Loading...
Agenda 01/08/2019 Item #16A 401/08/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Raffia Preserve Phase 1A, PL20140002067 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Raffia Preserve Phase 1A, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on December 1, 2015. At that time, the value of these potable water and sewer utility facilities (assets) was $256,631 and $454,530, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5233, at Page 2830, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on November 13, 2018 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4,000. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this action will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $711,161 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.4 Packet Pg. 659 01/08/2019 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Raffia Preserve Phase 1A, PL20140002067 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.4 Packet Pg. 660 01/08/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.4 Doc ID: 7358 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Raffia Preserve Phase 1A, PL20140002067 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in t he total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 01/08/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 11/15/2018 2:11 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 11/15/2018 2:11 PM Approved By: Review: Wastewater Beth Johnssen Additional Reviewer Completed 11/15/2018 2:43 PM Water Steve Messner Additional Reviewer Completed 11/15/2018 2:58 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 11/15/2018 3:34 PM Wastewater Steve Nagy Additional Reviewer Completed 11/16/2018 5:49 AM Water Pamela Libby Additional Reviewer Completed 11/16/2018 6:55 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 11/16/2018 9:11 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 11/19/2018 1:02 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 11/20/2018 4:25 PM Growth Management Department Matthew McLean Additional Reviewer Completed 11/21/2018 9:36 AM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 11/21/2018 2:39 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 11/27/2018 1:09 PM Growth Management Department James C French Deputy Department Head Review Completed 11/28/2018 5:42 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 12/03/2018 9:06 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 12/12/2018 3:09 PM Office of Management and Budget Allison Kearns Additional Reviewer Completed 12/14/2018 9:29 AM County Attorney's Office Emily Pepin CAO Preview Completed 12/20/2018 8:21 AM 16.A.4 Packet Pg. 661 01/08/2019 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 12/27/2018 9:52 AM Board of County Commissioners MaryJo Brock Meeting Pending 01/08/2019 9:00 AM 16.A.4 Packet Pg. 662 RAFFIA PRESERVE PHASE 1A LOCATION MAP 16.A.4.a Packet Pg. 663 Attachment: Location Map (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2014210171 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.4.b Packet Pg. 664 Attachment: Exhibit A (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A) VERIFICATION OF FINAL COST 10/16/2014 PROJECT NAME: RAFFIA PHASE IA LOCATION: Section 34, Township 48 South, Range 26 East, Collier County, Florida NAME & ADDRESS OF OWNER: WCI COMMUNITIES LLC 24301 WALDEN CENTER DR BONITA SPRTNGS, FL34134 TYPE OF UTILITY SYSTEM: POTABLE WATER | ITEM PVC C-900 DR18 Watermain PVC C-900 DR14 Watermain PVC C-900 DR14 Watermain TOTAL QUAN. UNIT COST SIZE $73,120 00 $1,440 00 $2,610 00 $28,300 00 $16,000 00 $9,500.00 $27,000 00 $17,000 00 $3,100 00 $6,200 00 $40 00 $32 00 $30 00 $20 00 $2,000 00 $1,900 00 S4.500.00 $500 00 $3,100 00 $3,100 00 1,828 LK 10 10" LF 45 87 LF 8" PVC C-900 DR18 Watermain Gate Valve & Box Gate Valve & Box F ire Hydrant Assembly Water Service Permanent Bacterial