Agenda 03/12/2019 Item #16A1203/12/2019
EXECUTIVE SUMMARY
Recommendation to approve final acceptance and unconditional conveyance of the potable water
and sewer utility facilities for Esplanade at Hacienda Lakes Phase 2B, PL20170002041 and to
authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount
of $4,000 to the Project Engineer or the Developer’s designated agent.
OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the
Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these
potable water and sewer facilities and to release the Final Obligation Bond in the amount of $4,000, in
accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31.
CONSIDERATIONS:
1) The Developer of Esplanade at Hacienda Lakes Phase 2B, has constructed the potable water and
sewer facilities within dedicated easements to serve this development. (See attached location map).
2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on
November 21, 2017. At that time, the value of these potable water and sewer utility facilities
(assets) was $16,524.88 and $16,270.03, respectively.
3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to
the County in the public records of Collier County, which were reviewed and approved by the
County Attorney’s office as to form and legality. The County acquired its record interest by Utility
Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5453, at Page 583, of
the Public Records of Collier County, Florida.
4) The potable water and sewer utility facilities have been operated and maintained during the required
one (1) year warranty period, following preliminary acceptance.
5) A final inspection to discover defects in materials and workmanship has been conducted by the
Development Review staff on February 6, 2019, in coordination with Public Utilities and these
facilities have been found to be satisfactory and acceptable.
6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation
Bond in the amount $4,000.
7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended.
8) Staff is unaware of any issues that would serve to negate the recommendation to release the
applicable security.
FISCAL IMPACT: Approval of this Executive Summary will result in the Collier County Water -Sewer
District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance,
had a total gross value of $32,794.91 (no depreciation applied) and an asset will be recorded in the
financial records of the county.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this
action.
16.A.12
Packet Pg. 390
03/12/2019
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval - SAS
RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable
water and sewer utility facilities for Esplanade at Hacienda Lakes Phase 2B, PL20170002041 and to
authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount
of $4,000 to the Project Engineer or the Developer’s designated agent.
Prepared by: Lucia S. Martin, Technician, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Exhibit A (PDF)
3. Assets Sheet (PDF)
16.A.12
Packet Pg. 391
03/12/2019
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.12
Doc ID: 7984
Item Summary: Recommendation to approve final acceptance and unconditional conveyance of
the potable water and sewer utility facilities for Esplanade at Hacienda Lakes Phase 2B, PL20170002041
and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount
of $4,000 to the Project Engineer or the Developer’s designated agent.
Meeting Date: 03/12/2019
Prepared by:
Title: Technician – Growth Management Development Review
Name: Lucia Martin
02/06/2019 10:40 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
02/06/2019 10:40 AM
Approved By:
Review:
Water Steve Messner Additional Reviewer Completed 02/06/2019 10:46 AM
Water Pamela Libby Additional Reviewer Completed 02/06/2019 11:42 AM
Wastewater Steve Nagy Additional Reviewer Completed 02/06/2019 12:47 PM
Wastewater Beth Johnssen Additional Reviewer Completed 02/06/2019 12:48 PM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 02/06/2019 12:59 PM
Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 02/06/2019 3:43 PM
Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 02/07/2019 9:27 AM
Growth Management Department Judy Puig Level 1 Reviewer Completed 02/08/2019 11:42 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 02/08/2019 2:33 PM
Growth Management Department James C French Deputy Department Head Review Completed 02/08/2019 3:16 PM
County Attorney's Office Scott Stone Level 2 Attorney Review Completed 02/08/2019 4:08 PM
Growth Management Department Thaddeus Cohen Department Head Review Completed 02/20/2019 2:02 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/20/2019 3:33 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 02/26/2019 4:52 PM
Budget and Management Office Mark Isackson Additional Reviewer Completed 02/28/2019 9:16 AM
County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 02/28/2019 4:17 PM
16.A.12
Packet Pg. 392
03/12/2019
Board of County Commissioners MaryJo Brock Meeting Pending 03/12/2019 9:00 AM
16.A.12
Packet Pg. 393
ESPLANADE AT HACIENDA LAKES PHASE 2B
LOCATION MAP
16.A.12.a
Packet Pg. 394 Attachment: Location Map (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)
Exhibit A
Utilities Performance Security (UPS) and Final Obligation Bond
Amount Receipt Number
10% UPS Bond W/Plat
Final Obligation Bond $4,000 2017036021
Total Amount $4,000
The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer
utilities being installed for the whole project which includes material and labor. The
contributory assets reflect the cost of materials, not labor and are based on the assets of
which the county will be owning and maintaining.
Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31
Attachments:
1.Verification of Final Cost
2.Receipt of Payment
16.A.12.b
Packet Pg. 395 Attachment: Exhibit A (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)
VERIFICATION OF FINAL COST
PROJECT NAME:
LOCATION:
NAME & ADDRESS OF OWNER:
TYPE OF UTILITY SYSTEM:
ITEM SIZE
PVC Water Main (C900, DR18) 8" PVC Water Main (C900, DR14) 8" Single Water Service, Complete 1" Double Water Service, Complete 1.5" Permanent Bacterial Sample Point Temporary Blow-off/Automatic Flushing Device Fire Hydrant, Complete
Esplanade at Hacienda Lakes -Phase 2B
Tract R, Esplanade at Hacienda Lakes Phase
2B, a subdivision according to the plat
thereof recorded in Plat Book 62, Pages 39
through 40, in the Public Records of Collier
Taylor Morrison of Florida, Inc.
4900 N. Scottsdale Road, Suite 2000
Scottsdale, AZ 85251
QUAN. UNIT COST TOTAL
602 LF $20.11 $12,106.22 43 LF $21.85 $939.55 8 EA $736.46 $5,891.68 7 EA $915.78 $6,410.46 1 EA $1,988.80 $1,988.80 1 EA $4,222.08 $4,222.08 1 EA $3,991.54 $3,991.54
TOTAL COST $35,550.33
I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system.
CERTIFYING:
OF:
STATE OF COUNTY OF
Haleakala Construction, Inc.
5758 Taylor Road
Naples. FL 34109
FlP�lt>A CoLLU:::.g
The foregoing instrument was signed and acknowledged before �,this / 5 day of AU.G. , 20J1 byJ:e��t>N O,u;s(Hr/tL'( who is personally known to me OR who produced identification
16.A.12.b
Packet Pg. 396 Attachment: Exhibit A (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)
VERIFICATION OF FINAL COST
PROJECT NAME:Esplanade at Hacienda Lakes -Phase 2B
LOCATION:Tract R, Esplanade at Hacienda Lakes Phase 2B, a
subdivision according to the plat thereof recorded
in Plat Book 62, Pages 39 through 40, in the Public
Records of Collier County, Florida.
NAME & ADDRESS OF OWNER:Taylor Morrison of Florida, Inc.
4900 N. Scottsdale Road, Suite 2000
Scottsdale, AZ 85251
TYPE OF UTILITY SYSTEM:SANITARY SEWER (MATERIAL AND SERVICES)
ITEM
Television Inspection
6" Single PVC Sewer Service
6" Double PVC Sewer Service
8" PVC Sanitary Sewer SDR-26 (0-6')
8" PVC Sanitary Sewer SDR-26 (6-8')
Manhole 4' Diameter with IET Coating (0-6')
Manhole 4' Diameter with IET Coating (6-8')
SIZE
6"
6"
8"
8"
4'
4'
QUAN. UNIT
567 LF
2 EA
10 EA
226 LF
341 LF
1 EA
2 EA
TOTAL COST
I do hereby certify that the quantities of material and services described above are a true and
accurate representation of the as-installed cost of the system.
CERTIFYING:
OF:
STATE OF
COUNTY OF
Haleakala Construction, Inc.
5758 Taylor Road
Naples, FL 34109
COST TOTAL
$2.20 $1,247.40
$713.50 $1,427.00
$755.90 $7,559.02
$54.14 $12,235.64
$63.14 $21,530.74
$5,223.30 $5,223.30
$5,907.20 $11,814.40
$61,037.50
�he foregoing instrument was signed and acknowledged before me )his li_ day of Au,, 20.r)._ bySo-t.J DrtE".0-}r\( ldl who is personally known to me _v' __ OR who produced identification __ _\
Type of Identification Produced __________________ _
16.A.12.b
Packet Pg. 397 Attachment: Exhibit A (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)
Collier County
Growth Management Division
2800 Horseshoe Drive N.
Naples, FL 34104
239-252-2400
RECEIPT OF PAYMENT
Receipt Number:2017412545
Transaction Number:2017-036021
Date Paid:06/07/2017
Amount Due:$4,000.00
Payment Details:Payment Method Amount Paid Check Number
Check $4,000.00 14000-00059849
Amount Paid:$4,000.00
Change / Overage:$0.00
Contact:TAYLOR MORRISON OF FL INC
551 N CATTLEMAN RD STE 200
SARASOTA , FL 34232
FEE DETAILS:
Fee Description Reference Number Original
Fee
Amount
Paid
GL Account
Utility Performance
Refundable Bond
PL20170002041 $4,000.00 $4,000.00 670-000000-220113
Cashier Name:ElizabethMendez
Batch Number:6422
Entered By: melissaalvarez
16.A.12.b
Packet Pg. 398 Attachment: Exhibit A (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)
CERTIFICATION OF CONTRIBUTORY ASSETS . COUNTY
Esplanade at Hacienda Lakes - Phase 28PROJECT NAME
LOCATION:Tract R, Esplanade at Hacienda Lakes Phase 28, a
subdlvision according to the plat thereof recorded in
Plat Eook 62, Pages 39 through 40, in the Public
Records of Collier County, Florida.
