EXECUTIVE SUMMARY
Recommendation to approve final acceptance of the potable water and sewer facilities for All
Seasons, PL20170002720, accept unconditional conveyance of a portion of the potable water and
sewer facilities, and to authorize the County Manager, or his designee, to release the Utilities
Performance Security (UPS) and Final Obligation Bond in the total amount of $24,909.94 to the
Project Engineer or the Developer's designated agent.
OBJECTIVE: To have the Board of County Commissioners, as Ex -Officio Governing Board of the
Collier County Water -Sewer District, approve final acceptance of the potable water and sewer facilities,
accept unconditional conveyance of a portion of the potable water and sewer facilities, and to release the
Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $24,909.94, in
accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31.
CONSIDERATIONS:
1) The Developer of All Seasons, has constructed the potable water and sewer facilities within
dedicated easements to serve this private development (see attached location map). A portion of the
potable water and sewer facilities will be conveyed to the County, as described in Official Records
(O.R.) Book 5441, Page (PG) 2694. The remaining potable water and sewer facilities will be private.
2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on
October 19, 2017. At that time, the value of these potable water and sewer utility facilities (assets)
was $2,087.83 and $1,447.52, respectively. (See attached asset sheet).
3) Staff recorded all preliminary acceptance documents associated with the potable water and sewer
facilities conveyed to the County in the public records of Collier County, which were reviewed and
approved by the County Attorney's office as to form and legality. The County acquired its interest in
a portion of the potable water and sewer facilities by Utilities Facilities Warranty Deed and Bill of
Sale recorded in Official Records Book 5441, at page 2694 of the Public Records of Collier County,
Florida.
4) The potable water and sewer utility facilities have been operated and maintained during the required
one (1) year warranty period, following preliminary acceptance.
5) A final inspection to discover defects in materials and workmanship has been conducted by staff on
February 15, 2019, in coordination with Public Utilities, and these facilities have been found to be
satisfactory and acceptable.
6) The on-site potable water and sewer utilities, less the potable water and sewer utilities described in
O.R. Book 5441, PG 2694, are owned and maintained by the developer.
7) Staff recommends final acceptance of the subject utility facilities and to release the Utility
Performance Security (UPS) and Final Obligation Bond in the total amount of $24,909.94. (See
attached Exhibit A).
8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended.
9) Staff is unaware of any issues that would serve to negate the recommendation to release the
applicable security.
Packet Pg. 467
03/26/2019
FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water -Sewer
District receiving unconditional title to a portion of the potable water and sewer utility facilities, which at
the time of preliminary acceptance, had a total gross value of $3,565.35 (no depreciation applied) and an
asset will be recorded in the financial records of the county.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this
action.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval -SAS
RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for All
Seasons, PL20170002720, accept unconditional conveyance of a portion of the potable water and sewer
facilities, and to authorize the County Manager, or his designee, to release the Utilities Performance
Security (UPS) and Final Obligation Bond in the total amount of $24,909.94 to the Project Engineer or
the Developer's designated agent.
Prepared by: Lucia S. Martin, Technician, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Exhibit A (PDF)
3. Contributory Assets (PDF)
16.A.3
Packet Pg. 468
16.A.3
03/26/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.3
Doe ID: 8080
Item Summary: Recommendation to approve final acceptance of the potable water and sewer
facilities for All Seasons, PL20170002720, accept unconditional conveyance of a portion of the potable
water and sewer facilities, and to authorize the County Manager, or his designee, to release the Utilities
Performance Security (UPS) and Final Obligation Bond in the total amount of $24,909.94 to the Project
Engineer or the Developer's designated agent.
Meeting Date: 03/26/2019
Prepared by:
Title: Technician — Growth Management Development Review
Name: Lucia Martin
02/19/2019 2:56 PM
Submitted by:
Title: Project Manager, Principal — Growth Management Department
Name: Matthew McLean
02/19/2019 2:56 PM
Approved By:
Review:
Water
Pamela Libby
Additional Reviewer
Water
Steve Messner
Additional Reviewer
Wastewater
Beth Johnssen
Additional Reviewer
Wastewater
Steve Nagy
Additional Reviewer
Public Utilities Planning and Project Management
Tom Chmelik
Engineering & Natural Resources
Jack McKenna
Additional Reviewer
Growth Management Operations & Regulatory Management Stephanie Amann
Growth Management Department
Judy Puig
Level 1 Reviewer
Growth Management Department
Matthew McLean
Additional Reviewer
Growth Management Department
James C French
Deputy Department Head Review
County Attorney's Office
Scott Stone
Level 2 Attorney Review
Growth Management Department
Thaddeus Cohen
Department Head Review
County Attorney's Office
Jeffrey A. Klatzkow Level 3 County Attorney's Office Review
Office of Management and Budget
Valerie Fleming
Level 3 OMB Gatekeeper Review
Budget and Management Office
Mark Isackson
Additional Reviewer
Completed
02/19/2019 2:57 PM
Completed
02/19/2019 3:01 PM
Completed
02/19/2019 3:04 PM
Completed
02/19/2019 3:13 PM
Additional Reviewer
Completed
Completed
02/19/2019 4:58 PM
Additional Reviewer
Completed
Completed
02/20/2019 4:07 PM
Completed
02/25/2019 10:11 AM
Completed
02/25/2019 8:11 PM
Completed
02/26/2019 8:10 AM
Completed
02/28/2019 9:34 AM
Completed
02/28/2019 9:59 AM
Completed
03/08/2019 3:05 PM
Completed
03/11/2019 9:37 AM
Packet Pg. 469
County Manager's Office
Board of County Commissioners
Heather Yilmaz Level 4 County Manager Review
Mary,lo Brock Meeting Pending
16.A.3
03/26/2019
Completed 03/18/2019 8:39 AM
03/26/2019 9:00 AM
Packet Pg. 470
16.A.3.a
ALL SEASONS
-,yrV
s LI C re c .
Ike
da ''RlaiAd
7
.Ltiteita�+idei,
- b0utr, 11e
�, qI
Arhan#a Lfl
AhFnbrz X11
TrO
�
s
�
j
S�yeetw9iv�p�ti
w
March
�
R
L'
f2!�4fL'ld 7C@
Y
�s
s 3t;
�erltwv��nrt �
�
a
ck DI
J11,
y
aF
FiI11JIL� z
r:,:l den. OF]
-
t
ti {
,U �f
3r a� ti
SUBJECT
:,prgiufrs
PROPERTY Claela�arl
c p{=rlrals is
Biil bever7y . �
Tenniy Fr;!
�nprrur�odtit Curie fi;
ALp
df+(1U8i !'O nS4 N oc anrlr,
{1 6emce5
C#
LOCATION MAP
Packet Pg. 471
LOCATION MAP
Packet Pg. 471
Exhibit A
Utilities Performance Security (UPS) and Final Obligation Bond
The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer
utilities being installed for the whole project which includes material and labor. The
contributory assets reflect the cost of materials, not labor and are based on the assets of
which the county will be owning and maintaining.
Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31
Attachments:
1. Verification of Final Cost
2. Receipt of Payment
16.A.3.b
rI
X
LU
c
a�
E
M
U
2
r
Q
Packet Pg. 472
Amount
Receipt Number
10% UPS Bond
$20,909.94
83BSBHP1995
Final Obligation Bond
$4,000
2017432103
Total Amount
$24,909.94
The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer
utilities being installed for the whole project which includes material and labor. The
contributory assets reflect the cost of materials, not labor and are based on the assets of
which the county will be owning and maintaining.
Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31
Attachments:
1. Verification of Final Cost
2. Receipt of Payment
16.A.3.b
rI
X
LU
c
a�
E
M
U
2
r
Q
Packet Pg. 472
16.A.3.b
VERIFICATION OF FINAL COST
PROJECT NAME: All Seasons
LOCATION: Section 9 Township 48 Range 25
Collier County, Florida
NAME & ADDRESS OF OWNER: All Seasons in Naples, LLC
31731 Northwestern Hwy, #250W
Farmington Hills, MI 48334
TYPE OF UTILITY SYSTEM: POTABLE WATER
Item Size—Quantity Units Cost Total
C-900 DR14 8" 1,092 LF $17.80 $19,437.60
C-900 DR14 6" 282 LF $13.60 $3,835.20
C-900 DR14 4" 755 LF $10.60 $8,003.00
Gate Valve 8" 2 EA $1,242.00 $2,484.00
Meter Assembly 3" 1 EA $20,456.00 $20,456.00
Gate Valve 4" 1 EA $798.00 $798.00
Air Release Valve 1 EA $1,511.00 $1,511.00
Backflow Preventer Assembly 8" 1 EA $12,002.00 $12,002.00
Post Indicator Valve 8" 1 EA $2,400.00 $2,400.00
Check Valve 8" 1 EA $2,323.00 $2,323.00
Fire Department Connection 1 EA $1,429.00 $1,429.00
Gate Valve 6" 2 EA $924.00 $1,848.00
Fire Hydrant Assembly 5 EA $3,785.00 $18,925.00
TOTAL COST $95,451.80
1 do hereby certify that the quantities of material and services described above are true and an accurate
representation of the as -installed system.
