Loading...
Agenda 01/08/2019 Item #16A 301/08/2019 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Verona Pointe Estates, PL20160002243 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Verona Pointe Estates, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on November 30, 2016. At that time, the value of these potable water and sewer utility facilities (assets) was $56,043.45 and $217,592.52, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5344, at Page 2453, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on November 8, 2018 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4,000. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this action will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $273,635.97 (no depreciation applied) and an asset will be recorded in the financial records of the county. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.3 Packet Pg. 648 01/08/2019 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Verona Pointe Estates, PL20160002243 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.3 Packet Pg. 649 01/08/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.3 Doc ID: 7316 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Verona Pointe Estates, PL20160002243 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 01/08/2019 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 11/08/2018 3:53 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 11/08/2018 3:53 PM Approved By: Review: Public Utilities Planning and Project Management Oscar Martinez Additional Reviewer Completed 11/08/2018 4:03 PM Wastewater Steve Nagy Additional Reviewer Completed 11/08/2018 8:53 PM Water Pamela Libby Additional Reviewer Completed 11/09/2018 7:09 AM Water Steve Messner Additional Reviewer Completed 11/09/2018 10:30 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 11/09/2018 11:26 AM Wastewater Beth Johnssen Additional Reviewer Completed 11/09/2018 3:05 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 11/13/2018 9:05 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 11/14/2018 4:19 PM Growth Management Department Matthew McLean Additional Reviewer Completed 11/21/2018 9:39 AM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 11/21/2018 2:35 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 11/27/2018 1:09 PM Growth Management Department James C French Deputy Department Head Review Completed 11/28/2018 5:51 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 12/03/2018 9:07 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 12/12/2018 3:06 PM Office of Management and Budget Allison Kearns Additional Reviewer Completed 12/14/2018 9:17 AM County Attorney's Office Emily Pepin CAO Preview Completed 12/20/2018 8:20 AM 16.A.3 Packet Pg. 650 01/08/2019 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 12/27/2018 9:49 AM Board of County Commissioners MaryJo Brock Meeting Pending 01/08/2019 9:00 AM 16.A.3 Packet Pg. 651 VERONA POINTE ESTATES LOCATION MAP 16.A.3.a Packet Pg. 652 Attachment: Location Map (7316 : Final Acceptance of Utilities - Verona Pointe Estates) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2016348956 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.3.b Packet Pg. 653 Attachment: Exhibit A (7316 : Final Acceptance of Utilities - Verona Pointe Estates) VERIFICATION OF FINAT COST PROIECT NAME: Veroia Pointe Estates LOCATION: Section 13, Township /l8 S, Rante 25 E Colller County, Florida NAME & ADORESS OF OWNER: Pulle Home Corporation 24311 Walden Center O.ive, Suite 3(x, Bonita Sprints, Flo,ida :]41:14 TYPE OF UTltlTY SYSTEM: POTABLE WATER (MATERIALS AND IABOR) ater a n 5 6" PVC (DR-18) water Main 6" PVC (DR-14)Water Main 8" Gate Valve 6" Gate valve Fire Hydrant, Complete