Taylor Morrlson of Florida, lnc.
4900 N. Scottsdale Road, Suite 2000
ScotEdale. AZ 85251
POTABLE WATER (MATERIALS ONLY)
PVC Waler Main (C900, DR18)
PVC Water Main (C900, DR14)
Single Water Service, Complete
Double Water Service, Complete
Permanent Bacterial Sample Point
Temporary Blow-off/Automatic Flushing Device
Fire Hydrant, Complete
LF
LF
EA
EA
EA
EA
EA
602
43
7
1
1
1
8"
1"
'1.5"
$6.24
$7.88
$361.46
$490.78
$1.038.80
$2.722.O8
$2,341.54
$3.756.48
$338.84
$2,891.68
$3,435.46
$1.038.80
$2.722.O8
$2.341.54
TOTAL COST t16,524.88
I do hereby ceftry that the quantities of material described above are a true and accurale representation of the
system being contributed to Collier County Utilities.
CERTIFYING:
Jayson
OF:
n
Haleakala Construction, lnc.
5758 Taylor Road
Napl€, FL 34109
STATE OF
COUNTY OF
The foregoi instrument was signed and acknowledged before
rl
Type of ldentification Produced
who is personally known to me OR who produced identrficalron _
mfhis
V_.-
/ 5 oav ot AtI6 , 2o".Jf by
N Public
t(a-L_,Seal
. :lli,,iT?'321,,"
S,ili:x1",5;7'a
= : -.-'u': =Z=-'. .FF ^..-- .' -=,;7;,*:.q$*,n:S
4,,',;,;:l;r,:]t".,.
NAME & ADDRESS OF OWNER:
TYPE OF UTILITY SYSTEM
ITEM SIZE QUAN. UNIT PRICE TOTAL
_trHL
16.A.12.c
Packet Pg. 399 Attachment: Assets Sheet (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)
CERTIFICATION OF CONTRIBUTORY ASSETS . COUNTY
Esplanada at Haclenda Lakes - Phase 2BPROJECT NAME
LOCATION:
NAME & ADDRESS OF OWNER
TYPE OF UTILITY SYSTEM
Taylor Monison of Florida, lnc.
4900 N. Scott3dale Road, Sulte 2000
ScotEdale. AZ 85251
SANITARY SEWER (MATERIALS ONLY)
evrsron nsPection
6" Single PVC Sewer Service
6" Double PVC Sewer Servic€
8" PVC Sanitary Sewer SDR-26 (0{)
8" PVC Sanitary Sewer SOR-26 (6-8)
Manhole 4' Diameter with IET Coating (0-6')
Manhole 4' Diameter with IET Coating (6-8')
567
2
10
226
341
1
2
$1.048.95
$477 .OO
$2,809.00
$935.64
$1.41't .7 4
$2,973.30
$6.614 40
6',
6',
8',
8',
4
4
LF $1.85EA $238.50EA $280.90LF $4.14LF 54.14
EA $2,973.30
EA $3,307.20
TOTAL COST s16,270.03
I do hereby certify that the quantities of material described above are a true and accurate representation of the system
being contributed to Collier County Utilities
ayson n
OF Haleakala Construction, lnc.
5758 Taylor Ro.d
NaDlaB, FL 34109
fyoP-tDtnwSTATE OF
COUNTY OF
The foregoing rnstrument was srgJrllsor{ ?ils<.*l rcr ned and acknowtedged before me gli3 / 5 oay ot AqIo . zo!/oy
who rs personatty kn=own to me 5/ - on *no proouEE?Eiiifi""ton '
N
K Seal
Tract R, Esplanade at Hacienda Lakes Phase 28, a
subdivlsion according to the plat ther€of recorded in
Plat Book 62, Pages 39 through 40, in the Public
Records of Collier County, Florida.
CERTIFYING:
Type of ldentification Produced
tFF 044fi1
:t
16.A.12.c
Packet Pg. 400 Attachment: Assets Sheet (7984 : Final Acceptance of Utilities - Esplanade at Hacienda Lakes Phase 2B)