CERTIFYING:
Ryan White, P.E. - Engineering Project Manager 7/20/17
Name and Title of Engineer Certifying
OF: Davidson Engineering
4365 Radio Road, #201
Naples, FL 34104
I do hereby certify that the quantities of material and services described above are true and an accurate
representation of the as -installed cost of the system.
CERTIFYI
Kevin Jpffsen, �sident
OF: JENSEN UNDERGROUND UTILITIES, INC.
5585 Taylor Road
Naples, Florida 34109
STATE OF FLORIDA )
) SS:
COUNTY OF COLLIER )
The foregoing instrument was signed and acknowledged before me this 18th day of July, 2017 by
Kevin Jensen , who is persopally known to rpe and who did not take an oath.
+'f' DONNALVBM
SEAL: .;1MISSI
MY COMONMFF206604
ry Public a:, EXPIRES: June 1, 2019
Bonded Thru N"Pe*Urdewtare
Packet Pg. 473
VERIFICATION OF FINAL COST
PROJECT NAME: All Seasons
LOCATION: Section 9 Township 48 Range 25
Collier County, Florida
NAME & ADDRESS OF OWNER: All Seasons in Naples, LLC
31731 Northwestern Hwy, #250W
Farmington Hills, M148334
1011 =111541ANA 11111111111106YI&I IIIA
Iltem Size_Quantity
Units
CostTotal
SDR 26 0'- 6'
8"
626
LF
$26.70
$16,714.20
SDR 26 6'- 8'
8"
186
LF
$30.50
$5,673.00
SDR 26
6"
492
LF
$12.30
$6,051.60
Cleanout Assembly
6"
14
EA
$394.00
$5,516.00
Sanitary Manhole 0'- 6'
2
EA
$3,756.00
$7,512.00
Sanitary Manhole 6'- 8'
2
EA
$4,923.00
$9,846.00
Grinder Pump Station
1
EA
$42,272.00
$42,272.00
DR 11 HDPE
4"
557
LF
$11.40
$6,349.80
Check Valve
4"
1
EA
$2,574.00
$2,574.00
Tapping Sleeve & Valve 4"
x 4"
1
EA
$4,288.00
$4,288.00
Air Release Valve
1
EA
$6,851.00
$6,851.00
TOTAL COST
$113,647.60
1 do hereby certify that the quantities of material and services described above
are true and
an accurate
representation of the as -installed system.
CERTIFYING:
Name and Title of Engineer Certifying
OF
Davidson Engineering
4365 Radio goad, #201
Naples, FL 34105
I do hereby certify that the quantities of material and services described above are true and an accurate
representation of the as -installed cost of the system.
OF:
STATE OF FLORIDA )
) SS:
COUNTY OF COLLIER )
JENSEN UNDERGROUND UTILITIES, INC.
5585 Taylor Road
Naples, Florida 34109
The foregoing instrumrL&u (Ient was signed and acknowledged before me this 2nd day of August, 2017 by
Kevin Jensen , who is personally known to me and who did not take an oath.
SEAL:
Donna L. Ventre , Notary Public
s rpt r,�y K MYCDONNALVION
OW861014FFIF 21)W4
iis a+ A= EXPIKS: June i, 2019
A "•j�f
Banded ThroWlAryPa*ttndeWK"
16.A.3.b
01
Q
Packet Pg. 474
CERTIFICATION OF PRIVATE MATERIAL
PROJECT NAME: All Seasons
LOCATION: Section 9 Township 48 Range 25
Collier County, Florida
NAME & ADDRESS OF OWNER: All Seasons in Naples, LLC
31731 Northwestern Hwy, #25OW
Farmington Hills, MI 48334
TYPE OF UTILITY SYSTEM: SANITARY SEWER
lfem
Size
guantity
Units
Cost
Total
SDR 26 0'- 6'
8"
626
LF
$5.34
$3,342.84
SDR 26 6'- 8'
8"
186
LF
$5.34
$993.24
SDR 26
6"
492
LF
$2.97
$1,461.24
Cleanout Assembly
6"
14
EA
$159.43
$2,232.02
Sanitary Manhole 0'- 6'
2
EA
$2,533.41
$5,066.82
Sanitary Manhole 6'- 8'
2
EA
$3,362.39
$6,724.78
Grinder Pump Station
1
EA
$28,759.11
$28,759.11
DR 11 HDPE
4"
552
LF
$3.78
$2,086.56
Check Valve
4"
1
EA
$1,849.16
$1,849.16
Air Release Valve
1
EA
$5,455.42
$5,455,42
TOTAL_ COST $57,971.19
I do hereby certify that the quantities of material described above aro true and an accurate representation
of the as -installed system.
CERTIFYING:
NAME & TITLE OF ENGINEERING CERTIFYING
OF: Davidson Engineering
4365 Radio Road, #201
Naple5v; FL 34105
I do hereby certify that the quantitic�,6f material described above aro true and an accurate representation
of the as -installed co ess M.
CERTIFYING -
OF
STATE OF FLORIDA )
) SS:
COUNTY OF COLLIER )
JENSEN UNDERGROUND UTILITIES, INC.
5585 Taylor Road
Naples, Florida 34109
The foregoing instrument was signed and acknowledged before me this 2nd day of August, 2017 by
Kevin Jensen ,who is personally known to me and who did not take an oath.
SEAL:
onna L. Ventre, otary Ic
a< OON11ILVIME
MYCOMMS&OWF2t18604
i" EXPIRES,, ur* 1, 2019
' Af Bor&dDruNotary WOUnd6mrhn
16.A.3.b
01
Q
1WENSON011CompanylExcel_Doc\DONNA-i1TimW0FMCo11ier CountylAll SeasonsWl Seasons Private Sewer
Packet Pg. 475
Form 2 - Rev. 2014 (Utilities Performance Bond)
UTILITIES PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS: that
OAKLAND MANAGEMENT CORPORATION,
MANAGER OF BEZTAK OF NAPLES, LLC,
WHO IS THE MANAGER OF ALL SEASONS IN NAPLES, LLC
15450 Tamiami Trail N.
Naples, FL 34110
Bond No. 83BSBHP1995
(hereinafter referred to as "Owner", and
Hartford Fire Insurance Company
(hereinafter referred to as "Surety"), are held and firmly bound unto Collier County, Florida,
(hereinafter called "County"), in the total aggregate penal sum of Twenty Thousand Nine
Hundred Nine dollars and Ninety Four cents. _111filM in lawful money of the United
States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs,
executors, administrators, successors, and assigns, jointly and severally, firmly by these
presents. Owner and Surety are used for singular or plural, as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner entered into a
certain Utilities System Construction Contract, dated _ 1ui', ii t 11 _ , 2015,
a copy of which is hereto attached and made a part hereof; and (Note:This is the contractor
with contractor)
WHEREAS the County has a material interest in the performance of said Contract; and
WHEREAS the County has adopted Ordinances and Resolutions (hereinafter "Land
Development Regulations") concerning the Owner's obligations to the County regarding the
construction, conveyance and warranty of potable water, non -potable irrigation water and/or
wastewater system(s) or portion(s) thereof constructed within the unincorporated area of
Collier County; i
NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and
duties to the County under said Land Development Regulations and all the undertakings,
covenants, terms, conditions, and agreements of said contract during the original term thereof,
and any extensions thereof which may be granted by the Owner, with or without notice to the
Surety and during the guaranty period established by the County, and thereafter, and if the
16.A.3. b
Packet Pg. 476
16.A.3.b
Owner shall satisfy all claims and demands incurred under such contract, and shall fully
indemnify and save harmless the County from all costs and damages which it may suffer by
reason of failure to do so, and shall reimburse and repay the County all outlay and expense
which the County may incur in making good any default, then this obligation shall be void.
otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees
that no change, extension of time, alteration or addition to the terns of the contract or to work
to be performed thereunder, or the specifications accompanying same shall in any way affect
its obligation on this Bond, and does hereby waive notice of ani, such change, extension of
time, alteration or addition to the terms of the contract or to the work or to the specifications.
PROVIDED, FURTHER, that it is expressly agreed that the bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, upon
amendment to the Contract not increasing the contract price more than twenty percent (20%),
so as to bind the Owner and the Surety to the full and faithful performance of the contract as so
amended. The term "Amendment", wherever used in this bond, and whether referring to this
bond, the Contract or other documents shall include any alteration, addition or modification of
any character whatsoever.
IN WITNESS WHEREOF, the parties hereto have caused this Instrument to be executed this
IS,, day of �, 2017.
First above written.