Connect to Existing Water Main 1.5" Single Water Service, Complete 1.5" 0ouble Water Service, Complete Temporary Blow Off w/ Sample Point Air Release Valve Temporary Bacterial Sample Point Permanent Bacterial Sample Point 1,159 110 3 3 7 1 L2 11 1 4 3 2 tF LF EA EA EA EA EA EA EA EA EA EA 36 S18.73 519.t2 S1,s60.36 s1,289.00 s4,431.10 Ss,3s6.4o 576s.70 s937.60 s4,502.10 S1,s09.so ss1.50 52,]37.40 52!,70a.07 s2,159.20 s4,681.08 s3,867.00 s31,017.70 ss,3s6.40 S9,188.40 S10,313.50 s4,s02.10 s6,038.00 S1s4.s0 54,274.80 s13S,916.4sTOTAT COST an D. Sloan, P.E,,1/tb FL License i 59978 OF WALDROP ENGINEERING 28100 Eonita Grande Dr. Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation ofthe as- installed system. CERTIFYING: .iayson Vice Pre OF Haleakala Construction, lnc. 5758 Taylor Road Naples, FL 34108 representation of the system being contributed to CERTIFYING: I ITEM cosr TOTATQUAN. UNIT not an s$ffiiz 'rn,ffi$ STATE OF Ft OR|OA ) )SSl couNTY oF co[tER ) The foregoing instrument war sitned and acknowledged belorc me ttis ? a"vot 4L16. 2olLbyJrfv</\i/ OU6<*W/<-(- who is persona[y known to nre and who did SEAL: 16.A.3.b Packet Pg. 654 Attachment: Exhibit A (7316 : Final Acceptance of Utilities - Verona Pointe Estates) PROJECT NAME: Verona Pointe Estates LOCATION TYPE OF UTlLlTY SYSTEM: SANITARY SIWER (MATERIALS AI{D LABORI Section 13, Township il8 S, Range 25 E Collier County, Florida I{aME & ADDRESS OF OwlIER: Pulte Home Corpo..ton 24311Walden Crnter Orive, Suhe :l0O Sonita SprlnSs, Flo.lda :|4t|4 8" PvC Sewer (0'-6') 8" PvC Sewe. (6!8') 8" PVC Sewer (8!10') 8" PvC Sewer (10'-12') 4' Manhole (G6') 4' Manhole (6'-8') 4' Manhole (8-10') 4'Manhole (10'-12') 4'Manhole (12'-14') single sewer s€rvice, Complete Oouble Sewer Service, Cornplete 4" PVC Force Main (DR-l8) 4" PVC Force Main (OR-14) 6" HDPE Force Maln ln 12" HDPE CasinS (DR-11) Air Release Valve Connect to Existing Force Main Pump Station 404 437 535 418 2 1 2 2 1 15 1,659 219 s42.98 9s1.98 S98.98 ss,187.10 s6,080.36 s7,112.48 s8,178.58 s9,1s1.22 s680.90 5716.94 S11.91 5L2.44 LF LF LF !F EA EA EA EA EA EA EA LF t-F LF 3.98 13,727 _92 s18,782.26 527,A$2A s41,373.64 s10,374.20 96,080.36 s14,224.96 s15,3S7.35 s9,1s1.22 s2,u2.10 510,7s4.10 s19,758.69 52,724.36 277 TOTAT COST 5123.18 534,120.86 $421,740,s7 4 2 1 1 EA EA EA EA s1,125.34 s5,1ss.70 55,320.90 5174,273.@ 54,s01.36 S12,311.4o s5,320.90 s174,273.m I do hereby cenify that the quantities representation ofthe system beinS co CERTIFYINGI Brendan D. Sloan, P.E. OF: CERTIFYING: OF sAq/ WATDROP EI{GI EERIflG 28100 Bonlta Grande Dr. Naples, fL:|4109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed system. Haleakala Construction, lnc 5758 T.ylor Road Naples, FL3a1O8 5TA1E Of fLORTDA ) ) ss: cout{TY oF co[rER ) The foregolng instrum€nt,las stgned and.qknowlcdged before me thb-f,aayot l)06 zol]aav J frvSN U IE5(,HNIC-K-WIo b personatty known ro m. .nd who drd ITEM TOTALcosrqUAN. UNIT take an s:\$l'i@ 4;ffi,,ffiN VERIFICATION OF FINAT COST SEAI.: 16.A.3.b Packet Pg. 655 Attachment: Exhibit A (7316 : Final Acceptance of Utilities - Verona Pointe Estates) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2016348956 Transaction Number:2016-055594 Date Paid:08/31/2016 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 0090203281 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:Pulte Group South Florida Division 3350 Peachtree Road NE Suite 150 Atlanta, GA 30326 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Utility Performance Refundable Bond PL20160002243 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:ElizabethMendez Batch Number:5610 Entered By: melissaalvarez 16.A.3.b Packet Pg. 656 Attachment: Exhibit A (7316 : Final Acceptance of Utilities - Verona Pointe Estates) n 6" PvC {DR-18) water Main 6" PVC (DR-14)Water Maln 8" Gate Valve 5" Gate valve Fire Hydranl Complete Connectto Existing Water Main 1.5" Single Water Service, Complete 1.5" Double Water Service, Complete Temporary Blow Off w/ Sample Point Air Release Valve Temporary Bacterial Sample Point Permanent Bacterial Sample Point 1,159 110 3 3 7 1 12 11 1 4 3 2 TF LF EA EA EA EA EA EA EA EA EA EA S3.73 54.72 5960.36 S689.oo 52,s81.10 52,003.40 536s.70 5487.