day Total 75 4261 725 5 102 3 1 14 1 0 0 0 0 124 5311 Percent 1.4% 80.2% 13.7% 0.1% 1.9% 0.1% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 2.3% ADT 5311 AM Peak 11:00 AM 8:00 AM 7:00 AM 1:00 AM 9:00 AM 6:00 AM 9:00 AM 5:00 AM 11:00 AM 8:00 AM Volume 9 391 69 1 14 1 4 1 13 464 PM Peak 5:00 PM 5:00 PM 5:00 PM 3:00 PM 12:00 PM 5:00 PM 2:00 PM 3:00 PM 12:00 PM 5:00 PM Volume 6 366 70 2 10 1 1 2 13 462 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 31 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 75 4261 725 5 102 3 1 14 1 0 0 0 0 124 5311 Percent 1.4% 80.2% 13.7% 0.1% 1.9% 0.1% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 2.3% ADT 5311 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 32 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 37 37 37 1:00 AM 13 13 13 2:00 AM 8 8 8 3:00 AM 10 10 10 4:00 AM 32 32 32 5:00 AM 72 72 72 6:00 AM 191 191 191 7:00 AM 407 407 407 8:00 AM 464 464 464 9:00 AM 360 360 360 10:00 AM 307 307 307 11:00 AM 320 320 320 12:00 PM 295 295 295 1:00 PM 313 313 313 2:00 PM 307 307 307 3:00 PM 299 299 299 4:00 PM 368 368 368 5:00 PM 462 462 462 6:00 PM 325 325 325 7:00 PM 293 293 293 8:00 PM 186 186 186 9:00 PM 121 121 121 10:00 PM 87 87 87 11:00 PM 34 34 34 Day Total 5311 5311 5311 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 464 464 464 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 462 462 462 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 33 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 2 16 21 17 3 0 0 0 0 0 0 0 0 0 59 21-30 38 1:00 AM 1 5 11 9 3 0 0 0 0 0 0 0 0 0 29 21-30 19 2:00 AM 2 7 5 2 0 0 0 0 0 0 0 0 0 0 16 16-25 12 3:00 AM 1 4 5 2 0 0 0 0 0 0 0 0 0 0 12 16-25 9 4:00 AM 0 4 2 4 1 1 0 0 0 0 0 0 0 0 12 21-30 6 5:00 AM 0 8 8 5 1 0 0 0 0 0 0 0 0 0 22 16-25 16 6:00 AM 2 29 40 21 4 0 0 0 0 0 0 0 0 0 96 16-25 69 7:00 AM 15 40 83 43 9 0 0 0 0 0 0 0 0 0 190 21-30 125 8:00 AM 31 61 121 75 16 2 0 0 0 0 0 0 0 0 306 21-30 196 9:00 AM 11 38 124 52 7 1 0 0 0 0 0 0 0 0 233 21-30 175 10:00 AM 11 33 98 74 13 0 0 0 0 0 0 0 0 0 229 21-30 172 11:00 AM 31 65 116 55 11 2 0 0 0 0 0 0 0 0 280 16-25 180 12:00 PM 23 70 126 79 22 1 0 0 0 0 0 0 0 0 321 21-30 205 1:00 PM 17 60 131 80 14 0 0 0 0 0 0 0 0 0 302 21-30 211 2:00 PM 13 80 105 74 13 2 0 0 0 0 0 0 0 0 287 16-25 185 3:00 PM 16 67 143 100 17 0 0 0 0 0 0 0 0 0 343 21-30 243 4:00 PM 34 97 179 94 27 1 0 0 0 0 0 0 0 0 432 16-25 276 5:00 PM 65 125 214 105 7 0 0 0 0 0 0 0 0 0 516 16-25 339 6:00 PM 37 91 157 110 17 1 0 0 0 0 0 0 0 0 413 21-30 267 7:00 PM 27 70 133 80 12 2 0 0 0 0 0 0 0 0 324 21-30 213 8:00 PM 11 50 128 83 9 0 0 0 0 0 0 0 0 0 281 21-30 211 9:00 PM 9 38 91 74 8 1 0 0 0 0 0 0 0 0 221 21-30 165 10:00 PM 13 24 70 48 6 0 0 0 0 0 0 0 0 0 161 21-30 117 11:00 PM 0 11 25 23 6 0 0 0 0 0 0 0 0 0 65 21-30 47 Day Total 372 1093 2136 1309 226 14 0 0 0 0 0 0 0 0 5150 21-30 3445 Percent ADT 5150 7.2% 21.2% 41.5% 25.4% 4.4% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 8:00 AM 11:00 AM 9:00 AM 8:00 AM 8:00 AM 8:00 AM 8:00 AM Volume 31 65 124 75 16 2 306 PM Peak 5:00 PM 5:00 PM 5:00 PM 6:00 PM 4:00 PM 2:00 PM 5:00 PM Volume 65 125 214 110 27 2 516 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 34 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 372 1093 2136 1309 226 14 0 0 0 0 0 0 0 0 5150 21-30 3445 Percent 7.2% 21.2% 41.5% 25.4% 4.4% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 7.2% 28.4% 69.9% 95.3% 99.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 5150 85th Percentile: Mean Speed(Average): Median Mode: 27 MPH 22 MPH 22 MPH 23 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 35 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 50 7 0 2 0 0 0 0 0 0 0 0 0 59 1:00 AM 0 25 1 1 2 0 0 0 0 0 0 0 0 0 29 2:00 AM 0 12 3 0 1 0 0 0 0 0 0 0 0 0 16 3:00 AM 0 8 1 1 2 0 0 0 0 0 0 0 0 0 12 4:00 AM 0 8 4 0 0 0 0 0 0 0 0 0 0 0 12 5:00 AM 0 14 4 0 3 1 0 0 0 0 0 0 0 0 22 6:00 AM 0 57 30 0 7 1 0 0 0 0 0 0 0 1 96 7:00 AM 2 118 39 1 18 1 0 8 2 0 0 0 0 1 190 8:00 AM 2 207 44 0 24 2 0 8 0 0 0 0 0 19 306 9:00 AM 1 154 48 1 23 1 0 2 0 0 0 0 0 3 233 10:00 AM 1 160 36 1 26 0 0 2 0 0 0 0 0 3 229 11:00 AM 2 178 60 2 16 0 0 4 0 0 0 0 0 18 280 12:00 PM 1 228 51 2 23 0 0 4 0 0 0 0 0 12 321 1:00 PM 0 225 55 1 16 0 0 3 0 0 0 0 0 2 302 2:00 PM 3 189 68 3 14 1 0 1 0 0 0 0 0 8 287 3:00 PM 2 233 66 3 29 1 0 4 1 0 0 0 0 4 343 4:00 PM 3 303 87 1 21 1 0 3 0 0 0 0 0 13 432 5:00 PM 3 380 86 1 26 1 0 0 1 0 0 0 0 18 516 6:00 PM 0 303 77 0 19 0 0 4 0 0 0 0 0 10 413 7:00 PM 0 243 56 1 13 0 0 0 0 0 0 0 0 11 324 8:00 PM 1 208 54 0 11 0 0 6 0 0 0 0 0 1 281 9:00 PM 0 186 31 0 4 0 0 0 0 0 0 0 0 0 221 10:00 PM 3 125 23 0 4 1 0 1 0 0 0 0 0 4 161 11:00 PM 0 55 8 0 2 0 0 0 0 0 0 0 0 0 65 Day Total 24 3669 939 19 306 11 0 50 4 0 0 0 0 128 5150 Percent 0.5% 71.2% 18.2% 0.4% 5.9% 0.2% 0.0% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 2.5% ADT 5150 AM Peak 7:00 AM 8:00 AM 11:00 AM 11:00 AM 10:00 AM 8:00 AM 7:00 AM 7:00 AM 8:00 AM 8:00 AM Volume 2 207 60 2 26 2 8 2 19 306 PM Peak 2:00 PM 5:00 PM 4:00 PM 2:00 PM 3:00 PM 2:00 PM 8:00 PM 3:00 PM 5:00 PM 5:00 PM Volume 3 380 87 3 29 1 6 1 18 516 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 36 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 24 3669 939 19 306 11 0 50 4 0 0 0 0 128 5150 Percent 0.5% 71.2% 18.2% 0.4% 5.9% 0.2% 0.0% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 2.5% ADT 5150 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 37 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 59 59 59 1:00 AM 29 29 29 2:00 AM 16 16 16 3:00 AM 12 12 12 4:00 AM 12 12 12 5:00 AM 22 22 22 6:00 AM 96 96 96 7:00 AM 190 190 190 8:00 AM 306 306 306 9:00 AM 233 233 233 10:00 AM 229 229 229 11:00 AM 280 280 280 12:00 PM 321 321 321 1:00 PM 302 302 302 2:00 PM 287 287 287 3:00 PM 343 343 343 4:00 PM 432 432 432 5:00 PM 516 516 516 6:00 PM 413 413 413 7:00 PM 324 324 324 8:00 PM 281 281 281 9:00 PM 221 221 221 10:00 PM 161 161 161 11:00 PM 65 65 65 Day Total 5150 5150 5150 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 306 306 306 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 516 516 516 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 38 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 10 19 21 31 14 1 0 0 0 0 0 0 0 0 96 21-30 52 1:00 AM 2 6 12 17 4 1 0 0 0 0 0 0 0 0 42 21-30 28 2:00 AM 6 7 8 3 0 0 0 0 0 0 0 0 0 0 24 16-25 15 3:00 AM 2 5 6 6 3 0 0 0 0 0 0 0 0 0 22 22-31 11 4:00 AM 0 4 7 11 16 5 1 0 0 0 0 0 0 0 44 26-35 27 5:00 AM 3 8 16 27 30 10 0 0 0 0 0 0 0 0 94 26-35 57 6:00 AM 14 55 93 79 40 6 0 0 0 0 0 0 0 0 287 21-30 172 7:00 AM 47 93 198 166 81 12 0 0 0 0 0 0 0 0 597 21-30 364 8:00 AM 59 143 241 214 100 9 4 0 0 0 0 0 0 0 770 21-30 454 9:00 AM 38 105 219 160 61 10 0 0 0 0 0 0 0 0 593 21-30 379 10:00 AM 27 81 194 159 63 11 1 0 0 0 0 0 0 0 536 21-30 352 11:00 AM 63 112 213 159 45 8 0 0 0 0 0 0 0 0 600 21-30 371 12:00 PM 46 122 224 152 66 6 0 0 0 0 0 0 0 0 616 21-30 375 1:00 PM 27 107 237 168 54 18 4 0 0 0 0 0 0 0 615 21-30 405 2:00 PM 30 127 205 164 55 12 1 0 0 0 0 0 0 0 594 21-30 368 3:00 PM 30 117 243 185 55 12 0 0 0 0 0 0 0 0 642 21-30 428 4:00 PM 61 151 293 204 78 12 1 0 0 0 0 0 0 0 800 21-30 496 5:00 PM 99 211 368 230 55 10 4 1 0 0 0 0 0 0 978 21-30 598 6:00 PM 50 128 235 222 79 16 8 0 0 0 0 0 0 0 738 21-30 456 7:00 PM 34 109 210 197 54 13 0 0 0 0 0 0 0 0 617 21-30 406 8:00 PM 21 73 170 158 41 4 0 0 0 0 0 0 0 0 467 21-30 328 9:00 PM 17 48 114 125 27 11 0 0 0 0 0 0 0 0 342 21-30 239 10:00 PM 20 33 88 79 22 5 1 0 0 0 0 0 0 0 248 21-30 167 11:00 PM 3 15 28 34 17 1 1 0 0 0 0 0 0 0 99 21-30 61 Day Total 709 1879 3643 2950 1060 193 26 1 0 0 0 0 0 0 10461 21-30 6593 Percent ADT 10461 6.8% 18.0% 34.8% 28.2% 10.1% 1.8% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 11:00 AM 8:00 AM 8:00 AM 8:00 AM 8:00 AM 7:00 AM 8:00 AM 8:00 AM Volume 63 143 241 214 100 12 4 770 PM Peak 5:00 PM 5:00 PM 5:00 PM 5:00 PM 6:00 PM 1:00 PM 6:00 PM 5:00 PM 5:00 PM Volume 99 211 368 230 79 18 8 1 978 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 39 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 709 1879 3643 2950 1060 193 26 1 0 0 0 0 0 0 10461 21-30 6593 Percent 6.8% 18.0% 34.8% 28.2% 10.1% 1.8% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 6.8% 24.7% 59.6% 87.8% 97.9% 99.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 10461 85th Percentile: Mean Speed(Average): Median Mode: 29 MPH 23 MPH 23 MPH 23 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 40 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 1 77 12 0 2 0 0 0 0 0 0 0 0 4 96 1:00 AM 0 35 2 2 2 0 0 0 0 0 0 0 0 1 42 2:00 AM 1 17 4 0 1 0 0 0 0 0 0 0 0 1 24 3:00 AM 0 16 2 1 2 0 0 0 0 0 0 0 0 1 22 4:00 AM 0 36 8 0 0 0 0 0 0 0 0 0 0 0 44 5:00 AM 0 79 10 0 3 1 0 0 1 0 0 0 0 0 94 6:00 AM 7 184 78 0 12 2 0 0 0 0 0 0 0 4 287 7:00 AM 8 434 108 1 25 1 0 8 2 0 0 0 0 10 597 8:00 AM 7 598 99 0 27 2 0 10 0 0 0 0 0 27 770 9:00 AM 5 444 90 2 37 1 0 6 0 0 0 0 0 8 593 10:00 AM 7 397 77 1 38 0 0 3 0 0 0 0 0 13 536 11:00 AM 11 427 98 2 26 1 0 4 0 0 0 0 0 31 600 12:00 PM 5 462 85 2 33 0 0 4 0 0 0 0 0 25 616 1:00 PM 3 477 99 1 21 0 0 4 0 0 0 0 0 10 615 2:00 PM 8 428 115 3 22 1 1 1 0 0 0 0 0 15 594 3:00 PM 4 458 125 5 36 1 0 6 1 0 0 0 0 6 642 4:00 PM 5 603 134 2 26 1 0 5 0 0 0 0 0 24 800 5:00 PM 9 746 156 1 35 2 0 1 1 0 0 0 0 27 978 6:00 PM 5 577 112 0 23 0 0 4 0 0 0 0 0 17 738 7:00 PM 2 494 93 1 13 0 0 1 0 0 0 0 0 13 617 8:00 PM 5 358 81 0 13 0 0 6 0 0 0 0 0 4 467 9:00 PM 0 297 38 0 4 0 0 0 0 0 0 0 0 3 342 10:00 PM 6 203 25 0 5 1 0 1 0 0 0 0 0 7 248 11:00 PM 0 83 13 0 2 0 0 0 0 0 0 0 0 1 99 Day Total 99 7930 1664 24 408 14 1 64 5 0 0 0 0 252 10461 Percent 0.9% 75.8% 15.9% 0.2% 3.9% 0.1% 0.0% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% ADT 10461 AM Peak 11:00 AM 8:00 AM 7:00 AM 1:00 AM 10:00 AM 6:00 AM 8:00 AM 7:00 AM 11:00 AM 8:00 AM Volume 11 598 108 2 38 2 10 2 31 770 PM Peak 5:00 PM 5:00 PM 5:00 PM 3:00 PM 3:00 PM 5:00 PM 2:00 PM 3:00 PM 3:00 PM 5:00 PM 5:00 PM Volume 9 746 156 5 36 2 1 6 1 27 978 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 41 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 99 7930 1664 24 408 14 1 64 5 0 0 0 0 252 10461 Percent 0.9% 75.8% 15.9% 0.2% 3.9% 0.1% 0.0% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% ADT 10461 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 42 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Pine Ridge Rd QC JOB #:14758305 SPECIFIC LOCATION:Whipporwill Ln south of Pine Ridge Rd CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 96 96 96 1:00 AM 42 42 42 2:00 AM 24 24 24 3:00 AM 22 22 22 4:00 AM 44 44 44 5:00 AM 94 94 94 6:00 AM 287 287 287 7:00 AM 597 597 597 8:00 AM 770 770 770 9:00 AM 593 593 593 10:00 AM 536 536 536 11:00 AM 600 600 600 12:00 PM 616 616 616 1:00 PM 615 615 615 2:00 PM 594 594 594 3:00 PM 642 642 642 4:00 PM 800 800 800 5:00 PM 978 978 978 6:00 PM 738 738 738 7:00 PM 617 617 617 8:00 PM 467 467 467 9:00 PM 342 342 342 10:00 PM 248 248 248 11:00 PM 99 99 99 Day Total 10461 10461 10461 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 770 770 770 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 978 978 978 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 43 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 4 0 1 3 13 6 0 0 0 0 0 0 0 0 27 31-40 19 1:00 AM 2 1 1 3 4 1 0 1 0 0 0 0 0 0 13 26-35 7 2:00 AM 0 0 0 1 1 0 1 0 0 0 0 0 0 0 3 26-35 2 3:00 AM 0 0 0 3 2 0 2 0 0 0 0 0 0 0 7 26-35 5 4:00 AM 0 0 0 5 5 11 6 0 1 0 0 0 0 0 28 36-45 17 5:00 AM 4 2 0 4 21 23 5 2 0 0 0 0 0 0 61 31-40 43 6:00 AM 1 2 2 30 58 40 11 0 1 0 0 0 0 0 145 31-40 98 7:00 AM 5 7 14 41 161 97 15 1 0 0 0 0 0 0 341 31-40 257 8:00 AM 6 20 24 41 157 115 30 2 0 0 0 0 0 0 395 31-40 272 9:00 AM 16 24 14 37 97 85 20 3 0 0 0 0 0 0 296 31-40 182 10:00 AM 8 27 19 41 65 76 11 3 1 0 0 0 0 0 251 31-40 140 11:00 AM 12 33 31 31 82 60 10 0 0 0 0 0 0 0 259 31-40 142 12:00 PM 13 40 33 35 73 46 15 1 0 0 0 0 0 0 256 31-40 118 1:00 PM 7 30 25 30 83 54 17 1 0 0 0 0 0 0 247 31-40 137 2:00 PM 7 27 17 23 84 67 10 0 0 0 0 0 0 0 235 31-40 151 3:00 PM 5 27 29 39 91 52 13 3 0 0 0 0 0 0 259 31-40 143 4:00 PM 7 45 38 43 82 66 14 1 0 0 0 0 0 0 296 31-40 147 5:00 PM 9 59 87 52 107 66 16 2 0 0 0 0 0 0 398 31-40 172 6:00 PM 1 22 18 27 88 70 18 4 0 1 0 0 0 0 249 31-40 158 7:00 PM 3 14 28 39 80 54 7 1 0 0 0 0 0 0 226 31-40 134 8:00 PM 1 7 8 27 63 25 8 1 0 0 0 0 0 0 140 28-37 89 9:00 PM 1 2 1 15 42 19 12 1 0 0 0 0 0 0 93 31-40 60 10:00 PM 1 2 3 12 29 16 10 1 1 0 0 0 0 0 75 31-40 45 11:00 PM 1 0 5 3 8 9 0 0 0 0 0 0 0 0 26 31-40 17 Day Total 114 391 398 585 1496 1058 251 28 4 1 0 0 0 0 4326 31-40 2554 Percent ADT 4326 2.6% 9.0% 9.2% 13.5% 34.6% 24.5% 5.8% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 9:00 AM 11:00 AM 11:00 AM 7:00 AM 7:00 AM 8:00 AM 8:00 AM 9:00 AM 4:00 AM 8:00 AM Volume 16 33 31 41 161 115 30 3 1 395 PM Peak 12:00 PM 5:00 PM 5:00 PM 5:00 PM 5:00 PM 6:00 PM 6:00 PM 6:00 PM 10:00 PM 6:00 PM 5:00 PM Volume 13 59 87 52 107 70 18 4 1 1 398 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 44 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 114 391 398 585 1496 1058 251 28 4 1 0 0 0 0 4326 31-40 2554 Percent 2.6% 9.0% 9.2% 13.5% 34.6% 24.5% 5.8% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 2.6% 11.7% 20.9% 34.4% 69.0% 93.4% 99.2% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 4326 85th Percentile: Mean Speed(Average): Median Mode: 38 MPH 30 MPH 32 MPH 33 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 45 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 23 2 0 0 0 0 0 0 0 0 0 0 2 27 1:00 AM 1 10 1 0 0 0 0 0 0 0 0 0 0 1 13 2:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 3 3:00 AM 0 6 1 0 0 0 0 0 0 0 0 0 0 0 7 4:00 AM 0 23 5 0 0 0 0 0 0 0 0 0 0 0 28 5:00 AM 2 51 4 0 1 2 0 0 0 0 0 0 0 1 61 6:00 AM 2 107 31 0 4 0 0 0 0 0 0 0 0 1 145 7:00 AM 1 283 50 0 7 0 0 0 0 0 0 0 0 0 341 8:00 AM 0 337 43 0 8 0 0 5 0 0 0 0 0 2 395 9:00 AM 1 243 39 0 10 0 0 2 0 0 0 0 0 1 296 10:00 AM 2 204 31 0 13 0 0 0 0 0 0 0 0 1 251 11:00 AM 2 215 27 0 13 0 0 0 0 0 0 0 0 2 259 12:00 PM 3 211 30 1 8 0 0 1 0 0 0 0 0 2 256 1:00 PM 1 211 28 0 5 0 0 1 0 0 0 0 0 1 247 2:00 PM 1 190 36 0 6 0 0 1 0 0 0 0 0 1 235 3:00 PM 1 202 41 2 10 1 0 2 0 0 0 0 0 0 259 4:00 PM 1 245 38 1 7 0 0 3 0 0 0 0 0 1 296 5:00 PM 1 329 56 0 7 0 0 1 0 0 0 0 0 4 398 6:00 PM 1 222 22 0 4 0 0 0 0 0 0 0 0 0 249 7:00 PM 0 197 25 0 3 0 0 1 0 0 0 0 0 0 226 8:00 PM 0 124 13 0 3 0 0 0 0 0 0 0 0 0 140 9:00 PM 0 86 6 0 1 0 0 0 0 0 0 0 0 0 93 10:00 PM 0 71 2 0 2 0 0 0 0 0 0 0 0 0 75 11:00 PM 0 24 1 0 1 0 0 0 0 0 0 0 0 0 26 Day Total 20 3616 533 4 113 3 0 17 0 0 0 0 0 20 4326 Percent 0.5% 83.6% 12.3% 0.1% 2.6% 0.1% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.5% ADT 4326 AM Peak 5:00 AM 8:00 AM 7:00 AM 10:00 AM 5:00 AM 8:00 AM 12:00 AM 8:00 AM Volume 2 337 50 13 2 5 2 395 PM Peak 12:00 PM 5:00 PM 5:00 PM 3:00 PM 3:00 PM 3:00 PM 4:00 PM 5:00 PM 5:00 PM Volume 3 329 56 2 10 1 3 4 398 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 46 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 20 3616 533 4 113 3 0 17 0 0 0 0 0 20 4326 Percent 0.5% 83.6% 12.3% 0.1% 2.6% 0.1% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.5% ADT 4326 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 47 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 27 27 27 1:00 AM 13 13 13 2:00 AM 3 3 3 3:00 AM 7 7 7 4:00 AM 28 28 28 5:00 AM 61 61 61 6:00 AM 145 145 145 7:00 AM 341 341 341 8:00 AM 395 395 395 9:00 AM 296 296 296 10:00 AM 251 251 251 11:00 AM 259 259 259 12:00 PM 256 256 256 1:00 PM 247 247 247 2:00 PM 235 235 235 3:00 PM 259 259 259 4:00 PM 296 296 296 5:00 PM 398 398 398 6:00 PM 249 249 249 7:00 PM 226 226 226 8:00 PM 140 140 140 9:00 PM 93 93 93 10:00 PM 75 75 75 11:00 PM 26 26 26 Day Total 4326 4326 4326 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 395 395 395 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 398 398 398 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 48 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 4 6 16 11 4 0 0 0 0 0 0 0 0 41 26-35 27 1:00 AM 0 0 2 5 8 1 0 0 0 0 0 0 0 0 16 26-35 13 2:00 AM 1 0 1 0 1 0 0 0 0 0 0 0 0 0 3 16-25 1 3:00 AM 0 1 0 1 2 1 0 0 0 0 0 0 0 0 5 31-40 3 4:00 AM 0 3 0 2 2 2 1 0 0 0 0 0 0 0 10 31-40 4 5:00 AM 1 0 2 4 3 3 0 0 0 0 0 0 0 0 13 30-39 6 6:00 AM 1 4 6 16 19 4 0 0 0 0 0 0 0 0 50 26-35 34 7:00 AM 6 6 34 45 25 7 0 0 0 0 0 0 0 0 123 21-30 79 8:00 AM 6 10 34 80 62 9 1 1 0 0 0 0 0 0 203 26-35 142 9:00 AM 4 15 34 51 41 12 0 0 0 0 0 0 0 0 157 26-35 91 10:00 AM 1 7 30 55 40 14 1 0 0 0 0 0 0 0 148 26-35 95 11:00 AM 11 14 43 63 44 9 1 0 0 0 0 0 0 0 185 26-35 107 12:00 PM 3 20 39 86 67 14 4 0 0 0 0 0 0 0 233 26-35 153 1:00 PM 3 15 52 93 57 14 1 0 0 0 0 0 0 0 235 26-35 150 2:00 PM 7 10 49 60 69 14 1 0 0 0 0 0 0 0 210 26-35 129 3:00 PM 2 11 39 97 84 20 4 1 0 0 0 0 0 0 258 26-35 181 4:00 PM 5 10 61 131 96 24 1 0 0 0 0 0 0 0 328 26-35 226 5:00 PM 5 19 102 196 99 6 1 0 0 0 0 0 0 0 428 21-30 298 6:00 PM 5 20 64 140 90 20 2 0 0 0 0 0 0 0 341 26-35 230 7:00 PM 2 10 41 111 55 15 4 1 0 0 0 0 0 0 239 26-35 166 8:00 PM 0 10 36 105 85 9 1 0 0 0 0 0 0 0 246 26-35 190 9:00 PM 2 14 23 86 61 14 0 1 0 0 0 0 0 0 201 26-35 146 10:00 PM 1 5 14 46 47 12 1 0 0 0 0 0 0 0 126 26-35 93 11:00 PM 0 3 3 15 13 6 2 0 0 0 0 0 0 0 42 26-35 28 Day Total 66 211 715 1504 1081 234 26 4 0 0 0 0 0 0 3841 26-35 2584 Percent ADT 3841 1.7% 5.5% 18.6% 39.2% 28.1% 6.1% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 11:00 AM 9:00 AM 11:00 AM 8:00 AM 8:00 AM 10:00 AM 4:00 AM 8:00 AM 8:00 AM Volume 11 15 43 80 62 14 1 1 203 PM Peak 2:00 PM 12:00 PM 5:00 PM 5:00 PM 5:00 PM 4:00 PM 12:00 PM 3:00 PM 5:00 PM Volume 7 20 102 196 99 24 4 1 428 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 49 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 66 211 715 1504 1081 234 26 4 0 0 0 0 0 0 3841 26-35 2584 Percent 