First Witness - S'bnature
Dianne Peterson
First Witness — Print or Type Name
STATE OF MICHIGAN
COUNTY OF OAKLAND
ALL SEASONS IN NAPLES, LLC
BY: Beztak of Na les, LLC_
BY: Oakla t1ag� et9#�or13
By:
Name: Sam Be -"
Title: Presiden
Gn
Second Witness - Signature
Mark A. Sturing
Second Witness — Print or Type Name
SUBSCRIBED AND SWORN to before me this 15 day of_gugust , 2017, by
Sam Beznos, as President of Oakland Management Corp, as Manager of Beztak of Naples,
LLC who is personally know to me.z.�
Ty- - n p oduced
��enti �c�o
Bonny Craft
Notary Pub c Sig4ture Printed, Typed or Stamped Name of
Notary
My Commission Expires: 06-06-2023
BONNY CRAFT
Notary Public, State of Michigan
County Of Oakland
My Commission Expires 06-06-2023
Acting in the County of Packet Pg. 477
i
BY: Hartford F nsura Company
By:
Name: [Harold Miller Jr.] ®'—
itle: [Attorney In Fact]
Fiikt 1 - Signature Seconli WWitness - Signature
If
First Witness – Karen Socha Second Witness – Kathy Weaver
STATE OF Illinois
COUNTY OF Cook
SUBSCRIBED AND SWORN to before me this 15 day of August, 2017, by
[Harold Miller Jr.], as [Attorney in Fact of [Hartford Fire Insurance Company] who is
personally know to me as Attorney in Fact OR produced identification
e' f entificati n produced _
Notary Pu 11 ignature
My Commission Expires:
6/25/2020
12/2014
Printed, Typed or Stamped Name of
Notary
3, s +Cr;a SEAL
LAUPILI
4s-,oTh,RY PUBLIC, STATE Ot- ILLINOIS
My Cornrnission E>.pires Jun 25, 2020
16.A.3. b
a
Packet Pg. 478
16.A.3.b
Direct fnquiriesICIaims 2o:
P I 1E HARTFORD
Bond T-4
OF ATTORNEY One Hartford Plaza
Hartford, Con nectleut 06155
ca/l. • 888-266-3488 or fax: 860-758-5835)
KNOW PERSONS BY THESE PRESENTS THAT: Agency Code: 83-550144
Hartford Fire insurance Company, a corporation duly organized under the taws of the State ofConnectieut
C _J Hartford Casualty insurance Company, a comm oration duly organized under the laws ofthe State of Indiana
® Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut
® Hartford Underwriters insurance Company, a corporation duly organized under the laws of the Stnte of Connecticut
Twin City Fire Insurance Company, a corporation duly organized under the latvs of the State of Indiana
® Hartford insurance Company of Illinois, a corporation duty organized under the laws of the State of Illinois
Hartford Insurance Company of the Midwest, a corporation duly organized under the latus of die State of Indiana
Hartford insurance Company of the Southeast, a corporation duly organized under the laws of the State ofFlorida
having their home'offica to Hartford, Connecticut (hereinafter colfectivety referred to as the °Companies'} do hereby make, constitute and appoint, N
up to the amount of Unlimited
Arlene M. Filipski, Sharon A. Foulk, William T. Krumm, Harold Miller, in
Jr., Jon A: Schroeder, Jodie Sellers, Karen E. Socha, Kathleen A. a
Weaver of ITASCA, Illinois
their true and lawful Altorney(s)-in-Fact, each in their separate capacity if more than one Is named above, to sign its name as surety(les) only as delineated
above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf
of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds
and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1. 2009, the Companies have
caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further,
pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any
mechanically applied signatures applied to this Power of Attorney.
TYna�� tr% , � tJt�r. J ` t cvy� yyd �'✓�ar
r
o_` Y h e`�rrer,7/n+ ► d®�� P 3� J �XtV Gy' 9
V'Caa'180 4 ., 0 28 a t a 9 to � q
_� �:..• P otrrntt s�q rC6r7,MA L•� 8a 70 €8 r07g � 10 7 Y®
J i'`._.. i � � � fes••- •.. . ft �r
u a �n•�rs�Pti• -��, ,r, 'o so ti o b 'L ��'��.oP' � �rOrns•' �,�
Sohn Gray, Assistant Secretary M. Ross Fisher, Vice President
STATE OF CONNECTICUT
ss. Hartford
COt1NTV OF HARTFORD
On this 12th day of July, 2012, before me personally came M. Ross fisher, to me known, who being by me duly sworn, did depose and say: that
he resides in the County of Hartford, State of Connecticut; that he is the Vice President of the Companies, the corporations described in and which executed
the above instrument: that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were
so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by tike authority.
y,�nLsyy�y 1 l
ar tu�� f Il1at.{-n trt/Z
' o
Aur" ° U
Kaddeen T. Malvard
CERTIFiCATE \olmy Public
Y Commissicn Expires July 31. 2016
1, the undersigned, Vice President of the Companies, DO HEREBY CER iFY that the above and foregoing Is a true and correct copy of the Power
of Attorney executed by said Companies, which is stilt in full force effective as of ?
Signed and sealed at the City of Hartford.
�?i. j� s tet ni, y` it+t t x• . � ��{$�`��, A''ls a t a� � ,. ec::'++s. i,�i s�,�
�tc�'p ��7 ' G �. . � J,� �v' i ��.:•
%S5:»AP par p"i 41-U tae lr n S
`�...� ate' 4.����' J •. �r�`�_�•o !jri a ,peso � e h /f i'�s'.; .., e`�`� �3;�..�.+ L .e R\ � �c�
-•-tel ,ftp, )t1 h..� `i tt��l0' � �.�
n• mar .'�Tf
Kevin Heckman. Assistant Vice President
LL
a
Packet Pg. 479
IIAIADocument
Standard Form of Agreement Between Owner and Contractor where the basis of
payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price
AGREEMENT made as of the 11 th day of Augustin the year 2015
This document Is not intended for
(In words, indicate day, month and year.)
ADDITIONS AND DELETIONS:
15450 Tamiami Trail North
The author of this document has
BETWEEN the Owner:
added information needed for Its
(Name, legal status, address and other information)
completion. The author may also
The Architect:
have revised the text of the original
All Seasons in Naples, LLC
AIA standard form. An Additions and
31731 Northwestern Highway, Suite 250 W
Deletions Report that notes added
Farmington Hills, Mi 48334
information as well as revisions to the
3300 Northeast Expressway, Building 6
standard form text Is available from
and the Contractor:
the author and should be reviewed. A
(Name, legal status, address and other information)
vertical line in the left margin of this
document indicates where the author
GATES Butz institutional Construction, LLC
has added necessary information
27599 Riverview Center Blvd, Suite 205
and where the author has added to or
Bonita Springs, Fl 34134
deleted from the original AIA text.
(239)593-3777 Fax (239)593-3477
This document has Important legal
consequences. Consultation with an
for the following Project:
attorney Is encouraged with respect
(Name, location and detailed description)
to Its completion or modification.
All Seasons Naples
This document Is not intended for
use in competitive bidding.
15450 Tamiami Trail North
Naples, Fl 34110
ALA Document A201TM-2007,
General Conditions of the Contract
The Architect:
for Construction, Is adopted in this
(Name, legal status, address and other information)
document by reference. Do not use
with other general conditions unless
C.M.M.1, Inc, now/known/as C&TC Design Studios
this document is modified.
3300 Northeast Expressway, Building 6
Atlanta, GA 30341
The Owner and Contractor agree as follows.
�il IL AIA Document A4021" - 2007 (formerly A111 T° - 1997). Copyright QD 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA' Document is pro to clad by U.S. Copyright Law and Into motional Treaties.
Unauthorized reproduction or distribution of this AIA- Document, or any portion of it, may result In savoro civil and criminal penalties, and will be
prosocutod to tho maximum extent possible under the law. This document was produced by AIA software at 13:45:15 on 08/11/2015 under Order
No 5090722145_1 which expires on 01102/20110, and is no! for resale.
/ User Notes: (1886872367)
16.A.3. b
Packet Pg. 480
16.A.3. b
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 RELATIONSHIP OF THE PARTIES
4 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
5 CONTRACT SUM
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in Q
the Contract Documents to be the responsibility of others.
ARTICLE 3 RELATIONSHIP OF THE PARTIES
The Contractor accepts the relationship of trust and confidence established by this Agreement and covenants with the
Owner to cooperate with the Architect and exercise the Contractor's skill andjudgment in furthering the interests of
the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of
workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner's
interests. The Owner agrees to furnish and approve, in a timely manner, information required by the Contractor and to
make payments to the Contractor in accordance with the requirements of the Contract Documents.
Ink. AIA Document A102m — 2007 (formerly All l "' — 1997). Copyright Q1920, 1925, 1951. 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Architects. AJI rights reserved. WARNING: This AIA- Document is protected by U,5 Copyright Law and International Treaties
Unauthorized reproduction or dIs tributmn of this AIA4 Document, or any portion of it, may result In sovere civil and trim lnal penalties, and will be
prosocuted to the maximum extent possible under the law. This document was produced by AIA software at 13:45:15 on 08/11/2015 under Order
j �itY No,5090722145_I which expires on 0110212016, and is not for resale.
