Agenda 04/02/2019 W - CRACOLLIER COUNTY
Board of County Commissioners
JOINT WORKSHOP AGENDA
COLLIER COUNTY COMMUNITY REDEVELOPMENT AGENCY AND
LOCAL REDEVELOPMENT ADVISORY BOARDS
Board of County Commission Chambers
Collier County Government Center
3299 Tamiami Trail East, 3rd Floor
Naples, FL 34112
April 02, 2019
9:00 AM
Commissioner William L. McDaniel, Jr., District 5 - Chair; CRAB Co-Chair
Commissioner Burt Saunders, District 3 – Vice-Chair
Commissioner Donna Fiala, District 1; CRAB Co-Chair
Commissioner Andy Solis, District 2
Commissioner Penny Taylor, District 4
Notice: All persons wishing to speak must turn in a speaker slip. Each speaker will receive no more
than three (3) minutes. Collier County Ordinance No. 2003-53 as amended by Ordinance 2004-05
and 2007-24, requires that all lobbyists shall, before engaging in any lobbying activities (including
but not limited to, addressing the Board of County Commissioners), register with the Clerk to the
Board at the Board Minutes and Records Department.
1. CALL TO ORDER AND ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. WORKSHOP TOPICS
3.A. ANNUAL JOINT MEETNG PRESENTATION
3.A.1. Annual Joint Meeting Presentation
3.B. IMMOKALEE COMMUNITY REDEVELOPMENT AREA
3.B.1. INTRODUCTIONS
3.B.2. PRESENTATION ON 2018 ACCOMPLISHMENTS AND FY 19/20
PRIORITIES
3.B.2.a. Immokalee Community Redevelopment Area
3.B.3. TOPICS FOR DISCUSSION
3.B.3.a. Stormwater Master Plan Update
3.B.3.b. Redevelopment Plan Update
3.B.4. ADVISORY BOARD COMMENTS
3.B.5. PUBLIC COMMENT
3.C. BAYSHORE GATEWAY TRIANGLE COMMUNITY REDEVELOPMENT
AREA
3.C.1. INTRODUCTIONS
3.C.2. PRESENTATION ON 2018 ACCOMPLISHMENTS AND FY 19/20
PRIORITIES
3.C.2.a. Bayshore Gateway Triangle Community Redevelopment Area
3.C.3. TOPICS FOR DISCUSSION
3.C.3.a. Redevelopment Plan Update
3.C.3.a.1. Mini-Triangle
3.C.3.a.2. 17 Acres
3.C.3.a.3. Thomasson Drive Improvements
3.C.3.b. Office Space
3.C.3.c. Next Steps
3.C.4. ADVISORY BOARD COMMENTS
3.C.5. PUBLIC COMMENT
4. ADJOURN
Inquiries concerning changes to the Board’s Agenda should be made to the County Manager’s Office at
252-8383.
04/02/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 3.A.1
Item Summary: Annual Joint Meeting Presentation
Meeting Date: 04/02/2019
Prepared by:
Title: Operations Analyst – County Manager's Office
Name: Geoffrey Willig
03/27/2019 3:02 PM
Submitted by:
Title: County Manager – County Manager's Office
Name: Leo E. Ochs
03/27/2019 3:02 PM
Approved By:
Review:
County Manager's Office Geoffrey Willig County Manager Review Completed 03/27/2019 3:02 PM
Board of County Commissioners MaryJo Brock Meeting Pending 04/02/2019 9:00 AM
3.A.1
Packet Pg. 4
COLLIER COUNTY
COMMUNITY
REDEVELOPMENT
AGENCY
ADVISORY BOARDS JOINT
WORKSHOP
APRIL 2, 2019
BAYSHORE GATEWAY TRIANGLE
AND
IMMOKALEE
COMMUNITY REDEVELOPMENT AREAS
3.A.1.a
Packet Pg. 5 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
IMMOKALEE
AGENDA
1.INTRODUCTIONS
2.2018 ACCOMPLISHMENTS
3.FY19/20 PRIORITIES
4.STORMWATER MASTER PLAN UPDATE
5.TOPICS FOR DISCUSSION
a)Redevelopment Plan Update
6.ADVISORY BOARD COMMENTS
7.PUBLIC COMMENTS
3.A.1.a
Packet Pg. 6 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
IMMOKALEE
ADVISORY BOARD MEMBERS
Local Redevelopment Area Advisory Board
Immokalee Lighting and Beautification MSTU
3.A.1.a
Packet Pg. 7 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
CRA PROJECTS
ROOF (Residential Options of Florida (ROOF) Grant
$30,000 Awarded:
Independence Place on Hamilton Street at Arrowhead.
Renovations of a single-family home established to house
approximately four individuals with development disabilities.
2018 ACCOMPLISHMENTS –
IMMOKALEE
3.A.1.a
Packet Pg. 8 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
IMMOKALEE
COMMUNITY DEVELOPMENT BLOCK GRANT
(CDBG) -Immokalee Sidewalk Improvements Project
Completed the construction of sidewalks and stormwater
improvements along South Ninth Street, West Eustis
Avenue, and a portion on South Fifth Street in May 2018.
The CRA was awarded a total of $600,000 CDBG funds
to complete the Immokalee Sidewalk Improvement
Project. The remainder of the project funds were paid
from the Immokalee CRA ($61,684) and Immokalee
MSTU (79,814) funds. Total project cost was $741,498.
S.9th Street
S.Eustis Ave.
3.A.1.a
Packet Pg. 9 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
IMMOKALEE
Immokalee Main Street Pedestrian Safety
Improvements Project
Project Schedule:
100% design by February 2019.
Out for bid by July 2019.
Award the contract to the contractor by Fall
2019.
Construction will begin within 60 days after
awarded contract.
3.A.1.a
Packet Pg. 10 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
Transportation Investment Generation Economic Recovery (TIGER) Grant
Immokalee Complete Street -Growing Connections to Create Mobility Opportunities
The project will construct complete streets improvements in Immokalee including
approximately 20 miles of new sidewalks, a bike boulevard network, a shared-use path, street
lighting, bus shelters, a new transit center, landscaping, drainage improvements, and
intersection and traffic calming retreats.
17
Funding Sources:
$16,415,864
•FHWA grant funds (80%
= $13,132,691)
•County match funds (20%
= $3,283,173)
Summary of Project’s Estimated Schedule and Milestones
Notification of TIGER Grant:Spring 2018
Coordination with FDOT and FHWA :On-going
Collier County budget/funding available for match:October 2018
Planned Completion of National Environmental Winter 2019
Policy Act (NEPA)Review (by FDOT and FTA):
Planned TIGER Agreement Execution:Spring 2020
Planned Start of Project Design/Build:Winter 2020
Planned Construction Substantial Completion Date:Winter 2023
Final TIGER Grant Reporting Requirement:Spring 2027
2018 ACCOMPLISHMENTS –
IMMOKALEE
3.A.1.a
Packet Pg. 11 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
IMMOKALEE
The Grill –Seminole Casino Hotel Grand Re-Opening March 30, 2018
First Bank of Immokalee Grand Opening May 29, 2018
Collier County Housing Authority Rehabbed Homes May 29, 2018
Private Investment
3.A.1.a
Packet Pg. 12 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2017 ACCOMPLISHMENTS –
IMMOKALEE
Unmet Needs Coalition
Housing Committee
Developed a Disaster Recovery and Resiliency Plan. The Plan
includes short and long-term efforts that will serve as an Action
Plan for the community.
Resource Directory & Communications Committee
Developed a Resource Directory for the Immokalee area
3.A.1.a
Packet Pg. 13 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
IMMOKALEE
Community Outreach:
•Florida Heartland Economic Region of
Opportunity (FHERO)
•FDOT Public Informational Meetings
•Blue Zone Project Southwest Florida
•Southwest Florida Promise Zone Designation
(SFPZ)
•Chamber of Commerce Meetings
•Opportunity Zone Program
•Impact Fee Installment Payment Pilot Program
3.A.1.a
Packet Pg. 14 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
IMMOKALEE
MSTU Beautification Project
Grady Minor &Associates,P.A.(Grady Minor)designed two monuments located at
the Farm Workers Village entrance (Panther Crossing)on SR29 and on the corner of
South First and East Eustis Avenue across the Seminole Casino Hotel Immokalee .
Both monuments should go out for bid in early 2019.
3.A.1.a
Packet Pg. 15 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2019 PRIORITIES –
IMMOKALEE
CRA MSTU
•Immokalee Master Plan Update
•Stormwater Master Plan
•Unmet Needs Coalition
•Housing Plan Implementation
•Sidewalk –Carver/5th Street
•Marketing/Branding
•Departmental Coordination
•Construction of New Welcome Signs
•Coordination with FDOT
•Main Street Improvements
•Lake Trafford –Tippins Terrace to Pier*
3.A.1.a
Packet Pg. 16 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
STORMWATER MASTER PLAN UPDATE
3.A.1.a
Packet Pg. 17 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
GENERAL DISCUSSION
1.Redevelopment Plan Update
2.Other Topics
3.A.1.a
Packet Pg. 18 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
ADVISORY BOARD COMMENTS
PUBLIC COMMENTS
3.A.1.a
Packet Pg. 19 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
BAYSHORE GATEWAY TRIANGLE
AGENDA
1.INTRODUCTIONS
2.2018 ACCOMPLISHMENTS
3.FY19/20 PRIORITIES
4.TOPICS FOR DISCUSSION
a)Redevelopment Plan
b)Mini-triangle
c)17 Acres
d)Thomasson Drive Improvements
5.ADVISORY BOARD COMMENTS
6.PUBLIC COMMENTS
3.A.1.a
Packet Pg. 20 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
BAYSHORE GATEWAY TRIANGLE
ADVISORY BOARD MEMBERS
Local Redevelopment Area Advisory Board
Bayshore Beautification MSTU
Haldeman Creek MSTU
3.A.1.a
Packet Pg. 21 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS-
BAYSHORE GATEWAY TRIANGLE
Fire Suppression
Fire Suppression Phase 1 -completed in June 2018. Total Cost -$520,282 including $350,000
Community Development Block Grant and City of Naples contribution of engineering and
CEI services plus $190,282 for construction. Improvements completed on Gordon Ave, Peters
Avenue and Collee Court.
Fire Suppression Phase 11 –Estimated Cost -$580,000. CDBG Award -$227,960 and City of
Naples contribution of engineering and CEI services plus $352,040 for construction.
Improvements on Becca and Pine Street.
3.A.1.a
Packet Pg. 22 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS-
BAYSHORE GATEWAY TRIANGLE
Commercial Building Improvement Grants
$115,286 Awarded:
Davis Community Dental Health –Interior and Exterior Renovations to an existing structure
Harborside Animal Clinic –new construction, funds allocated to stormwater improvements that will
benefit the building and system
Celebration Food Truck Park –assist with landscape improvements
Real Macaw –new signage
Requires 50% match from business owner.
Maximum $30,000 for exterior improvements and $20,000 for interior improvements.
3.A.1.a
Packet Pg. 23 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS-
BAYSHORE GATEWAY TRIANGLE
Surface Parking Lot -3321 Bayshore Drive
.5 Acre lot purchased in June 2018:
Trebilcock Consulting Solutions Hired –November 2018
Preliminary Concept Plans –scheduled for April 2 CRA Advisory Board Meeting
Evaluating the parking space management –free/meters/leased to commercial owners
3.A.1.a
Packet Pg. 24 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS-
BAYSHORE GATEWAY TRIANGLE
Preliminary Concept Plan:
37 spaces
31 Standard
2 Handicap
2EV Charging Stations
2 On Street spaces
Wayfinding Signage
Bicycle Rack
On Street Parking-reserved
for riding sharing services
Street Wall
3.A.1.a
Packet Pg. 25 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
BAYSHORE BEAUTIFICATION MSTU
Beautification Project –100%plans completed.
Improvements include sidewalks,landscaping,bike
lanes and decorative lighting.
CEI Selected –Negotiating Contract for Services
Hamilton Avenue –Separate Phase
Thomasson Drive and Hamilton Ave.
3.A.1.a
Packet Pg. 26 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2018 ACCOMPLISHMENTS –
HALDEMAN CREEK
Marker 15 Replaced
Irma Debris Removal 2,733 cubic yards removed
2 Community Clean Ups
April 14, 2018 –Two -30 yard dumpsters
September 15, 2018 –15 cubic yards
3.A.1.a
Packet Pg. 27 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
2019 PRIORITIES
Closing on Mini Triangle Mixed-Use
Project
Fire Suppression –Phase 2 and Phase 3
Market Analysis
Logo/Tagline
Commercial Improvement Grants
Additional Connection to Sugden Park
CRA Beautification
Thomasson Drive
Repair Decorative Lights
Renovation of Bayshore
Streetscape
Haldeman Creek
Bathremettic Survey
3.A.1.a
Packet Pg. 28 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
I.Redevelopment Plan
a)Gateway Triangle Project
b)17 Acres
c)Thomasson Drive
II.CRA Office Space
III.Other Topics
GENERAL DISCUSSION
3.A.1.a
Packet Pg. 29 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
GATEWAY TRIANGLE PROJECT
May 8, 2018 -Approval of Small Scale Plan Amendment and
rezoning
July 10, 2018 Approval of 4th Amendment to REPI Contract to
extend closing to 30 days after the demolition and
decommissioning of the cell tower.
July 18, 2018 –Cell Tower Agreement executed, outlines costs
and timing.
September 28, 2018 –Property owners meeting held to discuss
access and future redevelopment of the area.
The closing on the property is expected in 2019
Davis Blvd
3.A.1.a
Packet Pg. 30 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
17 ACRES
Zoned as the Cultural Arts Village at Bayshore
Following termination of negotiations with Arno, Inc. in June
2018, BCC directed CRA to wait until Redevelopment Plan
update to consider further options
Community survey conducted August/September 2018
Tindale Oliver sub-report identified options concurrent with
the community survey
Multiple parties still interested in development of parcel
Seeking Board direction on moving forward –consider RFP?
3.A.1.a
Packet Pg. 31 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
THOMASSON DRIVE IMPROVEMENTS
Project Schedule
CEI Services completion –June 2019
Notice to Proceed for construction –September 2019
12 month project duration
Completion of improvements –September 2020
Hamilton Drive Boat Parking
Working with Parks Department to design boat parking for
Bayview Park
3.A.1.a
Packet Pg. 32 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
OFFICE SPACE
March 12 –CRAB terminated proposed leased space at
Pineland Ave –directed staff to look into options on Gov
Center campus
Several commercial properties are available to meet the needs
of BGTCRA
Staff working with Facilities to identify possibilities for on-
campus move, limited space currently available
Possibility of combining multiple off-campus leases for short-
term until County-owned space becomes available
Long-term plan is to try and locate office space on County-
owned 17 Acre site when future direction is decided
3.A.1.a
Packet Pg. 33 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
ADVISORY BOARD COMMENTS
PUBLIC COMMENTS
3.A.1.a
Packet Pg. 34 Attachment: Annual Joint Meeting Presentation - 04.02.19 (8467 : Annual Joint Meeting
04/02/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 3.B.2.a
Item Summary: Immokalee Community Redevelopment Area
Meeting Date: 04/02/2019
Prepared by:
Title: Operations Analyst – County Manager's Office
Name: Geoffrey Willig
03/27/2019 10:55 AM
Submitted by:
Title: County Manager – County Manager's Office
Name: Leo E. Ochs
03/27/2019 10:55 AM
Approved By:
Review:
County Manager's Office Sean Callahan Additional Reviewer Completed 03/27/2019 12:04 PM
County Manager's Office Geoffrey Willig County Manager Review Completed 03/27/2019 12:05 PM
Board of County Commissioners MaryJo Brock Meeting Pending 04/02/2019 9:00 AM
3.B.2.a
Packet Pg. 35
IMMOKALEE COMMUNITY
REDEVELOPMENT AREA
2018 ANNUAL REPORT
3.B.2.a.a
Packet Pg. 36 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Mission Statement
“Those of us who live and work in Immokalee envision a future for our town.We see new business and job opportunitiesininternationaltradeanddistribution,agri-business,ecotourism,recreation and entertainment,and the constructionindustry.
We see Immokalee as an attractive,sustainable community with affordable workforce housing,parks and outstandingschools–a place where people walk and bicycle to do their errands,and where parents are returning to school to finishtheireducationandmasternewjobskills.Main Street will have a Latin flavor –colorful plazas,outdoor cafes,shops andentertainment–attracting both the local community and the tourists who come to explore our unique ecologyorentertainmentattheCasino.”