Sample Point LF 8" 1,415 10" 8 EA 5 EA 8" NA EA 6 34 EA NA 1 EA ARV NA 2 EA Wolfe/Pristine $32 00 $2,500 00 $4,500 00 $3,100 00 $3,100 00 $125 00 $111,648 00 $7,500 00 $31,500 00 $12,400 00 $6,200 00 S9.250 00 PVC C-900 DR18 Watermain 3,489 LF 12" Gate Valve & Box Fire Hydrant Assembly ARV Permanent Bacterial Sample Point Casing 12" 3 EA NA EA 7 EA NA 4 NA 2 EA 24" 74 LF S362,76800 TOTAL COST 1 do hereby certify that the quantities of material and services described above are true and accurate r epresentation of the as-installed cost of the system WfTRACTORAS^RTIFYING: ENGINEER REVIEW: jauAv-N IA Y $ON/OR F SCI TNI C K, VICE ^RESIDENT OF:/HA!EAKALA CONSTRUCTION. INC 5758 TAYLOR RD NAPLES, Florida 34109 MICHAEL J. DELATE P.E. OF: Q GRADY MINOR & ASSOCIATES 3800 VIA DEL RAY BONITA SPRINGS, Florida 34134 STA I EOF FLORIDA ) )SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 17th day of October, 2014 by Jayson Oreschnick who is personally known to me and who did not take an oath SEAL: UNDAMAHON MY COMMISSION# EE G3K:15 ! i EXPIRES: February | Bonded Thru Notary Public uroar .'LILTS ; X:\2013 ACTIVE PROiECTS\RAFFlA PRESERVE LEE MARVCLOSE OUT DOCSWeiifjcationFinaJCost-Water 1A+Wolf_ Rev 10-16-14 16.A.4.b Packet Pg. 665 Attachment: Exhibit A (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A) VERIFICATION OF FINAL COST 10/16/2014 PROJECT NAME: RAFFIA PHASE IA LOCAT ION: Section 34, Township 48 South, Range 26 East, Collier County, F loiida NAME & ADDRESS OF OWNER: WCI COMMUNITIES LLC 24301 WARDEN CENTER DR BONITA SPRINGS, FL 34134 TYPE OF UTILITY SYSTEM: SANITARY SEWER ITEM QUAN. UNIT COST TOTAL SIZE PVC Pipe SDR-26 Gravity Sewer Forcemain (PVC DR-14) Forcemain (PVC DR-18) Forcemain (PVC DR-14) Plug Valve ARV PVC Services w/Cleanout SINGLE PVC Services w/CIeanout DOUBLE Sanitary Manholes Lift Station Wolfe/Pristine Forcemain (PVC DR-14) ARV Casing Pipe HDPE SDR 11 Plug Valve $158,144 00 $1,845 00 $13,680 00 $2,310 00 $1,000 00 S 1,500 00 $4,620.00 SI8,750 00 S67,500 00 $300,000 00 $56 00 $15 00 $12.00 $42 00 $1,000 00 $1,500 00 $660 00 $750 00 $4,500.00 $150,000 00 LF 8" 4" 2,824 LF 123 4" 1,140 LF 6" 4" 55 LF 1 EA NA 1 EA EA NA 7 NA 25 EA NA 15 EA 8' LS 2 $20 00 $1,500 00 $100 00 $1,500 00 $27,660 00 $1,500 00 $3,300.00 $1,500 00 6" 1.383 LF EA NA 1 ) 16" 33 LF 6" EA TOTAL COST $603,309.00 I do hereby certify that the quantities of material and services described above are true and accutate representation of the as-installed cost of the system N T RACTOICpER TIFYING: ENGINEER REVIEW: MICIIAEL J. DELATE P.E. JAYSON ORESCHNICK,(yitE PRESIDENT OFI HALEAKALA CONSTRUCTION, INC 5758 TAYLOR RD NAPLES, Florida 34109 OF: Q GRADY MINOR & ASSOCIATES 3800 VTA DEL RAY BONITA SPRINGS, Florida 34134 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 17th day of October, 2014 bv Jayson Oreschnick who is personally known to me and who did not take an oath SEAL: LINDA MAH0N MY COMMISSION I EE 03® It €®J Strfef EXPIRES: February 2i am5 bonded Thru Notary Public U btferwitars X:\2013 ACTIVE PROJECTS\RAFF1A PRESERVE LEE MAR\CLOSE OUT DOCSWerificab'onFinalCost-Sewer 1A+Wolf_ Rev 10-18-14 16.A.4.b Packet Pg. 666 Attachment: Exhibit A (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2014210171 Transaction Number:2014-057289 Date Paid:11/04/2014 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 00413269 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:WCI COMMUNITIE LLC 24301 WALDEN CENTER RD BONITA SPRINGS , FL 34134 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Refundable Bonds PL20140002067 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:melissaalvarez Batch Number:4085 Entered By: hughes_j 16.A.4.b Packet Pg. 667 Attachment: Exhibit A (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A) CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: RAFFIA PHASE J A 10/16/2014 LOCATION: Section 34, Township 48 