�-'" User Notes:
,;-� (1880872367)
Packet Pg. 481
6 CHANGES IN THE WORK
0
7 COSTS TO BE REIMBURSED
a�
8 COSTS NOT TO BE REIMBURSED
Q
9 DISCOUNTS, REBATES AND REFUNDS
10 SUBCONTRACTS AND OTHER AGREEMENTS
r
=
r
11 ACCOUNTING RECORDS
0
12 PAYMENTS
ar
to
13 DISPUTE RESOLUTION
Q
0
v
14 TERMINATION OR SUSPENSION
Q
13 MISCELLANEOUS PROVISIONS
c
16 ENUMERATION OF CONTRACT DOCUMENTS
LL
0
17 INSURANCE AND BONDS
o
0
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Q
Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed
Z
in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are
as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire
W
and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements,
either written or oral. if anything in the other Contract Documents, other than a Modification, is inconsistent with this
m
Agreement, this Agreement shall govern.
E
t
ARTICLE 2 THE WORK OF THIS CONTRACT
v
r
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in Q
the Contract Documents to be the responsibility of others.
ARTICLE 3 RELATIONSHIP OF THE PARTIES
The Contractor accepts the relationship of trust and confidence established by this Agreement and covenants with the
Owner to cooperate with the Architect and exercise the Contractor's skill andjudgment in furthering the interests of
the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of
workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner's
interests. The Owner agrees to furnish and approve, in a timely manner, information required by the Contractor and to
make payments to the Contractor in accordance with the requirements of the Contract Documents.
Ink. AIA Document A102m — 2007 (formerly All l "' — 1997). Copyright Q1920, 1925, 1951. 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Architects. AJI rights reserved. WARNING: This AIA- Document is protected by U,5 Copyright Law and International Treaties
Unauthorized reproduction or dIs tributmn of this AIA4 Document, or any portion of it, may result In sovere civil and trim lnal penalties, and will be
prosocuted to the maximum extent possible under the law. This document was produced by AIA software at 13:45:15 on 08/11/2015 under Order
j �itY No,5090722145_I which expires on 0110212016, and is not for resale.
�-'" User Notes:
,;-� (1880872367)
Packet Pg. 481
16.A.3.b
ARTICLE 4 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 4.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
(Insert the date of commencement, if it differsfrom the date of this Agreement or, if applicable, state that the date will
be fixed in a notice to proceed)
The date of commencement shall be defined as the day from receipt of written notice to proceed from Owner,
recording of notice of commencement by Owner and receipt of ail necessary permits whichever is later plus 15
working days for mobilization.
If, prior to commencement of the Work, the Owner requires time to file mortgages and other security interests. the
Owner's time requirement shall be as follows:
in
O
ca
§ 4,2 The Contract Time shall be measured from the date of commencement.
a�
N
§ 4.3 The Contractor shall achieve Substantial Completion of the entire Work not later than Five Hundred ( 500)
Q
days from the date of commencement, or as follows:
(Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of
commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions ofthe
r
Work)
Substantial completion shall be defined as issuance of certificate of completion or temporary certificate of completion
O
a)
by the Building Department, No lost time has been included for events beyond the control of the contractor such as
U
weather, acts of God, Etc.
Portion of Work Substantial Completion date
tz
Q
subject to adjustments of this Contract Time as provided in the Contract Documents.
(Insert provisions, if arty, for liquidated damages relating to failure to achieve Substantial Completion on time, or for
ii
bonus payments for early completion of the Work.)
Q
There shall be liquidated damages in the amount of $1,000.00 per calendar day, if the contractor has failed to achieve
0
pc°
substantial completion as defined above. There will be no bonus for early completion.
Q
ARTICLE 5 CONTRACT SUM
§ 5.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the
x
Contract. The Contract Sum is the Cost of the Work as defined in Article 7 plus the Contractor's Fee.
W
§ 5.1.1 The Contractor's Fee:
r
(State a lump sum, percentage of Cost of the Work or other provision for determining the Contractor's Fee)
E
O
tv
a
§ 5.1,2 The method of adjustment of the Contractor's Fee for changes in the Work:
Five (5%) for increases
§ 5.1.3 Limitations, if any, on a Subcontractor's overhead and profit for increases in the cost of its portion of the Work:
To be specifically included in any change order.
Ink AIA Document A1021e —2007 (formerly A111 r'" —1997). Copyright 01920, 1925, 1951, 1956, 1961, 1963, 1967, 1974, 1978, 1967, 1997 and 2007 by The
American tris8tute of Architects. All rights reserved. WARNING: This AIAs Document is protected by U.S. Copyright Law and IntornationoI Treaties,
i Una uth arl:od reproduction or distribution of ih is AIAe Document, or any portion of It, may result in so veto civil and criminal pen a(tits, and will be
prosecuted to them a ximum extent pots Iblo under tho law. This documen(was produced by AIA software at 13:45:15 on 0 811 112 01 5 under Order
j� No.5090722145_1 which expires an 01102/2016, end Is not for resale.
User Notes; (1868872387)
Packet Pg. 482
16.A.3. b
§ 5.1.4 Rental rates for Contractor -owned equipment shall not exceed percent ( %) of the standard rate paid at the
place of the Project. NIA
§ 5.1.5 Unit prices, if any:
(Idents and state the unit price; state the quantity limitations, if any, to which the unit price will be applicable.)
Item Units and Limitations Price Per Unit (;0.00)
TBD
§ 5.2 GUARANTEED MAXIMUM PRICE
§ 5.2.1 The Contract Sum is guaranteed by the Contractor not to exceed
IIIIIIIIIIIft subject to additions and deductions by Change Order as
provided in the Contract Documents. Such maximum sum is referred to in the Contract Documents as the Guaranteed
Maximum Price. Costs which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the
Contractor without reimbursement by the Owner. Deductive change orders will decrease the contract amount by cost
(including general conditions) plus 0% for contractor's fee. For changes orders to the contract scope that increase to
critical path time schedule or lost time from critical path time schedule due to lost day(s) beyond the Contractor's
control; additional costs per day will be added for the prolonged need for jobsite supervision, project management,
office trailers, telephone, and other temporary utilities. See attached Exhibit "C" to determine actual costs at the time
of the delay and to be agreed upon by both parties.
(Insert specific provisions f the Contractor is to participate inany savings.)
If the "cost of work: plus Contractor's fee adjusted for changes orders is less than the Guaranteed Maximum Price, this
difference will be defined as savings. The savings will be shared equally between Contractor and Owner.
§ 5.2.2 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the
Contract Documents and are hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If bidding or proposal documents permit the Owner
to accept other alternates subsequent to the execution of this Agreement, attach a schedule ofsueh other alternates
showing the amount for each and the date when the amount expires.)
See exhibit "A" includes car port PCO
§ 5.2.3 Allowances included in the Guaranteed Maximum Price, if any:
(Idents allowance and state exclusions, ifarry, from the allowance price)
Item Price
Q
None
§ 5.2.4 Assumptions, if any, on which the Guaranteed Maximum Price is based:
x
LU
See Exhibit "A"
c
§ 5.2.5 To the extent that the Drawings and Specifications are anticipated to require further development by the
m
E
Architect. the Contractor has provided in the Guaranteed Maximum Price for such further development consistent
v
with the Contract Documents and reasonably inferable therefrom. Such further development does not include such
things as changes in scope, systems, kinds and quality of materials, finishes or equipment, all of which, if required,
Q
shall be incorporated by Change Order.
ARTICLE 6 CHANGES IN THE WORK
§ 6.1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work may be determined by any of
the methods listed in Section 7.3.3 of AIA Document A201-2007, General Conditions of the Contract for
Construction.
§ 6.2 In calculating adjustments to subcontracts (except those awarded with the Owner's prior consent on the basis of
cost plus a fee), the terms "cost" and "fee" as used in Section 7.3.3.3 of AIA Document A201-2007 and the term
AIA Document A102- — 2007 (formerly A111- — 1997). Copyright m 1920, 1925, 1951. 1958, 1 g61, 1983, 1987, 1974, 1978, 1987, 1997 and 2007 by The
Init. American Institute of Architects. All rights reserved. WARNING: This AIAa Document Is protected by US. Copyright Law and Intamational Treaties. 4
Unauthorized reproduction ordlstributlon of this AIAs Document, or any portion of It, may result in severe civil and criminal penalties, and will be
4�,,prosocutsd to the maximum extent possible under the law. This document was produced by AIA software at 13:45:15 on 06/11/2015 under Order
.z9C0U722145 1 which expires on 01102/2016, and Is not for resale
User Notes: (1866872367)
Packet Pg. 483
"costs" as used in Section 7.3.7 of AIA Document A201-2007 shall have the meanings assigned to them in AIA
Document A201-2007 and shall not be modified by Articles 5, 7 and 8 of this Agreement. Adjustments to
subcontracts awarded with the Owner's prior consent on the basis of cost plus a fee shall be calculated in accordance
with the terms of those subcontracts.
§ 6.3 In calculating adjustments to the Guaranteed Maximum Price, the terms "cost" and "costs" as used in the
above -referenced provisions of AIA Document A201-2007 shall mean the Cost of the Work as defined in Article 7 of
this Agreement and the tern "fee" shall mean the Contractor's Fee as defined in Section 5. 1.1 of this Agreement.