TABLE OF CONTENTS
CRA Staff………………...……………………………………………1
History of Immokalee.………………………………………………2-3
Board Chairs…………………………………………………………4-5
CRA & MSTU Board Members….…………………………………6
CRA & MSTU Boundary Map……...………………………………7
Immokalee Landmarks…………….………………………………8-9
What is a CRA……………………….………………………………10
What is an MSTU……………………………………………………11
CRA Projects ……………………………..…………………………12-13
MSTU Projects …………………………….…………………………14-15
Joint Community Projects…………………………………………16-19
Economic Development…………………..………………………20-21
Community Outreach………………………..……………………22-25
2018 Priorities…………...……………………………………………26
Financial Reporting…………………………………………………27-31
Mural is located outside RCMA Charter School.
3.B.2.a.a
Packet Pg. 37 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
CRA STAFF
Donna Lumbert
Budget Analyst
Donna joined Collier County in September 2018 as the Management and Budget Analyst for the
Bayshore Gateway and Immokalee CRA’s.She has a Bachelor’s in Business Administration/Finance but
is currently attending FAU for her Accounting degree.Her goal is to obtain a CPA license.Donna is
married and has two daughters.She enjoys reading and spending time with her family.Ms.Lumbert
invites you to contact her at any time with questions or for information about the Immokalee CRA
at Donna.Lumbert@colliercountyfl.gov.
Christie A. Betancourt
Operations Manager
Christie has been the Operations Manager for the Immokalee CRA since 2015.She has worked for Collier
County for 19 years,11 with the CRA and eight with Parks &Recreation.Since coming on board with the
Immokalee CRA Ms.Betancourt has contributed significantly to the development of the established CRA.
In addition to her regular office duties at the CRA,Ms.Betancourt assists local Immokalee community
members with logistical issues pertaining to grant programs and other governmental communication
efforts.Ms.Betancourt invites you to contact her at any time with questions or for information about the
CRA at Christie.Betancourt@colliercountyFl.gov.
Debrah Forester
Director, Collier County CRA
Joined the Collier County team in July 2017,coming from Charlotte County CRA where she was the
Redevelopment Manager for over 13 years.Debrah has over 25 years experience in redevelopment,
community planning,and economic development.She previously worked as a planner for Collier
County from 1995-2001 where she developed and managed the Collier County Community
Redevelopment Agency that included:agency creation,plan preparation and implementation for the
Bayshore Gateway Triangle and Immokalee Community Redevelopment Areas.Debrah welcomes you
to email her at Debrah.Forester@CollierCountyFL.gov.
1
In August 2018 the CRA staff moved to a new office space at the CareerSource SWFL building.The office is located in Suite C
and is approximately 2,669 square feet,it includes a private bathroom,private conference room,six offices and a private open
area for staff use only.
3.B.2.a.a
Packet Pg. 38 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
➢History
•Immokalee is an unincorporated area in Collier County.
•Originally known as Gopher Ridge by the Seminole and
Miccosukee Indians,Immokalee means "My Home"in Mikasuki
language,and also in Miccosukee,Mikisúkî or Hitchiti-Mikasuki,
a Muskogean language.
•The area is one of the major tomato growing centers in the
United States.
➢Transportation
•Collier Area Transit (CAT)provides local bus service and paratransit.
•The main road through Immokalee is State Road 29.Other important county
roads through the region are CR 29A (New Market Road)and CR 846.
2
•The Immokalee Airport is a general aviation airport
located one mile northwest of the central business
district.This county-owned facility provides a
great opportunity for business recruitment and
economic diversification.
Immokalee Area Map.
3.B.2.a.a
Packet Pg. 39 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
➢Community and Education
•Immokalee is the center of the region's agriculture industry
and home to many families who work the vast fields that
produce a large amount of the United States'fresh produce.
•The District School Board of Collier County is responsible for all
public schools in Immokalee including five elementary
schools,Immokalee Middle School and Immokalee High
School.iTECH technical college and Bethune Education
Center provide additional training.RCMA Charter School
and Pace Center for Girls are also in the community and
provide alternative education programs.Ave Maria University
is approximately six miles away in the community of Ave
Maria.➢Demographics –U.S.Census Bureau,2013-2017
American Community Survey
•Population -29,287
•Median age -28 years
•Median household income -$29,308
3
IMMOKALEE “MY HOME”3.B.2.a.a
Packet Pg. 40 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
BOARD CHAIRS
4
William L. McDaniel Jr., District 5 Commissioner
BOARD CHAIRS
William L.McDaniel,Jr.was born in Franklin,Pennsylvania March 25,1961,the eldest of three children.His mother and sister
still live in the Franklin area and his brother,a retired Marine Corps staff sergeant,also lives in NW Pennsylvania.A 1979
graduate of Rocky Grove High School,William enrolled at Clarion State University,where he majored in accounting and
computer programming with a minor in economics.To pay for college,William worked as a carpenter.A job building a
stable brought him to Naples in 1982,and he has lived in the area ever since.
After moving to Naples,William became a licensed real estate salesperson and,in 1985,he became a licensed Realtor.He
founded the Realty Company in 1987,which he manages today,focusing on the sale,management and development of
real estate in Southwest Florida.In 1998,he founded Big Island Excavating,Inc.,a mining company with an office located in
District 5 in eastern Collier County.The company,which William manages today,has operated mines in four Southwest
Florida counties (Collier,Lee,Hendry and Charlotte)and employs more than 35 people.In 1999,William was a founding
director of Marine National Bank.When the company was bought by Old Florida Bank in 2003,William was selected to
represent the shareholders and to serve on the new board of Old Florida Bank,until its sale in 2007 to the Bank of Florida.
Among his civic activities,William is currently the chairman of the Strategic Planning Committee of Goodwill of Southwest
Florida and has served on the Board of Directors of that organization since 1998.He is founder of and the current president
of the Corkscrew Island Neighborhood Association.From 2007 until early 2009,he served as the chairman of the Board of
County Commissioners-appointed East of 951 Horizon Study Committee.He also served for two years on the Board of County
Commissioners-appointed Rural Lands Stewardship Overlay Review Committee.In 2013,he was appointed by Gov.Rick
Scott to the Collier County Housing Authority and served on that Authority until his election as Collier County District 5
Commissioner in November 2016.
William has two children:Kelley Marie,a 22-year-old student at Florida Gulf Coast University,and William III,an 18-year-old
home schooled student.In their free time,the family enjoys outdoor activities like hunting,fishing and boating.
As Co-Chair of the Immokalee Community Redevelopment Agency (CRA),it is my pleasure to continue the ongoing efforts
of our CRA for the redevelopment of the Immokalee area.As we have in previous years,we will continue to engage our
residents to receive their input and assistance as we continue to develop our master plan.Immokalee is key to the long-
term economic success of Collier County and our resident’s participation is essential.I look forward to receiving your input
and working with you for the betterment of our community.
3.B.2.a.a
Packet Pg. 41 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Dr. Frank Nappo, Immokalee CRA Chair
Dr.Frank Nappo of Naples has a longstanding involvement in volunteering and public service.
He has served as a board member of the Naples Art Association and was President of the
association’s board 2007-2011.He has served as President of Drug Free Collier 2012-2016 and
has been a board member for the past ten years.He currently is the President of Immokalee
Housing and Family Services 2012-2018 serving on the board since 2008.He was appointed to
serve on the Governor’s Commission on Community Service,Volunteer Florida 2011-2015.He
was appointed to the Volunteer Florida Foundation 2013-2016.In 2014 he was appointed to the
Immokalee CRA and became Chair in 2016.He is a Board Member and Secretary/Treasurer of
Residential Options of Florida and a Past Board Member of 1 By 1 Leadership Immokalee.
Dr.Nappo is retired from a distinguished career in education including his role as Dean of
Liberal Arts and Associate Professor at Burlington County College.Burlington County College is
now known as Rowan College of Burlington.He earned his Ed.D.at Rutgers University and both
his B.A.and M.A.degrees at New Jersey City University.
Norma Garcia, Immokalee MSTU Chair
Norma Garcia was born in Boynton Beach,Delray,Florida,and moved to Immokalee and has
been a lifelong resident of Immokalee since.She has been employed with the Immokalee Water
&Sewer District since 2004.She currently holds the title Human Resource Administrator.She is
very involved in the community and serves on various boards.She has also served on the MSTU
board for five years and has been the Chair since 2018.She has been a part of the Immokalee
Chamber of Commerce,Immokalee Little League as a Board member/assistant coach,Pop
Warner as cheer leader coordinator,Immokalee High School Softball Varsity/Jr Varsity team as
assistant coach.She was involved with Relay for Life.She currently is a certified Human Resource
Manager through Villanova University and certified through the Florida Public Human Resource
Association,as well as other certifications.Currently she is working on her degree to major in
Human Resource..
5
3.B.2.a.a
Packet Pg. 42 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
BOARDS
Public meetings for the Immokalee CRA are held the third Wednesday of
every month.Public meetings for the Immokalee MSTU are held the
fourth Wednesday of every month.All meetings are held at 9 a.m.,at
750 South Fifth Street,Immokalee,Florida 34142 unless otherwise noticed.
6
3.B.2.a.a
Packet Pg. 43 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
CRA & MSTU BOUNDARY
7
3.B.2.a.a
Packet Pg. 44 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
8 LANDMARKS
Immokalee Pioneer Museum
Lake Trafford
Pepper Ranch Preserve
3.B.2.a.a
Packet Pg. 45 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Seminole Casino Hotel Immokalee
Immokalee Regional Airport
Immokalee Produce Center
9
TOURIST DESTINATIONS
3.B.2.a.a
Packet Pg. 46 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
WHAT IS A CRA?
•Established in March 2000 to alleviate slum and blight in two
separate Redevelopment Areas within Collier County:The
Bayshore Gateway Triangle Redevelopment Area and the
Immokalee Redevelopment Area.
•Community Redevelopment Agency refers to a public
entity created by Collier County to implement the activities
outlined under Chapter 163,Florida Statutes.The Board of
County Commissioners is the ex-officio governing board of
the CRA.
•In 2000 the Board of County Commissioners authorized the
creation of the Local Advisory Boards.The purpose of this
nine-member committee is to be the primary vehicle for
community and professional input to the CRA for matters
relating to the Immokalee Redevelopment Area.Terms are
for three years.
•How funding is created?Property values in the CRA are
capped,or frozen,at the assessed value for an established
base year (2000).Thereafter,any tax revenues due to
increases in property values in excess of the base are
dedicated to the redevelopment area.The generated
revenue is known as tax increment financing and is used in
the Immokalee CRA to leverage its redevelopment efforts.
10
3.B.2.a.a
Packet Pg. 47 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
WHAT IS A MSTU?
•A Municipal Service Taxing Unit (MSTU)is a funding mechanism wherecommunitymembers,with Board approval,assess themselves to makeimprovementstotheirneighborhoodand/or community and provideadditionalservicesbasedoncommunitydesires.
•The daily,routine services of the Immokalee Beautification MSTU consist ofmanagingthemaintenanceofallpublicareasalongMainStreet(SR29)andFirstStreet(CR846)within the limits of the Immokalee Urban Area.In addition,the MSTU provides assistance and coordination for communication withvariousgovernmentalagenciesandthepublic.
•The five-member advisory committee was created on October 22,1985,toassisttheBoardofCountyCommissionersinthebusinessaffairsoftheImmokaleeBeautificationTaxingDistrict,and to prepare and recommend anitemizedbudgettocarryoutthebusinessofthedistrictforeachfiscalyear.In2011,the CRA was designated to administer and manager the ImmokaleeMSTU.Membership on the advisory committee represents the populationwithintheImmokaleeBeautificationTaxingDistrict.Four members must bepermanentresidentswithintheMSTUandonemembermaybeanownerofresidentialorcommercialpropertywithintheMSTU;this member may be anindividual,an officer of a corporation,or a partner of a partnership.Terms arefouryears.
•How is funding created?Through a millage rate set by the MSTU’s enablingordinance.All capital projects,as well as the maintenance and otheroperatingprojectsaremanagedbytheImmokaleeCRA.
11
3.B.2.a.a
Packet Pg. 48 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
CRA PROJECTS
Immokalee CRA awarded a reimbursement grant totaling $30,000 to
Residential Options of Florida (ROOF)for renovations to a single-
family home to establish Independence Place:
On February 27,2018,Agenda Item 16B1,the BCC approved a grant
agreement between the CRA and ROOF to establish Independence
Place,located in Immokalee.ROOF is a 501(c)(3)corporation
founded in 2014 to promote safe,inclusive,affordable housing
opportunities for individuals with developmental disabilities.The
single-family home will eventually be transferred to the ROOF Housing
Trust whose sole mission is to acquire,create,and preserve
affordable housing in perpetuity to Floridians with intellectual and
developmental disabilities.
Florida Heartland Economic Region of Opportunity (FHERO):
In 2018,Marketing Alliance was hired by FHERO to develop an
economic development overview of the region.On December 14,
2018,they toured,videoed,and photographed the community of
Immokalee.The tour efforts included the Immokalee Regional
Airport,iTECH (Immokalee Technical College),Seminole Casino Hotel,
the Immokalee Culinary Accelerator,and Ann Olesky Park at Lake
Trafford.
Immokalee Area Master Plan:
The Immokalee CRA coordinated with Growth Management staff to draft the Immokalee Area
Master Plan and assisted with soliciting public input.The BCC directed staff to prepare transmittal
documents on June 26,2018.The public hearing process is expected to begin in the first quarter of
2019.
12
3.B.2.a.a
Packet Pg. 49 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
.
On July 11,2017,the BCC adopted Ordinance 2017-34 that established an Impact Fee
Installment Payment Pilot Program for the Immokalee CRA.The ordinance provides an
alternative to paying impact fees in full as a prerequisite for the issuance of a Certificate
of Occupancy.A feepayer may pay impact fees in installments rather than a lump sum
by entering into an impact fee installment payment program agreement with Collier
County that allows installment payments as a special assessment levied as non-ad
valorem tax against the subject property.The program took effect October 1,2017.
Low Tax Opportunity Zones,established by the federal Tax Cut and Jobs Act
of 2017,encourage long-term investment and job creation in targeted
communities by reducing taxes for many job creators.The zones enhance
local communities’ability to attract businesses,developers and financial
institutions to invest in targeted areas by allowing investors to defer capital
gains taxes through investments in federally established Opportunity Funds.
It's an economic and community development tax incentive program that
provides a new impetus for private investors to support distressed
communities through private equity investments in businesses and real estate
ventures.The incentive is deferral,reduction and potential elimination of
certain federal capital gains taxes.U.S.investors hold trillions of dollars in
unrealized capital gains in stocks and mutual funds alone,a significant
untapped resource for economic development!Immokalee has 8 areas of
the Census Tract included in the Opportunity Zone.
Immokalee Impact Fee Installment Payment Pilot Program
Collier County Opportunity Zone Program
13
The Southwest Florida Brownfields Coalition (SWFBC)requested $600,000 in assessment funding to provide
support to perform community-wide hazardous substance and petroleum assessments.The Coalition
includes all of Glades and Hendry Counties as well as the lmmokalee portion of Collier County.The
awarded funding will support economic development projects generating a positive outcome for the
region.The SWFBC's goal is to collectively mitigate the economic and environmental impacts of Brownfield
sites in the tri-county region.
Southwest Florida Regional Planning Council (SWFRPC)for the Brownfields Assessment Grant:
3.B.2.a.a
Packet Pg. 50 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
MSTU PROJECTS
Services of the Immokalee Beautification MSTU consist of managing the
maintenance of all public areas along Main Street (SR29)and First Street
(CR846)within the limits of the Immokalee Urban Area.A&M Property
Maintenance,a local Immokalee vendor,has been providing great
service by performing various maintenance and repair services,such as
lawn mowing,sidewalk and gutter cleaning,landscape maintenance,
irrigation system management,and installing banners and holiday
decorations.
14
3.B.2.a.a
Packet Pg. 51 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Monuments
The MSTU board approved two monument designs from Q.Grady Minor &Associates,P.A.(Grady Minor)for monuments
located at the Farm Workers Village entrance (Panther Crossing)on SR29 and on the corner of South First and East Eustis
Avenue across the Seminole Casino Hotel Immokalee.Both monuments should go out for bid in early 2019.
15
3.B.2.a.a
Packet Pg. 52 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
JOINT COMMUNITY PROJECTS
16
Immokalee CRA and the Immokalee MSTU coordinated with Collier County
Transportation Department to connect a portion of sidewalk on North 19th
Street and Immokalee Drive.The CRA constructed sidewalks on Immokalee
Drive in 2015 with grant funds.A private business owner constructed the
sidewalk along North 19th Street in 2017.The CRA coordinated with Collier
County Transportation Department to connect the gapped section that was
left on the county right-of-way.On October 2018,transportation planning
staff completed the sidewalk connection.
