Loading...
Agenda 03/26/2019 Item #16A 416.A.4 03/26/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Oyster Harbor at Fiddler's Creek Phase 2A, PL20160001312 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex -Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Oyster Harbor at Fiddler's Creek Phase 2A has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on August 19, 2016. At that time, the value of these potable water and sewer utility facilities (assets) was $135,290.69 and $130,256, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed, and Bill of Sale recorded in Official Records Book 5314, at Page 3444, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on February 13, 2019, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount of $4,000. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $265,546.69 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. Packet Pg. 496 03/26/2019 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Oyster Harbor at Fiddler's Creek Phase 2A, PL20160001312 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.4 Packet Pg. 497 16.A.4 03/26/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.4 Doe ID: 8083 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Oyster Harbor at Fiddler's Creek Phase 2A, PL20160001312 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 03/26/2019 Prepared by: Title: Technician — Growth Management Development Review Name: Lucia Martin 02/19/2019 3:08 PM Submitted by: Title: Project Manager, Principal — Growth Management Department Name: Matthew McLean 02/19/2019 3:08 PM Approved By: Review: Water Steve Messner Additional Reviewer Wastewater Steve Nagy Additional Reviewer Water Pamela Libby Additional Reviewer Wastewater Beth Johnssen Additional Reviewer Public Utilities Planning and Project Management Tom Chmelik Engineering & Natural Resources Jack McKenna Additional Reviewer Growth Management Operations & Regulatory Management Stephanie Amann Growth Management Department Judy Puig Level 1 Reviewer Growth Management Department Matthew McLean Additional Reviewer Growth Management Department James C French Deputy Department Head Review County Attorney's Office Scott Stone Level 2 Attorney Review Growth Management Department Thaddeus Cohen Department Head Review County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Budget and Management Office Mark Isackson Additional Reviewer County Manager's Office Heather Yilmaz Level 4 County Manager Review Completed 02/19/2019 3:10 PM Completed 02/19/2019 3:14 PM Completed 02/19/2019 3:16 PM Completed 02/19/2019 3:22 PM Additional Reviewer Completed Completed 02/19/2019 4:56 PM Additional Reviewer Completed Completed 02/20/2019 4:13 PM Completed 02/25/2019 10:14 AM Completed 02/25/2019 8:12 PM Completed 02/26/2019 8:12 AM Completed 02/28/2019 9:35 AM Completed 02/28/2019 9:59 AM Completed 03/08/2019 3:16 PM Completed 03/11/2019 9:39 AM Completed 03/18/2019 8:49 AM Packet Pg. 498 16.A.4 03/26/2019 Board of County Commissioners MaryJo Brock Meeting Pending 03/26/2019 9:00 AM Packet Pg. 499 OYSTER HARBOR AT FIDDLER'S CREEK PHASE 2A SITE � r LLJ 18 1� w �'VD�lPFR 23 19 22 FJf]DLtf2'S CREEK PARK WA Y. MAINSAIL DR. 30 LOCATION MAP 14 2� 2-9 16.A.4.a CL m m 0 0 J c d E z a Packet Pg. 500 Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.4.b X LU r c m E r r Q Packet Pg. 501 Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2016336327 