§ 6.4 If no specific provision is made in Article 5 for adjustment of the Contractor's Fee in the case of changes in the
Work, or if the extent of such changes is such, in the aggregate, that application of the adjustment provisions of Article
5. will cause substantial inequity to the Owner or Contractor, the Contractor's Fee shall be equitably adjusted on the
same basis that was used to establish the Fee for the original Work, and the Guaranteed Maximum Price shall be
adjusted accordingly.
ARTICLE 7 COSTS TO BE REIMBURSED
§ 7.1 COST OF THE WORK
§ 7.1.1 The term Cost of the Work shall mean costs necessarily incurred by the Contractor in the proper performance
of the Work. Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior
consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 7.
§ 7.1.2 Where any cost is subject to the Owner's prior approval, the Contractor shall obtain this approval prior to
incurring the cost. The parties shall endeavor to identify any such costs prior to executing this Agreement.
§ 7.2 LABOR COSTS
§ 7.2.1 Wages of construction workers directly employed by the Contractor to perform the construction of the Work at
the site or, with the Owner's prior approval, at off-site workshops.
§ 7.2.2 Wages or salaries of the Contractor's supervisory and administrative personnel when stationed at the site with
the Owner's prior approval.
(!f it is intended that the wages or salaries ofcertain personnel stationed at the Contractor's principal or other offices
shall be included in the Cost of the Work, idents in Article 15, the personnel to be included, whetherfor all or only
part of their time, and the rates at which their time will be charged to the Work.)
§ 7.2.3 Wages and salaries of the Contractor's supervisory or administrative personnel engaged at factories,
workshops or on the road, in expediting the production or transportation of materials or equipment required for the
Work, but only for that portion of their time required for the Work.
§ 7.2.4 Costs paid or incurred by the Contractor for taxes, insurance, contributions, assessments and benefits required
by law or collective bargaining agreements and, for personnel not covered by such agreements, customary benefits
such as sick leave, medical and health benefits, holidays, vacations and pensions, provided such costs are based on
wages and salaries included in the Cost of the Work under Sections 7.2.1 through 7.2.3.
§ 7.2.5 Bonuses, profit sharing, incentive compensation and any other discretionary payments paid to anyone hired by
the Contractor or paid to any Subcontractor or vendor, with the Owner's prior approval.
§ 7.3 SUBCONTRACT COSTS
Payments made by the Contractor to Subcontractors in accordance with the requirements of the subcontracts.
§ 7.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION
§ 7.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in
the completed construction.
§ 7.4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for
reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner's property at the completion
of the Work or, at the Owner's option, shall be sold by the Contractor. Any amounts realized from such sales shall be
credited to the Owner as a deduction from the Cost of the Work.
A]A Document A102'^ — 2007 (formerly AI I I r" — 1997). Copyright m 1920, 1925, 1951, 1958, 1961, 1967, 1987, 1974, 1978, 1087. 1997 and 2007 by The
tnit. American M7,01ute of Architocls. All right_g rasorvod. WARNING; This AIA'I Document Is p101eaia4 by U -S, Copyright Law and Intanrnliana; Troalias,
unuthor_od iaproduclIona i dn if, of lidm
s AIA4 I)acuonI, ar any portion of of it, may reswI in sova,a civil and cdinIna I penaIt; n;, and %,/III b"
prosocwod m :,ye mazinu rn extort poc..^,Iblo under ilia 17,N. This document we5 produced byAJAsoftwere at 13:45 is on 08/11/2015 under Order
0722145 1 which expires on 01/02/2016, and is not for resale.
User N
/User Notes: (1868872367)
i
16.A.3. b
01
Q
Packet Pg. 484
§ 7.5 COSTS OF OTHER MATERIALS AND EQUIPMENT, TEMPORARY FACILITIES AND RELATED ITEMS
§ 7.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies,
temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are
provided by the Contractor at the site and fully consumed in the performance of the Work. Costs of materials, supplies,
temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of
the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project
site. Costs for items not fully consumed by the Contractor shall mean fair market value.
§ 7.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by
construction workers that are provided by the Contractor at the site and costs of transportation, installation; minor
repairs, dismantling and removal. The total rental cost of any Contractor -owned item may not exceed the purchase
price of any comparable item. Rates of Contractor -owned equipment and quantities of equipment shall be subject to
the Owner's prior approval.
§ 7.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal.
§ 7.5,4 Costs of document reproductions, facsimile transmissions and long-distance telephone dills, postage and
parcel delivery charges, telephone service at the site and reasonable petty cash expenses of the site office,
§ 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the
Owner's prior approval.
6 7.6 MISCELLANEOUS COSTS
§ 7.6.1 Premiums for that portion of insurance and bonds required by the Contract Documents that can be directly
attributed to this Contract Self-insurance for either full or partial amounts of the coverages required by the Contract
Documents, with the Owner's prior approval.
§ 7.6.2 Sales, use or similar taxes imposed by a governmental authority that are related to the Work and for which the
Contractor is liable.
§ 7.6.3 Fees and assessments for the building permit and for other permits, licenses and inspections for which the
Contractor is required by the Contract Documents to pay.
§ 7.6,4 Fees of laboratories for tests required by the Contract Documents, except those related to defective or
nonconforming Work for which reimbursement is excluded by Section 13.5.3 of AIA Document A201-2007 or by
other provisions of the Contract Documents, and which do not fall within the scope of Section 7.7.3.
§ 7.8,5 Royalties and license fees paid for the use of a particular design, process or product required by the Contract
Documents; the cost of defending suits or claims for infringement of patent rights arising from such requirement of the
Contract Documents; and payments made in accordance with legal judgments against the Contractor resulting from
such suits or claims and payments of settlements made with the Owner's consent, However, such costs of legal
defenses, judgments and settlements shall not be included in the calculation of the Contractor's Fee or subject to the
Guaranteed Maximum Price. If such royalties, fees and costs are excluded by the last sentence of Section 3.17 of AIA
Document A201-2007 or other provisions of the Contract Documents, then they shall not be included in the Cost of
the Work.
§ 7.6.6 Costs for electronic equipment and software, directly related to the Work with the Owner's prior approval.
§ 7.6.7 Deposits lost for causes other than the Contractor's negligence or failure to fulfill a specific responsibility in
the Contract Documents.
§ 7,6.8 Legal, mediation and arbitration costs, including attorneys' fees, other than those arising from disputes
between the Owner and Contractor, reasonably incurred by the Contractor after the execution of this Agreement in the
performance of the Work and with the Owner's prior approval, which shall not be unreasonably withheld.
/�nl` AIA Document A10211— 2007 (formerly A111 "' — 1997), copyright m 1920, 1925, 1951, 1958, 1961, 1963, 1007, 1974, 1978, 1907, 1997 and 2007 by The
/ American Ins titule of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Low and Intornalional Troatles.
Unautho rizea repmducilon or distribution of this AIA' Document, or any portion of It, may result In severe clvll and criminal panalifas, and will be
prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:45.15 on 06/11/2015 under Order
No.5090722145 1 which expires on 01Y0212016, and Is not for resale
Usor Notes; (1866872367)
16.A.3. b
c
O
to
CU
O
Q
r
0
to
0
c
tis
13-
(D
L)
v
a
c
LIL
Q
Packet Pg. 485
§ 7.6,9 Subject to the Owner's prior approval, expenses incurred in accordance with the Contractor's standard written
personnel policy for relocation and temporary living allowances of the Contractor's personnel required for the Work.
§ 7.6.10 That portion of the reasonable expenses of the Contractor's supervisory or administrative personnel incurred
while traveling in discharge of duties connected with the Work.
§ 7.7 OTHER COSTS AND EMERGENCIES
§ 7.7.1 Other costs incurred in the performance of the Work if, and to the extent, approved in advance in writing by the
Owner.
§ 7.7.2 Costs incurred in taking action to prevent threatened damage, injury or loss in case of an emergency affecting
the safety of persons and property, as provided in Section 10.4 of AIA Document A201 -2D07.
§ 7.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Contractor, Subcontractors
or suppliers, provided that such damaged or nonconforming Work was not caused by negligence or failure to fulfill a
N
specific responsibility of the Contractor and only to the extent that the cost of repair or correction is not recovered by
y
the Contractor from insurance, sureties, Subcontractors, suppliers, or others.
§ 7.7.4 General conditions costs to be hump stun of $1,679,594.00 in accordance with exhibit "A", General conditions
Q
I estimate.
1n
r
§ 7.8 RELATED PARTY TRANSACTIONS
=
§ 7.8.1 For purposes of Section 7.8, the term "related party" shall mean a parent, subsidiary, affiliate or other entity
j
having common ownership or management with the Contractor; any entity in which any stockholder in, or
—
0
management employee of, the Contractor owns any interest in excess of ten percent in the aggregate; or any person or
entity which has the right to control the business or affairs of the Contractor. The term "related party" includes any
member of the immediate family of any person identified above.