Immokalee Main Street Pedestrian Safety Improvements Project
Sidewalk connection on North 19th Street and Immokalee Drive
Project Schedule:
•100 percent design by
February 2019.
•Out for bid by July 2019.
•Award the contract to the
contractor by fall 2019.
•Construction will begin within
60 days after contract award.
The CRA is continuing to coordinate with FDOT to improve
pedestrian safety along Main Street.Improvements include a
new signal at Third Street and Seventh Street,consolidating the
midblock crossing and signage.This project is currently in 90
percent design phase and is expecting to be constructed in FY
2019.
3.B.2.a.a
Packet Pg. 53 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Transportation Investment Generation Economic Recovery (TIGER) Grant
Immokalee Complete Street -Growing Connections to Create Mobility Opportunities
Both the CRA and the MSTU offered letters of support for the TIGER IX application submitted to U.S.Department of Transportation
by the Collier County Board of County Commissioners.The Growing Connections to Create Mobility Opportunities in Immokalee
will further implement the vision to redevelop Immokalee into a safe pedestrian/multi-modal community.This project will target
specific high-traffic pedestrian areas identified in the Immokalee Walkability Community Study adopted in 2011.
17
Funding Sources:
$16,415,864
•FHWA grant funds
(80% = $13,132,691)
•County match funds
(20% = $3,283,173)
Summary of Project’s Estimated Schedule and Milestones
Notification of TIGER Grant:Spring 2018
Coordination with FDOT and FHWA:On-going
Collier County budget/funding available for match:October 2018
Planned Completion of National Environmental Winter 2019
Policy Act (NEPA)Review (by FDOT and FTA):
Planned TIGER Agreement Execution:Spring 2020
Planned Start of Project Design/Build:Winter 2020
Planned Construction Substantial Completion Date:Winter 2023
Final TIGER Grant Reporting Requirement:Spring 2027
The project will construct complete streets
improvements in Immokalee including
approximately 20 miles of new sidewalks,a bike
boulevard network,a shared-use path,street
lighting,bus shelters,a new transit center,
landscaping,drainage improvements,and
intersection and traffic calming retreats.
3.B.2.a.a
Packet Pg. 54 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
•Funding Sources:
•CDBG -$600,000
•CRA -$61,684
•MSTU -$79,814
•$741,498 Sidewalk Project:
•Eustis Avenue
•South Fifth Street
•South Ninth Street
The Immokalee CRA completed the construction of sidewalks and
stormwater improvements along South Ninth Street,West Eustis
Avenue,and a portion on South Fifth Street in May 2018.The CRA
was awarded a total $600,000 of Community Development Block
Grant funds to complete the Immokalee Sidewalk Improvement
Project.The remainder of the project funds were paid from the
Immokalee CRA and Immokalee MSTU funds.
Community Development Block Grant (CDBG)-Immokalee Sidewalk Improvements Project:
18
S.9th Street
S.Eustis Ave.
3.B.2.a.a
Packet Pg. 55 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
The original Immokalee Stormwater Master Plan (ISWMP)was
prepared by H.W.Lochner (2005).Camp Dresser &McKee (CDM)
was contracted in 2010 to prepare construction plans for the
Downtown Immokalee and Immokalee Drive projects plus
update the ISWMP.A draft update document was prepared but
not finalized.On November 28,2018 county staff presented the
follow-up analysis.
Immokalee Stormwater Master Plan:
The Immokalee Stormwater Master Plan is being completed by the Collier County Stormwater
Department and will provide a comprehensive approach to improving stormwater in the
community.In January 2018,to facilitate immediate needs,the Immokalee CRA and MSTU
partnered with the Stormwater Department to share the cost of four Corrective Action Projects
within the Immokalee area.Growth Management Department covered half the cost and the
CRA &MSTU split the remainder cost.This project included both minor improvements to culverts
and swales along North Ninth Street and Lake Trafford Memorial Gardens and design,permitting
and construction review for new pipe and swales for Eden Gardens and North Third St.areas.
Future funding will need to be allocated to complete the construction of these two projects.
Awarded Fiscal Year 19 Community Development Block Grant (CDBG)Grant Funds
In June 2018,through a competitive process,the Immokalee CRA was selected and
awarded $200,000 grant funds for additional sidewalk improvements along the
southside of Immokalee.The grant funds will be available in FY19.
Immokalee CRA and the Immokalee MSTU partnered with Collier County Growth
Management Stormwater Department to fund Corrective Action Projects in Immokalee
totally $95,000:
19
Carver Street S.5th Street
3.B.2.a.a
Packet Pg. 56 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
ECONOMIC DEVELOPMENT
The Grill –Seminole Casino Hotel
Grand Re-Opening
March 30, 2018
First Bank of Immokalee
Grand Opening
May 29, 2018
Collier County Housing Authority
Rehabbed Homes
May 29, 2018
2018 was a busy year for both business development and expansion,and
infrastructure improvements in the community.Staff and the CRA and
MSTU advisory boards attended various ceremonies for the following
Immokalee businesses:
20
3.B.2.a.a
Packet Pg. 57 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Immokalee Inn remodel
New Homes constructed at Arrowhead
Papa Johns a New Business
CONSTRUCTION HIGHLIGHTS
21
New Pier at Ann Olesky Park
ROOF rehabbed home
Arrowhead
Arrowhead Community
Hatchers
3.B.2.a.a
Packet Pg. 58 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
The CRA hosted the Annual Tree Lighting on November 30,2018,at
the Immokalee Zocalo Plaza with the help of the MSTU,the Seminole
Casino Hotel,Collier County Parks &Recreation,the Immokalee
Chamber of Commerce,the Sheriff’s Department and the
Immokalee Fire Department.
CRA hosted the Fifth Annual Christmas Tree Lighting Event
Ciclovia Immokalee!is in its fourth year of providing the community
of Immokalee a monthly day of safe and open environment at the
Immokalee Community Park for families to run,bike,play and be well
together.
Immokalee Cattle Drive and Jamboree was held March 10,2018.This
annual event is organized by the Immokalee Pioneer Museum at
Roberts Ranch.The Immokalee Chamber of Commerce and the
CRA were sponsors of the event.
COMMUNITY OUTREACH
22
3.B.2.a.a
Packet Pg. 59 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Cultural Immersion Event was held April 18,2018,
as a joint collaboration with 1 By 1 Leadership,
Immokalee High School and Collier County Boys
&Girls Club.
Lipman Backpack Giveaway was held
August 4,2018,at the Immokalee High
School field.
Lipman 5K Run was held April 21,2018,
at the Immokalee High School field.
23
3.B.2.a.a
Packet Pg. 60 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Immokalee Unmet Needs Coalition (IUNC):
24
Disaster Recovery and Resiliency Plan –Housing and Infrastructure
On September 10,2017,the rural community of Immokalee experienced wind and
stormwater damage as Hurricane Irma moved through SW Florida.An initial county
assessment found 16 homes in the community were completely destroyed and another
69 were severely damaged.Residents,local stakeholders,and county government,
stepped in to help the community with immediate needs.The recovery is moving
forward and community leaders are seeking ways to rebuild the community and address
underlying issues that make Immokalee vulnerable to future storms and disasters.
The result is the Disaster Recovery and Resiliency Plan developed by the Immokalee
Unmet Needs Coalition and the Immokalee Community Redevelopment Agency (CRA).
The Plan includes short and long-term efforts that will serve as an Action Plan for the
community.
The goals are to increase and improve the supply of safe,affordable housing,reduce
the community’s dependence on substandard units,and improve infrastructure to make
the community more disaster-resistant.
The Immokalee CRA partnered with over 50 not-for-profit,faith based,and
governmental organizations from local,state and national organizations to form the
Immokalee Unmet Needs Coalition (IUNC)to meet the needs of the community after
Hurricane Irma made landfall.The IUNC was formed after the catastrophic event to
improve communication and coordination among the agencies providing recovery
services to those hardest hit in the rural community.The coalition formed committees
for Needs Assessment,Case Management,Resource Directory,Distribution Center,
Volunteer Management,Housing Task Force,and Spiritual &Emotional Care to help
rebuild a resilient community.
The Benison Distribution Center is the community warehouse that was established shortly
after Hurricane Irma due to the overwhelming amount of donations that were coming into
Immokalee.The donations are available free of charge to the organizations.To date,the
cost to operate the center has been funded through donations and volunteers.The
Housing Task Force Committee is dedicated to immediate and long-term housing needs of
the community of Immokalee.The committee developed a Disaster Recover and
Resiliency Plan that includes short and long-term efforts that will serve as an Action Plan for
the community.
Before
After
3.B.2.a.a
Packet Pg. 61 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
25
Commercial Façade Grant Program
In accordance with Objective 1.2 in the Immokalee Area Master Plan,the CRA
continued to provide financial incentives to businesses in Immokalee via the
Commercial Façade Improvement Grant program.The CRA implemented the
Program in October 2008.Since that time,17 façade grants have been awarded
to local businesses for a total of $294,621.67.Eligible applicants may receive grant
funding up to $20,000 as reimbursement,using a one-half to one match with
equal applicant funding for funding for façade improvements to commercial
structures.
The Immokalee CRA partnered with the Richard M.Schulze Family Foundation (RMSFF)to serve on the Community Assessment
Advisory Committee that guided the Collier County -Community Needs and Assessment (CNA)Report.
While this report illustrates specific community needs that have an impact on residents’everyday lives,it also moves beyond
specifics to provide a broader analysis regarding foundational issues that impact people’s quality of life along with assets found
within the county.The CNA captures conditions in the local environment that contribute to quality of life such as housing costs,
access to health care,places for recreation,and physical safety.The Community Needs Assessment report offers a portrait of
Collier County and the needs of its residents by presenting data on demographic and socioeconomic characteristics,as well as
an appraisal of the economic,physical,service,and social environments including the following ten domains:
Richard M.Schulze Family Foundation (RMSFF):
1)Employment and Economic Opportunity
2)Housing
3)Transportation/Infrastructure
4)Environment
5)Health Care
6)Education and other Social Services
7)Well-being and Community Cohesion
8)Health and Health Behaviors
9)Recreation and Leisure (including Culture & the Arts)
10)Safety
3.B.2.a.a
Packet Pg. 62 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
2018 PRIORITIES
26
Mural is located inside RCMA Charter School.
3.B.2.a.a
Packet Pg. 63 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
IMMOKALEE CRA ANNUAL REPORT
Financial Reporting
27
3.B.2.a.a
Packet Pg. 64 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
In accordance with s.163.356 (3)Fla.,Stat.,the annual report for the Immokalee Community
Redevelopment Agency (CRA)has been filed with Collier County.This report includes information on
activities for fiscal year 2018.Complete financial statements are contained in the 2018 Collier County
Comprehensive Annual Financial Report (CAFR).
Mural is located inside EE-TO-LEET-KE Grill at Seminole Casino Hotel Immokalee.
28
3.B.2.a.a
Packet Pg. 65 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
SCHEDULE OF REVENUES & EXPENDITURES -BUDGET TO ACTUAL
IMMOKALEE CRA
Mural is located inside EE-TO-LEET-KE Grill at Seminole Casino Hotel Immokalee.
29
3.B.2.a.a
Packet Pg. 66 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
IMMOKALEE BEAUTIFICATION
MUNICIPAL SERVICES TAXING UNIT
SCHEDULE OF REVENUES & EXPENDITURES -BUDGET TO ACTUAL
30
IMMOKALEE MSTU 3.B.2.a.a
Packet Pg. 67 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
IMMOKALEE CRA MANAGED ROAD SEGMENT
IMMOKALEE ROAD & SR 29
SCHEDULE OF REVENUES & EXPENDITURES -BUDGET TO ACTUAL
Mural is located inside EE-TO-LEET-KE Grill at Seminole Casino Hotel Immokalee.
31
3.B.2.a.a
Packet Pg. 68 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
Collier County Community Redevelopment Agency -Immokalee
CareerSource Southwest Florida
750 South Fifth Street
Immokalee, FL 34142
www.ImmokaleeToday.com
239-867-0025
Mural is located outside RCMA Charter School.
3.B.2.a.a
Packet Pg. 69 Attachment: Immokalee CRA 2018 Annual Report (8407 : Immokalee Community
04/02/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 3.C.2.a
Item Summary: Bayshore Gateway Triangle Community Redevelopment Area
Meeting Date: 04/02/2019
Prepared by:
Title: Operations Analyst – County Manager's Office
Name: Geoffrey Willig
03/27/2019 10:55 AM
Submitted by:
Title: County Manager – County Manager's Office
Name: Leo E. Ochs
03/27/2019 10:55 AM
Approved By:
Review:
County Manager's Office Sean Callahan Additional Reviewer Completed 03/27/2019 12:03 PM
County Manager's Office Geoffrey Willig County Manager Review Completed 03/27/2019 12:04 PM
Board of County Commissioners MaryJo Brock Meeting Pending 04/02/2019 9:00 AM
3.C.2.a
Packet Pg. 70
2018 Annual
Report
➢Bayshore/Gateway Triangle CRA
➢Bayshore Beautification MSTU
➢Haldeman Creek MSTU
DRAFT
3.C.2.a.a
Packet Pg. 71 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomCRA Overview
❖The Collier County
Community Redevelopment
Agency was created by the
Collier County Board of
County Commissioners on
March 14, 2000, by
Resolution 2000-82. The
Agency has two
redevelopment areas: The
Bayshore/Gateway Triangle
Community Redevelopment
Area (BGTCRA) and
Immokalee Community
Redevelopment Area.
❖The BGTCRA is
compromised of
approximately 1,800 acres
with a wide range of
residential and commercial
properties. Funding for the
CRA comes from Tax
Increment Financing (TIF).
TIF is a portion of the
property taxes generated
above what was received by
the county prior to the CRA
being established and does
not result in any additional
tax to the property owners.
❖Since the adoption of the
2000 Redevelopment Plan,
much has changed within the
redevelopment area
including: Bayshore Drive
streetscape improvements,
pedestrian pathways, crime
reduction, demolition of
substandard housing, new
residential and commercial
development, façade
improvements and the
opening of the Botanical
Gardens.
1
For more information, please
visit our website at:
www.bayshorecra.com or
Call 239-643-1115
3.C.2.a.a
Packet Pg. 72 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomCollier County
Community Redevelopment Agency
Executive Board (CRAB)
Stepping back in time,many people remember Kelly Road and what it was
like before the Community Redevelopment Agency (CRA)was created.I’ll
just say it wouldn’t be a place that was inviting to families.The name of
the road was changed to Bayshore Drive in hopes that it would become a
better place to live.However,changing the name wasn’t enough.The
residents of Windstar decided to take things into their own hands.They
searched for solutions to upgrade the community and reached out to the
City of Naples to gather information on the improvements to 5th Avenue
and how to establish a CRA.The residents of Bayshore petitioned the Board
of County Commissioners to create an agency for the Bayshore area.It was
a slow start,and there were many lessons to learn along the way,but the
CRA was approved by the commissioners,and the effort began to move
forward.
After all the work was started and the process very slowly began to work,
the Great Recession took over,we lost our Executive Director,peeled back
spending,and became rather stagnant until the recession period ended.
BUT –the heart and soul of Bayshore never changed!The residents and
businesses still wanted to see improvements and were willing to work hard
to get there.The slum and blight have slowly diminished,and new
businesses have been established and flourished.It hasn’t been easy at
times because of opposition by some,but this dedicated CRA Board and
staff has kept their eye on the future and what they want the area to
become.
With that dedication and determination,they will succeed!And we will be
on the sidelines cheering for them as they move forward,and we all
become winners.
Donna Fiala, CRA Co-Chair
Community Redevelopment
Agency Board
❖Donna Fiala, District 1
CRA Board Co-Chair
❖Andy Solis, District 2
❖BCC Chair
❖Burt Saunders, District 3
❖Penny Taylor, District 4
❖William L McDaniel, Jr, District 5
CRA Board Co-Chair 2
3.C.2.a.a
Packet Pg. 73 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomBayshore/Gateway Triangle
CRA Advisory Board
❖Maurice Gutierrez Chairman
❖Peter Dvorak Vice-Chair, At-large, Bayshore Resident
❖Karen Beatty Bayshore Resident
❖Larry Ingram Business Owner
❖Steve Main Business Owner
❖Michael Sherman Bayshore Resident
❖Dwight Oakley Bayshore Resident
❖Steven Rigsbee Gateway Resident
❖Ron Kezeske Davis Blvd Business Owner -Resigned
❖Shane Shadis Bayshore Resident -Resigned
Another year has passed but the changes in our district are all but
subtle.A quick ride around our neighborhood and you’ll see Davis
Boulevard buzzing with workers finishing the 2-new buildings going up.
These will compliment the new Porsche dealer already operational.