1.7% 5.5% 18.6% 39.2% 28.1% 6.1% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 1.7% 7.2% 25.8% 65.0% 93.1% 99.2% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 3841 85th Percentile: Mean Speed(Average): Median Mode: 33 MPH 27 MPH 28 MPH 28 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 50 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 35 6 0 0 0 0 0 0 0 0 0 0 0 41 1:00 AM 0 13 2 1 0 0 0 0 0 0 0 0 0 0 16 2:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 1 3 3:00 AM 0 3 2 0 0 0 0 0 0 0 0 0 0 0 5 4:00 AM 0 6 4 0 0 0 0 0 0 0 0 0 0 0 10 5:00 AM 0 8 3 0 1 1 0 0 0 0 0 0 0 0 13 6:00 AM 0 42 8 0 0 0 0 0 0 0 0 0 0 0 50 7:00 AM 1 85 22 0 6 0 0 5 1 0 0 0 0 3 123 8:00 AM 0 165 25 0 6 0 0 2 0 0 0 0 0 5 203 9:00 AM 0 123 19 0 11 0 0 3 0 0 0 0 0 1 157 10:00 AM 0 118 24 0 6 0 0 0 0 0 0 0 0 0 148 11:00 AM 2 150 21 0 6 0 0 2 0 0 0 0 0 4 185 12:00 PM 1 196 28 1 6 0 0 0 0 0 0 0 0 1 233 1:00 PM 1 198 29 1 5 0 0 0 0 0 0 0 0 1 235 2:00 PM 1 170 26 0 8 1 0 0 0 0 0 0 0 4 210 3:00 PM 2 210 36 1 6 1 0 0 0 0 0 0 0 2 258 4:00 PM 1 266 53 0 3 0 0 0 0 0 0 0 0 5 328 5:00 PM 4 371 42 0 10 0 0 0 0 0 0 0 0 1 428 6:00 PM 1 297 37 0 2 0 0 1 0 0 0 0 0 3 341 7:00 PM 0 216 19 0 3 0 0 0 0 0 0 0 0 1 239 8:00 PM 0 218 24 0 4 0 0 0 0 0 0 0 0 0 246 9:00 PM 0 179 20 0 1 0 0 0 0 0 0 0 0 1 201 10:00 PM 0 116 10 0 0 0 0 0 0 0 0 0 0 0 126 11:00 PM 0 40 1 0 1 0 0 0 0 0 0 0 0 0 42 Day Total 14 3227 461 4 85 3 0 13 1 0 0 0 0 33 3841 Percent 0.4% 84.0% 12.0% 0.1% 2.2% 0.1% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% ADT 3841 AM Peak 11:00 AM 8:00 AM 8:00 AM 1:00 AM 9:00 AM 5:00 AM 7:00 AM 7:00 AM 8:00 AM 8:00 AM Volume 2 165 25 1 11 1 5 1 5 203 PM Peak 5:00 PM 5:00 PM 4:00 PM 12:00 PM 5:00 PM 2:00 PM 6:00 PM 4:00 PM 5:00 PM Volume 4 371 53 1 10 1 1 5 428 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 51 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 14 3227 461 4 85 3 0 13 1 0 0 0 0 33 3841 Percent 0.4% 84.0% 12.0% 0.1% 2.2% 0.1% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% ADT 3841 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 52 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 41 41 41 1:00 AM 16 16 16 2:00 AM 3 3 3 3:00 AM 5 5 5 4:00 AM 10 10 10 5:00 AM 13 13 13 6:00 AM 50 50 50 7:00 AM 123 123 123 8:00 AM 203 203 203 9:00 AM 157 157 157 10:00 AM 148 148 148 11:00 AM 185 185 185 12:00 PM 233 233 233 1:00 PM 235 235 235 2:00 PM 210 210 210 3:00 PM 258 258 258 4:00 PM 328 328 328 5:00 PM 428 428 428 6:00 PM 341 341 341 7:00 PM 239 239 239 8:00 PM 246 246 246 9:00 PM 201 201 201 10:00 PM 126 126 126 11:00 PM 42 42 42 Day Total 3841 3841 3841 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 203 203 203 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 428 428 428 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 53 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 4 4 7 19 24 10 0 0 0 0 0 0 0 0 68 26-35 42 1:00 AM 2 1 3 8 12 2 0 1 0 0 0 0 0 0 29 26-35 19 2:00 AM 1 0 1 1 2 0 1 0 0 0 0 0 0 0 6 26-35 3 3:00 AM 0 1 0 4 4 1 2 0 0 0 0 0 0 0 12 26-35 8 4:00 AM 0 3 0 7 7 13 7 0 1 0 0 0 0 0 38 31-40 20 5:00 AM 5 2 2 8 24 26 5 2 0 0 0 0 0 0 74 31-40 50 6:00 AM 2 6 8 46 77 44 11 0 1 0 0 0 0 0 195 26-35 123 7:00 AM 11 13 48 86 186 104 15 1 0 0 0 0 0 0 464 31-40 290 8:00 AM 12 30 58 121 219 124 31 3 0 0 0 0 0 0 598 31-40 342 9:00 AM 20 39 48 88 138 97 20 3 0 0 0 0 0 0 453 31-40 234 10:00 AM 9 34 49 96 105 90 12 3 1 0 0 0 0 0 399 26-35 201 11:00 AM 23 47 74 94 126 69 11 0 0 0 0 0 0 0 444 26-35 219 12:00 PM 16 60 72 121 140 60 19 1 0 0 0 0 0 0 489 26-35 261 1:00 PM 10 45 77 123 140 68 18 1 0 0 0 0 0 0 482 26-35 263 2:00 PM 14 37 66 83 153 81 11 0 0 0 0 0 0 0 445 26-35 236 3:00 PM 7 38 68 136 175 72 17 4 0 0 0 0 0 0 517 26-35 311 4:00 PM 12 55 99 174 178 90 15 1 0 0 0 0 0 0 624 26-35 352 5:00 PM 14 78 189 248 206 72 17 2 0 0 0 0 0 0 826 26-35 454 6:00 PM 6 42 82 167 178 90 20 4 0 1 0 0 0 0 590 26-35 345 7:00 PM 5 24 69 150 135 69 11 2 0 0 0 0 0 0 465 26-35 285 8:00 PM 1 17 44 132 148 34 9 1 0 0 0 0 0 0 386 26-35 280 9:00 PM 3 16 24 101 103 33 12 2 0 0 0 0 0 0 294 26-35 204 10:00 PM 2 7 17 58 76 28 11 1 1 0 0 0 0 0 201 26-35 133 11:00 PM 1 3 8 18 21 15 2 0 0 0 0 0 0 0 68 26-35 39 Day Total 180 602 1113 2089 2577 1292 277 32 4 1 0 0 0 0 8167 26-35 4665 Percent ADT 8167 2.2% 7.4% 13.6% 25.6% 31.6% 15.8% 3.4% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 11:00 AM 11:00 AM 11:00 AM 8:00 AM 8:00 AM 8:00 AM 8:00 AM 8:00 AM 4:00 AM 8:00 AM Volume 23 47 74 121 219 124 31 3 1 598 PM Peak 12:00 PM 5:00 PM 5:00 PM 5:00 PM 5:00 PM 4:00 PM 6:00 PM 3:00 PM 10:00 PM 6:00 PM 5:00 PM Volume 16 78 189 248 206 90 20 4 1 1 826 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 54 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 180 602 1113 2089 2577 1292 277 32 4 1 0 0 0 0 8167 26-35 4665 Percent 2.2% 7.4% 13.6% 25.6% 31.6% 15.8% 3.4% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 2.2% 9.6% 23.2% 48.8% 80.3% 96.2% 99.5% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 8167 85th Percentile: Mean Speed(Average): Median Mode: 36 MPH 29 MPH 30 MPH 33 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 55 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 58 8 0 0 0 0 0 0 0 0 0 0 2 68 1:00 AM 1 23 3 1 0 0 0 0 0 0 0 0 0 1 29 2:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 1 6 3:00 AM 0 9 3 0 0 0 0 0 0 0 0 0 0 0 12 4:00 AM 0 29 9 0 0 0 0 0 0 0 0 0 0 0 38 5:00 AM 2 59 7 0 2 3 0 0 0 0 0 0 0 1 74 6:00 AM 2 149 39 0 4 0 0 0 0 0 0 0 0 1 195 7:00 AM 2 368 72 0 13 0 0 5 1 0 0 0 0 3 464 8:00 AM 0 502 68 0 14 0 0 7 0 0 0 0 0 7 598 9:00 AM 1 366 58 0 21 0 0 5 0 0 0 0 0 2 453 10:00 AM 2 322 55 0 19 0 0 0 0 0 0 0 0 1 399 11:00 AM 4 365 48 0 19 0 0 2 0 0 0 0 0 6 444 12:00 PM 4 407 58 2 14 0 0 1 0 0 0 0 0 3 489 1:00 PM 2 409 57 1 10 0 0 1 0 0 0 0 0 2 482 2:00 PM 2 360 62 0 14 1 0 1 0 0 0 0 0 5 445 3:00 PM 3 412 77 3 16 2 0 2 0 0 0 0 0 2 517 4:00 PM 2 511 91 1 10 0 0 3 0 0 0 0 0 6 624 5:00 PM 5 700 98 0 17 0 0 1 0 0 0 0 0 5 826 6:00 PM 2 519 59 0 6 0 0 1 0 0 0 0 0 3 590 7:00 PM 0 413 44 0 6 0 0 1 0 0 0 0 0 1 465 8:00 PM 0 342 37 0 7 0 0 0 0 0 0 0 0 0 386 9:00 PM 0 265 26 0 2 0 0 0 0 0 0 0 0 1 294 10:00 PM 0 187 12 0 2 0 0 0 0 0 0 0 0 0 201 11:00 PM 0 64 2 0 2 0 0 0 0 0 0 0 0 0 68 Day Total 34 6843 994 8 198 6 0 30 1 0 0 0 0 53 8167 Percent 0.4% 83.8% 12.2% 0.1% 2.4% 0.1% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.6% ADT 8167 AM Peak 11:00 AM 8:00 AM 7:00 AM 1:00 AM 9:00 AM 5:00 AM 8:00 AM 7:00 AM 8:00 AM 8:00 AM Volume 4 502 72 1 21 3 7 1 7 598 PM Peak 5:00 PM 5:00 PM 5:00 PM 3:00 PM 5:00 PM 3:00 PM 4:00 PM 4:00 PM 5:00 PM Volume 5 700 98 3 17 2 3 6 826 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 56 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 34 6843 994 8 198 6 0 30 1 0 0 0 0 53 8167 Percent 0.4% 83.8% 12.2% 0.1% 2.4% 0.1% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.6% ADT 8167 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 57 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Dudley Dr QC JOB #:14758306 SPECIFIC LOCATION:Whipporwill Ln south of Dudley Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 68 68 68 1:00 AM 29 29 29 2:00 AM 6 6 6 3:00 AM 12 12 12 4:00 AM 38 38 38 5:00 AM 74 74 74 6:00 AM 195 195 195 7:00 AM 464 464 464 8:00 AM 598 598 598 9:00 AM 453 453 453 10:00 AM 399 399 399 11:00 AM 444 444 444 12:00 PM 489 489 489 1:00 PM 482 482 482 2:00 PM 445 445 445 3:00 PM 517 517 517 4:00 PM 624 624 624 5:00 PM 826 826 826 6:00 PM 590 590 590 7:00 PM 465 465 465 8:00 PM 386 386 386 9:00 PM 294 294 294 10:00 PM 201 201 201 11:00 PM 68 68 68 Day Total 8167 8167 8167 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 598 598 598 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 826 826 826 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 58 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 0 1 9 16 1 0 0 0 0 0 0 0 0 27 26-35 25 1:00 AM 0 0 0 4 5 2 0 0 0 0 0 0 0 0 11 26-35 9 2:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 26-35 1 3:00 AM 0 0 1 2 1 1 0 0 0 0 0 0 0 0 5 26-35 3 4:00 AM 1 0 0 1 2 1 1 0 0 0 0 0 0 0 6 31-40 3 5:00 AM 0 0 0 2 2 0 1 0 0 0 0 0 0 0 5 26-35 4 6:00 AM 0 0 0 1 8 4 0 0 0 0 0 0 0 0 13 31-40 12 7:00 AM 2 0 0 14 13 5 0 0 0 0 0 0 0 0 34 26-35 27 8:00 AM 0 0 2 13 22 14 0 0 0 0 0 0 0 0 51 31-40 35 9:00 AM 1 0 0 8 36 15 2 1 0 0 0 0 0 0 63 31-40 51 10:00 AM 0 0 1 14 20 19 1 0 0 0 0 0 0 0 55 31-40 38 11:00 AM 0 0 2 11 42 19 1 0 0 0 0 0 0 0 75 31-40 60 12:00 PM 0 1 5 26 52 13 3 0 0 0 0 0 0 0 100 26-35 78 1:00 PM 1 0 7 19 54 19 5 1 0 0 0 0 0 0 106 31-40 73 2:00 PM 1 0 4 22 53 13 0 1 0 0 0 0 0 0 94 26-35 74 3:00 PM 1 0 3 25 72 25 2 0 0 0 0 0 0 0 128 27-36 97 4:00 PM 2 0 1 31 98 35 5 0 0 0 0 0 0 0 172 31-40 133 5:00 PM 2 0 2 53 111 41 4 0 0 0 0 0 0 0 213 26-35 163 6:00 PM 2 0 2 43 91 27 1 0 0 0 0 0 0 0 166 26-35 134 7:00 PM 4 0 4 55 64 13 1 0 0 0 0 0 0 0 141 26-35 119 8:00 PM 2 0 4 40 63 10 0 0 0 0 0 0 0 0 119 26-35 102 9:00 PM 0 0 6 46 33 15 1 0 0 0 0 0 0 0 101 26-35 78 10:00 PM 0 0 3 28 41 7 2 0 0 0 0 0 0 0 81 26-35 69 11:00 PM 0 0 0 5 14 4 0 0 0 0 0 0 0 0 23 26-35 19 Day Total 19 1 48 472 914 303 30 3 0 0 0 0 0 0 1790 26-35 1386 Percent ADT 1790 1.1% 0.1% 2.7% 26.4% 51.1% 16.9% 1.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 7:00 AM 8:00 AM 7:00 AM 11:00 AM 10:00 AM 9:00 AM 9:00 AM 11:00 AM Volume 2 2 14 42 19 2 1 75 PM Peak 7:00 PM 12:00 PM 1:00 PM 7:00 PM 5:00 PM 5:00 PM 1:00 PM 1:00 PM 5:00 PM Volume 4 1 7 55 111 41 5 1 213 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 59 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 19 1 48 472 914 303 30 3 0 0 0 0 0 0 1790 26-35 1386 Percent 1.1% 0.1% 2.7% 26.4% 51.1% 16.9% 1.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 1.1% 1.1% 3.8% 30.2% 81.2% 98.2% 99.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 1790 85th Percentile: Mean Speed(Average): Median Mode: 36 MPH 31 MPH 31 MPH 33 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 60 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 25 2 0 0 0 0 0 0 0 0 0 0 0 27 1:00 AM 0 9 2 0 0 0 0 0 0 0 0 0 0 0 11 2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 3:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 0 5 4:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 1 6 5:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 0 5 6:00 AM 0 13 0 0 0 0 0 0 0 0 0 0 0 0 13 7:00 AM 0 28 2 0 2 0 0 0 0 0 0 0 0 2 34 8:00 AM 0 45 6 0 0 0 0 0 0 0 0 0 0 0 51 9:00 AM 2 56 4 0 0 0 0 0 0 0 0 0 0 1 63 10:00 AM 1 47 6 0 1 0 0 0 0 0 0 0 0 0 55 11:00 AM 1 70 2 0 1 0 0 1 0 0 0 0 0 0 75 12:00 PM 1 94 3 0 2 0 0 0 0 0 0 0 0 0 100 1:00 PM 1 102 1 0 1 0 0 0 0 0 0 0 0 1 106 2:00 PM 0 82 5 0 4 1 0 0 0 0 0 0 0 2 94 3:00 PM 2 119 5 0 1 0 0 0 0 0 0 0 0 1 128 4:00 PM 1 165 4 0 0 0 0 0 0 0 0 0 0 2 172 5:00 PM 1 205 4 0 1 0 0 0 0 0 0 0 0 2 213 6:00 PM 1 160 3 0 0 0 0 0 0 0 0 0 0 2 166 7:00 PM 1 129 5 0 0 0 0 0 0 0 0 0 0 6 141 8:00 PM 1 114 1 0 0 0 0 0 0 0 0 0 0 3 119 9:00 PM 0 100 1 0 0 0 0 0 0 0 0 0 0 0 101 10:00 PM 0 79 2 0 0 0 0 0 0 0 0 0 0 0 81 11:00 PM 0 23 0 0 0 0 0 0 0 0 0 0 0 0 23 Day Total 13 1680 59 0 13 1 0 1 0 0 0 0 0 23 1790 Percent 0.7% 93.9% 3.3% 0.0% 0.7% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 1.3% ADT 1790 AM Peak 9:00 AM 11:00 AM 8:00 AM 7:00 AM 11:00 AM 7:00 AM 11:00 AM Volume 2 70 6 2 1 2 75 PM Peak 3:00 PM 5:00 PM 2:00 PM 2:00 PM 2:00 PM 7:00 PM 5:00 PM Volume 2 205 5 4 1 6 213 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 61 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 13 1680 59 0 13 1 0 1 0 0 0 0 0 23 1790 Percent 0.7% 93.9% 3.3% 0.0% 0.7% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 1.3% ADT 1790 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 62 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 27 27 27 1:00 AM 11 11 11 2:00 AM 1 1 1 3:00 AM 5 5 5 4:00 AM 6 6 6 5:00 AM 5 5 5 6:00 AM 13 13 13 7:00 AM 34 34 34 8:00 AM 51 51 51 9:00 AM 63 63 63 10:00 AM 55 55 55 11:00 AM 75 75 75 12:00 PM 100 100 100 1:00 PM 106 106 106 2:00 PM 94 94 94 3:00 PM 128 128 128 4:00 PM 172 172 172 5:00 PM 213 213 213 6:00 PM 166 166 166 7:00 PM 141 141 141 8:00 PM 119 119 119 9:00 PM 101 101 101 10:00 PM 81 81 81 11:00 PM 23 23 23 Day Total 1790 1790 1790 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 11:00 AM 11:00 AM 11:00 AM Volume 75 75 75 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 213 213 213 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 63 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 0 0 2 10 11 3 0 0 0 0 0 0 0 26 31-40 21 1:00 AM 0 0 0 1 3 4 2 1 0 0 0 0 0 0 11 31-40 7 2:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 31-40 1 3:00 AM 0 0 1 0 2 0 2 0 0 0 0 0 0 0 5 26-35 2 4:00 AM 0 0 0 1 0 2 1 0 1 0 0 0 0 0 5 36-45 3 5:00 AM 0 0 0 1 1 2 0 1 0 0 0 0 0 0 5 31-40 3 6:00 AM 0 0 0 0 1 6 5 1 0 0 0 0 0 0 13 36-45 11 7:00 AM 2 0 0 3 11 11 5 2 0 0 0 0 0 0 34 31-40 22 8:00 AM 0 0 1 3 11 16 17 2 0 0 0 0 0 0 50 36-45 33 9:00 AM 1 0 0 2 6 32 14 7 0 0 1 0 0 0 63 36-45 45 10:00 AM 0 0 0 4 10 13 21 5 1 0 0 0 0 0 54 36-45 34 11:00 AM 1 0 1 4 9 38 19 3 1 0 0 0 0 0 76 36-45 56 12:00 PM 23 1 2 6 27 38 17 5 1 0 0 0 0 0 120 31-40 64 1:00 PM 28 0 1 10 19 43 23 6 1 1 0 0 0 0 132 36-45 65 2:00 PM 29 0 0 5 28 41 16 2 0 1 0 0 0 0 122 31-40 69 3:00 PM 34 0 0 4 26 56 31 6 0 0 0 0 0 0 157 36-45 86 4:00 PM 44 0 0 1 43 76 40 7 3 0 0 0 0 0 214 32-41 118 5:00 PM 21 0 0 4 53 82 56 9 3 0 0 0 0 0 228 36-45 137 6:00 PM 19 0 0 3 44 73 31 11 1 0 0 0 0 0 182 31-40 116 7:00 PM 2 0 1 9 52 50 19 5 0 0 0 0 0 0 138 31-40 102 8:00 PM 2 0 0 14 34 51 17 2 0 0 0 0 0 0 120 31-40 84 9:00 PM 0 0 0 7 44 28 19 2 1 0 0 0 0 0 101 31-40 71 10:00 PM 0 0 0 6 24 35 11 3 0 0 0 0 0 0 79 31-40 59 11:00 PM 0 0 0 0 5 11 6 1 0 0 0 0 0 0 23 36-45 17 Day Total 206 1 7 90 463 720 375 81 13 2 1 0 0 0 1959 31-40 1183 Percent ADT 1959 10.5% 0.1% 0.4% 4.6% 23.6% 36.8% 19.1% 4.1% 0.7% 0.1% 0.1% 0.0% 0.0% 0.0% AM Peak 7:00 AM 3:00 AM 10:00 AM 7:00 AM 11:00 AM 10:00 AM 9:00 AM 4:00 AM 9:00 AM 11:00 AM Volume 2 1 4 11 38 21 7 1 1 76 PM Peak 4:00 PM 12:00 PM 12:00 PM 8:00 PM 5:00 PM 5:00 PM 5:00 PM 6:00 PM 4:00 PM 1:00 PM 5:00 PM Volume 44 1 2 14 53 82 56 11 3 1 228 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 64 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 206 1 7 90 463 720 375 81 13 2 1 0 0 0 1959 31-40 1183 Percent 10.5% 0.1% 0.4% 4.6% 23.6% 36.8% 19.1% 4.1% 0.7% 0.1% 0.1% 0.0% 0.0% 0.0% Cumulative Percent 10.5% 10.6% 10.9% 15.5% 39.2% 75.9% 95.0% 99.2% 99.8% 99.9% 100.0% 100.0% 100.0% 100.0% ADT 1959 85th Percentile: Mean Speed(Average): Median Mode: 42 MPH 34 MPH 36 MPH 38 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 65 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 21 5 0 0 0 0 0 0 0 0 0 0 0 26 1:00 AM 0 9 2 0 0 0 0 0 0 0 0 0 0 0 11 2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 3:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 0 5 4:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 0 5 5:00 AM 0 2 2 0 1 0 0 0 0 0 0 0 0 0 5 6:00 AM 0 10 3 0 0 0 0 0 0 0 0 0 0 0 13 7:00 AM 1 26 2 0 4 0 0 0 0 0 0 0 0 1 34 8:00 AM 0 44 4 0 1 0 0 1 0 0 0 0 0 0 50 9:00 AM 2 52 5 0 3 0 0 0 0 0 0 0 0 1 63 10:00 AM 1 43 8 0 2 0 0 0 0 0 0 0 0 0 54 11:00 AM 1 67 5 0 1 0 0 1 0 0 0 0 0 1 76 12:00 PM 1 88 4 1 3 0 0 0 0 0 0 0 0 23 120 1:00 PM 1 94 6 0 3 0 0 0 0 0 0 0 0 28 132 2:00 PM 0 79 8 2 3 1 0 0 0 0 0 0 0 29 122 3:00 PM 2 108 12 1 0 0 0 0 0 0 0 0 0 34 157 4:00 PM 0 152 17 0 1 0 0 0 0 0 0 0 0 44 214 5:00 PM 1 190 12 0 4 0 0 0 0 0 0 0 0 21 228 6:00 PM 0 156 6 0 0 0 0 1 0 0 0 0 0 19 182 7:00 PM 1 128 6 0 1 0 0 0 0 0 0 0 0 2 138 8:00 PM 1 111 6 0 0 0 0 0 0 0 0 0 0 2 120 9:00 PM 0 95 6 0 0 0 0 0 0 0 0 0 0 0 101 10:00 PM 0 76 3 0 0 0 0 0 0 0 0 0 0 0 79 11:00 PM 0 23 0 0 0 0 0 0 0 0 0 0 0 0 23 Day Total 12 1584 123 4 27 1 0 3 0 0 0 0 0 205 1959 Percent 0.6% 80.9% 6.3% 0.2% 1.4% 0.1% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 10.5% ADT 1959 AM Peak 9:00 AM 11:00 AM 10:00 AM 7:00 AM 8:00 AM 7:00 AM 11:00 AM Volume 2 67 8 4 1 1 76 PM Peak 3:00 PM 5:00 PM 4:00 PM 2:00 PM 5:00 PM 2:00 PM 6:00 PM 4:00 PM 5:00 PM Volume 2 190 17 2 4 1 1 44 228 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 66 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 12 1584 123 4 27 1 0 3 0 0 0 0 0 205 1959 Percent 0.6% 80.9% 6.3% 0.2% 1.4% 0.1% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 10.5% ADT 1959 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 67 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 26 26 26 1:00 AM 11 11 11 2:00 AM 1 1 1 3:00 AM 5 5 5 4:00 AM 5 5 5 5:00 AM 5 5 5 6:00 AM 13 13 13 7:00 AM 34 34 34 8:00 AM 50 50 50 9:00 AM 63 63 63 10:00 AM 54 54 54 11:00 AM 76 76 76 12:00 PM 120 120 120 1:00 PM 132 132 132 2:00 PM 122 122 122 3:00 PM 157 157 157 4:00 PM 214 214 214 5:00 PM 228 228 228 6:00 PM 182 182 182 7:00 PM 138 138 138 8:00 PM 120 120 120 9:00 PM 101 101 101 10:00 PM 79 79 79 11:00 PM 23 23 23 Day Total 1959 1959 1959 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 11:00 AM 11:00 AM 11:00 AM Volume 76 76 76 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 228 228 228 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 68 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 0 1 11 26 12 3 0 0 0 0 0 0 0 53 31-40 38 1:00 AM 0 0 0 5 8 6 2 1 0 0 0 0 0 0 22 31-40 13 2:00 AM 0 0 0 0 1 1 0 0 0 0 0 0 0 0 2 31-40 2 3:00 AM 0 0 2 2 3 1 2 0 0 0 0 0 0 0 10 30-39 4 4:00 AM 1 0 0 2 2 3 2 0 1 0 0 0 0 0 11 36-45 5 5:00 AM 0 0 0 3 3 2 1 1 0 0 0 0 0 0 10 31-40 5 6:00 AM 0 0 0 1 9 10 5 1 0 0 0 0 0 0 26 31-40 19 7:00 AM 4 0 0 17 24 16 5 2 0 0 0 0 0 0 68 31-40 40 8:00 AM 0 0 3 16 33 30 17 2 0 0 0 0 0 0 101 31-40 63 9:00 AM 2 0 0 10 42 47 16 8 0 0 1 0 0 0 126 31-40 89 10:00 AM 0 0 1 18 30 32 22 5 1 0 0 0 0 0 109 31-40 62 11:00 AM 1 0 3 15 51 57 20 3 1 0 0 0 0 0 151 31-40 108 12:00 PM 23 2 7 32 79 51 20 5 1 0 0 0 0 0 220 31-40 129 1:00 PM 