Q
§ 7.8.21f any of the costs to be reimbursed arise from a transaction between the Contractor and a related party, the
Contractor shall notify the Owner of the specific nature of the contemplated transaction, including the Identity of the
Q
related party and the anticipated cost to be incurred, before any such transaction is consummated or cost incurred. If
_
the Owner, after such notification, authorizes the proposed transaction, then the cost incurred shall be included as a
c
cost to be reimbursed, and the Contractor shall procure the Work, equipment, goods or service from the related party,
�y
as a Subcontractor, according to the terms of Article 10. If the Owner fails to authorize the transaction, the Contractor
shall procure the Work, equipment, goods or service from some person or entity other than a related party according to
00
the terms of Article 10.
o
0
ARTICLE 8 COSTS NOT TO BE REIMBURSED
Q
§ 8,1 The Cost of the Work shall not include the items listed below:
+�
A Salaries and other compensation of the Contractor's personnel stationed at the Contractor's principal
�
office or offices other than the site office, except as specifically provided in Section 7.2. or as may be
x
provided in Article 15;
W
.2 Expenses of the Contractor's principal office and offices other than the site office;
.3 Overhead and general expenses, except as may be expressly included in Article 7;
d
.4 The Contractor's capital expenses, including interest on the Contractor's capital employed for the
E
Work;
L)
.5 Except as provided in Section 7.7.3 of this Agreement, costs due to the negligence or failure of the
Contractor, Subcontractors and suppliers or anyone directly or indirectly employed by any of them or
Q
for whose acts any of them may be liable to fulfill a specific responsibility of the Contract;
.6 Any cost not specifically and expressly described in Article 7; and
.7 Costs, other than costs included in Change Orders approved by the Owner, that would cause the
Guaranteed Maximum Price to be exceeded.
ARTICLE 9 DISCOUNTS, REBATES AND REFUNDS
§ 9.1 Cash discounts obtained on payments made by the Contractor shall accrue to the Owner if (1) before making the
payment, the Contractor included them in an Application for Payment and received payment from the Owner, or (2)
the Owner has deposited funds with the Contractor with which to make payments; otherwise, cash discounts shall
Init. AIA Document A1021-2007 (formerly A111 " —1997). Copyright tD 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Architaets, Ali rights reserved. WARNING: This AIA* Document is protected by U.B. Copyright Law and International Treaties, 7
Unauthorized roproduction or distribution of this AIA' Document, or any portion of it, may result In severe civil and crlminal penaltles, and will be
• prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:45:15 on 0 8/1 11201 5 under Order
No 5090722145_1 which expires on 01/02/2016, and is not for resale.
,
` User Notes: (1866872367)
Packet Pg. 486
accrue to the Contractor. Trade discounts, rebates, refunds and amounts received from sales of surplus materials and
equipment shall accrue to the Owner, and the Contractor shalt make provisions so that they can be obtained.
§ 9,2 Amounts that accrue to the Owner in accordance with the provisions of Section 9.1 shall be credited to the
Owner as a deduction from the Cost of the Work.
ARTICLE 10 SUBCONTRACTS AND OTHER AGREEMENTS
§ 10.1 Those portions of the Work that the Contractor does not customarily perform with the Contractor's own
personnel shall be performed under subcontracts or by other appropriate agreements with the Contractor. The Owner
may designate specific persons from whom, or entities from which, the Contractor shall obtain bids. The Contractor
shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work
and shall deliver such bids to the Architect. The Owner shall then determine, with the advice of the Contractor and the
Architect, which bids will be accepted. The Contractor shall not be required to contract with anyone to whom the
Contractor has reasonable objection.
§ 10.2 When a specific bidder (1) is recommended to the Owner by the Contractor; (2) is qualified to perform that
portion of the Work; and (3) has submitted a bid that conforms to the requirements of the Contract Documents without
reservations or exceptions, but the Owner requires that another bid be accepted, then the Contractor may require that a
Change Order be issued to adjust the Guaranteed Maximum Price by the difference between the bid of the person or
entityrecommended to the Owner by the Contractor and the amount of the subcontract or other agreement actually
signed with the person or entity designated by the Owner.
§ 10,3 Subcontracts or other agreements shall conform to the applicable payment provisions of this Agreement, and
shall not be awarded on the basis of cost plus a fee without the prior consent of the Owner. If the Subcontract is
awarded on a cost-plus a fee basis, the Contractor shall provide in the Subcontract for the Owner to receive the same
audit rights with regard to the Subcontractor as the Owner receives with regard to the Contractor in Article 11, below.
ARTICLE 11 ACCOUNTING RECORDS
The Contractor shall keep full and detailed records and accounts related to the cost of the Work and exercise such
controls as may be necessary for proper financial management under this Contract and to substantiate all costs
incurred The accounting and control systems shall be satisfactory to the Owner. The Owner and the Owner's auditors
shall, during regular business hours and upon reasonable notice, be afforded access to, and shall be permitted to audit
and copy, the Contractor's records and accounts, including complete documentation supporting accounting entries,
books, correspondence, instructions, drawings, receipts, subcontracts, Subcontractor's proposals. purchase orders,
vouchers, memoranda and other data relating to this Contract. The Contractor shall preserve these records for a period
of three years after final payment, or for such longer period as may be required by law.
ARTICLE 12 PAYMENTS
§ 12.1 PROGRESS PAYMENTS
§ 12.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for
Payment issued by the Architect; the Owner shall make progress payments on account of the Contract Sum to the
Contractor as provided below and elsewhere in the Contract Documents.
§ 12.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the
month, or as follows:
§ 12.1.3 Provided that an Application for Payment is received and approved by the Architect on or about the 25th day
of a month, the Owner shall make payment of the certified amount to the Contractor about the 25th day of the
following month.
(Federal, state or local laws may require payment within a certain period of time.)
I § 12.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the
Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Guaranteed
Maximum Price among the various portions of the Work, except that the Contractor's Fee shall be shown as a single
Init. AIA Document A1021e' — 2007 (formerly A111 r" — 1997). Copyright O 1920, 1925, 1951, 1968, 1961, 1963, 1987, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Archilects. All rights reserved. WARNING: This AIAe Document Is protocted by U.S. Copyright Law and Intarnational Treaties
�',.. Unauthorizod reproduction ordlstributlon of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will bo
t prosecutad to the maximum extent possible under the law, This document was produced by AIA software at 13:45:15 on 08/11/2015 under Order
_ k No.5090722145_I which expires on 01102/2016. and Is not for resale.
User Notes: (1866872367)
16.A.3. b
El
LL
0
00
0
w
Q
r
t
X
W
c
O
E
t
v
r
Q
Packet Pg. 487
separate item. The schedule of values shall be prepared in such form and supported by such data to substantiate its
accuracy as the Architect may require. This schedule, unless objected to by the Architect or Owner, shall be used as a
basis for reviewing the Contractor's Applications for Payment.
§ 12.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end
of the period covered by the Application for Payment, The percentage of completion shall be the lesser of (1) the
percentage of that portion of the Work which has actually been completed; or (2) the percentage obtained by dividing
(a) the expense that has actually been incurred by the Contractor on account of that portion of the Work for which the
Contractor has made or intends to make actual payment prior to the next Application for Payment by (b) the share of
the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values.
§ 12.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be
computed as follows:
Take that portion of the Contract Sum properly allocable to completed Work as determined by
multiplying the percentage completion of each portion of the Work by the share of the Contract Sum
allocated to that portion of the Work in the schedule of values, less retainage of ten percent (10 % ).
Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall
be included as provided in Section 7.3.9 of AIA Document A201TM--2007, General Conditions of the
1
Contract for Construction;
.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and
suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in
advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of
ten percent ( 10% );
.3 Subtract the aggregate of previous payments made by the Owner; and
.4 Subtract amounts, if any, for which the Owner has withheld or nullified a Certificate for Payment as
provided in Section 9.5 of AIA Document A201-2007.
.S Upon Completion of fifty percent (50%) of the work, the retainage shall be reduced to 5% of each
approved application for payment.
§ 12.1.7
(Paragraphs deleted)
The Owner and the Contractor shall agree upon a (1) mutually acceptable procedure for review and approval of
payments to Subcontractors and (2) the percentage of retainage held on Subcontracts, and the Contractor shall execute
subcontracts in accordance with those agreements.
§ 12.1.8 In taking action on the Contractor's Applications for Payment, the Architect shall be entitled to rely on the
accuracy and completeness of the information furnished by the Contractor and shall not be deemed to represent that
the Architect has made a detailed examination, audit or arithmetic verification of the documentation submitted in
accordance with Section 12.1.4 or other supporting data., that the Architect has made exhaustive or continuous on-site
inspections; or that the Architect has made examinations to ascertain how or for what purposes the Contractor has
used amounts previously paid on account of the Contract. Such examinations, audits and verifications, if required by
the Owner, will be performed by the Owner's auditors acting in the sole interest of the Owner.
(Paragraph deleted)
§ 12.2 FINAL PAYMENT
§ 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the
Contractor when
the Contractor has fully performed the Contract except for the Contractor's responsibility to correct
Work as provided in Section 12,2.2 of ATA Document A201-2007, and to satisfy other requirements,, if
any, which extend beyond final payment; and
a final Certificate for Payment has been issued by the Architect.
lender has not required a holdback for any amount of work.