You can’t miss the new hotel going up on US 41 and Pine Street or the
storage facility almost complete just across the street.These are but a
few of the obvious projects investors have committed to,and more of
that,are in the planning stages.
Bayshore Drive is not excluded from all the construction activity as we
now have one of the best parks in town,Celebration Park .The
combination of the newly opened food truck park and 360 Market
across the creek has something for everyone’s visual and gastric
experience,bon appétit!If you’ve worked up a thirst,just wait until our
very own brewery opens,Ankrolab Micro Brewery.The building is
almost finished,and the buildings architecture has truly put a bit of
pizzazz on Bayshore drive;thank you Adam!
With growth comes parking issues and the CRA has purchased a vacant
lot on Bayshore Drive and Coco Avenue for public parking.We are
currently in the design and engineering phase of the project.
We are not only seeing commercial,but residential investments like
Mattamy Homes and smaller infill lots of single-family homes wanting
to call our district home.It may seem like all this has just happened,but
it’s been years in the making.
All of this and more could not have been realized without the support
of our County Commissioners,CRA staff,Advisory Board Members and
all the home owners who have shared our commitment to re-shape our
neighborhood through their continued support.We truly are
committed to make sure we “get it right”by not just improving it but
making sure it gives back to the community.On behalf of the Bayshore
CRA,thanks to all for letting us be part of this amazing neighborhood
transformation.
Maurice Gutierrez,Advisory Board Chairman
Advisory Board
Maurice Gutierrez
3
3.C.2.a.a
Packet Pg. 74 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomDebrah Forester,CRA Director,joined the Collier County
team in July 2017 as the Collier County Community
Redevelopment Agency (CRA)Director,overseeing both
the Bayshore Gateway Triangle and Immokalee CRAs.
Debrah is a member of the American Institute of Certified
Planners (AICP)and certified as a Redevelopment
Administrator by Florida Redevelopment Association.
Debrah previously worked in Collier County from 1995 to
2001 and facilitated the creation of the Collier County
CRA.Debrah has a Masters Degree in Regional Planning
from University of North Carolina,Chapel Hill.
Tami Scott,Senior Project Manager,joined the
Bayshore Gateway Triangle CRA team in 2017.Tami’s
primary role is to manage and facilitate construction
projects within BGTCRA and MSTU.Tami has 25 plus
years'experience in construction,design and project
management.Tami is a member of the American Institute
of Architects,Royal Institute of British Architects,American
Institute of Building Designers and is a licensed contractor.
Donna Lumbert,Management and Budget Analyst,
joined the CRA team in September,2018,and is
Management and Budget Analyst for Immokalee and
Bayshore CRAs.She is currently attending Florida Atlantic
University working towards her second bachelor’s degree
in Accounting while working towards a CPA license.
Shirley Garcia,Operations Coordinator,started working
for Collier County in 2005 with the Code Enforcement
Division.In 2015,Shirley joined the Bayshore CRA as
Operations Coordinator.Her duties include administrative
functions for the office;providing general information to
the public regarding CRA programs;and coordinates the
maintenance of CRA properties,landscaping,and debris
cleanup for the MSTUs.Shirley has a Bachelor of Science
in Legal Studies from Hodges University and is a Florida,
Notary Public.
Bayshore / Gateway Triangle
CRA Staff
4
The CRA welcomed Sean Callahan, Collier County Government’s Executive
Director of Corporate Business Operations, to the team in July 2018. Mr.
Callahan provides a direct connection to the County Manager’s Office.
3.C.2.a.a
Packet Pg. 75 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomCommunity Redevelopment Agency
2018 Accomplishments
Fire Suppression Phase 1 was finished in June 2018 completing
improvements along three streets in BGTCRA:Gordon Avenue,
Peters Avenue and Collee Court.
5
Fire Suppression Phase 2 includes
upgrading existing water lines
and installing new and/or
upgraded fire hydrants along two
streets -Becca Avenue and Pine
Street.Estimated project
construction cost is $580,000.
The CRA was awarded $227,960
from the FY2018-2019 CDBG and
the city will contribute the
balance ($352,040).In addition
the city will provide construction
documents and CEI services.The
project is expected to begin in
spring 2019.
❖Infrastructure:
Infrastructure Improvements play a significant role in revitalizing a
community and encouraging private investment.The BGTCRA is located
on the periphery of the City of Naples water service area.Existing
infrastructure is not adequate to meet current demands and the area is
experiencing low water flow and pressure conditions.
The CRA in partnership with the City of Naples has developed a multi-
phase plan to upgrade existing water lines and install new and/or
upgrade fire hydrants in the community.Through a competitive
countywide grant process for U.S.Housing and Urban Development
(HUD),Community Development Block Grant (CDBG)entitlement funds,
the CRA has applied and received funding for two of the eight identified
phases.The City of Naples Utilities Department provides in-house
design,construction management,and capital funding while the CRA
provides grant management.
Phase 1 -new water lines
3.C.2.a.a
Packet Pg. 76 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomCommunity Redevelopment Agency
2018 Accomplishments
❖Redevelopment Plan Update:
On January 9,2018,the CRA approved a contract with TOA Design Group
LLC to prepare an update to the 2000 Community Redevelopment Area
Plan for the Bayshore Gateway Triangle.TOA focus is on updating the
vision,goals,and strategies to continue to move the community forward
over the next decade.Considerable time and effort has been spent in 2018
to gather analysis and public input to draft a major amendment to the
Community Redevelopment Plan section related to the Bayshore Gateway
Triangle Redevelopment Area.
In April, a series of stakeholder meetings were held to gather input from
the property owners and tenants in the community.
6
Community Input continued
through 2018,with the draft
plan amendment presented to
the CRA Advisory Board in
November.After review,the
Board recommended approval
of the amendment.Adoption
hearings are scheduled for
Spring 2019.
April 2018 Stakeholders Meeting
3.C.2.a.a
Packet Pg. 77 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomCRA Properties
2018 Accomplishments
❖Mini Triangle:
In April 2016 the CRA approved the Purchase and Sales Agreement
(PSA)with Real Estate Partners International LLC (REPI)for the 5.27 acre
site in the Bayshore/Gateway Triangle “mini-triangle.”REPI continued
moving the project forward in 2018.
In February 2018,the Mini Triangle Comprehensive Plan Amendment
and MPUD zoning district were approved.The rezoning is intended to
create a vibrant mixed use development with a mix of residential units
along with a mix of commercial uses,including retail,restaurant and
office uses.
In July 2018,the CRA approved a Cell Tower Relocation Agreement
with Crown Castle to decommission and remove the cell tower located
on one of the CRA parcels under contract with REPI.In addition,the
CRA approved a fourth amendment to the PSA to extend the closing
date to 30 days after the removal and decommissioning of the cell
tower.The closing is anticipated in summer 2019.
On September 28 the CRA hosted a meeting of the property owners
within the mini-triangle to facilitate a discussion on the future
development and transportation vision for the area in conjunction with
the redevelopment plan update.
7
❖Partnerships:
Special thanks to our partners for all the work and support they have
provided over the year:
❖Collier County Code Enforcement –Handled 325 open cases with 299
cases being resolved in 2018.
❖Collier County Sheriff’s Office-Neighborhood Watch, Community Policing
and Task Force teams.
❖Naples Botanical Garden-Providing meeting room space for CRA public
meetings.
3.C.2.a.a
Packet Pg. 78 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in Bloom2018 Renovation and Reuse
Local Entrepreneurs Sparking Excitement
8
Ankrolab Brewing
Company:
Best Popcorn shop:
Taking advantage of the
Bayshore Overlay, the
renovation of a vacant art
gallery resulted in a family-
owned and operated
popcorn and ice cream shop
within walking distance of
the Botanical Gardens. The
facility is scheduled to open
in early 2019.
Naples Botanical
Gardens:
Renovations began in
2017 to transform an
existing building into
the Ankrolab Brewing
Company. The facility is
scheduled to open in
spring 2019.
The Reflections on Glass: Fräbel
in the Garden exhibition opened
in October 2018, bringing one of
the most influential flameworkers
in America to the Bayshore Arts
District.
3.C.2.a.a
Packet Pg. 79 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in Bloom2018 Private Investment
National Chains have their eye on the area:
9
Wood Springs Suites Hotel
a 123-room extended stay hotel
located along U.S.41. This facility
is scheduled to open in summer
2019.
Starbucks:
opened in November 2018
at the intersection of U.S.41
and Airport Road.
The Lockup Self Storage:
a former retail center from
the 1960s was purchased
and demolished by this
national retailer to fill a
market demand. The
facility is scheduled to
open in spring 2019.
ABC Liquors:
renovation of an existing single
story strip mall. Property owner
enhanced the existing roof lines
and embellished the existing
façade.
3.C.2.a.a
Packet Pg. 80 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomResidential Projects
10
Mattamy Homes,one of the largest developers of residential builders in the
United States and Canada began development of 244 townhomes on the
corner of Bayshore Drive and Thomasson Drive in 2018.This long-awaited
project will bring a new residential product type to the community.Prices are
anticipated to start in the low $300,000.
Gasparilla Island House
Bahama Cottage
Scattered lot development by local builders continued to be strong in 2018.
3.C.2.a.a
Packet Pg. 81 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Commercial Building Improvement Grants
11
Davis Community Dental –
Health LLC received a
CBIG Grant for both exterior
and interior improvements.
Dr. Kunstler is a native of
Naples and is returning home
to begin a new practice.
Harborside Animal Clinic –
Dr. Marsh, a local veterinarian, wanted
to expand and stay in the BGTCRA. The
CBIG Grant award assisted with
stormwater improvements that will not
only benefit this project but the overall
stormwater system throughout the area.
The Real Macaw -a Collier
County favorite and Bayshore
Drive landmark restaurant for
over 25 years received a CBIG
Grant to replace the entrance
signage.Creativity in BloomOne of the newest concepts to arrive in the
Bayshore Arts District this year is
Celebration Park, a fun and casual dining
spot along Haldeman Creek. With eight
food trucks offering an array of culinary
options and beautiful waterfront views, the
park has been a success since its opening
day in November.
Davis Community Dental Health
Harborside Animal Clinic
Celebration Park
3.C.2.a.a
Packet Pg. 82 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Tracking the Progress:
Project Location Map
12
•Indicates General Project Locations Creativity in Bloom3.C.2.a.a
Packet Pg. 83 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
CRA 2018 Budget
Creativity in BloomIn accordance with s.163.356 (S) Fla., Stat., the annual report for the Bayshore Gateway
Triangle Community Redevelopment Agency (CRA) has been filed with Collier County.
This report includes information on activities for fiscal year 2018. Complete financial
statements setting forth assets liabilities, income and operating expenses, as of the end
of the fiscal year are contained in the 2018 Collier County Comprehensive Annual
Financial Report (CAFR) that is on file at the Collier County Clerk of Court.
13
3.C.2.a.a
Packet Pg. 84 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomBayshore Beautification MSTU
Advisory Committee
Advisory Committee
❖Maurice Gutierrez, Chairman,
Bayshore MSTU Resident
❖Sheila Dugan, Vice Chair,
❖Bayshore MSTU Resident (Resigned
02/05/2018)
❖Sandra Arafet
Bayshore MSTU Resident
❖George Douglas
Bayshore MSTU Resident
❖Sheila Dimarco
Bayshore MSTU Resident
❖Stephen Jaron
Bayshore MSTU Resident
(Resigned 04/25/2018)
❖Robert Messmer
Bayshore MSTU Resident
Change is inevitable,or so I’ve read,but positive change is usually
engineered.Unfortunately engineering takes a long time,at least when
it comes to our lead project,Thomason Drive.
We are finally in the bid process and looking at June 2019 for breaking
ground.The finished product will have a center piece round-about,
wider sidewalks,decorative streetlights,landscaping and bike lanes.
The Collier County Parks and Recreation Division initiated a plan for
parking improvements along Hamilton Avenue that will add boat trailer
parking and improve safety.This project,in partnership with the
Bayshore MSTU project,will enhance our vision of preparing for our
future needs as our community continues to grow.It can’t come at a
better time as we are seeing the increase in residential development
along Thomason Drive.It will also help us better manage increased
traffic from the Botanical Gardens and the Isles of Collier as they
continue to grow with and around South Bayshore.
Visions and perceptions are separated by the lens of time.With hard
work,visions become a reality and perceptions are altered.Who would
have thought:Bayshore was perceived as the “bad”side of town but has
now become the “BAD (Bayshore Arts District)”side of town!
Maurice Gutierrez
Advisory Committee Chairman
Maurice Gutierrez
14
3.C.2.a.a
Packet Pg. 85 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomBayshore Beautification MSTU
2018 Accomplishments
15
The Bayshore Beautification MSTU and its engineering consultant RWA is
working on the Thomasson Drive and Hamilton Avenue Streetscape Project.
The project consists of
•Resurfacing and widening the roadways
•New sidewalks
•New bicycle paths
•New energy efficiency street lighting
•New efficient irrigation design
•New Florida-friendly landscaping
The design and construction documents are complete,AECOM,has been
selected to provide Construction Engineering Inspection services for this $4.5
million project.AECOM,with offices in Naples and Ft.Myers,will coordinate
with MSTU staff and the contractor to assure the project stays within budget
and schedule.Staff is negotiating a contract of services with AECOM,and
anticipates the contract to be approved in spring 2019.
Contractor selection and start date for the project is anticipated June of
2019.The street scape beautification project will take approximately 12
months,community outreach will be an important component of the project.
3.C.2.a.a
Packet Pg. 86 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomBayshore Beautification
MSTU Budget
In accordance with s.163.356 (S) Fla., Stat., the annual report for the Bayshore Gateway
Triangle Community Redevelopment Agency (CRA) has been filed with Collier County.
This report includes information on activities for fiscal year 2018. Complete financial
statements setting forth assets liabilities, income and operating expenses, as of the end of
the fiscal year are contained in the 2018 Collier County Comprehensive Annual Financial
Report (CAFR) that is on file at the Collier County Clerk of Court.
16
3.C.2.a.a
Packet Pg. 87 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomHaldeman Creek MSTU
Advisory Committee
Advisory Committee
❖Roy Wilson, Chairman
Haldeman Creek Resident
❖Jim King
Haldeman Creek Resident
❖Kate Riley
Haldeman Creek Resident
❖Jack Bonzelaar
Haldeman Creek Resident
❖Joe Adams
Haldeman Creek Resident
Roy Wilson
Early 2018 was still consumed with recovery from Hurricane Irma.
Between volunteers,Keep Collier Beautiful projects,and finally near
the end of 2018 a contracted effort with hurricane recovery funds,we
have cleaned up Haldeman Creek and its shorelines.Tons of debris
was removed.Thanks to all that participated in any of the efforts.
We continue to encourage residents to remove exotics and trim
mangroves that are extending beyond their own property lines and
overhanging Haldeman Creek .
We finally had a solution to the missing Marker 15.County staff tried
to replace the piling and marker sign to no avail due to rock so close
to the surface the piling would not stand.A floating Marker 15 was
installed,making navigation safer.
We continue to work with county staff to develop a realistic estimate
on time and cost of a future dredge.This task is not easy as we are a
small MSTU and have resisted paying outside engineers for this work .
Hopefully,we will develop the necessary information yet this year so
that we can insure our millage is correct.
During the election of officers for the MSTU in January,I announced
my desire to relinquish the role as Chairman.Twelve years was
enough.Vice-Chair,Jack Bonzelaar was elected Chairman.He will
serve you well.
Roy Wilson
Advisory Committee Chairman
17
3.C.2.a.a
Packet Pg. 88 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomHaldeman Creek MSTU
2018 Accomplishments
Haldeman Creek IRMA Debris Clean up:
Our sincere appreciation to Haldeman Creek MSTU Members,
Community Members, Keep Collier Beautiful, Code Enforcement, Collier
County Sheriff Weekender Program and CRA Staff.
18
❖Bay Days Cleanup: April 14, 2018
Boaters and kayakers participated in removing two, 30-yard
dumpsters filled to the top with debris, much of which were
remnants from Hurricane Irma.
3.C.2.a.a
Packet Pg. 89 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomHaldeman Creek MSTU
2018 Accomplishments
❖Keep Collier Beautiful:
On September 15,2018,with the assistance of Keep
Collier Beautiful and the City of Naples,an event was
held to continue the efforts to pick up debris in
Haldeman Creek .Local volunteers,with the support
from Collier County Sheriff’s Office Marine Patrol and
Greater Naples Fire Department,picked up over 800
pounds of debris,equal to 15 cubic yards.Thanks to all
for your continuing support.