@ s2,9s2.10 s609.s0 s26.s0 s837.40 54,323.O7 ss19.20 s2,881.08 s2,057.00 S18,067.70 52,003.40 54,388.40 ss,363.60 S2,9s2.10 s2,438.00 S79.so S1,674.80 $56,043.4sTOTAT COST I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed CERTIFYING: dan D. Sloan, P.E ?/sqlr The forego instrument was signed and acknowledged before me this I day of Aue. zolLtv 6 who is personally known to me and who did OF:WATDROP ENGINEERING 28100 Bonita Grande Dr. Naples, FL 34109 I do hereby certify that the quantitles of materialdescribed above are true and an accurate representation ofthe as-installed system. CERTIFYING: layson O Viae OF Haleakala Constructlon, lna. 5758 Taylor Road Naples, fL :14108 STATE OF FLORIDA ) ) ss: couNw oF colltER ) ITEM TOTATQUAN. UNIT COST not take an oath. &SEAL: .":$titi',ff%_s .ts-tr' ?o-r<n,. =-:*: -" -.- -.': * E zarr,ffirx CERTIFICATION OF CONTRIBUTORY ASSETS PROIECT NAME: Verona Polnte Estates LOCATION: Sectlon 13, Township /l8 S, Range 25 E colller County, f lorida NAME & ADDRESS OF OWNER: Pulte Home Corporatlon 243U Walden Center O ve, Suite:ioo Bonita SprinSs, Florida :141:14 IYPE OF UTILITY SYSTEM: POTABI.E WATER (MATERIAI.s ONI.Y} 16.A.3.c Packet Pg. 657 Attachment: Assets Sheet (7316 : Final Acceptance of Utilities - Verona Pointe Estates) CERTIFICATION OF CONTRIBUTORY ASSETS PROJECT NAME| Verona Pointe Estates LOCATION: S€ction 11, Township rl8 S, Rangr 25 t collier County, tlorlda NAME & ADDRESS OF OWt{ERr Pulte Home Corporatlon 24311Walden Center Driye, Suite :mO Bonita SprinSs, Florida :14134 WPE OT UflL]IY SYSTEM: SANITARY SEWER IMATERIAE OI{I.Y) 8" PVC Sewer (6'-8') 8" PVC Sewer (8!10') 8" PVC Sewer (10 -12') 4'Manhole (G6') 4'Manhole (6 '8') 4' Manhole (8-10') 4' Manhole (10!12') 4' Manhole (12'-14') Single Sewer Service, Complete Double Sewer Service, Complete 4" PVC Force Main (DR-18) 4" PVC Force Main (DR-14) 6" HDPE Force Main in 12" HDPE Casin8 (DR-11) 4" PluB Valve Air Release Valve Conned to Existing Force Main Pump Station PVC Sewer (0 -6'l s3.98 s3.98 s3.98 s3.98 s2,687.10 s3,080.35 s3,612.48 s4,428.68 s4,876.00 s280.90 s316.94 S1.91 52.44 s1,607.92 51,739.26 s2,133.28 s1,663.6,4 ss,374.20 s3,080.36 s7,224.96 s8,8s7.36 54,876.00 5u2.7o s4,754.10 53,168.69 ss34.36 52L7,s92.s2 444 437 536 418 2 1 2 2 1 3 1S 1,659 2L9 217 LF LF LF LF €A EA EA EA EA EA EA LF LF LF 4 2 1 1 EA EA EA EA s37.89 s455.34 s4,505.70 s1,870.90 S14&296,s0 s10,495.53 S1,861.36 s9,211.40 s1,870.90 s148,295.50 .epresentation ofthe system beinS co CERTIFYIN6: n D. Sloan, P.E.r llt TOTAL COST ot WAI-DROP ENGINEERING 28100 Bonita Grande Or. Naples, FL :!41(Xl ldo hereby certifythat the quantities of materialdescribed above aretrue and an accurate representation of the as- installed system. CERTIFYING: Jayson or Haleakale Construction, lnc. 5758 Taylor Road Naples, FL 34108 SIATE O' FLORIDA I ) ss: cour{TY oF coLLtER ) Theloregoing lnitrumentwas signed and acknowleaged belore me ttis -f d.yof fU6. 2d-.]Lby Jri.JSO N OZaaaHd la K who is p€Eorafly tnown to me and hfiodid nor t ke an oarh. ITEM TOTALQUAN. UNIT COST SEAI-: to I do hereby certify that the quantities of material 69978 * 16.A.3.c Packet Pg. 658 Attachment: Assets Sheet (7316 : Final Acceptance of Utilities - Verona Pointe Estates)