§ 12,2.2 The Owner's auditors will review and report in writing on the Contractor's final accounting within 30 days
after delivery of the final accounting to the Architect by the Contractor. Based upon such Cost of the Work as the
Owner's auditors report to be substantiated by the Contractor's final accounting, and provided the other conditions of
AIA Document A102T" — 2007 (formerly A111'" — 1997). Copyright m 1920, 1925, 1951, 1958, 1961, 1963, 1987, 1974, 1976, 1987, 1997 and 2007 by The
American Institute of Architecls. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright law and International Treaties.
Unauthorized reproduction or distribution of this AIAI Document, or any portion of it, may result in severs civil and criminal penalties, and will be
prosecuted to the maximum extent possible under the law, This document was produced by AIA software at 13:45:15 on 08/11/2015 under Order
No.5090722145_1 which expires on 01/02/2016, and is not for resale.
User Notes:
(1866872367)
16.A.3. b
LL
0
00
0
w
Q
r
t
K
W
c
tv
E
t
U
R
r
Q
Packet Pg. 488
16.A.3.b
Section 12.2.1 have been met, the Architect will, within seven days after receipt of the written report of the Owner's
72
auditors, either issue to the Owner a final Certificate for Payment with a copy to the Contractor, or notify the
Contractor and Owner in writing of the Architect's reasons for withholding a certificate as provided in Section 9.5.1 of
W
the AIA Document A201-2007. The time periods stated in this Section 12.2.2 supersede those stated in Section 9.4.1
};
of the AIA Document A201-2007. The Architect is not responsible for verifying the accuracy of the Contractor's final
y
accounting.
E
§ 12.2.3 If the Owner's auditors report the Cost of the Work as substantiated by the Contractor's final accounting to be
t
less than claimed by the Contractor, the Contractor shall be entitled to request mediation of the disputed amount
r
without seeking an initial decision pursuant to Section 15.2 of A201-2007. A request for mediation shall be made by
Q
the Contractor within 30 days after the Contractor's receipt of a copy of the Architect's final Certificate for Payment.
Failure to request mediation within this 30 -day period shall result in the substantiated amount reported by the Owner's
auditors becoming binding on the Contractor. Pending a final resolution of the disputed amount, the Owner shall pay
N
the Contractor the amount certified in the Architect's final Certificate for Payment.
o
in
§ 12,2.4 The Owner's final payment to the Contractor shall be made no tater than 30 days the follows:
R
m
U)
Issuance of the final Certificate of Occupancy and approval from the Lender. which approval shall not be
Q
unreasonably withheld.
,
§ 12.2.5!1; subsequent to final payment and at the Owner's request, the Contractor incurs costs described in Article 7
to
and not excluded by Article 8 to correct defective or nonconforming Work, the Owner shall reimburse the Contractor
�=
such costs and the Contractor's Fee applicable thereto on the same basis as if such costs had been incurred prior to
final payment, but not in excess of the Guaranteed Maximum Price. If the Contractor has participated in savings as
4—
provided in Section 5.2, the amount of such savings shall be recalculated and appropriate credit given to the Owner in
determining the net amount to be paid by the Owner to the Contractor.
ARTICLE 13 DISPUTE RESOLUTION
CL
§ 13.1 INITIAL DECISION MAKER
tv
The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the
Q
parties appoint below another individual,, not a party to the Agreement, to serve as Initial Decision Maker.
(If the parties mutually agree, Insert the name, address and other contact information of the Initial Decision Maker, if
other than the Architect.)
E
0
00
0
00
Q
r
§ 13.2 BINDING DISPUTE RESOLUTION
72
For any Claim subject to, but not resolved by mediation pursuant to Section 15.3 of AIA Document A201-2007, the
method of binding dispute resolution shall be as follows:
W
(Check the appropriate bar. If rhe Owner and Contractor do not select a method of binding dispute resolution below,
};
or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be
y
resolved by litigation in a court of competent jurisdiction.)
E
t
[ ) Arbitration pursuant to Section 15.4 of AIA Document A201-2007
r
Q
[ XX ] Litigation in a court of competent jurisdiction
[ ] Other (Specify)
ARTICLE 14 TERMINATION OR SUSPENSION
§ 14.1 Subject to the provisions of Section 14.2 below, the Contract may be terminated by the Owner or the Contractor
as provided in Article 14 of AIA Document A201-2007.
Init. AIA Document A102- — 2007 (formerly Al / 1- — 1997). Copyright ® 1920, 1925, 1951, 1958, 1961, 1963, 1987, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA-
Document is protected by U.B. Copyright Law and International Treaties, f0o Una uthorixod reproduction or distribution of this AlAI Ae Documont, or any portion of it, may result In sovoro civil and criminal pen altios, and will be
t prosecuted to the maximum extent possible undor the Iaw. This document was produced by AIA software al 13:45:15 on 0 811 112 01 5 under Order
No.5090722145 1 which expires on 01102/2016, and Is not for resale.
User Notes: (1866872367)
Packet Pg. 489
§ 14.2 If the Owner terminates the Contract for cause as provided in Article 14 of AIA Document A201-2007, the
amount, if any, to be paid to the Contractor under Section 14.2.4 of AIA Document A201-2007 shall not cause the
Guaranteed Maximum Price to be exceeded, nor shall it exceed an amount calculated as follows:
.1 Take the Cost of the Work incurred by the Contractor to the date of termination;
.2 Add the Contractor's Fee computed upon the Cost of the Work to the date of termination at the rate
stated in Section 5. 1.1 or, ifthe Contractor's Fee is stated as a fixed sum in that Section, an amount that
bears the same ratio to that fixed -sum Fee as the Cost of the Work at the time of termination bears to a
reasonable estimate of the probable Cost of the Work upon its completion; and
Subtract the aggregate of previous payments made by the Owner.
§ 14.3 The Owner shall also pay the Contractor fair compensation, either by purchase or rental at the election of the
Owner, for any equipment owned by the Contractor that the Owner elects to retain and that is not otherwise included in
the Cost of the Work under Section 14.2.1. To the extent that the Owner elects to take legal assignment of subcontracts
and purchase orders (including rental agreements), the Contractor shall, as a condition of receiving the payments
referred to in this Article 14, execute and deliver all such papers and take all such steps, including the legal assignment
of such subcontracts and other contractual rights of the Contractor, as the Owner may require for the purpose of fully
vesting in the Owner the rights and benefits of the Contractor under such subcontracts or purchase orders.
§ 14.4 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007; in such
case, the Guaranteed Maximum Price and Contract Time shall be increased as provided in Section 14.3.2 of AIA
Document A201-2007, except that the term "profit" shall be understood to mean the Contractor's Fee as described in
Sections 5.1.1 and Section 6.4 of this Agreement.
ARTICLE 15 MISCELLANEOUS PROVISIONS
§ 15.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract
Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract
Documents.
§ 15.2 Payments due and unpaid under the Contract shalt bear interest from the date payment is due at the rate stated
below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Insert rate of interest agreed upon, if any.)
Prime Rate as published in the Wall Street Journal on the day the payment becomes due plus (5%) percent.
§ 15.3 The Owner's representative:
(Name, address and other information)
Fritz Fransted
All Seasons in Naples, LLC
31731 Northwestern Highway, Suite 250 W
Farmington Hills, Mi 48334
§ 15.4 The Contractor's representative:
(Name, address and other information)
Marco Petretta. Project Director
GATES Butz Institutional Construction. LLC
27599 Riverview Center Blvd, Suite 205
Bonita Springs, Fl 34134
Phone: 239-593-3777
Karl Indivcro, S.R Project Manager
GATES Butz Institutional Construction, LLC
27599 Riverview Center Blvd, Suite 205
Bonita Springs, Fl 34134
Phone: 239-593-3777
9AIA Document A102- —2007 (formerly A111 e1— 1997). Copyright O 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The
-� . American Institute of Architeafs. All rights reserved, WARNING: This AIAa Docurnont is protected by U.5, Copyright Law and Intornational Treaties. 11
.� Unauthorized reproduction or distribution of this AIA- Document, or any portion of it, may result in severe civil and criminal penalties, and will be
prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:45:15 on 08/1112015 under Order
No.50907Y2145 1 which expires on 01/0212016, and is not for resale
User Notes: (1866872367)
16.A.3.b
LL
0
00
0
Q
r
t
K
W
c
lv
E
t
U
2
r
Q
Packet Pg. 490
Curtis Rimes, Superintendent
GATES Butz Institutional Construction, LLC
27599 Riverview Center Blvd, Suite 205
Bonita Springs, Fl 34134
Phone: 239-593-3777
§ 15,5 Neither the Owner's nor the Contractor's representative shall be changed without ten days' written notice to the
other party.
§ 15.6 Other provisions:
15.6.1 The following items will be included as job costs and charged to the Project at the rates indicated from the date
of commencement to substantial completion plus two (2) weeks:
1. Jobsite Supervision - $95.00- per hour (including labor burden).
2. Project Management - $95.00- per hour (including labor burden).
3. Project Coordinator - $40 — per hour (including labor burden).
4. Assistant Superintendent —$85.00- per hour (including labor burden).
5. Project Executive— $110.00- per hour (including labor burden).
6. Estimators — $95.00- per hour (including labor burden).
7. Project Engineering / Manager — $85.00- per hour (including labor burden).
8. Accounting - $50.00- per hour (including labor burden).
9. General Liability Expense — 0.5% of the total job cost including items.! -.4 above
15.6.2 Owner will be responsible for security, maintenance, utility costs and all insurances at substantial completion,
§ 15.7 The Contractor shall comply with any reasonable requirements from the Lender, which is PNC, to the extent the Lender's
requirements are contrary to or in addition to any term and condition contained herein.