19
3.C.2.a.a
Packet Pg. 90 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomHaldeman Creek MSTU
2018 Accomplishments
20
❖Haldeman Creek IRMA Debris Clean up:
Our sincere appreciation to Collier County Department of
Capital Project Planning,Stormwater,and Coastal Zone staff
for their assistance and resources to manage the removal of
approximately 2,733 cubic yards of debris.Crowder Gulf Joint
Venture Inc.,the contractor hired to preform the task,received
outstanding accolades from the community on their work .
Special thank you to Amy Patterson,Gino Santabarbara,Pawel
Brzeski,Chris D’arco and Bryan King.
3.C.2.a.a
Packet Pg. 91 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomHaldeman Creek
MSTU Budget
In accordance with s.163.356 (S) Fla., Stat., the annual report for the Bayshore Gateway
Triangle Community Redevelopment Agency (CRA) has been filed with Collier County.
This report includes information on activities for fiscal year 2018. Complete financial
statements setting forth assets liabilities, income and operating expenses, as of the
end of the fiscal year are contained in the 2018 Collier County Comprehensive Annual
Financial Report (CAFR) that is on file at the Collier County Clerk of Court.
21
3.C.2.a.a
Packet Pg. 92 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Creativity in BloomCommunity News
22
CRA Presentation to
Dell Ackerman
In appreciation for your
outstanding accomplishments as
a business owner
and generous donations and
support to the Bayshore
Community
we recognize Dell’s Corner to be
the intersection of Bayshore and
Thomasson Drive.
Small Business Advocate of the Year Amanda
Jaron, A. Jaron Fine Jewelry
30 year Anniversary
Alice Sweetwater Restaurant
July 2018 -Presented to Dell Ackerman
Naples Illustrated Magazine Article –October 2018
3.C.2.a.a
Packet Pg. 93 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
Bayshore/Gateway Triangle CRA
3570 Bayshore Drive, Unit 102
Naples, FL 34112
3.C.2.a.a
Packet Pg. 94 Attachment: Bayshore CRA 2018 Annual Report (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
1
Office of the County Manager
Collier County CRA MEMO
DATE: March 22, 2019
TO: Leo E. Ochs, Jr., County Manager
Sean Callahan, Executive Director of Corp Business Ops
FROM: Debrah Forester, CRA Director
SUBJECT: March 26 BCC Meeting Request for Changes to Items 14.B.1 and 9 c.
Collier County Community Redevelopment Plan Amendment
Replace Page 5-3-6 – to reflect comments received by Chairman Strain during the Mach 21 CCPC Meeting to
clarify the allowable densities listed in the Mini-Triangle catalyst site. The change references Ordinance No.
2018-23 and provides the approved development plan. (Attachment 1).
Replace entire 5-6 Chapter (pages 5-6-1 to 5-6-14) – During their review of the draft document, County
Administration noted that there were some discrepancies in the total tax increment revenue projected in
different parts of the CRA Plan. These discrepancies were corrected for consistency throughout the chapter.
Below is a brief overview of the current project status concerning the acquisition of the 5.27 acre site in the
Bayshore/Gateway Triangle CRA by Real Estate Partners International, LLC. (Attachment 2)
Growth Management Impact- Collier County Planning Commission- March 21, 2018 recommendation:
Joe Schmitt made a motion that they find it consistent with the Growth Management Plan (GMP)
with the exception that it stays as written in 2000 and sunset the CRA in 2030. Edwin Fryer
second the motion. Mr. Schmitt then amended the motion specifically in regard to the Bayshore
Gateway Triangle to not extend to 30 years but to extend the Immokalee Community
Redevelopment Agency for 30 years. Edwin Fryer second the motion. Passed unanimously.
Other CCPC Comments:
In addition to the finding of consistency, the CCPC had several general comments on the CRA Plan that have
been summarized below. These comments addressed a variety of topics throughout the draft plan, and while
outside of the finding of consistency, they have been included for reference.
- Complete Streets – There were comments/questions surrounding the topic of complete streets,
particularly how their implementation may affect automobile congestion within the CRA. The CCPC
requested that any complete street projects which include a reduction of travel lanes be reviewed to
determine potential impacts (particularly related to congestion).
- Review of future GMP and LDC amendments – The CCPC noted that a finding of consistency with
the GMP was not an approval of future GMP and LDC amendments that may come forward as part of
3.C.2.a.c
Packet Pg. 95 Attachment: Change Memo March 22 Update (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
2
plan implementation. Each GMP and LDC amendment would need to be reviewed again by the CCPC
before adoption.
- Duration of the CRA and Potential Fiscal Impacts – The draft CRA Plan includes a request to
extend the life of the CRA for another 30 years, which allow the plan to sunset in 2049. The CCPC
recommended denial of this extension, which would reduce the sunset to 2030. The CCPC cited fiscal
concerns for this recommendation, arguing that while the CRA is not a taxing agency, the increment
collected does reduce the amount of money available in the general fund.
- Soft Costs - In addition to the duration of the CRA, comments were made related to the costs
identified for capital vs. non-capital expenditures; specifically, that the non-capital expenditures seem
too high.
- Public Safety – There were comments regarding the need for a greater emphasis on Public Safety in
the plan.
3.C.2.a.c
Packet Pg. 96 Attachment: Change Memo March 22 Update (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
PLANNING FRAMEWORK & ELEMENTS
Bayshore Gateway Triangle CRA Area Plan—DraŌ March 2019 5‐3‐6
5.3
Future Land Use DensiƟes
Mixed Use AcƟvity Center
A. Mixed Use—Bayshore/Gateway Triangle Overlay
B. ResidenƟal—Bayshore/Gateway Triangle Overlay; 16 UPGA for area outside of
overlay
Redevelopment Overlay—
ProperƟes with access to US 41
East/Bayshore Dr/Davis Blvd (84)/
west side of Airport‐Pulling Rd1
12 UPA via density pool units (with cap of 97 density pool units per project); limits apply
for projects that do not comply with the requirements for this density increase. The Mini
Triangle Catalyst Site is an excepƟon with a maximum of 12 UPA and is not subject to the
density pool unit requirements. Within this site, there is a Mini‐Triangle Subdistrict that
was approved through Ordinance No. 2018‐23 for the following development plan:
377 mulƟ‐family dwelling units
228 hotel suites
150 assisted living units
200,000 square feet of commercial uses inclusive of 60,000 square feet of self‐
storage and 30,000 square feet of car dealership
Redevelopment Overlay—
ProperƟes having frontage on
one or more of Bayshore Drive,
Davis Boulevard, Airport‐ Pulling
Road (west side only) or US 41
East2
ResidenƟal only: 8 UPA via use of density bonus pool (with cap of 97 density pool units
per project). Eligibility requires that the project:
1. shall be a Planned Unit Development (PUD)
2. shall be a minimum of 3 acres
3. shall be redevelopment of a site
4. consist of all market‐rate units
Limits apply for projects that do not comply with the requirements for this density
increase.
Urban ResidenƟal Subdistrict
(outside Redevelopment Overlay)
Maximum residenƟal density determined through Collier County’s Density RaƟng
System, but shall not exceed 16 UPA except in accordance with Transfers of
Development Rights in the Land Development Code.
Urban Coastal Fringe Subdistrict
(outside of Redevelopment
Overlay)
To facilitate hurricane evacuaƟon and protect the adjacent environmentally sensiƟve
ConservaƟon designated area, residenƟal densiƟes within the Subdistrict shall not
exceed a maximum of 4 UPA, except as allowed in the Density RaƟng System to exceed 4
UPA through provision of Affordable Housing and Transfers of Development Rights, and
except as allowed by certain Future Land Use Element Policies under ObjecƟve 5 in the
Growth Management Plan. New rezones to permit mobile home development within
this Subdistrict are prohibited. Rezones are recommended to be in the form of a PUD.
Future Land Use Densities
The following table shows Future Land Use densiƟes corresponding to designaƟons on the Concept Map (Figure
5‐3‐1). Note that certain projects in the Redevelopment Overlay are eligible for addiƟonal units from a pool of
388; these units are referred to as “density pool units” below. Also note that the enƟre CRA area lies in the
Coastal High Hazard Area, which deducts one unit per gross acre (UPGA) from the eligible base density of four
units per acre (UPA) and does not permit rezones for mobile home development.
1This definiƟon is interpreted broadly to mean properƟes that can gain access to the road(s), whether directly (access point on the road) or via one or more
other roads; it is not viewed narrowly to mean have an access point onto the road(s). As a result, this definiƟon encompasses all properƟes in the Bayshore
Gateway Triangle Redevelopment Overlay except those on east side of Airport Road.
2According to Collier County Growth Management staff, such properƟes must literally have frontage on (abut) one or more of the specified roads.
3.C.2.a.d
Packet Pg. 97 Attachment: Attachment 1 Change Sheet Page 5-3-6 CCPC Recommendation (8406 : Bayshore Gateway Triangle Community Redevelopment
Section 5.6: Tax Increment & MSTU Estimates
3.C.2.a.e
Packet Pg. 98 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-1
5.6
5.6.1 Tax Increment Financing
The Redevelopment Area is dependent upon the use of
increment revenue financing for funding. Using this
method, the County froze all taxable values within the
Redevelopment Area at the 2000 rate to establish a base
collection amount. Millages are applied through the General
Fund (001) and the Unincorporated Area General Fund
(111). The future taxes collected (associated with tax base
and property value increases) are placed into a separate
account and designated for specific uses. The funds can be
dedicated to transportation or general improvements, or
placed in the general fund with the base ad valorem
revenues.
The analysis is based on the historical tax roll data obtained
from the Florida Department of Revenue (FDOR) and
population projections for Collier County obtained from the
Bureau of Economic and Business Research (BEBR). Specific
increases in the tax base are shown in terms of expected
development and its value. This expected development is
based exclusively on past patterns of activity adjusted for
anticipated community redevelopment activities within the
Redevelopment Area. These programmatic assumptions
offer a baseline for comparison with future potential
development.
For this analysis, the Bayshore CRA’s current millage rates
have been used, and were held constant over the planning
horizon.
As for the structure of the revenues which may accrue, only
the taxable value(s) net of the base year taxable value is
considered in calculating current or future increment
revenues.
The general procedures used to calculate available
revenues are shown in the following calculations:
• Assessed values, including new construction –
Exemptions or exclusions = Current taxable values.
• Current taxable values – Established base year taxable
values = Net valuations subject to applicable
jurisdictional millages.
• Net valuations × by applicable millages = increment
revenues. Pursuant to the Community Redevelopment
Act, Section 163.387, F.S., the maximum revenue
available to the Redevelopment Trust Fund will be 95
percent of the calculated increment revenues.
Note that the first five years of projected values are
obtained from Florida’s Office of Economic & Demographic
Research (EDR) Revenue Estimating Conference. The
conference produces detailed projections of the “County
Taxable Value” for each county in Florida. The values
projected by EDR were used for each CRA tax increment
scenario with the low, medium, high growth scenarios
starting in 2025. For projection purposes past 2025, three
different scenarios were developed that reflect different
future growth rates for taxable values in the
Redevelopment Area. Additional details for each scenario
are presented below and in Tables 5-6-1 through 5-6-3.
Scenario #1
Ad valorem revenues associated with the increment
revenue financing for the Redevelopment Area were
estimated using the projected growth of the taxable values
for residential and non-residential developments. The
average taxable values were indexed annually based on the
positive correlation between population growth and taxable
value increases discussed previously, along with the
historical growth trends of taxable values in the
Redevelopment Area, by land use. Based on these
projections, if the current millage is held constant (3.5645
mils for fund 001 and 0.8069 mils for fund 111), the ad
valorem taxes used for the Redevelopment Area fund are
estimated to generate approximately $92.9 million between
2018 and 2040.
Additional growth scenarios are presented in this report
that reflects more aggressive growth rates in taxable values
and potential revenues. Although more aggressive than the
growth rates in Scenario #1, these scenarios still present
revenue projections that can reasonably be obtained. Since
1976, the taxable value for residential property in Collier
County has averaged a 10 percent annual increase, and
commercial property has averaged a 9 percent annual
increase. Within the CRA, taxable values (all property) have
averaged a 5 percent annual increase.
Scenario #2
Scenario #2 reflects increased growth rates that are
consistent with the historical growth rates in taxable values
for the entire CRA area. This scenario estimates slightly
higher taxable value growth than Scenario #1, with a
projected average annual taxable value growth rate of 5.2
percent (as opposed to Scenario #1 at 4.8 percent). As CRA
properties are redeveloped, it is reasonable to assume that
taxable values will increase at or above historical growth
rates. Using these higher annual growth rates, the Scenario
#2 increment revenue financing option would generate
approximately $96.6 million between 2018 and 2040.
3.C.2.a.e
Packet Pg. 99 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-2
5.6
Scenario #3
Additionally, an optimistic growth rate scenario was
developed. Scenario #3 has increased growth rates that are
more than Scenarios #1 and #2, bringing the average
growth rate for all land uses more in line with the
recent growth rates of the entire county seen over the
last few years. This scenario projects the growth in
taxable values for all property to average
approximately 5.7 percent, annually. Using these rates,
the increment revenue financing option generated
approximately $103.9 million between 2018 and 2040.
For each of the following scenarios, the following
apply:
• Projected total taxable value of all properties
within Redevelopment Area. Projected growth
rates by land use are consistent with historical
growth rates observed between 2000 and 2017
within Redevelopment Area. All figures rounded to
nearest thousand.
• Difference between total taxable value (Item 1) for
each year and base year (2000).
• For projection purposes, millage rates are assumed
to remain the same through 2040.
• Increment revenue by year (Item 2), divided by
1,000, multiplied by total millage rate, and reduced
by 5 percent for budgeting purposes.
5.6.2 Municipal Service Taxing
Units (MSTUs)
There are two MSTUs that overlap with the CRA area –
the Bayshore Beautification MSTU and the Haldeman
Creek MSTU. The Bayshore Beautification MSTU was
created to provide certain streetscape and right-of-way
improvements in the CRA area generally south of US
41. The Haldeman Creek MSTU was created for
maintenance dredging and navigational marker
maintenance. Projected revenues for these two MSTUs
are based on the same scenarios described for the TIF
calculations above (see Tables 5-6-4 through 5-6-6 for
Bayshore Beautification MSTU and 5-6-7 through 5-6-9
for Haldeman Creek MSTU). Note that revenues stem
directly from millages (as opposed to an increment
difference with a base year as in the case of the TIF
revenues).