29 0 8 29 73 62 28 7 1 1 0 0 0 0 238 31-40 135 2:00 PM 30 0 4 27 81 54 16 3 0 1 0 0 0 0 216 31-40 135 3:00 PM 35 0 3 29 98 81 33 6 0 0 0 0 0 0 285 31-40 178 4:00 PM 46 0 1 32 141 111 45 7 3 0 0 0 0 0 386 31-40 251 5:00 PM 23 0 2 57 164 123 60 9 3 0 0 0 0 0 441 31-40 287 6:00 PM 21 0 2 46 135 100 32 11 1 0 0 0 0 0 348 31-40 235 7:00 PM 6 0 5 64 116 63 20 5 0 0 0 0 0 0 279 31-40 179 8:00 PM 4 0 4 54 97 61 17 2 0 0 0 0 0 0 239 31-40 157 9:00 PM 0 0 6 53 77 43 20 2 1 0 0 0 0 0 202 26-35 130 10:00 PM 0 0 3 34 65 42 13 3 0 0 0 0 0 0 160 31-40 107 11:00 PM 0 0 0 5 19 15 6 1 0 0 0 0 0 0 46 31-40 34 Day Total 225 2 55 562 1377 1023 405 84 13 2 1 0 0 0 3749 31-40 2400 Percent ADT 3749 6.0% 0.1% 1.5% 15.0% 36.7% 27.3% 10.8% 2.2% 0.3% 0.1% 0.0% 0.0% 0.0% 0.0% AM Peak 7:00 AM 8:00 AM 10:00 AM 11:00 AM 11:00 AM 10:00 AM 9:00 AM 4:00 AM 9:00 AM 11:00 AM Volume 4 3 18 51 57 22 8 1 1 151 PM Peak 4:00 PM 12:00 PM 1:00 PM 7:00 PM 5:00 PM 5:00 PM 5:00 PM 6:00 PM 4:00 PM 1:00 PM 5:00 PM Volume 46 2 8 64 164 123 60 11 3 1 441 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 69 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 225 2 55 562 1377 1023 405 84 13 2 1 0 0 0 3749 31-40 2400 Percent 6.0% 0.1% 1.5% 15.0% 36.7% 27.3% 10.8% 2.2% 0.3% 0.1% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 6.0% 6.1% 7.5% 22.5% 59.2% 86.5% 97.3% 99.6% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 3749 85th Percentile: Mean Speed(Average): Median Mode: 39 MPH 32 MPH 33 MPH 33 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 70 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 46 7 0 0 0 0 0 0 0 0 0 0 0 53 1:00 AM 0 18 4 0 0 0 0 0 0 0 0 0 0 0 22 2:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 3:00 AM 0 9 1 0 0 0 0 0 0 0 0 0 0 0 10 4:00 AM 0 10 0 0 0 0 0 0 0 0 0 0 0 1 11 5:00 AM 0 6 3 0 1 0 0 0 0 0 0 0 0 0 10 6:00 AM 0 23 3 0 0 0 0 0 0 0 0 0 0 0 26 7:00 AM 1 54 4 0 6 0 0 0 0 0 0 0 0 3 68 8:00 AM 0 89 10 0 1 0 0 1 0 0 0 0 0 0 101 9:00 AM 4 108 9 0 3 0 0 0 0 0 0 0 0 2 126 10:00 AM 2 90 14 0 3 0 0 0 0 0 0 0 0 0 109 11:00 AM 2 137 7 0 2 0 0 2 0 0 0 0 0 1 151 12:00 PM 2 182 7 1 5 0 0 0 0 0 0 0 0 23 220 1:00 PM 2 196 7 0 4 0 0 0 0 0 0 0 0 29 238 2:00 PM 0 161 13 2 7 2 0 0 0 0 0 0 0 31 216 3:00 PM 4 227 17 1 1 0 0 0 0 0 0 0 0 35 285 4:00 PM 1 317 21 0 1 0 0 0 0 0 0 0 0 46 386 5:00 PM 2 395 16 0 5 0 0 0 0 0 0 0 0 23 441 6:00 PM 1 316 9 0 0 0 0 1 0 0 0 0 0 21 348 7:00 PM 2 257 11 0 1 0 0 0 0 0 0 0 0 8 279 8:00 PM 2 225 7 0 0 0 0 0 0 0 0 0 0 5 239 9:00 PM 0 195 7 0 0 0 0 0 0 0 0 0 0 0 202 10:00 PM 0 155 5 0 0 0 0 0 0 0 0 0 0 0 160 11:00 PM 0 46 0 0 0 0 0 0 0 0 0 0 0 0 46 Day Total 25 3264 182 4 40 2 0 4 0 0 0 0 0 228 3749 Percent 0.7% 87.1% 4.9% 0.1% 1.1% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 6.1% ADT 3749 AM Peak 9:00 AM 11:00 AM 10:00 AM 7:00 AM 11:00 AM 7:00 AM 11:00 AM Volume 4 137 14 6 2 3 151 PM Peak 3:00 PM 5:00 PM 4:00 PM 2:00 PM 2:00 PM 2:00 PM 6:00 PM 4:00 PM 5:00 PM Volume 4 395 21 2 7 2 1 46 441 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 71 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 25 3264 182 4 40 2 0 4 0 0 0 0 0 228 3749 Percent 0.7% 87.1% 4.9% 0.1% 1.1% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 6.1% ADT 3749 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 72 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Whipporwill Ln south of Night Hawk Dr QC JOB #:14758308 SPECIFIC LOCATION:Whipporwill Ln south of Night Hawk Dr CITY/STATE:Naples, FL DIRECTION:NB/SB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 53 53 53 1:00 AM 22 22 22 2:00 AM 2 2 2 3:00 AM 10 10 10 4:00 AM 11 11 11 5:00 AM 10 10 10 6:00 AM 26 26 26 7:00 AM 68 68 68 8:00 AM 101 101 101 9:00 AM 126 126 126 10:00 AM 109 109 109 11:00 AM 151 151 151 12:00 PM 220 220 220 1:00 PM 238 238 238 2:00 PM 216 216 216 3:00 PM 285 285 285 4:00 PM 386 386 386 5:00 PM 441 441 441 6:00 PM 348 348 348 7:00 PM 279 279 279 8:00 PM 239 239 239 9:00 PM 202 202 202 10:00 PM 160 160 160 11:00 PM 46 46 46 Day Total 3749 3749 3749 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 11:00 AM 11:00 AM 11:00 AM Volume 151 151 151 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 441 441 441 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 73 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 0 1 0 1 1 1 2 0 0 0 0 0 0 6 41-50 3 1:00 AM 0 0 0 0 1 1 2 0 1 0 0 0 0 0 5 36-45 3 2:00 AM 0 0 0 0 2 0 0 0 0 0 0 0 0 0 2 26-35 2 3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1-10 0 4:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 26-35 1 5:00 AM 0 0 0 1 0 1 0 0 0 0 0 0 0 0 2 21-30 1 6:00 AM 0 0 0 1 0 3 1 0 0 0 0 0 0 0 5 36-45 4 7:00 AM 1 1 0 2 4 3 2 1 0 0 0 0 0 0 14 33-42 6 8:00 AM 0 0 1 2 8 12 10 0 0 1 0 0 0 0 34 36-45 22 9:00 AM 1 1 1 5 13 15 7 0 0 0 0 0 0 0 43 31-40 28 10:00 AM 1 2 1 3 7 12 10 3 1 0 0 0 0 0 40 36-45 22 11:00 AM 0 3 3 3 16 10 18 5 0 0 1 0 0 0 59 36-45 28 12:00 PM 1 3 2 7 12 21 13 5 0 0 0 0 0 0 64 36-45 34 1:00 PM 1 0 2 5 22 17 12 3 0 0 0 0 0 0 62 31-40 39 2:00 PM 1 0 2 7 12 26 13 1 1 1 0 0 0 0 64 36-45 38 3:00 PM 1 0 2 6 16 26 11 3 0 0 0 0 0 0 65 31-40 42 4:00 PM 3 1 1 6 14 28 18 2 1 0 0 0 0 0 74 36-45 45 5:00 PM 1 2 4 8 27 19 9 7 2 0 0 0 0 0 79 31-40 45 6:00 PM 1 2 0 8 19 23 17 4 0 1 1 0 0 0 76 33-42 41 7:00 PM 0 1 0 5 15 14 8 2 2 0 0 0 0 0 47 31-40 28 8:00 PM 0 0 3 3 17 14 8 0 0 0 0 0 0 0 45 31-40 30 9:00 PM 1 1 0 6 9 11 7 4 0 0 0 0 0 0 39 31-40 20 10:00 PM 0 0 1 2 7 4 4 1 0 0 0 0 0 0 19 31-40 11 11:00 PM 0 0 0 1 2 3 1 1 1 0 0 0 0 0 9 35-44 4 Day Total 13 17 24 81 225 264 172 44 9 3 2 0 0 0 854 31-40 488 Percent ADT 854 1.5% 2.0% 2.8% 9.5% 26.3% 30.9% 20.1% 5.2% 1.1% 0.4% 0.2% 0.0% 0.0% 0.0% AM Peak 7:00 AM 11:00 AM 11:00 AM 9:00 AM 11:00 AM 9:00 AM 11:00 AM 11:00 AM 1:00 AM 8:00 AM 11:00 AM 11:00 AM Volume 1 3 3 5 16 15 18 5 1 1 1 59 PM Peak 4:00 PM 12:00 PM 5:00 PM 5:00 PM 5:00 PM 4:00 PM 4:00 PM 5:00 PM 5:00 PM 2:00 PM 6:00 PM 5:00 PM Volume 3 3 4 8 27 28 18 7 2 1 1 79 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 74 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 13 17 24 81 225 264 172 44 9 3 2 0 0 0 854 31-40 488 Percent 1.5% 2.0% 2.8% 9.5% 26.3% 30.9% 20.1% 5.2% 1.1% 0.4% 0.2% 0.0% 0.0% 0.0% Cumulative Percent 1.5% 3.5% 6.3% 15.8% 42.2% 73.1% 93.2% 98.4% 99.4% 99.8% 100.0% 100.0% 100.0% 100.0% ADT 854 85th Percentile: Mean Speed(Average): Median Mode: 42 MPH 35 MPH 36 MPH 38 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 75 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 2 4 0 0 0 0 0 0 0 0 0 0 0 6 1:00 AM 0 3 2 0 0 0 0 0 0 0 0 0 0 0 5 2:00 AM 0 0 1 0 1 0 0 0 0 0 0 0 0 0 2 3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 5:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2 6:00 AM 0 1 4 0 0 0 0 0 0 0 0 0 0 0 5 7:00 AM 0 8 3 0 1 0 0 2 0 0 0 0 0 0 14 8:00 AM 0 12 16 1 1 0 0 4 0 0 0 0 0 0 34 9:00 AM 1 23 13 0 5 0 0 0 0 0 0 0 0 1 43 10:00 AM 2 20 8 0 9 0 0 0 0 0 0 0 0 1 40 11:00 AM 1 37 17 0 4 0 0 0 0 0 0 0 0 0 59 12:00 PM 0 38 20 1 5 0 0 0 0 0 0 0 0 0 64 1:00 PM 1 40 19 0 1 0 0 0 0 0 0 0 0 1 62 2:00 PM 0 37 23 0 3 0 0 1 0 0 0 0 0 0 64 3:00 PM 0 44 15 0 4 0 0 1 0 0 0 0 0 1 65 4:00 PM 0 51 19 1 1 0 0 0 0 0 0 0 0 2 74 5:00 PM 0 58 16 0 4 0 0 0 0 0 0 0 0 1 79 6:00 PM 2 51 18 0 5 0 0 0 0 0 0 0 0 0 76 7:00 PM 0 31 16 0 0 0 0 0 0 0 0 0 0 0 47 8:00 PM 0 31 12 0 2 0 0 0 0 0 0 0 0 0 45 9:00 PM 0 20 17 0 1 0 0 0 0 0 0 0 0 1 39 10:00 PM 0 16 3 0 0 0 0 0 0 0 0 0 0 0 19 11:00 PM 0 7 2 0 0 0 0 0 0 0 0 0 0 0 9 Day Total 7 532 249 3 47 0 0 8 0 0 0 0 0 8 854 Percent 0.8% 62.3% 29.2% 0.4% 5.5% 0.0% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% ADT 854 AM Peak 10:00 AM 11:00 AM 11:00 AM 8:00 AM 10:00 AM 8:00 AM 9:00 AM 11:00 AM Volume 2 37 17 1 9 4 1 59 PM Peak 6:00 PM 5:00 PM 2:00 PM 12:00 PM 12:00 PM 2:00 PM 4:00 PM 5:00 PM Volume 2 58 23 1 5 1 2 79 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 76 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 7 532 249 3 47 0 0 8 0 0 0 0 0 8 854 Percent 0.8% 62.3% 29.2% 0.4% 5.5% 0.0% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% ADT 854 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 77 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 6 6 6 1:00 AM 5 5 5 2:00 AM 2 2 2 3:00 AM 0 0 0 4:00 AM 1 1 1 5:00 AM 2 2 2 6:00 AM 5 5 5 7:00 AM 14 14 14 8:00 AM 34 34 34 9:00 AM 43 43 43 10:00 AM 40 40 40 11:00 AM 59 59 59 12:00 PM 64 64 64 1:00 PM 62 62 62 2:00 PM 64 64 64 3:00 PM 65 65 65 4:00 PM 74 74 74 5:00 PM 79 79 79 6:00 PM 76 76 76 7:00 PM 47 47 47 8:00 PM 45 45 45 9:00 PM 39 39 39 10:00 PM 19 19 19 11:00 PM 9 9 9 Day Total 854 854 854 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 11:00 AM 11:00 AM 11:00 AM Volume 59 59 59 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 79 79 79 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 78 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:WB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 31-40 1 1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1-10 0 2:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 31-40 1 3:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 31-40 1 4:00 AM 0 0 1 1 0 2 0 0 0 0 0 0 0 0 4 21-30 2 5:00 AM 0 0 1 1 1 3 2 0 0 0 0 0 0 0 8 36-45 5 6:00 AM 0 0 0 3 9 7 1 1 0 0 0 0 0 0 21 31-40 15 7:00 AM 1 1 1 5 31 19 2 1 0 0 0 0 0 0 61 31-40 49 8:00 AM 1 0 1 11 35 41 8 1 0 0 0 0 0 0 98 31-40 76 9:00 AM 0 3 4 11 26 19 4 1 0 0 0 0 0 0 68 31-40 44 10:00 AM 2 1 2 11 31 21 6 0 0 0 0 0 0 0 74 31-40 52 11:00 AM 2 0 1 9 19 21 4 0 0 0 0 0 0 0 56 31-40 40 12:00 PM 1 2 2 4 24 14 9 0 1 0 0 0 0 0 57 31-40 37 1:00 PM 2 1 1 7 25 12 6 0 0 0 0 0 0 0 54 31-40 37 2:00 PM 1 1 3 5 23 17 2 1 0 0 0 0 0 0 53 31-40 40 3:00 PM 0 2 1 15 28 9 3 0 0 0 0 0 0 0 58 26-35 43 4:00 PM 2 1 7 12 9 14 7 1 0 0 0 0 0 0 53 33-42 22 5:00 PM 1 2 8 11 19 7 1 0 0 0 0 0 0 0 49 27-36 29 6:00 PM 0 0 3 7 16 10 4 2 0 0 0 0 0 0 42 31-40 26 7:00 PM 1 1 1 8 13 7 3 0 0 0 0 0 0 0 34 26-35 21 8:00 PM 0 0 1 7 4 3 0 0 0 0 0 0 0 0 15 26-35 11 9:00 PM 0 1 1 1 8 3 4 0 0 0 0 0 0 0 18 31-40 11 10:00 PM 0 0 1 1 4 6 2 0 0 0 0 0 0 0 14 33-42 9 11:00 PM 0 0 0 0 3 0 0 2 0 1 0 0 0 0 6 26-35 3 Day Total 14 16 40 130 328 238 68 10 1 1 0 0 0 0 846 31-40 566 Percent ADT 846 1.7% 1.9% 4.7% 15.4% 38.8% 28.1% 8.0% 1.2% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% AM Peak 10:00 AM 9:00 AM 9:00 AM 8:00 AM 8:00 AM 8:00 AM 8:00 AM 6:00 AM 8:00 AM Volume 2 3 4 11 35 41 8 1 98 PM Peak 1:00 PM 12:00 PM 5:00 PM 3:00 PM 3:00 PM 2:00 PM 12:00 PM 6:00 PM 12:00 PM 11:00 PM 3:00 PM Volume 2 2 8 15 28 17 9 2 1 1 58 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 79 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:WB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 14 16 40 130 328 238 68 10 1 1 0 0 0 0 846 31-40 566 Percent 1.7% 1.9% 4.7% 15.4% 38.8% 28.1% 8.0% 1.2% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% Cumulative Percent 1.7% 3.5% 8.3% 23.6% 62.4% 90.5% 98.6% 99.8% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% ADT 846 85th Percentile: Mean Speed(Average): Median Mode: 39 MPH 33 MPH 33 MPH 33 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 80 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:WB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 4:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 0 4 5:00 AM 0 8 0 0 0 0 0 0 0 0 0 0 0 0 8 6:00 AM 0 20 1 0 0 0 0 0 0 0 0 0 0 0 21 7:00 AM 0 57 3 0 1 0 0 0 0 0 0 0 0 0 61 8:00 AM 3 91 3 0 1 0 0 0 0 0 0 0 0 0 98 9:00 AM 1 60 5 0 2 0 0 0 0 0 0 0 0 0 68 10:00 AM 1 61 5 0 6 0 0 0 0 0 0 0 0 1 74 11:00 AM 0 45 6 0 3 0 0 0 0 0 0 0 0 2 56 12:00 PM 0 53 3 0 1 0 0 0 0 0 0 0 0 0 57 1:00 PM 0 44 4 0 3 0 0 1 0 0 0 0 0 2 54 2:00 PM 0 45 5 0 2 0 0 1 0 0 0 0 0 0 53 3:00 PM 0 49 6 0 3 0 0 0 0 0 0 0 0 0 58 4:00 PM 0 43 1 0 2 0 0 6 0 0 0 0 0 1 53 5:00 PM 0 42 6 0 0 0 0 0 0 0 0 0 0 1 49 6:00 PM 1 36 5 0 0 0 0 0 0 0 0 0 0 0 42 7:00 PM 0 31 3 0 0 0 0 0 0 0 0 0 0 0 34 8:00 PM 0 15 0 0 0 0 0 0 0 0 0 0 0 0 15 9:00 PM 0 16 2 0 0 0 0 0 0 0 0 0 0 0 18 10:00 PM 0 12 1 0 1 0 0 0 0 0 0 0 0 0 14 11:00 PM 0 6 0 0 0 0 0 0 0 0 0 0 0 0 6 Day Total 6 740 60 0 25 0 0 8 0 0 0 0 0 7 846 Percent 0.7% 87.5% 7.1% 0.0% 3.0% 0.0% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.8% ADT 846 AM Peak 8:00 AM 8:00 AM 11:00 AM 10:00 AM 11:00 AM 8:00 AM Volume 3 91 6 6 2 98 PM Peak 6:00 PM 12:00 PM 3:00 PM 1:00 PM 4:00 PM 1:00 PM 3:00 PM Volume 1 53 6 3 6 2 58 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 81 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:WB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 6 740 60 0 25 0 0 8 0 0 0 0 0 7 846 Percent 0.7% 87.5% 7.1% 0.0% 3.0% 0.0% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.8% ADT 846 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 82 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:WB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 1 1 1 1:00 AM 0 0 0 2:00 AM 1 1 1 3:00 AM 1 1 1 4:00 AM 4 4 4 5:00 AM 8 8 8 6:00 AM 21 21 21 7:00 AM 61 61 61 8:00 AM 98 98 98 9:00 AM 68 68 68 10:00 AM 74 74 74 11:00 AM 56 56 56 12:00 PM 57 57 57 1:00 PM 54 54 54 2:00 PM 53 53 53 3:00 PM 58 58 58 4:00 PM 53 53 53 5:00 PM 49 49 49 6:00 PM 42 42 42 7:00 PM 34 34 34 8:00 PM 15 15 15 9:00 PM 18 18 18 10:00 PM 14 14 14 11:00 PM 6 6 6 Day Total 846 846 846 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 98 98 98 PM Peak 3:00 PM 3:00 PM 3:00 PM Volume 58 58 58 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 83 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB/WB DATE:Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace 12:00 AM 0 0 1 0 1 2 1 2 0 0 0 0 0 0 7 41-50 3 1:00 AM 0 0 0 0 1 1 2 0 1 0 0 0 0 0 5 36-45 3 2:00 AM 0 0 0 0 2 1 0 0 0 0 0 0 0 0 3 31-40 3 3:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 31-40 1 4:00 AM 0 0 1 1 1 2 0 0 0 0 0 0 0 0 5 31-40 3 5:00 AM 0 0 1 2 1 4 2 0 0 0 0 0 0 0 10 36-45 6 6:00 AM 0 0 0 4 9 10 2 1 0 0 0 0 0 0 26 31-40 19 7:00 AM 2 2 1 7 35 22 4 2 0 0 0 0 0 0 75 31-40 57 8:00 AM 1 0 2 13 43 53 18 1 0 1 0 0 0 0 132 31-40 95 9:00 AM 1 4 5 16 39 34 11 1 0 0 0 0 0 0 111 31-40 73 10:00 AM 3 3 3 14 38 33 16 3 1 0 0 0 0 0 114 31-40 70 11:00 AM 2 3 4 12 35 31 22 5 0 0 1 0 0 0 115 31-40 66 12:00 PM 2 5 4 11 36 35 22 5 1 0 0 0 0 0 121 31-40 71 1:00 PM 3 1 3 12 47 29 18 3 0 0 0 0 0 0 116 31-40 76 2:00 PM 2 1 5 12 35 43 15 2 1 1 0 0 0 0 117 31-40 77 3:00 PM 1 2 3 21 44 35 14 3 0 0 0 0 0 0 123 31-40 79 4:00 PM 5 2 8 18 23 42 25 3 1 0 0 0 0 0 127 36-45 67 5:00 PM 2 4 12 19 46 26 10 7 2 0 0 0 0 0 128 31-40 72 6:00 PM 1 2 3 15 35 33 21 6 0 1 1 0 0 0 118 31-40 67 7:00 PM 1 2 1 13 28 21 11 2 2 0 0 0 0 0 81 31-40 49 8:00 PM 0 0 4 10 21 17 8 0 0 0 0 0 0 0 60 31-40 38 9:00 PM 1 2 1 7 17 14 11 4 0 0 0 0 0 0 57 31-40 30 10:00 PM 0 0 2 3 11 10 6 1 0 0 0 0 0 0 33 31-40 21 11:00 PM 0 0 0 1 5 3 1 3 1 1 0 0 0 0 15 32-41 7 Day Total 27 33 64 211 553 502 240 54 10 4 2 0 0 0 1700 31-40 1055 Percent ADT 1700 1.6% 1.9% 3.8% 12.4% 32.5% 29.5% 14.1% 3.2% 0.6% 0.2% 0.1% 0.0% 0.0% 0.0% AM Peak 10:00 AM 9:00 AM 9:00 AM 9:00 AM 8:00 AM 8:00 AM 11:00 AM 11:00 AM 1:00 AM 8:00 AM 11:00 AM 8:00 AM Volume 3 4 5 16 43 53 22 5 1 1 1 132 PM Peak 4:00 PM 12:00 PM 5:00 PM 3:00 PM 1:00 PM 2:00 PM 4:00 PM 5:00 PM 5:00 PM 2:00 PM 6:00 PM 5:00 PM Volume 5 5 12 21 47 43 25 7 2 1 1 128 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 84 Type of report: Tube Count - Speed Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Speed Data LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB/WB DATE:Aug 07 2018 - Aug 07 2018 Start Time 1 15 16 20 21 25 26 30 31 35 36 40 41 45 46 50 51 55 56 60 61 65 66 70 71 75 76 999 Total Pace Speed Number in Pace Grand Total 27 33 64 211 553 502 240 54 10 4 2 0 0 0 1700 31-40 1055 Percent 1.6% 1.9% 3.8% 12.4% 32.5% 29.5% 14.1% 3.2% 0.6% 0.2% 0.1% 0.0% 0.0% 0.0% Cumulative Percent 1.6% 3.5% 7.3% 19.7% 52.2% 81.8% 95.9% 99.1% 99.6% 99.9% 100.0% 100.0% 100.0% 100.0% ADT 1700 85th Percentile: Mean Speed(Average): Median Mode: 41 MPH 34 MPH 34 MPH 33 MPHComments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 85 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB/WB DATE:Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total 12:00 AM 0 3 4 0 0 0 0 0 0 0 0 0 0 0 7 1:00 AM 0 3 2 0 0 0 0 0 0 0 0 0 0 0 5 2:00 AM 0 0 2 0 1 0 0 0 0 0 0 0 0 0 3 3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 4:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 0 5 5:00 AM 0 9 1 0 0 0 0 0 0 0 0 0 0 0 10 6:00 AM 0 21 5 0 0 0 0 0 0 0 0 0 0 0 26 7:00 AM 0 65 6 0 2 0 0 2 0 0 0 0 0 0 75 8:00 AM 3 103 19 1 2 0 0 4 0 0 0 0 0 0 132 9:00 AM 2 83 18 0 7 0 0 0 0 0 0 0 0 1 111 10:00 AM 3 81 13 0 15 0 0 0 0 0 0 0 0 2 114 11:00 AM 1 82 23 0 7 0 0 0 0 0 0 0 0 2 115 12:00 PM 0 91 23 1 6 0 0 0 0 0 0 0 0 0 121 1:00 PM 1 84 23 0 4 0 0 1 0 0 0 0 0 3 116 2:00 PM 0 82 28 0 5 0 0 2 0 0 0 0 0 0 117 3:00 PM 0 93 21 0 7 0 0 1 0 0 0 0 0 1 123 4:00 PM 0 94 20 1 3 0 0 6 0 0 0 0 0 3 127 5:00 PM 0 100 22 0 4 0 0 0 0 0 0 0 0 2 128 6:00 PM 3 87 23 0 5 0 0 0 0 0 0 0 0 0 118 7:00 PM 0 62 19 0 0 0 0 0 0 0 0 0 0 0 81 8:00 PM 0 46 12 0 2 0 0 0 0 0 0 0 0 0 60 9:00 PM 0 36 19 0 1 0 0 0 0 0 0 0 0 1 57 10:00 PM 0 28 4 0 1 0 0 0 0 0 0 0 0 0 33 11:00 PM 0 13 2 0 0 0 0 0 0 0 0 0 0 0 15 Day Total 13 1272 309 3 72 0 0 16 0 0 0 0 0 15 1700 Percent 0.8% 74.8% 18.2% 0.2% 4.2% 0.0% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% ADT 1700 AM Peak 8:00 AM 8:00 AM 11:00 AM 8:00 AM 10:00 AM 8:00 AM 10:00 AM 8:00 AM Volume 3 103 23 1 15 4 2 132 PM Peak 6:00 PM 5:00 PM 2:00 PM 12:00 PM 3:00 PM 4:00 PM 1:00 PM 5:00 PM Volume 3 100 28 1 7 6 3 128 Comments: Page 1 of 2 Report generated on 8/22/2018 9:35 PM 86 Type of report: Tube Count - Vehicle Classification Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) SUMMARY - Tube Count - Vehicle Classification Data LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB/WB DATE:Aug 07 2018 - Aug 07 2018 Start Time Motor- cycles Cars & Trailer 2 Axle Long Buses 2 Axle 6 Tire 3 Axle Single 4 Axle Single <5 Axle Double 5 Axle Double >6 Axle Double <6 Axle Multi 6 Axle Multi >6 Axle Multi Not Classified Total Grand Total 13 1272 309 3 72 0 0 16 0 0 0 0 0 15 1700 Percent 0.8% 74.8% 18.2% 0.2% 4.2% 0.0% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% ADT 1700 Comments: Page 2 of 2 Report generated on 8/22/2018 9:35 PM 87 Type of report: Tube Count - Volume Data SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) LOCATION:Marbella Lakes Dr east of Livingston Rd QC JOB #:14758307 SPECIFIC LOCATION:Marbella Lakes Dr east of Livingston Rd CITY/STATE:Naples, FL DIRECTION:EB/WB DATE:Aug 07 2018 - Aug 07 2018 Start Time Mon Tue 07-Aug-18 Wed Thu Fri Average Weekday Hourly Traffic Sat Sun Average Week Hourly Traffic Average Week Profile 12:00 AM 7 7 7 1:00 AM 5 5 5 2:00 AM 3 3 3 3:00 AM 1 1 1 4:00 AM 5 5 5 5:00 AM 10 10 10 6:00 AM 26 26 26 7:00 AM 75 75 75 8:00 AM 132 132 132 9:00 AM 111 111 111 10:00 AM 114 114 114 11:00 AM 115 115 115 12:00 PM 121 121 121 1:00 PM 116 116 116 2:00 PM 117 117 117 3:00 PM 123 123 123 4:00 PM 127 127 127 5:00 PM 128 128 128 6:00 PM 118 118 118 7:00 PM 81 81 81 8:00 PM 60 60 60 9:00 PM 57 57 57 10:00 PM 33 33 33 11:00 PM 15 15 15 Day Total 1700 1700 1700 % Weekday Average 100.0% % Week Average 100.0%100.0% AM Peak 8:00 AM 8:00 AM 8:00 AM Volume 132 132 132 PM Peak 5:00 PM 5:00 PM 5:00 PM Volume 128 128 128 Comments: Page 1 of 1 Report generated on 8/22/2018 9:35 PM 88 89 This Page Intentionally Left Blank Stop Sign Warrant Analysis 90 Multi-Way Stop Engineering Study Synopsis Date Project Name: February 8, 2019 Marbella Lakes Dr. @ Hermosa Way The Traffic Operations Section of the Collier County Growth Management Department conducted a Multi-Way Stop Intersection Study at the intersection of Marbella Lakes Dr. at Hermosa Way in Naples Florida. The purpose of this study was to determine if the intersection met warrant requirements for a multi-way stop installation as set forth in the Manual on Uniform Traffic Control Devices (MUTCD). Evaluated criteria included but was not limited to: TRAFFIC CONTROL SIGNAL NOT WARRANTED TRAFFIC VOLUMES ~ EQUAL / BALANCED-VOLUMES OF APPROACH CRASH DATA - PAST 12 MONTHS OF (5) OR MORE SUSCEPTIBLE TO CORRECTION VEHICULAR DATA - ENTERING INTERSECTION - attached CONCLUSION: Based on the analysis of the data sets summarized above, in accordance with the MUTCD guidelines / protocols, overall functionality, traffic metrics, crash history and engineering judgment: This intersection DOES NOT meet the merits for a multi-way stop intersection. Therefore, a multi-way stop control is not recommended to be installed at this time. End of Study Results of Study: Does Not Meet Warrants 91 Marbella Lakes Dr. at Hermosa Way Volume Entering Intersection VEHICULAR DATA - ENTERING INTERSECTION E:\collier county\2019\MWS\marbella lakes dr at hermosa way\Volume Summation seasonally adj 1000 v each direction 08 Feb 19.xlsx 2/8/2019 Spot Number: Major Street: Minor Street: Intersection: Speed Limit: Date Performed:Performed By: Major Major Major Minor Minor Total Total Hourly Volume Hourly Volume Major Street Actual Future Value Future Value Actual Seasonaly Adj.Seasonal Major Street Minor Street Volume EB EB Marbella Lakes WB NB NB Hermosa Major Minor >300 >200 Ranking Seasonal Adjustment 00:01 - 01:00 6 0 0 1 1 0 0 1 NO NO 11 1.22 01:00 - 02:00 5 0 0 0 0 0 0 0 NO NO 11 02:00 - 03:00 2 0 0 1 1 0 0 1 NO NO 11 03:00 - 04:00 0 0 0 1 1 0 0 1 NO NO 11 04:00 - 05:00 1 0 0 4 5 0 0 5 NO NO 11 05:00 - 06:00 2 0 0 8 10 0 0 10 NO NO 11 06:00 - 07:00 5 0 0 21 26 0 0 26 NO NO 11 07:00 - 08:00 14 0 0 61 74 0 0 74 NO NO 11 08:00 - 09:00 34 0 0 98 120 0 0 120 NO NO 11 09:00 - 10:00 43 0 0 68 83 0 0 83 NO NO 11 10:00 - 11:00 40 0 0 74 90 0 0 90 NO NO 11 11:00 - 12:00 59 100 100 56 68 0 200 68 NO NO 1 12:00 - 13:00 64 100 100 57 70 0 200 70 NO NO 1 13:00 - 14:00 62 100 100 54 66 0 200 66 NO NO 1 14:00 - 15:00 64 100 100 53 65 0 200 65 NO NO 1 15:00 - 16:00 65 100 100 58 71 0 200 71 NO NO 1 16:00 - 17:00 74 100 100 53 65 0 200 65 NO NO 1 17:00 - 18:00 79 100 100 49 60 0 200 60 NO NO 1 18:00 - 19:00 76 100 100 42 51 0 200 51 NO NO 1 19:00 - 20:00 47 100 100 34 41 0 200 41 NO NO 1 20:00 - 21:00 45 100 100 15 18 0 200 18 NO NO 1 21:00 - 22:00 39 0 0 18 22 0 0 22 NO NO 11 22:00 - 23:00 19 0 0 14 17 0 0 17 NO NO 11 23:00 - 00:00 9 0 0 6 7 0 0 7 NO NO 11 Total 854 1000 1000 846 1032 0 2000 1032 Do Metrics Require a Reduction in Volumes Due to Speed:NO Major Roadway Total Hours w/ Volumes > 300 / Hour:0 hours met requirements Minor Roadway Total Hours w/ Volumes > 200 / Hour:0 hours met requirements Does the Minor Road volume and Major Road volume meet time and quantity contrainsts?NO Marbella Lakes Dr. at Hermosa Way 30 2/8/2019 kjk Date Volumes Collected:10/16/2018 Manual of Uniform Traffic Control Devices Volume Summary 1 Marbella Lakes Dr.Hermosa Way 92 93 This Page Intentionally Left Blank 2012 Design Plans 94 Pine Ridge RdWHIPPOORWILL LNGOLDEN GATE PKWYLIVINGSTON RDAIRPORT PULLING RDSANTA BARBARA BLVDMARBELLA LAKES DRRevisionsPrepared by:GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.Whippoorwill Lane ExtensionCollier County Project No. 60016.3Section 18, Township 49 South, Range 26 EastCCDOT1 COVER SHEET AND INDEX OF DRAWINGS2 GENERAL NOTES AND SUMMARY OF PAY ITEMS3TYPICAL SECTIONS − 14 TYPICAL SECTIONS − 25SUMMARY OF DRAINAGE STRUCTURES6ROADWAY PLAN − 17ROADWAY PLAN − 28ROADWAY PLAN − 39ROADWAY PLAN − 410ROADWAY PLAN − 511 ROADWAY PLAN − 612 PLAN AND PROFILE − 113PLAN AND PROFILE − 214 PLAN AND PROFILE − 315PLAN AND PROFILE − 416ROADWAY SECTIONS − 117 ROADWAY SECTIONS − 218ROADWAY SECTIONS − 319ROADWAY SECTIONS − 420ROADWAY SECTIONS − 521 ROADWAY SECTIONS − 622 ROADWAY SECTIONS − 723ROADWAY SECTIONS − 824 ROADWAY SECTIONS − 925ROADWAY SECTIONS − 1026ROADWAY SECTIONS − 1127 ROADWAY SECTIONS − 1228 ROADWAY SECTIONS − 1329ROADWAY SECTIONS − 1430 ROADWAY SECTIONS − 1531 ROADWAY SECTIONS − 1632 EROSION CONTROL AND DEMOLITION PLAN − 133 EROSION CONTROL AND DEMOLITION PLAN − 234 EROSION CONTROL AND DEMOLITION PLAN − 335 EROSION CONTROL AND DEMOLITION PLAN − 436 EROSION CONTROL AND DEMOLITION PLAN − 537 EROSION CONTROL AND DEMOLITION PLAN − 638SITE, SIGNING AND MARKING PLAN − 139SITE, SIGNING AND MARKING PLAN − 240SITE, SIGNING AND MARKING PLAN − 341SITE, SIGNING AND MARKING PLAN − 442SITE, SIGNING AND MARKING PLAN − 543SITE, SIGNING AND MARKING PLAN − 6LOCATION OF PROJECTCollier CountyLENGTH OF PROJECTBEGIN PROJECTWHIPPOORWILL LANESTA. 0+58.50END FULL ROADWAY CONSTRUCTIONWHIPPOORWILL LANESTA.37+04.00MATCH EXISTINGMILE10BEGIN FULL ROADWAY CONSTRUCTIONWHIPPOORWILL LANESTA. 14+91.50MATCH EXISTINGEND PROJECTWHIPPOORWILL LANESTA. 38+50.00COUNTY PROJECT MANAGER: JULIO ORDONEZ, P.E.95 GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.96 GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.97 BEGIN PROJECTWHIPPOORWILL LANESTA 0+58.50AVIANO AT NAPLESPB 43 PGS 69-71MARBELLA LAKESPB 46 PGS 77-82GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.050'25'11x17 SCALE: 1" = 50'98 BEGIN FULL ROADWAY CONSTRUCTIONWHIPPOORWILL LANESTA 14+91.50MATCH EX. GRADEAVIANO AT NAPLESPB 43 PGS 69-71MARBELLA LAKESPB 46 PGS 77-82GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.050'25'11x17 SCALE: 1" = 50'99 AVIANO AT NAPLESPB 43 PGS 69-71MARBELLA LAKESPB 46 PGS 77-82GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.050'25'11x17 SCALE: 1" = 50'100 STRATFORD PLACETRACT PCONSERVATION EASEMENPB 40 PGS 15-21AVIANO AT NAPLESPB 43 PGS 69-71MARBELLA LAKESPB 46 PGS 77-82GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.050'25'11x17 SCALE: 1" = 50'101 STRATFORD PLACETRACT PCONSERVATION EASEMENTPB 40 PGS 15-21TRACT C-3COMMON AREA & D.E.PB 43 PG 70AVIANO AT NAPLESPB 43 PGS 69-71TRACT "P-4"PRESERVE & C.E.PB 43 PG 70ANDALUCIATRACT P-3PRESERVE AREA, C.E. & F.E.PB 43 PGS 93-97PRSTRATFORD PLACETRACT JDRAINAGE EASEMENTPB 40 PGS 15-21GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.050'25'11x17 SCALE: 1" = 50'102 END PROJECTWHIPPOORWILL LANESTA 38+50.00& F.E.ANDALUCIATRACT P-3PRESERVE AREA, C.E. & F.E.PB 43 PGS 93-97GradyMinorCivil Engineers●Land Surveyors●Planners●Landscape ArchitectsCERT. OF AUTH. EB 0005151 CERT. OF AUTH. LB 0005151BUSINESS LC 26000266Bonita Springs 239.947.1144Fort Myers 239.690.4380www.GradyMinor.com Q. Grady Minor and Associates, P.A.050'25'11x17 SCALE: 1" = 50'103 PowerPoint Presentations 104 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Marbella Lakes Homeowners Association Meeting January 10, 2019 105 Presentation Agenda 1 Purpose/Overview2Identified Issues3Potential Countermeasures4Concept Plan5Questions & Feedback 106 Purpose/Overview In 2012, Collier County approved construction plans for a conventional 2-lane roadway design to connect Whippoorwill Lane to Marbella Lakes Drive. 1 107 Purpose/Overview In 2014, the Collier County Board of County Commissioners (BCC), after hearing from the public, decided to not move the project forward at that time. 1 108 Purpose/Overview In 2018, the BCC approved the programming of funds for the project in FY2020 of the Capital Improvement Element (CIE). 1 109 Purpose/Overview Collier County Leadership directed the Transportation Planning Staff to develop a Concept Plan to connect Whippoorwill Lane to Marbella Lakes Drive as an alternative to the “Conventional Design”. 1 110 Purpose/Overview (cont.) The Concept Plan needs to address major issues/concerns and is to be vetted with HOA/Stakeholders prior to being presented to the BCC. 1 111 Purpose/Overview (cont.) Our Approach: •Preliminary meetings with HOA/Stakeholder Leadership to identify issues/concerns and potential countermeasures and solutions (Aug.-Oct. 2018) 1 112 Purpose/Overview (cont.) Our Approach: •Consider the issues and suggestions, and develop a Concept Plan to address as many of the issues as practical (Nov.-Dec. 2018) 1 113 Purpose/Overview (cont.) Our Approach: •Present the original Conventional Design and the Concept Plan to the HOAs/Stakeholders for feedback (Jan. 2019) •Consider the HOA/Stakeholder feedback 1 114 Purpose/Overview (cont.) Our Approach: •Prepare a final Concept Plan and documentation (Feb. 2019) •Present the Conventional Design and the Concept Plan to the BCC (Mar. 2019) 1 115 Purpose/Overview (cont.) Participants will be polled as to their support for, or opposition to: 1)The project as a whole 2)The Conventional Design or the Concept Plan 3)Some Options 1 116 Purpose/Overview (cont.) Participation in this process in no way precludes you from taking a position at any future public meeting(s) on whether the County should move forward with this project. 1 117 Purpose/Overview (cont.) At a March BCC meeting, both the original Conventional Design and the final Concept Plan will be presented to the BCC for their consideration. 1 118 Purpose/Overview (cont.) After hearing from the public, the BCC will decide whether to move forward with the original Conventional Design or the Concept Plan, or not proceed with the project and remove it from the work program. 1 119 Purpose/Overview (cont.) If the BCC decides to move forward with the project, any necessary adjustments to the current FY2020 funding would be made based on the final approved design. 1 120 Approved 2012 Design The approved design for the interconnection: •2 Lanes @11’ travel lanes •3’ paved shoulders on Marbella Lakes Drive •Sidewalks •40mph design speed (20 for curve) •30mph posted speed (15 for curve) 2 121 Approved 2012 Design 122 Approved 2012 Design 123 Approved 2012 Design 124 Approved 2012 Design 125 Approved 2012 Design 126 Approved 2012 Design 127 Approved 2012 Design 128 Approved 2012 Design 129 Identified Issues Increased Traffic Safety - Vehicles Safety - Bicyclists Safety - Pedestrians Safety -School Bus Stop Speeding 3 130 Identified Issues (cont.) Trucks (including Delivery) Noise School Bus Operations Capital Cost of the Project Property Value Decrease Due to Increased Noise 3 131 Identified Issues (cont.) Nissan Test Drive (Increased Activity) Loss of Green Space, Animal Habitat & Buffers Maintenance of Kensington Drainage Canal 3 132 Countermeasures 4 Safety •Operations •Speeding Traffic Calming Pedestrians & Bicyclists 133 Safety -Operations Traffic Signal at Livingston Road Truck Restrictions/Weight Restrictions Extend/Add Turn Lanes at HOA Entrances Improved School Bus Stops 4 134 Safety -Speeding Narrow Travel Lanes to 10’ Wide in 2-lane Un-Divided Segments Convert Striped Areas at Turn Lanes to Raised Medians to Reduce Travel Lanes to 11’ Wide Consider Reducing Posted Speed Limit 4 135 Traffic Calming Roundabouts (Full and/or Mini-) Splitter Island in 2-Lane Undivided Segments Speed Humps Rumble Strips Raised Intersections/Speed Tables Chicanes 4 136 Pedestrians/Cyclists Marked (w/Refuge) Crosswalks Pedestrian Access Over Canal Wider Sidewalk on Marbella Lakes Drive Wider Sidewalks on Whippoorwill Lane Bike Lanes/Paved Shoulders 4 137 Other Amenities Landscaping Medians, Roundabouts Street Lighting Where Needed Shift Alignment to Increase Vegetative Buffer Area Noise Walls 4 138 Issues/Countermeasures Matrix 139 Issues/Countermeasures Matrix 140 Issues/Countermeasures Matrix 141 Issues/Countermeasures Matrix 142 Countermeasure Implementation 143 Concept Plan Marbella Lakes Drive 5 N Livingston RoadMarbella Lakes Drive Hermosa Way 144 Concept Plan Marbella Lakes Drive 5 Livingston RoadMarbella Lakes Drive 10 Foot Wide Travel Lanes w/No Median 10 Foot Wide Median Shown w/Enhanced Landscaping N 145 Concept Plan Marbella Lakes Drive 5 Hermosa Way Dedicated Right Turn Lane New Roadway Alignment Shifted to North Pedestrian Connection 10 Foot Wide Travel Lanes w/No Median Roundabout & Approaches w/Lighting Shown w/Enhanced Landscaping N Raised Median Shown w/Optional Enhanced Landscaping 146 Concept Plan Marbella Lakes Drive 5 N 147 Concept Plan Marbella Lakes Drive 5 No Sidewalk on South Side Roundabout w/Lighting Shown w/Enhanced Landscaping Splitter Island 10 Foot Wide Travel Lanes w/No Median N Whippoorwill Lane Raised Median Shown w/Enhanced Landscaping 148 Concept Plan Whippoorwill Lane 5 Stratford Lane N Marbella Lakes Drive 149 Concept Plan Whippoorwill Lane 5 Splitter Island No Sidewalk on South Side Roundabout w/Lighting Shown w/Optional Enhanced Landscaping Stratford Lane Crosswalk Interconnection 10 Foot Wide Travel Lanes w/No Median New SidewalkN 150 Concept Plan Whippoorwill Lane 5 Mariposa Circle N Stratford Lane 151 Concept Plan Whippoorwill Lane 5 11 Foot Wide Travel Lanes Next to Medians Mariposa Circle Raised Medians to Reduce Width of Travel Lanes to 11 Feet Raised Medians to Reduce Width of Travel Lanes to 11 Feet N Shown w/Optional Enhanced Landscaping 152 Concept Plan Whippoorwill Lane 5 Andalucia Way Night Hawk Drive N Mariposa Circle 153 Concept Plan Whippoorwill Lane 5 Andalucia Way Night Hawk Drive Roundabout w/Lighting Shown w/Optional Enhanced Landscaping Existing Lane Widths Maintained N Raised Median to Reduce Width of Travel Lanes to 11 Feet Optional Enhanced Landscaping Raised Median to Reduce Width of Travel Lanes to 11 Feet 154 Concept Plan Whippoorwill Lane 5 Reserve Way Avow Hospice N Andalucia Way Night Hawk Drive 155 Concept Plan Whippoorwill Lane 5 Reserve WayShown w/Optional Enhanced Landscaping Existing Lane Widths Maintained Avow Hospice N Existing Lane Widths Maintained Raised Median to Reduce Width of Travel Lanes to 11 Feet 156 Concept Plan Whippoorwill Lane 5 Shown w/Optional Enhanced Landscaping Existing Lane Widths Maintained N Seagate Baptist Church Naples Nissan Raised Median to Reduce Width of Travel Lanes to 11 Feet 157 Concept Plan Options -Landscaping Capital Costs –by County Maintenance Costs: Minimal/Grass/Non-Irrigated – by County Trees/Shrubs/Grass/Irrigation – by MSBU 5 158 Questions & Feedback6 159 Q1 -What Roadway Do You Use to Access Your Home or Place of Work? A.Whippoorwill Lane B.Dudley Drive C.Marbella Lakes Drive 160 Q2 -Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? A.Yes B.No C.No Opinion 161 Q3 -Do You Prefer the Concept Plan as Shown or the Original Conventional Design? A.New Concept Plan B.Conventional Design C.No Opinion 162 Q4 -Optional Landscaping -Support for On-Going Maintenance of Roadway Landscaping? A.Minimal by County B.Enhanced by MSBU 163 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Mariposa Homeowners Association Meeting January 15, 2019 164 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Gusta Bella Vita Homeowners Association Meeting January 16, 2019 165 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Coventry at Stratford Homeowners Association Meeting January 17, 2019 166 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Whippoorwill Lane Area Businesses Homeowners Association Meeting January 22, 2019 167 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Andalucia Homeowners Association Meeting January 23, 2019 168 Collier County Capital Project Planning, Impact Fees & Program Management Division Whippoorwill Lane Marbella Lakes Drive Interconnection Study Aviano Homeowners Association Meeting January 24, 2019 169 Presentation Agenda 1 Purpose/Overview2Approved 2012 Design3Identified Issues 4 Concept Plan5Interactive Polling 170 Purpose/Overview1 Subject of Numerous Developer Commitments/Contributions Establishes Interconnectivity Provides 2nd Means of Access Better Routing for 1st Responders Traffic Signal at Livingston Rd. Reduced Delays, Reduces Emissions 171 Purpose/Overview1 2012 -Design Completed 2014 -BCC Deferred Construction 2018 -BCC Programmed Funds for Construction in 2020 2019 – BCC to Consider Moving Forward with the Project 172 Purpose/Overview Develop a Concept Plan as an alternative to the “Conventional Design” that: •Addresses Neighborhood Concerns •Is Vetted with HOA/Stakeholders 1 173 Purpose/Overview (cont.) Our Approach: 1 Aug Sept Oct Nov Dec Jan Feb Mar Preliminary Meeting w/Stakeholder Develop Concept Plan Final Concept Plan BCC Hearing Stakeholder Meetings 174 Purpose/Overview (cont.) Participants will be polled as to their support for, or opposition to: 1)The Project as a Whole 2)The Conventional Design or the Concept Plan 3)Some Options 1 175 Purpose/Overview (cont.) Participation in this process in no way precludes you from taking a position at any future public meeting(s) on whether the County should move forward with this project. 