ARTICLE 16 ENUMERATION OF CONTRACT DOCUMENTS
§ 16.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in
the sections below.
§ 161.1 The Agreement is this executed AIA Document A102-2007, Standard Form of Agreement Between Owner
and Contractor.
§ 16.1.2 The General Conditions are AIA Document A201-2007, General Conditions of the Contract for
Construction.
§ 16.1.3 The Supplementary and other Conditions of the Contract:
Document Title
N/A
Date
§ 16.1.4 The Specifications:
(Either list the Specifications here or refer to an exhibit attached to this Agreement.)
See attached "B" plan log
Section Title
Date
§ 16.1.5 The Drawings:
(Either list the Drawings here or refer to an exhibit attached to this Agreement.)
Exhibit "B" plan log
Number Title Date
Pages
Pages
Ir(N AIA Documont A1o21"— 2007 (formerly A111 TM -1997), Copyright V 1920, 1925, 1951, 1958, 1961, 1953, 1987, 1974, 1978, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. YARNING: This Al AT Document Is protected by US. copyright Law and Internatlonai Treaties. 12
Unauthorized reproduction or distribution of this AIA- Document, or any portion or it, may result in severe civil and criminal penalties, and will bo
t prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13;45:15 on 08/1112 015 under Order
No.5090722145_I which expires on 01/02/2016, and Is not for resale.
ori User Notes: (1686872367)
16.A.3.b
LL
0
00
0
00
Q
r
t
K
LU
c
O
E
s
U
2
r
Q
Packet Pg. 491
§ 16,1.6 The Addenda, if any:
Number
Addendum 1
Date Pages
01/09/15 1
Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding
requirements are also enumerated in this Article 16,
§ 16.1.7 Additional documents, if any, forming part of the Contract Documents:
1. Exhibit "A" budget worksheet dated July 22, 2D15
2. Exhibit "8" plan log draft, to be updated with final approved permit plans,
3.) Exhibit "C" additional general conditions cost breakdown, lost day expenses and calculations
(Paragraph deleted)
4.) AIA 201-2007 General Conditions to the Contract, as modified
5.) Exhibit "D" Construction Schedule
ARTICLE 17 INSURANCE AND BONDS
The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article I I of AIA Document
A201-2007.
(State bonding requirements, if arty, and limits of liability for insurance required in Article 11 ofAL4 Document
A201-2007.)
Type of Insurance or bond Limit of liability or bond amount ($0,00)
Liability insurance: Dual Obligee Bond AmountIMMOMM
$1,000,000 Occurrence
$2,000,000 Aggregate
$6,000,000 Umbrella
The Owner will provide builder's risk insurance. All material included within the scope of this contract will be
covered under the builders risk policy, Any item not included in the contractor's scope of work as described
herein is not covered under the builders risk policy and will not be the contractor's responsibility in the event
of loss or damage. Deductible to be paid by Owner. i
This Agreerhentto as of the day an ear first written
OWNER (Signature) C
0a. 111, .V;
John A Haye4 President not individually
All Seasons in Naples, LLC GATES Butz Institutional Construction, LLC
(Printed name and title) (Printed name and title)
AIA Document A102- — 2D07 (formerly A111- —1997), Copyright eD 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The
hit American Institute of Architects. All rights reserved. WARNING: This AIA- Document is protected by U S Copyright Law and International Treaties. 13
��— j ///""" Unauthorized roprod uctlon or distribution of this AIAa Document, or any portion of It, may result in severe clvi) and criminal pan allies, and will be
pros acutod to tha maximum extent possibla under tho law, This document was produced by AIA software at 13:45:15 on 06/11/2015 under Order
! No.5090722145_1 which expires on 01/0212016. and is not for resale.
!`l User Notes: (1866872367)
16.A.3.b
LL
0
00
0
00
t
K
LU
c
E
M
U
2
r
Q
Packet Pg. 492
Receipt Number:
Transaction Number:
Date Paid:
Amount Due:
Payment Details:
Amount Paid:
Change / Overage:
Contact:
FEE DETAILS:
Fee Description
Utility Performance
Refundable Bond
Cashier Name:
Batch Number:
Entered By:
Collier County
Growth Management Division
2800 Horseshoe Drive N.
Naples, FL 34104
239-252-2400
RECEIPT OF PAYMENT
2017432103
2017-055579
08/28/2017
$4,000.00
Payment Method Amount Paid
Check $4,000.00
$4,000.00
$0.00
ALL SEASONS IN NAPLES LLC
31731 NORTHWESTERN HWY # 250W
FARMINGTON HILLS, MI 48334
Check Number
679
Reference Number Original Amount GL Account
Fee Paid
PL20170002720 $4,000.00 $4,000.00 670-000000-220113
MartinRuedy
6655
hughes_j
Packet Pg. 493
CERTIFICATION OF CONTRIBUTORY COSTS (WATER)
PROJECT NAME:
LOCATION:
NAME & ADDRESS OF OWNER
All Seasons
Section 9 Township 48 Range 25
Collier County, Florida
All Seasons in Naples, LLC
31731 Northwestern Hwy, #250W
Farmington Hills, MI 48334
TYPE OF UTILITY SYSTEM:
POTABLE WATER (MATERIALS ONLY)
Item
Size
QALntity Units
Cost
Total
C-900 DR14
8"
30 LF
$10.79
$323.70
C-900 DR14
4"
40 LF
$3.16
$126.40
Gate Valve
8"
1 EA
$1,052.75
$1,052.75
Gate Valve
4"
1 EA
$584.98
$584.98
TOTAL COST
$2,087.83
I do hereby certify that the quantities of material described above are true and an accurate representation
of the as -installed system.
CERTIFYING:
Ryan White, P.E. - Engineering Project Manager 7/20/17
NAME & TITLE OF ENGINEER CERTIFYING
OF: Davidson Engineering
4365 Radio Road, #201
Naples, FL 34104
I do hereby certify that the quantities of material described above are true and an accurate representation
of the as -installed cost of the sys'tem.
CERTIFYIN . i/�✓
Kevi se resident
OF:
STATE OF FLORIDA )
) SS:
COUNTY OF COLLIER )
JENSEN UNDERGROUND UTILITIES, INC.
5585 Taylor Road
Naples, Florida 34109
16.A.3.c
The foregoing instrument was signed and acknowledged before me this 18th day of July, 2017 by
Kevin Jesnen who is personally ow to me and who did not take an oath.
DONMLVBM
MY COMMISSION FFi 208604
"i p' .EXPtR�6: Jure 1, 2019
II n> � BEA9ed Thru Notary POW Unden�s
onna L. Ventre otary i f-..
\\JENSON01\Company\Excel_Doc\DONNA-1\Tim\VOFC\Collier County\AII Seasons\AII Seasons County Water
Packet Pg. 494
CERTIFICATION OF CONTRIBUTORY COSTS (SEWER)
PROJECT NAME:
LOCATION:
NAME & ADDRESS OF OWNER:
All Seasons
Section 9 Township 48 Range 25
Collier County, Florida
All Seasons in Naples, LLC
31731 Northwestern Hwy, #250W
Farmington Hills, MI 48334
TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONLY)
Item Size Quantffy Units Cost Total
DR 11 HDPE 4" 5 LF $3.78 $18.90
Tapping Sleeve & Valve 4" x 4" 1 EA $1,458.62 $1,458.62
TOTAL COST $1,477.52
I do hereby certify that the quantities of material described above are true and an accurate representation
of the as -installed system.
CERTIFYING:
Ryan White, P.E. - Engineering Project Manager 7/20/17
NAME & TITLE OF ENGINEER CERTIFYING
OF:
Davidson Engineering
4365 Radio Road, #201
Naples, FL 34104
I do hereby certify that the quantities of material described above are true and an accurate representation
of the as -installed cost of the system.
CERTIFY
Kevin,densoVPresident
FON
STATE OF FLORIDA )
) SS:
COUNTY OF COLLIER )
JENSEN UNDERGROUND UTILITIES, INC.
5585 Taylor Road
Naples, Florida 34109
The foregoing instrument was signed and acknowledged before me this 18th day of July, 2017 by
Kevin Jesnen , who is perspnally known to me and who did not take an oath.
Al 6/V AA_/kSEAL:
Notary Public
���� DONNAI.V@IIHE
j*. MY COMMIBSIONtFF206604
EXPIRItS JuM 1.nn
� ��` y� � d Thm No1�Y Pub�thide
16.A.3.c
\\JENSON01\Company\Excel_Doc\DONNA-1\Tim\VOFC\Collier County\AII Seasons\AII Seasons County Sewer
Packet Pg. 495