3.C.2.a.e
Packet Pg. 100 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-3
5.6
Table 5-6-1: Scenario #1 Projected TIF Revenues
Notes:
1. Source: Scenario #1 projected taxable values for the Bayshore CRA. Average annual growth at 4.8%. Note that the first five years of projected values
are obtained from Florida’s Office of Economic & Demographic Research (EDR) Revenue Estimating Conference. http://edr.state.fl.us/Content/
conferences/advalorem/index.cfm
2. Taxable value for each year (Item 1) less the base year taxable value of $288,081,106
3. For each fund, the tax increment for the previous year multiplied by the millage, divided by 1,000 and reduced by 5%. Note that the revenues for each
year are offset against the tax increment changes due to timing of collections (i.e., the revenue for 2019 is based on the ta x increment change from
2017 to 2018
Fund 001 Fund 111 Fund 001 Fund 111 Total
2019 $761,806,000 $473,724,894 3.5645 0.8069 $1,398,514 $316,583 $1,715,097
2020 $810,239,000 $522,157,894 3.5645 0.8069 $1,604,162 $363,136 $1,967,298
2021 $861,111,000 $573,029,894 3.5645 0.8069 $1,768,171 $400,263 $2,168,434
2022 $914,322,000 $626,240,894 3.5645 0.8069 $1,940,438 $439,259 $2,379,697
2023 $970,752,000 $682,670,894 3.5645 0.8069 $2,120,623 $480,048 $2,600,671
2024 $1,062,117,000 $774,035,894 3.5645 0.8069 $2,311,712 $523,305 $2,835,017
2025 $1,109,715,000 $821,633,894 3.5645 0.8069 $2,621,100 $593,341 $3,214,441
2026 $1,158,389,000 $870,307,894 3.5645 0.8069 $2,782,277 $629,827 $3,412,104
2027 $1,208,139,000 $920,057,894 3.5645 0.8069 $2,947,101 $667,139 $3,614,240
2028 $1,258,967,000 $970,885,894 3.5645 0.8069 $3,115,570 $705,275 $3,820,845
2029 $1,310,871,000 $1,022,789,894 3.5645 0.8069 $3,287,685 $744,237 $4,031,922
2030 $1,363,851,000 $1,075,769,894 3.5645 0.8069 $3,463,447 $784,024 $4,247,471
2031 $1,417,909,000 $1,129,827,894 3.5645 0.8069 $3,642,854 $824,637 $4,467,491
2032 $1,473,043,000 $1,184,961,894 3.5645 0.8069 $3,825,907 $866,075 $4,691,982
2033 $1,529,253,000 $1,241,171,894 3.5645 0.8069 $4,012,606 $908,338 $4,920,944
2034 $1,586,541,000 $1,298,459,894 3.5645 0.8069 $4,202,951 $951,427 $5,154,378
2035 $1,644,905,000 $1,356,823,894 3.5645 0.8069 $4,396,942 $995,341 $5,392,283
2036 $1,704,346,000 $1,416,264,894 3.5645 0.8069 $4,594,579 $1,040,080 $5,634,659
2037 $1,764,863,000 $1,476,781,894 3.5645 0.8069 $4,795,862 $1,085,645 $5,881,507
2038 $1,826,457,000 $1,538,375,894 3.5645 0.8069 $5,000,791 $1,132,035 $6,132,826
2039 $1,889,128,000 $1,601,046,894 3.5645 0.8069 $5,209,365 $1,179,250 $6,388,615
2040 $1,952,876,000 $1,664,794,894 3.5645 0.8069 $5,421,586 $1,227,291 $6,648,877
2041 $2,017,700,000 $1,729,618,894 3.5645 0.8069 $5,637,453 $1,276,157 $6,913,610
2042 $2,083,601,000 $1,795,519,894 3.5645 0.8069 $5,856,965 $1,325,848 $7,182,813
2043 $2,150,579,000 $1,862,497,894 3.5645 0.8069 $6,080,124 $1,376,365 $7,456,489
2044 $2,218,633,000 $1,930,551,894 3.5645 0.8069 $6,306,928 $1,427,707 $7,734,635
2045 $2,287,764,000 $1,999,682,894 3.5645 0.8069 $6,537,379 $1,479,874 $8,017,253
2046 $2,357,971,000 $2,069,889,894 3.5645 0.8069 $6,771,475 $1,532,867 $8,304,342
2047 $2,429,256,000 $2,141,174,894 3.5645 0.8069 $7,009,218 $1,586,685 $8,595,903
2048 $2,501,617,000 $2,213,535,894 3.5645 0.8069 $7,250,606 $1,641,328 $8,891,934
$125,914,391 $28,503,387 $154,417,778
Revenue (3)Millage
Year Tax Increment(2)
Total
Taxable Value(1)
3.C.2.a.e
Packet Pg. 101 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-4
5.6
Table 5-6-2: Scenario #2 Projected TIF Revenues
Notes:
1. Source: Scenario #2 projected taxable values for the Bayshore CRA. Average annual growth at 5.2%. Note that the first five years of projected val-
ues are obtained from Florida’s Office of Economic & Demographic Research (EDR) Revenue Estimating Conference. http://edr.state.fl.us/Content/
conferences/advalorem/index.cfm
2. Taxable value for each year (Item 1) less the base year taxable value of $288,081,106
3. For each fund, the tax increment for the previous year multiplied by the millage, divided by 1,000 and reduced by 5%. Note that the revenues for
each year are offset against the tax increment changes due to timing of collections (i.e., the revenue for 2019 is based on the tax increment change
from 2017 to 2018
Fund 001 Fund 111 Fund 001 Fund 111 Total
2019 $761,806,000 $473,724,894 3.5645 0.8069 $1,398,514 $316,583 $1,715,097
2020 $810,239,000 $522,157,894 3.5645 0.8069 $1,604,162 $363,136 $1,967,298
2021 $861,111,000 $573,029,894 3.5645 0.8069 $1,768,171 $400,263 $2,168,434
2022 $914,322,000 $626,240,894 3.5645 0.8069 $1,940,438 $439,259 $2,379,697
2023 $970,752,000 $682,670,894 3.5645 0.8069 $2,120,623 $480,048 $2,600,671
2024 $1,028,659,000 $740,577,894 3.5645 0.8069 $2,311,712 $523,305 $2,835,017
2025 $1,086,938,000 $798,856,894 3.5645 0.8069 $2,507,799 $567,693 $3,075,492
2026 $1,146,540,000 $858,458,894 3.5645 0.8069 $2,705,150 $612,368 $3,317,518
2027 $1,207,463,000 $919,381,894 3.5645 0.8069 $2,906,977 $658,056 $3,565,033
2028 $1,269,707,000 $981,625,894 3.5645 0.8069 $3,113,279 $704,757 $3,818,036
2029 $1,333,274,000 $1,045,192,894 3.5645 0.8069 $3,324,057 $752,471 $4,076,528
2030 $1,398,162,000 $1,110,080,894 3.5645 0.8069 $3,539,310 $801,198 $4,340,508
2031 $1,464,372,000 $1,176,290,894 3.5645 0.8069 $3,759,040 $850,938 $4,609,978
2032 $1,531,904,000 $1,243,822,894 3.5645 0.8069 $3,983,245 $901,692 $4,884,937
2033 $1,600,757,000 $1,312,675,894 3.5645 0.8069 $4,211,925 $953,458 $5,165,383
2034 $1,670,932,000 $1,382,850,894 3.5645 0.8069 $4,445,081 $1,006,238 $5,451,319
2035 $1,742,429,000 $1,454,347,894 3.5645 0.8069 $4,682,713 $1,060,031 $5,742,744
2036 $1,815,247,000 $1,527,165,894 3.5645 0.8069 $4,924,821 $1,114,837 $6,039,658
2037 $1,889,387,000 $1,601,305,894 3.5645 0.8069 $5,171,404 $1,170,657 $6,342,061
2038 $1,964,849,000 $1,676,767,894 3.5645 0.8069 $5,422,463 $1,227,489 $6,649,952
2039 $2,041,632,000 $1,753,550,894 3.5645 0.8069 $5,677,997 $1,285,335 $6,963,332
2040 $2,119,738,000 $1,831,656,894 3.5645 0.8069 $5,938,007 $1,344,194 $7,282,201
2041 $2,199,165,000 $1,911,083,894 3.5645 0.8069 $6,202,493 $1,404,065 $7,606,558
2042 $2,279,913,000 $1,991,831,894 3.5645 0.8069 $6,471,454 $1,464,951 $7,936,405
2043 $2,361,983,000 $2,073,901,894 3.5645 0.8069 $6,744,891 $1,526,849 $8,271,740
2044 $2,445,375,000 $2,157,293,894 3.5645 0.8069 $7,022,804 $1,589,760 $8,612,564
2045 $2,530,089,000 $2,242,007,894 3.5645 0.8069 $7,305,192 $1,653,685 $8,958,877
2046 $2,616,125,000 $2,328,043,894 3.5645 0.8069 $7,592,056 $1,718,623 $9,310,679
2047 $2,703,482,000 $2,415,400,894 3.5645 0.8069 $7,883,396 $1,784,573 $9,667,969
2048 $2,792,161,000 $2,504,079,894 3.5645 0.8069 $8,179,211 $1,851,537 $10,030,748
$134,858,385 $30,528,049 $165,386,434
Revenue (3)
Tax Increment(2)
Millage
Year
Total
Taxable Value(1)
3.C.2.a.e
Packet Pg. 102 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-5
5.6
Table 5-6-3: Scenario #3 Projected TIF Revenues
Notes:
1. Source: Scenario #3 projected taxable values for the Bayshore CRA. Average annual growth at 5.70%. Note that the first five years of projected values
are obtained from Florida’s Office of Economic & Demographic Research (EDR) Revenue Estimating Conference. http://edr.state.fl .us/Content/
conferences/advalorem/index.cfm
2. Taxable value for each year (Item 1) less the base year taxable value of $288,081,106
3. For each fund, the tax increment for the previous year multiplied by the millage, divided by 1,000 and reduced by 5%. Note t hat the revenues for each
year are offset against the tax increment changes due to timing of collections (i.e., the revenue for 2019 is based on the tax increment change from
2017 to 2018
Fund 001 Fund 111 Fund 001 Fund 111 Total
2019 $761,806,000 $473,724,894 3.5645 0.8069 $1,398,514 $316,583 $1,715,097
2020 $810,239,000 $522,157,894 3.5645 0.8069 $1,604,162 $363,136 $1,967,298
2021 $861,111,000 $573,029,894 3.5645 0.8069 $1,768,171 $400,263 $2,168,434
2022 $914,322,000 $626,240,894 3.5645 0.8069 $1,940,438 $439,259 $2,379,697
2023 $970,752,000 $682,670,894 3.5645 0.8069 $2,120,623 $480,048 $2,600,671
2024 $1,054,119,000 $766,037,894 3.5645 0.8069 $2,311,712 $523,305 $2,835,017
2025 $1,119,750,000 $831,668,894 3.5645 0.8069 $2,594,015 $587,210 $3,181,225
2026 $1,187,573,000 $899,491,894 3.5645 0.8069 $2,816,259 $637,520 $3,453,779
2027 $1,257,587,000 $969,505,894 3.5645 0.8069 $3,045,925 $689,510 $3,735,435
2028 $1,329,792,000 $1,041,710,894 3.5645 0.8069 $3,283,012 $743,179 $4,026,191
2029 $1,404,190,000 $1,116,108,894 3.5645 0.8069 $3,527,521 $798,529 $4,326,050
2030 $1,480,778,000 $1,192,696,894 3.5645 0.8069 $3,779,450 $855,559 $4,635,009
2031 $1,559,559,000 $1,271,477,894 3.5645 0.8069 $4,038,801 $914,268 $4,953,069
2032 $1,640,531,000 $1,352,449,894 3.5645 0.8069 $4,305,573 $974,658 $5,280,231
2033 $1,723,694,000 $1,435,612,894 3.5645 0.8069 $4,579,766 $1,036,727 $5,616,493
2034 $1,809,049,000 $1,520,967,894 3.5645 0.8069 $4,861,381 $1,100,476 $5,961,857
2035 $1,896,596,000 $1,608,514,894 3.5645 0.8069 $5,150,416 $1,165,906 $6,316,322
2036 $1,986,334,000 $1,698,252,894 3.5645 0.8069 $5,446,873 $1,233,015 $6,679,888
2037 $2,078,264,000 $1,790,182,894 3.5645 0.8069 $5,750,751 $1,301,804 $7,052,555
2038 $2,172,385,000 $1,884,303,894 3.5645 0.8069 $6,062,051 $1,372,273 $7,434,324
2039 $2,268,698,000 $1,980,616,894 3.5645 0.8069 $6,380,771 $1,444,423 $7,825,194
2040 $2,367,202,000 $2,079,120,894 3.5645 0.8069 $6,706,913 $1,518,252 $8,225,165
2041 $2,467,898,000 $2,179,816,894 3.5645 0.8069 $7,040,476 $1,593,761 $8,634,237
2042 $2,570,786,000 $2,282,704,894 3.5645 0.8069 $7,381,460 $1,670,950 $9,052,410
2043 $2,675,865,000 $2,387,783,894 3.5645 0.8069 $7,729,865 $1,749,819 $9,479,684
2044 $2,783,135,000 $2,495,053,894 3.5645 0.8069 $8,085,692 $1,830,367 $9,916,059
2045 $2,892,598,000 $2,604,516,894 3.5645 0.8069 $8,448,940 $1,912,596 $10,361,536
2046 $3,004,251,000 $2,716,169,894 3.5645 0.8069 $8,819,609 $1,996,505 $10,816,114
2047 $3,118,097,000 $2,830,015,894 3.5645 0.8069 $9,197,699 $2,082,094 $11,279,793
2048 $3,234,133,000 $2,946,051,894 3.5645 0.8069 $9,583,211 $2,169,362 $11,752,573
$149,760,050 $33,901,357 $183,661,407
Revenue (3)
Taxable Value (1)Tax Increment(2)
Millage
Year
Total
3.C.2.a.e
Packet Pg. 103 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-6
5.6
Table 5-6-4: Bayshore Beautification MSTU Scenario #1 Projected Revenues
Notes: there is a 5% statutory reduction requirement for counties when projecting for budget
Tax Year (FY)MSTU Valuation Budgeting
Adjustment Millage Projected
Revenue
2019 $591,115,003 95%2.3604 $1,325,504
2020 $625,527,320 95%2.3604 $1,402,670
2021 $660,034,619 95%2.3604 $1,480,048
2022 $694,831,419 95%2.3604 $1,558,076
2023 $730,024,175 95%2.3604 $1,636,992
2024 $765,674,832 95%2.3604 $1,716,934
2025 $801,819,577 95%2.3604 $1,797,984
2026 $838,478,945 95%2.3604 $1,880,188
2027 $875,663,295 95%2.3604 $1,963,570
2028 $913,375,780 95%2.3604 $2,048,136
2029 $951,615,129 95%2.3604 $2,133,883
2030 $990,376,372 95%2.3604 $2,220,800
2031 $1,029,652,374 95%2.3604 $2,308,872
2032 $1,069,434,646 95%2.3604 $2,398,079
2033 $1,109,713,336 95%2.3604 $2,488,399
2034 $1,150,478,225 95%2.3604 $2,579,809
2035 $1,191,719,137 95%2.3604 $2,672,287
2036 $1,233,425,692 95%2.3604 $2,765,809
2037 $1,275,588,082 95%2.3604 $2,860,353
2038 $1,318,196,940 95%2.3604 $2,955,898
2039 $1,361,243,853 95%2.3604 $3,052,426
2040 $1,404,721,160 95%2.3604 $3,149,919
2041 $1,448,622,279 95%2.3604 $3,248,362
2042 $1,492,941,782 95%2.3604 $3,347,743
2043 $1,537,675,538 95%2.3604 $3,448,053
2044 $1,582,820,738 95%2.3604 $3,549,286
2045 $1,628,375,926 95%2.3604 $3,651,438
2046 $1,674,341,360 95%2.3604 $3,754,510
2047 $1,720,718,577 95%2.3604 $3,858,505
2048 $1,767,510,764 95%2.3604 $3,963,431
Total -FY 2019-48:$77,217,964
3.C.2.a.e
Packet Pg. 104 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-7
5.6
Table 5-6-5: Bayshore Beautification MSTU Scenario #2 Projected Revenues
Notes: there is a 5% statutory reduction requirement for counties when projecting for budget
Tax Year (FY)MSTU Valuation Budgeting
Adjustment Millage Projected
Revenue
2019 $606,549,761 95%2.3604 $1,360,115
2020 $647,828,592 95%2.3604 $1,452,678
2021 $688,973,702 95%2.3604 $1,544,941
2022 $730,242,846 95%2.3604 $1,637,482
2023 $771,769,450 95%2.3604 $1,730,600
2024 $813,623,294 95%2.3604 $1,824,453
2025 $855,837,738 95%2.3604 $1,919,113
2026 $898,423,883 95%2.3604 $2,014,608
2027 $941,377,891 95%2.3604 $2,110,927
2028 $984,686,255 95%2.3604 $2,208,041
2029 $1,028,328,725 95%2.3604 $2,305,904
2030 $1,072,280,092 95%2.3604 $2,404,459
2031 $1,116,512,185 95%2.3604 $2,503,645
2032 $1,160,994,826 95%2.3604 $2,603,392
2033 $1,205,696,625 95%2.3604 $2,703,630
2034 $1,250,585,657 95%2.3604 $2,804,288
2035 $1,295,630,050 95%2.3604 $2,905,295
2036 $1,340,798,359 95%2.3604 $3,006,579
2037 $1,386,060,036 95%2.3604 $3,108,073
2038 $1,431,385,662 95%2.3604 $3,209,711
2039 $1,476,747,194 95%2.3604 $3,311,428
2040 $1,522,118,310 95%2.3604 $3,413,168
2041 $1,567,474,241 95%2.3604 $3,514,873
2042 $1,612,792,344 95%2.3604 $3,616,493
2043 $1,658,052,037 95%2.3604 $3,717,983
2044 $1,703,234,847 95%2.3604 $3,819,300
2045 $1,748,324,458 95%2.3604 $3,920,408
2046 $1,793,306,734 95%2.3604 $4,021,275
2047 $1,838,170,219 95%2.3604 $4,121,876
2048 $1,882,905,417 95%2.3604 $4,222,189
Total -FY 2019-48:$83,036,927
3.C.2.a.e
Packet Pg. 105 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-8
5.6
Table 5-6-6: Bayshore Beautification MSTU Scenario #3 Projected Revenues
Notes: there is a 5% statutory reduction requirement for counties when projecting for budget
Tax Year (FY)MSTU Valuation Budgeting
Adjustment Millage Projected
Revenue
2019 $618,846,476 95%2.3604 $1,387,689
2020 $666,424,041 95%2.3604 $1,494,376
2021 $714,013,673 95%2.3604 $1,601,090
2022 $761,898,751 95%2.3604 $1,708,467
2023 $810,218,308 95%2.3604 $1,816,817
2024 $859,037,223 95%2.3604 $1,926,288
2025 $908,377,891 95%2.3604 $2,036,928
2026 $958,236,209 95%2.3604 $2,148,730
2027 $1,008,590,342 95%2.3604 $2,261,643
2028 $1,059,406,499 95%2.3604 $2,375,592
2029 $1,110,642,628 95%2.3604 $2,490,483
2030 $1,162,251,104 95%2.3604 $2,606,209
2031 $1,214,180,327 95%2.3604 $2,722,654
2032 $1,266,376,232 95%2.3604 $2,839,697
2033 $1,318,783,498 95%2.3604 $2,957,214