1 176 Purpose/Overview (cont.) BCC Meeting (March) Original Conventional Design Final Concept Plan The Public Input We Gather at these Meetings 1 177 Purpose/Overview (cont.) Following public input, the BCC will decide: Move forward with: The Original Conventional Design, or The Concept Plan, or Not Proceed with the Project 1 178 Approved 2012 Design2 179 Approved 2012 Design The approved design for the interconnection: •Two 11’ Wide Travel Lanes •3’ Paved Shoulders on Marbella Lakes Dr. •Sidewalks •40mph Design Speed (20 for curve) •30mph Posted Speed (15 for curve) •No Improvements to Whippoorwill Ln. 2 180 Identified Issues Issues we identified in consultation with HOA Leadership Traffic Issues Safety Green Space 3 181 Concept Plan4 Marbella Lakes Drive Whippoorwill Lane 182 Concept Plan Marbella Lakes Drive 4 N Livingston RoadMarbella Lakes Drive Hermosa Way 183 Concept Plan Marbella Lakes Drive 4 Livingston RoadMarbella Lakes Drive 10 Foot Wide Median Shown w/Optional Enhanced Landscaping Traffic Signal at Livingston Road N 10 Foot Wide Travel Lanes 184 Concept Plan Marbella Lakes Drive 4 Hermosa Way New Roadway Alignment Shifted to North Pedestrian Connection 10 Foot Wide Travel Lanes w/No Median Roundabout & Approaches w/Lighting Shown w/Optional Enhanced Landscaping N Raised Median Shown w/Optional Enhanced Landscaping 185 Concept Plan Marbella Lakes Drive 4 N Marbella Lakes Drive 186 Concept Plan Marbella Lakes Drive 4 No Sidewalk on South Side Roundabout w/Lighting Shown w/Optional Enhanced Landscaping Splitter Island 10 Foot Wide Travel Lanes w/No Median N Whippoorwill Lane Raised Median Shown w/Optional Enhanced Landscaping 187 Concept Plan Whippoorwill Lane 4 Stratford Lane N Marbella Lakes Drive Whippoorwill Lane 188 Concept Plan Whippoorwill Lane 4 Splitter Island No Sidewalk on East Side Roundabout w/Lighting Shown w/Optional Enhanced Landscaping Stratford Lane Crosswalk Interconnection 10 Foot Wide Travel Lanes w/No Median New SidewalkN 189 Concept Plan Whippoorwill Lane 4 Mariposa Circle N Stratford Lane Whippoorwill Lane 190 Concept Plan Whippoorwill Lane 4 11 Foot Wide Travel Lanes Next to Medians Mariposa Circle Raised Medians to Reduce Width of Travel Lanes to 11 Feet Raised Medians to Reduce Width of Travel Lanes to 11 Feet N Shown w/Optional Enhanced Landscaping 191 Concept Plan Whippoorwill Lane 4 Andalucia Way Night Hawk Drive N Mariposa Circle Whippoorwill Lane 192 Concept Plan Whippoorwill Lane 4 Andalucia Way Night Hawk Drive Roundabout w/Lighting Shown w/Optional Enhanced Landscaping Existing Lane Widths Maintained N Raised Median to Reduce Width of Travel Lanes to 11 Feet Optional Enhanced Landscaping Raised Median to Reduce Width of Travel Lanes to 11 Feet 193 Concept Plan Whippoorwill Lane 4 Reserve Way Avow Hospice N Andalucia Way Night Hawk Drive Whippoorwill Lane 194 Concept Plan Whippoorwill Lane 4 Reserve WayShown w/Optional Enhanced Landscaping Existing Lane Widths Maintained Avow Hospice N Existing Lane Widths Maintained Raised Median to Reduce Width of Travel Lanes to 11 Feet 195 Concept Plan Whippoorwill Lane 4 Shown w/Optional Enhanced Landscaping Existing Lane Widths Maintained N Seagate Baptist Church Naples Nissan Raised Median to Reduce Width of Travel Lanes to 11 Feet 196 Concept Plan Options -Landscaping Capital Costs –by County Maintenance Costs: Minimal/Grass/Non-Irrigated – by County Trees/Shrubs/Grass/Irrigation – by MSBU 4 197 Interactive Polling –Get Your Clickers Ready! 4 198 Q1 -What Roadway Do You Use to Access Your Home or Place of Work? A.Whippoorwill Lane B.Dudley Drive C.Marbella Lakes Drive 199 Q2 -Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? A.Yes B.No C.No Opinion 200 Q3 -Do You Prefer the Concept Plan as Shown or the Original Conventional Design? A.New Concept Plan B.Conventional Design C.No Opinion 201 Q4 -Optional Landscaping -Support for On-Going Maintenance of Roadway Landscaping? A.Minimal by County B.Enhanced by MSBU 202 Next Steps Public Outreach to adjacent HOAs and Businesses along Whippoorwill Lane Anticipate presentation to the BCC in March 2019 203 Thank You Please Fill Out a Comment Form Please Return All Clickers! 204 Approved 2012 Design 205 Approved 2012 Design 206 Approved 2012 Design 207 Approved 2012 Design 208 Approved 2012 Design 209 Approved 2012 Design 210 Approved 2012 Design 211 Approved 2012 Design 212 Identified Issues Increased Traffic Safety - Vehicles Safety - Bicyclists Safety - Pedestrians Safety -School Bus Stop Speeding 3 213 Identified Issues (cont.) Trucks (including Delivery) Noise School Bus Operations Capital Cost of the Project Property Value Decrease Due to Increased Noise 3 214 Identified Issues (cont.) Nissan Test Drive (Increased Activity) Loss of Green Space, Animal Habitat & Buffers Maintenance of Kensington Drainage Canal 3 215 Countermeasures Considered 4 Safety •Operations •Speeding Traffic Calming Pedestrians & Bicyclists Other Amenities 216 Safety -Operations Traffic Signal at Livingston Road Truck Restrictions/Weight Restrictions Extend/Add Turn Lanes at HOA Entrances Improved School Bus Stops 4 217 Safety -Speeding Narrow Travel Lanes to 10’ Wide in 2-Lane Un-Divided Segments Convert Striped Areas at Turn Lanes to Raised Medians to Reduce Travel Lanes to 11’ Wide Consider Reducing Posted Speed Limit 4 218 Traffic Calming Roundabouts (Full and/or Mini-) Splitter Island in 2-Lane Undivided Segments Speed Humps Rumble Strips Raised Intersections/Speed Tables Chicanes 4 219 Pedestrians/Cyclists Marked Crosswalks (w/Refuge) Pedestrian Access Over Canal Wider Sidewalk on Marbella Lakes Drive Wider Sidewalks on Whippoorwill Lane Bike Lanes/Paved Shoulders 4 220 Other Amenities Landscaping Medians, Roundabouts Street Lighting Where Needed Shift Alignment to Increase Vegetative Buffer Area Noise Walls 4 221 Sign-In Sheets 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 Comments 244 From:LantzLorraine To:Perry, Jeff Subject:FW: TP 7398 / Effect Of Whippoorwill Cut-through On Pine Ridge Rd Intersection Date:Thursday, March 14, 2019 11:16:48 AM Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov From: ScavoneMichelle  Sent: Monday, March 4, 2019 11:13 AM To: MarcellaJeanne <Jeanne.Marcella@colliercountyfl.gov>; CohenThaddeus <Thaddeus.Cohen@colliercountyfl.gov> Cc: AhmadJay <Jay.Ahmad@colliercountyfl.gov>; LantzLorraine <Lorraine.Lantz@colliercountyfl.gov>; ScottTrinity <Trinity.Scott@colliercountyfl.gov> Subject: TP 7398 / Effect Of Whippoorwill Cut-through On Pine Ridge Rd Intersection Please see the email below, which was sent on 3/1/19: From: LantzLorraine  Sent: Friday, March 1, 2019 1:45 PM To: asweet616@comcast.net Subject: RE: TP 7398 / Effect Of Whippoorwill Cut-through On Pine Ridge Rd Intersection Ms. Kessler, Yes, we conducted analysis utilizing the Collier Metropolitan Planning Organization’s transportation model to complete traffic projections with the interconnection.  We were remiss when we posted the original Pine Ridge Road Congestion Study analysis by not posting the specific technical analysis appendices.  We have added those appendices to our website.  Therefore, you can find the specific analysis in the link below: 245 https://www.colliercountyfl.gov/your-government/divisions-a-e/capital-project-planning-impact-fees-and- program-management/transportation-planning-section/planning-studies/pine-ridge- I trust that this provides the information that you are looking for. Please note, my email address is Lorraine.Lantz@colliercounty.FL.gov  I believe you may have my address incorrect as I am not receiving the comments directly from you, but rather as forwards from other staff members. Respectfully, Lorraine Lorraine M. Lantz, AICP Principal Planner Sincerely, Michelle Scavone Operations Coordinator & Collier 311 GMD Admin Community and Media Relations Growth Management Department From: Amy Kessler <asweet616@comcast.net>  Sent: Friday, March 1, 2019 1:01 PM To: Lorraine.Lanz@colliercountyfl.gov Cc: AhmadJay <Jay.Ahmad@colliercountyfl.gov>; CohenThaddeus <Thaddeus.Cohen@colliercountyfl.gov>; MarcellaJeanne <Jeanne.Marcella@colliercountyfl.gov>; ScottTrinity <Trinity.Scott@colliercountyfl.gov> Subject: Re: TP 7398 / Effect Of Whippoorwill Cut-through On Pine Ridge Rd Intersection Ms. Lanz, Have not heard back from you on this. Please respond.  Thank you, Amy & James Kessler Sent from my iPad On Feb 22, 2019, at 3:26 PM, Amy Kessler <asweet616@comcast.net> wrote: Ms. Lanz, Thank you for this information. This has not addressed my basic concern that, based on your most recent research, that if the cut-through is not done in conjunction with improvements at PINE RIDGE & WHIPPOORWILL, it will create major issues AT PINE RIDGE & WHIPPOORWILL.  246 Below is taken from your response: “Our analysis of the interconnection indicates a reduction of traffic at the north end of Whippoorwill Lane due to the resident’s use of what will be a new southern ingress/egress from the area. Therefore the interconnection does not exacerbate the conditions at Dudley Drive.”   Is there analysis reports on this that also speaks about the traffic that will be created by Marbella Lakes residents and those on Livingston who become aware of the cut through to utilize going north on Whippoorwill to more quickly get to I-75. You only address those on Whippoorwill who can go south but not the many who would now be able to go north. Also it becomes a short-cut for those people to use the always busy gas station on that corner. You’re traffic comes from BOTH ends.    Thank you in advance for your response.  Amy & James Kessler   Sent from my iPad On Feb 22, 2019, at 2:17 PM, <Michelle.Scavone@colliercountyfl.gov> wrote:   Ms. Kessler,   Thank you for your comments regarding the potential interconnection between Whippoorwill Lane and Marbella Lakes Drive.   The Pine Ridge Road Corridor Congestion Study you referenced, examined deficiencies in the corridor and identified potential improvements to the study area.  On March 27, 2018 the Board of County Commissioners voted to: 1. Accept the Pine Ridge Road Corridor Congestion Study  2. Pursue a partial-Continuous Flow Intersection (CFI) at Pine Ridge Road and Livingston Road  3. Continue discussions with the Florida Department of Transportation (FDOT) regarding innovative intersection improvements, e.g., the Restricted Crossing U-turn (RCUT) intersection of Pine Ridge Road and Whippoorwill Lane, and a Diverging Diamond Interchange (DDI) at the Pine Ridge Road/I- 75 Interchange.    The County is currently pursuing the design for the CFI at Pine Ridge Road and Livingston Road.  It is important to note that because, the Whippoorwill Lane intersection is in close proximity and partially included in the I-75 Limited Access Right-of-Way Limits, the study could only recommend that the County pursue an Interchange Modification Report (IMR) with FDOT for innovative intersection concepts such as the DDI and RCUT portion of the corridor.  Any additional 247 improvements or modifications to the Whippoorwill Lane intersection will require additional analysis by FDOT.  And in fact, in the latest draft tentative work program released by FDOT, they will begin the Interchange Modification Report necessary to allow for construction of improvements at the interchange as well as the Whippoorwill intersection.  We hope that those improvements will be completed concurrently with the CFI at Pine Ridge Road and Livingston Road.   Yes, although technically two separate and distinct projects, while evaluating the conventional and innovative improvements with the Pine Ridge Road Corridor Congestion Study, the impacts of the potential interconnection on future traffic volumes within the study area were studied.   Please see the Pine Ridge Corridor Congestion Study Executive Summary and Technical Memorandum. https://www.colliercountyfl.gov/your-government/divisions-a-e/capital- project-planning-impact-fees-and-program-management/transportation- planning-section/planning-studies/pine-ridge-   No, the interconnection study area limits begin south of the Whippoorwill Lane and Dudley Drive intersection.  The operational condition/issues with the Whippoorwill Lane and Dudley Drive intersection have been recognized and due to the proximity to the Pine Ridge Road/Whippoorwill intersection will be addressed as part of the larger Pine Ridge Road and Whippoorwill Lane improvements in the future.  Our analysis of the interconnection indicates a reduction of traffic at the north end of Whippoorwill Lane due to the resident’s use of what will be a new southern ingress/egress from the area.  Therefore the interconnection does not exacerbate the conditions at Dudley Drive.   The Whippoorwill Lane and Marbella Lakes Drive interconnection has been considered for over 15 years and has been the subject of numerous studies, agreements, developer commitments, and hearings.   The most recent process in 2013 included the Board of County Commissioners consideration of a 2012 design to interconnect Whippoorwill Lane and Marbella Lakes Drive. After hearing from the public, the Board decided to not move the project forward at that time. As part of the annual Capital Improvement Element (CIE)/budgeting process in 2018, the Board allocated funds to fiscal year 2020 in the Schedule of Capital Improvements to construct the interconnection. County leadership directed staff to develop a design concept to interconnect the two roadways that would include enhancements to mitigate the impacts to neighbors, to thoroughly vet the concept with area stakeholders, and to return to the Board with recommendations. 248   The most significant difference between the 2012 design and the 2018 Concept Plan is the proposed Concept Plan implements improvements along Whippoorwill Lane north to immediately south of Kraft Road. The 2012 design did not include any “traffic management” benefits and stopped immediately north of Stratford Lane, leaving the remaining portion of Whippoorwill Lane as it exists today.   The Concept Plan features a context sensitive design to achieve the objectives of reducing the speeds of vehicles using this interconnection.   Thank you for your comments.  If you have any additional questions, please feel free to contact Ms. Lantz at 239-252-5779.     On behalf of Lorraine M. Lantz, AICP / Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management Michelle Scavone, Operations Coordinator & Collier 311 GMD Admin     From: Amy Kessler <asweet616@comcast.net>  Sent: Wednesday, February 20, 2019 5:55 PM To: ScavoneMichelle <Michelle.Scavone@colliercountyfl.gov> Cc: AhmadJay <Jay.Ahmad@colliercountyfl.gov>; CohenThaddeus <Thaddeus.Cohen@colliercountyfl.gov>; MarcellaJeanne <Jeanne.Marcella@colliercountyfl.gov>; ScottTrinity <Trinity.Scott@colliercountyfl.gov> Subject: Re: TP 7398 / Effect Of Whippoorwill Cut-through On Pine Ridge Rd Intersection   Thank you. On February 20, 2019 at 4:32 PM ScavoneMichelle <Michelle.Scavone@colliercountyfl.gov> wrote: Ms. Kessler,   We are in receipt of your inquiry. It has been forwarded to the appropriate staff for a response by close of business day on 2/26/19  or sooner if possible.             Sincerely, Michelle Scavone 249 Operations Coordinator & Collier 311 GMD Admin Community and Media Relations Growth Management Department     From: Amy Kessler <asweet616@comcast.net> Date: February 17, 2019 at 3:48:17 PM EST To: JayAhmad@colliergov.net Cc: <ThaddeusCohen@colliergov.net> Subject: Effect Of Whippoorwill Cut-through On Pine Ridge Rd Intersection Reply-To: Amy Kessler <asweet616@comcast.net> Dear Mr. Ahmad: A great amount of research has been made on the Pine Ridge congestion study (link below) that includes the intersection of Whippoorwill Lane and Pine Ridge Road. Now your department has for some reason taken steps to focus only on the Whippoorwill Lane cut- through to Marbella Lakes Drive before there are any plans for anyone (you or the state of Florida) to address the Whippoorwill/Pine Ridge Road intersection issues. Have you done any research or predictions on how the cut through with it's additional traffic accessing this intersection, will affect the delays and back-ups already the worst of all the Pine Ridge Road intersections? Do you have any research on these back-ups blocking the already very challenging, poorly constructed (and in constant disrepair) intersection of Dudley Drive and Whippoorwill Lane? With the proposed cut-through, many 250 will use the proposed road to expedite access to I-75 by going up Whippoorwill and making a right at the Whippoorwill/Pine Ridge Road intersection. Without implementing anything new at this troubled intersection, current problems will multiply. We have many concerns about the safety issues being created by hurriedly creating the cut-through without addressing the major issues at the very dangerous intersection of Whippoorwill and Pine Ridge Road. We'd greatly appreciate a timely response as the cut-through plan has been put on a fast track by your department. Sincerely, Amy & James Kessler 1455 Tiffany Lane #101 Naples, FL 34105 239-659-0198 asweet616@comcast.net https://www.colliercountyfl.gov/home/showdocument? id=79588Table 1: Future 2040 Traffic – “Do Nothing” Alternative Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 251 From:LantzLorraine To:Perry, Jeff Subject:FW: Whippoorwill Lane Extension proposal Date:Thursday, March 14, 2019 10:41:07 AM Jeff,   Please add these comments and responses to the documentation.   