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.4.b X LU r c m E r r Q Packet Pg. 501 VERIFICATION OF FINAL COST (WATER) PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: Oyster Harbor at Fiddler's Creek PH 2A Section 13, Township 51 S, Range 26 E Collier County, Florida Taylor Morrison of Florida, Inc. 9401 Corkscrew Palms Circle Estero, FL 33928 TYPE OF UTILITY SYSTEM: POTABLE WATER (Material and Services) ITEM I SIZE= 1QUANTITY11 UNIT I COST I TOTAL DR -18 PVC Watermain 8" 3,355 LF $ 18.00 $ 60,390.00 DR -14 PVC Watermain 8" 106 LF $ 21.00 $ 2,226.00 DR -18 PVC Watermain 10" 773 LF $ 25.00 $ 19,325.00 DR -14 PVC Watermain 10" 39 LF $ 29.00 $ 1,131.00 Gate Valve wl Box 8" 6 EA $ 1,300.00 $ 7,800.00 Gate Valve wl Box 10" 2 EA $ 1,780.00 $ 3,560.00 Fire Hydrant Assembly wl Valve NIA 12 EA $ 4,100.00 $ 49,200.00 Single Water Service NIA 20 EA $ 755.00 $ 15,100.00 Double Water Service NIA 34 EA $ 960.00 $ 32,640.00 Temporary Blow Off NIA 5 EA $ 1,860.00 $ 9,300.00 Automatic Flushing Device NIA 3 EA $ 8,020.00 $ 24,060.00 Testing & Chlorination NIA 1 LS $ 17,000.00 $ 17,000.00 Permanent Bacteria Sample Point NIA 2 EA $ 1,500.00 $ 3,000.00 do hereby certify representation of 1 CERTIFYING: TOTAL COST $ 244,732.00 quantities of material and services described above are a true and accurate stalled cost of the system. L.['Neal, Vice PrYsident OF: Mitchell & Stark Construction Co., Inc. 6001 Shirley Street Naples, FL 34109 STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this 22 nd day of June , 2016 by L.D. Neal who is personally known to me and who did not ta k7n oath. SEAL. N ublic 16.A.4.b r Q BELINDA BURGBACHER <.; kly COMMISS310N N FF 162074 EXP?RES: January 2?, 2019 RQP.Jad Tlru N. -ry PXt Uiu'erwo" I Packet Pg. 502 VEOMICATION OF FINAL COST (SEWER) v PROJECT NAME: Oyster Harbor at Fiddler's Creek PH 2A LOCATION: Section 13, Township 51 S, Range 26 E Collier County, Florida NAME AND ADDRESS OF OWNER: Taylor Morrison of Florida, Inc. 9401 Corkscrew Palms Circle Estero, FL 33928 TYPE OF UTILITY SYSTEM: SANITARY SEWER (Material and Services) BEL114DA,BURGBACHER ITEM I SIZE JQIJANTITYJ UNIT I COST I TOTAL PVC Sanitary Sewer Main 8" 4,356 LF $ 29.09 $ 126,716.04 Manhole 4' 17 EA $ 6,150.00 $ 104,550.00 Manhole Drop Connection 1 EA $ 3,000.00 $ 3,000.00 Single and Double Sewer Services 6" 49 EA $ 990.00 $ 48,510.00 6" PVC Forcemain (C900, DR 18) 6" 719 EA $ 17.10 $ 12,294.90 6" PVC Forcemain (C900, DR 14) 6" 70 EA $ 20.25 $ 1,417.50 6" Plug Valve 6" 1 EA $ 1,690.00 $ 1,690.00 Air Release Valve 1 EA $ 5,970.00 $ 5,970.00 TOTAL COST $ 304,148.44 do hereby certify that theantities of material and services described above are a true and accurate representation of the as- 6Valled cost of the system . CERTIFYING: L.D. N�<Vice President OF: Mitchell & Stark Construction Co., Inc. 6001 Shirley Street Naples, FL 34109 STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this 3 rd day of June , 2016 by L.D. Neal who is personally known to me and who did not t e an oath. V SEAL: Not ublic 16.A.4. b Packet Pg. 503 BEL114DA,BURGBACHER MY COMRS&ON # FF 162074 s = a �•'F'F; x EXPIRE January 22, 2019 LU Bonded Thv notary PeClc L`n;.enrrae:s . . �..:�' rr d E L V w w Q Packet Pg. 503 Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Description Utility Performance Refundable Bond Cashier Name: Batch Number: Entered By: Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT 2016336327 2016-042965 07/14/2016 $4,000.00 Payment Method Amount Paid Check $4,000.00 $4,000.00 $0.00 FC OYSTER HARBOR 8156 FIDDLERS CREEK PARKWAY NAPLES, FL 34114 Reference Number PL20160001312 ElizabethMendez 5466 melissaalvarez Check Number 000216 Original Amount GL Account Fee Paid $4,000.00 $4,000.00 670-000000-220113 x LU r c m E r r Q Packet Pg. 504 16.A.4.c CERTIFICATION OF CONTRIBUTORY ASSETS (WATER) PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER Oyster Harbor at Fiddler's Creek PH 2A Section 13, Township 51 S, Range 26 E Collier County, Florida Taylor Morrison of Florida, Inc. 9401 Corkscrew Palms Circle Estero, FL 33928 TYPE OF UTILITY SYSTEM: POTABLE WATER (Material Only) ITEM I SIZE 1QUANTITY1 UNIT I COST I TOTAL DR -18 PVC Watermain 8" 3,355 LF $ 9.01 $ 30,228.55 DR -14 PVC Watermain 8" 106 LF $ 11.66 $ 1,235.96 DR -18 PVC Watermain 10" 773 LF $ 16.43 $ 12,700.39 DR -14 PVC Watermain 10" 39 LF $ 19.61 $ 764.79 Gate Valve wl Box 8" 6 EA $ 890.00 $ 5,340.00 Gate Valve wl Box 10" 2 EA $ 1,378.00 $ 2,756.00 Fire Hydrant Assembly wl Valve NIA 12 EA $ 2,597.00 $ 31,164.00 Single Water Service NIA 20 EA $ 371.00 $ 7,420.00 Double Water Service NIA 34 EA $ 509.00 $ 17,306.00 Temporary Blow Off NIA 5 EA $ 1,357.00 $ 6,785.00 Automatic Flushing Device NIA 3 EA $ 5,200.00 $ 15,600.00 Testing & Chlorination NIA 1 LS $ 2,000.00 $ 2,000.00 Permanent Bacteria Sample Point NIA 2 EA $ 995.00 $ 1,990.00 TOTAL COST $ 135,290.69 1 do hereby certify that thequantities of material described above are a true and accurate representation of the sy*m being contributed to Collier County Utilities, Inc. CERTIFYING: L.D. Nebl, Vice PresideW OF: Mitchell 8 Stark Construction Co., Inc. 6001 Shirley Street Naples, FL 34109 STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this 22 nd day of June , 2016 by L.D. Neal who is personally known to me and who did not to an oath. �- -r SEAL: No a lic Q CGAih115S101' p FF 13 74 EXPItRES; January 22.2019 _ _ ra Iktey huMr _�ndeeW,AOrs _.� Packet Pg. 505 CERTIFICAMON OF CONTRIBUTORY ASSETS (SMER) PROJECT NAME: Oyster Harbor at Fiddler's Creek PH 2A LOCATION: Section 13, Township 51 S, Range 26 E Collier County, Florida NAME AND ADDRESS OF OWNER: Taylor Morrison of Florida, Inc. EXPIPES: January 22, 2019 bonded ihru tJotsry Puha U.ndenvnters i 9401 Corkscrew Palms Circle Estero, FL 33928 TYPE OF UTILITY SYSTEM: SANITARY SEWER (Material Only) ITEM SIZE [QUANTITYI UNIT I COST TOTAL PVC Sanitary Sewer Main 8" 4,356 LF $ 9.00 $ 39,204.00 Manhole 4' 17 EA $ 3,300.00 $ 56,100.00 Manhole Drop Connection 1 EA $ 1,500.00 $ 1,500.00 Single and Double Sewer Services 6" 49 EA $ 410.00 $ 20,090.00 PVC Forcemain (C900, DR 18) 6" 719 EA $ 10.00 $ 7,190.00 PVC Forcemain (C900, DR 14) 6" 70 EA $ 12.00 $ 840.00 Plug Valve 6" 1 EA $ 1,120.00 $ 1,120.00 Air Release Valve 1 EA $ 4,212.00 $ 4,212.00 TOTAL COST $ 130,256.00 1 do hereby certify that the ntities of material described above are a true and accurate representation of the sys being contributed to Collier County Utilities, Inc. CERTIFYING: L.D. Neal, Vice President OF: Mitchell & Stark Construction Co., Inc. 6001 Shirley Street Naples, FL 34109 STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this 3 rd day of June , 2016 by L.D. Neal who is personally known to me and who did n take an oath. ~` SEAL, j(drary Public BELINDA BURGOACHER MY COMM?SSI(A k FF 162074 EXPIPES: January 22, 2019 bonded ihru tJotsry Puha U.ndenvnters i 16.A.4.c Packet Pg. 506