2034 $1,371,346,270 95%2.3604 $3,075,079
2035 $1,424,008,878 95%2.3604 $3,193,169
2036 $1,476,716,929 95%2.3604 $3,311,361
2037 $1,529,416,999 95%2.3604 $3,429,534
2038 $1,582,057,896 95%2.3604 $3,547,575
2039 $1,634,590,626 95%2.3604 $3,665,373
2040 $1,686,968,643 95%2.3604 $3,782,825
2041 $1,739,148,306 95%2.3604 $3,899,831
2042 $1,791,089,012 95%2.3604 $4,016,302
2043 $1,842,753,405 95%2.3604 $4,132,153
2044 $1,894,107,627 95%2.3604 $4,247,309
2045 $1,945,121,181 95%2.3604 $4,361,701
2046 $1,995,767,160 95%2.3604 $4,475,268
2047 $2,046,022,279 95%2.3604 $4,587,959
2048 $2,095,866,709 95%2.3604 $4,699,730
Total -FY 2019-48:$90,799,046
3.C.2.a.e
Packet Pg. 106 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-9
5.6
Table 5-6-7: Haldeman Creek MSTU Scenario #1 Projected Revenues
Notes: there is a 5% statutory reduction requirement for counties when projecting for budget
Tax Year (FY)MSTU Valuation Budgeting
Adjustment Millage Projected
Revenue
2019 $121,367,536 95%1.0000 $115,299
2020 $128,526,521 95%1.0000 $122,100
2021 $135,704,827 95%1.0000 $128,920
2022 $142,942,896 95%1.0000 $135,796
2023 $150,262,704 95%1.0000 $142,750
2024 $157,677,032 95%1.0000 $149,793
2025 $165,193,225 95%1.0000 $156,934
2026 $172,815,346 95%1.0000 $164,175
2027 $180,545,373 95%1.0000 $171,518
2028 $188,383,756 95%1.0000 $178,965
2029 $196,329,988 95%1.0000 $186,513
2030 $204,382,850 95%1.0000 $194,164
2031 $212,540,650 95%1.0000 $201,914
2032 $220,801,394 95%1.0000 $209,761
2033 $229,162,805 95%1.0000 $217,705
2034 $237,622,632 95%1.0000 $225,742
2035 $246,178,462 95%1.0000 $233,870
2036 $254,827,995 95%1.0000 $242,087
2037 $263,568,960 95%1.0000 $250,391
2038 $272,399,253 95%1.0000 $258,779
2039 $281,316,833 95%1.0000 $267,251
2040 $290,320,002 95%1.0000 $275,804
2041 $299,407,206 95%1.0000 $284,437
2042 $308,577,110 95%1.0000 $293,148
2043 $317,828,658 95%1.0000 $301,937
2044 $327,161,143 95%1.0000 $310,803
2045 $336,574,094 95%1.0000 $319,745
2046 $346,067,305 95%1.0000 $328,764
2047 $355,641,019 95%1.0000 $337,859
2048 $365,295,793 95%1.0000 $347,031
Total -FY 2019-48:$6,753,955
3.C.2.a.e
Packet Pg. 107 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-10
5.6
Table 5-6-8: Haldeman Creek MSTU Scenario #2 Projected Revenues
Notes: there is a 5% statutory reduction requirement for counties when projecting for budget
Tax Year (FY)MSTU Valuation Budgeting
Adjustment Millage Projected
Revenue
2019 $124,558,218 95%1.0000 $118,330
2020 $133,140,017 95%1.0000 $126,483
2021 $141,695,436 95%1.0000 $134,611
2022 $150,277,871 95%1.0000 $142,764
2023 $158,914,679 95%1.0000 $150,969
2024 $167,620,097 95%1.0000 $159,239
2025 $176,400,756 95%1.0000 $167,581
2026 $185,258,652 95%1.0000 $175,996
2027 $194,192,721 95%1.0000 $184,483
2028 $203,199,877 95%1.0000 $193,040
2029 $212,275,571 95%1.0000 $201,662
2030 $221,414,344 95%1.0000 $210,344
2031 $230,610,047 95%1.0000 $219,080
2032 $239,856,126 95%1.0000 $227,863
2033 $249,145,751 95%1.0000 $236,688
2034 $258,472,054 95%1.0000 $245,548
2035 $267,828,164 95%1.0000 $254,437
2036 $277,207,234 95%1.0000 $263,347
2037 $286,602,686 95%1.0000 $272,273
2038 $296,008,161 95%1.0000 $281,208
2039 $305,417,647 95%1.0000 $290,147
2040 $314,825,418 95%1.0000 $299,084
2041 $324,226,118 95%1.0000 $308,015
2042 $333,614,832 95%1.0000 $316,934
2043 $342,987,111 95%1.0000 $325,838
2044 $352,338,908 95%1.0000 $334,722
2045 $361,666,688 95%1.0000 $343,583
2046 $370,967,365 95%1.0000 $352,419
2047 $380,238,358 95%1.0000 $361,226
2048 $389,477,595 95%1.0000 $370,004
Total -FY 2019-48:$7,267,918
3.C.2.a.e
Packet Pg. 108 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-11
5.6
Table 5-6-9: Haldeman Creek MSTU Scenario #3 Projected Revenues
Notes: there is a 5% statutory reduction requirement for counties when projecting for budget
Tax Year (FY)MSTU Valuation Budgeting
Adjustment Millage Projected
Revenue
2019 $127,106,206 95%1.0000 $120,751
2020 $136,994,758 95%1.0000 $130,145
2021 $146,888,010 95%1.0000 $139,544
2022 $156,844,298 95%1.0000 $149,002
2023 $166,892,038 95%1.0000 $158,547
2024 $177,044,257 95%1.0000 $168,192
2025 $187,305,175 95%1.0000 $177,940
2026 $197,673,490 95%1.0000 $187,790
2027 $208,144,221 95%1.0000 $197,737
2028 $218,709,954 95%1.0000 $207,774
2029 $229,361,500 95%1.0000 $217,893
2030 $240,088,574 95%1.0000 $228,084
2031 $250,880,014 95%1.0000 $238,336
2032 $261,724,194 95%1.0000 $248,638
2033 $272,609,257 95%1.0000 $258,979
2034 $283,523,220 95%1.0000 $269,347
2035 $294,454,148 95%1.0000 $279,731
2036 $305,390,372 95%1.0000 $290,121
2037 $316,320,528 95%1.0000 $300,505
2038 $327,233,622 95%1.0000 $310,872
2039 $338,119,195 95%1.0000 $321,213
2040 $348,967,293 95%1.0000 $331,519
2041 $359,768,601 95%1.0000 $341,780
2042 $370,514,490 95%1.0000 $351,989
2043 $381,196,966 95%1.0000 $362,137
2044 $391,808,847 95%1.0000 $372,218
2045 $402,343,563 95%1.0000 $382,226
2046 $412,795,427 95%1.0000 $392,156
2047 $423,159,430 95%1.0000 $402,001
2048 $433,431,416 95%1.0000 $411,760
Total -FY 2019-48:$7,948,927
3.C.2.a.e
Packet Pg. 109 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-12
5.6
5.6.3 Underlying Assumptions
The following charts show underlying population and tax value trends that inform and contextualize the revenue
projections calculations presented in this section. Figure 5-6-1 shows that the rate of population growth for
Collier County has decreased sizably since 2002/2003, with a more gradual decrease projected out from
2017/2018 for the next few decades.
In terms of historic tax value growth rates since 2000, Figure 5-6-2 shows that there was an increase during the
lead up to the recession, followed by a drop during the recession itself. In recent years, the rate has gradually
risen.
Given the sizable changes during the lead-up to the recession and the recession itself, the model used to
generate TIF projections was matched to longer historical trends in County taxable values, from the 1970s
through 2003/2004 historical taxable value for Collier County. Figure 5-6-3 shows the historical trend used for
guidance in blue; this trend is continued for comparison to projection calculations (in this case, for the low
revenue projections, shown by the grey line through 2048). The orange line indicates historic data that was
excluded from the historic trend basis since it was considered an anomaly.
Figure 5-6-1: Population Growth Rate Trends and Projections (2000-2045)
Source: BEBR, Volume 51, Bulletin 180, January 2018
3.C.2.a.e
Packet Pg. 110 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-13
5.6
Figure 5-6-2: Trends in Tax Value Growth Rates (2000-2017)
Source: Florida Property Valuations and Tax Databook & EDR Ad Valorem Revenue Estimating Conference
Figure 5-6-3: Historic and Projected TIF Revenue Trend Comparison for Low Revenue Projection
Source: Florida Property Valuations and Tax Databook & EDR Ad Valorem Revenue Estimating Conference
y = 67,809,839.76x2 -717,793,067.39x + 6,145,364,420.48
R² = 0.95
$0
$50,000,000,000
$100,000,000,000
$150,000,000,000
$200,000,000,000
$250,000,000,000
$300,000,000,000
$350,000,000,000
3.C.2.a.e
Packet Pg. 111 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
TAX INCREMENT & MSTU ESTIMATES
Bayshore Gateway Triangle CRA Area Plan—Draft March 2019 5-6-14
5.6
Conclusion
With the recovery from the recession of 2008, the CRA
area is poised for revitalization via investment,
development, and redevelopment. With this update,
the CRA will be able to continue the general mission of
redevelopment that it set out when the Bayshore
Gateway Triangle redevelopment area was first created
in 2000.
The CRA can move forward with the more detailed
planning and evaluation for the suggested
implementation items of this Redevelopment Area Plan
with the guidance of the overall vision, allowing for
change and also protecting and enhancing what
defines the area and makes it unique.
3.C.2.a.e
Packet Pg. 112 Attachment: Attachment 2 Change Sheet- Replace Section 5.6 TIF Increment (8406 : Bayshore Gateway Triangle Community Redevelopment
COLLIER COUNTY
COMMUNITY
REDEVELOPMENT
PLAN AMENDMENT
Collier County Board of County
Commissioners
March 26, 2019
3.C.2.a.f
Packet Pg. 113 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
CRA BACKGROUND
1
3.C.2.a.f
Packet Pg. 114 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COLLIER COUNTY CRA
2
Established Community Redevelopment Agency by Resolution 2000-83
•Declared BCC as Community Redevelopment Agency
•Separate, legal, entity
•Established local advisory boards
Adopted Collier County Community Redevelopment Plan by Resolution
2000-181
•Section 4 -Immokalee Redevelopment Area Plan
•Section 5 -Bayshore Gateway Triangle Redevelopment Area Plan
•CCPC found the plan consistent with the Collier County Comprehensive Plan
•Duration –30 years
3.C.2.a.f
Packet Pg. 115 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COLLIER COUNTY CRA PLAN AMENDMENT
3
Proposed Changes
•Section 1:
•Updated language regarding Consistency with the Growth Management Plan
•Incorporated Immokalee Boundary Expansion adopted in 2004
•Duration of CRA –extended time frame to 30 years (Maximum allowed under
F.S. 163, Part III)
•Section 4:
•Immokalee Redevelopment Area Plan -Updated Maps
•Figures and Appendices
Updated to reflect historic references and current conditions
3.C.2.a.f
Packet Pg. 116 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COLLIER COUNTY PLANNING COMMISSION
•Collier County Planning Commission March 21, 2019 Meeting:
•Re place Page 5-3-6 –to reflect comments received by Chairman Strain during
the Mach 21 CCPC Meeting to clarify the allowable densities listed in the Mini-
Tr iangle catalyst site. The change references Ordinance No. 2018-23 and provides
the approved development plan.
•CCPC Motion: Found the amendment consistent with the Growth Management Plan and
recommended the duration of the CRA remain at 2030 for the Bayshore Gateway Triangle
Area and extend the duration for the Immokalee area an additional 30 years.
4
3.C.2.a.f
Packet Pg. 117 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
SECTION 5 -
BAYSHORE GATEWAY
TRIANGLE
REDEVELOPMENT
AREA PLAN UPDATE
5
3.C.2.a.f
Packet Pg. 118 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
SECTION 5.6 –TA X INCREMENT & MSTU ESTIMATES
6
REPLACEMENT OF THE SECTION 5.6:
Update Revenue Tables to reflect consistency with proposed plan timeline:
Re place Pages 5.6.3 to 5.6.11
To correct estimates showing a start date of 2019 instead of 2017 and a final year of
collection in 2048 instead of 2049. Projecting 30 years of tax increment and MSTU
collections.
Re place Pages 5.6.1 and 5.6.2 and 5.6.12
To correct consistency with time frame
3.C.2.a.f
Packet Pg. 119 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
2000 REDEVELOPMENT PLAN:
LAND USE
7
Land Use Plan: projects and fo cus areas
•Catalyst Projects
•Tr iangle –Hotel/Restaurant/Office
•Tr iangle –Flex Office/Warehouse
•To wn Center (Gulfgate Plaza)
•Entertainment Center (Haldeman Creek)
•Neighborhood Focus Initiatives
•Shadowlawn
•Bayshore
Shadowlawn
Neighborhood
Bayshore
Neighborhood
Bayshore
Neighborhood
Naples Steel
Site
Naples
Plaza
Town Center
(Gulfgate)
Hotel/
Restaurant/
Office
Office/
Warehouse/
Showroom
Entertainment
Center
(Haldeman
Creek)
Courthouse
Shadows
County
Center
Botanical
Gardens/
Avalon Park
Lake
Bay Center
3.C.2.a.f
Packet Pg. 120 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
2000 REDEVELOPMENT PLAN:
LAND USE
8
•Infrastructure
•Tr iangle Stormwater Management Plan
•Haldeman Creek and Canal System
Dredging Plan
•Ro adway
•US 41 Zoning Overlay and Landscaping
•Davis Streetlighting and Zoning Overlay
•Bayshore Dr Landscaping
•Other TIF Projects
•Botanical Gardens Support
Shadowlawn
Neighborhood
Bayshore
Neighborhood
Bayshore
Neighborhood
Naples Steel
Site
Naples
Plaza
Town Center
(Gulfgate)
Hotel/
Restaurant/
Office
Office/
Warehouse/
Showroom
Entertainment
Center
(Haldeman
Creek)
Courthouse
Shadows
County
Center
Botanical
Gardens/
Avalon Park
Lake
Bay Center
3.C.2.a.f
Packet Pg. 121 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
2000 REDEVELOPMENT PLAN: URBAN DESIGN
9
Urban Design Framework: additional guidance
•Areas of Stability/Change
•Site Design
•Old Florida architecture
•Small front setbacks, parking in rear
•Rectilinear block pattern
•Landscape/Streetscape Improvements
•Gateway Intersection Designs
Image Source: MHK Architecture & Planning, http://www.mhkap.com/residential/
3.C.2.a.f
Packet Pg. 122 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
2000 REDEVELOPMENT PLAN: PROGRESS HIGHLIGHTS
10
Private Development
•Haldeman Creek commercial
•Naples Steel, Naples Plaza developed
•New market-rate residential
•Density pool units from Botanical Gardens
Ro adway /Infrastructure
•Davis Boulevard Improvements
•Neighborhood stormwater plans
•Stormwater, water/fire projects
•Haldeman Creek dredge
•Re moval of substandard housing
Catalyst Sites
•17-Acre Site acquired (former Botanical
Garden site)
3.C.2.a.f
Packet Pg. 123 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
2000/2019 PLAN
COMPARISON
11
3.C.2.a.f
Packet Pg. 124 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
HOW DOES 2019 PLAN COMPARE TO 2000?
12
New Vision & Plan Framework
•Vision statement, including arts and culture focus
•Goals, objectives, policy framework by theme
•Character/redevelopment overview by sub-area (Character Areas)
New/Updated Non-Capital Initiatives
•Branding, Marketing, Communications
•Community Safety & Clean-Up Strategy
•Housing upgrade/façade improvement grants
•Public arts grant program
3.C.2.a.f
Packet Pg. 125 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
HOW DOES 2019 PLAN COMPARE TO 2000?
13
New/Expanded Tra nsportation/Infrastructure Considerations
•Continued focus on walkability/connectivity
•Additional focus on parks access
•Expanded scope of roadway improvements –Complete Streets -neighborhood
and major
•Commercial parking needs and alternatives
•Expanded infrastructure considerations –geographic and type
Expanded/New Design Considerations
•Expanded gateway intersection treatments
•Inclusion of modern design style for Triangle
•Public arts grant program
3.C.2.a.f
Packet Pg. 126 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
HOW DOES 2019 PLAN COMPARE TO 2000?
