Agenda 03/12/2019 Item #16A1503/12/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer facilities for Triangle Plaza at Lely Resort, PL20140000509, accept unconditional conveyance of a portion of the potable water, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,097.82 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of the potable water and sewer facilities, accept unconditional conveyance of a portion of the potable water facilities, and to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,097.82, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Triangle Plaza at Lely Resort, has constructed the potable water and sewer facilities within dedicated easements to serve this private development (see attached location map). A portion of the potable water facilities will be conveyed to the County, as described in Official Records (O.R.) Book 5582, Page (PG) 501. The remaining potable water facilities and all sewer facilities will be private. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on April 7, 2014. At that time, the value of these potable water utility facilities (assets) was $3,084.54. (See attached asset sheet). 3) Staff recorded all preliminary acceptance documents associated with the potable water facilities conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its interest in a portion of the potable water facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5582, at page 501 of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on February 6, 2019, in coordination with Public Utilities, and these facilities have been found to be satisfactory and acceptable. 6) The on-site potable water and sewer utilities, less the potable water utilities described in O.R. Book 5582, PG 501, are owned and maintained by the developer. 7) Staff recommends final acceptance of the subject utility facilities and to release the Utility Performance Security (UPS) and Final Obligation Bond in the total amount of $16,097.82. (See attached Exhibit A). 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 9) Staff is unaware of any issues that would serve to negate the recommendation to releas e the applicable security. 16.A.15 Packet Pg. 422 03/12/2019 FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water-Sewer District receiving unconditional title to a portion of the potable water utility facilities, which at the time of preliminary acceptance, had a total gross value of $3,084.54 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval -SAS RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for Triangle Plaza at Lely Resort, PL20140000509, accept unconditional conveyance of a portion of the potable water, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,097.82 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.15 Packet Pg. 423 03/12/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.15 Doc ID: 7987 Item Summary: Recommendation to approve final acceptance of the potable water and sewer facilities for Triangle Plaza at Lely Resort, PL20140000509, accept unconditional conveyance of a portion of the potable water, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,097.82 to the Project Engineer or the Developer’s designated agent. Meeting Date: 03/12/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 02/06/2019 11:07 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 02/06/2019 11:07 AM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 02/06/2019 11:36 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 02/06/2019 3:26 PM Water Steve Messner Additional Reviewer Completed 02/07/2019 9:45 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 02/07/2019 1:50 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 02/08/2019 11:08 AM Growth Management Department Matthew McLean Additional Reviewer Completed 02/08/2019 3:07 PM Growth Management Department James C French Deputy Department Head Review Completed 02/08/2019 3:17 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 02/08/2019 4:53 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 02/20/2019 2:05 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/20/2019 3:34 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 02/26/2019 4:59 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 02/28/2019 9:21 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 02/28/2019 4:14 PM Board of County Commissioners MaryJo Brock Meeting Pending 03/12/2019 9:00 AM 16.A.15 Packet Pg. 424 TRIANGLE PLAZA AT LELY RESORT LOCATION MAP 16.A.15.a Packet Pg. 425 Attachment: Location Map (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond $12,097.82 2014165788 Final Obligation Bond $4,000.00 2014163804 Total Amount $16,097.82 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.15.b Packet Pg. 426 Attachment: Exhibit A (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort) TRIANGLE PLAZA @ LELY RESORT Section 30 Township 50S Collier County, Florida Range 26E NAITIE &AODRESS OF OWNER: STOCK DEVELOPiTENT, LLC 2647 PROFESSIONAL CIRCLE #1201 NAPLES, FL 34119 TYPE OF UTILITY