South, Range 26 East, Collier County, Florida NAME & ADDRESS OF OWNER: WCJ COMMUNITIES LLC 24301 WALDEN CENTER DR BON 11A SPRINGS, EL 34134 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) | ITEM TOTAL | QUAN. UNIT COST SIZE $47,528 00 $990 00 $1,740 00 $21,225,00 $12,800 00 $7,000 00 $21,000 00 $11.900 00 $2,100 00 $4,400 00 PVC C-900 DR 18 Water-main PVC C-900 DR14 Wateimain PVC C-900 DRI4 Watermain PVC C-900 DR 18 Watermain Gate Valve & Box Gate Valve & Box Fire Hydrant Assembly Water Service Permanent Bacterial Sample Point ARV Wolfe/Pristine PVC C-900 DR18 Watermain Gate Valve & Box Fire Hydrant Assembly ARV ' Permanent Bacterial Sample Point Casing $2600 $22 00 $20 00 $1500 $1,600 00 $1,400 00 $3,500 00 $350 00 $2,100 00 S2.200.00 10" 1,828 IF 10" 45 LF 8" 87 LF 8" 1.415 LF 10" 8 EA 8" EA 5 6 EA EA 1" 34 EA EA 2 $76,758 00 $5.400 00 $24,500 00 $8,800 00 $4,200,00 $6,290 00 $22 00 $1,800 00 $3,500 00 $2,200 00 $2,100.00 $85 00 3.489 LF 12" 12" 3 EA 7 EA EA 4 EA 2 LF 24" 74 $256,631.00 TOTAL COST I do hereby certify that the quantities of material described above are tiue and accurate representation of the system being contr ibutcd to Collier County Utilities, Inc IRACTOi TIFMING: ENGINEER REVIEW: MICHAEL J. DELATE, P.E. IAYSO/4 ORESCHNICK. VICE PRESIDENT OR HALEAKALA CONSTRUCTION, INC 5758 TAYLOR RD NAPLES, Florida 34109 OF: Q GRADY MINOR & ASSOCIATES 3800 VIA DEL RAY BON1TA SPRINGS, Florida 34134 STAT EOF FLORIDA ) ) SS: COUNIYOF COLLIER ) The foregoing instrument was signed and acknowledged before me this 17th day of October, 2014 by Jayson Oieschnick who is personally known to me and who did not take an oath /) * UNDA MAHOR MY COMMISSION! EE 036615 mjssssaso; SEAL: % X:\2013 ACTIVE PROJECTS\RAFFIA PRESERVE LEE MAR\CLOSE OUT DOCS\CertCon(ributoryAssets-Water 1A+Wolf_Rev 10-16-14 16.A.4.c Packet Pg. 668 Attachment: Assets Sheet (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A) CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: RAFFIA PHASE TA LOCAT ION: Section 34 Iownship 48 South, Range 26 East, Colliei County, Florida NAME & ADDRESS OF OWNER: WCI COMMUNITIES LLC 24301 WALDEN CENTER DR BONITA SPRINGS, FL 34134 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONI. Y) TOTAL \ QUAN. UNIT COST ITEM SIZE $40 00 SI 2.00 S9 60 $36 00 $720 00 5900.00 $480 00 563 2 00 $3,840 00 $112,000 00 PVC Pipe SDR-26 Gravity Sewer Forcemain (PVC DR-14) Forcemain (PVC DR-18) Forcemain (PVC DR-14) Plug Valve ARV PVC Services w/CIeanout SINGLE PVC Services w/CIeanout DOUBLE Sanitary Manholes Lift Station Wolfe/Pristine Forcemain (PVC DR-14) ARV Casing Pipe HOPE SDR 11 Plug Valve $112,960 00 $1,476 00 $10,944 00 $1,980 00 $720 00 $900.00 $3,360.00 $15,800 00 $57,600 00 $224,000 00 2,824 8" LF 123 LF 4" 4" 1,140 LF 6" 55 I F 4" EA J NA EA 7 EA NA NA 25 EA NA 15 EA 8' 2 LS $1500 $900.00 $65.00 $1,000 00 $20,745 00 $900 00 $2,145 00 $1,000 00 1,383 LF 6" EA NA 16" 33 LF 6" I EA TOTAL COST $454,530 00 I do hereby certify that the quantities of material described above are true and accurate representation of the system being contributed to Collier County Utilities, Inc jNTRACT :ERTFFYING: ENGINEER REVIEW: MICHAEL.!. DELATE P.E. JAYS Of: I CfN ORESCHNICK, VICE PRESIDENT HALEAKALA CONSTRUCTION, INC 5758 TAYLOR RD NAPLES. Florida 34109 OF: Q GRADY MINOR & ASSOCIATES 3800 VIA DEL RAY BONITA SPRINGS, Florida 34134 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 17th day of October, 2014 by Javson Oresehnick who is personally known to me and who did not take an oath. rf)Mvdas 7)lJ\c^ SS! V-LINDA WW |.7 A MY COMMISSI® ' sc U36$15 EXHRE&Fabruarv 21.2015 ''i.fjr Bonded Thru Nets. "'nntic Underwriters SEAL: X:\2013 ACTIVE PROJECTStRAFFIA PRESERVE LEE MARtCLOSE OUT DOCStCertContributoryAssets-Sewer 1A+Woffe_Rev10-1S-14 16.A.4.c Packet Pg. 669 Attachment: Assets Sheet (7358 : Final Acceptance of Utilities - Raffia Preserve Phase 1A)