14
Updated Neighborhood Improvements
•Continues Neighborhood Focus Initiatives
•Additional infrastructure, design, land use compatibility, and Complete
Streets considerations
•Support for neighborhood-identified projects/initiatives
Updated Catalyst Projects
•Key focus on CRA-owned sites in Mini Triangle and 17-Acre
•Potential to include multi-purpose facility (arts, incubator, CRA offices)
•Fostering private efforts –ex: Gulfgate, Courthouse, Haldeman Creek
commercial
3.C.2.a.f
Packet Pg. 127 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
2019 PLAN OVERVIEW
15
3.C.2.a.f
Packet Pg. 128 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
VISION CONCEPT
16
Promote quality of life and economic vitality with a
mixe d-income,urban, multi-modal community
that welcomes visitors, cultivate s the area’s artistic
and cultural identity, uplifts unique local
destinations, and finds balance with the natural
environment.
3.C.2.a.f
Packet Pg. 129 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
LAND USE & DESIGN
Goal: Pro mote a defined, harmonious, and
urban visual and land use character
ta ilored to the CRA area, cultivating its
unique artistic and cultural identity.
17
3.C.2.a.f
Packet Pg. 130 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
LAND USE & DESIGN: STYLE
18 Image Source: Bottom left -Modern design of The Garden School (Source: Corban Architecture/Planning/Sustainability, http://www.davidcorban.com/the-garden-school/)
3.C.2.a.f
Packet Pg. 131 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
LAND USE & DESIGN: URBAN FORM
19
3.C.2.a.f
Packet Pg. 132 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
LAND USE & DESIGN: PUBLIC ART &GATEWAY
20
3.C.2.a.f
Packet Pg. 133 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
LAND USE & DESIGN:
TRANSITIONS
21
Needed Land
Use Transitions
Building
Green/Open Space
Pa rking /Landscape
Intensity
3.C.2.a.f
Packet Pg. 134 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PUBLIC SPACE, PARKS, & OPEN SPACE
22
Goal: Ensure accessible, activated, and
well-mainta ined public spaces, parks, and
open space.
3.C.2.a.f
Packet Pg. 135 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PUBLIC SPACE, PARKS, & OPEN SPACE
23 Images: East Naples Community Park and Sugden Regional Park –Collier County Parks & Recreation Division
Gateway
Tr iangle Pond
Design
3.C.2.a.f
Packet Pg. 136 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
DEVELOPMENT
Goal: Fo ster and guide private
development to enhance community
character and provide increased sta bility
and prosperity fo r community members.
24
3.C.2.a.f
Packet Pg. 137 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
DEVELOPMENT
25
Linwood Ave
Gulfgate Plaza
Del’s 24
Bayshore Dr
Courthouse Shadows
11
4433
22
55
Development/
Te nancy
Opportunities
3.C.2.a.f
Packet Pg. 138 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
TRANSPORTAT ION & WA LKABILITY
Goal: Ensure safe ty, comfo rt, and
conve nience fo r va rious modes within and
co nnecting with the CRA area.
26
3.C.2.a.f
Packet Pg. 139 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
27
TRANSPORTAT ION &
WA LKABILITY
Images: Slidr -https://www.paradisecoast.com/profile/slidr/1726, parking garage -https://www.naplesdowntown.com/transportation.htm,
Complete Streets
Recommendations
3.C.2.a.f
Packet Pg. 140 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
28
TRANSPORTAT ION & WA LKABILITY:
MAJOR COMPLETE STREET
3.C.2.a.f
Packet Pg. 141 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
29
TRANSPORTAT ION & WA LKABILITY:
NEIGHBORHOOD COMPLETE STREET
3.C.2.a.f
Packet Pg. 142 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
INFRASTRUCTURE
Goal: Pro vide effective infrastructure that
preserve s environmental and neighborhood
design quality through coordinated
improvement planning and funding.
30
3.C.2.a.f
Packet Pg. 143 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
INFRASTRUCTURE
31 Images: fire suppression construction –Bayshore/Gateway Triangle CRA, Palmetto green infrastructure bulb-out –Google Maps
3.C.2.a.f
Packet Pg. 144 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PROCESS
Goal: Carry out CRA area planning and
implementation efforts to engage and
ser ve the va rious communities within the
CRA area.
32
3.C.2.a.f
Packet Pg. 145 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PROCESS
33
3.C.2.a.f
Packet Pg. 146 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
34
3.C.2.a.f
Packet Pg. 147 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
CHARACTER AREAS
35
1.Mini Triangle/Davis
2.Shadowlawn
3.Airport Pulling
4.Ta miami
5.Windsta r
6.North Bayshore
7.South Bayshore
Focus Corridor Focus Development
Node/Intersection
3.C.2.a.f
Packet Pg. 148 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COST & FUNDING SUMMARY:SHORT-TERM
36
To tal Short-Te rm Costs
(1-5 Years):
$25.0 million
3.C.2.a.f
Packet Pg. 149 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PROJECT SUMMARY:SHORT-TERM
37
To tal Short-Te rm Costs
(1-5 Years):
$25.0 million
Capital Projects:
•Complete Street Initiative:
•Linwood Avenue -Commercial to Wild Pines
•Republic Dr. –Bayshore to East Naples
Community Park
•Danford Street –Bayview Park to Hamilton
•Connection to Sugden Pa rk
•Community Safety/Neighborhood Focus Initiatives
•Surface Parking Lot
•General Road Improvements
•Gateway Intersection
•Street Sign/Wayfinding
•Multi-modal amenities
•Stormwater Improvements
•Wa ter line and Fire Suppression Upgrades
•Sanitary Sewer Line Upgrades
Non-Capital:
•Complete Street Feasibility Study
•Land Development Code Updates
•Tr iangle Retention Pond Feasibility Study
•Stormwater Master Plan Update
•Arts and Cultural Master Plan
•Branding /Marketing /Communication Strategy
•Residential Grants/Loans
•Incentives/Grants for Commercial
Development
•Staff and Administrative Costs
3.C.2.a.f
Packet Pg. 150 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COST & FUNDING SUMMARY:MID-TERM
38
To tal Mid-Te rm Costs
(6-15 Years):
$57.9 million
3.C.2.a.f
Packet Pg. 151 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PROJECT SUMMARY:MID-TERM
39
Capital Projects:
•Tr iangle Retention Pond Improvements
•Bicycle and Pedestrian Trail along Sugden Park
•Community Safety/Neighborhood Focus Initiatives
•Surface Parking Lot in Mini-Tr iangle area
•Construction of multi-purpose facility –arts
incubator/CRA Office
•Commercial Parking Garage
•Local Street Improvements
•Gateway Intersection Design Improvements
•General Road Engineering improvements
•Wa ter line and Fire Suppression Upgrades
•Sanitary Sewer Line Upgrades
•Undergrounding Utilities along Bayshore
Non-Capital:
•Land Development Code Updates
•Complete Streets Feasibility Study
•Microenterprise and art incubator study
•Continued and expanded grant programs
•Staff and Administrative Costs
To tal Mid-Te rm Costs
(6-15 Years):
$57.9 million
3.C.2.a.f
Packet Pg. 152 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COST & FUNDING SUMMARY:LONG-TERM
40
To tal Long-Te rm Costs
(16-30 Years):
$74.5 million
3.C.2.a.f
Packet Pg. 153 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
PROJECT SUMMARY:LONG-TERM
41
Capital Projects:
•South Bayshore Drive Complete Street Improvements
•Commercial Parking Garage –Mini Triangle
•Sidewalk/Bicycle Infrastructure
•Land Acquisition for pocket parks
•Community Safety/Neighborhood Focus Initiatives
•Local Street Improvements
•Gateway Intersection Design Improvements
•General Road Engineering improvements
•Wa ter line and Fire Suppression Upgrades
•Sanitary Sewer Line Upgrades
•Undergrounding Utilities along Linwood/Commercial
Non-Capital:
•Studies/Analysis as identified
•Complete Street Feasibility Studies
•Continued and expanded grant programs
•Staff and Administrative Costs
To tal Long-Te rm Costs
(16-30 Years):
$74.5 million
3.C.2.a.f
Packet Pg. 154 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COST & FUNDING SUMMARY:TIF FUNDING SUMMARY
42
TIF Funding Summary To tal Overall Short-Te rm
(1-5 Years)
Mid-Te rm
(6-15 Years)1
Long Term
(16-30 Years)2
To tal Capital Costs -North of US 41 (Triangle)$42,665,594 $4,916,110 $11,505,545 $26,243,939
To tal Capital Costs -South of US 41 (Bayshore)$44,859,243 $7,790,481 $24,978,149 $12,090,612
To tal Capital Costs $87,524,836 $12,706,591 $36,483,694 $38,334,552
To tal Non-Capital Costs $69,915,363 $12,315,280 $21,449,912 $36,150,171
To tal TIF Revenue $154,417,778 $10,831,197 $39,256,457 $104,330,124
Difference -$3,022,421 -$14,190,674 -$18,677,149 $29,845,401
1 Overall period costs increased by 15% to account for annual increases
2 Overall period costs increased by 30% to account for annual increases
3.C.2.a.f
Packet Pg. 155 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
COST & FUNDING SUMMARY:PROJECTED REVENUES
43
Fund Revenue
Short Term
To tal
Mid
Te rm Total
Long
Te rm Total To tal
(1-5 Yr s)(6-15 Yrs)(16-30 Yr s)
Ta x Increment Financing (TIF)$10,831,197 $39,256,457 $104,330,124 $154,417,778
Bayshore Beautification MSTU $7,403,290 $20,956,845 $48,857,829 $77,217,964
Haldeman Creek MSTU $644,865 $1,831,442 $4,277,648 $6,753,955
3.C.2.a.f
Packet Pg. 156 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
FURTHER CONSIDERATIONS
•The original CRA was approved in 2000 for 30 years –approximately 11 years remain in
the lifetime. Plans are reevaluated every five years.
•The proposed Plan Amendment would extend the life by 30 years to 2049.
•The proposed Plan Amendment does not obligate funding to listed projects, but serves as
a guide for capital and non-capital projects that TIF can fund if approved.
•Section 4 –Immokalee Redevelopment Plan update is planned in FY20 –per F.S. 163,
extension can be considered any time the plan is amended.
44
3.C.2.a.f
Packet Pg. 157 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
TIF REVENUE CONSIDERATIONS
45
•Initial TIF funding occurred FY01 –through 2019:
•Bayshore: $22,631,017
•Immokalee: $8,659,135
•Est. TIF for the proposed 30 year term:
•Bayshore: $154,400,000 -$183,600,000
•Immokalee: $46,200,000 -$54,400,000
•Bayshore CRA holds current debt of $4,380,589 –will be satisfied
by sale of Triangle Pro perties or within original CRA term
$8,659,135 $22,631,017
$46,200,000
$154,400,000
Immokalee Bayshore
TIF Revenue
2000-2019 2019-2049 (est.)
3.C.2.a.f
Packet Pg. 158 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
CRA EXTENSION OPTIONS
46
OPTION 1:Adopt the redevelopment plan amendment as is and ex tend the life of the CRA
until 2049.
OPTION 2:Adopt the proposed plan amendment with no time ex tension and wait fo r
completion of the Immokalee Redevelopment Plan update (est.FY20)to consider
ex tension of the term of the CRA.
OPTION 3:Adopt the proposed plan amendment with no time ex tension and evaluate
progress on the plan in 5 years as prescribed to consider any ex tension then.
3.C.2.a.f
Packet Pg. 159 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
ANY QUESTIONS?
Recommendation:
Collier County Community Redevelopment Agency adopt a Resolution recommending to the Board of County Commissioners adopt an amendment to the Collier County Community Redevelopment Plan with the proposed changes presented.
Board of County Commissioners adopt a Resolution amending the Collier County Community Redevelopment Plan with the proposed changes.
Presentation | Date47
3.C.2.a.f
Packet Pg. 160 Attachment: CRA Plan Amendment Update (BCC March 26 Presentation) (8406 : Bayshore Gateway
1
Office of the County Manager
Collier County CRA MEMO
DATE: March 27, 2019
TO: Leo E. Ochs, Jr., County Manager
Nick Casalanguida, Deputy County Manager
Sean Callahan, Executive Director of Corp Business Ops
FROM: Debrah Forester, CRA Director
SUBJECT: Bayshore/Gateway Mini Triangle Property Status Report
Below is a brief overview of the current project status concerning the acquisition of the 5.27-acre site in the
Bayshore/Gateway Triangle CRA by Real Estate Partners International, LLC (REPI).
Real Estate Purchase Agreement:
Approved and fully executed agreement dated May 9, 2016
First Amendment approved September 27, 2016- Approved a modification to the Land Use Entitlement, revising
the Site Plan and removed references to height and density served as “Height Notice”.
Second Amendment - Administrative Approval to extend Inspection Period to October 28, 2016
Third Amendment approved October 25, 2016 – approves a cost sharing formula to relocate the cell tower:
• First $250,000 from Seller’s funds held in escrow
• Next $500,000 to $750,000 will be shared equally dollar for dollar by Seller and Purchaser
• Anything above $750,000 will come from the Seller’s funds and repaid from Tax Increment
Fourth Amendment approved July 10, 2018 - Extends the closing to 30 days after the termination of the lease
with Crown Castle and the removal and decommissioning of the cell tower and allows the earnest money
deposited ($637,296) to be used to disburse per the cell tower relocation agreement approved in July 18, 2018.
Purchaser will be credited, as appropriate, to bear a share of the cost to relocate the cell tower. If closing
doesn’t occur due to failure to relocate the tower, seller is obligated to refund the amount released from escrow.
Escrow: Earnest Money - Total Due $637,295.90. Current Balance -
Total Escrow deposited with Wells Fargo (non-interest-bearing account) - $637,296
August 2, 2018 - $70,000 transfer to Crown Castle per the Cell Tower Agreement
Escrow Balance - $567,296
Escrow will continue to be used to pay Crown Castle as outlined in the Cell Tower Agreement
Land Use Entitlements:
• Zoning Approved – May 8, 2018 Mini-Triangle MPUD Ordinance 2018-23
• Small Scale Plan Amendment – approved May 8, 2018
3.C.2.a.g
Packet Pg. 161 Attachment: Gateway Triangle Status Report - 03.27.19 Update (8406 : Bayshore Gateway Triangle Community Redevelopment Area)
2
Easement and Shared Access – On March 26, 2019, the CRAB approved granting an easement to provide
shared access between the CRA property and the adjacent property owner – London of Naples. This
easement will facilitate the development of the property.
Height Approval
Naples Municipal Airport agreed to Height at 160 feet above the established elevation of the Naples
Municipal Airport (168 ft above mean sea level) during the rezoning of the property and negotiated by REPI.
Declaration of Height Restrictions is awaiting signature between the appropriate parties. Staff is reviewing t he
item to bring forward an agreement between the Naples Municipal Airport and the CRAB for consideration.
Moving forward on this agreement prior to closing will help facilitate development.
Cell Tower
On July 18, 2018 the Agreement Regarding the Cell Tower was fully executed between Collier County CRA
and Crown Castle. The agreement includes the following conditions:
• CRA will pay Crown Castle a total of $1,000,000 (50% paid by contract purchaser - REPI)
• First Payment - $70,000 within 30 days of Fully Executed Agreement for due diligence and design
phase
• Second Payment - $330,000 due within 30 days of Construction Notice
• Final Payment - $600,000 due with 30 days of notice that the Cell Tower located on the CRA property
has been decommissioned and removed.
On March 29, 2018 – Crown Received a Notice of Presumed Hazard from FAA.
Crown is pursuing two options:
• They resubmitted to FAA on March 4, 2019 clarifying that only one new tower would be located at
Kirkwood and it would be the number of towers that would be at the Kirkwood Site. On March 22,
2019 they received notice that the application had been updated to “work status” triggering the
review process.
• They are preparing an application to Collier County to request a variance to allow two towers at the
Kirkwood site, if FAA doesn’t provide an exception to the notice of presumed hazard, the new tower would
be 153’ tower next to the existing 180’ at Kirkwood to accommodate all carriers.
SDPI was approved by the County on January 04, 2019 for the removal and replacement of the existing tower
on Kirkwood with the proposed 180 feet new tower, which is 2 feet lower than the current tower on the CRA
site.
3.C.2.a.g
Packet Pg. 162 Attachment: Gateway Triangle Status Report - 03.27.19 Update (8406 : Bayshore Gateway Triangle Community Redevelopment Area)