Thank you, Lorraine     Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: LantzLorraine  Sent: Thursday, March 14, 2019 10:40 AM To: 'Ken F' <irishkjf@gmail.com> Subject: RE: Whippoorwill Lane Extension proposal   Mr. Fullam,   You are welcome.  Please let me know if you have any additional questions.   Respectfully, Lorraine     Lorraine M. Lantz, AICP Principal Planner     252 Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: Ken F <irishkjf@gmail.com>  Sent: Thursday, March 14, 2019 10:35 AM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Re: Whippoorwill Lane Extension proposal   Lorraine,   Thank you very much for your quick response. Your answer is exactly what I was looking for. I knew I asked the right person!    The Concept Plan's placement of the road on the northern end of County property and the existing vegetation is ESSENTIAL in protecting the Marbella Lakes homes along the east portion of the roadway! Thank you for that! Hopefully, the design phase will address the remaining issue of favorable elevation.   Thanks again for all your help. Have a great weekend.   Sincerely,   Ken   On Thu, Mar 14, 2019, 10:15 LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> wrote: Mr. Fullam,   Thank you for your comments.  The potential interconnection concept design as presented does not include an elevation plan.  If the project moves forward, the design phase would include that.  The Concept Plan attempted to place the road on the north side of the county owned property (east of the Marbella entrance) and maintain as much of the native vegetation south of the interconnection as possible.  As a suggestion regarding the privacy wall and buffer, unless there is something in your development’s PUD documents that regulates the wall height or landscaping, the HOA could consider increasing the height of their existing privacy wall or adding more vegetation to their side of the right-of-way line next to the existing wall.   Respectfully, 253 Lorraine     Lorraine M. Lantz, AICP Principal Planner       Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: Ken F <irishkjf@gmail.com>  Sent: Tuesday, March 12, 2019 6:01 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whippoorwill Lane Extension proposal   Hi Lorraine,   Hope all is well with you.  I've been looking over the proposed (revised) plans for the Whippoorwill Extension project.  I also took another walk to look at levels of elevation at various parts of the Marbella Lakes development that would be affected by the road extension.   In a previous meeting, I believe it was Jeff who indicated that my suggestion for a much larger wall buffering the backs of the affected houses (similar to the wall type buffering Wydemere on Livingston Road) would not qualify as a necessity due to less than required traffic volume and would not be considered.   However, although the buffer zone is generous for homes east of the entrance to Marbella Lakes, the elevation would create vulnerability to being able to see INSIDE the homes from the vantage point of the new section of roadway! This would render backyard use of the homes nearly useless for privacy, which is not the case currently for the homes west of the entrance.   Do the elevation plans call for the road to be lower in elevation than the yards of the affected houses? Or, has that not been determined?  Also, would plans include clearing the entirety of the "preserve" area adjacent to the walls of Marbella Lakes?   I would appreciate any suggestions you have to address this issue in the event that the project goes forward.   Thank you for your help and all you have done thus far.   254 Respectfully, Ken Fullam IrishKJF@gmail.com (909)917-7059 Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 255 From:LantzLorraine To:Perry, Jeff Subject:FW: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update Date:Thursday, March 14, 2019 11:16:28 AM   Comments and correspondence.    Lorraine       Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: LantzLorraine  Sent: Wednesday, March 6, 2019 8:25 AM To: Christy Daggett <christy.daggett@gmail.com> Subject: RE: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update   Ms. Daggett, You are a resident of Board of County Commission District 4 – represented by Commissioner Penny Taylor. Her contact information is: Penny.Taylor@CollierCountyFL.Gov Commissioner Taylor’s executive aide is Sherry Greco. If you would like to contact Commissioner Taylor or have a meeting with her to discuss the project, I suggest contacting Sherry at 239-252-8604 or sherry.greco@colliercountyfl.gov Thank you, Lorraine 256 Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: Christy Daggett <christy.daggett@gmail.com>  Sent: Friday, March 1, 2019 5:39 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Re: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update   Thanks for the update Lorraine. I was wondering who our commissioner is and if I could get a meeting with him...or her. I will probably not go to the vote because I went the last time with some of our neighbors and the Marbella Lakes people were so belligerent that none of us were willing to speak up against them. I am assuming it will probably be just as bad if not worse this time. Christy Daggett  Sent from my iPhone On Mar 1, 2019, at 4:44 PM, LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> wrote:     You are receiving this project update because of your interest in the Whippoorwill Lane and Marbella Lakes Drive Interconnection Study.   Currently, the Board of County Commissioners (BCC) is tentatively scheduled to hear this item on Tuesday, April 9, 2019.  The BCC agendas are typically finalized one week prior to the meeting date, therefore I expect to receive confirmation of the agenda and item number during the first week of April.   When I receive notice of the finalized  agenda and the item number, I will distribute it.  You may also review the upcoming BCC Meeting Agendas once they are posted at:  http://colliercountyfl.iqm2.com/Citizens/default.aspx   257 Thank you, Lorraine   Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 258 From:LantzLorraine To:Perry, Jeff Subject:FW: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update Date:Thursday, March 14, 2019 11:15:11 AM Additional inquiries and correspondence. Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov From: Pam Howard <pamh@directorschoicellc.com> Sent: Wednesday, March 6, 2019 9:53 AM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: RE: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update Thank you, Pam Howard, CAM, CMCA Directors Choice, LLC 3784 Progress Avenue #107 Naples, FL 34104 P:239-877-7457 F:239-791-1076 From: LantzLorraine [mailto:Lorraine.Lantz@colliercountyfl.gov] Sent: Wednesday, March 06, 2019 8:30 AM To: Pam Howard Subject: RE: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update Hi Pam, Yes, staff’s recommendation will be to pursue the interconnection of Whippoorwill Lane and Marbella Lakes Drive using the Conceptual Plan as a start for the Design Phase. 259 Thanks, Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov From: Pam Howard <pamh@directorschoicellc.com> Sent: Sunday, March 3, 2019 12:56 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: RE: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update Will your department be recommending that this project will move forward? Pam Howard, CAM, CMCA Directors Choice, LLC 3784 Progress Avenue #107 Naples, FL 34104 P:239-877-7457 F:239-791-1076 From: LantzLorraine [mailto:Lorraine.Lantz@colliercountyfl.gov] Sent: Friday, March 01, 2019 4:44 PM Subject: Whippoorwill Lane/Marbella Lakes Drive Interconnection Update You are receiving this project update because of your interest in the Whippoorwill Lane and Marbella Lakes Drive Interconnection Study. Currently, the Board of County Commissioners (BCC) is tentatively scheduled to hear this item on Tuesday, April 9, 2019. The BCC agendas are typically finalized one week prior to the meeting date, therefore I expect to receive confirmation of the agenda and item number during the first week of April. When I receive notice of the finalized agenda and the item number, I will distribute it. You 260 may also review the upcoming BCC Meeting Agendas once they are posted at: http://colliercountyfl.iqm2.com/Citizens/default.aspx Thank you, Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 261 Meeting Notes for 1/22/19 Coordination Phone Call to discuss Potential Interconnection of Whippoorwill Lane and Marbella Lakes Drive Participants: •Ann Henderson, Routing Manger •Lorraine Lantz Project and Discussion Items: I previously sent the potential interconnection of Whippoorwill Lane and Marbella Lakes Drive presentation handouts to David Ogilvie, Transportation Director for Collier County Public Schools. Mr. Ogilvie was not in when I called, and I was forwarded to Ms. Henderson. Ms. Henderson stated that she had received the potential interconnection materials and had reviewed them for the Transportation Office Our discussion focused on the current conditions and the addition of the roundabouts in the new concept design. Ms. Henderson stated that she believed the roundabouts would be safer for the buses to load and unload. She stated that currently all students were picked-up outside the gated entrances to communities, but there was sometimes problems with oncoming vehicles stopping. She stated that in the design concept, buses would stop before entering the roundabout which was safer. Also, because there was a divided median and slower traffic, that there would not be as much issue with oncoming traffic. She also stated that CCPS Transportation was glad to see the traffic light at Livingston Road and Marbella Lakes Drive in the design plans. We also discussed a question I had received about school zoning and school district maps. She stated that there were currently no schools in either zone that were over capacity. She also stated that redistricting would be based on school capacity not on the potential interconnection of the two roads. As the discussion was ending, I asked if they would be willing to provide a letter or email documenting the CCPS Transportation position on the interconnection, the signal and the roundabouts. She indicated that she would send something to document their position. 262 Meeting Notes for 1/31/19 Coordination Meeting to discuss Potential Interconnection of Whippoorwill Lane and Marbella Lakes Drive Attendees: •Sargent Paul Cabral •Sargent Terry Smith •Jeff Perry •Lorraine Lantz Project and Discussion Items: After introductions were made, Jeff began to discuss the potential interconnection of Whippoorwill Lane and Marbella Lakes Drive Project. The project introduction included the history of the project including development commitments, the Green Blvd. removal from the LRTP, the 2012 Design, the New Concept and Design and need for additional access for the HOAs in and along the corridor. The discussion focused on the width of the travel lanes – current conditions, 2012 design and the new concept design. The intent was to slow traffic down to decrease speeding and create a more calming facility to reduce accidents. Both officers acknowledged that speed was a concern for the current facilities (both Whippoorwill and Marbella) as well as in the 2012 design. The current posted speed as well as the proposed speed of the 2012 study was discussed. The officers preferred the new concept as it was intended to force drivers to go slower. They stated that the lower the posted speed the better. There was a discussion about the traffic counts from the report and they believed the speeding problem was south of where the speed data was collected for the report (problem was south of Andalucía). There was a discussion regarding the lack of Bicycle Lanes in the concept design. The discussion included the balance of having a dedicated bike lane with the desire for slower speeds and less pavement. The suggestion of having signage and pavement markings (sharrows) for safety was made. There was also a suggestion to make the existing sidewalks along Aviano extra wide multi-use paths or shared-use pathways to accommodate recreational bicyclists. Sargent Smith provided crash data for the last 6 weeks and indicated that along Pine Ridge Road (from Livingston to I-75) there were 48 crashes. He was concerned about the number of crashes in the area. There was discussion of the CFI at Pine Ridge/Livingston as well as the status of the other innovative intersection improvements studied previously. Sargent Cabral is involved in the crime reports and analysis. He stated that the CCSO Crime Analyst for the area told him that crime is not an issue in this area and that the perceived criminal behavior at the north end of the project (near Pine Ridge) does not cause the crime in the study area. He stated that his team’s analysis indicated that criminals originating from north of the project were active in the Golden Gate City area. When asked if having the roads connected would cause an increase in criminal activity because of the easy access to I-75 from Marbella Lakes Drive, he indicated that it would be more of a crime prevention technique and deterrence. As the discussion was ending, I asked if they would be willing to provide a letter of support for the project. They indicated that they were not able to do so but were willing to state that they believed that if the County was putting in the interconnection, that the new concept was better than the 2012 concept. They both seemed to prefer the new concept to the old concept for safety and traffic reasons including lower speeds and a decrease in crime. They also stated that the additional ingress and egress made sense and that it would decrease their response times to traffic and safety incidents within their response zone. 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 Whippoorwill Lane/Marbella Lakes Drive Interconnection Study Gusta Bella Vita HOA Meeting Wednesday, January 16, 2019 COMMENT SHEET Name: Keith Keppler & Bok Nyeo Ock Representing: Home Owners in GBV Address: 1321 Corso Palermo Ct #2 City Naples State: Florida Zip Code: 34105 Comments: First, the BENEFITS: We support the concept of the proposed interconnection between Whippoorwill Lane and Marbella Lakes Drive for two obvious reasons: 1. The current conditions leave only one path of ingress and egress available to the residents of multiple residential developments. That constraint applies to both the residents on the Whippoorwill side and those on the Marbella Lakes side. A fundamental criterion in most all planning and design situations impacting all forms of occupancy is to provide two or more means of egress as essential to Public Safety. 2. This concept is equally valid for First Responder and emergency personnel. Access is essential so that residents and visitor population in the communities served by Whippoorwill Lane on one side and Marbella Lakes Drive on the other can be accessed by emergency vehicles. Next, CONCERNS: 1. The imperative must be to incorporate improvements in the ultimate plan that will limit traffic speed and discourage the development of a convenience route resulting in increased traffic, noise and endangerment to residents and families. 2. The presentation referred to reduced speed limits on Whippoorwill Lane, median road dividers, a couple traffic circles. Solutions of this nature are essential to discourage the build up of a convenience shortcut. Thank you to the County for including us in the informational meeting and the opportunity to express our support and concerns. Submitted via e-mail to : Lorraine.Lantz@colliercountyfl.gov 280 281 282 283 284 285 286 287 288 289 290 From:LantzLorraine To:Perry, Jeff Subject:FW: Proposed Whipporwill changes Date:Friday, February 08, 2019 3:25:29 PM FYI     Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: WAYNE HAUPERT <coral42@comcast.net>  Sent: Wednesday, January 23, 2019 9:25 AM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Proposed Whipporwill changes   Lorraine, I live in Andalucia and am one only a handful who have been here since the beginning in 2005/6. I am unable to attend the meeting tonight at our clubhouse, but I want you to know that I would be totally in favor of punching Whipporwill thru to Livingston and the other changes that are proposed. It would be a wonderful change especially the roundabouts down Whipporwill as it looks very industrial right now. Thank you and I sincerely hope the changes will happen. Sincerely, Wayne WAYNE M HAUPERT 1402 Serrano Circle 291 Naples, FL 34105-4951 PH: 239-961-3499 Email:coral42@comcast.net Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 292 From:LantzLorraine To:Karen Allison Cc:Perry, Jeff Subject:RE: Whippoorrwill/Marbella Interconnection Date:Friday, February 08, 2019 8:04:56 AM Ms. Allison, Thank you for your comments. We are tentatively scheduled to bring this item to the Board of County Commissioners during the March 12th meeting. I will update the entire distribution list when we have a firm date. Thank you, Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov -----Original Message----- From: Karen Allison <karenallison1@gmail.com> Sent: Thursday, February 7, 2019 5:45 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whippoorrwill/Marbella Interconnection My name is Karen Allison. I live in Andalucia off of Whippoorwill Lane. I attended the meeting that you held for our community. It was very informative. Thank you. I am very much in favor of this project. I think it is critical that we have secondary ingress and egress from our neighborhood. I also think it is necessary given the other changes that will be made in the Pine Ridge project. I would also be in favor of the enhanced landscaping option. Would it be possible for you to let us know when nap County meeting will take place? Thank you very much, Karen Allison ________________________________ Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response 293 to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 294 295 296 297 298 299 From:LantzLorraine To:Tammy Piccola Cc:Perry, Jeff Subject:RE: Whippoorwill Lane/Marbella Lakes Drive Date:Tuesday, February 05, 2019 11:32:33 AM     Thank you for your comments.  