SYSTEM:POTABLE WATER Fire Backflow Preventer B' 1 LF $11,057.35 $11 057.35 C900 DR'14 Pipe Gate Valve C900 DR'14 Pipe Single Fare Service Fire Hydrant Assembly C900 DR14 Pipe Gate Valve Tapping Sleeve and Valve Water Service I do hereby certify that B" 444 8"1 6', 330 6"2 4 4', 752 4',1 4" x2" 5 2"6 TOTAL $40.91 $18,'164.04$1,332.40 $1,332.40 $36.80 $12144.00 $3,570.72 $7,141.44 $3,098.00 $12,392.00 $22.85 $17,183.20 $1,2'14.06 $1,214.06 $138.45 $692.2s $1,181.1B $7,087.08 -5ssi6?s'z ve are true and an accurate PROJECT NAME: LOCATION: representat on CERTIFYING: N OF FIN 3 COST escribed abo LF EA LF EA EA LF EA EA EA of material and services d of the ed system. G roup ite 10200 Naples, FL 34108 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING Name and Title OF: Kevin Je OF: n, P JENSEN UNDERGROUND UTILITIES, INC 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this j!!, day of Ma rch , 2014 by Kevin Jensen , who is personally known to me and who did not take an oath OONNA L, VENTRE Iiotary Public - State ol Florida My Comm Expircs Jun 1,2015 Comnrission # EE 97879 Donna L. Ventre , Notary Public SEAL I 16.A.15.b Packet Pg. 427 Attachment: Exhibit A (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort) OHlGihre; VERIFICATION OF FINAL COST TRIANGLE PLAZA @ LELY RESORT Section 30 Township 50S Gollier County, Florida NAME & AODRESS OF OWNER: STOCK DEVELOPMENT, LLC 26,47 PROFESSIONAL CIRCLE #1201 NAPLES, FL 34119 TYPE OF UTILITY SYSTEM SANITARY SEWER Range 26E Manhole SDR 26 Pipe Clean Out Assembly Sewer Service I do hereby certify CERTIFYING: 4', 8', o R8 o 2EA 601 LF 10 EA TOTAL COST $3,681.48 $24.05 $319.20 $1,512.28 $7,362.96 $14,454.05 $3,192.00 $7,561.40 q $32,570.41 uantities of material and services described above are true and an accurate ATE OF Name and Title of E OF:o ineering Group 9128 Strada Place, Site 10200 Naples, FL 34108 I do hereby certify that the quantities of al and services described above are true and an accurate CERTIFYING Kevin Pres nt OF:JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: couNTY oF coLLtER ) The foregoing instrument was si gned and acknowledged before me this 24th day of February, 2014 by own to me and who did not take an oath. OONNA !. VENTEE Nolary Public ' State o, Florida My Comm. Expires Jun 1. 2015 Commission # EE 97879 na L.e who is onall Pu PROJECT NAME: LOCATION: c ,/, 16.A.15.b Packet Pg. 428 Attachment: Exhibit A (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort) Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change/ Overage: Contact: FEE DETAILS: Fee Description Refundable Bonds Cashier Name: Batch Number : Entered By: \ j Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT 2014165788 2014-012907 03/25/2014 $12,097.82 Payment Method Check $12,097.82 $0.00 STOCK DEVELOPMENT LLC Amount Paid Check Number $12,097.82 21235 2647 PROFESSIONAL CIR STE 12 01 NAPLES , FL 3411 9 Reference Number Original Amount GL Account Fee Paid PL20 140000509 $12,097.82 $12,097.82 670-000000-220113 melissaalvarez 3668 hughes_j 16.A.15.b Packet Pg. 429 Attachment: Exhibit A (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort) Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Description Refundable Bonds Cashier Name: Batch Number: Entered By: Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT 2014163804 2014-010923 03/13/2014 $4,000.00 Payment Method Check $4,000.00 $0.00 Amount Paid Check Number $4,000.00 21135 STOCK DEVELOPMENT LLC 2647 PROFESSIONAL CIR# 1201 NAPLES , FL 34119 Reference Number PL20140000509 melissaalvarez 3650 hughes_j Original Fee $4,000.00 Amount GL Account Paid $4,000.00 670-000000-220113 16.A.15.b Packet Pg. 430 Attachment: Exhibit A (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort) NAME & ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: CERTIFIC 'ION OF CONTRIBUTORY COSTS (WAT' 'I TRIANGLE PLAZA @ LELY RESORT Section 30 Township 50S Collier County, Florida Range 26E STOCK DEVELOPMENT, LLC 2647 PROFESSIONAL CIRCLE #1201 NAPLES, FL 341 19 POTABLE WATER (MATERIALS ONLY) o C900 DR14 Pipe Gate Valve C900 DR14 Pipe Gate Valve Water Service 8 1 6 1 1 B' 4', 4', 2', LF EA EA EA LF $23.72 $1,032.40 $4.99 $914.06 $681.18 $426.90 $1,032.40 $29.94 $914.06 $681.18 TOTAL COST $3,084.54 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed system. CERTIFYING NAME & TITLE NGINEER CERTIFYING OF:Mitchell Engineering Group 9128 Strada Place, Site't0200 Naples, FL 34108 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING: Kevin Jensen, OF:JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: couNTY oF coLLtER ) The foregoing i trument was signed and acknowledged before me this 24th day of February, 2014 by Yin Jesnen who i rsonall n to me and who did not take an ide E OONNA t, VENTBE Notary Pubtic - State ot Ftorida My Comm. Errires Jun l. 20.15 Comoission # EE 97879 o a L. Ventre ,N ry Public oath PROJECT NAME: LOCATION: ,Qs;:l ,7, /. 16.A.15.c Packet Pg. 431 Attachment: Assets Sheet (7987 : Final Acceptance of Water Utilities - Triangle Plaza at Lely Resort)