As stated during our presentation, we will be bringing this item to the Board of County Commissioners in March.  We are tentatively scheduled for the March 12th meeting.  I will update the entire distribution list when we have a firm date.   Thank you, Lorraine           Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: Tammy Piccola <tapiccola@gmail.com>  Sent: Sunday, January 27, 2019 11:26 AM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whippoorwill Lane/Marbella Lakes Drive   Hi Lorraine,   My husband and I live in Andalucia at 1665 Serrano Circle, and we are in favor of the Whippoorwill/Marbella Lakes Drive.  Let me know if you have any questions.   Warm Regards,   300 From:LantzLorraine To:Maggie Ulrich Cc:Perry, Jeff Subject:RE: Whipporwill / Marbella Lakes Date:Tuesday, February 05, 2019 11:32:26 AM Thank you for your comments. As stated during our presentation, we will be bringing this item to the Board of County Commissioners in March. We are tentatively scheduled for the March 12th meeting. I will update the entire distribution list when we have a firm date. Thank you, Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov -----Original Message----- From: Maggie Ulrich <maggieulrich@hotmail.com> Sent: Monday, January 28, 2019 8:29 AM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whipporwill / Marbella Lakes Lorraine, As a resident of Andalucia community, my husband and I are highly in favor of the extension of Whippoorwill to allow us an alternative exit if Pine Ridge is closed. Also if the right turn only is approved the extension would be crucial for all traffic needing to go West. Thank you, Maggie Ulrich 1414 Serrano Circle Sent from my iPhone ________________________________ Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in 301 From:LantzLorraine To:Jamie Fisher Cc:Perry, Jeff Subject:RE: Whipperwill In Favor Date:Tuesday, February 05, 2019 11:32:16 AM   Thank you for your comments.  As stated during our presentation, we will be bringing this item to the Board of County Commissioners in March.  We are tentatively scheduled for the March 12th meeting.  I will update the entire distribution list when we have a firm date.   Thank you, Lorraine             Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: Jamie Fisher <Jamie@thefishers.co>  Sent: Sunday, January 27, 2019 7:39 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whipperwill In Favor   I am in favor of the extension of whipperwill to Marbella lakes drive.    Thanks, Jamie Fisher Andalucia Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 302 303 From:LantzLorraine To:Ashley Kelly Cc:Perry, Jeff Subject:RE: Whippoorwill/Marbella Lakes Drive Date:Tuesday, February 05, 2019 11:29:07 AM   Thank you for your comments.  As stated during our presentation, we will be bringing this item to the Board of County Commissioners in March.  We are tentatively scheduled for the March 12th meeting.  I will update the entire distribution list when we have a firm date.   Thank you, Lorraine             Lorraine M. Lantz, AICP Principal Planner     Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov   From: Ashley Kelly <ashkkelly@gmail.com>  Sent: Wednesday, January 30, 2019 6:00 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whippoorwill/Marbella Lakes Drive   Hello Lorraine -   I hope your week is going well!   My husband and I live in Andalucia off of Whipporwill Rd. I wanted to email you indicating that I'm in favor of the Whippoorwill/Marbella Lakes Drive road construction. Thank you, 304   -- Thank you,   Ashley K. Kelly Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 305 From:LantzLorraine To:Marcia Azar Subject:RE: Whippoorwill Marbella Drive Date:Tuesday, February 05, 2019 11:28:23 AM Thank you for your comments.  As stated during our presentation, we will be bringing this item to the Board of County Commissioners in March.  We are tentatively scheduled for the March 12th meeting.  I will update the entire distribution list when we have a firm date. Thank you, Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov From: Marcia Azar <marciaazar@yahoo.com>  Sent: Saturday, February 2, 2019 4:52 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Fwd: Whippoorwill Marbella Drive Sent from my iPhone Begin forwarded message: From: Marcia Azar <marciaazar@yahoo.com> Date: February 1, 2019 at 11:46:44 AM EST To: lorraine.lantz@collercountyfl.gov Cc: Marcia Azar <marciaazar@yahoo.com> 306 Subject: Whippoorwill Marbella Drive Hi Lorraine  I think we very much need to develop the new exit out of Andalucia if Whippoorwill becomes a right turn only at Pine Ridge. I am most concerned for safety during an emergency. Another exit would be of great importance if Pine Ridge gets backed up from 75 and we would have to sit through several lights before getting onto Pine Ridge during an emergency!  Both my husband Marcus and myself Marcia are in favor of this expansion. We both have health issues that could result in need of quick access. (Marcus-Previous heart attack Marcia-aortic aneurysm). Thank you for your consideration.  Sincerely, Marcia Azar (Marcus) 1527 Raffina Court Andalucia  314-800-8045 Sent from my iPhone Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 307 From:LantzLorraine To:Christine Lewis Subject:RE: Whippoorwill + Marbella Connection Proposal Date:Tuesday, February 05, 2019 11:26:18 AM Ms. Lewis, Thank you for your comments. As stated during our presentation, we will be brining this item to the Board of County Commissioners in March. We are tentatively scheduled for the March 12th meeting. I will update the entire distribution list when we have a firm date. Thank you, Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov From: Christine Lewis <christie.lewis@ymail.com> Sent: Tuesday, February 5, 2019 11:14 AM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Whippoorwill + Marbella Connection Proposal Lorraine, Thank you for your team's presentation on January 23 at Andalucia to discuss the Whippoorwill + Marbella Lakes connection and improvements to those roads. As you'll recall from my comments below, I am 100% in favor of this connection which will improve connectivity and safety for all residents who live off of both Whippoorwill and Marbella Lakes. The presentation of the proposed road improvements exceeded my expectations. I applaud the team who reviewed what some might consider a small improvement in Naples for taking a detailed look at the connectivity and for presenting a plan that will not only solve the traffic flow issues, but will also beautify the roads. I believe these improvements will help to transform both roads from simply 308 functional to a more residential look which could ultimately improve everyone's property values. Now that I've seen what's possible, these improvements can't happen soon enough. Every time I leave to turn left from Andalucia and I wait for every car coming south or north on Whippoorwill, I can't help but think how traffic will be improved once the roundabouts are installed. Every time I leave to head to Golden Gate and Airport Pulling and I make a right from Pine Ridge to get onto I-75 (and drive below the speed limit on I-75 in the right-hand lane due to congestion) every morning, I think about how much our commute will improve once we are able to simply use Livingston, a relatively underutilized road around 7:30 am when we would use it. Further, I am wholly in favor of any and all landscaping the county wishes to provide up front with full knowledge that this will mean we residents will take up the maintenance expense. That expense will be disbursed among our nearly 1,300 Whippoorwill and Marbella residents which should be more than enough to fund the on-going maintenance while keeping annual costs low per household. That expense will be worth it as we will benefit daily from a more beautiful drive to and from our homes. To summarize: I am 100% in favor of both the connectivity and the full landscaped improvements proposed. I look forward to hearing that this connection and landscaping are approved in March. This proposal matches the high standards set for Naples' beautification and ease of transportation - Thank you to your team for such fantastic effort! Christie Lewis WESTPARK CONSULTING INC. (813)299-2736 christie.lewis@ymail.com www.linkedin.com/in/christinelewis On Wednesday, March 21, 2018, 8:32:04 AM EDT, LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> wrote: Ms. Lewis, Thank you for your comments regarding the Pine Ridge Road Corridor Study. The Study is currently on the March 27, 2017 Board of County Commissioner’s (BCC) Agenda. The entire BCC Agenda will be posted later in the week. You may check back using this link: http://colliercountyfl.iqm2.com/Citizens/default.aspx All BCC meetings are open to the public. If you are interested in speaking regarding your comments, please note that any persons wishing to speak on an agenda item must register prior to presentation of the agenda item to be addressed. All registered speakers will receive up to three (3) minutes unless the time is adjusted by the chairman. Sincerely, 309 Lorraine Lorraine M. Lantz, AICP Principal Planner Collier County Capital Projects, Planning, Impact Fees & Program Management NOTE: Email Address Has Changed 2685 S. Horseshoe Drive, Suite #103 Naples, FL 34104 Phone: (239) 252-5779 Lorraine.Lantz@CollierCountyFL.gov From: Christine Lewis [mailto:christie.lewis@ymail.com] Sent: Tuesday, March 20, 2018 8:54 PM To: LantzLorraine <Lorraine.Lantz@colliercountyfl.gov> Subject: Pine Ridge Road improvements Lorraine Lantz, Please consider this email as a public comment from a resident of Andalucia, a community off of Whippoorwill. Regarding the extension of Whippoorwill ... I understand that years ago, before my home was constructed, a meeting was held to extend Whippoorwill to Livingston where the residents of Marbella Lakes strongly opposed the connection (understatement). 310 As a resident of Andalucia, the connection between Whippoorwill and Marbella Lakes would greatly benefit our community. I frequently commute to/through the Airport Pulling and Golden Gate intersection (twice per day for my children's school, other times for downtown, other times for Fleishmann Park practices and games after school and on weekends). A left onto Pine Ridge followed by a left onto Livingston is a less reliably timed route versus a right onto Pine Ridge and a right onto I-75, therefore I always take the highway one exit south. This Whippoorwill-Marbella Lakes connection would not only help those of us attempting to go south on Livingston, but also for quick trips to the shopping center on the southeast corner of Livingston and Pine Ridge where a right onto Livingston would eliminate two lefts. Now that the topic of removing the left-turn from Whippoorwill onto Pine Ridge is on the table, this connection is needed more than ever. I highly recommend it be considered to accompany the restricted left construction. There are approximately 167 single-family residents and 776 multi-family residents including Andalucia, Gusto Bella Vita, Mariposa, and Stratford Place (I omitted the rental community at the north end of Whippoorwill: Naples Reserve). 943 total households living on Whippoorwill. There are 282 SFD and 208 MF households in Marbella Lakes - a total 490 households - half that of the residents on Whippoorwill. I would imagine that if the same meeting were held today to discuss connecting Whippoorwill and Marbella Lakes, it would have a different tone now that Whippoorwill is fully built out and the discussion of removing our left-turn onto Pine Ridge is on the table. If the county wants to improve traffic flow, the county should consider granting the residents of Whippoorwill access to Marbella Lakes Dr as an alternative. This one entry/exit works for 100% of Marbella Lakes' residents' commuting needs - for this same reason, it would also be desirable for the residents off of Whippoorwill. As a side-story, in the last few months, there was a night when there was an accident on Whippoorwill just south of the church - traffic was blocked in both directions for over an hour. This impacted 783 of the 943 households listed above. 783 households were trapped either unable to get home or to leave. I consider this a safety hazard. Naples is known for having superb traffic flow and for the ease of travel - having a restricted left and no connectivity to Marbella Lakes Dr is counter intuitive to the Naples commutes I currently enjoy - it isn't consistent with decisions that have been made in the past to improve the traffic flow for all. 311 I hope my comments will be heard as I believe this connectivity is in the best interest for all residents, Marbella Lakes included, now and for the future. Christie Lewis WESTPARK CONSULTING INC. (813) 299-2736 christie.lewis@ymail.com www.linkedin.com/in/christinelewis Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 312 313 314 315 Polling Results 316 Session Name: 1-10-2019 7-00 PM Date Created:1/10/2019 5:32:43 PM Active Participants:78 of 78 Average Score:0.00%Questions:5 Results by Question 1. Q1 - What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 2.88 Median 3.00 Variance 0.23 Standard Deviation 0.48 Responses Percent Count Whippoorwill Lane 6.12% 3 Dudley Drive 0% 0 Marbella Lakes Drive 93.88% 46 Totals 100% 49 of Work? (Multiple Choice) 1/11/2019 Page 1 of 5 317 2. Q1 - What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 2.94 Median 3.00 Variance 0.11 Standard Deviation 0.33 Responses Percent Count Whippoorwill Lane 2.78% 2 Dudley Drive 0% 0 Marbella Lakes Drive 97.22% 70 Totals 100% 72 oWo ?(MutpleC oce) 1/11/2019 Page 2 of 5 318 3. Q2 - Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.81 Median 2.00 Variance 0.15 Standard Deviation 0.39 Responses Percent Count Yes 18.67% 14 No 81.33% 61 No Opinion 0% 0 Totals 100% 75 ella Lakes Dr.?(Multiple Choice) 1/11/2019 Page 3 of 5 319 4. Q3 - Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.51 Median 1.00 Variance 0.75 Standard Deviation 0.87 Responses Percent Count New Concept Plan 73.68% 56 Conventional Design 1.32% 1 No Opinion 25% 19 Totals 100% 76 Conventional Design?(Multiple Choice) 1/11/2019 Page 4 of 5 320 5. Q4 - Optional Landscaping - Support for On-Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.53 Median 2.00 Variance 0.25 Standard Deviation 0.50 Responses Percent Count Minimal by County 47.3% 35 Enhanced by MSBU 52.7% 39 Totals 100% 74 1/11/2019 Page 5 of 5 321 Session Name: 1­15­2019 5­50 PM Date Created:1/15/2019 5:25:30 PM Active Participants:23 of 23 Average Score:0.00%Questions:4 Results by Question 1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.48 Median 1.00 Variance 0.42 Standard Deviation 0.65 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.41 Median 1.00 Variance 0.42 Standard Deviation 0.65 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.50 Median 1.50 Variance 0.25 Standard Deviation 0.50 Responses Percent Count Whippoorwill Lane 100%22 Dudley Drive 0%0 Marbella Lakes Drive 0%0 Totals 100%22 Responses Percent Count Yes 60.87%14 No 30.43%7 No Opinion 8.7%2 Totals 100%23 Responses Percent Count New Concept Plan 68.18%15 Conventional Design 22.73%5 No Opinion 9.09%2 Totals 100%22 Responses Percent Count Minimal by County 50%11 Enhanced by MSBU 50%11 Totals 100%22 1/16/2019 Page 1 of 4 322 Session Name: 1­15­2019 5­50 PMDate Created:1/15/2019 5:25:30 PM Active Participants:23 of 23Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.48 Median 1.00 Variance 0.42 Standard Deviation 0.65 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.41 Median 1.00 Variance 0.42 Standard Deviation 0.65 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.50 Median 1.50 Variance 0.25 Standard Deviation 0.50 ResponsesPercent CountWhippoorwill Lane 100%22Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%22 Responses Percent Count Yes 60.87%14 No 30.43%7 No Opinion 8.7%2 Totals 100%23 Responses Percent Count New Concept Plan 68.18%15 Conventional Design 22.73%5 No Opinion 9.09%2 Totals 100%22 Responses Percent Count Minimal by County 50%11 Enhanced by MSBU 50%11 Totals 100%22 1/16/2019 Page 2 of 4 323 Session Name: 1­15­2019 5­50 PMDate Created:1/15/2019 5:25:30 PM Active Participants:23 of 23Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.48Median1.00Variance0.42Standard Deviation 0.65 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.41 Median 1.00 Variance 0.42 Standard Deviation 0.65 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.50 Median 1.50 Variance 0.25 Standard Deviation 0.50 ResponsesPercent CountWhippoorwill Lane 100%22Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%22ResponsesPercentCountYes60.87%14No30.43%7No Opinion 8.7%2Totals100%23 Responses Percent Count New Concept Plan 68.18%15 Conventional Design 22.73%5 No Opinion 9.09%2 Totals 100%22 Responses Percent Count Minimal by County 50%11 Enhanced by MSBU 50%11 Totals 100%22 1/16/2019 Page 3 of 4 324 Session Name: 1­15­2019 5­50 PMDate Created:1/15/2019 5:25:30 PM Active Participants:23 of 23Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.48Median1.00Variance0.42Standard Deviation 0.653. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice)Question StatisticsMean 1.41Median1.00Variance0.42Standard Deviation 0.65 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.50 Median 1.50 Variance 0.25 Standard Deviation 0.50 ResponsesPercent CountWhippoorwill Lane 100%22Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%22ResponsesPercentCountYes60.87%14No30.43%7No Opinion 8.7%2Totals100%23ResponsesPercentCountNew Concept Plan 68.18%15Conventional Design 22.73%5No Opinion 9.09%2Totals100%22 Responses Percent Count Minimal by County 50%11 Enhanced by MSBU 50%11 Totals 100%22 1/16/2019 Page 4 of 4 325 Session Name: 1­16­2019 6­23 PM Date Created:1/16/2019 5:34:05 PM Active Participants:10 of 10 Average Score:0.00%Questions:4 Results by Question 1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.50 Median 1.00 Variance 0.65 Standard Deviation 0.81 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.20 Median 1.00 Variance 0.16 Standard Deviation 0.40 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.40 Median 1.00 Variance 0.24 Standard Deviation 0.49 Responses Percent Count Whippoorwill Lane 100%10 Dudley Drive 0%0 Marbella Lakes Drive 0%0 Totals 100%10 Responses Percent Count Yes 70%7 No 10%1 No Opinion 20%2 Totals 100%10 Responses Percent Count New Concept Plan 80%8 Conventional Design 20%2 No Opinion 0%0 Totals 100%10 Responses Percent Count Minimal by County 60%6 Enhanced by MSBU 40%4 Totals 100%10 1/17/2019 Page 1 of 4 326 Session Name: 1­16­2019 6­23 PMDate Created:1/16/2019 5:34:05 PM Active Participants:10 of 10Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.50 Median 1.00 Variance 0.65 Standard Deviation 0.81 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.20 Median 1.00 Variance 0.16 Standard Deviation 0.40 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.40 Median 1.00 Variance 0.24 Standard Deviation 0.49 ResponsesPercent CountWhippoorwill Lane 100%10Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%10 Responses Percent Count Yes 70%7 No 10%1 No Opinion 20%2 Totals 100%10 Responses Percent Count New Concept Plan 80%8 Conventional Design 20%2 No Opinion 0%0 Totals 100%10 Responses Percent Count Minimal by County 60%6 Enhanced by MSBU 40%4 Totals 100%10 1/17/2019 Page 2 of 4 327 Session Name: 1­16­2019 6­23 PMDate Created:1/16/2019 5:34:05 PM Active Participants:10 of 10Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.50Median1.00Variance0.65Standard Deviation 0.81 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.20 Median 1.00 Variance 0.16 Standard Deviation 0.40 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.40 Median 1.00 Variance 0.24 Standard Deviation 0.49 ResponsesPercent CountWhippoorwill Lane 100%10Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%10ResponsesPercentCountYes70%7No10%1No Opinion 20%2Totals100%10 Responses Percent Count New Concept Plan 80%8 Conventional Design 20%2 No Opinion 0%0 Totals 100%10 Responses Percent Count Minimal by County 60%6 Enhanced by MSBU 40%4 Totals 100%10 1/17/2019 Page 3 of 4 328 Session Name: 1­16­2019 6­23 PMDate Created:1/16/2019 5:34:05 PM Active Participants:10 of 10Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.50Median1.00Variance0.65Standard Deviation 0.813. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice)Question StatisticsMean 1.20Median1.00Variance0.16Standard Deviation 0.40 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.40 Median 1.00 Variance 0.24 Standard Deviation 0.49 ResponsesPercent CountWhippoorwill Lane 100%10Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%10ResponsesPercentCountYes70%7No10%1No Opinion 20%2Totals100%10ResponsesPercentCountNew Concept Plan 80%8Conventional Design 20%2No Opinion 0%0Totals100%10 Responses Percent Count Minimal by County 60%6 Enhanced by MSBU 40%4 Totals 100%10 1/17/2019 Page 4 of 4 329 Session Name: 1­17­2019 7­02 PM Date Created:1/17/2019 5:11:04 PM Active Participants:33 of 33 Average Score:0.00%Questions:4 Results by Question 1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.36 Median 1.00 Variance 0.23 Standard Deviation 0.48 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.31 Median 1.00 Variance 0.34 Standard Deviation 0.58 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.55 Median 2.00 Variance 0.25 Standard Deviation 0.50 Responses Percent Count Whippoorwill Lane 100%33 Dudley Drive 0%0 Marbella Lakes Drive 0%0 Totals 100%33 Responses Percent Count Yes 63.64%21 No 36.36%12 No Opinion 0%0 Totals 100%33 Responses Percent Count New Concept Plan 75%24 Conventional Design 18.75%6 No Opinion 6.25%2 Totals 100%32 Responses Percent Count Minimal by County 45.16%14 Enhanced by MSBU 54.84%17 Totals 100%31 1/18/2019 Page 1 of 4 330 Session Name: 1­17­2019 7­02 PMDate Created:1/17/2019 5:11:04 PM Active Participants:33 of 33Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.36 Median 1.00 Variance 0.23 Standard Deviation 0.48 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.31 Median 1.00 Variance 0.34 Standard Deviation 0.58 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.55 Median 2.00 Variance 0.25 Standard Deviation 0.50 ResponsesPercent CountWhippoorwill Lane 100%33Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%33 Responses Percent Count Yes 63.64%21 No 36.36%12 No Opinion 0%0 Totals 100%33 Responses Percent Count New Concept Plan 75%24 Conventional Design 18.75%6 No Opinion 6.25%2 Totals 100%32 Responses Percent Count Minimal by County 45.16%14 Enhanced by MSBU 54.84%17 Totals 100%31 1/18/2019 Page 2 of 4 331 Session Name: 1­17­2019 7­02 PMDate Created:1/17/2019 5:11:04 PM Active Participants:33 of 33Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.36Median1.00Variance0.23Standard Deviation 0.48 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.31 Median 1.00 Variance 0.34 Standard Deviation 0.58 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.55 Median 2.00 Variance 0.25 Standard Deviation 0.50 ResponsesPercent CountWhippoorwill Lane 100%33Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%33ResponsesPercentCountYes63.64%21No36.36%12No Opinion 0%0Totals100%33 Responses Percent Count New Concept Plan 75%24 Conventional Design 18.75%6 No Opinion 6.25%2 Totals 100%32 Responses Percent Count Minimal by County 45.16%14 Enhanced by MSBU 54.84%17 Totals 100%31 1/18/2019 Page 3 of 4 332 Session Name: 1­17­2019 7­02 PMDate Created:1/17/2019 5:11:04 PM Active Participants:33 of 33Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.36Median1.00Variance0.23Standard Deviation 0.483. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice)Question StatisticsMean 1.31Median1.00Variance0.34Standard Deviation 0.58 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.55 Median 2.00 Variance 0.25 Standard Deviation 0.50 ResponsesPercent CountWhippoorwill Lane 100%33Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%33ResponsesPercentCountYes63.64%21No36.36%12No Opinion 0%0Totals100%33ResponsesPercentCountNew Concept Plan 75%24Conventional Design 18.75%6No Opinion 6.25%2Totals100%32 Responses Percent Count Minimal by County 45.16%14 Enhanced by MSBU 54.84%17 Totals 100%31 1/18/2019 Page 4 of 4 333 Session Name: 1­22­2019 6­36 PM Date Created:1/22/2019 5:07:21 PM Active Participants:5 of 5 Average Score:0.00%Questions:4 Results by Question 1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.80 Median 2.00 Variance 0.16 Standard Deviation 0.40 Responses Percent Count Whippoorwill Lane 100%5 Dudley Drive 0%0 Marbella Lakes Drive 0%0 Totals 100%5 Responses Percent Count Yes 100%5 No 0%0 No Opinion 0%0 Totals 100%5 Responses Percent Count New Concept Plan 100%5 Conventional Design 0%0 No Opinion 0%0 Totals 100%5 Responses Percent Count Minimal by County 20%1 Enhanced by MSBU 80%4 Totals 100%5 1/23/2019 Page 1 of 4 334 Session Name: 1­22­2019 6­36 PMDate Created:1/22/2019 5:07:21 PM Active Participants:5 of 5Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.80 Median 2.00 Variance 0.16 Standard Deviation 0.40 ResponsesPercent CountWhippoorwill Lane 100%5Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%5 Responses Percent Count Yes 100%5 No 0%0 No Opinion 0%0 Totals 100%5 Responses Percent Count New Concept Plan 100%5 Conventional Design 0%0 No Opinion 0%0 Totals 100%5 Responses Percent Count Minimal by County 20%1 Enhanced by MSBU 80%4 Totals 100%5 1/23/2019 Page 2 of 4 335 Session Name: 1­22­2019 6­36 PMDate Created:1/22/2019 5:07:21 PM Active Participants:5 of 5Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.80 Median 2.00 Variance 0.16 Standard Deviation 0.40 ResponsesPercent CountWhippoorwill Lane 100%5Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%5ResponsesPercentCountYes100%5No0%0No Opinion 0%0Totals100%5 Responses Percent Count New Concept Plan 100%5 Conventional Design 0%0 No Opinion 0%0 Totals 100%5 Responses Percent Count Minimal by County 20%1 Enhanced by MSBU 80%4 Totals 100%5 1/23/2019 Page 3 of 4 336 Session Name: 1­22­2019 6­36 PMDate Created:1/22/2019 5:07:21 PM Active Participants:5 of 5Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.003. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.80 Median 2.00 Variance 0.16 Standard Deviation 0.40 ResponsesPercent CountWhippoorwill Lane 100%5Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%5ResponsesPercentCountYes100%5No0%0No Opinion 0%0Totals100%5ResponsesPercentCountNew Concept Plan 100%5Conventional Design 0%0No Opinion 0%0Totals100%5 Responses Percent Count Minimal by County 20%1 Enhanced by MSBU 80%4 Totals 100%5 1/23/2019 Page 4 of 4 337 Session Name: 1­23­2019 7­18 PM Date Created:1/23/2019 5:58:26 PM Active Participants:53 of 53 Average Score:0.00%Questions:4 Results by Question 1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 1.00 Median 1.00 Variance 0.00 Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.21 Median 1.00 Variance 0.21 Standard Deviation 0.45 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.10 Median 1.00 Variance 0.09 Standard Deviation 0.29 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.71 Median 2.00 Variance 0.21 Standard Deviation 0.46 Responses Percent Count Whippoorwill Lane 100%50 Dudley Drive 0%0 Marbella Lakes Drive 0%0 Totals 100%50 Responses Percent Count Yes 80.77%42 No 17.31%9 No Opinion 1.92%1 Totals 100%52 Responses Percent Count New Concept Plan 90.38%47 Conventional Design 9.62%5 No Opinion 0%0 Totals 100%52 Responses Percent Count Minimal by County 29.41%15 Enhanced by MSBU 70.59%36 Totals 100%51 1/24/2019 Page 1 of 4 338 Session Name: 1­23­2019 7­18 PMDate Created:1/23/2019 5:58:26 PM Active Participants:53 of 53Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.21 Median 1.00 Variance 0.21 Standard Deviation 0.45 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.10 Median 1.00 Variance 0.09 Standard Deviation 0.29 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.71 Median 2.00 Variance 0.21 Standard Deviation 0.46 ResponsesPercent CountWhippoorwill Lane 100%50Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%50 Responses Percent Count Yes 80.77%42 No 17.31%9 No Opinion 1.92%1 Totals 100%52 Responses Percent Count New Concept Plan 90.38%47 Conventional Design 9.62%5 No Opinion 0%0 Totals 100%52 Responses Percent Count Minimal by County 29.41%15 Enhanced by MSBU 70.59%36 Totals 100%51 1/24/2019 Page 2 of 4 339 Session Name: 1­23­2019 7­18 PMDate Created:1/23/2019 5:58:26 PM Active Participants:53 of 53Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.21Median1.00Variance0.21Standard Deviation 0.45 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.10 Median 1.00 Variance 0.09 Standard Deviation 0.29 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.71 Median 2.00 Variance 0.21 Standard Deviation 0.46 ResponsesPercent CountWhippoorwill Lane 100%50Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%50ResponsesPercentCountYes80.77%42No17.31%9No Opinion 1.92%1Totals100%52 Responses Percent Count New Concept Plan 90.38%47 Conventional Design 9.62%5 No Opinion 0%0 Totals 100%52 Responses Percent Count Minimal by County 29.41%15 Enhanced by MSBU 70.59%36 Totals 100%51 1/24/2019 Page 3 of 4 340 Session Name: 1­23­2019 7­18 PMDate Created:1/23/2019 5:58:26 PM Active Participants:53 of 53Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 1.00Median1.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.21Median1.00Variance0.21Standard Deviation 0.453. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice)Question StatisticsMean 1.10Median1.00Variance0.09Standard Deviation 0.29 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.71 Median 2.00 Variance 0.21 Standard Deviation 0.46 ResponsesPercent CountWhippoorwill Lane 100%50Dudley Drive 0%0Marbella Lakes Drive 0%0Totals100%50ResponsesPercentCountYes80.77%42No17.31%9No Opinion 1.92%1Totals100%52ResponsesPercentCountNew Concept Plan 90.38%47Conventional Design 9.62%5No Opinion 0%0Totals100%52 Responses Percent Count Minimal by County 29.41%15 Enhanced by MSBU 70.59%36 Totals 100%51 1/24/2019 Page 4 of 4 341 Session Name: 1­24­2019 5­09 PM Date Created:1/24/2019 3:44:09 PM Active Participants:32 of 32 Average Score:0.00%Questions:4 Results by Question 1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice) Question Statistics Mean 2.00 Median 2.00 Variance 0.00 Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.61 Median 2.00 Variance 0.30 Standard Deviation 0.55 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.23 Median 1.00 Variance 0.30 Standard Deviation 0.55 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.34 Median 1.00 Variance 0.23 Standard Deviation 0.47 Responses Percent Count Whippoorwill Lane 0%0 Dudley Drive 100%31 Marbella Lakes Drive 0%0 Totals 100%31 Responses Percent Count Yes 41.94%13 No 54.84%17 No Opinion 3.23%1 Totals 100%31 Responses Percent Count New Concept Plan 83.87%26 Conventional Design 9.68%3 No Opinion 6.45%2 Totals 100%31 Responses Percent Count Minimal by County 65.62%21 Enhanced by MSBU 34.38%11 Totals 100%32 1/25/2019 Page 1 of 4 342 Session Name: 1­24­2019 5­09 PMDate Created:1/24/2019 3:44:09 PM Active Participants:32 of 32Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 2.00Median2.00Variance0.00Standard Deviation 0.00 2. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice) Question Statistics Mean 1.61 Median 2.00 Variance 0.30 Standard Deviation 0.55 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.23 Median 1.00 Variance 0.30 Standard Deviation 0.55 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.34 Median 1.00 Variance 0.23 Standard Deviation 0.47 ResponsesPercent CountWhippoorwill Lane 0%0Dudley Drive 100%31Marbella Lakes Drive 0%0Totals100%31 Responses Percent Count Yes 41.94%13 No 54.84%17 No Opinion 3.23%1 Totals 100%31 Responses Percent Count New Concept Plan 83.87%26 Conventional Design 9.68%3 No Opinion 6.45%2 Totals 100%31 Responses Percent Count Minimal by County 65.62%21 Enhanced by MSBU 34.38%11 Totals 100%32 1/25/2019 Page 2 of 4 343 Session Name: 1­24­2019 5­09 PMDate Created:1/24/2019 3:44:09 PM Active Participants:32 of 32Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 2.00Median2.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.61Median2.00Variance0.30Standard Deviation 0.55 3. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice) Question Statistics Mean 1.23 Median 1.00 Variance 0.30 Standard Deviation 0.55 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.34 Median 1.00 Variance 0.23 Standard Deviation 0.47 ResponsesPercent CountWhippoorwill Lane 0%0Dudley Drive 100%31Marbella Lakes Drive 0%0Totals100%31ResponsesPercentCountYes41.94%13No54.84%17No Opinion 3.23%1Totals100%31 Responses Percent Count New Concept Plan 83.87%26 Conventional Design 9.68%3 No Opinion 6.45%2 Totals 100%31 Responses Percent Count Minimal by County 65.62%21 Enhanced by MSBU 34.38%11 Totals 100%32 1/25/2019 Page 3 of 4 344 Session Name: 1­24­2019 5­09 PMDate Created:1/24/2019 3:44:09 PM Active Participants:32 of 32Average Score:0.00%Questions:4Results by Question1. Q1 ­ What Roadway Do You Use to Access Your Home or Place of Work? (Multiple Choice)Question StatisticsMean 2.00Median2.00Variance0.00Standard Deviation 0.002. Q2 ­ Are You in Favor of Connecting Whippoorwill Ln. to Marbella Lakes Dr.? (Multiple Choice)Question StatisticsMean 1.61Median2.00Variance0.30Standard Deviation 0.553. Q3 ­ Do You Prefer the Concept Plan as Shown or the Original Conventional Design? (Multiple Choice)Question StatisticsMean 1.23Median1.00Variance0.30Standard Deviation 0.55 4. Q4 ­ Optional Landscaping ­ Support for On­Going Maintenance of Roadway Landscaping? (Multiple Choice) Question Statistics Mean 1.34 Median 1.00 Variance 0.23 Standard Deviation 0.47 ResponsesPercent CountWhippoorwill Lane 0%0Dudley Drive 100%31Marbella Lakes Drive 0%0Totals100%31ResponsesPercentCountYes41.94%13No54.84%17No Opinion 3.23%1Totals100%31ResponsesPercentCountNew Concept Plan 83.87%26Conventional Design 9.68%3No Opinion 6.45%2Totals100%31 Responses Percent Count Minimal by County 65.62%21 Enhanced by MSBU 34.38%11 Totals 100%32 1/25/2019 Page 4 of 4 345 March 15, 2019